Loading...
HomeMy WebLinkAbout09-02-1998 Staff Reports SARATOGA CITY COUNCIL EXECUTIVE SUMMARY NO. 3 04b AGENDA ITEM 3) MEETING DATE: September 2, 1998 CITY MANAGER: •1 i; ORIGINATING DEPT.: CITY MANAGER PREPARED BY: ak.e A irvy k SUBJECT(S): 1. Amendment of the Memorandum of Understanding Between the City and the Saratoga Employees Association, dated December 3, 1997, Adjusting Salary Ranges for Non Management Employees Through the Period Ending June 30, 1999. 2. Approval of the Salary Ranges for the Positions of City Clerk and Human Resources Analyst. RECOMMENDED MOTION(S): 1. Move to adopt the Resolution amending the Memorandum of Understanding (MOU) between the City and the Saratoga Employees Association (SEA) to set the new salary ranges for non- management employees. 2. Move to adopt the Resolution assigning salary ranges for the positions of City Clerk and Human Resources Analyst. REPORT SUMMARY: Attached are two Resolutions in connection with the latest reorganization plan recommended by the City Manager and approved by the City Council on July 1s` The first Resolution amends the MOU between the City and the SEA by incorporating a revised salary schedule for the period July 1, 1998 through June 30, 1999, listing the SEA assigned positions and corresponding salary ranges previously agreed to. The second Resolution establishes salary ranges for the new positions of City Clerk and Human Resources Analyst. Since these two positions have not been assigned to a bargaining unit at this time, their salaries are set by separate Resolution. Eventually, if and when these positions are assigned to a bargaining unit, their salaries will be set via the Resolution establishing salaries for those positions in the corresponding bargaining unit. FISCAL IMPACTS: As previously reported to the City Council via Executive Summary dated March 4 and Memorandum dated May 20 ADVERTISING, NOTICING AND PUBLIC CONTACT: Nothing additional. CONSEQUENCES OF NOT ACTING ON RECOMMENDED MOTION(S): Depends on Council's action. Either one or both of the Resolutions would not be adopted meaning that either the MOU would not be amended as previously agreed to, and/or the salary ranges for the two undesignated positions would not be approved. ATTACHMENT(S): Resolutions (2). SARATOGA CITY COUNCIL tory E X E C U T I V E S U M M A R Y NO. o U AGENDA I T E M S MEETING DATE: SEPTEMBER 2, 1998 CITY MGR.: ORIGINATING DEPT.: PUBLIC WORKS PREPARED BY: SUBJECT: 1998 Pavement Management Program Award of Construction Contract Recommended Motion(s): 1. Move to declare C.F. Archibald Paving, Inc., of Redwood City to be the lowest responsible bidder on the project. 2. Move to award a construction contract to C.F. Archibald Paving, Inc. in the amount of $1,102,784.60. 3. Move to authorize staff to execute change orders to the contract up to $75,000. Report Summary: Sealed bids for the 1998 Pavement Management Program were opened on August 26. A list of the streets which will receive work are attached (Attachment 1). A total of four contractors submitted bids and a summary of the bids received is also attached (Attachment 2). C.F. Archibald Paving, Inc. of Redwood City, who has worked for the City before, submitted the lowest bid of $1,102,784.60 which is less than 1% below the Engineer's Estimate of $1,112,653.75. Staff has carefully checked the bid along with the listed references and has determined that the bid is responsive to the Notice Inviting Sealed Bids dated August 5. It is therefore recommended that the Council declare C.F. Archibald Paving, Inc. to be the lowest responsible bidder on the project, and award the attached construction contract (Attachment 3) to this firm in the amount of their bid. Further, it is recommended that the Council authorize staff to execute change orders to the contract up to an amount of $75,000 to cover any unforeseen circumstances which may arise during the course of the work. Fiscal Impacts: Funding for this work is programmed in the adopted budget in Activity 3005 (Street Maintenance) Account No. 4010 (Contract Services) and Activity 3015 (Traffic Control) Account No. 4010 (Contract Services). The adopted budget contains sufficient funds to cover the contract and recommended change order amounts. Advertising. Noticing and Public Contact: Nothing additional. Consequences of Not Acting on the Recommended Motions: C.F. Archibald Paving, Inc. will not be declared the lowest responsible bidder and a construction contract will not be awarded to that firm. The Council may make specific findings to declare another bidder to be the lowest responsible bidder, or reject all of the bids and direct staff to re-bid the entire project. However, staff does not believe that a lower bid will be obtained by re- bidding the project due to the competitive nature of the current bids received. Follow Un Actions: The contract will be executed and the contractor will be issued a Notice to Proceed. Work will most likely begin in mid September and last through the end of October. Attachments: 1. List of Streets. 2. Bid Summary. 3. Construction Contract. h 1998/99 STREET MAINTENANCE PAVEMENT MANAGEMENT PROGRAMS TYPE: LEGEND: LIGHT OVERLAY (1 1/2" AC) 1 HEAVY OVERLAY (2" AC): 2 SLURRY SEAL: 3 D DELETE, A ADD, 3->1 UPGRADE SLURRY TO LIGHT OVERLAY, RFSS REPAIR FAILED STREET SECTION STREET NAME TYPE LENGTH WIDTH AREA 1 112" AC 2" AC AC LEVELING, WEDGE RFSS ADJUST ADJUST ADJUST ADJUST PAVE. NOTES OVERLAY OVERLAY COURSE CUT VALVES MON. STORM MH SAN MH FABRIC FROM< >TO (FT) (F1) (SY) (TON) (TON) (TON) (LF) (SF) (EA) (EA) (EA) (EA) (S (EA (SY) WOODMONT DR 2 440 41 226 525 3809 2 2004 PIERCE TO CHATEAU WOODMONT DR 2 160 41 82 320 2308 1 729 CHATEAU TO 43 210 END PIERCE RD 2 250 30 94 500 5994 1 1 833 WOODMONT TO PIERCE PIERCE CT 2 210 30 79 685 49 1 1 700 PIERCE TO 69 END PIERCE RD 2 780 37 361 1560 120 1 2 6 3207 REGAN TO WOODMONT IDLEWOOD LN 2 285 30 99 750 1 883 PIERCE TO 43 END REGAN LN 2 460 37 213 995 2 1891 PIERCE TO COX REGAN LN 2 160 37 74 395 2949 2 1 658 PIERCE TO 2 750 45 422 BLAUER REGAN LN 2 135 37 62 270 2949 2 3 4 555 BLAUER TO 2 640 41 328 TRICIA ARGONAUT DR 2 1031 38 490 320 3 4353 REGAN TO CHATEAU TOTAL 0 0 2684 0 6530 18178 1 6 5 22 15814 1 .k :4 v 1998/99 STREET MAINTENANCE PAVEMENT MANAGEMENT PROGRAMS TYPE. LEGEND: LIGHT OVERLAY (1 1/2" AC) 1 HEAVY OVERLAY AC): 2 SLURRY SEAL: 3 D DELETE, A ADD, 3->1 UPGRADE SLURRY TO LIGHT OVERLAY, RFSS REPAIR FAILED STREET SECTION STREET NAME TYPE LENGTH WIDTH AREA 1 1/2' AC 2' AC AC LEVELING WEDGE RFSS ADJUST ADJUST ADJUST ADJUST PAVE. NOTES OVERLAY OVERLAY COURSE CUT VALVES MON. STORM MH, SAN MH FABRIC FROM >TO (FT) (FT) (SY) (TON) (TON) (TON) (LF) (SF) (EA) (EA) (EA) (EA) (SY) ARGONAUT DR 2 810 41 415 120 19935 2 3690 CHATEAU TO CHATEAU CHATEAU DR BLAUER TO 2 825 41 423 240 7139 3 3 3758 REGAN CHATEAU DR 2 1260 41 646 760 15434 2 5740 SAN. VALVES: 1 ARGONAUT TO WINTER CHATEAU DR 2 1040 41 533 400 12618 4738 WINTER TO ARGONAUT WINTER LN 2 147 41 75 1140 5899 1 3 670 CHATEAU TO 2 510 37 236 CUMBERLAND WINTER LN 2 430 41 220 1 2 1959 CHATEAU TO 65 END BLAUER DR 2 1265, 41 648 240 12410 1 5763 CHATEAU TO REGAN CRAIGEN CIR 2 960 41 492 480. 9501 2 4373 REGAN TO CHATEAU CHATEAU CT 2 155 41 79 200 1240 1 706 CHATEAU TO END ARGONAUT CT 2 100 41 51 120 640 1 456 ARGONAUT TO END TOTAL 0 0 3884 0 3700 84816 0 1 4 17 31852 1998/99 STREET MAINTENANCE PAVEMENT MANAGEMENT PROGRAMS TYPE: LEGEND: LIGHT OVERLAY (1 1/7' AC) 1 HEAVY OVERLAY (2' AC): 2 SLURRY SEAL: 3 D DELETE, A ADD, 3- >1 UPGRADE SLURRY TO LIGHT OVERLAY, RFSS REPAIR FAILED STREET SECTION STREET NAME TYPE LENGTH WIDTH AREA 1 1/7' AC 2' AC AC LEVELING WEDGE RFSS ADJUST ADJUST ADJUST ADJUST PAVE. NOTES OVERLAY OVERLAY COURSE CUT VALVES, MON. STORM MH SAN MH, FABRIC FROM<->TO (FT) (FT) (SY) (TON) (TON) (TON) (LF) (SF) (EA) (EA) (EA) (EA) (SY) CHATEAU DR 2 331 41 170 240 1 1 1508 ARGONAUT TO BLAUER ASHLEY WY 1 1450 34 462 2900 5689 2 7 3 4 5478 YOLO TO END ASHLEY CT 1 175 28 48 538 3083 1 1 544 ASHLEY TO 26 END CARNIEL CT 1 107 28 28 188 1630 3 1 333 ASHLEY TO 26 END YOLO DR 1 314 35 103 468 1 3 2 1 1221 WARDELL TO END CARNIEL AVE 1 281 34 90 602 1062 ASHLEY TO WARDELL JESPEN CT 1 130 28 34 448 1 1 404 CARNIEL TO 26 END BEAUMONT AVE 1 380 37 132 920 9264 2 1 1562 THELMATO GLEN BRAE HERRIMAN AVE -338 fa SARATOGA CR OUTIO RD 10 100 O MAUDE AVE GERNEIL CT 1 100 31 29 401 2243 1 1 344 JERRIES TO 30 END TOTAL 0 1032 170 0 6705 22347 5 17 6 10 12457 0 :1 1-.w' 1998/99 STREET MAINTENANCE PAVEMENT MANAGEMENT PROGRAMS TYPE: LEGEND: LIGHT OVERLAY (1 1/2" AC) 1 HEAVY OVERLAY (7' AC): 2 SLURRY SEAL: 3 D DELETE, A ADD, 3->1 UPGRADE SLURRY TO LIGHT OVERLAY, RFSS REPAIR FAILED STREET SECTION STREET NAME TYPE LENGTH WIDTH AREA 1 117 AC 7' AC AC LEVELING, WEDGE RFSS ADJUST ADJUST ADJUST ADJUST PAVE. NOTES OVERLAY OVERLAY COURSE CUT VALVES MON. STORM MH SAN MH FABRIC FROM<- TO (FT) (FT) (SY) (TON) (TON) (TON) (LF) (SF) (EA) (EA) (EA) (EA) (SY) SHADOW OAKS WY 2 2032 41, 1041 1704 13500 2 12 6 4 9257 SARATOGA TO SARATOGA VICKERY AVE 2 1565 33 646 2880 7 4 7 5738 LOMITA TO CODY CODY LN 2 500 27 169 1350 3 1 2 1 1500 HIGHWAY 9 TO 2 375 27 127 END VICKERY PL 2, 310, 27, 105 814 1 1 930 VICKERY TO 38 END BUTANO TER 2 275 27 93 577 2 1 825 VICKERY TO END PEACH HILL RD 2 2510 17 533 1350 2619 9 1 4 4741 PIEDMONT TO #15600 WOODBANK WY 2 210 21 55 450 1240 2 1 1 1 490 AMBLESIDE TO 53 TO END WOODBANK WY 2 600 21 158 1400 210 1400 AMBLESIDE TO 2 400 28 140 QUITO SOBEY RD 125 8" AC SECTION MARSHALL LN SCHOOL ELVA AVE 2 1085 20 350 2260 770 1 1 3 2411 SPEED HUMPS: 3 4TH TO MICHAELS TOTAL 0 0 3632 0 12785 18339 17 26 13 22 27292 s N m k£ i s fi N i o R$ i. R E N F R»» 1. E x a 2» g E a x N 1. I g N m n 5 1 1 S N at N N 2 1 I 1< 1 a 8 8$ e N N U F N LL U 1 1 A: g A q o g A N A i i N N w N p N N a 4 N N N i1 w W N I .g, h 3 8 N o w a N W 1- a 3 1 1 1 1 I§ 2 I§ 15 6 16 16 5 I5. 12 5 5 5 15 15 5 5. 5 5 6 6 6 6 16 6 6 6 16 6 6 6 6 16 6 6 16 1 1 n R R e- N s N r F 3 N g F. b B A$ F I H a m a r 14 r. 8 1 Kg S`a; a I 2 I I m 1 0 i a W W 8: g L/ g u: 's i r s i i i i a o N O O O O C O A G O O C O O N (7 U' O C U O Z 10 9 tl j 0 N tl 0 9 9 9 N Y 10 O O 6 O 1- W I", W IL W W IG W W W W Y f o .2 Q O F O F y W 6 a 4 a a 6 a a a R y U O W C LL' K C 1' K K 1' LL' C K Y H K C E' W i 2 O N N ffq E g r g N g N h N Q G 2 a j 1 q G W LL W H U 2-2 O O u U LL LL U U 1 E 1'1 2 -d G z a0 f LL O `LL 1 I y` LL Q YQLL, Q 1 y 1` a y pO 2 �j 1 L Z ZtH 11 U H LL N 6' 1r R C K LL' c 6' 6' C 1 K O 1 N 2• 11�� 2 1 _k -i W K 1 j N N ii *1� w 6 Z Z Z Z Z Z Z Z Z 2 2 Z W Z W g O C q a 8 al G N F f M f 1- f f RK V W G O pp Q a Q a a Q< Q Q< Q a Q a C a Q a a Q a a< 3 p p U m m f C 6 Q 6 6 d 6 d 4 6 6 d 6 6 6 d -6 d R a a 6 p a a 6 C F CO Q Q 1 iiI�L LLIbI.,LImIWI4LI4I4I�IeIm LImIWI4LI4I4I4 14 I4LI4I4 I4I414I I414IoIAIA I.) CITY OF SARATOGA I BID SUMMARY: 1998 PAVEMENT MANAGEMENT PROGRAM I BID OPENING DATE: AUGUST 28, 1999 ENGINEER'S ESTIMATE O'GRADY PAVING, INC. RGW CONSTRUCTION ITEM ITEM DESCRIPTION QUANTITY UNITS UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1. TRAFFIC CONTROL 1 LS NIA $20,000.00 WA $26,000.00 NA $20,000.00 2. ASPHALT CONCRETE OVERLAY 11,402 TON $42.00 $478,884.00 $42.00 $478,884.00 $41.00 $487,482.00 3. REPAIR FAILED STREET SECTION 5,388 TON $70.00 $377,180.00 $100.00 $538,800.00 $105.00 5565,740.00 4. WEDGE CUT 29.720 LF $1.26 $37,160.00. $2.00 $59,440.00 $1.00 $29,720.00 6. PAVEMENT FABRIC 87,415 SY $1.00 $87,415.00 $0.80 589,932.00 $1.00 $87,415.00 8. INSTALL SPEED HUMPS 3 EA $1,500.00 $4,500.00 51,500.00 $4,500.00 $1,500.00 $4,600.00 7. ADJUST STORM MH TO GRADE 28 EA $260.00 $7,000.00 $300.00 $8,400.00 $350.00 $9,800.00 B. ADJUST MONUMENTS TO GRADE 50 EA $150.00 $7,600.00 $160.00 $7,500.00 $300.00 $16,000.00 9. REMOVE STATE DETAIL NO. 22 14,900 LF $1.00 $14,900.00 $0.90 $13,410.00 $0.80. $11,920.00 10. PAINT TRAFFIC STRIPE-S.D. #2 2,856 LF $0.25 $883.76 $0.28 $890.30 $1.00 $2,855.00 11. PAINT TRAFFIC STRIPES.D. #8 380 IF $0.25 $9510 $0.26 $981W $0.25 596.00 12. PAINT TRAFFIC STRIPE -S.D. #21 38,240 LF $0.26 $9,080.00 $0.18 $6,798.40 50.15 $5,438.00 13. PAINT TRAFFIC STRIPES.D.#22 18,795 LF $0.50 $8,397.50 $0.68 $9,40520 $0.80 $10,077.00 14. PAINT TRAFFIC STRIPES.D.#27B 48,740 LF $0.25 $12,185.00 $0.15 $7,311.00 $0.15 $7,311.00 15. PAINT TRAFFIC STRIPE-S.D. #27C 520 LF $0.25 $130.00 $0.15 $78.00 $0.15 $78.00 18. PAINT TRAFFIC STRIPE-S.D. 028 290 LF $0.26 $72.60 $0.15 $43.60 $0.30 $87.00 17. PAINT TRAFFIC STRIPES.D.#36 176 LF' $0.25 $43.75 $0.60 $105.00 $1.00 $176.00 18. PAINT TRAFFIC STRIPE-S.D. #38A 785 LF $0.25 $198.25 $0.35 5274.75 $1.00 $785.00 19. PAINT TRAFFIC STRIPE-S.D. #39 13,045 LF $0.20 52,809.00 $0.13 $1,896.85 $0.20 $2,809.00 20. PAINT TRAFFIC STRIPES.13.1139A 4,080 LF $0.20 $812.00 $0.13 5627.80 $0.15 $809.00 21. PAINT STOP BARS 29 EA $25.00 $725.00 $20.00 $580.00 $18.00 $522.00 22. PAINT CROSSWALKS 22 EA $160.00 $3,300.00 $100.00 $2,200.00 $84.00 $1,848.00 23. PAINT 'STOP' 30 EA $75.00 $2,250.00 $80.00 $2,400.00 $70.00 12,100.00 24. PAINT '26' 4 EA $60.00 $200.00 $45.00 $180.00 $38.00 $162.00 26. PAINT 'SCHOOL' 12 EA 550.00. $800.00 $58.00 $872.00 $61.00. 5812.00 28. PAINT 'AHEAD' 3 EA $75.00 $225.00 $110.00 $330.00 598.00 $288.00 27. PAINT'XING' 21 EA $50.00 11,050.00 185.00 $1,785.00 $77.00 $1,817.00 28. PAINT 'BIKE LANE' 77 EA $50.00 $3,850.00 $35.00 $2,895.00 $32.00 $2,484.00 29. PAINT ARROWS 20 EA $50.00 $1,000.00 $40.00 $800.00 $38.00 $720.00 30. PAINT 'SLOW' 12 EA $50.00 $800.00 $85.00 $1,020.00 $77.00 $924.00 31. PAINT 'ONLY' 4 EA $50.00 $200.00 $85.00 $340.00 $77.00 $309.00 32. PAINT'PED' 9 EA $50.00 5450.00 185.00 $585.00 558.00 $622.00 33. PAINT RXR 2 EA $260.00 $500.00 $250.00 $500.00 $224.00 $448.00 34. TYPED PAVEMENT MARKERS 1,452 EA $6.00 $7,280.00 $5.00 $7,260.00. 14.60 $8,534.00 35. BLUE PAVEMENT MARKERS 37 EA $10.00 $370.00 $10.00 $370.00 $8.00 $288.00 36A. ADJUST SANITARY MH TO GRADE 71 EA $260.00. $17,750.00 $300.00 $21,300.00 $276.00. $19,526.00 37A ADJUST SANITARY CO TO GRADE 1 EA $250.00 $250.00 $150.00 $160.00 $525.00 $625.00 38A ADJUST WATER VALVES TO GRADE 22 EA $160.00 $3,300.00 $160.00 $3,300.00 $280.00 $5,720.00 TOTAL $1,112,853.75 $1,278,361.80 $1,288,819.00 1 SARATOGA CITY COUNCIL e c7 EXECUTIVE SUMMARY NO. D q 7 AGENDA ITEM 5'8 0) MEETING DATE: September 2, 1998 CITY MGR. ORIGINATING DEPT. City Clerk SUBJECT: Notice of Need to Amend onflict of Interest Codes Saratoga Parking Authority; Saratoga Public Financing Authority; City of Saratoga Recommended Motion: Direct staff to prepare recommended changes in the City of Saratoga Conflict of Interest Code for the September 16 Council meeting. Report Summary: The Political Reform Act requires that all Conflict of Interest Codes be reviewed biennially to determine whether they must be amended. The City Council is responsible for codes adopted by the City of Saratoga as well as the Saratoga Parking Authority and the Saratoga Public Financing Authority (the two bodies established in connection with financing the Leonard Road Assessment District Project and the refinancing of debt issued in connection with Village Parking District #3). Changes in codes may be required for two reasons: organizational changes or changes in State law. The codes of the two authorities need no amendments for either reason. Therefore, staff recommends no changes in these two codes. However, there have been several organizational and staffing changes in the City administration which will require amendments to the City of Saratoga Conflict of Interest Code. The law requires that the recommended changes be forwarded to the Council for approval within 90 days of this Notice of Need to Amend. In order to complete this process while the current City Clerk is still in office, the changes will be prepared for the agenda of September 16. Fiscal Impacts: None. Follow Up Actions: Staff will place City of Saratoga Conflict of Interest Code changes on the September 16 agenda. Attachments: None. i