Loading...
HomeMy WebLinkAbout10-01-1991 Planning Commission Minutes+it 1~ CITY OF SARATOGA PLANNING COMMISSION MINUTES DATE: Tuesday, October 1, 1991, 7:30 p.m. PLACE: Senior Center - Adult Day Care Center 19655 Allendale Avenue TYPE: Adjourned Regular Meeting ---------------------------------------------------------------- The meeting is a study session between applicants, interested citizens and staff, to discuss continued applications, advance planning projects and general planning issues. The Planning Commission has a policy that no decisions will be made at these sessions. A written report will .be made of the proceedings. ITEMS OF DISCUSSION 1. DR-91-042 - Westbrook, 20611 Lomita Ave. Request for design review approval for a 1, 003 sq. ft. one and two-story addition to an existing 2,077 sq. ft. one-story residence for a total of 3,080 sq. ft. per Chapter 15 of the City Code. The parcel is 9,281 sq. ft. located within the R- 1-10,000 zone district. Continued 6-0 to a 10/1/study session and a 10/23 public hearing to allow the City Arborist to provide a supplemental evaluation of the affect construction will have on the large Monterey Pine. Staff Planner, Walgren, presented a brief overview of the project. Saratoga's Horticultural Consultant, Barrie Coate, was present to answer Commissioners' questions regarding the preservation of the large Monterey Pine situated to the northwest of the proposed addition. Mr. Coate discussed his report and recommended preservation procedures, including: a. Pier and grade beam construction. b. Irrigation system within the structure's foundation? If this was determined to be structurally acceptable, it would ensure the trees long-term survival. Discussion then ensued regarding the general worth of non- native pines in this region. The meeting concluded with the applicant agreeing to investigate the following modifications for the 10/23 public hearing: a. Relocate addition 17.5 ft. away from the pine tree trunk. b. Provide an irrigation system within the structure's foundation. c. Moisture treated pier foundation system permitting irrigation. ADJOURNMENT - 9 p.m.