Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
104-Attachment C ? Bid summary.pdf
Attachment B Saratoga Library Book Drop Glare and Weather Protection Project Bid Summary CRW Industries Premier West Comfort Construction General Conditions 5,726.00$ 7,857.00$ 22,772.75$ Sitework and Demolition 7,800.00$ 5,705.00$ 10,900.00$ Concrete 4,500.00$ 7,367.00$ 14,950.00$ Masonry -$ -$ -$ Metals -$ -$ 1,500.00$ Wood and Plastic 10,660.00$ 8,200.00$ 14,250.00$ Thermal and Moisture protection 10,500.00$ 5,710.00$ 10,690.00$ Doors and Windows -$ -$ -$ Painting and Finishes 1,500.00$ 1,710.00$ 1,650.00$ Equipment -$ -$ -$ Furnishings (planters)2,500.00$ 1,000.00$ 1,000.00$ Fire alarms and Sprinklers 3,500.00$ 2,565.00$ 4,440.00$ Conveying Systems -$ -$ -$ Mechanical and Plumbing 600.00$ 320.00$ 2,380.00$ Electrical and Lights 2,500.00$ 1,365.00$ 3,305.00$ TOTAL 49,786.00$ 41,799.00$ 87,837.75$