Loading...
HomeMy WebLinkAbout102-1. Bid Summary.pdfItemized Bid Summary: Annual Concrete Repair and Replacement Program: Bid Opening January 13, 2009 11:00 A.M.  Item  No.  Approx.  Qty Unit  Description of Street  Maintenance Bid Items Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total  1 4,300 LF  Remove and Replace Curb  and Gutter 40.00 172,000.00 31.00 133,300.00 30.20 129,860.00 29.00 124,700.00 36.00 154,800.00 45.30 194,790.00  2 1,500 SF  Remove and Replace  Driveway Approach 20.00 30,000.00 10.00 15,000.00 15.75 23,625.00 22.00 33,000.00 10.00 15,000.00 11.00 16,500.00  3 9,100 SF  A/C saw cut and Patch  Paving 10.00 91,000.00 5.30 48,230.00 6.03 54,873.00 4.80 43,680.00 9.00 81,900.00 4.80 43,680.00  4 1 LS  Quito Rd & Aspesi Dr  W ork N/A 10,000.00 N/A 3,820.00 N/A 3,095.00 N/A 8,000.00 N/A 2,500.00 N/A 4,900.00  5 1 LS Clear and Grub N/A 5,000.00 N/A 7,335.00 N/A 2,012.50 N/A 3,500.00 N/A 500.00 N/A 1,934.00  6 1 LS Traffic Control N/A 2,500.00 N/A 2,730.00 N/A 500.00 N/A 4,000.00 N/A 500.00 N/A 6,610.00  Description of Sidewalk  Bid Items  7 2,500 SF  Remove and Replace  Sidewalk 10.00 25,000.00 9.50 23,750.00 12.36 30,900.00 12.00 30,000.00 9.00 22,500.00 10.00 25,000.00  8 1 LS Clear and Grub N/A 5,000.00 N/A 3,300.00 N/A 2,012.50 N/A 2,500.00 N/A 500.00 N/A 1,058.00  TOTAL BID  JJR Const Jos J Albanese  $249,380.00 $278,200.00 $294,472.00  Bianchi Const Alaniz Const  $340,500.00 $237,465.00 $246,878.00  Engineers Estimate Guerra Const.