Loading...
HomeMy WebLinkAbout05-12-1998 Staff ReportsTIME: Tuesday, May 12, 1998 5:30 p.m. PLACE: Adult Care Center, 19655 Allendale Avenue TYPE: Adjourned Regular Meeting /Joint Meeting with Youth Commission /Friends of the Warner Hutton House 1. Roll Call 5:30 p.m. AGENDA SARATOGA CITY COUNCIL 2. Report of City Clerk on Posting of Agenda Pursuant to Government Code 54954.2, the agenda for this meeting was properly posted on May 8. The notice of adjournment from the May 6 Council meeting was properly posted on May 7. 3. Oral Communications from the Public on Non Agendized Items 4. Joint Meeting with Youth Commission and Friends of the Warner Hutton House A. Overview of Accomplishments this Year B. Attic Conversion of Warner Hutton House C. Fundraising Results D. Communications E. Discussion of Goals for 1998 -99 5. Proposed contract with Beals Landscape Architecture for Project Management Services in connection with Park Development Projects to be submitted Monday. 6. FY 98- 99/99 -00 Budget Presentation 7:00 p.m. 7. Self Evaluation of Previous Meeting 8. Agency Assignment Reports Assoc. of Bay Area Governments Moran Chamber of Commerce Board Wolfe County Cities Assn. Leg. Task Force Bogosian County HCD Policy Committee Jacobs Emergency Planning Council Moran Hakone Foundation Liaison Shaw Joint Venture Silicon Valley Wolfe KSAR Community Access TV Board Shaw Library Joint Powers Agency Bogosian N. Cent. Flood Cont. Zone Adv. Bd. Bogosian Penin. Div., League of Cal. Cities Wolfe Santa Clara Valley Water Commission Jacobs Santa Clara County Cities Assn./ Wolfe /Moran City Council Agenda 2 May 12, 1998 City Selection Committee SASCC Liaison Shaw Saratoga Business Dev. Council Wolfe School Liaison Jacobs Sister City Liaison Shaw Solid Waste JPA Moran Valley Transportation Authority Wolfe Valley Transportation Authority PAC Shaw West Valley Sanitation District Moran 9. Other 10. Adjournment In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact Peter Gonda at 408/868 -1221. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. [28 CFR 35.102- 35.104 ADA Title II] TO: City Council Finance Commission FROM: City Manager SUBJECT: Budget Materials DATE: May 8, 1 998 MEMO As of 4:00 p.m. today, there remains a fair amount of number crunching and compiling to do to finish the draft two year budget. It is therefore unlikely that the budget materials for your meetings next week will be delivered with your packets. However, I am optimistic that this work will be finished by Monday afternoon. This means that the Finance Commission will not have a chance to look over the draft budget until their meeting Monday evening. For the City Council, I will arrange for a delivery of the budget materials on Monday afternoon so you will have at least some time to review the budget prior to Tuesday's meeting. For both meetings, staff will endeavor to put together a presentation of the budget which captures the essential highlights and will allow discussion to focus more on budget priorities and policies rather than on details. In the subsequent two week period, prior to the next budget meeting on May 26, more focus can be placed on the details. I continue to believe that a satisfactory budget document will be produced in accordance with the schedule adopted by the Council, and I apologize for the delay in rolling out the initial draft of the budget. Public hearings will start promptly at 8:00, when the Council will move from whatever item it is considering at that time to public hearings. Note: Devices to assist the hearing impaired are now available in the lobby. 6:30 Anderson 6:40 Fine 6:50 Wyman 7:00 Peepari Closed Session 7:15 p.m. Regular Meeting 7:30 p.m. Mayor's Report on Closed Session. 7:30 Pledge of Allegiance 1. ROLL CALL 2. CEREMONIAL ITEMS A. ORAL COMMUNICATIONS AGENDA SARATOGA CITY COUNCIL TIME: Wednesday, May 6, 1998 6:30 p.m. PLACE: Civic Theater, 13777 Fruitvale Ave. TYPE: Regular Meeting Special Meeting 6:30 p.m. Administration Conference Room Heritage Commission Interviews CONFERENCE WITH LEGAL COUNSEL- ANTICIPATED LITIGATION Possible initiation of litigation pursuant to subdivision (c) of Government Code Section 54956.9(c) in one case. A. Resolution commending Angie Fredrick for service on Public Safety Commission B. Proclamation on Hire -A- Veteran Week C. Proclamation on the Origin and Significance of the Name of the City of Saratoga 3. REPORT OF CITY CLERK ON POSTING OF AGENDA Pursuant to Government Code 54954.2, the agenda for this meeting was properly posted on May 1. 4. COMMUNICATIONS FROM COMMISSIONS AND THE PUBLIC City Council Agenda 2 May 6, 1998 1) Presentation by Keith Relph, General Manager of TCI Cablevision, on upcoming changes to CATV in Saratoga B. COMMUNICATIONS FROM COMMISSIONS None. C. WRITTEN COMMUNICATIONS None. 5. CONSENT CALENDAR These items will be acted upon in one motion for each section unless they are removed from the Consent Calendar for discussion by Councilmembers or any interested party. However, items in Section A have already been considered by the Council at a previous meeting where the public was invited to comment, after which the hearing was closed. Those items are not subject to public discussion at this meeting because the vote taken at the previous meeting was final. Resolutions concerning decisions made at previous meetings are for the purpose of memorializing the decision to assure the accuracy of the findings, the prior vote, and any conditions imposed. A. Previously- Discussed Items 1) Resolution denying Weiser Appeal of Persson Project to be delivered next week B. New Items 1) Planning Commission Actions, 4/22 Note and file. 2) Memo Authorizing Publicity for Upcoming Hearings No hearings scheduled for May 20. 3) Approval of Check Register 4) Resolution calling Public Hearing in connection with Underground Utility District No. 8 along Saratoga Avenue between Fruitvale Avenue and Baroni Court 5) Final Acceptance and Notice of Completion for Saratoga Sunnyvale Rd. Median Landscaping Project (Capital Project No. 9601) 6) Resolution relating to City Manager Compensation C. CLAIMS AGAINST THE CITY 1) Claim of DiNucci in connection with automobile damage due to pothole caused by water company Recommended Action: Deny claim; refer to water company. 6. PUBLIC HEARINGS None. City Council Agenda 3 May 6, 1998 4. A. Oral Communications (continued) and instructions to staff regarding actions on current oral communications 7. OLD BUSINESS A. Resolution waiving certain Sign Ordinance Requirements during "Saratoga Market Days" Recommended Action: Adopt resolution. 8. NEW BUSINESS None. 9. ROUTINE MATTERS (Note: City Attorney may be excused at this point if no longer needed.) A. Approval of Minutes 4/15; 4/21 10. CITY COUNCIL ITEMS A. Agenda items for May 12 adjourned regular meeting (Note: The purpose of listing the following items is not to discuss or take action on them, but simply to decide whether they are to be placed on the agenda for the adjourned City Council meeting of May 12.) B. Other 11. CITY MANAGER'S REPORT 1) Joint Meeting with Youth Commission and Friends of the Warner Hutton House 2) Proposed Contract with Beals Landscape Architecture for Project Management Services in connection with Park Development Projects 3) FY 98- 99/99 -00 Budget Presentation 12. ADJOURNMENT to closed session pursuant to Government Code Section 54956.9 (a) Conference with Legal Counsel Existing Litigation Name of Case: San Francisco Baykeepers v. Saratoga 13. RECONVENE to open session for Mayor's Report on Closed Session 14. ADJOURNMENT to next meeting at 7:00 p.m. on Tuesday, May 12, at the Adult Care Center, 19655 Allendale Avenue. In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact Peter Gonda at 408/868 -1221. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility -e, SARATOGA CITY COUNCIL EXECUTIVE SUMMARY NO. 300(o AGENDA ITEM MEETING DATE: May 12, 1998 CITY MANAGER: ORIGINATING DEPT.: CITY MANAGER PREPARED BY: !MB SUBJECT: Agreement with Beals Landscape Architecture for Project Management Services in connection with Park Development Projects RECOMMENDED MOTION(S): 1. Approve the proposed agreement with Beals Landscape Architecture to serve as the Project Manager who will coordinate the development of and improvements to playfields at designated school sites. REPORT SUMMARY: At the Council's joint meeting of March 24, 1998 with the Parks and Recreation Commission, it was the Commission's recommendation to Council to retain the services of a consultant to serve as a Project Manager to help coordinate the development of new and renovation of old playfields at designated school sites. Development of playfields is one of the numerous projects that the Parks and Recreation Commission plans to implement through funding from the Park Development Fund. The Project Manager would be responsible for 1) establishing joint -use agreements between sports leagues, school districts and the City before any site is developed or renovated and 2) submitting a strategic plan and timeline for implementing the playfield projects once the agreements have been established. Recent negotiations between the City and sports leagues in recent weeks over the use of Congress Springs Park, have expanded the Project Manger's original scope of services to include 3) negotiating joint -use agreements for all existing playfields city -wide. Staff concurs with the Parks and Recreation Commission's recommendation to retain Mr. Beals services in order to move forward with this project as quickly as is possible. The anticipated date to conclude with the negotiation process is set for the end of September. Attached is a copy of the proposed agreement between the City and Beals Landscape Architecture. Council is being asked to approve the attached agreement and to direct staff to i execute the contract with the Project Manager in order to begin implementing the activities outlined in the scope of services. FISCAL IMPACTS: Monies to fund this project would be deducted from the Park Development Fund. No general Fund monies would be used. ADVERTISING, NOTICING AND PUBLIC CONTACT: None CONSEQUENCES OF NOT ACTING ON RECOMMENDED MOTION(S): The listed recommendation will not be approved and Beals Landscape Architecture's services will not be retained to move forward on the Park Development Project. FOLLOW UP ACTIONS: All sports leagues, school districts and other appropriate parties listed on page three of Exhibit A will be contacted and invited to participate in a series of negotiation meetings. ATTACHMENTS: 1. Proposed Contractual Agreement between the City of Saratoga and Beals Landscape Architecture. 6 CITY OF SARATOGA CONTRACTUAL SERVICES AGREEMENT THIS AGREEMENT is made at Saratoga, California, as of, May 13, 1998, by and between the CITY OF SARATOGA, a municipal corporation "City and Beals Landscape Architecture, "Contractor who agree as follows: 1. SCOPE OF SERVICES. Subject to the terms and conditions set forth in this Agreement, Contractor shall provide to City the services described in Exhibit A. Contractor shall provide said services at the time, place and in the manner specified in Exhibit A. 2. PAYMENT SCHEDULE. City shall pay Contractor for services rendered pursuant to this Agreement at the time and in the manner set forth in Exhibit B. The payments specified in Exhibit B shall be the only payments to be made to Contractor for services rendered pursuant to this Agreement. Contractor shall submit all billings for said services to City in the manner specified in Exhibit B; or, if no manner be specified in Exhibit B, then according to the usual and customary procedures and practices which Contractor uses for billing clients similar to City. 3. FACILITIES AND EQUIPMENT. Except as set forth in Exhibit C, Contractor shall, at its sole cost and expense, furnish all facilities and equipment which may be required for furnishing services pursuant to this Agreement. City shall furnish to Contractor only the facilities and equipment listed in Exhibit C according to the terms and conditions set forth in Exhibit C. 4. GENERAL PROVISIONS. The general provisions set forth in Exhibit D are part of this Agreement. In the event of any inconsistency between said general provisions and any other terms or conditions of this Agreement, the other term or condition shall control insofar as it is inconsistent with the general provisions. 5. EXHIBITS. All exhibits referred to herein are attached hereto and are by this reference incorporated herein. 6. CONTRACT ADMINISTRATION. This Agreement shall be administered by Larry I. Perlin, "Administrator All correspondence shall be directed to or through the Administrator or his or her designee. 7. NOTICES. Any written notice to Contractor shall be sent to: William Jay Beals, Beals Landscape Architecture Two North Market, Fifth Floor San Jose, CA 95113 Any written notice to City shall be sent to: Larry Perlin, City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 Standard Contractual Services Agreement Page 2 of 20 A: \CONTRACT.STD I Executed as of the day first above stated: CITY OF SARATOGA, a municipal corporation By Larry Perlin, "City" Attest: Betsy Cory, City Clerk By William J. Beals, "Contractor" Approved as to form: Mike Ri a s ck, City f. Attorney Approved as to budget authority: 011ie Wright, Finance Director Accounting Data Amount Contract Standard Contractual Services Agreement Page 3 of 20 A: \CONTRACT.STD A EXHIBIT A SCOPE OF SERVICES Please refer to attached Exhibits A and Exhibit A -1 that outline the scope of services and the proposed project schedules. S tandard Contractual Services Agreement Page 4 of 20 A: \CONTRACT.STD EXHIBIT A PROPOSAL FOR CITY OF SARATOGA MANAGEMENT OF PARTNERSHIP PROCESS BETWEEN THE CITY OF SARATOGA, THREE SCHOOL DISTRICT AND THE USER GROUPS PROJECT UNDERSTANDING The City of Saratoga has selected Jay Beals and Beals. Landscape Architecture, Inc. to lead the effort in achieving satisfactory joint -use agreements and contracts relating to park and school athletic field usage. The purpose is to build consensus between City of Saratoga, the three School Districts and various user groups leading to development of joint use agreements and contracts, roles, responsibilities, and obligations of each party. This need has been brought about for various reasons summed up as follows: 1. There is a limited amount of available open space for use by community and athletic groups. 2. There is a limited amount of funding and manpower to maintain the sites currently open and used by these groups. 3. The combination of an increase in users, and a reduction in available funding to cities, compounded with federal cutbacks from the federal government to municipalities has resulted in the inability of the majority of cities to properly maintain existing facilities. 4. The voters did not approve a utility fax that would have assisted in reconciling these expenditures. 5. The majority of open space within the City of Saratoga that is currently developed belongs to three School Districts and therefore is used by these Districts during school hours. This land is and should be available to the remainder of the community during evenings and weekends as well as summer time pursuant to the Civic Center Act. 6. The City may have funding available to put into capital improvements to achieve the end result of reducing maintenance costs and obligations. However, these maintenance obligations must be agreed upon and finalized prior to said improvements being implemented. 7. The City of Saratoga has seen a reduction in funding and staff position in recent times including the recent vacancy of the Superintendent of Parks. That has not, and probably will not, be filled by the City in the foreseeable future. Those duties have been shared amongst the remainder of the people in the organization. The above-stated reasons are not intended to constitute all of the items that are influencing the need for the City to achieve the above stated agreements, however, they are the primary ones. There are existing agreements and contracts and long- standing perceived obligations on all parties. The City of Saratoga has taken it upon themselves to retain a consultant to assist them in the process of formalizing new agreements that look forward to recreation and joint -use in a new millennium. The City of Saratoga has designated specific sites to be included within this project management work. The site users and associated school districts, where applicable, are noted below. Priority Projects I. Play fields at School Sites A. Foothill School/Foothill Park: Saratoga Union School District 1. SUSD; Los Gatos Saratoga'Girls Softball League 2. AYSO, CYSA B. Saratoga School (Oak Street School): Saratoga Union School District 1. Unknown who may be interested 2. Good potential for practice fields if drainage problems are resolved 3. CYSA C. Argonaut School: Saratoga Union School District 1. Does have much potential 2. O.K. for practice /games J CITY OF SARATOGAIPROPOSAL 4-2398 REVS-7.00C Page 1 B E A L S L A N D S C A P E A R C H I T E C T U R E I N C. D. 'Redwood Middle School: Saratoga Union School District 1. Best potential for games/tournaments because of location and parking 2. Saratoga Little League, AYSO, CYSA E. Marshall Lane (Campbell Elementary): Campbell School District 1. Quito Little League F. Blue Hills School/Azule Park Site: Cupertino School District 1. Great potential for field development G. Christa Macauliffe School: Cupertino School District 1. Determine potential and interest II. Project sites and parks within the City of Saratoga A. Congress Springs 1. Saratoga Little League 2. AYSO B. Kevin Moran C. El Quito *Maintained by City At the project pre- planning meeting, it was agreed by those present that because of the recent events relating to the potential increase in fees for user groups, there is considerable resistance in fee increases from these user groups. Therefore, though the original purpose of this contract and the project management was to secure and negotiate lease and contracts with the multiple agencies and user groups, for school sites, the current role of the consultant has changed to be a more global one. It was agreed at the meeting that this project should begin with a mission statement to which all parties agree and that the work of the Task Force should be to achieve goals and objectives to support that mission statement. It is understood that this may include various funding aspects, including fee increases, but also including other opportunities such as assessment districts, user taxes, reapportionment of utility taxes, new utility taxes, service clubs, corporate sponsors and other options that may be brainstormed during the process. One other objective to be achieved is the maintenance options relating to who maintains sites, why, and how that particular group is compensated. Because of the critical nature of this particular project and the agreements currently expiring in 1998, there is an urgent need to complete this process as soon as possible ending in a report that would go to the City Council for consideration. To begin this project, the people present at the pre planning meeting agreed on the initial mission statement that should be taken forward to the task force to begin the process. That is, "The purpose of this process is to develop a mutually inclusive and equitable partnership for joint -use development and maintenance of sites within the City of Saratoga." SCOPE OF SERVICES The following specific Scope of Services are represented in this proposal. The process is divided into 6 parts that reflect specific product and time milestones. I. Project Pre planning This phase of the project is used to establish a baseline of work and services to be performed by the consultant as agreed upon by the client. The purpose is to ensure that the process is properly designed to meet the known and anticipated needs of the client. A. Initial meeting with the City representative. B. Establish the initial project scoping and understanding. C. Complete preparation for the pre-planning meetings: 1. Review of provided material 2. Design of meeting and establish CPR 3. Establish agenda 4. Prepare required materials D. Pm- planning meeting including meeting minutes. E. Finalization of Project Scoping, Fees Timeline. J CITY OF SARATOGAIPROPOSAL 4-28.98 REV5-7DOC Page 2 B E A L S L A N D S C A P E A R C H I T E C T U R E IN C. F. Approval and ratification of consultant contract by the Park Recreation Commission and City Council. 1. Attend Park Recreation Commission meeting May 4, 1998 and City Council meeting May 12, 1998. II. Project Framing To appropriately begin the project an accepted framework needs to be established. Once selection of the Task Force is approved, it is important to have all members take an integral part in the establishment of that framework. The essential parts are: Mission Statement Goals Objectives Process End Product Process Timeline In order to achieve this, we propose the following work items for this phase; A. Assist the City in designing a Task force and Project Planning Committee. The Project Planning Committee (PPC) will be composed of City Staff, Park Recreation Commission, and Council Members. Their purpose is to provide specific direction to the consultant relating to City policy, historical issues, technical issues (i.e., maintenance) costs, funding and other materials required by the consultant. We propose the Task Force be comprised of selected representatives from each of the following organizations. We suggest that the quantity of representatives be proportional to stake holding capacity of each organization. 1. City of Saratoga a) City Council (1) b) City Manager's Office (1) c) Parks Recreation Commission (2) d) City Maintenance (Parks Superintendent) (1) e) City Staff Liaison (1) 2. School District (3 total) a) Policy maker (Board of Trustees) (1x3) b) Facility Manager (Deputy Superintendent) (1x3) 3. User Groups a) Los Gatos Girls Softball (1) b) AYSO (1) c) Saratoga Little League (1) d) Pony Baseball (1) e) Quito Little League (1) t) CYSA g) Others B. Hold a Task Force pre planning meeting with staff to verify needs and uses of the sites_ C. Complete a site walk to review each site. The sites will be documented photographically for future use and a matrix diagram will be prepared to begin to establish the following; 1. Code compliance and safety issues 2. Current site condition and potential improvements 3. Current and potential maintenance levels 4. Other general observations D. Prepare for the PPC Meeting. 1. Review of provided material 2. Design of meeting and establish CPR 3. Establish agenda 4. Prepare required materials E. Facilitate PPC Meeting #1 JIPROPOSALaP981P98.27 WY OF SARATOGAIPROPOSAL 42898 REVS.? DOC Page 3 B E A L S L A N D S C A P E A R C H I T E C T U R E I N C F. Prepare for the Task Force meeting. 1. Review of provided material 2. Design of meeting and establish CPR 3. Establish agenda 4. Prepare required materials G. Facilitate Task Force Meeting #1 1. Develop ground rules 2. Develop roles and responsibilities 3. Develop Process Framework 4. Agree on accountability 5. Agree on action work items for each member. III. Impact on Sites To properly evaluate the needs for site development and maintenance, it is critical to establish the current use and impact on the sites. The action items out of the Project Framing portion will include research into specific site impacts by the Task Force members. The purpose of this phase is for the consultant to evaluate that data and present it in a structured manner to the PPC and Task Force. A. Receive data from Task Force members. B. Complete second site visit to evaluate data on a site specific basis. C. Complete preparation for the PPC meeting. 1. Review of provided material 2. Design of meeting and establish CPR 3. Establish agenda 4. Prepare required materials D. Facilitate PPC meeting #2 E. Prepare for the Task Force meeting. 1. Review of provided material 2. Design of meeting and establish CPR 3. Establish agenda 4. Prepare required materials F. Facilitate Task Force meeting #2 1. Review current site use and capacity 2. Review required or anticipated use needs 3. Review development needs 4. Review current and anticipated maintenance levels 5. Agree on accountability 6. Agree on action work items for each member IV. Establish Criteria for Accountability The end product of this process has not yet been agreed upon, but is believed to be inconcert with the preliminary Mission Statement resulting in agreements between parties and the criteria for reaching these agreements that can be used for future negotiation. It will also provide the basis for future improvements to current sites. To achieve this product, each party must be held accountable for meeting their portion of the agreement. The first step towards this, once the challenge has been defined is to develop the criteria for that accountability. A. Receive data from Task Force members. B. Complete independent survey and'consultation with external resources. C. Develop conceptual site improvements program plans to a costable level. D. Complete preparation for the PPC meeting. 1. Review of provided material 2. Design of meeting and establish CPR 3. Establish agenda 4. Prepare required materials E. Facilitate PPC #3 J 1PROPOSSLSP9eN911-77 CITY OF SARATOGAIPROPOSAI 4.2848 REVS? ooc Page 4 B E A L S L A N D S C A P E A R C H I T E C T U R E I N C. F. Prepare for the Task Force meeting. 1. Review of provided material 2. Design of meeting and establish CPR 3. Establish agenda 4. Prepare required materials G. Facilitate Task Force meeting #3 1. Review general desired improvement and maintenance levels in concept. including cost parameters 2. Review individual site program plans 3. Review potential site improvement costs 4. Review corresponding maintenance levels and requirements 5. Agree on action work items for each member V. Agreement on Accountability The final job of the Task Force is to reach agreement on who will be held accountable for what items. The agreement will be based on a clear understanding of each stakeholder's role and responsibility. This will include improvements and maintenance responsibilities with an understanding of real costs and cost burdens and methods of measurement. A. Consultant will develop a matrix on a site -by -site basis of the users, site impact, suggested improvements and maintenance cost parameters. B. Complete preparation for the PPC meeting. 1. Review of provided material 2. Design of meeting and establish CPR 3_ Establish agenda 4. Prepare required materials C. Facilitate PPC meeting #4 D. Prepare for the Task Force meeting. 1. Review of provided material 2. Design of meeting and establish CPR 3. Establish agenda 4. Prepare required materials E. Facilitate Task Force meeting #4 1. Review maintenance general costs by level 2. Review roles, responsibilities of each group 3. Review general agreement and contract criteria 4. Review specific site -by -site agreement drafts 5. Obtain agreement of accountability for agreements to send forward to City Attorney and City Council 6. Celebrate the success of the work completed VI. Contract Development Ratification The last phase of the project is to work with the Staff and City Attorney to develop a legal and binding document that is concurrent with the draft documents. Consultants will meet independently with all parties to review the specific site requirements and responsibilities included in the final document. A. Meetings with Staff and City Council (2 total) B. Meetings with user groups (6 total) C. Meetings with the School Districts (3•total D. Presentation to the Parks Recreation Commission E. Presentation to the City Council Optional service J,IPROPOSAL.aP981P98.27 ow OF SARATOGAIPROPOSAL 4 -28-98 REV5-7.000 Page 5 R E A LS L A N D S C A PE A R C H I T R C T U R E. I N C. EXHIBIT A -1 PROPOSAL FOR CITY OF SARATOGA MANAGEMENT OF PARTNERSHIP PROCESS BETWEEN THE CITY OF SARATOGA, THREE SCHOOL DISTRICTS AND THE USER GROUPS TENTATIVE PROJECT SCHEDULE Meeting Milestone Accelerated Anticipated Pre Planning 4 -23 -98 4 -23 -98 Park Recreation Commission 5-4 -98 5 -4 -98 City Council 5 -12 -98 5 -12 -98 Task Force Pre Planning 5 -14 -98 PPC Meeting #1 5 -14 -98 6 -11 -98 Task Force Meeting #1 5 -20-98 6 -17 -98 PPC Meeting #2 6 -11 -98 7 -9 -98 Task Force Meeting #2 6 -17 -98 7 -15 -98 PPC Meeting #3 7 -9 -98 8 -13 -98 Task Force Meeting #3 7 -15 -98 8 -19 -98 PPC Meeting #4 8 -13 -98 9 -12 -98 Task Force Meeting #4 8 -19 -98 9 -16 -98 Park Recreation Commission Meeting TBD TBD City Council Meeting TBD TBD Items indicated with an asterisk are provided as a non billable service. J:IPROPOSALS1P981P98 -27 CfTY OF SARATOGA MEETING MILESTONES 4-29-98.DOC Page 1 i F L. S L A N D S C A P E A R C H I T E C T U R E I N C. EXHIBIT B PAYMENT SCHEDULE City shall pay Contractor an amount not to exceed the total sum of Forty -seven thousand three hundred forty dollars($47,340.00) for services to be performed and reimbursable costs incurred pursuant to this Agreement. Contractor shall submit invoices, not more often than once a month during the term of this Agreement, based on the cost for services performed and reimbursable costs incurred prior to the invoice date. Invoices shall contain the following information. 1. Serial identifications of progress bills, i.e., Progress Bill No. 1. 2. The beginning and ending dates of the billing period. 3. A Task Summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available and the percentage of completion. I 4. For each work item in each task, a copy of the applicable time sheets shall be submitted showing the name of the person doing the work, the hours spent by each person, a brief description of the work, and each reimbursable expense. City shall make monthly payments, based on such invoices, for services satisfactorily performed, and for authorized S tandard Contractual Services Agreement Page 5 of 20 A: \CONTRACT.STD reimbursable costs incurred. City shall pay the last 10% of the total sum due pursuant to this Agreement within forty -five (45) days after completion of the services and submittal to City, if all services due pursuant to this Agreement have been satisfactorily performed. The total sum stated above shall be the total which City shall pay for the services. to be rendered by Contractor pursuant to this Agreement. City shall .not pay any additional sum for any expense or cost whatsoever incurred by Contractor in rendering services pursuant to this Agreement. City shall make no payment for any extra, further or additional service pursuant to this Agreement unless such extra service and the price therefor is agreed to in writing executed by the City Manager or other designated official of City authorized to obligate City thereto prior to the time such extra service is rendered and in no event shall such change order exceed twenty -five (25%) of the initial contract price. Fees for work performed by Contractor on an hourly basis shall not exceed the amounts shown on the fee schedule of hourly billing included as Attachment B -1. Reimbursable expenses are specified on Attachment B -2, and shall not exceed One Thousand Dollars($ 1,000). Expenses not listed on Attachment B -2 are not chargeable to City. The services to be provided under this Agreement may be S tandard Contractual Services Agreement Page 6 of 20 A: \CONTRACT.STD 1 terminated without cause at any point in time in the sole and exclusive discretion of. City. In this event, City shall compensate the Contractor for all outstanding costs incurred for work satisfactorily completed as of the date of written notice thereof. Contractor shall maintain adequate logs and time sheets in order to verify costs incurred to date. The Contractor is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of a fully executed Purchase Order from the Finance Department of the City of Saratoga. Please refer to attached Exhibit A -2 that outlines professional fee rates and fee estimate sheet. Standard Contractual Services Agreement Page 7 of 20 A: \CONTRACT.STD EXHIBIT A 2 PROPOSAL FOR CITY OF SARATOGA MANAGEMENT OF PARTNERSHIP PROCESS BETWEEN THE CITY OF SARATOGA, THREE SCHOOL DISTRICTS AND THE USER GROUPS PROFESSIONAL FEES Based on Scope of Services shown under "Exhibit A" for City of Saratoga, we propose a fixed fee of $47,340.00 for the project, excluding expenses, as noted in the fee breakdown below. Scope of Services is based on the attached Fee Estimate Sheet. Beals Landscape Architecture, Inc. Prime 47,340 Management of Partnership Process Project Pre Planning $3,220 Project Framing 9,400 Impact on Sites 8,850 Establish Criteria for Accountability 11,270 Agreement on Accountability 9,020 Contract Development 5,580 Total 47,340 PROJECT HOURS MATRIX Please refer to the pages that follow for the task and hourly breakdown. DIRECT EXPENSES Direct expenses charged by the Beals Landscape Architecture, Inc. team include mileage, in- house computer plotting and printing and outside services such as printing reproduction, soil fertility testing, photo processing, etc. REIMBURSABLE RATES Blueprints and Reproductions, Plotting Cost plus 20% Transportation .32 per mile Sub Consultant Services Cost plus 20% In -House Blue Prints 1.85 per print Sepia 6.85 per print SepiaMylar $17.85 per print Xerox .26 per page Plotting 1.25 per SF /Bond 3.00 per SFNellum REIMBURSABLE EXPENSES Blueprints and Reproductions Promotional Brochures Photography Parking and Toll Expenses 15% Models and Renderings Permit Fees 15% Fax $.26 per page Telephone Costs 15% B E A L S L A N D S C A P E A R C H I T E C T U R E 1:.(, FEE ESTIMATE WORKSHEET CLIENT: City of Saratoga BEALS LANDSCAPE ARCHITECTURE, INC. PROJECT Management of Partnership Process Date: April 28, 1998 BLAi JOB NO. P98 -27 PREP. BY: Jay Beals Task Description CTID $50.00 PLA $70.00 PIC $150.00 Total Fees I Project Pre- Planning A Initial Meeting $0.00 $0.00 2.0 $300.00 $300.00 B Initial Project Scoping 1.0 $50.00 $0.00 4.0 $600.00 $650.00 C Complete Preparation for Meetings 4.0 $200.00 2.0 $140.00 4.0 $600.00 $940.00 D Pre planning Meeting $0.00 3.0 $210.00 3.0 $450.00 $660.00 E Finalization of Project Scoping $0.00 1.0 $70.00 4.0 $600.00 $670.00 Fl Attend PRC City Council Mtgs. $0.00 $0.00 4.0 NC NC SUB -TOTAL 5.0 $250.00 6.0 $420.00 21.0 $2,550.00 $3,220.00 Task Description CTID $50.00 PLA $70.00 PIC $150.00 Total Fees II Project Framing A Assist in Designing a Task Force 12.0 $600.00 2.0 $140.00 4.0 $600.00 $1,340.00 B Task Force Pre Planning $0.00 3.0 $210.00 2.0 $300.00 $510.00 C Complete a Site Walk 15.0 $750.00 $0.00 5.0 $750.00 $1,500.00 D Prepare for PPC Meeting 4.0 $200.00 10.0 $700.00 6.0 $900.00 $1,800.00 E Facilitate #1 PPC Meeting 2.0 $100.00 5.0, $350.00 3.0 $450.00 $900.00 F Prepare for Task Force Meeting 4.0 $200.00 15.0 $1,050.00 8.0 $1,200.00 $2,450.00 G Facilitate #1 Task Force Meeting 2.0 $100.00 5.0 $350.00 3.0 $450.00 $900.00 SUB -TOTAL 39.0 $1,950.00 40.0 $2,800.00 31.0 $4,650.00 $9,400.00 0 Task Description CTID $50.00 PLA $70.00 PIC $150.00 Total Fees III Impact on Sites A Receive Data from Task Force 12.0 $600.00 10.0 $700.00 2.0 $300.00 $1,600.00 B Complete 2nd Site Walk 12.0 $600.00 $0.00 4.0, $600.00 $1,200.00 C Complete Preparation for PPC Mtg. 4.0 $200.00 10.0 $700.00 6.0 $900.00 $1,800.00 D Facilitate #2 PPC Meeting 2.0 $100.00 5.0 $350.00 3.0 $450.00 $900.00 E Prepare for Task Force Meeting 4.0 $200.00 15.0 $1,050.00 8.0 $1,200.00 $2,450.00 F Facilitate #2 Task Force Meeting $100.00 5.0 $350.00 3.0 $450.00 $900.00 SUB -TOTAL 36.0 $1,800.00 45.0 $3,150.00 26.0 $3,900.00 $8,850.00 Task Description CTID $50.00 PLA $70.00 PIC $150.00 Total Fees IV Establish Criteria for Accountability A Receive Data from Task Force 12.0 $600.00 10.0 $700.00 2.0 $300.00 $1,600.00 B Complete Independent Survey 12.0 $600.00 12.0 $840.00 4.0 $600.00 $2,040.00 C Develop Conceptual Site Improv. $0.00. .16.0 $1,120.00. 4.0 $600.00 $1,720.00 D Complete Preparation for PPC Mtg. 4.0 $200.00 8.0 $560.00 6.0 $900.00 $1,660.00 E Facilitate #3 PPC Meeting 2.0 $100.00 5.0 $350.00 3.0 $450.00 $900.00 F Prepare for Task Force Meeting 4.0 $200.00 15.0 $1,050.00 8.0 $1,200.00 $2,450.00 G Facilitate #3 Task Force Meeting 2.0 $100.00 5.0 $350.00 3.0 $450.00 $900.00 SUB -TOTAL 36.0 $1,800.00 71.0 $4,970.00 30.0 $4,500.00 $11,270.00 J:\Standards\Proposals\Fee Estimate.xls Page 1 B E A L S L A N D S C A P E A R C H I T E C T U R E I N C i FEE ESTIMATE WORKSHEET CLIENT: City of Saratoga BEALS LANDSCAPE ARCHITECTURE, INC. PROJECT Management of Partnership Process Date: April 28, 1998 BLAi JOB NO. P98 -27 PREP. BY: Jay Beals Task Description CT /D $50.00 PLA $70.00 PIC $150.00 Total Fees V Agreement on Accountability A Develop a Matra 12.0 $600.00 20.0 $1,400.00 4.0 $600.00 $2,600.00 B Complete Preparation for PPC Mtg. 4.0 $200.00 15.0 $1,050.00 6.0 $900.00 $2,150.00 C Facilitate #4 PPC Meeting 2.0 $100.00 6.0 $420.00 4.0 $600.00 $1,120.00 D Prepare for Task Force Meeting $0.00 15.0 $1,050.00 8.0 $1,200.00 $2,250.00 E Facilitate #4 Task Force Meeting 2.0 $100.00 5.0 $350.00 3.0 $450.00 $900.00 SUB -TOTAL 20.0 $1,000.00 61.0 $4,270.00 25.0 $3,750.00 $9,020.00 Task Description CTID $50.00 PLA $70.00 PIC $150.00 Total Fees VI Contract Development A Meeting uataff City Council 2.0 $100.00 8.0 $560.00 6.0 $900.00 $1,560.00 B Meetings w /User Groups 2.0 $100.00 8.0 $560.00 6.0 $900.00 $1,560.00 C Meetings w/SchoolDistricts 2.0 $100.00 8.0 $560.00 6.0 $900.00 $1,560.00 D Presentation to PRC $0.00 $0.00 3.0 $450.00 $450.00 E Presentation to City Council $0.00 $0.00 3.0 $450.00 $450.00 SUB TOTAL 6.0 $300.00 24.0 $1,680.00 24.0 $3,600.00 $5,580.00 TOTALS $7,100.00 $17,290.00 $22,950.00 $47,340.00 J:'Standards\Proposals\Fee Estimate.xds Page 2 BE A L S L A N D S C A P E A R C H I T E C T U R E I N C EXHIBIT C FACILITIES AND EQUIPMENT City shall furnish physical facilities such as desks, filing cabinets, and conference space, as may be reasonably necessary for Contractor's use while consulting with City employees and reviewing records and the information in possession of City. The location, quantity, and time of furnishing said physical facilities shall be in the sole discretion of City. In no event shall City be obligated to furnish any facility which may involve incurring any direct expense, including, but not limiting the generality of this exclusion, long- distance telephone or other communication charges, vehicles, and reproduction facilities. Standard Contractual Services Agreement Page 8 of 20 A: \CONTRACT.STD EXHIBIT D GENERAL PROVISIONS 1. INDEPENDENT CONTRACTOR. At all times during the term of this Agreement, Contractor shall be an independent contractor and shall not be an employee of City. City shall have the right to control Contractor only insofar as the results of Contractor's services rendered pursuant to this Agreement; however, City shall not have the right to control the means by which Contractor accomplishes services rendered pursuant to this Agreement., 2. LICENSES; PERMITS; ETC. Contractor represents and warrants to City that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for Contractor to practice its profession. Contractor represents and warrants to City that Contractor shall, at its sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals which are legally required for Contractor to practice its profession. In addition to the foregoing, Contractor shall obtain and maintain during the term hereof a valid City of Saratoga Business License. 3. TIME. Contractor shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary for satisfactory performance of Contractor's Standard Contractual Services Agreement Page 9 of 20 A: \CONTRACT.STD obligations pursuant to this Agreement. 4. INSURANCE REQUIREMENTS. Contractor shall procure and maintain for the duration of the contract "occurrence coverage" insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, employees or subcontractors. The cost of such insurance shall be included in the Contractor's bid. A. Minimum Scope of Insurance. Coverage shall be at least as broad as: (1) Insurance Services Office form number GL 0002 (Ed. 1/73) covering comprehensive General Liability and Insurance Services Office form number GL 0404 covering Broad Form Comprehensive General Liability; or Insurance Services Office Commercial General Liability coverage "occurrence" form CG 0001.) (2) Insurance Services Office form number CA 0001 (Ed. 1/78) covering Automobile Liability, code 1 "any auto" and endorsement CA 0025. Standard Contractual Services Agreement Page 10 of 20 4 4 A: \CONTRACT.STD (3) Workers' Compensation Insurance as required by the Labor Code of the State of California and Employers Liability Insurance. B. Minimum Limits of Insurance. Contractor shall maintain limits no less than: (1) General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. If commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project /location or the general aggregate limit shall be twice the required occurrence limit. (2) Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. (3) Workers' Compensation and Employers Liability: Workers' Compensation limits as required by the Labor Code of the State of California and Standard Contractual Services Agreement Page 11 of 20 A: \CONTRACT.STD Employers Liability limits of $1,000,000 per accident. C. Deductibles and Self Insured Retention. Any deductibles or self insured retention must be declared to and approved by the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self- insured retention as respects the City, its officers, officials and employees; or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. D. Other Insurance Provisions. The policies are to contain, or be endorsed to contain, the following provisions: (1) General Liability and Automobile Liability Coverage. a. The City, its officers, officials, employees and volunteers are to be covered as insured as respects: liability arising out of activities performed by or on behalf of the Standard Contractual Services Agreement Page 12 of 20 A: \CONTRACT.STD Contractor; products and completed operations of the Contractor, premises owned, occupied or used by the Contractor, or automobiles owned, leased, hired or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of the protection afforded to the City, its officers, officials, employees or volunteers. b. The Contractor's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance or self insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Contractor's insurance and shall not contribute with it. c. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, employees or volunteers. d. The Contractor's insurance shall apply Standard Contractual Services Agreement Page 13 of 20 A: \CONTRACT.STD separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. (2) Workers' Compensation and Employers Liability Coverage. The insurer shall agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. (3) Professional Liability. Contractor shall carry professional liability insurance in an amount deemed by the City to adequately protect the Contractor against liability caused by negligent acts, errors or omissions on the part of the Contractor in the course of performance of the services specified in this Agreement. Standard Contractual Services Agreement Page 14 of 20 A: \CONTRACT.STD (4) All Coverage. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the City. E. Acceptability of Insurers. Insurance is to be placed with insurers with a Bests' rating of no less than A:VII. F. Verification of Coverage. Contractor shall furnish City with certificates of insurance and with original endorsements effecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance Standard Contractual Services Agreement Page 15 of 20 A: \CONTRACT.STD policies, at any time. G. Subcontractors. Contractor shall include all subcontractors as insured under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein. H. The Risk Manager of City may approve a variation in those insurance requirements upon a determination that the coverage, scope, limits and forms of such insurance are either not commercially available or that the City's interests are otherwise fully protected. 5. CONTRACTOR NO AGENT. Except as City may specify in writing, Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Contractor shall have no authority, express or implied, pursuant to this Agreement to bind City to any obligation whatsoever. 6. ASSIGNMENT PROHIBITED. No party to this Agreement may assign any right or obligation pursuant to this Agreement. Any attempted or purported assignment of any right or obligation pursuant to this Agreement shall be void and of no effect. Standard Contractual Services Agreement Page 16 of 20 A: \CONTRACT.STD 7. PERSONNEL. Contractor shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any such persons, Contractor shall, immediately upon receiving notice from city of such desire of City, cause the removal of such person or persons. 8. STANDARD OF PERFORMANCE. Contractor shall perform all services required pursuant to this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Contractor is engaged in the geographical area in which Contractor practices its profession. All instruments of service of whatsoever nature which Contractor delivers to City pursuant to this Agreement shall be prepared in a substantial, first class and workmanlike manner and conform to the standards of quality normally observed by a person practicing in Contractor's profession. 9. HOLD HARMLESS AND RESPONSIBILITY OF CONTRACTORS. Contractor shall take all responsibility for the work, shall bear all losses and damages directly or indirectly resulting to him, to any subcontractor, to the City, to City officers and employees, or to parties designated by the City, on account of the performance or Standard Contractual Services Agreement Page 17 of 20 A: \CONTRACT.STD character of the work, unforeseen difficulties, accidents, occurrences or other causes predicated on active or passive negligence of the Contractor or of any subcontractor. Contractor shall indemnify, defend and hold harmless the City, its officers, officials, directors, employees and agents from and against any or all loss, liability, expense, claim, costs (including costs of defense), suits, and damages of every kind, nature and description directly or indirectly arising from the performance of the work. This paragraph shall not be construed to exempt the City, its employees and officers from its own fraud, willful injury or violation of law whether willful or negligent. For purposes of Section 2782 of the Civil Code the parties hereto recognize and agree that this agreement is not a construction contract. By execution of this Agreement, Contractor acknowledges and agrees that it has read and understands the provisions hereof and that this paragraph is a material element of consideration. Approval of the insurance contracts does not relieve the Contractor or subcontractors from liability under this paragraph. 10. GOVERNMENTAL REGULATIONS. To the extent that this Agreement may be funded by fiscal assistance from another governmental entity, Contractor shall comply with all applicable rules and Standard Contractual Services Agreement Page 18 of 20 A: \CONTRACT.STD regulations to which City is bound by the terms of such fiscal assistance program. 11. DOCUMENTS. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda or other written documents or materials prepared by Contractor pursuant to this Agreement shall become the property of City upon completion of the work to be performed hereunder or upon termination of the Agreement. 12. COMPLIANCE WITH APPLICABLE LAWS. Contractor shall comply with all laws applicable to the performance of the work hereunder, including, but not limited to, laws prohibiting discrimination based on race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status or sex. 13. USE OF RECYCLED PRODUCTS. Contractors shall prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper. 14. PROFESSIONAL SEAL. Where applicable in the determination of the contract administrator, the first page of a technical report, Standard Contractual Services Agreement Page 19 of 20 A: \CONTRACT.STD first page of design specifications, and each page of construction drawings shall be stamped /sealed and signed by the licensed professional responsible for the report /design preparation. The stamp /seal shall be in a block entitled "Seal and Signature of Registered Professional with report /design responsibility" as per sample below. Seal and Signature of Registered Professional with report. /design responsibility. Standard Contractual Services Agreement Page 20 of 20 A: \CONTRACT.STD