Loading...
HomeMy WebLinkAbout101-Staff Report.pdfPage 1 of 2 SARATOGA CITY COUNCIL MEETING DATE: February 4, 2009 AGENDA ITEM: DEPARTMENT: Public Works CITY MANAGER: Dave Anderson PREPARED BY: John Cherbone DIRECTOR: John Cherbone Public Works Director Public Works Director _______ SUBJECT: Annual Concrete Repair and Replacement Program – Award of Construction Contract RECOMMENDED ACTIONS: 1. Move to declare Guerra Construction Group to be the lowest responsible bidder on the Annual Concrete Repair and Replacement Program. 2. Award a construction contract for the Annual Concrete Repair and Replacement Program to Guerra Construction Group in the amount of $237,465 and authorize the City Manager to execute the same. 3. Authorize staff to execute change orders to the construction contract in the amount of $40,000. 4. Adopt Budget Resolution amending the Fiscal Year 2008-2009 budget. REPORT SUMMARY: Sealed bids for the Annual Concrete Repair and Replacement Program were opened on January 13, 2009. A total of nine contractors’ submitted bids and a summary of the bids received are attached (Attachment 1). Guerra Construction Group of San Jose submitted the lowest bid of $237,465. Staff has carefully checked the bid along with the listed references and has determined that the bid is responsive to the Notice inviting Sealed Bids dated December 22, 2008. The scope of work consists of supplying all labor, equipment and materials to repair and replace damaged concrete curbs, gutters, and sidewalks at various locations throughout the City as identified on the attached location list (Attachment 2). FISCAL IMPACTS: A budget resolution amending the current fiscal year budget in the amount of $22,500 is attached (Attachment 3) for additional sidewalk work above the approved CIP budget for that purpose. The majority of sidewalk repair funds were expended last fall and since that time staff has identified additional sidewalk repair locations. The additional work is primarily the mitigation of tripping hazards. Page 2 of 2 If approved by City Council, the funds for the additional sidewalks work will be transferred from the Streets and Roads account. The following is a breakdown of the funding: Sidewalk Repair Budget: $50,000 Sidewalk Repair Work Completed: ($37,500) Balance: $12,500 Additional Work w/Contingency: $35,000 Budget Amendment: $22,500 Concrete repairs other than sidewalk work are funded from the Street Improvements Fund. CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION: Guerra Construction Group would not be selected for this project. The Council may make specific findings to declare another bidder to be the lowest responsible bidder, or reject all the bids and direct staff to re-bid the entire project again. ALTERNATIVE ACTION: None additional to the Recommended Actions. FOLLOW UP ACTION: The Construction Contract will be executed and Guerra Construction Group will be notified to start construction as described above. ADVERTISING, NOTICING AND PUBLIC CONTACT: Nothing additional. ATTACHMENTS: 1. Bid Summary 2. Repair Locations 3. Budget Resolution 4. Construction Contract