CITY OF SARATOGA
CONTRACT DOCUMENTS
FOR
SARATOGA LIBRARY HVAC RENOVATION
KEY BID DATES
Date Issued: ………………………………………………………..…May 20, 2009
Requests for Equals/Clarifications Due: ………………….………...June 1, 2009
Bid Due: ………………………………………………………………June 10, 2009
Notice Inviting Bids i
1191148v3 80097/0002
CITY OF SARATOGA
SARATOGA LIBRARY HVAC RENOVATION
Table of Contents
NOTICE INVITING BIDS ................................................................................................. 1
INFORMATION FOR BIDDERS ...................................................................................... 3
SCOPE AND LOCATION OF WORK ................................................................... 3
INSPECTION OF WORK SITE ............................................................................. 3
EXAMINATION OF CONTRACT DOCUMENTS .................................................. 3
REPORT OF ERRORS AND OMISSIONS ........................................................... 3
INTERPRETATION OF CONTRACT DOCUMENTS ............................................ 4
BIDS ..................................................................................................................... 4
ADDENDA ............................................................................................................ 5
BID PRICES.......................................................................................................... 5
TAXES .................................................................................................................. 6
EXPERIENCE OF BIDDERS ................................................................................ 6
LISTS OF SUBCONTRACTORS .......................................................................... 6
BID GUARANTY ................................................................................................... 7
MODIFICATION OF BID ....................................................................................... 7
POSTPONEMENT OF OPENING ........................................................................ 7
NON COLLUSION AFFIDAVIT ............................................................................. 7
DISQUALIFICATION OF BIDDER ........................................................................ 7
REJECTION OF BIDS .......................................................................................... 7
RELIEF OF BIDDERS .......................................................................................... 8
COMPLETING AND SIGNING FORMS ................................................................ 8
DEBARRED CONTRACTORS AND SUBCONTRACTORS ................................. 8
PRIOR APPROVAL OF SUBSTITUTIONS ("APPROVED EQUALS") ................. 8
PREVAILING WAGE AND APPRENTICESHIP .................................................... 8
BID PROTEST PROCEDURES ............................................................................ 9
GENERAL CONDITIONS .............................................................................................. 11
SECTION GC-1 DEFINITIONS AND TERMS .................................................... 11
SECTION GC-2 BID REQUIREMENTS AND CONDITIONS ............................. 12
SECTION GC-3 AWARD AND EXECUTION OF CONTRACT .......................... 13
SECTION GC-4 SCOPE OF WORK .................................................................. 15
SECTION GC-5 CONTROL OF WORK ............................................................. 17
SECTION GC-6 CONTROL OF MATERIALS .................................................... 20
SECTION GC-7 LEGAL RELATIONS AND RESPONSIBILITY ......................... 22
SECTION GC-8 PROSECUTION AND PROGRESS ........................................ 36
SECTION GC-9 MEASUREMENT AND PAYMENT .......................................... 39
SECTION GC-10 DUST CONTROL .................................................................. 42
SECTION GC-11 RESERVED ........................................................................... 43
SECTION GC-12 DIFFERING SITE CONDITIONS ........................................... 43
SECTION GC-13 ARCHAEOLOGICAL EXAMINATION .................................... 44
Notice Inviting Bids ii
1191148v3 80097/0002
WAIVER FORMS .......................................................................................................... 45
CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT ....... 46
CONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT .................. 47
UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS
PAYMENT .......................................................................................................... 48
UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT ............ 49
SPECIAL CONDITIONS ................................................................................................ 50
STATEMENT OF EXPERIENCE AND QUALIFICATIONS ........................................... 55
CONTRACTOR'S EXPERIENCE AND QUALIFICATIONS ................................ 56
BID FORM ..................................................................................................................... 58
CONTRACT BID TO CITY OF SARATOGA ....................................................... 59
BID SCHEDULE ................................................................................................. 60
BONDS.......................................................................................................................... 61
BID BOND .......................................................................................................... 62
FAITHFUL PERFORMANCE BOND ................................................................... 64
LABOR AND MATERIALS PAYMENT BOND .................................................... 67
CONTRACT FOR CONSTRUCTION ............................................................................ 70
REQUIRED CERTIFICATIONS ..................................................................................... 76
BIDDER'S CHECKLIST ...................................................................................... 77
CONTRACTOR'S CERTIFICATE REGARDING WORKER'S
COMPENSATION ............................................................................................... 78
NONCOLLUSION AFFIDAVIT ............................................................................ 79
PROPOSED MAJOR MATERIAL SUPPLIERS .................................................. 80
PROPOSED SUBCONTRACTORS .................................................................... 81
AFFIDAVIT CONCERNING CONFLICTS OF INTEREST AND
NONCOMPETITIVE PRACTICES ...................................................................... 82
FAIR EMPLOYMENT PRACTICES CERTIFICATE ............................................ 84
FAIR EMPLOYMENT PRACTICE CERTIFICATION .......................................... 87
CONTRACTORS RESPONSE FORM ................................................................ 88
A CERTIFICATION CONCERNING CONTROL OF EMPLOYEES OF
CONTRACTOR................................................................................................... 89
PROJECT SPECIFICATIONS
Notice Inviting Bids 1
1191148v3 80097/0002
NOTICE INVITING BIDS
SARATOGA LIBRARY HVAC RENOVATION
SEALED BIDS will be received by the CITY OF SARATOGA (CITY) until June 10, 2009
at 11:00 A.M. for SARATOGA LIBRARY HVAC RENOVATION. Sealed bids shall be
submitted addressed and noted as follows:
Public Works Director
City of Saratoga
13777 Fruitvale Ave.
Saratoga, CA 95070
Sealed Bid for SARATOGA LIBRARY HVAC RENOVATION
All bids must be accompanied by bidder's security in accordance with California Public
Contract Code Sections 20170 et seq.
Following the closure of the bid submittal period, bids will be publicly opened and
read for performing work as follows:
Furnishing all labor, materials, equipment, and performing all work necessary
and incidental to the construction of the project known as SARATOGA LIBRARY
HVAC RENOVATION, according to drawings and specifications as prepared by
Listengineering Mechanical Consultants and according to the Contract
Documents. The work to be done consists of supplying all labor, methods or
processes, implements, tools, machinery, equipment and materials to provide,
relocate, replace, install, and revise Ceiling Fans, Smoke Detectors, Boilers, and
other work not specifically mentioned herein, but which may be required as
directed by CITY or its designated representative.
Project is to be completed within 45 calendar days from the date specified
in the Notice to Proceed. The Contractor shall pay to the City of Saratoga
the sum of $1,000.00 for each and every calendar day's delay in finishing
the work in excess of the calendar day completion time.
Bidders may obtain copies of the bidding documents at the Public Works Department at
no charge. Send requests for project drawings and specifications to City of Saratoga;
13777 Fruitvale Avenue; Saratoga, California 95070; Attn: Public Works Director.
A prebid conference will be held at the Saratoga Library located at 13650 Saratoga
Avenue, Saratoga, California on May 28, 2009, at 10:00 A.M. All prospective bidders
and subcontractors are encouraged to attend.
Pursuant to California Labor Code Section 1771, the successful bidder and all
subcontractors shall pay not less than the prevailing rate of per diem wages as
determined by the Director of the California Department of Industrial Relations. Copies
of such prevailing rate of per diem wages are available for view at the City of Saratoga
Department of Public Works.
Notice Inviting Bids 2
1191148v3 80097/0002
Pursuant to California Public Contract Code Section 22300, the Contractor may, at its
option, choose to substitute securities for monies earned by the Contractor and retained
by CITY to ensure the performance of the Contract.
Pursuant to California Public Contract Code Section 3300, City has determined that the
Contractor shall possess a valid Class B General Building Contractor or Class C-4
Boiler License at the time that the bid is submitted. Failure to possess the specified
license at the time the bid is submitted shall render the bid non-responsive.
The successful bidder will be required to furnish a payment bond in the amount equal to
one hundred percent (100%) of the Contract Price, as well as a faithful performance
bond, in the amount equal to one hundred percent (100%) of the Contract Price. The
bonds shall be on the forms included in the Contract Documents.
The successful bidder shall insure that employees and applicants for employment are
not discriminated against on the basis of age, color, race, national origin, ancestry,
religion, sex, sexual preference, or marital status, and shall comply with the Americans
with Disabilities Act.
Bids will be examined and reported to the City of Saratoga City Council (Council) at a
meeting within sixty (60) days of the bid opening. CITY reserves the right to reject any
and all bids, or to waive any irregularities or informalities in any bid or in the bidding
procedure, or to postpone the bid opening or award for good cause. No Bidder may
withdraw its bid for a period of 75 calendar days after the date of opening of the bids.
Each bidder will be notified of award of contract, if award is made. Contract
Documents, Forms of Bid and any questions concerning this bid should be addressed to
Public Works Director, City of Saratoga, (408) 868-1239.
CITY OF SARATOGA
Office of the Clerk
May 20, 2009
Information for Bidders 3
1191148v3 80097/0002
INFORMATION FOR BIDDERS
SARATOGA LIBRARY HVAC RENOVATION
SCOPE AND LOCATION OF WORK
The work to be performed under this contract consists of the furnishing of all labor,
materials, plant, equipment and services for the construction of the Project, complete,
and in satisfactory operating condition, all as shown on the Contract Documents and/or
as specified herein. The work is to be performed in the City of Saratoga, County of
Santa Clara.
INSPECTION OF WORK SITE
Bidders are required to inspect the site of the work in order to satisfy themselves, by
personal examination or by such other means as they may prefer, of the location of the
proposed work and the actual conditions of and at the site. Bidders may apply to the
Director of Public Works for additional information and explanation before submitting
bids. However, no supplemental information requested or furnished shall vary the terms
of the Contract Documents or affect the Contractor's sole responsibility to satisfy itself
as to the conditions of the work to be performed. No claim for additional compensation
will be allowed which is based upon a lack of knowledge of the actual conditions or
location of the Work.
Submission of a bid by the bidder shall constitute acknowledgment that, if awarded the
contract, the bidder has relied and is relying on its own examination of (a) the site of the
work; (b) access to the site; (c) all other data, matters, and things requisite to the
fulfillment of the work, including but not limited to the availability of labor and materials;
and (d) its own knowledge of existing facilities on and in the vicinity of the site of the
Project and not on any representation or warranty by City or its agents of the above
items. Removal, relocation, or protection of existing public utilities not identified by City
shall be done in conformance with California Government Code Section 4215.
EXAMINATION OF CONTRACT DOCUMENTS
Each bidder shall thoroughly examine and be familiar with legal and procedural
documents, general conditions, specifications, drawings and addenda (if any).
Submission of a bid shall constitute acknowledgment, upon which City may rely, that the
bidder has thoroughly examined and is familiar with the Contract Documents. Failure or
neglect of a bidder to receive or examine any of the Contract Documents shall in no way
relieve the bidder of any obligation with respect to its bid or to the Contract. No claim
for additional compensation will be allowed which is based upon a lack of knowledge of
any Contract Documents.
REPORT OF ERRORS AND OMISSIONS
Bidder shall review architectural and/or engineering plans and specifications, if any,
prior to submission of the bid, and report any errors and omissions noted by the bidder
Information for Bidders 4
1191148v3 80097/0002
to the Director of Public Works. The review by the Contractor shall be confined to the
Contractor's capacity as a contractor, and not as a licensed design professional.
INTERPRETATION OF CONTRACT DOCUMENTS
No oral representation or interpretations will be made to any bidders as to the meaning
of the Contract Documents. Requests for interpretation shall be made in writing and
delivered to the Director of Public Works at least seven (7) working days before the time
announced for opening the bids. Interpretations, where necessary, will be made in the
form of an addendum to the Contract Documents and, when issued, will be sent as
promptly as is practical to all parties to whom the bid documents have been issued. All
such addenda shall become part of the Contract.
Requests for information before or after the award of contract shall be directed to:
Director of Public Works
13777 Fruitvale Avenue, CA 95070
Phone (408) 868-1239; fax (408) 868-1281
It shall also be the bidder's responsibility to call to the attention of Director of Public
Works any missing pages in the Contract Documents, including the addenda. These
items shall be brought to the attention of Director of Public Works in writing, at least one
week prior to the bid opening date.
BIDS
Bids shall be made on the blank forms prepared by City, which may be removed from
the bound Contract Documents. All bids shall include, in the space provided, all
information requested, shall be signed by the bidder or an authorized representative
thereof, and shall include the bidder's business address.
Bidders must prepare and submit all required documents.
Bids must be accompanied by security in accordance with California Public Contract
Code Sections 20170 et seq.
If the bid is made by an individual, his or her name, signature, and business address
shall be shown.
If the bid is made by a firm or partnership, the name and business address of the firm or
partnership and the signature of at least one of the general partners shall be shown.
If the bid is made by a corporation, the bid shall show the name of the corporation and
the state(s) in which the corporation is incorporated; the name and business address of
the corporation's local agent; and the signature of at least one officer authorized to sign
on behalf of the corporation. Additionally, the bid shall include a document empowering
the signatory or signatories to execute the bid and to bind the corporation.
Information for Bidders 5
1191148v3 80097/0002
If the bid is made by a joint venture, the bid shall be signed by at least one of the joint
venture firms in a format meeting with the requirements outlined above. Additionally,
the bid shall include a document empowering the signatory or signatories to execute the
bid and to bind the joint venture.
Every contractor, other than a joint venture, who submits a bid, must at the time the bid
is submitted have a California Contractor's License in good standing. The license shall
be in the class or classes specified in the Contract Documents. Any bid from an
unlicensed contractor, other than those persons exempt under California Business &
Professions Code Section 7028.15, shall be non-responsive and shall be rejected.
Section 7028.15 makes it a misdemeanor for any person without a valid contractor's
license (with specified exceptions) to submit a bid to act as a contractor to a public
agency. The penalties on a bidder violating these provisions are severe.
Each bid shall be enclosed in a sealed envelope, labeled and delivered to the Director
of Public Works at the address above. Bidders are warned against making erasures or
alterations of any kind, without initialing each and every such change. Bids that contain
uninitialed erasures, alterations or irregularities of any kind, or omissions, may be
rejected. No oral, telegraphic, or telephone (including facsimile) bids or modifications
will be considered.
Each bidder shall submit with its bid a statement setting forth its experience and
qualifications on the forms included in the Contract and Bidding Documents.
Telephones will not be available to bidders for the preparation of the bids or for calling in
bid results. Bid forms received after the designated time will not be accepted. Bidders
and their authorized agents are invited to attend the bid opening.
No bidder may withdraw its bid for a period of sixty (60) days after the date set for the
opening of bids.
City reserves the right to reject any or all bids; to make any awards or any rejections in
what it alone considers to be in the best interest of City, and to waive any informalities
or irregularities in the bids.
ADDENDA
Each bid shall include specific acknowledgment (in the space provided) of the receipt of
all addenda issued during the bidding period. A bidder's failure to acknowledge all
addenda may result in the bid being rejected as not responsive.
BID PRICES
Bid prices shall include everything necessary for the completion of construction and
fulfillment of the contract, including but not limited to furnishing all transportation,
materials, equipment, tools, excavation, utilities, sheeting, shoring, bracing and
supports, plant and other facilities, and all management, superintendence, permits,
labor and services, except as may be provided otherwise in the Contract Documents.
Information for Bidders 6
1191148v3 80097/0002
In the event that the product of a unit price and an estimated quantity does not equal the
extended amount quoted, the unit price shall govern and the correct product of the unit
price and the estimated quantity shall be deemed to be the amount bid. If the sum of
the individual items does not equal the total base price, the individual item totals shall
govern and the corrected sum shall be deemed to be the total base bid.
Where there is a conflict between words and figures, the words shall govern and the
figures shall be disregarded.
TAXES
Bid prices shall include all applicable federal, state, and local taxes.
EXPERIENCE OF BIDDERS
At the time of bidding, and throughout the period of the contract, each bidder shall be
licensed under the provisions of the California Business and Professions Code to do the
type of work contemplated for the project. The license classification shall be a Class B
General Building Contractor or Class C-4 – Boiler License.
It is the intention of City to award a contract, if at all, to the lowest responsive
responsible bidder who demonstrates the attributes of trustworthiness, as well as
quality, fitness (including financial qualifications), capacity and experience to enable it to
prosecute the work successfully and properly, and to complete the work within the time
period named in the Contract Documents.
To determine the degree of responsibility to be credited to the bidder, City will weigh
any evidence that the bidder has performed satisfactorily other contracts of like nature
and magnitude, and comparable difficulty and rates of progress, to the Work. City shall
have sole discretion to determine what contracts are of like nature and magnitude, and
comparable difficulty and rates of progress. City may reject bids from Contractors who
cannot satisfactorily prove the experience and qualifications outlined in paragraph 10
hereof.
LISTS OF SUBCONTRACTORS
On the forms provided, each bidder shall list the name and address of each
subcontractor to whom the bidder proposes to sublet portions of the work in excess of
one-half of one percent of the total amount of the bid or $10,000, whichever is greater.
For the purpose of this paragraph, a subcontractor is defined as anyone who contracts
with the Contractor to furnish materials and labor or labor only, and/or one who specially
fabricates and/or installs a portion of the work or improvement according to detailed
drawings contained in the Contract Documents. All listings and subsequent
substitutions, if any, shall be done in conformance with the Subletting and
Subcontracting Fair Practices Act, California Public Contract Code Section 4100 et seq.
Information for Bidders 7
1191148v3 80097/0002
BID GUARANTY
The bid shall be accompanied by a bid guaranty bond duly completed by a corporate
surety authorized to conduct business in the State of California payable to the City of
Saratoga in the sum of at least ten percent (10%) of the total amount of the bid. The
bond shall be on the form included in the Contract Documents. Alternatively, a certified
or cashier's check, payable to the City of Saratoga, in the sum of at least ten percent
(10%) of the total amount of the bid may be substituted for the bid guaranty bond. The
amount payable to the City of Saratoga under the bid guaranty bond, or the certified or
cashier's check, as the case may be, shall be forfeited to City as liquidated damages in
the case of the failure or neglect of the successful bidder to furnish, execute, and deliver
to City the required performance and payment bonds and evidences of insurance,
and/or to enter into, execute, and deliver to City the Agreement on the form provided
herewith, within ten (10) days after being notified in writing by City that the award has
been made.
MODIFICATION OF BID
Modification of a bid already received will be considered only if the modification is
received prior to the deadline for receiving bids. All modifications shall be made in
writing, executed, and submitted in the same form and manner as the original bid.
POSTPONEMENT OF OPENING
City reserves the right to postpone the date and time for receiving and/or opening of
bids at any time prior to the date and time established in the Notice Inviting Bids.
Pursuant to Public Contract Code Section 4104.5, the City shall extend the date and
time for closing of submission of bids (the "bid deadline") by no less than seventy-two
(72) hours in the event that CITY issues any material changes, additions, or deletions to
the bidding documents later than seventy-two (72) hours prior to the bid deadline.
NON COLLUSION AFFIDAVIT
California Public Contract Code Section 7106 requires that each bidder execute a
Noncollusion Affidavit on all public works contracts. Bidder shall execute the
Noncollusion Affidavit included with the Contract Documents and submit it to City with
the bid.
DISQUALIFICATION OF BIDDER
If there is a reason to believe that collusion exists among any of the bidders, none of the
bids of the participants in such collusion will be considered, and City may choose to
reject all bids received.
REJECTION OF BIDS
City reserves the right to reject any bids which are incomplete, obscure, or irregular; any
bids which omit a bid on any one or more items for which bids are required; any bids
Information for Bidders 8
1191148v3 80097/0002
which omit unit prices if unit prices are required; any bids in which unit prices are
unbalanced in the opinion of City; any bids accompanied by insufficient or irregular bid
guaranty; and any bids from bidders who has been delinquent or unfaithful in any former
contract with City. City reserves the right to reject defective bids or to waive technical
defects, as the interests of City may require.
RELIEF OF BIDDERS
Attention is directed to the provisions of California Public Contract Code Section 5100,
et seq., concerning relief of bidders, and in particular to the requirement therein that if a
bidder claims a mistake was made in its bid, the bidder shall give City written notice of
the alleged mistake within five (5) calendar days after the opening of the bids, specifying
in the notice, in detail, how the mistake occurred.
COMPLETING AND SIGNING FORMS
The Bidder's attention is directed to the forms included in the Contract Documents,
which must be completed and signed. FAILURE TO PROPERLY COMPLETE AND
SIGN ANY FORMS MAY BE CAUSE FOR REJECTION OF A BID.
DEBARRED CONTRACTORS AND SUBCONTRACTORS
No contractor or subcontractor who is ineligible to bid or work on, or be awarded, a
public works contract under California Labor Code Sections 1777.1 or 1777.7 can bid
on, be awarded or perform work as a subcontractor on the Project. The Contractor is
prohibited from letting work on the Project to a subcontractor who is ineligible to perform
work on a public works project under these sections of the Labor Code.
PRIOR APPROVAL OF SUBSTITUTIONS ("APPROVED EQUALS")
Bidders wishing to obtain prior approval of a substitution for a specified material or
system (an "approved equal") shall submit all required documentation in compliance
with procedures established in the Contract Documents. Any request for an approved
equal must be fully supported with technical data, test results, or other pertinent
information as evidence that the substitute offered is equal to or better than the
specification requirement.
Prior approval requests must be received by City, in writing, at least 7 working days
prior to bid deadline. If City determines the requested material or system is equal to
that specified, City will notify the Bidders prior to time for submitting bids. City's failure
to notify the Bidders of an approved equal shall be deemed a rejection of the requested
substitution.
PREVAILING WAGE AND APPRENTICESHIP
In accordance with California Labor Code Section 1771, all contractors and
subcontractors on this public work project shall pay not less than current prevailing
wage rates as determined by the California Department of Industrial Relations ("DIR").
Information for Bidders 9
1191148v3 80097/0002
All contractors and subcontractors on this public work project shall comply with the
requirements of California Labor Code Sections 1777.5 and 1777.6 in the employment
of apprentices.
Questions regarding general prevailing wage rates should be directed to:
Department of Industrial Relations
Division of Labor Statistics and Research
P.O. Box 420603
San Francisco, CA 94142-0603
Phone: (415) 703-4774
Questions pertaining to apprenticeship crafts should be directed to:
Department of Industrial Relations
Division of Apprenticeship Standards
P.O. Box 420603
San Francisco, CA 94142-0603
Phone: (415) 703-4920
Information is also available at the Department of Industrial Relations' website:
http://www.dir.ca.gov
Any contractor who is awarded a public works contract is not relieved of the obligation
to pay prevailing wage rates for any craft or classification not listed in the General
Determinations or in any Special Determination. If a contractor intends to use a craft or
classification not listed in the General Determinations or existing Special
Determinations, he or she must notify CITY no later than forty-five (45) days before the
bid deadline and request a Special Determination. If no determination has been made
at the time the contract is awarded, the contractor shall pay the prevailing wage rate of
the craft or classification most closely related to the craft or classification used.
All prevailing wage rates are subject to modification pursuant to Important Notices
issued by the DIR's Division of Labor Statistics and Research and recent union contract
negotiations.
BID PROTEST PROCEDURES
These procedures apply to all procurement actions, whether by sealed bid, request for
bid or sole source, and regardless of the stage of the procurement process at which the
protest is filed.
Any protest relating to the form or content of the bidding or contract documents must be
submitted in writing to Public Works Director at 13777 Fruitvale Avenue, Saratoga, CA
95070 no later than ten (10) working days before the bid deadline. Any person who
submits a bid shall be deemed to have waived any protest to the form or content of the
proposal documents that has not been submitted as provided in this section.
Information for Bidders 10
1191148v3 80097/0002
Any protest relating to any particular proposal or the award of the contract must be
submitted in writing to Public Works Director. The protest must be received no later
than five (5) calendar days after the basis of protest is known or should have been
known, whichever is earlier, and in no event will any protest received more than ten (10)
calendar days after the bid date be accepted.
The initial protest document shall contain a complete statement of the basis for the
protest.
The protest shall refer to the specific portion(s) of the proposal documents which forms
the basis for the protest.
The protest shall include the name, business address and telephone number of the
person representing the protesting party.
The party filing the protest shall concurrently transmit a copy of the initial protest
document and any attached documentation to all other parties who have a direct
financial interest that may be adversely affected by the outcome of the protest. Such
parties shall include all other bidders who appear to have a reasonable prospect of
receiving an award depending upon the outcome of the protest. The documents shall
be transmitted by fax or overnight mail.
The procedure and time limits set forth in this section are mandatory and are the sole
and exclusive remedy in the event of protest. Failure to comply with these procedures
shall constitute a waiver of any right to further pursue the protest, including filing a
Government Code claim or instituting legal proceedings.
General Conditions 11
1191148v3 80097/0002
GENERAL CONDITIONS
SARATOGA LIBRARY HVAC RENOVATION
SECTION GC-1 DEFINITIONS AND TERMS
Whenever in the Contract Documents the following terms are used, the intent and
meaning shall be interpreted as follows (unless noted otherwise):
Agreement – the written instruments comprising the complete and integrated contract
between the City of Saratoga and the Contractor.
Business day – see "working day" below
Calendar day – a period of twenty-four (24) hours measured from midnight to the next
midnight. If not otherwise specified in the Agreement, days shall be presumed to be
calendar days.
Caltrans Standard Specifications - Standard Specifications for Construction of Local
Streets and Roads issued by the State of California, Department of Transportation,
2006 edition. Any reference therein to a State agency or officer shall be interpreted as if
the corresponding City of Saratoga office or officer acting under this contract were so
specified.
Caltrans Standard Plans - Standard Plans for Construction of Local Streets and Roads
issued by the State of California, Department of Transportation, current edition. All
metric measurements or quantities in the Caltrans Standard Plans shall be disregarded,
and equivalent United States measures used.
Contractor – the individual or entity with whom City has entered into the Agreement.
Council - The City of Saratoga City Council, the governing body of the City of Saratoga.
County – Santa Clara County, California.
City – the City of Saratoga.
Engineer – List Engineering Mechanical Consultant or its successor.
Laboratory - The designated laboratory authorized by the City of Saratoga to test
materials and work involved in the contract.
Working day – is as defined in Section 8-1.06 ("Time of Completion") of the Caltrans
Standard Specifications.
Other terms appearing in the Contract Documents shall have the intent and meaning
specified in Section 1 ("Definitions and Terms") of the Caltrans Standard Specifications.
Waiver Forms 12
1191148v3 80097/0002
SECTION GC-2 BID REQUIREMENTS AND CONDITIONS
A. APPROXIMATE QUANTITY ESTIMATE
The quantities given in the Notice Inviting Bids and in the bid and contract forms are
approximate only, being given as a basis for the comparison of bids, and CITY does
not, expressly or by implication, agree that the actual amount of work will correspond
therewith, but reserves the right to increase or decrease the amount of any class or
portion of the Work, or to omit portions of the Work, as may be deemed necessary or
advisable by the Director of Public Works.
B. EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF
WORK
The bidder shall examine carefully the site of work contemplated and all Contract
Documents, including all bid and contract forms incorporated by reference therein. The
submission of a bid shall be conclusive evidence that the bidder has investigated and is
satisfied as to the conditions to be encountered, as to the character, quality, and scope
of work to be performed, the quantities of materials to be furnished, and as to the
requirements of the bid, plans, specifications, and the contract. If, during the course of
its examination, a bidder finds facts or conditions which appear to be in conflict with the
letter or spirit of the project plans and specifications, the bidder shall contact CITY for
additional information and explanation before submitting its bid. Any request for
information must be submitted at least ten (10) working days before the time announced
for opening the bids, if any.
C. QUESTIONS DURING BIDDING
Any questions regarding the Contract Documents or bid forms shall be directed to the
person listed in the Information For Bidders. All questions must be submitted at least
ten (10) working days before the original bid deadline.
D. ADDENDA
When CITY deems it necessary, addenda may be issued to the Contract Documents to
amend, clarify or correct matter contained therein. Such addenda shall constitute a part
of the Contract Documents and shall be equally binding with them. Addenda shall be
forwarded to all prospective bidders when such addenda are issued prior to receipt of
bids. Bidder must acknowledge all addenda on the bid form. Failure to acknowledge all
addenda issued will render the bid nonresponsive.
E. BID FORM
All bids must be submitted upon blank forms provided in the Contract Documents. Bid
prices shall include all applicable taxes that the Contractor is required to pay. All bids
must give the prices proposed and must be signed by the bidder and include bidder's
business address. If the bid is made by an individual, his name and business address
must be shown. If made by a firm or partnership, the name and business address of
Waiver Forms 13
1191148v3 80097/0002
each member of the firm or partnership must be shown. If made by a corporation, the
bid must show the name of the state(s) in which the bidder is incorporated and the
names, titles, and business addresses of the corporation's president, secretary, and
treasurer. All bids shall be submitted as directed in the Notice Inviting Bids under
sealed cover plainly marked as a bid, and identifying the project to which the bid relates
and the date of the bid opening therefor. Bids which are not properly marked may be
disregarded.
F. PUBLIC OPENING OF BIDS
Bids will be opened and read publicly at the time and place indicated in Notice Inviting
Bids. Bidders or their authorized agent are invited to be present.
SECTION GC-3 AWARD AND EXECUTION OF CONTRACT
A. AWARD OF CONTRACT
CITY reserves the right to reject any and all bids. The contract will be awarded, if at all,
to the lowest responsive responsible bidder whose bid complies with all the
requirements set forth in the Notice Inviting Bids and Information to Bidders and all
documents referenced therein.
In the event that bids are required to include prices for items that may be added to or
deducted from the scope of the work of the contract for which the bid is being submitted,
the lowest bid shall be the lowest bid price on the base contract those additive or
deductive items that were specifically identified in the bid solicitation as being used for
the purpose of determining the lowest bid price. CITY reserves the right to add to or
deduct from the contract any of the additive or deductive items after the lowest
responsible bidder has been determined.
The contract will be awarded, if at all, within 60 calendar days after the opening of the
bids.
The Work will not start until CITY has successfully acquired all necessary rights of way,
easements and permits to begin work on this project.
B. CONTRACT BONDS
The successful bidder shall furnish two separate contract bonds. Each of the bonds
shall be executed in an amount equal to at least 100% of the Contract Price. One bond
shall guaranty the faithful performance of the contract by the Contractor; and the other
bond shall secure payment of the claims of laborers, mechanics, and material suppliers
employed under the contract and shall contain all provisions required by law to be
included in such bond forms, including the requirements of Civil Code Sections 3247 -
3252. No alteration, extension of time, extra and additional work, or other change
authorized by the Contract Documents will affect the obligations of the surety or sureties
on the payment or performance bonds, and no notice to the surety or sureties shall be
required.
Waiver Forms 14
1191148v3 80097/0002
Any bond required herein shall be issued by a corporate surety admitted to transact
surety business in the State of California and holding a valid Certificate of Authority to
transact Surety Insurance in the State of California.
C. EXECUTION OF THE CONTRACT
The Contract shall be signed by the successful bidder and returned, together with the
Contract bonds required by Section GC-3 (B) and insurance certificate required by
Section GC-7 (S) of these General Conditions, after the bidder has received notice that
the Contract has been awarded. No bid shall be considered binding upon the City of
Saratoga until the award of the contract by the Council.
D. NOTICE TO PROCEED
A separate Notice to Proceed will be issued to the Contractor for this work. Within ten
(10) working days from the Notice to Proceed or date specified in the Notice to Proceed,
the Contractor shall commence work. Working days will be charged to the Contractor
after the ten-day period has elapsed.
E. FAILURE TO EXECUTE CONTRACT
Failure to execute the Agreement and file acceptable performance and payment bonds
and insurance as provided herein within fifteen (15) calendar days after the bidder has
received notice that the contract for the Work has been awarded to him, shall be just
cause for the annulment of the award and the forfeiture of the bid guaranty. Upon any
such failure by the successful bidder, the contract for the work may be awarded to the
second lowest responsible bidder. If the second lowest responsible bidder fails to
execute the Agreement and file acceptable bonds and insurance as provided herein
within fifteen (15) calendar days after such bidder has received notice that the contract
for the Work has been awarded to him, the contract for the Work may be awarded to the
third lowest responsible bidder. Failure of the second or of the third lowest responsible
bidder to whom a contract is so awarded to execute the Agreement and file acceptable
bonds and insurance as provided herein within fifteen (15) calendar days after such
bidder has received notice that the contract for the Work has been awarded to him shall
be just cause for the annulment of the award and the forfeiture of the bid guaranty of
each such bidder.
F. RETURN OF BID GUARANTEES
CITY will retain all bid guarantees until the Agreement for the Work has been fully
executed and CITY has received the bonds and evidence of insurance required to be
furnished, or CITY has acted to reject all bids. CITY will return the bid guarantees of
unsuccessful bidders, other than those forfeited.
Waiver Forms 15
1191148v3 80097/0002
SECTION GC-4 SCOPE OF WORK
A. INTENT OF PLANS AND SPECIFICATIONS
The intent of the Contract Documents is to prescribe the details for the construction and
completion of the work the Contractor undertakes to perform.
Where the plans or specifications describe portions of the work in general terms, but not
in complete detail, it is understood that only the best general practice is to prevail and
that only materials and workmanship of the first quality are to be used. Unless
otherwise specified, the Contractor shall furnish all labor, material, tools, equipment,
flaggers, and incidentals, and do all the work involved in executing the contract in a
satisfactory and workmanlike manner.
B. STANDARD SPECIFICATIONS AND SPECIAL CONDITIONS
All work embraced herein shall be constructed in strict accordance with the applicable
codes, plans and the Caltrans Standard Specifications, where applicable. All work will
be done under the inspection of City, the Engineer and any other public agency with
jurisdiction over the Project and shall be the responsibility of the Contractor.
The work embraced herein shall be done in accordance with specifications approved by
CITY if such work, material or equipment is not specifically detailed in the Contract
Documents, Special Conditions, or accompanying plans.
The parts of the Contract Documents are intended to be complementary.
In case of conflict between Sections 1 through 9 of the Caltrans Standard Specifications
and the General Conditions or Special Conditions of this Agreement, the General
Conditions or Special Conditions shall control. In case of a conflict between the
General Conditions and the Special Conditions, the Special Conditions shall control. In
case of conflict between the Caltrans Standard Specifications and the other Contract
Documents, the provisions of paragraph GC-5.D Coordination And Interpretation Of
Plans, Standard Specifications, and Special Conditions shall apply.
C. FINAL CLEAN-UP
Before acceptance and final payment, the Contractor shall clean the streets, roads,
structures, and all ground occupied by him in connection with the Work, of all rubbish,
excess materials, temporary structures, and equipment. All parts of the Work shall be
left in a neat and presentable condition. Any damage to property, missing signs,
mailboxes, etc. must be repaired/replaced to the satisfaction of CITY. Full
compensation for final clean up shall be deemed included in the prices paid for the
various contract items of work, and no separate payment will be made therefor.
Waiver Forms 16
1191148v3 80097/0002
D. CHANGES
CITY reserves the right to make such alterations, deviations, additions to or omissions
from the Contract Documents, including the right to increase or decrease the quantity of
any item or portion of the Work or to omit any item or portion of the Work, as may be
deemed by the Director of Public Works to be necessary or advisable and to require
such extra work as may be determined by the Director of Public Works to be necessary
for the proper completion or construction of the whole work. Changes in quantities shall
be in accordance with the provisions of Section 4-1.03B ("Increased or Decreased
Quantities") of the Caltrans Standard Specifications.
Any such changes will be set forth in a contract change order which will specify, in
addition to the work to be done in connection with the change made, adjustment of
contract time, if any, and the basis of compensation for such work. A contract change
order will not become effective until approved by CITY in writing.
All changes in the work shall be made as provided in the Contract Documents. Notice
is hereby given that under certain circumstances, changes may require the approval of
the Council, and may further require notice to affected property owners and a public
hearing.
E. SALVAGE FOR THE CITY
The Contractor shall remove and preserve carefully any materials designated to be
salvaged for the City and shall arrange for the delivery of those materials to the City as
directed by the Director of Public Works. The Contractor shall be liable for any damage
or destruction of materials designated for salvage. Contractor shall notify Owner at
least two working days before commencing demolition of the existing boiler system so
that Owner can document the existing conditions
F. SEVERABILITY CLAUSE
If any provision or any part of any provision of these Contract Documents is, for any
reason, held to be invalid, unenforceable or contrary to any public policy, law, statute,
regulation or ordinance, then the remainder of these Contract Documents shall not be
affected thereby and shall remain valid and fully enforceable.
G. EXTRA WORK
New and unforeseen work will be classed as extra work when such work cannot be
covered by any of the various items or combination of items for which there is a bid
price. The Contractor shall do no extra work except upon written order from the Director
of Public Works. Compensation for authorized extra work will be paid as previously
agreed upon in writing, or by force account as provided in Section 9-1.03 ("Force
Account Payment") of the Caltrans Standard Specifications.
Waiver Forms 17
1191148v3 80097/0002
SECTION GC-5 CONTROL OF WORK
A. AUTHORITY OF DIRECTOR OF PUBLIC WORKS
The Director of Public Works shall decide all questions which may arise as to the quality
or acceptability of materials furnished and work performed and as to the manner or
performance and loss of progress of the work; all questions which may arise as to the
interpretation of the plans and specifications; all questions as to the acceptable
fulfillment of the contract on the part of the Contractor; and all questions as to
compensation. The Director of Public Work's decision shall be final and shall have
authority to enforce and make effective such decisions and orders which the Contractor
shall carry out promptly.
B. PLANS AND WORKING DRAWINGS
All authorized alterations affecting the requirements and information given on the
approved plans shall be in writing. No changes shall be made to any plan or drawing
without approval of the Director of Public Works.
The Plans furnished consist of general drawings and show such details as are
necessary to give a comprehensive idea of the construction contemplated. All
authorized alterations affecting the requirements and information given on the contract
plans shall be in writing.
The Plans shall be supplemented by such working drawings prepared by the Contractor
as are necessary to perform the Work adequately. No change shall be made by the
Contractor to any working drawing after it has been approved by the Director of Public
Works.
It is expressly understood, however, that approval of the Contractor's working drawings
shall not relieve the Contractor of any responsibility for accuracy of dimensions and
details, or for mutual agreement of dimensions and details. Contractor shall be
responsible for agreement and conformity of his working drawings with the Contract
Documents.
Full compensation for furnishing all working drawings shall be deemed included in the
prices paid for the contract items of work to which such drawings relate and no separate
payment will be made therefor.
C. CONFORMITY WITH CONTRACT DOCUMENTS AND ALLOWABLE
DEVIATIONS
Work and materials shall conform to the lines, grades, cross sections, dimensions and
material requirements, including tolerances, in the Contract Documents. Although
measurement, sampling and testing may be considered evidence as to such conformity,
the Director of Public Works shall be the sole judge as to whether the work or materials
deviate from the plans and specifications, and his decision as to any allowable
deviations therefrom shall be final. Deviations from the approved plans, as may be
Waiver Forms 18
1191148v3 80097/0002
required by the exigencies of construction, will be determined in all cases by the
Director of Public Works and authorized in writing.
D. COORDINATION AND INTERPRETATION OF PLANS, STANDARD
SPECIFICATIONS, AND SPECIAL CONDITIONS
The Caltrans Standard Specifications, the Santa Clara County Standard Plans and
Specifications (if any), any Special Conditions, these General Conditions, contract
change orders, and all supplementary documents are essential parts of the Contract
Documents, and a requirement occurring in one is binding as though occurring in all.
They are intended to be cooperative, to describe, and to provide for a complete work.
In the event of a conflict, the most stringent shall govern.
In the event of any discrepancy between any drawing and the figures written thereon,
the figures shall be taken as correct. Detail drawings shall prevail over general
drawings.
E. ORDER OF WORK
When required by the Special Conditions or Plans, the Contractor shall follow the
sequence of operations as set forth therein. Full compensation for conforming with
such requirements will be deemed included in the prices paid for the various contract
items of work and no separate payment will be made therefor.
F. SUPERINTENDENCE
The Contractor shall provide competent supervision of the Work as approved by the
Director of Public Works. The Contractor or designated representative shall be present
at the site at all times while work is actually in progress. Before starting work, the
Contractor shall designate in writing a representative who shall have the authority to
represent and act for the Contractor regarding any written or verbal directions, or
requests of the Director of Public Works. Directions or requests delivered to the
representative shall have the same force and effect as if delivered to the Contractor.
The authorized representative shall be an employee of the Contractor's organization
and shall be shown on the Contractor's payroll
The Contractor will not designate a subcontractor as the authorized representative.
Whenever the Contractor or its representative is not present on any particular part of the
work where the Director of Public Works desires to give direction, the Director of Public
Works will give orders which shall be received and obeyed by the superintendent or
foreman who may have charge of the particular work for which the order is given.
Failure of the Contractor or its representative to be present at the job site at all times
when work is in progress will be deemed failure on the part of the Contractor to perform
a provision of the Contract. If the Contractor or its representative is not present at the
job site, the Director of Public Works may, in accordance with Section 8-1.05
("Temporary Suspension of Work") of the Caltrans Standard Specifications, suspend all
Waiver Forms 19
1191148v3 80097/0002
work until satisfactory arrangements have been made to have a designated
representative on the site at all times when work is in progress. No additional
compensation or additional working days will be allowed for such suspension. All
working days lost due to such suspension will be charged to the Contractor.
During periods when work is suspended, arrangements acceptable to the Director of
Public Works shall be made for any emergency work that is required.
G. LINES AND GRADES
Unless otherwise such stakes or marks will be set by the Director of Public Works as
the Director of Public Works determines to be necessary to establish the lines and
grades required for the completion of the Work.
When the Contractor requires such stakes or marks, the Contractor shall notify the
Director of Public Works of his requirements in writing at least three (3) calendar days
(72 hours) in advance of starting operations that require such stakes or marks. The
Contractor shall coordinate his work such that each staking request will have a
minimum of four (4) hours of field staking time. If the Contractor submits a request
having less than the minimum four (4) hours of field staking time, the Contractor will be
billed the Director of Public Work's time and cost for the difference between the four (4)
hour minimum and the actual staking time.
The Contractor shall ensure that the area to receive stakes shall be free of all
obstructions, equipment, stockpiles, etc. If the area to receive stakes is not ready for
staking when City's representative arrives on the site, the original 72 hour advance time
will become void and City's representative will have 72 hours from the time the area is
made ready for stakes to place the stakes and to prepare cut sheets.
Stakes and marks set by the City shall be carefully protected from vandalism and
preserved by the Contractor. In case such stakes and marks are lost, destroyed, or
damaged, the Contractor must notify the Director of Public Works in writing of his
request for the stakes to be reset. Upon receipt of the request, the City will replace the
stakes within three (3) working days. The Contractor will be charged for the cost of
necessary replacement or restoration of stakes and marks which in the judgment of the
Director of Public Works were carelessly lost or willfully destroyed or damaged by the
Contractor's operations. Restake charges shall include any recalculation, checking, and
administrative charges CITY incurs. These charges will be deducted from any monies
due or to become due the Contractor.
H. INSPECTION
The Director of Public Works shall at all times have access to the Work during its
construction and shall be furnished with every reasonable facility for ascertaining that
the materials and the workmanship are in accordance with the requirements and
intentions of the Contract Documents. All work done and all materials furnished shall be
subject to the Engineer's inspection.
Waiver Forms 20
1191148v3 80097/0002
The inspection of the work or materials shall not relieve the Contractor of any of its
obligations to perform the Work as prescribed. Work and materials not meeting such
requirements shall be made good; unsuitable work or materials may be rejected,
notwithstanding that such work or materials may have been previously inspected by the
Director of Public Works or that payment therefor has been included in a progress
estimate.
I. REMOVAL OF REJECTED AND UNAUTHORIZED WORK
The Contractor shall remedy or remove and replace at its own expense and in an
acceptable manner all work that has been rejected. CITY will not pay for such removal,
replacement, or remedial work.
Any work done beyond the lines and grades shown on the plans or established by the
Director of Public Works, or any extra work done without written authority, will be
deemed unauthorized work for which CITY will not pay. Upon order of the Director of
Public Works, the Contractor shall remedy or remove and replace unauthorized work at
the Contractor's expense.
Upon failure of the Contractor to comply promptly with any order of the Director of
Public Works made under this section, the Director of Public Works may cause rejected
or unauthorized work to be remedied, removed, or replaced, and to deduct the costs
from any monies due or to become due the Contractor.
J. CHARACTER OF WORKERS
If any subcontractor or person employed by the Contractor appears to CITY to be
incompetent or to act in a disorderly or improper manner, he or she shall be discharged
immediately on the request of CITY, and such person shall not again be employed on
the Work.
K. FINAL INSPECTION
When the work has been completed, CITY and Engineer will make the final inspection.
The Contractor shall request the final inspection in writing.
SECTION GC-6 CONTROL OF MATERIALS
A. GENERAL
The control of the materials used in the work, including but not limited to the sources,
handling, testing, and rejections, shall conform to Section 6 of the Caltrans Standard
Specifications.
B. SAMPLES AND TESTS
The source of supply of each material shall be approved by the Director of Public Works
before delivery begins and before the material is used in the work.
Waiver Forms 21
1191148v3 80097/0002
Upon request of the Director of Public Works or as specified in these documents,
representative material samples of the prescribed character and quality shall be
submitted by the Contractor for testing or examination. No material shall be used
without approval of the Director of Public Works.
All tests of materials furnished by the Contractor shall be made in accordance with
commonly recognized standards of national organizations, and such special methods
and tests as are prescribed in the Caltrans Standard Specifications, and the Special
Conditions. The cost of re-testing material or workmanship that fails to pass the first
test shall be borne by the Contractor. Contractor shall submit all test results to the
Director of Public Works within five (5) calendar days of the testing at no charge to
CITY.
Full compensation for conforming with the requirements of this section shall be deemed
included in the prices paid for the various contract items of work and materials, and no
separate payment will be made therefor.
C. DEFECTIVE MATERIALS
All materials that the Director of Public Works determines do not conform to the
requirements of the Contract Documents will be rejected, whether in place or not. They
shall be removed immediately from the work site, unless otherwise permitted by the
Director of Public Works. No rejected material shall be used in the Work, unless the
defects are corrected and the Director of Public Works gives written approval.
Upon failure of the Contractor to comply promptly with any order of the Director of
Public Works made pursuant to this section, the Director of Public Works may cause the
removal and/or replacement of rejected material and may deduct the costs thereof from
any monies due or to become due the Contractor.
D. CHANGES TO SPECIFICATIONS/APPROVED EQUALS
Changes to the specifications will be made only by written addendum executed by the
Public Works Director.
Requests for approved equals or for clarification of specifications and protests of
specifications must be received by CITY, in writing, by the time specified in the
Instructions to Bidders prior to bid deadline or, if made after the contract is awarded, no
more than fifteen days after the facts giving rise to the request came to the attention of
the Contractor. Any request for an approved equal or protest of the specifications must
be fully supported with technical data, test results, or other pertinent information as
evidence that the substitute offered is equal to or better than the specification
requirement.
If CITY determines the requested material or system is equal to that specified, CITY will
notify the Bidders prior to bid deadline or Contractor within thirty calendar days after
receiving the request. City's failure to notify the Bidders or the Contractor of an
approved equal shall be deemed a rejection of the requested substitution.
Waiver Forms 22
1191148v3 80097/0002
Wherever brand, manufacturer or product names are indicated in the specifications,
they are included ONLY for the purpose of establishing identification and a general
description of the item. Wherever such names appear, the term "or approved equal"
should be understood to follow.
It should be understood that specifying a brand name, components and/or equipment in
this specification shall not relieve the supplier from its responsibility to produce the
product in accordance with the performance warranty and contractual requirements.
The supplier is responsible for notifying CITY of any inappropriate brand name,
component and/or equipment that may be called for in the specifications and to propose
a suitable substitute for consideration.
E. WARRANTY OF TITLE
Contractor warrants to CITY and its successors and assigns that the title to the
materials, supplies or equipment covered by the Contract, when delivered to CITY or to
its successors or assigns, is free from all liens and encumbrances.
F. WARRANTY OF FITNESS
Contractor warrants that all materials, supplies and products furnished meet the
requirements and conditions of the Contract Documents and are fit for the purpose
intended.
G. WARRANTY OF MERCHANTABILITY
Contractor warrants that the goods are merchantable in accordance California
Commercial Code Section 2314. In accepting this and other warranties and the
materials or supplies to be manufactured or assembled pursuant to the Contract
Documents, CITY does not waive any warranty, either express or implied, in California
Commercial Code Sections 2312 through 2315, inclusive, or any liability of the
manufacturer as determined by any decision of a court of the State of California or of
the United States.
SECTION GC-7 LEGAL RELATIONS AND RESPONSIBILITY
A. GENERAL
In connection with laws to be observed and responsibility of the Contractor, attention is
directed to Section 7 ("Legal Relations and Responsibility") of the Caltrans Standard
Specifications and to the laws applicable to this contract and to the Work that are
referenced therein. Full compensation for conforming to the provisions of Section 7-
1.08 ("Public Convenience") and Section 7-1.09("Public Safety") shall be deemed
included in the prices paid for the various contract items of work, and no separate
payment will be made therefor.
Waiver Forms 23
1191148v3 80097/0002
B. LAWS TO BE OBSERVED
The Contractor shall keep itself fully informed of all existing and future state and federal
laws and county and municipal ordinances and regulations which in any manner affect
those engaged or employed in the work, or the materials used in the work, or which in
any way affect the conduct of work, and of all such orders and decrees of bodies or
tribunals having any jurisdiction or authority over the same.
The Contractor shall at all times observe and comply with, and shall cause all his agents
and employees to observe and comply with all existing and future laws, ordinances,
regulations, orders, and decrees applicable to this contract or to the Work.
The Contractor shall protect, defend, and indemnify CITY, and all officers and
employees thereof connected with the work, against any claim or liability arising from or
based on the violation of any such law, ordinance, regulation, order, or decree, whether
by City's representative or its employees. If any discrepancy or inconsistency is
discovered in the plans, drawings, specifications, or contract for the work in relation to
any such law, ordinance, regulation, order, or decree, the Contractor shall forthwith
report the same to the Director of Public Works in writing.
C. LABOR
In connection with laws to be observed and responsibility of the Contractor, attention is
directed to Section 7 ("Legal Relations and Responsibility") of the Standard
Specifications and to the laws applicable to this contract and to the Work that are
referenced therein. Attention is particularly directed to the subsections pertaining to
Hours of Labor, Alien Labor, Labor Discrimination, Prevailing Wages, Apprentices, and
the Fair Labor Standards Act.
This is a public works contract within the meaning of Part 7 of Division 2 of the
California Labor Code (Sections 1720 et seq.), and the contractor and any
subcontractor under him shall pay not less than the specified prevailing wage rates to all
workers employed. Pursuant to the provisions of Section 1773 of the California Labor
Code, the CITY has obtained the general prevailing rate of wages and employer
payments for health and welfare, vacation, pension and similar purposes in the City of
Saratoga, a copy of which is on file 13777 Fruitvale Avenue, Saratoga, California at the
office of the Public Works Director, and shall be made available for viewing to any
interested party upon request.
Attention is directed to the provisions in of the Labor Code Sections 1777.5 and 1777.6
concerning the employment of apprentices by the Contractor or any subcontractor
under the Contractor. It shall be the responsibility of the Contractor to comply with and
to insure that all subcontractors comply with the requirements of said sections in the
employment of apprentices. Information relative to apprenticeship standards, wage
schedules, and other requirements may be obtained from the Director of Industrial
Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or
from the Division of Apprenticeship Standards and its branch offices.
Waiver Forms 24
1191148v3 80097/0002
Pursuant to the requirements of Division 4 of the Labor Code, the Contractor will be
required to secure the payment of worker's compensation to its employees in
accordance with the provisions of Section 3700 of the Labor Code.
Prior to commencement of work, the Contractor shall sign and file with the Director of
Public Works a certification in the following form:
"I am aware of the provisions of Section 3700 of the Labor Code which require every
employer to be insured against liability for worker's compensation or to undertake self-
insurance in accordance with the provisions before commencing the performance of the
work of this contract."
Full compensation for conforming to the requirements of this section shall be deemed
included in the prices paid for the various contract items of work, and no separate
payment will be made therefor.
All penalties set forth in Section 7 ("Legal Relations and Responsibilities") of the
Caltrans Standard Specifications shall be payable to the City of Saratoga.
D. CONTRACTOR'S LICENSING LAWS
Attention is directed to the California Business and Professions Code Sections 7000 et
seq. concerning the licensing of contractors. All bidders and subcontractors shall be
licensed in accordance with the laws of this State and any bidder or subcontractor not
so licensed is subject to penalties imposed by such laws.
E. CHILD AND FAMILY SUPPORT OBLIGATIONS
The contractor shall fully comply with all state and federal laws relating to child and
family support enforcement, including, but not limited to, disclosure of information and
compliance with earnings assignment orders, as provided in Chapter (commencing with
Section 5200) of Part 5 of Division 9 of the Family Code.
F. DOMESTIC MATERIALS
Only such unmanufactured materials as have been produced in the United States, and
only such manufactured materials as have been manufactured in the United States,
substantially all from materials produced in the United States, shall be used in the
performance of the contract, in accordance with the provisions of California Government
Code Sections 4300 et seq.
Pursuant to California Government Code Section 4304, any person who fails to comply
with this section of the contract shall not be awarded any contract for the construction,
alteration or repair of public works or for the purchase of materials for public use for a
period of three (3) years from the date of the violation.
Waiver Forms 25
1191148v3 80097/0002
G. PAYMENT OF TAXES
The contract prices paid for the Work shall include full compensation for all taxes the
Contractor is required to pay, whether imposed by federal, state or local government,
including, without being limited to, federal excise tax. Taxes shall be deemed included
in the prices paid for the various contract items of work, and no separate payment will
be made therefor.
H. PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges and fees, and
give all notices necessary and incidental to the due and lawful prosecution of the Work.
Any construction permits required by CITY for performing any work on this project will
be issued by CITY at no charge to the Contractor. The Contractor and all
subcontractors shall pay all City business license fees.
I. PATENTS
The Contractor shall assume all costs arising from the use of patented materials,
equipment, devices, or processes used on or incorporated in the Work. In addition to
the obligations set forth in paragraph N ("Responsibility for Damage") below, the
Contractor shall indemnify, defend, and hold CITY, its elected and appointed officials,
and its employees harmless against any claim arising from Contractor's work under this
Agreement in which a violation of intellectual property rights, including but not limited to
copyright or patent infringement, is alleged.
J. SAFETY
The Contractor shall be solely and completely responsible for conditions of the job site,
including safety of all persons (including employees) and property on or near the Project
or adjacent to the work site during the performance of the Work. This requirement shall
apply continuously and not be limited to normal working hours.
The duty of the Director of Public Works to conduct review of the Work does not include
review or approval of the adequacy of the Contractor's safety program, safety
supervisor, or any safety measures taken in, on, or near the job site.
Safety provisions shall conform to Cal-OSHA Safety Orders, and all other applicable
federal, state, county, and local laws, ordinances, codes, and regulations. Where any of
these are in conflict, the more stringent requirement shall be followed. The Contractor's
failure to thoroughly familiarize itself with the aforementioned safety provisions shall not
relieve it from the obligation to comply with such provisions or from the penalties set
forth therein.
The Contractor shall develop and maintain for the duration of this contract a safety
program that will effectively incorporate and implement all required safety provisions.
The Contractor shall appoint a qualified employee to supervise and enforce compliance
Waiver Forms 26
1191148v3 80097/0002
with the safety program. Information regarding the safety program shall be posted at the
project site.
K. PUBLIC CONVENIENCE AND SAFETY
Contractor shall submit a traffic control plan to the Director of Public Works for approval
prior to start of work.
The Contractor's attention is directed to Section 7-1.08 ("Public Convenience") and 7-
1.09 ("Public Safety") of the Caltrans Standard Specifications. Full compensation for
complying with the provisions of such subsections shall be deemed included in the
prices paid for the various contract items of work, and no separate payment will be
made therefor.
All signs required by the Director of Public Works shall be furnished and installed by the
Contractor. The cost of furnishing, installing, maintaining, and removing such signs
shall be deemed included in the prices paid for the various contract items of work, and
no separate payment will be made therefor.
The Contractor shall notify the City of Saratoga Fire and Police Departments in writing
at least 2 working days before closing any street or otherwise hindering access by
emergency vehicles to any area.
L. FLAGGING COSTS
The costs of furnishing all flagmen and guards under the provisions of this section and
Sections 7-1.08 ("Public Convenience"), 7-1.09 ("Public Safety"), and 12-2.02
("Flagging Costs") of the Caltrans Standard Specifications will be borne by the
Contractor and shall be considered included in the prices paid for the various contract
items of work; no separate payment will be made therefor.
M. PRESERVATION OF PROPERTY
Attention is directed to Section 7-1.12 ("Indemnification and Insurance") and to Section
8-1.10, ("Utility and Non-Highway Facilities") of the Caltrans Standard Specifications.
Contractor shall exercise due care to avoid injury to existing highway improvements or
facilities, utility facilities, adjacent property, and roadside trees and shrubbery that are
not to be removed.
Roadside trees and shrubbery; pole lines, fences; mailboxes; signs; markers and
monuments; buildings and structures; conduits; pipe lines under or above ground ;
sewer and water lines ; all highway facilities ; and any other improvements or facilities
within or adjacent to the work, other than those to be removed in accordance with the
plans, shall be protected from injury or damage. If ordered by the Director of Public
Works, the Contractor shall provide and install suitable safeguards, approved by the
Director of Public Works, to protect such objects from injury or damage. If such objects
are injured or damaged by reason of the Contractor's operation, they shall be replaced
or restored at the Contractor's expense. The facilities shall be replaced or restored to a
Waiver Forms 27
1191148v3 80097/0002
condition as good as when the Contractor entered upon the work, or as good as
required by the contract, if any such objects are a part of the work being performed
under the contract. The Director of Public Works may make or cause to be made such
temporary repairs as are necessary to restore to service any damaged highway or other
facility. The cost of such repairs shall be borne by the Contractor and may be deducted
from any monies due or to become due to the Contractor under the contract.
It shall be the Contractor's responsibility to ascertain the existence of any underground
improvements or facilities that may be subject to damage in the course of performing
the Work. A minimum of forty-eight (48) hours, or two working days, prior to beginning
of construction, the Contractor shall notify Underground Services Alert (USA), telephone
1-800-642-2444, to have existing facilities marked in the field.
Full compensation for furnishing all labor, materials, tools, equipment and incidentals,
and for doing all the work involved in protecting or repairing property as specified in this
section shall be deemed included in the prices paid for the various contract items of
work and no separate payment will be made therefor.
N. PRE CONSTRUCTION SURVEY
The Contractor shall, if required by CITY, provide pre-construction color photographs,
35mm or larger film size, of the work site including surrounding areas as stated above.
Each photograph shall be marked to indicate the date, name of work, and the location
where the photograph was taken. Photographs shall be taken at intervals as directed
by the Director of Public Works or his designee.
Prints shall be submitted in a three-ring photo album binder with clear plastic-covered
fillers, four photos each side, grouped according to street, lateral, or line, and in
sequence. Each group of prints shall be identified by a label that projects beyond the
edge of filler and is easily recognized. Negatives may be placed within the filler sleeves
or submitted separately.
Approximately twenty-five (25) photographs shall be submitted to the Director of Public
Works for the Director of Public Work's approval. This approval shall be obtained
before proceeding with the remaining photographs. Video may also be required if
specified in the technical specifications.
The photographs and/or video tapes shall be submitted to the Director of Public Works
either prior to or with the first progress payment request. The progress payment
request will not be considered for payment until the Director of Public Works accepts
this deliverable.
Full compensation for furnishing all pre-construction survey photos and/or videos shall
be deemed included in the prices paid for the various contract items of work and no
separate payment will be made therefor.
Waiver Forms 28
1191148v3 80097/0002
O. RESPONSIBILITY FOR DAMAGE
The City of Saratoga and all officers and employees thereof connected with the Work,
including but not limited to the City Council, shall not be answerable or accountable in
any manner for any loss or damage that may happen to the Work or any part thereof;
for any loss or damage to any of the materials or other things used or employed in
performing the Work; for injury to or death of any person; or for damage to property from
any cause except losses due to sole or active negligence of the City of Saratoga's
officers or employees.
All loss or damage arising from any unforeseen obstruction or difficulties, either natural
or artificial, which may be encountered in the execution of the work, or the furnishing of
the supplies, materials, or equipment, or from any action of the elements prior to final
written acceptance of the work, or of the supplies, materials or equipment, or from any
act or omission not authorized by the Contract Documents on the part of the Contractor
or any agent or person employed by it, shall be sustained and borne solely by the
Contractor.
Notwithstanding any other provision of the Contract Documents, Contractor shall, to the
fullest extent allowed by law, defend, indemnify and hold harmless the City of Saratoga,
its elected and appointed officials, and its employees from all liability, penalties, costs,
losses, damages, expenses, causes of action, claims or judgments, including attorney's
fees and other defense costs, resulting from injury to or death sustained by any person
(including Contractor's employees), or damage to property of any kind, or any other
injury or damage whatsoever arising out of or in any way connected with the
performance of the Contract, including any of the same resulting from the alleged or
actual negligent acts or omissions of City's officers, agents, contractors or employees;
except that said indemnity shall not be applicable to injury, death or damage to property
arising from the sole or active negligence or willful misconduct of CITY, its officers,
agents, or employees who are directly responsible to CITY. This indemnification shall
extend to claims asserted after termination of this Contract for whatever reason.
Without limiting the generality of the foregoing indemnity, such indemnity obligation
expressly extends to and includes any and all claims, demands, losses, damages,
costs, expenses, fines, penalties, judgments or liability occasioned as a result of:
a) Damages to adjacent property caused by the conduct of the Work;
b) The violation by the Contractor, the Contractor's agents, employees, or
independent contractors or subcontractors, of any provisions of federal,
state or local law, including applicable administrative regulations such as,
without limitation, discharge permit requirements;
c) Injury to or death of any person, or any property damage to property
owned by any person while on or about the site or as a result of the Work,
whether such persons are on or about the site by right or not, whenever
Waiver Forms 29
1191148v3 80097/0002
the Work is alleged to have been a contributing cause in any degree
whatsoever.
In addition to any remedy authorized by law, so much of the money due the Contractor
under and by virtue of the contract as shall be considered necessary by CITY, may be
retained by CITY until disposition has been made of such suits or claims for damage.
P. COOPERATION
Should construction be under way by CITY, other agencies or other contractors within
or adjacent to the limits of the Work, or should work of any other nature be under way
by other forces within or adjacent to said limits, the Contractor shall cooperate with all
such other contractors or other forces to the end that any delay or hindrance to their
work will be avoided.
CITY reserves the right to perform other or additional work at or near the site (including
material sources) at any time, by the use of other forces.
Q. CONTRACTOR'S RESPONSIBILITY FOR WORK AND MATERIALS
Until the final acceptance of the contract, the Contractor shall have the charge and care
of the Work and of the materials to be used therein, including materials for which partial
payment has been received. CITY shall not be held responsible for the care or
protection of any material or parts of the Work prior to final acceptance, except as
expressly provided in the Special Conditions.
R. ACCEPTANCE OF CONTRACT
Upon completion of the Project CITY will conduct such tests as may be required to
determine to its own satisfaction that the Project is in conformance with the terms,
conditions and requirements of the Contract Documents. After final inspection, CITY
shall determine whether or not to accept the Project and will notify the Contractor in
writing within fifteen (15) days thereof. In the event of non-acceptance, CITY shall
inform the Contractor in writing of the deficiencies found.
When the Director of Public Works has made the final inspection and determines that
the contract has been completed in all respects in accordance with the plans and
specifications, the Director of Public Works may recommend that the Council formally
accept the contract. Immediately upon and after such acceptance by the Council, the
Contractor will not be required to perform any further work, except completion or
correction of such items as the Director of Public Works may direct, and the Contractor
shall be relieved of his responsibility for injury to persons or property or damage to the
Work that occurs after the formal acceptance by the Council.
The formal acceptance by the Council does not relieve the Contractor of the one (1)
year maintenance responsibility.
S. PERSONAL LIABILITY
Waiver Forms 30
1191148v3 80097/0002
Neither the Council, nor any other officer or authorized employee of the City of
Saratoga, nor any officer or employee of any state, county, or local agency shall be
personally responsible for any liability arising under or by virtue of the contract.
T. INSURANCE
Within ten (10) days after award of the Contract, the Contractor shall promptly obtain, at
its own expense, all the insurance described in this section, and submit coverage
verification for review and approval by CITY. This insurance shall be in addition to any
other form of insurance or bonds required under the terms of the contract.
The Notice to Proceed with the Work will not be issued, and the Contractor shall not
commence work, until such insurance has been approved by CITY. Such insurance
shall remain in full force and effect at all times during the prosecution of the Work and
until the final completion and acceptance thereof. In addition, the Commercial General
Liability Insurance shall be maintained for a minimum of five (5) years after final
completion and acceptance of the Work. The Notice to Proceed does not relieve the
Contractor of the duty to obtain such insurance as required herein.
The Contractor shall not allow any subcontractors to commence work until all insurance
required of the subcontractor has been obtained and verified by the Contractor and
submitted to CITY. Subcontractors shall furnish original certificates and endorsements
as verification of insurance coverage. The liability insurance limits specified herein shall
apply to all subcontractors listed in Contractor’s bid. The Contractor shall designate
appropriate insurance limits for all other subcontractors.
Companies writing the insurance under this article shall be authorized to do business in
the State of California. Insurance is to be placed with insurers with a current A.M.
Best’s rating of no less than A:VII.
Contractor shall include all costs for all insurance in its bid.
Nothing contained in these insurance requirements is to be construed as limiting the
extent of the Contractor's responsibility for payment of damages resulting from its
operations under this Contract. Coverage required hereunder shall operate as Primary
Insurance.
The Contractor shall procure, pay for, and maintain throughout the duration of this
Contract the following insurance coverage:
Commercial General and Automobile Liability Insurance - This insurance shall
protect the Contractor from claims for bodily injury and property damage which
may arise because of the nature of the work or from operations under this
Contract. The coverage shall be at least as broad as Insurance Services Office
Waiver Forms 31
1191148v3 80097/0002
(ISO) Commercial General Liability coverage (occurrence Form CG 0001), ISO
Form G0009 11 88 Owners and Contractors Protective Liability Coverage –
Coverage for Operations of Designated Contractor) and Insurance Services
Office Form Number CA 0001 covering Automobile Liability, code 1 (any auto).
Claims-made policies will not be accepted.
a. Additional Insureds – The Commercial General Liability ("CGL") policy of
insurance shall be endorsed to name as additional insureds the City of
Saratoga, all of its elected and appointed officials, directors, officers,
employees, agents and servants, using ISO Form CG201185 or forms that
provide equivalent coverage, including completed operations. This policy
shall provide coverage to each of the additional insureds with respect to
the Work. Both bodily injury and property damage insurance must be on
an occurrence basis. The policy shall be endorsed to provide primary
coverage to the full limit of liability stated in the declarations. If the
additional insureds have any other insurance or self-insurance against the
loss covered by this policy, that other insurance shall be excess insurance
and not contribute with contractor’s policy.
b. Amount of Coverage - The bodily injury and property damage liability of
the CGL insurance shall provide coverage in the following limits of liability:
$2,000,000 per occurrence with an annual general aggregate limit of not
less than $4,000,000, and $4,000,000 products and completed operations
aggregate, combined single limit. The Automobile Liability insurance
policy shall provide minimum limits of $1,000,000 per accident for bodily
injury and property damage.
c. Subcontractors - The CGL insurance shall not require the Contractor to
have its subcontractors named as insureds in the Contractor's policy, but
the insurance shall protect the Contractor from contingent liability which
may arise from operations of its subcontractors.
d. Included Coverage - The CGL insurance shall also include all of the
following coverages:
Premises – Operations;
Owner's/Independent Contractors and Contractor's Protective;
Products - Completed Operations;
Personal Injury - (False Arrest, Libel, Wrongful Eviction, etc.);
Blanket Contractual Liability, including the indemnity agreement in this
contract;
Separation of Insureds / Cross-Liability Provisions;
Duty to Defend All Insureds;
Deletion of any limitation on Coverage for Bodily Injury or Property
Damage Arising Out of Subsidence or Soil or Earth Movement;
A provision that the annual general aggregate and the products and
Waiver Forms 32
1191148v3 80097/0002
completed operations annual aggregate shall apply separately to the
Project;
Pollution Legal Liability Endorsement;
XCU - Explosion, Collapse, Underground Damage. (XCU may be deleted
with City’s prior written approval when not applicable to operations
performed by the Contractor or its sub-contractors.)
e. Umbrella Policy or Follow-Form Excess Liability Policy - At the option of
the Contractor, primary limits may be less than required, with an Umbrella
Policy or Follow-Form Excess Liability Policy providing the additional limits
needed. This form of insurance will be acceptable provided that the
Primary and Umbrella/Excess Policies both provide the insurance
coverages herein required, including all additional insured requirements.
The umbrella/excess insurance shall be provided on a “following form”
basis with coverage at least as broad as provided on the underlying CGL
insurance.
f. The certificate of insurance shall guaranty that the policy will not be
amended, altered, modified, or canceled without at least thirty (30) days
notice mailed by registered mail to the Administrative Services Director,
City of Saratoga; 13777 Fruitvale Ave.; Saratoga, California 95070.
g. In accordance with Insurance Code Section 11580.04, coverage shall not
extend to any indemnity coverage for the active negligence of the
additional insured in any case where any agreement to indemnify the
additional insured would be invalid under Civil Code Section 2782(b).
Workers’ Compensation Insurance – California Labor Code Sections 3700 et seq.
require every employer to be insured against liability for Workers’' Compensation or to
undertake self-insurance in accordance with the provisions of that code. The Contractor
shall comply and shall ensure that all subcontractors comply with such provisions. In
addition, the Contractor shall have and maintain Employers' Liability insurance with
limits of $1,000,000 per accident for bodily injury or disease before commencing the
performance of the Work.
Before the Notice to Proceed is issued, the Contractor shall submit written evidence that
the Contractor has obtained for the period of the Contract full Workers’' Compensation
Insurance coverage for all persons whom it employs or may employ in carrying out the
Work. This insurance shall be in accordance with the requirements of the most current
and applicable State Workers’' Compensation Insurance Laws.
Builder's Risk (Course of Construction) Insurance - The Contractor shall purchase and
maintain " Course of Construction" Builder's Risk Insurance Covering all risks of loss
less policy exclusions.
Minimum Limits of Insurance: Contractor shall maintain limits no less than:
Builder’s Risk – Installation Floater: Completed value of the project with no
Waiver Forms 33
1191148v3 80097/0002
coinsurance penalty provisions.
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of
Construction coverage. Such coverage shall contain the following provision:
This insurance shall name the City of Saratoga, its elected and appointed officials,
employees, agents and servants and the Contractor as insureds, as their interests may
appear.
If the project does not involve new, or major reconstruction, at the option of the Entity,
an Installation Floater may be acceptable. For such projects, a property installation
floater shall be obtained that provides for the improvement, remodel, modification,
alteration, conversion or adjustment to existing buildings, structures, processes,
machinery and equipment. The Property Installation Floater shall provide property
damage coverage for any building, structure, machinery or equipment damaged,
impaired, broken or destroyed during the performance of the Work, including during
transit, installation and testing at the Entity’s site.
Coverage for acts of God, as defined in Public Contract Code Section 7105, in excess
of five percent of the Contract amount is subject to separate coverage and is required
only if listed as a separate bid item in the bid schedule.
Builder’s Risk Insurance policies shall contain the following provisions:
(1) CITY shall be named as loss payee.
(2) The insurer shall waive all rights of subrogation against CITY.
Builder’s Risk Insurance may have a deductible clause not to exceed the following
limits:
(1) If, pursuant to Public Contract Code Section 7105, CITY requires coverage for
any damage to the work caused by an act of God, and has set forth the amount of the
work to be covered and the insurance premium for such coverage as a separate bid
item, the deductible for such coverage shall not exceed five percent (5%) of the value of
the Work at risk at the time of the loss.
(2) All other perils: $5,000.
The Contractor shall be responsible for paying any and all deductible costs.
The policy shall provide CITY the right to occupy the premises without termination of the
policy until acceptance of the project.
U. TERMINATION
Waiver Forms 34
1191148v3 80097/0002
CITY reserves the right to terminate the Contractor's control of the Work in accordance
with Section 8-1.08 ("Termination of Control") of the Caltrans Standard Specifications.
CITY reserves the right to terminate the contract in accordance with Section 8-1.11
("Termination of Contract") of the Caltrans Standard Specifications.
CITY also reserves the right to terminate the Contract for any of the following reasons:
· The Contractor is insolvent or has made a general assignment for the benefit of
creditors, or a receiver has been appointed on account of the insolvency of the
Contractor.
· The Contractor or any of its subcontractors violate any of the material provisions
of the Agreement or fail to perform the Work within the time specified in the
Contract Documents.
· The Contractor or any of its subcontractors should fail to make prompt payment
to subcontractors or to suppliers for material or for labor.
· The Contractor or a subcontractor persistently disregards laws, ordinances, or
the instructions of CITY or the Director of Public Works.
· The Contractor fails to abide by a proper stop work notice or fails to correct
rejected work or materials.
· The Contractor fails to provide and keep in full force and affect all required
insurance or fails to cause all subcontractors to so comply.
· The Contractor fails to supply a sufficient number of properly skilled workers or
proper materials, or fails to diligently prosecute the Work.
· The Contractor commits any substantial violation of the Contract that constitutes
a material breach of the Contract.
CITY may, without prejudice to any other right or remedy, give written notice to the
Contractor of its intention to terminate the contract.
If, within seven (7) days of the delivery of such notice, the Contractor does not cease
such violation or otherwise make satisfactory arrangements for a correction thereof,
which arrangements are set forth in a written agreement signed by the Contractor and
CITY, the Contractor's right to complete the Work shall cease and terminate.
If CITY terminates the Contractor's control for failure to correct the violation, it shall
immediately give written notice of termination to the Contractor.
If CITY takes over the Work, it may prosecute the same to completion by contract or by
any other method it deems advisable, for the account and at the expense of the
Contractor. The Contractor shall be liable to CITY for any excess costs, including
Waiver Forms 35
1191148v3 80097/0002
management, supervision, and design support, occasioned thereby. In such event,
CITY may, without liability, take possession of and utilize in completing the Work, the
Contractor's materials and equipment to be incorporated into the Work, whether stored
at the project site or elsewhere. Whenever the Contractor's right to proceed is
terminated, the Contractor shall not be entitled to receive any further payment until the
Work is finished.
If CITY terminates the Contract for cause, CITY may retain out of any funds due or to
become due the Contractor the amount of the cost of completing the Work and any
expense incidental to reletting the contract or performing the Work. CITY may also hold
the Contractor and the Contractor's sureties responsible for such cost and expense, and
for any damages resulting from the abandonment or failure. The Contractor shall not
receive any further payment until the Work is complete.
V. ASSIGNMENT OF ANTI-TRUST CLAIMS
In entering into a public works contract or a subcontract to supply goods, services, or
materials pursuant to a public works contract, the contractor or subcontractor offers and
agrees to assign to the awarding body all rights, title, and interest in and to all causes of
action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the
Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of
the Business and Professions Code), arising from purchases of goods, services, or
materials pursuant to the public works contract or the subcontract. This assignment
shall be made and become effective at the time the awarding body tenders final
payment to the contractor, without further acknowledgement by the parties.
W. CONTRACTOR'S BOOKS AND RECORDS
A. Contractor and its subcontractors shall establish and maintain records
pertaining to this contract. Contractor's and subcontractors' accounting systems shall
conform to generally accepted accounting principles and all records shall provide a
breakdown of total costs charged under this contract, including properly executed
payrolls, time records, invoices and vouchers.
B. Contractor shall maintain any and all ledgers, books of account, invoices,
vouchers, canceled checks and other records or documents evidencing or relating to
charges for services or expenditures and disbursements charged to CITY for a
minimum period of three (3) years, or for any longer period required by law, from the
date of final payment to Contractor to this Agreement.
C. Contractor shall maintain all documents and records which demonstrate
performance under this Agreement for a minimum period of three (3) years, or for any
longer period required by law, from the date of termination or completion of this
Agreement.
D. Any records, data or documents required to be maintained pursuant to this
Agreement shall be made available for inspection, copying or audit, at any time during
regular business hours, upon written request by CITY or a designated representative for
Waiver Forms 36
1191148v3 80097/0002
the purpose of auditing and verifying statements, performance, invoices, or bills
submitted by Contractor pursuant to this contract and shall provide such assistance as
may be reasonably required in the course of such inspection. Copies of such
documents shall be provided to CITY for inspection at City's facility when it is practical
to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be
available at Contractor's address indicated for receipt of notices in the Agreement.
E. Where CITY has reason to believe that such records or documents may
be lost or discarded due to dissolution, disbandment or termination of Contractor's
business, CITY may, by written request, require that custody of the records be given to
CITY and that the records and documents be maintained at City's facility. Access to
such records and documents shall be granted to any party authorized by Contractor,
Contractor's representatives, or Contractor's successor-in-interest.
F. Pursuant to California Government Code Section 8546.7, the parties to
this Contract shall be subject to the examination and audit of representative of the
Auditor General of the State of California for a period of three (3) years after final
payment under the contract. The examination and audit shall be confined to those
matters connected with the performance of this contract including, but not limited to, the
cost of administering the contract.
SECTION GC-8 PROSECUTION AND PROGRESS
A. GENERAL
The prosecution and progress of the work shall conform to Section 8 of the Caltrans
Standard Specifications and the Special Conditions.
B. SUBLETTING AND ASSIGNMENT
Attention is directed to Section 8-1.01 ("Subcontracting") of the Caltrans Standard
Specifications which provides that the Contractor shall give personal attention to the
performance of the Contract and shall keep the Work under its control.
No subcontractors will be recognized as such, and all persons engaged in the work of
construction will be deemed employees of the Contractor. The Contractor will be held
responsible for all subcontractors' work, which shall be subject to the provisions of the
Contract and specifications.
When a portion of the work that has been subcontracted by the Contractor is not being
prosecuted in a manner satisfactory to CITY, the subcontractor shall be removed
immediately on the requisition of CITY and shall not again be employed on the work.
Attention is directed to Section 8-1.02 ("Assignment") of the Standard Specifications.
The performance of the Contract may not be assigned except upon written consent of
CITY.
Waiver Forms 37
1191148v3 80097/0002
C. COMMENCEMENT OF WORK, PROGRESS, AND TIME FOR COMPLETION
The Contractor shall begin work within ten (10) working days after the date specified on
the Notice to Proceed and shall diligently prosecute the same to completion within the
time set forth in these Contract Documents.
D. HOURS OF WORK, HOLIDAYS, AND OVERTIME
The Contractor shall perform all work during the working hours of 7:00 a.m. to 3:30
p.m., Monday through Friday (unless otherwise noted below). If the Contractor wishes
to work during any other hours or on weekends, the Contractor must obtain written
permission from CITY. The request must be received at least two (2) working days in
advance of any work.
No work will be allowed on CITY holidays except in an emergency. A listing of CITY
holidays is available from the City Clerk's Office 13777 Fruitvale Avenue, Saratoga,
California, 95070.
If Contractor requests overtime work in which CITY will incur costs, CITY reserves the
right to bill the Contractor at time and one half to cover the costs incurred.
E. TEMPORARY SUSPENSION OF WORK
In accordance with Section 8-1.05 ("Temporary Suspension of Work") in the Caltrans
Standard Specifications, the Director of Public Works or his designee shall have the
authority to suspend the Work wholly or in part, for such a period as the Director of
Public Works may deem necessary.
F. TIME OF COMPLETION AND LIQUIDATED DAMAGES
The Contractor shall complete all or any designated portion of the work called for under
the contract in all parts and requirements within the time set forth in the Special
Conditions. The Contractor's attention is directed to Section 8-1.07 ("Liquidated
Damages") of the Caltrans Standard Specifications which shall apply here. In addition to
the foregoing liquidated damages, CONTRACTOR shall pay any fines, penalties or
other monetary sanctions levied by any authority having jurisdiction over the Project on
account of delays in completing the WORK not solely attributable to CITY, including but
not limited to violations of discharge permit limits or other discharge restrictions.
The parties to the Contract agree that in case all the work called for under the Contract
is not completed before or upon the expiration of the time limit as set forth in this
Agreement damage will be sustained by the CITY. The parties further agree that it is
and will be impracticable to determine the actual damage that the CITY will sustain in
the event of and by reason of such delay. It is therefore agreed that the Contractor will
pay to the CITY the sum stated in the Notice Inviting Bids for each and every calendar
day's delay beyond the time prescribed to complete the work. The Contractor agrees to
pay such liquidated damages as herein provided, and in case the same are not paid,
Waiver Forms 38
1191148v3 80097/0002
agrees that the CITY may deduct the amount thereof from any monies due or that may
become due the Contractor under the Agreement.
It is further agreed that if the work called for under the Contract is not finished and
completed in all parts and requirements within the time specified, CITY shall have the
right to extend the time for completion. CITY is under no obligation to extend the time
for completion. If CITY decides to extend the time for completion, it shall further have
the right to charge to the Contractor, his heirs, assigns or sureties, and to deduct from
the final payment for the Work, all or any part, as it may deem proper, of the actual cost
of engineering, inspection, superintendence, and other overhead expenses which are
directly chargeable to the Contract, and which accrue during the period of such
extension, except that the cost of final surveys and preparation of final estimate shall
not be included in such charges.
The Contractor will not be assessed liquidated damages or the cost of engineering and
inspection during a delay in the completion of the Work caused by acts of God (as
defined in Public Contract Code Section 7105) or of the public enemy; fire; floods;
epidemics; quarantine restrictions; strikes; freight embargoes; unusually severe
weather; and/or delays of subcontractors due to such causes, provided that the
Contractor within fifteen (15) days from the beginning of any such delay notifies the
Director of Public Works in writing of the causes of delay. The Director of Public Works
shall ascertain the facts and the extent of delay, and the Director of Public Work's
findings thereon shall be final and conclusive.
Except for the additional compensation provided for in Section 8-1.09 ("Right of Way
Delays") of the Caltrans Standard Specifications, and except as provided in Public
Contract Code Section 7102, the Contractor shall have no claim for damage or
compensation for any delay or hindrance.
It is the intention of the above provisions that the Contractor shall not be relieved of
liability for liquidated damages or engineering and inspection charges for any period of
delay in completion of the work in excess of that expressly provided for in Section 8-
1.07 of the Caltrans Standard Specifications.
G. LIMITS OF WORK
The "limits of work" are shown on the plans (where applicable). The Contractor shall
make its own arrangements, and pay all expenses for additional area required outside
of the limits of work unless provided in the Special Conditions.
H. UTILITY FACILITIES
The Contractor shall protect from damage any utility facilities that are to remain in place,
be installed, relocated, or otherwise rearranged.
If the Contractor while performing the Work discovers utility facilities not identified in the
Contract Documents with reasonable accuracy, the Contractor shall immediately notify
CITY and the utility owner. CITY shall arrange the removal, relocation, or protection of
Waiver Forms 39
1191148v3 80097/0002
existing main or trunk line utility facilities located at the site of the Work but not identified
in the Contract.
If the Contractor is required to locate, repair damage not due to the Contractor's failure
to exercise reasonable care, and remove or relocate existing main or trunk line utility
facilities, it shall be compensated under Section 9-1.03 ("Force Account Payment") of
the Caltrans Standard Provisions, including payment for equipment on the Project
necessarily idled during such work.
Contractor will not be entitled to damages or additional payment for delays caused
solely by the failure of CITY, or the owner of the utility, to provide for removal or
relocation of existing main or trunk line utility facilities not identified in the Contract
Documents, except for equipment necessarily idled during such work.
Contractor will not be assessed liquidated damages for delay in completing the work
solely attributable to the failure of CITY, or the owner of the utility, to provide for removal
or relocation of existing main or trunk line utility facilities not indicated in the Contract
Documents.
The right is reserved by CITY and by the owners of facilities or their authorized agents
to enter the job for the purpose of making such changes as are necessary for the
rearrangement of their facilities or for making necessary connections or repairs to their
properties. The Contractor shall cooperate with forces engaged in such work and shall
conduct its operations in such a manner as to avoid any delay or hindrance to the work
being performed by such other forces.
Attention is directed to the possible existence of underground facilities not known to
CITY, or in a location different from that which is shown on the plans or in the Special
Conditions. The Contractor shall take all steps reasonably necessary to ascertain the
exact location of all underground facilities prior to doing work that may damage such
facilities or interfere with their service, including but not limited to calling USA to mark
utilities. See GC-7(L).
I. COMPENSATION
Full compensation for conforming to the requirements of this section shall be deemed
included in the prices paid for the various contract items of work, and no separate
payment will be made therefor, except that this provision does not constitute a waiver,
alteration, or limitation of the applicability of California Public Contracts Code Section
7102.
SECTION GC-9 MEASUREMENT AND PAYMENT
A. GENERAL
Attention is directed to Section 9 ("Measurement and Payment") of the Caltrans
Standard Specifications which includes procedures for determination of payments,
compensation for extra work by force account, partial payments, and final payments.
Waiver Forms 40
1191148v3 80097/0002
B. SCOPE OF PAYMENT
The Contractor shall accept the compensation provided in the Contract as full payment
for furnishing all labor, materials, tools, equipment, and incidentals necessary to the
completed work and for performing all work contemplated and embraced under the
contract; for loss or damage arising from the nature of the work, from the action of the
elements, or from any unforeseen difficulties that may be encountered during the
prosecution of the work until the acceptance by CITY; for all risks of every description
connected with the prosecution of the work; for all expenses incurred in consequence of
the suspension or discontinuance of the work as provided in the contract; and for
completing the work according to the plans and specifications.
In accordance with Public Contract Code Section 9203, for any public work contract with
a total cost greater than five thousand dollars ($5,000) progress payments shall not be
made in excess of ninety-five percent (95%) of actual Work completed plus a like
percentage of the value of material delivered on the ground or stored subject to, or
under the control of, CITY, and unused.
In all contracts with subcontractors, the contractor shall comply with Public Contract
Code Section 7200 regarding the percentage of retention proceeds withheld.
Neither the payment of any estimate nor of any retained percentage shall relieve the
Contractor of any obligation to make good any defective work or material.
Contractor shall submit certified payroll reports with each payment request.
CITY shall review each payment request and tender payment in accordance with Public
Contract Code Section 20104.50.
No compensation will be made in any case for loss of anticipated profits. Contractor
shall include with each estimate for payment a "Conditional Waiver and Waiver and
Release Upon Progress Payment" form as prescribed in Civil Code Section 3262 signed
by all subcontractors, material suppliers, equipment lessors and other parties covering
labor, materials, equipment or services included in the pay estimate. Within thirty (30)
days of the date CITY makes payment to the Contractor on an estimate for payment,
the Contractor shall obtain and submit to Owner "Unconditional Waiver and Release
Upon Progress Payment" in the form prescribed in Civil Code Section 3262 from the
same subcontractors, suppliers, equipment lessors and others. These forms are
included at the end of the General Conditions Section, following subsection GC-13.
C. EXTRA AND FORCE ACCOUNT WORK
Extra work as herein before defined, when ordered and accepted, shall be paid for
under a written work order in accordance with the terms therein provided, and as
provided in Section GC-4 (F) of the General Conditions. Payment for extra work will be
made at the unit price or lump sum previously agreed upon in writing or by force
account as provided in Section 9-1.03 ("Force Account Payment") of the Caltrans
Standard Specifications.
Waiver Forms 41
1191148v3 80097/0002
D. STOP NOTICES
CITY, by and through appropriate City of Saratoga office or officers, may at its option
and at any time retain out of any amounts due the Contractor, sums sufficient to cover
claims stated in stop notices filed pursuant to Civil Code Sections 3179 et seq. and to
provide for the cost of any litigation thereunder.
E. PAYMENT
Upon final approval and acceptance of the work by CITY, Contractor shall be paid all
sums of money in accordance with the terms and conditions as outlined in the
Contractor's submittal of City's Bid Form.
No such estimate or payment shall be construed to be an acceptance of any defective
work or improper materials.
F. SUBSTITUTION OF SECURITIES FOR WITHHELD AMOUNTS
Pursuant to Public Contract Code Section 22300, the Contractor may substitute
securities for any monies retained to ensure performance. At the request and expense
of the Contractor, securities equivalent to the amount retained shall be deposited with
CITY, or with a state or federally chartered bank in California as the escrow agent, and
CITY shall then pay such monies to the Contractor. Alternatively, the Contractor may
request that CITY make payment directly to the escrow holder, to be invested at the
Contractor's expense and direction.
Eligible securities shall include those listed in Government Code Section 16430, or bank
or savings and loan certificates of deposit, interest bearing demand deposit accounts,
standby letters of credit, or any other security mutually agreed to by the Contractor and
CITY. The Contractor shall be the beneficial owner of any securities substituted for
monies, and shall receive any interest on such securities.
Any escrow agreement shall be substantially similar in form to the form of escrow
agreement included in Public Contract Code Section 22300(f).
G. FINALIZING PROGRESS PAYMENT
CITY shall, after the completion of all Work required under the Contract, make a final
estimate of the amount of work done, and the value of such work, and CITY shall pay
ninety percent (90%) of the entire sum so found to be due after deducting therefrom all
previous payments and all amounts to be kept and all amounts to be retained under the
provisions of the Contract Documents.
H. FINAL PAYMENT
The 10% retained by CITY after each progress payment is made shall be due and
payable to the Contractor after the expiration of thirty-five (35) days from the date of
recordation of the Notice of Completion following acceptance of the Work by CITY. It is
Waiver Forms 42
1191148v3 80097/0002
expressly understood that said final payment or a portion thereof may not be paid to the
Contractor if any stop notices are properly filed.
No certificate given or payments made under the Contract, except the final certificate or
final payment, shall be conclusive evidence of the performance of the Contract, either
wholly or in part, against any claim of CITY, and no payments shall be construed to be
acceptance of any defective work or improper materials.
Payment by CITY of the final undisputed amount due under the Contract, including
payment based upon adjustments for any work done in accordance with any alterations
of the Contract Documents, shall be contingent upon the Contractor furnishing CITY
with a release of all claims against CITY arising by virtue of the contract related to those
amounts. In the event the Contractor has any such claims, such claims in stated
amounts may be specifically excluded by the Contractor from the release, in which case
the payment by CITY may be of only undisputed amounts.
I. REPAIR OR RECONSTRUCTION OF DEFECTIVE WORK
If, within a period of one (1) year after final acceptance of the work performed under this
contract, any structure furnished, installed, constructed, and/or caused to be installed or
constructed by the Contractor, or any of the work done under this contract, fails to fulfill
any of the requirements of the Contract Documents, the Contractor shall without delay
and without any cost to CITY, repair, replace or reconstruct any defective or otherwise
unsatisfactory part or parts of the Work. Should the Contractor fail to act promptly or in
accordance with this requirement, or should the situation require that repairs or
replacements be made before the Contractor can be notified, CITY may, at its option,
make the necessary repairs or replacements or perform the necessary work and the
Contractor shall pay to CITY the actual cost of such repairs plus 25%.
J. FISCAL AGENT PAYMENT
With certain exceptions, all monies for the progress payments and final payment under
the contract will be sent to the Contractor. CITY will send, by first-class mail, warrants
payable to the Contractor to the mailing address specified on the separate payment
request certified and approved by CITY.
K. CLAIMS PROCEDURES
Attention is directed to the provisions in Section 9 ("Measurement and Payment") of the
Caltrans Standard Specifications regarding notice of claims or potential claims, which
shall apply to any and all claims, including requests for additional compensation and/or
an adjustment in the time for performing the Work. Claims shall be resolved by
arbitration as described in Section 9-1.10 of the Caltrans Standard Specifications.
SECTION GC-10 DUST CONTROL
The Contractor shall provide suitable means for dust control by applying either water or
dust palliative for operations within the limits of the Work. Dust control work shall be
Waiver Forms 43
1191148v3 80097/0002
performed in such manner to prevent dust at all times, including during non-working
hours. Full compensation for providing dust control shall be deemed included in the
prices paid for the various contract items of work, and no separate payment will be
made therefor.
If dust control is not performed in a manner satisfactory to the Director of Public Works,
then either (i) work shall be suspended until the dust control measures are sufficient or
(ii) dust control may be performed by CITY, or its designee, and CITY will deduct all
costs it incurs performing dust control plus twenty-five percent (25%) from amounts due
or that become due to Contractor.
SECTION GC-11 RESERVED
SECTION GC-12 DIFFERING SITE CONDITIONS
The Contractor shall promptly, and before the following conditions are disturbed, notify
CITY in writing of any:
a) Material that the Contractor believes may be hazardous waste, as defined
in California Health and Safety Code Section 25117, that is required to be
removed to a Class I, Class II, or Class III disposal site in accordance with
provisions of existing law;
b) Subsurface or latent physical conditions at the site differing materially from
those indicated in the Contract Documents; or
c) Unknown physical conditions at the site of any unusual nature, differing
materially from those ordinarily encountered and generally recognized as
inherent in work of the character provided for in the Contract Documents.
CITY shall promptly investigate the conditions. If it finds that such conditions do
materially differ from conditions indicated in the Contract Documents or ordinarily
encountered in work of this character, or do involve hazardous waste, and cause an
increase or decrease in the Contractor's costs or the time needed to perform any part of
the Work, CITY shall issue a change order under the provisions described in the
Contract Documents. No claim of the Contractor under this clause shall be allowed
unless the Contractor has given the notice required in the Contract Documents. In the
event a dispute arises between CITY and the Contractor as to whether the conditions
materially differ, or involve hazardous waste, or cause a decrease or increase in the
Contractor's costs or the time needed to perform any part of the Work, Contractor shall
not be excused from completing the Work as provided in the Contract Documents. The
Contractor shall proceed with all work to be performed under the Contract Documents.
The Contractor shall retain any and all rights provided either by the Contract Documents
or by law that pertain to the resolution of disputes and protests.
Waiver Forms 44
1191148v3 80097/0002
SECTION GC-13 ARCHAEOLOGICAL EXAMINATION
If archaeological materials are uncovered during grading, trenching or other excavation,
earthwork within 100 feet of these materials shall be stopped until a professional
archaeologist certified by the Society of California Archaeology (SCA) and/or by the
Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the
significance of the find and to suggest appropriate mitigation measures as necessary.
In the event the work of archaeological examination and related work delays the
Contractor's work, he shall be entitled to an extension of time to complete the work
equal to the number of working days the Work is thus delayed. However, the
Contractor shall have no claim for compensation as a consequence of delay of the Work
for the period of time required by CITY for such archaeological examination and related
work.
Waiver Forms 45
1191148v3 80097/0002
WAIVER FORMS
Waiver Forms 46
1191148v3 80097/0002
CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT
Upon receipt by the undersigned of a check from
(Maker of Check) in the sum of $ (Amount of Check) payable to
(Payee or Payees of Check) and when the check has been properly
endorsed and has been paid by the bank upon which it is drawn, this document shall
become effective to release any mechanic's lien, stop notice, or bond right the
undersigned has on the job of CITY located at (Job Description) to
the following extent. This release covers a progress payment for labor, services,
equipment or material furnished to (Your Customer) through
(Date) only and does not cover any retentions retained before or after the
release date; extras furnished before the release date for which payment has not been
received; extras or items furnished after the release date. Rights based upon work
performed or items furnished under a written change order that has been fully executed
by the parties prior to the release date are covered by this release unless specifically
reserved by the claimant in this release. This release of any mechanic's lien, stop
notice, or bond right shall not otherwise affect the contract rights, including rights
between parties to the contract based upon a rescission, abandonment, or breach of the
contract, or the right of the undersigned to recover compensation for furnished labor,
services, equipment, or material covered by this release if that furnished labor, services,
equipment, or material was not compensated by the progress payment. Before any
recipient of this document relies on it, said party should verify evidence of payment to
the undersigned.
DATED: , 20__
By
Its
Waiver Forms 47
1191148v3 80097/0002
CONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT
Upon receipt by the undersigned of a check from in the
sum of $ payable to and
when the check has been properly endorsed and has been paid by the bank upon which
it is drawn, this document shall become effective to release any mechanic's lien, stop
notice, or bond right the undersigned has on the job of the City of Saratoga located at
(Job Description). This release covers the
final payment to the undersigned for all labor, services, equipment or material furnished
on the job, except for disputed claims for additional work in the amount of $
. Before any recipient of this document relies on it, the party should verify
evidence of payment to the undersigned.
DATED: , 20
By
Its
Waiver Forms 48
1191148v3 80097/0002
UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT
The undersigned has been paid and has received a progress payment in the sum of
$ for labor, services, equipment or material furnished to
(Your Customer) on the job of City of
Saratoga located at (Job Description) and does hereby
release any mechanic's lien, stop notice, or bond right that the undersigned has on the
above referenced job to the following extent. This release covers a progress payment
for labor, services, equipment, or materials furnished to
(Your Customer) through (Date) only and does not
cover any retentions retained before or after the release date; extras furnished before
the release date for which payment has not been received; extras or items furnished
after the release date. Rights based upon work performed or items furnished under a
written change order that has been fully executed by the parties prior to the release date
are covered by this release unless specifically reserved by the claimant in this release.
This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect
the contract rights, including rights between parties to the contract based upon a
rescission, abandonment, or breach of the contract, or the right of the undersigned to
recover compensation for furnished labor, services, equipment, or material covered by
this release if that furnished labor, services, equipment, or material was not
compensated by the progress payment.
DATED: , 20
By
Its
NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES
THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT
IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN
PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM.
Waiver Forms 49
1191148v3 80097/0002
UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT
The undersigned has been paid in full for all labor, services, equipment or material
furnished to: (Your Customer) on the job of the City of
Saratoga located at (Job Description) and does hereby
waive and release any right to a mechanic's lien, stop notice, or any right against a labor
and material bond on the job, except for disputed claims for extra work in the amount of
$ .
DATED: , 20 .
By
Its
NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES
THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT
IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN
PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM
Waiver Forms 50
1191148v3 80097/0002
SPECIAL CONDITIONS
1. SPECIAL QUALIFICATIONS
Contractor is advised that in addition to the standard qualifications, the following
additional specialty qualifications apply to this Contract: None.
2. SPECIALTY WARRANTIES
In addition to the standard Warranties for overall workmanship and landscaping work
identified in Section 6 of the Contract for Construction, the following are required:
Provide copies of all equipment manufacturer warranties for all equipment used in
project, boilers, fans, controls, valves, thermometers, pressure gauges, piping, thermal
insulation, electrical motors, roofing materials and smoke detectors. The time length of
the warranties on the materials is from the Manufacturers with Labor covered for one
year by the Contractor.
3. AWARD
The award of the contract, if it is to be awarded, will be to the lowest responsive
responsible bidder whose proposal complies with all the requirements of the bid
documents. The low bid will be determined based upon: Base bid only.
4. ORDER of WORK
The Contractor shall provide for the orderly progression of work.
Since the building is occupied, Contractor shall order work to avoid disruption to Library
operations.
5. LIMITS of WORK
Contractor is advised that the City will provide off-site areas for Contractor activities as
follows: Equipment storage at City's corporation yard, 19700 Allendale Avenue. On site
storage will be limited to no more than 5 parking places in the Library parking lot.
6. TESTING
Contractor is advised that the following special testing requirements apply:
None in addition to building permit requirements.
7. SOUND CONTROL
Contractor shall implement the following sound control measures:
None in addition Saratoga Code stipulations.
Waiver Forms 51
1191148v3 80097/0002
8. Permits and Licenses
Contractor shall obtain the following permits and licenses before commencing work:
Electrical Permits: No Fee.
Mechanical Permits: No Fee
Business License: $75
Contractor shall comply with all permit conditions in performing the Work.
9. PUBLIC CONVENIENCE & SAFETY
Contractor is responsible for protecting all existing facilities and property in and around
the Library from damage resulting from the Work, as well as protecting all workers,
Library staff and the public from injury related to the Work.
10. HOURS of WORK
The Saratoga Library is open seven days a week:
Mon. and Tuesday 1:00 PM to 9:00 PM
Wed. and Thursday 10:00 A.M. to 9:00 p.m.
Friday and Saturday 10:00 A.M. to 6:00 P.M.
Sunday 1:00 P.M. to 5:00 P.M.
Contractor may perform work inside the Library building only when the Library is NOT
open to the public. Contractor must give at least 5 working day's notice to the City
before performing any work inside the Library building.
11. MITIGATION MEASURES
None.
12. MILESTONES and SCHEDULES
A. Construction Progress Schedule
The Contractor shall prepare and submit the Contractor's Initial Construction Schedule
within ten (10) calendar days after the issuance of the Notice to Proceed. The Initial
Construction Schedule shall be in a form acceptable to the Engineer, and shall be
produced using Microsoft Project or other software acceptable to CITY. Contractor shall
provide the Initial Schedule in electronic format acceptable to City.
Activity durations shall be the total number of actual days required to perform the work
including consideration of weather impacts. Area codes shall distinguish construction
Waiver Forms 52
1191148v3 80097/0002
activities related to individual buildings or areas within buildings (i.e. locker rooms) and
site work.
Contractor staff preparing schedules shall be qualified and experienced in the
scheduling method specified and capable of fulfilling the scheduling requirements of this
section for the duration of the contract.
The Engineer will meet with the Contractor to review and comment on the Contractor's
Initial Schedule within five (5) days of its receipt. The Contractor will finalize and re-
submit the schedule within five (5) days of the review meeting. Upon favorable review
by the Director of Public Works, the Initial Schedule will become the project Baseline
Contract Schedule. The Baseline Schedule shall not be revised without written
approval of the City. CITY shall have the right to withhold progress payments from the
Contractor at its discretion if the Contractor fails to finalize and obtain approval for the
Baseline Contract Schedule within the prescribed period.
Failure of the Contractor to incorporate all elements of work required for the
performance of the contract or any inaccuracy in the Baseline Contract Schedule shall
not excuse the Contractor from performing all work required for a completed project
within the specified contract time period, notwithstanding CITY's Representatives
favorable review of the Baseline Contract Schedule.
B. Short Interval Schedule
Short Interval Schedules (SIS) shall be submitted to the Engineer at every weekly site
meeting. The Interval shall be three weeks and shall include the past week, the week
submitted and the week thereafter. The SIS may be prepared by hand. The SIS shall
be based on the Contract Schedule and shall be in bar chart form. The SIS shall be in
sufficient detail to evaluate the Contractor's performance in the preceding week and
planned progress in upcoming weeks vis a vis the Contract Schedule and Updates
thereof.
C. Float Time
Float or slack time is defined as the amount of time between the earliest start date and
the latest start date or the earliest finish date and the latest finish date of a scheduled
activity. Float or slack time is not for the exclusive use or benefit of either the
Contractor or CITY. The Contractor acknowledges and agrees that actual delays
affecting path of activities containing float will not have any effect upon the Contract
completion date, provided that the actual delay does not exceed the float time
associated with those activities.
D. Construction Schedule Revisions
If during the process of schedule updating it becomes apparent that the Construction
Schedule no longer represents the actual prosecution and progress of the work, City
may require the Contractor to submit a revised schedule at no additional cost to CITY.
CITY shall have the right to withhold progress payments from the Contractor at its
Waiver Forms 53
1191148v3 80097/0002
discretion, if the Contractor fails to submit a timely, detailed and workable schedule.
Updating the construction schedule to reflect actual progress shall not be considered to
be a revision of the Schedule.
If actual progress of the Work falls five (5) days behind the most recent schedule update
favorably reviewed by Engineer, Contractor shall prepare and submit a recovery
schedule within five (5) working days of a written request to explain and display how
Contractor intends to reschedule activities (including increasing working hours, shifts,
days, or equipment) to regain compliance with the Construction Schedule.
E. Early Completion of Project
In the event the Contractor wishes to complete work earlier than the specified contract
completion date, and CITY and Director of Public Works approve such earlier
completion, the following conditions apply:
Approval by CITY of Contractor's proposed earlier completion date shall not change the
contract completion date. Contractor shall not, under any circumstances, receive
additional compensation from CITY for indirect, general, administrative or other forms of
overhead costs, for the period between the time of earlier completion proposed by the
Contractor and the official contract completion date.
F. Time Extension Requests
The monthly Updated construction schedules submitted by the Contractor shall not
show a completion date later than the Contract Time, subject to any time extensions
granted by CITY.
If the Contractor believes that it is entitled to an extension of the Contract Time due to a
Change Order, delay/disruption or other event beyond its control, the Contractor, within
five (5) working days of the qualifying event(s), shall submit:
1. A Time Extension Request notification letter with a detailed narrative
justifying the time extension requested;
2. Analysis of the delay impact, identifying all schedule activities that are
affected by the subject occurrence;
3. A tabular report of the qualifying schedule the analysis is based on; and
4. A schedule analysis entitled "Time Extension Request Schedule" that
incorporates the findings of the analysis of delay impact into the latest
update of the project schedule.
Time extension request schedules shall be time scaled, utilizing a computer generated
network analysis unless otherwise approved by the Director of Public Works. The time
extension request shall forecast the adjusted project completion date and impact to any
intermediate milestones.
Waiver Forms 54
1191148v3 80097/0002
Contract time extensions shall be granted only to the extent the equitable time
adjustments to the activity or activities affected by a change order or delay/disruption
exceed the total float of a critical activity (or path) and extend the Contract Completion
Date.
When Contractor does not submit a Time Extension Request within ten (10) working
days, it is mutually agreed that the particular Change Order (including Proposed
Change Order) or delay/disruption does not affect the construction schedule and hence
no time extension is due to the Contractor.
CITY shall have no obligation to consider any time extension request if the Contractor
does not comply with the requirements of the Contract Documents. CITY shall not be
responsible or liable to the Contractor for any constructive acceleration due to failure of
CITY to grant time extensions under the terms of this contract, should Contractor fail to
comply with the time extension submission and justification requirements stated herein.
Experience and Qualifications 55
1191148v3 80097/0002
STATEMENT OF EXPERIENCE AND QUALIFICATIONS
Experience and Qualifications 56
1191148v3 80097/0002
CONTRACTOR'S EXPERIENCE AND QUALIFICATIONS
The following statements as to the experience and qualifications of the bidder are to be
submitted with the Contract Bid, as a part thereof. The bidder warrants that the
information provided is true and accurate.
The bidder has been engaged in the contracting business, under the present business
name, for _____ years. Experience in work of a nature similar to that covered in the Bid
extends over a period of _____ years.
The bidder, as a contractor, has successfully completed at least two (2) projects of like
magnitude, comparable difficulty and rates of progress to the work, including: (list two or
more projects).
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
The bidder, as a contractor, has never failed to satisfactorily complete a contract
awarded to the Contractor, except as follows: (name any and all exceptions and
reasons therefor).
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
The bidder has satisfactorily completed the following contracts in the last three (3)
years, for the owner indicated, and to whom reference is made (list five contracts).
(Provide a contact person and telephone number for each project.)
CONTRACT YEAR TYPE OF WORK AMOUNT CONTACT
Experience and Qualifications 57
1191148v3 80097/0002
The names of all persons interested in the foregoing bids as principals are as follows:
(NOTE: If Bidder or other interested person is a corporation, state the legal name of the
corporation, along with the names of the president, secretary, treasurer, and manager
thereof; if a general partnership, state true name of the firm, also the names of all
individual partners composing the firm; if a limited partnership, the names of all general
partners and limited partners; and if Bidder or other interested person is an individual,
state first and last names in full.)
Contractor's License Number:
License Renewal Date:
Bid Form 58
1191148v3 80097/0002
BID FORM
Bid Form 59
1191148v3 80097/0002
CONTRACT BID
TO
CITY OF SARATOGA
FOR
SARATOGA LIBRARY HVAC RENOVATION
Name of Bidder
of Business Address
Telephone (___) _______ and (___) _______ Facsimile (___) _______
TO THE CITY COUNCIL OF THE CITY OF SARATOGA:
Pursuant to and in compliance with your Notice Inviting Bids for
SARATOGA LIBRARY HVAC RENOVATION
and the other Contract Documents relating thereto, the undersigned Bidder, being fully
familiar with the terms of the Contract Documents, the current general prevailing wage
rates, local conditions affecting the performance of the Project, the character, quality,
quantities and scope of the work, and the cost of the work at the place of performance,
hereby proposes and agrees, within the time stipulated in the Contract Documents, to
furnish to the City of Saratoga all of the transportation, materials, equipment, tools,
excavation, sheeting, shoring, bracing, supports, plant and other facilities, labor,
services, permits, utilities, and other items necessary to conduct and complete said
work, all in strict conformity with the Contract Documents, including Addenda Nos. ___,
____, and ____ on file in ______________, for the total price of
_____________________________dollars ($____________________).
Bidder acknowledges receipt of the following addendum or addenda during the bidding
period and represents that the information contained in the addendum or addenda has
been considered in the preparation of this bid proposal: Addendum
__________________________.
NOTE: failure to acknowledge receipt of all addenda may be considered an irregularity
in the bid proposal.
Bidder declares that the only persons or parties interested in this bid are those named
herein, and that this bid is made without collusion with any person, firm or corporation.
Bidder proposes and agrees, if the bid is accepted, that Bidder will execute a contract
with CITY, in strict conformity to the Contract Documents, in the form set forth in the
Contract Documents, and will perform the entire work for the prices set forth in the
attached Bid Schedule, upon which the award of contract is made.
Bid Form 60
1191148v3 80097/0002
BID SCHEDULE
Saratoga Library HVAC Renovation
Ite
m
No.
Approx.
Qty Unit Description
Unit
Price Total
Ceiling Fans
1 26 Each Ceiling Fans with Controls
Smoke Detectors
4 5 Each Relocate Existing Smoke Detectors, WIFI
5 7 Each Replace Duct Mounted Detector
Boilers
6 2 Each
Remove and Replace Existing Boilers, including all related
pumps, piping, plumbing, controls and related work
TOTAL BID
Bonds 61
1191148v3 80097/0002
BONDS
Bonds 62
1191148v3 80097/0002
BID BOND
KNOWN ALL PERSONS BY THESE PRESENTS that, _
hereinafter called the PRINCIPAL, and
, a corporation duly organized under the laws of the State of having its principal
place of business at _______________________ in the State of and authorized to do
business in the State of California, hereinafter call the SURETY, are held and firmly
bound unto the City of Saratoga, hereinafter called the OBLIGEE, on order, in the sum
of ________________________________Dollars ($________________) (being at
least ten percent (10%) of the total amount of PRINCIPAL 's bid) lawful money of the
United States, for the payment of which we bind ourselves, our heirs, executors,
administrators, successors, and assigns, jointly and severally, firmly by these present.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH THAT:
WHEREAS, the PRINCIPAL has submitted its Bid for the project entitled
SARATOGA LIBRARY HVAC RENOVATION to the OBLIGEE, said Bid, by reference
thereto; being hereby made a part hereof.
NOW, THEREFORE, if said Bid is rejected or, in the alternative, if said Bid is accepted
and the PRINCIPAL signs and delivers a Contract and furnishes a Performance Bond
and Payment Bond, in the form and within the time required by the Bid and the Contract
Documents, then this obligation shall become null and void, otherwise the same shall
remain in full force and effect and upon default of the PRINCIPAL shall be forfeited to
the OBLIGEE, it being expressly understood and agreed that the liability of the SURETY
for any and all default of the PRINCIPAL shall be the amount of this obligation as herein
stated, as liquidated damages. Such forfeiture and liquidated damages under this bond
shall be without prejudice to the OBLIGEE'S right to pursue any excess actual damages
from the PRINCIPAL for breach of contract or otherwise.
The SURETY, for value received, hereby agrees that the obligations of said SURETY
and its bond shall not be impaired or affected by any extension of the time within which
the OBLIGEE may accept such Bid, and the SURETY hereby waives notice of any such
extension.
In the event suit is brought upon this bond by the OBLIGEE and judgment is recovered,
the SURETY shall pay, in addition to the sum set forth above, all costs incurred by the
OBLIGEE in such suit, including reasonable attorney's fees and expert witness fees, to
be fixed by the court.
Signed this day of , 2002
PRINCIPAL
BY
Bonds 63
1191148v3 80097/0002
SURETY
BY
Note: Signature of person executing for SURETY must be notarized and evidence of
corporate authority attached.
Bonds 64
1191148v3 80097/0002
FAITHFUL PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:
WHEREAS, the City of Saratoga, California (hereinafter referred to as "Owner")
and ________________________, (hereinafter referred to as "Contractor"), have
entered into a written contract for furnishing of all labor, materials, equipment,
transportation and services for the construction of the SARATOGA LIBRARY HVAC
RENOVATION (hereinafter referred to as the "Construction Contract"); and
WHEREAS, Contractor is required by the terms of the Construction Contract to
furnish a bond for the faithful performance of all terms and conditions of the
Construction Contract;
NOW, THEREFORE, Contractor, as principal, and
__________________________ (hereinafter referred to as "Surety"), as surety, are
held and firmly bound unto Owner in the penal sum of
______________________________________ Dollars ($ ___________), lawful money
of the United States, for the payment of which sum well and truly to be made as
provided in this Performance Bond.
1. Contractor and Surety, jointly and severally, bind themselves, their heirs,
executors, administrators, successors and assigns to Owner for the performance of the
Construction Contract, which is incorporated herein by reference.
2. If Contractor timely performs each and every obligation under the Construction
Contract, Surety and Contractor shall have no obligation under this Bond, except to
participate in conferences as provided in Subparagraph 3.1.
3. Surety's obligation under this Performance Bond shall arise after:
3.1 Owner has declared a Contractor Default and has notified Contractor and Surety
at its address described in Paragraph 10 below that Owner has declared a Contractor
Default and has requested and attempted to arrange a conference with Contractor and
Surety to be held not later than seven days after receipt of such notice to discuss
methods of performing the Construction Contract; and
3.2 Owner has agreed to pay the Balance of the Agreement Price, as calculated
under the terms of the Construction Contract, to Surety in accordance with the terms of
the Construction Contract or to a contractor selected to perform the Construction
Contract in accordance with the terms of the Construction Contract with Owner.
4. When Owner has satisfied the conditions of Paragraph 3, Surety shall promptly
and at Surety's expense take one of the following actions:
4.1 Arrange for Contractor, with consent of Owner, to perform and complete the
Construction Contract; or
Bonds 65
1191148v3 80097/0002
4.2 Undertake to perform and complete the Construction Contract itself, through its
agents or through independent contractors; or
4.3 Obtain bids or negotiated bids from qualified contractors acceptable to Owner for
a contract for performance and completion of the Construction Contract, arrange for a
contract to be prepared for execution by Owner and the contractor selected with
Owner's concurrence, to be secured with performance and payment bonds executed by
a qualified surety equivalent to the bonds issued on the Construction Contract, and pay
to Owner the amount of damages as described in Paragraph 6 in excess of the Balance
of the Agreement Price, as calculated under the terms of the Construction Contract,
incurred by Owner resulting from Contractor's Default; or
4.4 Waive its right to perform and complete, arrange for completion, or obtain a new
Contractor and with reasonable promptness under the circumstances:
1. After investigation, determine the amount for which it may be liable to
Owner and, as soon as practicable after the amount is determined, tender
payment thereof to Owner; or
2. Deny liability in whole or in part and notify Owner citing specific reasons
therefor.
5. If Surety does not proceed as provided in Paragraph 4 within twenty days from
receipt of the notice described in paragraph 3.1 (whether or not a conference has been
held pursuant to paragraph 3.1), or such longer period upon which Owner and Surety
may agree in writing, Surety shall be deemed to be in default on this Bond. If the Surety
proceeds as provided in Subparagraph 4.4, and Owner refuses the payment tendered
or the Surety has denied liability, in whole or in part, without further notice Owner shall
be entitled to enforce any remedy available to Owner.
6. After Owner has declared a Contractor Default, and if Surety elects to act under
Subparagraph 4.1, 4.2, or 4.3 above, then the responsibilities of Surety to Owner shall
not be greater than those of Contractor under the Construction Contract, and the
responsibilities of Owner to Surety shall not be greater than those of the Owner under
the Construction Contract. To the limit of the amount of this Performance Bond, but
subject to commitment by Owner of the Balance of the Agreement Price to mitigation of
costs and damages on the Construction Contract, Surety is obligated without duplication
for:
6.1 The responsibilities of Contractor for correction of defective work, materials and
equipment and completion of the Construction Contract;
6.2 Additional legal, design professional, construction management and delay costs
resulting from the Contractor's Default, and resulting from the actions or failure to act of
the Surety under Paragraph 4; and
Bonds 66
1191148v3 80097/0002
6.3 Liquidated damages, or if no liquidated damages are specified in the
Construction Contract, actual damages caused by delayed performance or non-
performance of Contractor.
7. Surety shall not be liable to Owner or others for obligations of Contractor that are
unrelated to the Construction Contract, and the Balance of the Agreement Price shall
not be reduced or set off on account of any such unrelated obligations. No right of
action shall accrue on this Bond to any person or entity other than Owner or its heirs,
executors, administrators or successors.
8. Surety hereby waives notice of any change, including changes of time, to the
Construction Contract or to related subcontracts, purchase orders and other obligations.
9. Any proceeding, legal or equitable, under this Bond may be instituted in any court
of competent jurisdiction. The prevailing party in any such action shall be entitled to
recover its attorneys' fees, to be taxed as an item of costs.
10. Notice to Surety, Owner or Contractor shall be mailed or delivered to the
address, or sent via facsimile to the facsimile number, shown on the signature page.
11. DEFINITIONS
11.1 Balance of the Agreement Price: The total amount payable by Owner to
Contractor under the Construction Contract after all proper adjustments have been
made, including allowance to Contractor of any amounts received or to be received by
Owner in settlement of insurance or other claims for damages to which Contractor is
entitled, reduced by all valid and proper payments made to or on behalf of Contractor
under the Construction Contract.
11.2 Construction Contract: The agreement between the Owner and the Contractor
identified on the first page of this bond, including all Contract Documents and changes
thereto.
11.3 Contractor Default: Failure of the Contractor, which has neither been remedied
nor waived, to perform or otherwise to comply with the terms of the Construction
Contract.
CONTRACTOR, as Principal SURETY
By: By:
Its: Its:
Address: Address:
FAX: FAX:
Note: Signatures of those executing for Surety must be properly acknowledged. The
bond must be accompanied by a power of attorney from the Surety authorizing its agent
to bind it to this bond.
Bonds 67
1191148v3 80097/0002
LABOR AND MATERIALS PAYMENT BOND
KNOW ALL PERSONS BY THESE PRESENTS:
WHEREAS, the City of Saratoga, California (hereinafter referred to as "Owner")
and ________________________________________ (hereinafter referred to as
"Contractor"), have entered into a written contract for furnishing of all labor, materials,
equipment, transportation and services for the construction of the SARATOGA
LIBRARY HVAC RENOVATION (hereinafter referred to as the "Construction
Contract"); and
WHEREAS, Contractor is required by the terms of the Construction Contract to
furnish a bond to secure payment for all work, labor, materials, equipment or services
furnished in connection with the Construction Contract;
NOW, THEREFORE, Contractor, as principal, and
(hereinafter referred to as "Surety"), as surety, are held and firmly bound unto
Claimants, as defined herein, in the penal sum of
Dollars ($ ), lawful money of the United States, for the payment of
which sum well and truly to be made as provided in this Payment Bond.
1. Contractor and Surety, jointly and severally, bind themselves, their heirs,
executors, administrators, successors and assigns to Owner to pay for work, labor,
materials, equipment, services, or other items furnished for use and actually used in the
performance of the Construction Contract, which is incorporated herein by reference.
2. With respect to Owner, this obligation shall be null and void if Contractor:
2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and
2.2 Defends, indemnifies and holds Owner harmless from claims, demands, liens or
suits by any person or entity whose claim, demand, lien or suit is for the payment for
work, labor, materials, equipment, services or other items furnished for use in the
performance of the Construction Contract, provided Owner has promptly notified
Contractor and Surety (at the address described in Paragraph 12) of any claims,
demands, liens or suits and tendered defense of such claims, demands, liens or suits to
Contractor and Surety.
3. With respect to Claimants, this obligation shall be null and void if Contractor
promptly makes payment, directly or indirectly, for all sums due.
4. Surety shall have no obligation to Claimants under this Bond until:
4.1 Claimants who are employed by or have a direct contract with Contractor have
given notice to Surety (at the address described below) and sent a copy, or notice
thereof, to Owner, stating that a claim is being made under this Payment Bond and, with
substantial accuracy, the amount of the claim.
Bonds 68
1191148v3 80097/0002
4.2 Claimants who do not have a direct contract with the Contractor:
1. Have furnished written notice to Contractor and sent a copy, or notice
thereof, to Owner, as required by and conforming with Civil Code Sections
3252 and 3091; and
2. Not having been paid within thirty (30) days of sending the required notice,
have sent a written notice to Surety (at the address described below) and
sent a copy to the Owner, stating that a claim is being made under this
Payment Bond and enclosing a copy of the previous written notice
furnished to Contractor.
5. When the Claimant has satisfied the conditions of Paragraph 4, Surety shall
promptly and at Surety's expense take the following actions:
5.1 Send an answer to the Claimant, with a copy to Owner, within 20 days after
receipt of the claim, stating the amounts that are undisputed and the basis for
challenging any amounts that are disputed.
5.2 Pay or arrange for payment of any undisputed amounts.
6. Surety's total obligation shall not exceed the amount of this Payment Bond, and
the amount of this Payment Bond shall be credited for any payments made in good faith
by Surety.
7. Amounts owed by Owner to Contractor under the Construction Contract shall be
used for the performance of the Construction Contract and to satisfy claims, if any,
under the Performance Bond. By Contractor furnishing and Owner accepting this
Payment Bond, they agree that all funds earned by Contractor in the performance of the
Construction Contract are dedicated to satisfy obligations of Contractor and Surety
under this Bond, subject to the Owner's priority to use the funds for the completion of
the work or the satisfaction of Owner's claims, including liquidated damages, under the
Construction Contract.
8. Surety shall not be liable to Owner, Claimants or others for obligations of the
Contractor that are unrelated to the Construction Contract. Owner shall not be liable for
payment of any costs or expenses of any Claimants under this Payment Bond, and shall
have under this Payment Bond no obligation to make payments to, give notices on
behalf of, or otherwise have any obligation to Claimants under this Payment Bond.
9. Surety hereby waives notice of any change, including changes of time, to the
Construction Contract or to related subcontracts, purchase orders and other obligations.
10. No suit or action shall be commenced by a Claimant under this Bond other than
in a court of competent jurisdiction. The prevailing party in any such action shall be
entitled to recover its attorneys' fees, to be taxed as costs.
Bonds 69
1191148v3 80097/0002
11. Notice to Surety, Owner or Contractor shall be mailed or delivered to the address
shown on the signature page.
12. This Payment Bond has been furnished to comply with Civil Code Sections 3247
through 3252. Any provision in this Payment Bond conflicting with those statutory
requirements shall be deemed deleted and provisions conforming to such statutory or
other legal requirement shall be deemed incorporated herein. The intent is that this
Payment Bond shall be construed as a statutory bond and not as a common law bond.
13. Upon request by any person or entity appearing to be a potential beneficiary of
this Payment Bond, the Contractor shall promptly furnish a copy of this Payment Bond
or shall permit a copy to be made.
14. DEFINITIONS
14.1 Claimant: An individual or entity identified in California Civil Code Sections 3181
or 3248.
14.2 Construction Contract: The agreement between Owner and Contractor identified
above, including all Contract Documents and changes thereto.
CONTRACTOR, as Principal SURETY
By: By:
Its: Its:
Address: Address:
FAX: FAX:
Note: Signatures of those executing for Surety must be properly acknowledged. The
bond must be accompanied by a power of attorney from the Surety authorizing its agent
to bind it to this bond.
Contract for Construction 70
1191148v3 80097/0002
CONTRACT FOR CONSTRUCTION
SARATOGA LIBRARY HVAC RENOVATION
Contract for Construction 71
1191148v3 80097/0002
THIS CONTRACT FOR CONSTRUCTION is made and entered into this _____ day of
______________, 20__, by and between the City of Saratoga, a municipal corporation
(herein called CITY) and ________________________, a California corporation, a
partnership or an individual (circle one) located at
______________________________________, herein called Contractor.
RECITALS
A. WHEREAS, the City has caused to be prepared in the manner prescribed by law,
plans, specifications and other contract documents for the public work of construction
SARATOGA LIBRARY HVAC RENOVATION herein described and shown and has
approved and adopted the Contract Documents, including the specifications and plans,
and has caused to be published in the manner and for the time required by law a Notice
Inviting Bids for the work described in the Contract Documents, and
B. WHEREAS, the Contractor in response to the City's Notice has submitted to the
City a sealed bid proposal accompanied by a bid guaranty in an amount not less than
ten percent (10%) of the amount bid for the construction of all of the proposed work in
accordance with the terms of the Contract Documents, and
C. WHEREAS, the City, in the manner prescribed by law, has publicly opened,
examined and declared the bids submitted and as a result has determined and declared
the Contractor to be the lowest responsible bidder and has duly awarded to the
Contractor a contract for all of the work and for the sum or sums named in the bid
proposal and in this Contract.
Accordingly, CITY and Contractor agree as follows:
(1) CONTRACT SUM: CITY agrees to pay, and the Contractor agrees to accept, in
full payment for performance the Work in strict accordance with the Contract
Documents, the sum of _________________________________ dollars
($_____________________) to be paid in accordance with the Contract
Documents.
(2) CONTRACT TIME: Contractor shall complete the Work in its entirety within 45
calendar days from the date specified in the Notice to Proceed (the "Contract
Time"). If Contractor fails to complete the Work within the Contract Time, the
Owner will sustain damage. It is and will be impracticable to determine the actual
damage the Owner will sustain in the event of and by reason of such delay. It is
therefore agreed that the Contractor will pay to the Owner the sum of $1,000 for
each and every calendar day's delay beyond the Contract Time that the Project is
not complete. This amount is a reasonable estimate of the costs the Owner will
incur if completion of the Work is delayed. Contractor agrees to pay such
liquidated damages as herein provided, and in case the same are not paid,
agrees that the Owner may deduct the amount thereof from any monies due or
that may become due the Contractor under the Contract.
Contract for Construction 72
1191148v3 80097/0002
(3) COMPLIANCE WITH LAW: CITY is a public agency. All provisions of law
applicable to public contracts are a part of this contract to the same extent as
though set forth herein and will be complied with by the Contractor.
(4) CONTRACT DOCUMENTS: The following Contract Documents relating to this
Contract for Construction are hereby made a part of and incorporated by
reference into this Contract:
The Notice Inviting Bids
Information for Bidders
Statement of Experience and Qualifications Bid Form
Contract Proposal,
Faithful Performance Bond
Labor and Materials Payment Bond
Contractor's Certificate Regarding Worker's Compensation
Certificate of Insurance and Endorsements,
Affidavit Concerning Conflicts of Interest and Noncompetitive Practices
Fair Employment Practices Certificate
General Conditions, Special Conditions and Attachments thereto,
State of California Department of Transportation Standard Specifications, 2006
State of California Department of Transportation Standard Plans and
Specifications, current year
Plans and Specifications prepared by Listengineering dated 4/15/09, and all
addenda issued by City prior to receipt of the Contract Proposals.
Any work called for in one contract document not mentioned in another is to be
performed and executed the same as if mentioned in all Contract Documents.
This Agreement (including all documents referred to above and incorporated herein)
represents the entire and integrated Agreement between CITY and Contractor for the
Project and supersedes all prior negotiations, representations, or agreements, either
written or oral. This document may be amended only by written instrument, as provided
in the General Conditions.
(5) PROHIBITED INTEREST. Contractor represents that to the best of its
knowledge no director, officer, or employee of CITY has any interest, contractual
Contract for Construction 73
1191148v3 80097/0002
or non-contractual, financial or otherwise, in this transaction or in the business of
Contractor. If any such interest comes to the knowledge of Contractor at any
time, a full and complete disclosure of all such information shall be made in
writing to CITY, even if such interest would not be considered a conflict of
interest under Article IV Division 4 (commencing with Section 1090) or Division
4.5 (commencing with Section 3600) of the Government Code of the State of
California. No member, officer, or employee of CITY or of any of its member
jurisdictions during his/her tenure of office, or for one year thereafter, shall have
any interest, direct or indirect, in this Contract or the proceeds therefrom.
(6) NOTICES. Any notices to be given hereunder by either party to the other may be
effected either by personal delivery, fax or mail. Mail shall be sent registered or
certified, postage pre-paid, return receipt requested. Mailed notices shall be
addressed to the parties at the addresses set forth below, but each party may
change its address by written notice in accordance with this paragraph. Notices
delivered personally shall be effective immediately. Notices sent by mail shall be
effective one (1) day after mailing. Notices sent by facsimile shall be effective
upon transmission to the number set forth below.
CITY OF SARATOGA CONTRACTOR
Public Works Director
City of Saratoga
13777 Fruitvale Ave.
Saratoga, CA 95070
(408) 868-1239
(7) Warranties. The Contractor hereby warrants and guarantees for one (1) year
from and after the date City accepts the Work provided for in this Agreement that
said materials and labor necessary for the SARATOGA LIBRARY HVAC
RENOVATION shall operate as provided for in the Technical Specifications and
Contract Documents. During the term of this warranty, Contractor shall provide
all materials, parts and labor, at its own expense, which are necessary to repair
and/or correct any and all defects, installation or operational failures in the
equipment from any cause. Notwithstanding the foregoing, Contractor shall not
be required to bear the expense of correction of any failure in the Work that is
caused solely by the negligence or willful misconduct of City. The warranties of
each part or component supplied are in addition to the warranties required of
Contractor in the Contract Documents.
(8) Waiver. No waiver of any breach of the terms, conditions or covenants of this
contract shall be construed to be a waiver of any succeeding breach of the same
or any other covenants, conditions or terms of this contract. The waiver by any
party of a breach of this Contract shall not constitute a continuing waiver, or a
waiver of any subsequent breach, either of the same of different provision of this
Contract.
Contract for Construction 74
1191148v3 80097/0002
(9) Time of the Essence. Time is of the essence in this contract.
(10) Controlling Law. This contract and all matters relating to it shall be governed by
the laws of the State of California.
(11) Entire Agreement. It is expressly agreed between CITY and Contractor that this
contract, including the documents listed in paragraph 3 and incorporated herein,
expresses the complete agreement between the parties and supersedes all prior
oral or written negotiations, agreements and understandings between them
regarding the subject matter hereof. This Agreement may be amended only by
written agreement between the parties as provided in the Contract Documents.
CONTRACTORS ARE REQUIRED BY LAW TO BE LICENSED AND REGULATED BY
THE CONTRACTORS' STATE LICENSE BOARD WHICH HAS JURISDICTION TO
INVESTIGATE COMPLAINTS AGAINST CONTRACTORS IF A COMPLAINT
REGARDING A PATENT ACT OR OMISSION IS FILED WITHIN FOUR (4) YEARS OF
THE DATE OF THE ALLEGED VIOLATION. A COMPLAINT REGARDING A LATENT
ACT OR OMISSION PERTAINING TO STRUCTURAL DEFECTS MUST BE FILED
WITHIN TEN (10) YEARS OF THE DATE OF THE ALLEGED VIOLATION. ANY
QUESTIONS CONCERNING A CONTRACTOR MAY BE REFERRED TO THE
REGISTRAR, CONTRACTORS' STATE LICENSE BOARD, P.O. BOX 26000,
SACRAMENTO, CALIFORNIA 95826.
This Agreement is executed by CITY upon approval by the Council at its regular
scheduled meeting of ___________________________, and the Contractor has
caused this Agreement to be duly executed.
CITY OF SARATOGA CONTRACTOR:
By: By:
[NAME, TITLE] (Authorized Representative of
Contractor)
Dated: _________________, 20__ Printed Name:
Title:
(Attach Acknowledgment for Authorized
Representative of Contractor)
Contractors License No.:
Expiration Date:
ATTEST:
_____________________________
_____________________________ Dated: ____________________,
20__
APPROVED AS TO FORM:
Contract for Construction 75
1191148v3 80097/0002
______________________________
[NAME],
City Attorney
(Contractor Signatures must be Notarized)
Required Certifications 76
1191148v3 80097/0002
REQUIRED CERTIFICATIONS
Required Certifications 77
1191148v3 80097/0002
BIDDER'S CHECKLIST
All forms must be properly signed and returned with Bid.
Statement of Experience and Qualifications
Bid Form
Bid Surety
Certificate Regarding Workers Compensation
Non Collusion Affidavit
Proposed Major Material Suppliers
Proposed Subcontractors
Affidavit Concerning Conflicts of Interest and Noncompetitive Practices
Fair Employment Practices Certificate
Contractor's Response Form
Certification Concerning Control of Employee of Contractor
Required Certifications 78
1191148v3 80097/0002
CONTRACTOR'S CERTIFICATE REGARDING WORKER'S COMPENSATION
Contract with the CITY OF SARATOGA, for the construction of:
SARATOGA LIBRARY HVAC RENOVATION
Labor Code Section 3700 provides in relevant part:
"Every employer except the state shall secure the payment of compensation in one or
more of the following ways:
(a) By being insured against liability to pay compensation in one or more insurers, duly
authorized to write compensation insurance in this state.
(b) By securing from the Director of Industrial Relations a certificate of consent to self-
insure either as an individual employer or as one employer in a group of employers,
which may be given upon furnishing proof satisfactory to the Director of Industrial
Relations of ability to self-insure and to pay any compensation that may become due to
his or her employees. "
I am aware of the provisions of Section 3700 of the Labor Code, which require every
employer to be insured against liability for worker's compensation or to undertake self-
insurance in accordance with the provisions of that code, and I will comply with such
provisions before commencing the performance of the work of this contract.
Dated: , 20__
(Contractor)
By________________________________
__________________________________
(Official Title)
(SEAL)
Note: Labor Code Section 1861, provides that the above certificate must be signed and
filed by the Contractor with CITY prior to performing any work under this contract.
(Contractor Signatures must be Notarized)
Required Certifications 79
1191148v3 80097/0002
NONCOLLUSION AFFIDAVIT
State of California
County of ss.
, being first duly sworn, deposes and
says that he or she is [title] of
, the party making the foregoing bid, that the bid is not made in the interest of, or
on behalf of, any undisclosed person, partnership, company, association, organization,
or corporation; that the bid is genuine and not collusive or sham; that the bidder has not
directly or indirectly induced or solicited any other bidder to put in a false or sham bid,
and has not directly or indirectly colluded, conspired, connived, or agreed with any
bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding;
that the bidder has not in any manner, directly or indirectly, sought by agreement,
communication, or conference with anyone to fix the bid price of the bidder or any other
bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other bidder, or to secure any advantage against the public body awarding the contract
of anyone interested in the proposed contract; that all statements contained in the bid
are true; and, further, that the bidder has not, directly or indirectly, submitted his or her
bid price or any breakdown thereof, or the contents thereof, or divulged information or
data relative thereto, or paid, and will not pay, any fee to any corporation, partnership,
company, association, organization, bid depository, or to any member or agent thereof
to effectuate a collusive or sham bid.
Signed: Date:
Bidder's Name: ___________________
Required Certifications 80
1191148v3 80097/0002
PROPOSED MAJOR MATERIAL SUPPLIERS
The bidder is required to furnish the following information on major materials and
manufacturers. No changes will be allowed in materials or manufacturers without the
prior approval of CITY.
1. Boilers
2. Ceiling fans
3. Smoke Detectors
4. Controls
Signature of Bidder
Date
Required Certifications 81
1191148v3 80097/0002
PROPOSED SUBCONTRACTORS
Pursuant to the Subletting and Subcontracting Fair Practices Act (Public Contract Code
Sections 4100 et seq.), the following list gives the name, business address, and portion
of work (description of work to be done) for each subcontractor who will perform work or
labor or render service to the prime contractor in or about the construction of the work or
improvements, or a subcontractor licensed by the State of California who, under
subcontract to the prime contractor, specifically fabricates and installs a portion of the
work or improvement according to detailed drawings contained in the plans and
specifications, in an amount in excess of one-half of one percent of the prime
contractor's total bid or, in the case of bids or offers for the construction of streets or
highways, including bridges, in excess of one-half of one percent of the prime
contractor's total bid or ten thousand dollars ($10,000), whichever is greater. Additional
supporting data may be attached to this page. Each page shall be sequentially
numbered, headed "Proposed Subcontractors" and shall be signed.
NAME BUSINESS
ADDRESS
Portion of Work
After the award of contract, substitutions of the above-listed proposed subcontractors
may only be made with the prior approval of CITY in accordance with Public Contract
Code Section 4104.
Signature of Bidder
Date
Required Certifications 82
1191148v3 80097/0002
AFFIDAVIT CONCERNING CONFLICTS OF INTEREST AND
NONCOMPETITIVE PRACTICES
State of ) ss
County of )
A. Conflict of Interest. That the Contractor by entering into this contract with CITY
to perform or provide work, services or materials to CITY has thereby
covenanted, and by this affidavit does again covenant and assure that it has no
direct or indirect pecuniary or proprietary interest, and that it shall not acquire any
such interest, which conflicts in any manner or degree with the services required
to be performed under this contract and that it shall not employ any person or
agent having any such interest. In the event that the Contractor or its agents,
employees or representative hereafter acquires such a conflict of interest, it shall
immediately disclose such interest to CITY and take action immediately to
eliminate the conflict or to withdraw from this contract, as CITY may require.
B. Contingent Fees and Gratuities. That the Contractor, by entering into this
Contract with CITY to perform or provide services or material for CITY has
thereby covenanted, and by this affidavit does again covenant and assure:
1. That no person or selling agency except bona fide employees or
designated agents or representative of the Contractor has been employed
or retained to solicit or secure this contract with an agreement or
understanding that a commission, percentage, brokerage or contingent
fee would be paid; and
2. That no gratuities, in the form of entertainment, gifts or other, were offered
or given by the Contractor or any of its agents, employees or
representatives, to any official, member or employee of CITY or other
governmental agency with a view toward securing this contract or securing
favorable treatment with respect to the awarding or amending, or the
making of any determination with respect to the performance of this
contract.
3. That no contracts of communication or lobbying efforts were made by
Contractor, its agents or officer with any member of the Council, any board
or commission, or the staff of the City of Saratoga with regard to this
process.
Company Name
By ______________________________
Title ______________________________
Subscribed and Sworn to before me
This ______ day of _________, 20___.
Required Certifications 83
1191148v3 80097/0002
_____________________________
Notary Public in and for State of ___________________________________
residing at _____________________________________________
Required Certifications 84
1191148v3 80097/0002
FAIR EMPLOYMENT PRACTICES CERTIFICATE
In connection with the performance of work under this contract, the Contractor agrees
as follows:
1. The Contractor will not willfully discriminate against any employee or applicant for
employment because of race, color, religious creed, ancestry, national origin, age, sex,
sexual orientation, physical disability, mental disabilities, marital status, or medical
condition as defined in Government Code Section 12926. The Contractor will take
affirmative action to ensure that applicants are employed, and that employees are
treated during employment, without regard to their race, color, religious creed, ancestry,
national origin, age, sex, sexual orientation, physical disability, mental disability, marital
status, or medical condition as defined in Government Code §12926. Such action shall
include, but not be limited to, the following: employment, upgrading, demotion or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or
other forms of compensation; and selection for training including apprenticeship. The
Contractor agrees to post in conspicuous places, available to employees and applicants
for employment, notices setting forth the provisions of this Fair Employment Practices
section.
2. The Contractor will send to each labor union or representative of worker with
which it has a collective bargaining agreement or other contract or understanding, a
notice, advising the said labor union or worker's representative of the Contractor's
commitments under this section; and the Contractor shall post copies of the notice in
conspicuous places available to employees and applicants for employment.
3. The Contractor will permit access to its records of employment, employment
advertisements, application forms, and other pertinent data and records by the Fair
Employment Practices Commission, CITY or any other appropriate agency of the State
of California designated by CITY, for the purposes of investigation to ascertain
compliance with the Fair Employment Practices section of this contract.
4. A finding of willful violation of the Fair Employment Practices section of this
contract or of the Fair Employment Practices Act shall be regarded by CITY as a basis
for determining the Contractor to be not a "responsible Contractor" as to future contracts
for which such Contractor may submit bids, for revoking the Contractor's pre-
qualification rating, if any, and for refusing to establish, re-establish or renew a pre-
qualification rating for the Contractor.
CITY shall deem a finding of willful violation of the Fair Employment Practices Act
to have occurred upon receipt of written notice from the Fair Employment Practices
Commission that it has investigated and determined that the Contractor has violated the
Fair Employment Practices Act and has issued an order under Government Code
§12970 or obtained a court order under Government Code §12973.
Upon receipt of such written notice from the Fair Employment Practices
Commission, CITY shall notify the Contractor that unless it demonstrates to the
Required Certifications 85
1191148v3 80097/0002
satisfaction of CITY within a stated period that the violation has been corrected, the
Contractor's pre-qualification rating will be revoked at the expiration of such period.
5. The Contractor agrees that should CITY determine that the Contractor has not
complied with the Fair Employment Practices section of this contract, then pursuant to
Labor Code Sections 1735 and 1775, the Contractor shall, as a penalty to CITY, forfeit,
for each calendar day, or portion thereof, for each person who was denied employment
as a result of such noncompliance, the penalties provided in the labor code for violation
of prevailing wage rates. Such monies may be recovered from the Contractor. CITY
may deduct any such damages from any monies due the Contractor.
6. Nothing contained in this Fair Employment Practices section shall be construed
in any manner of fashion so as to prevent CITY from pursuing any other remedies that
may be available at law.
7. Prior to award of the contract, the Contractor shall certify to CITY that it has or
will meet the following standards for affirmative compliance, which shall be evaluated in
each case by CITY:
a. The Contractor shall provide evidence, as required by CITY, that it has
notified all supervisors, foremen and other personnel officers, in writing, of the
content of the anti-discrimination clause and their responsibilities under it.
b. The Contractor shall provide evidence, as required by CITY, that it has
notified all sources of employee referral (including unions, employment agencies,
advertisements, and the Department of Employment) of the content of the anti-
discrimination clause.
c. The Contractor shall file a basic compliance report as required by CITY.
Willfully false statements made in such reports shall be punishable as provided
by law. The compliance report shall also spell out the sources of the work force
and who has the responsibility for determining whom to hire, or whether or not to
hire.
d. Personally, or through its representatives, the Contractor shall, through
negotiations with the unions with whom it has agreements, attempt to develop an
agreement which will:
(1) Spell out responsibilities for nondiscrimination in hiring, referral, upgrading
and training.
(2) Otherwise implement an affirmative anti-discrimination program in terms of
the unions' specific areas of skill and geography, to the end that qualified minority
workers will be available and given an equal opportunity for employment.
e. The Contractor shall notify CITY of opposition to the anti-discrimination
clause by individuals, firms or organizations during the period of its pre-
qualification.
Required Certifications 86
1191148v3 80097/0002
8. The Contractor will include the provisions of the foregoing Paragraphs 1 through
7 in every first-tier subcontract so that such provisions will be binding upon each
subconsultant.
9. Statements and Payrolls. The Contractor shall maintain its records in
conformance with the requirements in the Specifications and the following special
provisions:
a. The submission by the Contractor of payrolls, or copies thereof, is not
required. However, each Contractor and subconsultant shall preserve their
weekly payroll records for a period of three (3) years from the date of completion
of this contract.
b. The payroll records shall contain the name, address and social security
number of each employee, his/her correct classification, rate of pay, daily and
weekly number of hours worked, itemized deductions made, and actual wages
paid.
c. The Contractor shall make its payroll records available at the project site
for inspection by CITY and shall permit CITY to interview employees during
working hours on the job.
The following certification is to be executed by every Contractor and enclosed and
forwarded in a sealed envelope containing the bid. The person signing the certification
shall state his/her address and official capacity.
Required Certifications 87
1191148v3 80097/0002
FAIR EMPLOYMENT PRACTICE CERTIFICATION
The undersigned, in submitting a bid for performing the following work by contract,
hereby certifies that the Contractor will meet the above standards of affirmative
compliance with the Fair Employment Practices Act.
______________________________________________
(Type) PROPOSING COMPANY
________________________________________________________
SIGNATURE
________________________________________________________
(Type) NAME OF SIGNER
________________________________________________________
(Type) TITLE
________________________________________________________
(Type) NUMBER AND STREET
________________________________________________________
(Type) CITY STATE ZIP CODE
________________________________________________________
(Type) TELEPHONE
Required Certifications 88
1191148v3 80097/0002
CONTRACTORS RESPONSE FORM
Contractors Declarations and Statement of Understanding
The undersigned (hereinafter called the "Contractor") declares that he/she has read the
Notice Inviting Bids and has authority to submit the following. The Contractor
understands that, in addition to this Response Form, the Information for Bidders and
Contractor's supporting documents constitute parts of the contract and are incorporated
herein by reference.
Contractor acknowledges that Addenda numbers _____ through _____ have been
delivered and have been taken into account as part of the Agreement, and that all
addenda issued are hereby made part of the Agreement.
Contractor hereby designates ______________________________ as the person to
contact for additional information. (Telephone No: ______________________ Fax No:
_________________________, e-mail Address:________________________)
Internal Revenue Service (IRS) Reporting Requirements
Check one: Corporation; Partnership; Sole Proprietor; Other
______________________________________________________________________
Identify: State of Incorporation: ___________________________________________
Provide one: Federal Tax Number ___________ Social Security Number __________
What is the official name registered with the IRS for this number _________________
Firm Name: ______________________________________
______________________________________
Address: ______________________________________
City, State, Zip ____________________________________
Phone Number ____________________________________
Authorized Signature _______________________________
Required Certifications 89
1191148v3 80097/0002
CITY OF SARATOGA
A CERTIFICATION CONCERNING CONTROL OF EMPLOYEES
OF CONTRACTOR
The Contractor, by entering into this Agreement with CITY to perform or provide work,
services or materials to CITY, does hereby certify and assure that in performing the
services under this Agreement, the Contractor shall act as an independent Contractor
and shall have full control of the work and Contractor's employees. Contractor and its
employees in no circumstances whatsoever shall imply or be deemed an agent(s) or
employee(s) of CITY. Contractor's employees in no circumstances shall be entitled to
part of any pension plan, insurance, bonus or any similar benefits which CITY provides
its own employees.
Any infraction of this Certification shall be cause for termination of this Agreement.
Signed
Authorized Representative of Bidder
Title
Date