Civic Center Master Plan
At the City Council meeting on Tuesday, October 9, 2001 Christopher Noll presented six
Civic Center site plans in conceptual form. His presentation included four options using a
combination of existing and new buildings and two options of tearing down existing
buildings and building new facilities. After the presentation the City Council narrowed
down the options. The Council requested that a new Senior/Community Center be placed
near the Corporation Yard, so current programs in the existing building would not be
disrupted during construction. After the architects incorporated this input into the master
plan, it was presented to the Task Force and then to the facility user groups. The
consensus and recommendation from the groups was to not squeeze a new center in that
location. For the short term, programs could be relocated to portable buildings or off site
locations. This would be disruptive but everyone felt, in the long run, the best location for
the Center would be closer to City Hall. After this input, the Task Force requested that
the architects present an additional site plan with the Senior/Community Center in the
middle of the property.
At the City Council meeting on December 11, 2001 Christopher Noll and Elizabeth
McLeod from Noll and Tam Architects will be making the final preSentation. The
presentation will include three site plans, the program and phasing summary for each
option, and construction costs.
Attachments: 1. Project Summary Form
2. Phasing Summary
3. Site Plans
Saratoga Civic Center Master Plan
Program Summary
Option 1
December 11, 2001
Facility Existing Program Proposed
Option 1
Community Center/
Senior Center 16,471 Sq. Ft. 28,000 Sq. Ft. 28, 400 Sq. Ft.-Two Story
Gymnasium with
lockerrooms/Multi- 13,134 Sq. Ft. (Plus stage '16,000 Sq. Ft.-Two story
Purpose with stage - and storage) TeenV°lume'centerPlUs shared lobby xvith
4,500 Sq. Ft.-Single Story
(9,000 Sq. Ft. -Two-Story)
Teen Center Warner-Hutton House Not specified includes shared lobby with
Gym/Multi-Purpose
1,925 Sq. Ft. addition to rear
Civic Theater 8,640 Sq. Ft. 10,000 Sq. Ft. +/- of theater, plus
remodeled/shared LObby with
Council Chambers
12,244 Sq. Ft. Plus
City Hall 10,894 Sq. Ft. 13,617 Sq. Ft. Remodeled/Shared Lobby
with Council Chambers
City Council 7,800 Sq. Ft. Includes
Chambers/Shared Lobby 3,500 Sq. Ft. lobby/restrooms for Theater
New fence alignment between
Community/Senior Center.
Corporation Yard Existing to remain Existing to remain Corp staff parking to be
brought within Yard
Convert house & gardens to
Rentable Space - Modify
Warner-Hutton House Existing to remain Existing to remain
garden perimeters for ,
improved site access
309 (120 in 20,400 Sq. Ft. +/-
Parking 209 Surface Spaces 270 without Gym, Parking structure
335 with Gym (2 stories: 1/2 level down &
1/2 level up from grade)
NOTES:
1. Warner Hutton House and trrounds to be converted to rentable sr~ace for the Citv.
2. Corporation yard is assumed to remain as is in ail scenarios. All parkin~ for this facilit~ will be relocated within.
the fenced area. Staff parkinl~ for the Corporation yard is assumed to be 37 spaces.
3. The parking quantities are approximate. Existing parking appears to be 209 spaces, not 418 as listed in RFP.
Saratoga Civic Center Master Plan
Phasing Summary
Option 1
December 11, 2001
Facility PHASE I PHASE II PHASE III
Demolish old
Construct new Community/ Community Center,
Community Center/ Senior Center. Existing remove portables. Move
Senior' Center Community Center and into new
ancillary portables to remain
functional. Community/Senior
Center
Construct new gym/multi-
Gymnasium/Multi- - purpose building and teen
Purpose center
[Teen Center - -
Construct
teen
center
attached to gym
Construct addition to
Civic Theater - -
rear of building.
Remodel entry to City
City Hall - - Hall and build addition at
[north side of building
City Council Construct Chambers and
Chambers/Shared -
Lobby shared lobby.
Consolidate Corp. Yard
Corporation Yard functions, rebuild / realign -
fence at east side
Convert house & gardens
to Rentable Space -
Warner-Hutton House Modify garden perimeters
for improved site access
Construct 2 level Parking
Garage. Reconfigure Complete landscape
Parking & Landscape parking lot along
Fmitvale & Allendale concepts throughout site.
Avenues
Saratoga Civic Center Master Plan
- Program Summary
Option 2
December 11, 2001
Facility Existing Program Proposed
Option 2
~Community Center/ i28, 000 Sq. Ft.-Two Story
Senior Center 16,471 Sq. Ft. 28,000 Sq. Ft. (17,260 First Floor,
10,740 Second Floor)
Gymnasium with ....
lockerrooms/Multi- 13,134 Sq. Ft. (Plus Stage 17,300 Sq. Ft.-Two story
Purpose with stage - and Storage) ' TeenV°lume'centerPlUs shared lobby with
5,075 Sq. Ft.-Single Story
(10,150 Sq. Ft. -Two-Story)
Teen Center Warner-Hutton House Not specified includes shared lobby with
Gym/Multi-Purpose
1,925 Sq. Ft. addition to rear
of theater, plus
Civic Theater '8,640 Sq. Ft. 10,000 Sq. Ft. +/-
remodeled/shared Lobby with
Council Chambers
12,244 Sq. Ft. Plus
City Hall 10,894 Sq. Ft. 13,617 Sq. Ft. Remodeled/Shared Lobby
with Council Chambers
City Council 7,800 Sq. Ft. Includes
Chambers/Shared Lobby - 3,500 Sq. Ft. lobby/restrooms for Theater
· New fence alignment between
Corporation Yard Existing to remain Existing to remain Community/Senior Center.
Corp staff parking to be
brought within Yard
Convert house & gardens to
Rentable Space - Modify
Warner-Hutton House Existing to remain Existing to remain
garden perimeters for ,
improved site access '
314 (92 in 18,000 Sq. Ft. +/-
Parking 209 Surface Spaces 270 without Gym, Parking Structure (2 stories:
335 with Gym 1/2 level down & 1/2 level up
from grade)
NOTES:
1. Warner Hutton House and ~rounds to be converted to rentable soace for the City.
2. Corporation yard is assumed to remain as is in all scenarios. All l~arkin~ for this facility will be relocated within.
the fenced area. Staff parkinl~ for the Corporation yard is assumed to be 37 sl~aces.
3. The parking quantifies are approximate. Existing parking appears to be 209 spaces, not 418 as listed in RFP.
Saratoga Civic Center Master Plan_.
Phasing Summary
Option 2
December 11, 2001
Facility PHASE I PHASE II
Relocate existing Community Center functions off
Community Center/ site or into portables. Demolish old Community Move imo Community/Senior Center, remove
Senior Center Center. Construct new Community/Senior portables.
Center.
Gymnasium/Multi- Construct new gym/multi-purpose building
Purpose and teen center
Teen Center Construct teen center attached to gym
Civic Theater Construct addition to rear of building.
Remodel entry to City Hall and build addition at
City Hall aorth side of building
City Council
Chambers/Shared Construct Chambers and shared lobby.
Lobby.
Corporation Yard Consolidate Corp. Yard functions, rebuild / realign
fence at east side
Convert house & gardens to Rentable Space -
Warner-Hutton Hous~ Modify garden perimeters for improved site
access
Construct 2 level Parking Garage. Reconfigure
Parking & Landscape parking lot along Fmitvale & Allendale
Avenues. Complete landscape concepts
throughout site.
Saratoga Civic Center Master Plan
Program Summ~ry
Option 3
December 11, 2001
Facility Existing Program Proposed
Option 3
Community Center/ 28, 000 Sq. Ft.-Two Story
Senior Center 16,471 Sq. Ft. 28,000 Sq. Ft. (16,800 First Floor,
11,200 Second Floor)
Gymnasium with
lockerrooms/Multi- - _
Purpose with stage
6,400 Sq. Ft.-Single Story
Teen Center Warner-Hutton House Not specified (12,800 Sq. Ft. -Two-Story)
1,925 Sq. Ft. addition to rear.
!Civic Theater 8,640 Sq. Ft. 10,000 Sq. Ft. +/- of theater, plus
remodeled/shared Lobby with
Council Chambers
12~244 Sq. Ft. Plus
City Hall 10,894 Sq.. Ft. 13,617 Sq. Ft. Remodeled/Shared Lobby
with Council Chambers
City Council 7,800 Sq. Ft. Includes
Chambers/Shared Lobby 3,500 Sq. Ft. lobby/restrooms for Theater
New fence alignment between
Community/Senior Center.
Corporation Yard Existing to remain Existing to remain' Corp staff parking to be
brought within Yard
Convert house & gardens to
Rentable Space - Modify
Wamer-Hutt0n House Existing to remain Existing to remain
garden perimeters for
~mproved site access ~
270 without Gym, 292 Surface Spaces
Parking 209 Surface Spaces 335 with Gym
NOTES:
I1. Warner Hutton House and erounds to be converted to rentable soace for the City.
2. Corporation yard is assumed to remain as is in ail scenarios. All parkin~ for this facility will be relocated within.
the fenced area. Staff p~rkinl~ for the Corporation yard is assumed to be 37 spaces.
3. The parking quantifies are approximate. Existing parking appears to be 209 spaces, not 418 as listed in RFP.
Saratoga Civic Center Master Plan_
Phasing SUhamary
Option 3
December 11, 2001
Facility PHASE I PHASE II
Relocate existing Community Center
. functions off site or into portables. Demolish old Community Center,
Community Senior
Demolish old Community Center. remove portables. Move into new
and Teen Center
Construct new Community/Senior' Community/Senior/Teen Center
/TeenCenter.
Civic Theater Construct addition to rear of building.
City Hall Remodel entry to City Hall and build
addition at north side of building
City Council
Chambers/Shared Construct Chambers and shared lobby.
Lobby
Consolidate Corp. Yard functions,
Corporation Yard
rebuild / realign fence at east side
, Convert house & gardens to Rentable
Warner-Hutton House - !Space - Modify garden perimeters for
unproved site access
Complete landscape concepts
Parking & Landscape -
throughout site.
CITY OF SARATOGA
CITY COUNCIL
LAND USE AGENDA
TUESDAY, DECEMBER 4, 2001
3:00 P.M.
SITE VISITS WILL BE MADE TO THE FOLLOWING ITEMS
ON THE CITY COUNCIL AGENDA FOR
DECEMBER 5, 2001 ON DECEMBER 4, 2001
ROLL CALL
REPORT OF P~STING AGENDA
AGENDA
ARCHIVE COPY
Ao
B°
UP-01-010 (403-24-001)-METRO PCS, 13686 Quito Road;- Request for
Use Permit approval to locate a wireless antenna system and equipment on an
existing PG&E transmission tower. The system would be comprised of six
new directional antennas mounted on the existing tower and new equipment
cabinets located below the tower. The maximum height of the cabinets will
be six feet tall. The project is located in an R-l-10,000 zoning district.
UP-01-009 (393-21-013)-METRO PCS, 12383 Saratoga-Sunnyvale Road;-
Request for Use Permit approval to locate a wireless antenna system and
equipment on an existing PG&E transmission tower. The system would be
comprised of six new directional antennas mounted on the existing tower and
new equipment cabinets located below the tower. The maximum height of the
cabinets will be six feet tall. The project is located in an R-1-12,500 zoning
district.
The City Council conducts site visits to properties which are new items on the City Council
agenda. The site visits are held on Tuesday preceding the Wednesday hearing between
3:00 p.m. - 5:00 p.m. Site visits only occur when there is an appeal scheduled before the
City Council.
It is not necessary for the applicant to be present, but you are invited to join the Council at
the site visit to answer any questions which may arise. Site visits are generally short (5 to 10
minutes) because of time constraints. Any presentations and testimony you may wish to
give should be saved for the public hearing. Please contact staff Tuesday moming for an
estimated time of the site visit.