CITY OF SARATOGA
AGENDA BILL NO. AGENDA ITEM
DATE: 3/12/86
Dom_ City Clerk
SUBJECT:
Summary:
The City of Saratoga currently has no official records management policy to
govern the records management. program. It would be useful to have such a
policy in order to encourage compliance with established procedures on a year
to -year basis regardless of personnel changes. Although the policy establishes
no new procedures, it reiterates the State laws and the main points of the
local procedures which make up our program. The policy would also improve
the credibility of the records management program.
Fiscal Impacts:
None.
Exhibits /Attachments:
Resolution.
Recommended Action:
Adopt resolution establishing records management policy.
Council Action
3/19: Adopted.
Resolution Establishing Records Management Policy
CITY MGR. APPROVA4009
AGENDA BILL NO: /033 Agenda Item /E
DATE:
March 14, 1986 City Mgr Approval
DEPARTMENT: Maintenance
SUBJECT: Congress Springs Park Project
Issue Summary
Bids were opened on Wednesday, March 12th at 3:00, for the
Congress Springs Park Project. At that time we received only two
bids for the project. (See attached bid summary). The low bid
is approximately $160,000 above project estimate, therefore, we
recommend the bid be rejected.
We have discussed the problem with the low bidder and plan
holders who did not bid, and have determined that by breaking the
contract into two segments, the building (restroom and
snackshack) into one, landscaping in another, and by making some
cost reducing modifications, we should be able to receive new
bids that should get the total project much closer to our budget
of $450,000 which does not include the additional parking area
located in the Pacific Gas and Electric right of way.
Fiscal Impact
The total project, including architectural services, will be
approximately $450,000. When the exact amount can be determined,
we will be asking for an additional appropriation from the Park
Development Fees. There is currently $415,000 in the budget so
the additional funding will be approximately $35,000.
Exhibits /Attachments
Bid Summary
Recommended Action
Reject bids and authorize rebidding under two separate contracts.
Council Action
3/19: Approved staff recommendation.
Page 1
BID SUMMARY
CONGRESS SPRINGS PARK PROJECT
BUKTENICA ESTIMATE MUNKDALE QUATMAN
CONTRACT UNIT UNIT UNIT
ITEM QUANTITY UNIT ITEM PRICE' AMOUNT PRICE AMOUNT PRICE AMOUNT
1 Lump Sum Demolition 12,520 49,200 L.S. 24,299
2 168,384 S.F. Rough grade .05 3,419 .15 25,257.60 .90 151,549.60
3 292,490 S.F. Finish. grade .09 26,324 .02 5,849.80 .02 5,849.80
4 Lump Sum Potable Water
System 5,800 1,500 L.S. 1,797
5 Lump Sum Sanitary Sewer:
System 2,700 3,000 L.S. 6,685
6 Lump Sum Storm Sewer
System 8,900 10,100 L.S. 12,069
7 Lump Sum Site Electrical 8,500 15,840 L.S. 14,544
8 51,518 S.F. Decomposed Granite .40 20,607 .34 17,516.12 .40 20,607.20
9 3,016 L.F. Redwood Header 2.50 7,540 2.20 6,635.20 2.3825 7,185.62
10 1,405 S.F. Concrete Paving 2.50 3,513 2.75 3,863.75 4.32 6,069.60
11 Lump Sum Parking Lot 37,600 34,900 L.S. 36,396
12 Lump Sum Parking Lot Striping 300 750 240
13 Lump Sum Chain Link Fencing 10,200 12,200 L.S. 13,770
)14 18,650 S.F. Skinned Infield .40 7,460 .63 11,749.50 .28 5,222
15 500 S.F. Unit Paver 5.50 2,750 6.00 3,000 8.00 4,000
16 3 Ea. Drinking Fountains 175. 525 1,375. 4,125 .481.00 1,443
17 Lump Sum Bollards 600 1,000 L.S. 884
18 Lump Sum Gopher Control 3,500 3,670 L.S. 1,773
19 Lump Sum Irrigation 35,000 34,900 L.S. 50,995
20 Lump Sum Irrigation Controller 2,000 2,085 L.S. 2,682
Page 2
BID SUMMARY
CONGRESS SPRINGS PARK PROJECT
BUKTENICA ESTIMATE MUNKDALE QUATMAN
CONTRACT UNIT UNIT UNIT
ITEM QUANTITY UNIT ITEM PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
21 Lump Sum Tennis Posts 850 1,200 L.S. 1,686
22 21,000 S.F. Athletic Courts 1.35 28,350 2.00 42,000 2.39 50,190
23 Lump Sum Chain Link Fencing
at Tennis Courts 7,120 9,300 9,634
24 2 Ea. Basketball Backstop 2000. 4,000 900.00 1,800 943.50 1,887
25 2 Ea. Post Sleeves 100.00 200 175.00 350 106.00 412
26 712 L.F. Redwood Header 2.50 1,780 2.50 1,780 3.50 2,492
27 •5 Ea. Re -use Picnic
Tables 70.00 350 60.00 300 81.20 406
28 2 Ea. Picnic Tables 450.00 900 500.00 1,000 615.00 1,230
29 2 Ea. Re -use BBQ Grills 53.00 106 60.00 120 101.00 202
30 10 Ea. Re -use Double
Benches 100.00 1,000 180.00 .1,800 201.80 2,018
31 6 Ea. Re -use Square
Benches 50.00 300 80.00 480 201.80 1,210.80
32 2 Ea. Re -use Bike Racks 35.00 70 60.00 120 217.50 435
33 4 Ea. Re -use Bleacher 100.00 400 275.00 1,100 300.00 1,200
34 4 Ea. Re -use Player's
Bench 60.00 240 90.00 360 335.50 1,340
35 4 Ea. Player's Bench 330.00 1,320 235.00 940 226.00 904
36 2 Ea. Re -use Backstop 500.00 1,000 1,760.00 3,520 1,312.00 2,624
37 3 Ea. Pedestal Bench 400.00 1,200 400.00 1,200 378.00 1,134
38 82 Ea. Trees 15 gal. 100.00 8,200 75.00 6,900 58.90 5,418.80
39 39 Ea. Trees Transplanted 30.00 1,170 110.00 4,290 504.00 19,656
BID SUMMARY
CONGRESS SPRINGS PARK PROJECT
Page 3 BUKTENICA ESTIMATE MUNKDALE QUATMAN
CONTRACT UiIT UNIT UNNIT
I;REM QUANTITY UNIT ITEM PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
40 2 Ea. Vines 5 gal. 25.00 50 35.00 70 20.00 40
41 5350 S.F. Groundcover .45 2,408 .54 2,889 .64 3,424
42 10 C.Y. Fir Bark Mulch 40.00 400 40.00 400 53.70 537
43 190,510 S.F. Lawn from seed .10 19,501 .17 33,767.10 .115 22,842.45
44 Lump Sum Restroom /Concession
Building 85,000 165,000 L.S. 221,003
45 Lump Sum Wood Fence at Tot Lot 400 550 L.S. 432..
TOTAL BASE BID 370,623 528,378.07 719,874.27
ALTERNATE BID
1 Lump Sum Demolition at Field A 1,100 2,200 L.S. 10,476
2. 36,510 Rough Grade Field A .05 1,826 4,700 .90 32,859
.02 1,745 .02 1,745
3 87,250 Fine Grade Field A .09 7,853
1 4 22,150 S.F: Skinned Infield .40 9,004 .60 13,506 .28 6,302.80
5 64,740 S.F. Lawn from seed .10 6,474 .17 11,507 .115 7,445.10
6 Lump Sum Irrigation
Alternate "C" 1,750 1,535 L.S. 6,663
7 Lump Sum Irrigation
Alternate "D" 1,200 1,300 L.S. 2,863
8 Lump Sum Delete Hood /Ventilator
System at Bldg. 2,000 750 L.S. 1,620
ALTERNATE BID
BID SUMMARY
CONGRESS SPRINGS PARK PROJECT
Page 4
BUKTENICA ESTIMATE MUNKDALE QUATMAN
CONTRACT Ui1IT UNIT UNJIT
ITTEM QUANTITY UNIT ITEM PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
9 Lump Sum Substitution of
Electrical Service
to grill and Water
Heater +500 400 L.S. 1,620
10 Lump Sum Substitution of
Concrete curb in
Parking Lot +2,860 8,700 L.S. 5,065
11 Lump Sum Irrigation Controller
Alternate "B" 9,000 6,900 L.S. 2,682
TOTAL BASE BID 370,623 528,378.07 719,874.27
TOTAL ALTERNATE #1 1,100 2,200 10,476
TOTAL ALTERNATE #2 1,826 4,700 32,859
TOTAL ALTERNATE #3 7,853 1,745 1,745
TOTAL ALTERNATE #4 9,004 13,506 6,302
TOTAL ALTERNATE #5 6,474 11,005.80 7,445.10
TOTAL ALTERNATE #6 1,750 1,535 6,663
TOTAL ALTERNATE #7 1,200 1,300 2,863
TOTAL ALTERNATE #8 2,000 750 1,620
TOTAL ALTERNATE #9 500 400 1,620
TOTAL ALTERNATE #10 2,860 8,700 5,065
TOTAL ALTERNATE #11 9,000 6,900 2,682
Add
Water meter and line to W.M.
Gas meter and line to G.M.