HomeMy WebLinkAboutCity Council Resolution 02-031RESOLUTION NO. 02-031
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA AUTHORIZING
REQUEST TO THE METROPOLITAN TRANSPORTATION COMMISSION FOR THE
ALLOCATION OF FISCAL YEAR 2002/03 TRANSPORTATION DEVELOPMENT ACT.
ARTICLE 3. PEDESTRIANBICYCLE PROJECT FUNDING
WHEREAS, Article 3 of the Transportation Development Act (TDA), Public Utilities Code (PUC)
Section 99200 et sec ., authorizes the submission of claims to a regional transportation planning agency for the
funding of projects exclusively for the benefit and/or use of pedestrians and bicyclists; and
WHEREAS, the Metropolitan Transportation Commission (MTC), as the regional transportation
planning agency for the San Francisco Bay region, has adopted MTC Resolution No. 875, Revised, entitled
"Transportation Development Act, Article 3, PedestrianBicycle Projects," which delineates procedures and
criteria for submission of requests for the allocation of "TDA Article 3" funding; and
WHEREAS, MTC Resolution No. 875, Revised requires that requests for the allocation of TDA Article
3 funding be submitted as part of a single, countywide coordinated claim from each county in the San Francisco
Bay region; and
WHEREAS, the City of Saratoga desires to submit a request to MTC for the allocation of TDA Article
3 funds to support the projects described in Attachment B to this resolution, which are for the exclusive benefit
and/or use of pedestrians and/or bicyclists; now, therefore, be it.
RESOLVED, that the City of Saratoga declares it is eligible to request an allocation of TDA Article 3 '
funds pursuant to Section 99234 of the Public Utilities Code, and furthermore, be it
RESOLVED, that there is no pending or threatened litigation that might adversely affect the project or
projects described in Attachment B to this resolution, or that might impair the ability of the City of Saratoga to
carry out the project; and furthermore, be it
RESOLVED, that the City of Saratoga attests to the accuracy of and approves the statements in
Attachment A to this resolution; and furthermore, be it
RESOLVED, that a certified copy of this resolution and its attachments, and any accompanying
supporting materials shall be forwarded to the congestion management agency, countywide transportation
planning agency, or county association of governments, as the case maybe, of Santa Clara County for
submission to MTC as part of the countywide coordinated TDA Article 3 claim.
The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City
Council held on the 15th day of May 2002 by the following vote:
AYES: Councilmembers Stan Bogosian, John Mehaffey, Vice Mayor Evan Baker, Mayor Nick Streit
NOES: None
ABSENT: Councilmember Ann Waltonsmith
ABSTAIN: None
Nick Streit, Mayor
Resolution No. 02-031
Attachment A
Re: Request to the Metropolitan Transportation Commission for the Allocation of Fiscal Year 2002/03
Transportation Development Act. Article 3. PedestrianBicycle Project Funding
Findings
page 1 of 1
1. That the City of Saratoga is not legally impeded from submitting a request to the Metropolitan
Transportation Commission for the allocation of Transportation Development Act (TDA) Article 3 funds,
nor is the City of Saratoga legally impeded from undertaking the projects described in "Attachment B" of
this resolution.
2. That the City of Saratoga has committed adequate staffing resources to complete the projects described on
Attachment B.
3. A review of the projects described in Attachment B has resulted in the consideration of all pertinent matters,
including those related to environmental and right permits and clearances, attendant to the successful
completion of the projects.
4. Issues attendant to securing environmental and right-of--way permits and clearances for the projects
described in Attachment B have been reviewed and will be concluded in a manner and on a schedule that
will not jeopardize the deadline for the use of the TDA funds being requested.
5. That the projects described in Attachment B comply with the requirements of the California Environmental
Quality Act (CEQA, Public Resources Code Sections 21000 et seq.), and that the City of Saratoga is in
possession of the document(s) supporting such compliance, said document(s) having been made available to
for public review and stamped by the County Clerk or County Recorder of the county in which the claimant
is located.
6. That as portrayed in the budgetary descriptions of the projects in Attachment B, the sources of funding other
than TDA are assured and adequate for completion of the projects.
7. That the projects described in Attachment B are for capital construction and/or design engineering; and/or
for the maintenance of a Class I bikeway which is closed to motorized traffic; and/or for the purposes of
restriping Class II bicycle lanes; and/or for the development or support of a bicycle safety education
program; and/or for the development of a comprehensive bicycle and/or pedestrian facilities plan, and an
allocation of TDA Article 3 funding for such a plan has not been received by the City of Saratoga within
the prior five fiscal years.
8. That the projects described in Attachment B which are bicycle projects have been included in a detailed
bicycle circulation element included in an adopted general plan, or included in an adopted comprehensive
bikeway plan (such as outlined in Section 2377 of the California Bikeways Act, Streets and Highways Code
section 2370 et sue.).
9. That any project described in Attachment B that is a "Class I Bikeway," meets the mandatory minimum
safety design criteria published in Chapter 1000 of the California Highway Design Manual.
10. That the projects described in Attachment B are ready to commence implementation during the fiscal year
of the requested allocation.
11. That the City of Saratoga agrees to maintain, or provide for the maintenance of, the projects and facilities
described in Attachment B, for the benefit of and use by the public.
Resolution No. 02-031
Attachment B
page 1 of 2
TDA Article 3 Project Application Form
Fiscal Year of this Claim: 02/03 Applicant: City of Saratoga
Contact person: Morgan Kessler
E-Mail Address mkesslerQsaratoga.ca.us Telephone: (408)-868-1218
Secondary Contact Tohn Cherbone
E-Mail Address: jcherboneQsaratoga.ca.us Telephone: (408)-868-1241
Short Title Description of Project: Saratoga Avenue Walkway Project
Amount of claim: $18 565.00
Functional Description of Project:
Asuhalt concrete & Portland Cement Concrete walkway along Saratoga Avenue, between Herriman Drive and Big Basin Way.
Financial Plan:
Below, please list project components being applied for such as planning, engineering right-of-way, construction,
contingencies, etc.; also provide project budget showing total cost of project and other funding sources. If this is a segment
of a larger project, include prior and proposed funding sources for other segments.
Project Components: Final Design, specification, construction, inspection.
Fundin Source All Prior FYs A lication FY Next FY Followin FYs Totals
TDA Article 3 $85,370.00 $18,556.00 $18,556.00
list all other sources:
1.
2.
3.
Totals $85,370.00 $18,556.00 $103,926.00
Project Eligibility: YES?/NO?
A. Has the project been approved by the claimant's governing body? (If "NO," use the next page to Yes
provide the approximate date approval is anticipated)
B. Has this project previously received TDA Article 3 funding? If "YES," provide an explanation on the Yes
next page
C. For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter
1000 of the California Highway Design Manual?
(Available on the Internet at: ham://www.dot.caQOV/hq/oppd/hdm/chapters/t1001.htm)
D. Has the project been reviewed by a Bicycle Advisory Committee? (If "NO," use the next page to Yes
provide a sound explanation)
E. Has the public availability of the environmental compliance documentation for the project pursuant to Yes
CEQA been evidenced by the dated stamping of the document by the county clerk or county recorder?
F. Will the project be completed within the three fiscal year time period (including the fiscal year of Yes
funding) after which the allocation expires?
Enter the anticipated completion date of project (month and year)
G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant Yes
arranged for such maintenance by another agency? (If an agency other than the Claimant is to
maintain the facility provide its name: 1
Resolution No. 02-031
Attachment B
page 2 of 2
TDA Article 3 Project Application Form
Explanatory Comments Page
Short Title Description of Project: Sarato¢a Avenue Walkway Project
Enter explanatory comments below, as required due to certain "YES" or "NO" answers to items "A" through
"G" on the Project Application Form, or to provide information that will not fit on the application form, or to
provide information that will clarify any potential confusion concerning the scope, cost or schedule for the
project.
B. This project has had "guaranteed" funding allocated through prior Article 3 program years.
Metropolitan Transportation Commission
Request for Allocation
Transportation Development Act Article
Bicycle and Pedestrian Projects
Requirement Checklists
Claimant Requirements (e.q., for cities and counties)
Submit a completed checklist with the application materials
enter an 'X" on each line
A. Governing Body Resolution, four parts: below to indicate submittal
1. Abstract (optional)
2. Resolution Body
3. Attachment A, Required Findings
4. Attachment B, Project Application Form(s)
B. Fiscal Audit*
'"MTC must have received the fiscal audit covering TDA Article 3 funds disbursed to a claimant during
the most recent prior fiscal year. If the audit was submitted prior to submission of the claim, the audit
does not have to be resubmitted with the claim; otherwise, submit the audit with the claim. MTC
Accounting Department staff maintain records of all claimants who are deficient or delinquent in
submitting required fiscal audits to MTC. If MTC has not received the required audit, but the audit is
in process at the time the claim is submitted, MTC staff may process the claim; however, funds
allocated under such circumstances will not be disbursed prior to MTC's receipt of the required audit.
Instructions for the Use of the Model Governing Body Resolution for Use by Claimants
A copy of the model resolution follows these instructions.
The model resolution contains three parts:
1. Body ("boilerplate') of the Resolution (required)
2. Attachment A to the Resolution -Required Findings (required)
3. Attachment B to the Resolution -Claim Form(s) (required)
All TDA Article 3 claimants must use this model resolution since it includes findings by the claimant
that eliminate the need to submit separate documentation covering "opinion of counsel," and
environmental clearance, DO NOT USE TDA ARTICLE 3 APPLICATION FORMS OR MATERIALS
FROM PRIOR FISCAL YEARS!
One resolution may be used for requesting allocations for multiple projects.
The exact text of the body of the model resolution must be submitted to MTC; however, a claimant
may reformat the resolution for administrative purposes.
Attachment A, the "Findings," must by included as part of the resolution. If you have questions about
revising any of the text in Attachment A, or altering or omitting any of the findings, contact your MTC
representative.
Attachment B -the "Project Application" form(s) -must be submitted. One claim form (including
accompanying "Explanatory Comments" page) must be used for each project. If the claim covers
multiple projects, the multiple claim forms still constitute only one Attachment B. In other words,
Attachment B can be 1 to "n" number of claim forms, and the total number of page of Attachment B is
the total number of pages of all of the claim forms (including accompanying "Explanatory Comments"
pages).
Where you see INSERT NUMBER, insert - in upper and lower case black type -the number you
assign to the resolution.
Where you see INSERT NAME OF CLAIMANT, insert - in upper and lower case black type -the
official name of the city or county (e.g., "the City of Oakland," "the County of Solano").
Where you see INSERT FISCAL YEAR, insert - in upper and lower case black type -the fiscal year
of the allocation request; for example, "2003-03."
Where you see INSERT NAME OF COUNTY, insert - in black type -the name of the county from
which the claim is being submitted. (e.g., "Napa County").