Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
06-02-2010 CITY COUNCIL packet
AGENDA SPECIAL MEETING SARATOGA CITY COUNCIL JUNE 2 2010 SPECIAL MEETING —5:30 P.M. ADMINISTRATIVE CONFERENCE ROOM, 13777 FRUITVALE AVENUE. CALL MEETING TO ORDER — 5:30 P.M. REPORT OF CITY CLERK ON POSTING OF AGENDA (Pursuant to Gov't. Code 54954.2, the agenda for this meeting was properly posted on May 27, 20 10) ORAL COMMUNICATIONS ON NON - AGENDIZED ITEMS Any member of the public will be allowed to address the City Council for up to three (3) minutes on matters not on this agenda. The law generally prohibits the council from discussing or taking action on such items. However, the Council may instruct staff accordingly regarding Oral Communications under Council Direction to Staff. COUNCIL DIRECTION TO STAFF Instruction to Staff regarding actions on current Oral Communications. ADJOURN TO CLOSED SESSION — 5:30PM ANNOUNCEMENT OF CLOSED SESSION CONFERENCE — REAL PROPERTY NEGOTIATION (Gov't Code Section 54956.8): Wildwood Way Agency Negotiator: Dave Anderson, City Manager and John Cherbone, Public Works Director CALL JOINT MEETING TO ORDER — 6:00 P.M. Joint Meeting with Montalvo Arts & Board Members Recommended Action: Informational only. ADJOURNMENT In accordance with the Ralph M. Brown Act, copies of the staff reports and other materials provided to the City Council by City staff in connection with this agenda are available at the office of the Community Development Department Director at 13777 Fruitvale Avenue, Saratoga, CA 95070. Note that copies of materials distributed to the City Council concurrently with the posting of the agenda are also available on the City Website at www.sarato Any materials distributed by staff after the posting of the agenda are made available for public review at the office of the City Clerk at the time they are distributed to the City Council. In Compliance with the Americans with Disabilities Act, if you need assistance to participate in this meeting, please contact the City Clerk at 4081868 -1269. Notification 24 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. [28 CFR 35.102 - 35.104 ADA title II] Certificate of Posting of Agenda: I, Ann Sullivan, City Clerk for the City of Saratoga, declare that the foregoing agenda for the meeting of the City Council was posted on May 27, 2010, at the City of Saratoga, 13777 Fruitvale Ave., Saratoga, CA 95070 and was available for public review at that location. The agenda is also available on the City's website at www.saratoga. ca. us Signed this 27` day of May 2010 at Saratoga, California. Ann Sullivan, CMC City Clerk Table of Contents Agenda..... ..............................3 Commendations Honoring Five Outgoing Youth Commissioners Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Commendation - Baker . . . . . . . . . . . . . . . . . . . . . . 10 Commendation - Fatemi . . . . . . . . . . . . . . . . . . . . . . 11 Commendation - Rao . . . . . . . . . . . . . . . . . . . . . . . 12 Commendation - Rees . . . . . . . . . . . . . . . . . . . . . . . 13 Commendation - Tkalcevic . . . . . . . . . . . . . . . . . . . . 14 Appointment of Eight Youth Commissioners and Oath of Office Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 Commendation Honoring the Saratoga High School Chess Team Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Commendation . . . . . . . . . . . . . . . . . . . . . . . . . .29 Commendation Honoring Bob Hopkins and the "Soccer for Kids with Special Needs" Program Staff report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 Commendation . . . . . . . . . . . . . . . . . . . . . . . . . .32 City Council Meeting Minutes — May 19, 2010 Staff report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Minutes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34 Treasurer's Report for the Month Ended April 30, 2010 Treasurer's Report for the Month Ended April 30, 2010. . . . . . 47 Review of Accounts Payable Check Registers AP Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . 52 05/13/10 Check Register . . . . . . . . . . . . . . . . . . . . . 54 05/20/10 Check Register . . . . . . . . . . . . . . . . . . . . . 59 Adoption of Fiscal Year 2010/11 Operating & Capital Budget and the Environmental Impact Assessment for new CIP projects Budget Adoption . . . . . . . . . . . . . . . . . . . . . . . . . . 63 Environmental Assessment Report . . . . . . . . . . . . . . . . 72 Fiscal Year 2010/11 Gann Appropriation Limit Gann Limit Report . . . . . . . . . . . . . . . . . . . . . . . . . 73 Resolution Calling the General Municipal Election — November 2, 2010 Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77 Resolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80 ROV Calendar . . . . . . . . . . . . . . . . . . . . . . . . . . . 82 Legal Ad . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84 Transportation Development Act (TDA) Article 3 Application for the Saratoga Avenue Walkway Project. Staff report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85 Resolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87 VoIP Telecommunication Agreement 1 Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90 Attachment A - ShoreTel features list . . . . . . . . . . . . . . . 95 Attachment B - Breakdown of ShoreTel bundle pricing . . . . . . 98 Budget Resolution . . . . . . . . . . . . . . . . . . . . . . . . . 99 Side Letter of Agreement between the Saratoga Management . . . . . . 285 Organization and the City of Saratoga . . . . . . 286 Staff report & resolution . . . . . . . . . . . . . . . . . . . . . . 100 City Manager Voluntary Benefits Waiver Staff report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104 Attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . .105 Landscaping & Lighting Assessment District LLA -1 - Public Hearing, Approval of Engineer's Report, and Confirmation of Assessments for FY 10 -11 Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107 1. Resolution Confirming Assessments .. . . . . . . . . . . . . . 109 2. Engineer's Report . . . . . . . . . . . . . . . . . . . . . . . . 112 Resolution Ordering the Abatement of a Public Nuisance by Removal of Hazardous Vegetation (Brush) Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 255 Resolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 258 SCC Fire Letter . . . . . . . . . . . . . . . . . . . . . . . . . . 259 Legal Ad . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 261 Commencement Report . . . . . . . . . . . . . . . . . . . . . . 262 Email from Citizen White . . . . . . . . . . . . . . . . . . . . . 265 Initiation of Annexation of an approximately 2.68 (gross) square foot parcel (APN 503 -80 -004) located at 22480 Mount Eden Road. Subsequent annexation proceedings will consider a pre - annexation agreement, lot merger, Williamson Act agreement, zoning amendment (AP -OS overlay), and a use permit with variation from standards for the owner's adjacent 35 acre parcel. Staff Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 276 Resolution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 282 List of Services Report . . . . . . . . . . . . . . . . . . . . . . 283 Proposed Lot Merger and Annexation Map . . . . . . . . . . . . 284 Trail Easement Map . . . . . . . . . . . . . . . . . . . . . . . . 285 Floor Area and Lot Coverage Table . . . . . . . . . . . . . . . . 286 P AGENDA REGULAR MEETING SARATOGA CITY COUNCIL WEDNESDAY, JUNE 2 2010 REGULAR MEETING — 7:00 P.M. — CIVIC THEATER/COUNCIL CHAMBERS AT 13777 FRUITVALE AVENUE PLEDGE OF ALLEGIANCE ROLL CALL REPORT OF CITY CLERK ON POSTING OF AGENDA (Pursuant to Gov't. Code 54954.2, the agenda for this meeting was properly posted on May 27, 20 10) COMMUNICATIONS FROM COMMISSIONS & PUBLIC Oral Communications on Non- Aundized Items Any member of the public will be allowed to address the City Council for up to three (3) minutes on matters not on this agenda. The law generally prohibits the council from discussing or taking action on such items. However, the Council may instruct staff accordingly regarding Oral Communications under Council Direction to Staff. Oral Communications - Council Direction to Staff Instruction to Staff regarding actions on current Oral Communications. Communications from Boards and Commissions Council Direction to Staff Instruction to Staff regarding actions on current Communications from Boards & Commissions. ANNOUNCEMENTS CEREMONIAL ITEMS Commendations Honoring Five Outgoing Youth Commissioners Recommended action Present commendations. 2. Appointment of Eight Youth Commissioners and Oath of Office Recommended action Adopt the attached resolution appointing eight (8) members to the Youth Commission and direct the City Clerk to administer the Oath of Office. Commendation Honoring the Saratoga High School Chess Team Recommended action 3 Read and present commendation. 4. Commendation Honoring Bob Hopkins and the "Soccer for Kids with Special Needs" Program Recommended action Read and present commendation. SPECIAL PRESENTATIONS CONSENT CALENDAR The Consent Calendar contains routine items of business. Items in this section will be acted in one motion, unless removed by the Mayor or a Council member. Any member of the public may speak to an item on the Consent Calendar at this time, or request the Mayor remove an item from the Consent Calendar for discussion. Public Speakers are limited to three (3) minutes. City Council Meeting Minutes — May 19, 2010 Recommended action Approve minutes. 6. Treasurer's Report for the Month Ended April 30, 2010 Recommended action Review and accept the Treasurer's Report for the month ended April 30, 2010. 7. Review of Accounts Payable Check Registers Recommended action That the City Council review and accept the Check Registers for the following Accounts Payable payment cycles: May 13, 2010 May 20, 2010 8. Adoption of Fiscal Year 2010/11 Operating & Capital Budget and the Environmental Impact Assessment for new CIP projects Recommended action 1. Adopt resolution approving the Proposed FY 2010/11 Operating and Capital Budgets, directing staff to incorporate within the final adopted budget any changes related to minor corrections, carryforward appropriations, refined estimates, grant approvals, claim reimbursements, pass - through appropriations, or additional direction from Council upon adoption of the budget. 2. Adopt attached Environmental Impact Assessment for new projects included in the FY 2010/11 CIP update. 9. Fiscal Year 2010/11 Gann Appropriation Limit Recommended action Adopt resolution approving the Gann Appropriations Limit for FY 2010/11 10. Resolution Calling the General Municipal Election — November 2, 2010 Recommended action That City Council adopts the Resolution Calling the General Municipal Election for n November 2, 20 10. 11. Transportation Development Act (TDA) Article 3 Application for the Saratoga Avenue Walkway Project. Recommended action Adopt resolution supporting the Metropolitan Transportation Commission's Transportation Development Act Article 3 Pedestrian/Bicycle Grant Application for the Saratoga Avenue Walkway Project. 12. VOIP Telecommunication Agreement Recommended action 1. Accept report and direct staff to enter into an agreement with ZAG Technical Services / 3GC Group to replace the existing PBX telecommunication system with a Voice over Internet Protocol (VoIP) telephone system for the main City Hall buildings, the Joan Pisani Community Center, the Corporation Yard, the Saratoga Area Senior Coordinating Council and the Saratoga Prospect Center. 2. Adopt Budget Resolution to transfer $55,000 from the IT Equipment Replacement Fund to the CIP Administrative Fund. 13. Side Letter of Agreement between the Saratoga Management Organization and the City of Saratoga Recommended action Adopt the resolution approving the Side Letter of Agreement between the Saratoga Management Organization (SMO) and the City of Saratoga suspending members' car allowance for fiscal year 2010 -2011. 14. City Manager Voluntary Benefits Waiver Recommended action Authorize the Mayor to sign a letter agreement documenting the City Manager's offer to voluntarily waive certain benefits specified in his employment agreement. PUBLIC HEARINGS Members of the public may comment on any item for up to three minutes. Items requested for continuance are subject to Council's approval at the Council meeting 15. Landscaping & Lighting Assessment District LLA -1 - Public Hearing, Approval of Engineer's Report, and Confirmation of Assessments for FY 10 -11 Recommended action Move to adopt the Resolution Ordering the Improvements and Confirming the Diagram and Assessments for FY 10 -11. 16. Resolution Ordering the Abatement of a Public Nuisance by Removal of Hazardous Vegetation (Brush) Recommended action Open public hearing; listen to public testimony; and close public hearing. Adopt resolution overruling objections and ordering hazardous vegetation abatement (brush). 5 OLD BUSINESS NEW BUSINESS 17. Initiation of Annexation of an approximately 2.68 (gross) acres parcel (APN 503 -80- 004) located at 22480 Mount Eden Road. Subsequent annexation proceedings will consider a pre- annexation agreement, lot merger, Williamson Act agreement, zoning amendment (AP -OS overlay), and a use permit with variation from standards for the owner's adjacent 35 acre parcel. Recommended action Approve the attached Resolution thereby initiating annexation proceedings for 22480 Mount Eden Road. ADHOC & AGENCY ASSIGNMENT REPORTS Mayor Kathleen King ABAG County HCD Policy Committee Hakone Foundation Executive Committee West Valley Flood Control Zone & Watershed Advisory Committee SCC Cities Association Selection Committee Santa Clara County Emergency Council West Valley Mayors and Managers Association Vice Mayor Jill Hunter Hakone Foundation Board Historical Foundation Library Joint Powers Association SASCC Sister City Liaison Village AdHoc Councilmember Howard Miller City School Ad -Hoc Chamber of Commerce Council Finance Committee Highway 9 Adhoc KSAR Santa Clara County Cities Association Board West Valley Solid Waste Joint Powers Authority West Valley Transportation Authority PAC Councilmember Chuck P City School Ad -Hoc Santa Clara Valley Water District Commission Saratoga Ministerial Association West Valley Sanitation District Council Finance Committee 0 CITY COUNCIL ITEMS CITY MANAGER'S REPORT ADJOURNMENT In accordance with the Ralph M. Brown Act, copies of the staff reports and other materials provided to the City Council by City staff in connection with this agenda are available at the office of the Community Development Department Director at 13777 Fruitvale Avenue, Saratoga, CA 95070. Note that copies of materials distributed to the City Council concurrently with the posting of the agenda are also available on the City Website at www.sarato�4a.ca.us Any materials distributed by staff after the posting of the agenda are made available for public review at the office of the City Clerk at the time they are distributed to the City Council. In compliance with the Americans with Disabilities Act (ADA), if you need special assistance to participate in this meeting, please contact the City Clerk at (408) 868 -1269. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting (28 CFR 35.102 - 35.104 ADA Title II) Certificate of Posting of Agenda: I, Ann Sullivan, City Clerk for the City of Saratoga, declare that the foregoing agenda for the meeting of the City Council for the City of Saratoga was posted on May 27, 2010, at the City of Saratoga, 13777 Fruitvale Ave., Saratoga, CA 95070 and was available for public review at that location. The agenda is also available on the City's website at www. sarato�a. ca. us Signed this 27` day of May 2010 at Saratoga, California. Ann Sullivan, CMC City Clerk 7 NOTE: To view current or previous City Council meetings anytime, go to the City Video Archives at www.saratoaa.ca.us , _AV 6/2 6/16 7/7 7/21 CITY OF SARATOGA CITY COUNCIL MEETING CALENDAR 2010 Regular Meeting — Joint meeting with Montalvo Arts Regular Meeting — Joint Meeting with HOA Presidents Regular Meeting — Regular Meeting — Joint Meeting with SASCC SUMMER RECESS — NO COUNCIL MEETING SUMMER RECESS — NO COUNCIL MEETING 9/1 Regular Meeting — Joint Meeting with Historical Foundation & Heritage Preservation Comm. 9/15 Regular Meeting — Joint meeting with Assemblymember Jim Beall 10/6 Regular Meeting —Joint meeting with West Valley Board of Trustees 10/20 Regular Meeting — Joint Meeting with Traffic Safety Commission 11/3 Regular Meeting — Joint meeting with Saratoga Ministerial Association 11/17 Regular Meeting - Joint Meeting with Hakone Foundation 11/30 Council Reorganization 12/1 Regular Meeting - Joint Meeting with Library Commission and Friends of the Saratoga Libraries 12/15 Regular Meeting - SARATOGA CITY COUNCIL MEETING DATE: June 2, 2010 AGENDA ITEM: ORIGINATING DEPT: City Manager's Office CITY MANAGER: PREPARED BY: DEPT HEAD: Ann Sullivan. City Clerk Dave Anderson. City Manager SUBJECT: Commendations Honoring Five Outgoing Youth Commissioners RECOMMENDED ACTION: Present commendations. REPORT SUMMARY: Attached are commendations honoring outgoing Youth Commissioners: Jacob Baker, Tara Fatemi, Sammy Rao, Elena Rees, and Natalie Tkalcevic, FISCAL IMPACTS: N/A CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: N/A ALTERNATIVE ACTION: N/A FOLLOW UP ACTION: N/A ADVERTISING, NOTICING AND PUBLIC CONTACT: Pursuant to Government Code 54954.2, this item was properly posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting. ATTACHMENTS: Attachments — Copy of Commendations. 9 CITY OF SARATOGA RESOLUTION OF THE CITY COUNCIL COMMENDING "JACOB BAKER" WHEREAS, Jacob Baker was first appointed to the Saratoga Youth Commission in June 2007; and WHEREAS, Jacob has demonstrated his leadership skills and capabilities while participating on the following: 2009 -2010: Chair & Film Fest Committee 2008 -2009: Film Fest & Website Committee 2007 -2008: Website & Lecture Committee WHEREAS, the City Council of the City of Saratoga is proud of the citizens who contribute their time and talent to our community. NOW, THEREFORE, BE IT RESOLVED, that Jacob Baker is hereby commended and thanked for his hard work and dedication on the Youth Commission; and BE IT FURTHER RESOLVED that the Saratoga City Council and the Saratoga residents wish him well in the future. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA on this 2 nd day of June 2010. Kathleen M. King, Mayor City of Saratoga CITY OF SARATOGA RESOLUTION OF THE CITY COUNCIL COMMENDING "TARA FATEMI" WHEREAS, Tara Fatemi was first appointed to the Saratoga Youth Commission in June 2008; and WHEREAS, Tara has demonstrated her leadership skills and capabilities while participating on the following: 2009 -2010: Blog Committee 2008 -2009: Concert Committee WHEREAS, the City Council of the City of Saratoga is proud of the citizens who contribute their time and talent to our community. NOW, THEREFORE, BE IT RESOLVED, that Tara Fatemi is hereby commended and thanked for her hard work and dedication on the Youth Commission; and BE IT FURTHER RESOLVED that the Saratoga City Council and the Saratoga residents wish her well in the future. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA on this 2 nd day of June 2010. Kathleen M. King, Mayor City of Saratoga CITY OF SARATOGA RESOLUTION OF THE CITY COUNCIL COMMENDING "SAMANTHA RAO" WHEREAS, Samantha Rao was first appointed to the Saratoga Youth Commission in June 2008; and WHEREAS, Sammy has demonstrated her leadership skills and capabilities while participating on the following: 2009 -2010: Vice -Chair & In the Park Committee 2008 -2009: Oral Survey & Film Fest Committees WHEREAS, the City Council of the City of Saratoga is proud of the citizens who contribute their time and talent to our community. NOW, THEREFORE, BE IT RESOLVED, that Samantha Rao is hereby commended and thanked for her hard work and dedication on the Youth Commission; and BE IT FURTHER RESOLVED that the Saratoga City Council and the Saratoga residents wish her well in the future. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA on this 2 nd day of June 2010. Kathleen M. King, Mayor City of Saratoga CITY OF SARATOGA RESOLUTION OF THE CITY COUNCIL COMMENDING "ELENA REES" WHEREAS, Elena Rees was first appointed to the Saratoga Youth Commission in June 2008; and WHEREAS, Elena has demonstrated her leadership skills and capabilities while participating on the following: 2009 -2010: Hunger Banquet Committee 2008 -2009: Invisible Children WHEREAS, the City Council of the City of Saratoga is proud of the citizens who contribute their time and talent to our community. NOW, THEREFORE, BE IT RESOLVED, that Elena Rees is hereby commended and thanked for her hard work and dedication on the Youth Commission; and BE IT FURTHER RESOLVED that the Saratoga City Council and the Saratoga residents wish her well in the future. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA on this 2 nd day of June 2010. Kathleen M. King, Mayor City of Saratoga CITY OF SARATOGA RESOLUTION OF THE CITY COUNCIL COMMENDING "NATALIE TKALCEVIC" WHEREAS, Natalie Tkalcevic was first appointed to the Saratoga Youth Commission in June 2008; and WHEREAS, Natalie has demonstrated her leadership skills and capabilities while participating on the following: 2009 -2010: Hunger Banquet Committee 2008 -2009: Invisible Children and Film Fest Committee WHEREAS, the City Council of the City of Saratoga is proud of the citizens who contribute their time and talent to our community. NOW, THEREFORE, BE IT RESOLVED, that Natalie Tkalcevic is hereby commended and thanked for her hard work and dedication on the Youth Commission; and BE IT FURTHER RESOLVED that the Saratoga City Council and the Saratoga residents wish her well in the future. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA on this 2 nd day of June 2010. Kathleen M. King, Mayor City of Saratoga SARATOGA CITY COUNCIL 1 MEETING DATE: June 2, 2010 AGENDA ITEM: DEPARTMENT: City Manager's Office CITY MANAGER: Dave Anderson PREPARED BY: Ann Sullivan, City Clerk DIRECTOR: SUBJECT: Appointment of Eight Youth Commissioners and Oath of Office RECOMMENDED ACTION: Adopt the attached resolution appointing eight (8) members to the Youth Commission and direct the City Clerk to administer the Oath of Office. REPORT SUMMARY: The City Council recently conducted interviews to fill eight (8) vacancies on the Youth Commission resulting from expired terms of Jacob Baker, Aditya Dev, Kia Fariba, Tara Fatemi, Kaitlin Finch, Sammy Rao, Elena Rees, and Natalie Tkalcevic. Council appointed Jane Chang, Somya Khare, Vikas Nookala, Sierra Smith, Anu Sreedhara, and re- appointed Aditya Dev, Kia Fariba, and Kaitlin Finch to the Youth Commission. The terms for these commissioners will be July 2010 to July 2012. In addition, Council created one additional new commission position, that of "Alternate ", and appointed Mercedes Chien to fill the Alternate position. This position would resume the position of a current commissioner in the event that a current commissioner was unable to complete his /her term. The term for the "Alternate" position will be July 2010 to July 2012. Upon direction from the City Council the Oath of Office will be administered by the City Clerk and signed by the new Commissioners. The administered Oaths of Office will be effective July 1, 2010. FISCAL IMPACTS: N/A CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: Appointments will not be made to the Youth Commission. ALTERNATIVE ACTION: N/A 15 FOLLOW UP ACTION: Update City's Official Roster. ADVERTISING, NOTICING AND PUBLIC CONTACT: Pursuant to Government Code 54954.2, this item was properly posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting. ATTACHMENTS: Attachment — Resolution of Appointment Attachments — Oath of Office (8) 16 RESOLUTION NO. 10 — A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA APPOINTING FIVE NEW MEMBERS AND THE REAPPOINTMENT OF THREE MEMBERS TO THE YOUTH COMMISSION WHEREAS, eight vacancies were created on the Youth Commission resulting from the expired terms of Jacob Baker, Aditya Dev, Kia Fariba, Tara Fatemi, Kaitlin Finch, Sammy Rao, Elena Reese and Natalie Tkalcevic; and WHEREAS, Commissioners Aditya Dev, Kia Fariba, and Kaitlin Finch, were eligible for re- appointment; and WHEREAS, Council created one new Youth Commission position — "Alternate ", on May 17, 2010; and WHEREAS, a notice of vacancy was posted, applications were received, interviews have been conducted, and it is now appropriate to fill the vacancies. NOW, THEREFORE, the City Council of the City of Saratoga hereby resolves that the following appointments were made for terms beginning July 2010 and expiring: Commissioner Expiration Date Aditya Dev(reapp ointment 07/2012 Kia Faria (reappointment) 07/2012 Kaitlin Finch (reappointment) 07/2012 Jane Chan 07/2012 Som a Khare 07/2012 Vikas Nookala 07/2012 Sierra Smith 07/2012 Anu Sreedhara 07/2012 Mercedes Chien Alternate The above and foregoing resolution was passed and adopted at a Regular meeting of the Saratoga City Council held on the 2nd day of June 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN Kathleen M. King, Mayor ATTEST: 17 Ann Sullivan, City Clerk STATE OF CALIFORNIA COUNTY OF SANTA CLARA I do solemnly swear (or affirm) that I will support and defend the Constitution of the United States and the Constitution of the State of California against all enemies, foreign and domestic; that I will bear true faith and allegiance to the Constitution of the United States and the Constitution of the State of California; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will faithfully discharge the duties upon which I am about to enter. Aditya Dev Commissioner Subscribed and sworn to before me on This 2nd day of June 2010. Ann Sullivan, CMC City Clerk in STATE OF CALIFORNIA COUNTY OF SANTA CLARA I do solemnly swear (or affirm) that I will support and defend the Constitution of the United States and the Constitution of the State of California against all enemies, foreign and domestic; that I will bear true faith and allegiance to the Constitution of the United States and the Constitution of the State of California; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will faithfully discharge the duties upon which I am about to enter. Kia Fariba Commissioner Subscribed and sworn to before me on This 2nd day of June 2010. Ann Sullivan, CMC City Clerk 19 STATE OF CALIFORNIA COUNTY OF SANTA CLARA I do solemnly swear (or affirm) that I will support and defend the Constitution of the United States and the Constitution of the State of California against all enemies, foreign and domestic; that I will bear true faith and allegiance to the Constitution of the United States and the Constitution of the State of California; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will faithfully discharge the duties upon which I am about to enter. Kaitlin Finch Commissioner Subscribed and sworn to before me on This 2nd day of June 2010. Ann Sullivan, CMC City Clerk 20 STATE OF CALIFORNIA COUNTY OF SANTA CLARA I do solemnly swear (or affirm) that I will support and defend the Constitution of the United States and the Constitution of the State of California against all enemies, foreign and domestic; that I will bear true faith and allegiance to the Constitution of the United States and the Constitution of the State of California; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will faithfully discharge the duties upon which I am about to enter. Jane Chang Commissioner Subscribed and sworn to before me on This 2nd day of June 2010. 21 Ann Sullivan, CMC City Clerk STATE OF CALIFORNIA COUNTY OF SANTA CLARA I do solemnly swear (or affirm) that I will support and defend the Constitution of the United States and the Constitution of the State of California against all enemies, foreign and domestic; that I will bear true faith and allegiance to the Constitution of the United States and the Constitution of the State of California; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will faithfully discharge the duties upon which I am about to enter. Somya Khare Commissioner Subscribed and sworn to before me on This 2nd day of June 2010. Ann Sullivan, CMC City Clerk 22 STATE OF CALIFORNIA COUNTY OF SANTA CLARA I do solemnly swear (or affirm) that I will support and defend the Constitution of the United States and the Constitution of the State of California against all enemies, foreign and domestic; that I will bear true faith and allegiance to the Constitution of the United States and the Constitution of the State of California; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will faithfully discharge the duties upon which I am about to enter. Vikas Nookala Commissioner Subscribed and sworn to before me on This 2nd day of June 2010. Ann Sullivan, CMC City Clerk 23 STATE OF CALIFORNIA COUNTY OF SANTA CLARA I do solemnly swear (or affirm) that I will support and defend the Constitution of the United States and the Constitution of the State of California against all enemies, foreign and domestic; that I will bear true faith and allegiance to the Constitution of the United States and the Constitution of the State of California; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will faithfully discharge the duties upon which I am about to enter. Sierra Smith Commissioner Subscribed and sworn to before me on This 2nd day of June 2010. Ann Sullivan, CMC 24 City Clerk STATE OF CALIFORNIA COUNTY OF SANTA CLARA I do solemnly swear (or affirm) that I will support and defend the Constitution of the United States and the Constitution of the State of California against all enemies, foreign and domestic; that I will bear true faith and allegiance to the Constitution of the United States and the Constitution of the State of California; that I take this obligation freely, without any mental reservation or purpose of evasion; and that I will faithfully discharge the duties upon which I am about to enter. Anu Sreedhara Commissioner Subscribed and sworn to before me on This 2nd day of June 2010. 25 Ann Sullivan, CMC City Clerk 26 ti � SARATOGA CITY COUNCIL 1 MEETING DATE: June 2, 2010 AGENDA ITEM: ORIGINATING DEPT: City Manager's Office CITY MANAGER: Dave Anderson PREPARED BY: Ann Sullivan, City Clerk DEPT HEAD: Dave Anderson SUBJECT: Commendation Honoring the Saratoga High School Chess Team RECOMMENDED ACTION: Read and present commendation. REPORT SUMMARY: The attached commendation recognizes and commends the Saratoga High School Chess Team. The Chess Team competed in the Northern California CalChess State Chess Championship Tournament on April 17 and 18, 2010, and won the team championship for the varsity section. The Chess Championship was the sixth consecutive championship for the Saratoga High School Chess Team, which is a record for the State of California. National Master Michael Aigner was the professional coach for the team and trained them in chess technique and also imparted on the team a deep appreciation of the benefits of strategic thinking, hard work and training for all efforts in life. FISCAL IMPACTS: N/A CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: N/A ALTERNATIVE ACTION: N/A FOLLOW UP ACTION: None 27 ADVERTISING, NOTICING AND PUBLIC CONTACT: Pursuant to Government Code 54954.2, this item was properly posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting. ATTACHMENTS: Commendation COMMENDATION OF THE CITY COUNCIL OF THE CITY OF SARATOGA HONORING THE SARATOGA HIGH SCHOOL CHESS TEAM WHEREAS, Six members of the Saratoga High School Chess Team competed at the CalChess State Chess Championship on April 17 and 18 2010 and won the team championship for the varsity section; and WHEREAS, this Chess Championship was the sixth consecutive championship for the Saratoga High School Chess Team which is a record for the State; and WHEREAS, the Saratoga High School Chess Team competed in chess competitions throughout the 2009/2010 school year and won the Santa Clara County high school chess championship, with four of the team members placing in the top five finishers, and came in 2nd place in the regional high school league chess championship; and WHEREAS, the team has been self - motivated and trained though out the year for this championship; and WHEREAS, National Master Michael Aigner was the professional coach for the team and trained them in chess technique but also imparted on the team a deep appreciation of the benefits of strategic thinking, hard work and training for all efforts in life; and WHEREAS, in recognition thereof, it is appropriate to extend to them the special honors and highest commendations of the community of Saratoga. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga, does hereby congratulate and commend the members of the Saratoga High School Chess Team for this outstanding achievement. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA on this 2nd day of June 2010. Kathleen M. King, Mayor City of Saratoga ti � SARATOGA CITY COUNCIL 1 MEETING DATE: June 2, 2010 AGENDA ITEM: ORIGINATING DEPT: City Manager's Office CITY MANAGER: Dave Anderson PREPARED BY: Ann Sullivan, City Clerk DEPT HEAD: Dave Anderson SUBJECT: Commendation Honoring Bob Hopkins and the "Soccer for Kids with Special Needs" Program RECOMMENDED ACTION: Read and present commendation. REPORT SUMMARY: The attached commendation recognizes and commends Bob Hopkins for his dedication to bring the game of safe soccer to our special needs kids and recognizes and commends all the special kids that participate in the "Soccer for Kids with Special Needs" program. FISCAL IMPACTS: N/A CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: N/A ALTERNATIVE ACTION: N/A FOLLOW UP ACTION: None ADVERTISING, NOTICING AND PUBLIC CONTACT: Pursuant to Government Code 54954.2, this item was properly posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting. 30 ATTACHMENTS: Commendation 31 COMMENDATION OF THE CITY COUNCIL OF THE CITY OF SARATOGA HONORING "BOB HOPKINS" WHEREAS, Bob Hopkins has taken the dream of "Everyone Plays ", a philosophy of AYSO, and has made it a reality for hundreds of special needs kids who cannot participate safely in a mainstream soccer program. The local program "South Bay VIP Soccer ", www.southbayvipsoccer.org was started by the three AYSO regions covering Saratoga, Cupertino and West San Jose. Bob volunteered to be the administrator when it began in the Fall of 2003. He has successfully lead this program in both Fall and Spring seasons. This Fall will be his eighteenth season; and WHEREAS, many of the families of the players have been in the program since its inception and all have expressed deep gratitude that this is available for their children. Additionally, the VIP program has provided opportunities for the youth in the area to earn their community service requirements in a fun - filled and enriching program for these special players. We call our youth volunteers "Buddies" because they participate as a new friend and in many cases have developed strong bonds with the players and their families; and WHEREAS, families of players have said that the first day their child put on his or her uniform was one of the happiest days of their lives; and WHEREAS, all of this has been possible because of Bob Hopkins' volunteers who participate as buddies, coaches and helpers. Bob Hopkins is a special person whose energy, guidance, and dedication are second to none; and WHEREAS, the mission of the American Youth Soccer Organization VIP Program is to provide a quality soccer experience for individuals with physical or mental disabilities that make it difficult for them to successfully participate on mainstream soccer teams. Successful participation is defined by the player's enjoyment and the safety of all team members. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga does hereby recognize and commend Bob Hopkins for his dedication to bring the game of safe soccer to our special needs kids. BE IT FURTHER RESOLVED, that the City Council of the City of Saratoga does hereby recognize and commend all the special kids that participate in the "Soccer for Kids with Special Needs" program. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA on this 2nd day of June 2010. Kathleen M. King, Mayor City of Saratoga SARATOGA CITY COUNCIL 1 MEETING DATE: June 2, 2010 AGENDA ITEM: DEPARTMENT: City Manager's Office PREPARED BY: Ann Sullivan, City Clerk CITY MANAGER: Dave Anderson DIRECTOR: Dave Anderson SUBJECT: City Council Meeting Minutes — May 19, 2010 RECOMMENDED ACTION: Approve minutes. REPORT SUMMARY: Approve minutes as submitted for May 19, 2010 City Council Regular Meeting. FISCAL IMPACTS: N/A CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: N/A ALTERNATIVE ACTION: N/A FOLLOW UP ACTION: Retain minutes for legislative history. ADVERTISING, NOTICING AND PUBLIC CONTACT: Pursuant to Government Code 54954.2, this item was properly posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting. ATTACHMENTS: Attachment A — Minutes from May 19, 2010 City Council Regular Meeting. 33 MINUTES SARATOGA REGULAR CITY COUNCIL MEETING MAY 19, 2010 The City Council held a Joint Meeting with the Los Gatos - Saratoga Union High School District and Saratoga Union Elementary District in the Administrative Conference Room at 5:30 p.m. The City Council met in Closed Session in the Administrative Conference Room, 13777 Fruitvale Avenue, at 6:30 p.m. ANNOUNCEMENT OF CLOSED SESSION Conference with Legal Counsel — Existing Litigation: Government Code Section 54956.9 (a)): (1 case) City of Saratoga v. PG &E et al., (Santa Clara County Superior Court Case No.1- 08 -CV- 124267) MAYOR'S REPORT ON CLOSED SESSION Mayor King stated there was no reportable information from the Closed Session held prior to the Regular Council meeting. Mayor King called the Regular City Council meeting to order at 7:00 p.m. and lead the Pledge of Allegiance. ROLL CALL PRESENT: Councilmembers Chuck Page, Howard Miller, Vice Mayor Jill Hunter and Mayor Kathleen King ABSENT: Vacant (Susie Nagpal) ALSO Dave Anderson, City Manager PRESENT: Richard Taylor, City Attorney Ann Sullivan, City Clerk Barbara Powell, Assistant City Manager Mary Furey, Administrative Services Director John Cherbone, Public Works Director John Livingstone, Community Development Director Crystal Morrow, Administrative Analyst 11 REPORT OF CITY CLERK ON POSTING OF AGENDA Mayor Kathleen King reported that pursuant to Government Code Section 54954.2, the agenda for the meeting of May 19, 2010 was properly posted on May 13, 2010. 34 COMMUNICATIONS FROM BOARDS AND COMMISSIONS Mayor King noted the representatives from the Los Gatos - Saratoga Union High School District and Saratoga Union Elementary District would provide a report of their 5:30 p.m. joint meeting with the City Council at a later meeting in June. COUNCIL DIRECTION TO STAFF None at this time. ORAL COMMUNICATIONS ON NON - AGENDIZED ITEMS None COUNCIL DIRECTION TO STAFF None With the concurrence of the Council, Mayor King moved on to the Ceremonial Items. After the Ceremonial Items was completed, Mayor King moved on to the Announcement section of the agenda. ANNOUNCEMENTS Vice Mayor Hunter noted the Memorial Service in memory of Susie Ngpal will be held on May 31 at Villa Montalvo from 4PM to 6PM. Councilmember Page noted that due to limited parking at Villa Montalvo, a shuttle service would be available at West Valley College to Villa Montalvo. He added that a Blood Drive in honor of Councilmember Susie Nagpal was scheduled for June 8, 2010, from 12:OOPM to 6:OOPM at Saratoga Federated Church and appointments are required to donate blood. Appointments can be made online at www.redcrossblood.org or by calling the American Red Cross at 1- 800 - GIVE -LIFE. Councilmember Page also noted his wife's birthday was today and wished his wife a happy birthday. Mayor King noted that City Councils from many of the Santa Clara County cities have been reaching out to the Saratoga community conveying their condolences to the family of Councilmember Susie Nagpal. In addition, many of the cities are asking for a moment of silence at their respective council meetings and /or sending letters of condolences. CEREMONIAL ITEMS 1. COMMENDATION HONORING DEBI SNYDER — SARATOGA AREA SENIOR COORDINATING COUNCIL (SASCC) EMPLOYEE STAFF RECOMMENDATION 2 35 Read and present commendation. Mayor King read and presented the commendation to Debbie Snyder. 2. PROCLAMATION HONORING "NATIONAL FOSTER CARE — MONTH OF MAY 2010" STAFF RECOMMENDATION Read and present proclamation. Mayor King read and presented the proclamation to Lisa Traxler, a Saratoga foster parent. Ms. Traxler was accompanied by her foster child, Jamie. SPECIAL PRESENTATIONS 3. VTA GOVERNANCE PRESENTATION STAFF RECOMMENDATION Listen to a short presentation by Chris Moylan, Vice Mayor, City of Sunnyvale, on Valley Transportation Authority (VTA) Governance. Mayor King announced that Chris Moylan, Vice Mayor of the City of Sunnyvale, notified the City Clerk earlier on this day noting that he was cancelling his presentation. Mayor King moved on to the Consent Calendar section on the agenda. CONSENT CALENDAR No one requested to speak on any items on the Consent Calendar. 4. CITY COUNCIL MEETING MINUTES — MAY 5, 2010 STAFF RECOMMENDATION Approve minutes. PAGE/MILLER MOVED TO APPROVE CITY COUNCIL MEETING MINUTES — MAY 5, 2010. MOTION APPROVED 4 -0- Vacant. REVIEW OF ACCOUNTS PAYABLE CHECK REGISTERS STAFF RECOMMENDATION That the City Council review and accept the Check Registers for the following Accounts Payable payment cycles: April 29, 2010 May 06, 2010 36 PAGE/MILLER MOVED TO ACCEPT THE CHECK REGISTERS FOR THE FOLLOWING ACCOUNTS PAYABLE PAYMENT CYCLES: APRIL 29, 2010. MOTION PASSED 4 -0- Vacant. 6. ADOPTION OF ORDINANCE AMENDMENT TO CITY CODE ARTICLE 4 -5 MASSAGE ESTABLISHMENTS AND MASSAGE PRACTITIONERS STAFF RECOMMENDATION Staff recommends the Council waive the Second Reading and adopt the Ordinance amending the Massage Establishments and Massage Practitioners Ordinance related to City Code Article 4 -55. ORDINANCE NO. 278 PAGE/MILLER MOVED TO WAIVE THE SECOND READING AND ADOPT THE ORDINANCE AMENDING THE MASSAGE ESTABLISHMENTS AND MASSAGE PRACTITIONERS ORDINANCE RELATED TO CITY CODE ARTICLE 4 -55. MOTION PASSED 4 -0- Vacant. 7. ADOPTION OF ORDINANCE AMENDING THE ZONING REGULATIONS RELATED TO CITY CODE ARTICLE 15 -47 -WATER EFFICIENT LANDSCAPE ORDINANCE STAFF RECOMMENDATION Waive the Second Reading and adopt the Ordinance amending the Zoning Regulations related to City Code Article 15 -47 - Water Efficient Landscape Ordinance. ORDINANCE NO. 279 PAGE/MILLER MOVED TO WAIVE THE SECOND READING AND ADOPT THE ORDINANCE AMENDING THE ZONING REGULATIONS RELATED TO CITY CODE ARTICLE 15 -47 - WATER EFFICIENT LANDSCAPE ORDINANCE. MOTION PASSED 4 -0- Vacant. 8. HISTORICAL PARK LANDSCAPE IMPROVEMENT PROJECT — BUDGET AMENDMENT STAFF RECOMMENDATION Approve Budget Resolution. RESOLUTION NO. 10 -024 PAGE/MILLER MOVED TO APPROVE BUDGET RESOLUTION. MOTION PASSED 4 -0- Vacant. 9. CITYWIDE SIGNAL UPGRADE PROJECT PHASE I— AWARD OF CONSTRUCTION CONTRACT STAFF RECOMMENDATION 11 37 1. Move to declare Guerra Construction of San Jose to be the lowest responsible bidder on the project 2. Move to award a construction contract to Guerra Construction in the amount of $188,305 and authorize the City Manager to execute the same. 3. Move to authorize the staff to issues change orders to the contract up to $23,000. PAGE/MILLER MOVED TO 1.) DECLARE GUERRA CONSTRUCTION OF SAN JOSE TO BE THE LOWEST RESPONSIBLE BIDDER ON THE PROJECT; 2.) MOVE TO AWARD A CONSTRUCTION CONTRACT TO GUERRA CONSTRUCTION IN THE AMOUNT OF $188,305 AND AUTHORIZE THE CITY MANAGER TO EXECUTE THE SAME; AND 3.) AUTHORIZE THE STAFF TO ISSUES CHANGE ORDERS TO THE CONTRACT UP TO $23,000. MOTION PASSED 4 -0- Vacant. Mayor King suggested moving to Item 14 at this time. Council concurred. PUBLIC HEARINGS 10. FISCAL YEAR 2010/11 PROPOSED OPERATING & CAPITAL BUDGET PUBLIC HEARING STAFF RECOMMENDATION Conduct a public hearing on the proposed FY 2010/11 Operating & Capital Budget, and provide direction to staff for budget adoption on June 2, 2010. Mary Furey, Administrative Services Director, presented the staff report. Director Furey proceeded to provide a report on the proposed FY 2010/11 Operating Budget. She then continued to provide a report on the proposed Capital Improvements of the FY 2010/11 Budget and asked if Council had any specific questions regarding the proposed Capital Improvements. At this time, Mayor King announced she would recuse herself from Council discussion on the Canyon View storm drain item due to the fact that she lived within 500 feet of that item. Mayor King stated she would turn this portion of the meeting over to Vice Mayor Hunter for this specific item. Mayor King left the Dias and chambers at 9:06 p.m. Vice Mayor Hunter opened the public hearing for comment on the Canyon View Project in the Capital Improvement portion of the public hearing. No one requested to speak on this item. Vice Mayor Hunter closed the public hearing comment on this specific item. MILLER/PAGE MOVED TO APPROVE THE CANYON VIEW PROJECT ON THE PROPOSED FY 2010/11 OPERATING & CAPITAL BUDGET. MOTION PASSED 3 -0 -1 WITH MAYOR KING RECUSED and Vacant. Mayor King returned to the Dias to continue discussion on the remainder of the proposed FY 2010/11 Budget and Capital Improvements. Mayor King opened the public hearing and invited public comment on the remainder of the budget public hearing. The following people requested to speak on the remainder of the FY 2010/11 Budget and Capital Improvements: Ann Waltonsmith addressed the Council regarding the financial difficulties facing the Saratoga Area Senior Citizens Council ( SASCC) and asked Council to consider a challenge grant in the amount of $50,000 to assist with SASCC's financial needs. She noted that SASCC has prepared a letter to send to all Saratoga households asking for monetary support to help sustain SASCC's programs, adding that any funds the Council could provide would be used to urge citizens to match the granted funds. She concluded by thanking Council for their consideration of this request. Kathleen Casey requested to speak on this item. City Manager Dave Anderson responded to Ms. Casey's comments regarding the purchase a Mid Peninsula parcel of land. City Manager Dave Anderson responded to Ms. Casey's comments regarding Hakone Gardens. No one else requested to speak on this item. Mayor King closed the public comment period. Councilmember Miller thanked the staff for all their voluntary reductions in salary and work hours in order to present a balanced budget to the Council and noted he would support the proposed budget. Councilmember Page also thanked staff for their efforts to help present a balanced budget and noted he supported the proposed budget. Vice Mayor Hunter thanked the staff for all their efforts and appreciates the personal cuts staff has taken in order to present a balanced budget and noted she supports the proposed budget. Mayor King commended staff for all their voluntary reductions in hours and salary and noted she supports the proposed budget. Mayor King also commented on the $50,000 challenge grant request to support SASCC's programs and suggested that Council consider this request with the allocation of some funding from the undesignated funds in order to help SASCC raise additional funding through there challenge grant letter. I 39 Vice Mayor Hunter stated that $50,000 is a large monetary request and feels there should be a specific reason noted in the SASCC letter for what this money would be used for. Councilmember Page also felt a tangible reason should be noted as to what the requested funds would be used for. Councilmember Miller stated that he supported providing funding assistance to help SASCC maintain their services to the community; however, he felt that SASCC should provide a presentation at a future council meeting outlining their future plans in a more detailed manner. Councilmember Page recommended allocating $25,000 from Council's discretionary unallocated fund and another $5,000 from other funds for a total of $30,000. KING/MILLER MOVED TO SUPPORT A CHALLENGE GRANT OF $30,000 ALLOCATING $25,000 FROM THE CONTINGENCY FUND AND AN ADDITIONAL $5,000 FROM UNDESIGNATED FUNDS FOR A TOTAL OF $30,000 — A ONE DOLLAR FOR ONE DOLLAR CHALLENGE GRANT TO BE NOTED IN THE SASCC LETTER AND THAT THE LETTER BE WRITTEN IN A LARGER FONT. MOTION PASSED 4 -0- Vacant. COUNCIL DIRECTION Staff should bring this item back for adoption at the next regular council meeting and agendize a presentation from SASCC at the July 21, 2010 Joint Meeting describing in more detail how the funds would be used. 11. HEARING TO CONSIDER ADOPTION OF A RESOLUTION OF NECESSITY (EMINENT DOMAIN) FOR ACQUISITION OF AN ADDITIONAL EASEMENT IN PACIFIC GAS & ELECTRIC RIGHT OF WAY FOR JOE'S TRAIL AT SARATOGA DE ANZA STAFF RECOMMENDATION Adopt a Resolution of Necessity making the appropriate findings and authorizing an amendment to the complaint in eminent domain proceedings for Joe's Trail at Saratoga De Anza (the "Project ") to acquire an Additional Easement necessary for the Proj ect. Heather Minner, attorney representing the City Attorney's Office of Shute, Mihaly, and Weinberger, presented the staff report. Mayor King opened the public hearing for comment. Kathleen Casey requested to speak on this item. No one else requested to speak on this item. Mayor King closed the public hearing comment period. RESOLUTION NO. 10 -025 7 .X PAGE/MILLER MOVED TO ADOPT A RESOLUTION OF NECESSITY MAKING THE APPROPRIATE FINDINGS AND AUTHORIZING AN AMENDMENT TO THE COMPLAINT IN EMINENT DOMAIN PROCEEDINGS FOR JOE'S TRAIL AT SARATOGA DE ANZA (THE "PROJECT ") TO ACQUIRE AN ADDITIONAL EASEMENT NECESSARY FOR THE PROJECT. MOTION PASSED 4 -0- Vacant. OLD BUSINESS 12. CITY COUNCIL AND COMMISSIONS' ELECTRONIC COMMUNICATIONS POLICY STAFF RECOMMENDATION Adopt a resolution establishing a City Council and Commissions' Electronic Communications Policy. Richard Taylor, City Attorney, presented the staff report. Mayor King invited public comment. Kathleen Casey requested to speak on this item. No one else requested to comment on this item. Mayor King closed the public comment. RESOLUTION NO. 10 -026 PAGE/MILLER MOVED TO ADOPT RESOLUTION ESTABLISHING A CITY COUNCIL AND COMMISSIONS' ELECTRONIC COMMUNICATIONS POLICY. MOTION PASSED 4 -0- Vacant. 13. 2010 FALL ISSUE OF THE SARATOGAN STAFF RECOMMENDATION Accept report and direct staff accordingly. Crystal Morrow, Administrative Analyst 11, presented the staff report. Mayor King invited public comment. No one requested to speak on this item. COUNCIL DIRECTION Council provided suggestions for articles in the Fall Saratogan. NEW BUSINESS 41 14. REMEMBRANCE FOR COUNCILMEMBER SUSIE NAGPAL STAFF RECOMMENDATION Accept report and direct staff accordingly. Crystal Morrow, Administrative Analyst II, presented the staff report. Ms. Morrow noted that Mayor King and Vice Mayor Hunter proposed a memorial garden, in honor of Councilmember Nagpal, at the corner of Fruitvale and Allendale Avenue at the City Hall campus. She added that in the past, the City has planted memorial trees with a plaque to honor council members who have passed away. Vice Mayor Hunter noted that Councilmember Nagpal was very supportive of the Village Gardeners and frequently commented on the fact that Mr. Nagpal loved gardening; therefore, she felt a floral garden around the City of Saratoga signage at the Fruitvale /Allendale intersection, along with a monument plaque, would be a great location to honor Councilmember Susie Nagpal. Councilmember Miller noted he supported a memorial of planting both a tree and flowers in honor of Councilmember Susie Nagpal. Mayor King invited public comment. No one requested to speak on this item. Mayor King closed the public comment period. COUNCIL DISCUSSION Mayor King noted the possibility of a garden and bench memorial and suggested having a group of individuals to help plan the memorial. Vice Mayor Hunter suggested having the community help plant the flowers in a specified memorial location or plant 1,000 daffodils bulbs throughout the community in the spring. Councilmember Miller noted he would also like a tree planted in Councilmember Nagpal's honor so that a hundred years from now people could look at that tree and know that Susie Nagpal made a difference in this community. Councilmember Page noted the suggestions were great ideas and felt that steps needed to be taken to assure long term maintenance of a garden. He supported planting a tree in Councilmember Nagpal's honor and suggested Council create an AdHoc Committee to work with Mr. Nagpal and city staff to begin the process. COUNCIL DIRECTION Create an Adhoc Committee comprised of Vice Mayor Hunter and Councilmember Page to work with members of the Nagpal family. Those family members or family 9 'A friends that would like to work with the Adhoc Committee should contact the city clerk letting her know of their interest in working with the Adhoc Committee. Plans for the memorial would begin later in June or early July 2010. At this time Council members and members on the Dias expressed their appreciation and remembrances of working with Councilmember Susie Nagpal. Mayor King declared a break at 7:43 p.m. Mayor King reconvened the meeting at 7:55 p.m. and proceeded to Item 15 on the agenda. At this time Mayor King announced the Council would move to Item 10 — FISCAL YEAR 2010/11 PROPOSED OPERATING AND CAPITAL BUDGET PUBLIC HEARING on the agenda. Mayor King then announced the Council would instead move to Item 15 — FILLING CITY COUNCIL VACANCY on the agenda and then return to the Proposed Operating and Capital Budget Public Hearing. 15. FILLING CITY COUNCIL VACANCY STAFF RECOMMENDATION Direct staff as to the Council's preferred course of action to fill the vacancy on the City Council. Richard Taylor, City Attorney, presented the staff report. City Attorney Richard Taylor noted that State law requires the City Council to act within 30 days of the vacancy occurring. He noted Council must decide by June 12, 2010, how they would like to fill this vacancy. He stated Council could fill the vacancy by appointment or by calling a special election and if Council chooses to call a Special Election, the election for this vacancy would be held at the same time as the Regular General Election in November of 2010. Attorney Richard Taylor added that the person appointed or elected to fill this vacancy would hold this office only for the remainder of Councilmember Nagpal's term, which ends in November 2012. City Attorney Richard Taylor noted that if Council chooses to fill this vacancy by appointment, they should have discussion regarding how they would like to proceed with the application and interview process. Mayor King invited public comment. The following people requested to speak on this item: Kathleen Casey addressed the Council and asked how this type of situation has been handled in the past and noted that if someone is appointed to fill this vacancy, it should be a previous Mayor or Councilmember. Emma Wyckoff addressed the Council and stated she supported a special election to fill the vacated seat. 10 43 Ann Waltonsmith, previous Mayor and Councilmember, provided a brief report on the history of Councilmember Jim Shaw's passing while a member of the Saratoga Council and how she was appointed to fulfill his remaining term. No one else requested to speak on this item. Mayor King closed the public comment period. COUNCIL DISCUSSION Vice Mayor Hunter noted she supports a special election to fill the vacancy. Councilmember Page noted he supports an appointment to fill the vacancy. Councilmember Miller noted he supports an appointment to fill the vacancy and added Council should agendize the discussion of Mayoral rotation on a future agenda in order to address the rotation protocol under these conditions. Mayor King noted she supports an appointment to fill the vacancy and added the interview and appointment process should be conducted in a public forum. Mayor King called for a motion and a vote at this time. PAGE/MILLER MOVED TO FILL THE VACANT COUNCIL SEAT AS SOON AS POSSIBLE BY APPOINTMENT TO COMPLETE COUNCIL MEMBER NAGPAL'S TERM (THAT TERM RUNS UNTIL THE COUNCIL REORGANIZATION FOLLOWING THE NOVEMBER 2012 ELECTION MOTION PASSED 3 -1- Vacant WITH VICE MAYOR HUNTER OPPOSING. DISCUSSION OF APPOINTMENT PROCESS Council suggested a Study Session on Monday, May 24, 2010 at 5:OOPM to discuss the interview and appointment process. Council suggested Friday, June 4, 2010, 12:00 noon — application submittal deadline. Council suggested Monday, June 7, 2010, at 6:00 p.m. to conduct interviews of applicants that have submitted applications and other required documents expressing an interest in being appointed to fill the unexpired term of Councilmember Susie Nagpal, which runs until the Council reorganization following the November 2012 election. PAGE/MILLER MOVED TO DIRECT STAFF TO IMPLEMENT THE PROPOSED DATES OF 1) STUDY SESSION ON MONDAY, MAY 24, 2010 AT SPM; 2) FRIDAY, JUNE 4,2010,12:00 NOON — APPLICATION SUBMITTAL DEADLINE; AND 3) MONDAY, JUNE 7, 2010, INTERVIEW APPLICANTS INTERESTED IN BEING APPOINTED TO FILL UNEXPIRED TERM OF COUNCILMEMBER SUSIE NAGPAL. MOTION PASSED 4 -0- Vacant. 11 .. At this time Mayor King moved to Item 10. FISCAL YEAR 2010/11 PROPOSED OPERATING AND CAPITAL BUDGET PUBLIC HEARING. ADHOC & AGENCY ASSIGNMENT REPORTS Mayor Kathleen King — reported: SCC Cities Association Selection Committee — she attended the last meeting and Bonnie Broderick spoke about the "no sugar" beverage program in County facilities; diet drinks are permitted. Ms. Broderick also noted that they did receive $7 million in Federal funding that was available to fight obesity and /or tobacco use, and they will use these funds to help fight tobacco use and must come up with a plan quite quickly showing how the funds will be spent over the two -year period. [Councilmember Miller suggested the City should apply for a $50,000 grant to move forward with the adoption of the no smoking in parks ordinance] Vice Mayor Jill Hunter — reported: Hakone Foundation Board — meets next week. SASCC — meets next week. Historical Foundation — met last week and they had a great discussion about the Erie Canal. The Foundation has a newsletter that will be going out shortly. Councilmember Howard Miller — reported: KSAR — has approved their operating budget for the next Fiscal Year and are continuing to look at their capital budget with regard to a PEG fee, which comes from the cable company ad AT &T; discussion continues on intern planning. Santa Clara County Cities Association Board — has addressed their next Fiscal year's budget and they discussed plans for addressing the excess reserves the Association has amassed in the last five years. The excess reserves isn't large, however, they would like to adjust the rate structure downward and hold the rate constant for a period of time in order to use up the reserves. West Valley Solid Waste Joint Powers Authority — adopted next Fiscal Year budget; implemented statutory rate increases and franchise rate increase; and they approved commercial food scrap recycling beginning January 1, 2011, with direction to the hauler to do extensive outreach to key businesses and to the chamber of commerce's representing the cities being served. West Valley Transportation Authority PAC — the State has authorized up to a $10 tax per vehicle and the VTA PAC Board will decide if they want to move forward with a ballot measure to get it passed. Councilmember Chuck Page — reported: Saratoga Ministerial Association — asked that staff provide information regarding the location of the meetings. West Valley Sanitation District — he attended the last meeting and discussion took place regarding a Prop 218 question regarding a minimal rate increase over a three year period; the District's long time attorney has retired and a new attorney has been hired to represent the District. CITY COUNCIL ITEMS None 12 45 CITY MANAGER'S REPORT None ADJOURNMENT There being no additional business, Mayor King asked for a motion to adjourn. MILLER/PAGE MOVED TO ADJOURN THE REGULAR MEETING AT 10:30PM MOTION PASSED 4 -0- Vacant. Respectfully submitted, Ann Sullivan, CMC City Clerk 13 SARATOGA CITY COUNCIL MEETING DATE: June 2, 2010 AGENDA ITEM: DEPARTMENT: Finance & Administrative Services CITY MANAGER: Dave Anderson PREPARED BY: Ann Xu, Accountant DEPT HEAD: Mary Furey SUBJECT: Treasurer's Report for the Month Ended April 30, 2010 RECOMMENDED ACTION Review and accept the Treasurer's Report for the month ended April 30, 2010. REPORT SUMMARY California government code section 41004 requires that the City Treasurer (the Municipal Code of the City of Saratoga, Article 2 -20, Section 2- 20.035, designates the City Manager as the City Treasurer) submit to the City Clerk and the legislative body a written report and accounting of all receipts, disbursements, and fund balances. Section 41004. Regularly, at least once each month, the City Treasurer shall submit to the City Clerk a written report and accounting of all receipts, disbursements, and fund balances. He shall file a copy with the legislative body. The following attachments provide various financial transaction data for the City of Saratoga's Funds collectively as well as specifically for the City's General (Operating) Fund, including an attachment from the State Treasurer's Office of Quarterly LAIF rates from the 1 St Quarter of 1977 to present. FISCAL IMPACT Cash and Investments Balance by Fund As of April 30, 2010, the City had $310,180 in cash deposit at Comerica bank, and $14,972,069 on deposit with LAIF. Council Policy on operating reserve funds, adopted on April 20, 1994, states that: for cash flow purposes, to avoid occurrence of dry period financing, pooled cash from all funds should not be allowed to fall below $2,000,000. The total pooled cash balance as of April 30, 2010 is $15,282,249 and exceeds the minimum limit required. 47 Cash Summary Unrestricted Cash Comerica Bank $ 310,180 Deposit with LAIF $ 14,972,069 Total Unrestricted Cash $ 15,282,249 The Fund Balance schedule presented on the following page represents actual funding available for all funds at the end of the monthly period. This amount differs from the above Cash Summary schedule as assets and liabilities are components of the fund balance. As illustrated in the summary below, Total Unrestricted Cash is adjusted by the addition of Total Assets less the amount of Total Liabilities to arrive at the Ending Fund Balance which represents the actual amount of funds available. Adjusting Cash to Ending Fund Balance Total Unrestricted Cash Plus: Assets Less: Liabilities Ending Fund Balance $ 15,282,249 555,525 (995,650) $ 14,842,124 CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION The City would not be in compliance with Government Code Section 41004. ALTERNATIVE ACTION N/A FOLLOW UP ACTION N/A ADVERTISING, NOTICING AND PUBLIC CONTACT N/A ATTACHMENTS A — Change in Total Fund Balances by Fund B — Change in Total Fund Balances by CIP Project C — Local Agency Investment Fund (LAIF) Quarterly Apportionment Rates ATTACHMENT A CHANGES IN TOTAL FUND BALANCE Fund Description Fund Balance 7/1/09 Increase/ (Decrease) Jul -Mar Current Revenue Current Expenditure Transfers Fund Balance 4/30/10 General Undesignated Unreserved Balance 857,524 (1,395,695) 3,502,564 1,396,035 1,568,359 Reserved Fund Balance: Petty Cash Reserve 1,300 - - 1,300 Designated Fund Balances: - - Designated for Operations 2,870,140 2,870,140 Designated Economic Uncertainty 1,500,000 1,500,000 Designated for Development 707,380 (75,000) 632,380 Designated for Environmental 613,182 (50,000) 563,182 Designated for Uncollected Deposits 182,159 182,159 Designated for Mid Pen Open Space 250,000 (250,000) - Designated for Hillside Reserve 300,000 300,000 Designated for CIP Matching Grant 600,000 600,000 Designated for CIP Transfer 300,000 (300,000) - Designated for Economic Stability 25,000 (25,000) Designated for Carryforward 22,000 (22,000) - Special Revenue Landscape /Lighting Districts 359,917 6,244 46,469 60,758 351,873 CDBG Federal Grants - (42,859) 71,157 - 28,298 SHARP Loan 209,175 666 - - 209,842 Capital Project Street Projects 1,926,230 40,438 115,433 87,421 1,994,681 Park and Trail Projects 542,045 140,983 - 4,372 678,656 Facility Improvement Projects 953,833 (353,198) (25,738) 65,648 509,251 Administrative Projects 163,910 15,684 9,820 169,773 Tree Fine Fund 62,943 (43,759) - (773) 19,957 CIP Grant Fund - Street Repair (81,463) (218,679) 234,601 30,570 (96,111) CIP Grant Fund - Park & Trail (119,015) 88,033 - 855 (31,837) Gas TaxFund 62,495 (119,521) 244,244 - 187,218 Debt Service Library Bond 931,361 (482,254) 2,407 - 451,514 Internal Service Fund Liability /Risk Management 202,872 (37,880) 62,500 3,719 223,772 Workers Compensation 123,034 38,022 62,500 1,643 221,914 Office Stores Fund 39,633 4,525 (5,953) 2,814 35,391 Information Technology Services 174,838 42,219 100,946 36,870 281,133 Equipment Maintenance 56,654 20,095 39,250 23,165 92,834 Building Maintenance 208,842 66,442 141,850 68,266 348,869 Equipment Replacement 153,214 124,373 (40,000) - 237,586 Technology Replacement 315,290 (57,669) 14,503 2,473 269,651 Trust/Agency Library Fund 354,394 (35,012) - (32,615) 351,997 KSAR- Community Access TV 84,603 (10,812) 14,553 - 88,344 Total City 14,953,490 (2,209,615) 4,581,286 1,761,039 (722,000) 14,842,124 I ATTACHMENT B FUND BALANCES BY CIP PROJECT 50 Fund Increase/ Fund Balance (Decrease) Current Current Balance CIPFunds / Projects 7/1/09 Jul -Mar Revenue Mcpendfirre Transfers 4/30/10 Street Projects Traffic Safety 90,472 78,352 - 21,027 147,796 Highway 9 Safety Project 45,129 8,194 - 3,573 49,750 Annual Street Resurfacing Project 233,602 (46,111) 115,433 42,993 259,931 Sidewalks Annual Project 18,935 82,425 - 3,975 97,385 Saratoga Sunnyvale Road Resurfacing 64,972 34,040 - - 99,011 Traffic Signal g Verde Vista Lane 90,000 - - - 90,000 Fourth Street Bridge 100,000 - - - 100,000 Quito Road Bridge Replacement Design 9,730 - - - 9,730 Quito Road Bridge Construction 115,726 - - - 115,726 Village NewsrackEnclosure 23,307 (10,723) - 12,246 338 Village Fagade Program 18,815 (2,837) - - 15,978 Solar Power Radar Feedback Signs 24,158 - - - 24,158 El Quito Area Curb Replacement 37,553 - - - 37,553 Sobey Road Calvert Repair 150,000 - - - 150,000 Annual Sto-D Upgrade 246 53,637 - - 53,883 Village Trees & Lights at Sidestreets 25,336 - - - 25,336 Village Pedestrian Enhancement 9,128 6,489 - (146) 15,764 Prospect Road Median 151,036 (99,373) - - 51,663 City Entrance Sign /Monument 23,788 - - - 23,788 Village-Streets cape Impv 517,188 (7,050) - 3,752 506,385 Samtoga- Sunny vale "3 way Sidewalk 4,107 (585) - - 3,522 Comer Drive Retai Wall 173,003 56,020 116,983 Total Street Projects 1,926,230 40,438 115,433 87,421 - 1,994,681 Parks & Trails Hakone Garden Koi Pond 49,150 (23) - - 49,127 EL Quito Park Improvements 43,905 - - 4,353 39,552 Wildwood Park -Water Feature /Seating 275 (275) - - - Historical ParkLandscape 33,890 972 - - 34,862 Hakone Garden Retaining Wall&D /W 142,829 - - - 142,829 Hakone Garden UpperMoon House 125,000 - - - 125,000 Kevin Moran Improvements 69,082 (69,082) - - - WestValleySoccerField (29,176) 20,975 - - (8,201) Park/Trail Repairs 7,748 (4,878) - - 2,870 Trail Segment #3 Repair 7,912 (7,912) - - - TeerlinkRanchTrail 14,850 (14,850) - - - TankTrailRepair 60,695 (33,945) - 19 26,731 Mid Pen O/S Land Purchase - 250,000 - - 250,000 CIP Allocation Fund 15,885 15,885 Total Parks & Trails 542,045 140,983 - 4,372 - 678,656 Facility Improvements Wamer Hutton House Improvements 812 (812) - - - Facility Projects 108,643 (41,236) (1,000) 12,877 53,530 Civic Center Improvement 4,294 (340) - 2,873 1,081 CDD /Engineering - Carpet - - - - - Theater Improvement 68,518 (16,710) 25,000 9,037 67,771 Adult Care Wash Station - 25,000 - - 25,000 Book -Go -Round Bldg Paint - 5,000 - - 5,000 CorpYard - Men's Restroom 1,829 365 (1,744) 450 - Fire At- at Mc Williams &Museum 11,371 - - - 11,371 North Campus Improvements 43,960 (40,425) - - 3,536 North Campus -Bldg Removal 73,250 (73,037) - - 213 Civic Hall SewerPump Rep - (110) 11,062 10,952 - Portable Carpeting - 3,890 (780) 3,110 - HVAC SystemUpgrade - 125,000 - 2,484 122,517 Multi- Purpose RoomFund 250,000 (250,000) - - - Kitchen Improvement - 25,661 (25,661) - - Corp Yard Solar Project 93,250 125,000 - - 218,250 Library HVAC Upgrade 276,143 (243,528) (32,615) - - Libmry -EXT Improvement 10,000 5,000 - - 15,000 Museum ADA Ramp - CDBG - (1,915) - 23,866 (25,781) McWilliams House Improvement 10,000 - - - 10,000 Historical Park Fire AI=S stem 1,762 1,762 Total Facility Improvements 953,832 (353,198) (25,738) 65,648 - 509,251 Arad nis trative Projects Financial SystemUpgmde 3,534 - - - 3,534 Document Imaging Project 86,780 (1,597) - - 85,183 CDD Document Imaging Project 36,635 (4,646) - - 31,989 Website Development Project 30,959 (28,074) - - 2,885 IT Emergency Power Back - 10,000 - - 10,000 IT Server Room A/C - 40,000 " - 9,820 30,180 KSAR Equip Upgrades 6,002 6,002 Total Administrative Projects 163,910 15,684 - 9,820 - 169,773 Tree Fine Fund Tree Fine Fund 62,943 (43,759) - (773) 19,957 CIP Fund- S treet Repair CIP Cmant Fund (81,463) (218,679) 234,601 30,570 (96,111) CIP Fund- Park & Trail CIP Cmant Fund (119,015) 88,033 r - 855 (31,837) Gax Fund Gas T-Fund 62,495 (119,521) 244,244 - 187,218 Total CIP Funds 3,510,977 (450,019) 568,540 197,913 3,431,587 50 ! f �' •", " x ` r �.: - - ?r•r - �- ',-fir`. -�`t f • . �� ' #.• _` —�� '�t :�.,a� {'_,::���� �• '::{�_•��� °.i ::;,k.yY� li C- ; IWI I iq I 'I t••w ; 'ter -.'{ - =.; rii Y� k - ''�-?��.' I : �: r. �: - � � � = fir' JC" i i, �F'•_ 3'J SARATOGA CITY COUNCIL MEETING DATE: June 2, 2010 AGENDA ITEM: DEPARTMENT: Finance & Administrative Services CITY MANAGER: Dave Anderson PREPARED BY: Melanie Whittaker DEPT. DIRECTOR: Mary Furey SUBJECT: Review of Accounts Payable Check Registers INX4111 /Q/1010I]0117:Tei Y1110 That the City Council review and accept the Check Registers for the following Accounts Payable payment cycles: May 13, 2010 May 20, 2010 REPORT SUMMARY: Attached are the Check Registers for: Type of Checks Date Starting Check No. Ending Check No. Total Checks Amount Checks Released Prior Check Register Date Ending Check No. Accounts Payable 05/13/10 115102 115151 49 136,127.02 05/13/10 05/06/10 115101 Accounts Payable 05/20/10 115152 1 115200 1 48 1 455,999.90 1 05/20/10 1 05/13/10 115151 The following is ,a list of Accounts Payable checks issued for more than $20,000 and a brief description of the expenditure: AP Date Check No. Issued to Fund Dept. Purpose Amount Comp Shared Risk 05/13/10 115108 Pool Worker's Comp Non -Dept Deposit Premium Q4 /10 42,612.78 05/13/10 115151 West Valley Sanitation General Public Works Annual Storm Drain Cleaning 20,661.40 CIP - Street Projects & 05/20/10 115159 BFK Engineers Grant Fund - CIP Streets Public Works Prof Svcs - Hwy 9 / Phase III 29,590.98 Prof Svcs - ADA Signal & CIP Streets Projects & Building Roof Frame 05/20/10 115177 Mark Thomas & Co General Public Works Evaluation 23,197.50 05/20/10 1 115181 Office of Sheriff General Public Safety Monthly Law Enforcement 344,573.67 The following are Accounts Payable checks that were voided AP Date Check No. Issued to Description Amount 05/13/10 None - 05/20/10 1 112744 IMarinaBezak I Staledated - Void/Reissued (55.00) 52 The following is a list of cash reduction by fund: Fund # Fund Description AP 05113 AP 05/20 Total 111 General 76,396.77 365,324.54 441,721.31 231 Village Lighting 133.56 133.56 243 Carnelian Glen 93.38 93.38 244 Cunningham /Glasgow Landscape 43.25 43.25 247 Kerwin Ranch Landscape 231.47 231.47 249 Manor Drive Landscape 55.80 55.80 252 Prides Crossing Landscape 10,429.00 10,429.00 253 Saratoga Legends Landscape 290.95 290.95 254 Sunland Park Landscape 560.14 560.14 255 Tricia Woods Landscape 12.56 12.56 271 Beauchamps Landscape 111.24 111.24 273 Gateway Landscape 8.58 8.58 274 Horseshoe Landscape/Lighting 217.88 217.88 277 Village Commercial Landscape 505.41 505.41 311 Library Bond Debt Service 795.00 795.00 411 CIP Street Projects 1 32,180.71 33,321.63 413 CIP Facility Projects 7,125.28 7,125.28 421 Tree Fine Fund 803.53 803.53 431 Grant Fund - CIP Streets 2,568.75 26,696.89 29,265.64 432 Grant Fund - Parks & Trails 450.80 450.80 611 Liability/Risk Mgt 330.81 900.00 1,230.81 612 Workers' Comp 43,077.12 43,077.12 621 Office Stores Fund 1,413.00 196.60 1,609.60 622 Information Technology 2,610.61 107.17 2,717.78 623 Vehicle & Equipment Maint 3,654.25 2,639.51 6,293.76 624 Building Maintenance 2,180.53 3,307.85 5,488.38 631 Vehicle & Equipment Replacement 1,357.79 1 632 IT Equipment Replacement 4,175.27 4,175.27 TOTALI 136,127.02 455,999.90 592,126.92 ALTERNATIVE ACTION: N/A FOLLOW UP ACTION: N/A ADVERTISING, NOTICING AND PUBLIC CONTACT: N/A ATTACHMENTS: Check Registers in the 'A/P Checks By Period and Year' report format 53 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 05/24/2010 CITY OF SARATOGA ACCTPA21 TIME: 15:18:00 CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115102' and '115151' ACCOUNTING PERIOD: 11 /10 - - - -- VENDOR - - -- --- - - - - -- BUDGET UNIT ----- DESCRIPTION - - - -- $15 SEWER SERVICE 6246202 SEWER REPAIR- COM CTR $15 SEWER SERVICE 6246202 SEWER REPAIR- COM CTR ABLE UNDERGROUND CONSTRU 1115201 SEPTIC SVC- VILLA OAK AT &T MOBILITY 1112101 MTHLY SVC 02/22 -03/23 AT &T MOBILITY 1112101 MTHLY SVC 03/23 -04/22 BOETHING TREELAND FARMS 4219211 -002 CANDACE TROY 1116101 COAST OIL COMPANY LLC 6235202 COMP SHARED RISK POOL 6128501 COURTESY CHEVROLET LLC 6235202 DATA TICKET INC 1117101 DE LAGE LANDEN PUBLIC FI 6213102 STATE OF CALIFORNIA 1115201 FEHR & PEERS 111 FEHR & PEERS 1115101 TREES - FRUITVALE AVE INSTRUCTOR - ART UNLEADED / DIESEL DEPOSIT PREMIUM Q4 /10 PARTS - VEH #116 CITATION FEES 03/10 COPIER - 04/21 -05/20 SIGNAL / LIGHTS 03/10 APP# PWTR10 -0001 PROF SVCS 02/27 -03/26 GARDENLAND POWER EQUIPME 6315203 PRESSURE WASHER GARDENLAND POWER EQUIPME 1115301 SUPPLIES - PARKS GRACE TSANG 1116101 HYDROTEC IRRIGATION EQUI 1115301 HYDROTEC IRRIGATION EQUI 1115301 HYDROTEC IRRIGATION EQUI 4219211 -002 HYDROTEC IRRIGATION EQUI 1115301 HYDROTEC IRRIGATION EQUI 1115301 INTERSTATE TRAFFIC CONTR 4119111 -002 INTERSTATE TRAFFIC CONTR 4119121 -001 ROSTER CHANGE ROSTER CHANGE SPRINKLERS FUND - 009 - DISBURSEMENT FUND CASH ACCT CHECK NO ISSUE DT - - - - -- 11111 115102 05/13/10 581 11111 115102 05/13/10 581 TOTAL CHECK 11111 115103 05/13/10 627 11111 115104 05/13/10 790 11111 115104 05/13/10 790 TOTAL CHECK 11111 115105 05/13/10 362 11111 115106 05/13/10 825 11111 115107 05/13/10 229 11111 115108 05/13/10 27 11111 115109 05/13/10 258 11111 115110 05/13/10 342 11111 115111 05/13/10 564 11111 115112 05/13/10 573 11111 115113 05/13/10 423 11111 115113 05/13/10 423 TOTAL CHECK 11111 115114 05/13/10 455 11111 115114 05/13/10 455 TOTAL CHECK 11111 115115 05/13/10 500 11111 115116 05/13/10 500 11111 115117 05/13/10 14 11111 115117 05/13/10 14 11111 115117 05/13/10 14 11111 115117 05/13/10 14 11111 115117 05/13/10 14 TOTAL CHECK 11111 115118 05/13/10 63 11111 115118 05/13/10 63 TOTAL CHECK 11111 115119 05/13/10 500 11111 115120 05/13/10 500 - - - -- VENDOR - - -- --- - - - - -- BUDGET UNIT ----- DESCRIPTION - - - -- $15 SEWER SERVICE 6246202 SEWER REPAIR- COM CTR $15 SEWER SERVICE 6246202 SEWER REPAIR- COM CTR ABLE UNDERGROUND CONSTRU 1115201 SEPTIC SVC- VILLA OAK AT &T MOBILITY 1112101 MTHLY SVC 02/22 -03/23 AT &T MOBILITY 1112101 MTHLY SVC 03/23 -04/22 BOETHING TREELAND FARMS 4219211 -002 CANDACE TROY 1116101 COAST OIL COMPANY LLC 6235202 COMP SHARED RISK POOL 6128501 COURTESY CHEVROLET LLC 6235202 DATA TICKET INC 1117101 DE LAGE LANDEN PUBLIC FI 6213102 STATE OF CALIFORNIA 1115201 FEHR & PEERS 111 FEHR & PEERS 1115101 TREES - FRUITVALE AVE INSTRUCTOR - ART UNLEADED / DIESEL DEPOSIT PREMIUM Q4 /10 PARTS - VEH #116 CITATION FEES 03/10 COPIER - 04/21 -05/20 SIGNAL / LIGHTS 03/10 APP# PWTR10 -0001 PROF SVCS 02/27 -03/26 GARDENLAND POWER EQUIPME 6315203 PRESSURE WASHER GARDENLAND POWER EQUIPME 1115301 SUPPLIES - PARKS GRACE TSANG 1116101 HYDROTEC IRRIGATION EQUI 1115301 HYDROTEC IRRIGATION EQUI 1115301 HYDROTEC IRRIGATION EQUI 4219211 -002 HYDROTEC IRRIGATION EQUI 1115301 HYDROTEC IRRIGATION EQUI 1115301 INTERSTATE TRAFFIC CONTR 4119111 -002 INTERSTATE TRAFFIC CONTR 4119121 -001 ROSTER CHANGE ROSTER CHANGE SPRINKLERS - FOOTHILL REPAIRS - K MORAN PK BUBBLER - AZULE SPRINKLERS - K MORAN BUBBLERS - K MORAN SIGNS - RESTRIPING SIGNS- TRAFFIC SAFETY JANIENE SCOTT 1116101 CANCELLED CLASS JENNIFER CENICERUS 1116101 ROSTER CHANGE SALES TAX 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AMOUNT 86.50 81.50 168.00 720.00 68.65 38.85 107.50 582.85 438.75 2,017.72 42,612.78 79.83 100.00 1,413.00 312.28 581.24 12,248.55 12,829.79 1,357.79 19.06 1,376.85 4.00 7.00 2,382.57 369.50 220.68 913.86 1,061.12 4,947.73 444.50 365.59 810.09 50.00 4.00 54 SUNGARD PUBLIC SECTOR PAGE NUMBER: DATE: 05/24/2010 CITY OF SARATOGA ACCTPA21 TIME: 15:18:00 CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115102' and '115151' ACCOUNTING PERIOD: 11 /10 2 41H FUND - 009 - DISBURSEMENT FUND CASH ACCT CHECK NO ISSUE DT -------- - - - - -- VENDOR - - -- --- - - - - -- BUDGET UNIT - - - -- DESCRIPTION - - - - -- SALES TAX AMOUNT 11111 115121 05/13/10 118 JUST FOR KICKS 1116101 INSTRUCTOR - SOCCER 0.00 296.25 11111 115121 05/13/10 118 JUST FOR KICKS 1116101 INSTRUCTOR - SOCCER 0.00 237.00 11111 115121 05/13/10 118 JUST FOR KICKS 1116101 INSTRUCTOR - SOCCER 0.00 325.88 11111 115121 05/13/10 118 JUST FOR KICKS 1116101 INSTRUCTOR - SOCCER 0.00 207.38 TOTAL CHECK 0.00 1,066.51 11111 115122 05/13/10 212 LIVINGSTONE, JOHN 1114101 SCAPPO MTG O5 /05 0.00 30.00 11111 115123 05/13/10 500 MEI GECHLIK 1116101 ROSTER CHANGE 0.00 8.00 11111 115124 05/13/10 131 NORMAN PAUL PRINT CTR 1116201 BUS CARDS - T SCOTT 0.00 32.90 11111 115124 05/13/10 131 NORMAN PAUL PRINT CTR 1111101 BUS CARDS - K KING 0.00 32.89 11111 115124 05/13/10 131 NORMAN PAUL PRINT CTR 1117102 ER PREP CERTS - BLANK 0.00 32.90 TOTAL CHECK 0.00 98.69 11111 115125 05/13/10 135 NORTH BAY BLDG MAINTENAN 6246202 WKLY SVC 4/18 -4/24 0.00 361.00 11111 115126 05/13/10 540 ORCHARD SUPPLY 6246202 SUPPLIES - FACILITIES 0.00 93.48 11111 115127 05/13/10 168 ORCHARD SUPPLY HARDWARE- 1115201 SUPPLIES - STREETS 0.00 156.72 11111 115127 05/13/10 168 ORCHARD SUPPLY HARDWARE- 1115301 SUPPLIES - PARKS 0.00 207.87 11111 115127 05/13/10 168 ORCHARD SUPPLY HARDWARE- 1115201 DISCOUNT TAKEN 0.00 -8.52 TOTAL CHECK 0.00 356.07 11111 115128 05/13/10 173 PACIFIC GAS & ELECTRIC 6246202 NATURAL GAS VEHICLE 0.00 56.92 11111 115128 05/13/10 173 PACIFIC GAS & ELECTRIC 1115301 PARKS / OPEN SPACE 0.00 8.58 11111 115128 05/13/10 173 PACIFIC GAS & ELECTRIC 1115301 LIBRARY ORCHARD 0.00 1,495.42 11111 115128 05/13/10 173 PACIFIC GAS & ELECTRIC 2315302 VILLAGE LIGHTING 0.00 22.12 11111 115128 05/13/10 173 PACIFIC GAS & ELECTRIC 2735302 GATEWAY 0.00 8.58 TOTAL CHECK 0.00 1,591.62 11111 115129 05/13/10 278 PETROTEK 6235202 AQMD TESTING 04/27 0.00 700.00 11111 115130 05/13/10 873 PME EQUIPMENT SALES 6235202 PARTS - GAS PUMP 0.00 52.22 11111 115131 05/13/10 375 QUALITY ASSURANCE TRAVEL 1116101 BUS SVC - 06/23/10 0.00 775.00 11111 115131 05/13/10 375 QUALITY ASSURANCE TRAVEL 1116101 BUS SVC - 06/10/10 0.00 930.00 TOTAL CHECK 0.00 1,705.00 11111 115132 05/13/10 393 REED & GRAHAM, INC 4119111 -001 ASPHALT 0.00 118.50 11111 115132 05/13/10 393 REED & GRAHAM, INC 4119111 -001 ASPHALT 0.00 126.73 TOTAL CHECK 0.00 245.23 11111 115133 05/13/10 500 ROBERT CHAYKIN 111 FACILITY DEP REFUND 0.00 300.00 11111 115134 05/13/10 382 RV CLOUD CO 1115301 SUPPLIES - PARKS 0.00 32.25 11111 115135 05/13/10 87 SAN JOSE WATER COMPANY 1115301 PARKS / OPEN SPACE 0.00 2,002.15 11111 115135 05/13/10 87 SAN JOSE WATER COMPANY 6246202 BUILDINGS 0.00 368.61 TOTAL CHECK 0.00 2,370.76 2 41H SUNGARD PUBLIC SECTOR PAGE NUMBER: 3 DATE: 05/24/2010 CITY OF SARATOGA ACCTPA21 TIME: 15:18:00 CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115102' and '115151' ACCOUNTING PERIOD: 11 /10 FUND - 009 - DISBURSEMENT FUND CASH ACCT CHECK NO ISSUE DT - 11111 115136 05/13/10 1 - - - -- VENDOR - - -- --- - - - - -- BUDGET UNIT SANTA CLARA COUNTY 4319122 -004 ----- DESCRIPTION - - - -- FEES - HWY9 PHASE III 11111 115137 05/13/10 729 11111 115137 05/13/10 729 11111 115137 05/13/10 729 11111 115137 05/13/10 729 11111 115137 05/13/10 729 11111 115137 05/13/10 729 TOTAL CHECK 11111 115138 05/13/10 136 11111 115138 05/13/10 136 11111 115138 05/13/10 136 11111 115138 05/13/10 136 TOTAL CHECK 11111 115139 05/13/10 500 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 11111 115140 05/13/10 154 TOTAL CHECK 11111 115141 05/13/10 236 11111 115142 05/13/10 277 11111 115143 05/13/10 500 11111 115144 05/13/10 336 11111 115145 05/13/10 726 11111 115146 05/13/10 500 SARATOGA SCHOOL OF DANCE 1116101 SARATOGA SCHOOL OF DANCE 1116101 SARATOGA SCHOOL OF DANCE 1116101 SARATOGA SCHOOL OF DANCE 1116101 SARATOGA SCHOOL OF DANCE 1116101 SARATOGA SCHOOL OF DANCE 1116101 INSTRUCTOR - DANCE INSTRUCTOR - DANCE INSTRUCTOR - DANCE INSTRUCTOR - DANCE INSTRUCTOR - DANCE INSTRUCTOR - DANCE SCOTTY'S AUTOMOTIVE 6235202 MAINTENANCE VEH #105 SCOTTY'S AUTOMOTIVE 6235202 MAINTENANCE VEH #110 SCOTTY'S AUTOMOTIVE 6235202 MAINTENANCE VEH #112 SCOTTY'S AUTOMOTIVE 6235202 MAINTENANCE VEH #113 SHIVANI GOVIL 111 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 1118201 SHUTE MIHALY & WEINBERGE 4329274 -001 SHUTE MIHALY & WEINBERGE 4319152 -002 SHUTE MIHALY & WEINBERGE 1118201 SOLECTRIC ELECTRIC CONTR 2315302 TAK'S EQUIPMENT 6235202 TESSIE PARKER 1116101 TLC ADMINISTRATORS 1112301 TREES 360 DEGREES 1115201 TZUFONG HUANG 111 FACILITY DEP REFUND CTYATTN - CODE ENF CTYATTN - LITIGATION OFFICE HOURS /C MTGS CTYATTN - PW CTYATTN - RECREATION CTYATTN - CTY CLRK CTYATTN -CIRC ELEMENT CTYATTN - NEWS RACK CTYATTN - SHABAZI CTYATTN - CTY MGR CTYATTN - ADMIN CTYATTN - HOUSING ELEM CTYATTN - SZE NONDEPT - LEGAL RSRCH GENLGL - PW GENLGL - CIRC ELEMENT OUTSIDE COUNSEL LITIGATION - DUTTA CEQA DEANZA TRAIL QUITO RD BRIDGES QUARRY ACQUISITION REPLACED GFCI - BBWAY MAINTENANCE #E026 ROSTER CHANGE MTHLY 125 FEES O5 /10 OAK TREE REMOVAL ARBORIST DEP REFUND SALES TAX 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AMOUNT 2,060.25 252.00 210.00 345.10 190.40 285.60 95.20 1,378.30 66.08 66.08 66.08 66.08 264.32 500.00 96.00 57.60 3,206.40 806.40 940.80 307.20 57.60 96.00 38.40 960.00 115.20 288.00 172.80 1.79 217.80 19.80 828.36 4,275.00 450.80 508.50 2,943.85 16,388.30 111.44 445.27 4.00 175.00 4,200.00 1.780.00 W% SUNGARD PUBLIC SECTOR PAGE NUMBER: DATE: 05/24/2010 CITY OF SARATOGA ACCTPA21 TIME: 15:18:00 CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115102' and '115151' ACCOUNTING PERIOD: 11 /10 FUND - 009 - DISBURSEMENT FUND CASH ACCT CHECK NO ISSUE DT -------- - - - - -- VENDOR - - -- --- - - - - -- BUDGET UNIT - - - -- DESCRIPTION - - - - -- SALES TAX AMOUNT 11111 115147 05/13/10 377 UNITED SITE SERVICES OF 1115301 FENCE RNTL - K MORAN 0.00 74.33 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1115101 DATA SVC - GIS 0.00 1,995.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1118101 ONLINE B/U - 04/10 0.00 81.95 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111201 TSC MTG 03/31 0.00 23.14 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1114101 OFFICE SUPPLIES 0.00 32.73 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 MAGAZINE WALL RACKS 0.00 38.69 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116102 SUPPLIES - TEEN EVENT 0.00 177.26 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 SUPPLIES - CAMP 0.00 50.23 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116102 SUPPLIES - RETURN 0.00 -47.41 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 SUPPLIES - YOUTH DAY 0.00 10.01 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116102 SUPPLIES - RETURN 0.00 -26.14 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 SUPPLIES - CAMP 0.00 6.57 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116102 SUPPLIES - YOUTH DAY 0.00 26.18 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 MTHLY SVC 4/10 0.00 85.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1112101 ROTARY DUES 0.00 186.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1115201 TRAINING MATERIALS 0.00 154.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1115301 OFFICE SUPPLIES 0.00 25.11 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 SUPPLIES - FACILITIES 0.00 128.18 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 SUPPLIES - FACILITIES 0.00 16.32 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 SUPPLIES - FACILITIES 0.00 139.67 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 SUPPLIES - FACILITIES 0.00 38.90 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 SUPPLIES - FACILITIES 0.00 446.69 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 SUPPLIES - FACILITIES 0.00 71.08 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1118101 WOMEN'S SUMMIT 4/14 0.00 200.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 COUNCIL MTG 4/21 0.00 10.98 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 COUNCIL MTG 4/21 0.00 2.84 11111 115150 05/13/10 391 US BANK PURCHASING CARD 4119142 -004 BID PACKETS - MAILING 0.00 85.60 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6128501 WELLNESS SNACKS 0.00 115.29 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1115201 OFFICE SUPPLIES 0.00 40.25 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6223201 DATA SVC - GIS 0.00 2,000.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6223201 SUPPLIES - COMPUTER 0.00 111.61 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6223201 FIREWALL RENEWAL 0.00 499.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 TABLE - PROSPECT CTR 0.00 122.37 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6118401 CAMERA - RISK MGMT 0.00 280.81 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 SUPPLIES - CAMP 0.00 39.57 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 OFFICE SUPPLIES 0.00 28.39 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1118101 WOMEN'S SUMMIT 4/14 0.00 175.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6235202 PARTS - VEH #125 0.00 94.89 11111 115150 05/13/10 391 US BANK PURCHASING CARD 111 WVM &M MTG 3/24 0.00 19.54 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 COUNCIL MTG 4/07 0.00 11.98 11111 115150 05/13/10 391 US BANK PURCHASING CARD 111 WVM &M MTG 3/24 0.00 189.77 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1112301 ICMA WEBCONFERENCE 0.00 149.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 111 WVM &M MTG 3/24 0.00 40.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 AGENDA MTG 4/01 0.00 8.75 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1112101 POSTAGE 0.00 3.12 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 COUNCIL MTG 4/07 0.00 111.30 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 AGENDA MTG 4/08 0.00 17.50 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 GEN ASSEMBLY CONF 0.00 85.00 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 AGENDA M MTG 4/15 0.00 8.75 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 COUNCIL MTG 4/21 0.00 59.99 57 SUNGARD PUBLIC SECTOR DATE: 05/24/2010 TIME: 15:18:00 CITY OF SARATOGA CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115102' and '115151' ACCOUNTING PERIOD: 11 /10 FUND - 009 - DISBURSEMENT FUND 14.78 ).00 11.24 ).00 50.00 ).00 CASH ACCT CHECK NO ISSUE DT -------- - - - - -- VENDOR - - -- --- - - - - -- BUDGET UNIT ----- DESCRIPTION - - - -- 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 COUNCIL MTG 4/21 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1111101 COUNCIL MTG 4/21 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1112101 AFFORDABLE HSNG TOUR 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1115301 ANNUAL DUES - GARDNER 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1115301 SUPPLIES - EL QUITO 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6128501 WELLNESS SNACKS 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6128501 WELLNESS SNACKS 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6128501 WELLNESS SNACKS 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1114101 OFFICE SUPPLIES 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6118401 SAFETY AWARDS 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116201 MIRROR - FACILITY RNTL 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 OFFICE SUPPLIES 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 EXCURSION FEE 3/25 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 OFFICE SUPPLIES 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 DEPOSIT - TRAIN 9/10 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 TRIP ESCORT MEAL 3/25 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 SNACKS - 4 EXCURSIONS 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 TRIP ESCORT MEAL 4/08 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 EXCURSION FEE 4/15 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116101 SNACKS - 3 EXCURSIONS 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 SUPPLIES - FACILITIES 11111 115150 05/13/10 391 US BANK PURCHASING CARD 6246202 TABLE - COM CTR 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116102 SUPPLIES - TEEN EVENT 11111 115150 05/13/10 391 US BANK PURCHASING CARD 1116102 SUPPLIES - TEEN EVENT TOTAL CHECK 11111 115151 05/13/10 613 WEST VALLEY SANITATION D 1115103 NPS SVC 7/01- 12/31/99 TOTAL CASH ACCOUNT TOTAL FUND TOTAL REPORT PAGE NUMBER: ACCTPA21 SALES TAX AMOUNT ).00 7.99 ).00 14.78 ).00 11.24 ).00 50.00 ).00 56.93 ).00 123.68 ).00 162.82 ).00 62.55 ).00 84.77 ).00 50.00 ).00 150.00 ).00 92.80 ).00 600.00 ).00 27.29 ).00 85.00 ).00 9.03 ).00 37.22 ).00 8.10 ).00 453.00 ).00 18.66 ).00 16.02 ).00 153.29 ).00 42.49 ).00 3.29 ).00 10,491.41 0.00 20,661.40 0.00 136,127.02 0.00 136,127.02 0.00 136.127.02 5 yZ SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 05/24/2010 CITY OF SARATOGA ACCTPA21 TIME: 15:20:52 CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115152' and '115200' ACCOUNTING PERIOD: 11 /10 FUND - 009 - DISBURSEMENT FUND VENDOR BUDGET UNIT DESCRIPTION 11111 115152 05/20/10 234 11111 115152 05/20/10 234 11111 115152 05/20/10 234 11111 115152 05/20/10 234 11111 115152 05/20/10 234 11111 115152 05/20/10 234 11111 115152 05/20/10 234 11111 115152 05/20/10 234 11111 115152 05/20/10 234 TOTAL CHECK SUPPLIES - PARKS ALLIED LOCK & SAFE INC 11111 115153 05/20/10 546 11111 115154 05/20/10 72 11111 115154 05/20/10 72 11111 115154 05/20/10 72 TOTAL CHECK 4319122 -001 PROF SVC - HWY9 /III 11111 115155 05/20/10 521 11111 115155 05/20/10 521 TOTAL CHECK 11111 115156 05/20/10 197 11111 115157 05/20/10 254 11111 115158 05/20/10 714 11111 115159 05/20/10 641 11111 115159 05/20/10 641 TOTAL CHECK 11111 115160 05/20/10 369 11111 115160 05/20/10 369 11111 115160 05/20/10 369 TOTAL CHECK 11111 115161 05/20/10 179 11111 115162 05/20/10 228 11111 115162 05/20/10 228 TOTAL CHECK 11111 115163 05/20/10 545 11111 115164 05/20/10 528 11111 115165 05/20/10 651 11111 115165 05/20/10 651 11111 115165 05/20/10 651 11111 115165 05/20/10 651 11111 115165 05/20/10 651 • T & T 6246202 XEROX MACHINE • T & T 6246202 MEASURED BUS LINE • T & T 6246202 BOOK GO ROUND • T & T 1117102 ER LINE - CM OFFICE • T & T 1117102 EMP ER LINE • T & T 1117102 AM 1610 RADIO • T & T 1115301 GATEWAY IRRIGATION • T & T 1115301 PHONE LINES / PARKS • T & T 1115301 C SPRINGS PARK ABAG POWER PURCHASING 6246202 GAS SVC 04/10 ADVANTAGE JANITORIAL SUP 6246202 SUPPLIES - JANITORIAL ADVANTAGE JANITORIAL SUP 6246202 SUPPLIES - JANITORIAL ADVANTAGE JANITORIAL SUP 1115301 SUPPLIES - PARKS ALLIED LOCK & SAFE INC 6246202 SUPPLIES - FACILITIES ALLIED LOCK & SAFE INC 6246202 SUPPLIES - FACILITIES ARROWHEAD MOUNTAIN SPRIN 6246202 MTHLY SVC O5 /10 AWARD COMPANY OF AMERICA 1111101 AWARD PLAQUES BIGGS CARDOSA ASSOCIATIO 4119142 -004 SARA VILLAGE 03/10 BKF ENGINEERS 4119122 -001 PROF SVC - HWY9 /III BKF ENGINEERS 4319122 -001 PROF SVC - HWY9 /III BORTZ, SHERI L 1116101 INSTRUCTOR - YOGA BORTZ, SHERI L 1116101 INSTRUCTOR - YOGA BORTZ, SHERI L 1116101 INSTRUCTOR - YOGA CIM AIR, INC 4139313 -001 CLASSIC CAR WASH 6235202 CLASSIC CAR WASH 6235202 CPRESCUE 6118401 DAVID . GATES & ASSOCIAT 4119142 -004 ELLA CHEKHANOVSKAYA 1116101 ELLA CHEKHANOVSKAYA 1116101 ELLA CHEKHANOVSKAYA 1116101 ELLA CHEKHANOVSKAYA 1116101 ELLA CHEKHANOVSKAYA 1116101 HVAC PROJECT MAINTENANCE -VEH /EQUIP DISCOUNT TAKEN CPR /AED TRAINING 4/20 VILLAGE PROJECT 3/10 INSTRUCTOR - GYM INSTRUCTOR - GYM INSTRUCTOR - GYM INSTRUCTOR - GYM INSTRUCTOR - GYM SALES TAX 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AMOUNT 14.53 38.53 30.29 25.77 14.53 15.82 15.51 16.34 31.34 202.66 1,200.35 715.81 476.32 442.16 1,634.29 55.55 13.75 69.30 131.07 234.90 1,600.00 3,394.09 26,196.89 29,590.98 124.00 186.00 450.88 760.88 4,568.00 1,299.00 - 125.00 1,174.00 900.00 2,500.00 373.80 218.05 342.65 291.20 342.65 W SUNGARD PUBLIC SECTOR PAGE NUMBER: 2 DATE: 05/24/2010 CITY OF SARATOGA ACCTPA21 TIME: 15:20:52 CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115152' and '115200' ACCOUNTING PERIOD: 11 /10 FUND - 009 - DISBURSEMENT FUND CASH ACCT CHECK NO ISSUE DT - - - - -- 11111 115165 05/20/10 651 TOTAL CHECK ERIC SOLBERG 111 11111 115166 05/20/10 500 11111 115167 05/20/10 419 11111 115167 05/20/10 419 TOTAL CHECK IRRIGATION 1115301 11111 115168 05/20/10 421 11111 115168 05/20/10 421 11111 115168 05/20/10 421 11111 115168 05/20/10 421 11111 115168 05/20/10 421 11111 115168 05/20/10 421 11111 115168 05/20/10 421 11111 115168 05/20/10 421 11111 115168 05/20/10 421 TOTAL CHECK 11111 115169 05/20/10 454 11111 115170 05/20/10 463 11111 115171 05/20/10 832 11111 115171 05/20/10 832 TOTAL CHECK 11111 115172 05/20/10 491 11111 115173 05/20/10 14 11111 115174 05/20/10 61 11111 115174 05/20/10 61 TOTAL CHECK 11111 115175 05/20/10 63 11111 115176 05/20/10 221 11111 115177 05/20/10 665 11111 115177 05/20/10 665 TOTAL CHECK 11111 115178 05/20/10 328 11111 115179 05/20/10 79 11111 115180 05/20/10 135 11111 115181 05/20/10 1 - - - -- VENDOR - - -- --- - - - - -- BUDGET UNIT ----- DESCRIPTION ----- ELLA CHEKHANOVSKAYA 1116101 INSTRUCTOR -GYM ERIC SOLBERG 111 FACILITY DEP REFUND EVENT SERVICES 1115301 PORTA POTTY SVC 04/10 EVENT SERVICES 1115301 PORTA POTTY 04/10 EWING IRRIGATION 1115301 SUPPLIES - AZULE EWING IRRIGATION 1115301 SUPPLIES - BEAUCHAMPS EWING IRRIGATION 1115301 SUPPLIES - BEAUCHAMPS EWING IRRIGATION 1115301 SUPPLIES - PARKS EWING IRRIGATION 1115301 SUPPLIES - IRRIGATION EWING IRRIGATION 1115301 SUPPLIES - BROOKGLEN PK EWING IRRIGATION 1115301 SUPPLIES - RAVENWOOD EWING IRRIGATION 2525302 REPAIR - PRIDES CROSS EWING IRRIGATION 2525302 REPAIRS - PRIDES CROSS GACHINA LANDSCAPE MANAGE 1115201 GRAINGER 4139322 -001 HEWLETT - PACKARD COMPANY 6323202 HEWLETT - PACKARD COMPANY 6323202 HUMAN BEHAVIOR ASSOCIATE 1112301 HYDROTEC IRRIGATION EQUI 4139321 -001 INTERSTATE BATTERY SYSTE 6235202 INTERSTATE BATTERY SYSTE 6235202 INTERSTATE TRAFFIC CONTR 4119111 -002 LORAL LANDSCAPING, INC 2545302 MARK THOMAS & COMPANY 4119121 -003 MARK THOMAS & COMPANY 1115301 METROPOLITAN PLANNING GR 4319122 -004 MUNISERVICES LLC 1113101 NORTH BAY BLDG MAINTENAN 6246202 OFF OF SHERIFF - FISCAL SV 1117101 HWY9 / ALOHA - 05 /10 LADDER - THEATER HP SERVER HP SERVER EAP SVC - 04/10 IRRIGATION - WHH BATTERIES - AUTOS BATTERIES - AUTO SUPPLIES - RESTRIPING PIPE REPAIR - SUNLAND PROF SVC - ADA SIGNAL ROOF FRAME EVALUATION PROF SVC - AUSTIN WAY SALES TAX Q4/09 WKLY SVC 4/25- 4/30/10 LAW ENFORCEMENT 5 /10 SALES TAX 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 firurfiffi ► i 317.10 1,885.45 300.00 152.95 305.90 458.85 52.57 11.33 57.12 94.35 140.08 38.29 8.07 5,214.50 5,214.50 10,830.81 390.00 425.75 306.27 3,869.00 4,175.27 465.50 587.53 97.18 97.18 194.36 854.72 360.28 22,197.50 1,000.00 23,197.50 500.00 500.00 342.00 344,573.67 M- 8 SUNGARD PUBLIC SECTOR PAGE NUMBER: 3 DATE: 05/24/2010 CITY OF SARATOGA ACCTPA21 TIME: 15:20:52 CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115152' and '115200' ACCOUNTING PERIOD: 11 /10 FUND - 009 - DISBURSEMENT FUND CASH ACCT CHECK NO ISSUE DT - - - - -- 11111 115182 05/20/10 145 11111 115182 05/20/10 145 11111 115182 05/20/10 145 11111 115182 05/20/10 145 TOTAL CHECK 2555302 TRICIA WOODS 11111 115183 05/20/10 60 11111 115184 05/20/10 278 11111 115185 05/20/10 821 11111 115186 05/20/10 500 11111 115187 05/20/10 500 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 11111 115188 05/20/10 87 TOTAL CHECK 11111 115189 05/20/10 136 11111 115189 05/20/10 136 11111 115189 05/20/10 136 TOTAL CHECK 11111 115190 05/20/10 160 11111 115190 05/20/10 160 11111 115190 05/20/10 160 TOTAL CHECK 11111 115191 05/20/10 874 11111 115192 05/20/10 710 11111 115193 05/20/10 343 11111 115194 05/20/10 385 11111 115194 05/20/10 385 TOTAL CHECK 11111 115195 05/20/10 500 VENDOR - - -- --- - - - - -- BUDGET UNIT DESCRIPTION SALES TAX 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AMOUNT 196.60 14.50 47.90 68.94 327.94 5.00 200.00 124.00 134.00 300.00 OFFICE DEPOT INC. 6213102 OFFICE DEPOT INC. 1114101 OFFICE DEPOT INC. 1114102 OFFICE DEPOT INC. 1115101 ONTRAC 1115101 PETROTEK 6235202 PLACER SALES ASSOCIATES 4139322 -001 QUILI ZHOU 1116101 ROSALVA MUNOZ 111 COPY PAPER OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES CALTRANS 04/28 FUEL TESTING 04/10 SCAFFOLD - THEATER CANCELLED CLASS FACILITY DEP REFUND SAN JOSE WATER COMPANY 6246202 BUILDINGS SAN JOSE WATER COMPANY 1115301 PARKS / OPEN SPACES SAN JOSE WATER COMPANY 2495302 MANOR DRIVE SAN JOSE WATER COMPANY 2555302 TRICIA WOODS SAN JOSE WATER COMPANY 2715302 BEAUCHAMPS SAN JOSE WATER COMPANY 2545302 SUNLAND PARK SAN JOSE WATER COMPANY 2775302 VILLAGE COMMERICAL SAN JOSE WATER COMPANY 2535302 MINA WAY SAN JOSE WATER COMPANY 2445302 CUNNINGHAM SAN JOSE WATER COMPANY 2475302 KERWIN RANCH SAN JOSE WATER COMPANY 2745302 HORSESHOE DR SAN JOSE WATER COMPANY 2435302 CARNELIAN GLEN SCOTTY'S AUTOMOTIVE 6235202 MAINTENANCE VEH# 107 SCOTTY'S AUTOMOTIVE 6235202 MAINTENANCE VEH #115 SCOTTY'S AUTOMOTIVE 6235202 MAINTENANCE VEH #111 SIERRA PACIFIC TURF SUPP 1115301 SUPPLIES - PARKS SIERRA PACIFIC TURF SUPP 1115301 SUPPLIES - C SPRINGS SIERRA PACIFIC TURF SUPP 1115301 FERTILIZER - PARKS SILICON CONSTELLATIONS, 4119111 -001 THE BANK OF NEW YORK MEL 3118601 TMT ENTERPRISES INC 1115301 UNIVERSAL SWEEPING SERVI 1115103 UNIVERSAL SWEEPING SERVI 1115103 VANDA ROTH 111 MARKERS - RESURFACING BOND SERIES 2001 MULCH - PARKS SWEEP SVC 04/10 SWEEP SVC 04/10 FACILITY DEP REFUND 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 134.39 1,517.51 55.80 12.56 111.24 199.86 505.41 290.95 43.25 231.47 217.88 93.38 3,413.70 35.00 66.08 66.08 167.16 89.97 557.18 795.13 1,442.28 1,634.40 795.00 202.11 742.92 7,489.00 8,231.92 300.00 N SUNGARD PUBLIC SECTOR PAGE NUMBER: 4 DATE: 05/24/2010 CITY OF SARATOGA ACCTPA21 TIME: 15:20:52 CHECK REGISTER - DISBURSEMENT FUND SELECTION CRITERIA: transact.check_no between '115152' and '115200' ACCOUNTING PERIOD: 11 /10 FUND - 009 - DISBURSEMENT FUND 1 _ �9 : � _ C � I � i i t i l . I a [ � 1: � ► [ � � �XY � l � � y i 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 11111 115196 05/20/10 395 TOTAL CHECK 11111 115197 05/20/10 402 11111 115198 05/20/10 544 11111 115198 05/20/10 544 TOTAL CHECK 11111 115199 05/20/10 198 11111 115199 05/20/10 198 11111 115199 05/20/10 198 TOTAL CHECK VENDOR VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS BUDGET UNIT DESCRIPTION 11111 115200 05/20/10 696 TOTAL CASH ACCOUNT TOTAL FUND TOTAL REPORT 1115301 1115101 1112101 1112201 1112301 1113101 6223201 1114201 1114101 1114103 1115201 1115102 6246202 VISTA LANDSCAPE & MAINTE 4139353 -001 WHEEL WORKS 6235202 WHEEL WORKS 6235202 WITTWER & PARKIN, LLP 111 WITTWER & PARKIN, LLP 111 WITTWER & PARKIN, LLP 111 ZAG TECHNICAL SERVICES, 6223201 PW - PARKS PW - ENGINEERING CTY MGR OFFICE CTY CLRK OFFICE HR DEPT FINANCE DEPT IT SERVICES CDD - BUILDING /INSPEC CDD - DEVELOPMENT CDD - CODE COMPLIANCE PW - STREETS PW - ENG DEVELOPMENT FACILITIES FENCE - FRIENDSHIP HALL MAINTENANCE VEH #116 MAINTENANCE VEH #114 APP# 04 -016 APP# ANX 09 -0002 APP# GPA 09 -0002 IT SUPPORT SVC 4/26 SALES TAX 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 firurfiffi ► i 303.71 108.96 33.51 63.22 77.30 64.80 65.92 82.69 71.91 36.32 158.05 0.28 155.26 1,221.93 1,420.00 592.07 311.92 903.99 125.50 200.80 200.80 527.10 41.25 455,999.90 455,999.90 455.999.90 M SARATOGA CITY COUNCIL MEETING DATE: June 2, 2010 AGENDA ITEM: DEPARTMENT: Finance & Admin Services CITY MANAGER: Dave Anderson PREPARED BY: Mary Furey DIRECTOR: Mary Furey SUBJECT: Adoption of Fiscal Year 2010/11 Operating & Capital Budget and the Environmental Impact Assessment for new CIP projects RECOMMENDED ACTIONS 1. Adopt resolution approving the Proposed FY 2010/11 Operating and Capital Budgets, directing staff to incorporate within the final adopted budget any changes related to minor corrections, carryforward appropriations, refined estimates, grant approvals, claim reimbursements, pass- through appropriations, or additional direction from Council upon adoption of the budget. 2. Adopt attached Environmental Impact Assessment for new projects included in the FY 2010/11 CIP update. BACKGROUND The City's Proposed Operating and Capital Budgets reflect both revenue and expenditure appropriations which provide for the City's service operations, administration, obligations, and infrastructure improvement projects. The City's Operating Budget document is structured into a departmental format which defines departmental oversight, key program services, and significant projects or initiatives for the fiscal year. Summary level revenue and expenditure budget appropriations and assigned personnel schedules for proposed, current and prior years are included within each departmental program to identify the resources used to provide these services and operations, and for historical reference. The Financial Summaries section of the Operating Budget document compiles the individual financial and staffing information into summary schedules to provide users with an consolidated view of funding sources and uses from different perspectives, including departmental, fund type, and category. The City's Capital Budget document is structured into four program areas, (Streets, Parks & Trails, Facilities, and Administrative Improvement Projects) which are further categorized by either the type of infrastructure improvement in the Streets and Administrative Improvement programs, or by site in the Parks & Trails and Facilities programs. The Capital Improvement Plan represents a multi -year work plan for major capital expenditures and related funding sources, to improve and maintain the various types of city infrastructure. Attached to this report, for Council adoption, is an Environmental Impact Assessment report in compliance with the California Environmental Quality Act (CEQA) requirement to ensure an assessment of the environmental impacts of new projects has been made by the governing body. 63 REPORT DISCUSSION Budget Status A public hearing was held on May 19, 2010 to review the City of Saratoga's proposed operating and capital budgets and obtain community input. The FY 2010/11 Proposed Operating Budget sustains service levels, operations, and obligations as are currently in place, with a few exceptions. Staff time will be impacted with the reduction of six full -time staff to part-time status, and from a 3 day furlough for the remainder of the City's full -time staff. Overtime and temporary staff hours were also reduced. These reductions will impact services and workload, particularly in the City Manager's Office where three of the FTE reductions will occur. There will be numerous operational changes, including two that will be visible to the public. The Saratogan newsletter will no longer be delivered as a stand -alone mailing to residents; it will instead be included in the City's recreation guide and mailed to residents on the three times a year recreation guide schedule. A second noticeable change will come from restricting public notifications published in the newspaper to those notices that are legally required to be published, such as ordinances and fee hearings. Beginning next year, notifications such as the annual public hearing for the budget will be posted at City Hall and on the City's website in order to reduce expenses. In addition to new reductions, most prior year operating budget expenditure reductions will continue, most notable are the elimination of a Planner and Building Inspector position in Community Development; a Recreation Coordinator position in Recreation; and the reduction of the City Manager's Executive Assistant from full -time to three - quarter time. The city continues to under -fill the IT Technician position with a temporary IT Intern for the third consecutive fiscal year, and a temporary half -time Sr. Accountant backfills the eliminated Accounting Supervisor position. Staff continues to seek out opportunities to increase operational efficiencies and reduce service costs on an ongoing basis, in order to provide the best use of City resources. Budget Appropriations The Operating & Capital Budget's Financial Summaries include schedules which illustrate summary level revenue and expenditures information. This first schedule on the following page illustrates the Proposed Budget's total activity by fund, categorized by fund group, beginning with the estimated July 1, 2010 fund balance, adding and subtracting all budgeted activity, and ending with the estimated year end fund balance at June 30, 2011. This Total Fund Activity Summary schedule categorizes the City's different funds by function. Operating Funds support the City's general operations, restricted revenue programs and services, and internal support services. Debt Service Funds account for the funding and payment of the City's bond debt, and Trust & Agency Funds account for funds held in a trustee capacity; not to be used for City purposes. Capital Funds are used to account for major acquisition and construction of asset expenditures, in order to separate one -time activity from ongoing operational activities. As shown, the Operating Budget's Total Expenditures and Transfers -Out exceed Total Revenues and Transfers -In. This is a consequence in part, of transferring out prior year operating fund surpluses to the Capital Project Funds. Additionally, other fund expenditures may be budgeted higher than revenues in some budget years. This would occur for example, in a replacement Internal Service Fund, where funding receipts may be less than amounts budgeted for replacement during any given fiscal year. It will also occur if the Internal Service Fund (ISF) includes current year contingency funding which may or may not be expended. This is typical in the Building Maintenance ISF to allow for urgent repairs to be made if needed, while avoiding a continual build -up of fund balance if repairs are not needed. .11 Total Fund Activity Summary FY 2010/11 Special Revenue Funds CDBG Program Fund SHARP Program Fund Landscape & Lighting Districts Internal Service Funds Liability/Risk Management Workers Compensation Office Support Services IT Services Vehicle & Equipment Maintenance Building Maintenance Vehicle & Equipment Replacement IT Equipment Replacement - Estimated Revenues Expenditures Source (Use) Estimated 437,472 Fund Balance & & of Fund Balance Fund Category July 1, 2010 Transfers In Transfers Out Fund Balance June 30, 2011 Operating Funds 400,000 (440,134) 59,693 200,000 (210,623) General Fund 725,000 (741,161) 237,587 100,000 (99,000) Reserve for Petty Cash 1,300 (77,500) $', - 1,300 Designated for Operations 2,891,666 28,917 2,920,582 Economic Uncertainty 1,500,000 5,335,132 (6,494,857) - 1,500,000 Environmental Reserve 563,182 556,413 2,589,807 (50,000) 513,182 Development Reserve 632,380 Facility Projects 438,443 (210,000) 422,380 Uncollected Deposits 182,159 Administrative Projects 219,773 182,159 CIP/MatchingReserve 726,983 - (505,000) 221,983 Hillside Stability Reserve 300,000 - - $ - 300,000 Undesignated Fund Balance 884,762 15,285,004 (16,045,428) 736,083 860,421 Total General Fund 7,682,432 15,285,004 (16,045,428) - 6,922,008 Special Revenue Funds CDBG Program Fund SHARP Program Fund Landscape & Lighting Districts Internal Service Funds Liability/Risk Management Workers Compensation Office Support Services IT Services Vehicle & Equipment Maintenance Building Maintenance Vehicle & Equipment Replacement IT Equipment Replacement - 394,356 (394,356) 210,125 1,000 437,472 455,193 (631,156) 241,493 281,500 (393,464) 199,109 225,000 (247,791) 31,033 42,000 (48,050) 127,589 400,000 (440,134) 59,693 200,000 (210,623) 189,039 725,000 (741,161) 237,587 100,000 (99,000) 158,296 50,000 (77,500) 211,125 261,509 Total Operating Funds Debt Service 2001 Series GO Bonds Total Debt Service $ 9,573,868 $ 18,159,053 $ (19,328,664) $ 959,553 962,000 (1,019,656) _ $ 959,553 $ 962,000 $ (1,019,656) $ 129,529 176,318 24,983 87,454 49,070 172,878 238,587 130,796 $ 8,404,257 901,897 $ 901,897 Trust & Agency Funds Library Capital Improvement 345,033 - (345,033) KSAR 105,588 68,500 (174,088) Total Trust & Agency Funds $ 450,621 $ 68,500 $ (519,121) $ TOTAL OPERATING BUDGET $ 10,984,042 $ 19,,189,553 $(20,867,441) $ $', 9,306,154 Capital Funds Street Projects 1,258,469 5,335,132 (6,494,857) 98,744 Park & Trail Projects 556,413 2,589,807 (3,146,220) - Facility Projects 438,443 761,636 (1,200,079) Administrative Projects 219,773 - (219,773) - Total Capital Funds $ 2,473,097 $ 8,686,575 $ (11,060,929) $ - $ 98,744 TOTALALLFUNDS $ 13,457,139 $ 27,876,128' $(31,928,370) $ $' 9,404,898 65 Of particular note on the Total Activity schedule, is that the Capital Projects Funds reflect end -of the - year estimates two months prior to the end of the fiscal year - which means there will be many project ending balance changes, which changes the final budget numbers. The impact of this is that for Capital Budgets, estimated year -end project balances are automatically carried forward as continued budgeted appropriations into the following fiscal year. CIP projects are multi -year operations; therefore the beginning fund balance is dependent on prior year project expenditures which are not finalized at the time the proposed budget is adopted. In addition, on the budget schedule, the entire estimated carryforward and all new funding is typically appropriated and subsequently expended during the new budget year, typically leaving a fund balance of zero in each of the Capital Project funds. This method of full appropriation provides flexibility to allow the full funding for the project to be encumbered under contract if needed (as project work extends beyond fiscal year boundaries). However, the result of this capital budgeting method is a higher estimated Beginning Fund Balance than the estimated Ending Fund Balance, (as well as higher revenue and expenditure appropriations than will actually occur). For FY 2010/11, a balance of $98,744 remains in the Streets program at year end as funds designated for a utility undergrounding project were not appropriated as final development of the project scope is on hold awaiting additional funding. Budget Adjustments Throughout the year, Council may approve both Operating and Capital Budget adjustments for additional initiatives or projects. Within the Operating Budget, the Council approves the budget at the Fund level, meaning the City Manager is authorized to make program and account changes within a fund, however Council approval is required for adjustments that would either increase or decrease fund appropriations. The Capital Budget is authorized at the project level, meaning Council approval is required for both appropriation dollar changes and project scope changes. As a budget simplification, projects are typically budgeted with total expenditure appropriations accounted for in one project construction account, whereas actual expenditures are accounted for in the appropriate capital expense account. As a contingency built into the budget resolution, if at project close, an immaterial project balance remains, the amount will be transferred out to the annual Streets Resurfacing project in the Streets Program, to the Annual Park & Trail Maintenance project in the Parks & Trail program, to the Annual Facility Improvement project in the Facility Program, and to the Manager's Records Management project in the Administrative Improvements program. If the ending balance is material, a fund balance transfer to another project or back to the General Fund Capital Reserve will be requested for approval from the Council. This methodology simplifies project closure while still retaining appropriated funding in the original capital project fund. General Fund The General Fund is the main operating fund used to account for the majority of the City's operations. The following two charts provide a graphical overview of the budgetary appropriations for General Fund revenues and expenditures by category. The schedules below each graph provide summary level financial data for the proposed budget year (gray column), as well as the current and two prior fiscal years for historical reference. As you can see on the following page, the General Fund Revenue and Transfers In chart includes additional funding from designated reserves to clearly identify the total General Fund sources which offset the total General Fund uses. The second chart; General Fund Expenditures and Transfers Out shows that total uses is slightly less than the total sources, leaving us with a balanced General Fund budget. .. � r`�� Funding from Use of Designated Funds FY 2007/08 FY 2008/09 FY 2009 /10 FY 2009 /10 FY 2010/11 '' % of Revenue Category Actuals Actuals Adjusted Estimated Proposed Total Property Tax $ 7,922,815 $ 8,155,362 $ 8,175,500 $ 8,091,904 $ ''8,022,600 52.5% Sales Tax 1,057,977 1,043,034 910,000 875,000 910,000 6.0% Transient Occupancy Tax 211,532 151,378 140,000 120,000 120,000 0.8% Business & Other Taxes 482,184 511,675 490,000 425,000 425,000 2.8% Franchise Fee Tax 1,623,318 1,656,716 1,675,000 1,651,579 1,652,000 10.8% Intergovernmental 428,304 303,212 268,500 323,377 267,000 1.7% Fees, Licenses & Permits 1,747,922 1,186,319 1,083,750 1,036,249 1,012,300 6.6% Charge for Services 1,738,918 1,670,175 1,551,531 1,461,411 1,532,035 10.0% Interest 615,731 362,588 170,000 90,275 90,000 0.6% Rental Income 386,834 366,619 364,342 411,694 435,320 2.8% Other Sources 387,958 467,124 288,000 357,789 569,200 3.7% Total Revenues S 16,603,493 S 15,874,201 S 15,116,623 S 14,844,277 S 15,035,454 98.4% Fund Transfers In 2,275,254 153,732 273,859 325,842 249,550 1.6% Total Revenues & Transfers S 18,878,747 S 16,027,933 S 15,390,482 S 15,170,119 S 15,285,004 100.0% Funding from Use of Designated Funds Theater Surcharge Deposit - 53,167 - - Funding Carryforward 80,000 58,386 22,000 22,000 - Development Reserve 99,447 75,000 75,000 75,000 210,000 Environmental Reserve 40,000 66,735 50,000 50,000 50,000 CIP Reserve - 1,400,000 550,000 550,000 505,000 Economic Stability Reserve - - 25,000 25,000 - Total Operating Sources 19,098,194 17,681,221 16,112,482 15,892,119 16,050,004_ 67 General Fund Revenues & Transfers In By Category FY 2010/11 F The FY 2010/11 General Fund proposed budget appropriations reflect net sources (revenues, transfers in, carryforward, and designated fund balance funding) exceeding uses (expenditures and transfers out to other funds) by $4,576. Overall, the FY 2010/11 General Fund proposed budget revenues reflect slightly more ($191,000) than the current year's estimated revenues, primarily due to several small expected increases in Sales Tax and Recreation Services, and a reimbursement from the Sheriff's Office. Additional funds are coming from the Development Reserve under Council's policy of use in economic downturns, from the Environmental Reserve for Solid Waste diversion programs, and from the CIP reserve to fund approved CIP projects. Budgeted expenditures reflect an increase from FY 2009/10 estimated expenditures due to increases in budgeted salary and benefits, and from public safety contracts. Even with staffing and salary reductions, .: General Fund Expenditures & Transfers Out By Category FY 2010/11 FY 2007/08 FY 2008/09 FY 2009/10 FY 2009/10 FY 2010/11 _ ''' % of Expenditure Category Actuals Actuals Adjusted Estimated Proposed Total Salary & Benefits $ 6,172,956 $ 6,485,451 $ 6,505,303 $ 6,343,849 $ 6,553,680 40.8% Materials & Supplies 316,073 216,062 185,525 164,724 174,008 1.1% Fees & Charges 621,787 619,648 698,080 636,499 701,859 4.4% Consultant & Contract Services 5,516,722 5,985,878 5,821,677 5,795,654 5,972,756 37.2% Meetings, Events & Training 73,746 74,204 55,265 44,278 57,975 0.4% Community Grants & Events 189,934 162,669 208,006 207,792 181,376 1.1% Fixed Assets 30,127 30,105 - 0.0% Internal Services Charges 2,053,479 2,189,340 1,873,576 1,873,576 1,798,775 11.2% Total Expenditures $ 14,974,823 $ 15,763,356 $ 15,347,432 $ 15,066,373 $ 15,440,428 96.2% Fund Transfers Out: 3,764,304 1,571,727 650,000 650,000 605,000 3.8% Total Expenditures & Transfers $ 18,300,791 $ 17,335,083 $ 15,997,432 $ 15,716,373 $ 16,045,428 100.0% The FY 2010/11 General Fund proposed budget appropriations reflect net sources (revenues, transfers in, carryforward, and designated fund balance funding) exceeding uses (expenditures and transfers out to other funds) by $4,576. Overall, the FY 2010/11 General Fund proposed budget revenues reflect slightly more ($191,000) than the current year's estimated revenues, primarily due to several small expected increases in Sales Tax and Recreation Services, and a reimbursement from the Sheriff's Office. Additional funds are coming from the Development Reserve under Council's policy of use in economic downturns, from the Environmental Reserve for Solid Waste diversion programs, and from the CIP reserve to fund approved CIP projects. Budgeted expenditures reflect an increase from FY 2009/10 estimated expenditures due to increases in budgeted salary and benefits, and from public safety contracts. Even with staffing and salary reductions, .: General Fund Expenditures & Transfers Out By Category FY 2010/11 budgeted expenses increased slightly from last year primarily from medical insurance premium increases, the 1% COLA increase, and some step increases. Under the salary and benefits budgeting method, most staff is budgeted at the top level, however management staff and temporary staff are not, and these wages may be adjusted on a yearly basis. In addition, the highest cost medical benefit is used in calculating benefits in order to build in potential costs that could occur if all employees were to choose the highest cost medical plan. While this methodology provides consistency in budget numbers, not all staff members are at top step or use the most expensive medical plan, therefore staffing cost actuals are less than budget each year, which provides some General Fund savings. CPI adjustments in both the Sheriff Services and Animal Control Services contracts also contributed to the budget increase, however with the limited CPI increases in the last couple of years, the increase was minimized. For the Sheriff's contract, the increase for the next fiscal year was held to $117,000. For the Animal Services, the increase from the prior year is $11,200. Overall, the General Fund Operating Budget's expenditures reflect reductions in staff time, operating materials, supplies, fees, and services where available without significantly impacting community services, in order to offset areas of increase. The Proposed Operating and Capital Budget reflects estimated amounts for FY 2009/10, whereas the final budget document will be adjusted to actuals prior to publication and posting to provide the public with accurate information for future year's reference. The final budget document will also include any additional changes as a result of direction from Council and /or identified by staff as a clean -up item will be included in the final budget, per Council's adoption of the FY 2010/11 Operating & Capital Budget resolution at the June 2, 2010 Council Meeting. CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION The City would not adopt an Operating & Capital Budget for FY 2010/11. ALTERNATIVE ACTION N/A FOLLOW UP ACTIONS 1. Prepare FY 2010/11 Adopted Operating & Capital Summary and Detail Budget documents as directed by Council. 2. Monitor revenues and expenditures and provide quarterly reports and updates as necessary to Finance Committee and Council. ADVERTISING, NOTICING AND PUBLIC CONTACT N/A ATTACHMENTS A: Resolution to Adopt the Fiscal Year 2010/11 Operating & Capital Budget .• Attachment A A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA ADOPTING THE FISCAL YEAR 2010/11 OPERATING & CAPITAL BUDGET WHEREAS, the City Council held a public hearing on the Proposed Operating & Capital Budget for Fiscal Year 2010/11 on May 19, 2010; WHEREAS, Section 2- 20.050(1) of the Code of the City of Saratoga requires the City Manager to prepare and submit the proposed annual budget to the City Council for its approval; WHEREAS, the Planning Commission has conducted an annual review of proposed new capital projects for consistency with the City's general plan; and WHEREAS, after the Planning Commission's approval of the proposed new projects the City Manager did submit a proposed budget for FY 2010/11 to the City Council; and WHEREAS, the City Council has considered and, upon consensus may provide direction for modifications to the proposed budget during a public hearing; and WHEREAS, the City Council gave staff direction to adopt the Fiscal Year 2010/11 operating and capital budgets as proposed; NOW THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga hereby adopts the Fiscal Year 2010/11 Operating & Capital Budget as shown in the Total Fund Activity Summary schedule in the budget adoption report; AND BE IT FURTHER RESOLVED, that the final adopted budget includes carry - forward appropriations for prior year capital projects, identified funding for specified expenditures, grants, and pass- through balances; that capital projects are in compliance with the General Plan; that there be carried forward from the prior year within each fund an amount sufficient to cover approved outstanding encumbrances as of June 30, 2010; AND BE IT FURTHER RESOLVED, that the City Council hereby directs staff that any changes or impacts resulting from: Council approval of the meet and confer process or management compensation plan; from classification adjustments or miscellaneous corrections; from changes due to more refined estimates, grant approvals, or claim reimbursements; from development fee based pass - through budget appropriations; or from further City Council consensus direction received on June 2, 2010 be incorporated within the final Fiscal Year 2010/11 Operating & Capital Budgets; 70 Attachment A AND BE IT FURTHER RESOLVED, that the Finance and Administrative Services Director is directed to record these changes into the City's accounting records in accordance with appropriate accounting practices. The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City Council held on the 2nd day of June, 2010, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Kathleen King, Mayor City of Saratoga ATTEST: Ann Sullivan, City Clerk of the City of Saratoga 71 1 cry f` ,�'�*� .;� `,' AL 1L Y z z — C , I 4 " 4;0�4 ��a'�,+ �°� n� 'F�iv �� �.��" i M rp'����t�ai�l �������a� 1 S �5 � �" i �� + �? f �l Wn� om i 37 A -46 I F-4. !km I I I !we ti � SARATOGA CITY COUNCIL f 1 MEETING DATE: June 2, 2010 AGENDA ITEM: DEPARTMENT: Finance & Admin Services CITY MANAGER: Dave Anderson PREPARED BY: Mary Furey DIRECTOR: Mary Furey SUBJECT: Fiscal Year 2010/11 Gann Appropriation Limit RECOMMENDED ACTION Adopt resolution approving the Gann Appropriations Limit for FY 2010/11. REPORT DISCUSSION Background On November 6, 1979, California voters approved Proposition 4, commonly known as the Gann Spending Limitation Initiative, establishing Article XIIIB of the California State Constitution. This proposition, which became effective in fiscal year 1980/81, mandated an appropriations (spending) limit on the amount of tax revenues that the State and most local government jurisdictions may appropriate within a fiscal year. This limit grows annually by a population and cost -of- living factor. The State Appropriation Limit was since modified by two subsequent initiatives - Proposition 98 in 1988 and Proposition 111 in 1990. Proposition 98 established the return of tax revenues exceeding appropriation limit levels to citizens through a process of refunds, rebates, or other means. Proposition 111 allowed more flexibility in the appropriation calculation factors. Only tax proceeds are subject to this limit. Charges for services, fees, grants, loans, donations and other non -tax proceeds are excluded. Exemptions are also made for voter - approved debt which existed prior to January 1, 1979, and for the cost of compliance with court or Federal government mandates. The City Council adopts an annual resolution establishing an appropriations limit for the following fiscal year using population and per capita personal income data provided by the State of California's Department of Finance. Each year's limit is based on the amount of tax proceeds that were authorized to be spent in fiscal year 1978/79, with inflationary adjustments made annually to reflect increases in population and the cost of living. Calculation The California Department of Finance distributes the annual percentage change per capita personal income and the percentage population change within the City and the County to jurisdictions on May 1St each year. Either the City or County's population factor may be used in the appropriation calculation with the California Per Capita Income A; however using the larger population factor increases the limit to a higher dollar amount. Therefore, for Saratoga, the County population factor is more often used. 73 The County's percentage increase in population change is combined with the State's change in per capita income to determine the City's appropriation factor. The current year's appropriation limit is then increased by this appropriation factor to calculate the Gann Appropriation Limit for the following fiscal year. The calculation for the FY 2010/11 limit is as follows: FY 2010/11 Calculation % Increase in California 2009/10 2010/11 County Per Capita Appropriation Appropriation Appropriation Population Income A Factor Limit Limit 1.0126 X 0.9746 = 0.9869 X $ 31,261,971 = $ 30,851,813 Summary: The Gann Appropriation Limit establishes the maximum amount of tax revenue proceeds the City may appropriate in the following fiscal year. The City's proposed budget for FY 2010/11 anticipates $9,599,500 in Gann designated tax revenues, which is $21,252,313 less than the appropriation limit of $30,851,813. Conclusion: It is recommended that the Council adopt the resolution approving the FY 2010/11 Gann Appropriation Limit of $30,851,813. CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION The City would not be in compliance with Article X11113 of the State of California Constitution. ALTERNATIVE ACTION N/A FOLLOW UP ACTION N/A ADVERTISING, NOTICING AND PUBLIC CONTACT N/A ATTACHMENTS A - Gann Appropriation Limit Factors and Calculation B — Resolution 74 Attachment A APPROPRIATION LIMIT FACTORS For Beginning County City YE Appropriation Population Population June 30 Limit Factor Factor 2001 19,675,107 1.0163 1.0055 2002 20,977,606 1.0147 1.0055 2003 22,950,540 1.0125 1.0191 2004 23,092,833 1.0079 1.0029 2005 23,694,794 1.0072 1.0000 2006 24,471,983 1.0112 1.0124 2007 26,078,624 1.0118 1.0034 2008 27,203,516 1.0152 1.0138 2009 28,837,681 1.0172 1.0077 2010 30,592,104 1.0156 1.0070 California Ending % Per Capita Appropriation Limit Income a Limit Increase 1.0491 20,977,606 6.62% 1.0782 22,950,540 9.40% 0.9873 23,092,833 0.62% 1.0231 23,694,794 2.61% 1.0328 24,471,983 3.28% 1.0526 26,078,624 6.57% 1.0396 27,203,516 4.31% 1.0442 28,837,681 6.01% 1.0429 30,592,104 6.08% 1.0062 31.261.971_ I'' 2.19% FY 2010/11 Calculation % Increase in California 2009/10 2010/11 County Per Capita Appropriation Appropriation Appropriation Population Income a Factor Limit Limit 1.0126 X 0.9746 = 0.9869 X $ 31,261,971 = $ 30,851,813 Percentage of Appropriation 2010/11 2010/11 Percentage Tax Appropriation of 75 Attachment B RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA ESTABLISHING THE FISCAL YEAR 2010/11 GANN LIMIT APPROPRIATION FOR THE CITY OF SARATOGA WHEREAS, the City of Saratoga has established its Base Year Appropriation Limit as $5,961,747 in Fiscal Year 1978/79; and WHEREAS, the cumulative changes to population and to the California per capita personal income since the Base Year established the revised Proposition 111 Fiscal Year 1996/97 Appropriation Limit as $16,153,314, and WHEREAS, to the best of the City's knowledge and belief, the State Department of Finance figures provided to the City in response to Proposition 111 passed by the voters in June 1990, reflects the appropriate statistics relevant to the calculation of the Fiscal Year 2010/11 Appropriation Limit, which includes: • County population adjustments for the year ended December 31, 2009 equal to 1.26 %, and • City population adjustment for the year ended December 31, 2009 equal to 1.00 %, and • Change in California per capita cost of living for fiscal year 2010/11 equal to .9746% NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga hereby resolves that, based on the foregoing figures and the provisions of the Article XIIIB of the Constitution of the State of California, the following figure accurately represents the Fiscal Year 2010/11 Appropriation Limit for the City of Saratoga at: $30,851,813 The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City Council held on the 2nd day of June 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN Kathleen King, Mayor ATTEST: Ann Sullivan, City Clerk 76 SARATOGA CITY COUNCIL MEETING DATE: June 2, 2010 AGENDA ITEM: ORIGINATING DEPT: City Manager's Office CITY MANAGER: PREPARED BY: DEPT HEAD: Ann Sullivan, City Clerk Dave Anderson, City Manager SUBJECT: Resolution Calling the General Municipal Election — November 2, 2010 RECOMMENDED MOTION: That City Council adopts the Resolution Calling the General Municipal Election for November 2, 2010. REPORT SUMMARY The following report recommends Council adoption of the attached resolution (Attachment 1), calling the General Municipal Election for three (3) City Council seats. The resolution specifies the County's responsibility throughout the filing and election process. An election calendar highlighting dates of interest to candidates and the public is attached to this report as references. (Attachment 2) DISCUSSION: Pursuant to Election Code commencing with Section 10400, the City Council hereby requests the Board of Supervisors of the County of Santa Clara to order the consolidation of the general and special municipal election to be conducted within the boundaries of the City of Saratoga on November 2, 2010, with respect to which the Board of Supervisors of the County of Santa Clara has the power to order a consolidation. The City Council further consents to and orders the consolidation of the general and special municipal election hereby called with the statewide general election. Upon consolidation, the consolidation election shall be held and conducted, election officers appointed, voting precincts designated, ballots printed, polls opened at 7:00 a.m. and closed at 8:00 p.m., ballots counted and returned, returns canvassed, and all other proceedings in connection with the election shall be regulated and done by the Registrar of Voters of the County of Santa Clara in accordance with the provisions of law regulating consolidated elections. 77 The nomination period for the 2010 General Municipal Election calls for the filing period of July 12, 2010 — August 5, 2010, except that if an incumbent elective officer does not file within the period, the voters shall have until 5 p.m. on Wednesday August 11, 2010 to nominate candidates other than incumbents. A General Municipal Election hereby is called to be held in and for the City of Saratoga on Tuesday, November 2, 2010 to elect three (3) Council members, each for a full term of four (4) years. In accordance with the California Elections Code Section 13307b), the County Registrar of Voters is required to provide all election material to be printed in five (5) mandated languages: English, Chinese, Spanish, Tagalog and Vietnamese, including instructions and words to a measure. The resolution provides the following: 1. Call for the General Municipal Election for election of certain officers for November 2, 2010 to be consolidated with the Santa Clara County Registrar of Voters. 2. Requests to the governing body of any political subdivision holding elections on November 2, 2010, that such election be consolidated with Saratoga's Municipal Election, under the administration of the County of Santa Clara Registrar of Voters office. 3. Determining that the length of candidate's statements shall not exceed four hundred (400) words in length, those candidates desiring to distribute a candidate's statement shall pay the prorated share of the estimated fee per candidate of $2,900. 4. Under Section 10228 of the Election Code there is a required filing fee of $25, which covers the City costs of processing nomination paper. FISCAL IMPACT Election costs have risen since the last General Election and the Registrar of Voters Office estimates the cost of the 2010 Election for the City of Saratoga to be approximately $48,000. The Registrar of Voters has based its increased charges per registered voter on several factors including: printing of bilingual ballots, publication of legal notices, postal rate increase, cost of living in personnel costs, bilingual recruitment of polling place workshops in targeted precincts, increased absentee voting, materials and supplies, and DRE (Electronic Voting Equipment Recovery Fee). ADVERTISING, NOTICING AND PUBLIC CONTACT: Pursuant to Government Code 54954.2, this item was properly posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting. 2 Publish Notice of Election in the Saratoga News and posting of the Council Agenda. FOLLOW UP ACTIONS: A certified copy of adopted Resolution Calling the General and Municipal Election shall be forwarded to the Santa Clara County Board of Supervisors and Santa Clara County Registrar of Voters no later than June 30, 2010. ATTACHMENTS: 1. Resolution 2. General Municipal Election Calendar 3. Notice of Election for Publication 79 RESOLUTION NO. 10 - RESOLUTION OF THE CITY OF SARATOGA ORDERING AND CALLING A GENERAL MUNICIPAL ELECTION TO BE HELD IN THE CITY OF SARATOGA ON NOVEMBER 2,2010; FOR THE ELECTION OF CERTAIN OFFICERS; REQUESTING THE SERVICES OF THE REGISTRAR OF VOTERS; REQUESTING CONSOLIDATION OF ELECTIONS AND SPECIFYING CERTAIN PROCEDURES FOR THE CONSOLIDATION OF ELECTIONS AND DETERMINING TO LEVY THE COST OF CANDIDATES' STATEMENTS; REQUIRING PAYMENT OF CANDIDATES' FILING FEES; AND PROVIDING FOR GIVING NOTICE OF ELECTION WHEREAS, California Election Code Section 1301 provides that the general election for the City of Saratoga can be held on the day of the statewide general election; WHEREAS, pursuant to Part 3 of Division 10 of the California Elections Code, a general election may be consolidated with a statewide election; and WHEREAS, a statewide election will be held on November 2, 2010; NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Saratoga: 1. A general municipal election is hereby called to be held in and for the City of Saratoga on Tuesday, November 2, 2010 to elect three (3) Council Members, each for a full term of four (4) years. 2. Pursuant to Election Code commencing with Section 10400, the City Council hereby request the Board of Supervisors of the County of Santa Clara to order the consolidation of the general municipal election to be conducted within the boundaries of the City of Saratoga on November 2, 2010, with respect to which the Board of Supervisors of the County of Santa Clara has the power to order a consolidation. The City Council further consents to and orders the consolidation of the general municipal election hereby called with the statewide general election. Upon consolidation, the consolidated election shall be held and conducted, election officers appointed, voting precincts designated, ballots printed, polls opened at 7:00 a.m. and closed at 8:00 p.m., ballots counted and returned, returns canvassed, and all other proceedings in connection with the election shall be regulated and done by the Registrar of Voters of the County of Santa Clara in accordance with the provisions of law regulating consolidated elections. The City Clerk is hereby authorized and directed to publish a notice of general municipal election within the time and in the manner specified in Elections Code Section 12109. The City Clerk is further authorized and directed to do all other things required by law to hold the general election above provided. :1 4. Pursuant to Section 13307 of the Elections Code, the City Council hereby determines to levy against each candidate availing himself or herself of the service of including a candidate's statement not to exceed four hundred (400) words in length in the voter's pamphlet, the actual pro -rated cost of printing, handling and translating the candidate statement, incurred by the City of Saratoga. The estimated cost per candidate for a four hundred (400) word candidate's statement is $2,900, in addition to the $25.00 filing fee. The City Clerk shall provide written notice to such effect with each set of nomination papers issued and shall require payment of the estimated pro rata share at the time the candidate statement is filed. 5. The City Clerk is hereby authorized and directed to certify to the adoption of the resolution and to transmit a certified copy to the Board of Supervisors of the County of Santa Clara and to the Registrar of Voters of the County of Santa Clara. PASSED AND ADOPTED at a regular meeting of the City of Saratoga this 2nd day of June 2010 by the following vote: AYES: NOES: ABSTAIN: ABSENT: SIGNED: KATHLEEN M. KING, MAYOR OF THE CITY OF SARATOGA SARATOGA, CALIFORNIA ATTEST: ANN SULLIVAN, CITY CLERK OF THE CITY OF SARATOGA SARATOGA, CALIFORNIA Abbreviated General Election Calendar November 2, 201 Santa Clara County 05/04/2010 %' 4 1 ID" s _ ��e4 € € � E ����j��:� as , 4 'AP 14H' h June 30, 2010 DUE DATE FOR RESOLUTIONS FOR GOVERNIA Q BOARD ELECTIONS (E — 125) Deadline for jurisdictions to submit resolutions for a governing board election. July 12, 2010 NOMINATION PERIOD OPENS First day candidates may pick up nomination do uments either at the district (E — 113) office or at the Office of the Registrar of Voters. August 6, 201 NOMINATION PERIOD CLOSES * (E — 88) Deadline to file (in the Office of the Registrar of Voters only) all required nomination documents, WITHDRAWAL OF CA IVDIDA TE No candidate shall withdraw after 5:00 p.m. on this date for offices which do not have an extension period. DUE DATE FOR MEASURE RESOLUTIONS AND TAX RATE STATEMENTS Last day for jurisdictions to file a resolution calling or a measure election, and if applicable, tax rate statements. August 7, through EXTENSION PERIOD If an incumbent fails to file a Declaration of Candid l ey by August 6 ' h for his or her August 11, 2010 office, there will be a 5-calendar-day extension wring which any candidate, other than the incumbent, may file or withdraw from said office. (E -87 to E — 83) August 10, 2010 DUE DA TE FOR ARGUMENTS Deadline set by the Registrar of Voters for submitting arguments in favor of and (E — 84) against a measure. August 12, 201 RANDOMIZED ALPHABET DRAWING This day the Secretary of State and the local elections official will conduct a (E — 82) drawing of letters of the alphabet to determine the order in which candidates appear on the ballot. August 17, 2010 DUE DATE FOR REBUTTALS AND IMPARTIAL ANALYSES Deadline set by the Registrar of Voters for submitt ng rebuttals to arguments in (E — 77) favor of and against and the impartial analysis. September 7** through WRITE-M! CANDIDACY OPENS AND CLOSES Time frame for write-in candidates to obtain and ile nomination documents in October 19, 2010 the Office of the Registrar of Voters. (E -57 to E - 14) 05/04/2010 %' Abbreviated General Election Calendar November 2, 2010 Santa Clara County ?, :�� �6 Ey� &T i 1 Ef E E % � - : �y.� � OBE €e B�Ei & EaE� >• � . E �� C P4 1 :���l�Y -'{ October 5, 2010 F.P.P.C. 1st PRE - ELECTION STATEMENT DUE Deadline for financial disclosure report Form 460 covering the period of 7 -1- (E — 28) 10 * ** to 9- 30 -10. October 4, 2010 FIRST DA Y FOR MAILING OF VOTE BY MAIL BALLOTS (E — 29) First day of mailing of Vote by Mail ballots. October 18, 2010 LAST DAY TO REGISTER TO VOTE FOR NOVEMBER ELECTION (E —15) Deadline to register to be eligible to vote in the November 2, 2010 election. October 21, 2010 F.P.P.C..2" PRE- ELECTION STATEMENT DUE Deadline For financial disclosure report Form 460 the period of 10 -1 -10 (E - 12) 7vering to 10- 16 -10. October 17 through LATE CO NTRIBUTION /INDEPENDENT EXPENDI URES Sums over $1000 to /from a single source must be reported within 24 hours. The November 1 2010 ' Late Independent Expenditure report is required only for committees (not (E —16 to E— 1) candidate committees) that make independent exr enditures totaling $1,000 or more to support or oppose a single candidate or a s ngle ballot measure. October 26, 2010 LAST DA Y TO REQ UEST VOTE BY MAIL BALLO BY MAIL (E — 7) Deadline at 5:00 p.m. to submit a request for a Vote by Mail ballot to be mailed to vote r. NOVEMBER 2, 2010 ELECTION DAY Polls are open from 7:00 a.m. to 8:00 p.m. November 30, 2010 OFFICIAL. CANVASS OF VOTE Registrar of Voters to certify election results by Nov mber 30, 2010, This calendar may not contain all of a candidate's or district's filing requirements. The Office of the Registrar of Voters is not open for filings on Saturday, Sunday or holidays. * The legal 10- calendar -day public examination period in which a writ of mandate may be sought begins Immediately following the filing deadline for submission of those documents. The writ of mandate request shall be filed no later than the end of the 10- calendar -day public exam nation period. ** Due to holiday. * ** The period covered by any statement begins on the day after the closing filed, OR January 1", if no previous statement has been filed. of the last statement OE/04/2010 NOTICE OF ELECTION Notice is hereby given that a General Municipal Election will be held in the City of Saratoga on Tuesday, November 2, 2010, for the following offices: Three (3) Council Members, each for a full four -year term. The polls will be open between the hours of 7:00 a.m. and 8:00 p.m. Individuals interested in running for office may obtain nomination papers from and file them in the City Clerk's Office, 13777 Fruitvale Avenue, Saratoga, CA. The nomination period is open from 8:00 a.m. July 12, 2010 through 5:00 p.m. August 5, 2010. Candidates must be registered voters within the corporate limits of the City of Saratoga. If an incumbent who is eligible to run for office does not file nomination papers by August 5, 2010, the deadline will be extended to August 11, 2010. /s /Ann Sullivan City Clerk (PUB: SN 06/29/10) ., ti � SARATOGA CITY COUNCIL 1 MEETING DATE: June 2, 2010 AGENDA ITEM: DEPARTMENT: Public Works CITY MANAGER: Dave Anderson PREPARED BY: Macedonio Nunez DIRECTOR: John Cherbone Associate Engineer SUBJECT: Transportation Development Act (TDA) Article 3 Application for the Saratoga Avenue Walkway Project. RECOMMENDED ACTION: Adopt resolution supporting the Metropolitan Transportation Commission's Transportation Development Act Article 3 Pedestrian/Bicycle Grant Application for the Saratoga Avenue Walkway Project. REPORT SUMMARY: Saratoga Avenue Walkway Project: In April 2009, Public Works staff applied for a Metropolitan Transportation Commission grant titled Transportation Development Act Article 3 Pedestrian/Bicycle Grant Application (TDA Article 3 Grant) for the Saratoga Avenue Walkway Project. Under the TDA Article 3 Grant, "Guaranteed" funds are made available each year for bicycle /pedestrian projects. On January 21, 1998, a Resolution was passed by City Council in support of the Saratoga Avenue Walkway Project that utilized the TDA allocations. This project has been ongoing since 1992, and has created new walkways along Saratoga Avenue from the City limits to Heritage Oak. This year's Guaranteed Allocation for the City of Saratoga is $11,937. These funds have also funded Pedestrian Safety Improvements at Crestbrook Drive, Herriman Avenue and La Paloma Avenue intersections. DISCUSSION: Renewed authorization to submit the attached application needs to be granted by the City Council. This will be accomplished by adopting the attached Resolution. FISCAL IMPACTS: No local match is required for TDA Article 3 Grants. Page 1 of 2 CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: The project would not be approved, and the TDA Guaranteed Allocation of $11,937 would be reallocated to other cities in Santa Clara County. ALTERNATIVE ACTION(S): None in addition to the above. FOLLOW UP ACTION(S): Resolution will be forwarded to the MTC. ADVERTISING, NOTICING AND PUBLIC CONTACT: This item was posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting and residents may subscribe to the agenda on -line by opting in at www.saratoga.ca.us. ATTACHMENTS Resolution Page 2 of 2 :. Resolution No. INSERT NUMBER Re: Request to the Metropolitan Transportation Commission for the allocation of fiscal year 2010 -11 Transportation Development Act Article 3 Pedestrian /Bicycle project funding WHEREAS, Article 3 of the Transportation Development Act (TDA), Public Utilities Code (PUC) Section 99200 et sec.., authorizes the submission of claims to a regional transportation planning agency for the funding of projects exclusively for the benefit and /or use of pedestrians and bicyclists; and WHEREAS, the Metropolitan Transportation Commission (MTC), as the regional transportation planning agency for the San Francisco Bay region, has adopted MTC Resolution No. 875, Revised, entitled "Transportation Development Act, Article 3, Pedestrian/Bicycle Projects," which delineates procedures and criteria for submission of requests for the allocation of "TDA Article 3" funding; and WHEREAS, MTC Resolution No. 875, Revised requires that requests for the allocation of TDA Article 3 funding be submitted as part of a single, countywide coordinated claim from each county in the San Francisco Bay region; and WHEREAS, the CITY OF SARATOGA desires to submit a request to MTC for the allocation of TDA Article 3 funds to support the projects described in Attachment B to this resolution, which are for the exclusive benefit and /or use of pedestrians and /or bicyclists; now, therefore, be it RESOLVED, that the CITY OF SARATOGA declares it is eligible to request an allocation of TDA Article 3 funds pursuant to Section 99234 of the Public Utilities Code, and furthermore, be it RESOLVED, that there is no pending or threatened litigation that might adversely affect the project or projects described in Attachment B to this resolution, or that might impair the ability of the CITY OF SARATOGA to carry out the project; and furthermore, be it RESOLVED, that the CITY OF SARATOGA attests to the accuracy of and approves the statements in Attachment A to this resolution; and furthermore, be it RESOLVED, that a certified copy of this resolution and its attachments, and any accompanying supporting materials shall be forwarded to the congestion management agency, countywide transportation planning agency, or county association of governments, as the case may be, of SANTA CLARA COUNTY for submission to MTC as part of the countywide coordinated TDA Article 3 claim. The CITY OF SARATOGA adopted this resolution on June 2, 2010. AYES: NAYS: ABSENT: ABSTAIN: Kathleen King, Mayor Attest Ann Sullivan, City Clerk City of Saratoga Resolution No. INSERT NUMBER Attachment A Re: Request to the Metropolitan Transportation Commission for the Allocation of Fiscal Year 2010 -11 Transportation Development Act Article 3 Pedestrian/Bicycle Project Funding Findings Page 1 of 1 1. That the CITY OF SARATOGA is not legally impeded from submitting a request to the Metropolitan Transportation Commission for the allocation of Transportation Development Act (TDA) Article 3 funds, nor is the CITY OF SARATOGA legally impeded from undertaking the project(s) described in "Attachment B" of this resolution. 2. That the CITY OF SARATOGA has committed adequate staffing resources to complete the project(s) described in Attachment B. 3. A review of the project(s) described in Attachment B has resulted in the consideration of all pertinent matters, including those related to environmental and right -of -way permits and clearances, attendant to the successful completion of the project(s). 4. Issues attendant to securing environmental and right -of -way permits and clearances for the projects described in Attachment B have been reviewed and will be concluded in a manner and on a schedule that will not jeopardize the deadline for the use of the TDA funds being requested. 5. That the project(s) described in Attachment B comply with the requirements of the California Environmental Quality Act (CEQA, Public Resources Code Sections 21000 et seq.). 6. That as portrayed in the budgetary description(s) of the project(s) in Attachment B, the sources of funding other than TDA are assured and adequate for completion of the project(s). 7. That the project(s) described in Attachment B are for capital construction and /or design engineering; and /or for the maintenance of a Class I bikeway which is closed to motorized traffic; and /or for the purposes of restriping Class 11 bicycle lanes; and /or for the development or support of a bicycle safety education program; and /or for the development of a comprehensive bicycle and /or pedestrian facilities plan, and an allocation of TDA Article 3 funding for such a plan has not been received by the CITY OF SARATOGA within the prior five fiscal years. 8. That the project(s) described in Attachment B which are bicycle projects have been included in a detailed bicycle circulation element included in an adopted general plan, or included in an adopted comprehensive bikeway plan (such as outlined in Section 2377 of the California Bikeways Act, Streets and Highways Code section 2370 et SeMc .). 9. That any project described in Attachment B that is a "Class I Bikeway," meets the mandatory minimum safety design criteria published in Chapter 1000 of the California Highway Design Manual. 10. That the project(s) described in Attachment B are ready to commence implementation during the fiscal year of the requested allocation. 11. That the CITY OF SARATOGA agrees to maintain, or provide for the maintenance of, the project(s) and facilities described in Attachment B, for the benefit of and use by the public. Resolution No. INSERT NUMBER Attachment B Page 1 of 2 TDA Article 3 Project Application Form Fiscal Year of this Claim: 10/11 Applicant: City of Saratoga Contact person: Macedonio Nunez Mailing Address: 13777 Fruitvale Avenue, Saratoga CA 95070 E -Mail Address: mnunez(a)saratoga.ca.us Telephone: (408) 868 -1218 Secondary Contact (in event primary not available) John Cherbone E -Mail Address: icherbone(a)saratoga.ca Telephone:(408) 868 -1241 Short Title Description of Project: Saratoga Avenue Pathway Project Amount of claim: $ 11,937 Functional Description of Project: Asphalt concrete & Portland cement concrete walkway along Saratoga Avenue, between Saratoga - Sunnyvale Rd to Park Place Financial Plan: List the project elements for which TDA funding is being requested (e.g., planning, environmental, engineering, right -of -way, construction, inspection, contingency, audit). Use the table below to show the project budget. Include prior and proposed future funding of the project. If the project is a segment of a larger project, include prior and proposed funding sources for the other segments. Project Elements: Final design, specification, construction and inspection Funding Source All Prior FYs Application FY Next FY Following FY s Totals TDA Article 3 $235,151 $11,937 For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California Highway Design Manual? (Available on the internet via: http: / /www.dot.ca.gov $11,937 list all other sources: YES E. Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that include construction). YES F. 1. YES G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name: YES 2. 3. 4. 1 $247,088 Totals $235,151 $11,937 Project Eligibility: YES ? /NO? A. Has the project been approved by the claimant's governing body? (If "NO," provide the approximate date approval is anticipated). NO 06/02/10 B. Has this project previously received TDA Article 3 funding? If "YES," provide an explanation on a separate page. YES C. For "bikeways," does the project meet Caltrans minimum safety design criteria pursuant to Chapter 1000 of the California Highway Design Manual? (Available on the internet via: http: / /www.dot.ca.gov D. Has the project been reviewed by a Bicycle Advisory Committee? (If "NO," provide an explanation). YES E. Has the public availability of the environmental compliance documentation for the project (pursuant to CEQA) been evidenced by the dated stamping of the document by the county clerk or county recorder? (required only for projects that include construction). YES F. Will the project be completed before the allocation expires? Enter the anticipated completion date of project (month and year) June 2010 YES G. Have provisions been made by the claimant to maintain the project or facility, or has the claimant arranged for such maintenance by another agency? (If an agency other than the Claimant is to maintain the facility provide its name: YES :• SARATOGA CITY COUNCIL MEETING DATE: June 2, 2010 DEPARTMENT: Administrative Services PREPARED BY: Leo Salindong IT Analyst AGENDAITEM: CITY MANAGER: Dave Anderson DIRECTOR: Mary Furey Finance & Administrative Services Director SUBJECT: VoIP Telecommunication Agreement RECOMMENDED ACTION: 1. Accept report and direct staff to enter into an agreement with ZAG Technical Services / 3GC Group to replace the existing PBX telecommunication system with a Voice over Internet Protocol (VoIP) telephone system for the main City Hall buildings, the Joan Pisani Community Center, the Corporation Yard, the Saratoga Area Senior Coordinating Council and the Saratoga Prospect Center. 2. Adopt Budget Resolution to transfer $55,000 from the IT Equipment Replacement Fund to the CIP Administrative Fund. BACKGROUND: During the December 2, 2009 City Council Meeting, staff was directed to move forward with a Request for Proposal (RFP) to replace the existing PBX telecommunication system with a VoIP telephone system. At the time, Council indicated that staff should seek proposals that would enable VoIP connectivity throughout the main City Hall buildings, the Joan Pisani Community Center, the Corporation Yard, the Saratoga Area Senior Coordinating Council (SASCC) and the Saratoga Prospect Center. Additionally, staff was directed to request RFP submittals that offered electronic fax integration in the system. A VoIP Telephone Agreement committee comprised of four staff members was established to develop the RFP and review submittals. Members included Rob Balbuena, Crystal Morrow, Thomas Scott, and Leo Salindong. The RFP was released to the public on March 3, 2010 and proposals were due by March 31, 2010. The City received a total of twelve submittals to the VoIP Telephone System Upgrade RFP. Various phone systems were proposed including Avaya, A1tiGen, Cisco, NEC Sphericall, ShoreTel, 8x8, and 3COM. Proposals were evaluated based on the following criteria as stated in the RFP: • Clarity of Proposal • Demonstrated success in similar projects (particular attention was paid to proposals from businesses with experience implementing VoIP telephone systems for municipalities) • Responsiveness of the proposal to the City's objective and scope of work • The technical ability, capacity, and flexibility of the proposer to perform the scope of work • Total cost of proposal M Of the twelve proposals, four submissions met all the requirements outlined in the RFP - Capture Technologies, Network Computing Architects, Packet Fusion, and ZAG Technical Services / 3GC Group. The four companies specialize in A1tiGen and ShoreTel phone systems. Below is a matrix comparing costs for hardware, software, installation, and training. To determine which business would best be able to meet the needs of the City, staff held interviews with each of the four selected firms and requested a demonstration of their proposed VoIP telephone system. During these meetings, each business presented their VoIP telephone system and answered questions regarding their proposal, company, and services. From the demonstrations, staff paid particular attention to each company's response to meeting the security goal of keeping SASCC's data network separate from the City's network and the desired remote site connectivity for Saratoga Prospect Center. In addition, staff made observations noting key strengths and weaknesses in the overall design of the proposed VoIP platform and architecture from each company's presentation. Staff reviewed each presentation and agreed that ZAG Technical Services / 3GC Group gave the best overall response to the requirements contained in the VoIP RFP. During the interview process, all key areas of interest from staff were satisfied regarding their proposed VoIP architecture and support, and follow -up discussions with client references were consistently positive. 91 Capture Technologies Network Computing Architects Packet Fusion' ZAGTechnical Services /3GC PHONE SYSTEM AltiGen ShoreTel ShoreTel ShoreTel City Hall Campus Hardware 30,353 24,433 23,224 28,975 (bundled with partial software license costs) Software License 7,875 9,213 9,462 1,666 Subtotal $ 38,228 S 33,646' $ 32,686 $ 30,641 Hardware 2,275 2,754 3,530 1,733 Software License 525 1,036 1,064 952 Subtotal $' 2,800 $ 3,790' S 4,594 $ 2,685 Saratoga Hardware 831 2,509 1,513 743 Software License 375 810 456 408 Subtotal $' 1,206 S 3,320' S 1,969 $ 1,151 PHONESYSTEMTOTAL $'' 42,234 $ 40,756'' $ 39,249 $ 34,476' Tax (Hardware /Software) 3,907 3,770 3,631 3,189 Installation 4,800 7,000 10,500 14,995 Training - User & Admin 800 1,825 *combined with Installation costs *combined with Installation costs TOTAL CAPITAL COSTS $' 51,741 S 53,350' $ 53,379 $ 52,660 To determine which business would best be able to meet the needs of the City, staff held interviews with each of the four selected firms and requested a demonstration of their proposed VoIP telephone system. During these meetings, each business presented their VoIP telephone system and answered questions regarding their proposal, company, and services. From the demonstrations, staff paid particular attention to each company's response to meeting the security goal of keeping SASCC's data network separate from the City's network and the desired remote site connectivity for Saratoga Prospect Center. In addition, staff made observations noting key strengths and weaknesses in the overall design of the proposed VoIP platform and architecture from each company's presentation. Staff reviewed each presentation and agreed that ZAG Technical Services / 3GC Group gave the best overall response to the requirements contained in the VoIP RFP. During the interview process, all key areas of interest from staff were satisfied regarding their proposed VoIP architecture and support, and follow -up discussions with client references were consistently positive. 91 SUMMARY: Preferred Vendor - Of the three companies providing solutions with ShoreTel VoIP platforms, the joint proposal from ZAG Technical Services / 3GC Group best addressed all specific requirements and security goals stated in the VoIP RFP, as well as offering the most cost effective overall design and implementation. Preferred Platform - This determination allowed staff to narrow the selection to Capture Technologies' AltiGen VoIP solution and ZAG Technical Services / 3GC Group's ShoreTel VoIP solution. Although both systems provided similar functionality and operation, staff consistently found ShoreTel's devices and overall interface required the least amount of technical knowledge for staff to understand and operate. Staff determined that ShoreTel's integration with Outlook was simpler to understand and use for staff with less technical knowledge. For administrative functions, staff noted advantages that ShoreTel's administrative console had grouping functions for making changes to set workgroups, whereas with the AltiGen system workgroup changes would need to be configured one user at a time. The phone units offered by the companies specializing in ShoreTel felt more ergonomic to touch and had a more pleasing aesthetic feel and value over the AltiGen phones. Furthermore, the ShoreTel phones offered more features and were easier to use. Staff believed that ShoreTel's VoIP platform offered a variety of features and qualities that would best meet the City's needs. A list of features and functions for the ShoreTel platform and devices is included in Attachment A. In addition, ZAG Technical Services / 3GC Group was the only business that included a bundled ShoreTel package offering a broader collection of features that other firms did not offer. The bundled ShoreTel package included three levels of software licenses: • Level 1: Extension/Mailbox License /Personal Call Manager • Level 2: Professional Call Manager • Level 3: Mobile Call Manager The Professional Call Manager allows further desktop integration for users requiring more advanced call management, while the Mobile Call Manager allows users to sync personal phone devices as well as other wireless devices to the ShoreTel VoIP telephone system. (If a staff member is off -site, s/he can forward her/her office phone to a cell phone, Personal Digital Assistant, and /or home phone. Staff did an analysis of the bundled package and learned that purchasing the items individually came at a higher cost. Comparatively, staff calculated the cost for removing the extra featured items and purchasing only the Level 1 software package, found there to be only a slight savings incurred and concluded that the bundled package provided an additional value by including extra features at a reduced cost. Attachment B includes a breakdown of the ShoreTel bundle pricing. References agree that working with ZAG Technical Services / 3GC Group to implement their ShoreTel systems, from design to post - installation, were satisfied with the quality of project management, quality of the product and level of support offered. Jay Juarez, IT Director for De La Salle High School, said "project costs were all straightforward, 3GC even found ways to reduce the cost of the project." In addition, Eric Simmons, Director, IT Operations from Conceptus, a medical device company, added that "The project management was good, with no unexpected problems or hidden costs." Rich Santos IT Manager for Sweda, a promotional material supplier, commented on having ZAG Technical Services / 3GC Group install their ShoreTel phone system and the quality of their overall experience. "The phone system is like a George Foreman Grill; you set it and forget it." •I As a result of staff's evaluation of the four qualified submittals and feedback received from references, staff believes ZAG Technical Services / 3GC Group's proposal best meets the City's VoIP Telephone Agreement needs. FISCAL IMPACTS: The table below summarizes budgeted capital costs for the telecommunications project, as well as ongoing operating costs. These costs are explained in more detail following the table. Summary of Costs Bud Capital Project Vote System, Installation, and Training Costs 52,660 Firewall (S -P Center) 600 Project Contingency 1,740 Total Capital Budget 55,000 Annual 1 B udget) Telecommunication System Maintenance & Support 2,418 Business Class Internet Connection (S -P Center) 1,200 Total Annual Operating Costs 3,618 VoIP Capital Costs - Initially it was estimated the cost of the project would be approximately $100,000. However, the project was scaled back at the December 2, 2009 City Council Meeting after Council decided that network cabling could be done at a later time. Consequently, estimated funding for the project was expected to be around $50,000, which was to be funded through a transfer from the IT Equipment Replacement Fund to the CIP Administrative Fund. All four of the VoIP installation proposals were competitively priced at slightly above $50,000. The ZAG Technical Services / 3GC Group proposal for the VoIP installation is $52,660. Ongoing annual maintenance and support costs are to be funded in the IT Services Fund. VoIP Annual Support and Maintenance - Currently the City pays $4,700 per year for telephone maintenance support and software service. The ZAG Technical Services / 3GC Group provided the lowest cost 5 -year term annual support and maintenance agreement from the three ShoreTel telephone providers for the new VoIP system at a cost of approximately $2,418 per year. The service will include free software updates and upgrades for the ShoreTel telephone system. Additional Project Costs— Staff recommends incorporating a Virtual Private Network (VPN) over internet with a DSL connection to establish VoIP connectivity to the Saratoga Prospect Center. As there is limited use of the facility at the moment, this solution provides basic connectivity to the Internet as well as trusted access to computing resources in City Hall. This will require a one -time cost of $600 for a firewall, along with annual costs of $1,200 per year for a DSL connection. 93 CONSEQUENCES OF NOT FOLLOWING THE RECOMMENDED ACTIONS: Current telecommunications conditions will remain as is; the City's telephone system will continue to have unstable communications and unpredictable failures. If no action is taken, in the event of a major failure to the system, catastrophic failure may occur, causing the City to be without telecommunications (including: phone, fax, modem, credit card terminals). ALTERNATIVE ACTION(S): Council could direct staff to pursue another alternative than the one recommended; could request additional information; or could provide other direction to staff. FOLLOW UP ACTION(S): Implement Council direction. ADVERTISING, NOTICING AND PUBLIC CONTACT: None. ATTACHMENTS: A. ShoreTel telephone system features list B. Breakdown of ShoreTel bundle pricing C. Budget Resolution ., Attachment A Unified Messaging • Voicemail - ShoreWare® voicemail service requires no additional hardware, consumes no ports, and storage is limited only by the size of the server hard disk. Notification of voicemail or even a copy (WAV file) of the voicemail can be sent to the user's mailbox. This integration supports any SMTP target, including Exchange 2010. • "Any- Telephone" access is available with ShoreTel's embedded telephone user interface (TUI), which can be used to access voice messages stored on ShoreTel's application server and to interface with ShoreTel's embedded auto - attendant. • "Visual" access is available through either ShoreTel's ShoreWare Call Manager for the PC or ShoreWare Mobile Call Manager for mobile devices. Both provide a simple visual display, access to voicemails stored on ShoreTel's application server, and access to the corporate and Outlook personal directories. • Find Me - The Find Me capability helps callers connect with users even when they are not at their regular extension. Users can easily direct calls to ring first at their extension, then at any two other phones they assign (including cell phones). • Call Handling Modes - With a simple click, users can manage incoming calls when they are in a meeting, working from home or out of town. Users can also customize greetings, forward calls, specify voicemail pick up, and receive message alerts. • ShoreWare Personal Call Manager and Outlook Integration - ShoreWare Personal Call Manager helps streamline business communications, improves communication accuracy, and enhances overall productivity for every user on the end -to -end ShoreTel Unified Communications (UC) solution. By leveraging the integrated Personal Call Manager, you can realize better communications and improved customer service out of the box. • Find and connect to people fast • Manage voicemail and contacts through Microsoft® Outlook® • Access all key features such as voicemail in one window with tabbed contents • Continue to be effective while away from the desk attending meetings and traveling the corridors • Minimize end user training with a single, customizable interface • See and manage up to 16 calls in the same interface • Gain easy access to advanced features such as whisper, intercom and others • Easily transfer or start a conference call • Faster, more accurate access to contacts • QuickDialer gives you rapid access to directories or your personal Outlook contacts, providing a quick way to connect using IM or an email. Reach your party faster, with the most appropriate communication mode. • With Outlook integration, you can manage voicemail and contacts with features such as: • Listen, replay, forward and save voicemail right from the inbox • Call contacts right from the Outlook application ■ . Define call handling from a Meeting /Appointment Request ■ . Define routing and answering protocols • Configure different ways to handle calls or voicemail greetings whether you're "in" or "in a meeting" or the "out of the office" mode. Direct the system to route calls to you, voicemail or try to find you by calling your various assigned phone numbers. 95 Attachment A 911 and Emergencv Calls The ShoreTel system is fully compliant with E -911. The system is configurable to provide Caller's Emergency Service Identification (CESID) specific to a user's location. Auto Attendant Capability The ShoreWare Auto - Attendant service provides 24 -hour automated call answering and routing to improve service and enhance a company's image for inbound callers. Outgoing prompts can be customized and linked to the time of day and /or day of week. Individual groups, like technical support and sales organizations, can have their own menus with unique greetings and options. Like the ShoreWare Voice Mail service, the ShoreWare Auto - Attendant service also consumes no physical ports and can be distributed at larger locations to save valuable WAN bandwidth. Administration, Management, and Reporting ShoreWare Director is a powerful web -based tool that enables IT organizations to manage all sites, users, and applications as a single image voice communications network. There are no command -line scripts to learn, no ponderous reference guides to study. The simple, browser - based, point- and -click interface makes it easy to add or delete trunks, switches, and users in seconds, eliminating the need for expensive training or outside consultants. On -line Help quickly guides the administrator through system installation and configurations using an easy point- and -click interface. ShoreWare Director offers a new paradigm in voice system administration, eliminating the need for multiple management consoles and enabling a single IT administrator to easily manage voice communications for the entire network from a single location anywhere in the enterprise. • HTTPS based access to administration interface • Comprehensive diagnostics imbedded including trunk test tool and event /alert notification via email • Easy database management and backup /recovery • Intuitive, graphical interface for all administrative tasks • Comprehensive Call Detail Reports • Single point software updates — all software and firmware updates and administered and pushed from the ShoreWare director. Disaster Recovery Even though the ShoreTel solution uses a distributed architecture, it functions as a single image system so there is only one database to backup making disaster recovery or replacement of the ShoreWare server very easy. Again call processing is handled by the ShoreGear switches so core telephony continues regardless of server status. .• 97 Attachment A Attachment B Breakdown of Bundled ShoreTel package Description Midsize Business Bundle 1 $17,600 Discount 32% $5,632 i $11,968 ShoreGear 220TIA 1 $6,495 32% Included $1,697 ShoreGear 50V 1 $2,495 32% Included $6,800 Level 1 — software license 50 $200 32% Included $1,350 Level 2 — software license 25 $80 32% Included $323 Level 3 — software license 5 $95 Included $14,587 TOTAL $11,968 Pricing of all items if purchased separately Description ShoreGear 220TIA 1 $6,495 Discount 32% $4,417 i $4,417 ShoreGear 50V 1 $2,495 32% $1,697 $1,697 Level 1 — software license 50 $200 32% $136 $6,800 Level 2 — software license 25 $80 32% $54 $1,350 Level 3 — software license 5 $95 32% $65 $323 TOTAL $14,587 Pricing of items if purchased separately excluding Level 2 and Level 3 software license Description ShoreGear 220TIA 1 $6,495 Discount 32% $4,417 i $4,417 ShoreGear 50V 1 $2,495 32% $1,697 $1,697 Level 1 — software license 50 $200 32% $136 $6,800 TOTAL $12,914 .; RESOLUTION NO. RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA AMENDING THE CAPITAL BUDGET FOR FISCAL YEAR 2009/10 TO PROVIDE FUNDING FOR THE VoIP TELECOMMUNICATION PROJECT WHEREAS, the City Council desires to replace the existing PBX telecommunication system with a Voice over Internet Protocol (VoIP) system for the main City Hall Buildings, the Joan Pisani Community Center, the Corporation Yard, the Saratoga Area Senior Coordinating Council Center, and the Saratoga- Prospect Center; and WHEREAS, additional financing in the amount of $55,000 is needed for the completion of said project; and WHEREAS, it is necessary to make adjustments to the Fiscal Year 2009/10 budget as follows: Account Description Account# Amount To budget appropriations for the Telecommunication System Upgrade Project and transfer funds for this project from the IT Equipment Replacement Fund to the CIP Administrative Improvement Fund Telecommunication System Upgrade — Services Telecommunication System Upgrade — Transfer In IT Equipment Replacement Fund — Transfer Out 414.9421- 001.81161 $ 55,000 414.9421- 001.49999 $ 55,000 632.3202.99999 $ 55,000 NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga hereby approves the above adjustments to the Fiscal Year 2009/10 Capital Improvement Budget. BE IT FURTHER RESOLVED, the above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City Council held on 2nd day of June, 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Attest: Ann Sullivan, City Clerk Kathleen King, Mayor City of Saratoga .. SARATOGA CITY COUNCIL 1 MEETING DATE: June 2, 2010 AGENDA ITEM: DEPARTMENT: City Manager's Office CITY MANAGER: Dave Anderson PREPARED BY: Dave Anderson DIRECTOR: City Manager SUBJECT: Side Letter of Agreement between the Saratoga Management Organization and the City of Saratoga RECOMMENDED ACTION(S): Adopt the resolution approving the Side Letter of Agreement between the Saratoga Management Organization (SMO) and the City of Saratoga suspending members' car allowance for fiscal year 2010 -2011. REPORT SUMMARY: At its August 1, 2007 meeting, the City Council approved a new Memorandum of Understanding (MOU) between the City and SMO. Recently, in response to financial constraints faced by the City, SMO members voluntarily agreed to suspend receipt of their car allowance for fiscal year 2010 -2011. The attached Side Letter of Agreement between SMO and the City memorializes the one -year car allowance suspension. FISCAL IMPACTS: Suspension of SMO members' car allowance for fiscal year 2010 -2011 will reduce budget expenditures by $24,000. CONSEQUENCES OF NOT FOLLOWING THE RECOMMENDED ACTIONS: The City would incur a charge to the General Fund in the amount of $24,000 for fiscal year 2010- 11 and would need to identify alternative reductions in order to achieve a balanced budget. ALTERNATIVE ACTION(S): Choose not to accept the Side Letter of Agreement. Page 1 of 4 100 FOLLOW UP ACTION(S): Staff will execute the Side Letter of Agreement and implement its elements. ADVERTISING, NOTICING AND PUBLIC CONTACT: Pursuant to Government Code 54954.2, this item was properly posted as a City Council agenda i tern and was i nd uded i n the packet made avai I abl e on the Ci ty' s web si to i n advance of the meeti ng. A copy of the agenda packet i s al so made avai I abl a at the Saratoga Branch L i brary each M onday i n advance of the Counci I meeti ng. ATTACHMENTS: • Resolution to adopt the Side Letter of Agreement between the City and SMO • Side Letter of Agreement between the City and SMO Page 2 of 4 101 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA APPROVING A SIDE LETTER OF AGREEMENT BETWEEN THE SARATOGA MANAGEMENT ORGANIZATION (SMO) AND THE CITY OF SARATOGA (CITY) WHEREAS, representatives of the City and SMO have reached an understanding regarding changes in salaries, benefits and other matters for the period beginning July 1, 2007, through September 30, 2011, for employees represented by SMO; and WHEREAS, the members of SMO have ratified the MOU and the City Council approved the MOU on August 1, 2007; and WHEREAS, the City of Saratoga is experiencing financial constraints such that it has proposed numerous expenditure reductions for fiscal year 2010 -2011, which have been endorsed by the City Council; and WHEREAS, in recognition of the financial constraints faced by the City, the members of SMO have voluntarily agreed to forego receipt of their car allowance, pursuant to Section VII. C. Car Allowance of the MOU, for fiscal year 2010 -2011; and WHEREAS, the representatives of the City and SMO have agreed to enter into a Side Letter of Agreement to the SMO MOU providing for a temporary elimination of SMO members' car allowance for fiscal year 2010 -2011; WHEREAS, the temporary elimination of SMO members' car allowance will commence with the first pay period of fiscal year 2010 -2011 (June 26 to July 9, 2010) and will terminate with the last pay period of fiscal year 2010 -2011 (June 25, 2011 to July 8, 2011). NOW, THEREFORE, BE IT RESOLVED, that the terms and conditions of the Side Letter of Agreement, Dated the 2nd day of June, 2010, are hereby approved. The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City Council held on the 2nd day of June 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Kathleen King, Mayor ATTEST: Ann Sullivan, City Clerk Page 3 of 4 102 SIDE LETTER OF AGREEMENT Between The Saratoga Management Organization and the City of Saratoga TEMPORARY ELIMINATION OF CAR ALLOWANCE This Side Letter of Agreement is executed by and between the City Council of the City of Saratoga ( "City ") and the Saratoga Management Organization ( "SMO "). As a result of financial constraints that are anticipated by the City of Saratoga for fiscal year 2010 — 2011 (July 1, 2010 to June 30, 2011) and notwithstanding Article VII (C) of the Memorandum of Understanding dated August 1, 2007 between the City and SMO (hereinafter referred to as "MOU"), the City and SMO agree that the members of SMO will temporarily forego receipt of their monthly $400.00 car allowance from the first pay period of fiscal year 2010 -2011 (June 26, 2010 to July 9, 2010) through the final pay period of fiscal year 2010 -2011 (June 25, 2011 to July 8, 2011). Signed this day, June 2, 2010 City of Saratoga Kathleen King, Mayor Saratoga Management Organization John Cherbone, SMO President Page 4 of 4 103 SARATOGA CITY COUNCIL June 2, 2010 DEPARTMENT: City Attorney PREPARED BY: Richard Taylor AGENDAITEM: CITY MANAGER: Dave Anderson DIRECTOR: Richard Taylor SUBJECT: City Manager Voluntary Benefits Waiver RECOMMENDED ACTION: Authorize the Mayor to sign a letter agreement documenting the City Manager's offer to voluntarily waive certain benefits specified in his employment agreement. REPORT SUMMARY: In light of significant revenue shortfalls to the City due to current economic conditions and state fiscal policies the City Manager and other senior staff have offered to forego certain benefits to which they are otherwise entitled. Because the City Manager and other senior staff have separate employment agreements, they are addressed in separate staff reports. The City Manager has offered to waive the following benefits for the 2010 -2011 fiscal year: • An annual cost of living adjustment in salary; • An annual salary increase contingent on satisfactory performance; • A monthly car allowance; and • The right to sell back accrued leave. The City Manager made this offer voluntarily and was not asked to do so by any City representative or member of the City Council. The City Manager's employment agreement provides him with the option of treating certain reductions in salary or benefits as a termination entitling him to other rights under the agreement. The attached letter documents that the City Manager has voluntarily offered the benefits waiver and that, accordingly, he is not entitled to treat the benefit reduction as a circumstance that would give him the termination rights specified in the agreement. FISCAL IMPACTS: City costs will be reduced in the coming fiscal year. This cost savings is reflected in the proposed budget. FOLLOW UP ACTION: The mayor and the City Manager will sign the attached letter. ADVERTISING, NOTICING AND PUBLIC CONTACT: This item was posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting and residents may subscribe to the agenda on -line by opting in at www.saratoga.ca.us. ATTACHMENTS: Letter from Mayor to City Manager Page 1 of 1 104 CITY OF SARATOGA 13777 FRUITVALE AVENUE * SARATOOA, CALIFORNIA 95070 - (408) 868 -1200 hyDrporated Ocbber22,1955 June 2, 2010 Dave Anderson City Manager City of Saratoga c/o Saratoga City Hall 13777 Fruitvale Avenue Saratoga, California 95070 Re: Voluntary Benefits Waiver Dear Dave: COUNCIL MEMBERS: Jill Hunter Kathleen King Chuck Page Howard Miller Vacant I am writing to confirm your offer to waive certain benefits provided to you under the terms of your employment agreement with the City of Saratoga (attested by the City Clerk September 20, 2007). That agreement entitles you, among other things, to the following benefits: • An annual cost of living adjustment in salary (as set forth in section III.A.1 of the agreement); • An annual salary increase contingent on satisfactory performance (as set forth in section IV.A of the agreement); • A monthly car allowance (as set forth in section I.F of Attachment A to the agreement; Attachment A is made a part of the agreement by section III.B of the agreement); and • To be paid each January for accrued annual leave in excess of 160 hours (as set forth in section II.B of Attachment A to the agreement). In light of significant revenue shortfalls to the City due to current economic conditions and state fiscal policies you have offered to forego the four benefits described above for the 2010 -2011 fiscal year. You have made this offer voluntarily and have not been asked to do so by any City representative or member of the City Council. 105 Section III.A.2 of your employment agreement provides you with the option of treating certain reductions in your salary or benefits by the City Council as a termination entitling you to certain other rights under the agreement. You have indicated to the City that you understand and agree that the City's acceptance of your offer to forego the benefits described above would not constitute a reduction in salary or benefits for the purposes of section III.A.2. The City Council appreciates your committed service to the residents of Saratoga and stands ready to stand by the terms of the original employment agreement. Your offer to waive the benefits described above will help resolve a difficult budget situation. If this letter accurately describes your offer and your understanding of its effect please sign this letter below. Sincerely Understood and agreed: Kathleen M. King Mayor City of Saratoga Dave Anderson Date Cc: Richard Taylor, City Attorney 106 F':• ��k +I IV SARATOGA CITY COUNCIL MEETING DATE: June 2, 2010 ORIGINATING DEPT: Public Works AGENDA ITEM: CITY MANAGER: PREPARED BY: John Cherbone DEPT HEAD: John Cherbone SUBJECT: Landscaping & Lighting Assessment District LLA -1 - Public Hearing, Approval of Engineer's Report, and Confirmation of Assessments for FY 10 -11 RECOMMENDED ACTION(S): Move to adopt the Resolution Ordering the Improvements and Confirming the Diagram and Assessments for FY 10 -11. REPORT SUMMARY: Attached is the final Resolution, which requires adoption by the Council to complete the renewal of the Landscaping and Lighting Assessment District LLA -1 for FY 10 -11 (Attachment 1). Once adopted, the Resolution approves the appropriate Engineer's Report and confirms the assessments for the upcoming fiscal year. The Council can consider the Resolution only after the close of the Public Hearing. FISCAL IMPACTS: All of the costs associated with the administration and operation of the Landscape & Lighting Assessment District are recovered via the assessments levied against the benefiting properties. CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION(S): The Resolution would not be adopted and the assessments would not be confirmed. If this occurs, the Council will need to direct staff accordingly. ALTERNATIVE ACTION(S): None in addition to the above. FOLLOW UP ACTION(S): The assessment roll will be finalized and transmitted to the County Auditor by August 10 for placement on the upcoming tax roll. Page 1 of 2 107 ADVERTISING, NOTICING AND PUBLIC CONTACT: The Resolution of Intention and Notice of Hearing have been published a locally distributed newspaper as prescribed by law. ATTACHMENTS: 1. Resolution Confirming Assessments. 2. Engineer's Report Page 2 of 2 1: RESOLUTION NO. A RESOLUTION ORDERING THE IMPROVEMENTS AND CONFIRMING THE DIAGRAM AND ASSESSMENT FISCAL YEAR 2010 -2011 CITY OF SARATOGA LANDSCAPING AND LIGHTING ASSESSMENT DISTRICT LLA -1 RESOLVED, by the City Council of the City of Saratoga, California, as follows: WHEREAS, on the 3rd day of March, 2010, said Council adopted its Resolution No. 10- 009, "A Resolution Describing Improvements and Directing Preparation of Engineer's Report for Fiscal Year 2010 - 2011" for the City of Saratoga Landscaping and Lighting Assessment District LLA -1, pursuant to the Landscaping and Lighting Act of 1972, and directed the City Assessment Engineer to prepare and file with the Clerk of this City a written report called for under said Act and by said Resolution No. 10 -009; and WHEREAS, said report was duly made and filed with the Clerk of said City, whereupon said Clerk presented it to the City Council for its consideration; and WHEREAS, said Council thereupon duly considered said report and each and every part thereof and found that it contained all the matters and things called for by the provisions of said Act and said Resolution No. 10 -009, including (1) plans and specification of the existing improvements and the proposed new improvements; (2) estimate of costs; (3) diagram of the District; and (4) an assessment according to benefits; all of which were done in the form and manner required by said Act; and WHEREAS, said Council found that said report and each and every part thereof was sufficient in every particular and determined that it should stand as the report for all subsequent proceedings under said Act, whereupon said Council pursuant to the requirements of said Act, appointed Wednesday, the 2nd day of June, 2010, at the hour of 7:00 p.m. of said day in the City Council Chambers at 13777 Fruitvale Avenue, Saratoga, California, as the time and place for hearing protests in relation to the levy and collection of the proposed assessments for said improvements, including the maintenance or servicing, or both, thereof, for Fiscal Year 2010- 2011, and directing said Clerk to give notice of said hearing as required by said Act; and WHEREAS, it appears that notices of said hearing were duly and regularly published and posted in the time, form and manner required by said Act, as evidenced by the Affidavits and Certificates on file with said Clerk, and that all notices and ballots required by Article XIIID, Section 4(c) and (d) of the California Constitution, were mailed to all property owners of record subject to the assessment at least 45 days prior to the date of the public hearing on the proposed assessment or increase, as evidenced by the Affidavit and Certificates on file with the City Clerk, whereupon said hearing was duly and regularly held at the time and place stated in said notice; and 109 WHEREAS, persons interested, objecting to or in favor of, said improvements, including the maintenance or servicing, or both, thereof, or to the extent of the assessment district, or any zones therein, or to the proposed assessment or diagram or to the Engineer's estimate of costs thereof, and all persons desiring to be heard were given an opportunity to be heard, and all matters and things pertaining to the levy and collection of the assessments for said improvements, including the maintenance or servicing, or both, thereof, were fully heard and considered by said Council; NOW, THEREFORE, it is hereby found, determined and ordered, as follows: 1. That the public interest, convenience and necessity require and said Council does hereby order the levy and collection of assessments pursuant to said Act, for the construction or installation of the improvements, including the maintenance or servicing, or both, thereof, more particularly described in said Engineer's Report and made a part hereof by reference thereto. 2. That the City of Saratoga Landscaping and Lighting Assessment District LLA -1 and the boundaries thereof benefited and to be assessed for said costs for the construction or installation of the improvements, including the maintenance or servicing, or both, thereof, are situate in Saratoga, California, and are more particularly described by reference to a map thereof on file in the office of the Clerk of said City. Said map indicates by a boundary line the extent of the territory included in said District and any zone thereof and the general location of said District. 3. That the plans and specifications for the existing improvements and for the proposed improvements to be made within the assessment district or within any zone thereof contained in said report, be, and they hereby are, finally adopted and approved. 4. That the Engineer's estimate of the itemized and total costs and expenses of said improvements, maintenance and servicing thereof, and of the incidental expenses in connection therewith, contained in said report, be, and it hereby is, finally adopted and approved. 5. That the public interest and convenience require, and said Council does hereby order the improvements to be made as described in and in accordance with said Engineer's Report, reference to which is hereby made for a more particular description of said improvements. 6. That the diagram showing the exterior boundaries of the assessment district referred to and described in said Resolution No. 10 -009, and also the boundaries of any zones therein and the lines and dimensions of each lot or parcel of land within said District as such lot or parcel of land is shown on the County Assessor's maps for the fiscal year to which it applies, each of which lot or parcel of land has been given a separate number upon said diagram, as contained in said report, be, and it hereby is, finally approved and confirmed. 110 7. That the assessment of the total amount of the costs and expenses of said improvements upon the several lots or parcels of land in said District in proportion to the estimated benefits to be received by such lots or parcels, respectively, from said improvements, and the maintenance or servicing, or both, thereof and of the expenses incidental thereto contained in said report be, and the same hereby is, finally approved and confirmed. 8. That said Engineer's Report for Fiscal Year 2010 -2011 be, and the same hereby is, finally adopted and approved as a whole. 9. That the City Clerk shall forthwith file with the Auditor of Santa Clara County the said assessment, together with said diagram thereto attached and made a part thereof, as confirmed by the City Council, with the certificate of such confirmation thereto attached and the date thereof. 10. That the order for the levy and collection of assessment for the improvements and the final adoption and approval of the Engineer's Report as a whole, and of the plans and specifications, estimate of the costs and expenses, the diagram and the assessment, as contained in said Report, as hereinabove determined and ordered, is intended to and shall refer and apply to said Report, or any portion thereof, as amended, modified, revised or corrected by, or pursuant to and in accordance with any resolution or order heretofore duly adopted or made by this Council. Passed and adopted by the City Council of the City of Saratoga, California, at a meeting thereof held on the day of , 2010, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Kathleen King, Mayor City of Saratoga ATTEST: Ann Sullivan, CMC City Clerk 111 CITY OF SARATOGA LANDSCAPE AND LIGHTING DISTRICT LLA -'I ENGINEER'S REPORT on the Levy of an Assessment for the 2010 -2011 Fiscal Year April 2010 JOHN H. HEINDEL - CONSULTING CIVIL ENGINEER ENGINEER OF WORK 112 TABLE OF CONTENTS Pages Assessment & Cost Summary 1 -3 Rules for Spreading Assessment 4 -5 Description of Improvements 6 -8 Cost Detail 9 -13 Assessment Roll Assessment Diagram Certificates 113 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT for Fiscal Year 2010 -2011 WHEREAS, on , 2010, the City Council of the City of Saratoga, California, pursuant to the provisions of the Landscaping and Lighting Act of 1972, adopted its Resolution No. 10- 009 describing improvements and directing preparation of the Engineer's Report for Fiscal year 2010- 2011, more particularly therein described, and WHEREAS, said Resolution No. 10 -009 directed the Engineer of Work to prepare and file a report presenting plans and specifications for the proposed improvements, an estimate of costs, a diagram of the assessment district, and an assessment of the estimated costs of the improvements upon all assessable lots or parcels of land within the assessment district, to which Resolution reference is hereby made for further particulars, NOW, THEREFORE, I, John H. Heindel, by virtue of the power vested in me under said Act and the order of the City Council of said City of Saratoga, hereby make the following assessment to cover the portion of the estimated cost of said improvements, including the maintenance and servicing thereof and the costs and expenses incidental thereto, to be paid by the assessment district for the Fiscal Year 2010- 2011: ENGINEER'S ESTIMATE SUMMARY ADMINISTRATIVE COSTS Wages & benefits $ 19,683 Attorney 500 Assessment engineer 10,000 Other 300 $ 30,483 OPERATIONS Wages & benefits $ 75,118 Contract Services 290,500 Repair services -0- Maintenance services 66,128 Irrigation water 43,900 Electric power 69,950 INDIRECT COSTS Total costs Previous year carryover 545,596 57,607 $633,686 (475,566) 114 Estimated property tax revenue Carryover not recovered Carryover not reimbursed 16( 8,655 Net cost $ (10,535) (10,910) 301,067 Assessment $ 279,622 SUMMARY OF ASSESSMENT BY ZONE * See Cost Detail herein for breakdown ** Plus $12.54 per front foot 115 As Preliminarily Approved As Confirmed Zone No. Total Per Parcel Total Per Parcel 1 $ 73 2.52 $ $ 2 6,723 79.10 3 18,501 105.12 4 -0- 0.00 5 -0- 0.00 6 8,131 127.04 7A -0- 0.00 7B -0- 0.00 9 14,041 292.52 10 2,560 284.48 11 16,694 66.78 12 3,252 361.34 15 5,215 127.20 16 8,699 158.16 17 14,493 72.46 22 45,942 53.24 24 -0- NIA 25 8,727 581.80 26 73,724 784.30 27 7,128 229.94 28 10,212 638.26 29 9,547 156.50 .31 9,958 191.50 32 12,540 7.90* 33 3,462 173.12 Total $279,622 $ * See Cost Detail herein for breakdown ** Plus $12.54 per front foot 115 And I do hereby assess and apportion said portion of the estimated cost of the improvements, including the maintenance and servicing thereof and the costs and expenses incidental thereto, upon the several lots or parcels of land liable therefor and benefited thereby, and hereinafter numbered to correspond with the numbers upon the attached diagram, upon each, severally and respectively, in proportion to the benefits to be received by such property, respectively, from the construction and installation of the improvements, and from the maintenance and servicing thereof, and more particularly set forth in the Assessment Roll hereto attached and by this reference made a part hereof. As required by said Act, a diagram is hereto attached showing the assessment district, and also the boundaries and dimensions of the respective lots or parcels of land within said assessment district, as the same existed at the time of the passage of said Resolution No. 10 -009. The diagram and assessment numbers appearing in the Assessment Roll herein under the column headed "A.P.N." are the diagram numbers appearing on said diagram, to which reference is hereby made for a more particular description of said property. I hereby place in the Assessment Roll, opposite the number of each lot or parcel of land assessed, the amount assessed thereon. Each lot or parcel of land is described in said Assessment Roll by reference to its parcel number as shown on the assessor's maps of the County of Santa Clara for the Fiscal Year 2010 - 2011, and includes all of such parcel. Respectfully submitted, Dated: 3 , 2010 ��6 RULES FOR SPREADING ASSESSMENT The amounts to be assessed against the assessable lots or parcels of land to pay the estimated cost of the improvements, including the maintenance and servicing thereof and the costs and expenses incidental thereto, shall be based upon the estimated benefits to be derived by the various lots or parcels of land within the assessment district. The assessment for administrative costs shall be spread equally to all of the lots or parcels of land located in the assessment district. The assessment for cost of improvements, including the maintenance and servicing thereof, in Zones I through 713, 9 through 12, 15 through 17, 22, 25 through 29, 31, and 33, as described in Resolution No. 09 -008, shall be spread equally to all of the lots or parcels of land located within each said respective zone of the assessment district. The assessment for cost of improvements, including the maintenance and servicing thereof, in Zone 24, as described in Resolution No. 09 -008, shall be spread as follows: Costs related to street lights and street trees shall be spread to all the lots or parcels of land located within said zone, proportional to usable parcel area. Costs related to the Village Parking District (VPD) parking lots shall be spread to all the lots or parcels of land in commercial use located within said zone, proportional to the number of parking spaces existing in the VPD parking lots that are assigned to each parcel within said zone, rounded to the nearest one tenth (0.1) of a parking space. Spaces shall be assigned by adding the total number of spaces in the VPD parking lots and the total private spaces existing on assessable parcels, distributing this sum proportionally by weighted building area, and deducting the number of private spaces, if any, from the resulting number for each parcel. Weighted building area shall be defined as actual building area multiplied by a factor dependent on parcel use, as follows: Retail = 1.0; office /service ° 0.5; restaurant = 2.0. The assessment for cost of improvements, including the maintenance and servicing thereof, in Zone 32, as described in Resolution No. 09 -008, shall be spread proportionally to the frontage on Saratoga - Sunnyvale Road of each of the lots or parcels of land located and benefited within Zone 32. Zones 0, 8, 13, 14, 18 through 21, 23, and 30 have been either detached or merged with other zones. A portion of Zone 4 was redesignated Zone 26 in 1997. Notwithstanding the above, the assessment levied for Fiscal Year 1999 -2000 for each parcel in Zones 2, 3, 6, 11, 16, 22, 25, 26, and 29 shall not exceed the amount indicated in Table 1 attached hereto; the assessment levied for Fiscal Year 2000 -2001 for each parcel in Zones 1, 9, 12, 17, 27, and 28, shall not exceed the amount indicated in Table 2 attached hereto; the assessment levied for Fiscal Year 2004 -2005 for each parcel in Zone 32 shall not exceed the amount indicated in Table 3 attached hereto; and the assessment levied for Fiscal Year 2008 -2009 for each parcel in Zones 31 and 33 shall not exceed the amount indicated in Table 4 attached hereto. In subsequent years, the maximum assessment for each parcel shall be the amount calculated by multiplying its maximum assessment for the previous year by 1.05. 117 TABLE 1 - MAXIMUM ASSESSMENTS ZONE 2 3 6 11 16 22 25 26 29 FISCAL YEAR 1999 -2000 $ 52.50 $ 63.00 $ 78.75 $ 52.50 $ 94.50 $ 52.50 $341.25 $498.75 $100.00 FISCAL YEAR 2010 -2011 $ 89.79 $107.75 $134.69 $ 89.79 $161.63 $ 89.79 $583.65 $853.03 $171.03 TABLE 2 - MAXIMUM ASSESSMENTS ZONE 1 9 12 17 27 28 FISCAL YEAR �nnn_�nni $ 75.00 $180.00 $275.00 $ 60.00 $150.00 $400.00 FISCAL YEAR 2010 -2011 $122.17 $293.20 $447.95 $ 97.73 $244.33 $651.56 TABLE 3 - MAXIMUM ASSESSMENTS - ZONE 32 A. P. N. 366 -12 -054 366 -12 -065 366 -12 -066 366 -22 -023 386 -30 -035 386 -30 -036 386 -30 -037 386 -30 -038 386 -30 -039 386 -52 -032 386 -52 -033 FRONT FEET 110 118 160 149 106 -0- 50 50 100 75 75 993 FISCAL YEAR 2004 -2005 $ 1,052.16 $ 1,125.66 $ 1,511.48 $ 1,410.44 $ 1,015.42 $ 41.66 $ 500.98 $ 500.98 $ 960.30 $ 730.64 $ 730.64 TABLE 4 - MAXIMUM ASSESSMENTS FISCAL YEAR ZONE 2008 -2009 31 $175.00 33 $160.00 FISCAL YEAR 2010 -2011 $ 1,410.00 $ 1,508.49 $ 2,025.53 $ 1,890.12 $ 1,360.76 $ 55.83 $ 671.36 $ 671.36 $ 1,286.89 $ 979.13 $ 979.13 FISCAL YEAR 2010 -2011 $192.94 $176.40 -5- 118 DESCRIPTION OF IMPROVEMENTS The design, construction or installation, including the maintenance or servicing, or both, thereof, of landscaping, including trees, shrubs, grass or other ornamental vegetation, statuary, fountains and other ornamental structures and facilities, and public lighting facilities for the lighting of any public places, including traffic signals, ornamental standards, luminaires, poles, supports, tunnels, manholes, vaults, conduits, pipes, wires, conductors, guys, stubs, platforms, braces, transformers, insulators, contacts, switches, capacitors, meters, communication circuits, appliances, attachments and appurtenances, including the cost of repair, removal or replacement of all or any part thereof; providing for the life, growth, health and beauty of landscaping, including cultivation, irrigation, trimming, spraying, fertilizing and treating for disease or injury; the removal of trimmings, rubbish, debris and other solid waste; electric current or energy, gas or other illuminating agent for any public lighting facilities or for the lighting or operation of any other improvements; and the operation of any fountains or the maintenance of any other improvements. This work specially benefits the parcels assessed therefor since' 1) the work is adjacent to the neighborhoods within which said parcels are located, and results in a) helping to identify, distinguish and enhance these neighborhoods, including the entrances thereto; b) helping to improve the quality of life in these neighborhoods by reducing the potential for graffiti, eliminating dust and litter, providing sound attenuation, eliminating the potential for blight, and providing added security and safety through lighting and an added City presence; and 2) in the absence of this assessment district, the work and improvements would not be otherwise accomplished by the City. Benefits Provided within Each Zone: Zone 1 (Manor Drive Landscape District) - Provides for landscape maintenance of the Manor Drive median and Saratoga - Sunnyvale Road frontage along Tract 3822. Zone 2 (Fredericksburg Landscape District) - Provides for landscape maintenance along the Cox Avenue frontage of Tracts 3777, 4041 and 4042. Zone 3 (Greenbrier Landscape District) - Provides for landscape maintenance of the Seagull Way entrance to Tracts 4628, 4725 and 4726, and of the common areas along Goleta Avenue and Guava Court. Zone 4 (Quito Lighting District) - Provides for streetlighting and landscape maintenance in the El Quito Park residential neighborhood: Tracts 669, 708, 748, 6785, 7833, and 8700. Zone 5 ( Azule Lighting District) - Provides for streetlighting in the Azule Crossing residential neighborhoods: Tracts 184, 485, 787, 1111, and 1800. Zone 6 (Sarahills Lighting District) - Provides for streetlighting in the Sarahills residential neighborhood: Tracts 3392 and 3439. Zone 7 (Village Lighting District) - Provides for streetlighting in four separate residential neighborhoods surrounding Saratoga Village, and in Saratoga Village. Includes all or a portion of Cunningham Acres, La Paloma Terrace, Mary Springer #1 and #2, McCartysville, Saratoga Park, Williams, and Tracts 270, 336, 416, 2399, 2502, 4477, 5350, 5377, 5503, 5676, 6419, and 6731, and Saratoga Village. Zone 9 (McCartysville Landscape District) - Provides for Landscape maintenance along the Saratoga - Sunnyvale Road frontage of Tract 5944. Zone 10 (Tricia Woods Landscape District) - Provides for landscape maintenance along the Saratoga- Sunnyvale Road frontage of Tract 7495. (Maintenance and water shared with Zone 27). Zone 11 (Arroyo de Saratoga Landscape District) - Provides for landscape maintenance of the Via Monte entrances to all or a portion of Tracts 2694, 2835, 3 03 6, and 4344. Zone 12 ( Leutar Court Landscape District) - Provides for landscape maintenance of the Leutar Court frontage in Tract 6996. Zone 15 (Bonnet Way Landscape District) - Provides for monthly landscape maintenance along Bonnet Way: Tract 5462. Zone 16 ( Beauchamps Landscape District) - Provides for landscaping and lighting of the Prospect Road entrance to the Beauchamps subdivision: Tract 7763. Zone 17 (Sunland Park Landscape District) - Provides for landscape maintenance along the Quito Road frontage of Tracts 976 and 977. Zone 22 (Prides Crossing Landscape District) - Provides for periodic landscape maintenance along Prospect Road between the Route 85 overcrossing and Titus Avenue, and along Cox Avenue between the Route 85 overcrossing andSaratoga Creek. Includes all properties bordered by Route 85, Prospect Road and Saratoga Creek with the exception of the Brookview neighborhood (Tracts 1493, 1644, 1695, 1727, 193 8, and 1996). Zone 24 (Village Commercial Landscape District) - Provides for routine maintenance of Village Parking Districts 1 -4 and Big Basin Way landscaping. Zone 25 (Saratoga Legends Landscape District) - Provides for landscape maintenance along the Saratoga - Sunnyvale Road frontage of, and pedestrian pathways within, Tract 8896. Zone 26 (Bellgrove Landscape and Lighting District) - Provides for common area landscape maintenance and lighting associated with Tract 8700. Zone 27 (Cunningham Place /Glasgow Court Landscape District) - Provides for landscape maintenance along the Saratoga - Sunnyvale Road frontage of Tracts 6199 and 7928. (Maintenance and water shared with Zone 10). Zone 28 (Kerwin Ranch Landscape District) - Provides for landscape maintenance along the Fruitvale Avenue and Saratoga Avenue frontages of Tracts 8559 and 8560. Zone 29 (Tollgate Landscape and Lighting District) - Provides for maintenance of the common area landscape and lighting improvements along Tollgate Road at the entrance to Tracts 3946 and 5001. -7- 120 Zone 31 (Horseshoe Drive Landscape and Lighting District) - Provides for landscape maintenance along the Saratoga -Los Gatos Road frontage of Tract 247. Zone 32 (Gateway Landscape and Lighting District) - Provides for maintenance of frontage landscaping along Saratoga - Sunnyvale Road between Prospect Road and the Union Pacific railroad tracks. Zone 33 (Carnelian Glen Landscape and Lighting District) — Provides foi maintenance of landscaping along the Saratoga -Los Gatos Road frontage of APNs 397 -21 -031 and 397 -37- 015. -8- 121 Zone Number Administration Operations Wages Contract Services Repairs Maintenance Water Electric Indirect Costs Total Costs Carryover Property Tax Net cost C'over not recov. C'over not reirab. Net assess. No. of Parcels Assmt,/Pel. 5,500 4,500 $ 73 $ 6,723 29 85 $ 2.52 $ 79.10 1,500 31,088 172,857 $ 18,501 $ -0- $ -0- 176 698 120 $ 105.12 $ -0- $ -0- -9- 122 COST DETAIL 1 2 3 4 5 $ 229 $ 671 $ 1,390 $ 5,514 $ 948 $ 635 1,861 $ 3,853 $ $ 3,000 3,000 10,000 75,000 50,000 1,920 1,584 4,872 1,980 400 250 1,250 16,100 3,000 $ 5,955 $ 6,695 $ 19,975 $ 93,080 $ 53,000 618 737 2,136 9,859 5,395 $ 6,802 $ 8,103 $ 23,501 $108,453 $ 59,343 (8,729) (5,280) (1,500) (92,541) (209,200) (3,500 600 (5,000) 4c 7,000 2( 3,000) $ (5,427) 2,223 $ 17,001 $(31,088) $(172,857) 5,500 4,500 $ 73 $ 6,723 29 85 $ 2.52 $ 79.10 1,500 31,088 172,857 $ 18,501 $ -0- $ -0- 176 698 120 $ 105.12 $ -0- $ -0- -9- 122 Zone Number 6 Administration $ 505 Operations $ 3,839 $ Wages $ 379 Contract Services $ 6,757 4,000 Repairs $ 1,051 Maintenance 20 Water 7,400 Electric 5,000 3,500 $ 7,500 Indirect Costs 801 Total Costs $ 8,806 Carryover 35,000 (8,675) Property Tax 225 Net cost $ 131 Cover not recov. $ 12,386 C'over not reimb. 7,060 Net assess. 1276 No. of Parcels Assmt./Pcl. COST DETAIL 7A 7B 9 10 $ 3,839 $ 2,323 $ 379 $ 71 $ 6,757 $ $ 1,051 $ 197 20 7,400 800 5,000 2,160 540 1,550 450 35,000 225 125 $ 66,757 $ -0- $ 12,386 $ 2,112 7,060 232 1276 218 $ 77,656 $ 2,555 $ 14,041 2,401 (25,300) (2,500) 159 (55,000 } (2,555} $ (2,644) $ -0- $ 11,541 $ 2,560 8,000 2,644 $ 8,13I $ -0- $ -0- 64 486 294 $ 127.04 $ -0- $ -0- 2,500, $ 14,041 $ 2,560 48 9 $ 292.52 $ 284.48 -10- 123 Zone Number 11 Administration $ 1,975 Operations Wages $ 5,472 Contract Services 20,000 Repairs COST DETAIL 12 15 $ 71 $ 324 $ 197 $ 897 2,500 16 17 $ 434 $ 1,580 $ 1,204 $ 4,378 3,500 5,000 Maintenance 1,020 1,020 1,620 1,020 2,436 Water 800 350 1,000 1,200 1,600 Electric 550 Indirect Costs Total Costs Carryover Property Tax Net cost C'over not recov. C'over not reimb. Net assess. No. of Parcels Assmt./Pcl $ 27,292 $ 4,067 $ 3,517 $ 7,474 $ 13,414 2,927 414 384 791 1,499 $ 32,194 $ 4,552 $ 4,225 $ 8,699 $ 16,493 (30,500) (5,300) 2,400 (5,000) (12,000) $ 1,694 $ (748) $ 6,625 $ 3,699 (1,410) 15,000 4,000 $ 16,694 $ 3,252 250 9 $ 66.78 $361.34 $ 4,493 5,000 10,000 $ 5,215 $ 8,699 $ 14,493 41 55 200 $ 127.20 $ 158.16 $ 72.46 -11- 124 Cover not recov. Cover not reimb. 15,000 COST DETAIL 5,000 Net assess. $ 45,942 $ -0- $ 8,727 $ 73,724 Zone Number 22 24 132 15 94 25 26 $ 53.24 27 $ 229.94 Administration $ 6,817 $ 1,043 $ 119 $ 742 $ 245 Operations Wages $ 18,891 $ 23,159 $ 328 $ 2,058 $ 678 Contract Services 30,000 17,000 600 25,000 4,000 Repairs Maintenance 5,376 1,896 19,176 1,800 Water 2,000 4,000 1,800 18,000 1,500 Electric 500 100 7,500 75 $ 56,767 $ 44,159 $ 4,724 $ 71,734 $ 8,054 Indirect Costs 6,358 4,520 484 7,248 830 Total Costs $ 69,942 $ 49,722 $ 5,327 $ 79,724 $ 9,128 Carryover (39,000) (20,500) 3,400 (16,000) (7,000) Property Tax 32 000) Net cost $ 30,942 $ (2,778) $ 8,727 $ 63,724 $ 2,128 Cover not recov. Cover not reimb. 15,000 2,778 10,000 5,000 Net assess. $ 45,942 $ -0- $ 8,727 $ 73,724 $ 7,128 No. of Parcels 863 132 15 94 31 Assmt./Pcl. $ 53.24 $ -0- $ 581.80 $784.30 $ 229.94 -12- 125 33 158 $ 438 250 1,620 500 296 Total Costs $10,212 COST DETAIL $ 8,458 $ 8,540 Zone Number 28 29 31 32 4,000 200 Administration $ 126 $ 482 $ 411 $ 87 Operations Wages $ 350 $ 1,335 $ 1,138 $ 241 Contract Services 2,500 5,000 1,000 950 Repairs Maintenance 3,732 1,080 3,840 2,436 Water 2,500 1,000 1,200 2,550 Electric 75 1,600 100 1,500 $ 9,157 $ 10,015 $ 7,278 $ 7,677 Indirect Costs 929 1,050 769 776 33 158 $ 438 250 1,620 500 296 Total Costs $10,212 $11,547 $ 8,458 $ 8,540 $ 3,262 Carryover (700) (7,000) 11,000 4,000 200 Property Tax Net cost C'over not recov. Cover not reimb. Net assess. No. of Parcels No. of Front Feet Assmt./Pcl. Assmt. /front foot $ 9,512 700 $10,212 16 $ 4,547 $ 19,458 $ 12,540 $ 3,462 (9,500) 5,000 $ 9,547 61 $ 638.26 $ 156.50 $ 9,958 $ 12,540 $ 3,462 52 11 20 993 $ 191.50 $ 7.90 $ 173.12 $ 12.54 -13- 126 E.D.S. Date: 5- 4 -2010 Page: 1 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 366 -05 -023 16 71 $158.16 366 -05 -024 16 71 $158.16 366 -05 -025 16 71 $158.16 366 -05 -026 16 71 $158.16 366 -05 -027 16 71 $158.16 366 -05 -028 16 71 $158.16 366 -05 -029 16 71 $158.16 366 -05 -030 16 71 $158.16 366 -05 -031 16 71 $158.16 366 -05 -032 16 71 $158.16 366 -05 -034 16 71 $158.16 366 -05 -035 16 71 $158.16 366 -05 -036 16 71 $158.16 366 -05 -037 16 71 $158.16 366 -05 -038 16 71 $158.16 366 -05 -039 16 71 $158.16 366 -05 -040 16 71 $158.16 366 -05 -041 16 71 $158.16 366 -05 -042 16 71 $158.16 366 -05 -043 16 71 $158.16 366 -05 -044 16 71 $158.16 366 -05 -045 16 71 $158.16 366 -05 -046 16 71 $158.16 366 -05 -047 16 71 $158.16 366 -05 -048 16 71 $158.16 366 -05 -049 16 71 $158.16 366 -05 -050 16 71 $158.16 366 -05 -051 16 71 $158.16 366 -05 -052 16 71 $158.16 366 -05 -053 16 71 $158.16 366 -05 -054 16 71 $158.16 366 -05 -055 16 71 $158.16 366 -05 -056 16 71 $158.16 366 -05 -057 16 71 $158.16 366 -05 -058 16 71 $158.16 366 -05 -059 16 71 $158.16 366 -05 -060 16 71 $158.16 366 -05 -061 16 71 $158.16 366 -05 -062 16 71 $158.16 366 -05 -063 16 71 $158.16 366 -05 -064 16 71 $158.16 366 -05 -065 16 71 $158.16 366 -05 -066 16 71 $158.16 366 -05 -067 16 71 $158.16 366 -05 -068 16 71 $158.16 366 -05 -069 16 71 $158.16 366 -05 -070 16 71 $158.16 366 -05 -071 16 71 $158.16 366 -05 -072 16 71 $158.16 366 -05 -073 16 71 $158.16 366 -05 -074 16 71 $158.16 366 -05 -075 16 71 $158.16 366 -05 -076 16 71 $158.16 366 - 05077 16 71 $158.16 366 -05 -078 16 85 $158.16 366 -12 -054 32 118 110 $1,387.30 366 -12 -065 32 118 118 $1,487.62 366 -12 -066 32 118 160 $2,014.30 366 -20 -005 1 1 $2.52 366 -20 -006 1 1 $2.52 366 -20 -007 1 1 $2.52 366 -20 -008 1 1 $2.52 366 -20 -009 1 1 $2.52 366 -20 -010 1 1 $2.52 366 -20 -011 1 1 $2.52 366 -20 -012 1 1 $2.52 366 -20 -013 1 1 $2.52 366 -20 -014 1 1 $2.52 366 -20 -015 1 1 $2.52 ENGINEERING DATA SERVICES 650 - 967 -5484 127 E.D.S. Date: 5- 4 -2010 Page: 2 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS( A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIR. 366 -20 -016 1 1 $2.52 366 -20 -017 1 1 $2.52 366 -20 -018 1 1 $2.52 366 -20 -019 1 1 $2.52 366 -20 -020 1 1 $2.52 366 -20 -021 1 1 $2.52 366 -20 -022 1 1 $2.52 366 -20 -023 1 1 $2.52 366 -20 -024 1 1 $2.52 366 -20 -025 1 1 $2.52 366 -20 -026 1 1 $2.52 366 -20 -027 1 1 $2.52 366 -20 -028 1 1 $2.52 366 -20 -041 1 1 $2.52 366 -20 -042 1 1 $2.52 366 -20 -043 1 1 $2.52 366 -20 -044 1 1 $2.52 366 -20 -045 1 1 $2.52 366 -22 -023 32 118 149 $1,876.36 386 -03 -011 22 74 $53.24 386 -03 -012 22 74 $53.24 386 -03 -013 22 74 $53.24 386 -03 -014 22 74 $53.24 386 -03 -015 22 74 $53.24 386 -03 -016 22 74 $53.24 386 -03 -017 22 74 $53.24 386 -03 -018 22 74 $53.24 386 -03 -019 22 74 $53.24 386 -03 -020 22 74 $53.24 386 -03 -021 22 74 $53.24 386 -03 -022 22 74 $53.24 386 -03 -023 22 74 $53.24 386 -03 -024 22 74 $53.24 386 -03 -025 22 74 $53 -24 386 -03 -026 22 74 $53.24 386 -03 -027 22 74 $53.24 386 -03 -028 22 74 $53.24 386 -03 -029 22 74 $53.24 386 -03 -030 22 74 $53.24 386 -03 -031 22 74 $53.24 386 -03 -032 22 74 $53.24 386 -03 -033 22 74 $53.24 386 -03 -034 22 74 $53.24 386 -03 -035 22 74 $53.24 386 -03 -036 22 74 $53.24 386 -03 -037 22 74 $53.24 386 -03 -038 22 74 $53.24 386 -03 -039 22 74 $53.24 386 -03 -040 22 74 $53.24 386 -03 -041 22 74 $53.24 386 -03 -042 22 74 $53.24 386 -03 -043 22 74 $53.24 386 -03 -044 22 74 $53.24 386 -03 -045 22 74 $53.24 386 -03 -046 22 74 $53.24 386 -03 -047 22 74 $53.24 386 -03 -048 22 74 $53.24 386 -03 -049 22 74 $53.24 386 -03 -050 22 74 $53.24 386 -03 -051 22 74 $53.24 386 -03 -052 22 74 $53.24 386 -04 -016 22 75 $53.24 386 -04 -017 22 75 $53.24 386 -04 -018 22 75 $53.24 386 -04 -019 22 75 $53.24 386 -04 -020 22 75 $53.24 386 -04 -021 22 75 $53.24 386 -04 -022 22 75 $53.24 386 -04 -023 22 75 $53.24 ENGINEERING DATA SERVICES 650- 967 -5484 128 E.D.S. Date: 5- 4 -2010 Page: 3 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.F.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -04 -024 22 75 $53.24 386 -04 -025 22 75 $53.24 386 -04 -026 22 75 $53.24 386 -04 -027 22 75 $53.24 386 -04 -028 22 75 $53.24 386 -04 -029 22 75 $53.24 386 -04 -030 22 75 $53.24 386 -04 -031 22 75 $53.24 386 -04 -032 22 75 $53.24 386 -04 -033 22 75 $53.24 386 -04 -034 22 85 $53.24 386 -11 -001 4 7 $0.00 386 -11 -002 4 7 $0.00 386 -11 -003 4 7 $0.00 3B6 -11 -004 4 7 $0.00 386 -11 -005 4 7 $0.00 386 -11 -006 4 7 $0.00 386 -11 -007 4 7 $0.00 386 -11 -008 4 7 $0.00 386 -11 -009 4 7 $0.00 386 -11 -010 4 7 $0.00 386 -11 -011 4 7 $0.00 386 -11 -012 4 7 $0.00 386 -11 -013 4 7 $0.00 386 -11 -014 4 7 $0.00 386 -11 -015 4 7 $0.00 386 -11 -016 4 7 $0.00 386 -11 -017 4 7 $0.00 386 -11 -018 4 7 $0.00 386 -11 -020 4 7 $0.00 386 -11 -021 4 7 $0.00 386 -11 -022 4 7 $0.00 386 -11 -023 4 7 $0.00 386 -11 -024 4 7 $0.00 386 -11 -025 4 7 $0.00 386 -11 -026 4 7 $0.00 386 -11 -027 4 7 $0.00 386 -11 -028 4 7 $0.00 386 -11 -029 4 7 $0.00 386 -11 -030 4 7 $0.00 386 -11 -031 4 7 $0.00 386 -11 -032 4 7 $0.00 386 -11 -033 4 7 $0.00 386 -11 -034 4 7 $0.00 386 -11 -035 4 7 $0.00 386 -11 -036 4 7 $0.00 386 -11 -037 4 7 $0.00 386 -11 -038 4 7 $0.00 386 -11 -039 4 7 $0.00 386 -11 -040 4 7 $0.00 386 -12 -036 4 8 $0.00 386 -12 -037 4 8 $0.00 386 -12 -038 4 8 $0.00 386 -12 -039 4 8 $0.00 386 -12 -040 4 8 $0.00 386 -12 -041 4 8 $0.00 386 -12 -042 4 8 $0.00 386 -12 -043 4 8 $0.00 386 -12 -044 4 8 $0.00 386 -12 -045 4 8 $0.00 386 -12 -046 4 8 $0.00 386 -12 -047 4 8 $0.00 386 -12 -048 4 8 $0.00 386 -12 -049 4 8 $0.00 386 -12 -050 4 8 $0.00 386 -12 -051 4 8 $0.00 386 -12 -052 4 8 $0.00 386 -12 -053 4 8 $0.00 386 -12 -054 4 8 $0.00 ENGINEERING DATA SERVICES 650 -967 -5484 129 E.D =S= Date: 5- 4 -2010 Padre; 4 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS( A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CO. 386 -12 -055 4 8 $0.00 386 -12 -056 4 8 $0.00 386 -12 -057 4 8 $0.00 386 -12 -058 4 8 $0.00 386 -12 -059 4 8 $0.00 386 -12 -060 4 8 $0.00 386 -12 -061 4 8 $0.00 386 -12-062 4 8 $0.00 386 -12 -063 4 8 $0.00 386 -12 -064 4 8 $0.00 386 -12 -065 4 8 $0.00 386 -12 -066 4 8 $0.00 386 -12 -067 4 8 $0.00 386 -12 -068 4 8 $0.00 386 -12 -069 4 8 $0.00 386 -12 -070 4 8 $0.00 386 -12 -071 4 8 $0.00 386 -12 -072 4 8 $0.00 386 -12 -073 4 8 $0.00 386 -12 -074 4 8 $0.00 386 -13 -001 4 9 $0.00 386 -13 -002 4 9 $0.00 386 -13 -003 4 9 $0.00 386 -13 -004 4 9 $0.00 386 -13 -005 4 9 $0.00 386 -13 -006 4 9 $0.00 386 -13 -007 4 9 $0.00 386 -13 -008 4 9 $0.00 386 -13 -009 4 9 $0.00 386 -13 -010 4 9 $0.00 386 -13 -011 4 9 $0.00 386 -13 -012 4 9 $0.00 386 -13 -013 4 9 $0.00 `. 386 -13 -014 4 9 $0.00 386 -13 -015 4 9 $0.00 386 -13 -016 4 9 $0.00 386 -13 -017 4 9 $0.00 386 -13 -018 4 9 $0.00 386 -13 -019 4 9 $0.00 386 -13 -020 4 9 $0.00 386 -13 -021 4 9 $0.00 386 --13 -022 4 9 $0.00 386 -13 -023 4 9 $0.00 386 -13 -024 4 9 $0.00 386 -13 -025 4 9 $0.00 386 -13 -026 4 9 $0.00 386 -13 -027 4 9 $0.00 386 -13 -028 4 9 $0.00 386 -13 -029 4 9 $0.00 386 -13 -030 4 9 $0.00 386 -13 -031 4 9 $0.00 386 -13 -032 4 9 $0.00 386 -13 -033 4 9 $0.00 386 -13 -034 4 9 $0.00 386 -13 -035 4 9 $0.00 386 -13 -036 4 9 $0.00 386 -13 -037 4 9 $0.00 386 -13 -038 4 9 $0.00 386 -13 -039 4 9 $0.00 386 -13 -040 4 9 $0.00 386 -13 -041 4 9 $0.00 386 -13 -042 4 9 $0.00 386 -13 -043 4 9 $0.00 386 -13 -044 4 9 $0.00 386 -13 -045 4 9 $0.00 386 -13 -046 4 9 $0.00 386 -13 -047 4 9 $0.00 386 -13 -048 4 9 $0.00 386 -13 -049 4 9 $0.00 ENGINEERING DATA SERVICES 650 -967 -5484 130 E.D.S. Date: 5- 4 -2010 Page: 5 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -13 -050 4 9 $0.00 386 -13 -051 4 9 $0.00 386 -13 -052 4 9 $0.00 386 -13 -053 4 9 $0.00 386 -13-054 4 9 $0.00 386 -13 -055 4 9 $0.00 386 -13 -056 4 9 $0.00 386 -13 -057 4 9 $0.00 386 -13 -058 4 9 $0.00 386 -13 -059 4 9 $0.00 386 -13 -060 4 9 $0.00 386 -13 -061 4 9 $0.00 386 -13 -062 4 9 $0.00 386 -13 -063 4 9 $0.00 386 -13 -064 4 9 $0.00 386.13 -065 4 9 $0.00 386 --14-003 4 10 $0.00 386 -14 -011 4 10 $0.00 386 -14 -012 4 10 $0.00 386 -14 -014 4 10 $0.00 386 -14 -016 4 10 $0.00 386 -14 -018 4 10 $0.00 386 -14 -023 4 10 $0.00 386 -14 -026 4 10 $0.00 386 -14 -027 4 10 $0.00 386 -22 -009 22 79 $53.24 386 -22 -010 22 79 $53.24 386 -26 -001 22 80 $53.24 386 -26 -002 22 80 $53.24 386 -26 -003 22 80 $53.24 386 -26 -004 22 80 $53.24 386 -26 -005 22 80 $53.24 386 -26 -006 22 80 $53.24 386 -26 -007 22 80 $53.24 386 -26 -008 22 80 $53.24 386 --26 -009 22 80 $53.24 386 -26 -010 22 80 $53.24 386 -26 -011 22 80 $53.2 386 -26 -012 22 80 $53.24 386 -26 -013 22 80 $53.24 3B6 -26 -014 22 BO $53.24 3B6 -26 -015 22 BO $53.24 3B6 -26 -016 22 80 $53.24 3B6 -26 -017 22 80 $53.24 3B6 -26 -018 22 80 $53.24 3B6 -26 -019 22 80 $53.24 3B6 -26 -020 22 80 $53.24 386 -26 -021 22 80 $53.24 386 -26 -022 22 80 $53.24 386 -26 -023 22 80 $53.24 386 -26 -024 22 80 $53.24 386.26 -025 22 80 $53.24 386 -26 -026 22 80 $53.24 386 -26 -027 22 80 $53.24 386 -26 -028 22 80 $53.24 386 -26 -029 22 80 $53.24 386 -26 -030 22 80 $53.24 386 -26 -031 22 80 $53.24 386 -26 -032 22 80 $53.24 386 -26 -033 22 80 $53.24 386 -26 -034 22 80 $53.24 386 -26 -035 22 80 $53.24 386 -26 -036 22 80 $53.24 386 -26 -037 22 80 $53.24 386 -26 -038 22 80 $53.24 386 -26 -039 22 80 $53.24 386 -26 -040 22 80 $53.24 386 -26-041 22 80 $53.24 386 -26 -042 22 80 $53.24 ENGINEERING DATA SERVICES 650 - 967 -5484 131 E.D.S. Date: 5- 4 -2010 Page: 6 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS A.P.N. ZONES SHEET $$ AREA /FRON'T'AGE LIMINARILY APPROVED FINALLY CONFIRa. a 386 -26 -043 22 80 $53.24 386 -26 -044 22 80 $53.24 386 -26 -045 22 80 $53.24 386 -26 -046 22 80 $53.24 386 -26 -047 22 80 $53.24 386 -26 -048 22 80 $53.24 386 -26 -049 22 80 $53.24 386 -26 -050 22 80 $53.24 386 -26 -051 22 80 $53.24 386 -26 -052 22 80 $53.24 386 -26 -053 22 80 $53.24 386 -26 -054 22 80 $53.24 386 -26 -055 22 80 $53.24 386 -26 -056 22 80 $53.24 386 -26 -057 22 80 $53.24 386 -26 -058 22 80 $53.24 386 -26 -059 22 80 $53.24 386 -26 -060 22 80 $53.24 386 -26 -061 22 80 $53.24 386 -26 -062 22 80 $53.24 386 -26 -063 22 80 $53.24 386 -26 -064 22 80 $53.24 386 -26 -065 22 80 $53.24 386 -26 -066 22 80 $53.24 386 -26 -067 22 80 $53.24 386 -26 -068 22 80 $53.24 386 -26 -069 22 80 $53.24 386 -26 -070 22 80 $53.24 386 -26 -071 22 80 $53.24 386 -27 -001 22 81 $53.24 386 -27 -002 22 81 $53.24 386 -27 -003 22 81 $53.24 386 -27 -004 22 81 $53.24 386 -27 -005 22 81 $53.24 386 -27 -006 22 81 $53.24 386 -27 -007 22 81 $53.24 386 -27 --008 22 81 $53.24 386 -27 -009 22 81 $53.24 386 -27 -010 22 81 $53.24 386 -27 -011 22 81 $53.24 386 -27 --012 22 81 $53.24 386 -27 -013 22 81 $53.24 386 -27 -014 22 81 $53.24 386 -27 -015 22 81 $53.24 386 -27 -016 22 81 $53.24 386 -27 -017 22 81 $53.24 386 -27 -018 22 81 $53.24 386 -27 -019 22 81 $53.24 386 -27 -020 22 81 $53.24 386 -27 -021 22 81 $53.24 386 -27 -022 22 81 $53.24 386 -27 -023 22 81 $53.24 386 -27 -024 22 81 $53.24 386 -27 -025 22 81 $53.24 386 -27 -026 22 81 $53.24 386 -27 -027 22 81 $53.24 386 -27 -028 22 81 $53.24 386 -27 -029 22 81 $53.24 386 -27 -030 22 81 $53.24 386 -27 -031 22 81 $53.24 386 -27 -032 22 81 $53.24 386 -27 -033 22 81 $53.24 386 -27 -034 22 81 $53.24 386 -27 -035 22 81 $53.24 386 -27 -036 22 81 $53.24 386 -27 -037 22 81 $53.24 �. 386 -27 -038 22 81 $53.24 386 -27 -039 22 81 $53.24 386 -27 -040 22 81 $53.24 ENGINEERING DATA SERVICES 650- 967 -5484 132 E.D.S. Date: 5- 4 -2010 Page: 7 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -27 -041 22 B1 $53.24 386 -27 -042 22 B1 $53.24 386 -27 -043 22 81 $53.24 386 -27 -044 22 81 $53.24 386 -27 -045 22 81 $53.24 386 -27 -046 22 81 $53.24 386 -27 -047 22 81 $53.24 386- 27 -04B 22 81 $53.24 386 -27 -049 22 81 $53.24 386 -27 -050 22 81 $53.24 386 -27 -051 22 81 $53.24 386 -27 -052 22 81 $53.24 386 -27 -053 22 81 $53.24 386 -27 -054 22 81 $53.24 386 -27 -055 22 81 $53.24 386 -27 -056 22 81 $53.24 386 -27 -057 22 81 $53.24 386 -27 -058 22 81 $53.24 386 -27 -059 22 81 $53.24 3B6 -27 -060 22 81 $53.24 3B6 -27 -061 22 81 $53.24 3B6 -27 -062 22 81 $53.24 386 -27 -063 22 81 $53.24 3B6 -27 -064 22 81 $53.24 3B6 -27 -065 22 81 $53.24 3B6 -27 -066 22 81 $53.24 386 -27 -067 22 81 $53.24 386 -27 -068 22 81 $53.24 3B6 -27 -069 22 81 $53.24 3B6 -27 -070 22 81 $53.24 386 -27 -071 22 B1 $53.24 3B6 -27 -072 22 B1 $53.24 3B6 -27 -073 22 B1 $53.24 386 -27 -074 22 81 $53.24 3B6 -28 -001 22 B2 $53.24 3B6 -28 -002 22 B2 $53.24 3B6 -28 -003 22 B2 $53.24 386 -28 -004 22 82 $53.24 386 -28 -005 22 82 $53.24 3B6 -2B -006 22 B2 $53.24 3B6 -28 -007 22 B2 $53.24 3B6 -28 -008 22 B2 $53.24 386 -28 -009 22 82 $53.24 386 -28 -010 22 B2 $53.24 386 -28 -011 22 B2 $53.24 386 -28 -012 22 B2 $53.24 386 -28 -013 22 B2 $53.24 386 -28 -014 22 B2 $53.24 386 -28 -015 22 82 $53.24 386 -28 -016 22 82 $53.24 386 -28 -017 22 B2 $53.24 3B6- 28 -01B 22 B2 $53.24 3B6 -28 -019 22 B2 $53.24 3B6 -28 -020 22 82 $53.24 386 -28 -021 22 82 $53.24 386 -28 -022 22 82 $53.24 386 -28 -023 22 82 $53.24 3B6 -28 -024 22 82 $53.24 3B6 -28 -025 22 82 $53.24 3B6 -28 -026 22 82 $53.24 3B6 -28 -027 22 82 $53.24 3B6 -28 -028 22 82 $53.24 3B6 - 28029 22 82 $53.24 3B6 -28 -030 22 82 $53.24 3B6 -28 -031 22 82 $53.24 3B6 -28 -032 22 82 $53.24 3B6 -28 -033 22 82 $53.24 3B6 -28 -034 22 82 $53.24 3B6 -28 -035 22 82 553.24 ENGINEERING DATA SERVICES 650 - 967 -5484 133 E.D.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED 386 -28 -036 22 82 $53.24 386 -28 -037 22 82 $53.24 386 -28 -038 22 82 $53.24 386 -28 -039 22 82 $53.24 386 -2B -040 22 B2 $53.24 386 -28 -041 22 82 $53.24 386 -29 -002 22 83 $53.24 386 -29 -003 22 83 $53.24 386 -29 -004 22 83 $53.24 386 -29 -005 22 83 $53.24 386 -29 -006 22 83 $53.24 386 -29 -007 22 83 $53.24 386 -29 -008 22 83 $53.24 386 -29 -009 22 83 $53.24 386 -29 -010 22 83 $53.24 386 -29 -011 22 83 $53.24 386 -29 -012 22 83 $53.24 386 -29 -013 22 83 $53.24 386 -29 -014 22 83 $53.24 386 -29 -015 22 83 $53.24 386.29 -016 22 83 $53.24 386 -29 -017 22 83 $53.24 386 -29 -018 22 83 $53.24 386 -29 -019 22 83 $53.24 386 -29 -020 22 83 $53.24 386 -29 -021 22 83 $53.24 386 -29 -022 22 83 $53.24 386 -29 -023 22 83 $53.24 386 -29 -024 22 83 $53.24 386 -29 -025 22 83 $53.24 386 -29 -026 22 83 $53.24 386 -29 -027 22 83 $53.24 386 -29 -028 22 83 $53.24 386 -29 -029 22 83 $53.24 386 -29 -030 22 83 $53.24 386 -29 -031 22 83 $53.24 386 -29 -032 22 83 $53.24 386 -29 -033 22 83 $53.24 386 -29 -034 22 83 $53.24 386 -29 -035 22 83 $53.24 386 -29 -036 22 83 $53.24 386 -29 -037 22 83 $53.24 386 -29 -038 22 83 $53.24 386 -29 -039 22 83 $53.24 386 -29 -040 22 83 $53.24 386 -29 -041 22 83 $53.24 386 -29 -042 22 83 $53.24 386 -29 -043 22 83 $53.24 386 -29 -044 22 83 $53.24 386 -29 -045 22 83 $53.24 386 -29 -046 22 83 $53.24 386 -29 -047 22 83 $53.24 386 -29 -048 22 83 $53.24 386 -29 -049 22 83 $53.24 386 -29 -050 22 83 $53.24 386 -29 -051 22 83 $53.24 386 -29 -052 22 83 $53.24 386 -29 -053 22 83 $53.24 386 -29 -054 22 83 $53.24 386 -29 -055 22 83 $53.24 386 -29 -056 22 83 $53.24 386 -29 -057 22 83 $53.24 386 -29 -058 22 83 $53.24 386 -29 -059 22 83 $53.24 386 -29 -060 22 83 $53.24 386 -29 -061 22 83 $53.24 386 -29 -062 22 83 $53.24 386 -29 -063 22 83 $53.24 386 -29 -064 22 83 $53.24 ENGINEERING DATA SERVICES 650 -967 -5484 Page: 8 ASSESSMENTS( FINALLY CONFIM y 134 E.D.S. Date: 5- 4 -2010 Page: 9 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -29 -065 22 83 $53.24 386 -29 -066 22 83 $53.24 386 -29 -067 22 83 $53.24 386 -29 -068 22 83 $53.24 366 -29 -069 22 83 $53.24 366 -29 -070 22 83 $53.24 386 -29 -071 22 63 $53.24 386 -29 -072 22 63 $53.24 386 -29 -073 22 83 $53.24 386 -29 -074 22 83 $53.24 386 -29 -075 22 83 $53.24 386 -29 -076 22 83 $53.24 386 -29 -077 22 83 $53.24 386 -30 -035 32 118 106 $1,337.14 386 -30 -036 32 118 $7.90 386 -30 -037 32 118 50 $634.90 386 -30 -038 32 118 50 $634.90 386 -30 -039 32 118 100 $1,261.90 386 -31 -001 22 84 $53.24 386 -31 -002 22 84 $53.24 386 -31 -003 22 84 $53.24 386 - 31004 22 84 $53.24 386-31-005 22 84 $53.24 386 -31 -006 22 84 $53.24 386 -31 -007 22 84 $53.24 386 -31 -008 22 84 $53.24 386 -31 -009 22 84 $53.24 386 -31 -010 22 84 $53.24 3B6 -31 -011 22 84 $53.24 386 -31 -012 22 84 $53.24 3B6 -31 -013 22 84 $53.24 3B6 -31 -014 22 84 $53.24 386 -31 -015 22 84 $53.24 386 -31 -016 22 84 $53.24 386 -31 -017 22 84 $53.24 386 -31 -016 22 84 $53.24 386 -31 -019 22 84 $53.24 386 -31 -020 22 84 $53.24 386 -31 -021 22 84 $53.24 386 -31 -022 22 84 $53.24 386 -31 -023 22 84 $53.24 386 -31 -024 22 84 $53.24 386 -31 -025 22 84 $53.24 386 -31 -026 22 84 $53.24 386 -31 -027 22 84 $53.24 386 -31 -028 22 84 $53.24 386 -31 -029 22 84 $53.24 386 -31 -030 22 84 $53.24 386 -31 -031 22 84 $53.24 386 -31 -032 22 84 $53.24 386 -31 -033 22 84 $53.24 386 -31 -034 22 84 $53.24 386 -31 -035 22 84 $53.24 386 -31 -036 22 84 $53.24 386 -31 -037 22 84 $53.24 386 -31 -038 22 84 $53.24 386 -31 -039 22 84 $53.24 386 -31 -040 22 84 $53.24 386 -31 -041 22 84 $53.24 386 -31 -042 22 84 $53.24 386 -31 -043 22 84 $53.24 386 -31 -044 22 84 $53.24 366 -31 -046 22 84 $53.24 386 -31 -047 22 84 $53.24 386 -31 -048 22 84 $53.24 3B6 -31 -049 22 84 $53.24 366 -31 -050 22 84 $53.24 386 -31 -051 22 84 $53.24 386 -31 -052 22 84 853.24 ENGINEERING DATA SERVICES 650 - 967 -5484 135 E,D,S, Date: 5- 4 -2010 Page: 10 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS( A.P.N. ZONES SHEET AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIR 386 -31 -054 22 84 $53.24 386 -31 -055 22 84 $53.24 386 -31 -056 22 84 $53.24 386 -31 -057 22 84 $53.24 386 -31 -058 22 84 $53.24 386 -31 -059 22 84 $53.24 386 -31 -060 22 84 $53.24 386 -31 -061 22 84 $53.24 386 -31 -062 22 84 $53.24 386 -31 -068 22 84 $53.24 386 -32 -001 22 85 $53.24 386 -32 -002 22 85 $53.24 386 -32 -003 22 85 $53.24 386 -32 -004 22 85 $53.24 386 -32 -005 22 85 $53.24 386 -32 -006 22 85 $53.24 386 -32 -007 22 85 $53.24 386 -32 -008 22 85 $53.24 386 -32 -009 22 85 $53.24 386 -32 -010 22 85 $53.24 386 -32 -011 22 85 $53.24 386 -32 -012 22 85 $53.24 386 -32 -013 22 85 $53.24 386 -32 -014 22 85 $53.24 386 -32 -015 22 85 $53.24 386 -32 -016 22 85 $53.24 386 -32 -017 22 85 $53.24 386 -32 -018 22 85 $53.24 386 -32 -019 22 85 $53.24 386 -32 -020 22 85 $53.24 386 -32 -021 22 85 $53.24 386 -32 -022 22 85 $53.24 386 -32 -023 22 85 $53.24 386 -32 -024 22 85 $53.24 386 -32 -025 22 85 $53.24 386 -32 -026 22 85 $53.24 386 -32 -027 22 85 $53.24 386 -32 -028 22 85 $53.24 386 -32 -029 22 85 $53.24 386 -32 -030 22 85 $53.24 386 -32 -031 22 85 $53.24 386 -32 -032 22 85 $53.24 386 -32 -033 22 85 $53.24 386 -32 -034 22 85 $53.24 386 -32 -035 22 85 $53.24 386 -32 -037 22 85 $53.24 386 -34 -002 22 86 $53.24 386 -34 -003 22 86 $53.24 386 -34 -004 22 86 $53.24 386 -34 -005 22 86 $53.24 386 -34 -006 22 86 $53.24 386 -34 -007 22 86 $53.24 386 -34 -008 22 86 $53.24 386 -34 -009 22 86 $53.24 386 -34 -010 22 86 $53.24 386 -34 -011 22 86 $53.24 386 -34 -012 22 86 $53.24 386 -34 -013 22 86 $53.24 386 -34 -014 22 86 $53.24 386 -34 -015 22 86 $53.24 386 -34 -016 22 86 $53.24 386 -34 -017 22 86 $53.24 386 -34 -018 22 86 $53.24 386 -34 -019 22 86 $53.24 386 -34 -020 22 86 $53.24 386 -34 -021 22 86 $53.24 I 386 -34 -024 22 86 $53.24 \ 386 -34 -025 22 86 $53.24 386 -34 -026 22 86 $53.24 ENGINEERING DATA SERVICES 650 -967 -5484 136 E.D.S. Date: 5- 4 -2010 Page: 11 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -34 -027 22 B6 $53.24 386- 34 -02B 22 B6 $53.24 386 -34 -029 22 86 $53.24 386 -34 -030 22 86 $53.24 386 -34 -031 22 86 $53.24 386 -34 -032 22 86 $53.24 3B6 -34 -033 22 86 $53.24 3B6 -34 -034 22 86 $53.24 3B6 -34 -035 22 86 $53.24 3B6 -34 -036 22 B6 $53.24 3B6 -34 -037 22 B6 $53.24 3B6 -34 -038 22 B6 $53.24 386 -34 -039 22 86 $53.24 3B6 -34 -040 22 B6 $53.24 386 -34 -041 22 86 $53.24 386 -34 -042 22 B6 $53.24 386 -34 -043 22 86 $53.24 386 -34 -044 22 86 $53.24 386 -34 -045 22 86 $53.24 386 -34 -046 22 86 $53.24 386 -34 -047 22 86 $53.24 386 -34 -048 22 86 $53.24 386 -34 -049 22 86 $53.24 386 -34 -050 22 86 $53.24 386 -34 -051 22 86 $53.24 386 -34 -052 22 86 $53.24 386 -34 -053 22 86 $53.24 386 -34 -054 22 86 $53.24 386 -34 -055 22 86 $53.24 386 -34 -056 22 86 $53.24 386 -34 -057 22 86 $53.24 386 -34 -058 22 86 $53.24 386 -34 -059 22 86 $53.24 386 -34 -060 22 86 $53.24 386 -34 -061 22 86 $53.24 386 -34 -062 22 B6 $53.24 386 -34 -063 22 86 $53.24 386 -34 -064 22 86 $53.24 386 -35 -030 22 87 $53.24 386 -35 -031 22 87 $53.24 386 -35 -045 22 87 $53.24 386 -35 -046 22 87 $53.24 386 -35 -047 22 87 $53.24 386 -35 -048 22 87 $53.24 386 -35 -049 22 87 $53.24 386 -35 -050 22 87 $53.24 386 -35 -051 22 87 $53.24 386 -35 -052 22 87 $53.24 386 -35 -053 22 87 $53.24 386 -35 -054 22 87 $53.24 386 -35 -055 22 87 $53.24 386 -35 -056 22 87 $53.24 386 -35 -057 22 87 $53.24 386 -35 -058 22 87 $53.24 386 -35 -059 22 87 $53.24 386 -35 -060 22 87 $53.24 386 -35 -061 22 87 $53.24 386 -35 -062 22 87 $53.24 386 -35 -063 22 87 $53.24 386 -35 -064 22 87 $53.24 386 -35 -065 22 87 $53.24 386 -35 -066 22 87 $53.24 386 -35 -067 22 87 $53.24 386 -36 -001 2 105 $79.10 386 -36 -002 2 105 $79.10 386 -36 -003 2 105 $79.10 386 -36 -004 2 105 $79.10 386 -36 -005 2 105 $79.10 386 -36 -006 2 105 $79.10 ENGINEERING DATA SERVICES 650- 967 -5484 137 ENGINEERING DATA SERVICES 650- 967 -5484 138 narP- 5- 4 -2070 Page: 12 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIR, i 386 -36 -007 2 105 $79.10 386 -36 -008 2 105 $79.10 386 -36 -009 2 105 $79.10 386 -36 -010 2 105 $79.10 386 -36 -011 2 105 $79.10 386 -36 -012 2 105 $79.10 386 -36 -013 2 105 $79.10 386 -36 -014 2 105 $79.10 386 -36 -015 2 105 $79.10 386 -36 -016 2 105 $79.10 386 -36 -017 2 105 $79.10 386 -36 -019 2 105 $79.10 386 -36 -020 2 105 $79.10 386 -36 -021 2 105 $79.10 386 -36 -022 2 105 $79.10 386 -36 -023 2 105 $79.10 386 -36 -024 2 105 $79.10 386 -36 -025 2 105 $79.10 386 -36 -026 2 105 $79.10 386 -36 -027 2 105 $79.10 386 -36 -028 2 105 $79.10 386 -36 -029 2 105 $79.10 386 -36 -030 2 105 $79.10 386 -36 -031 2 105 $79.10 386 -36 -032 2 105 $79.10 386 -36 -033 2 105 $79.10 386 -36 -035 2 105 $79.10 386 -36 -036 2 105 $79.10 386 -36 -037 2 105 $79.10 386 -36 -038 2 105 $79.10 386 -36 -039 2 105 $79.10 386 -36 -040 2 105 $79.10 386 -36 -041 2 105 $79.10 386-36 -042 2 105 $79.10 386 -36 -043 2 105 $79.10 386 -36 -044 2 105 $79.10 386 -36 -045 2 105 $79.10 386 -36 -046 2 105 $79.10 386 -36 -047 2 105 $79.10 386 -36 -048 2 105 $79.10 386 -36 -049 2 105 $79.10 386 -36 -050 2 105 $79.10 386 -36 -051 2 105 $79.10 386 -36 -052 2 105 $79.10 386 -36 -053 2 105 $79.10 386 -36 -054 2 105 $79.10 386 -37 -001 22 88 $53.24 386 -37 -002 22 88 $53.24 386 -37 -003 22 88 $53.24 386 -37 -004 22 88 $53.24 386 -37 -005 22 88 $53.24 386 -37 -006 22 88 $53.24 386 -37 -007 22 88 $53.24 386 -37 -008 22 88 $53.24 386 -37 -009 22 88 $53.24 386 -37 -010 22 88 $53.24 386 -37 -011 22 88 $53.24 386 -37 -012 22 88 $53.24 386 -37 -013 22 88 $53.24 386 -37 -014 22 88 $53.24 386 -37 -015 22 88 $53.24 386 -37 -016 22 88 $53.24 386 -37 -017 22 88 $53.24 386 -37 -018 22 88 $53.24 386 -37 -019 22 88 $53.24 386 -37 -020 22 88 $53.24 f 386 -37 -021 22 88 $53.24 386 -37 -022 22 88 $53.24 386 -37 -023 22 88 $53.24 ENGINEERING DATA SERVICES 650- 967 -5484 138 E.D.S. Date: 5- 4 -2010 Page: 13 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -37 -024 22 88 $53.24 386 -37 -025 22 88 $53.24 386 -37 -026 22 88 $53.24 386 -37 -027 22 88 $53.24 386 -37 -028 22 88 $53.24 386 -37 -029 22 88 $53.24 386 -37 -030 22 88 $53.24 386 -37 -031 22 88 $53.24 386 -37 -032 22 88 $53.24 386 -37 -033 22 88 $53.24 386 -37 -034 22 88 $53.24 386 -37 -035 22 88 $53.24 386 -37 -036 22 88 $53.24 386 -37 -037 22 88 $53.24 386 -37 -038 22 88 $53.24 386 -37 -039 22 88 $53.24 386 -37 -040 22 88 $53.24 386 -37 -041 22 88 $53.24 386 -37 -042 22 88 $53.24 386 -37 -043 22 88 $53.24 386 -37 -044 22 88 $53.24 386 -37 -045 22 88 $53.24 386 -37 -046 22 88 $53.24 386 -37 -047 22 88 $53.24 386 -37 -048 22 88 $53.24 386 -37 -049 22 88 $53.24 386 -37 -050 22 88 $53.24 386 -37 -051 22 88 $53.24 386 -37 -052 22 88 $53.24 386 -37 -053 22 88 $53.24 386 -37 -054 22 88 $53.24 386 -38 -001 22 89 $53.24 386 -38 -002 22 89 $53.24 38638 -003 22 89 $53.24 386 -38 -004 22 89 $53.24 386 -38 -005 22 89 $53.24 386 -38 -006 22 89 $53.24 386 -39 -001 2 106 $79.10 386 -39 -002 2 106 $79.10 386 -39 -003 2 106 $79.10 386 -39 -004 2 106 $79.10 3B6 -39 -005 2 106 $79.10 386 -39 -006 2 106 $79.10 3B6 -39 -007 2 106 $79.10 386 -39 -008 2 106 $79.10 386 -39 -009 2 106 $79.10 386 -39 -010 2 106 $79.10 386 -39 -011 2 106 $79.10 386 -39 -012 2 106 $79.10 386 -39 -015 2 106 $79.10 386 -39 -016 2 106 $79.10 386 -39 -017 2 106 $79.10 386 -39 -018 2 106 $79.10 386 -39 -019 2 106 $79.10 386 -39 -020 2 106 $79.10 386 -39 -021 2 106 $79.10 386 -39 -022 2 106 $79.10 386 -39 -023 2 106 $79.10 386 -39 -024 2 106 $79.10 386 -39 -025 2 106 $79.10 386 -39 -026 2 106 $79.10 3B6 -39 -027 2 106 $79.10 386 -39 -028 2 106 $79.10 386 -39 -029 2 106 $79.10 386 -39 -030 2 106 $79.10 386 -39 -031 2 106 $79.10 386 -39 -032 2 106 $79.10 386 -39 -033 2 106 $79.10 386 -39 -034 2 106 $79.10 ENGINEERING DATA SERVICES 650- 967 -5484 139 F_._D.S_ Da1-e! 5- 4 -2010 Page: 14 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL ENGINEERING DATA SERVICES 650 - 967 -5484 140 DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTSf A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIR; 386 -39 -035 2 106 $79.10 386 -40 -001 22 90 $53.24 386 -40 -002 22 90 $53.24 386 -40 -003 22 90 $53.24 386 -40 -004 22 90 $53.24 386 -40 -005 22 90 $53.24 386 -40 -006 22 90 $53.24 386 -40 -007 22 90 $53.24 386 -40 -008 22 90 $53.24 386 -40 -009 22 90 $53.24 386 -40 -010 22 90 $53.24 386 -40 -011 22 90 $53.24 386 -40 -012 22 90 $53.24 386 -40 -013 22 90 $53.24 386 -40 -014 22 90 $53.24 386 -40 -015 22 90 $53.24 386 -40 -016 22 90 $53.24 386 -40 -017 22 90 $53.24 386 -40 -018 22 90 $53.24 386 -40 -019 22 90 $53.24 386 -40 -020 22 90 $53.24 386 -40 -021 22 90 $53.24 386 -40 -022 22 90 $53.24 386 -40 -023 22 90 $53.24 386 -40 -024 22 90 $53.24 386 -40 -025 22 90 $53.24 386 -40 -026 22 90 $53.24 386 -40 -027 22 90 $53.24 386 -40 -028 22 90 $53.24 386 -40 -029 22 90 $53.24 386 -40 -030 22 90 $53.24 386 -40 -031 22 90 $53.24 �. 386 -40 -032 22 90 $53.24 386 -40 -033 22 90 $53.24 386 -40 -034 22 90 $53.24 386 -40 -035 22 90 $53.24 386 -40 -036 22 90 $53.24 386 -40 -037 22 90 $53.24 386 -40 -038 22 90 $53.24 386 -40 -039 22 90 $53.24 386 -40 -040 22 90 $53.24 386 -40 -041 22 90 $53.24 386 -40 -042 22 90 $53.24 386 -40 -043 22 90 $53.24 386 -40 -044 22 90 $53.24 386 -40 -045 22 90 $53.24 386 -40 -046 22 90 $53.24 386 -41 -001 5 24 $0.00 386.41 --002 5 24 $0.00 386 -41 -003 5 24 $0.00 386 -41 -004 5 24 $0.00 386 -41 -005 5 24 $0.00 386 -41 -006 5 24 $0.00 386 -41 -007 3 2 $105.12 386 -41 -010 3 2 $105.12 386 -41 -011 3 2 $105.12 386 -41 -012 3 2 $105.12 386 -41 -014 3 2 $105.12 386 -41 -015 3 2 $105.12 386 -41 -016 3 2 $105.12 386 --41 -017 3 2 $105.12 386 -41 -018 3 2 $105.12 386 -41 -019 3 2 $105.12 386 -41 -020 3 2 $105.12 386 -41 -021 3 2 $105.12 386 -41 -022 3 2 $105.12 386 -41 -023 3 2 $105.12 < 386 -41 -024 3 2 $105.12 386 -41 -027 3 2 $105.12 ENGINEERING DATA SERVICES 650 - 967 -5484 140 E.D.S. Date: 5- 4 -2010 Page: 15 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -41 -028 3 2 $105.12 386 -41 -029 3 2 $105.12 386 -41 -030 3 2 $105.12 386 -41 -031 3 2 $105.12 386-41-032 3 2 $105.12 386 -41 -033 3 2 $105.12 386 -41 -034 3 2 $105.12 386 -41 -036 3 2 $105.12 386 -41 -037 3 2 $105.12 386 -41 -038 3 2 $105.12 386 -41 -039 3 2 $105.12 386 -41 -040 3 2 $105.12 386 -41 -041 3 2 $105.12 386 -41 -042 3 2 $105.12 386 -41 -043 3 2 $105.12 386 -41 -044 3 2 $105.12 386 -41 -045 3 2 $105.12 386 -41 -046 3 2 $105.12 386 -41 -047 3 2 $105.12 38641 -048 3 2 $105.12 386 -41 -049 3 2 $105.12 386 -41 -050 3 2 $105.12 386 -41 -051 3 2 $105.12 386 -41 -052 3 2 $105.12 386 -41 -053 3 2 $105.12 386 -41 -054 3 2 $105.12 386 -41 -055 3 2 $105.12 386 -41 -056 3 2 $105.12 386 -41 -057 3 2 $105.12 386 -41 -058 3 2 $105.12 386 -41 -059 3 2 $105.12 386 -41 -060 3 2 $105.12 386 -41 -061 3 2 $105.12 386 -41 -062 3 2 $105.12 386 -41 -063 3 2 $105.12 386 -42 -001 3 3 $105.12 386 -42 -002 3 3 $105.12 386 -42 -003 3 3 $105.12 386 -42 -004 3 3 $105.12 386 -42 -005 3 3 $105.12 386 -42 -006 3 3 $105.12 386 -42 -007 3 3 $105.12 386 -42 -008 3 3 $105.12 386 -42 -009 3 3 $105.12 386 -42 -010 3 3 $105.12 386 -42 -011 3 3 $105.12 386 -42 -012 3 3 $105.12 386 -42 -013 3 3 $105.12 386 -42 -014 3 3 $105.12 386 -42 -015 3 3 $105.12 386 -42 -016 3 3 $105.12 386 -42 -017 3 3 $105.12 386 -42 -018 3 3 $105.12 386 -42 -019 3 3 $105.12 386 -42 -020 3 3 $105.12 386 -42 -021 3 3 $105.12 386 -42 -022 3 3 $105.12 386 -42 -023 3 3 $105.12 386 -42 -024 3 3 $105.12 386 -42 -025 3 3 $105.12 386 -42 -026 3 3 $105.12 386 -42 -027 3 3 $105.12 386 -42 -028 3 3 $105.12 386 -42 -029 3 3 $105.12 386 -42 -030 3 3 $105.12 38642 -031 3 3 $105.12 386 -42 -032 3 3 $105.12 38642 -033 3 3 $105.12 386 -42 -034 3 3 $105.12 ENGINEERING DATA SERVICES 650 - 967 -5484 141 F.D.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- A.P.N. ZONES SHEET # AREA /FRONTAGE LIMIN,ARILY APPROVED 386 -42 -035 3 3 $105.12 386 -42 -037 3 3 $105.12 386 -42 -038 3 3 $105.12 386 -42 -039 3 3 $105.12 386 -42 -040 3 3 $105.12 386 -42 -041 3 3 $105.12 386 -42 -042 3 3 $105.12 386 -43 -001 22 91 $53.24 386 -43 -002 22 91 $53.24 386 -43 -003 22 91 $53.24 386 -43 -004 22 91 $53.24 386 -43 -005 22 91 $53.24 386 -43 -006 22 91 $53.24 386 -43 -007 22 91 $53.24 386 -43 -008 22 91 $53.24 386 -43 -009 22 91 $53.24 386 -43 -010 22 91 $53.24 386 -43 -011 22 91 $53.24 386 -43 -012 22 91 $53.24 386 -43 -013 22 91 $53.24 386 -43 -014 22 91 $53.24 386 -43 -015 22 91 $53.24 386 -43 -016 22 91 $53.24 386 -43 -017 22 91 $53.24 386 -43 -018 22 91 $53.24 386 -43 -019 22 91 $53.24 386 -43 -020 22 91 $53.24 386 -43 -021 22 91 $53.24 386 -43 -022 22 91 $53.24 386 -43 -023 22 91 $53.24 386 -43 -024 22 91 $53.24 386 -43 -025 22 91 $53.24 386 -43 -026 22 91 $53.24 386 -43 -027 22 91 $53.24 386 -43 -028 22 91 $53.24 386 -43 -029 22 91 $53.24 386 -43 -030 22 91 $53.24 386 -43 -033 22 91 $53.24 386 -43 -034 22 91 $53.24 386 -43 -035 22 91 $53.24 386 -43 -036 22 91 $53.24 386 -43 -037 22 91 $53.24 386 -43 -038 22 91 $53.24 386 -44 -001 3 4 $105.12 386 -44 -002 3 4 $105.12 386 -44 -003 3 4 $105.12 386 -44 -004 3 4 $105.12 386 -44 -005 3 4 $105.12 386 -44 -006 3 4 $105.12 386 -44 -007 3 4 $105.12 386 -44 -008 3 4 $105.12 386 -44 -009 3 4 $105.12 386 -44 -010 3 4 $105.12 386 -44 -011 3 4 $105.12 386 -44 -012 3 4 $105.12 386 -44 -013 3 4 $105.12 386 -44 -014 3 4 $105.12 386 -44 -015 3 4 $105.12 386 -44 -016 3 4 $105.12 386 -44 -017 3 4 $105.12 386 -44 -018 3 4 $105.12 386 -44 -019 3 4 $105.12 386 -44 -020 3 4 $105.12 386 -44 -021 3 4 $105.12 386 -44 -022 3 4 $105.12 386 -44 -023 3 4 $105.12 386 -44-024 3 4 $105.12 386 -44 -025 3 4 $105.12 386 -44 -026 3 4 $105.12 ENGINEERING DATA SERVICES 650 - 967 -5484 Page: ?6 ASSESSMENTS FINALLY CONFIRf 142 E.D.S. Date: 5- 4 -2010 Page: 17 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -44 -027 3 4 $105.12 386 -44 -028 3 4 $105.12 386 -44 -029 3 4 $105.12 386 -44 -030 3 4 $105.12 386 -44 -031 3 4 $105.12 386 -44 -032 3 4 $105.12 386 -44 -033 3 4 $105.12 386 -44 -034 3 4 $105.12 386 -44 -035 3 4 $105.12 386 -44 -036 3 4 $105.12 386 -44 -037 3 4 $105.12 386 -46 -001 4 11 $0.00 386 -46 -002 4 11 $0.00 386 -46 -003 4 11 $0.00 386 -46 -004 4 11 $0.00 386 -46 -005 4 11 $0.00 386 -46 -006 4 11 $0.00 386 -46 -007 4 11 $0.00 386 -46 -008 4 11 $0.00 386 -46 -009 4 11 $0.00 386 -46 -010 4 11 $0.00 386 -46 -011 4 11 $0.00 386 -46 -012 4 11 $0.00 386 -46 -013 4 11 $0.00 386 -46 -014 4 11 $0.00 386 -46 -015 4 11 $0.00 386 -46 -016 4 11 $0.00 386 -46 -017 4 11 $0.00 386 -46 -018 4 11 $0.00 386 -46 -019 4 11 $0.00 386 -46 -020 4 11 $0.00 386 -46 -021 4 11 $0.00 386 -46 -022 4 11 $0.00 386 -46 -023 4 11 $0.00 386 -46 -024 4 11 $0.00 386 -46 -025 4 11 $0.00 38646 -026 4 11 $0.00 386 -46 -027 4 11 $0.00 386 -46 -028 4 11 $0.00 386 -46 -029 4 11 $0.00 386 -46 -030 4 11 $0.00 386 -46 -031 4 11 $0.00 386 -46 -032 4 11 $0.00 386 -46 -033 4 11 $0.00 386 -46 -034 4 11 $0.00 386 -46 -035 4 11 $0.00 386 -47 -002 22 92 $53.24 386 -47 -003 22 92 $53.24 386 -47 -004 22 92 $53.24 386 -47 -005 22 92 $53.24 386 -47 -006 22 92 $53.24 38647 -007 22 92 $53.24 386 -47 -008 22 92 $53.24 386 -47 -009 22 92 $53.24 386 -47 -010 22 92 $53.24 386 -47 --011 22 92 $53.24 386 -47 -012 22 92 $53.24 386 -47 -013 22 92 $53.24 386 -47 -014 22 92 $53.24 386 -47 -015 22 92 $53.24 386 -47 -016 22 92 $53.24 386 -47 -017 22 92 $53.24 386 -47 -018 22 92 $53.24 386 -47 -019 22 92 $53.24 386 -47 -020 22 92 $53.24 386 -47 -021 22 92 $53.24 386 --47 -022 22 92 $53.24 386- 47-023 22 92 $53.24 386 -47 -024 22 92 $53.24 ENGINEERING DATA SERVICES 650 - 967 --5484 143 E.D.S. Date: 5- 4 -2010 Page: 18 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL ENGINEERING DATA SERVICES 650 - 967 -5484 144 DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS1 A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIR1._ 386 -47 -025 22 92 $53.24 386 -47 -026 22 92 $53.24 386 -47 -027 22 92 $53.24 386 -47 -028 22 92 $53.24 386 -47 -029 22 92 $53.24 386 -47 -030 22 92 $53.24 386 -47 -031 22 92 $53.24 386 -47 -032 22 92 $53.24 386 -47 -033 22 92 $53.24 386 -47 -034 22 92 $53.24 386 -47 -036 22 92 $53.24 386 -47 -037 22 92 $53.24 386 -47 -038 22 92 $53.24 386 -47 -039 22 92 $53.24 386 -47 -040 22 92 $53.24 386 -48 -001 22 93 $53.24 386 -48 -002 22 93 $53.24 386 -48 -003 22 93 $53.24 386 -48 -004 22 93 $53.24 386 -48 -005 22 93 $53.24 386 -48 -006 22 93 $53.24 386 -48 -007 22 93 $53.24 386 -48 -008 22 93 $53.24 386 -48 -009 22 93 $53.24 386 -48 -010 22 93 $53.24 386 -48 -011 22 93 $53.24 386 -48 -012 22 93 $53.24 386 -48 -013 22 93 $53.24 386 -48 -014 22 93 $53.24 386 -48 -015 22 93 $53.24 386 -48 -016 22 93 $53.24 386-48 -017 22 93 $53.24 386 -48 -018 22 93 $53.24 386 -48 -019 22 93 $53.24 386 -49 -001 3 5 $105.12 386 -49 -002 3 5 $105.12 386 -49 -003 3 5 $105.12 386 -49 -004 3 5 $105.12 386 -49 -005 3 5 $105.12 386 -49 -006 3 5 $105.12 386 -49 -007 3 5 $105.12 386 -49 -008 3 5 $105.12 386 -49 -009 3 5 $105.12 386 -49 -010 3 5 $105.12 386 -49 -011 3 5 $105.12 386 -49 -012 3 5 $105.12 386 -49 -013 3 5 $105.12 386 -49 -014 3 5 $105.12 386 -49 -015 3 5 $105.12 386 -49 -016 3 5 $105.12 386 -49 -017 3 5 $105.12 386 -49 -018 3 5 $105.12 386 -49 -019 3 5 $105.12 386 -49 -020 3 5 $105.12 386 -49 -021 3 5 $105.12 386 -49 -022 3 5 $105.12 386 -49 -023 3 5 $105.12 386 -49 -024 3 5 $105.12 386 -49 -025 3 5 $105.12 386 -49 -026 3 5 $105.12 386 -49 -027 3 5 $105.12 386 -49 -028 3 5 $105.12 386 -49 -029 3 5 $105.12 386 -49 -030 3 5 $105.12 386 -49 -031 3 5 $105.12 386 -49 -032 3 5 $105.12 386 -49 -033 3 5 $105.12 ` 386 -49 -034 3 5 $105.12 386 -49 -035 3 5 $105.12 ENGINEERING DATA SERVICES 650 - 967 -5484 144 E.D.S. Date: 5- 4 -2010 Page: 19 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -50 -001 22 94 $53.24 386 -50 -002 22 94 $53.24 386 -50 -003 22 94 $53.24 386 -50 -004 22 94 $53.24 386 -50 -005 22 94 $53.24 386 -50 -006 22 94 $53.24 386 -50 -007 22 94 $53.24 386 -50 -008 22 94 $53.24 386 -50 -009 22 94 $53.24 386 -50 -010 22 94 $53.24 386 -50 -011 22 94 $53.24 386 -50 -012 22 94 $53.24 366 -50 -013 22 94 $53.24 386 -50 -014 22 94 $53.24 366 -50 -015 22 94 $53.24 3B6 -50 -017 22 94 $53.24 3B6 -50 -018 22 94 $53.24 386 -50 -019 22 94 $53.24 386 -50 -020 22 94 $53.24 3B6 -50 -021 22 94 $53.24 3B6 -50 -022 22 94 $53.24 386 -50 -023 22 94 $53.24 386 -50 -024 22 94 $53.24 386 -50 -025 22 94 $53.24 386 -50 -026 22 94 $53.24 386 -50 -027 22 94 $53.24 386 -50 -028 22 94 $53.24 386 -50 -029 22 94 $53.24 386 -50 -030 22 94 $53.24 386 -50 -031 22 94 $53.24 386 -50 -032 22 94 $53.24 386 -50 -033 22 94 $53.24 386 -50 -034 22 94 $53.24 386 -50 -035 22 94 $53.24 386 -50 -036 22 94 $53.24 386 -50 -037 22 94 $53.24 3B6 -50 -056 22 94 $53.24 386 -51 -001 9 107 $292.52 386 -51 -002 9 107 $292.52 366 -51 -003 9 107 $292.52 366 -51 -004 9 107 $292.52 386 -51 -005 9 107 $292.52 386 -51 -006 9 107 $292.52 3B6 -51 -007 9 107 $292.52 386 -51 -008 9 107 $292.52 386 -51 -009 9 107 $292.52 366 -51 -010 9 107 $292.52 3B6 -51 -011 9 107 $292.52 386 -51 -012 9 107 $292.52 386 -51 -013 9 107 $292.52 366 -51 -014 9 107 $292.52 366 -51 -015 9 107 $292.52 386 -51 -016 9 107 $292.52 386 -51 -017 9 107 $292.52 386 -51 -018 9 107 $292.52 386 -51 -019 9 107 $292.52 386 -51 -020 9 107 $292.52 386 -51 -021 9 107 $292.52 386 -51 -022 9 107 $292.52 386 -51 -023 9 107 $292.52 386 -51 -024 9 107 $292.52 386 -51 -025 9 107 $292.52 386 -51 -026 9 107 $292.52 386 -51 -027 9 107 $292.52 386 -51 -028 9 107 $292.52 386 -51 -029 9 107 $292.52 386 -51 -030 9 107 $292.52 386 -51 -031 9 107 $292.52 386 -51 -032 9 107 $292.52 ENGINEERING DATA SERVICES 650 - 967 -5484 145 F_n,S, Harp 5- 4-2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED 386 -51 -033 9 107 $292.52 386 -51 -034 9 107 $292.52 386 -51 -035 9 107 $292.52 386 -51 -036 9 107 $292.52 386 -51 -037 9 107 $292.52 386 -51 -038 9 107 $292.52 386 -51 -039 9 107 $292.52 38651 -040 9 107 $292.52 386 -51 -041 9 107 $292.52 386 -51 -042 9 107 $292.52 386 -51 -043 9 107 $292.52 386 -51 -044 9 107 $292.52 386 -51 -045 9 107 $292.52 386 -51 -046 9 107 $292.52 386 -51 -047 9 107 $292.52 386 -51 -048 9 107 $292.52 386 -52 -005 5 25 $0.00 386 -52 -006 5 25 $0.00 386 -52 -008 5 25 $0.00 386 -52 -009 5 25 $0.00 386 --52 -010 5 25 $0.00 386 -52 --011 5 25 $0.00 386 -52 -012 5 25 $0.00 386 -52 -013 5 25 $0.00 386 -52 -014 5 25 $0.00 386 -52 --015 5 25 $0.00 386 -52 -016 5 25 $0.00 386 -52 -017 5 25 $0.00 386 -52 -016 5 25 $0.00 386 -52 -019 5 25 $0.00 386 -52 -020 5 25 $0.00 386 -52 -021 5 25 $0.00 386 -52 -022 5 25 $0.00 386 -52 -023 5 25 $0.00 386 -52 -024 5 25 $0.00 386 -52 -025 5 25 $0.00 386 -52 -026 5 25 $0.00 386 -52 -027 5 25 $0.00 386 -52 -028 5 25 $0.00 386 -52 -029 5 25 $0.00 386 -52 -030 5 25 $0.00 386 -52 -031 5 25 $0.00 386 -52 -032 32 118 75 $948.40 386 -52 -033 32 118 75 $948.40 386 -52 -034 5 25 $0.00 386 -52 -035 5 25 $0.00 386 -52 -036 5 25 $0.00 386 -52 -037 5 25 $0.00 386 -52 -038 5 25 $0.00 386 -52 -039 5 25 $0.00 386 -52 -040 5 25 $0.00 386 -52 -041 5 25 $0.00 386 -52 -042 5 25 $0.00 386 -52 -043 5 25 $0.00 386 -52 -044 5 25 $0.00 386 -52 -045 5 25 $0.00 386 -52 -046 5 25 $0.00 386 -52 -047 5 25 $0.00 386 -53 -002 5 26 $0.00 386 -53 -003 5 26 $0.00 386 -53 -004 5 26 $0.00 386 -53 -005 5 26 $0.00 386 -53 -006 5 26 $0.00 386.53 -008 5 26 $0.00 386 -53 -009 5 26 $0.00 386 -53 -010 5 26 $0.00 386 -53 -011 5 26 $0.00 386 -53 -012 5 26 $0.00 386 -53 -013 5 26 $0.00 ENGINEERING DATA SERVICES 650 -967 -5484 Page; 20 ASSESSMENTS( FINALLY CONFIRI W% E.D.S. Date: 5- 4 -2010 Page: 21 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -53 -014 5 26 $0.00 386 -53 -015 5 26 $0.00 386 -53 -020 12 68 $361.34 386 -53 -021 12 68 $361.34 386 -53 -022 12 68 $361.34 386 -53 -023 12 68 $361.34 386 -53 -024 12 68 $361.34 386 -53 -025 12 68 $361.34 386 -53 -026 12 68 $361.34 386 -53 -027 12 68 $361.34 386 -53 -028 12 68 $361.34 386 -53 -031 5 26 $0.00 386 -53 -033 5 26 $0.00 386 -53 -034 5 26 $0.00 386 -53 -048 5 26 $0.00 386 -53 -049 5 26 $0.00 386 -53 -050 5 26 $0.00 386 -53 -051 5 26 $0.00 386 -53 -052 5 26 $0.00 386 -53 -053 5 26 $0.00 386 -53 -054 5 26 $0.00 386 -54 -001 5 27 $0.00 386 -54 -002 5 27 $0.00 386 -54 -003 5 27 $0.00 386 -54 -004 5 27 $0.00 386 -54 -005 5 27 $0.00 386 -54 -006 5 27 $0.00 386 -54 -007 5 27 $0.00 386 -54 -008 5 27 $0.00 386 -54 -009 5 27 $0.00 386 -54 -010 5 27 $0.00 386 -54 -011 5 27 $0.00 386 -54 -012 5 27 $0.00 386 -54 -013 5 27 $0.00 386 -54 -014 5 27 $0.00 386 -54 -015 5 27 $0.00 386 -54 -016 5 27 $0.00 386 -54 -018 5 27 $0.00 386 -54 -019 5 27 $0.00 386 -54 -020 5 27 $0.00 386 -54 -021 5 27 $0.00 386 -54 -022 5 27 $0.00 386 -54 -023 5 27 $0.00 386 -54 -024 5 27 $0.00 386 -54 -025 5 27 $0.00 386 -54 -026 5 27 $0.00 386 -54 -027 5 27 $0.00 386 -54 -028 5 27 $0.00 386 -54 -029 3 6 $105.12 386 -54 -030 3 6 $105.12 386 -54 -031 3 6 $105.12 386 -54 -032 3 6 $105.12 386 -54 -033 3 6 $105.12 386 -54 -034 3 6 $105.12 386 -54 -035 3 6 $105.12 386 -54 -036 3 6 $105.12 386 -54 -037 3 6 $105.12 386 -54 -038 3 6 $105.12 386 -54 -039 5 27 $0.00 386 -54 -040 5 27 $0.00 386 -54 -041 5 27 $0.00 386 -54 -042 5 27 $0.00 386 -54 -043 5 27 $0.00 386 -54 -044 5 27 $0.00 386 -54 -045 5 27 $0.00 386 -54 -046 5 27 $0.00 386 -54 -047 5 27 $0.00 386 -54 -048 5 27 $0.00 386 -54 -049 5 27 $0.00 ENGINEERING DATA SERVICES 650 - 967 -5484 147 E.D.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET ## AREA /FRONTAGE LIMINARILY APPROVED 386 - 54-050 5 27 $0.00 386 -54 -051 5 27 $0.00 386 -54 -052 5 27 $0.00 386 -54 -053 5 27 $0.00 386 -54 -054 5 27 $0.00 386 -54 -055 5 27 $0.00 386 -54 -056 5 27 $0.00 386 -54 -057 3 6 $105.12 386 -54 -058 3 6 $105.12 386 -55 -003 5 28 $0.00 386 -55 -004 5 28 $0.00 386 °55 -005 5 28 $0.00 386 -55 -006 5 28 $0.00 386 -55 -007 5 28 $0.00 386 -55 -008 5 28 $0.00 386 -58 -001 4 12 $0.00 386 -58 -002 4 12 $0.00 386 -58 -003 4 12 $0.00 386 -58 -004 4 12 $0.00 386 -58 -005 4 12 $0.00 386 -58 -006 4 12 $0.00 386 -58 -007 4 12 $0.00 386 -58 -008 4 12 $0.00 386 -58 -009 4 12 $0.00 386 -58 -010 4 12 $0.00 386 -58 -011 4 12 $0.00 386 -58 -012 4 12 $0.00 386 -58 -013 4 12 $0.00 386 -58 -014 4 12 $0.00 386 -58 -015 4 12 $0.00 386 -58 -016 4 12 $0.00 386 -58 -017 4 12 $0.00 386 -58 -018 4 12 $0.00 386 -58 -019 4 72 $0.00 386 -58 -020 4 12 $0.00 386 -58 -021 4 12 $0.00 386 -58 -022 4 12 $0.00 386 -58 -023 4 12 $0.00 386 -58 -024 4 12 $0.00 386 -58 -025 4 12 $0.00 386 -58 -026 4 12 $0.00 386 -58 -027 4 12 $0.00 386 -58 -028 4 12 $0.00 386 -58 -029 4 12 $0.00 386 -58 -030 4 12 $0.00 386 -58 -031 4 12 $0.00 386 -58 -032 4 12 $0.00 386 -58 -033 4 12 $0.00 386 -58 -034 4 12 $0.00 386 -58 -035 4 12 $0.00 386 -58 -036 4 12 $0.00 386 -58 -037 4 12 $0.00 386 -58 -038 4 12 $0.00 386 -58 -039 4 12 $0.00 386 -58 -040 4 12 $0.00 386 -58 -041 4 12 $0.00 386 -58 -042 4 12 $0.00 386 -58 -043 4 12 $0.00 386 -59 -001 4 13 $0.00 386 -59 -002 4 13 $0.00 386 -59 -003 4 13 $0.00 386 -59 -004 4 13 $0.00 386 -59 -005 4 13 $0,00 386 -59 -006 4 13 $0.00 386 -59 -007 4 13 $0.00 386 -59 -008 4 13 $0.00 386 -59 -009 4 13 $0.00 386 -59 -010 4 13 $0.00 386 -59 -011 4 13 $0.00 ENGINEERING DATA SERVICES 650 -967 -5484 Page: 22 ASSESSMENTS( FINALLY CONFIR 1 ,. M E.D.S. Date: 5- 4 -2010 Page: 23 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA/FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 386 -59 -012 4 13 $0.00 386 -59 -013 4 13 $0.00 386 -59 -014 4 13 $0.00 386 -59 -015 4 13 $0.00 386 -59 -016 4 13 $0.00 386 -59 -017 4 13 $0.00 386 -59 -018 4 13 $0.00 386 -59 -019 4 13 $0.00 386 -59 -020 4 13 $0.00 386 -59 -021 4 13 $0.00 386 -59 -022 4 13 $0.00 386 -59 -023 4 13 $0.00 386 -59 -024 4 13 $0.00 386 -59 -025 4 13 $0.00 386 -59 -026 4 13 $0.00 386 -59 -027 4 13 $0.00 386 -59 -028 4 13 $0.00 386 -59 -029 4 13 $0.00 386 -59 -031 4 13 $0.00 386 -59 -032 4 13 $0.00 386 -59 -033 4 13 $0.00 386 -59 -034 4 13 $0.00 386 -62 -001 4 14 $0.00 386 -62 -002 4 14 $0.00 386 -62 -003 4 14 $0.00 386 -62 -004 4 14 $0.00 386 -62 -005 4 14 $0.00 386 -62 -006 4 14 $0.00 386 -62 -007 4 14 $0.00 386 -62 -008 4 14 $0.00 386 -62 -009 4 14 $0.00 386 -62 -010 4 14 $0.00 386 -62 -011 4 14 $0.00 386 -62 -012 4 14 $0.00 386 -62 -013 4 14 $0.00 386 -62 -014 4 14 $0.00 386 -62 -015 4 14 $0.00 386 -62 -016 4 14 $0.00 386 -62 -017 4 14 $0.00 386 -62 -018 4 14 $0.00 386 -62 -019 4 14 $0.00 386 -62 -020 4 14 $0.00 386 -62 -021 4 14 $0.00 389 -01 -002 22 76 $53.24 389 -01 -003 22 76 $53.24 389 -01 -004 22 76 $53.24 389 -01 -005 22 76 $53.24 389 -01 -006 22 76 $53.24 389 -01 -007 22 76 $53.24 389 -01 -008 22 76 $53.24 389 -01 -009 22 76 $53.24 389 -01 -010 22 76 $53.24 389 -01 -011 22 76 $53.24 389 -01 -012 22 76 $53.24 389 -01 -013 22 76 $53.24 389 -01 -014 22 76 $53.24 389 -01 -015 22 76 $53.24 389 -01 -016 22 76 $53.24 389 -01 -017 22 76 $53.24 389 -01 -018 22 76 $53.24 389 -01 -019 22 76 $53.24 389 -01 -024 22 76 $53.24 389 -01 -025 22 76 $53.24 389 -01 -026 22 76 $53.24 389 -01 -027 22 76 $53.24 389 -01 -028 22 76 $53.24 389 -01 -029 22 76 $53.24 389 -01 -030 22 76 $53.24 389 -01 -031 22 76 $53.24 ENGINEERING DATA SERVICES 650- 967 -5484 m! hate! 5- 4 -2010 Page: 24 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CON__R. 389 -01 -032 22 76 $53.24 389 -01 -033 22 76 $53.24 389 -02 -003 22 95 $53.24 389 -02 -004 22 95 $53.24 389 -02 -005 22 95 $53.24 389 -02 -006 22 95 $53.24 389 -02 -007 22 95 $53.24 389 -02 -008 22 95 $53.24 389 -02 -009 22 95 $53.24 389 -02 -010 22 95 $53.24 389 -02 -011 22 95 $53.24 389 -02 -012 22 95 $53.24 389 -02 -013 22 95 $53.24 389 -02 -014 22 95 $53.24 389 -02 -015 22 95 $53.24 389 -02 -016 22 95 $53.24 389 -02 -017 22 95 $53.24 389 -02 -016 22 95 $53.24 389 -02 -019 22 95 $53.24 389 -02 -020 22 95 $53.24 389 -02 -021 22 95 $53.24 389 -02 -022 22 95 $53.24 389 -02 -023 22 95 $53.24 389 -02 -024 22 95 $53.24 369 -02 -025 22 95 $53.24 389 -02 -026 22 95 $53.24 389 -04 -001 22 96 $53.24 389 -04 -002 22 96 $53.24 389 -04 -003 22 96 $53.24 389 -04 -004 22 96 $53.24 389 -04 -005 389 -04 -006 22 22 96 96 $53.24 $53.24 389 -04 -007 22 96 $53.24 389 -04 -008 22 96 $53.24 389 -04 -009 22 96 $53.24 389 -04 -010 22 96 $53.24 3B9 -04 -011 22 96 $53.24 3B9 -04 -012 22 96 $53.24 389 -04 -013 22 96 $53.24 389 -04 -014 22 96 $53.24 389 -04 -015 22 96 $53.24 389 -04 -016 22 96 $53.24 389 -04 -017 22 96 $53.24 389 -04 -016 22 96 $53.24 389 -04 -019 22 96 $53.24 389 -04 -020 22 96 $53.24 389 -04 -021 22 96 $53.24 389 -04 -022 22 96 $53.24 389 -04 -023 22 96 $53.24 389 -04 -024 22 96 $53.24 389 -04 -025 22 96 $53.24 389 -04 -026 22 96 $53.24 389 -04 -027 22 96 $53.24 389 -04 -028 22 96 $53.24 389 -04 -029 22 96 $53.24 389 -04 -030 22 96 $53.24 389 -04 -031 22 96 $53.24 389 -04 -032 22 96 $53.24 389 -04 -033 22 96 $53.24 369 -04 -034 22 96 $53.24 389 -04 -035 22 96 $53.24 389 -04 -036 22 96 $53.24 389 -04 -037 22 96 $53.24 389 -04 -036 22 96 $53.24 389 -04 -039 22 96 $53.24 389 -04 -040 22 96 $53.24 389 -04 -041 22 96 $53.24 389 -04 -042 22 96 $53.24 369 -04 -043 22 96 $53.24 ENGINEERING DATA SERVICES 650- 967 -5484 150 E.D.S. Date: 5- 4 -2010 Page: 25 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 389 -04 -044 22 96 $53.24 389 -04 -045 22 96 $53.24 389 -04 -046 22 96 $53.24 389 -04 -047 22 96 $53.24 389 -05 -001 22 97 $53.24 389 -05 -002 22 97 $53.24 389 -05 -003 22 97 $53.24 389 -05 -004 22 97 $53.24 389 -05 -005 22 97 $53.24 389 -05 -006 22 97 $53.24 389 -05 -007 22 97 $53.24 3B9 -05 -008 22 97 $53.24 389 --05 -009 22 97 $53.24 389 -05 -010 22 97 $53.24 389 -05 -011 22 97 $53.24 389 -05 -012 22 97 $53.24 389 -05 -013 22 97 $53.24 389 -05 -014 22 97 $53,24 389 -05 -015 22 97 $53.24 389 705 -016 22 97 $53.24 389 -05 -017 22 97 $53.24 389 -05 -018 22 97 $53.24 389 -05 -019 22 97 $53.24 389 -05 -020 22 97 $53.24 389 --05 -021 22 97 $53.24 389 -12 -001 4 16 $0.00 389 -12 -002 4 16 $0.00 389 -12 -003 4 16 $0.00 389 -12 -004 4 16 $0.00 389 -12 -005 4 16 $0.00 389 -12 -006 4 16 $0.00 389 -12 -007 4 16 $0.00 3B9 -12 -008 4 16 $0.00 3B9 -12 -009 4 16 $0.00 3B9 -12 -010 4 16 $0.00 389 -12 -011 4 16 $0.00 3B9 -12 -012 4 16 $0.00 3B9 -12 -013 4 16 $0.00 3B9 -12 -014 4 16 $0.00 389 -12 -015 4 16 $0.00 389 -12 -016 4 16 $0.00 389 -12 -017 4 16 $0.00 3B9 -12 -018 4 16 $0.00 389 -12 -019 4 16 $0.00 3B9 -13 -001 4 17 $0.00 3B9 -13 -002 4 17 $0.00 3B9 -13 -003 4 17 $0.00 3B9 -13 -004 4 17 $0.00 3B9 -13 -005 4 17 $0.00 3B9 -13 -006 4 17 $0.00 3B9 -13 -007 4 17 $0.00 389 -13 -008 4 17 $0.00 389 -13 -009 4 17 $0.00 389 -13 -010 4 17 $0.00 389 -13 -011 4 17 $0.00 389 -13 -012 4 17 $0.00 389 -13 -013 4 17 $0.00 389 -13 -014 4 17 $0.00 389 -13 -015 4 17 $0.00 389 -13 -016 4 17 $0.00 389 -13-017 4 17 $0.00 389 -13 -018 4 17 $0.00 389 -13 -019 4 17 $0.00 389 -13 -020 4 17 $0.00 389 -13 -021 4 17 $0.00 389 -13 -022 4 17 $0.00 389 -13 -023 4 17 $0.00 389 -13 -024 4 17 $0,00 389 -13 -025 4 17 80.00 ENGINEERING DATA SERVICES 650- 967 -5484 151 E.D.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET ## AREA /FRONTAGE LIMINARILY APPROVED 389 -13 -026 4 17 $0.00 389 -13 -027 4 17 $0.00 389 -13 -028 4 17 $0.00 389 -13 -029 4 17 $0.00 389 -13 -030 4 17 $0.00 389 -13 -031 4 17 $0.00 389 -13 -032 4 17 $0.00 389 -13 -033 4 17 $0.00 389 -13 -034 4 17 $0.00 389 -13 -035 4 17 $0.00 389 -13 -036 4 17 $0.00 389 -13 -037 4 17 $0.00 389 -13 -038 4 17 $0.00 389 -13 -039 4 17 $0.00 389 -13 -040 4 17 $0.00 389 -13 -041 4 17 $0.00 389 -13 -042 4 17 $0.00 389 -13 -043 4 17 $0:00 389 -13 -044 4 17 $0.00 389 -13 -045 4 17 $0.00 389 -13 -046 4 17 $0.00 389 -13 -047 4 17 $0.00 389 -13 -048 4 17 $0.00 389 -13 -049 4 17 $0.00 389 -13 -050 4 17 $0.00 389 -13 -051 4 17 $0.00 389 -13 -052 4 17 $0.00 389 -13 -053 4 17 $0.00 389 -13 -054 4 17 $0.00 389 -13 -055 4 17 $0.00 389 -14 -001 4 18 $0.00 389 -14 -002 4 18 $0.00 389 -14 -003 4 18 $0.00 389 -14 -004 4 18 $0.00 389 -14 -005 4 18 $0.00 389 -14 -006 4 18 $0.00 389 -14 -007 4 18 $0.00 389 -14 -008 4 18 $0.00 389 -14 -009 4 18 $0.00 389 -14 -010 4 18 $0.00 389 -14 -011 4 18 $0.00 389 -14 -012 4 18 $0.00 389 -14 -013 4 18 $0.00 389 -14 -014 4 18 $0.00 389 -14 -015 4 18 $0.00 389 -14 -016 4 18 $0.00 389 -14 -017 4 18 $0.00 389 -14 -018 4 18 $0.00 389 -14 -019 4 18 $0.00 389 -14 -020 4 18 $0.00 389 -14 -021 4 18 $0.00 389 -14-022 4 18 $0.00 389 -14 -023 4 18 $0.00 389 -14 -024 4 18 $0.00 389 -14 -025 4 18 $0.00 389 -14 -026 4 18 $0.00 389 -14 -027 4 18 $0.00 389 -14 -028 4 18 $0.00 389 -14 -029 4 18 $0.00 389 -14 -030 4 18 $0.00 389 -14 -031 4 18 $0.00 389 -14 -032 4 18 $0.00 389 -14 -033 4 18 $0.00 389 -14 -034 4 18 $0.00 389 -14 -035 4 18 $0.00 389 -14 -036 4 18 $0.00 389 -14 -038 4 18 $0.00 389 -14 -039 4 18 $0.00 389 -14 -040 4 18 $0.00 ENGINEERING DATA SERVICES 650 - 967 -5484 Pam; 26 ASSESSMENTS FINALLY CONFIR_ 152 E.D.S. Date: 5- 4 -2010 Page: 27 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA/FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 3B9 -14 -041 4 18 $0.00 369 -14 -042 4 18 $0.00 3B9 -14 -043 4 16 $0.00 3B9 -14 -044 4 16 $0.00 3B9 -14 -045 4 18 $0.00 369 -14 -046 4 18 $0.00 389 -14 -047 4 16 $0.00 389 -14 -048 4 16 $0.00 389 -14 -049 4 18 $0.00 389 -14 -050 4 18 $0.00 389 -14 -051 4 18 $0.00 389 -14 -052 4 18 $0.00 389 -14 -053 4 18 $0.00 389 -14 -054 4 18 $0.00 389 -14 -055 4 18 $0.00 389 -14 -056 4 18 $0.00 389 -14 -057 4 18 $0.00 389 -14 -058 4 18 $0.00 389 -14 -059 4 18 $0.00 389-14-060 4 18 $0.00 389 -14 -061 4 18 $0.00 389 -14 -062 4 18 $0.00 389 -14 -063 4 18 $0.00 389 -14 -064 4 18 $0.00 389 -14 -065 4 18 $0.00 389 -14 -066 4 18 $0.00 389 -14 -067 4 18 $0.00 389 -14 -068 4 18 $0.00 389 -14 -069 4 18 $0.00 389 -14 -070 4 18 $0.00 389 -14 -071 4 18 $0.00 369 -14 -072 4 18 $0.00 369 -14 -073 4 18 $0.00 389 -14 -074 4 18 $0.00 389 -14 -075 4 16 $0.00 389-14-076 4 18 $0.00 389 -14 -.077 4 18 $0,00 389 -14 -078 4 18 $0.00 389 -14 -079 4 18 $0.00 389 -14 -080 4 18 $0.00 389 -14 -081 4 18 $0.00 389 -15 -001 4 19 $0.00 389 -15 -002 4 19 $0.00 389 -15 -003 4 19 $0.00 389 -15 -004 4 19 $0.00 389 -15 -005 4 19 $0.00 389 -15 -006 4 19 $0.00 389 -15 -007 4 19 $0.00 389 -15 -008 4 19 $0.00 389 -15 -009 4 19 $0.00 389 -15 -010 4 19 $0.00 389 -15 -011 4 19 $0.00 389 -15 -012 4 19 $0.00 389 -15 -013 4 19 $0.00 389 -15 -014 4 19 $0.00 389 -15 -015 4 19 $0.00 389-15-016 4 19 $0.00 389 -15 -017 4 19 $0.00 389 -15 -018 4 19 $0.00 389 -15 -019 4 19 $0.00 389 -15 -020 4 19 $0.00 389 -15 -021 4 19 $0.00 389 -15 -022 4 19 $0.00 389 -15 -023 4 19 $0.00 389 -15 -024 4 19 $0.00 389 -15 -025 4 19 $0.00 389 -15 -026 4 19 $0.00 3B9 -15 -027 4 19 $0.00 369 -15 -028 4 19 $0.00 ENGINEERING DATA SERVICES 650 - 967 -5484 153 E.D.S. Date: 5- 4 -2010 Page: 28 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRT'. 389 -15 -029 4 19 $0.00 389 -15 -030 4 19 $0.00 389 -15 -031 4 19 $0.00 389 -15 -032 4 19 $0.00 389 -15 -033 4 19 $0.00 389 -15 -034 4 19 $0.00 389 -15 -035 4 19 $0.00 389 -15 -036 4 19 $0.00 389 -15 -037 4 19 $0.00 389 -15 -038 4 19 $0.00 389 -15 -039 4 19 $0.00 389 -15 -040 4 19 $0.00 389 -15 -041 4 19 $0.00 389 -15 -042 4 19 $0.00 389 -15 -043 4 19 $0.00 389 -15 -044 4 19 $0.00 389 -15 -045 4 19 $0.00 389 -15 -046 4 19 $0.00 389 -15 -047 4 19 $0.00 389 -15 -048 4 19 $0.00 389 -15 -049 4 19 $0.00 389 -15 -050 4 19 $0.00 389 -15 -051 4 19 $0.00 389 -15 -052 4 19 $0.00 389 -15 -053 4 19 $0.00 389 -15 -054 4 19 $0.00 389 -15 -055 4 19 $0.00 389 -15 -056 4 19 $0.00 389 -15 -057 4 19 $0.00 389 -15 -058 4 19 $0.00 389 -15 -059 4 19 $0.00 389 -15 -060 4 19 $0.00 389 -15 -061 4 19 $0.00 389 -15 -062 4 19 $0.00 389 -15 -063 4 19 $0.00 389 -15 -064 4 19 $0.00 389 -15 -065 4 19 $0.00 389 -15 -066 4 19 $0.00 389 -15 -067 4 19 $0.00 389 -15 -068 4 19 $0.00 389 -15 -069 4 19 $0.00 389 -15 -070 4 19 $0.00 389 -15 -071 4 19 $0.00 389 -15 -072 4 19 $0.00 389-15 -073 4 19 $0.00 389 -15 -074 4 19 $0.00 389 -15 -075 4 19 $0.00 389 -15 -076 4 19 $0.00 389 -15 -077 4 19 $0.00 389 -15 -078 4 19 $0.00 389 -15 -079 4 19 $0.00 389 -15 -080 4 19 $0.00 389 -15 -081 4 19 $0.00 389 -15 -082 4 19 $0.00 389 -15 -083 4 19 $0.00 389 -15 -084 4 19 $0.00 389 -15 -085 4 19 $0.00 389 -15 -086 4 19 $0.00 389 -15 -087 4 19 $0.00 389 -15 -088 4 19 $0.00 389 -15 -089 4 19 $0.00 389 -16 -001 4 20 $0.00 389 -16 -002 4 20 $0.00 389 -16 -003 4 20 $0.00 389 -16 -004 4 20 $0.00 389 -16 -005 4 20 $0.00 389 -16 -006 4 20 $0.00 389 -16 -007 4 20 $0.00 389 -16 -008 4 20 $0.00 ENGINEERING DATA SERVICES 650- 967 -5484 154 E.D.S. Date: 5- 4 -2010 Page: 29 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 389 -16 -009 4 20 $0.00 389 -16 -010 4 20 $0.00 389 -16 -011 4 20 $0.00 389 - 16012 4 20 $0.00 389 -16 -013 4 20 $0.00 389 -16 -014 4 20 $0.00 389 -16 -015 4 20 $0.00 389 -16 -016 4 20 $0.00 389 -16 -017 4 20 $0.00 389 -16 -018 4 20 $0.00 389 -16 -019 4 20 $0.00 389 -16 -020 4 20 $0.00 389 -16 -021 4 20 $0.00 389 -16 -022 4 20 $0.00 389 -16 -023 4 20 $.0.00 389 -16 -024 4 20 $0.00 389 -16 -025 4 20 $0.00 389 -16 -026 4 20 $0.00 389 -16 -027 4 20 $0.00 389 -16 -028 4 20 $0.00 389 -16 -029 4 20 $0.00 389 -16 -030 4 20 $0.00 389 -16 -031 4 20 $0.00 389 -16 -032 4 20 $0.00 389 -16 -033 4 20 $0.00 389 -16 -034 4 20 $0.00 389 -16 -035 4 20 $0.00 389 -16 -036 4 20 $0.00 389 -16 -037 4 20 $0.00 389 -16 -038 4 20 $0.00 389 -16 -039 4 20 $0.00 389 -16 -040 4 20 $0.00 389 -16 -041 4 20 $0.00 389 -16 -042 4 20 $0.00 389 -16 -043 4 20 $0.00 389 -16 -044 4 20 $0.00 389 -16 -045 4 20 $0.00 389 -16 -046 4 20 $0.00 389 -17 -001 4 21 $0.00 389 -17 -002 4 21 $0.00 389 -17 -003 4 21 $0.00 389 -17 -004 4 21 $0.00 389 -17 -005 4 21 $0.00 389 -17 -006 4 21 $0.00 389 -17 -007 4 21 $0.00 389 -17 -008 4 21 $0.00 389 -17 -009 4 21 $0.00 389 -17 -010 4 21 $0.00 389 -17 -011 4 21 $0.00 389 -17 -012 4 21 $0.00 389 -17 -013 4 21 $0.00 389 -17 -014 4 21 $0.00 389 -17 -015 4 21 $0.00 389 -17 -016 4 21 $0.00 389 -17 -017 4 21 $0.00 389 -17 -018 4 21 $0.00 389 -17 -019 4 21 $0.00 389-17-020 4 21 $0.00 38917 -021 4 21 $0.00 389 -17 -022 4 21 $0.00 389 -17 -023 4 21 $0.00 389 -17 -024 4 21 $0.00 389 -17 -025 4 21 $0.00 389 -17 -026 4 21 $0.00 389 -17 -027 4 21 $0.00 389 -17 -026 4 21 $0.00 389 -17 -029 4 21 $0.00 389 -17 -030 4 21 $0.00 389 -17 -031 4 21 $0.00 ENGINEERING DATA SERVICES 650 - 967 -5484 155 E.D.S, Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED 389 -17 -032 4 21 $0.00 389 -17 -033 4 21 $0.00 389 -17 -034 4 21 $0.00 389 -17 -035 4 21 $0.00 389 -17 -036 4 21 $0.00 389 -17 -037 4 21 $0.00 389 -17 -038 4 21 $0.00 389 -17 -039 4 21 $0.00 389 -17 -040 4 21 $0.00 389 -17 -041 4 21 $0.00 389 -17 -042 4 21 $0.00 389 -17 -043 4 21 $0.00 389 -17 -044 4 21 $0.00 389 -17 -045 4 21 $0.00 389 -17 -046 4 21 $0.00 389 -17 -047 4 21 $0.00 389 -17 -048 4 21 $0.00 389 -17 -049 4 21 $0.00 389 -17 -050 4 21 $0.00 389 -17 -051 4 21 $0.00 389 -17 -052 4 21 $0.00 389 -17 -053 4 21 $0.00 389 -17 -054 4 21 $0.00 389 -17 -055 4 21 $0.00 389 -17 -056 4 21 $0.00 389 -17 -057 4 21 $0.00 389 -17 -058 4 21 $0.00 389 -17 -059 4 21 $0.00 389 -17 -060 4 21 $0.00 389 -17 -061 4 21 $0.00 389 -17 -062 4 21 $0.00 389 -17 -063 4 21 $0.00 389 -17 -064 4 21 $0.00 389 -18 -001 4 22 $0.00 389 -18 -002 4 22 $0.00 389 -18 -003 4 22 $0.00 389 -18 -004 4 22 $0.00 389 -18 -005 4 22 $0.00 389 -18 -006 4 22 $0.00 389 -18 -007 4 22 $0.00 389 -18 -008 4 22 $0.00 389 -18 -009 4 22 $0.00 389 -18 -010 4 22 $0.00 389 -18 -011 4 22 $0.00 389 -18 -012 4 22 $0.00 389 -18 -013 4 22 $0.00 389 -18 -014 4 22 $0.00 389 -18 -015 4 22 $0.00 389 -18 -016 4 22 $0.00 389 -18 -017 4 22 $0.00 389 -18 -018 4 22 $0.00 389 -18 -019 4 22 $0.00 389 -18 -020 4 22 $0.00 389 -18 -021 4 22 $0.00 389 -18 -022 4 22 $0.00 389 -18 -023 4 22 $0.00 389 -18 -024 4 22 $0.00 389 -18 -025 4 22 $0.00 389 -18 -026 4 22 $0.00 389 -18 -027 4 22 $0.00 389 -18 -028 4 22 $0.00 389 -18 -029 4 22 $0.00 389 -18 -030 4 22 $0.00 389 -18 -031 4 22 $0.00 389 -18 -032 4 22 $0.00 389 -18 -033 4 22 $0.00 389 -18 -034 4 22 $0.00 389 -18 -035 4 22 $0.00 389 -18 -036 4 22 $0.00 ENGINEERING DATA SERVICES 650 - 967 --5484 Page: 30 ASSESSMENT FINALLY CONFIRL 156 E.D.S. Date: 5- 4 -2010 Page: 31 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 389 -18 -037 4 22 $0.00 389 -18 -038 4 22 $0.00 389 -18 -039 4 22 $0.00 389 -18 -040 4 22 $0.00 389 -18 -041 4 22 $0.00 389 -18 -042 4 22 $0.00 389 -18 -043 4 22 $0.00 389 -18 -044 4 22 $0.00 389 -18 -045 4 22 $0.00 389 -18 -046 4 22 $0.00 389 -18 -047 4 22 $0.00 389 -18 -048 4 22 $0.00 389 -18 -049 4 22 $0.00 389 -18 -050 4 22 $0.00 389 -18 -051 4 22 $0.00 389 -18 -052 4 22 $0.00 389 -18 -053 4 22 $0.00 389 -18 -054 4 22 $0.00 389 -18 -055 4 22 $0.00 389 -18 -056 4 22 $0.00 389 -18 -057 4 22 $0.00 389 -21 -001 15 70 $127.20 389 -21 -002 15 70 $127.20 389 -21 -003 15 70 $127.20 389 -21 -004 15 70 $127.20 38921 -005 15 70 $127.20 389 -21 -006 15 70 $127.20 389 -21 -007 15 70 $127.20 389 -21 -008 15 70 $127.20 389 -21 -009 15 70 $127.20 389 -21 -010 15 70 $127.20 389 -21 -011 15 70 $127.20 389 -21 -012 15 70 $127.20 389 -21 -013 15 70 $127.20 389 -21 -015 15 70 $127.20 389 -21 -017 15 70 $127.20 389 -21 -019 15 70 $127.20 389 -21 -021 15 70 $127.20 389 -21 -022 15 70 $127.20 389 -21 -023 15 70 $127.20 389 - 21024 15 70 $127.20 389 -21 -025 15 70 $127.20 389 -21 -026 15 70 $127.20 389 -21 -027 15 70 $127.20 389 -21 -028 15 70 $127.20 389 -21 -029 15 70 $127.20 389 -21 -030 15 70 $127.20 389 -21 -031 15 70 $127.20 389 -21 -032 15 70 $127.20 389 -21 -033 15 70 $127.20 389 -21 -034 15 70 $127.20 389 -21 -035 15 70 $127.20 389 -21 -036 15 70 $127.20 389 -21 -037 15 70 $127.20 389 -21 -038 15 70 $127.20 389 -21 -039 15 70 $127.20 389 -21 -040 15 70 $127.20 389 -21 -041 15 70 $127.20 389 -21 -042 15 70 $127.20 389 -21 -043 15 70 $127.20 389 -21 -044 15 70 $127.20 389 -21 -045 15 70 $127.20 389 -42 -001 4 23 $0.00 389 -42 -013 4 23 $0.00 389 -42 -014 4 23 $0.00 389 -43 -007 28 110 $638.26 389- 43 -OOB 28 110 $638.26 389 -43 -009 28 110 $638.26 389 -43 -010 28 110 $638.26 ENGINEERING DATA SERVICES 650 - 967 -5484 157 E.D.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRON'T'AGE LIMINARILY APPROVED 389 -43 -011 28 110 $638.26 389 -43 -012 28 110 $638.26 389 -43 -013 28 110 $638.26 389 -43 -014 28 110 $638.26 389 -43 -016 28 110 $638.26 389 -43 -017 28 110 $638.26 389 -43 -018 28 110 $638.26 389 -43 -019 28 110 $638.26 389 -43 -020 28 110 $638.26 389 --43 --021 28 110 $638.26 389 -43 -022 28 110 $638.26 389 -43 -023 28 110 $638.26 389 -44 -001 26 112 $784.30 389 -44 -002 26 112 $784.30 389 -44 -003 26 112 $784.30 389 -44 -004 26 112 $784.30 389 -44 -005 26 112 $784.30 389 -44 -006 26 112 $784.30 389 -44 -007 26 112 $784.30 389 -44 -008 26 112 $784.30 389 -44 -009 26 112 $784.30 389 -44 -010 26 112 $784.30 389 -44 -011 26 112 $784.30 389 -44 -012 26 112 $784.30 389 -44 -013 26 112 $784.30 389 -44 -014 26 112 $784.30 389 -44 -015 26 112 $784.30 389 -44 -017 26 112 $784.30 389 -44 -018 26 112 $784.30 389 -44 -019 26 112 $784.30 389 -44 -020 26 112 $784.30 389 -44 -021 26 112 $784.30 389 -44 -022 26 112 $784.30 389 -44 -023 26 112 $784.30 389 -44 -024 26 112 $784.30 389 -44 -025 26 112 $784.30 389 -44 -026 26 112 $784.30 389 -44 -027 26 112 $784.30 389 -44 -028 26 112 $784.30 389 -44 -029 26 112 $784.30 389 -44 -030 26 112 $784.30 389 -44 -031 26 112 $784.30 389 -44 -032 26 112 $784.30 389 -44 -033 26 112 $784.30 389 -44 -034 26 112 $784.30 389 -44 -035 26 112 $784.30 389 -44 -036 26 112 $784.30 389 -44 -037 26 112 $784.30 389 -44 -038 26 112 $784.30 389 -44 -039 26 112 $784.30 389 -44 -040 26 112 $784.30 389 -44 -041 26 112 $784.30 389 -44 -042 26 112 $784.30 389 -44 -043 26 112 $784.30 389 -44 -044 26 112 $784.30 389 -44 -045 26 112 $784.30 389 -44 -056 4 15 $0.00 389 -45 -001 26 113 $784.30 389 -45 -002 26 113 $784.30 389 -45 -003 26 113 $784.30 389 -45 -004 26 113 $784.30 389 -45 -005 26 113 $784.30 389 -45 -007 26 113 $784.30 389 -45 -006 26 113 $784.30 389 -45 -009 26 113 $784.30 389 -45 -010 26 113 $784.30 389 -45 -011 26 113 $784.30 389 -45 -012 26 113 $784.30 389 -45 -013 26 113 $784.30 ENGINEERING DATA SERVICES 650 -967 -5484 Page: 32 ASSESSMENT FINALLY CONFIRM._ J 158 E.D.S. Date: 5- 4 -2010 Page: 33 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA/FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 389 -45 -014 26 113 $784.30 389 -45 -015 26 113 $784.30 389 -45 -016 26 113 $784.30 389 -45 -017 26 113 $784.30 389 -45 -018 26 113 $784.30 389 -45 -019 26 113 $784.30 389 -45 -020 26 113 $784.30 389 -45 -021 26 113 $784.30 389 -45 -022 26 113 $784.30 389 -45 -023 26 113 $784.30 389 -45 -024 26 113 $784.30 389 -45 -025 26 113 $784.30 389 -45 -026 26 113 $784.30 389 -45 -027 26 113 $784.30 389 -45 -028 26 113 $784.30 389 -45 -029 26 113 $784.30 389 -45 -030 26 113 $784.30 389 -45 -031 26 113 $784.30 389 -45 -032 26 113 $784.30 389 -45 -033 26 113 $784.30 389 -45 -034 26 113 $784.30 389 -45 -035 26 113 $784.30 389 -45 -036 26 113 $784.30 389 -45 -037 26 113 $784.30 389 -45 -038 26 113 $784.30 389 -45 -039 26 113 $784.30 389 -45 -040 26 113 $784.30 389 -45 -041 26 113 $784.30 389 -45 -042 26 113 $784.30 389 -45 -043 26 113 $784.30 389 -45 -044 26 113 $784.30 389 -45 -045 26 113 $784.30 3B9 -45 -046 26 113 $784.30 389 -45 -047 26 113 $784.30 3B9 -45 -048 26 113 $784.30 3B9 -45 -049 26 113 $784.30 3B9 -45 -050 26 113 $784.30 389 -45 -051 26 113 $784.30 393 -02 -011 27 108 $229.94 393 -02 -012 27 108 $229.94 393 -02 -013 27 108 $229.94 393 -02 -014 27 108 $229.94 393 -02 -015 27 108 $229.94 393 -02 -016 27 108 $229.94 393 -02 -017 27 108 $229.94 393 -02 -018 27 108 $229.94 393 -02 -019 27 108 $229.94 393 -02 -020 27 108 $229.94 393 -02 -021 27 108 $229.94 393 -02 -022 27 108 $229.94 393 -02 -023 27 108 $229.94 393 -02 -024 27 108 $229.94 393 -02 -025 27 108 $229.94 393 -02 -026 27 108 $229.94 393 -02 -027 27 108 $229.94 393 -02 -028 27 108 $229.94 393 -02 -029 27 108 $229.94 393 -02 -030 27 108 $229.94 393 -02 -031 10 108 $284.48 393 -02 -032 10 108 $284.48 393 -02 -033 10 108 $284.48 393 -02 -034 10 108 $284.48 393 -02 -035 10 108 $284.48 393 -02 -036 10 108 $284.48 393 -02 -037 10 108 $284.48 393 -0.2 -038 10 108 $284.48 393 -02 -039 10 108 $284.48 393 -03 -015 27 109 $229.94 393 -03 -016 27 109 $229.94 ENGINEERING DATA SERVICES 650 - 967 -5484 159 E.D.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED 393 -03 -017 27 109 $229.94 393 -03 -018 27 109 $229.94 393 -03 -019 27 109 $229.94 393 -03 -020 27 109 $229.94 393 -03 -021 27 109 $229.94 393 -03 -022 27 109 $229.94 393 -03 -023 27 109 $229.94 393 -03 -024 27 109 $229.94 393 -03 -025 27 109 $229.94 393 -13 -014 11 59 $66.78 393 -13 -015 11 59 $66.78 393 -13 -016 11 59 $66.78 393 -13 -017 11 59 $66.78 393 -13 -018 11 59 $66.78 393 -13 -019 11 59 $66.78 393 -13 -020 11 59 $66.78 393 -13 -021 11 59 $66.78 393 -13 -022 11 59 $66.78 393 -13 -023 11 59 $66.78 393 -13 -024 11 59 $66.78 393 -13 -025 11 59 $66.78 393 -13 -026 11 59 $66.78 393 --13 -027 11 59 $66.78 393 -14 -001 11 60 $66.78 393- -14 -002 11 60 $66.78 393 -14 -003 11 60 $66.78 393 -14 -004 11 60 $66.78 393 - 14.005 11 60 $66.78 393 -14 -006 11 60 $66.78 393 -14 -007 11 60 $66.78 393 -14 -008 11 60 $66.78 393 -14 -009 11 60 $66.78 393 -14 -010 11 60 $66.78 393 -14 -011 11 60 $66.78 393 -14 -012 11 60 $66.78 393 -14 -013 11 60 $66.78 393 -14 -014 11 60 $66.78 393 -15 -010 11 61 $66.78 393 -15 -011 11 61 $66.78 393 -15 -012 11 61 $66.78 393 -15 -013 11 6I $66.78 393 -18 -001 11 62 $66.78 393 -16 -037 11 62 $66.78 393 -18 -058 11 62 $66.78 393 -18 -059 11 62 $66.78 393 -18 -060 11 62 $66.78 393 -19 -001 11 63 $66.78 393 -19 -002 11 63 $66.78 393 -19 -003 11 63 $66.78 393 -19 -004 11 63 $66.78 393 -19 -005 11 63 $66.78 393 -19 -006 11 63 $66.78 393 -19 -007 11 63 $66.78 393 -19 -008 11 63 $66.78 393 -19 -009 11 63 $66.78 393 -19 -010 11 63 $66.78 393 -19 -011 11- 63 $66.78 393 -19 -012 11 63 $66.78 393 -19 -013 11 63 $66.78 393 -19 -014 11 63 $66.78 393 -19 -015 11 63 $66.78 393 -19 -016 11 63 $66.78 393 -19 -017 11 63 $66.78 393 -19 -018 11 63 $66.78 393 -19 -019 11 63 $66.78 393 -19 -020 11 63 $66.78 393 -19 -021 11 63 $66.78 393 -19 -022 11 63 $66.78 393 -19 -023 11 63 $66.78 ENGINEERING DATA SERVICES 650 - 967 -5484 Page: 34 ASSESSMENT£ FINALLY CONFIR,._,_J 1� 160 E.D.S. Date: 5- 4 -2010 Page: 35 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 393 -19 -024 11 63 $66.78 393 -19 -025 11 63 $66.78 393 -19 -026 11 63 $66.78 393 -19 -027 11 63 $66.78 393 -19 -028 11 63 $66.78 393 -19 -029 11 63 $66.78 393 -19 -030 11 63 $66.78 393 -19 -031 11 63 $66.78 393 -19 -032 11 63 $66.78 393 -19 -033 11 63 $66.78 393 -19 -034 11 63 $66.78 393 -19 -035 11 63 $66.78 393 -19 -036 11 63 $66.78 393 -19 -037 11 63 $66.78 393 -19 -038 11 63 $66.78 393 -19 -039 11 63 $66.78 393 -19 -040 11 63 $66.78 393 -19 -041 11 63 $66.78 393 -19 -042 11 63 $66.78 393 -19 -043 11 63 $66.78 393 -19 -044 11 63 $66.78 393 -19 -045 11 63 $66.78 393 -19 -046 11 63 $66.78 393 -19 -047 11 63 $66.78 393 -19 -048 11 63 $66.78 393 -19 -049 11 63 $66.78 393 -19 -050 11 63 $66.78 393 -19 -051 11 63 $66.78 393 -19 -052 11 63 $66.78 393 -19 -053 11 63 $66.78 393 -19 -054 11 63 $66.78 393 -19 -055 11 63 $66.78 393 -19 -056 11 63 $66.78 393 -19 -057 11 63 $66.78 393 -19 -058 11 63 $66.78 393 -19 -059 11 63 $66.78 393.19 -060 11 63 $66.78 393 -19 -061 11 63 $66.78 393 -19 -062 11 63 $66.78 393 -19 -063 11 63 $66.78 393 -19 -064 11 63 $66.78 393 -19 -065 11 63 $66.78 393 -19 -066 11 63 $66.78 393 -19 -067 11 63 $66.78 393 -19 -068 11 63 $66.78 393 -19 -069 11 63 $66.78 393 -20 -001 11 64 $66.78 393 -20 -002 11 64 $66.78 393 -20 -003 11 64 $66.78 393 -20 -004 11 64 $66.78 393 -20 --005 11 64 $66.78 393 -20 -006 11 64 $66.78 393 -20 -007 11 64 $66.78 393 -20 -008 11 64 $66.78 393 -20 -009 11 64 $66.78 393 -20 -010 11 64 $66.78 393 -20 -011 11 64 $66.78 393 -20 -012 11 64 $66.78 393 -20 -013 11 64 $66.78 393 -20 -014 11 64 $66.78 393 -20 -015 11 64 $66.78 393 -20 -016 11 64 $66.78 393 -20 -017 11 64 $66.78 393 -20 -018 11 64 $66.78 393 -20 -019 11 64 $66.78 393 -20 -020 11 64 $66.78 393 -20 -021 11 64 $66.78 393 -20 --022 11 64 $66.78 393 -20 -023 11 64 $66.78 ENGINEERING DATA SERVICES 650 -967 -5484 161 E.D.S. Date: 5- 4 -2010 Page: 36 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENT A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFI 393 -20 -024 11 64 $66.78 393 -20 -025 11 64 $66.78 393 -20 -026 11 64 $66.78 393 -20 -027 11 64 $66.78 393 -20 -028 11 64 $66.78 393 -20 -029 11 64 ,$66.78 393 -20 -030 11 64 $66.78 393 -20 -031 11 64 $66.78 393 -20 -032 11 64 $66.78 393 -20 -033 11 64 $66.78 393 -20 -034 11 64 $66.78 393 -20 -035 11 64 $66.78 393 -20 -036 11 64 $66.78 393 -20 -037 11 64 $66.78 393 -20 -038 11 64 $66.78 393 -20 -039 11 64 $66.78 393 -20 -040 11 64 $66.78 393 -20 -041 11 64 $66.78 393 -20 -042 11 64 $66.78 393 -20 -043 11 64 $66.78 393 -20 -044 11 64 $66.78 393 -20 -045 11 64 $66.78 393 -20 -046 11 64 $66.78 393 -22 -001 11 65 $66.78 393-22 -002 11 65 $66.78 393 -22 -003 11 65 $66.78 393 --22 --004 11 65 $66.78 393 -22 -006 11 65 $66.78 393 -22 -007 11 65 $66.78 393 -22 -009 11 65 $66.78 393 -22 -010 11 65 $66.78 393 -22 -011 11 65 $66.78 393 -22 -012 11 65 $66.78 393 -22 -013 11 65 $66.78 393 -22 -014 11 65 $66.78 393 -22 -015 11 65 $66.78 393 -22 -016 11 65 $66.78 393 -22 -017 11 65 $66.78 393 -22 -018 11 65 $66.78 393 -22 -019 11 65 $66.78 393 -22 -020 11 65 $66.78 393 -22 -021 11 65 $66.78 393 -22 -022 11 65 $66.78 393 -22 -023 11 65 $66.78 393 -22 -024 11 65 $66.78 393 -22 -025 11 65 $66.78 393 -22 -026 11 65 $66.78 393 -22 -027 11 65 $66.78 393 -22 -028 11 65 $66.78 393 -22 -029 11 65 $66.78 393 -22 -030 11 65 $66.78 393 -22 -031 11 65 $66.78 393 -22 -032 11 65 $66.78 393 -22 -033 11 65 $66.78 393 -22 -034 11 65 $66.78 393 -22 -035 11 65 $66.78 393 -22 -036 11 65 $66.78 393 -22 -037 11 65 $66.78 393 -22 -038 11 65 $66.78 393-22-039 11 65 $66.78 393 -22 -040 11 65 $66.78 393 -22 -041 11 65 $66.78 393 -22 -042 11 65 $66.78 393 -22 -043 11 65 $66.78 393 -22 -044 11 65 $66.78 393 -22 -045 11 65 $66.78 393 -22 -046 11 65 $66.78 393 -22 -047 11 65 $66.78 393 -22 -048 11 65 $66.78 ENGINEERING DATA SERVICES 650 - 967 -5484 162 E.D.S. Date: 5- 4 -2010 Page: 37 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 393 -22 -049 11 65 $66.78 393 -22 -050 11 65 $66.78 393 -22 -051 11 65 $66.78 393 -22 -052 11 65 $66.78 393 -22 -053 11 65 $66.78 393 -22 -054 11 65 $66.78 393 -22 -055 11 65 $66.78 393 -22 -056 11 65 $66.78 393 -22 -057 11 65 $66.78 393 -22 -058 11 65 $66.78 393 -22 -059 11 65 $66.78 393 -22 -060 11 65 $66.78 393 -22 -061 11 65 $66.78 393 -22 -062 11 65 $66.78 393 -22 -063 11 65 $66.78 393 -22 -064 11 65 $66.78 393 -22 -065 11 65 $66. 393 -22 -066 11 65 $66.78 393 -23 -001 11 66 $66.78 393 -23 -002 11 66 $66.78 393 -23 -003 11 66 $66.78 393 -23-005 11 66 $66.78 393 -23 -006 11 66 $66.78 393 --23 -007 11 66 $66.78 393 -23 -008 11 66 $66.78 393 -23 -009 11 66 $66.78 393 -23 -010 11 66 $66.78 393 -23 -011 11 66 $66.78 393 -23 -012 11 66 $66.78 393 -23 -013 11 66 $66.78 393 -23 -014 11 66 $66.78 393 -23 -015 11 66 $66.78 393 -23 -016 11 66 $66.78 393 -23 -017 11 66 $66.78 393 -23 -018 11 66 $66.78 393 -23 -019 11 66 $66.78 393 -23 -020 11 66 $66.78 393 -23 -021 11 66 $66.78 393 -23 -022 11 66 $66.78 393 -23 -023 11 66 $66.78 393 -23 -024 11 66 $66.78 393 -24 -014 11 67 $66.78 393 -24 --015 11 67 $66.78 393 -24 -016 11 67 $66.78 393 -24 -017 11 67 $66.78 393 -24 -018 11 67 $66.78 393 -24 -019 11 67 $66.78 393 -24 -020 11 67 $66.78 393 -24 -021 11 67 $66.78 393 -24 -024 11 67 $66.78 393 -24 -025 11 67 $66.78 393 -24 -026 11 67 $66.78 397 -20 -011 31 116 $191.50 397 -20 -012 31 116 $191.50 397 -20 -013 31 116 $191.50 397 -20 -014 31 116 $191.50 397 -20 -026 31 116 $191.50 397 -20 -027 31 116 $191.50 397 -20 -028 31 116 $191.50 397 -20 -029 31 116 $191.50 397 -20 -030 31 116 $191.50 397-20 -032 31 116 $191.50 397 -20 -034 31 116 $191.50 397 -20 -035 31 116 $191.50 397 -20 -036 31 116 $191.50 397 -20 -037 31 116 $191.50 397 -20 -038 31 116 $191.50 397 -20 -039 31 116 $191.50 397 -20 -041 31 116 $191.50 ENGINEERING DATA SERVICES 650- 967 -5484 163 E.D.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED 397 -20 -042 31 116 $191.50 397 -20 -043 31 116 $191.50 397 -20 -044 31 116 $191.50 397 -20 -045 31 116 $191.50 397 -20 -046 31 116 $191.50 397 -20 -047 31 116 $191.50 397 -20 -048 31 116 $191.50 397 -20 -049 31 116 $191.50 397 -20 -050 31 116 $191.50 397 -20 -051 31 116 $191:50 397 -20 -052 31 116 $191.50 397 =20 -053 31 116 $191.50 397 -20 -054 31 116 $191.50 397 -20 -055 31 116 $191.50 397 -20 -057 31 116 $191.50 397 -20 -058 31 116 $191.50 397 -20 -059 31 116 $191.50 397 -20 -064 31 116 $191.50 397 -20 -065 31 116 $191.50 397 -20 -074 31 116 $191.50 397 -20 -075 31 116 $191.50 397 -20 -077 31 116 $191.50 397 -20 -079 31 116 $191.50 397 -20 -090 31 116 $191.50 397 -20 -091 31 116 $191.50 397 -20 -093 31 116 $191.50 397 -20 -095 31 116 $191.50 397 -20 -099 31 116 $191.50 397 -20 -100 31 116 $191.50 397 -20 -101 31 116 $191.50 397 -20 --102 31 116 $191.50 397 -21 -003 7B 30 $0.00 397 -21 -004 7B 30 $0.00 397 -21-005 7B 30 $0.00 397 -21 -009 713 30 $0.00 397 -21 -011 7B 30 $0.00 397 -21 -012 7B 30 $0.00 397 -21 -021 7B 30 $0.00 397 -21 -024 713 30 $0.00 397 -21 -025 713 30 $0.00 397 -21 -026 7B 30 $0.00 397 -21 -028 7B 30 $0.00 397 -21-029 713 30 $0.00 397 -21-030 713 30 $0.00 397 -21 -031 33 119 $173.12 397 -21 -032 33 119 $173.12 397 -21 -033 33 119 $173.12 397 --21 -034 33 119 $173.12 397 -21 -035 33 119 $173.12 397 -22 -002 7A 31 $0.00 397 -22 -003 7A 31 $0.00 397 -22-004 7A 31 $0.00 397 -22 -005 7A 31 $0.00 397 -22 -006 7A 31 $0.00 397 -22 -007 7A 31 $0.00 397 -22 -008 7A 31 $0.00 397 -22 -011 7A 31 $0.00 397 -22 -015 7A 31 $0.00 397 -22 -023 7A 31 $0.00 397 -22 -027 7A 31 $0.00 397 -22 -028 7A 31 $0.00 397 -22 -029 7A 31 $0.00 397 -22 -031 7A 31 $0.00 397 -22 -032 7B 31 $0.00 397 -22 -033 7B 31 $0.00 397 -22 -034 7B 31 $0.00 397 -22 -035 7B 31 $0.00 397 -22 -036 7B 31 $0.00 397 -22 -037 7B 31 $0.00 ENGINEERING DATA SERVICES 650 - 967 -5484 Page: 38 ASSESSMENTS( FINALLY CONFIR ,._ i 164 E.D.S. Date: 5- 4 -2010 Page: 39 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 397 -22 -039 7B 31 $0.00 397 -22 -040 7B 31 $0.00 397 -22 -041 7A 31 $0.00 397 -22 -044 7A 31 $0.00 397 -22 -045 7A 31 $0.00 397 -22 -047 7B 31 $0.00 397 -22 -048 7B 31 $0.00 397 -22 -049 7B 31 $0.00 397 -22 -050 7B 31 $0.00 397 -22 -051 7B 31 $0.00 397 -22 -052 7A 31 $0.00 397 -22 -053 7A 31 $0.00 397 -22 -054 7A 31 $0.00 397 -22 -056 7A 31 $0.00 397 -22 -058 7A 31 $0.00 397-22 -059 7A 31 $0.00 39 - 7 -22 -060 7A 31 $0.00 397 -22 -061 7A 31 $0.00 397 -22 -062 7A 31 $0.00 397 -22 -068 7A 31 $0.00 397-22 -069 7A 31 $0.00 397 -23 -001 7A 32 $0.00 397 -23 -002 7B 32 $0.00 397 -23 -003 7B 32 $0.00 397 -23 -004 7B 32 $0.00 397 -23 -005 7B 32 $0.00 397 -23 -006 7B 32 $0.00 397 -23 -007 7B 32 $0.00 397 -23 -008 7A 32 $0.00 397 -23 -009 7A 32 $0.00 397 -23 -010 7A 32 $0.00 397 -23 -011 7A 32 $0.00 397 -23 -012 7A 32 $0.00 397 -23 -014 7A 32 $0.00 397 -23 -015 7A 32 $0.00 397 -23 -016 7A 32 $0.00 397 -23 -017 7A 32 $0.00 397 -23 -018 7A 32 $0.00 397 -23 -020 7A 32 $0.00 397 -23 -021 7A 32 $0.00 397 -23 -022 7A 32 $0.00 397 -23 -023 7A 32 $0.00 397 -23 -027 7B 32 $0.00 397 -23 -028 7B 32 $0.00 397 -23 -029 7B 32 $0.00 397 -23 -030 7B 32 $0.00 397 -23 -031 7B 32 $0.00 397 -23 -032 7B 32 $0.00 397 -23 -033 7B 32 $0.00 397 -23 -034 7B 32 $0.00 397 -23 -035 7B 32 $0.00 397 -23 -036 7B 32 $0.00 397 -23 -037 7B 32 $0.00 397 -23 -038 7B 32 $0.00 397 -23 -039 7B 32 $0.00 397 -23 -040 7B 32 $0.00 397-23 -041 7B 32 $0.00 397 -23 -042 7B 32 $0.00 397 -23 -043 7A 32 $0.00 397 -23 -044 7A 32 $0.00 397 -23 -045 7B 32 $0.00 397 -23 -046 7A 32 $0.00 397 -23 -047 7A 32 $0.00 397 -23 -048 7B 32 $0.00 397 -24 -001 7A 33 $0.00 397 -24 -003 7A 33 $0.00 397 -24 -004 7A 33 $0.00 397 -24 -007 7A 33 $0.00 397 -24 -008 7A 33 $0.00 ENGINEERING DATA SERVICES 650 - 967 -5484 165 E.D.S. Date; 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET ## AREA /FRONTAGE LIMINARILY APPROVED 397 -24 -009 7A 33 $0.00 397 -24 -011 7A 33 $0.00 397 -24 -012 7A 33 $0.00 397 -24 -013 7A 33 $0.00 397 -24 -014 7B 33 $0.00 397 -24 -015 7B 33 $0.00 397 -24 -016 7B 33 $0.00 397 -24 -017 7B 33 $0.00 397 -24 -018 7B 33 $0.00 397 -24 -019 7B 33 $0.00 397 -24 -020 7B 33 $0.00 397 --24 -022 7B 33 $0.00 397 -24 -023 7B 33 $0.00 397 -24 -040 7A 33 $0.00 397 -24 -041 7A 33 $0.00 397 -24 -048 7A 33 $0.00 397 -24 -049 7A 33 $0.00 397 -24 -070 7A 33 $0.00 397 -24 -071 7A 33 $0.00 397 -24 -076 73 33 $0.00 397 -26 -002 7B 34 $0.00 397 -26 -045 7B 34 $0.00 397 -26 -046 7B 34 $0.00 397 -26 -047 7B 34 $0.00 397 -26 -054 7B 34 $0.00 397 -26 -057 7B 34 $0.00 397 -26 -061 7B 34 $0.00 397 -26 -062 7B 34 $0.00 397 -26 -063 7B 34 $0.00 397 -26 -064 7B 34 $0.00 397 -27 -008 7A 35 $0.00 397 -27 -009 7A 35 $0.00 397 -27 -010 7A 35 $0.00 397 -27 -011 7A 35 $0.00 397 -27 -012 7A 35 $0.00 397 -27 -013 7A 35 $0.00 397 -27 -014 7A 35 $0.00 397 -27 -017 7A 35 $0.00 397 -27 -018 7A 35 $0.00 397 -27 -019 7A 35 $0.00 397 -27 -020 7A 35 $0.00 397 -27 -025 7A 35 $0.00 397 -27 -028 7A 35 $0.00 397 -27 -029 7A 35 $0.00 397 -27 -030 7A 35 $0.00 397 -27 -032 7A 35 $0.00 397 -27 -033 7A 35 $0.00 397 -27 -034 7A 35 $0.00 397 -27 -035 7A 35 $0.00 397 -27 -036 7A 35 $0.00 397 -27 -037 7A 35 $0.00 397 -27 -038 7A 35 $0.00 397 -28 -001 7A 36 $0.00 397 -28 -002 7A 36 $0.00 397 -28 -004 7A 36 $0.00 397 -28 -005 7A 36 $0.00 397 -28 -006 7A 36 $0.00 397 -28 -012 7A 36 $0.00 397 -28 -013 7A 36 $0.00 397 -28 -014 7A 36 $0.00 397 -28 -015 7A 36 $0.00 397 -28 -016 7A 36 $0.00 397 -28 -018 7A 36 $0.00 397 -28 -019 7A 36 $0.00 397 -28 -020 7A 36 $0.00 397 -28 -021 7A 36 $0.00 397 -28 -022 7A 36 $0.00 397 -28 -023 7A 36 $0.00 397 -28 -024 7A 36 $0.00 ENGINEERING DATA SERVICES 650 -967 -5484 Page: 40 ASSESSMENTS( FINALLY CONFIRIL i W.U. E.D.S. Date. 5-- 4 -2010 Page: 41 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 397 --28 -025 7A 36 $0.00 397 -28 -027 7A 36 $0.00 397 -28 -032 7A 36 $0.00 397 -2B -033 7A 36 $0.00 397 -28 -034 7A 36 $0.00 397 -2B -037 7A 36 $0.00 397- 2B -03B 7A 36 $0.00 397 -2B -041 7A 36 $0.00 397 -2B -042 7A 36 $0.00 397 -2B -043 7A 36 $0.00 397 -2B -044 7A 36 $0.00 397 -28 -045 7A 36 $0.00 397 -28 -049 7A 36 $0.00 397 -28 -050 7A 36 $0.00 397 -28 -051 7A 36 $0.00 397 -28 -052 7A 36 $0.00 397 =28 =053 7A 36 *0.00 397-26 -054 7A 36 $0.00 397 -28 -055 7A 36 $0.00 397 -28 -056 7A 36 $0.00 397 -28 -057 7A 36 $0.00 397 -28 -058 7A 36 $0.00 397 -28 -059 7A 36 $0.00 397 -28 -066 7A 36 $0.00 397 -28 -067 7A 36 $0.00 397 -28 -068 7A 36 $0.00 397 -28 --069 7A 36 $0.00 397 -28 --070 7A 36 $0.00 397 -28 -071 7A 36 $0.00 397 -28 -072 7A 36 $0.00 397.31 -001 7B 37 $0.00 397 -31 -002 7B 37 $0.00 397 -31 -003 7B 37 $0.00 397 -31 -004 7B 37 $0.00 397 -31 -008 7A 37 $0.00 397 -31 -011 7A 37 $0.00 397 -31 -020 7A 37 $0.00 397 -33 -001 7B 36 $0.00 397 -33 -002 7B 3B $0.00 397 -33 -003 7B 38 $0.00 397 -33 -004 7B 38 $0.00 397 -33 -005 7B 38 $0.00 397 -33 -006 7B 38 $0.00 397' -33 -007 76 38 $0.00 397 -33 -008 7B 38 $0.00 397 -33 -009 7B 38 $0.00 397 -33 -010 7B 38 $0.00 397 -33 -011 7B 38 $0.00 397 -33 -012 713 38 $0.00 397 -33 -013 7B 38 $0.00 397 -33 -014 7B 38 $0.00 397 -33-015 7B 38 $0.00 397 -33 -016 7B 38 $0.00 397 -33 -017 7B 38 $0.00 397 -33 -018 7B 3B $0.00 397 -33 -019 7B 38 $0.00 397 -33 -020 7B 3B $0.00 397 -33 -021 7B 3B $0.00 397 -33 -022 713 3B *0.00 397 -33 -023 713 38 $0.00 397 -37 -001 33 119 $173.12 397 -37 --002 33 119 $173.12 397 -37 -003 33 119 $173.12 397 -37 -004 33 119 $173.12 397 -37 -005 33 119 $173.12 397.37 -007 33 119 $173.12 397 -37 --008 33 119 $173.12 397 -37 -009 33 119 $173.12 397 -37 -010 33 119 $173.12 ENGINEERING DATA SERVICES 650- 967 -5484 167 E.D,S, Date: 5- 4 -2010 Page: 42 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL ENGINEERING DATA SERVICES 650- 967 -5484 •i DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS1 A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIR + -_ 397 -37 -011 33 119 $173.12 397 -37 -012 33 119 $173.12 397 -37 -013 33 119 $173.12 397 -37 -014 33 119 $173.12 397 -37 -015 33 119 $173.12 397 -37 -016 31 117 $191.50 397 -37 -018 31 117 $191.50 397 -37 -019 31 117 $191.50 397 -37 -020 31 117 $191.50 397 -37 -021 33 119 $173.12 397 -38 -001 7B 39 $0.00 397 -38 -002 7B 39 $0.00 397 -38 -003 7B 39 $0.00 397 -38 -004 73 39 $0.00 397 -38 -005 7B 39 $0.00 397 -38 -006 7B 39 $0.00 397 -38 -007 7B 39 $0.00 397 -38 -008 7B 39 $0.00 397 -38 -009 7B 39 $0.00 397 -38 -010 7B 39 $0.00 397 -38 -011 7B 39 $0.00 397 -38 -012 7B 39 $0.00 397 -38 -013 7B 39 $0.00 397 -38 -014 7B 39 $0.00 397 -38 -015 7B 39 $0.00 397 -38 -016 7B 39 $0.00 397 -38 -017 7B 39 $0.00 397 -38 -018 7B 39 $0.00 397 -38 -019 7B 39 $0.00 397 -38 -020 7B 39 $0.00 397 -38 -021 7B 39 $0.00 397 -38 -022 7B 39 $0.00 �. 397 -38 -023 7B 39 $0.00 397 -38 -024 7B 39 $0.00 397 -39 -001 7B 40 $0.00 397 -39 -002 7B 40 $0.00 397 -39 -003 7B 40 $0.00 397 -39 -004 7B 40 $0.00 397 -39 -005 7B 40 $0.00 397 -39 -006 7B 40 $0.00 397 -39 -007 7B 40 $0.00 397 -39 -008 7B 40 $0.00 397 -39 -009 7B 40 $0.00 397 -39 -010 7B 40 $0.00 397 -39 -011 7B 40 $0.00 397 -39 -012 7B 40 $0.00 397 -39 -013 7B 40 $0.00 397 -39 -014 7B 40 $0.00 397 -39 -015 7B 40 $0.00 397 -39 -016 73 40 $0.00 397 -39 -017 7B 40 $0.00 397 -39 -018 7B 40 $0.00 397 -39 -019 7B 40 $0.00 397 -39 -020 7B 40 $0.00 397 -39 -021 7B 40 $0.00 397 -39 -022 7B 40 $0.00 397 -39 -023 7B 40 $0.00 397 -39 -024 7B 40 $0.00 403 -27 -001 17 72 $72.46 403 -27 -002 17 72 $72.46 403 -27 -003 17 72 $72.46 403 -27 -004 17 72 $72.46 403 -27 -005 17 72 $72.46 403 -27 -006 17 72 $72.46 403 -27 -007 17 72 $72.46 403 -27 -008 17 72 $72.46 403 -27 -009 17 72 $72.46 `. 403 -27 -010 17 72 $72.46 403 -27 -011 17 72 $72.46 ENGINEERING DATA SERVICES 650- 967 -5484 •i E.D.S. Date: 5- 4 -2010 Page: 43 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 403 -27 -012 17 72 $72.46 403 -27 -013 17 72 $72.46 403 -27 -014 17 72 $72.46 403 -27 -015 17 72 $72.46 403 -27 -016 17 72 $72.46 403 -27 -017 17 72 $72.46 403 -27 -018 17 72 $72.46 403 -27 -019 17 72 $72.46 403 -27 -020 17 72 $72.46 403 -27 -021 17 72 $72.46 403 -27 -022 17 72 $72.46 403 -27 -023 17 72 $72.46 403 -27 -024 17 72 $72.46 403 -27 -025 17 72 $72.46 403 -27 -026 17 72 $72.46 403 -27 -027 17 72 $72.46 403 -27 -028 17 72 $72.46 403 -27 -029 17 72 $72.46 403 -27 -030 17 72 $72.46 403 -27 -031 17 72 $72.46 403 -27 -032 17 72 $72.46 403 -27 -033 17 72 $72.46 403 -27 -034 17 72 $72.46 403 -27 -035 17 72 $72.46 403 -27 -036 17 72 $72.46 403 -27 -037 17 72 $72.46 403 -27 -038 17 72 $72.46 403 -27 -039 17 72 $72.46 403 -27 -040 17 72 $72.46 403 -27 -041 17 72 $72.46 403 -27 -042 17 72 $72.46 403 -27 -043 17 72 $72.46 403 -27 -044 17 72 $72.46 403 -27 -045 17 72 $72.46 403 -27 -046 17 72 $72.46 403 -27 -047 17 72 $72.46 403 -27 -048 17 72 $72.46 403 -27 -049 17 72 $72.46 403 -27 -050 17 72 $72.46 403 -27 -051 17 72 $72.46 403 -27 -052 17 72 $72.46 403 -27 -053 17 72 $72.46 403 -27 -054 17 72 $72.46 403 -27 -055 17 72 $72.46 403 -27 -056 17 72 $72.46 403 -27 -057 17 72 $72.46 403 -27 -058 17 72 $72.46 403 -27 -059 17 72 $72.46 403 -27 -060 17 72 $72.46 403 -27 -061 17 72 $72.46 403 -27 -062 17 72 $72.46 403 -27 -063 17 72 $72.46 403 -27 -064 17 72 $72.46 403 -27 -065 17 72 $72.46 403 -27 -066 17 72 $72.46 403 -27 -067 17 72 $72.46 403 -27 -068 17 72 $72.46 403 -27 -069 17 72 $72.46 403 -27 -070 17 72 $72.46 403 -27 -071 17 72 $72.46 403 -27 -072 17 72 $72.46 403 -27 -073 17 72 $72.46 403 -27 -074 17 72 $72.46 403 -27 -075 17 72 $72.46 403 -27 -076 17 72 $72.46 403 -27 -077 17 72 $72.46 403 -27 -078 17 72 $72.46 403 -27 -079 17 72 $72.46 403 -27 -080 17 72 $72.46 ENGINEERING DATA SERVICES 650 - 967 -5484 We E.D.S. Dates 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED 403 -27 -081 17 72 $72.46 403 -27 -082 17 72 $72.46 403 -27 -083 17 72 $72.46 403 -27 -084 17 72 $72.46 403 -27 -085 17 72 $72.46 403 -27 -086 17 72 $72.46 403 -27 -087 17 72 $72.46 403 -27 -088 17 72 $72.46 403 -27 -089 17 72 $72.46 403 -27 -090 17 72 $72.46 403 -27 -091 17 72 $72.46 403 -27 -092 17 72 $72.46 403 -27- 093 17 72 $72.46 403 -27- 094 17 72 $72.46 403 -27 -095 17 72 $72.46 403 -27 -096 17 72 $72.46 403 -27 -097 17 72 $72.46 403 -27 -098 17 72 $72.46 403 -27 -099 17 72 $72.46 403 -27 -100 17 72 $72.46 403 -27 -101 17 72 $72.46 403 -27 -102 17 72 $72.46 403 -27 -103 17 72 $72.46 403 -27 -104 17 72 $72.46 403 -27 -105 17 72 $72.46 403 -28 -001 17 73 $72.46 403 -28 -002 17 73 $72.46 403 -28 -003 17 73 $72.46 403 -28 -004 17 73 $72.46 403 -28 -005 17 73 $72.46 403 -28 -006 17 73 $72.46 403 -28 -007 17 73 $72.46 403 -28 -008 17 73 $72.46 403 -28 -009 17 73 $72.46 403 -28 -010 17 73 $72.46 403 -28 -011 17 73 $72.46 403 -28 -012 17 73 $72.46 403 -28 -013 17 73 $72.46 403 -28 -014 17 73 $72.46 403 -28 -015 17 73 $72.46 403 -28 -016 17 73 $72.46 403 -28 -017 17 73 $72.46 403 -28 -018 17 73 $72.46 403 -28 -019 17 73 $72.46 403 -28 -020 17 73 $72.46 403 -28 -021 17 73 $72.46 403 -28 -022 17 73 $72.46 403 -28 -023 17 73 $72.46 403 -28 -024 17 73 $72.46 403 -28 -025 17 73 $72.46 403 -28 -026 17 73 $72.46 403 -28 -027 17 73 $72.46 403 -28 -028 17 73 $72.46 403 -28 -029 17 73 $72.46 403 -28 -030 17 73 $72.46 403 -28 -031 17 73 $72.46 403 -28 -032 17 73 $72.46 403 -28 -033 17 73 $72.46 403 -28 -034 17 73 $72.46 403 -28 -035 17 73 $72.46 403 -28 -036 17 73 $72.46 403 -28 -037 17 73 $72.46 403 -28 -038 17 73 $72.46 403 -28 -039 17 73 $72.46 403 -28 -040 17 73 $72.46 403 -28 -041 17 73 $72.46 403 -28 -042 17 73 $72.46 403 -28 -043 17 73 $72.46 403 -28 -044 17 73 $72.46 ENGINEERING DATA SERVICES 650 - 967 -5484 Page: 44 ASSESSMENT FINALLY CONFIX J 170 E.D.S. Date: 5- 4 -2010 Page: 45 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET ## AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 403 -28 -045 17 73 $72.46 403 -28 -046 17 73 $72.46 403 -28 -047 17 73 $72.46 403 -28 -048 17 73 $72.46 403 -28 -049 17 73 $72.46 403 -28 -050 17 73 $72.46 403 -28 -051 17 73 $72.46 403 -28 -052 17 73 $72.46 403 -28 -053 17 73 $72.46 403 -28 -054 17 73 $72.46 403 -28 -055 17 73 $72.46 403 -28 -056 17 73 $72.46 403 -28 -057 17 73 $72.46 403 -28 -058 17 73 $72.46 403 -28 -059 17 73 $72.46 403 -28 -060 17 73 $72.46 403 -28 -061 17 73 $72.46 403 -28 --062 17 73 $72.46 403 -28 -063 17 73 $72.46 403 -28 -064 17 73 $72.46 403 -28 -065 17 73 $72.46 403-28 -066 17 73 $72.46 403 -28 -067 17 73 $72.46 403 -28 -068 17 73 $72.46 403 -28 -069 17 73 $72.46 403 -28 -070 17 73 $72.46 403 -28 -071 17 73 $72.46 403 -28 -072 17 73 $72.46 403 -28 -073 17 73 $72.46 403 -28 -074 17 73 $72.46 403 -28 -075 17 73 $72.46 403 -28 -076 17 73 $72.46 403 -28 -077 17 73 $72.46 403 -28 -078 17 73 $72.46 403 -28 -079 17 73 $72.46 403 -28 -080 17 73 $72.46 403 -28 -081 17 73 $72.46 403 -28 -082 17 73 $72.46 403 -28 -083 17 73 $72.46 403 -28 -084 17 73 $72.46 403 -28 -085 17 73 $72.46 403 -28 -086 17 73 $72.46 403 -28 -087 17 73 $72.46 403 -28 -088 17 73 $72.46 403 -28 -089 17 73 $72.46 403 -28 -090 17 73 $72.46 403 -28 -091 17 73 $72.46 403 -28 -092 17 73 $72.46 403 -28 -093 17 73 $72.46 403 -28 -094 17 73 $72.46 403 -28 -095 17 73 $72.46 503 -21 -022 25 111 $581.80 503 -21 -023 25 111 $581.80 503 -21 -024 25 111 $581.80 503 -21 -025 25 111 $581.80 503 -21 -026 25 111 $581.80 503 -21 -027 25 111 $581.80 503 -21-028 25 111 $581.80 503 -21 -029 25 111 $581.80 503 -21 -030 25 111 $581.80 503 -21 -031 25 111 $581.80 503 -21 -032 25 111 $581.80 503 -21 -033 25 111 $581.80 503 -21 -034 25 111 $581.80 503 -21 -035 25 111 $581.80 503 -21 -036 25 111 $581.80 503 -22 -066 7B 41 $0.00 503 -22 -068 7B 41 $0.00 503 -22 -069 7B 41 $0.00 ENGINEERING DATA SERVICES 650 -967 -5484 171 E.D.S. Date: 5- 4 -2010 Page: 46 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS A.P.N. ZONES SHEET ## AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIR•_ 503 -22 -071 7B 41 $0.00 503 -22 -075 7B 41 $0.00 503 -22 -082 7B 41 $0.00 503 -22 -084 7A 41 $0.00 503 -22 -085 7A 41 $0.00 503 -22 -086 7A 41 $0.00 503 -22 -087 7A 41 $0.00 503 -22 -091 7A 41 $0.00 503 -22 -092 7B 41 $0.00 503 -22 -093 7B 41 $0.00 503 -22 -094 7B 41 $0.00 503 -22 -095 7B 41 $0.00 503 -22 -096 7B 41 $0.00 503 -22 -098 7B 41 $0.00 503 -22 -099 7B 41 $0.00 503 -22 -100 7A 41 $0.00 503 -22 -101 7A 41 $0.00 503 -22 -102 7A 41 $0.00 503 -23 -006 7A 42 $0.00 503 -23 -007 7A 42 $0.00 503 -23 -008 7A 42 $0.00 503 -23 -009 7A 42 $0.00 503 -23 -010 7A 42 $0.00 503 -23 -011 7A 42 $0.00 503 -23 -012 7A 42 $0.00 503 -23 -013 7B 42 $0.00 503 -23 -014 7B 42 $0.00 503 -23 -015 7B 42 $0.00 503 -23 -017 7B 42 $0.00 503 -23 -018 7B 42 $0.00 503 -23 -019 7B 42 $0.00 503 -23 -020 7B 42 $0.00 503 -23 -021 7B 42 $0.00 503 -23 -022 7B 42 $0.00 503 -23 -023 7B 42 $0.00 503 -23 -024 7B 42 $0.00 503 -23 -025 7B 42 $0.00 503 -23 -027 7B 42 $0.00 503 -23 -028 7B 42 $0.00 503 -23 -029 7B 42 $0.00 503 -23 -030 7A 42 $0.00 503 -23 -033 7A 42 $0.00 503 -23 -034 7A 42 $0.00 503 -23 -035 7A 42 $0.00 503 -23 -037 7A 42 $0.00 503 -23 -040 7A 42 $0.00 503 -23 -041 7A 42 $0.00 503 -23 -042 7A 42 $0.00 503 -23 -043 7A 42 $0.00 503 -23 -044 7A 42 $0.00 503 -23 -045 7A 42 $0.00 503 -23 -046 7A 42 $0.00 503 -23 -047 7A 42 $0.00 503 -23 -048 7A 42 $0.00 503 -23 -049 7B 42 $0.00 503 -23 -052 7B 42 $0.00 503 -23 -053 7B 42 $0.00 503 -23 -054 7B 42 $0.00 503 -23 -055 7B 42 $0.00 503 -23 -056 7B 42 $0.00 503 -23 -057 7B 42 $0.00 503 -24 -008 24 98 2013 $0.00 503 -24 -009 24 98 2620 $0.00 503 -24 -020 24 98 $0.00 503 -24 -023 24 98 $0.00 503 -24 -027 24 98 $0.00 503 -24 -029 24 98 $0.00 503 -24 -030 24 98 $0.00 503 -24 -034 24 98 $0.00 ENGINEERING DATA SERVICES 650- 967 -5484 172 E.D.S. Date: 5- 4 -2010 Page: 47 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 503 -24 -046 24 98 $0.00 503 -24 -050 24 98 3457 $0.00 503 -24 -051 24 98 5119 $0.00 503 -24 -054 24 98 4939 $0.00 503 -24 -057 24 98 2150 $0.00 503 -24 -058 24 98 9890 $0.00 503 -24 -059 24 98 1600 $0.00 503 -24 -060 24 98 $0.00 503 -24 -062 24 98 1212 $0.00 503 -24 -063 24 98 4168 $0.00 503 -24 -064 24 98 3495 $0.00 503 -24 -066 24 98 4076 $0.00 503 -24 -067 24 98 $0.00 503 -24 -070 24 98 $0.00 503 -24 -071 24 98 $0.00 503 -24 -072 24 98 $0.00 503 -24 -073 24 98 $0.00 503 -24 -078 24 98 1838 $0.00 503 -24 -079 24 98 5029 $0.00 503 -25 -003 24 99 $0.00 503 -25 -007 24 99 $0.00 503 -25 -008 24 99 $0.00 503 -25 -012 24 99 $0.00 503 -25 -013 24 99 $0.00 503 -25 -015 24 99 $0.00 503 -25 -016 24 99 $0.00 503 -25 -022 24 99 $0.00 503 -25 -025 24 99 $0.00 503 -25 -026 24 99 $0.00 503 -25 -028 24 99 $0.00 503 -25 -029 24 99 $0.00 503 -25 -032 24 99 $0.00 503 -25 -034 24 98 $0.00 503 -25 -035 24 98 $0.00 503 -25 -036 24 98 $0.00 503 -25 -037 24 98 $0.00 503 -25 -038 24 98 $0.00 503 -25 -039 24 99 $0.00 503 -25 -040 24 99 $0.00 503 -25 -041 24 99 $0.00 503 -26 -003 7A 43 $0.00 503 -26 -004 7A 43 $0.00 503 -26 -005 7A 43 $0.00 503 -26 -006 7A 43 $0.00 503 -26 -007 7A 43 $0.00 503 -26 -008 7A 43 $0.00 503 -26 -009 7A 43 $0.00 503 -26 -010 7A 43 $0.00 503 -26 -011 7A 43 $0.00 503 -26 -013 7A 43 $0.00 503 -26 -014 7A 43 $0.00 503 -26 -015 7A 43 $0.00 503 -26 -020 7A 43 $0.00 503 -26 -021 7A 43 $0.00 503 -26 -022 7A 43 $0.00 503 -26 -026 7A 43 $0.00 503 -26 -027 7A 43 $0.00 503 -26 -028 7A 43 $0.00 503 -26 -029 7A 43 $0.00 503 -26 -030 7A 43 $0.00 503 -26 -031 7A 43 $0.00 503 -26 -032 7A 43 $0.00 503 -26 -035 7A 43 $0.00 503 -26 -043 7A 43 $0.00 503 -26 -046 7A 43 $0.00 503 -26 -048 7A 43 $0.00 503 -26 -050 7A 43 $0.00 503 -26 -051 7A 43 $0.00 503 -26 -052 7A 43 $0.00 ENGINEERING DATA SERVICES 650 - 967 -5484 173 E.D -S. Dare: 5- 4 -2010 Page: 48 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRP. i 503 -26 -054 7A 43 $0.00 503 -26 -055 7A 43 $0.00 503 -26 -056 7A 43 $0.00 503 -26 -057 7A 43 $0.00 503 -26 -058 7A 43 $0.00 503 -27 -009 7A 44 $0.00 503 -27 -010 7A 44 $0.00 503 -27 -011 7A 44 $0.00 503 -27 -012 7A 44 $0.00 503 -27 -013 7A 44 $0.00 503 -27 -016 7A 44 $0.00 503 -27 -017 7A 44 $0.00 503 -27 --018 7A 44 $0.00 503 -27 -020 7A 44 $0.00 503 -27 -021 7A 44 $0.00 503 -27 -022 7A 44 $0.00 503 -27 -023 7A 44 $0.00 503 -27 -024 7A 44 $0.00 503 -27 -026 7A 44 $0.00 503 -27 -027 7A 44 $0.00 503 -27 -028 7A 44 $0.00 503 -27 -029 7A 44 $0.00 503 -27 -030 7A 44 $0.00 503 -27 -031 7A 44 $0.00 503 -27 -033 7A 44 $0.00 503 -27 -034 7A 44 $0.00 503 -27 -035 7A 44 $0.00 503 -27 -036 7A 44 $0.00 503 -27 -037 7A 44 $0.00 503.27 -038 7A 44 $0.00 503 -27 -039 7A 44 $0.00 503 -27 -040 7A 44 $0.00 503 -27 -041 7A 44 $0.00 503 -27 -042 7A 44 $0.00 503 -27 -044 7A 44 $0.00 503 -27 -045 7A 44 $0.00 503 -27 -047 7A 44 $0.00 503 -27 -048 7A 44 $0.00 503 -27 -050 7A 44 $0.00 503 -27 -051 7A 44 $0.00 503 -27 -052 7A 44 $0.00 503 -27 -053 7A 44 $0.00 503 -27 -054 7A 44 $0.00 503 -27 -055 7A 44 $0.00 503 -27 -056 7A 44 $0.00 503 -27 -057 7A 44 $0.00 503 -27 -058 7A 44 $0.00 503 -27 -059 7A 44 $0.00 503 -27 -060 7A 44 $0.00 503 -27 -061 7A 44 $0.00 503 -27 -062 7A 44 $0.00 503 -27 -066 7A 44 $0.00 503 -27 -067 7A 44 $0.00 503 -27 -068 7A 44 $0.00 503 -27 -069 7A 44 $0.00 503 -27 -071 7A 44 $0.00 503 -27 -073 7A 44 $0.00 503 -27 -074 7A 44 $0.00 503 -27 -075 7A 44 $0.00 503 -27 -076 7A 44 $0.00 503 -27 -077 7A 44 $0.00 503 -27 -078 7A 44 $0.00 503 -27 -079 7A 44 $0.00 503 -27 -080 7A 44 $0.00 503 -27 -081 7A 44 $0.00 503 -27 -082 7A 44 $0.00 503 -27 -083 7A 44 $0.00 503 -27 -085 7A 44 $0.00 503.27.086 7A 44 $0.00 ENGINEERING DATA SERVICES 650- 967 -5484 174 E.B.S. Date: 5- 4 -2010 Page: 49 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 503 -27 -090 7A 44 $0.00 503 -27 -091 7A 44 $0.00 503 -27 -092 7A 44 $0.00 503 -27 -093 7A 44 $0.00 503 -27 -094 7A 44 $0.00 503 -27 -095 7A 44 $0.00 503 -27 -096 7A 44 $0.00 503 -27 -097 7A 44 $0.00 503 -27 -098 7A 44 $0.00 503 -27 -099 7A 44 $0.00 503 -27 -100 7A 44 $0.00 503 -27 -101 7A 44 $0.00 503 -27 -107 7A 44 $0.00 503 -27 -108 7A 44 $0.00 503 -27 -109 7A 44 $0.00 503 -27 -110 7A 44 $0.00 503 -27 -111 7A 44 $0.00 503 -27 -112 7A 44 $0.00 503 -53 -001 6 29 $127.04 503 -53 -002 6 29 $127.04 503 -53 -003 6 29 $127.04 503 -53 -004 6 29 $127.04 503 -53 -005 6 29 $127.04 503 -53 -006 6 29 $127.04 503 -53 -007 6 29 $127.04 503 -53 -008 6 29 $127.04 503 -53 -009 6 29 $127.04 503 -53 -010 6 29 $127.04 503 -53 -011 6 29 $127.04 503 -53 -012 6 29 $127.04 503 -53 -013 6 29 $127.04 503 -53 -014 6 29 $127.04 503 -53 -015 6 29 $127.04 503 -53 -016 6 29 $127.04 503 -53 -017 6 29 $127.04 503 -53 -018 6 29 $127.04 503 -53 -019 6 29 $127.04 503 -53 -020 6 29 $127.04 503 -53 -021 6 29 $127.04 503 -53 -022 6 29 $127.04 503 -53 -023 6 29 $127.04 503 -53 -024 6 29 $127.04 503 -53 -025 6 29 $127.04 503 -53 -026 6 29 $127.04 503 -53 -027 6 29 $127.04 503 -53 -029 6 29 $127.04 503 -53 -030 6 29 $127.04 503 -53 -031 6 29 $127.04 503 -53 -032 6 29 $127.04 503 -53 -033 6 29 $127.04 503 -53 -034 6 29 $127.04 503 -53 -035 6 29 $127.04 503 -53 -036 6 29 $127.04 503 -53 -037 6 29 $127.04 503 -53 -038 6 29 $127.04 503 -53 -039 6 29 $127.04 503 -53 -040 6 29 $127.04 503 -53 -041 6 29 $127.04 503 -53 -042 6 29 $127.04 503 -53 -043 6 29 $127.04 503 -53 -044 6 29 $127.04 503 -53 -045 6 29 $127.04 503 -53 -046 6 29 $127.04 503 -53 -047 6 29 $127.04 503 -53 -048 6 29 $127.04 503 -53 -049 6 29 $127.04 503 -53 -050 6 29 $127.04 503 -53 -051 6 29 $127.04 503 -53 -052 6 29 $127.04 ENGINEERING DATA SERVICES 650 - 967 -5484 175 E.D.S. Date: 5- 4 -2010 Page: 50 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - ASSESSMENTS( A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRru_.j 503 -53 -053 6 29 $127.04 503 -53 -054 6 29 $127.04 503 -53 -055 6 29 $127.04 503 -53 -056 6 29 $127.04 503 -53 -057 6 29 $127.04 503 -53 -059 6 29 $127.04 503 -53 -060 6 29 $127.04 503 -53 -061 6 29 $127.04 503 -53 -062 6 29 $127.04 503 -53 -063 6 29 $127.04 503 -53 -064 6 29 $127.04 503 -53 -065 6 29 $127.04 503 -53 -067 6 29 $127.04 503 -55 -002 29 114 $156.50 503 -55 -003 29 114 $156.50 503 -55 -005 29 114 $156.50 503 -55 -006 29 114 $156.50 503 -55 -007 29 114 $156.50 503 -55 -008 29 114 $156.50 503 -55 -009 29 114 $156.50 503 -55 -010 29 114 $156.50 503 -55 -011 29 114 $156.50 503 -55 -012 29 114 $156.50 503 -55 -013 29 114 $156.50 503 -55 -014 29 114 $156.50 503 -55 -015 29 114 $156.50 503 -55 -016 29 114 $156.50 503 -55 -026 29 114 $156.50 503 -55 -027 29 114 $156.50 503 -55 -028 29 114 $156.50 503 -55 -029 29 114 $156.50 503 -55 -032 29 114 $156.50 503 -55 -033 29 114 $156.50 503.55 -034 29 114 $156.50 503 -55 -035 29 114 $156.50 503 -55 -036 29 114 $156.50 503 -55 -037 29 114 $156.50 503 -55 -038 29 114 $156.50 503 -55 -039 29 114 $156.50 503 -55 -040 29 114 $156.50 503 -55 -044 29 114 $156.50 503 -55 -045 29 114 $156.50 503 -55 -046 29 114 $156.50 503 -55 -047 29 114 $156.50 503 -55 -048 29 114 $156.50 503 -55 -049 29 114 $156.50 503 -55 -052 29 114 $156.50 503 -55 -053 29 114 $156.50 503 -55 -054 29 114 $156.50 503 -55 -055 29 114 $156.50 503 -55 -056 29 114 $156.50 503 -55 -057 29 114 $156.50 503 -55 -058 29 114 $156.50 503 -55 -059 29 114 $156.50 503 -55 -063 29 114 $156.50 503 -55 -064 29 114 $156.50 503 -55 -067 29 114 $156.50 503 -55 -068 29 114 $156.50 503 -55 -070 29 114 $156.50 503 -55 -071 29 114 $156.50 503 -55 -072 29 114 $156.50 503 -55 -073 29 114 $156.50 503 -55 -075 29 114 $156.50 503.62 -001 29 115 $156.50 503 -62 -002 29 115 $156.50 503 -62 -003 29 115 $156.50 503 -62 -004 29 115 $156.50 503 -62 -005 29 115 $156.50 503 -62 -006 29 115 $156.50 ENGINEERING DATA SERVICES 650 - 967 -5484 176 E.D.S. Date: 5- 4 -2010 Page: 51 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 503 -62 -007 29 115 $156.50 503 -62 -008 29 115 $156.50 503 -62 -009 29 115 $156.50 503 -62 -010 29 115 $156.50 503 -62 -011 29 115 $156.50 503 -63 -001 7A 45 $0.00 503 -63 -002 7A 45 $0.00 503 -63 -003 7A 45 $0.00 503 -63 -004 7A 45 $0.00 503 -63 -005 7A 45 $0.00 503 -63 -006 7A 45 $0.00 503 -63 -007 7A 45 $0.00 503 -63 -008 7A 45 $0.00 503 -63 -009 7A 45 $0.00 503 -63 -010 7A 45 $0.00 503 -63 -011 7A 45 $0.00 503 -63 -012 7A 45 $0.00 503 -63 -013 7A 45 $0.00 503 -63 -014 7A 45 $0.00 503 -63 -015 7A 45 $0.00 503 -63 -016 7A 45 $0.00 503 -63 -017 7A 45 $0.00 503 -63 -018 7A 45 $0.00 503 -63 -019 7A 45 $0.00 503 -63 -020 7A 45 $0.00 503 -63 -021 7A 45 $0.00 503 -63 -022 7A 45 $0.00 503 -63 -023 7A 45 $0.00 503 -63 -024 7A 45 $0.00 503 -63 -025 7A 45 $0.00 503 -63 -026 7A 45 $0.00 503 -63 -027 7A 45 $0.00 503 -63 -028 7A 45 $0.00 503 -63 -029 7A 45 $0.00 503 -63 -030 7A 45 $0.00 503 -63 -031 7A 45 $0.00 503 -63 -032 7A 45 $0.00 503 -63 -033 7A 45 $0.00 503 -63 -034 7A 45 $0.00 503 -63 -035 7A 45 $0.00 503 -63 -036 7A 45 $0.00 503 -63 -037 7A 45 $0.00 503 -63 -038 7A 45 $0.00 503 -63 -039 7A 45 $0.00 503 -63 -040 7A 45 $0.00 503 -63 -041 7A 45 $0.00 503 -63 -042 7A 45 $0.00 503 -63 -043 7A 45 $0.00 503 -63 -044 7A 45 $0.00 503 -63 -045 7A 45 $0.00 503 -63 -046 7A 45 $0.00 503 -63 -047 7A 45 $0.00 503 -63 -048 7A 45 $0.00 503 -63 -049 7A 45 $0.00 503 -63 -050 7A 45 $0.00 503 -63 -051 7A 45 $0.00 503 -63 -052 7A 45 $0.00 50363 -053 7A 45 $0.00 50363 -054 7A 45 $0.00 503 -63 -055 7A 45 $0.00 503 -63 -056 7A 45 $0.00 503 -63 -057 7A 45 $0.00 503 -63 -058 7A 45 $0.00 503 -63 -059 7A 45 $0.00 503 -63 -060 7A 45 $0.00 503 -63 -061 7A 45 $0.00 503 -63 -062 7A 45 $0.00 503 -63 -063 7A 45 $0.00 503 -63 -064 7A 45 $0.00 ENGINEERING DATA SERVICES 650- 967 -5484 177 E.A.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED 503 -63 -065 7A 45 $0.00 503 -63 -066 7A 45 $0.00 503 -63 -067 7A 45 $0.00 503 -63 -068 7A 45 $0.00 503 -63 -069 7A 45 $0.00 503 -63 -070 7A 45 $0.00 503 -63 -071 7A 45 $0.00 503 -63 -072 7A 45 $0.00 503 -63 -073 7A 45 $0.00 503 -63 -074 7A 45 $0.00 503 -63 -075 7A 45 $0.00 503 -63 -076 7A 45 $0.00 503 -63 -077 7A 45 $0.00 503 -63 -078 7A 45 $0.00 503 -63 -079 7A 45 $0.00 503 -63 -080 7A 45 $0.00 503 -63 -081 7A 45 $0.00 503 -63 -082 7A 45 $0.00 503 -63 -083 7A 45 $0.00 503 -63 -084 7A 45 $0.00 503 -63 -085 7A 45 $0.00 503 -63 -086 7A 45 $0.00 503 -63 -087 7A 45 $0.00 503 -63 -088 7A 45 $0.00 503 -63 -089 7A 45 $0.00 503 -63 -090 7A 45 $0.00 503 -63 -091 7A 45 $0.00 503 -63 -092 7A 45 $0.00 503 -63 -093 7A 45 $0.00 503 -63 -094 7A 45 $0.00 503 -63 -095 7A 45 $0.00 503 -63 -096 7A 45 $0.00 503 -63 -097 7A 45 $0.00 503 -63 -098 7A 45 $0.00 503 -63 -099 7A 45 $0.00 503 -63 -100 7A 45 $0.00 503 -63 -101 7A 45 $0.00 503 -63 -102 7A 45 $0.00 503 -63 -103 7A 45 $0.00 503 -63 -104 7A 45 $0.00 503 -63 -105 7A 45 $0.00 503 -63 -106 7A 45 $0.00 503 -63 -107 7A 45 $0.00 503 -63 -108 7A 45 $0.00 503 -63 -109 7A 45 $0.00 503 -63-110 7A 45 $0.00 503 -63 -111 7A 45 $0.00 503 -63 -112 7A 45 $0.00 503 -67 -001 24 100 $0.00 503 -67 -002 24 100 $0.00 503 -67 -003 24 100 $0.00 503 -67 -004 24 100 $0.00 503 -67 -005 24 100 $0.00 503 -67 -006 24 100 $0.00 503 -76 -001 24 101 $0.00 503 -76 -002 24 101 $0.00 503 -76 -003 24 101 $0.00 503 -76 -004 24 101 $0.00 503 -76 -005 24 101 $0.00 503 -76 -006 24 101 $0.00 503 -76 -007 24 101 $0.00 503 -76 -008 24 101 $0.00 503 -76 -009 24 101 $0.00 517 -07 -006 7B 48 $0.00 517 -07 -007 7B 48 $0.00 517 -07 -010 7A 48 $0.00 517 -07 -011 7A 48 $0.00 517 -07 -012 7A 48 $0.00 517 -07 -013 7A 48 $0.00 ENGINEERING DATA SERVICES 650 - 967 -5484 Page: 52 ASSESSMENTS FINALLY CONFIR_ 178 E.D.S. Date: 5- 4 -2010 Page: 53 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 517 -07 -014 7A 48 $0.00 517 -07 -015 7A 48 $0.00 517 -07 -016 7A 48 $0.00 517 -07 -017 7A 48 $0.00 517 -07 -018 7A 48 $0.00 517 -07 -019 7A 48 $0.00 517 -07 -023 7A 48 $0.00 517 -07 -024 7A 48 $0.00 517 -07 -025 7A 48 $0.00 517 -08 -001 7A 49 $0.00 517 -08 -002 7A 49 $0.00 517 -08 -003 7A 49 $0.00 517 -08 -004 24 102 $0.00 517 -08 -005 24 102 $0.00 517 -08 -010 24 102 $0.00 517 -08 -011 24 102 $0.00 517 -08 -012 24 102 $0.00 517 -08 -017 7A 49 $0.00 517 -08 -018 7A 49 $0.00 517 -08 -021 7A 49 $0.00 517 -08 -022 7A 49 $0.00 517 -08 -023 7A 49 $0.00 517 -08 -024 7A 49 $0.00 517 -08 -025 7A 49 $0.00 517 -08 -026 7A 49 $0.00 517 -08 -027 7B 49 $0.00 517 -08 -028 7B 49 $0.00 517 -08 -029 7B 49 $0.00 517 -08 -030 7B 49 $0.00 517 -08 -031 7B 49 $0.00 517 -08 -032 7B 49 $0.00 517 -08 -033 7B 49 $0.00 517 -08 -034 7B 49 $0.00 517 -08 -035 7B 49 $0.00 517 -08 -036 7B 49 $0.00 517 -08 -037 7B 49 $0.00 517 -08 -038 7B 49 $0.00 517 -08 -039 7B 49 $0.00 517 -08 -040 7B 49 $0.00 517 -08 -041 7B 49 $0.00 517 -08 -042 7B 49 $0.00 517 -08 -043 7A 49 $0.00 517 -08 -044 7A 49 $0.00 517 -08 -045 7A 49 $0.00 517 -08 -046 7A 49 $0.00 517 -08 -047 7A 49 $0.00 517 -08 -048 24 102 $0.00 517 -08 -053 7A 49 $0.00 517 -08 -054 7A 49 $0.00 517 -08 -055 7A 49 $0.00 517 -08 -056 7A 49 $0.00 517 -08 -058 7A 49 $0.00 517 -08 -060 7A 49 $0.00 517 -08 -061 7A 49 $0.00 517 -08 -062 7A 49 $0.00 51708 -065 24 102 $0.00 517 -08 -066 24 102 $0.00 517 -08 -067 24 102 $0.00 517 -08 -068 24 102 $0.00 517 -08 -069 24 102 $0.00 517 -08 -070 24 102 $0.00 517 -08 -077 7A 49 $0.00 517 -08 -078 7A 49 $0.00 517 -08 -079 24 102 $0.00 517 -08 -080 24 102 $0.00 517 -08 -081 24 102 $0.00 517 -09 -011 24 103 $0.00 517 -09 -012 24 103 $0.00 517 -09 -013 24 103 $0.00 ENGINEERING DATA SERVICES 650 -967 -5484 179 E.D.S. Date: 5- 4 -2010 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE - A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED 517 -09 -014 24 103 $0.00 517 -09 -015 24 103 $0.00 517 -09 -017' 24 103 $0.00 517 -09 -020 24 103 $0.00 517 -09 -021 24 103 $0.00 517 -09 -024 7A 50 $0.00 517 -09 -025 7A 50 $0.00 517 -09 -026 7A 50 $0.00 517 -09 -027 7A 50 $0.00 517 -09 -031 7A 50 $0.00 517 -09 -032 7A 50 $0.00 517 -09 -042 24 103 $0.00 517 -09 -045 7A 50 $0.00 517 -09 -046 24 103 $0.00 517 -09 -047 24 103 $0.00 517 -09 -051 7A 50 $0.00 517 -09 -052 7A 50 $0.00 517 -09 -053 7A 50 $0.00 517 -09 -054 7A 50 $0.00 517 -09 -055 7A 50 $0.00 517 -09 -056 7A 50 $0.00 517 -09 -058 24 103. 6400 $0.00 517-09 -059 24 103 2740 $0.00 517 -09 -060 24 103 4600 $0.00 517 -09 -061 24 103 4470 $0.00 517 -09 -063 7A 50 $0.00 517 -09 -064 7A 50 $0.00 517 -09 -065 7A 50 $0.00 517 -09 -066 7A 50 $0.00 517 -09 -068 24 103 20480 $0.00 517 -09 -069 24 103 $0.00 517 -09 -071 7A 24 50 103 1750 $0.00 517 -09 -072 7A 50 $0.00 517 -09 -073 7A 50 $0.00 517 -09 -074 7A 50 $0.00 517.09 -075 7A 50 $0.00 517.09 -076 7A 50 $0.00 517 --09 -077 7A 50 $0.00 517 -09 -080 7A 50 $0.00 517 -09 -081 7A 50 $0.00 517 -09 -084 24 103 $0.00 517 -09 -085 24 103 $0.00 517 -09 -086 24 103 $0.00 517 -09 -087 24 103 $0.00 517-09 -088 24 103 $0.00 517.09 -089 24 103 $0.00 517 -10 -002 7A 51 $0.00 517 -10 -003 7A 51 $0.00 517 -10 -004 7A 51 $0.00 517 -10 -.005 7A 51 $0.00 517 -10 -006 7A 51 $0.00 517 -10 -007 7A 51 $0.00 517 -10 -008 7A 51 $0.00 517 -10 -009 7A 51 $0.00 517 -10 -011 7A 51 $0.00 517 -10 -014 7A 51 $0.00 517 -10 -015 7A 51 $0.00 517 -10 -018 7B 51 $0.00 517.10 -019 7B 51 $0.00 517 -10 -020 7B 51 $0.00 517 -10 -022 7B 51 $0.00 517 -10 -023 7B 51 $0.00 517 -10 -024 7B 51 $0.00 517 -10 -025 7B 51 $0.00 517 -10 -027 73 51 $0.00 517 -10 -028 73 51 $0.00 517 -10 -031 7B 51 $0.00 517 -10 -032 7B 51 $0.00 517 -10 -033 7B 51 $0.00 ENGINEERING DATA SERVICES 650- 967 -5484 Page: 54 ASSESSMENTSf FINALLY CONFIRIM_ i1 E.D.S. Date: 5- 4 -2010 Page: 55 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS AS A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRMED 517 -10 -034 7A 51 $0.00 517 -10 -035 7B 51 $0.00 517 -10 -036 7B 51 $0.00 517 -10 -039 7B 51 $0.00 517 -10 -042 7B 51 $0.00 517 -10 -043 7B 51 $0.00 517 -10 -044 7B 51 $0.00 517 -10 -045 7B 51 $0.00 517 -10 -046 7B 51 $0.00 517 -10 -047 7A 51 $0.00 517 -11 -003 7B 52 $0.00 517 - 11.004 7B 52 $0.00 517 -11 -005 7B 52 $0.00 517 -11 -006 7B 52 $0.00 517 -11 -027 7B 52 $0.00 517 -11 -028 7B 52 $0.00 517 -11 -029 7B 52 $0.00 517 -11 -030 7B 52 $0.00 517 -11 -031 7B 52 $0.00 517 -11 -032 7B 52 $0.00 517 -11 -033 7B 52 $0.00 517 -11 -041 713 52 $0.00 517 -11 -042 7B 52 $0.00 517-11 -043 7B 52 $0.00 517 -11 -044 7B 52 $0.00 517 -11 -045 7B 52 $0.00 517 -11 -046 7B 52 $0.00 517 -11 -047 7B 52 $0.00 517 -11 -048 7B 52 $0.00 517 -11 -049 7B 52 $0.00 517 -11 -050 7B 52 $0.00 517 -11 -051 7B 52 $0.00 517 -11 -052 7B 52 $0.00 517 -11 -053 7B 52 $0.00 517 -11 -054 7B 52 $0.00 517 -11 -055 7B 52 $0.00 517 -11 -056 7B 52 $0.00 517 -11 -057 7B 52 $0.00 517 -11 -058 7B 52 $0.00 517 -11 -059 7B 52 $0.00 517 -11 -069 7B 52 $0.00 517 -11 -072 7B 52 $0.00 517 -11 -073 7B 52 $0.00 517 -11 -074 7B 52 $0.00 517 -11 -075 7B 52 $0.00 517 -12 -002 7A 53 $0.00 517 -12 -004 7A 53 $0.00 517 -12 -005 7A 53 $0.00 517 -12 -006 7A 53 $0.00 517 -12 -007 7B 53 $0.00 517 -12 -008 7B 53 $0.00 517 -12 -009 7B 53 $0.00 517 -12 -010 7B 53 $0.00 517 -12 -011 7B 53 $0.00 517 -12 -012 7B 53 $0.00 517 -12 -020 7B 53 $0.00 517 -12 -021 7B 53 $0.00 517 -12 -022 7B 53 $0.00 517 -12 -026 7B 53 $0.00 517 -12 -027 7B 53 $0.00 517 -12 -028 7B 53 $0.00 517 -12 -029 7B 53 $0.00 517 -12 -030 7B 53 $0.00 517 -12 -031 7B 53 $0.00 517 -12 -033 7B 53 $0.00 517 -12 -034 7B 53 $0.00 517 -13 -021 7A 54 $0.00 517 -13 -030 7A 54 $0.00 517 -13 -031 7A 54 $0.00 ENGINEERING DATA SERVICES 650- 967 -5484 181 E.D.S. Date: 5- 4 -2010 Page: 56 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 ASSESSMENT ROLL 182 DIAGRAM ASSESSMENTS AS PRE- ASSESSMENTS( A.P.N. ZONES SHEET # AREA /FRONTAGE LIMINARILY APPROVED FINALLY CONFIRM. 517 -13 -032 7A 54 $0.00 517 -13 -035 7A 54 $0.00 517 -13 -040 7A 54 $0.00 517 -13 -041 7A 54 $0.00 517 -18 -018 7B 55 $0.00 517 -18 -028 73 55 $0.00 517 -18-029 7B 55 $0.00 517 -18 -031 7B 55 $0.00 517 -18 -033 7B 55 $0.00 517 -18 -063 7B 55 $0.00 517 -27 -001 7B 56 $0.00 517 -27 -002 73 56 $0.00 517 -27 -003 73 56 $0.00 517 -27 -004 73 56 $0.00 517 -27 -005 7B 56 $0.00 517 -27 -006 7B 56 $0.00 517 -27 -007 73 56 $0.00 517 -27 -008 7B 56 $0.00 517 -27 -009 7B 56 $0.00 517 -27 -010 7B 56 $0.00 517 -27 -011 7B 56 $0.00 517 -27 -012 7B 56 $0.00 517 -27 -013 7B 56 $0.00 517 -27 -014 7B 56 $0.00 517 -27 -015 7B 56 $0.00 517 -27 -016 7B 56 $0.00 517 -27 -017 7B 56 $0.00 517 -27 -018 7B 56 $0.00 517 -29 -001 24 104 $0.00 517 -29 -002 24 104 $0.00 517 -29 -003 517 -29 -004 24 24 104 104 $0.00 $0.00 { 517 -29 -005 24 104 $0.00 l 517 -29 -006 24 104 $0.00 517 -29 -007 24 104 $0.00 517 -29 -008 24 104 $0.00 517 -29 -009 24 104 $0.00 517 -29 -010 24 104 $0.00 517 -29 -011 24 104 $0.00 517 -29 -012 24 104 $0.00 517 -29 -013 24 104 $0.00 517 -29 -014 24 104 $0.00 517 -29 -015 24 104 $0.00 517 -29 -016 24 104 $0.00 517 -29 -017 24 104 $0.00 517 -29 -018 24 104 $0.00 517 -29 -019 24 104 $0.00 517 -29 -020 24 104 $0.00 517 -29 -021 24 104 $0.00 517 -29 -022 24 104 $0.00 517 -29 -023 24 104 $0.00 517 -29 -024 24 104 $0.00 517 -29 -025 24 104 $0.00 517 -29 -026 24 104 $0.00 517 -29 -027 24 104 $0.00 517 -29 -028 24 104 $0.00 517 -29 -029 24 104 $0.00 517 -34 -001 7A 58 $0.00 517 -34 -002 7A 58 $0.00 517 -34 -003 7A 58 $0.00 517 -34 -004 7A 58 $0.00 517 -34 -005 7A 58 $0.00 517 -34 -006 7A 58 $0.00 517 -34 -007 7A 58 $0.00 517 -34 -008 7A 58 $0.00 182 E.D.S. Date: 5- 4 -2010 Page: 57 CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 SUMMARY TABLE 29 PARCELS IN ZONE 1, ASSESSMENT $73.08 85 PARCELS IN ZONE 2, ASSESSMENT $6,723.50 176 PARCELS IN ZONE 3 ASSESSMENT $18,501.12 698 PARCELS IN ZONE 4, ASSESSMENT $0.00 120 PARCELS IN ZONE 5, ASSESSMENT $0.00 64 PARCELS IN ZONE 6, ASSESSMENT $8,130.56 488 PARCELS IN ZONE 7A, ASSESSMENT $0.00 294 PARCELS IN ZONE 7B, ASSESSMENT $0.00 48 PARCELS IN ZONE 9, ASSESSMENT $14,040.96 9 PARCELS IN ZONE 10, ASSESSMENT $2,560.32 250 PARCELS IN ZONE 11, ASSESSMENT $16,695.00 9 PARCELS IN ZONE 12, ASSESSMENT $3,252.06 41 PARCELS IN ZONE 15, ASSESSMENT $5,215.20 55 PARCELS IN ZONE 16, ASSESSMENT $8,698.80 200 PARCELS IN ZONE 17, ASSESSMENT $14,492.00 864 PARCELS IN ZONE 22, ASSESSMENT $45,999.36 130 PARCELS IN ZONE 24, ASSESSMENT $0.00 15 PARCELS IN ZONE 25, ASSESSMENT $8,727.00 94 PARCELS IN ZONE 26, ASSESSMENT $73,724.20 31 PARCELS IN ZONE 27, ASSESSMENT $7,128.14 16 PARCELS IN ZONE 28, ASSESSMENT $10,212.16 61 PARCELS IN ZONE 29, ASSESSMENT $9,546.50 52 PARCELS IN ZONE 31, ASSESSMENT $9,958.00 11 PARCELS IN ZONE 32, ASSESSMENT $12,539.12 20 PARCELS IN ZONE 33, ASSESSMENT $3,462.40 3,860 TOTAL PARCELS ASSESSMENT $279,679.48 l� ME ASSESSMENT DIAGRAM FOR CITY OF SARATOGA LANDSCAPING AND. LIGHTING D.jS7R1CT LLA-I Far the Fiscal Year' 2010 261 .k City of Saratoga, Santa Clara County, Slate 0 California Filed in the office of the Clerk of the City of Saralaga, 50 -10 Clara Caanty, State at Calif.-Oa. Mi■ ^ dal -1 , 19— An assessment .ies lerred by Ine City_Counnl of the Crly of Saratoga, Santa Clore County, 540111- al Calilarnie; on of lord sno an Phis diagram an the — aay OF ,19_ by rts flesokution No. ,' City Clerk, City of ea{ataga Clly Clkk and Ti-offlcla Clerk of 14 CvtiYC+ ►.41LD/ 04 Blalkloge" County Audifor of Iles Coauy 01.5aalel arro A$sr Qg11ArIVT bIA IGRAl41 : ChT dr SARATOOA _ - SARA706A - SUNN`IVALE _ ROAD ILANDSCAPINO AND LIOHTIN4 DI LLA:I ' LEGEND - - D13TRICT 80UHDARY „ O� I A99�StM ER' 1 ENT NUMB � ` � 1 � � f �.`PFILECEDED BY ace. -zo _ c - - �♦ ,a I � L5 vci x vsi 7 64 s .1 - • ' O O - t si it O J :0 i --O NE 1 s- - .. l��`.1. C _ � .. :ARAB CI.i �lf.�i •• �" 185 •� Filed in Ine office of the Cauniy Addilor ai the County of Santa Clans S1s.1e o1 Colitorme. Ihi. — day of Is w C ONTENTS ZONE SHEET ZONE SHEET ZONE SHE 105- 06 ZONE SHEET 7- ." 1.5 70 1D 108 2 ji 2 -2 s I I -z 10 -to 3 Z I7 72 3 7. I io 11 59 -67 24 4$ -gyp - 21v I I� Jt Filed in the office of the Clerk of the City of Saralaga, 50 -10 Clara Caanty, State at Calif.-Oa. Mi■ ^ dal -1 , 19— An assessment .ies lerred by Ine City_Counnl of the Crly of Saratoga, Santa Clore County, 540111- al Calilarnie; on of lord sno an Phis diagram an the — aay OF ,19_ by rts flesokution No. ,' City Clerk, City of ea{ataga Clly Clkk and Ti-offlcla Clerk of 14 CvtiYC+ ►.41LD/ 04 Blalkloge" County Audifor of Iles Coauy 01.5aalel arro A$sr Qg11ArIVT bIA IGRAl41 : ChT dr SARATOOA _ - SARA706A - SUNN`IVALE _ ROAD ILANDSCAPINO AND LIOHTIN4 DI LLA:I ' LEGEND - - D13TRICT 80UHDARY „ O� I A99�StM ER' 1 ENT NUMB � ` � 1 � � f �.`PFILECEDED BY ace. -zo _ c - - �♦ ,a I � L5 vci x vsi 7 64 s .1 - • ' O O - t si it O J :0 i --O NE 1 s- - .. l��`.1. C _ � .. :ARAB CI.i �lf.�i •• �" 185 •� Filed in Ine office of the Cauniy Addilor ai the County of Santa Clans S1s.1e o1 Colitorme. Ihi. — day of Is w N '` wqY — 1 ` - I v.�y wj TRACT tip 172fi 6l1EfN98ER ` s Y� p t' uinrr�a - _ u � ci �,'.3 • _�:., - ".s +�' ' l/w ._ .._ .�._- I -..: ;,, , �` �eg -�r�fll�T•1�r'Y�,h'"=9k'F"y. ¢ `car f!!lL/RE mfir x4iieY FHe.Fwar gC CIT�.AIF ATOiA : ! :, -� } i�; -; ' ' , , TA: k ltE... 9REENBIER ? '=} » } m - ■ +en nee sa a9e sla - enr ` - 1 is zf zs sz sv A z: n 4 e 1 I' IA 0 1N4 41t6:_N:14Mf11(4= 015TRSCT Syu* - { � � ! I' I I I f ZONU e � GOLE7A - WAY -- R k 7 F LWEAAD _ 4y a o' 11 � ar . � �neicr sicu+a;!R r O „`:v - - • ' - / u no + e + s ' 4 Wp y eye' Aj J . t al r - � '`' � v 48 ..i i -- 1 • ti 9 � � � a �.� f1 \ �w .� +`�� d ;', Ind { .- .oc SEAGQL INK 4628 BRE$NBLR {_- 18 t 3 I " ; � r ...� ; .. , .a� 1':- _ F =: }- a � a, ar s -_ - s r-Y -.� �,�+'�` � �'" �v-� "'�,t�..�(�'9�•�v� ..c I l �_— h r Y -_ -. t y 1 1 k t � - r x t � ; z � �I�t p' o-•4,+d ILL xa gleLLai r y ,^ - � h � � �a s G9 j i s ' sa l +t4 - D a rr •3B'9E -� _ �.; -y` � -- f, .� ?t s " 9� nen kl elry abrs ���N � .�; "a if fr l 0 = '' - V f - y ;•- , yl _ ' I o c Q 'CJ � l y - - ;� LL v x 3P F71 AV 8vo» -?AV, �: AN11WW. /btlQtQ s ( r a9 .b ' Sv 'mow - - i0 ° r t ?.Fr" , r r77 f'p's -1 > 17ii91II10 Sf1114fiIt.bH/ 71lY14V. Otf�9 3ti.t l ; r ti V3'41M�14c sq F - - , ; - � aa€ ` AiIItlJIMMI/271YLf1G �^� {. o- / �t � + r :QN307 ryja I Y. , rfl !1 ', _ .i'� "y � • }¢`:. r .- - r ' � n p H - sf• � LYl I /: ~� .. 1. - ' :.i - N-r 4 L! - ►Gl'f LCI t G>fiu b 8 ��� �J S �� �/ � ! �. •--�7� — ��,sl ...q._, ' szl �y �I sx a Z z IlF YG *.z''tlr�' - sr -- iorl aLN t! ". ;�6 a � i t n, SJtl A 4E1 `fir✓ oil 'S.°IG � f1 WI ZI V«/ '$ __ �-�__ .. /� F ,.?�' `'z tir �.+, a��"1�211J- -a! -.. ! / ® g 1 ` - i arT � AFT` ��lZfglfJ '• k ry r f - .� � w , - - 4x f" 3 y'a ®, i zP1 © / - i 1 M I �� " £bN 11aJf1 � _ •+rt �! ! �, - tlaItlBN33H`J -9dLb aN 1]gtl1 _ _ G }y KI oil . k i -717 1717!141¢ bHI1H411 aNV 9nrdY�Pan/1 f • - - - 7OO.LVMVC ' dQ AAID - - �] i -'. �r • i . "3; a*: Ft Y3 ?I: //y��`GM }�� �'G j/7 J . I " ; � r ...� ; .. , .a� 1':- _ F =: }- a � a, ar s -_ - s r-Y -.� �,�+'�` � �'" �v-� "'�,t�..�(�'9�•�v� ..c I l �_— h r Y -_ -. t y 1 1 k t � - r x t � ; z � �I�t p' o-•4,+d ILL xa gleLLai r y ,^ - � h � � �a s G9 j i s ' sa l +t4 - D a rr •3B'9E -� _ �.; -y` � -- f, .� ?t s " 9� nen kl elry abrs ���N � .�; "a if fr l 0 = '' - V f - y ;•- , yl _ ' I o c Q 'CJ � l y - - ;� LL v x 3P F71 AV 8vo» -?AV, �: AN11WW. /btlQtQ s ( r a9 .b ' Sv 'mow - - i0 ° r t ?.Fr" , r r77 f'p's -1 > 17ii91II10 Sf1114fiIt.bH/ 71lY14V. Otf�9 3ti.t l ; r ti V3'41M�14c sq F - - , ; - � aa€ EN CITY 0 LAIVACA-FlLjfi A?40 UdWrMii> A-1 ZONE :SSE ACULL— ds WAY-- TRACT N ----- ----- ------- 4T23 REENO ON - 54 ------ r6 - w --------- 4S 77 02 so 74 M i su I!! r- a • TPL(T Mt 669 m EL QUITO PARK.- A % M L - S cr P-1 1"loo, CHERRY n 1 11 LN. a z ' —T 49 EEIRIER NI 3 �j 102 �l it: - T - !t l 1 so lis mc I 101 1 135 A Iss i • ' �;� -• � ��'_.� . ors:�aiar �auua�er � ' �`' ® � �1: .•��,, �' � . r+� �� � '� ® a . � . Asunwidemr #rmwR ® re . GUAVA a CT r- a • TPL(T Mt 669 m EL QUITO PARK.- A % M L - S cr P-1 1"loo, 3 .2 � �. •� '4t Kt r ; _��". ��{ge�sz� �J h � � f �1'�l>��LF16 .FL _ —. ' - �. W N W t ;� -�`� cif itf If#3. Cl'X OF SA1tAT08A. y f� . etc LA!{C6 l►PUIG D f .LlgWnNa'J I6MiCT t ' IruT AiNwI£R - ° f"= iad ��pgESmO[D!Y 9d6 !d TnncTn, .,os v� x+ xs &3. . rr sea TRACT O PAR � 1 E ROAD � r ���V3��t - . �helicitili�is� .•r ?.� �i�^at - ` ,,, a .'r -.... , �... _ _..._.— . i ASSIt 6ry' OF SARATOGA LAWDS7CAPljQ6 'Am)'wGwriNG DISTRICT LLA-i O VlJ7R1CrS0UNPAA aSSESSMfnr - PRECA-090 BY 386 -14 - NUWER ED MORELAND SCHOOL rimsis FARM _ tslom 4 Q 1.44 AC.Hf-T P. AV E tN4 U E r 10 AISOE TS MWEN77 Eni6APIWG AND LIGHTING bISTRICT LLAmI ZONE: 4 -ED- A/ -.,/a —CERRO-- - oo a , - I- '. - . m S. 0 JW 0 191 I *, rY. - mr; �C 'yLs r ,1 �L � . ._ _ - • - s 2--- .� _ _ - -�7� _��( - -_ ��� 'I'iPE(vi fjxl��s - - . - `j +v -s CL1PL� EEVNT• CGLIS9BNIG - f ;:- +�� ;ANDSafi,,P3.kd Mao- 'i,IG1ETING DESTRILT 11A -1 �y ZoNe: -A TRACT NE s�e3 -- Ai�Sa: + _ C 0 N i 0 M 1 N 1 V M I ( Imp - d If IIHIf UNIT UNLTS UNITS uN ITS . - M 15 - [ V61 T. VHIT UeI f' II + 9 ,p I -16 IE li S] I ITS E - - - UNIT •UNLI VNsT I = n - _ 9A.4.4: PARK f PVT) - - CI17 CLE � �•; - iF ^ -� - ` 4 VkITS 9NITS UNITS 71 �N +: ` a � UNITS Ulf175 ,y UMO ylT'i{+v UO9 UiI kumBER HEX - r UxFT fiRYBER AREAINT NuNEER RREe INL Ta s f T �- 4 _ as - _ ? -� 5 -• - — !! i q - UNITS UN • .' 'i•GENA'= - ~. : :� f � _ Q VHIT, UNIT] UNITS ]6 -11 3T ti 33 -3S 39 -39 35 -MI -lI t r�i� - � •U117T{1C7�,�0+lNB - •' t -- i6 ay � i �3 .BSSE�SMEIVT A (lMBfK ti. z Yx �' c'3 c' �rf } !y K � e l, r•* ' ./W _ M R°e g.Ey+ Y _} A - satr;•1" - !r ,:'.. !� YT AVFee S, L�H� Y k::..•?`+x: t ii.: - - -..r CI — k ;.. l3TRlC7 BD+wbARY LANDSCAF4NG AND LIGHTING DiMiCT LLA - V ASS[S9MEVf fW/MBER OOAIE': 4 ' S TRACT' NS G7 AG -- .- - - Coil UOXII N I UM. !DF LoT 1 1 = 40' VX TASESIIWSCOYYON iTr. ♦� NVNILN GAFF INT- - SARA, PARK _4- T \ I G A ' 31 VN>T uTGT C 99 uxrt UNIT lE 3 I I t 1 $I UNIT VRIT UNIT' - 6E 6! yt UNIT VHIT t G T. I T 3 J i - i •t sl _ �_ PAR I — T 1 Xr. TL 3; C/RCLE - �; U41TS ,volts VHS 9 V IT US14 9t 69 95 -90 4 G - SI -] >! I UNI Tg , Wil V I1` 17'. UNLT VHIT'. ti y T; A S9 - 5q ST Gt ss 9T - 93 9e -s9 E I ASSESSMENT DIAGRAM , CITY Of SARATOGA �f LANDSCAPING AND LIGHTING DiSTRiCT LLA -I °-- -- - - - -- SARATOGA — -- AVER - _ -- LEGEND --- BOUNDARY i it ~ __ 1•____ r o ASSESSMENT NUMBER I I �• PRECEDED BY386 - � O M'B._ —� � BQRRAI ti�/Ft�TJ �� e4NE �. vj sa•� .I E I [ I I I ZoN-r- 4 ,e o i a z m j rnS ED j CERRO I 193 O F F I C E V� A R� OF C0UN T ASSESSOR - - - -- SANTA CLAR A COu BOOK PAGE 389 44 1 ° 46 /47.68 i 6}.29 R 25S Q ZDNE 4 ,' 8 9 S ti f` 4 12 / �J TRACT 8700 �' 13 10 } � i 28.s s / ° \ �y9' ,` r1D` /� �9 ♦ 4 j 4 � 103 4 s 0 19 ` / 3? t "00 49 % 4 ry• `Y 2 �S J 6 / 58 3 `�S.r p ry / /�\ 37 �/ 57 35 6 5� \` �N / / O N 5 / \ / /0 n / - 1ps ! J k n 1 '4ry 2 JJS S, JV p //S � ~ , `� /N 'Sl \ �ryj ^ / �'� J I 5 � 34 \ / /8 `. 60 n � ,fir /r/ryaY 'rep �O ry / >S �(/ //� '2 `Ia ,a w .�`\ 39 B1 yry'55 33 7.53 oS 51 J 7958 pQ / rya v // m 92S rory / Z 94 r 47 4./v / o `. 40 ° / 5.4 r o h� 's ! iS 2 4.70 fo C n RI / 4 / pry 90 ` 2 c , h 92 2 0 \ o ' 00 r le Q/l 57 }.99 ?> �� / 35 ` , 41 ��/ 51 i�`� -113 N i s . \ �� / %ry 29 / R� 52 0j T 42 30 (� 53 4 to 64 ° �? ro / , \ 43 / M )T 9 " �` 65 4�1 4 se d f f ^ 10 6 0� / �` O� -� 81.24 A, "' 44 28 66 _ CE C~ 50 27 45 - 7 // 49 ��� 67 �i� �I 6 ro /� '�^ 47 25 194 Icr I CITY OF S ARATOGA_ " 4 !•) }'j1y7 r t r x t • J f • • . - - r_ —_ . _._ __ . , `, -. ; i X0 PIE: A-, • -- LANDSCAPING AND LIGHTING DISTRICT LLA=1 r `��:�ryr �'. - - -- LEGEND DfSTRIGTBOUNDARY _ : �6, 0 ASSESSMENT NUMBER PRECEDED BY3 @9 -rz =,•... } t AV F_ «— p ; - &nS 4c 4ET "RK, T x RG 5 +9f 7 pm 390 -M•19 A i4 7 bLI 4. E f IN f� Q ! ASSESSME ` CI TY'OF EN DIAGRAM SARATOGA _ LANDSCAPING AND [ LIGHTING DISTRICT LLA f^•tr� r � r f r ! y } 'Q r . `C07C - - •... - - - -_ — __ _. - _ .. — . _ - - . - - . _.._. AVM _ )} .! x+ I is 1� `YA Q W TYAC7 n' 708 LADO a - _ .� 2 -�i C 'm F ` _ .0 Z .� Q w.c ass ).a +\s .G l `: r'• U Wtp .Ga .I .! .1 n - - . v [ 1 \ wo x Q S - ,i''^ DEVON _. AVE.' —+ 195 1- r e NOSCAPING .AND LIG)#T �►SS SS NT DIAG 'AI ` '� t �t' .� r■ E H 1 n � la � m I li I i! .4 1. _ u nu 1 _s { +fit ' �'_?� : •] - i i ] I I k 1 1 1 �` a • µ � ✓c.� � . s',':,. ,_ :� �'� ] ® I Q i ® a Q I Q r Q •� ©� Q r •" = Q rrs{. "�® a � � {EF} 1 M ° . FARLAND ; ,, •� p , I I . ,r It6A4 CL Y: F'SARATOGA ' 3 . - - .O © 1 ®. I. Y! 'L/ I `�/ i I 'ti RI/ �• F - - •, ' ® LEGI N �• ;':••�' a Y.. � _ �_ 1- 1 ! s ! I t ,- � S :: ['} ■ I 7 j � t -� .t I p _ ti 1 ie ] ti I Qa 1 to ' !' 1 ■° F 1 ■ [ i IT S r MARTHA AYE �14 '• � :. t - i' - s- �- '�-- i-!°_- i- w-�- 'tg'�i��t�'� -�: �• ^L?U!- ,�leLc_��t■�• ;=- r! ■J�4- _ It I- cr :! 1 � r Joe I '��'� � Y �: F t��c� .- � *- �� � 7r ' wnt. I l" ® - ,F __:.� j...�_ .�w ® ■ -.� s'. ,�_ :1 r -. - n - •�'.`»- --•^_ I �.. -- * Oct pn - - �ror ri . •�4Z't�`Y- , ?F�,ti -y�l- , � �.;. dt.i l'I ..i. Y'.r+:: " "",_ �, - -� V I F ''''ASSMMENT DIAGRAM = f�• �.. _ .,s:.w d..:,r.:,,, O F F S,. ARATOGAi•k i"""�'�"� ''• r Q f. r �i'^W LA:ffDSCAPING AND 41GHTIN(i 01'STF.iC7.L`l.A +1,3F,x HEATH` - �; �� a] } P 1 / - • 1 1 1 r e0 i l I i C �'•' .fit l a: .J� _ '•/ .erg. 1 I I 1 1 I ■• `� I 4t` _ ...��._ r - - - • k; - 41 - S, • -,Pk t .H d+� so 1 . n 1 b I tt 1 b O X 1 It z yl0 ,'.r �, ®� `y r`` ]��M r r' ® � � I � ••7 � � !s "'4Je /a1. n © �-•° „ {r' O / rj r �1, _ .e j r t I ■ I 7 I - .� _ W -.t -__ , I t z U)�^. f ® ® ® ® 1 —"� — --- r�- -__ ri i to 87, Zf r! ! I_ -• - t I I - .. _...- i y � - - . M N,; • � S. ®.� r �. �etrwT� hh .::: I. l 7 I r 1 ■ �:' I ® -� _RL _- .� . _ !1 � --- ® t 1 � v r a l 1: J •© I® O I � UCT BOUNDARY BENT NUMBER ED BY R89 -14 1 140 ! A•SkSSMEN't DIAGRAM AVE--tLt Nc • I O 05. 141P ov 'o A— .k.k, 7�t�' jai ""At CITY OF SARATOGA LANIISCAPING AND LIGHTING DISTRICT LLA-I MOSCAPING LIGHTING: DISTRICT LQK-I 20Mt A_ I I ASSESSMENT DIAGRAM 1 if "I fm yl, j .IT fill I 20 21 Sri+ F 7- r • � !; T•e+cax - t f;ISIIRbv QG t�Y 1i = { . SS�VIENT D1A�A�A • 13k- T �• _ ver a ' I i`g ...' - ' G D LIGFITF �'° ° a. r c- Z NE ., ,i.ar s 27 _ ©!STRICT AL — ` r s.i `'nisf$�. 1} '3 _ ..1, ... /1 } - ' i pis ri -I liii� 4 s 5 _ r,• t l?}.� 1 Jtl-.`i•.E tom' LEGEND. --- • DISTRICT90UNDARY f`{ -� Ed Q ASSESSMENT NUMBER a _ -y s if PRECEDED BY389r}8 ,, !I je � _ - - S S{'1 eT 4g �+ -I i f - ij r i = ab� • '' + 1 - W *a � I, 'I ro. e3 - � t .e � 4 .� N. 5 �.: c 46. 4q q l ��'�^tt •�a. sih.� �✓ •..i • cy s ;�� { (. +._3'M' � �, '...•�.. -, !� _ - -. F.r, _ .._. - ASSESSMI NY' DIAGRAM . G.ITY OF SARgT06A �,,•_ :... �' / LANDSCAPING AND LIGHTING -DISTRICT 41.A -I LEGEND - — DISTRICT BOUNDARY D ASSESSMENT NUMBER I'- loo'. PRECEDED BY9e9-4- 1 2 ' CA - -AFTON —_ ... .., : I 198 23 A O � m`- i 1 _ o k4f LU ` 1 :q3 0� 1�1a 4� • �1 j 1 _,,re - 2 c k G Dlb7RieT "LF+w =S LAWb6C*RWG AND :UrmHM l - µT w 3 tom% � �� �� ?�/ fZ -t✓i� pCL -D 1 a tod - 2 c f� w ti ►r N . LLA 15 2 2-9047 '. GULL 1 C 29.61 162.88 w m .98 a r 2 0 , 008 UN1T N' �A r u 1 5 j 75 2 049¢ j 7 2 J,3B0 7s.1a =" 2 l r j sz.so J 1, 0 nV N �► 3 �, 0 '• oc N 6�2 V ' k fC� rM LJ t f N V A C �' 5� ! /C. rn 0 �s SoG 'ti N O 79 14 15 + ; Ct 06, � 15V°j• 5_0. * a 2r i ��•43 , f$ 7,'l l 7.19 -P, 10 4 C /Ic- / c ?l. ti S� F / 3 7g 4 2 v 7 A ' U , O n °-� �, \_ m - N g oo Z:z .40 a 7 !! V T7. r 3x.03 y� ° p , 27 76 cw ,fie• �� s� arm r�" .� m- -- _ }�S �rm rS ra °' 73.Q X 32 0 C u _ W cm , � ^ ` r3 ,y 21. 4 57.74 9A 29 gi. �i i rq1 ciA / r a A 4Q fit 4$ 5 ` Z!op rr• Y s CI O 7756 } 1 1 , 1 % �A •9/L T3. s . � r �� �� / o •.�`�� j 60.28 1u b b/ �, S a�, ,/ f �2 • �z t 75 0 � Pj r ?� .r ��`` i f /• S S A rf.TO h o i / c,�� S 19 14 TRACT �No 1 6 4 qZ p N o 63 * MESIr `.J W i i T, =r .���wf �.Srs l��'r;1 /;�•. •.r, tS�ryil� .i 'Q•_� .1.. ( 7 a iw:F{•�� ..� - ' C11Y Ok IA RA'l�0 y � A • ; -`` •. ' �.' • (� - �� . n LiGNS7ilG 011CtRICY LL A- 1 . F "0 is CAP I"a om zone: S •J•, ;= ".� y T� r WJ e+ 3• r (,7�� r. j WAS q 1 •: +•� ••. ;:- ' ..UH 4 r _�•�i , `__�].: �_ C.11___- ____�_ ._�•'T ' �-+ `/ :� ® I CJ �! {L qT r k �IOy' ti .•aS r'N "•. lORKA ' ..� .µ n ©' CHERRY ! ' t , .. "•', ..4' / �s+rxsln+ s a.lLe eoacsrres !RS - lH. 1+ � r -'�- I T. _ °Y•xL__..A F___Lbll.__- _ __Ife. -. -- {CJ 7j ® 91 ® .i ® ® - : I I q' $I• �' _ - - f N_ .4t �� i n .ox .p rW I n M _ • .ti - I ! ! y � r I �3 - �:'': i " c.{ l - 1 1 17 -In[ HOAiESITE9;3 + GUAVA r xtti�ND t r- N it ... ' ' yi.iw ` - AJd r,•frCY �fMVOrJrY r • � '1'��YS�tRiCO�[QI!': de�e34' � - � r` � � ..t ' r � � .. "� "•. . � : • F � ��F. p: ��t ii k i�'� rX• a�qt..`�� � - �R, fiSr F •5 -ii . 20 1 • 97 VOW IT T 400: 9 IMP AJJE( . r - ;!s' e - - 'i -�' � - LAfIDSGARfli6 AND 416>iY1N!. DISTRICT L.LA. -1 { 3 t ZON OfsrMCr multinw -1x.43 AC NE1 - rs <S!rldMdnfr IVNMBrR -' E CUPERTINO UNION SCHOOL DISTRICT w l ff R � �� - - °ti�i x `-• %. ° .tee �� O i © _ AVE. _ _ TRiR IBDO 42 ULE K 51 ES TR IP - -IIII ' k ' MULE HQWSITES Nt 4 = f ' •' .. S:z �YLYPWhy i m i 2� ,dSSr` .]V�EJiT = DIAGRAM CITY O SA RA YOQA LANDSCAPING AND UGNTINa DISTRICT LL4l Tl 4A al : 41 3 ®, ZONE: e ® .. 1 °. ~ ts' i S �^ fl a O 3 O �{' W i � .� 1 Lwek i 14DIk'� calaa�T _ LfSl1dMFNT .VUNaER � Pwecsa ■r 3p3 -53 � - i i S �^ fl a - w 3T LAWDSCAVING ZONE #1 M 0"i A� J i- ."tr..::..-..:L: h ,&j -.- I r N oiorwcr Wrzmzww 0 A5JESJ"NAfr N11Ad&KJt meceDrokr 397-21 ASSESSMENT DJAGRAM - S ` CITY CtTYjDF A ' WAt - ObA - -- - -- DISTRICT BOUNDARY LiN'DISCAPING'AND 11 'L - L I G HTING - RIA C) ASSESSMENT NUMBER PRECEDED BY 397-2 1 ROA uNTIED 3 TATES MIMI SEWPC A 'o SARATOGA- LOS G,6'05 I— toy 1111 z PL \cp 0 0 0 � $� 203 30 31 ..sl3y QtIAMNTAL !ONE SARATOGA AVENUE 10 � - ----------------- x, HAM ACES I f of O 12 "3[ --------------- LUTHERIA - E EL 0 (D -olerRier av&�Zl 0 - "J"S"EAr lov"a FAr 71zi OAK :: PLACE .� PAEC"ED sr mpe -q r Tf m DIA RAW -AA LANDSC&PINf; AND Li4%WrINr. DISTRICT LLA,-% SAFLAI(3GA AVENU < W X FS Cr UTO Rift . � .. � � < �_ � _ k_ ,.fie :a _._.. ,_: , ; �,f,� -/- J � , • � / @ 3 1 1 pt CE -t Pt 'A" 'cipLa 204 oS r � 31 suw,. "W. js ".V a 'ji. g. K A f 1 Kai w LJL sr s9r— 3c I A 11 o.s. _ 14 ASSESSMENT DIAGRAM . r 2 CITY OF SARATOGA ,LANDSCAPING •N0 LIGHTING- DIS TRIC7.LLA-1 DETAI LEGEND -DISTRICT BOUNDARY (ASSESSMENT NUMBER PRECEQED 'BY 397 -x7 -ONE;7 PJE 7 - A ri LU RAT A VJ .3s WALNUT' r- 423-M'39 d - d 9 � L 7 S 8 S Y� 1r �� LEGEND �' -- — DISTRICT BOUNDARY O ASSESSMENT NUMBER PRECEDED BY397 -z& LJ x�`��►�/-.::1 � ; 3F i��7' , ! - W' 41F SARATOOA - LANDSCAPLNG AND UGHTINd OIOTRiGT_. L4A =f ZONE• k 1' 100 �a BARA/�saSp - w t - Jai ,w° Pct,A.' 1- /[ 3w PTN 2.719 AG. ..... pC L A „ 1 o nL.L L25 RG 131; AC. ESMZ a 3 �L.3' - .. p�s1• .8. 138-M•39MARY PIIRNER.MOMESTE4D xOSaxsnn AVENUE \ .-.I ilfiSlJdM4 NlIS►Y�p ” _ ECC�ses�9s, 37 Mow P-111-A n B" a V MWG DISTRICT LLA- I 1 RL Clk st, 0,,5- 10 coal', ;W0 '7A IA A 7A zB &OU haa 1123 Inteml !A A. 4k. �] . - Aif*~m Ic lh,u 4c an P F :- F7 .2.1 CONDWINIU M OF LOT I OF TR. NO 0029 5 ARATOGA INN PLICE sk, T /s De- j r 'AREA 1285 AC. NET Ila !wi � . SLOG I h' 66, 49V9A AW*r '--S;-- M 'A61f -Aj 38 2., �!a-tARATMW�L ��'f rv*wn Kali WON KDA 7 _ I � M C I@ UK 11 Wt IS I UN ' 0 AH - L/ 3 0 L WVII �• "��KUA MLL) M�ff%Tw ��UE�fflox IIIIIIIIIIIJIm Ej -j r LL L t - L L -r - L -r L L -j ' L -j L L. -j - L -r L L. -i ® ® CMZMWDA LOT A FT A.. A.—id wick U.M. I.G4 AC. , i 1 ( - LAPAL-O PLV! L 202=110M 71-1 lJ L J U- KIDA L ------- EWS . X E{lO N WDA Kom M KOR Kom -Aj 38 2., �!a-tARATMW�L ��'f TRACT N' 5024 SARATOSA CREEKSIDE CON 9 a MINIUM ASSESSMENT DIAGRAM CITY OF SARATOGA 4 EACIEND. ar LANDSCAPING AND L[G14TLNjjD_13rRlGTLLA I ASSAWAMAW J97- —A C:�,aer IW JB 207 ZONE: 7 1. M 1!7 1 7 _ I � M C I@ UK 11 Wt IS I UN ' 0 AH - L/ 3 0 L WVII �• MLL) IIIIIIIIIIIJIm Ej -j r LL L t - L L -r - L -r L L -j ' L -j L L. -j - L -r L L. -i LOT A FT A.. A.—id wick U.M. I.G4 AC. , i 1 ( - LAPAL-O PLV! L 202=110M 71-1 lJ L J U- L ------- . X TRACT N' 5024 SARATOSA CREEKSIDE CON 9 a MINIUM ASSESSMENT DIAGRAM CITY OF SARATOGA 4 EACIEND. ar LANDSCAPING AND L[G14TLNjjD_13rRlGTLLA I ASSAWAMAW J97- —A C:�,aer IW JB 207 ZONE: 7 1. M WVII IIIIIIIIIIEN" MLL) IIIIIIIIIIIJIm Ej m H ME E�UKI[ 202=110M MOM TRACT N' 5024 SARATOSA CREEKSIDE CON 9 a MINIUM ASSESSMENT DIAGRAM CITY OF SARATOGA 4 EACIEND. ar LANDSCAPING AND L[G14TLNjjD_13rRlGTLLA I ASSAWAMAW J97- —A C:�,aer IW JB 207 ZONE: 7 1. M 27 �;�� GARAGES Cummen A rqu Amewd VM Unite. All 2.79 AC. rT 4 - 4� ju _oft _.'__SARALT0GA U10 70PUNIT NR 10 FL%op BOT DE THE SARATOGAN ASSESSMENT DIAGRAM IT Y OF 'SARATOGA LANDSCAPING, AND LIGHT] NO DISTRICT LLA-I Ell) ov .1 N V DIANE CANYON VIEW ' 171 Z ONE 7 JE` WE - 7 LANE 1 � 1 1' 110 pm - LEGEND - - DISTRICT BOUNDARY 0 ASSESSMENT NUMBER PRECEDED B Y sad zz X97 39. I II 208 41 01113M � wimm� 0mir Z ONE 7 JE` WE - 7 LANE 1 � 1 1' 110 pm - LEGEND - - DISTRICT BOUNDARY 0 ASSESSMENT NUMBER PRECEDED B Y sad zz X97 39. I II 208 41 x '.. , —'r _ . .... - 1;. ;;.,.. sis . .k1ir,3. ?•h`• «. r, • . 9. .h � -: t,r r ' .LF • t�. •... r•1S'< 4 - A,,r- .yr.'is 5 dT f � I M •' �- .I t'IN rlT oa`sAk3aioalr -s' CAP ;N4 /uJO dka4 LLI► -1 'ZONE:. 7 • - {r RO LDI-*37 POWAV 9)BW or! ' 5 s _ - _ 1 • f� f II ��S • 3 LH - oKr co • _ :: ..:• si'' �,. I FF rsr ' O r rr i ... •, Irk � �• ` r'�r��i�bidt'NlGT ' 1'a4Nn.Ni! ' - /+ � kb « �A n I e: ' ... = J�dddJ.1V�yNiwHairt - ��` 1 c V. MrernrYn JY � #O! -td ' :_.- . �Lll I . ',�, • nx'" nay ewe ^ y O " `"r _�'J ;` atiLr ' - ei v `'r r� � r i � � _ f' 7 @ t •� • 8ROOKW000 Mbp 1 3 , ''� �_ tom ':.- -�� r � 7-�'-. esi' p 1$ 125.10 T 151.15 231.7�� y �,•� + PCL.3 In PCL,2 o oa SAC. 54 a erg. . ,• 0.448AC. Q.4 !' ] - fsaoo- 71.57 & °5 p R RA'e OB'.a I ry g77 ry ti:� 1 ��_, :• J ' 7p Dr 8 g J ? a 5� erbo. gg U 83.60 ) 7 4.57 �� 79.25 e]7�9.a� 44 1:riCir:ir: '•E; �r;,cfr �ti; :,; +" i 2 /�� PCL.A 8 r �� - f88f5 27 p �J f O 0,609AC. rn�ZZ.21 � OPEN SPACE `'`i 5 PCL.4 a rig^ ° 217.5 i 4 .1.4 0.439AC. so T '/'y it /� t, _ ;MINQ AND 1J6L M1K 01$'YAICTrLLA -{ 1 / 0 ft CF j � ;• 1 .. ��. S]� ]' b '�{. 1, � � s1.. h J1 V :� k ! fj1 r�..� " :Y , A J��Fr . { � �� 4 .'•�/'' �� 1 � LY l-J r�'./ r•''fQ sa,.L. ,' `,'�• ' �J ' �°' - : • � . i� ',� ` 1 111 "i ,a 1 r •� +- �.�darw+rr auwaerer % O _ wJarartrrr+r vuw�aea V. 1 _ aneereto •r •soa -te - s c. pf ----------- — w ioo (D ti AbSESSMENT DIAGRAM CITY OF SARA - - IA .. , ZONE 0 (D ANDSCAPI NO A NO LIGHTING! 0 111w WED LN AVE lo- AVENUE — L 7 .44 AMES-56416 DMAORAM r C. j gpftl L win AND L (D LLJ 0 ZONE: 7 M 0 1 0 O ti AbSESSMENT DIAGRAM CITY OF SARA - - IA .. , ZONE 0 (D ANDSCAPI NO A NO LIGHTING! 0 111w WED LN AVE lo- AVENUE — L 7 .44 ZIA I I- I Fovla -: G . ol ol 01. 0. 210 msrRie r souivamy 0 Jijrjs"rArr xvMffljq Pwlccvffo or ml 0 R 'VA vAly MAPM 2 AMES-56416 DMAORAM r C. j gpftl AND L A - I ZONE: 7 M ©' � milil I Q ;all Q. � 0. OL rRAC T NA JJJd - SA 7',[Hdu51 comov"imiUm ZIA I I- I Fovla -: G . ol ol 01. 0. 210 msrRie r souivamy 0 Jijrjs"rArr xvMffljq Pwlccvffo or ml 0 R 'VA vAly MAPM 2 to 211 �47 • 4 LE4�lYC; 0', V +AS+rrvr wncMnr rr `',, _ nRl[IDa_e /y 3JT•7 ?e� - - .A :IFS -sG'• £k 1 1 I . a, L� E - 51 F: TH - . ti.... .. i4 k ' t�`� •'1 -1 � �`y E F: TH - . ti.... .. r7 F� 4J' r - AVE [ ASSCSSMENT WAGR'AM CITY DF S'AWATOGA • � LANDSC.APi `G AND LIGHTING D1 StRlCt LI:A; yV O ZONE r] LEAD —"- — DISTRICT BQ NpapY T ASSESSMENT NUMBER �� P2RECEDED E q 57^— 5 f .s d; 1 F Cl OF A SAFIATO -`> ASSE r g r TE DIAGRAM Re 04N i STREET � - bIG BASpf'r C- r.r y�k1 Q I •Y LEGEND ?I ISTRICTBOUNDAAY 1 O ASSESSMENT NUMBER PRECEDED BY 5J7_C..T LANDSCAPING AND LIGHTING DISTRICT LLA• -I so OAF( LANOSCAplNC NO NT /N4 AISTR/C} �` Jl ' l i -- P STREET SQN£: - x' "° r "ry li 'trCis r t fm4[ � r V � lYlarr�l tr_ r y .fy�11177 ��rt f •i 5� f(. i A aARA'fpr.A SCNr,U r, - Ells T it i c: y � f , r: K " -, �� ' 1 � �. trN !Y {tRAYOnt„ - •...Y. I .i�F_ r 6K JkAy 1 •7y: AF . : -..„ 7Aatr xre 7soz � IOOK O PGL.7 PAC an.a• z - • E11 'A7�1dp, n If an__ y W 1 � � •. i - . • SI Xt .EQEND: •.�OF-FA P. H. een..a r -•. 4 .. ,�':�� �• '�. li.ti - -- blrrRrcr rnuna,�r AVE .: pI ��•�» ?�� . _ Auzfj"gNr N ws,t*R- - .. {" �rs��cti. ..:i � °- - .. _ - .. - _ . ..... . _.:a 1 A; r:. ' . �'. , z I � .:li:dY,� . SS':ar � - • � f 3 I> s y:i - I f ill W A :' " ALOHI AVE j A►p' + "t/6x�rr.y �: �tFe s , f . 7 ,o rs p Y f 1 y� 1 1 Pr `� N i n Zs - 23 /I - f - aw At 1 r+ aT4 Al I - n rn Irz - /• pl RECORD OF SURVEY 111 -x -2 .. ! 2q NI VICKERY j _ 1 1 I ' I I 25 Q 14 At ,�—� � ® :� � ® � 'O' it ` _ �s • '; I � �� •. •� .Q e3, e Fm ry I•. �oo� YILiSEAY Pt =� �YiCK ' + -- DlJTRlG1 ObZNUAgy MFR AVE. LANE I - - O Assessm6VT Nz'Mf"R _ - - ' - PRECEDED By 5/7 -" - - 1 - -._. ..- .. -__ -.. . _. _ _,... 4_ -• - i"sn..SY'xls..�3[�'1C�NPft+F 4 f F . ASSIoSSMENT DIAGRAM LANDSCAPING. AN-D-- LIGJMNSG ,S LA -I - `` �:2• l LOMITA AVENUE�a PciL O 10 ,OI A O air O I{r� I j i4 O O L _ •� ]] PB O { I ;i y Y CL A i •�` Q - --.. .... . - -' - °' - -' - - - , .. P M. 324. : 2] � — � •� � c 0 j + ' R " LEGEND --- -` - DISTRICT Bo6oN RY O, ASSESSMENT NUMBER Z14 PRECEDED BY__ -rz _S 2 7 A UIAUKAM CITY OF SARATOGA LANDSCAPING AN LIGHTING D ISTRICT LLA-1 -LEGEND zoNdF-7 — DISTRICT BOUNDARY O ASSESSMENT NUMBER PRECEDED BYS17-1.9 I G=w A011W __DISTRICT 9ou.VD.4Ry 0 _ 4S$,646MENr NIIA45ER PRECEDED 6?y 517-/e �2) .4 CITY 6F LANDSCAPING AND Ur.Wr1NG DIGTRICT LI-A-1 ZONES 7' A. , ZbO NUR IMAC 13V . 1.33 AL. 6 .27 AC� KET — — 'A 7.95 AG, GR. 7.48AC. NET a� 15.02ACNET KL. 9 17-65 AC. M 15-92 AC.NET ea W 4 , ..., , " 's;v c 4, no Aq 4c 4c, CR bVtf . WK_l kc 4 1. 4f, 3 54 C'El fy a _ x5 J3rl�NT AlA:GRAA4 Y, _t rx L.IivoSewa /11►a..�Na rr�tirrrNG - alarRier LLA -1 " GI ViCkEAY— - * I T�04. ACT N0. 2399 '.x �4 :•• ICO' F 333nnn I \ uj 44 37 53 39 i 32 CA Fl. 1 I Y - i `! u]x \ \\ Ff '_ f.cx Cxl la Its aate.'' 46 l qz h i VICKERY PLACE * 1.130 AG_ NET ' Q ryI t"_/ 5 1 15 - - %Gib LEGdND: „a' - w LANE I, CODY °____O1dIRlrr soimrafRY O _.dsJESSAIENT Nv"&& t - _ = PREC£OEO BY SIT. -R7 3 216 s7 , OFF itE OF COUNTY Q. [t[OA -- 84NTA 0LA[A COUNTY.- C4L IFO4B14 FCL.IA UN. Mt COYNON AREA fHT. 7 [p r a 1A • H 14 AMENDED T: TRACT rH 7265 -THREE OAKS VILLAGE TOWNHOLIES J , — ��._.. .IARAGE BELOW UN. x r w BAR. L a [ LOT I f U /Yder UN.A ^ ©, ,.„ ! U. A /47NY4 �roeAaE/ $0- w ST. ED O 1 4 ' i y f /1 !0 S z OF 9ARATOGe(5y - ' # 4$ $ES$!NI�IVT'DIAGRA141x LltikTfNG �iSTRICT t��j�1- , r L l t:- it.. .+�'�'• ,�' - - -- - -"- .t•:t i i i t s 1i ��e�'��' Y, lr } r - ,� •... ,j _ 1. is t�j' f! �, ti •,�., x+�• : t{ ]f 13q 4Y7 r ¢s LEGEND DISTRICTZOUNDARY zoNl� :L J_ �- v:'5 �. t'1 ; � 1 •' O ASSESSMENT NUMBER }� 0 " I ` PRECEDED BYas-y- 7 ,i 1 fi1ARTEF.3: AVE 4 € I o 18, DR- r - °n.•5'�--�' - r '' SLG7! AND . _ .:; °e, # ; T ' . +L 17 - � 59 '_' It -.. 1 - -• '..{ i. - .. OAK---- r:•- r .IARAGE BELOW UN. x r w BAR. L a [ LOT I f U /Yder UN.A ^ ©, ,.„ ! U. A /47NY4 �roeAaE/ $0- w ST. ED O 1 4 ' i y f /1 !0 S z OF 9ARATOGe(5y - ' # 4$ $ES$!NI�IVT'DIAGRA141x LltikTfNG �iSTRICT t��j�1- , r L l t:- it.. .+�'�'• ,�' - - -- - -"- .t•:t i i i t s 1i ��e�'��' Y, lr } r - ,� •... ,j _ 1. is t�j' f! �, ti •,�., x+�• : t{ ]f 13q 4Y7 r ¢s LEGEND DISTRICTZOUNDARY zoNl� :L J_ �- v:'5 �. t'1 ; � 1 •' O ASSESSMENT NUMBER }� 0 " I ` PRECEDED BYas-y- 7 ,i 1 fi1ARTEF.3: AVE 4 € I o 18, DR- r - °n.•5'�--�' - r '' SLG7! AND . _ .:; °e, # ; T ' . +L 17 - � 59 {rb t r - t - � - , „1 tia�, a i, •c'ii+ fr »r yFt;.F! . r'r.'i °5� A. �E8�UE1J� i1, # VN►s V'} ,- a I •. r r r. 8 ■ O TEN ' • 5 t5 } + 10 _ } } sY / ■ t a I °e.- 'k _ _ e'R��� 4 _ f.•M 11 �I W _ ' M -a - 71F4CT X!�KT C{AR'�s - I �•- ' r + I -4, r s•fM A f r Jul _I'Y OF. sA -Q A' SaMEtVT DlQGFiAM' LEGEND.,,.',. IP1NG. AND L1!!tf —"- �DISTRICT80lINDAAY ICT 0 ASSESSMENT NUMBER 12 - PRECEDED BY393Tk5 _ 7 I I f .X.� ez± zea z3e i 236 T LN, +•. W 4NTrR - - '% ..e L. JAC6i RANDA •CF .g -� • :Z re .n n , y •te a- t)C er Lu .I }• :. .� S e" F �j [ r i �/ O I� O !}tea lei • to g ~ 5 S7 yx - — , .f NY• le ' t• V1A .. 0 3.n .nu ,. � 15e ESCUELA� - L . 218 s�,ASSESSMENT DIAGRAM V;, IF SAR.ATor END 0 !E�G A — DISTRICT BOUNDARY 0 ASSESSMENT NU MBER :. PRECEDED BY333-)A "', V151 A. LANDSCAPING A LIGHTIN DISTRICT LLA-I 203 I IN I I me S goll L 3% .01 V/8 I 'A TR. H. 220 UMW.4 DR Anq DE "jg� fo F h , 9 1 -rv — — z -7 214 226 I our 260— T MACT 11!11"0 TEN OAX ad Est I 2De 237 V., X. UTY:0F SARATOGA' w - . 'j.- . I I .. . . - LANDS.CAPING-Amn I ',1 11 � - . k "Ilma U1 S FRICT Lq 74 1 11 - . � f 7°' 1 f I I I I ® ti'I. ® >t m 181- IS 1.2 ! "' t 1"0 1 3 1 f jo 134 IYDE -4 r)tArr H•5'.7,3ji as ARROY0 DE MRAT kp'-w wa ' 't f-TF 1 a' Its DR. a It 47 .rw ep Io� s, 114 lot 101 @ I" R ANly C , - - - - - - 4 - T:ff 8 w Q c dill v !� of � q Z Id I 6c t .0 IL Ga 1 � 7p- 108 , tr Is 13- � � zorvF: �2 23 m 0 ZA Z cQ wo mw N2 w ` w , 0 fly W. cf) fu .4c (L 42 .1`- 2 "SF�rS` -'4v_ - _ " er , i - _ �t;'. ','!`• r7 �+!� 4,r`.� '�_:tirr`.'t....��x .ir•,ir9S7r . N r L n I u i a+ I w .p - -I � .y � . {• ' � I N '. - �' ^� ,r•► , � wt .� ! ® ! Q f rte, f �t I � I ® �'• r �a� �>� ,�•,c REAL- Tnl�Cr IriW / ZONE e! IN IF ■n a spa ow r DR. IT l r A \ 7 *vI MA DR s CT. "t ' - CITY':4F:'S"A �,��• '�s� _: ' vi a._ � ■ I D$�irA AND 1 'a J 0 4 . r, B l d A � : ; =.s• L_�f "' ISTR ICT ILL A-1 .• -r.-, ` ` +t F � t ~ � � � � ' /sue ' Y I �, [ LEGENR --`- -- DISTRICT BOUNDARY - e O A55ESWENT NUMBER 'PRECEDED DY 39�_ Zo t ,• ! f .I ..• k tl_ ._. Ir i:, j a ♦ } !, , � 5 -r �I+1 it ' � .. - � kt +tf�4 fr f , 147'.1 �� •� ccur-"Au r t zo'a�w I ufa,gl5 ASSESSMENT DIAGRAM' N6 1�` t• r i — DISTRICT D0l1NDRRY•.. a 5 •' ASSESSMENT NUMBER .+ [�: La �' �+ PRECEDED BY�v3 — zz X se, amor 'N /s tl -,® +. -® - •1 �- ii L, 'fr 6 ANDSCAPING AND LIGHTING,. -{ ' z 1 , �61 STRICT LLA -I t I� ® I •� at ' k ••SA3tATtlGA —AYE. � Ct © i S m raac N• a 'M � � � •'� o �� ® ` W 4 s .• �lr 5 , ♦fa t reA l s at `P� +j = t'• - - . ® +1. ` • ='AI ,x.� nn y ,a t' �5d 5 � �, r l�t � \ � � `�•C6��: i" �: JE ae lb 5 �rTre _S .►'< sr ' y ` \'C",./• `�1 r, wil d +4 ze p r a" . � #�� Q � -t[ /•'y��L �i d Na'6`�� •� .:, ', r� - � y w• _y f � 1 © Ia '� \`- P A C L,{ ,s ue � '� a+ VIA ARMaA { :S!j v�© � - ! ¢ r 7 ay N �, 5 tt, r: ? � is 1•> •' . " tl r r 'f ® �! t0 � � s♦ t ne,. ;rwn,nx: ... - -has - _•�' 1 91 ' K•• r 1 . ..n n•4 • warm kelr 40� " ' • -`SARATOGII, r d s QA.M.A [ UUA-<i' -le, ASSESSMENT DIAGRAM } [ �IA D.SCAPING'ArtD' f13FfTING. DIST jj " — L L A- I ; ai 7 #• s LEGEND — .DISTRICT BOUNDARY a + A §SESSMENT NUMBER rz ;di .PRECEDED BY 393 - 40 N t. PC! O IS �w ... �& �S{[ 1��? k'`k�s.�,�?�SAaef:i1�L.'r[°..' � ; X r- i ss w;��'.'.l;�r''•�i ..i - .. r OJ Q '1 i - r oti ' �1. •N9 • 4 + .wd „ SCOTLAND— ASSESSMENT DIAGRAM.. C ITY OF SARATOGA `YZ •fir i v . �AiN e` - 4 RCS •& Y Si - ' LANDSCAPING AND LIGHTING DISTRICT LLA -I.- LEGEND z ONE- I -- -- - DISTRICT BOUNDARY C) ASSESSMENT NUMBER PRECEDED B.Y 333 -2+ �J i • n d 1 .° I � c 1K V + + t6 y_V R � 1 1� V 221 i- 7jjg�� LV� _J� OF S*RATOGA tANDSCAPING AND LIGHTING DISTRICT LILA I 114 ASSESSMENT DIAGRAM LEGEND ra j ---- - DISTRICT BOUNDARY C) ASSESSMENT NUMBER PRECEDED BY 3a,6-63 IN I 5v V 4V A f 111 _.. �� • a ' � r • _ ' l lz z,. i N 222 6 1 L� LEGEN -DISTRICT BOUNDARY 0 ASSESSMENT NUMBER PRECEDED BY GE A N Q D 0 s S PRE I S E S C E T RICT BOUNDARY ) MENT NUMB� By_ R ED 7 7 - o i - D- �4( J L 9 ASSESSMENT DIAGRAM �TIF� OF SARATOGA -LANDSCAPING -AND LIGHTING DISTRICT LLA-1 _ 0 q 4 k Al iL O 223 W :_c I I I ZONE Jr. ' -.` {� ._.;"" GfTY OF SARATOG/� LEG Nb ;. SESSMENT DI Gf AI ~ r•= zoc' .; , , DISTRICT BOUNDARY. Aa r) � 9 •- --' '��6 �� �I NE ''i. LANDSCAPIN T –L G AND LIGHTING DISTRICLA. ! 3; 0 VANDE RSIL+z ,, OFt1.YE w ZO CT C LEMSQH r n� CITY OF SA.RATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 LEGEND — DISTRICT BOUNDARY ASSESSMENT NUMBER 0 PRECEDED BY Bl6- ci ' 4 LC .- r °M1� � i�T ire � - ]� r - - :•. � 1�`.r -, J,lDzl C WcoY ^ - _-AVENUE n" ' -.` {� ._.;"" GfTY OF SARATOG/� LEG Nb ;. SESSMENT DI Gf AI ~ " – .; , , DISTRICT BOUNDARY. r ...�' i - ''i. LANDSCAPIN T –L G AND LIGHTING DISTRICLA. O S SESSMENT NUMBER PRECEDED BY.Fp3 –zy VANDE RSIL+z ,, OFt1.YE w ZO CT C �':. _: - i_ - I � j;q O'� .V. O �„��' -_! ` i --O ? YJ O _' - y. C LEMSQH r n� CITY OF SA.RATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -1 LEGEND — DISTRICT BOUNDARY ASSESSMENT NUMBER 0 PRECEDED BY Bl6- ci ' 4 LC .- r °M1� � i�T ire � - ]� r - - :•. � 1�`.r -, J,lDzl C WcoY ^ - _-AVENUE n" I •.RiS: ASSESSMENT DIAGRAM :' y,,.,' " 'CITY OF SA�RATOGA ' LEGEND DISTRICT BOUNDARY ASSESSMENT NUMBER PRECEDED BY 385 -3 r F n zO ,� o ILANbStAPING AND LIGHTING I y ` DISTRICT LLA -1 OI �� AVENUE r B ONE 2Z • ��i •_� SC r; - . . � ��• r' iV O - :� :} i 7• _ - nr - �4� !t =t. t ® � •i: 73 C[TY SARATO "_�. OF G�,� :, "its , �.wr•a,,� , �• F�:,.... . .- "" " 5 ASSESSMENT DIAGRAM � LEGEND LANDSCAPING AND •" - - - -- DISTRICT BOUNDARY LIGHTING DISTRICT LLA -I { O ASSESSMENT NUMBER PRECEDED BY3a6 -4- rON,5 22 - --= arw - - - - -- r UORLHFSTLR M' SCULLY AVE g • dy pFF7fi OF - muRi AssEMR 94HTA�PCJIA✓1 :1- OGINTY G�17 A " . ` 3 -;-- _ ^ �'7C TRACT N. zm- MORCETOWN -UN. W. I - .- . _ " SUBONISION �t DICEY f�f E9YdT� - - - 70 WEST VAL { C Fzs nssa sas.ac also LL lr l r =arr l � Ff2EE�YAY RTE. �H as �1 _ 0 p f -f rs ,l 14. a� S 1 !V' of I 7�ffil ! �a N ..�pBRA e.� Ih �sr.rr 97 f r.«n I 97 + b ib 97 [� / SJ - YIP 33 d Vas Simr rm TRACE N' g9'J4 rD17: 90 wal eef 4 "wly I rr �s 3 / 89 0 t l Y 76 77 227 `7A IT? N'T blAGAAM ASSESSMEN A LANDSCAPING AND LirHTPNIG DISTFNCT--LLA-I LEGEND -4, —DISTRICT BOUNDARY 0 ASSESSMENT NUMBER PRECEDED BY3,96-22 - ------------- -41 Z u j - - - - - - - — — — - -- - - -_- ASSESSMENT b IAGRAM CITY OF'SAAATOGA � ' ' L E G E N D LANDSCAPING AND LIGHTING Z40NE ZZ I I -----DISTRI TBOUNDARY C ASSESSME 7 NUMBER PRECEDED BY 386 -06; W-i 1 DISTRICT LLA- go TV 4 qD pt IX Rm RAF -.,r DRIVE 3 IF 20 rd L --- 1 1 Y O F S A R A T 0 0 A I. LANDSCAPING AND L113H % i DISTRICT'LL.4ni. 'I ZONE 22 uj > M7 j.7- 7 - -I'- — ac , ffio (o T CAMPY 40 3*1UNDA COURT LEGEND 2 ---- - DISTRICT BOUNDARY ut IL 0 ASSESSMENT NUMBER y O qJ g O s, O P 4r PRECEDED BY386-Z7 cm LANE r.*_Q ASSESSMENT DIAG F�4 ' - '� , CITY M OF SARATOGA MIELINDA LEGEND LANDSCAPING AND LIGHTING ---- — DISTRIGTBOUNgARY DISTRICT LLA-I I 0 ASSESSMENrNUIVIBER PRECEDED BY38r--'g -_4 ZONE 02 PA I Li.1RV qt%fty LANE , n, 7 c CIRCLL- E " D 12 ^Vgkua 229 r.*_Q UlgUMMM ri - off CITY OF SARATOGA LANDSCAPING A LIG HTING MILLER DISTRICT LLA -! — - — �. rluxla. naeL[ , 4 . - 'ti - -' " - - - -- > �l \\ ZONE 22 J7 EG£ND w Y , - "' ; 0 s C __ •f _- — DISTRICT SOUNQAFY • - :_ II ASSESSMENT NUMBER 0 s7 c, �� "• w s r O - PRECEDED 13Y3e6 -24 _ _ i �x > ev , e _" _ _ ... _. _4•? . _ _ _ _ �. I I i l O a5 4l 11 � JI 3v ]7 !/ D u D/'• I� O .'41% y Sl - � � , I I ; 1 /may �r`___•t ___ MILLER lb I I , I r .. Min . +G3�w URL v nerL�ER HbbtbSMENT DIAGRAM -CF SARATOGA L" AvE LEGEND I �LANDSCAPING AND LIGHTING SC4L[ I :l ' DISTRICT BOUNDARY DISTRICT LLA -I ASSESSMENT NUMBER e� O PRECEDED BY 386 -3f E 22 DARI E N WAY B' ZON =:® C.AAif3RIDGE _ Ili ; DRfve � O •a O �Od Lu N - w SS �_' s I '•� �lQ Fes. O F I O I O.[ O x K - "_ ter• - ' @ PLYAAOUTW ,:•n I O O DRIVE W W 49 1 c Q ` 3 _1 r•.1- L-01rIC14 I,. IJIHhf AM NORTHAMpTCN pA1V 1s' i O - LEGEND ^ - -- — DISTRICT BOUNDARY CITY OF SARATOGA O ASSESSMENT NUMBER LANDSCAPING AND LIGHTING PRECEDED BY3es -3z DISTRICT LLA -I C I T Y OFF - SWR A G ki LANDSCAPING AND --- -"R - - -- O r�.r- �•__i # . n _ O LIGHTING DISTRICT i c LLA -I t sure I r'• rei - ucwrovr - -- -- ZON; 22 LT . _ ; 4 O � • ' i i O R z N ` ` 0 zm y t !l TARREIICE J,vE. WC] — W n°vec ul 0 ) LLA z N 7 O 3 4 UJ as - -- - - - - -- ® © �'o r A! O o ._.,{r, a ® _, n•M___ WALDEN , 0 O f a N s 231 $lo j z Z .fir- nr DORCHESTER pRtWE )x » ZONE 22 i O - LEGEND ^ - -- — DISTRICT BOUNDARY CITY OF SARATOGA O ASSESSMENT NUMBER LANDSCAPING AND LIGHTING PRECEDED BY3es -3z DISTRICT LLA -I C I T Y OFF - SWR A G ki LANDSCAPING AND --- -"R - - -- O r�.r- �•__i # . n _ O LIGHTING DISTRICT i c LLA -I t sure I r'• rei - ucwrovr - -- -- ZON; 22 LT . _ ; 4 O � • ' i i O R z N ` ` 0 zm y t !l TARREIICE J,vE. WC] — W n°vec ul 0 ) LLA z N 7 O 3 4 UJ as - -- - - - - -- ® © �'o r A! O o ._.,{r, a ® _, n•M___ WALDEN , 0 O f a N s 231 $lo LEA _ — DISTRICT BOUNDARY O ASSESSMENT NUMBER PRECEDED BY3se -3$ I lull V %l1 I ., , yv' ASSESSMENT DIAGRAM -- G I T Y OF SARATOGA 70NEZZ LANDSCAPING AND LIGHTING scu�w AVENUE DISTRICT LLA -f a R -- ` -•ns -" j -- .j17 -' -- �r___n -- d __- lrt+i• -•� :� I I O o t p aGC a i I* .p W _ I W p q O u to - iea +� +J Hz°a'""_ - � '�__ -�___ �l9 W _ o ,,� n Q ,•;; - • M wr, K ]�1 - - i•17 i� a b O 7e w f y N END — DISTRICT BOUNDARY ASSESSMENT NUMBER PRECEDED BY386 - 37 232 E►SStb5A4kNi DIAGRA - M CITY OF SARA'�O�GAi'� t LANDSCAPING AND LIGHTING bq DISTRICT LLA -I ZOt4EZZ ;s� ° MiLLER Li W 31 . F - 77 al sr O VSi ® 47 � QE 3- • - � `� l �T as N b6 1 uJ 7 r p W -- J cr � L' - -b ' 15 yv' ASSESSMENT DIAGRAM -- G I T Y OF SARATOGA 70NEZZ LANDSCAPING AND LIGHTING scu�w AVENUE DISTRICT LLA -f a R -- ` -•ns -" j -- .j17 -' -- �r___n -- d __- lrt+i• -•� :� I I O o t p aGC a i I* .p W _ I W p q O u to - iea +� +J Hz°a'""_ - � '�__ -�___ �l9 W _ o ,,� n Q ,•;; - • M wr, K ]�1 - - i•17 i� a b O 7e w f y N END — DISTRICT BOUNDARY ASSESSMENT NUMBER PRECEDED BY386 - 37 232 E►SStb5A4kNi DIAGRA - M CITY OF SARA'�O�GAi'� t LANDSCAPING AND LIGHTING bq DISTRICT LLA -I ZOt4EZZ ;s� ° MiLLER Li W 31 . F - 77 al sr O VSi ® 47 � QE 3- • - � `� l �T as N b6 1 SCULLY AVE 89 I 50 t! UIAURAM Ul• •5AHAI LANDSCAPING AND LIGHTING DISTRICT LLA-I 70H5 . 22 I LEGEND ---- - DISTRICT BOUNDARY 0 ASSESSMENT NUMBER PRECEDED BY386-3.9 WSblmZ,WEN I DIAUHAM -�-4 �A.. PTY OF S ARA GF% LANDSCAPING AND LIGHTING DISTRICT "LL A-[ L EGEND GEND 60 — DISTRICT BOUNDARY 0 ASSESSMENT NUMBER j P RECEDED By f5l: L MILLER 4 *^' -, ZONE 22 TITUS 7-u:7 7 � of A s 0 ..� � O - nn e- O 39 r` O -pn L EGEND GEND 60 — DISTRICT BOUNDARY 0 ASSESSMENT NUMBER j P RECEDED By f5l: L MILLER 4 *^' -, OELLNJOOO CITY OF - SARAT -OPiA- a DaivF LANDSCAPING AND ,LIGHTING DISTRICT LL A -I _ \\ r r BONE 22 _ ;145 O •� --r � Q ; ®' i O �f O •; ® - _ .- a ii.rt nsa� _ OUNT14ER s COt1Rr m -- l O - , F I f s O •. ioa - --� w � •'6 'Y r�I� ® x Q i Q f �� of O � - --- - -- -� »am �- -LANE • 0R a L r O r ^---- "DISTRICT BOUNDARY w - ' Q ASSESSMENT NUMBER PRECEDED aY3a6-.g3 l Y + UTAUHAM GI1 Y OF SARATOGA _LEGEND LANDSCAPING AND LIGHTING - ' — DISTRICT BOUNDARY D1STRfCT LL A-1 Q ASSESSMENT NUMBER PRECEDED BY3as - BONE' 22 Ua • _ - Q 2a y r• O R ?_ o.— i a � O rT ac is � L� Q l 50 •. _ O d Y O �e � � i ns } 111 - . 234 _� rw +k. I I O Xi O� O 8 U I ros t iw I Boa w 1 __ 1.09 AL.1�ET r^ � � a! 4i) 12 A .. -� CITY OF SARATOGA LEGEND } ANDSCAPING AND LIGHTING DISTRICT LLA - - — DISTRICT BOUNDARY O ASSESSMENT NUMBER z O Nr 22 PRECEDED BY386 -48 I" • roo ti ,A Q �r� Q n -,t w�SAR CITY ATOGA OF .. f EDINA LANE 0 a J _, - b S •• w 7 R J - DISTRICT BOUNDARY 3 Q Yk O ASSESSMENT NUMBER PRECEDED BY386 - .5 0 ZONE 22 l � l l Z - - 1 235 i n -,t CIO - 1$ Z0NE 22 � 11 \ _ - L' Jr ASSESSMENT DIAGRAM, Li r 1 _ cr LEGENO h •' �3 s.� — DISTRICTBOUNDAR O ER• ASSESSMENT NUMB ; s 5 PREC EDED BY38 9- a 2j -Y S 1T X !9 DR I I LANDSCAPING AND LIGHTING. DISTRICT LLA -I AVE. 5o r 3F Q 1 o 0 N a: r•. . 61 I Y OF SARATOGA LEGEND LANDSCAP-ING AN LI,CiHTfNG DISTRICT LLA -I • =bI$TRICTB0'UND6y ' ASSESSMENT NUMBER ASSESSMENT DIAGRAM' ,Or,PRECEDED BY 3? 70 N6 22 Cox AVE. - �� — 9 O Q O ; 1 Q ° 1J YI al Q O !1 r¢ SHUBERT - —� N, .zli . n Tian_ N We. tE • _ t Off 7 , � I i - � .. . g s re 236 LANDSCAPING' AND LIGHTING DISTRICT LLA -I +` LEGEND, — " DISTRICTBOUNDARY ASSESSMENT NUMBER f(�1 ® PRECEDED BY 3e`_' ASSESSMENT', DIAGRAM I -� xD NE 22 ' t x Q - " ANZA ��•� O x w CITY OF SAFVAT'0 A Y ` L, fN,Ds AOINO AND 'L,IOHTINO - DISTRICT LVA =1 ASSESSWIENT DIAGRAM." zoNE 2-4 ff LEGEN D RICT 8OUNDA RY MENT NUMBER ED BY503 -z¢ f x' r ' u �SC.VW° fSYT 'i 1 ....�1.. -_... @) Y¢ •e. 'S. • 4 9 3 ` 73 0 ' E BIG BASIN ,x pY ' \ X P i' ! I 237 I J. ASSES.Sm C ITY OF SkgtA LAW0001J4mQ ANO L161-MM& Of SM!cT LL TOWN OF MS CARTYSVILLE zowe. 'A'of Maps f�. 43 Sqpt. 20, iM s. p; �� a �•.. . it �Y�• ' +�'L:7� r • , - at pff TRACT HS date 99 CITY OF ffmt,ATorffl, LA%MDffCA6PI"rA AND LlCpl4TfP4rA DISTMcT LLA.-j - (D- LEGEND: ----_D . AisEss"er N 0 P-Ecg--v Or' 503-67' - AX, 238 �� i J � 2 1. , (32) P /P� I I lo 71 i¢r:•;g3,- ;..• �-- �� CITY OF SARAT0'0A I Y .. `LANDSCAPINO AND LIGHTING DkS7RfCt LL:AIi k ' t UNDARY LE�GE STRiG7 BO SSMENT NUMBER EDED BY r - 25 - - - - . C/L BIG 9d5lN WAY !IS I V ,�k.�� � �r,sla• +c.�+�['�I .Uis' _.�, �Y.Mie.t�. �-•'.i •�k•f.�-y- .xr:.►�.- .,;,•... .inu.K- ,n;•... ,, I �9 hOMINA AVE s AVE ASSES D {AGRAM i . Sa ':; CITY OF SARA T .OGA LANDSCAPI 0 AND L1014TIN(3 Df STRIC# LLA;- � -- DISTnIr.T BOUNDARY 0 ASSESSMENT NUMBER ECEDED BY s17-6 - 1 Ur SARATO?A ASS E§'TL c kT DIAGRAM STREET i - BIG LN4Sifl 42� SEWPV . - r: LEGEND It S5 $7 S$ DISTRICT BOUNDARY Y a ASSESSMENT NUMBER ZaN�e Z4 PRECEDED BY 5vj LANDSCAPING AND LIGMTING DISTRICT LLA -{ _ C/rr eF aw+eAro6,4 - 4.4/V49JCA?WX.IN6 L /tiKr /N& 41J7^R)tt'.. {Ci?1 ; ION£:-4 I I _ - �' f -- •— u,srarcr Xvuvatizr ; � � � - y .. !a • � ';tea+ INS DI LLA -11 1' :3 -� rN•�� it -•. -I a��� * - �.sl �. ` �a ' s'sai . .,�= s��_, � " -- - �S� ZONE : 2 - It. •r � r W -..si ti N 2 rP ' r6 - r •� U I 4 ' _ nr Hf ro n ' .•: ',° M1 .. � ` �5 I � ;.. ,11P� �� � �y/ "K � ri s 7 r � �`� - `=/ a ''� _ __ ;�' " - — 5 eff I h .b, V?! Y yr y 5 f - _ r 45 ,�, LHEVEALY C.T. 1 -_ -hp , R 1 . a gs _ Z, is — __ - - - -__ K .LflS77PlCT- YdIVAftlNY _ - Ia '}' `� =/ - SHF111011N p tIR[ ;E - � ' t ; 4T. Z/'fM�iVT •Y/Mf[� +. y� ® I �+` d ° r 4/ - � s1t�r : _ � m „ s :I- I 3 1 / -05 } - LANDbc"imG Axe) maFrri IS DISTRICT LLA - LONE: 2 'rte 5 -e 54��E F' -:ro x i i¢r- ^r rV o vAvi "_ ;VENUE - .•� a _.. l ^i, V '4� , 1q) lER T_ f4 Y \ 1 Ny - . 1.4 l O ri /J-, M s r ASSESSMENT DIAGRAM - Ar, CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLAAl LEGEND — DISTRICT BOUNDARY 0 ASSESSMENT NUMBER PRECEDED I3Y:j,93_0p,?_ IL 7—omE 10 a - Af `* ROAD Y"" OF SARAT.QGA W y i-T LANG GCAP AND LIGHTING DISTRICT LLjk— ZONE c? 4t. V '4� , 1q) lER T_ f4 Y \ 1 Ny - . 1.4 l O ri /J-, M s r ASSESSMENT DIAGRAM - Ar, CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLAAl LEGEND — DISTRICT BOUNDARY 0 ASSESSMENT NUMBER PRECEDED I3Y:j,93_0p,?_ IL 7—omE 10 a - Af `* ROAD Y"" OF SARAT.QGA W y i-T LANG GCAP AND LIGHTING DISTRICT LLjk— ZONE c? 1 I 1 ®9 243 ASSESSMENT DIAGRAM CITY OF SARATOGA LANDSCAPING AND LIGHTING DISTRICT LLA -I - ONE• 2� D- Lu 0 KiLBRIOE . 3CT. = .. LBRIpE_ a . I R I � 2d 19 !: 7 • c "I � I + � 'B I I .I I of '.a 5a•�ff`- / t- + - --- -- —�— MILJEVICH- --- - _ J O N° LEGEND � N Q - — DISTRICT BOUNOARY o O ASSESSMENT NUMBER PRECEDED 13Y393 —o3 rn I 1 ®9 243 38R 43 34 7�NE ZS � RACT N0. 7919 113 138 112.58 111.67 47 200.17 o I 1 1 3 I 4 r 5 9 f ° o i r r I r r 0 �r r 10 i $.47 f rr 16i9' i 7 Bt.[153 124.14 G ,� { o m n r 60 14 O . _ ... 98.60 79.61 11 ?6 16 ��i ° r 0 y y� ct`_ 5 O 1507 ` RANCH CT. o m. \`=I �Z77 39.16 116 23.0 4$,86 m 1 Q, f9 ,- I I l Iw Im I Iw I l \ n: Lo 15 14 4 13 \\ 12 5 0 -- - - FRU I TVALE TRACT N0. 8560 --C x p0,36 � 3 ��q 3 n - 144.89 y 60 IN ' O rn r� I N E 4 E I - 04 - A V E N U E - TRACT N0. 8559 PHASE 1 VERDE A C r L m i_ ■��r: 5 .11 87.83 3?. , C f) q 0 M ;u rnrn 1'1 o // do d ?6 h0 5 \\ LA ,r / \ 1 g " / IN / Iv / 1 2 1 3 I 12, 13 6.79 I 1 30,50 111,90 10 Ica �• 1 ,,. 8, ,I , �`\ 6 0.6 2 I 8 o 1 5ti.e1 Y – – BOOK CAGE 503 21 ZONE 2 S — —T— LAN E — —�� W , 0 0 87.82 100.46 3p� 10 I rn 15. I I� U '� %' I N1 �I �I _ 1 120.00 t NI , I � S7 70.23 q 7 30 U C3 cn io 0 0 120.00 -- – – – – – – – – – W [e 0 I V V ;y V O O o G W © 1 120.00 7 ` 171.00 , 14 12 ' fTl / 34 i 9 z \. 52.07 I o� - 14 o 30' 1 1 {4 I � 66 -98 I 7o.aa n OB � r X6 60 a 1 38.3 2 g N 0 7 0 0 - 129.98 __– •---+ /w r S EATO N AVENUE 0 6 ' P3 / n h /' 13 '�o- 260 y s rko`' Ln ro i i ro 35 r7 11 HERRIMAN N — A of 1 & .0.? r ^ r r x24.09 59.96 I 69.67 q) 77.9 I L I 25 M1 ! I_ LA Q w / _ N In 26 r r I I W 5 1 9 , 4 1 r 3 i 2 ; 1 35' 91.35 r – 99.03 102.04 1 00.00 45� � WD LLJ TRACT N0. 8896 ? Z - j � 245 - 171.00 , 14 12 ' fTl / 34 i 9 z \. 52.07 I o� - 14 o 30' 1 1 {4 I � 66 -98 I 7o.aa n OB � r X6 60 a 1 38.3 2 g N 0 7 0 0 - 129.98 __– •---+ /w r S EATO N AVENUE 0 6 ' P3 / n h /' 13 '�o- 260 y s rko`' Ln ro i i ro 35 r7 11 HERRIMAN N — A of 1 & .0.? r ^ r r x24.09 59.96 I 69.67 q) 77.9 I L I 25 M1 ! I_ LA Q w / _ N In 26 r r I I W 5 1 9 , 4 1 r 3 i 2 ; 1 35' 91.35 r – 99.03 102.04 1 00.00 45� � WD LLJ TRACT N0. 8896 ? Z - j � 245 - Q - If 0 FFI C E OF C0 UN T AS S E55 o - - - -- S A RTA C LA R A C 0U NTY, CA LIF 0RN I A ZO NE ? 6 TRACT 8700 4 / ' , o a 56 57 42 I is 9 5 B 5 a 46 •'s s ' e ie T2 m H00K PAGE I 389 44 Y= 100• a R 3s •, i 37 ss 'Y x lcm F �° O 14n•� �--- --- -- so - `39 rte. Si'� rn 19 Z5 �fi1 55 33 �,q� r'-- -izo6o _ - � D °s 0a.94 -16° sz 2 .t s i °/ 32 I I moo �.i 51 R -_ ° I 108 ° ter 29 i 53 0 8 g9 x' n 1 1 m im a ll St, 1' I E E E E p S• � `� � e 1 i3 23 18 9.l .a BRACE CT. ' 4 20 � S A N T A C L A R A COUNTY. 0 A L I F 0 R N I A BOCK PACE ® 389 45 h— 6 Ta ±5i`�. \,--- ' d im 4T 21 -'(W ♦12116` & L---- - ----- tD -';�, 9D �; Io mm r �i /y �T �!^ 45 39 �'i UO' 2-1 1'= T P me , O:.i2 "'f M1i 106,66 !108 L- - - -_ '� •� �F�J i2°� 22 44 24 f C B7 Gj� 38 im _ -44- ®� ` 23 _ e�fia - ss r ' io�,z x i ti �_ �YJ s Q 1 '1�- 0 F i CE O F C DUN TY ASSE S S 0R - - - -- OFFICE OF COUNTY A55ESSOR SAH1 7$ CLARA COUNTY I CALIFORNIA Ei F ' - ', 200 I 164.51 163.71 1 760 - -� -� 700 i 49d 0 31 1 30 24 23 1 ' 22 , I.074 Ac+ 20 17 36 Ff 1� 1.419 AL.! 1.D62 A0 A I 3 \ l 1 204.40 4 . r b' o- o- 7s �I 102f ALA ` ` .l �° ` 156 , �i n� 21 �! rp/ �] ' � ~ G-6 17 .f or 25 r l in N_1 f r , 7 9 6 o 2.61 AC. NETT �� dAD 1 !j r -- - - - - -t ,3058 . - �� , .x ' � �, ,, •�'- � , 32 � P~ �! r f � ��' O , ' ZSi .•" �4 ,010 1 1.09 AC. �M1 28 38 mf !'F I V F- .lSl sy 1 ;! �.� 77.53 ;n o 49 /er`'` 4- 1 u(} r Zb 211.S {' 1 y UD 1 - 151 r�, a 17 �f3 _� s A s� r o T a 3s� 14 16 I OC• ,'y r .o ' � II °I - r .Is Aso 27 39 RY 0, a 1 r 15 r u9 1D 3a's, 4 I E.5 AC. 33 • �' R, I.11C -H 5641 11669 1 1034 11C w '' 4 h h T r , 94.15 .403 p •V B,. ° Jq to, cp O M 7 39 0M1. I b An 1.949 AG ` !o? N "� °6 E 480 p 1 J J A ' - .,fi 1.14 AC ._. ..2633 a d o P`J L- 2' . 40 ix �� 2? hr AC _ 1 r 4.83 604, u. ' Tt `a y 35 1 004 AC ! 't7 w f� r d' 4 r9 A, r l 47 36 So C4 �N, -- sll -ay -k — AS }I f ro 37 ? ?', 65 Ou Cry Q L/ 141.89 - .7o-� P 44. �ssJ SO rs .� r N��M� 1D ,` ^� �� c am „ _° I L14A _pic117 m l 1 v LO IJ .J r s Ul `�/ O O' J� Zk - ss 43 \ m� 1.550 AC W r .�^, `!`. 7 1 •�' �' ?r) by + � '� f J 1 ` X65 AC j + 4s Jul 1.1 1.023 AC - ,M 53 tl 3 �9 1 4 2.14 ACS. 1�lE7 t F T +b5 ' %p5 'F� • �� ' r TSB a - 1rs5z L IDs 1 titi Q AA tJY - GA 56 " 1.291 Act 21, I 1.10 ± 1 632 c • - 361 V Jr7 49 1 u 101s ° zoo uss� R 0A p rc, 760x q 1.00 AC. S9 99.65 169.26 50 Y 51 ! Its L� _ - � .s , M AP 2 2.093 AC. i 1 1 S. 1. W.W. 547 rrJ 6 .49 J 7 70.1 !0209 a IJ `r1 O 31r. 51 — ' " ���� 3 ,y t - �r„•)x 8J6 a •�– — 1 CITY OF ShRATOGA f /� ���• f j u.29Ac. 247 I C E 01= 1; 0UNT Y ASSESSOR SANTA 9 ' g • � � MLJ M 25. O y GR. 3 � C' L A R A C 0 U N T C A L I F C R N; A } 55 ao S.J.w.w. _ TR ACT N2 5007 � 34.0 5a 4 ... 4 1 # a 5 1.206 Ay N 1.053 Ac. Net � 1.170Ar. N' ti 1 244 AL. NET }� 4 p, k 427Ac NeT n d ! r3s9 co AC NET s _ z �e' 7 c 1 11 � L •.S T` y° i sus. GAIN - 0 cn s � ( 9k /C / 8,1 k V 1.554 C. N ET _ Boz so ., 9 0 �I 460 _ ... 34256 r � 97 8 v _ 4tr s j5: �r ac I Z.B ar 5.i5 AC, NET : 157 i 2S5� 585.39 + ` I&35 O y i 5 4 143.76 2_48 AC. GR. .° �� 32.50 1 2. 15 :,C,N�T 'E ?F An NET a3.ab C_ �� 1 L Fv o !7465 .4 RA)sc 0 � � a rr 17 �m r+ Im 0.46 z �/ I 6� / ,v i I 6.00 AC. NET / `*\F ?- 45.4G1 S,fi2 83. 59 340 � I ' f 0FFIC 0UNTY ASS ES50R SANTA " A cou4TY, 0ALIF0RbIA •. 54.• tey4 � w�'.f i 5EC.7 7A65. MW, M.D.M. � ���'x� ��� � 0 4• /fir ` 1l , \V 4�' o i• " N F 'N S ( 4 �� d + ti 5 q' i 1 qt 1! r to , J rr) I D 145 � ;4 JJ W +� + J 4 S� PM. 5 - M 48 145JQ bb p �• �J b. ` ate_ 211_ ___ - ] 00 i�2.fi +�''• 87.s�r� '� a\ i50— 4� 1y.� N 2t9 ,` tote u Ir '�+ 1.16 AC. (7) „ t E (ypf «� p gt li r 7 * . 1 . FM. 564 M -37 r 28 �' t:J s'` �t reiia b cl� 4 I [� V �• � ei a Yr,SM o N, • w'1 d s z r v /// d¢ S;� {kso y a 'arc 7 i }�• a ` � f _ -- ---- - - - - -- F C) a PC L. 2 �, 5 ltst P be 1-12 AC. N 5,.9 sr.4a 1.541 +4C, a `� ti} ti yyy � • , 119.34 147-. 2 PM.613M29 9j cy. 1y \�'�tcti' . 0'►4,� Qs 7 v o vq s s 1 y YC•., a � e � � � {r i �.• 1.33 AC. \� ,tiaM1 M1' \\ \��•t�`y'f ,�,.ro Ac = 150 75.07 .uixr °^ (S`.7► J' S� tiF 9 6f `\ ,fi :@_G_:,��� ?. BELLE VISTA o,J ,`'�� ' % 'r'• G '' 13:23 �� ` n LPG , 0 A. 0 \ �' y zo S3rr Y1 r:j �D i ;aoJS ism t 4 9 % Lp sv y C'. Y1 61 �} 35c I Iso —�� TIAC xcyer �� 4s� te r" pby4¢ 6 - 1 r s r µ410A Y `; eP• +i �_ sr.es ox as �N, LqT+ SUTZE {7 SUBD � ( IES K h:0. -5 31816 was. t z,7f 23 PTN. LOT 33• �eFt ATOGA 1-05 GAZOS r, 17 R OAD s o A o • . ,397 2(} fS a Y 16 ° V Q) 4fN Ccmpied n cWormmea pith sec. 327 of the R, k 1 cede. Fu vswneat purposes OdY. E!l.cl" RM 1998 -99 LAWRENCE E. STONE — ASSESSOR SANTA CLARA COUNTY, CALI FOR NIA gppK PAGE 3 97 37 f � / / 4 I 1T� � r � 3g• W6 s / ' 36. to t t t t� t.a tw t l 1 i t tt0 � m' a � o� 5� l � N 250 117 ZONE 32 KIRKMON O ROAD GULL N 0 DA N Proposed Carnelian Glen Landscape and Lighting District ZcnO I, Ann Sullivan, the City Cleric of the City of Saratoga, hereby certify that the foregoing assessments, in the amounts set forth in the column headed "Assessments as Preliminarily Approved ", with the diagram thereto attached, was filed with me on , 2010 Ann Sullivan I, John H. Heindel, the Engineer of Work for the City of Saratoga, hereby certify that the foregoing assessments, in the amounts set forth in the column headed "Assessments as Preliminarily Approved ", have been recomputed in accordance with the order of the City Council of said City of Saratoga as expressed by Resolution No. 10 -0_, duly adopted by said City Council on , 2010, said recomputed assessments being the amounts set forth in the column headed "Assessments as Finally Confirmed "; provided, however, if the column headed "Assessments as Finally Confirmed" is blank, the figures in the column headed "Assessments as Preliminarily Approved" were confirmed without change. Dated , 2010 John H. Heindel, RCE 13319 I, Ann Sullivan, the City Clerk of the City of Saratoga, hereby certify that the foregoing assessments, in the amounts set forth in the Column headed "Assessments as Finally Confirmed" (unless said column is blank, in which event the amounts in the column headed "Assessments as Preliminarily Approved" apply), with the diagram thereto attached, was approved and confirmed by the City Council of said City of Saratoga on , 2010. Ann Sullivan The Assessment and Assessment Diagram were filed in the office of the County Auditor of the County of Santa Clara, California, on , 2010. County Auditor 253 254 SARATOGA CITY COUNCIL MEETING DATE: June 2, 2010 AGENDA ITEM: ORIGINATING DEPT: City Manager's Office CITY MANAGER: Dave Anderson PREPARED BY: Ann Sullivan, City Clerk DEPT HEAD: Dave Anderson SUBJECT: Resolution Ordering the Abatement of a Public Nuisance by Removal of Hazardous Vegetation (Brush) RECOMMENDED ACTION: Open public hearing; listen to public testimony; and close public hearing. Adopt resolution overruling objections and ordering hazardous vegetation abatement (brush). REPORT SUMMARY: The focus of this program is the identification of perennial vegetation, brush, trees, and shrubs in designated high fire hazard areas and removal according to fire department requirements to lower the threat of wildfire in the hillside areas. The required posting and publishing for this hearing has been done. Property owners have been noticed by mail by the Santa Clara County Fire Department to remove brush in accordance with fire safety standards. Those properties not in compliance are listed in Attachment D. Council is considering authorizing the Office of the Agricultural Commissioner to enter such properties, abate the nuisance and place the cost of abatement on a lien against their property. This hearing is an opportunity for those objecting to the potential charges to come forward and be heard. The City annually declares hazardous vegetation (brush) a nuisance due to fire danger and enters into a contract (along with other municipalities) with the Office of the Agricultural Commissioner to abate the hazardous vegetation (brush) not removed by property owners. FISCAL IMPACTS: None to the City. Office of the Agricultural Commissioner covers its costs from administrative portion of fee charged to property owner. CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: Abatement process by the Office of the Agricultural Commissioner will not proceed. It would be necessary to depend upon the property owners to take care of their own abatement. ALTERNATIVE ACTION: None. 255 FOLLOW UP ACTION: Upon adoption, the Office of the Agricultural Commissioner will begin abatement. ADVERTISING, NOTICING AND PUBLIC CONTACT: Pursuant to Government Code 54954.2, this item was properly posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting. A Notice of Public Hearing was published in the Saratoga News as required by law. ATTACHMENTS: Attachment A — Resolution Attachment B — Letter from Santa Clara County Fire Department to property owners Attachment C — Notification to Public Attachment D — 2010 Brush Program Commencement Report Attachment E — Email Communication from citizen Nancy White 256 RESOLUTION NO. RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA OVERRULING OBJECTIONS AND ORDERING ABATEMENT OF HAZARDOUS VEGETATION (BRUSH) AS A PUBLIC NUISANCE WHEREAS, hazardous vegetation (brush) is declared a nuisance and will be abated by the Office of the Agricultural Commissioner and the cost thereof made a lien upon the private properties from which they are removed if the owners thereof fail to do so; and WHEREAS, the County Fire Marshall has given Notice to all property owners found in non- compliance; and WHEREAS, pursuant to said resolution and notice, the Saratoga City Council conducted a public hearing this date with respect thereto, at which time all property owners having any objections to the proposed destruction or removal of such attest: RESOLVED, by the City Council of the City of Saratoga hazardous vegetation (brush) is declared a nuisance and will be abated by the Office of the Agricultural Commissioner and the cost thereof made a lien upon the private properties from which they are removed if the owners thereof fail to do so, and a hearing was held on June 2, 2010, during which all property owners having any objections to the proposed destruction or removal of such hazardous vegetation (brush) were heard and given due consideration; and NOW, THEREFORE, IT IS ORDERED by the City Council of the City of Saratoga, that hazardous vegetation (brush) is authorized to be abated by the Office of the Agricultural Commissioner and the cost thereof made a lien upon the private properties from which they are removed if the owners thereof fail to do so. The above and foregoing resolution was passed and adopted by the Saratoga City Council at a regular meeting held on the 2nd day of June 2010, by the following vote: AYES: NAYES: ABSTAIN: ABSENT: Kathleen M. King, Mayor ATTEST: Ann Sullivan, City Clerk 257 RESOLUTION NO. 10 — RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA OVERRULING OBJECTIONS AND ORDERING ABATEMENT OF HAZARDOUS VEGETATION (BRUSH) AS A PUBLIC NUISANCE WHEREAS, hazardous vegetation (brush) is declared a nuisance and will be abated by the Office of the Agricultural Commissioner and the cost thereof made a lien upon the private properties from which they are removed if the owners thereof fail to do so; and WHEREAS, the County Fire Marshall has given Notice to all property owners found in non - compliance; and WHEREAS, pursuant to said resolution and notice, the Saratoga City Council conducted a public hearing this date with respect thereto, at which time all property owners having any objections to the proposed destruction or removal of such attest; and RESOLVED, by the City Council of the City of Saratoga hazardous vegetation (brush) is declared a nuisance and will be abated by the Office of the Agricultural Commissioner and the cost thereof made a lien upon the private properties from which they are removed if the owners thereof fail to do so, and a hearing was held on June 2, 2010, during which all property owners having any objections to the proposed destruction or removal of such hazardous vegetation (brush) were heard and given due consideration; and NOW, THEREFORE, IT IS ORDERED by the City Council of the City of Saratoga, that hazardous vegetation (brush) is authorized to be abated by the Office of the Agricultural Commissioner and the cost thereof made a lien upon the private properties from which they are removed if the owners thereof fail to do so. The above and foregoing resolution was passed and adopted by the Saratoga City Council at a regular meeting held on the 2nd day of June 2010, by the following vote: AYES: NAPES: ABSTAIN: ABSENT: Kathleen M. King, Mayor ATTEST: Ann Sullivan, City Clerk 258 GLARA L,. �a FIRE LOVRTESY E SERME FIRE DEPARTMENT SANTA CLARA COUNTY 14700 Winchester Blvd., Los Gatos, CA 95032 -1818 (408) 378 -4010 - (408) 378 -9342 (fax) - www.sccfd org Dear property owner, �.m �nrcrnar, .:e� Internationally Accred,tej AQtnly Your property, which is located in the Wildland -Urban Interface Fire Area, was recently inspected by the Santa Clara County Fire Department. At that time your property was found to be non- compliant with Wildland Safety Regulations. Enclosed is a copy of the notice that was left at the residence and indicates the corrections that are necessary. Please note that a public hearing will be held during the City of Saratoga council meeting on June 2, 2010 at 7:00 PM. At that time, all properties identified by the Fire Department as being non - compliant with Wildland Safety Regulations will be declared to have hazardous conditions requiring abatement. An additional inspection of all identified properties will be conducted after the hearing and prior to ordering any abatement work. If your property is found to be in compliance at the time of the re- inspection or upon the arrival of the abatement contractor, no work will be done and no charges will be imposed. If you are interested in having the County of Santa Clara do any brush or weed removal or wish to have an inspection for a cost estimate, please contact the Hazardous Vegetation Department at (408) 282 -3145. For your convenience, a price list indicating the rates for the County Contractor is included with this notice. If you should have any questions about the information on this notice, please contact the Fire Prevention Division of the Santa Clara County Fire Department at (408) 378 -4010. ized as the Santa Clara Countu Central Fire Protection District Seruing Santa Clara County and the communities of Campbell, Cupertino, Los Altos. Los Altos Hills, Los Gatos, Mont 6T no, Morgan Hill, and Saratoga 2010 COUNTY CONTRACTOR'S. ABATEMENT PRICE LIST Prices INCLUDE a 150% County Administrative Fee A) Disc Work ** PARCEL SIZE: V Disc + 2 " Disc = Total Discs 0 - 12,500 sq.ft. $769.50 $76.95 $ 846.45 12,501sq.ft. - 43,560sq.ft. $769.50 $102.60 $87 2.10 Larger than 1 Acre $513.00 $102.60 $615.60 (Per Acre) ** It is required that parcels be disced twice a year. The cost for the first discing is higher due to additional work normally required during the first discing. B) HANDWORK Q FLAIL MOWING D) LOADER WORK E) DUMP TRUCK F) BRUSH WORK G) BOOM MOWING G) DUMP FEE 109.03 PE R PERSON, PER HOUR 6 Foot Mower $184.68 PER HOUR 12 Foot Mow er $369.35 PER 'HOUR $320.63 PER HOUR 320.63 PER HOUR $109.03 PER HOUR $423.23 PER HOUR 100 %P Added to orders with debris removal at 100 % of the dumpsite charge. *Please note -this program does not offer herbicide application as a method of abatement 260 NOTICE OF HEARING BEFORE THE CITY COUNCIL Notice is hereby given that the City Clerk of the City of Saratoga, California, has set Wednesday, the 2nd of June 2010 at 7:00 p.m. in the City Council Chambers at 13777 Fruitvale Avenue, Saratoga, California, as the time and place for a public hearing on: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA ORDERING THE ABATEMENT OF PUBLIC NUISANCE BY REMOVAL OF HAZARDOUS VEGETATION (BRUSH). All interested persons may appear and be heard at the above time and place. If you challenge the subject projects in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice in written correspondence delivered to the City Council at, or prior to, the public hearing. In order to be included in the City Council's information packet, written communications should be filed on or before the Thursday before the meeting. A copy of any material provided to the City Council on the above hearing(s) is on file at the Office of the Saratoga City Clerk at 13777 Fruitvale Avenue. Questions may be addressed to the City Clerk, 868 -1269. /s /Ann Sullivan, City Clerk PUB: 05/18/10 261 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 30 STG 100 STG 100 STG 100 STG 30 N N 2010 BRUSH PARCELS Work A- 30 ft J 100 ft Defensible Space APN TRA Request Situs B- Clear shrubs /trees of dead leaves & branches Owner Name Owner Address C- Remove pine needles & leaves from roofs etc. D- Trim tree limbs 10 ft from chimneys 503 -55 -018 15 A,C,D,F 14665 AMBRIC KNOLLS RD STG HORVATH DORIS A TRUSTEE 14665 AMBRIC KNOLLS RD SARATOGA CA 366 -06-042 15 A,B,D 21400 ARROWHEAD LN STG HAND MARY S ET AL 501 FOREST AV UNIT 409 PALO ALTO CA 517 -07-006 15 NO ACCESS 20860 BIG BASIN WY STG THOMPSON IRENE TRUSTEE 20860 BIG BASIN WY SARATOGA CA 366 -06 -022 15 NO ACCESS 21250 BLUE HILLS LN STG CHEN HUEY C TRUSTEE 21250 BLUE HILLS LN SARATOGA CA 517 -13-024 15 D 15007 BOHLMAN RD STG SAREEN SURYA AND INDU 15007 BOHLMAN RD SARATOGA CA 517 -14 -006 15 NO ACCESS 15331 BOHLMAN RD STG DEVA SHAILENDRA AND POONAM 15331 BOHLMAN RD SARATOGA CA 503 -178 15 A 21045 COMER DR STG GAUDREAU DANIEL AND NASRIN 20334 THELMA AV SARATOGA CA 397 -20 -006 15 C 14701 FARWELL AV STG MORAN THOMAS W AND DEAN 14701 FARWELL AV SARATOGA CA 503- 18-028 15 D 12909 FOOTHILL LN STG CHAMBERLIN LOUISE A TRUSTEE 800 BLOSSOM HILL RD APT L134 LOS GATOS CA 397 -10 -009 15 B 15288 FRUITVALE AV STG CHENG CHIEN -FENG KENNETH AND 15288 FRUITVALE AV SARATOGA CA 397 -20 -030 15 CD 14562 HORSESHOE DR STG BUTTAR JAGDEEP S AND HARPREET 14562 HORSESHOE DR SARATOGA CA 517 -07 -029 15 A,F 20878 JACKS RD STG ROESSLER RUSSELL TRUSTEE 20878 JACKS RD SARATOGA CA 366 -21 -015 15 A,B,C,E,F 21166 MARIA LN STG VLAHOPOULIOTIS BOB AND 21166 MARIA LN SARATOGA CA STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 30 STG 100 STG 100 STG 100 STG 30 N N 366 -07-008 15 NO ACCESS 22501 ROLLING HILLS RD STG AGRAWAL ANANT AND CARMEN C 22501 ROLLING HILLS RD SARATOGA CA 366-07 -009 15 DENIED 22505 ROLLING HILLS RD STG STEPHENSON- BRANDT LYNNE A 22505 ROLLING HILLS RD SARATOGA CA 366 -07 -006 15 NO ACCESS 22549 ROLLING HILLS RD STG MARSHALL STEVEN C AND RENEE D 22549 ROLLING HILLS RD SARATOGA CA STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 503-72 -019 15 A 2010 BRUSH PARCELS Work STG p ace trees APN TRA Request 14580 SARATOGA HEIGHTS CT B - Ci a sh bsf of dead leaves & branches Owner Name Own Owner Address C- Remove pine needles & leaves from roofs etc. 21225 SARATOGA HILLS RD D- Trim tree limbs 10 ft from chimneys 503 -72-007 15 A 14780 MASSON CT STG SZE ROBERT MEI AND MABEL KWONG 14780 MASSON CT SARATOGA CA 517 -13 -020 15 AE NO 15175 NORTON RD STG FOX BONNIE AND GREGORY T 15175 NORTON AV SARATOGA CA 503 -16 -023 15 BD 13270 PIERCE RD STG JAN CHIN -LANG AND JENNIFER 13270 PIERCE RD SARATOGA CA 366-06 -043 15 A 21351 PROSPECT RD STG ROYBAL PHILIP M AND JULIE A 21351 PROSPECT RD SARATOGA CA 366-06 -012 15 A 21555 PROSPECT RD STG KRISTOVICH NEDJELKO AND ANDREA 21555 PROSPECT RD SARATOGA CA 366 -31-002 15 A 22301 ROLLING HILLS RD STG CARLSON NANCY TRUSTEE 22301 ROLLING HILLS RD SARATOGA CA 366 -07-008 15 NO ACCESS 22501 ROLLING HILLS RD STG AGRAWAL ANANT AND CARMEN C 22501 ROLLING HILLS RD SARATOGA CA 366-07 -009 15 DENIED 22505 ROLLING HILLS RD STG STEPHENSON- BRANDT LYNNE A 22505 ROLLING HILLS RD SARATOGA CA 366 -07 -006 15 NO ACCESS 22549 ROLLING HILLS RD STG MARSHALL STEVEN C AND RENEE D 22549 ROLLING HILLS RD SARATOGA CA STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 STG 100 503-72 -019 15 A 14580 SARATOGA HEIGHTS CT STG STG 100 LI PING TRUSTEE & ET AL 14580 SARATOGA HEIGHTS CT SARATOGA CA 503 -29 -035 15 D 21225 SARATOGA HILLS RD STG STG 100 SEQUEIRA ALLWYN AND JENNIFER 21225 SARATOGA HILLS RD SARATOGA CA 503 -29 -116 15 A,B,C,D 21463 SARATOGA HILLS RD STG STG 100 JORDAN JERRY W AND JOAN M 21463 SARATOGA HILLS RD SARATOGA CA 503 -29 -117 15 AC 21485 SARATOGA HILLS RD STG STG 100 SCHEUERMANN W J II TRUSTEE & ET 21485 SARATOGA HILLS RD SARATOGA CA c� N 2010 BRUSH PARCELS Work A-30 ft 1100 ft Defensible Space APN TRA Request Situs B- Clear shrubs /trees of dead leaves & branches Owner Name Owner Address C- Remove pine needles & leaves from roofs etc. D- Trim tree Iimbs 10 ft from chimneys 517 - 14-045 15 A 20644 SIGAL DR STG STG 100 WHITING ELLIS E AND CLARA L 20640 SIGAL DR SARATOGA CA 517 -14 -046 15 AF 20645 SIGAL DR STG YAMAOKA NOREEN T TRUSTEE P.O. BOX 2879 SARATOGA CA 503 -27 -077 15 D,E 14391 SPRINGER AV STG SCHNEIDER SCOTT K AND NOLA ANN 14510 BIG BASIN WAY 9226 SARATOGA CA 503 -28 -074 15 A,F 15000 SPRINGER AV STG MILLER LORE J AND RONALD E 15000 SPRINGER AV SARATOGA CA 366 -50 -011 15 C 12720 STAR RIDGE CT STG KOENEN RICHARD A TRUSTEE & ET 12720 STAR RIDGE CT SARATOGA CA 503 -28 -139 15 AF 21154 SULLIVAN WY BAHL KENNETH S AND SWARAN B 14645 BIG BASIN WY SARATOGA CA 503 -75 -007 15 A 14900 VINTNER CT SHENG STEVE NIN -CHUN AND 14900 VINTNER CT SARATOGA CA STG 100 STG 100 STG 100 STG 100 STG STG 100 STG STG 100 503 -17 -031 15 A 21130 WARDELL RD STG GUICHARD MARGARET C TRUSTEE & 21130 WARDELL RD SARATOGA CA STG 100 N Vey Mucb Appreciated! Nancy R. White Owner - Magic Machining Inc 1120 West Evelyn Ave, Units B & C Sunnyvale, CA 94086 Phone: 408 730 -5330 Fax: 408 730 -5334 nanc�(a�magicmachininq.com - - - -- Original Message - - - -- From: Cit >. Clerk An Sullivan To' nancy Sent: Friday, May 21, 2010 8:54 AM Subject: RE: Code Enforcement -- Weed Abatement -- 30 acre parcel Dear Nancy — I will include your email correspondence with the City in the staff report for this item. I will also send you the link to the City website after I have posted the June 2 d agenda. Regards, Ann Sullivan From: nancy [mailto :nancy @magicmachining.com] Sent: Friday, May 21, 2010 8:32 AM To: City Clerk [Ann Sullivan] Subject: Re: Code Enforcement -- Weed Abatement -- 30 acre parcel Thank You Ann for the update. Very much appreaated! I am familiar w'tb the noticing process wbicb both the City & County are required by law to follow in ibis regard. I worked for GreenbeltAlliance in my other life. I do not understand Darby the property was ignored tbese pastyears. However, I can assureyou, it's now choked witb more vegetation. This is a source of concern for the residents along Via Regina Road as I understand. I would like the information & email discussions I've bad between Jana, yourself, & I, to be included as part of the public record and be included in the Councils packets for consideration wben ibis item comes to them on June 2nd.- Contact numbers, email /websites, names of sources for the purpose ofgra -ing the property for weedlfire abatement -- Steven's Creek Volunteer Fire Department ' to schedule a training exercise to brush fire lines along the property lines & riparian corridor? -- so it' on band and I do not bare to remake the wbeel, so to speak. Additionally, is itpossible to go on line to previewlprint out the agenda, prior to June 2? I would like to see wbat order the brusb abatementprogram mill be in, so I can adjust my schedule & rally the troops. Canyon also provide we witb the address of wbereyour City Council meeting is to be beld? Best regards, Nancy R. White Owner - Magic Machining Inc 1120 West Evelyn Ave, Units B & C Sunnyvale, CA 94086 265 Phone: 408 730 -5330 Fax: 408 730 -5334 nancy@magicmachining.com - - - -- Original Message - - - -- From: City,'Clerk Ann Sullivan To: Jana Rinaldi ; nanc Sent: Thursday, May 20, 2010 4:51 PM Subject: RE: Code Enforcement -- Weed Abatement -- 30 acre parcel Nancy — My apologies to you, Nancy. I wasn't aware that you were waiting to hear from me, as our Code Compliance Specialist, Jana Rinaldi, conveyed to you via this email that I had contacted the Santa Clara County Agricultural Department and they confirmed that this property was on their list for inspection; therefore, alerting you that the County has this property on their list of properties to be inspected. The City annually declares hazardous vegetation (brush) a nuisance due to fire danger and enters into a contract (along with other municipalities) with the Office of the Agricultural Commissioner to abate the hazardous vegetation (brush) not removed by property owners by a specific deadline. There are a number of steps that take place prior to the scheduling of this public hearing regarading this phase of the process, such as notification to the property owners from the County regarding hazardous conditions on the property, etc. You are welcome to attend the June 2, 2010 Council meeting where this item — the annual Brush Abatement Program Public Hearing, has been agendized for discussion and action by the Council. The County Agriculture Brush Abatement Program Coordinator will be present at that meeting to address the Council on this item and members of the public are welcome and encouraged to speak on any item on the agenda as well. I hope this helps clarify some of the steps and alleviates your concerns. I assure you that both the City and the County work closely with regard to any type of hazardous vegetation /brush on any property in Saratoga. I look forward to maybe meeting you at that meeting. The meeting starts at 7PM. Regards, Ann Sullivan, CIVIC City Clerk From: Jana Rinaldi Sent: Thursday, May 20, 2010 12:30 PM To: 'nancy' Cc: City Clerk [Ann Sullivan] Subject: RE: Code Enforcement -- Weed Abatement -- 30 acre parcel 266 Hi Nancy, I will talk with Ann and find out if she has had any feedback from County Fire. Thank you. Jana Rinaldi, Code Compliance Specialist City of Saratoga 13777 Fruitvale Avenue, Saratoga jrinaldi 4saratog_ a. ca. us 408.868.1214 CONFIDENTIALITY NOTICE The information contained in this e -mail message is privileged, confidential, and protected from disclosure. If you are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you have received this e -mail message in error, please e -mail the sender at irinaldi4saratoga.ca.us or telephone (408) 868 -1214. Please consider the environment before printing this e-mail or attachments. From: nancy [mailto :nancy @magicmachining.com] Sent: Thursday, May 20, 2010 11:32 AM To: Jana Rinaldi Subject: Re: Code Enforcement -- Weed Abatement -- 30 acre parcel Hi Jana, Your city clerk bas not been in contact witb we and I liked to bearfrom ber...Lastyear, notbing happen after I notified the City &Santa Clara C. Fire ... Tbat's notgoing to bappen a gain .... I'll be bird - dogging tbis for the follow tbrougb... Nancy R. White Owner - Magic Machining Inc 1120 West Evelyn Ave, Units B & C Sunnyvale, CA 94086 Phone: 408 730 -5330 Fax: 408 730 -5334 nancy@rnac icmachininc .com - - - -- Original Message - - - -- From: Jana Rinaldi To. nanc Sent: Thursday, May 20, 2010 9:07 AM Subject: RE: Code Enforcement -- Weed Abatement -- 30 acre parcel 267 Hi Nancy, I have forwarded your email to our City Clerk. Thank you for your time and efforts. Jana Rinaldi, Code Compliance Specialist City of Saratoga 13777 Fruitvale Avenue, Saratoga irinaldi4sarato a. ca. us 408.868.1214 CONFIDENTIALITY NOTICE The information contained in this e -mail message is privileged, confidential, and protected from disclosure. If you are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you have received this e -mail message in error, please e -mail the sender at irinaldi(a�saratoga.ca.us or telephone (408) 868 -1214. Please consider the environment before printing this e-mail or attachments. From: nancy [mailto :nancy @magicmachining.com] Sent: Thursday, May 20, 2010 8:55 AM To: Jana Rinaldi Subject: Re: Code Enforement -- Weed Abatement -- 30 acre parcel Hi Jana, This note is to follow up on the phone message I left on your voice mail. Stevens Creek Volunteer Fire Department. PO Box 2673 Cupertino - 93093 -- www.scvfd o d -- email - fire scdo -- tbey are stationed out of the Cal -Fire station on Stevens Creek Canyon Road, next to the dam. I spoke ' Andrew can't remember his last name, who schedules trainings for [be unit. Tbey're Captain, knew [be location of [be property and [be Peck's, wbo sold it. They are more [ban willing to come out and band brushing for fire abatement, along my paddock fence lines .... I asked if [bey would do a control burn, butgot [be impression [bat may not be in [beir "wbeel bouse ...... Andrew seemed very open to being able to come onto theproperty for thispurpose. ... Igot [be impression [bat ibis would be a ' free -be" too .... so, if [be property owner does not respond to [be notice and [be City, or County needs to step in, ibis maybe a very cost-effective solution.... Regards, Nancy R. White Owner - Magic Machining Inc .: 1120 West Evelyn Ave, Units B & C Sunnyvale, CA 94086 Phone: 408 730 -5330 Fax: 408 730 -5334 nancy@_maqicmachining.com - - - -- Original Message - - - -- From: Jana Rinaldi To. nanc Sent: Friday, May 07, 2010 3:29 PM Subject: RE: Code Enforement -- Weed Abatement -- 30 acre parcel Hi, please tell Patrick hello from me! Jana Rinaldi, Code Compliance Specialist City of Saratoga 13777 Fruitvale Avenue, Saratoga _7rinaldi �sarato�a. ca. us 408.868.1214 CONFIDENTIALITY NOTICE The information contained in this e -mail message is privileged, confidential, and protected from disclosure. If you are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you have received this e -mail message in error, please e -mail the sender at irinaldi(c�jsaratoga.ca.us or telephone (408) 868 -1214. Please consider the environment before printing this e-mail or attachments. From: nancy [mailto :nancy @magicmachining.com] Sent: Friday, May 07, 2010 3:27 PM To: Jana Rinaldi Subject: Re: Code Enforement -- Weed Abatement -- 30 acre parcel Hi Jana! Scorel...1 justgot a call back from Mike McClintock, Park SupervisorforAlum Bock Park. His direct line is 408 277- 3267 .... Tbey usegoats & sbeep for weed /fire abatement ... Tbey contract out to 'Living Systems Land Management" -- �ar�a w.LSLM. om ... Contact name is Cbarlotte Lena is 413 843 -6747. Living Systems Land Management work w1b agenglpnvale interest, for botb sbort & long term range management. ... [by wllfence theproperty witbportable electric fencing -- then remove it wben the land isgrazed 269 down. [bey will allow for trail users needs, bring a herd witb a herder wbo lives on sight, in a trailer, and us dogs for berd control &preaictor needs ...[bey need a water source for bo[b [be animals & berdsman ... I believe [bere is an old water trougb on [be nortb rarest corner, bebind [begate I mentioned... He ' it cost 9 7K for [be 20+ acres Alum Bock Park basgra .Zed... but it's cbeaper [ban a wild land fire... Who will put up the out ofpocket cost if the land owners do not comply, is the key. ... He also suggested contacting Santa Clara County Open space Autbority. The contact name [bere is Patrick Congdon ... I will follow up on Monday witb bim ... I worked at GreenbeltAlliance in my otber life ... ibis is familiar territog for me... I �arill also ask fan Garrod, if be knows the cost of having the propery aisks, for a comparison price...I know be could do this work too... dzsking would really disrupt the wild life habitat tbougb ... and not sure boar it would effect [be slide area. I know tbeproperty bas been aisked before... about 90 -92yrs back... but it was mostly in strips, likefire breaks ...along the creek, down the middle, and a couple strips on [be rarest ridge line ... like a set back .... [by didn't disk up near [be property lines on [be east side... Have a fun weekend! Nancy R. White Owner - Magic Machining Inc 1120 West Evelyn Ave, Units B & C Sunnyvale, CA 94086 Phone: 408 730 -5330 Hi Nancy, It was nice talking with you and hearing about Saratoga history! Ann did hear back from County of Ag and they believe the property is in their jurisdiction. Our contact did say the property has not been inspected to date, but should take place in the next couple of days. I will keep you posted if I hear anymore. Also, let me know what you find out. Thank you. Jana Rinaldi, Code Compliance Specialist City of Saratoga 13777 Fruitvale Avenue, Saratoga 7rinaldiAsarato�. us 408.868.1214 CONFIDENTIALITY NOTICE The information contained in this e -mail message is privileged, confidential, and protected from disclosure. If you 270 are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you have received this e -mail message in error, please e -mail the sender at 'rl inaldi(c�saratoga.ca.us or telephone (408) 868 -1214. Please consider the environment before printing this e-mail or attachments. From: nancy [mailto :nancy @magicmachining.com] Sent: Thursday, May 06, 2010 3:14 PM To: Jana Rinaldi Subject: Re: Code Enforement -- Weed Abatement -- 30 acre parcel Tanks for calling Jana....I take a little drive to wbere I believe is Ibe entrance to Ibis parcel... cbeck out if there are any for sale signs, and cbeck out wbo is listing tbis....I also have a friend �a bo is a realtor...I ask her to check to BO, or short sale listings that she is privy too, to see if any thing matcbing ibis sbow up...Likeyou said,...30 acres, it's probaby 29 +, is rare in Saratoga ... I find out and keep you in [be loop... Haven't seen anytbing from Anne Sullivan.... send it wben you can... Nancy R. White Owner - Magic Machining Inc 1120 West Evelyn Ave, Units B & C Sunnyvale, CA 94086 Phone: 408 730 -5330 Fax: 408 730 -5334 nanc (c�magicmachininq.com - - - -- Original Message - - - -- From: Jana Rinaldi To: nanc Sent: Thursday, May 06, 2010 2:41 PM Subject: FW: Code Enforement -- Weed Abatement -- 30 acre parcel 4a C<Rm1 Jana Rinaldi, Code Compliance Specialist City of Saratoga 13777 Fruitvale Avenue, Saratoga jrinaldi(a saratoga. ca. us 408.868.1214 CONFIDENTIALITY NOTICE The information contained in this e -mail message is privileged, confidential, and protected from disclosure. If you 271 are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you have received this e -mail message in error, please e -mail the sender at 'rl inaldi(c�saratoga.ca.us or telephone (408) 868 -1214. Please consider the environment before printing this e-mail or attachments. From: City Clerk [Ann Sullivan] Sent: Thursday, May 06, 2010 2:40 PM To: 'Julie Linney (julie.linney @cnt.sccgov.org)'; 'Kumre, Moe' Cc: Jana Rinaldi Subject: FW: Code Enforement -- Weed Abatement -- 30 acre parcel Hello Julie — Moe: Please note the message towards the bottom of this chain of emails and let me know if the County or County Ag is aware of this property and if the property owner /s have been notified. We have a Brush Abatement Program Public Hearing scheduled for Wednesday, June 2 nd Thanks. Ann Sullivan City Clerk From: Jana Rinaldi Sent: Thursday, May 06, 2010 1:56 PM To: City Clerk [Ann Sullivan] Subject: FW: Code Enforement -- Weed Abatement -- 30 acre parcel Please see below. 101a C Jana Rinaldi, Code Compliance Specialist City of Saratoga 13777 Fruitvale Avenue, Saratoga _7rinaldi �sarato�a. ca. us 408.868.1214 CONFIDENTIALITY NOTICE The information contained in this e -mail message is privileged, confidential, and protected from disclosure. If you 272 are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you have received this e -mail message in error, please e -mail the sender at 'rl inaldi(c�saratoga.ca.us or telephone (408) 868 -1214. Please consider the environment before printing this e-mail or attachments. From: nancy [mailto :nancy @magicmachining.com] Sent: Thursday, May 06, 2010 1:40 PM To: Jana Rinaldi Subject: Re: Code Enforement -- Weed Abatement -- 30 acre parcel Hi , jana, It's undeveloped land ..as far as I know, tbere is not a street address ...tbe fire department was able to located it on their maps...[be development never bappened...it's allpart of the public record & on aparcel map ... tbeplanning department bas it...Please do the leg work on the address /parcel number, it right there in your o�ce... it maybe Iz�sted on Mount Eden road... I'm working on getting contacts forgra�ing herds, as a low impact solution for the weed/ fire abatement issue...I bare calls into the president of the farm bureau, Alum Bock park wbo uses sbeep 'goats for ibis purpose... Let's sbare... Nancy R. White Owner - Magic Machining Inc 1120 West Evelyn Ave, Units B & C Sunnyvale, CA 94086 Phone: 408 730 -5330 Hi Nancy, the first thing I need is the address — after I get the address I will follow up with the Fire District. The Fire District is contracted for the weed abatement. Thank you. Jana Rinaldi, Code Compliance Specialist 273 City of Saratoga 13777 Fruitvale Avenue, Saratoga jrinaldi 4saratog_ a. ca. us 408.868.1214 CONFIDENTIALITY NOTICE The information contained in this e -mail message is privileged, confidential, and protected from disclosure. If you are not the intended recipient, any dissemination, distribution, or copying is strictly prohibited. If you have received this e -mail message in error, please e -mail the sender at j rinaldl(q&S rato„ ca.0 or telephone (408) 868 -1214. Please consider the environment before printing this e-mail or attachments. From: nancy [mailto :nancy @magicmachining.com] Sent: Thursday, May 06, 2010 11:41 AM To: Jana Rinaldi Cc: Debbie Bretschneider Subject: Code Enforement -- Weed Abatement -- 30 acre parcel Hello Jana, I'm sendzngyou a follow up email, to the voice main left today. I board borses on Via Regina Road.... Mere is a 30 acre parcel, [be old Peck property, sandwicbed between [be following roads: Via Regina, Vista Begina, Mt. Eden, and [be below [be entrance to [be Cacardi Estates neigbborbood. Tbis property was once aggie... ruit orchards, & bay fields...I'm 36 &grew up in ibis area ...It also bas a seasonal creek wbicb flora s into Calabasas creek, & riparian corridor, �a bicb splits thepropery, roughly in half, wbicb is clogged wi[b tree debris... bay laurel, euca�ptus, oak.... Tbis property, from my understanding, was to be developed witb roughly with 7 -9 executive home on the �a est side, below the ridge line, wi[b a trail & designatedprivate open space, on [be eastportion ... [be eastportion of [beproperty bas been deemed a active slide area, wbicb prevented the developer from locating bousing...I've followed tbis pr iect at it beginningpbases... xzgb[ now, over 9 years, no[bing bas happen as far as the development is concern....Ho�a ever, the property bas been neglected and is a fire bazard...My son, wbo works for Cal -fire, said it's a tinder box, �a itbplenty of fuel to set it off ..I contacted Santa Clara County Fire department lastyear... notbing was done... Tbisyear, I'd like an off notice sent to the propery owner on record by the City of Saratoga, to disk [be vegetation under, deal wi[b [be creek, and clear [be weeds [bat are encroacbing onto [be neigbboring fence lines. The mustard & [bistles are easily 8 feet tall along [be fence line wbere I'm located... I know, [beproperty owner can be noticed and asked to comply ..if not, [be City bas [be autbority to contract out [be work, bill, orput a lien on [be property as a last resort ..Even, contracting wi[b some one wbo can gravegoa[s, sbeep, or cattle on [be property wouldget ibis situation under control ... V orst case scenario ... a catastropbic Wild land fire, like 274 Oakland Hills, tbatfunnels up into the surroundingproperties & homes ... tbependingfingerpointing ...charges of whose lack of fore -sigbt & responsibility it Maras... bere come the law suits... Pleasegive we a call ..so we can come up witb a solution ibis issue.... Nancy B. V bite Owner - Magic Machining Inc 9 920 Vest Evelyn Ave, Units B & C Sunnyvale, CA 94086 Pbone: 408 730 -3330 Fax. 408 730 -3334 nan�agicmachg. com 275 rt =: +� . . . , . C CITY ;i. MEETING DATE: June 2, 2010 DEPARTMENT: Community Development PREPARED BY: Cynthia McCormick, AICP AGENDAITEM: CITY MANAGER: Dave Anderson DIRECTOR: John Livingstone, AICP SUBJECT: Initiation of Annexation of an approximately 2.68 (gross) acres parcel (APN 503 -80 -004) located at 22480 Mount Eden Road. Subsequent annexation proceedings will consider a pre- annexation agreement, lot merger, Williamson Act agreement, zoning amendment (AP -OS overlay), and a use permit with variation from standards for the owner's adjacent 35 acre parcel. RECOMMENDED ACTION: Staff recommends the City Council approve the attached Resolution thereby initiating annexation proceedings for 22480 Mount Eden Road. REPORT SUMMARY: The applicant, GP Farms (c /o Jack Bauer, property manager) has filed an application with the City of Saratoga for annexation approval. The parcel is located in Santa Clara County and is approximately 2.68 gross (1.55 net) acres. The property (hereinafter referred to as `the annexation parcel') is contiguous with the western limits of the City of Saratoga and is within the City's Sphere of Influence and Urban Service Boundary. The applicant owns an adjacent parcel of land approximately 35 acres in size that is within the City of Saratoga. (See attachment 3.) The annexation is being proposed to facilitate comprehensive planning for the two parcels together. Prior to the City's final action on the annexation the applicant has proposed that the City consider a series of proposed actions related to the two parcels. These actions would include a preannexation agreement, a merger of the two parcels, adoption of an Agricultural Preserve /Open Space Zoning Overlay, and approval of a Williamson Act contract for agricultural land preservation, a conditional use permit and variation from standards for the merged parcels, and design review for a remodel of the existing home on the 35 acre parcel. These applications would be considered by the Planning Commission prior to the City Council's final consideration of the annexation proposal. The remainder of this report provides background information on the annexation parcel and the parcel already within City limits and then describes the various actions that would be considered during the annexation review process. DISCUSSION: 276 Annexation Parcel The 2.68 acre annexation parcel is currently developed with a driveway and a sand equestrian arena which is surrounded by an approximately five foot (5') high open wood fence. The parcel has public water (San Jose Water) and sanitary sewer service (Cupertino Sanitary District). The annexation parcel is not directly adjacent to Mt. Eden Road but is accessed via a private road that is connected to Mt. Eden Road. The private road is shared among five (5) parcels including the annexation parcel. No structures are proposed for the 2.68 acre parcel and the applicant would reduce the development potential of the lot by merging the lot with the adjacent parcel as described below. Under City of Saratoga standards the development potential of the annexation parcel if not merged is approximately 6,560 square feet of floor area (based on size of 1.55 acre net with 24% average slope). If the parcel is not annexed, Santa Clara County development standards would apply; the applicable County RHS zoning district allows a maximum height of 35 -feet and 3- stories, with setbacks of 30 feet in the front, 25 feet in the back, and 20 feet on the sides. Adjacent Parcel The applicant owns a parcel adjacent to the annexation parcel known as "Lindy Farms." The adjacent parcel is 35.13 acres and was annexed to the City in 2006. Access to this parcel is from an easement across the 2.68 annexation parcel and three other County parcels. The parcel contains a residence, accessory structures, and community stable facilities that existed at the time it was annexed to the City. The main structures include the 5,330 square foot two -story single - family residence with basement, 1,121 square foot detached four -car garage, and 895 square foot detached pool house. The community stable structures include a 13,068 square foot Stable, 791 square foot Workshop, 4,150 square foot Hay Barn, 3,308 square foot Utility Barn, and a 1,492 square foot apartment above the utility barn. The total existing floor area including all living spaces, accessory structures, and community facility structures (enclosed by three or more walls and a roof) is 30,155 square feet. (The foregoing square footage calculations reflect the City Code requirement that any space with an interior height of fifteen feet or greater is double counted'. The stable, hay barn, and utility barn all have ceiling heights over 15 feet. The calculations are summarized in the attached table (attachment 5).) The total existing impervious area is 103,450 square feet. The applicant has provided County permits for the existing stable, accessory structures, and apartment. The applicant has indicated that the existing house was built prior to the need for County permits. While the existing structures appear to have been built legally in the County (either with permits or prior to the need for permits), the total floor area and site coverage exceeds the maximum allowed for new development in the City of Saratoga. Trail Easement A dedicated trail easement through both the annexation parcel and the adjacent 35.13 acre parcel was recorded in the Santa Clara County Recorder's Office on July 16, 2007 (Attachment 4). Pre - Annexation Agreement ' City Code Section 15- 45.030 277 Because of the various actions contemplated in connection with the annexation, staff and the applicant believe that pre- annexation agreement will be valuable to facilitate rational comprehensive planning and foster predictability, certainty, economy and efficiency in future land use planning. The pre- annexation agreement will include requirements for the proposed annexation, lot merger, overlay zoning, Williamson Act contract, conditional use permit and variation from standards, and design review /building permit. Parcel Merger The applicant proposes to merge the annexation parcel with the Lindy Farms parcel. The merger will make the two lots into a single lot. This will extinguish the development potential of the annexation parcel for a separate single family home. The merger would take effect upon completion of the annexation. Williamson Act Contract The applicant would also include the entire merged property under a Williamson Act contract. This would require rescinding the existing Williamson Act city contract on the 35.13 acre parcel and simultaneously re- entering a Williamson Act contract for the entire merged property. The Williamson Act contract would include the stables and all other existing uses. The Williamson Act contract would be considered by the Council as part of the final annexation. Agricultural Preserve /Open Space Overlay (AP -OS) The entire merged property would be made subject to the Agricultural Preserve /Open Space Overlay zoning. The AP -OS overlay promotes agricultural uses and is necessary to satisfy legal requirements for land on which Williamson Act contracts are executed and renewed. The overlay zone thereby encourages and preserves such contracts in accordance with the policies set forth in the General Plan. Accordingly, staff will process a Zoning Map amendment application to be made by the applicant for Planning Commission and Council consideration with the annexation approval. Conditional Uses and Variation from Standards City Code Section 15- 13.040 allows community stables and associated accessory structures in the Hillside Residential zoning district with a Conditional Use Permit. City Code Section 15- 55.030 allows a variation from site area standards for conditional uses. Under this provision, policy has been to include floor area in the site area variation. As part of the annexation process the applicant is requesting a conditional use permit and variation from standards in order to bring the uses on the site into conformity with City requirements. This will be considered by the Planning Commission as part of its review of the annexation and any Planning Commission action will be contingent on the City Council's final approval of the annexation. The applicant intends to remodel the existing 5,330 square foot home as shown on the attached plans (Attachment 6). The applicant would add 3,236 square feet of floor area to the first story (including those areas that are double counted due to ceiling height) and reduce the second story by 379 square feet. The new home would be 7,207 square feet with a new 1,682 square foot 278 basement that is excluded from the floor area maximum allowance (which is 8,000 square feet in the HR zoning district). No changes are proposed for the garage or any of the other structures on the property. The remodel would require design review approval by the Planning Commission. Annexation Procedures The Cortese - Knox - Hertzberg Local Government Reorganization Act of 2000 (the Act) provides that cities in Santa Clara County may proceed independently of LAFCO in processing annexation applications within the City's Urban Service Area (Government Code Section 56757). Where, as here, an annexation applies only to land owned by the person requesting annexation, the City is allowed to initiate annexation proceedings without a formal public hearing. The Act requires that cities follow the procedures used by LAFCO to the extent practicable. The Act establishes a three -part process for annexations: (1) Initiation of Annexation; (2) Protest Proceedings which may be waived by the City Council; and (3) Approval of Annexation. Furthermore, the City Council is required to make findings pursuant to Government Code Section 56757 prior to adopting the resolution approving the annexation. After the resolution is adopted, a certified copy of the resolution and paperwork is submitted to LAFCO. The Act and other state laws require the preparation of a number of documents as part of the annexation process. These documents fall into three categories: a service plan, LAFCO materials, and the California Environmental Quality Act (CEQA) materials. These are described below: Service Plan All annexations are to begin with a proposed service plan for the area to be annexed. This plan includes a description of the parcel to be annexed; the reasons for the proposal; and a listing and description including the level, range, any change to, and financing of services to be provided to the annexed parcel (see attachment 2). The service plan should also include an indication of any improvement or upgrading of structures, roads, sewer or water facilities, or other conditions that the City would impose or require on the annexed lands. No inhabited territory will be annexed as part of this proposal and all services will be consistent with the current conditions. LAFCO Materials — Cities in Santa Clara County proceeding independently of LAFCO are required to make the findings listed below before approving an annexation. The formal findings need not be made until the end of the process. Each finding is followed by a brief description of Staff's review. • That the unincorporated territory is within the urban service area of the city as adopted by Commission. Staff had confirmed that the property to be annexed is within the City's Urban Service Area. • That the County Surveyor has determined the boundaries of the proposal to be definite and certain, and in compliance with LAFCO's road annexation policies. The City will be providing a map prepared by the applicant to the County Surveyor once initiation of annexation has been approved by the City Council. 279 • That the proposal does not split lines of assessment or ownership. Staff has determined that the property to be annexed does not split lines of assessment or ownership. • That the proposal does not create islands or areas in which it would be difficult to provide municipal services. Staff has reviewed the geography of the proposed annexation and concluded that it would not create an island or present difficulties in providing municipal services since the majority of the services will remain unchanged. • That the proposal is consistent with the adopted General Plan of the City. The land use designation for the annexation parcel is RHC (Residential Hillside Conservation). The land has been pre -zoned HR (Hillside Residential) which is consistent with the General Plan Designation and the surrounding zoning. The General Plan provides that lands in the hillsides should be considered for annexation if they meet the following Policy: Policy LU 14 — Land shall not be annexed to Saratoga unless it is contiguous to the existing city limits, within the Sphere of Influence, and it is determined by the city that public services can be provided without unreasonable cost to the City and dilution of services to existing residents. As discussed throughout this document, the annexation parcel is contiguous to the existing city limits, is within the Sphere of Influence, and has existing public services that would not unreasonably change the cost to the City or dilute services to existing residents. California Environmental Quality Act Annexations such as this one are categorically exempt from the California Environmental Quality Act (CEQA) pursuant to the Guidelines for Implementation of CEQA (14 Cal Code §15319). The Category 19 Exemption includes annexations of individual small parcels of the minimum size for facilities exempted by Section 15303 which exempts up to three single- family residences. CEQA applies only to projects which have the potential of causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. This annexation would not have the potential to cause a significant effect on the environment because the area contains existing public utilities. FISCAL IMPACTS: No impact. The applicant is responsible for all City review fees and LAFCO processing fees. CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: Future development of the annexation parcel would be subject to requirements of Santa Clara County in lieu of City of Saratoga development standards. ALTERNATIVE ACTION: Deny the proposed resolution initiating annexation and provide Staff with direction. FOLLOW UP ACTION: :1 At the direction of Council, Staff will proceed with the annexation approval procedure. The proposal for the addition, conditional use permit, and variation from standards will require Planning Commission review and approval. The zoning amendment, Williamson Act, Pre - Annexation Agreement, and final annexation approval will require final approval by the City Council at a future meeting. ADVERTISING, NOTICING AND PUBLIC CONTACT: This item was posted as a City Council agenda item and was included in the packet made available on the City's web site in advance of the meeting. A copy of the agenda packet is also made available at the Saratoga Branch Library each Monday in advance of the Council meeting and residents may subscribe to the agenda on -line by opting in at www.saratoga.ca.us. Noticing is not required. ATTACHMENTS: 1. Resolution approving Initiation of the Annexation 2. List of Services Report 3. Proposed Lot Merger and Annexation Map 4. Trail Easement Map 5. Floor Area and Lot Coverage Table 6. Proposed Plans for addition to existing home (separate attachment) 281 IN0kT1]RNY[1IM11a A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA INITIATING ANNEXATION OF A PROPERTY LOCATED AT 22480 MT. EDEN RD. WHEREAS, the City Council is considering the annexation of an approximately 2.68 acre property, hereinafter referred to as `the territory', APN 503 -80 -004, contiguous to the City of Saratoga; and WHEREAS, as provided in Government Code Section 56757, the City Council of the City of Saratoga is the conducting authority for the annexation; and WHEREAS, the territory to be annexed at 22480 Mt. Eden Rd. is in the City of Saratoga's Urban Service Area and Sphere of Influence and is prezoned as Hillside Residential [HR]; and WHEREAS, the territory is considered uninhabited for the purposes of annexation proceedings and there is one hundred percent (100 %) owner consent for the annexation proceedings, no notice, public hearing or election will be required for annexation approval by the City; and WHEREAS, the annexation will be evaluated concurrently with consideration of a pre- annexation agreement, lot merger, Williamson Act agreement, zoning amendment (AP -OS overlay), and a proposed use permit and variation from standards for the owner's adjacent 35 acre parcel. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Saratoga hereby initiates annexation proceedings and will consider annexation of the territory to the City known as Assessor's Parcel Number 503 -09 -004 located at 22480 Mt. Eden Rd. at a meeting to be scheduled to approve the annexation. The above Resolution was passed and adopted at a regular meeting of the City Council of the City of Saratoga held on the 2nd day of June 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: Kathleen King, Mayor Ann Sullivan, City Clerk Date y, Application #ANX09 -0002 — South Thunder, LLC: 22480 Mt. Eden Road List of Services Report Districts Saratoga Union Elementary School NO CHANGE TO DISTRICTS Los Gatos Union High School West Valley Community College Saratoga Madronia Cemetery Guadalupe — Coyote Resource Conservation Bay Area Air Quality Management Mid - Peninsula Regional Open Space Cupertino Sanitary Santa Clara Valley County Water Santa Clara County Zone NC -1 County Water Santa Clara County Importation Water - Miscellaneous Central Fire Protection Area No. 01 Library Benefit Assessment County Service Area No. 01 Library Services County Services Santa Clara County Vector Control San Jose Water Services Street Sweep Santa Clara County provides no regular street sweeping. NO CHANGE The City of Saratoga has a contract with Recology Southbay (Los Altos Garbage) to sweep residential streets once a month. Law Enforcement The City of Saratoga has a contract with the Santa Clara INCREASE IN SERVICE County Sheriffs Department that provides two patrol cars to the City. The County has only one car for this area and it also has to respond to the Los Gatos Mountains. Santa Clara Valley Transportation Authority NO CHANGE 283 - — 191111 - - ,5 yy �� I�bl'9p U7 i S S� g as at� ,4�ia pki§ r I"1 t r f fo" 1 I �" � + ``i 145. > }F,r� ` I 1 ; ow Ir 4 'yt ,� "�biC41'F�, 9i s { � IW �7r�t�i�Tp 41. v 4`. i H . y a���� s��f 41 l'�., - � ' �'� ���'., �i� = 51�� • I h I A ♦ ok 7 IV I 1 I 'i 1 • %; 0q, t Cl 4p T Am -I V� INFL-F �. 0 I TT bbl- r � FLOOR AREA Structures Existing Proposed Change Final House 1st Floor 2,945 2,256 5,201 2nd Floor 2,385 -379 2,006 15' height calculation 0 980 980 Garage 1,1211 0 1,121 FARI 6,451 1 2,857 9,308 Basement Stable 1 2841 1 8,4481 1,682 01 1,966 8,448 15' height calculation 1 4,620 FARI Hay Barn 13,068 1 2,0751 1 01 01 13,068 2,075 15' height calculation 1 2,075 FARI Utility Barn 4,150 2,4001 1 01 01 4,150 2,400 2nd Floor apartment 1,4921 01 1,492 15' height calculation 908 FAR Pool House 4,800 1 8951 1 01 01 4,800 895 FARI Work Shop 895 1 7911 1 01 01 895 791 FARI TOTALFARI 791 1 30,166 01 2,867 791 33,012 01990 Impervious Coverage Structures Existing Proposed Change Final Driveway (small parcel) 4,832 0 4,832 Driveway (large parcel) Parking at House 34,093 1,248 0 01 34,093 1,248 Parking at Barn Rubber Pavers 1 1,7101 1 4,6201 01 01 1,710 4,620 Deck at backyard 1 5251 01 525 Deck at house Patios and Paths 1 980 1 10,418 -591 -2,569 921 7,849 Pool 1 8001 01 800 Porch Buildings 1 2661 3721 638 House (1st Floor) 2,945 2,256 5,201 House (Garage) 1,121 0 1,121 Stable 8,448 0 8,448 Hay Barn 2,075 0 2,075 Utility Barn 2,400 0 2,400 Pool House 895 0 895 Work Shop 791 0 791 Arena roof overhang 23,586 0 23,586 Loafing Sheds: North Shed 300 0 300 Hay Barn Shed 405 0 405 Upper Shed 1 3721 01 372 Lower Shed L IMPERVIOUS COVERAGE 1 6201 103,460 01 0 620 103,460 .0628% PDF created with pdfFactory Pro trial version www.pdi Agry.com