HomeMy WebLinkAbout05-21-1996 CITY COUNCIL AGENDASARATOGA CITY COUNCIL EXECUTIVE SUMMARY NO. MEETING DATE: MAY 21, 1996 ORIGINATING DEPT.: PUBLIC WORKS AGENDA ITI CITY MGR. DEPT. HEAI SUBJECT: Approval of Design Services Proposal from Sugimura & Assoc. for Saratoga- Sunnyvale Rd. Median Landscaping, Capital Project No. 9601 Recommended Motion(s): Move to approve the design services proposal from Sugimura & Associates dated May 10 and authorize staff to enter into a standard consultant services agreement for an amount up to $14,344. Report Summary: Attached is a proposal dated May 10 from Sugimura & Assoc. for landscape design services for the recently completed medians along Saratoga - Sunnyvale Rd. between Big Basin Way and Verde Vista Lane, Capital Project No. 9601. Staff selected this firm to submit a proposal from a list of qualified consultants maintained on file. The primary reason for choosing Sugimura & Assoc. is that this firm has successfully completed similar projects in Saratoga over the past couple of years both for the City (Cox Ave. Landscaping) , and for the Traffic Authority (Saratoga Ave. landscaping at Route 85 interchange) with very fine results. In staff's opinion, they produce efficient and attractive landscape designs at reasonable costs. Additionally, they have a strong track record of processing their plans through the Caltrans review process, a requirement of this project. The attached proposal suggests a complete set of construction documents can be prepared for bidding within 10 - 12 weeks. This includes two rounds of submittals for review and comment by City staff and Caltrans. The proposed fee for these services is $14,344, which represents a little more than 9.5% of the total project budget of $150,000, a percentage which staff feels is appropriate. Consequently, staff recommends that the City Council accept the proposal from Sugimura & Assoc. and authorize staff to enter into a standard consultant services agreement for the outlined scope of services in the amount of $14,344. Fiscal Impacts: $150,000 is programmed in the adopted budget for Capital Project No. 9601. Sufficient funds therefor exist to cover the proposed cost of the design services. Further, the consultant recognizes the limited funding available for construction, and has expressed confidence that a suitable plan can be developed to meet the overall budget target for the project. Advertising, Noticing and Public Contact: Nothing additional. Consequences of Not Acting on the Recommended Motions: The consultant's proposal would not be accepted. The Council may either direct staff to negotiate another proposal with this consultant, or to select another consultant, or to not proceed further with the development of this project at this time. Follow Up Actions: A standard consultant services agreement will be entered into with Sugimura & Assoc. after which a Notice to Proceed will be issued. The proposed schedule suggests that construction documents will be ready for advertising around the beginning of September. Attachments: 1. Proposal from Sugimura & Assoc. dated May 10, 1996. SUgimura & Associates Architects Archilec(ure • Plannina • Interiors Landscape ! !rrivation May 10, 1996 City of Saratoga Public Works Department 13777 Fruitvale Avenue Saratoga, California 95070 Attn: Mr. John Cherbone Re: Saratoga - Sunnyvale Median Landscape Project Upon review of the landscape plans developed by Wilsey & Ham, we found they were no longer adequate because of the following. 1. Proposed planting in some areas do not meet current Caltrans setback requirements. 2. Planting setbacks or spacing in some areas will create long term maintenance and safety problems (i.e. ground covers overgrowing curbs). 3. Planting under the drip line of existing oaks is not recommended because of the surface watering necessary for plant establishment. This water may lead to accelerated decline of the oaks. 4. Proposed irrigation system will result in constant maintenance problems. The emitters and tubing suggested attract insects which clog or block water flow. This system also attracts vandalism. 5. No planting and irrigation specifications developed. To correct the above problems and develop a stronger planting concept, redesign of the medians would prove beneficial and take better advantage of the $125,000 landscape budget. This letter is our fee proposal to develop the necessary design and construction drawings. Our understanding of the scope of work is as follows: 1. Review all available construction documents of the constructed median island work and preliminary planting and irrigation drawings developed by the City. 2155 So Bascom Ave.. Ste. 200 Campbell. CA 05008 2. Conduct field investigation to determine existing conditions. 408/879-0600 Fx 408/377 -6066 3. Develop /complete irrigation and planting plans with specifications and develop a cost estimate. All conforming Prin, owls to current code requirements and Caltrans standards. Gore M. Sua' mura. AAA 4. Assist with bidding or contractor selection process and field Anulony J Cuschlen. AIA observation services during construction. (An additional service Dale A. Krann. AIA Leo A. Tlraco, AIA which can be provided during the construction phase.) P g P ) Reea C. Gmnd, "SIC 4sso�n ?res la(ah ! ;V i homs. AIA Da io R Rhoces..',�A !uli:r fvleve, AIA J.:c,son cu: De,,- Upon notification to proceed, our preliminary schedule to complete this project is as follows: Weeks 1 -2 Field investigation and complete 50% CD's. Weeks 3 -4 City and Caltrans review and comments. Weeks 5 -7 Respond to comments and complete 100% CD's and Our estimate is as follows: 1. Plans and Specifications including Reimbursables: $14,344.00 2. Bids and Field Observation during Construction: $ 6.262.00 Total Fee: $20,606.00 Please call if you have any questions. If you have no questions, I look forward to receiving the City's notice to proceed. Sincere . G enn A. Rock, ASLA Signing for Reed C. Grandy, ASIC Principal specifications. Weeks 8 -9 Final City and Caltrans review. Week 10 Make final corrections and submit final CD's and specifications to City for bidding. Weeks 10 -11 Advertise for bidders. Weeks 12 -14 Bidding and bid submittal. Weeks 15 -16 Review bids and award contract. Weeks 17 -24 Construction. Weeks 25 -37 Plant establishment and completion of contract. Our estimate is as follows: 1. Plans and Specifications including Reimbursables: $14,344.00 2. Bids and Field Observation during Construction: $ 6.262.00 Total Fee: $20,606.00 Please call if you have any questions. If you have no questions, I look forward to receiving the City's notice to proceed. Sincere . G enn A. Rock, ASLA Signing for Reed C. Grandy, ASIC Principal Sugimura & Associates Architects Architecture • Planning • Interiors Landscape / Irrigation 2155 So. Bascom Ave., Ste. 200 Campbell. CA 95008 408/879 -0600 Fx 408/377 -6066 Piircipals Gene M. Sugimura. AIA Anthony J. Cuschieri, AIA Dale A. Krahn. AIA Leo A. Tiraoo. AIA Reed C. Grandy, ASIC Associates Natalie 4V. Thomas, AIA David R.Rhodes. AIA Kathleen Turner Mever. AIA Patricia Jackson. Bus. Dev. May 10, 1996 City of Saratoga Public Works Department 13777 Fruitvale Avenue Saratoga, California 95070 Attn: Mr. John Cherbone Re: Cost for Saratoga - Sunnyvale Median Landscape Project TASK PRINC- I._ ARCH T)RAFTFR rT FRIreI field investigation 8 bases /sheet set -up 10 6 50% planting and irrigation plans 24 24 outline specs. I details 10 6 100% planting and irrigation plans 40 40 specifications 9 6 plan check 8 final plans 10 6 iviI'Li. riuUM3 b 112 82 6 Billing rates are: Principal $125.00 /hr Landscape Architect $72.00 /hr Drafter $55.00 /hr Clerical $45.00 /hr Please call if you have any questions. Sincere y. Glenn A. Rock, ASLA Signing for Reed C. Grandy, ASIC Principal q A96013 5 \wp \cost.wpd SARATOGA CITY COUNCIL EXECUTIVE SUMMARY NO. MEETING DATE: MAY 21, 1996 ORIGINATING DEPT.: PUBLIC WORKS AGENDA ITEM CITY MGR.: DEPT. HEAD: SUBJECT: Award of construction contract for relandscaping Saratoga /Sunnyvale Road Medians from Verde Vista Lane to Leonard Road. Recommended Motion (s): 1. Move to declare Blossom Valley Landscaping of San Jose to be the lowest responsible bidder on the project. 2. Move to award a standard construction contract to Blossom Valley Landscaping in the amount of $7,056.00. 3. Move to authorize staff to issue change orders to the contract up to $1,000. Report Summary: The landscape median on Saratoga /Sunnyvale Road from Verde Vista Lane to Leonard Road is in need of relandscaping. The Arcotheca (Cape Weed) ground cover has become weed infected and very difficult to manage. It now requires a number of man hours devoted solely to control the weeds in these areas. Staff is suggesting that this ground cover be removed and replanted with shrubs that are both attractive and less labor intensive to maintain. This project is similar to what was previously done the past two years between Blauer Drive and Verde Vista Lane. As part of this project, staff recommends that the irrigation system be converted from the spray type system to a more water efficient drip system. After this work is complete, staff will purchase and install the new plant materials. Staff requested quotations from qualified landscape contractors using the informal bidding procedures prescribed in Article 12 -15 of the City Code. Two contractors responded with bids which are summarized as follows: Blossom Valley Landscaping $ 7,056.00 B and B Landscape Contractors 9,645.00 Staff has checked the low bid, their references and determined that it is responsive to the City's solicitation for bids. Consequently, it is recommended that Council declare Blossom Valley Landscaping of San Jose to be the lowest responsible bidder and authorize staff to award a construction contract to this firm in the amount of their bid. Further, it is recommended that Council authorize staff to issue change orders up to $1,000 to cover any additional work beyond the scope of the base contract which may be warranted. Fiscal impacts: The adopted budget contains $10,000 in Activity 3035 (Medians & Parkways), Account 4510 (Contract Services), for this work. This is sufficient to cover the base contract, change order authorization and cost of plant materials. Advertising, Noticing and Public- Contact: Nothing additional. Consequences of Not Acting on the Recommended Motions: If the relandscaping of these median strips is not approved as recommended, staff will assume that it is directed to maintain the existing landscaping as originally installed. Follow -Up Actions: A purchase order will be issued to Blossom Valley Landscaping. The work will take 2 -3 weeks to complete. Attachments: 1. Proposal from Blossom Valley Landscaping. Ilk WAVIN K j P.O. Box 24533 • San Jose, California 95154 • (408) 993 -0766 FAX (408) 294 -0697 April 10, 1996 City of Saratoga, Parks Division t & 13777 Fruitvale Avenue T IV6 Saratoga, Ca. 95070 ATTN: Mr. David Mooney RE: Saratoga - Sunnyvale Road Median Work Dear Mr. Mooney: We are pleased to submit the following bid for the above mentioned work: Soil preparation; a) 92 yds. amendment, b) spredd & till into soil, c) rough grade $ 2,611.00 Safety 570.00 Total S 3,181.00 �2Y Dnn imea on: a) 110 octa u6 ers, er to mg, c) 852 plugs & stakes, d) i 12 u below grade $ 3,305.00 Safety 570.00 3. Install 426 -5 gal. shrubs: a) 1278 plant tablets, b) amendment $ 6,007.00 Safety 285.00 Total S 6,292.00 4. Install 426 -1 gal. shrubs; a) 852 plant tablets, b) amendments $ 2,620.00 Safety 285.00 Total S 2,905.00 5. Provide & place 50 yds. bark mulch; $ 2,543.00 Safety 285.00 / Total S 2,828.00 Bid excludes: 1) City of Saratoga permits, 2) Cal -Trans encroachment permit `( - d - 5-- 1 1 S roq Thank you for this opportunity to bid your work. Should questions arise, please do not hesitate to contact our office. Respectfully submitted, Ozi�l k�, - Rocci tia RUgh State License #471202