HomeMy WebLinkAbout08-01-2007 SUPPLEMENTAL COUNCIL AGENDAConstruction and Demolition Materials Diversion Ordinance Comparison
for the West Valley Solid Waste Management Authority
City
Program Summary
Goal
Trigger
Fees
Consequences
Alameda
Building permit
Divert at least 50% of
Construction,
The hauler that will
If sufficient waste is not
applicant must submit
debris.
demolition, or
collect or receive waste
diverted or if proof of
recycling plan to City;
renovation projects
from the project must
diversion is not
plan must be approved
which cost at least
submit a performance
submitted, a fine per ton
before permit will be
$100,000. Includes City
bond to City.
not diverted may be
issued.
projects.
assessed and subtracted
from performance bond,
or charged separately.
Final inspection
approval/ Certificate of
Occupancy may also be
withheld.
Los Gatos
Demolition permit
None cited.
Demolition permit
None cited.
Demolition inspection
applicant must submit
application.
may be held until proof
the name of company
of diversion is
that will recycle all
submitted.
wood, metal, glass, and
aluminum building
materials.
Oakland
Building permit
Divert at least 50% of
All new construction; all
None cited.
Final inspection/
applicant must submit
C &D debris.
non- residential and
Certificate of Occupancy
recycling plan to City;
multi- family demolition;
may not be issued if
plan'must be approved
any non- residential and
sufficient waste is not
before permit will be
multi- family additions
diverted or if proof of
issued.
with valuation of at least
diversion is not
$50,000.
submitted.
Palo Alto
Building permit
Divert at least 90% of
All demolitions; all other
Program fee of $225.
If sufficient waste is not
applicant must submit
inert solids, and at least
projects valued at least
diverted or if proof of
recycling plan and
50% of other C &D
$75,000. Includes City
diversion is not
program fee to City; plan
debris.
projects.
submitted, City may
must be approved before
abate through criminal
permit will be issued.
prosecution, abatement,
administrative penalties,
or civil action.
CADocuments and Settings \BHIH \Local Settings \Temporary Internet Fi1es \0LK29 \CD Ordinance Comparison Nlatrix.doc
Page 1
Construction and Demolition Materials Diversion Ordinance Comparison
for the West Valley Solid Waste Management Authority
City
Program Summary
Goal
Trigger
Fees
Consequences
San Jose
Monetary deposit made
Divert at least 50% of
Value of work; e.g., new
Deposit made when
All or part of deposit
to City by building
C &D debris.
residential construction
building permit
may not be refunded if
permit applicant; deposit
with value greater than
application filed.
sufficient waste is not
returned when proof of
$115,000.
Deposit refunded when
diverted or if proof of
materials diversion
waste is diverted.
diversion is not
submitted.
Amount of deposit
submitted.
calculated per square
foot of building segment,
up to a set maximum;
e.g., new residential
construction $0.20/ sq.
ft. up to 125,000 sq. ft.
San Mateo
Building permit
Divert at least 60% of
Construction or full
Deposit made when
All or part of deposit
applicant must submit
debris fi-om demolition
demolition of all
building permit filed.
may not be refunded if
recycling plan and
and new construction; at
residential and
Deposit refunded when
sufficient waste is not
deposit to City; plan
least 50% from
commercial buildings;
waste is diverted.
diverted or if proof of
must be approved before
remodels.
remodeling projects with
Deposit amount is
diversion is not.
permit will be issued.
value of at least $50,000.
calculated as 3% of
submitted.
project value for
remodels, up to a
maximum; per pound of
debris for new
construction and
demolition. Minimum
deposit is $1,000.
HF &H Model
Contractor must submit
Maintain City's AB939.
Construction,
None cited.
If sufficient waste is not
recycling plan to Public
compliance.
demolition, or
diverted or if proof of
Works Dept. prior to
remodeling projects of
diversion is not
commencing work.
structures over 10,000
submitted, future permit
sq ft
applications by
contractor may not be
approved.
Page 2
CADoctiments and Settings \BiIIH \Local Settings \Temporary hitemet Files \0LK29 \CD Ordinance Comparison Nlatrix.doc
Construction and Demolition Materials Diversion Ordinance Comparison
for the West Valley Solid Waste Management Authority
City
Program Summary
Goal
Trigger
Fees
Consequences
CIWMB Model
Building /demolition
Divert from 50% to 75%
May choose trigger
Deposit made when
If sufficient waste is not
permit applicant must
of construction,
based on project cost or
building permit
diverted or if proof of
submit Waste
demolition, and remodel
square footage of
application filed.
diversion is not
Management plan and
waste.
project; may further
Deposit refunded when
submitted, a fine per ton
deposit to City; plan
distinguish by type of
waste is diverted.
not diverted may be
must be approved before
project (construction,
Amount of deposit
assessed and subtracted
permit will be issued.
demolition, remodel)
calculated by ton of
fi-om deposit, or charged
waste to be produced,
separately. Final
square footage of
inspection approval/
project, cost of project,
Certificate of Occupancy
or a fixed amount.
may also be withheld.
Page 3
CADocuments and Settings \BilIMLocal Settings\Temporary Internet Files \0LK29 \CD Ordinance Comparison hlatrix.doc
Option Menu:
Construction and Demolition Materials Diversion Ordinance Comparison
for the West Valley Solid Waste Management Authority
Program Summary
Goal
Trigger
Fees
Consequences
Building permit
Percentage of debris
Value of work, as a
Performance bond
Fine amount per ton of
applicants must meet
generated by project.
dollar amount.
submitted by contractor.
waste not diverted.
requirements of C &D
Ordinance.
Separate goals for inert
Size of structure, in
Set fee from permit
Withhold final
and other wastes.
square feet.
applicant to City.
inspection/ Certificate of
Demolition permit
Occupancy.
applicants trust meet
Separate goals by type of
Separate triggers by type
Deposit submitted and
requirements of C &D
project: demolition, new
of structure: residential,
then refunded.
Criminal prosecution,
Ordinance.
construction, or remodel.
multi- family, non-
abatement,
residential.
Amount of deposit by
administrative penalties,
size of structure, in
civil action.
Separate triggers by type
square feet.
of project: demolition,
Withhold approval of
new construction, or
Amount of deposit by
fixture applications.
remodel.
value of work, as a
dollar amount.
Include City projects.
Amount of deposit by
amount of waste to be
generated, in pounds.
Set minimum / maximum
deposits.
Page 4
C:ADocuments and Settings \Bliili\LocaI SettingsUemporary Internet Files \0LK29 \CD Ordinance Comparison Nlatrix.doc
Preferred Optioi
Construction and Demolition Materials Diversion Ordinance Comparison
for the West Valley Solid Waste Management Authority
us:
Program Summary
Goal
Trigger
Fees
Consequences
All building permit and
50% of C &D debris
Projects valued at
Performance bond
Fine amount per ton of
demolition permit
generated by project
$100,000 or more;
submitted by contractor.
waste not diverted.
applicants must meet
must be diverted.
trigger amount to be
requirements of C &D
adjusted annually.
Set fee from permit
Ordinance.
applicant to City.
Deposit submitted and
then refunded.
Amount of deposit by
size of structure, in
square feet.
Amount of deposit by
value of work, as a
dollar amount.
Amount of deposit by
amount of waste to be
generated, in pounds.
Set minimum / maximum
deposits.
Charge admin fee?
2�a�lo� C-�� .
Q-L-O- C--�
Do -
00
V�-
(Sample) E -MAIL NOTIFICATION
Note:
You are required to keep a copy of the notification for your
records, and verify that all filers received the e -mail.
FPPC Toll -Free Helpline: 866 /ASK -FPPC
y.
i
Z .1 Atj 1:14
Ix 06 ��//
'07
C- -a-:-
C-0