Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
104-ATTACHMENT C - Library Overhang Construction Bid Summary.pdf
Attachment B Saratoga Library Book Drop Glare and Weather Protection Project Bid Summary CRW Industries Premier West Comfort Construction General Conditions $ 5,726.00 $ 7,857.00 $ 22,772.75 Sitework and Demolition $ 7,800.00 $ 5,705.00 $ 10,900.00 Concrete $ 4,500.00 $ 7,367.00 $ 14,950.00 Masonry $ -$ -$ -Metals $ -$ -$ 1,500.00 Wood and Plastic $ 10,660.00 $ 8,200.00 $ 14,250.00 Thermal and Moisture protection $ 10,500.00 $ 5,710.00 $ 10,690.00 Doors and Windows $ -$ -$ -Painting and Finishes $ 1,500.00 $ 1,710.00 $ 1,650.00 Equipment $ -$ -$ -Furnishings (planters) $ 2,500.00 $ 1,000.00 $ 1,000.00 Fire alarms and Sprinklers $ 3,500.00 $ 2,565.00 $ 4,440.00 Conveying Systems $ -$ -$ -Mechanical and Plumbing $ 6 00.00 $ 3 20.00 $ 2,380.00 Electrical and Lights $ 2,500.00 $ 1,365.00 $ 3,305.00 TOTAL $ 49,786.00 $ 41,799.00 $ 87,837.75