HomeMy WebLinkAbout08-14-1991 City Council Minutes MINUTES
SARATOGA CITY COUNCIL
TIME: Wednesday, August 14, 1991 - 8:30 p.m.
PLACE: Arts and Crafts Pan., Community Ctr., 19655 Allendale Ave.
TYPE: ~Adjourned Regular Meeting
Mayor Kohler called the meeting to order at 8:36 p.m.
Councilmembers Anderson, Clevenger, Monia, Stutzman and Mayor Kohler
were present.
Staff members present were City Attorney Steve Meyers, City Manager
Harry Peacock, City Engineer Larry Perlin, Assistant to the City
Manager Carolyn King, Environmental Programs Manager Isabel Gloege.
1. Report of City Clerk on Posting of Agenda
The City Clerk announced that pursuant to Government Code 54954.2, the
agenda for this meeting was properly posted on August 9. The notice
of adjournment from the August 7 Council meeting was properly posted
on August 8.
2. Addition of Items to Agenda - Rubbish Rates; Proclamation
It was moved by Monia, seconded by Anderson and approved 5-0 to add an
item to the agenda regarding a reduction in rubbish rates and a
proclamation for Asian-American Community Involvement.
3. Request by Mid-Peninsula Housing coalition for Loan of CDBG
Funds
Assistant to the City Manager King presented a report on the request
from the Mid-Peninsula Housing Coalition for further funding to
rehabilitate low income housing in the City of Campbell.
It was moved by Clevenger, seconded by Anderson and approved 5-0 to
approve the loan request in principle. The loan documents are to be
returned to the City Council for authority to execute once they are
prepared.
4. Soundwall and berm heights for Route 85 Freeway Saratoga
Avenue interchange easterly to San Tomas Creek
The City Council reviewed the 100% submittal plans for berms and
soundwalls with the City Engineer and a letter dated August 11, 1991,
from Allan Strong restating the issues the Ravenwood/Montpere
neighborhood had presented to the City Council on April 17.
The Council reached consensus on the following points:
- The walls and berms between Quito Road and across Wildcat Creek are
acceptable as designed.
- The wall across San Tomas Creek should be raised from 10 feet to 12
feet. Staff is to request sucha change from the Traffic Authority.
- From STATION 356 to approximately STATION 359+60 on the south side
there should be a uniform 16-foot elevation difference between the
freeway centerline finished grade and the elevation of the combined
berm and barrier wall elevation. Staff is to request such a change
from the Traffic Authority.
- When landscaping plans are prepared by the Traffic Authority the City
will hold a workshop with the adjoining neighborhoods to review the
plans before the City accepts the landscape design.
5. Public Safety Commission Recommendations concerning School
Traffic Safety
The city Council reviewed the recommendations and made the following
decisions:
City Council Minutes 2 August 14, 1991
- The staff is to schedule a workshop for Council and the Komina Avenue
residents to discuss the appropriateness of installing a raised curb
and walkway on the southwest side of Komina opposite Oak Street
school.
- The staff is to perform a warrant study on placing STOP signs at Oak
Street and 3rd and Oak Street and 6th and report its findings back
to the City Council. If warranted, STOP signs will be installed.
- The staff will review signage and speed limits on Highway 9 between
Big Basin and Montalvo with CalTrans to determine if changes are
warranted.
- Staff is to review signage and markings on Komina and report its
findings to the council at the workshop with Komina residents.
- The City 'Manager is to direct the Sheriff's Office to provide extra
patrol at Oak Street school during the first two weeks of school in
the morning to strictly enforce speed limits and stop signs and to
enforce parking and stopping regulations at the morning drop-off
times and the afternoon pick-up hours.
- The City will ask the Oak Street School Principal to:
1. Strongly encourage parents helping or visiting at the school to
use the school parking lot.
2. Consider using parent monitors to assist younger children from
drop-off and pick-up areas into and out of the classroom.
3.Consider using Oak Street as the drop-off and pick-up area for
one kindergarten class and Komina for the other.
4. Consider installing a second gate in the fence on Komina'leading
into the school nearer to Oak Street.
- Staff is to replace the NO PARKING signs at Redwood School on
Fruitvale with NO STOPPING, NO STANDING, NO PARKING ANYTIME signs.
- The staff and Redwood School are requested to review possible
circulation changes including better use of Allendale as a drop-off
and pick-up area to reduce congestion and child/auto conflict which
now occurs. A signal at Fruitvale and the Redwood School entrance
is not an acceptable solution.
- Staff to pursue widening the bike lane on the east side of Fruitvale
north of Allendale and to do so if it can be done without
compromising other engineering design standards. Staff to also step
up the sweeping schedule on this bike lane to more than once a month.
Reaffirmed the plan to reconfigure the Saratoga Avenue/Fruitvale
intersection as provided in the Capital Improvements Plan in Fiscal
1993-94.
Staff to explore the options of constructing a two-way bike lane on
the west side of Saratoga AvenUe between Fruitvale and Scotland or
constructing a bike path along the north side of St. Andrews Church
to Saratoga Creek, then along the east side of the Creek to Scotland
and report its findings to the City Council.
- Staff to explore installing a "caution" light system on Saratoga
Avenue at the Sacred Heart School entrance with funding assistance
from the school and report back to the City Council.
- Staff to install a crosswalk at Scotland and Saratoga Avenue across
Scotland when the Saratoga Avenue sidewalk is installed.
- Staff to explore warrants for a signal at Scotland and Saratoga
Avenue. The signal, as an option, could be for pedestrian purposes
only.
- Staff to explore the desirability of an additional crosswalk between
City Council Minutes 3 August 14, 1991
Argonaut School and the corner of Shadow Mountain/Miljevich.
- Staff to explore the possibility of providing left turn protection
from westbound Saratoga Avenue into Sacred Heart School.
6. ~Contract for Traffic Consultant for SW/NE Road and Quito Road
As recommended in the report of the Planning Director, it was moved by
Monia, seconded by Stutzman and approved 5-0 to retain the firm of
Paterson & Associates to do the work.
7. Rubbish Rate Adjustment
It was pointed out in the staff report from the Environmental Programs
Manager that a temporary rate reduction for metered can service in hard
to serve areas was in order to keep the rate below unlimited backyard
pickup in these same areas. This-error in the new rate structure had
been brought to the attention of the staff by residents.
It was moved by Anderson, seconded by Stutzman to adopt Resolution 91-
56.1, which adjusted rates from September 1, 1991, through March 31,
1992, for metered can service in hard to serve areas. The motion
passed 5-0.
8. Proclamation of Asian-American Community Involvement Month
Mayor Kohler asked concurrence to so proclaim and it was done so by
unanimous consent.
9. Adjournment
The meeting was adjourned at 10:45 p.m. to August 27 at 7:30 p.m. for
joint meeting with Planning Commission in Community Center, 19655
Allendale Avenue, and to transact such other business as may be
necessary since the Council will not be holding its regular meeting of
August 21, 1991.
Respectfully submitted,
Harry R. Peacock
City Clerk