At your April 19, 1989 meeting you adopted Resolution No. 2565, a resolution describing
the improvements and directing preparation of the Engineer's Report for fiscal year
1989 -1990 for the continuation of the Landscaping and Lighting District LLA -1. Addi-
tional Council action is required for this district to proceed.
The Engineer's Report is not included because of the following:
Engineer's Report contains the Total Assessment for each zone, Rules for Spreading
Assessment, Cost Estimate for each zone, Description of Work, Assessment Roll and
Assessment Diagram.
This report is similar in size to the existing Landscaping and Lighting District report
and will be available on May 17, 1989 for Council review.
Fiscal acts:
The costs for the administration, maintenance and servicing, and lighting costs are
charged to the various zones within the District based on benefit received. The Santa
Clara County Assessor's Office will collect the amounts through the taxes and., in turn,
send to the City.
Exhibits /Attache -ents :
1. Engineer's Report to be presented Wednesday night.
2. Resolution No.
3. Resolution No.
Reccnunended Action:
Adopt the following:
Resolution "Resolution of Preliminary Approval of Engineer's Report"
"Resolution of Intention to order the Annexation of Territory
to an Existing Assessment District and the Levy and Collection
of Assessments within said Territory Pursuant to the Landscaping
and Lighting Act of 1972 ". This Resolution also sets the time
and place for the public hearing for said District on June 21, 1989.
Council Action:
SARATOGA CITY COUNCIL
EXECU'T'IVE SUMMARY NO. 3z' AGENDA ITEM A
MEETING DATE: _ 5 -8 -89 (5-17-89) CITY MGR. APPROVAL ��
ORIGINATING DEPT: — ENGINEERING ,—
SUBJECT: LANDSCAPING AND LIGHTING DISTRICT LTA -1 (Existing)
Summary :
At your April 19, 1989 meeting you adopted Resolution No. 2564, a resolution describing
the improvements and directing preparation of the Engineer's Report for fiscal year
1989 -1990 for the continuation of the Landscaping and Lighting District LLA -1. Addi-
tional Council action is required for this district to proceed.
The Engineering's Report is not included because of the following:
Engineer's Report contains the Total Assessment for each zone, Rules for Spreading
Assessment, Cost Estimate for each zone, Description of Work, Assessment Roll and
Assessment Diagram.
This report is made up of 110 pages and will be available on May 17, 1989 for Council
review.
Fiscal acts:
The costs for the administration, maintenance and servicing and lighting costs are
charged to the various zones within the District based on benefit received. The
Santa Clara County Assessor's office will collect the amounts through the taxes and,
in turn, send to the City.
Exhibits /Attachments:
1. Engineer's Report to be presented Wednesday night.
2. Resolution No.
3. Resolution No.
Recommended Action:
Adopt the following:
Resolution "A Resolution of Preliminary Approval of Engineer's Report"
"A Resolution of Intention to Order the Levy and Collection
of Assessments Pursuant to the Landscaping and Lighting Act
of 1972 ". This Resolution also sets the time and place of
the public hearing for said district on June 21, 1989.
Council Action:
SARATOGA CITY COUNCIL
EXECU'T'IVE SUMMARY N0. .", AGENDA ITEM
MEETING DATE: 5 -10 -89 (5- 17 -89) CITY MGR. APPROVAL _
ORIGINATING DEPT: ENGINEERING DEPT.
SUBJECT: CONDITIONAL FINAL MAP APPROVAL FOR TRACT 8220
Saratoga - Sunnyvale Road & Cox Avenue
Recommended Motion:
Approve Resolution No. SD 87 -019.2 for Conditional Approval for Tract 8220.
Report Summary
1. Developer has completed all conditions for Tract 8220 except encroadl-unent permit
from Cal Trans and Santa Clara Valley Water District.
2. A11 fees have been paid.
3. Developer has provided bonds for improvements for Tract 8220.
Fiscal Impacts:
None.
Attachments:
1. Resolution No. SD 87- 019.2.
2. Resolution approving Tentative Map.
3. Location Map.
Motion and Vote:
a-z4 �z_- 2_�
Ci
RESOLUTION NO. SD-88 -019.2
RESOLUTION APPROVING FINAL MAP OF (AL)
TRACT 8220
WHEREAS, a final subdivision map of TRACT 8220
having heretofore been filed with this City
Council for approval, and it appearing that all streets, public ways and
easements shown thereon have not been satisfactorily improved nor completed,
and it further appearing that otherwise said map conforms with the require-
ments of Division 2 of Title 7 of the Government Code of the State of
California, and with all local ordinances applicable at the time of
approval of the tentative map and all rulings made thereunder, save
and except as follows: \
Qbtain encroadmpnt perm man Cal, and Clara �T�lley V ter.
D lct / \ /
NOW THEREFORE BE IT RESOLVED:
(1) The aforesaid final map is hereby conditionally approved. Said
approval shall automatically be and become unconditional and final
upon compliance by subdivider with such requirements, if any, as set forth
immediately above as not yet having been complied with, and upon compliance
with Section (3) hereof.
(2) All street dedications, and all other dedications offered on said
final map (except such easements as are declared to be accepted by
the terms of the City Clerks certificate on said map), are hereby rejected
pursuant and subject to Section #66477.1 of the Government Code of the
State of California.
(3) As a condition precedent to and in consideration of the future accept-
ance of any streets and easements not by this resolution now accepted,
and as a condition precedent to the City Clerk certifying the approval and
releasing said map for recordation, the owner and subdivider shall enter
into a written agreement with the City of Saratoga, secured by good and
sufficient surety bond or bonds, money or negotiable bonds, in amount of the
-1-
f
e
l
estimated cost of improvements, agreeing to improve said streets, public
ways and easements in accord with the standards of Chap. 14. Municipal Code
as amended and with the improvement plans and specifications presently
on file, and to maintain the same for one year after completion. The form
and additional terms of said written agreement and surety bond shall be
as heretofore adopted by the City Council and as approved by the City
Attorney. The mayor of the City of Saratoga is hereby authorized to exe-
cute the aforesaid improvement agreement on behalf of said city.
(4) Upon compliance by subdivider and /or owner with any remaining require.
ments as set forth in the preamble of this resolution (if any) and
with the provisions of Section (3) hereof, the City Clerk is authorized
and directed to execute the City Clerk's certificate as shown on said map
and to transmit said map,as certified to the Clerk of the Santa Clara
County Board of Supervisors.
The above and foregoing resolution was duly and regularly introduced
and passed by the City Council of the City of Saratoga on the day
of , 19 , by the following vote:
AYES:
NOES:
ABSENT:
ATTEST:
CITY CLERK
MAYOR
f
TIN
RESOLUTION NO. SD -87 -019.1
RESOLUTION APPROVING TENTATIVE MAP OF
SARATOGA PARTNERS, APN 393 -01 -001, SARATOGA- SUNNYVALE ROAD
WHEREAS, application has been made to the Advisory Agency under
the Subdivision Map Act of the State of California and under the
Subdivision Ordinance of the City of Saratoga, for tentative map
approval of 10 lots, all as more particularly set forth in File No.
SD -87 -019.1 of this City, and
WHEREAS, this Advisory Agency hereby finds that the proposed
subdivision, together with the provisions for its design and
improvement, is consistent with the Saratoga General Plan and with
all specific plans relating thereto, and the proposed subdivision
and land use is compatible with the objectives, policies and general
land use and programs specified in such General Plan, referenced to
the Staff Report dated 9/14/88 being hereby made for further
particulars, and
WHEREAS, this body has heretofore received and considered the
Negative Declaration prepared for this project in accord with the
currently applicable provisions of CEQA, and
WHEREAS, none of the conditions set forth in Subsections (a)
through (g) of Government Code Section 66474 exist with respect to
said subdivision, and tentative approval should be granted in accord
with conditions as hereinafter set forth.
WHEREAS, the Planning Commission has conducted a duly noticed
public hearing at which time all interested parties were given a
full opportunity to be heard and to present evidence;
NOW, THEREFORE, HE IT RESOLVED that the tentative map for the
hereinafter described subdivision, which map is dated the 6th day
of September, 1988 and is marked Exhibit A in the hereinabove
referred file, be and the same is hereby conditionally approved.
The conditions of said approval are as follows:
N.A. 1. Pay storm drainage fee in effect at the time of obtaining Final
Map approval.
Done 2. Submit "Final Map" to City for checking and recordation and pay
required fees.
Done 3. Submit "Irrevocable Offer of Dedication" to provide for a 30
foot half- street on Cox Avenue.
Done 4. Submit "Irrevocable Offer of Dedication" to provide easements
as required.
Done 5. Improve Cox Avenue to City Standards, including the following:
4
f Ir
SD -87- 019.1, Saratoga - Sunnyvale Road
a. Designed structural section 20 ft. between center line and
face of curb.
b. P.C. concrete curb, gutter and sidewalk (V -24)
Shown on Improvement 6. Widen Cox Avenue bridge over Rodeo Creek on the southerly side
of Cox Avenue to provide 20 feet between the centerline and face
Plan of curb, and construct curb, gutter and sidewalk.
7. Improve Saratoga - Sunnyvale Road to City standards, including the
following:
a. Widen Saratoga - Sunnyvale Road to City standards, at easterly
side approximately four feet, and construct curb, gutter and
sidewalk for the entire length of the site along Saratoga -
Sunnyvale Road.
b. Underground existing overhead utilities.
8. Construct storm drainage system as directed by the City Engineer
including constructing storm drains with outfalls to Rodeo
Creek.
Done 9. Install traffic signal system at the intersection of Saratoga -
Sunnyvale Road and Pierce Road to Caltran standards.
10. Construct standard driveway approaches.
11. Provide adequate sight distance and remove obstructions of view
as required at driveway and access road intersections.
12. Watercourses must be kept free of obstacles which will change,
retard or prevent flow.
13. Protective planting required on roadside cuts and fills.
Done
14. Obtain encroachment permit from Caltrans for work to be done
within State right -of -way.
15. Engineered improvement plans required for:
a. Street improvements
b. Storm drain construction
16. Pay plan- check and inspection fees as determined from
improvement plans.
17. Upon satisfaction of all conditions of tentative subdivision
approval, either through performance thereof or the execution by
applicant of City's standard form of improvement agreement and
5
SD -87- 019.1, Saratoga - Sunnyvale Road
the posing of security satisfactory to City to assure
performance thereunder, but in no event later than six (6)
months after the date of tentative approval, applicant shall
file an application for final building site or subdivision
approval.
Done 18. Pay the cost of adjusting utilities, signals, etc. to accomplish
the improvements described in Condition #'s 7, 8, 9 and 11.
N.A.
19. Within sixty (60) days after the granting by City of final map
approval, applicant shall file complete applications for such
grading and building permits as required to be issued by City
for construction of the project.
Shown on Tract Map
20. An easement for flood control purposes shall be transferred to
the SCVWD per that agency's specifications. A plat and
description of the proposed easement shall be submitted to and
approved by SCVWD.
Shown on Tract Map
21. Ingress - egress easements shall be transferred to SCVWD over the
driveway in the commercial area to enable the district to access
the proposed easement. All paving should be designed for H -20
loading.
Shown On Improvement
22. An easily removable guardrail shall be installed between the
Plan
commercial parking area and the creek. A curb should be
installed three feet back from the guardrail to prevent damage
to the guardrail.
N.A.
23. All existing trees in the proposed easement shall remain.
Done
24. There should be no overbank drainage from the proposed
development to the creek. The site's drainage should be
incorporated into an existing storm drainage system. If a storm
drain outfall into the creek is necessary, it should be designed
in accordance with SCVWD standards.
N.A.
25. In accordance with District 75 -6, the owner should show any
existing wells on the plans. The wells should be properly
registered with SCVWD and either maintained or abandoned in
accordance with District standards.
With Building Plans
26. Install a fence along the easterly side of the SCVWD easement 18
feet back from the top of bank to separate the town houses and
pool from the creek.
Working with
27. Developer shall install two fire hydrants that meet the Saratoga
San Jose Water Works
Fire District's specifications. The hydrants shall be installed
and accepted prior to final map.
Not Done
28. Applicant shall obtain an encroachment permit for any work
within the state right -of -way.
6
SD- 87- 019.1, Saratoga - Sunnyvale Road
29. The applicant shall submit C.C.& R.'s for the townhomes to
include the following:
Approved b Plann
� y 1.17CJ a. Maintenance of all common areas;
Department b• Prohibition on exterior alterations unless approved by the
Planning Department.
C. Prohibition on amending the C.C. &R's without consent of the
City. These C.C. &R's shall be submitted for Planning
Department review and approval prior to final map approval.
d. Restriction on the hours of the pool and spa, 8:OOa.m. to
10:00p.m.
Done 30. The applicant shall enter into a Landscape Maintenance Agreement
with the City for those landscaped areas within the pubic right -
of -way.
31. Tree removal prohibited unless in compliance with City
requirements.
Section 1. Applicant shall sign the agreement to these
conditions within 30 days of the passage of this resolution or said
resolution shall be void.
Section 2. Conditions must be completed within 6 months or
approval will expire.
Section 3. All applicable requirements of the State, County,
City and other Governmental entities must be met.
Section 4. Unless appealed pursuant to the requirements of
Article 15 -90 of the Saratoga City Code, this resolution shall
become effective ten (10) days from the date of adoption.
PASSED AND ADOPTED by the City of Saratoga Planning Commission,
State of California, this 14th day of September, 1988 by the following
vote:
AYES: Commissioners Guch, Siegfried, Burger, Harris, Kolstad, Tucker, an
Tappan
NOES: None
ABSENT: None
7
Chairman, Planning ommission
SUMMARY OF FEES & BONDS
ENGINEERING DEPARTMENT
TRACT NO 8220 SD NO
Storm Drain Fees N.A.
Park & Recreation Fees $10,400.00
Plan Check & Inspection Fees $14,700.00
Final Map Check Fees $ 650.00
REPORT TO THE PLANNING COMMISSION
FROM: Kathryn Caldwell
DATE. 9/14/88
PLNG. DIR. APPRV.
APPLICATION NO. & LOCATION: DR87 -123.1 , 12902 Saratoga - Sunnyvale Road
APPLICANT /OWNER: Saratoga Partners /City of Saratoga
APN: 393 -01 -001 Q
N
I 11729 74 og
}— 386-36- ..� 31?L-34- V5 0-5
n C2 C3 Idly
(1!) (6)
7 Q 1��3;t '386 -36 14 �✓ 12-722 Zc
3 3(.4-13 366 -13-7 Z 3 7 U
73 U J
366 -13-71 (q' 1 i 12735 uo) '
386 -36 -15
54 Zo501 ^�, 2 40 !2'152 (8) 12 98a-750 Z(4�
le (A) 60 }18 -98 C! 1 I� j 5 386 -3b- 16 J 37B
r jtiL -'L-17 '�V 3%6•S6
20542 0l 49
94 cc l- '
55
1$- so3 -1g -95 O 20502 20395 O >:Zo36
1J r _j 540:3-18 89 I o 391-03-253 4D 03 70114 7 1275,
r? • 391 -0?
3 I. 0 27 J/ Z 0391 (2) O 258 219
�j Zo37r-
D4 J 391 -03• 39/•03- (2i71
)3- �1� 254 9 4) 257 391-0•
g- I 1-03- 203gp 22c
) / 3912-053- 39t -o3- 127
26 256 9,
f-8 5 °3-18 -91 1 391-0
37 391 -03 -277 (19`) C195) (194)
CI
20397 20379 Zo3b1 12
391 -03 _2 391 -03 391 -o
82 3- 391 -03- 31I
�t 141 140
So3-re -O
15 395 , 12851 �l9B7 t
284/ 5 391- o/- 391 -03- 2036c 2b
503 -1g 28/ 143 391 -03- 391
04. 144
poi -19 -63 12861 C3Z)
12848
391-05-175 12870
sod -17 3511-03
2c
(21 174- 3°
12979
1285Q 12948 391-03 -176
so3- 19 503 r9 -4� 39(-03-27/
16 121397 (3)
391-03' 1 77 ('
(14) 2036°
129ZI 41Z- (,) 391-__3
C/J 391-03'27o 12915
11911 49 f'J ro470 D91- 03 -I�e ie�.