Loading...
HomeMy WebLinkAbout04-17-2002 City Council staff reportSARATOGA CITY COUNCIL MEETING DATE: April 17, 2002 AGENDA ITEM ORIGINATING DEPT: City Manager CITY MANAGER: PREPARED BY: DEPT. HEAD: SUBJECT: Public Safety Center RECOMMENDED ACTION(S): Accept report. Take public input. Provide direction to staff. BACKGROUND: The Adhoc Project was initiated to explore the availability of the Post Office property and if available, to integrate the concept of a new Public Safety Center including a Fire Station, Sheriff's Office and a Post Office at this location. Stakeholders were appointed by the Mayor to represent all major interests in the outcome of this process, including the City, Saratoga Fire District, Santa Clara Sheriff's Office, and County Administration, the United States Post Office, FACT, the Federated Church, neighbors and residents, and representatives from the City's Planning and Public Safety Commissions. The City hired the firm of ATI, Architects and Engineers to develop a conceptual plan for a safety center on December 11, 2001. At the outset of the conceptual design process the committee studied three options with several design variations including: ➢ Option 1 included the three existing agencies on the site; Sheriff, Fire and Post Office, without using additional parking resources from the adjacent Federated Church. ➢ Option 2 included all three agencies and utilized additional parking from the adjacent Federated Church. ➢ Option 3 included only two agencies, with the Post Office or Sheriff's Office moving from the site. By the time the Committee brought conceptual design options to the City Council for the 50% design review, all Option 1 conceptual plans had been dropped recognizing that additional offsite parking may be required (under Option 2) or that fewer agencies would fit on the site (Option 3). At that meeting the City Council requested that the AdHoc Committee further investigate 1) Option 3 -3 which oriented the fire station on Saratoga Avenue with a front setback large enough to accommodate fire apparatus backing into the station without utilizing the Saratoga Avenue, keeping the post office in its existing location; 2) and an option placing a new fire station facing Highway 9 featuring a drive - through capability. The AdHoc Committee has spent much of its time between the March 6, 2002 meeting with the City Council and the present, refining these two models. At present they are represented by conceptual schemes "A" and "D ". Both schemes "A" and "D" have the following common features: ➢ Move the Monument to Plaza ➢ Add dedicated right turn lane on northbound Saratoga -Los Gatos Road, and westbound from Highway 9 onto Saratoga Avenue ➢ Widen all lanes to 12 feet on Saratoga Avenue ➢ Pursue signalization of the Oak Street intersection ➢ New median to block left turn movements onto Oak Place from southbound Saratoga Los Gatos Road ➢ Land- swaps /transfers required to allow proper parcel configuration ➢ Cross parking and access easements will need to be granted to allow for optimum reconfiguration of the parking layout and circulation system ➢ Postal Service and Sheriff Department will continue to occupy the existing structure ➢ Turnout for postal service drop -off from Saratoga Avenue will be developed ➢ Access to future Federated Church underground parking area to be maintained Scheme "A" has the following features: ➢ Back -in Fire Station Configuration located on Saratoga Avenue utilizing a revision to the design presented in Option 3 -3. This design reduces the size of the main fire station from 1.4,000 sq. ft. to 10,000 sq. ft. ➢ 4,000 sq. ft. of additional Fire District support space located at the Contempo Building including room for fire fighter training and storage. ➢ Contempo will need seismic upgrade /remodeling to house a temporary Fire Station during construction. ➢ Egress at Oak Street intersection will be developed by modifying existing parking located at the south portion of the Contempo property. ➢ 69 parking spaces provided (62 spaces targeted) Project Cost: Building $2.2 million Contempo Upgrade $350,000 Site Development $540,000 Soft Costs $750,000 Off -Site Improvements $240,000 TOTAL $4.08 million Scheme "D" has the following features: ➢ Drive -thru Fire Station located on Highway 9 with adequate front apron to facilitate off- street back -in movements. ➢ New design for larger Fire Station at 14,000 sq. ft. required which will incorporate training facility and storage requirements. ➢ Existing fire station will remain in operation during construction of new facility. ➢ 73 parking spaces provided (62 spaces targeted) Project Cost: Building $3 million Site Development $600,000 Soft costs $900,000 Off -Site Improvements $240,000 TOTAL $4.74 million Drawings of Scheme A and Scheme B are attached. ATI, Architects and Engineers will provide Council with additional written materials and will make a presentation outlining the opportunities and constraints inherent in the conceptual designs of both schemes presented for Council consideration at the Council meeting. Of course, additional more detailed design work would be required to proceed with either scheme. As the models were refined, the City hired Keith Higgins & Associates as an independent traffic consultant to perform a traffic analysis on each model. His analysis details the benefits and problems inherit in each design based upon the traffic related criteria agreed to by the Adhoc Committee. That report is attached as Appendix B. Keith will also be available at the Council meeting to address traffic issues related to each scheme. The AdHoc Committee deserves credit for their many hours of dedicated attention to the complex issues before them. The process has resulted in two conceptual designs that would result in a new fire station for the community, improved safety for fire personnel, and that respond to many of the concerns that were raised regarding the original design. The AdHoc process has also had several collateral benefits. The process facilitated the organization of the Village Green Neighborhood Association and the subsequent Neighborhood Traffic Management Program in that neighborhood. It also resulted in a traffic warrant for a signal at Oak Street on Highway 9. In addition, our City's independent traffic engineer has provided for a redesign of the intersection at the corner of Saratoga Avenue and Highway 9 that would add an exclusive right hand turn on the northbound approach lane of Highway 9 onto the eastbound lane of Saratoga Avenue. An additional exclusive right -hand turn lane is also proposed for the westbound lane on Saratoga Avenue onto the northbound lane of Saratoga - Sunnyvale Road. These dedicated turn lanes he predicts, will result in an improvement from service level "D" to service level "C" at the intersection. He also states that this is likely to greatly improve the cut - through traffic now existing in the Village Green Neighborhood. With this report, the AdHoc process is concluded. At this stage, staff requires direction from the Council as to whether to pursue one of the conceptual schemes presented or to work with the Fire District to develop other options. Because both schemes involve the use of City property, both require City participation with the Fire District and other affected landowners to implement the necessary land transfers. FISCAL IMPACTS: Included in report. CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION(S): N/A ALTERNATIVE ACTION(S): o Direct staff to work with the Fire District to develop a project based upon Scheme "A ". o Direct staff to work with the Fire District to develop a project based upon Scheme "D ". o Direct staff to work with the Fire District to develop a project based upon a combination of factors to be determined by the City Council. FOLLOW UP ACTION(S): ADVERTISING, NOTICING AND PUBLIC CONTACT: N/A ATTACHMENTS: Attachment A — Scheme "A" Attachment B — Scheme "D" Attachment C — Traffic Evaluation — Higgins and Associates Attachment D — E -mail from John E. Keenan Cathleen Boyer From: John E. Keenan [john @ald.com] Sent: Thursday, April 11, 2002 8:52 PM To: Cathleen Boyer Cc: Kevin Schott; Aaron Katz; Art Marshall; Barry Ford; Berk Gilson; Bill Morrison; Bill Sousa; Charles Hackett; Dave Dolloff; Ed Farrell; Karen Walter; Tom Blaisdell Subject: Notes for the 4/17 CC meeting Cathleen, Next Wednesday I will be out of town and will not be able to provide my 3 minutes of wisdom on the fire station, so would you please add the following to the CC packet. Thanks, APR 12 2002 john Mr. Mayor and members of the City Council: Re: ATI final alternatives for the SFD fire station I would have liked to share these thoughts in person, but unfortunately I will be in Utah during the 4/17 meeting. I fully support alternative 'D' proposed by ATI. This alternative provides: 1) Not only a drive through station, but a back -in alternative as well. In an emergency, trucks could depart the station in either direction, should one become blocked for any reason. This is a major safety enhancement. 2) It can easily support 3 large equipment bays plus a smaller bay for an ambulance. This provides for future changes in the equipment structure and doesn't lock us in to the present equipment complement. This station must have a long life. 3) It allows the SFD to operate from their present position with no interruption in service during the construction phase. It also keeps costs down by eliminating all of the relocation costs associated with Plan A. 4) It will mandate a traffic light at Oak Street which will have secondary benefits to both pedestrians and traffic throughout the neighborhood. I urge you to require the SFD to adopt Plan D. Regards, -------------------------------------------- -------------------------------------------- John E. Keenan, President Advanced Logical Design, Inc 12280 Saratoga- Sunnyvale Rd. Suite 201 Saratoga, CA 95070 john @ald.com (408) 446 -1004 (408) 446 -1079 FAX www.ald.com 1 SARATOGA PUBLIC SAFETY CENTER TRAFFIC EVALUATION SARATOGA, CALIFORNIA Prepared For City of Saratoga Saratoga, California April 11, 2002 A02 -041 Report -l.wpd TABLE OF CONTENTS CHAPTER PAGE NO. DESCRIPTION T I. INTRODUCTION 1 II. EXISTING TRAFFIC CONDITIONS 2 A. Arterial Streets 2 B. Highway 9 / Saratoga Avenue Intersection 2 C. Highway 9 / Oak Street Intersection 4 D. Highway 9 / Oak Place Intersection 5 E. Park Place / Oak Place Neighborhood 5 I. FIRE STATION ALTERNATIVE LOCATIONS EVALUATION 6 IV. TEMPORARY FIRE STATION TRAFFIC OPERATIONS 9 V. RECOMMENDATIONS VI. CONCLUSION A02 -041 Report -1 mpd 10 11 I. INTRODUCTION The City of Saratoga hired the firm of Higgins Associates to support the efforts of the Ad Hoc committee studying conceptual design alternatives for a public safety center on or near the southeast corner of the Highway 9 (Saratoga -Los Gatos Road)/ Saratoga Avenue intersection in the easterly portion of the Saratoga Village in the City of Saratoga, California. A project location map is included as Exhibit 1. The proposed project has two alternative site plans. Scheme A involves constructing a new fire station at approximately the same location as the existing fire station, which has direct access onto Saratoga Avenue just east of Highway 9. Scheme D involves constructing a new fire station on the site currently occupied by the Contempo Realty building with direct access onto Highway 9 immediately east of Oak Street. The existing post office, which is immediately east of the existing fire station, is proposed to remain on both site plans. The post office building currently houses not only the United States Postal Service but a Santa Clara County Sheriff's Station as well. An aerial photo depicting the existing site as well as conceptual site plans of Scheme A and D are provided as Exhibits 2, 3 and 4, respectively. The purpose of this study is to determine the advantages and disadvantages of the two project alternatives with respect to traffic operations. This includes a variety of factors such as the volume and speed of conflicting vehicular and pedestrian traffic associated with the two alternatives, design constraints such as sight distance adequacy, impacts on emergency vehicle response times, the positive or negative impacts on the nearby residential neighborhood (primarily Oak Place and Park Place), and opportunities for solving existing traffic operational issues in the project vicinity. This study is not an attempt to evaluate Fire Department operations except as they are related to the above factors. It is also not an attempt to develop strategies to improve quality -of -life in the nearby neighborhood, which may include traffic control devices or traffic calming strategies. It is also not an attempt to directly address or solve traffic operational issues associated with the Saratoga Elementary School on Oak Street. This report is also not a traffic impact analysis although it does provide traffic data and an evaluation of traffic operations. A traffic impact assessment prepared earlier under a report entitled Proposed Replacement of Saratoga Fire Station - Traffic Study, February 6, 2001, prepared by Fehr and Peers. Fehr and Peers also prepared an evaluation of access and egress alternatives for a temporary fire station located at the Contempo building in two reports "Proposed Replacement of Saratoga Fire Station - Traffic Assessment of Temporary Operations and Alternative Access on SR9 " , August 10, 2001 and Saratoga Fire Station Replacement - Traffic Assessment of Proposed Temporary Circulation Plan, August 29, 2001. These additional documents are available at the City of Saratoga City Offices. The traffic impact analysis prepared by Fehr and Peers determined that the proposed fire station would not generate any additional traffic beyond what is currently generated by the existing fire station and would not have any significant off -site traffic impacts. Based on the information gathered as a part of this current study, the Fehr and Peers conclusion of no significant impact still applies to both proposed site plans. A02 -041 Report -Lwpd A technical appendix including raw traffic survey data, level of service calculations and other background material is provided under separate cover. It is available at the City of Saratoga city offices. II. EXISTING TRAFFIC CONDITIONS A. Arterial Streets The project site for both alternatives is bounded by Saratoga Avenue on the north, Highway 9 (Saratoga/Los Gatos Road) on the west and Saratoga Federated Church on the southeast, a residential unit fronting Saratoga Avenue on the east, (which is used as a church office) and a residential unit that fronts Highway 9 (which is used as a child care facility to the south of the project). Saratoga Avenue is a two lane east -west arterial with a 35 mile per hour speed limit along the project frontage east of Highway 9. It connects the Saratoga Village on the west with San Jose and Santa Clara on the east. Its name changes west of the Highway 9 intersection, where it becomes Big Basin Way. This is also under Caltrans jurisdiction as Highway 9. The Saratoga Avenue approach to its intersection with Highway 9 has a left turn lane and an optional through/right turn lane. Highway 9 south of Saratoga Avenue is also known as Saratoga -Los Gatos Road and is a two -lane state highway under Caltrans jurisdiction that has a north -south orientation. Highway 9 has a speed limit of 30 miles per hour in the vicinity of the project. Highway 9 connects the City of Saratoga with the City of Los Gatos and also is a part of a north -south thoroughfare that also connects the City of Sunnyvale to the north as Saratoga - Sunnyvale Road. B. Highway 9 / Saratoga Avenue Intersection The Highway 9 / Saratoga Avenue intersection, which is located at the northwest corner of the project site is currently signalized. The signal provides left turn phasing for northbound and southbound left turns and split - phasing for the eastbound and westbound movements. Split- phasing means that the phasing is "split" between the eastbound and westbound approaches. In other words, a separate combined phase is provided for eastbound lefts and throughs, followed by a separate phase for westbound lefts and throughs. This is inefficient because it only allows one direction of through traffic to go at a time. These movements, which could occur concurrently, are required to occur sequentially. This increases the delay for all movements at the intersection. A noticeable reduction in delay and improvement in level of service can be experienced, especially during off -peak hours where delay is controlled primarily by signal timing, if the eastbound and westbound approaches are changed to protected left turn phasing. The split - phasing is especially inefficient if pedestrians activate both the eastbound and westbound phases within the same cycle, especially under low volume conditions. A very long green phase must be provided for the eastbound movement in order to allow a pedestrian to cross, which is followed by a very long westbound green phase to allow the westbound pedestrian to cross. With A02 -041 Report -Lwpd protected left -turn phasing, both pedestrian movements would occur simultaneously, which would significantly reduce the amount of green time allocated to the eastbound and westbound approaches. The Highway 9 / Saratoga Avenue intersection currently includes a left turn lane, a through lane and an optional through/right turn lane on the northbound Highway 9 approach.. The southbound approach includes a left turn lane, a through lane and an optional through/right turn lane. The eastbound approach includes a left turn lane and a through lane. The eastbound right turn movement is accommodated by a separate right turn ramp that is created by a triangular island on the southwest corner of the intersection. This eliminates right turns from the intersection proper. The westbound approach includes a left turn lane and an optional through/right lane. The provision of a right turn lane on both the northbound approach and on the westbound approach would provide additional capacity at the intersection. However, this is currently precluded because of the close proximity of the existing fire station to the southeast corner of the intersection. The Saratoga Circulation and Scenic Highway Element Update, Fehr and Peers Associates, Inc., September 29, 2001, recommends the provision of a separate southbound right turn lane at this intersection as well. The intersection currently operates at a D level of service during the morning and evening peak hours. The provision of the modification and signal phasing plus the addition of right turn lanes on the northbound, westbound and southbound approaches would improve the intersection to a C level of service. The split -phase improvement can be implemented without constructing any roadway widening. Caltrans should be requested to perform this signal operational change. The demolition of the existing fire station will provide the opportunity to construct a westbound Saratoga Avenue right turn lane and a northbound Highway 9 right turn lane with either site plan alternative. This should be implemented as a part of the fire station project. As mentioned in the General Plan Circulation Element Update, the southbound right turn lane on Saratoga - Sunnyvale Road should be implemented by the City of Saratoga when funding is available. It should be noted that the level of service calculations assume long signal cycle lengths. This is in order to be consistent with the level of service determinations included in the General Plan Circulation Element. However, using optimized signal cycle lengths, the level of service will be somewhat better and probably represented by level of service C for existing conditions. The recommended improvements would result in achieving level of service B under optimized signal timing. Also, traffic volumes are likely to increase in the future which will result in more significant benefits from the recommended improvements. Exhibit 5 summarizes morning and evening Highway 9 / Saratoga Avenue levels of service with various improvement alternatives. During the morning peak hour, queues as long as 29 vehicles were measured during the morning peak hour. During the same peak hour, a queue length of about 16 vehicles was experienced on westbound Saratoga Avenue. Queue lengths during the evening peak hour on these two approaches were significantly less, with 8 vehicles being the maximum queue on northbound Highway 9 and 12 vehicles being the maximum queue on westbound A02 -041 Report -Lwpd Saratoga Avenue. The average queues were between 10% and 40% of the maximum queues. The existing fire station has minimal set backs from Highway 9 and Saratoga Avenue. This creates a sight distance restriction for westbound right turns onto northbound Saratoga - Sunnyvale Road. The City of Saratoga and Caltrans have installed a "No Right Turn on Red" sign to eliminate the exposure of vehicles attempting to enter the intersection while traffic is proceeding northbound through the intersection from the south leg of Highway 9. The close proximity of the fire station to the existing intersection also impedes sight distance for northbound Highway 9 traffic turning right onto eastbound Saratoga Avenue. When the Saratoga Fire Department responds to an emergency call, fire personnel must manually control traffic, especially on this northbound right turn movement to insure that there is no conflict with fire trucks responding to emergency calls. Fire personnel must also monitor this traffic movement when fire trucks are attempting to back into the fire station or when any type of traffic activity is taking place on the apron in front of the fire station. This is an undesirable operational deficiency that has negative safety consequences. C. Highway 9 / Oak Street Intersection The Highway 9 / Oak Street intersections is located near the southwest corner of the project. It is in very close proximity to the location of the Scheme D Fire Station driveway. Traffic counts were performed at this intersection for both the morning and evening peak hours. The counts indicate that "Peak Hour and Four Hour" and "Interruption of Continuous Traffic" signal warrants are currently met. It is probable that additional signal warrants are met at this location as well. One of the reasons for signal warrants being met at this location is that it is one of the primary access routes to the Saratoga Elementary School, which is located about one block to the west of Highway 9. A significant amount of vehicular traffic uses Oak Street for access to and egress from the school. In addition, there is a fairly significant amount of pedestrian traffic that crosses Highway 9 at this intersection. A total of 32 pedestrians were counted crossing Highway 9 during the 7:00 AM to 9:00 AM two -hour time period. A total of 27 pedestrians were counted crossing Highway 9 at Oak Street between 4:00 PM and 6:00 PM. The two -hour time period between 3:00 PM and 5:00 PM included a total of 25 pedestrians. In order to meet school crossing traffic signal warrants based on pedestrian traffic, a total of 70 school pedestrians must cross the roadway in a two hour period. It is evident the school pedestrian traffic signal warrant is not met. Warrant 2 - "Interruption of Continuous Traffic" requires 75 vehicles per hour for each of eight hours in order to meet signal warrants. A total of only six hours currently have been counted as a part of this study. Five out of the six hours counted exceed the 75 vehicles per hour threshold to warrant signals. The early afternoon hours that were counted had volumes exceeding 130 vehicles per hour, which indicates that it is highly likely that three other hours earlier in the afternoon or later in the evening would exceed this threshold. This would make a third warrant being met for existing conditions. A traffic signal will be able to be justified for this location. However, it is uncertain whether Caltrans will allow a A02 -041 Report -l.wpd traffic signal to be installed on Highway 9 at Oak Street due to its close proximity (within 400 feet) of the existing traffic signal at Saratoga Avenue. Traffic signals spaced too closely are difficult to coordinate, which results in inefficient traffic flow on the major street. Caltrans will require a more detailed signal warrant analysis as well as an evaluation of traffic operations if a signal is installed to make their determination as to whether to allow a signal at this location. The City of Saratoga is beginning the study process at this time. D. Highway 9 / Oak Place Intersection Immediately south of the Highway 9 / Oak Street intersection is the Highway 9 / Oak Place intersection. This intersection is controlled by a stop sign on the east leg (westbound approach) of Oak Place. Sight distance for westbound traffic exiting Oak Place and proceeding southbound on Saratoga Avenue is somewhat marginal. Sight distance improvements should be made at this intersection. This would include vegetation, trimming along the east side of Highway 9 south of Oak Place. Parking prohibitions on the east side of Highway 9, south of Oak Place, should also be considered. The Oak Place approach sight distance constraint could also be mitigated by including this leg in the signal system for Oak Street. However, the Oak Place approach is offset by about 100 feet from Oak Street. This would require an extremely wide intersection along Highway 9 and would also require split - phasing between the Oak Street and Oak Place approaches. This would result in a very inefficient signal system which would not be looked upon favorably by Caltrans. However, it is an alternative that should be explored. E. Park Place / Oak Place Neighborhood In addition to the major arterial streets in the immediate vicinity, a residential neighborhood is located to the southeast of the fire station. This is accessed by Park Place and Oak Place. Residential development fronts along these two roadways as well. The neighborhood is experienced cut through traffic associated with the morning and evening commuting pattern and nearby elementary school as well as the Saratoga Village commercial area and from the Saratoga Federated Church, which is located immediately to the southeast of the project site. The neighborhood has requested that the City of Saratoga investigate means of reducing the amount of traffic intrusion into their neighborhood by traffic calming features and possibly prohibitions of turning movements at access points to the neighborhood. The City of Saratoga is in the process of investigating traffic calming strategies in this neighborhood traffic management plan. The investigation of traffic management strategies for the neighborhood is not a part of this study. However, the project should be designed to avoid impacts associated with fire station operations in the neighborhood and also possibly provide alternative routes for traffic from nearby lane uses as well. A02 -041 Report -Lwpd III. FIRE STATION ALTERNATIVE LOCATIONS EVALUATION The two fire station alternatives currently being considered include, Scheme A, which has the fire station located on Saratoga Avenue just east of Highway 9, and Scheme D, which has the fire station located on Highway 9 directly across from Oak Street, both locations will affect or be affected by the traffic operations discussed for existing and background conditions in the previous chapters of this report. The following discussion describes the various criteria associated with traffic operations as they relate to the fire station site alternatives. The more favorable alternative for each criterion is also identified. The alternative comparisons are summarized on Exhibit 6. 1. Adjacent Traffic Volumes - The Saratoga Avenue east of Highway 9 currently carries about 10,650 vehicles per day. Highway 9 currently carries about 11,322 vehicles per day south of Saratoga Avenue. This is not a significant difference in traffic volumes. However, Saratoga Avenue would be the preferred access point based upon average daily traffic, which favors Scheme A. 2. Adjacent Travel Speeds - The adjacent travel speed along Saratoga Avenue near the Scheme A driveway is approximately 33 miles per hour. Highway 9 currently has prevailing speeds of about 37 miles per hour. This is not a significant difference in travel speed. However, this does favor the Saratoga Avenue (Scheme A) site. It should also be mentioned that traffic speeds immediately adjacent to the signalized Highway 9 / Saratoga Avenue intersection are slower than speeds at proximities further away from the intersection. The average travel speeds stated herein are based upon speeds during a green light. 3. Queue Lengths on Approaches to the Highway 9 / Saratoga Avenue Intersection - When emergency vehicles on an emergency call are required to wait for a queue of vehicles at a traffic signal to clear before they can proceed through an intersection, it has an impact on the emergency vehicles response time. The longer the queue, the greater the impact on the response time. The westbound Saratoga Avenue approach has a much less average in maximum queue length during the morning peak hour than the Highway 9 approach. However, it also has a lower average queue length during the PM peak hour. However, Saratoga Avenue has experienced a longer maximum queue during the evening peak hour than the maximum queue experienced on Highway 9 when the data collection was performed in late March, 2002. There is a significant advantage for the Saratoga Avenue site based upon the morning peak hour. The evening peak hour is virtually the same for the two approaches. This criteria favors the Saratoga Avenue site (Scheme A). 4. Queue on Near or Far Side of Station - The ability of an emergency vehicle to proceed around a queue of vehicles by traveling in the opposing travel lanes can significantly mitigate the impact of the queue on the vehicle response time. For vehicles exiting the station, the ability to exit on the far side of the queue is much A02 -041 Report -l.wpd better than exiting where the queue is immediately adjacent to the curb along the fire station frontage. In this case, the westbound Saratoga Avenue is on the far side (i.e., north half) of Saratoga Avenue while the fire station is located on the south half of the street, adjacent to the eastbound travel lanes. The Highway 9 site is located on the east side of Highway 9 which is immediately adjacent to the long northbound Highway 9 queue created by the traffic signal at Saratoga Avenue. Scheme A - The Saratoga Avenue site is favored based on this criterion. 5. Added Response Time from Highway 9 / Saratoga Intersection - Although queue lengths are generally significantly longer in the peak hours on the northbound Highway 9 approach than the westbound Saratoga Avenue approach, these conditions only represent one to two hours out of the day. Observations of traffic indicate that queue lengths are significantly less during most day light hours and are almost nonexistent during nighttime hours. The overall effect on response time is probably only a few seconds. The computation included on Exhibit 5 assumes that a queued vehicle has an impact of two seconds on the response time of an emergency vehicle, with the exception of the first vehicle in the queue, which has an impact of three seconds. Scheme A is favored based on this factor. 6. Sight Distance Adequacy at Fire Station Driveway - The existing fire station has very severe sight distance restrictions. These are proposed to be remedied by the Scheme A site plan, which demolishes the existing building and constructs a new fire station with setbacks that meet the City's Zoning Ordinance on both the Highway 9 site yard frontage and along Saratoga Avenue. The setback from Saratoga Avenue to the fire station building will actually be much greater in order to provide a staging area for fire station trucks on a concrete apron. No sight distance constraint will exist for the Saratoga Avenue (Scheme A) site plan. There is currently a sight distance of about 400 feet to the south of the proposed driveway for the Scheme D fire station. Based on prevailing speeds of 40 miles per hour on northbound Highway 9, the sight distance requirement is 315 feet. This also accounts for the downhill gradient of the roadway as northbound traffic approaches the fire station. The sight distance will be adequate at this location as well. In addition, a traffic signal is likely to be installed at the Highway 9 / Oak Street intersection. Emergency vehicles would be able to exit the fire station with the protection of a standard traffic signal, which would make sight distance a minor issue. The proposed design of Scheme A will allow emergency vehicles to exit the fire station directly into the middle of the Highway 9 /Saratoga Avenue intersection and pre -empt the normal signal operation to stop all entering traffic with red signal indications. Sight distance will not be an issue with this proposed sight plan alternative and traffic signal pre - emption. Neither alternative is favored for this consideration. A02 -041 Report -l.wpd 7. Traffic Impact on Park Place Neighborhood - Both Scheme A and Scheme D propose to allow right turns and left turns into the fire station. The apron providing the driveway in front of the fire station is proposed to be large enough to accommodate vehicles to turn around and back into the fire station without encroaching on the travel lanes on either Saratoga Avenue or Highway 9. It is expected that both fire station locations would have a mitigating effect on fire station traffic impacts in the Oak Place and Park Place neighborhood. The existing fire station has minimal apron at Saratoga Avenue and fire equipment occasionally meanders through the neighborhood to make a right turn into the fire station to stage for backing into the apparatus bays. Neither alternative is favored using this criterion. 8. Conflicts With Pedestrian Traffic - Based upon field observations, sporadic pedestrian traffic occurs along the existing fire station frontage along the south side of Saratoga Avenue east of Highway 9. By contrast, the Highway 9 /Oak Street intersection carried approximately 120 to 120 pedestrians during the six hours of manual counts including 7:00am to 9:00am and 2:00pm to 6:00pm. Many of these pedestrians were school age on their way to or from the Saratoga Elementary School located on Oak Street west of Highway 9. The potential for conflicts with pedestrian traffic is greater at the Scheme D site than the Scheme A site. This favors Scheme A. 9. Facilitate Solutions to Other Traffic Problems on Highway 9 - As mentioned under the Existing Traffic Conditions section of this report, a traffic signal is already warranted at the Highway 9 /Oak Street intersection. It is possible that a fire station exit as the east leg of this intersection would provide a much stronger case for installing a traffic signal. However, the data currently available indicates that a traffic signal can clearly be justified for this location. The traffic signal at the Highway 9 /Oak Street intersection also provides an opportunity to create a fourth leg at this intersection that would serve the parking area for Saratoga Federated Church as well as the public parking facilities for the Post Office and personnel parking for the fire station and sheriff's station. Both site plan alternatives provide the ability to add a public driveway to this intersection as well. The Scheme A site plan allows some flexibility by not co- mingling public traffic with fire station operations. Based on the increased likelihood of obtaining a signal at the Highway9 /Oak Street intersection, Scheme D is favored. 10. Facilitate Solutions to Other Traffic Problems on Saratoga Avenue - The currently proposed Scheme A site plan allows the inclusion of a westbound right turn lane on Saratoga Avenue. It also allows the conversion of the existing diagonal parking in front of the Post Office to parallel parking. The existing diagonal parking is highly undesirable along most public streets but especially along a moderate speed and moderate traffic volume arterial such as Saratoga Avenue. The diagonal parking operations will be exacerbated by the addition of the westbound right turn lane on Saratoga Avenue because the lanes will need to be re- striped further to the south to accommodate this additional travel lane along the north curb line. This will result in eastbound through traffic being immediately adjacent to the rear bumpers of the cars parked in the existing diagonal spaces. They must be eliminated as a part of the A02 -041 Report -Lwpd addition of the right turn lane. A total of two or three spaces can be accommodated with the Scheme A site plan. The Scheme A site plan also has some constraints regarding the ability to allow the existing bike lanes to remain along Saratoga Avenue. The Highway 9 (Scheme D) site will allow the implementation of the westbound Saratoga Avenue right turn lane and the provision of five parallel parking spaces along Saratoga Avenue to serve the Post Office. It also can probably be designed to accommodate standard bike lanes for eastbound and westbound Saratoga Avenue. The ability to implement traffic operational improvements along Saratoga Avenue favors the Scheme D site. 11. Facilitate Fourth Leg at Highway 9 /Oak Street - At the Highway 9 /Oak Street intersection to provide signalized access to and from public and Church parking areas as described in criterion 8, both project site plan alternatives can be designed to accommodate a driveway to serve public and Church parking areas. However, the co- mingling of public traffic and fire station operations is not desirable under Scheme D This favors Scheme A, the Saratoga Avenue site. Overall, the Scheme A (Saratoga Avenue site) is favored for six criteria. Scheme D, (the Highway 9 site) is favored in three criteria. Both alternatives are essentially equivalent based on three of the criteria. This would seem to favor the Saratoga Avenue site. However, the differences between adjacent traffic volumes and travel speeds are fairly inconsequential, especially with traffic signalization at the Highway 9 /Oak Street intersection. Neither alternative has overwhelming advantages with regard to traffic operations over the other alternative. Also, both sites can be designed to satisfactorily and safely accommodate traffic operations. The consideration of a variety of other criteria that are not related to traffic will need to be considered in making a determination of the appropriate site plan to implement. IV. TEMPORARY FIRE STATION TRAFFIC OPERATIONS If Scheme A is implemented, it will require the demolition of the existing fire station and the reconstruction of a new fire station essentially on the existing fire station site. During construction, the fire station will need to be moved to a temporary location. This has been identified as the existing Contempo building which is near where the Scheme D fire station would be located. Several emergency response routes could be implemented for the temporary fire station at the Contempo building. These were evaluated in the Proposed Replacement of Saratoga Fire Station - Traffic Assessment of Temporary Operations and Alternate Access on SR -9, Fehr & Peers Associates, Inc., August 10, 2001, and Saratoga Fire Station Replacement - Traffic Assessment - A Proposed Temporary Circulation Plan, Fehr & Peers Associates, Inc., August 29, 2001. The temporary circulation recommended by Fehr & Peers is to access the Contempo temporary fire station via Highway 9 and to exit onto Saratoga Avenue at the existing one -way driveway east of and adjacent to the post office. This is also the recommended temporary circulation alternative based upon on this A02 -041 Report -Lwpd current traffic assessment. The August 29, 2001 report suggests some mitigations to reduce the potential conflicts between emergency response vehicles and pedestrians where the existing sidewalk in front of the post office intersects the one -way exit driveway to be used by fire vehicles during an emergency response. This is illustrated on Exhibit 7. A new sidewalk is recommended that would extend perpendicular to the existing sidewalk in front of the post office to provide a relocated cross walk further away from the corner of the post office building, which currently limits visibility between eastbound pedestrians and exiting vehicles. A hand rail would be constructed across the pedestrian approach to the driveway on the post office side of the driveway and a convext mirror installed to provide better visibility between pedestrians and exiting vehicles. An alternative mitigation strategy developed in the August 29, 2001 report is to install an extinguishable, internally illuminated "car coming" sign that would flash as a vehicle approached on the exit. It would be activated by vehicle detection similar to what is provided at a traffic signal. Rather than this being an alternative measure, it is recommended that it be installed in addition to the measures depicted on Exhibit 7. This will provide additional measure to minimize pedestrian and exiting vehicle conflicts. V. RECOMMENDATIONS The following recommendations are based upon the preceding analysis. 1. The Highway 9 / Saratoga Avenue intersection should have the following improvements implemented to improve existing traffic conditions and to mitigate future. a. Modify the existing traffic signal from the existing eastbound and westbound split - phasing to protected left turn phasing on the eastbound and westbound approaches. The traffic signal modification should be the responsibility of Caltrans. b. Install a northbound Highway 9 right turn lane. C. Install a westbound Saratoga Avenue right turn lane. d. Install a southbound Saratoga - Sunnyvale Road right turn lane. The northbound right turn lane and westbound right turn lane should be implemented as a part of the fire station project, whether Scheme A or Scheme D or any other scheme is implemented. The southbound right turn lane should be implemented by the City of Saratoga as the City continues to develop in the future. 2. Install a traffic signal at the Highway 9 / Oak Street intersection. This is required for existing traffic conditions. The neighborhood has indicated that it would be desirable to have a raised median on the south leg of this intersection that would be extended south of the Oak Place intersection to restrict the Oak Place intersection to right turns in and out only. This design component will also need to be approved by Caltrans. The traffic signal will need to be approved by Caltrans and will require the preparation of detailed traffic signal warrant analysis and an evaluation of the A02 -041 Report -Lwpd resulting traffic operations assuming a signal at Oak Street as well as the existing signal at Saratoga Avenue. 3. The Scheme A site should have emergency vehicle preemption installed at the Highway 9 / Saratoga Avenue intersection that would stop all four legs of the intersection, thus allowing emergency vehicles to enter directly into the intersection, essentially as a fifth leg. The same type of configuration and traffic signal operation should be provided at the future Highway 9 / Oak Street intersection if the Scheme D fire station is implemented. 4. The existing diagonal parking in front of the post office should be modified to parallel parking at the time of implementation of a westbound right turn lane on Saratoga Avenue at Highway 9. 5. The temporary station that would utilize the existing Contempo building if Scheme A is implemented, should include vehicles entering via Highway 9 and exiting on to Saratoga Avenue in the one -way driveway east of the post office. The measure is depicted on Exhibit 7 in addition to an extinguishable message sign activated by vehicle detection on the exit to warn pedestrians of approaching vehicles should be installed to minimize conflicts between exiting vehicles and pedestrians in front of the post office. VI. CONCLUSION Both Scheme A and Scheme D can be designed to adequately and safely accommodate vehicular traffic and emergency vehicle traffic operations. Scheme A has certain advantages including being located on the lower volume, low -speed street roadway and being able to have reduced emergency vehicle response times. It also has less pedestrians in the proximity of the fire station driveway and facilitates the provision of a fourth leg at the Highway 9 / Oak Street intersection that would serve as a major access and egress point for the Saratoga Federated Church and the other public parking areas in the vicinity of the fire station. On the other hand, Scheme D may provide a stronger reason to signalize the Highway 9 / Oak Street intersection which would be helpful in negotiating with Caltrans. It also provides the ability to widen Saratoga Avenue to accommodate five parallel parking spaces along its south curb line, thus fully replacing the existing five diagonal parking spaces in front of the post office. It will also be easier to retain the existing bike lanes on the east leg of Saratoga Avenue. Neither alternative has such distinct advantages over the other alternative with regarding to traffic operations to be able to identify a preferred alternative. Other non - traffic operations considerations will need to be considered in identifying the best project alternative. A02 -041 Report -Lwpd LIST OF EXHIBITS EXHIBIT NO. DESCRIPTION 1. PROJECT LOCATION MAP 2. AERIAL PHOTO OF EXISTING SITE CONDITIONS 3. SCHEME A SITE PLAN 4. SCHEME D SITE PLAN 5. LEVEL OF SERVICE SUMMARY 6. SARATOGA PUBLIC SAFETY CENTER ALTERNATIVE COMPARISON SUMMARY TABLE 7. TEMPORARY FIRE STATION SARATOGA AVENUE EXIT IMPROVEMENTS A02 -041 Report -l.wpd j T°�/ OR. R. SONEfNM1 G Fq �' AV 6R6ENBPWK ro w' SEAGULL O a KExN ' SLISA< � � pi 3 a BROOKVIE G DR. K z � �A 71 c 0 . roux. AV NIIIER CL rAl 'PC _ °%1 �-r' WORTNAM / ( % RTC Q3O adl 'F1AY a GOIEfA �..�» Pfph cr/M o •$ ER OP. �+ ,FLf(q 2rp W G �, ! 9,� / g� DIEISLfR I GOSOON `B +• ` � �I _t � ' . .. � \ q /� ;. '� � �N�Yr� P i� M c W VEPD'SEHM I L MOR E / W } T (A; aar n 1Fx1E6C\ • (y EOIILI A = z � N1xNaF( ARP c MS�N/ - I.SARATOGA ¢ 4R X ( c[ _. �yaa;a¢' $ o •, sEAeu s • f1Le � ' /' � T WARDELL 3 90 � � Y O'er. � Z � LN. R. '� c f COX WIWAM B °s V �AYIXIGYUBA c} x �' aB C`�OB $ '� a�4�'-1 to R9T0 Al I. IDUNDTY CLUB' ~ ' r _ G G G Q a 3 .,g cry, G(FN RME D SHUBER7 0 mV Sot@ o; PIERCE ° RD, o R, R. d» 1 q, a RTF 6E (L ,� ¢CHATEAU o W` � �( = P pP• j¢ DR. a s NYTNE CT BRANOrNtNE V¢ W R' OkT' z10 . J Is �bG MFR �OR. '?7AAgD 3�, BIAUEfO GIN oNiERj -N a „� o o o t PA ARGON CHATEAO WA SCUEEA ys G OR. •tt • ROOEO� z f momw ILL a rrIARIERS TIR D. P GRANDE OR. j C. �+ �0, %BELLA VIVA HOLLOW N IDA m' w . AGBE7 i o 'gRRI e 5. x t! 8 `(% CUNN N r G 11 -1 x �+A ARCUa cr. s � i�S�' IPA G \�� �/ it nw�- SEVILLA � o byh FRANKLIN A. ' sry ��' �, o �' O \ � 1 _ mrAR AS R0. SARA(R((S °y A z EL ooRAOO P I51A CT. W m 9 A `` �� , SAflATOGI` F .6- s NERWB '+' tour. us /' •` O'' H m a4 < RpNN1E \GH d -? 1 VERGE A VISTA ° LN, -> z i OLD I k/RLE o Twux .....- :...m.w� S r....: n.... - __ _ _..... MERRI oo s � vcE 3 W G A � � /ptHOS G 3 HERRIMAN !� k 9 MALCONAV �pZON AV. + �myxAiy LENDALE q ! MAGNOLIA CL v 2 MINA WY. o / t CONi/. (lA•+. • '� 2Y � s- %�++PLLMiOFE� y 1 3PETUNIAGT R . o k' YA�o , PRUNE BLDSSOM� 6 DY C£ ..O y1RIE5 Il M ® ®J �7 m AN. o l`I'kC. �KElll ZO 4 ' DR. , 5 vA. p y/ m r "°e MOpT WEST VALLEY V cS M S5 p� S p�I ° CQwtmLLUSi. bL �i PALO - ¢ PO• vH+�� g n COLLEGE 1 f OERSEY, �F1S Dfl. ,ON s ` �P'i z \yVEVpo ys +[,G'R4 I dDLLIP ARR dd / -p•C S DURHAM I �M1 y, I,. Pal' TFq Ay 3 "TLI CANYON c+ hFW ! hT• ¢ xMLA 5P 4PJ S TAOA CE 3G jj � xwox6»u•RrtE 4 '` � �I, � W. • , . ' A 0Q HTS. .r a� F a .': .. �� Tx o '0y v° ° �55� ~ Sk 9 _T_ __ __e ___r tu 711 �. �. ncr" r ! � / / � � SAN NARCOS R0. OIESTFq 3 . O BANK y .. 9y y1. 4� /C(. a \ I ; L `J SIN SAILLES NDY 1 'G• E '}tF o �P' n,• p P�S1`5 / oQ \ CW I aAeaS I 1 NNTAGBLR. �A F ji ¢ fT3' wMron(> •ip� �e`O I F RWEU °�' AV. PoyuNa oEi , . r� n. ri 1A e5 yw l_____/ DE mRGaseY 7G✓ c vANDr t°Mr-0 +r ao tQByo t W rs-cq O ��! IE Bp$1� V\Ew,( F. .. RAx 01 uRRfu P \SP7•� x BIG J\. C �„ AV 11450 r ' tom, `iqF ty�rp ONNIE BME � � Z y I G�POEMS \' � - 'Y`Y (�4' "k z °�'�.. '� x �LSOHN. W. ' HILL A= j TN EE OAKS VA; QO_ / LN. _ NOTREi '' ,DAME,, j Yfe, T� WWW!48 DR. Oe' I , NOWWA .•.� uz ell. // PARK DR. iVR� Z c 7 ° aaiL WY SIGA( ROBIN MoyT�D�NA .LGE� Qo.�lKT F s_ (/ LARK JIB O RITE V +SM a \ FGE yo T �� o arxuxA ° qA DR. 1iRED `� R D / OR„_. � y� WONT SUA RArOOA .. / .VILLA cm - -'. SUNSET GLEN. WY. IU DNYSIDE cta ON yy( I /. A ... ! �� I .Q 5 tiTL6$ /'"� \+6�• JS L08 s 4 MONTALVO ! o I .,.ARBORETU...I pp 0��%g�• C �\ / Mm 0.EO o AN ROJ RAVINE O N - °r g= { 1 j i �y r DR. o EXHIBIT 1 PROJECT LOCATION MAP HIGGINS ASSOCIATES EXHIBIT 2 AERIAL PHOTO OF EXISTING SITE CONDITIONS HIGGINS /ASSOCIATES Source: EXHIBIT 3 ATI Architects and Engineers, SCHEME A April 11, 2002 SITE PLAN Saratoga-Los Gatos/HWY 9 Source: EXHIBIT 4 ATI Architects and Engineers, SCHEME D April 11, 2002 SITE PLAN N N N �i m. N �c r r 0 Notes: 1. L, T, R = Left, Through, Right. 2. NB, SB, EB, WB = Northbound, Southbound, Eastbound, Westbound. 3. Analysis uses the Santa Clara County Congestion Management Program (CMP) intersection analysis methodologies, including the 1985 Highway Capacity Manual. 4. Existing eastbound triangular island modeled as free right turn in analysis. 5. Improvement Options are as follows: Option 1: Add NB and WB Right Turn Lanes. Change East -West Signal Phasing from Split Phase to Protected. Option 2: Option 1 plus SB Right Turn Lane Option 3: Option 2 plus new EB Right Turn Lane. 6. Right turn lane improvements analyzed with right turn overlap phasing, in order to model right turns on red. A01 -041 LOS.x is - LOS Existing Existing Existing Conditions Operational Lane Intersection N -S E -W Configuration Control AM Peak HE PM Peak Hr Street I Street Delay LOS Delay LOS (sec) V/C (sec) V/C 1 Saratoga -Los Gatos Big Basin Way NB 1 -L, 1 -T, 1 -T /R Signal 25.8 D 27.0 D Road (SR 9) - (SR9) - SB 1 -L, 1 -T, 1 -T /R 0.604 0.650 Saratoga - Sunnyvale Saratoga EB 1 -L, 1 -T, 1 -R Improvement Option 1 23.5 C 24.2 C Road Avenue WB 1 -L, 1 -T /R 0.536 0.569 Improvement Option 2 23.3 C 23.5 C 0.496 0.501 Improvement Option 3 22.8 C 23.1 C 0.496 0.501 Notes: 1. L, T, R = Left, Through, Right. 2. NB, SB, EB, WB = Northbound, Southbound, Eastbound, Westbound. 3. Analysis uses the Santa Clara County Congestion Management Program (CMP) intersection analysis methodologies, including the 1985 Highway Capacity Manual. 4. Existing eastbound triangular island modeled as free right turn in analysis. 5. Improvement Options are as follows: Option 1: Add NB and WB Right Turn Lanes. Change East -West Signal Phasing from Split Phase to Protected. Option 2: Option 1 plus SB Right Turn Lane Option 3: Option 2 plus new EB Right Turn Lane. 6. Right turn lane improvements analyzed with right turn overlap phasing, in order to model right turns on red. A01 -041 LOS.x is - LOS EXHIBIT 6 - SARATOGA PUBLIC SAFETY CENTER ALTERNATIVE COMPARISON SUMMARY TABLE 5. ADDED RESPONSE TIME FROM HWY 9 /SARATOGA INTERSECTION DELAY (SECONDS) ADDED OVERALL RESPONSE TIME (SECONDS) 6. SIGHT DISTANCE ADEQUACY - FIRE STATION DRIVEWAY 7. IMPACT ON PARK PLACE NEIGHBORHOOD 8. PEDESTRIAN CONFLICTS AT DRIVEWAY 9. FACILITATES SOLUTIONS TO OTHER TRAFFIC PROBLEMS ON HIGHWAY 9 10. FACILITATES SOLUTIONS TO OTHER TRAFFIC PROBLEMS ON SARATOGA AVE. 11. FACILITATES FOURTH LEG AT HWY 9 /OAK TO PROVIDE SIGNALIZED ACCESS TO AND FROM PUBLIC AND CHURCH PARKING AREAS Higgins Associates 1.0 7.4 A - Saratoga Avenue 0.6 MOST RESTRICTED APPROACH APPROACH SPEED (MPH) SIGHT DISTANCE PROVIDED (FT) SIGHT DISTANCE REQUIRED (FT; SIGHT DISTANCE ADEQUATE? REMEDIAL MEASURE NB Hwy 9 Right 15 50 80 No Fire Personnel to Control Traffic Potential for Fire Trucks to use Park Place to allow a right turn into the station if a design that does not allow WB Saratoga Left Turns is used. Sporadic pedestrian traffic 1. Signal appears to be warranted w/o Fire Station at Oak St. None Apparent Allows conversion of e)dsting perpendicular spaces at Post Office to 3 parallel spaces. 1. Driveway can be provided adjacent to ebsting Contempo building. 04/11/2002 6.0 MOST RESTRICTED APPROACH NB Hwy 9 APPROACH SPEED (MPH) 40 SIGHT DISTANCE PROVIDED (FT) 400 SIGHT DISTANCE REQUIRED (FT) 315 SIGHT DISTANCE ADEQUATE? Yes REMEDIAL MEASURE None Required Potential for Fire Trucks to use Park Place to allow a right turn into the station if a pull through design is not used. 130 pedestrians in 6 hours, many elementary students 1. May provide stronger reason to signalize Hwy 9/ Oak Street. This would improve pedestrian and vehicular access and egress for Saratoga Elementary 2. Signal appears to be warranted w/o Fire Station at Oak St. Eliminates Fire Station driveway along Saratoga Ave. 1. This will allow conversion of e)dsting perpendicular spaces at Post Office to 5 parallel spaces. 1. Driveway can be provided adjacent to proposed Fire Station building. However, the comingling of public traffic and fire station operations is not desirable. D - Highway 9 Both Alternatives Equal A - Saratoga Avenue D - Highway 9 D - Highway 9 A - Saratoga Avenue a02- 0411summary2.)ds PREFERRED CRITERIA SCHEME A - SARATOGA AVENUE SCHEME D - HIGHWAY 9 ALTERNATIVE 1. ADJACENT TRAFFIC VOLUMES - ADT 10,650 11,322 A - Saratoga Avenue 2. ADJACENT TRAVEL SPEEDS - MPH EB 34 NB 40 (BASED ON 85th PERCENTILE) WB 32 SB 33 AVE 33 AVE 36.5 A - Saratoga Avenue 3. QUEUE LENGTHS ON APPROACH AM AVE 1.5 AM AVE 5.8 TO HWY9 /SARATOGAAVE (VEHICLES) AM MAX 16 AM MAX 29 A - Saratoga Avenue PM AVE 1.9 PM AVE 3 PM MAX 12 PM MAX 8 4. QUEUE ON NEAR OR FAR SIDE OF STATION FAR SIDE - ALLOWS DIRECT ACCESS TO NEAR SIDE - ALLOWS DIRECT ACCESS TO Both Alternatives Equal HIGHWAY 9 /SARATOGA AVE. INTERSECTION SIGNALIZED HIGHWAY 9 /OAK ST. INTERSECTION 5. ADDED RESPONSE TIME FROM HWY 9 /SARATOGA INTERSECTION DELAY (SECONDS) ADDED OVERALL RESPONSE TIME (SECONDS) 6. SIGHT DISTANCE ADEQUACY - FIRE STATION DRIVEWAY 7. IMPACT ON PARK PLACE NEIGHBORHOOD 8. PEDESTRIAN CONFLICTS AT DRIVEWAY 9. FACILITATES SOLUTIONS TO OTHER TRAFFIC PROBLEMS ON HIGHWAY 9 10. FACILITATES SOLUTIONS TO OTHER TRAFFIC PROBLEMS ON SARATOGA AVE. 11. FACILITATES FOURTH LEG AT HWY 9 /OAK TO PROVIDE SIGNALIZED ACCESS TO AND FROM PUBLIC AND CHURCH PARKING AREAS Higgins Associates 1.0 7.4 A - Saratoga Avenue 0.6 MOST RESTRICTED APPROACH APPROACH SPEED (MPH) SIGHT DISTANCE PROVIDED (FT) SIGHT DISTANCE REQUIRED (FT; SIGHT DISTANCE ADEQUATE? REMEDIAL MEASURE NB Hwy 9 Right 15 50 80 No Fire Personnel to Control Traffic Potential for Fire Trucks to use Park Place to allow a right turn into the station if a design that does not allow WB Saratoga Left Turns is used. Sporadic pedestrian traffic 1. Signal appears to be warranted w/o Fire Station at Oak St. None Apparent Allows conversion of e)dsting perpendicular spaces at Post Office to 3 parallel spaces. 1. Driveway can be provided adjacent to ebsting Contempo building. 04/11/2002 6.0 MOST RESTRICTED APPROACH NB Hwy 9 APPROACH SPEED (MPH) 40 SIGHT DISTANCE PROVIDED (FT) 400 SIGHT DISTANCE REQUIRED (FT) 315 SIGHT DISTANCE ADEQUATE? Yes REMEDIAL MEASURE None Required Potential for Fire Trucks to use Park Place to allow a right turn into the station if a pull through design is not used. 130 pedestrians in 6 hours, many elementary students 1. May provide stronger reason to signalize Hwy 9/ Oak Street. This would improve pedestrian and vehicular access and egress for Saratoga Elementary 2. Signal appears to be warranted w/o Fire Station at Oak St. Eliminates Fire Station driveway along Saratoga Ave. 1. This will allow conversion of e)dsting perpendicular spaces at Post Office to 5 parallel spaces. 1. Driveway can be provided adjacent to proposed Fire Station building. However, the comingling of public traffic and fire station operations is not desirable. D - Highway 9 Both Alternatives Equal A - Saratoga Avenue D - Highway 9 D - Highway 9 A - Saratoga Avenue a02- 0411summary2.)ds Red Cure � R° a ° 0 = o b 0 o Q- y Ny o CD o CD o CD Saratoga Fire Station Building Replacement ..,.r Traffic Study White Curb Green Curb 15 min. Green Curb (15 min.) Fence or planters® POSt Office Tjrn�ri�� y - j ote: Plan is conceptual only and is not a design drawing. rA H H Exhibit C PROPOSED DRIVEWAY MODIFICATIONS O )05 -306 -1 (9_23 -01) Z hr & Peers. Associates, Inc. y New curb Saratoga Avenue d ctosswalk MA Edge of Pavement Scale: I"= 20' ,�l fp LIST OF APPENDICES APPENDIX NO. TITLE A. PEAK HOUR VOLUMES B. LEVEL OF SERVICE CALCULATIONS C. RAW PEAK HOUR TRAFFIC COUNTS D. RAW 24 -HOUR COUNTS AND SPEED DATA E. RAW RADAR SPEED SURVEY DATA F. SARATOGA PUBLIC SAFETY CENTER ALTERNATIVE COMPARISON G. HIGHWAY 9 / OAK STREET SIGNAL WARRANTS (PRELIMINARY) A02 -041 Report - I.wpd APPENDIX A - PEAK HOUR VOLUMES kAj T\j ;IFF 1,1� APPENDIX B LEVEL OF SERVICE CALCULATIONS MITIG8 - AM Existing Thu Apr 11, 2002 09:16:04 Page 1 -1 Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos = Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.604 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 25.8 Optimal Cycle: 50 Level Of Service: D+ ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Ignore Include Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 1 0 1 1 0 0 1 0 Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 570 196 60 410 140 200 220 100 95 213 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 130 620 213 65 446 152 217 239 0 103 232 48 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 130 620 213 65 446 152 217 239 0 103 232 48 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 130 620 213 65 446 152 217 239 0 103 232 48 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.04 1.00 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.00 1.00 Lanes: 1.00 1.47 0.53 1.00 1.48 0.52 1.00 1.00 1.00 1.00 0.83 0.17 Final Sat.: 1750 2753 946 1750 2757 942 1750 1900 1750 1750 1492 308 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.07 0.23 0.23 0.04 0.16 0.16 0.12 0.13 0.00 0.06 0.16 0.16 Crit Moves:* * ** * * ** * * ** * * ** Green Time: 16.5 44.7 44.7 7.4 35.7 35.7 25.0 25.0 0.0 30.8 30.8 30.8 Volume /Cap: 0.54 0.60 0.60 0.60 0.54 0.54 0.60 0.60 0.00 0.23 0.60 0.60 Delay /Veh: 38.6 23.7 23.7 48.0 27.3 27.3 34.5 34.6 0.0 26.8 31.4 31.4 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 38.6 20.1 20.1 48.0 23.2 23.2 34.5 29.4 0.0 26.8 26.7 26.7 DesignQueue: 8 28 9 4 22 7 12 13 0 5 12 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traf£ix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM Existing Thu Apr 11, 2002 09:16:23 Page 1 -1 ----------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.650 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 27.0 Optimal Cycle: 55 Level Of Service: D+ ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- II---------- - - - - -1 Control: Protected Protected Split Phase Split Phase Rights: Include Include Ignore Include Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 1 0 1 1 0 0 1 0 ------------ I---------- =---- II---------------- II----------- +---- II------------- - -1 Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 235 76 82 588 206 145 218 103 124 276 57 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 105 240 78 84 600 210 148 222 0 127 282 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 240 78 84 600 210 148 222 0 127 282 58 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 105 240 78 84 600 210 148 222 0 127 282 58 ------------ I--------------- 11--------------- II--------------- II---------- - - - - -I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.04 1.00 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.00 1.00 Lanes: 1.00 1.50 0.50 1.00 1.47 0.53 1.00 1.00 1.00 1.00 0.83 0.17 Final Sat.: 1750 2795 904 1750 2739 960 1750 1900 1750 1750 1492 308 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.09 0.09 0.05 0.22 0.22 0.08 0.12 0.00 0.07 0.19 0.19 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 11.1 44.5 44.5 7.0 40.4 40.4 21.6 21.6 0.0 34.9 34.9 34.9 Volume /Cap: 0.65 0.23 0.23 0.82 0.65 0.65 0.47 0.65 0.00 0.25 0.65 0.65 Delay /Veh: 46.0 19.7 19.7 68.1 26.5 26.5 34.3 37.7 0.0 24.8 30.3 30.3 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 46.0 16.8 16.8 68.1 22.5 22.5 34.3 32.1 0.0 24.8 25.8 25.8 DesignQueue: 6 10 3 5 28 10 8 13 0 6 14 3 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM Ex + Optionl Thu Apr 11, 2002 09:16:42 Page 1 -1 -------------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.536 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 23.5 Optimal Cycle: 46 Level Of Service: C- ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Include Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 1 0 1 1 0 1 0 1 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 570 196 60 410 140 200 220 100 95 213 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 130 620 213 65 446 152 217 239 0 103 232 48 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 130 620 213 65 446 152 217 239 0 103 232 48 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 130 620 213 65 446 152 217 239 0 103 232 48 ------------ I--------------- II--------------- II--------------- ---------- - - - - -I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 1.48 0.52 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 2757 942 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.07 0.16 0.12 0.04 0.16 0.16 0.12 0.13 0.00 0.06 0.12 0.03 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 16.7 45.9 63.5 7.0 36.2 36.2 27.8 37.5 0.0 17.6 27.3 34.3 Volume /Cap: 0.54 0.43 0.23 0.64 0.54 0.54 0.54 0.40 0.00 0.40 0.54 0.10 Delay /Veh: 38.3 20.9 11.5 50.4 26.9 26.9 31.8 24.9 0.0 35.9 32.0 23.9 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 38.3 17.8 9.8 50.4 22.9 22.9 31.8 21.2 0.0 35.9 27.2 20.3 DesignQueue: 8 27 7 4 22 7 11 11 0 6 12 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM Ex + Optionl Thu Apr 11, 2002 09:17:05 Page 1 -1 -------------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.569 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 24.2 Optimal Cycle: 47 Level Of Service: C- ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II --------------- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Include Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 1 0 1 1 0 1 0 1 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 235 76 82 588 206 145 218 103 124 276 57 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0..00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 105 240 78 84 600 210 148 222 0 127 282 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 240 78 84 600 210 148 222 0 127 282 58 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 105 240 78 84 600 210 148 222 0 127 282 58 ------------ I--------------- II--------------- il--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 1.47 0.53 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 2739 960 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: V61/Sat: 0.06 0.06 0.04 0.05 0.22 0.22 0.08 0.12 0.00 0.07 0.15 0.03 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 12.7 34.6 53.4 24.2 46.2 46.2 17.8 30.4 0.0 18.8 31.3 55.5 Volume /Cap: 0.57 0.22 0.10 0.24 0.57 0.57 0.57 0.46 0.00 0.46 0.57 0.07 Delay /Veh: 41.8 24.6 14.7 30.6 22.5 22.5 38.3 29.3 0.0 35.9 30.4 13.6 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 41.8 20.9 12.5 30.6 19.1 19.1 38.3 24.9 0.0 35.9 25.9 11.6 DesignQueue: 6 12 3 5 26 9 9 11 0 7 14 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM Ex + Option2 Thu Apr 11, 2002 09:17:31 Page 1 -1 -------------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.496 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 23.3 Optimal Cycle: 46 Level Of Service: C- ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 10 1 1 0 1 0 1 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 .213 44 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 570 196 60 410 140 200 220 100 95 213 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 130 620 213 65 446 152 217 239 0 103 232 48 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 130 620 213 65 446 152 217 239 0 103 232 48 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 130 620 213 65 446 152 217 239 0 103 232 48 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.07 0.16 0.12 0.04 0.12 0.09 0.12 0.13 0.00 0.06 0.12 0.03 Crit Moves:* * ** * * ** * * ** * * ** Green Time: 18.8 39.4 58.5 9.0 29.6 59.7 30.1 40.5 0.0 19.0 29.5 38.5 Volume /Cap: 0.47 0.50 0.25 0.50 0.47 0.17 0.50 0.37 0.00 0.37 0.50 0.09 Delay /Veh: 36.0 24.8 13.7 42.9 29.6 12.6 30.0 23.1 0.0 34.7 30.3 21.6 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 AdjDel /Veh: 36.0 21.1 11.6 42.9 25.2 10.7 30.0 19.6 0.0 34.7 25.7 18.4 DesignQueue: 7 29 8 4 23 5 11 11 0 6 12 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM Ex + Option2 Thu Apr 11, 2002 09:18:01 Page 1 -1 -------------------------------------------------------------------------- - - - - -- ----------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.501 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 23.5 Optimal Cycle: 46 Level Of Service: C- ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T R ------------ I--------------- II--------------- II--------------- 11---------- - - - - -I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 235 76 82 588 206 145 218 103 124 276 57 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 105 240 78 84 600 210 148 222 0 127 282 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 240 78 84 600 210 148 222 0 127 282 58 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 105 240 78 84 600 210 148 222 0 127 282 58 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.06 0.04 0.05 0.16 0.12 0.08 0.12 0.00 0.07 0.15 0.03 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 14.4 30.7 52.0 21.5 37.8 58.1 20.3 34.5 0.0 21.3 35.5 57.0 Volume /Cap: 0.50, 0.25 0.10 0.27 0.50 0.25 0.50 0.41 0.00 0.41 0.50 0.07 Delay /Veh: 39.2 27.0 15.3 32.4 25.7 13.8 35.6 26.5 0.0 33.8 27.1 13.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 39.2 22.9 13.0 32.4 21.8 11.8 35.6 22.5 0.0 33.8 23.1 11.0 DesignQueue: 6 12 3 5 29 7 8 11 0 7 14 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM Ex + Option3 Thu Apr 11, 2002 09:20:06 Page 1 -1 Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.496 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 22.8 Optimal Cycle: 46 Level Of Service: C ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ovl Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 570 196 60 410 140 200 220 100 95 213 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 PHF Volume: 130 620 213 65 446 152 217 239 109 103 232 48 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 130 620 213 65 446 152 217 239 109 103 232 48 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 130 620 213 65 446 152 217 239 109 103 232 48 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.07 0.16 0.12 0.04 0.12 0.09 0.12 0.13 0.06 0.06 0.12 0.03 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 18.8 39.4 58.5 9.0 29.6 59.7 30.1 40.5 59.4 19.0 29.5 38.5 Volume /Cap: 0.47 0.50 0.25 0.50 0.47 0.17 0.50 0.37 0.13 0.37 0.50 0.09 Delay /Veh: 36.0 24.8 13.7 42.9 29.6 12.6 30.0 23.1 12.4 34.7 30.3 21.6 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 36.0 21.1 11.6 42.9 25.2 10.7 30.0 19.6 10.6 34.7 25.7 18.4 DesignQueue: 7 29 8 4 23 5 11 11 4 6 12 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM Ex + Option3 Thu Apr 11, 2002 09:20:22 Page 1 -1 Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.501 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 23.1 Optimal Cycle: 46 Level Of Service: C- ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ovl Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 -------------- I--------------- II--------------- II-------- .------- II--------------- I Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 235 76 82 588 206 145 218 103 124 276 57 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 PHF Volume: 105 240 78 84 600 210 148 222 105 127 282 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 240 78 84 600 210 148 222 105 127 282 58 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 105 240 78 84 600 210 148 222 105 127 282 58 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.06 0.06 0.04 0.05 0.16 0.12 0.08 0.12 0.06 0.07 0.15 0.03 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 14.4 30.7 52.0 21.5 37.8 58.1 20.3 34.5 48.9 21.3 35.5 57.0 Volume /Cap: 0.50 0.25 0.10 0.27 0.50 0.25 0.50 0.41 0.15 0.41 0.50 0.07 Delay /Veh: 39.2 27.0 15.3 32.4 25.7 13.8 35.6 26.5 17.1 33.8 27.1 13.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 39.2 22.9 13.0 32.4 21.8 11.8 35.6 22.5 14.5 33.8 23.1 11.0 DesignQueue: 6 12 3 5 29 7 8 11 4 7 14 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM 2025 Thu Apr 11, 2002 09:22:44 Page 1 -1 Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 1.026 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 52.0 Optimal Cycle: 180 Level Of Service: E ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II --------------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Ignore Include Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 1 0 1 1 0 0 1 0 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 204 969 333 102 697 238 340 374 170 162 362 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 222 1053 362 111 758 259 370 407 0 176 394 81 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 222 1053 362 111 758 259 370 407 0 176 394 81 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 222 1053 362 111 758 259 370 407 0 176 394 81 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.04 1.00 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.00 1.00 Lanes: 1.00 1.47 0.53 1.00 1.48 0.52 1.00 1.00 1.00 1.00 0.83 0.17 Final Sat.: 1750 2753 946 1750 2757 942 1750 1900 1750 1750 1492 308 ------------ I --------------- II --------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.13 0.38 0.38 0.06 0.27 0.27 0.21 0.21 0.00 0.10 0.26 0.26 Crit Moves:* * ** * * ** * * ** * * ** Green Time: 16.5 44.7 44.7 7.4 35.7 35.7 25.0 25.0 0.0 30.8 30.8 30.8 Volume /Cap: 0.92 1.03 1.03 1.03 0.92 0.92 1.01 1.03 0.00 0.39 1.03 1.03 Delay /Veh: 66.0 54.3 54.3 118.9 40.3 40.3 76.0 78.6 0.0 28.3 73.7 73.7 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 66.0 46.2 46.2 118.9 34.2 34.2 76.0 66.8 0.0 28.3 62.6 62.6 DesignQueue: 13 49 17 7 38 13 21 23 0 9 21 4 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM 2025 Thu Apr 11, 2002 09:23:12 Page 1 -1 -------------------------------------------------------------------------- - - - - -- ----------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 1.105 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 67.8 Optimal Cycle: 180 Level Of Service: F ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Ignore Include Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 1 0 1 1 0 0 1 0 --------------------------- II--------------- II--------------- 11---------- - - - - -I Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 175 400 129 139 1000 350 247 371 175 211 469 97 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 179 408 132 142 1020 357 252 378 0 215 479 99 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 179 408 132 142 1020 357 252 378 0 215 479 99 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 179 408 132 142 1020 357 252 378 0 215 479 99 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1600 1800 1800 1800 1800 1800 Adjustment: 0.97 1.04 1.00 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.00 1.00 Lanes: 1.00 1.50 0.50 1.00 1.47 0.53 1.00 1.00 1.00 1.00 0.83 0.17 Final Sat.: 1750 2795 904 1750 2739 960 1750 1900 1750 1750 1492 308 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.10 0.15 0.15 0.08 0.37 0.37 0.14 0.20 0.00 0.12 0.32 0.32 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 11.1 33.1 33.1 18.4 40.4 40.4 21.6 21.6 0.0 34.9 34.9 34.9 Volume /Cap: 1.10 0.53 0.53 0.53 1.10 1.10 0.80 1.10 0.00 0.42 1.10 1.10 Delay /Veh: 137.2 28.4 28.4 37.1 87.6 87.6 44.9 113 0.0 26.5 101 100_7 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 137.2 24.2 24.2 37.1 74.5 74.5 44.9 96.3 0.0 26.5 85.6 85.6 DesignQueue: 11 20 7 8 50 17 14 22 0 10 25 5 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM 2025 + Optionl Thu Apr 11, 2002 09:23:32 Page 1 -1 -------------------------------------------------------------------------- - - - - -- ----------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.911 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 33.0 Optimal Cycle: 127 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Include Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 1 0 1 1 0 1 0 1 --------.=.--- I--------------- II--------------- II--------------- II--------------- I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 204 969 333 102 697 238 340 374 170 162 362 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 222 1053 362 111 758 259 370 407 0 176 394 81 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 222 1053 362 111 758 259 370 407 0 176 394 81 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 .1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 222 1053 362 111 758 259 370 407 0 176 394 81 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 1.48 0.52 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 2757 942 1750 1900 1750 1750 1900 1750 ------------ I--------------- II--------------- II--------------- 11---------- - - - - -I Capacity Analysis Module: Vol /Sat: 0.13 0.28 0.21 0.06 0.27 0.27 0.21 0.21 0.00 0.10 0.21 0.05 Crit Moves:* * ** * * ** * * ** * * ** Green Time: 16.7 43.0 60.6 9.8 36.2 36.2 27.8 37.5 0.0 17.6 27.3 37.1 Volume /Cap: 0.91 0.77 0.41 0.77 0.91 0.91 0.91 0.68 0.00 0.68 0.91 0.15 Delay /Veh: 63.3 27.9 14.3 55.9 38.7 38.7 51.4 29.7 0.0 41.9 50.8 22.8 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 63.3 23.7 12.1 55.9 32.9 32.9 51.4 25.2 0.0 41.9 43.2 19.4 DesignQueue: 13 49 13 7 38 13 20 20 0 10 21 4 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM 2025 + Option! Thu Apr 11, 2002 09:23:49 Page 1 -1 -------------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.967 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 38.7 Optimal Cycle: 176 Level Of Service: D- ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Include Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 1 0 1 1 0 1 0 1 ----------- = 1 --------------- II--------------- II--------------- II--------------- I Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 175 400 129 139 1000 350 247 371 175 211 469 97 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 179 408 132 142 1020 357 252 378 0 215 479 99 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 179 408 132 142 1020 357 252 378 0 215 479 99 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 179 408 132 142 1020 357 252 378 0 215 479 99 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 1.47 0.53 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 2739 960 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.10 0.11 0.08 0.08 0.37 0.37 0.14 0.20 0.00 0.12 0.25 0.06 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 12.7 33.5 52.3 25.4 46.2 46.2 17.8 30.4 0.0 18.8 31.3 56.7 Volume /Cap: 0.97 0.38 0.17 0.38 0.97 0.97 0.97 0.79 0.00 0.79 0.97 0.12 Delay /Veh: 82.4 26.7 15.7 31.2 39.8 39.8 73.0 37.6 0.0 46.6 57.0 13.5 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 AdjDel /Veh: 82.4 22.7 13.4 31.2 33.8 33.8 73.0 32.0 0.0 46.6 48.5 11.4 DesignQueue: 11 20 5 8 46 16 15 20 0 12 25 4 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM 2025 + Option2 Thu Apr 11, 2002 09:24:22 Page 1 -1 -------------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.843 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 29.8 Optimal Cycle: 95 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 204 969 333 102 697 238 340 374 170 162 362 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 222 1053 362 111 758 259 370 407 0 176 394 81 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 222 1053 362 111 758 259 370 407 0 176 394 81 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 222 1053 362 111 758 259 370 407 0 176 394 81 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.13 0.28 0.21 0.06 0.20 0.15 0.21 0.21 0.00 0.10 0.21 0.05 Crit Moves: Green Time: 18.8 39.4 58.5 9.0 29.6 59.7 30.1 40.5 0.0 19.0 29.5 38.5 Volume /Cap: 0.81 0.84 0.42 0.84 0.81 0.30 0.84 0.63 0.00 0.63 0.84 0.14 Delay /Veh: 48.1 32.3 15.3 66.2 36.0 13.6 42.1 26.9 0.0 39.2 41.9 22.1 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 48.1 27.4 13.0 66.2 30.6 11.5 42.1 22.9 0.0 39.2 35.6 18.8 DesignQueue: 13 51 13 7 40 9 19 19 0 10 21 4 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM 2025 + Option2 Thu Apr 11, 2002 09:24:41 Page 1 -1 -------------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.851 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 29.8 Optimal Cycle: 98 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 175 400 129 139 1000 350 247 371 175 211 469 97 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 179 408 132 142 1020 357 252 378 0 215 479 99 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 179 408 132 142 1020 357 252 378 0 215 479 99 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 179 408 132 142 1020 357 252 378 0 215 479 99 ------------ I--------------- II--------------- 11------------- --11---------- - - - - -I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.10 0.11 0.08 0.08 0.27 0.20 0.14 0.20 0.00 0.12 0.25 0.06 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 14.4 29.7 51.0 22.5 37.8 58.1 20.3 34.5 0.0 21.3 35.5 58.0 Volume /Cap: 0.85 0.43 0.18 0.43 0.85 0.42 0.85 0.69 0.00 0.69 0.85 0.12 Delay /Veh: 57.7 29.1 16.3 33.4 33.5 15.5 50.9 31.5 0.0 39.6 38.6 12.9 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 57.7 24.8 13.9 33.4 28.5 13.1 50.9 26.8 0.0 39.6 32.8 11.0 DesignQueue: 11 21 5 8 50 13 14 19 0 12 24 3 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM 2025 + Option3 Thu Apr 11, 2002 09:25:04 Page 1 -1 -------------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.843 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 29.1 Optimal Cycle: 95 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II --------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ovl Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 204 969 333 102 697 238 340 374 170 162 362 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 PHF Volume: 222 1053 362 111 758 259 370 407 185 176 394 81 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 222 1053 362 111 758 259 370 407 185 176 394 81 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 222 1053 362 111 758 259 370 407 185 176 394 81 ------------ I--------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.0'0 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.13 0.28 0.21 0.06 0.20 0.15 0.21 0.21 0.11 0.10 0.21 0.05 Crit Moves:* * ** * * ** * * ** * * ** Green Time: 18.8 39.4 58.5 9.0 29.6 59.7 30.1 40.5 59.4 19.0 29.5 38.5 Volume /Cap: 0.81 0.84 0.42 0.84 0.81 0.30 0.84 0.63 0.21 0.63 0.84 0.14 Delay /Veh: 48.1 32.3 15.3 66.2 36.0 13.6 42.1 26.9 13:0 39.2 41.9 22.1 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 48.1 27.4 13.0 66.2 30.6 11.5 42.1 22.9 11.1 39.2 35.6 18.8 DesignQueue: 13 51 13 7 40 9 19 19 6 10 21 4 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 ­PM 2025 + Option3 Thu Apr 11, 2002 09:25:22 Page 1 -1 -------------------------------------------------------------------------- - - - - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.851 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 29.1 Optimal Cycle: 98 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ovl Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 ------------ I--------------- II--------------- 11--------------- II---------- - - - - -I Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 175 400 129 139 1000 350 247 371 175 211 469 97 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 PHF Volume: 179 408 132 142 1020 357 252 378 179 215 479 99 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 179 408 132 142 1020 357 252 378 179 215 479 99 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 179 408 132 142 1020 357 252 378 179 215 479 99 ------------ --------------- II--------------- II--------------- II---------- - - - - - I Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- II--------------- II--------------- II---------- - - - - - I Capacity Analysis Module: Vol /Sat: 0.10 0.11 0.08 0.08 0.27 0.20 0.14 0.20 0.10 0.12 0.25 0.06 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 14.4 29.7 51.0 22.5 37.8 58.1 20.3 34.5 48.9 21.3 35.5 58.0 Volume /Cap: 0.85 0.43 0.18 0.43 0.85 0.42 0.85 0.69 0.25 0.69 0.85 0.12 Delay /Veh: 57.7 29.1 16.3 33.4 33.5 15.5 50.9 31.5 17.9 39.6 38.6 12.9 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 57.7 24.8 13.9 33.4 28.5 13.1 50.9 26.8 15.2 39.6 32.8 11.0 DesignQueue: 11 21 5 8 50 13 14 19 7 12 24 3 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY APPENDIX C RAW PEAK HOUR TRAFFIC COUNTS Higgins Associates 22 103 Civil and Traffic Engineers 6 135 1335 First St. Suite A File Name :02-041-2 Gilroy, Ca. 95020 Site Code :00000002 201 Start Date : 03/20/2002 226 Page No : 1 HWY 9 / OAK PLACE / OAK STREET Grouns Printed- Cars - Trucks - Buses 08:00 AM 22 103 HWY 9 6 135 OAK PLACE 4 2 0 Y HW 9 6 201 OAK STREET 0 226 18 5 From North 0 28 From East 08:15 AM 25 From South CI 2 13 From West:{ 5 9 2 Rig Thr 12 Ped App. Rig 214 47 Ped App. Rig Thr 431 Ped App. Rig Thr 3 Ped App. Irtt. Start Time ht u Left � s Total ht MThr ft s Total ht u Left s I Total ht u �� s Total Total Factor 1.01 1.01 1.01 1.01 16 1.01 1.01 1.0 1.01 8 1.01 1.01 1.01 1.01 76 1.01 1.0 1 1 1.0 21 17 07:00 AM 7 30 4 2 43 1. 0 0 2 3 4 128 9 0 141 6 0 6 3 15 202 07:15 AM 11 47 0 3 61 3 1 1 1 6 4 171 19 0 194 6 3 5 3 17 278 07:30 AM 9 70 1 3 83 6 1 0 2 9 8 248 12 0 268 1 1 10 0 12 372 07:45 AM 16 131 4 0 151 3 2 4 0 9 10 228 21 0 259 11 2 4 0 17 436 Total 43 278 9 8 338 13 4 5 5 27 26 775 61 0 862 24 6 25 6 61 1288 08:00 AM 22 103 4 6 135 8 4 2 0 14 6 201 19 0 226 18 5 5 0 28 403 08:15 AM 25 87 2 13 127 5 9 2 1 17 12 188 14 0 214 47 11 15 0 73 431 08:30 AM 12 95 4 3 114 4 0 1 4 9 8 188 5 0 201 14 2 19 1 36 360 , 08:45 AM 17 70 5 2 94 4 4 3 1 12 9 177 16 0 202 9 7 8 0 24 332 Total 76 355 15 24 470 21 17 8 6 52 35 754 54 0 843 88 25 47 1 161' 1526 - BREAK - 02:15 PM 19 141 2 9 171 3 1 1 0 5 4 116 19 8 1471 42 1 25 7 75 398 02:30 PM 13 139 3 0 155 7 1 3 0 11 4 119 9 0 132 13 3 14 0 30 328 02:45 PM 14 111 3 1 129 0 1 3 1 5 7 102 3 0 112 12 2 13 2 29 275 03:00 PM 03:15 PM 03:30 PM 03:45 PM 12 18 14 13 139 138 152 138 3 2 5 2 0 1 3 9 154 159 174 162 8 8 4 4 1 2 0 1 3 10 8 4 1 2 3 4 13 22 15 13 8 3 2 2 97 83 114 107 9 7 7 14 0 3 0 0 114 96 123 123 10 9 20 17 1 2 0 0 11 15 20 19 4 5 1 3 26 31 41. 39 307 308 353 337 Total 57 567 12 13 649 24 4 25 10 63 15 401 37 3 456 56 3 65 13 137 1305 04:00 PM 23 180 1 0 204 2 2 6 2 12 3 100 6 1 110 15 4 12 1 32 358 04:15 PM 16 152 3 4 175 4 2 4 0 10 4 90 9 0 103 14 2 6 5 27 315 04:30 PM 16 179 4 7 206 1 0 5 1 7 0 94 13 0 107 4 2 10 5 21 341 04:45 PM 18 174 2 1 195 4 2 6 1 13 2 102 12 0 116 10 0 5 1 16 340 Total 73 685 10 12 780 11 6 21 4 42 9 386 40 1 436 43 8 33 12 96 1354 05:00 PM 14 182 3 1 200 1 1 3 1 6 5 82 8 0 95 13 1 10 1 25 326 05:15 PM 16 179 1 2 198 3 3 3 3 12 0 95 6 0 101 16 3 7 3 29 340 05:30 PM 17 175 1 3 196 5 3 0 3 11 4 88 7 0 99 16 4 4 0 24 330 05:45 PM 12 175 4 9 200 3 0 2 1 6 4 94 6 0 104 11 1 8 4 24 334 06:00 PM 18 173 5 3 199 2 2 4 0 8 3 73 11 0 87 9 0 11 2 22 316 G and 372 3166 68 85 3685 93 43 78 34 248 116 305 261 12 3474. 343 57 262 51 713 8120 tal 10. 85. 37. 17. 31. 13. 3 88 48. 36 Apprch % 1 8 1.8 2.3 5 3 5 7 .3 8 7.5 0.3 1 8.0 7 7.2 Total % 4.6 38. 0.8 1.0 45.4 1.1 0.5 1.0 0.4 3.1 1.4 38. 3.2 0.1 42.8 4.2 0.7 3.2 0.6 8.8 3 l _ - .- Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name : 02 -041 -2 Site Code : 00000002 Start Date : 03/20/2002 Page No : 2 369 3117 HWY9 77 3 27 0 Out In Total 0 16 0 0 3399 3631 7030 3160 68 85 Ped 28 38 66 Rig Thr 496 Ped 13 16 1 29 Rig Thr 2 Ped 3440 3685 1 7125 Rig Thr Ped App. Int. Start Time 259 Volume Left 4 0 151 Peak Left Factor Left High Int. Right Thru Left Peds Volume 4J 1 4 u 0 �0 ((o N 00 F (`7 (7 U) ((O � N N Q)--t 1 I ^T co co 12 w co — o 2 North 00 ���(JO (° O N (� (n ii —► 0/2002 7:00:00 AM —2 A A C _ o n Total /2002 6:00:00 PM ('' ° ° w N N — ��O'cr r- Y < r� (h i Cars � c000m oow 0 (n0 O m Trucl6 Buses 'O (D m A A 0 d pw N A O (J O N W d T r Left Thru Right Peds 3534 3432 6966 28 28 56 19 14 33 3581 3474 7055 Out In Total HWY9 369 3117 68 77 3 27 0 8 0 16 0 0 372 3160 68 85 259 3046 115 12 2 26 0 0 0 13 1 0 261 3065 116 12 reaK riour rrom ut:W Am TO utcuu Am - vex HWY 9 OAK PLACE HWY 9 OAK STREET 8 3 From North From East From South From West n 9 7 Rig Thr Ped App. Rig Thr 496 Ped App. Rig Thr 2 Ped App. Rig Thr Ped App. Int. Start Time 259 Volume Left 4 0 151 Peak Left Factor Left High Int. Left Volume ht u 0 s Total ht u 12 s Total ht u 15 s Total ht u s Total Total reaK riour rrom ut:W Am TO utcuu Am - vex Intersectio 66 0 22 16 8 3 07:30 AM 44. 32. 16. 6.1 n 9 7 3 0.0 Volume 72 391 11 22 496 Percent 14. 7. 2.2 4.4 2 1 17 2 07:45 228 21 0 259 Volume 16 131 4 0 151 Peak Factor High Int. 07:45 AM Volume 16 131 4 0 151 Peak 8 248 12 0 Factor 47 11 15 0.821 iKIOTI 865 66 0 22 16 8 3 49 44. 32. 16. 6.1 3.7 9 7 3 0.0 3 2 4 0 9 08:15 AM 5 5 9 2 1 17 2 0.721 36 865 66 0 967' 77 19 34 0 130 1642 3.7 89" 6.8 0.0 59. 14. 26. 0.0 5 2 6 2 10 228 21 0 259 11 2 4 0 17 436 0.942 07:30 AM 08:15 AM 8 248 12 0 268 47 11 15 0 73 0.9 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name : 02 -041 -2 Site Code :00000002 Start Date : 03/20/2002 Paae No :3 Peak Hour From 02:00 PM to 06:00 PM - Pe; Intersectio HWY9 1 14 5 22 n Out In Total 28. 10. 44. 18. Volume 9211 496 1417 11 16 715 Percent 721 3911 111 22 1.5 2.2 03:30 PM 100 Thru Left Peds 1 4 0 8 04:00 R'ht 1 1 0 �� m 6 M�s T �N rn 2 North °1 O O a, C F C O j — U) High Int. 20/2002 7:30:00 AM Q Volume 02002 8:15:00 AM �(D 0 00� `) Car Trucks co ,o 0.876 d Buses �° w �' 4� T r Left Thru Right Peds 661 8651 361 0 476 967 1443 Out In Total HWY9 Peak Hour From 02:00 PM to 06:00 PM - Pe; Intersectio 03:30 PM 1 14 5 22 n 50 28. 10. 44. 18. Volume 66 622 11 16 715 Percent 9.2 87. 1.5 2.2 03:30 PM 100 6 1 4 0 8 04:00 23 180 1 0 204 Volume Peak Factor High Int. 04:00 PM Volume 23 180 1 0 204 Peak 0.876 Factor 3k1of1 411 36 1 14 5 22 9 50 28. 10. 44. 18. 4.3 0 0 0 0 2 2 6 2 12 03:30 PM 100 6 1 4 0 8 3 15 0.833 11 411 36 1 459 47. 89. 41. 2.4 4.3 7.8 0.2 3 100 6 1 110 03:30 PM 2 114 7 0 123 0.933 66 6 57 10 139 47. 41. 4.3 7.2 15 4 12 1 32 03:30 PM 20 0 20 1 41 0.848 1363 358 0.952 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A File Name Gilroy, Ca. 95020 Site Code Start Date Page No : 02 -041 -2 :00000002 : 03/20/2002 :4 HWY9 Out In Total 482 F 1197 661 6221 111 16 Right Thru Left Peds 4J 1 '� Fc uni , J * O ^ A N� w `O 2 North O W rn t F- 4 =r 20, D r j — 0/2002 3:30:00 PM Y � L 0/2002 4:15:00 PM a D O j O O � ° v Cars Trucl6 ° N a. Buses N m — V 01 #1 T r Left Thru Right Peds 361 4111 111 1 71 01 F-1-1-6-9 Out In Total HWY9 : 02 -041 -2 :00000002 : 03/20/2002 :4 Higgins Associates 0 2 Civil and Traffic Engineers 08:15 AM 3 1335 First St. Suite A File Name : 02 -041 -2 Gilroy, Ca. 95020 Site Code : 00000002 08:45 AM Start Date : 03/20/2002 0 0 Page No : 1 HWY 9 / OAK PLACE / OAK STREET r,muns Prinfxr- Tnirks 08:00 AM 0 2 HWY 9 08:15 AM 3 OAK PLACE 0 0 08:30 AM 0 HWY 9 0 0 08:45 AM OAK STREET 1 0 0 03:00 PM 0 From North 0 0 03:15 PM From East 0 0 0 From South 0 3 From West 03:45 PM 0 1 Rig Thr 0 Ped App. Rig Thr 0 Ped App. Rig Thr 3 Ped App. Rig Thr 0 Ped App. Int. Start Time 0 0 Left 0 0 0 0 Left 0 0 2 3 Left 04:30 PM 0 0 0 Left 0 0 0 0 ht u 0 s Total ht u 0 s Total ht u 4 s Total ht u 0 s Total Total Factor 1.0 1.01 1.01 1.01 0 1.01 1.0 1 1.0 1 1.0 1 0 1.0 1 1.0 1 1.0 1 1.0 1 1.0 1.01 1.0 1.0 0 0 07:00 AM 0 1 0 0 1 0 0 0 1 1 0 4 0 0 4 0 0 0 0 0 6 07:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 07:30 AM 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 2 07:45 AM 0 4 0 0 4 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 9 Total 0 6 0 0 61 0 0 0 1 1 1 0 10 1 0 11 1 0 0 0 0 0 18 08:00 AM 0 2 0 0 08:15 AM 3 2 0 0 08:30 AM 0 1 0 0 08:45 AM 0 1 0 0 - BREAK '** 02:15 PM 0 2 0 0 02:30 PM 0 1 0 0 02:45 PM 0 3 0 0 Total 0 6 0 0 03:00 PM 0 0 0 0 03:15 PM 0 0 0 0 03:30 PM 0 3 0 3 03:45 PM 0 1 0 0 2 0 0 0 0 5 0 0 0 0 1 0 0 0 3 1 0 0 0 1 2 0 0 0 0 1 0 0 0 0 3 0 0 0 1 0 0 0 0 1 0 0 0 0 2 6 0 0 0 3 1 0 0 0 1 0 0 0 0 0 0 0 2 1 0 3 0 4 0 0 1 0 1 0 0 4 0 7 1 0 0 0 2 0 0 0 0 1 0 0 1 0 0 0 0 1 0 3 0 0 1 0 2 0 0 2 0 0 0 0 3 0 1 0 0 1 0 2 0 0 0 0 0 0 0 3 0 0 1 0 4 0 0 0 0 1 0 0 0 0 81 0 0 1 0 2 0 0 0 2 1 0 0 0 0 0 0 0 1 0 3 0 0 1 2 2 0 0 0 2 0 0 0 0 1 1 0 0 0 0 2 0 0 0 3 0 2 1 9 0 8 0 3 2 6 0 2 1 5 3 13 2 5 1 3 0 10 3 7 Total 0 4 0 3 71 0 0 0 7 71 0 5 0 0 51 0 0 0 6 61 25 04:00 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 3 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 2 3 3 04:30 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 3 3 4 04:45 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 Total 0 2 0 0 2 0 0 0 2 2 0 0 0 0 0 1 0 0 6 7 11 05:00 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1 2 05:15 PM 0 1 0 2 3 0 0 0 2 2 0 0 0 0 0 0 0 0 2 2 7 05:30 PM 0 1 0 2 3 0 0 0 3 3 0 1 0 0 1 0 1 0 0 1 8 05:45 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Total 0 3 0 4 7 0 0 0 6 6 0 1 0 0 1 0 1 0 3 4 18 06:00 PM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Grand Total 3 27 0 8 38 0 0 0 21 21 0 26 2 0 28, 1 1 2 17 21 108 Apprch 96 7.9 71 0.0 21. 0.0 0.0 0.0 100 0.0 92 7.1 0.0 4.8 4.8 9.5 81. 1 1 0 9 0 Total % 2.8 25. 0.0 7.4 35.2 0.0 0.0 0.0 19. 19.4 0.0 24. 1.9 0.0 25.9 0.9 0.9 1.9 15. 19.4 Higgins Associates 0 From North Civil and Traffic Engineers 0 From East 1335 First St. Suite A File Name :02-041-2 Gilroy, Ca. 95020 Site Code : 00000002 3 Start Date : 03/20/2002 Rig Page No : 1 HWY 9 / OAK PLACE / OAK STREET Total 0 From North 0 0 From East 0 0 From South 0 0 From West 3 0 0 Rig Thr 0 Ped App. Rig Thr BREAK' Ped App. Rig Thr Ped I App. Rig Thr Ped I App. Int . Start Time ht u Left s Total M u Left s Total ht u Left s Total ht u Left I s Total Total Factor 1.0 1.0 1.0 1.0 0 1.0 1.01 1.0 1.0 0 1.0 1.0 1 1.0 1 1.0 1 0 1.01 1.0 1 1.0 1 1.0 1 0 07:00 AM 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 2 07:15 AM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 2 07:30 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 BREAK *" Grand 0 16 0 0 16 0 0 0 0 0 1 13 0 Total 0 2 0 0 21 0 0 0 0 01 0 3 0 0 31 0 0 0 0 01 5 08:00 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 08:15 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 0 0 0 1 2 08:30 AM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 1 0 0 0 1 3 BREAK ` "` 9.1 0.0 0.0 0.0 9.1 0.0 Total 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 2 0 0 0 2 6 *" BREAK * ** 02:15 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 2 02:45 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 2 Total 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 1 0 0 0 1 6 03:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 1 03:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 1 Total 0 2 0 0 2 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 4 04:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 1 04:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:45 PM 0 2 0 0 2 0 0 0 0 0 1 2 0 0 3 0 0 0 0 0 5 Total 0 4 0 0 4 0 0 0 0 0 1 3 0 0 4 0 0 0 0 0 8 BREAK' ** 05:15 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 05:30 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0., 0 1 05:45 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 2 Total 0 2 0 0 2 0 0 0 0 01 0 2 0 0 2 0 0 0 0 0 4 - BREAK * *' Grand 0 16 0 0 16 0 0 0 0 0 1 13 0 0 14. 3 0 0 0 3 33 Total Apprch % 0.0 100 0.0 0.0 0.0 0.0 0.0 0.0 7.1 92. 0.0 0.0 1000 0.0 0.0 0.0 0 Total % 0.0 48. 0.0 48.5 0.0 0.0 0.0 0.0 0.0 3.0 39. 0.0 0.0 42.4 9.1 0.0 0.0 0.0 9.1 0.0 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 HWY 9 / SHERIFF'S DWYS / CONTEMPO DWY rrnunc Printarl_ rare - Tnjckc . Rucac File Name :02-041-5 Site Code : 00000005 Start Date : 03/20/2002 Page No : 1 08:00 AM 0 0 0 0 08:15 AM 0 0 0 0 08:30 AM 0 0 1 0 08:45 AM 2 0 0 0 * ** BREAK 02:15 PM 0 0 3 0 02:30 PM 0 0 1 0 02:45 PM 0 0 0 0 Total HWY 9 SHERIFF DEPT. DWY HWY 9 DRIVEWAY 0 0 From North From East From South From West 0 0 03:30 PM 0 0 1 0 03:45 PM 0 0 0 0 Total 0 0 3 0 0 1 1 0 0 0 Rig 0 0 0 0 0 1 0 0 0 2 0 2 4 05:15 PM 0 0 Rig 0 0 Left 0 0 0 2 2 0 Left 0 2 0 0 1 0 1 5 05:30 PM Rig 0 ht 0 2 ont 0 1 0 4 1 0 into 0 1 0 0 2 0 2 9 05:45 PM ht 0 into 0 0 0 0 ont 0 0 1 1 Dw 0 2 0 0 0 0 0 2 Total 0 0 Dw 0 2 Hw 0 2 0 8 4 1 y Thr 5 Ped App. Rig Thr 5 Ped App. 0 Thr 0 Ped App. 2 Thr Hw Ped App. Int. Start Time 0 0 Left 0 0 0 0 Left 2 Grand She he y y 9 fro u s Total ht u s Total 3 0 15 s Total 92 u Y9 s Total Total 1 w 0 18 3 0 7 0 10 146 Apprch % riff Dw 0.0 fro m 0.0 fro m 0.0 f 0.0 88. 5.6 H 0.0 30. 0.0 70 0.0 y. Hw Dw m 9 Y9 0 0 Total % 2.1 0.0 10. 12.3 63.. 0.0 Dw 0.0 68.5 11. 0.7 0.7 0.0 12.3 2.1 0.0 4.8 0.0 6.8 Y9 Y. Factor 1.0 1.01 1.01 1.0 1.0 1.0 1.0 1.0 1.01 1.0 1.01 1.01 1.0 1.01 1.0. 1.0 07:00 AM 0 0 0 0 0 8 0 2 0 10 0 0 0 0 0 0 0 0 0 0 10 07:15 AM 0 0 2 0 2 6 0 1 0 7 2 0 0 0 2 0 0 0 0 0 11 07:30 AM 0 0 0 0 0 1 0 0 0 1 3 0 0 0 3 1 0 0 0 1 5 07:45 AM 1 0 0 0 1 4 0 1 0 5 0 0 0 0 0 0 0 1 0 1 7 Total 1 0 2 0 3 19 0 4 0 23 5 0 0 0 5 1 0 1 0 2 33 08:00 AM 0 0 0 0 08:15 AM 0 0 0 0 08:30 AM 0 0 1 0 08:45 AM 2 0 0 0 * ** BREAK 02:15 PM 0 0 3 0 02:30 PM 0 0 1 0 02:45 PM 0 0 0 0 Total 0 0 4 0 03:00 PM 0 0 2 0 03:15 PM 0 0 0 0 03:30 PM 0 0 1 0 03:45 PM 0 0 0 0 Total 0 0 3 0 0 5 0 1 0 0 4 0 0 0 1 3 0 0 0 2 3 0 0 0 6 0 0 0 0 4 1 0 1 0 3 0 0 0 0 3 0 0 0 0 0 0 0 0 0 2 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 1 0 161 1 1 0 1 0 21 1 0 1 0 3 8 0 0 0 1 8 0 0 0 0 5 0 1 0 41 21 0 1 0 2 8 0 0 0 0 6 0 0 0 1 4 0 0 0 0 5 0 0 0 04:00 PM 0 0 1 0 1 4 0 0 0 04:15 PM 0 0 1 0 1 0 0 0 0 04:30 PM 0 0 1 0 1 1 0 0 0 04 :45 PM 0 0 0 0 0 1 0 0 0 8 0 0 0 0 8 1 0 0 0 6 0 0 0 0 8 1 0 0 0 6 1 0 0 0 4 0 0 0 0 5 2 0 0 0 3 4 0 0 0 4 1 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 I 1 1 0 0 0 0 00 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 0 0 2 0 0 0 0 41 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 1 7 0 4 1 6 23 1 12 0 10 0 6 1 28 0 11 0 7 0 5 0 7 0 30 0 6 0 1 0 2 0 1 Total 0 0 3 0 3 6 0 0 0 6 1 0 0 0 1 0 0 0 0 0 10 05:00 PM 0 0 0 0 0 1 0 1 0 2 0 0 0 0 0 0 0 2 0 2 4 05:15 PM 0 0 0 0 0 2 0 0 0 2 2 0 0 0 2 0 0 1 0 1 5 05:30 PM 0 0 2 0 2 3 0 1 0 4 1 0 0 0 1 0 0 2 0 2 9 05:45 PM 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 2 Total 0 0 2 0 2 6 0 2 0 8 4 1 0 0 5 0 0 5 0 5 20 06:00 PM 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 0 0 2 Grand Total 3 0 15 0 18 92 0 8 0 100 16 1 1 0 18 3 0 7 0 10 146 Apprch % 16 7 0.0 83 3 0.0 92. 0.0 0.0 88. 5.6 5.6 0.0 30. 0.0 70 0.0 8.0 0 9 0 0 Total % 2.1 0.0 10. 12.3 63.. 0.0 5.5 0.0 68.5 11. 0.7 0.7 0.0 12.3 2.1 0.0 4.8 0.0 6.8 0.0 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 HWY9 Site Code �v-oov r -36r-L Q� H } 0000 o! 0 2 2 ¢ o00o 0 0 c� _ 0 F > 00OC -) °0 0 2 J OIZ � 0000 ODO 0 w O 0 0 N 0 2 Peak Left M ac 0 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 3 0 15 0 0 0 0 0 0 0 0 0 3 0 15 0 pert i nru Herz reas Dwy from H19 North 0/2002 7:00:00 AM 0f2002 6:00:00 PM Cars Truo"s Buses Right j Right Dwv from HWWito Sheriff DRIeds 1 1 16 0 0 0 0 0 2 2 0 0 1 1 16 0 11 18 129 0 0 0 0 11 18 Out In Total File Name HWY9 Site Code Out In Total 100 18 118 0 0 0 0 0 0 100 18 118 °0 0 2 r 3 0 15 0 0 0 0 0 0 0 0 0 3 0 15 0 pert i nru Herz reas Dwy from H19 North 0/2002 7:00:00 AM 0f2002 6:00:00 PM Cars Truo"s Buses Right j Right Dwv from HWWito Sheriff DRIeds 1 1 16 0 0 0 0 0 2 2 0 0 1 1 16 0 11 18 129 0 0 0 0 11 18 Out In Total File Name :02-041-5 Site Code : 00000005 Start Date : 03/20/2002 Paae No :2 tz- HWY 9 From North SHERIFF DEPT. DWY From East HWY 9 From South N N OO O m C.,OO�Sm 50. Volume 1 0 2 0 3 Percent 33. 0.0 20000 0.0 2 0 10 °0 0 2 r o0 °00 ;:, ODO 0 w Rig 0 0 —I 0 2 Peak Left M mOO�m '0000 Intersectio HWY 9 From North SHERIFF DEPT. DWY From East HWY 9 From South DRIVEWAY From West 0.0 50. Volume 1 0 2 0 3 Percent 33. 0.0 66 0.0 2 0 10 0 0 2 07:15 Rig 0 0 2 0 2 Peak Left Factor High Int. 07:15 AM Volume Rig 2 0 2 Left ht into Rig ht ont ont D ht into 0 Y Thr Ped App. Rig Thr Ped App, into D y Ped App. Y 9 Thr Hw Ped App. Int. Start Time Left Left frno1 u s Total ht u s Total u s Total u s Total Total riff Dw fro m fro m fro Hw Y. Hw Dw m Y 9 Dw Y9 Y. Intersectio 07:00 AM 0 23 82. 0.0 17. 0.0 50. Volume 1 0 2 0 3 Percent 33. 0.0 66 0.0 2 0 10 0 0 2 07:15 Volume 0 0 2 0 2 Peak 11 Factor High Int. 07:15 AM Volume 0 0 2 0 2 19 0 4 0 23 82. 0.0 17. 0.0 50. 6 0 1 0 7 07:00 AM 0.0 8 0 2 0 10 5 0 0 0 5 100 33 50. 50. 0.0 0.0 0.0 .0 0.0 0.0 2 0 0 0 2 07:30 AM 3 0 0 0 3 1 0 1 0 2 33 50. 50. 0.0 0.0 0 0 0 0 0 11 07:30 AM 1 0 0 0 1 10.750 Peak Factor 0.375 0 n Fc LJ- o Q N r O�O y a= O Peak Hour From 02:00 PM to 06:00 PM - Pe; Intersectio 0 T Right Right Dwy from H1 ' o Sheriff ds 02:15 PM 0 51 0 0.0 0.0 n 5 Fl0 Out In Total .0 Volume 0 0 6 0 6 Percent 0.0 0.0 1000 0.0 8 0 0 0 02:15 0.938 Volume 0 0 3 0 3 Peak 0.250 Factor High Int. 02:15 PM Volume 0 0 3 0 3 Peak Factor 0.500 0.575 HW1T9 Out In Total 20 3 1 23 11 01 21 0 Left Thru Left Peds Dwy m Hwy 9 North 0/2002 7:00:00 AM 0/2002 7:45:00 AM Cars Tr-k-, Buses V 0 0 T Right Right Dwy from H1 ' o Sheriff ds 0 0 51 0 0.0 0.0 0.0 5 Fl0 Out In Total .0 HWY9 ik1of1 0 0 0 2 29 0 1 0 30 96. 0.0 0.0 0.0 0.0 3.3 0.0 .0 7 0 0 0 0 8 0 0 0 8 02:15 PM 8 0 0 0 8 0.938 0.417 V, t-AN O V^ -7 20 E0 N b' fD f J N O a O 0 m ^_ U) O 2 0 0 0 2 100 100 0.0 0.0 0.0 .0 .0 0 0 0 0 0 02:30 PM 1 0 0 0 1 0.500 0.500 1 0 0 0 1 39 100 0.0 0.0 0.0 .0 1 0 0 0 1 12 0.813 02:15 PM 1 0 0 0 1 0.250 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-5 Site Code : 00000005 Start Date : 03/20/2002 Page No : 4 HWY9 Out In Total ® Z6 Z 0 Left Thru Left Peds into Dwy from HT L+ 4J E Fes— 0 O m cNO °' z o ~ North ~2, T Luc! /2002 2:15:00 PM w E m o r dj) z /2002 3:00:00 PM r r o O o d Cars Trucks a m O 0_ c 0 Buses o j Right Right into Dwy from HW' o Sheriff Dftds 0 0 21 0 0 2 Out In Total HWY9 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 HWY 9 / SHERIFF'S DWYS / CONTEMPO DWY (;rnune PrintpA- Tnirks File Name :02-041-5 Site Code :00000005 Start Date : 03/20/2002 Page No : 1 - -- bKtAK' -- Grand 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % HWY 9 From North SHERIFF DEPT. DWY From East HWY 9 From South DRIVEWAY From West Rig Rig Left Left Rig ht ont ht into °nt ht into o Dw into Dw Hw y Thr Ped App. Rig Thr Ped App. Thr Ped App. Thr Hw Ped App. Int. Start Time fro u Left s Total ht u Left s Total She u y s Total Y' u y 9 s Total Total riff fro fro m Dw m m fro Y9 Hw Dw y- 11 y 9 Y. Dw Factor 1.0 1.0 1.01 1.0 1.0 11 1.0 11 1.0 1 1.0 1.0 1.0 1.01 1.01 1.0 1.01 1.01 1.0 - -- bKtAK' -- Grand 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % Higgins Associates HWY 9 From North SHERIFF DEPT. DWY From East Civil and Traffic Engineers DRIVEWAY From West 1335 First St. Suite A File Name :02-041-5 Gilroy, Ca. 95020 Site Code : 00000005 Start Date : 03/20/2002 Page No : 1 HWY 9 / SHERIFF'S DWYS / CONTEMPO DWY r:muns Prin}od- Rusts Grand 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % HWY 9 From North SHERIFF DEPT. DWY From East HWY 9 From South DRIVEWAY From West Rig Left Rig Left Rig ht ont into ht into 0 ont Dw into Dw Hw y Thr Ped App. Rig Thr Ped App. Thr Ped App. Thr Hw Ped App. Int. Start Time fro u Left s Total ht u Left s Total She u y s Total y 9 u Y9 s Total Total riff fro fro Dw m m fro Hw y. Hw Dw Y9 Dw Y 9 Y• Y. Factor 1.0 1.0 1 1.0 1.0 1.0 1.0 1.0 1.0 1 1.0 1.01 1.01 1.01 1 1.0 1.0 1.0 1 1.0 Grand 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % Higgins Associates 4 PARK PLACE Civil and Traffic Engineers 0 OAK PLACE 1335 First St. Suite A File Name :02-041-3 Gilroy, Ca. 95020 Site Code : 00000003 0 Start Date : 03/20/2002 0 Page No : 1 PARK PLACE / OAK PLACE Groups Printed- Cars - Trucks - Buses 08:00 AM 4 PARK PLACE 1 0 OAK PLACE 0 7 PARK PLACE 0 7 OAK PLACE 0 0 0 0 From North 4 10 From East 14 26 From South 8 0 From West 0 9 2 Rig I Thr I Ped App. Rig Thr 0 Ped App. Rig Thr 0 Ped App. Rig Thr 0 Ped App. Int. Start Time 1 0 Left 2 0 0 0 Left 0 0 1 8 Left 9 13 08:45 AM 10 Left 2 0 12 1 ht u 0 s Total ht u 0 s Total ht u 0 s Total ht u 0 s Total Total Factor 1.0 1.0 1.0 1.0 0 1.0 1.0 1.0 1.0 0 1.0 1.0 1.0 1.0 19 1.0 1.0 1.0 1.0 0 17 07:00 AM 1 0 2 0 3 0 1 0 0 1 0 0 0 0 0 0 2 5 0 7 11 07:15 AM 5 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 3 4 0 7 12 07:30 AM 3 0 0 0 3 2 2 0 0 4 0 0 0 0 0 0 2 8 0 10 17 07:45 AM 3 0 1 0 4 0 4 0 0 4 0 0 0 0 0 0 7 8 0 15 23 Total 12 0 3 0 15 2 7 0 0 9 0 0 0 0 0 0 14 25 0 39 63 08:00 AM 4 0 1 0 5 0 7 0 0 7 0 0 0 0 0 0 4 10 0 14 26 08:15 AM 8 0 1 0 9 2 9 0 0 11 0 0 0 0 0 0 6 16 0 22 42 08:30 AM 1 0 1 0 2 1 1 0 0 2 0 0 0 0 0 0 1 8 0 9 13 08:45 AM 10 0 2 0 12 1 1 0 0 2 0 0 0 0 0 0 3 12 0 15 29 Total 23 0 5 0 281 4 18 0 0 22 BREAK '** 02:15 PM 5 0 1 0 6 0 0 0 0 0 0 0 1 0 1 1 2 2 0 5 12 02:30 PM 7 0 1 0 8 1 4 0 0 5 0 0 0 0 0 0 6 2 0 8 21 02:45 PM 4 0 1 0 5 0 3 0 0 3 0 0 0 0 0 0 7 4 0 11 19 Total 16 0 3 0 19 1 7 0 0 8 0 0 1 0 1 1 15 8 0 24 52 03:00 PM 2 0 1 0 3 1 3 0 0 4 0 0 0 0 0 0 2 10 0 12 19 03:15 PM 16 0 1 0 17 0 1 0 0 1 0 0 0 0 0 0 6 4 0 10 28 03:30 PM 9 0 1 0 10 2 8 0 0 10 0 0 0 0 0 0 4 1 0 5 25 03:45 PM 5 0 1 0 6 1 0 0 0 1 0 0 0 0 0 0 5 1 0 6 13 Total 32 0 4 0 36 4 12 0 0 16 0 0 0 0 0 0 17 16 0 33 85 04:00 PM 4 0 1 0 5 0 4 0 0 4 0 0 0 0 0 0 2 5 0 7 16 04:15 PM 4 0 1 0 5 1 4 0 0 5 0 0 0 0 0 0 7 4 0 11 21 04:30 PM 7 0 2 0 9 0 0 0 0 0 0 0 0 0 0 0 4 2 0 6 15 04:45 PM 9 0 1 0 10 1 2 0 0 3 0 0 0 0 0 0 2 4 0 6 19 Total 24 0 5 0 29 2 10 0 0 12 0 0 0 0 0 0 15 15 0 30 71 05:00 PM 4 0 0 0 4 2 1 0 0 3 0 0 0 0 0 0 5 1 0 6 13 05:15 PM 5 0 2 0 7 1 3 0 0 4 0 0 0 0 0 0 5 2 0 7 18 05:30 PM 5 0 1 0 6 0 1 0 0 1 0 0 0 0 0 0 3 2 0 5 12 05:45 PM 3 0 1 0 4 0 2 0 0 2 0 0 0 0 0 0 7 4 0 11 17 Total 17 0 4 0 21 3 7 0 0 10 0 0 0 0 0 0 20 9 0 29 60 Grand Total 124 0 24 0 148 16 61 0 0 77 0 0 1 0 1 1 95 119 0 215 441 Apprch % 83 8 0.0 16 2 0.0 20. 79. 0.0 0.0 0.0 0.0 100 0.0 0.5 44. 55. 0.0 8 2 0 2 3 Total % 28. 0.0 5.4 0.0 33.6 3.6 1 . 0.0 0.0 17.5 0.0 0.0 0.2 0.0 0.2 0.2 21. 27. 0.0 48.8 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-3 Site Code : 00000003 Start Date : 03/20/2002 Pace No :2 123 0 PARK PLACE 0 1 0 0 Out In Total 135 147 0 0 0 0 1 1283 0 24 0 Ped 0 Rig Thr 08:15 AM Ped 148 Rig Thr 0 Ped App. Rig Thr 0.0 Ped App. Int. Start Time 9 Peak Left Factor Left 0 0 High Int. Right Thru Left Peds 0 0 6 Volume 4j 1 L+ 2 0 moo. -oo F V V' mccm�� r J 1 I �?Of OOOf O " O noon noou� °) °) L —► North 02002 7:00:00 AM �? �n o o co O s Total 202002 5:45:00 PM rn rn o O a . - oo' L� u s voo� < O + Cars �� m o co Trucks o o 0 o Buses m o n- N0000 rnoorn– 41 T r Left Thru Right Peds 1 1 2 0 0 0 0 0 0 1 1 2 Out In Total PARK PLACE 123 0 24 0 1 0 0 0 0 0 0 0 124 0 24 0 1 0 0 0 0 0 0 0 0 0 0 0 1 D 0 0 F'eaK Hour From U /:UU AM to Uy:UU AM - f e; PARK PLACE OAK PLACE PARK PLACE OAK PLACE 0 n From North From East From South From West Volume 23 0 Rig Thr 28 Ped App. Rig Thr 08:15 AM Ped App. Rig Thr 0 Ped App. Rig Thr 0.0 Ped App. Int. Start Time 9 Peak Left Factor Left 0 0 High Int. Left 0 0 6 Volume Left 2 0 12 Peak ht u s Total ht u s Total ht u s Total ht u s Total Total F'eaK Hour From U /:UU AM to Uy:UU AM - f e; Intersectio 08:00 AM 0 4 18 0 n 22 18. 81. 0.0 0.0 Volume 23 0 5 0 28 Percent 82. 0.0 17. 0.0 08:15 AM 0.0 2 9 0 08:15 11 0.0 Volume 8 0 1 0 9 Peak Factor 0 0 High Int. 08:45 AM 0 0 6 Volume 10 0 2 0 12 Peak Factor 0.583 iK1ot1 0 0 0 4 18 0 0 22 18. 81. 0.0 0.0 2 8 2 9 0 0 11 08:15 AM 0.0 0.0 2 9 0 0 11 0.0 0.500 0 0 0 0 0' 0 14 46 0 60 110 23. 76. 0.0 0.0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 6 16 0 22 42 6:45:00 AM 1 08:15 AM 0 0 0 0 0 0 6 16 0 22 0.682 0.655 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name : 02 -041 -3 Site Code : 00000003 Start Date : 03/20/2002 Paae No :3 Peak Hour From 02:00 PM to 05:45 PM - Pe Intersectio PARK PLACE 0 0 0.0 0.0 n Out In Total 0 0 0 Volume 50 28 78 4 0 35 Percent 231 01 51 0 14 28 Right Thru Left Peds 0.0 0.813 03:00 PM 03:15 4J 1 �► o� a) I _� O w 2 North -a O O o C � r — ► H —? C ° (L— High Int. 0/2002 8:00:00 AM Y O ° r °—� 0/2002 8:45:00 AM r �� rNi O� ° y Cars Trucl6 ° m M A d �° 0.515 D_ Buses C1 y ° T F+ Left Thru Right Peds 0 0 01 0 0 0 7-70 Out In Total PARK PLACE Peak Hour From 02:00 PM to 05:45 PM - Pe Intersectio 02:45 PM 0 0 0.0 0.0 n 0.0 0 0 0 Volume 31 0 4 0 35 Percent 88. 0.0 14 28 0.0 0.813 03:00 PM 03:15 0 2 Volume 16 0 1 0 17 Peak 0.792 Factor High Int. 03:15 PM Volume 16 0 1 0 17 Peak 0.515 Factor ak1of1 3 15 0 0 18 16. 83. 0.0 0.0 7 3 0 1 0 0 1 03:30 PM 2 8 0 0 10 0.450 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0 0 0 19 19 0 38 91 0.0 50. 50. 0.0 0 0 0 6 4 0 10 28 0.813 03:00 PM 0 2 10 0 12 0.792 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-3 Site Code : 00000003 Start Date : 03/20/2002 Page No : 4 PARK PLACE Out In Total 0 E35 57 311 01 41 0 ht Thru Le� Peds 1 J T ^?` W O N .r3 0) North W a 0/2002 245:00 PM E Y OO� ° r y 0!2002 3:30:00 PM ° Cars Trucks o m �� d Buses y o T r Left Thru Right Peds 0 0 01 0 DO 0 0 Out In Total PARK PLACE PARK PLACE / OAK PLACE Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 [ruins Printwd- Truelrs File Name :02-041-3 Site Code : 00000003 Start Date : 03/20/2002 Page No : 1 °` BREAK PARK PLACE OAK PLACE PARK PLACE OAK PLACE From North From East I From South From West Rig Thr Ped App. Rig Thr Ped App. Rig Thr 0 Ped App. Rig Thr 0 Ped App. Int. Start Time ht u Left s Total ht u Left s Total ht u Left s Total ht u Left s Total Total Factor 1.0 1.0 1.0 1.0 --1,-0T-1-,0T Total 1.0 1 1.0 1 1 1.01 1.01 1.01 1.01 0 1 1.01 1.0 1 1.0 1 1.01 0 1 °` BREAK "` 02:15 PM 1 0 0 0 1 0 0 0 0 01 0 0 0 0 01 0 0 0 0 01 1 BREAK "' Total 1 0 0 0 1 0 0 0 0 01 0 0 0 0 01 0 0 0 0 01 1 BREAK "' Grand Total 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Apprch % 1000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % 1000 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PARK PLACE / OAK PLACE Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 Groups Prinked- Ruses File Name :02-041-3 Site Code : 00000003 Start Date : 03/20/2002 Page No : 1 --- t$KLAK --- Grand 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 Total % 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PARK PLACE OAK PLACE PARK PLACE OAK PLACE From North From East I From South From West Rig Ped App. Rig Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Int. Start Time ht �LThr Left s Total ht u Left s Total ht u s Total ht u s Total Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 --- t$KLAK --- Grand 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 Total % 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Higgins Associates 0 SARATOGA AVE. Civil and Traffic Engineers FIRE DEPT./ POST OFFICE DWYS 1 1335 First St. Suite A File Name :02-041-4 Gilroy, Ca. 95020 Site Code :00000004 From East Start Date : 03/20/2002 From South Page No : 1 FIRE DEPT. / POST OFFICE DWYS / SARATOGA AVENUE Groups printed- Cars - Trucks - Rusas 08:00 AM 0 SARATOGA AVE. 1 FIRE DEPT./ POST OFFICE DWYS 1 SARATOGA AVE. 0 1 0 5 6 From East 0 0 From South 12 08:15 AM 0 From West 7 0 Start Time Right Thru Left Peds 5 Right Thru Left Peds 4 Right Thru Left Peds 2 0 2 11 0 1 0 Total 5 0 0 0 Total 1 08:45 AM 0 0 Tot. Total Factor 1.0 1.0 1.01 1.01 9 1.01 1.01 1.01 1.01 9 1.0 1.0 1.01 1.0 14 0 07:00 AM 0 0 4 0 4 1 0 0 0 1 8 0 0 0 8 13 07:15 AM 0 0 2 0 2 2 0 1 0 3 8 0 0 0 8 13 07:30 AM 0 0 3 0 3 1 0 1 0 2 2 '0 0 0 2 7 07:45 AM 0 0 2 0 2 2 0 0 0 2 6 0 0 0 6 10 Total 0 0 11 0 11 6 0 2 0 8 24 0 0 0 24 43 08:00 AM 0 0 1 0 1 4 0 1 0 5 6 0 0 0 6 12 08:15 AM 0 0 7 0 7 3 0 2 0 5 4 0 0 0 4 16 08:30 AM 0 0 2 0 2 11 0 1 0 12 5 0 0 0 5 19 08:45 AM 0 0 4 0 4 8 0 1 0 9 9 0 0 0 9 22 Total 0 0 14 0 14 26 0 5 0 31 24 0 0 0 24 69 — BREAK — 02:15 PM 0 0 3 0 3 3 0 1 0 4 4 0 0 0 4 11 02:30 PM 0 0 3 0 3 5 0 1 0 6 12 0 0 0 12 21 02:45 PM 0 0 6 0 6 7 0 1 0 8 8 0 0 0 8 22 Total 0 0 12 0 12 15 0 3 0 18 24 0 0 0 24 54 03:00 PM 0 0 1 0 1 6 0 1 0 7 10 0 0 0 10 18 03:15 PM 0 0 3 0 3 6 0 0 0 6 9 0 0 0 9 18 03:30 PM 0 0 1 0 1 5 0 0 0 5 11 0 0 0 11 17 03:45 PM 0 0 0 0 0 3 0 1 0 4 7 0 0 0 7 11 Total 0 0 5 0 5 20 0 2 0 22 37 0 0 0 37 64 04:00 PM 0 0 3 0 3 6 0 1 0 7 5 0 0 0 5 15 04:15 PM 0 0 2 0 2 2 0 0 0 2 6 0 0 0 6 10 04:30 PM 0 0 3 0 3 4 0 1 0 5 4 0 0 0 4 12 BREAK "' Total 0 0 8 0 81 12 0 2 0 141 15 0 0 0 151 37 05:00 PM 0 0 0 0 0 3 0 0 0 3 7 0 0 0 7 10 05:15 PM 0 0 1 0 1 4 0 0 0 4 3 0 0 0 3 8 05:30 PM 0 0 1 0 1 4 .0 0 0 4 2 0 0 0 2 7 05:45 PM 0 0 2 0 2 2 0 1 0 3 3 0 0 0 3 8 Grand �Tot Total 0.0 0.0 1 0 0.0 18.0 I 30.7 0.0 14.0 5.0 0.0 35.7 1 146.3 0.0 0.0 0.0 46.3 3� Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 _j6 F, ° ° Lo °oo0 2 T j H North °Or°'i rnoorn. 0/20027:00:00 AM co r� 0/2002 5:45:00 PM Cars O o 0 0 N o o Trucks 0 a Buses r* Left Riaht Peds 15 92 0 0 0 0 0 0 0 15 921 0 193 107 300 0 0 0 0 0 0 193 107 300 Out In Total ZE DEPT./ POST OFFICE DW File Name :02-041-4 Site Code : 00000004 Start Date : 03/20/2002 Page No : 2 NeaK hour from Uf:UU AM to UB:UU AM - NeaK 1 of 1 SARATOGA AVE. 0 C 2000° 31 24 From East From South aooa 14 a0oa Right Thru Left Peds C 00000 Right -i. -+ -� 0 a�i00 W 0 Left NeaK hour from Uf:UU AM to UB:UU AM - NeaK 1 of 1 SARATOGA AVE. FIRE DEPT./ POST OFFICE DWYS SARATOGA AVE. 31 24 From East From South From West 14 Start Time Right Thru Left Peds App Right Thru Left Peds 0 4 Right Thru Left Peds I Peak Factor 9 0 0 0 High Int. Total Volume Tota. 0 7 0 7 Peak Factor Total Total NeaK hour from Uf:UU AM to UB:UU AM - NeaK 1 of 1 Intersection 08:00 AM 0 31 24 Volume 0 0 14 0 14 Percent 0.0 0.0 100.0 0.0 08:45 0 0 4 0 4 Volume 8 0 1 0 Peak Factor 9 0 0 0 High Int. 08:15 AM Volume 0 0 7 0 7 Peak Factor 0.784 08:30 AM 0.500 26 0 5 0 31 24 0 0 0 24 69 83.9 0.0 16.1 0.0 100.0 0.0 0.0 0.0 8 0 1 0 9 9 0 0 0 9 22 0.784 08:30 AM 08:45 AM 11 0 1 0 12 9 0 0 0 9 0.646 0.667 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-4 Site Code :00000004 Start Date : 03/20/2002 Paae No :3 �N 1 ~ ,L' I aCh Ul 2 (n ¢ o ¢ C N V N 3/20/2002 6:00:00 AM E 0 3/20/2002 8:45:00 AM a a D 0 0) d Cars o. ¢ O Trucks m o ° Buses Lft Rilht Peds 5 26 0 38 31 Out In Total FIRE DEPT.I POST OFFICE DWYS Peak Hour From 02:00 PM to 05:45 PM - Peak 1 of 1 Intersection 02:30 PM 0 27 39 Volume 0 0 13 0 13 Percent 0.0 0.0 100.0 0.0 02 :45 0 0 6 0 6 Volume 7 0 1 0 Peak Factor 8 0 0 0 High Int. 02:45 PM Volume 0 0 6 0 6 Peak Factor 0.898 02:45 PM 0.542 24 0 3 0 27 39 0 0 0 39 79 88.9 0.0 111 0.0 100.0 0.0 0.0 0.0 7 0 1 0 8 8 0 0 0 8 22 0.898 02:45 PM 02:30 PM 7 0 1 0 8 12 . 0 0 0 12 0.844 0.813 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A File Name Gilroy, Ca. 95020 Site Code Start Date Page No �-T 2 T o� CO j — � North 4 — 2 '° o Q fh T cll� 0/2002 2:30:00 PM 5 O 012002 3:15:00 PM w o� y Cars m Fn O Trucks m o ° � Buses m — Lft Riht Peds 3 24 0 52 27 79 Out In Total FIRE DEPT. / POST OFFICE DWYS 02 -041 -4 00000004 03/20/2002 4 Higgins Associates SARATOGA AVE. FIRE DEPT./ POST OFFICE DWYS Civil and Traffic Engineers 1335 First St. Suite A File Name :02-041-4 Gilroy, Ca. 95020 Site Code : 00000004 Thru Start Date : 03/20/2002 Page No : 1 FIRE DEPT. / POST OFFICE DWYS / SARATOGA AVENUE Groins Printnd- Tnir_ks ... t3KF -AK — Grand Total 0 0 0 0 Apprch % 0.0 0.0 0.0 0.0 Total % 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 SARATOGA AVE. FIRE DEPT./ POST OFFICE DWYS SARATOGA AVE. From East From South From West Start Time Right Thru Left Peds Right Thru Left Peds TAI Right Thru Left Peds TAPP 1 Total Total Factor 1.0 1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.0 1.01 1.01 1.0 ... t3KF -AK — Grand Total 0 0 0 0 Apprch % 0.0 0.0 0.0 0.0 Total % 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Higgins Associates SARATOGA AVE. FIRE DEPT.! POST OFFICE DWYS Civil and Traffic Engineers 1335 First St. Suite A File Name : 02 -041 -4 Gilroy, Ca. 95020 Site Code : 00000004 Thru Start Date : 03/20/2002 Page No : 1 FIRE DEPT. / POST OFFICE DWYS / SARATOGA AVENUE r:rnonc Prin}orl_ Rimac IJKLAK ___ Grand Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % SARATOGA AVE. FIRE DEPT.! POST OFFICE DWYS SARATOGA AVE. From East From South From West Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int Total T�otap� Total Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 IJKLAK ___ Grand Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % Higgins Associates 0 SARATOGA AVE. Civil and Traffic Engineers 0 PARK PLACE 1335 First St. Suite A File Name :02-041-7 Gilroy, Ca. 95020 Site Code : 00000000 142 Start Date : 03/20/2002 From East Page No : 1 PARE( PLACE / SARATOGA AVENUE Grnuos Printed- Cars - Trucks - Ruses 08:00 AM 0 SARATOGA AVE. 2 0 PARK PLACE 11 0 2 SARATOGA AVE. 15 1 142 0 0 From East 277 08:15 AM From South 121 1 0 122 From West 0 3 1 17 8 123 0 App- 131 270 08:30 AM 0 84 4 0 88 6 0 1 0 Start Time Right Thru Left Peds 143 Right Thru Left Peds 21 Total 97 Thru Left Peds Total Total Factor 1.0 1.0 1.0 1.0 255 1.0 1.0 1.0 28 1.0 426 1.0 1.0 1.0 1.0 58 30 07:00 AM 0 41 4 0 45 0 0 0 3 3 4 83 0 0 87 135 07:15 AM 0 67 2 0 69 4 0 3 2 9 2 119 0 0 121 199 07:30 AM 0 75 3 0 78 7 0 5 0 12 1 111 0 0 112 202 07:45 AM 0 76 6 0 82 13 0 6 4 23 3 159 0 0 162 267 Total 0 259 15 0 274 24 0 14 9 47 10 472 0 0 482 803 08:00 AM 0 117 2 0 119 11 0 2 2 15 1 142 0 0 143 277 08:15 AM 0 121 1 0 122 13 0 3 1 17 8 123 0 0 131 270 08:30 AM 0 84 4 0 88 6 0 1 0 7 5 138 0 0 143 238 08:45 AM 0 76 21 0 97 12 0 7 0 19 16 123 0 0 139 255 Total 0 398 28 0 426 42 0 13 3 58 30 526 0 0 556 1040 BREAK "' 02:15 PM 0 97 6 0 103 3 0 5 0 8 8 158 0 0 166 277 02:30 PM 0 99 5 0 104 7 0 4 1 12 4 96 0 0 100 216 02:45 PM 0 110 6 0 116 1 0 7 1 9 7 107 0 0 114 239 Total 0 306 17 0 323 11 0 16 2 29 19 361 0 0 380 732 03:00 PM 0 111 2 0 113 6 0 4 0 10 7 100 0 0 107 230 03:15 PM 0 93 1 0 94 6 0 4 0 10 4 97 0 0 101 205 03:30 PM 0 109 2 0 111 4 0 4 2 10 10 112 0 0 122 243 03:45 PM 0 119 2 0 121 3 0 4 1 8 7 101 0 0 108 237 Total 0 432 7 0 439 19 0 16 3 38 28 410 0 0 438 915 04:00 PM 0 106 4 0 110 5 0 1 1 7 0 92 0 0 92 209 04:15 PM 0 91 5 0 96 0 0 1 1 2 4 60 0 0 64 162 04:30 PM 0 84 5 0 89 4 0 2 6 12 2 65 0 0 67 168 04:45 PM 0 103 6 0 109 7 0 6 0 13 2 89 0 0 91 213 Total 0 384 20 0 404 16 0 10 8 34 8 306 0 0 314 752 05:00 PM 0 94 9 0 103 8 0 1 2 11 6 85 0 0 91 205 05:15 PM 0 108 2 0 110 2 0 1 4 7 2 88 0 0 90 207 05:30 PM 0 109 4 0 113 2 0 0 3 5 2 68 0 0 70 188 05:45 PM 0 106 2 0 108 5 0 2 1 8 3 89 0 0 92 208 Total 0 417 17 0 434 17 0 4 10 31 13 330 0 0 343 808 06:00 PM 0 98 3 0 101 2 0 1 1 4 4 106 0 0 110 215 Grand Total 0 2294 107 0 2401 131 0 74 36 241 112 2511 0 0 2623 5265 Apprch % 0.0 95.5 4.5 0.0 54.4 0.0 30.7 14.9 4.3 95.7 0.0 0.0 Total % 0.0 43.6 2.0 0.0 45.6 2.5 0.0 1.4 0.7 4.6 2.1 47.7 0.0 0.0 49.8 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name : 02 -041 -7 Site Code : 00000000 Start Date : 03/20/2002 Paae No : 2 PARK PLACE Out In Total J00000 [1000 F,—,—OT--1 0 0 0 0 W t" V J T 0000 N(OA�O O North O Q OI (7 v 0 O L 0/2002 7:00:00 AM { —� N N Q W •-'-N N NF C f0 jam u> so 012002 6:00:00 PM A N N 3-0 N W F N N NOON L r- �1 W � 0 Q Cars C) Q ao j Trucls O D < N�NCOV 0000 y, Buses NO �0 A A N V p l d a W O V m- N 0 0 0 0 +, T r Left Thru Right Peds 218 220 438 1 21 22 0 0 0 219 241 460 Out In Total PARK PLACE 73 0 131 16 1 0 0 20 0 0 0 0 74 0 131 36 reaK nOUf From ut:uu Am To uti:uu Am - reaK l OT l SARATOGA AVE. PARK PLACE SARATOGA AVE. 62 Volume From East From South From West Percent Start Time Right Thru Left Peds 2 Right Thru Left Peds 11 Right Thru Left Peds High Int. 08:15 AM 0 143 Volume 0 121 1 Total Peak Factor 0.842 Total 0.949 07:45 AM Total Total reaK nOUf From ut:uu Am To uti:uu Am - reaK l OT l Intersection 07:45 AM 7 62 Volume 0 398 13 0 411 Percent 0.0 96.8 3.2 0.0 08:00 0 117 2 0 119 Volume 11 Peak Factor 2 2 15 High Int. 08:15 AM 0 143 Volume 0 121 1 0 122 Peak Factor 0.842 43 0 12 7 62 17 562 0 0 579 1052 69.4 0.0 19.4 11.3 2.9 97.1 0.0 0.0 11 0 2 2 15 1 142 0 0 143 277 0.949 07:45 AM 07:45 AM 13 0 6 4 23 3 159 0 0 162 0.674 0.894 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-7 Site Code : 00000000 Start Date : 03/20/2002 Pape No :3 Peak Hour From 02:00 PM to 06:00 PM - Peak 1 of 1 Intersection PARK PLACE 2 39 Volume 0 417 Out In Total 0 436 Percent 0.0 95.6 4.4 0 02 :15 0 97 o �y1 1 O io w Peak Factor North 0 F. C r- O ° F —► 0 —2 � -i O 0 110 6 0/2002 7:45:00 AM 20/2002 8:30:00 AM r �W a o a?� O c o Cars Trucks �� o 02:30 PM a Buses y o - 02:15 PM 4� T r 7 0 Left Thru Right Peds 1 12 8 158 0 12 0 431 7 166 30 62 92 0.813 Out In Total 0.733 PARK PLACE Peak Hour From 02:00 PM to 06:00 PM - Peak 1 of 1 Intersection 02:15 PM 2 39 Volume 0 417 19 0 436 Percent 0.0 95.6 4.4 0.0 02 :15 0 97 6 0 103 Volume 3 Peak Factor 5 0 8 High Int. 02:45 PM 0 166 Volume 0 110 6 0 116 Peak Factor 0.940 17 0 20 2 39 26 461 0 0 487 1 962 43.6 0.0 51.3 5.1 5.3 94.7 0.0 0.0 3 0 5 0 8 8 158 0 0 166 277 0.868 02:30 PM 02:15 PM 7 0 4 1 12 8 158 0 0 166 0.813 0.733 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-7 Site Code : 00000000 Start Date : 03/20/2002 Page No : 4 PARK PLACE Out In Total 0 �� J ? HO w North O 012002 2:15:00 PM w N Low 012002 3:00:00 PM a �� a) O `r � � Cars Trucks � .. Fn o a Buses C m 4- T r Left Thru Right Peds 201 01 171 2 45 39 Out In Total PARK PLACE Higgins Associates 0 SARATOGA AVE. Civil and Traffic Engineers 0 PARK PLACE 1335 First St. Suite A File Name :02-041-7 Gilroy, Ca. 95020 Site Code : 00000000 0 Start Date : 03/20/2002 0 Page No : 1 PARK PLACE / SARATOGA AVENUE Grouns Printed- Trucks BREAK '** 0 SARATOGA AVE. 0 0 PARK PLACE 0 0 SARATOGA AVE. 1 1 0 0 0 From East 0 1 From South 0 1 1 From West 21 .0 Start Time Right Thru Left Peds App' Right Thru Left Peds App' Right Thru Left Peds App. Int. 0 0 1 1 21 Total 1 0 0 1 Total 7 08:00 AM 0 0 Total Total Factor 1.0 1.0 1.0 1.0 1 1.0 1.0 1.0 1.0 0 1.0 1.0 1.0 1.0 0 0 07:00 AM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 07:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 BREAK '** 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 07:45 AM 0 1 1 0 21 .0 0 1 1 21 0 0 0 0 01 1 4_ Total 0 3 1 0 41 0 0 1 1 21 0 1 0 0 1 1 7 08:00 AM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 08:15 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 1 08:30 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 08:45 AM 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 0 2 Total 0 0 0 0 0 0 0 0 1 1 0 4 0 0 4 1 5 "' BREAK "' 02:30 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 02:45 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 Total 0 0 0 0 01 0 0 0 2 21 0 0 0 0 01 2 BREAK "' 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 03:30 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 BREAK "' Total 0 0 0 0 01 0 0 0 1 1 0 1 0 0 1 1 2 04:00 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 04:15 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 04:30 PM 0 2 0 0 2 0 0 0 4 4 0 0 0 0 0 6 04:45 PM 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 Total 0 4 0 0 4 0 0 0 5 5 0 3 0 0 3 12 05:00 PM 0 2 0 0 2 0 0 0 2 2 0 0 0 0 0 4 05:15 PM 0 0 0 0 0 0 0 0 4 4 0 1 0 0 1 5 05:30 PM 0 2 0 0 2 0 0 0 2 2 0 2 0 0 2 6 05:45 PM 0 0 0 0 0 0 0 0 1 1 0 1 0 0 1 2 Total 0 4 0 0 4 0 0 0 9 9 0 4 0 0 4 17 06:00 PM 0 1 0 0 1 0 0 0 1 1 0 1 0 0 1 3 Grand Total 0 12 1 0 13 0 0 1 20 21 0 14 0 0 14 48 Apprch % 0.0 92.3 7.7 0.0 0.0 0.0 4.8 95.2 0.0 100.0 0.0 0.0 Total % 0.0 25.0 2.1 0.0 27.1 0.0 0.0 2.1 41.7 43.8 0.0 29.2 0.0 0.0 29.2 Higgins Associates SARATOGA AVE. PARK PLACE Civil and Traffic Engineers 0 3 0 0 1335 First St. Suite A File Name :02-041-7 Gilroy, Ca. 95020 Site Code : 00000000 0 4 Start Date : 03/20/2002 0 0 Page No : 1 PARK PLACE / SARATOGA AVENUE Groups Printed- Buses °" BREAK'"' 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total BREAK - 02:15 PM 02:30 PM 02:45 PM Total 03:00 PM BREAK - 03:30 PM 03:45 PM 0 1 SARATOGA AVE. PARK PLACE SARATOGA AVE. 0 3 0 0 From East From South From West 0 0 0 1 0 0 0 4 0 0 0 7 0 0 0 3 0 0 0 0 0 0 0 2 0 0 0 5 0 0 0 2 0 0 0 1 Start Time Right Thru Left Peds Total Right Thru Left Peds Total 0 Thru Left Peds TApppl Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0 1.0 1.0 1.0 1 1.0 0 BREAK "' 07:00 AM 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 °" BREAK'"' 07:30 AM 07:45 AM Total 08:00 AM 08:15 AM 08:30 AM 08:45 AM Total BREAK - 02:15 PM 02:30 PM 02:45 PM Total 03:00 PM BREAK - 03:30 PM 03:45 PM 0 1 0 0 0 1 0 0 0 3 0 0 0 1 0 0 0 1 0 0 0 1 0 0 0 4 0 0 0 7 0 0 0 3 0 0 0 0 0 0 0 2 0 0 0 5 0 0 0 2 0 0 0 1 0 0 1 0 0 0 0 1 0 0 0 0 31 0 0 0 0 1 0 0 0 0 1 0 0 0 0 1 0 0 0 0 4 0 0 0 0 7 0 0 0 0 3 0 0 0 0 0 0 0 0 0 2 0 0 0 0 51 0 0 0 0 21 0 0 0 0 11 0 0 0 0 Total 04:00 PM BREAK "' 0 0 4 2 0 0 0 0 41 2 0 0 0 0 0 0 0 0 Total 0 2 0 0 21 0 0 0 0 05:00 PM 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 BREAK "' Total 0 0 0 0 01 0 0 0 0 BREAK "' Grand Total 0 21 0 0 21 0 0 0 0 Apprch % 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % 0.0 52.5 0.0 0.0 52.5 0.0 0.0 0.0 0.0 0 0 0 0 1 1 0 0 0 1 0 1 2 2 01 0 4 0 0 41 7 0 0 0 0 0 0 1 0 0 2 0 0 2 3 0 0 2 0 0" 2 3 0 0 2 0 0 2 6 0 0 6 0 0 6 13 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 01 0 2 0 0 21 01 0 2 0 0 21 0 0 2 0 0 2 0 0 0 0 0 0 01 0 4 0 0 4 01 0 1 0 0 11 0 0 0 0 1 1 0 0 0 1 0 1 01 0 2 0 0 2 0 0 19 0 0 19 0.0 100.0 0.0 0.0 0.0 0.0 47.5 0.0 0.0 47.5 1 F 7 4 3 1 8 3 1 1 2 40 RAW 24 -HOUR COUNTS AND SPEED DATA Weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000001 Board Copyright 1998 Start Date: 03/18/2002 Other File I.D. 02 -041 -1 Street name :SARATOGA AVE. Cross street:PARK PLACE EB /WB Page 1 Begin Mon. 03 18 Tues. Wed. Thur. Fri. Sat. Sun. Week Avg. Time EB WB EB WB EB WB EB WB EB WB EB WB EB WB EB WB 12:00 am * * * * * * 42 46 * * * * * * 42 46 01:00 * * * * * * 14 25 * * * * * * 14 25 02:00 + * + + * + 5 9 + + + + + * 5 9 03:00 + + + + + + 7 6 + + + + + + 7 6 04:00 + + + + + * 8 7 + + + + + + 8 7 05:00 * * * * * * 14 12 * * * * * * 14 12 06:00 * * * * * * 71 44 * * * * * * 71 44 07:00 * * * * * * 202 122 * * * * * * 202 122 08:00 * * * * * * 461 265 * * * * * * 461 265 09:00 * * * * * * 469 348 * * * * * * 469 348 10:00 * * * * * * 367 290 * * * * * * 367 290 11:00 * * * * * * 342 302 * * * * * * 342 302 12:00 pm * * * * * * 322 362 * * * * * * 322 362 01:00 * * * * * * 345 337 * * * * * * 345 337 02:00 * * * * 374 357 * * * * * * * * 374 357 03:00 * * * * 477 392 * * * * * * * * 477 392 04:00 * * * * 379 363 * * * * * * * * 379 363 05:00 * * * * 332 387 * * * * * * * * 332 387 06:00 * * * * 323 372 * * * * * * * * 323 372 07:00 * * * * 288 346 * * * * * * * * 286 346 08:00 * * * * 199 271 * * * * * * * * 199 271 09:00 * * * * 177 218 * * * * * * * * 177 218 10:00 * * * * 161 146 * * * * * * * * 181 146 11:00 * * * * 117 107 * * * * * * * * 117 107 Totals 0 0 0 0 2847 2959 2669 2175 0 0 0 0 0 0 5516 5134 0 0 5806 4844 0 0 0 10650 Avg. Day .0% .0% .0% .0% 51.6% 57.6% 48.3% 42.3% .0% .0% .0% .0% .0% .0% AM Peaks 09:00 09:00 09:00 09:00 Volume 469 348 469 348 PM Peaks 03:00 03:00 01:00 12:00 03:00 03:00 Volume 477 392 345 362 477 392 ADTs Weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000001 Board # Copyright 1998 Start Date: 03/20/2002 Other File I.D. 02 -041 -1 Street name :SARATOGA AVE. Cross street:PARK PLACE EB Page 1 Begin Int. 0- 16 21 26 31 36 41 46 51 56 61 66 71 76 Time Total 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 12:00 03/20 * * * * * * * * * * * * * * + 01:00 x x + x x + x x + x + x + + + 02:00 + x + x x x x + x + x x x x + 03:00 x + x x x + x x x x + + + x + 04:00 + + + x x x x + x x x x x x + 05:00 x x x + + x + x x + + + + + x 06:00 + + + x x x x + x x x x x x x 07:00 + + x x + x x + x + x x x x x 08:00 x x x + x + x x + x x + + x x 09:00 + + + x x x + + + x + x + + x 10:00 x + + + x + + x + x x + x + + 11:00 + + x + x x x + x + + + + x + 12:00 pm + + + + + x x + + + + + x x + 01:00 x x x x + x x x x + x x + x + 02:00 374 10 15 46 155 110 16 1 1 0 0 1 0 0 19 03:00 477 7 17 46 195 162 20 3 2 .2 1 0 1 0 21 04:00 379 10 19 43 143 108 26 2 0 1 1 0 0 0 26 05:00 332 6 20 33 101 131 20 3 1 0 0 0 1 0 16 06:00 323 8 14 24 102 121 29 4 0 0 0 0 0 0 21 07:00 288 10 11 22 101 107 22 3 1 0 1 0 1 0 9 08:00 199 5 8 25 58 75 20 0 3 0 0 0 0 1 4 09:00 177 0 2 11 48 88 16 2 0 0 0 0 0 0 10 10:00 181 1 2 10 37 95 30 3 0 0 0 0 0 0 3 11:00 117 0 1 5 28 61 18 2 0 0 0 0 0 2 0 Day Totals 2847 57 109 265 968 1058 217 23 8 3 3 1 3 3 129 12:00 03/21 42 0 1 4 8 20 9 0 0 0 0 0 0 0 0 01:00 14 0 0 2 1 4 4 2 0 0 0 0 0 0 1 02:00 5 0 0 0 1 3 0 1 0 0 0 0 0 0 0 03:00 7 0 0 1 3 0 1 2 0 0 0 0 0 0 0 04:00 8 1 0 0 3 2 2 0 0 0 0 0 0 0 0 05:00 14 0 0 1 2 4 7 0 0 0 0 0 0 0 0 06:00 71 0 5 4 9 37 14 1 0 0 0 0 0 0 1 07:00 202 2 6 9 33 106 42 2 0 0 0 0 0 0 2 08:00 461 6 9 15 146 207 58 4 1 0 0 0 0 0 15 09:00 469 7 8 44 187 163 32 7 1 1 0 1 1 0 17 10:00 367 2 6 32 125 149 23 2 0 2 1 2 2 0 21 11:00 342 4 12 39 124 120 20 0 1 1 0 2 1 0 18 12:00 pm 322 2 9 32 107 134 20 2 1 1 1 0 0 0 13 01:00 345 5 9 39 127 113 17 4 0 0 1 0 0 0 30 Grand Total 5516 86 174 487 1844 2120 466 50 12 6 6 6 7 3 247 Speed Statistics. 15th Percentile Speed 25 MPH Median Speed (50th percentile): 30 MPH Average Speed - All Vehicles 35 MPH 85th Percentile Speed 34 MPH 95th Percentile Speed 50 MPH 10 MPH Pace Speed 26 -35 MPH Number of Vehicles in Pace 3964 Percent of Vehicles in Pace 72.168 Number of Vehicles > 35 MPH 805 Percent of Vehicles > 35 MPH: 14.658 Weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000001 Board # Copyright 1998 Start Date: 03/20/2002 Other File I.D. 02 -041 -1 Street name •SARATOGA AVE Cross street•PARK PLACE WB Page 1 Begin Int. 0- 16 21 26 31 36 41 46 51 56 61 66 71 76 Time Total 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 12.00 03/20 * * * * * 01:00 + + x + + + x + + + + + + + + 02:00 03:00 x + x x + + + + + x + + * x + 04:00 x x + + + x x + + x + x + x x 05:00 + + + x + + + + x + x + + x x 06:00 + x + x + x + x + + + x + * x 07:00 x x + + + + + x + x + x + + x 08:00 x x + + + + x x + x + x + + x 09:00 + x x + x + + + + + + + + + + 10:00 x + x x + + + + x + x + + x x 11:00 x + + + x + + + + + x + + + x 12:00 pm x + + x + + + + x x + + + * + 01:00 + x x x x + x + + x + + + + + 02:00 357 12 39 97 131 48 8 2 2 1 0 1 2 1 13 03:00 392 5 19 85 175 67 13 3 1 0 2 2 0 2 18 04:00 363 12 23 91 140 62 8 4 1 0 3 0 0 1 18 05:00 387 12 28 85 152 62 13 1 1 0 2 0 0 1 10 06:00 372 4 B 42 166 124 13 2 1 0 1 1 0 0 10 07:00 346 4 11 64 140 103 12 1 1 0 0 0 0 0 10 08:00 271 0 3 16 116 106 23 2 0 1 0 0 0 0 4 09:00 218 1 2 16 87 94 12 0 1 0 0 0 0 1 4 10:00 146 0 2 11 54 62 11 0 1 0 0 0 1 0 4 11:00 107 0 1 12 31 47 14 1 0 0 1 0 0 0 0 Day Totals 2959 50 136 519 1192 795 127 16 9 2 9 4 3 6 91 12:00 03/21 46 0 0 0 15 24 6 1 0 0 0 0 0 0 0 01:00 25 0 1 1 8 10 4 1 0 0 0 0 0 0 0 02:00 9 0 1 0 5 2 1 0 0 0 0 0 0 0 0 03:00 6 0 0 1 1 1 3 0 0 0 0 0 0 0 0 04:00 7 0 1 1 2 3 0 0 0 0 0 0 0 0 0 05:00 12 0 0 0 2 3 6 1 0 0 0 0 0 0 0 06:00 44 0 1 7 15 11 10 0 0 0 0 0 0 0 0 07:00 122 1 2 7 42 50 15 1 0 0 0 0 0 0 4 08:00 265 3 16 35 112 69 10 4 3 0 0 0 1 0 12 09:00 348 9 17 54 145 86 12 2 0 0 1 1 0 2 19 10:00 290 2 10 34 122 89 15 3 0 0 1 1 0 0 13 11:00 302 6 18 30 125 95 13 0 0 0 1 1 0 0 13 12:00 pm 362 6 22 53 163 93 13 3 0 1 0 1 0 0 7 01:00 337 6 17 43 141 96 11 2 2 1 0 1 0 1 16 Grand Total 5134 83 242 785 2090 1427 246 34 14 4 12 9 4 9 175 Speed Statistics. 15th Percentile Speed 22 MPH Median Speed (50th percentile): 28 MPH Average Speed - All Vehicles 32 MPH 85th Percentile Speed 33 MPH 95th Percentile Speed 40 MPH 10 MPH Pace Speed 26 -35 MPH Number of Vehicles in Pace 3517 Percent of Vehicles in Pace 68.738 Number of Vehicles > 35 MPH 507 Percent of Vehicles > 35 MPH: 9.918 Weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000002 Board # Copyright 1998 Start Date: 03/18/2002 Other File I.D: : 02 -041 -2 Street name :HWY 9 /SARTOGA -LOS GATOS Cross street:OAK STREET NB /SB Page 1 Begin Mon. 03/18 Tues. Wed. Thur. Fri. Sat. Sun. Week Avg. Time NB SB NB SB NB SB NB SB NB SB NB SB NB SB NB SB 12:00 am * * * * * * 32 21 * * * * * * 32 21 01:00 + + x + + + 4 8 + + + + + + 4 8 02:00 * * * * * * 10 5 * * * * * * 10 5 03:00 + + * + + + 0 2 + + + + + + 0 2 04:00 + * x x + x 4 3 x + + + + x 4 3 05:00 * * * * * * 25 17 * * * * * * 25 17 06:00 * * * * * * 148 59 * * * * * * 148 59 07:00 * * * * * * 600 147 * * * * * * 600 147 08:00 * * * * * * 603 341 * * * * * * 603 341 09:00 * * * * * * 498 292 * * * * * * 498 292 10:00 * * * * * * 366 310 * * * * * * 366 310 11:00 * * * * * * 392 346 * * * * * * 392 346 12:00 pm * * * * * * 367 378 * * * * * * 367 378 01:00 * * * * * * 64 48 * * * * * * 64 48 02:00 * * * * 425 481 * * * * * * * * 425 481 03:00 * * * * 372 555 * * * * * * * * 372 555 04:00 * * * * 338 610 * * * * * * * * 338 610 05:00 * * * * 322 633 * * * * * * * * 322 633 06:00 * * * * 280 601 * * * * * * * * 260 601 07:00 * * * * 240 358 * * * * * * * * 240 358 08:00 * * * * 148 199 * * * * * * * * 148 199 09:00 * * * * 161 189 * * * * * * * * 161 189 10:00 * * * * 94 144 * * * * * * * * 94 144 11:00 * * * * 37 45 * * * * * * * * 37 45 Totals 0 0 0 0 2417 3815 3113 1977 0 0 0 0 0 0 5530 5792 0 0 6232 5090 0 0 0 11322 Avg. Day .0% .0% .0% .0% 43.7% 65.8% 56.2% 34.1% .0% .0% .0% .0% .0% .0% AM Peaks 08:00 11:00 08:00 11:00 Volume 603 346 603 346 PM Peaks 02:00 05:00 12:00 12:00 02:00 05:00 Volume 425 633 367 378 425 633 ADTs Weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000002 Board # Copyright 1998 Start Date: 03/20/2002 Other File I.D. 02 -041 -2 Street name :HW-Y 9 /SARATOGA -LOS GATOS Cross street:OAK STREET SB Page 1 Begin Int. 0- 1 21 26 31 36 41 46 51 56 61 66 11 76 Time Total 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 12:00 03/20 * * * * * * * * * * * * * + 01:00 + + + + * + * + + + + + + + + 02:00 + + + + + + + + + + + + + + + 03:00 + + * + + + + + + + + + + + + 04.00 + + + + + + + + + + + * * + + 05:00 + + + + + + + * + + + * + + + 06:00 + + + + + + + * + + * * + + + 07:00 + * + + + + + + + + + + + + + 08:00 + + + + + + + + + + + + + + + 09:00 + + + * + + + + + + * + + * + 10:00 + + + + + + + + + + + + + * + 11:00 + + + * + + + + + + + + + + + 12:00 pm + + + + * + + + * + + * + + + 01:00 + + + + + + * + + + + + * + + 02:00 481 14 56 92 172 100 13 4 3 0 0 2 0 4 21 03:00 555 11 43 83 195 159 32 4 3 4 0 1 1 0 19 04:00 610 18 48 121 218 137 32 7 1 2 2 0 2 1 21 05:00 633 9 39 74 237 199 40 8 4 0 3 0 2 0 18 06:00 601 8 35 97 209 179 44 6 3 1 1 0 1 2 15 07 :00 358 2 16 30 122 136 31 4 0 0 1 0 0 1 15 08:00 199 2 5 10 65 83 23 5 1 0 0 0 0 0 5 09:00 189 2 6 12 67 73 20 3 0 0 0 0 0 1 5 10:00 144 1 7 12 48 62 12 2 0 0 0 0 0 0 0 11:00 45 0 0 2 13 23 5 1 0 0 0 0 0 0 1 Day Totals 3815 67 255 533 .1346 1151 252 44 15 7 7 3 6 9 120 12:00 03/21 21 0 2 2 5 10 2 0 0 0 0 0 0 0 0 01:00 8 0 1 1 2 4 0 0 0 0 0 0 0 0 0 02:00 5 0 0 2 0 2 1 0 0 0 0 0 0 0 0 03:00 2 0 0 0 1 1 0 0 0 0 0 0 0 0 0 04:00 3 0 0 0 0 2 1 0 0 0 0 0 0 0 0 05:00 17 0 2 1 7 3 3 1 0 0 0 0 0 0 0 06:00 59 2 5 9 17 20 6 0 0 0 0 0 0 0 0 07:00 147 2 13 15 36 45 17 1 4 0 1 0 0 0 13 08:00 341 18 59 47 102 66 12 5 1 0 0 0 2 2 27 09:00 292 11 28 34 B2 90 22 2 2 0 0 3 2 0 16 10:00 310 5 39 33 97 96 22 2 0 0 2 0 3 1 10 11:00 346 10 36 52 113 104 17 2 1 0 1 1 0 0 9 12:00 pm 378 18 30 49 125 90 27 6 1 0 3 1 3 0 25 01:00 48 3 4 4 24 10 2 0 0 0 0 0 0 0 1 Grand Total 5792 136 474 782 1957 1694 384 63 24 7 14 8 16 12 221 Speed Statistics. 15th Percentile Speed 21 MPH Median Speed (50th percentile): 28 MPH Average Speed - All Vehicles 33 MPH 85th Percentile Speed 34 MPH �► 95th Percentile Speed 47 MPH 10 MPH Pace Speed 26 -35 MPH ... Number of Vehicles in Pace 3651 Percent of Vehicles in Pace 63.308 Number of Vehicles > 30 MPH 2443 Percent of Vehicles > 30 MPH: 42.358 Weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000002 Board H Copyright 1998 Start Date: 03/20/2002 Other File I.D. 02 -041 -2 Street name :HWY 9 /SARATOGA -LOS GATOS Cross street:OAK STREET NB Page 1 Begin Int. 0- 16 21 26 31 36 41 46 51 56 61 66 71 76 Time Total 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 12:00 03/20 * * * * 01:00 * x * x * x * x x * * x x x 02:00 * * * x x x x * x * x * * x 03:00 x x * x x x x x * x x x x x x 04:00 * * * * * x * x x * x x x x x 05:00 06:00 x x * x x * x x * x x x * x x 07:00 08:00 x x x x x x * * x x x * * x x 09:00 x x x x * x * * x * x * * x x 10:00 x * x x * x x * x x * x * x 11:00 x x x x x * * x x x x * x * x 12:00 pm * * * * x x x x * x x x x x x 01:00 * * x x x x x x x * x * x x x 02:00 425 19 27 33 37 132 126 25 1 1 2 3 3 1 15 03:00 372 7 22 17 16 105 152 32 4 0 0 1 1 0 15 04:00 338 8 18 27 28 85 119 25 1 0 1 2 2 2 20 05:00 322 10 12 28 28 79 116 26 5 1 0 1 1 0 15 06:00 280 5 4 16 10 88 102 25 4 0 3 1 0 3 19 07:00 240 7 16 10 24 87 71 16 1 0 0 0 0 1 7 08:00 148 2 13 9 14 48 50 11 0 0 0 0 0 0 1 09:00 161 6 10 18 17 48 55 5 2 0 0 0 0 0 0 10:00 94 0 6 4 8 30 29 12 1 1 0 0 0 0 3 11:00 37 1 2 1 3 15 9 5 0 1 0 0 0 0 0 Day Totals 2417 65 130 163 185 717 829 182 19 4 6 8 7 7 95 12:00 03/21 32 1 3 3 3 5 10 5 1 0 1 0 0 0 0 01:00 4 0 0 1 0 3 0 0 0 0 0 0 0 0 0 02:00 10 0 1 0 2 0 7 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 4 0 0 0 1 1 1 0 1 0 0 0 0 0 0 05:00 25 0 0 0 2 9 9 3 2 0 0 0 0 0 0 06:00 148 3 6 6 10 33 59 28 3 0 0 0 0 0 0 07:00 600 19 32 40 55 213 193 32 3 0 0 0 2 0 11 06:00 603 28 54 49 86 193 129 14 4 1 2 2 2 2 37 09:00 498 6 16 47 44 158 160 46 4 1 0 1 1 0 14 10:00 366 3 21 32 25 101 123 43 2 2 0 4 1 1 8 11:00 392 10 19 31 38 115 122 33 3 1 3 2 1 0 14 12:00 pm 367 18 41 35 26 106 99 25 1 0 0 2 0 1 13 01:00 64 2 4 4 12 19 18 2 0 0 0 0 0 0 3 Grand Total 5530 155 327 411 489 1673 1759 413 43 9 12 19 14 11 195 Speed Statistics. 15th Percentile Speed 23 MPH Median Speed (50th percentile): 33 MPH Average Speed - All Vehicles 37 MPH 85th Percentile Speed 39 MPH 95th Percentile Speed 47 MPH 10 MPH Pace Speed 31 -40 MPH ++� Number of Vehicles in Pace 3432 Percent of Vehicles in Pace 62.32% Number of Vehicles > 30 MPH 4148 Percent of Vehicles > 30 MPH: 75.32% APPENDIX E RAW RADAR SPEED SURVEY DATA City of Saratoga Public Safety Center Speed Study Analysis Location: Highway 9 2 2 26 2 4 Direction: NB 50th percentile speed (median): 33 mph Average Speed: 33 mph Day of the Week: Thursday 85th percentile speed (critical): 40 mph Standard Deviation: 5 mph Date: Mar. 21,2002 10 mph pace speed 2: 26 to 35 Mode': 31 mph Time of Day: 10:11 AM -10:45 AM Percent in pace speed: 72 % % Exceeding Speed Limit: 70 % Posted Speed Limie: 30 mph Range of speeds: 25 to 43 36 1 2 Vehicles Observed: 50 2 78 38 3 6 Survey Data Speed Number Percent. Cumul. (mph) of Obs. of Total Percent 25 1 2 2 26 2 4 6 27 5 10 16 28 2 4 20 29 2 4 24 30 3 6 30 31 6 12 42 32 4 8 50 33 5 10 60 34 3 6 66 35 4 8 74 36 1 2 76 37 1 2 78 38 3 6 84 39 0 0 84 40 3 6 90 41 3 6 96 42 1 2 98 43 1 2 100 t. i� n !� c :a v 111, 1- 1� Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. A02-041"NBI - Output City of Saratoga Public Safety Center Speed Study Analysis Location: Highway 9 1 2 2 24 Direction: SIB 50th percentile speed (median): 31 mph Average Speed: 30 mph Day of the Week: Thursday 85th percentile speed (critical): 33 mph Standard Deviation: 3 mph Date: Mar. 21,2002 10 mph pace speed 2: 25 to 34 Model: 33 mph Time of Day: 10:47AM - 11:20AM Percent in pace speed: 90 % % Exceeding Speed Limit: 52% Posted Speed Limit ?: 30 mph Range of speeds: 23 to 35 8 16 Vehicles Observed: 50 3 6 70 33 ►IMP Speed Number Percent. Cumul. (mph) of Obs. of Total Percent 23 1 2 2 24 1 2 4 25 4 8 12 26 2 4 16 27 5 10 26 28 5 10 36 29 1 2 38 30 5 10 48 31 8 16 64 32 3 6 70 33 10 20 90 34 2 4 94 35 3 6 100 ■■ ■ ■ ■ ■ ■■ ■ ■ ■ ■■ ■ 12 10 N 8 C O m O 6 �g z 4 S. z x 23 24 25 26 27 28 29 30 31 32 33 34 35 Speed (mph) Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. A02-041 hnyeSB1 •Output City of Saratoga Speed Study Analysis Location: Saratoga Ave. E/O Hwy 9 Dumber Percent. Cumul. >f Obs. of Total Direction: EB 50th percentile speed (median): 29 mph Average Speed: 30 mph Day of the Week: Thursday 85th percentile speed (critical): 34 mph Standard Deviation: 3 mph Date: Mar 21,2002 10 mph pace speed 2: 25 to 34 Mode': 28 mph Time of Day: 9:06AM - 9:20Am Percent in pace speed: 92 % % Exceeding Speed Limit: 2% Posted Speed Limie: 35 mph Range of speeds: 25 to 37 Vehicles Observed: 50 Speed I (mph) 25 ! 26 27 ! 28 ! 29 30 31 1 32 1 33 34 ! 35 36 1 37 Survey Data Dumber Percent. Cumul. >f Obs. of Total Percent. i 10 10 1 8 18 i 10 28 1 18 46 i 10 56 1 6 62 i 12 74 I 0 74 1 8 82 i 10 92 1 6 98 I 0 98 2 100 ��111111111�11>• Ililllll��llilll�llilllll�llllllll�llllllll�a ■■■ Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. A02-00.aretopsE61 -Output �e. City of Saratoga Public Safety Center Speed Study Analysis Location: Saratoga Ave E/O Hwy 9 4 4 24 1 2 Direction: WB 50th percentile speed (median): 28 mph Average Speed: 29 mph Day of the Week: Thursday 85th percentile speed (critical): 32 mph Standard Deviation: 3 mph Date: Mar. 21,2002 10 mph pace speed 2: 25 to 34 Mode': 25 mph Time of Day: 9:30AM - 10:07AM Percent in pace speed: 88 % % Exceeding Speed Limit: 2 % Posted Speed Limit: 35 mph Range of speeds: 23 to 36 34 3 6 Vehicles Observed: 50 4 98 36 1 2 Survey Data Speed Number Percent. Cumul. (mph) of Obs. of Total Percent 23 2 4 4 24 1 2 6 25 9 18 24 26 1 2 26 27 7 14 40 28 7 14 54 29 2 4 58 30 4 8 66 31 8 16 82 32 2 4 86 33 1 2 88 34 3 6 94 35 2 4 98 36 1 2 100 Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. A02-041 er "ME31 - Output P q1_ 1 Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. A02-041 er "ME31 - Output APPENDIX F SARATOGA PUBLIC SAFETY CENTER ALTERNATIVE COMPARISON FIRE DEPARTMENT EMERGENCY RESPONSE CALLS - DIRECTION FROM HWY 9 / SARATOGA AVE INTERSECTION CODE 3 CALLS DIRECTION ROUTE OF CODE 3 PERCENT NUMBER OF TOTAL NORTH Saratoga - Sunnyvale Road 245 22.0% SOUTH Saratoga - Los Gatos Road (Hwy 9) 213 19.1% EAST Saratoga Avenue 410 36.8% WEST Big Basin (Hwy 9) 247 22.2% TOTAL 1,115 100.0% Based on historical data - March 18, 2001 - March 18, 2002 APPENDIX G HIGHWAY 9 /OAK STREET SIGNAL WARRANTS (PRELUVE NARY) 9 -6 TRAFFIC SIGNALS AND LIGHTING Traffic Manual 1 -1992 Figure 9 -1 TRAFFIC SIGNAL WARRANTS CALL DATE DIST CO RITE /fly PM CHK DATE ! 1a Major St: 9" Critical Approach Speed mph Minor St: ' Critical Approach Speed mph Critical speed of major street traff ic > 40 mph — —'—'c V ❑ or RURAL (R) In built up area of isolated community of < 10,000 pop. — — — — — — — — — ❑ ❑ URBAN (U) WARRANT 1 - Minimum Vehicular Volume 100% SATISFIED YES X NO 8 MINIMUM REQUIREMENTS 0% SATISFIED YES NO (80% SHOWN IN BRACKETS) APPROACH f lV1��, /� t ° J t Ot LANES 1 2 or more Hour Both Apprchs. 500 350 600 420 ri Major Street 1 (400) 1 (280) (480) 1 (336) 1 "(/ �l7 U� Highest Apprch. 150 1 105 200 140 / j % Minor Street (120) (84) (160) (112) !1 0 klgftl" He,_':t a WARRANT 2 - Interruption of t ntinuous Traffic .MINIMUM REQUIREMENTS (80% SHOWN IN BRACKETS) U I R 11 U I R APPROACH 1 2 or more Both Apprchs. 750 525 900 630 Major Street (600) (420) (720) 504 Highest Apprch. 75 53 100 70 Minor Street (60) (42) (80) (56) WARRANT 3 - Minimum Pedestrian Volume t utf (y F37 100% SATISFIED 80% SATISFIED I� j / N YES ,K NO ❑ YES,I' NO ❑ � Hour �% D e 100% SATISFIED YES ❑ NO REQUIREMENT FULFILLED Pedestrian volume crossing the major street is 100 or more for each of any four hours or is 190 or more during any one Yes ❑ No hour; AMD There are less than 60 gaps per hour in the major street traf- fic stream of adequate length for pedestrians to cross; The nearest traff ic signal along the major street is greater Yes ❑ ❑ than 300 feet; ANQ No The new traff ic signal will not seriously disrupt progressive Yes El No ❑ traffic flow on the major street. ZY y{l !✓ The satisfaction of a warrant Is not necessarily justification for a signal. Delay, congestion, confusion or other evidence of the need for right -of -way assignment must be shown. Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9 -7 1 -1ssz Figure 9 -2 TRAFFIC SIGNAL WARRANTS WARRANT 4 - School Crossings WARRANT 5 - Progressive Movement Not Applicable — — _ — — — — - - — — ❑ See School Crossings Warrant Sheet ❑ SATISFIED YES ❑ NOX MINIMUM REQUIREMENTS DISTANCE TO NEAREST SIGNAL FULFILLED > 1000 FT. N ft, S ft, E ft, W ft. YES ❑ NO ❑ ON ONE WAY ISOLATED STREETS OR STREETS WITH ONE WAY TRAFFIC SIGNIFICANCE AND ADJACENT SIGNALS ARE SO FAR APART THAT NECESSARY PLATOONING & SPEED CONTROL WOULD BE LOST SATISFIED ON 2 -WAY STREETS WHERE ADJACENT SIGNALS DO NOT PROVIDE NECESSARY PLATOONING AND - SPEED CONTROL PROPOSED SIGNALS COULD CONSTITUTE A PROGRESSIVE SIGNAL SYSTEM ❑ ❑ WARRANT 6 - Accident Experience 'r /Vol SATISFIED YES ❑ NO ❑ REQUIREMENTS WARRANT FULFILLED ONE WARRANT WARRANT 1 - MINIMUM VEHICULAR VOLUME SATISFIED - - - - - - - - - - - - - - - - - - - - - - - - - - - - - OR 80% WARRANT 2 - INTERRUPTION OF CONTINUOUS TRAFFIC YES ❑ NO ❑ SIGNAL WILL NOT SERIOUSLY DISRUUPT PROGRESSIVE TRAFFIC FLOW ❑ ❑ ADEQUATE TRIAL OF LESS RESTRICTIVE REMEDIES HAS FAILED TO REDUCE ACCIDENT FREQUENCY ❑ ❑ ACC. WITHIN A 12 MONTH PERIOD SUSCEPTIBLE OF CORR. & INVOLVING INJURY OR >- $500 DAMAGE MINIMUM REQUIREMENT NUMBER OF ACCIDENTS 5 OR MORE ❑ ❑ WARRANT 7 - Systems Warrant SATISFIED YES El NO� I MINIMUM VOLUME REQUIREMENT ENTERING VOLUMES ALL APPROACHES FULFILLED DURING TYPICAL WEEKDAY PEAK HOUR VEH /HR 1000 VEH /HR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - i OR DURING EACH OF ANY 5 HRS. OF A SAT. AND /OR SUN. VEH /HR YES ❑ NO ❑ CHARACTERISTICS OF MAJOR ROUTES MAJOR ST. MINOR ST. HWY. SYSTEM SERVING AS PRINCIPLE NETWORK FOR THROUGH TRAFFIC ----------------------------- - - - - -- - - - -- - - - -- RURAL OR SUBURBAN HWY OUTSIDE OF, ENTERING, OR TRAVERSING A CITY ------------------------- - - - - -- - - - -- - - - -- APPEARS AS MAJOR ROUTE ON AN OFFICIAL PLAN ANY MAJOR ROUTE CHARACTERISTICS MET, BOTH STREETS ❑ ❑ The satisfaction of a warrant Is not necessarily justification for a signal. Delay, congestion, confusion or other evidence of the need for right -of -way assigmmnent must be shown. 9 -8 TRAFFIC SIGNALS AND LIGHTING Traffic Manual 1 -1991 Figure 9 -3 TRAFFIC SIGNAL WARRANTS WARRANT 8 - Combination of Warrants SATISFIED YES ❑ NO ❑ REQUIREMENT WARRANT J FULFILLED TWO WARRANTS 1. MINIMUM VEHICULAR VOLUME SATISFIED YES NO 2. INTERRUPTION OF CONTINUOUS TRAFFIC 80% WARRANT 9 - Four Hour Volume SATISFIED* YES 6- NO ❑ Hour * Refer to Figure 9 -6 (URBAN AREAS) or Figure 9 -7 (RURAL AREAS) to determine if this warrant is satisfied. WARRANT 10 - Peak Hour Delay SATISFIED YES El NO ❑ (ALL PARTS MUST BE SATISFIED) 1. The total delay experienced for traffic on one minor street approach contro led by a STOP sign equals or exceeds four vehicle -hours for a one -lane approach and five vehicle -hours for a two -lane approach; AND YES ❑ NO ❑ 2. The volume on the same minor street approach equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND YES ❑ NO ❑ 3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches. YES ❑ NO ❑ WARRANT 11 - Peak Hour Volume SATISFIED* YES NO ❑ Hour * Refer to Figure 9 -8 (URBAN AREAS) or Figure 9 -9 (RURAL AREAS) to determine if this warrant is satisfied. The satisfaction of a warrant is not necessarily justification for a signal. Delay, congestion, confusion or other evidence of the need for right -of -way assignment must be shown. Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9 -9 1 -1992 Figure 9 -4 TRAFFIC SIGNAL WARRANTS (Based on Estimated Average Daily Traffic - See Note) URBAN RURAL Minimum Requirements ......................... ............................. EADT 1. Minimum Vehicular Vehicles per day on Vehicles per day on Satisfied Not Satisfied major street (total of higher - volume minor both approaches) street approach (one direction only) Number of lanes for moving traffic on each approach Urban Rural Urban Rural Major Street Minor Street 1 ....... ............................... 1....... ............................... 8,000 5,600 2,400 1,680 2 or more ........................ 1 ....... ............................... 9,600 6,720 2,400 1,680 2 or more ........................ 2 or more ......................... 9,600 6,720 3,200 2,240 1 ...... ............................... 2 or more ......................... 8,000 5,600 3,200 21240 2. Interuption of Continuous Traffic Vehicles per day on Vehicles per day on Satisfied Not Satisfied major street (total of higher- volume minor both approaches) street approach (one direction only) Number of lanes for moving traffic on each approach Major Street Minor Street h,, Urban Rural Urban Rural 1 ....... ............................... 1....... ............................... 12,000 8,400 1,200 850 2 or more ........................ 1 ....... ............................... 14,400 10,080 1,200 850 2 or more ........................ 2 or more ......................... 14,400 10,080 1,600 1,120 1 ...... ............................... 2 or more ......................... 12,000 8,400 1,600 1,120 3. Combination Satisfied Not Satisfied 2 Warrants 2 Warrants No one warrant satisfied, but following warrants fulfilled 80% or more ......... 1 2 NOTE: To be used only for NEW INTERSECTIONS or other locations where actual traffic volumes cannot be counted. 9.10 TRAFFIC SIGNALS AND LIGHTING Traffic Manual 1 -1992 Fi.gure .9 -5 SCHOOL PROTECTION WARRANTS CALC DATE DIST CO RTE PM CHK DATE Major St: Critical Approach Speed mph Minor St: Critical Approach Speed mph Critical speed of major street traffic ? 40 mph.— — — — — — — — — — — — — — � RURAL R () In built up area of isolated community of < 10,000 pop. — — — — — _ El URBAN (U) FLASHING YELLOW SCHOOL SIGNALS (ALL PARTS MUST BE SATISFIED) Minimum Requirements PART A U I R SATISFIED YES ❑ NO ❑ Vehicle Volume Each of 2 hours 200 140 School Age Pedestrians Each of 40 40 �3 Crossing Street 2 hours 500 350 AND PART B Critical Approach Speed Exceeds 35 mph AND PART C SATISFIED YES ❑ NO ❑ SATISFIED YES ❑ NO ❑ Is nearest controlled crossing more than 600 feet away? SATISFIED YES ❑ NO ❑ SCHOOL AREA TRAFFIC SIGNALS (ALL PARTS MUST BE SATISFIED) Minimum Requirements PART A 11 U I R SATISFIED Vehicle Volume Each of 2 hours 500 350 School Age Pedestrians Each of 2 hours_ 100 70 �3 Crossing Street or 500 350 per day AND SATISFIED YES ❑ NO YES ❑ NO PART B Is nearest controlled crossing more than 600 feet away? SATISFIED YES ❑ NO cL 50C I = 40C I— U wQ cr300 (n a- cr-Q O w 200 Z 0 100 0 = 300 FIGURE 47. FOUR HOUR VOLUME WARRANT 2 OR MORE LANES & 2 OR MORE LANES 2 OR MORE LANES & 1 LANE 1 LANE & 1 LANE 400 500 600 700 800 900 1000 1100 1200 1300 1400 MAJOR STREET — TOTAL OF BOTH APPROACHES — VPH 'NOTE: 115 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 80 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE. FIGURE 48. FOUR HOUR VOLUME WARRANT (COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400 vo � 2 gs-z o KI)AR I = 300 f— U wQ wO cc cc !— a. a. 200 ac Q O uj Z2 J O 100 > 0 200 2 OR MORE LANES £t 2 OR MORE LANES 2 OR MORE LANES & 1 LANE 1 LANE Et 1 LANE 300 400 500 600 700 800 900 MAJOR STREET — TOTAL OF BOTH APPROACHES — VPH "NOTE: 80 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 60 VPH APPLIES AS THE LOUVER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE. KEITH B. HIGGINS & / ssOCIATES, INC. 1000 0 49 0 Highway 9/ Oak Street CALTRANS PEAK HOUR VOLUME SIGNAL WARRANT (Urban Areas) 700 x = a 500 >a ~ w � 400 ww N _j 300 O0 �O Z 200 x Notes: 100 M I I �hh EE 0 0 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 MAJOR STREET (VPH) TOTAL OF BOTH APPROACHES Scenario Major Street Minor Street North/South East/West A 7-8AM 1192 55 B. 8-9AM 1289 160 C. 2 -3PM 1076 163 D. 3-4PM 1089 124 E. 4-5PM 1142 84 F. 5-6PM ° 1178 94 G. 0 0 H. 01 0 1. 150 VPH applies as the lower threshold volume for a minor street approach with two or more lanes and 100 VPH applies as the lower threshold volume for a minor street approaching with one lane. 2. Bold line applies to intersection geometry. Higgins Associates warrants.)ds - Signal - Urban NONE 1 0 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 MAJOR STREET (VPH) TOTAL OF BOTH APPROACHES Scenario Major Street Minor Street North/South East/West A 7-8AM 1192 55 B. 8-9AM 1289 160 C. 2 -3PM 1076 163 D. 3-4PM 1089 124 E. 4-5PM 1142 84 F. 5-6PM ° 1178 94 G. 0 0 H. 01 0 1. 150 VPH applies as the lower threshold volume for a minor street approach with two or more lanes and 100 VPH applies as the lower threshold volume for a minor street approaching with one lane. 2. Bold line applies to intersection geometry. Higgins Associates warrants.)ds - Signal - Urban 1. 150 VPH applies as the lower threshold volume for a minor street approach with two or more lanes and 100 VPH applies as the lower threshold volume for a minor street approaching with one lane. 2. Bold line applies to intersection geometry. Higgins Associates warrants.)ds - Signal - Urban CnRnTn(,e -I nC r-ATnQ / NIAIV O LEGEND 1 Upgrade signal time phasing to improve the level of service at intersection 2 Additional 12' -0" wide right turn lane to improve level of service 3 Proposed new signal lights at intersection to improve traffic flow to intersection as well as provide a greater level of safety to pedestrian connectivity from the neighborhood to Oak Street 4 All existing east and west bound lanes changed from 11' -0" to 12' -0" wide 5 Proposed new left turn lane to provide safe ingress the Public Safety Center site. 6 Proposed median to prevent cut - through traffic from HWY9 through the neighborhood. Property of Fire Department Property of USPS Property of City of Saratoga �/J1C+�If Clb vE HGh4FNb� Z110, `A&P.. A J-_� . RITF PI AN t Surface Parking oo GO, 010,009, 17q" 0 1� Surfacei parking, 1 f r, 4 0 W N k O i r O r SARATOGA -LOS GATOS / HWY 9 PROJECT DESCRIPTION This scheme envisions a back -in Fire Station Configuration located on Saratoga Avenue utilizing a revision to the original design. Additional support space for the Fire District will be located in the Contempo building. The USPS and Sheriffs Department will continue to occupy the existing structure on Saratoga Avenue. Cross parking and access easements will need to be granted to allow for optimum parking layout. Total Parking Shown 69 stalls Total Required Parking 62 stalls SUMMARY OF PROBABLE COST Building 11,000 sf @ $200 /sf $2,200,000 Contempo Seismic Upgrade $ 275,000 Contempo Interiors 4,000 sf @ $30 /sf $ 120,000 Site Development $ 540,000 Off -site Development $ 240,000 Soft Costs $ 750,000 Sub -Total $4,125,000 Design Contingency 20% $ 825,000 TOTAL $4,950,000 v W- -lECI{ — or.* MW s ` T ,t sang >, PROJECT DESCRIPTION -' This scheme envisions adrive -thru Fire Station #' Configuration located on Saratoga Los Gatos Road with adequate front apron to facilitate back -in movements.The new design for the Fire Station will incorporate training facility requirements. The existing Fire Station will remain in operation during the construction of the new facility. A proposed land swap will regularize existing parcels on the site.The Postal Service and Sheriffs Department will continue to occupy o�Q the existing structure on Saratoga Avenue. � r Total Parking Shown 69 stalls C9c� Total Required Parking 62 stalls 1 C s c6 �2hA'i�9 t SUMMARY OF PROBABLE COST Building 15,000 sf @ $200 /sf $3,000,000 Site Development $ 600,000 Off -site Development $ 240,000 Soft Costs $ 900,000 Sub -Total $4,740,000 ark 1.,W Design Contingency 20% $ 948,000 , r f' TOTAL $5,688,000 Surface -` Parking M` - sQ • o 0 SARATOGA -LOS GATOS / HWY 9 ��A�etEC t[ ✓V EKahEEAS� R • AW V � _ - "Vit- ON lwl� A*6 . Nk MCC Public Safety Center, Saratoga law, T 1 - '. • - 'L'�' '°'yid tea- �; � � ��►�'•' � .. �.,= -. -- - --�,.� Wig N."'r'' 4 .• r L Public Safety Center, Saratoga PROOF OF PUBLICATION (2015.5 C.C.P.) State of California County of Santa Clara I am a citizen of the United States and a resident of the County aforesaid: I am over the age of 18 years, and not party to or interested in the above entitled matter. I am the principal clerk of the printer of the: Saratoga News 14375 Saratoga Avenue, Suite E2 Saratoga, California 95070- 59789, a newspaper of general circulation, printed every Wednesday in the City of San Jose, California, County of Santa Clara, and which newspaper has been adjudged a newspaper of general circulation by the Superior Court of the County of Santa Clara, State of California, Case number 3281 -48, dated June 2, 1975 that the notice of which the annexed is a printed copy (set in type not smaller than nonpareil has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to wit: In the year of 2002 1 certify (or declare) under penalty of perjury that the foregoing is true and correct. Dated: Q at San Jo , Calif rnia Kathy hghtson Filing Stamp PROOF OF PUBLICATION I September 5,. 2001 the City /s /Cathleen Boyer Council denied a Request for City Clerk Design Review and Use (PUB SN: 7/24/02) Permit approval to demolish an existing Fire Station and construct a new 12,689 square foot Fire Station and a Temporary Use Permit to allow the temporary Fire Station to be located behind the subject property at 20473 Saratoga -Los Gatos Road, during construction. The maximum height of the new Fire Station would be 34 feet 6 inches tall. On July 17, 2002 the City Council direct - ed that motion for reconsid. eration be heard on August 7, 2002 and that if that motion is approved a public hearing be held to reconsider the decision made on -September 5, 2001. The project is locat- ed within a. Professional Administrative (P -A) zoning Legal s district. Applicant: Saratoga Fire District Appellant: F.A.C.T. (Fire Fighters & CITY OF SARATOGA Citizens Task Force) ' All interested persons may NOTICE ICE OF PUBLIC NEARING appear and be heard at the Notice otice Is hereby given tha above time and place. If you challenge the subject the City Clerk of the Saratoga City Council, State of projects in court, you may be California, has set limited to raising only those issues you or someone Wednesday, the 7th day of else raised at the public August 2002, at 7:30 p.m. in hearing described in this the City Council Chambers at notice or in written corre- 13777 Fruitvale Avenue, Saratoga, California, as the spondence delivered to the time and place for public City Council at, or prior to, the public hearing. A copy hearings on: Reconsideration of of any material provided to Resolution No. 01.060 the City Council on the above hearing(s) is on file at (adopted September 5, the Office of the Saratoga 2001) Denying City Clerk at 13777 Fruitvale DR -01 -006, UP- 03.002, TUP- Avenue, Saratoga. 01 -003, (397 - 22.019) — Questions may be addressed SARATOGA FIRE DISTRICT, to the City Clerk, 14380 Saratoga Road; - On (408) 868.1269. Street Reconfiguration Re- alignment of Intersection Re- alignment of Pedestrian Crosswalks Closure of One -Way Street Move Monument to Plaza Across the Street Provide Street Parking Proposed New Signal Lights ':e1' :_11 Fire Department New Building involving new design or modified RRM design. Building Area - 16,000 sf Parking Required - 24 stalls Sheriff s Building Area - 9,000 sf Department Parking Required - 62 stalls Patrol Cars - 28 stalls Private Cars - 34 stalls United States Building Area - 5,000 sf Postal Service Parking Required - 31 stalls Total Required Parking - 117 stalls a -Los Gatos /HWY -9 L � l AL Property of Fire Department Property of United States Postal Service Property of City of Saratoga Pedestrian Linkages & Proposed Improvements Proposed Signalized Intersections • Street Reconfiguration Street Reconfiguration Proposed New Signal Lights Pedestrian Crosswalk Across Oak Place M11=6*1rrlkiW -11 1II►,l1:11rel61[ -� Front Setback - 25' -0" Side Setback - Minimum 15' -0" Ground Coverage - 30% The intersection at Saratoga Avenue and Highway 9 has been reconfigured to improve pedestrian safety and enhance pedestrian connections to the Village and surrounding neighborhoods. Proposed signalization at Oak Street and Oak Place will increase safety and connectivity from the Village Green Neighborhood to the school. Signalization will also reduce cut- thrutraffic from HWY 9 to Saratoga Avenue through Oak Place. The Monument has been moved to the Plaza across the street. The right turn one way street from Saratoga Avenue to HWY 9 has been closed and incorporated with the landscaped island as part of a larger'Urban Plaza'. SITE CONTEXT �z Public Safety Center, Saratoga AMC - Me kR"D8W tCA%ft �MOR[t5 re lta+ut -s1 MAS44,w Y. 92K11011 1A OPTION ONE This Option assumes a Public Safety Center without , the use of the Federated Church Parking lot. OPTION TWO This Option assumes a Public Safety Center with the use of the Federated Church Parking lot. 3A OPTION THREE This Option assumes a Public Safety Center with one of three primary agencies moved to a location off -site. 3B 3C DESIGN EVOLUTION Public Safety Center, Saratoga i / `s --UMML- 2E IIIIIIIIIIIIIIIIIIFIV9 3A - \ 2 -2 _ Q �3 1 7W WYh-k RW.D— i*.CA'NAM [C'S= crrDxEtri>• M 925"SW F: f35iY1l11 f. i u .LiE i Avenue Section OPTION 2 - SCHEME 1 Public Safety Center, Saratoga r Second PROJECT DATA Surface Parking for PSC Garage Parking for PSC on Site Garage Parking for PSC under Church Parking Lot Total Parking Provided for PSC Total Parking Required for PSC 50 stalls 40 stalls 30 stalls 120 stalls 86 stalls Garage Parking for Church Provided 80 stalls , i� Saratoga -Los Gatos /HWY 9 Garage i Parking ao c- prewy c a- � _ _ _ _Garage Parki. Under conten w 15 o w On Site Garage Parking Plan =Fire Department Building _ USPS / Sheriffs Department Building AMYd&mk Rwi.ftwWCAfL1K �.acattra .v u.o.aEEass "Rm"aUe F,106 0111 sa r.f S4��yG �'ai a'N ; i I t ♦oho i t a ♦ ♦ as \` y Plaza'_' Surface E Parking IE Contempo ` R Property I J OPTION 2 - SCHLME 2 Public Safety Center, Saratoga Saratoga -Los Gatos /HWY aecaon - M Second Surface Parking for PSC 46 stalls Garage Parking for PSC on Site v Garage Parking for PSC under Church Parking Lot 30 stalls Total Parking Provided for PSC 116 stalls Total Parking Required for PSC 86 stalls Garage Parking for Church Provided 80 stalls �o c' °. °. aecaon - M Second Surface Parking for PSC 46 stalls Garage Parking for PSC on Site 40 stalls Garage Parking for PSC under Church Parking Lot 30 stalls Total Parking Provided for PSC 116 stalls Total Parking Required for PSC 86 stalls Garage Parking for Church Provided 80 stalls Under UOMMpo On Site Garage Parking Plan 30 15 0 30 _ Fire Department Building _ USPS / Sheriffs Department Building IRM PINI.Mw \Nud, lbw. Hk. ('A 9i5W � E -0I T: 929dJ8 8808 F: 92 <.6{t 8111 e► � G� tp t QyG gai ; " a /cP Contempo Property atoga -Los Gatos /HWY 9 d L R • U - --- -'- - - -- Canlemo Saratoga _ ( Property ,ent.e Section OPTION 3 - SCHEME I Public Safety Center, Saratoga Second Floor Plan Garage Parking for PSC on Site Total Parking Provided for PSC Total Parking Required for PSC Off -Site Parking Required 67 stalls 15 stalls 82 stalls 86 stalls 4 stalls On Site Garage Parking Plan n 1< n 30 =Fire Department Building _ USPS / Sheriff's Department Building iW9 BIVM4wY RwW, DwwrYk. ('A M796 �uerrt[�•S aro twautwss T: 9t!•(Ia W9 F: 9ISilt tlll - / Sib, , lu ,�y alai / . r ` . ♦ %- _ �...�.. -sat -s .. (rd Road l Contempo ' 5�r Property ark. Saratoga -Los Gatos /HWY 9 r . Alw- -�1' Saratoga Benue OPTION 3 - SCHEME 2 Public Safety Center, Saratoga w- - .l- ---- - - - - -- - - - - -- Section r r Second Floor l . . PROJECT DATA Surface Parking for PSC 59 stalls Garage Parking for PSC on Site 43 stalls Total Parking Provided for PSC 102 stalls Total Parking Required for PSC 86 stalls v QQJ On Site Garage Parking Plan Ju 15 a }p =Fire Department Building _ USPS / Sheriff's Department Building .... - WN BYdiW4RW.Ouvi.GltiM �uu.rrc*5 oe uaxaes¢f 7f 12fiYpN F: flliN Nll � P r- M. 1 t OPTION 3 - SCHEME 3 Public Safety Center, Saratoga 'reow"W jow `'Wq _ � el■rl` SUrfa park; ce surface i Contempo ng Parking - Property -- - -- ---- -- r` - Saratoga -Los Gatos /HWY 9 d 1 � OwItARVIS 30' -o' za' -a• n._o. o._o. P FA Second Floor Plan PROJECT DATA Surface Parking for Fire Department 22 stalls Surface Parking for USPS, 10 stalls Surface Parking for Sheriffs Department 34 stalls Total Parking Provided for PSC 66 stalls Total Parking Required for PSC 94 stalls Total Off -Site Parking Required 28 stalls o 15 0 30 Plan Showing Land Swap _Fire Department Building _ USPS / Sherifrs Department Building 'nm408w F'N"Nau PUBLIC SAFETY CENTER Aroma of Ciro nm I%ro- nf• L!a ulNlrnn I stimated Cost Of Construction - Fire Department @ $200 /sf = stimated Cost Of Construction - Sheriff's Department @ $170 /sf 16000 16000 16000 16000 16000 90001 90001 9000 9000 0 $ 3,200,000 $ 3,200,000 $ 3,200,000 $ 3,200,000 $ 3,200,000 $ 1,530,000 $ 1,530,000 $ 1,530,000 $ 1,530,000 $ - Total Estimated Cost of Building Construction I $ 4,730,000-T$ 4,730,-00-0-F$- ,730,000 $ 4,730,000T$ 4,730,000 $ 3,200,000 M- Gara e Parking on Site Gara e Parking for Church under Contem o Property Garage Parking for PSC under Church Property Garage Parking for Church under Church Property Surface Parking at Saratoga Avenue Level Surface Parking at Contem o Level :Required Parking Per Program Total Parking Provided For PSC Off-site Parking Spaces Required 40 40 151 43 94 30 30 30 30 50 50 15 11 141 6 29 351 351 531 53 37 86 86 86 86 94 120 116 82 102 66 NONE NONE 4 NONE 28 I'Total Parking Provided for Church 1 80 80 COST OF -A- PUBLIC - = stimated Cost for all Underground Parking @ $35,000 per Space = stimated Cost for all Surface Parking @ $5,000 per space = stimated Cost for Deck Parking @ $21,000 per space Potential for 30 $ 2,450,000 $ 2,450,000 $ 525,000 $ 1,505,000 $ 75,000 $ 55,000 $ 260,000 $ 30,000 $ 735,000 $ 735,000 $ 315,000 $ 1,113,000 $ 330,000 Total Estimated Cost for Parking $ 3,260,000 r $ :3,240,0-007 $ 1,100,000 $ 2,648,0-007 $ 330,000 Note: All costs are estimated costs "Dotal E-stimated Costs shown above does not include Land Transaction Costs. T ANALYSIS iII60 ah(i�vwL Itmd, ITaw�llk. <'A 9v1Y6 T: 921.p�,v 9gpp r: 9j46yy 14911 � -�cf4' Public Safety Center, Saratoga • • • SARATOGA PUBLIC SAFETY CENTER. A02 -041 Report-lmpd TRAFFIC EVALUATION SARATOGA, CALIFORNIA Prepared For City of Saratoga Saratoga, California April 11, 2002 i • • TABLE OF CONTENTS CHAPTER PAGE NO. DESCRIPTION NO. I. INTRODUCTION 1 II. EXISTING TRAFFIC CONDITIONS 2 A. Arterial Streets 2 B. Highway 9 / Saratoga Avenue Intersection 2 C. Highway 9 / Oak Street Intersection - 4 D. Highway 9 / Oak Place Intersection 5 E. Park Place / Oak Place Neighborhood 5 I. FIRE STATION ALTERNATIVE LOCATIONS EVALUATION 6 IV. TEMPORARY FIRE STATION TRAFFIC OPERATIONS 9 V. RECOMMENDATIONS VI. CONCLUSION A02 -041 Report-l.wpd 10 11 r� I. INTRODUCTION The City of Saratoga hired the firm of Higgins Associates to support the efforts of the Ad Hoc committee studying conceptual design alternatives for a public safety center on or near the southeast corner of the Highway 9 (Saratoga -Los Gatos Road)/ Saratoga Avenue intersection in the easterly portion of the Saratoga Village in the City of Saratoga, California. A project location map is included as Exhibit 1. The proposed project has two alternative site plans. Scheme A involves constructing a new fire station at approximately the same location as the existing fire station, which has direct access onto Saratoga Avenue just east of Highway 9. Scheme D involves constructing a new fire station on the site currently occupied by the Contempo Realty building with direct access onto Highway 9 immediately east of Oak Street. The existing post office, which is immediately east of the existing fire station, is proposed to remain on both site plans. The post office building currently houses not only the United States Postal Service but a Santa Clara County Sheriff's Station as well. An aerial photo depicting the existing site as well as conceptual site plans of Scheme A and D are provided as Exhibits 2, 3 and 4, respectively. The purpose of this study is to determine the advantages and disadvantages of the two project alternatives with respect to traffic operations. This includes a variety of factors such as the volume and speed of conflicting vehicular and pedestrian traffic associated with the two alternatives, design constraints such as sight distance adequacy, impacts on emergency vehicle response times, the positive or negative impacts on the nearby residential neighborhood (primarily Oak Place and Park Place), and opportunities for solving existing traffic operational issues in the project vicinity. This study is not an attempt to evaluate Fire Department operations except as they are related to the above factors. It is also not an attempt to develop strategies to improve quality -of -life in the nearby neighborhood, which may include traffic control devices or traffic calming strategies. It is also not an attempt to directly address or solve traffic operational issues associated with the Saratoga Elementary School on Oak Street. This report is also not a traffic impact analysis although it does provide traffic data and an evaluation of traffic operations. A traffic impact assessment prepared earlier under a report entitled Proposed Replacement of Saratoga Fire Station - Traffic Study, February 6, 2001, prepared by Fehr and Peers. Fehr and Peers also prepared an evaluation of access and egress alternatives for a temporary fire station located at the Contempo building in two reports "Proposed Replacement of Saratoga Fire Station - Traffic Assessment of Temporary Operations and Alternative Access on SR9" , August 10, 2001 and Saratoga Fire Station Replacement - Traffic Assessment of Proposed Temporary Circulation Plan, August 29, 2001. These additional documents are available at the City of Saratoga City Offices. The traffic impact analysis prepared by Fehr and Peers determined that the proposed fire station would not generate any additional traffic beyond what is currently generated by the existing fire station and would not have any significant off -site traffic impacts. Based on the information gathered as a part of this current study, the Fehr and Peers conclusion of no significant impact still applies to both proposed site plans. A02 -041 Report-Lwpd A technical appendix including raw traffic survey data, level of service calculations and other background material is provided under separate cover. It is available at the City of Saratoga city offices. II. EXISTING TRAFFIC CONDITIONS A. Arterial Streets The project site for both alternatives is bounded by Saratoga Avenue on the north, Highway 9 (Saratoga/Los Gatos Road) on the west and Saratoga Federated Church on the southeast, a residential unit fronting Saratoga Avenue on the east, (which is used as a church office) and a residential unit that fronts Highway 9 (which is used as a child care facility -to the south of the project). Saratoga Avenue is a two lane east -west arterial with a 35 mile per hour speed limit along the project frontage east of Highway 9. It connects the Saratoga Village on the west with San Jose and Santa Clara on the east. Its name changes west of the Highway 9 intersection, where it becomes Big Basin Way. This is also under Caltrans jurisdiction as Highway 9. The Saratoga Avenue approach to its intersection with Highway 9 has a left turn lane and an optional through/right turn lane. Highway 9 south of Saratoga Avenue is also known as Saratoga -Los Gatos Road and is a two -lane state highway under Caltrans jurisdiction that has a north -south orientation. Highway 9 has a speed limit of 30 miles per hour in the vicinity of the project. Highway 9 connects the City of Saratoga with the City of Los Gatos and also is a part of a north -south thoroughfare that also connects the City of Sunnyvale to the north as Saratoga - Sunnyvale Road. B. Highway 9 / Saratoga Avenue Intersection The Highway 9 / Saratoga Avenue intersection, which is located at the northwest corner of the project site is currently signalized. The signal provides left turn phasing for northbound and southbound left turns and split - phasing for the eastbound and westbound movements. Split- phasing means that the phasing is "split" between the eastbound and westbound approaches. In other words, a separate combined phase is provided for eastbound lefts and throughs, followed by a separate phase for westbound lefts and throughs. This is inefficient because it only allows one direction of through traffic to go at a time. These movements, which could occur concurrently, are required to occur sequentially. This increases the delay for all movements at the intersection. A noticeable reduction in delay and improvement in level of service can be experienced, especially during off -peak hours where delay is controlled primarily by signal timing, if the eastbound and westbound approaches are changed to protected left turn phasing. The split - phasing is especially inefficient if pedestrians activate both the eastbound and westbound phases within the same cycle, especially under low volume conditions. A very long green phase must be provided for the eastbound movement in order to allow a pedestrian to cross, which is followed by a very long westbound green phase to allow the westbound pedestrian to cross. With A02 -041 Report-Lwpd protected left -turn phasing, both pedestrian movements would occur simultaneously, which would significantly reduce the amount of green time allocated to the eastbound and westbound approaches. The Highway 9 / Saratoga Avenue intersection currently includes a left turn lane, a through lane and an optional through/right turn lane on the northbound Highway 9 approach.. The southbound approach includes a left turn lane, a through lane and an optional through/right turn lane. The eastbound approach includes a left turn lane and a through lane. The eastbound right turn movement is accommodated by a separate right turn ramp that is created by a triangular island on the southwest corner of the intersection. This eliminates right turns from the intersection proper. The westbound approach includes a left turn lane and an optional through/right lane. The provision of a right turn lane on both the northbound approach and on the westbound approach would provide additional capacity at the intersection. However, this is currently precluded because of the close proximity of the existing fire station to the southeast corner of the intersection. The Saratoga Circulation and Scenic Highway Element Update, Fehr and Peers Associates, Inc., September 29, 2001, recommends the provision of a separate southbound right turn lane at this intersection as well. The intersection currently operates at a D level of service during the morning and evening peak hours. The provision of the modification and signal phasing plus the addition of right turn lanes on the northbound, westbound and southbound approaches would improve the intersection to a C level of service. The split -phase improvement can be implemented without constructing any roadway widening. Caltrans should be requested to perform this signal operational change. The demolition of the existing fire station will provide the opportunity to construct a westbound Saratoga Avenue right turn lane and a northbound Highway 9 right turn lane with either site plan alternative. This should be implemented as a part of the fire station project. As mentioned in the General Plan Circulation Element Update, the southbound right turn lane on Saratoga - Sunnyvale Road should be implemented by the City of Saratoga when funding is available. It should be noted that the level of service calculations assume long signal cycle lengths. This is in order to be consistent with the level of service determinations included in the General Plan Circulation Element. However, using optimized signal cycle lengths, the level of service will be somewhat better and probably represented by level of service C for existing conditions. The recommended improvements would result in achieving level of service B under optimized signal timing. Also, traffic volumes are likely to increase in the future which will result in more significant benefits from the recommended improvements. Exhibit 5 summarizes morning and evening Highway 9 / Saratoga Avenue levels of service with various improvement alternatives. During the morning peak hour, queues as long as 29 vehicles were measured during the morning peak hour. During the same peak hour, a queue length of about 16 vehicles was experienced on westbound Saratoga Avenue. Queue lengths during the evening peak hour on these two approaches were significantly less, with 8 vehicles being the maximum queue on northbound Highway 9 and 12 vehicles being the maximum queue on westbound A02 -041 Report-Lwpd Saratoga Avenue. The average queues were between 10% and 40% of the maximum queues. The existing fire station has minimal set backs from Highway 9 and Saratoga Avenue. This creates a sight distance restriction for westbound right turns onto northbound Saratoga - Sunnyvale Road. The City of Saratoga and Caltrans have installed a "No Right Turn on Red" sign to eliminate the exposure of vehicles attempting to enter the intersection while traffic is proceeding northbound through the intersection from the south leg of Highway 9. The close proximity of the fire station to the existing intersection also impedes sight distance for northbound Highway 9 traffic turning right onto eastbound Saratoga Avenue. When the Saratoga Fire Department responds to an emergency call, fire personnel must manually control traffic, especially on this northbound right turn movement to insure that there is no conflict with fire trucks responding to emergency calls. Fire personnel must also monitor this traffic movement when fire trucks are attempting to back into the fire station or when any type of traffic activity is taking place on the apron in front of the fire station. This is an undesirable operational deficiency that has negative safety consequences. C. Highway 9 / Oak Street Intersection The Highway 9 / Oak Street intersections is located near the southwest corner of the project. It is in very close proximity to the location of the Scheme D Fire Station driveway. is Traffic counts were performed at this intersection for both the morning and evening peak hours. The counts indicate that "Peak Hour and Four Hour" and "Interruption of Continuous Traffic" signal warrants are currently met. It is probable that additional signal warrants are met at this location as well. One of the reasons for signal warrants being met at this location is that it is one of the primary access routes to the Saratoga Elementary School, which is located about one block to the west of Highway 9. A significant amount of vehicular traffic uses Oak Street for access to and egress from the school. In addition, there is a fairly significant amount of pedestrian traffic that crosses Highway 9 at this intersection. A total of 32 pedestrians were counted crossing Highway 9 during the 7:00 AM to 9:00 AM two -hour time period. A total of 27 pedestrians were counted crossing Highway 9 at Oak Street between 4:00 PM and 6:00 PM. The two -hour time period between 3:00 PM and 5:00 PM included a total of 25 pedestrians. In order to meet school crossing traffic signal warrants based on pedestrian traffic, a total of 70 school pedestrians must cross the roadway in a two hour period. It is evident the school pedestrian traffic signal warrant is not met. Warrant 2 - "Interruption of Continuous Traffic" requires 75 vehicles per hour for each of eight hours in order to meet signal warrants. A total of only six hours currently have been counted as a part of this study. Five out of the six hours counted exceed the 75 vehicles per hour threshold to warrant signals. The early afternoon hours that were counted had volumes exceeding 130 vehicles per hour, which indicates that it is highly likely that three other hours earlier in the afternoon or later in the evening would exceed this threshold. This would make a third warrant being met for existing conditions. A traffic signal will be able to be justified for this location. However, it is uncertain whether Caltrans will allow a A02 -041 Report-Lwpd traffic signal to be installed on Highway 9 at Oak Street due to its close proximity (within 400 feet) of the existing traffic signal at Saratoga Avenue. Traffic signals spaced too closely are difficult to coordinate, which results in inefficient traffic flow on the major street. Caltrans will require a more detailed signal warrant analysis as well as an evaluation of traffic operations if a signal is installed to make their determination as to whether to allow a signal at this location. The City of Saratoga is beginning the study process at this time. D. Highway 9 / Oak Place Intersection Immediately south of the Highway 9 / Oak Street intersection is the Highway 9 / Oak Place intersection. This intersection is controlled by a stop sign on the east leg (westbound approach) of Oak Place. Sight distance for westbound traffic exiting Oak Place and proceeding southbound on Saratoga Avenue is somewhat marginal. Sight distance improvements should be made at this intersection. This would include vegetation, trimming along the east side of Highway 9 south of Oak Place. Parking prohibitions on the east side of Highway 9, south of Oak Place, should also be considered. The Oak Place approach sight distance constraint could also be mitigated by including this leg in the signal system for Oak Street. However, the Oak Place approach is offset by about 100 feet from Oak Street. This would require an extremely wide intersection along Highway 9 and would also require split - phasing between the Oak Street and Oak Place approaches. This would result in a very inefficient signal system which would not be looked upon favorably by Caltrans. However, it is an alternative that should be explored. E. Park Place / Oak Place Neighborhood In addition to the major arterial streets in the immediate vicinity, a residential neighborhood is located to the southeast of the fire station. This is accessed by Park Place and Oak Place. Residential development fronts along these two roadways as well. The neighborhood is experienced cut through traffic associated with the morning and evening commuting pattern and nearby elementary school as well as the Saratoga Village commercial area and from the Saratoga Federated Church, which is located immediately to the southeast of the project sit--. The neighborhood has requested that the City of Saratoga investigate means of reducing the amount of traffic intrusion into their neighborhood by traffic calming features and possibly prohibitions of turning movements at access points to the neighborhood. The City of Saratoga is in the process of investigating traffic calming strategies in this neighborhood traffic management plan. The investigation of traffic management strategies for the neighborhood is not a part of this study. However, the project should be designed to avoid impacts associated with fire station operations in the neighborhood and also possibly provide alternative routes for traffic from nearby lane uses as well. A02 -041 Report -Lwpd III. FIRE STATION ALTERNATIVE LOCATIONS EVALUATION The two fire station alternatives currently being considered include, Scheme A, which has the fire station located on Saratoga Avenue just east of Highway 9, and Scheme D, which has the fire station located on Highway 9 directly across from Oak Street, both locations will affect or be affected by the traffic operations discussed for existing and background conditions in the previous chapters of this report. The following discussion describes the various criteria associated with traffic operations as they relate to the fire station site alternatives. The more favorable alternative for each criterion is also identified. The alternative comparisons are summarized on Exhibit 6. 1. Adjacent Traffic Volumes - The Saratoga Avenue east of Highway 9 currently carries about 10,650 vehicles per day. Highway 9 currently carries about 11,322 vehicles per day south of Saratoga Avenue. This is not a significant difference in traffic volumes. However, Saratoga Avenue would be the preferred access point based upon average daily traffic, which favors Scheme A. 2. Adjacent Travel Speeds - The adjacent travel speed along Saratoga Avenue near the Scheme A driveway is approximately 33 miles per hour. Highway 9 currently has prevailing speeds of about 37 miles per hour. This is not a significant difference in travel speed. However, this does favor the Saratoga Avenue (Scheme A) site. It should also be mentioned that traffic speeds immediately adjacent to the signalized Highway 9 / Saratoga Avenue intersection are slower than speeds at proximities further away from the intersection. The average travel speeds stated herein are based upon speeds during a green light. 3. Queue Lengths on Approaches to the Highway 9 / Saratoga Avenue Intersection - When emergency vehicles on an emergency call are required to wait for a queue of vehicles at a traffic signal to clear before they can proceed through an intersection, it has an impact on the emergency vehicles response time. The longer the queue, the greater the impact on the response time. The westbound Saratoga Avenue approach has a much less average in maximum queue length during the morning peak hour than the Highway 9 approach. However, it also has a lower average queue length during the PM peak hour. However, Saratoga Avenue has experienced a longer maximum queue during the evening peak hour than the maximum queue experienced on Highway 9 when the data collection was performed in late March, 2002. There is a significant advantage for the Saratoga Avenue site based upon the morning peak hour. The evening peak hour is virtually the same for the two approaches. This criteria favors the Saratoga Avenue site (Scheme A). 4. Queue on Near or Far Side of Station - The ability of an emergency vehicle to proceed around a queue of vehicles by traveling in the opposing travel lanes can significantly mitigate the impact of the queue on the vehicle response time. For vehicles exiting the station, the ability to exit on the far side of the queue is much A02 -041 Report-l.wpd • better than exiting where the queue is immediately adjacent to the curb along the fire station frontage. In this case, the westbound Saratoga Avenue is on the far side (i.e., north half) of Saratoga Avenue while the fire station is located on the south half of the street, adjacent to the eastbound travel lanes. The Highway 9 site is located on the east side of Highway 9 which is immediately adjacent to the long northbound Highway 9 queue created by the traffic signal at Saratoga Avenue. Scheme A - The Saratoga Avenue site is favored based on this criterion. 5. Added Response Time from Highway 9 / Saratoga Intersection - Although queue lengths are generally significantly longer in the peak hours on the northbound Highway 9 approach than the westbound Saratoga Avenue approach, these conditions only represent one to two hours out of the day. Observations of traffic indicate that queue lengths are significantly less during most day light hours and are almost nonexistent during nighttime hours. The overall effect on response time is probably only a few seconds. The computation included on Exhibit 5 assumes that a queued vehicle has an impact of two seconds on the response time of an emergency vehicle, with the exception of the first vehicle in the queue, which has an impact of three seconds. Scheme A is favored based on this factor. 6. Sight Distance Adequacy at Fire Station Driveway - The existing fire station has very severe sight distance restrictions. These are proposed to be remedied by the Scheme A site plan, which demolishes the existing building and constructs a new fire station with setbacks that meet the City's Zoning Ordinance on both the Highway 9 site yard frontage and along Saratoga Avenue. The setback from Saratoga Avenue to the fire station building will actually be much greater in order to provide a staging area for fire station trucks on a concrete apron. No sight distance constraint will exist for the Saratoga Avenue (Scheme A) site plan. There is currently a sight distance of about 400 feet to the south of the proposed driveway for the Scheme D fire station. Based on prevailing speeds of 40 miles per hour on northbound Highway 9, the sight distance requirement is 315 feet. This also accounts for the downhill gradient of the roadway as northbound traffic approaches the fire station. The sight distance will be adequate at this location as well. In addition, a traffic signal is likely to be installed at the Highway 9 / Oak Street intersection. Emergency vehicles would be able to exit the fire station with the protection of a standard traffic signal, which would make sight distance a minor issue. The proposed design of Scheme A will allow emergency vehicles to exit the fire station directly into the middle of the Highway 9 /Saratoga Avenue intersection and pre -empt the normal signal operation to stop all entering traffic with red signal indications. Sight distance will not be an issue with this proposed sight plan alternative and traffic signal pre - emption. Neither alternative is favored for this consideration. A02 -041 Report-l.wpd 7. Traffic Impact on Park Place Neighborhood - Both Scheme A and Scheme D propose to allow right turns and left turns into the fire station. The apron providing the driveway in front of the fire station is proposed to be large enough to accommodate vehicles to turn around and back into the fire station without encroaching on the travel lanes on either Saratoga Avenue or Highway 9. It is expected that both fire station locations would have a mitigating effect on fire station traffic impacts in the Oak Place and Park Place neighborhood. The existing fire station has minimal apron at Saratoga Avenue and fire equipment occasionally meanders through the neighborhood to make a right turn into the fire station to stage for backing into the apparatus bays. Neither alternative is favored using this criterion. 8. Conflicts With Pedestrian Traffic - Based upon field observations, . sporadic pedestrian traffic occurs along the existing fire station frontage along the south side of Saratoga Avenue east of Highway 9. By contrast, the Highway 9 /Oak Street intersection carried approximately 120 to 120 pedestrians during the six hours of manual counts including 7:00am to 9:00am and 2:00pm to 6:00pm. Many of these pedestrians were school age on their way to or from the Saratoga Elementary School located on Oak Street west of Highway 9. The potential for conflicts with pedestrian traffic is greater at the Scheme D site than the Scheme A site. This favors Scheme A. 9. Facilitate Solutions to Other Traffic Problems on Highway 9 - As mentioned under the Existing Traffic Conditions section of this report, a traffic signal is already warranted at the Highway 9 /Oak Street intersection. It is possible that a fire station exit as the east leg of this intersection would provide a much stronger case for installing a traffic signal. However, the data currently available indicates that a traffic signal can clearly be justified for this location. The traffic signal at the Highway 9 /Oak Street intersection also provides an opportunity to create a fourth leg at this intersection that would serve the parking area for Saratoga Federated Church as well as the public parking facilities for the Post Office and personnel parking for the fire station and sheriff's station. Both site plan alternatives provide the ability to add a public driveway to this intersection as well. The Scheme A site plan allows some flexibility by not co- mingling public traffic with fire station operations. Based on the increased likelihood of obtaining a signal at the Highway9 /Oak Street intersection, Scheme D is favored. 10. Facilitate Solutions to Other Traffic Problems on Saratoga Avenue - The currently proposed Scheme A site plan allows the inclusion of a westbound right turn lane on Saratoga Avenue. It also allows the conversion of the existing diagonal parking in front of the Post Office to parallel parking. The existing diagonal parking is highly undesirable along most public streets but especially along a moderate speed and moderate traffic volume arterial such as Saratoga Avenue. The diagonal parking operations will be exacerbated by the addition of the westbound right turn lane on Saratoga Avenue because the lanes will need to be re- striped further to the south to accommodate this additional travel lane along the north curb line. This will result in eastbound through traffic being immediately adjacent to the rear bumpers of the cars parked in the existing diagonal spaces. They must be eliminated as a part of the A02 -041 Report-Lwpd addition of the right turn lane. A total of two or three spaces can be accommodated with the Scheme A site plan. The Scheme A site plan also has some constraints regarding the ability to allow the existing bike lanes to remain along Saratoga Avenue. The Highway 9 (Scheme D) site will allow the implementation of the westbound Saratoga Avenue right turn lane and the provision of five parallel parking spaces along Saratoga Avenue to serve the Post Office. It also can probably be designed to accommodate standard bike lanes for eastbound and westbound Saratoga Avenue. The ability to implement traffic operational improvements along Saratoga Avenue favors the Scheme D site. 11. Facilitate Fourth Leg at Highway 9 /Oak Street - At the Highway 9 /Oak Street intersection to provide signalized access to and from public and Church parking areas as described in criterion 8, both project site plan alternatives can be designed to accommodate a driveway to serve public and Church parking areas. However, the co- mingling of public traffic and fire station operations is not desirable under Scheme D This favors Scheme A, the Saratoga Avenue site. Overall, the Scheme A (Saratoga Avenue site) is favored for six criteria. Scheme D, (the Highway 9 site) is favored in three criteria. Both alternatives are essentially equivalent based on three of the criteria. This would seem to favor the Saratoga Avenue site. However, the differences between adjacent traffic volumes and travel speeds are fairly inconsequential, especially with traffic signalization at the Highway 9 /Oak Street intersection. Neither alternative has overwhelming advantages with regard to traffic operations over the other alternative. Also, both sites can be designed to satisfactorily and safely accommodate traffic operations. The consideration of a variety of other criteria that are not related to traffic will need to be considered in making a determination of the appropriate site plan to implement. IV. TEMPORARY FIRE STATION TRAFFIC OPERATIONS If Scheme A is implemented, it will require the demolition of the existing fire station and the reconstruction of a new fire station essentially on the existing fire station site. During construction, the fire station will need to be moved to a temporary location. This has been identified as the existing Contempo building which is near where the Scheme D fire station would be located. Several emergency response routes could be implemented for the temporary fire station at the Contempo building. These were evaluated in the Proposed Replacement of Saratoga Fire Station - Traffic Assessment of Temporary Operations and Alternate Access on SR -9, Fehr & Peers Associates, Inc., August 10, 2001, and Saratoga Fire Station Replacement - Traffic Assessment - A Proposed Temporary Circulation Plan, Fehr & Peers Associates, Inc., August 29, 2001. The temporary circulation recommended by Fehr & Peers is to access the Contempo temporary fire station via Highway 9 and to exit . onto Saratoga Avenue at the existing one -way driveway east of and adjacent to the post office. This is also the recommended temporary circulation alternative based upon on this A02 -041 Report-Lwpd current traffic assessment. The August 29, 2001 report suggests some mitigations to reduce the potential conflicts between emergency response vehicles and pedestrians where the existing sidewalk in front of the post office intersects the one -way exit driveway to be used by fire vehicles during an emergency response. This is illustrated on Exhibit 7. A new sidewalk is recommended that would extend perpendicular to the existing sidewalk in front of the post office to provide a relocated cross walk further away from the corner of the post office building, which currently limits visibility between eastbound pedestrians and exiting vehicles. A hand rail would be constructed across the pedestrian approach to the driveway on the post office side of the driveway and a convext mirror installed to provide better visibility between pedestrians and exiting vehicles. An alternative mitigation strategy developed in the August 29, 2001 report is to install an extinguishable, internally illuminated "car coming" sign that would flash as a vehicle approached on the exit. It would be activated by vehicle detection similar to what is provided at a traffic signal. Rather than this being an alternative measure, it is recommended that it be installed in addition to the measures depicted on Exhibit 7. This will provide additional measure to minimize pedestrian and exiting vehicle conflicts. V. RECOMMENDATIONS The following recommendations are based upon the preceding analysis. 1. The Highway 9 / Saratoga Avenue intersection should have the following is improvements implemented to improve existing traffic conditions and to mitigate future. a. Modify the existing traffic signal from the existing eastbound and westbound split - phasing to protected left turn phasing on the eastbound and westbound approaches. The traffic signal modification should be the responsibility of Caltrans. b. Install a northbound Highway 9 right turn lane. C. Install a westbound Saratoga Avenue right turn lane. d. Install a southbound Saratoga - Sunnyvale Road right turn lane. The northbound right turn lane and westbound right turn lane should be implemented as a part of the fire station project, whether Scheme A or Scheme D or any other scheme is implemented. The southbound right turn lane should be implemented by the City of Saratoga as the City continues to develop in the future. 2. Install a traffic signal at the, Highway 9 / Oak Street intersection. This is required for existing traffic conditions. The neighborhood has indicated that it would be desirable to have a raised median on the south leg of this intersection that would be extended south of the Oak Place intersection to restrict the Oak Place intersection to right turns in and out only. This design component will also need to be approved by Caltrans. The traffic signal will need to be approved by Caltrans and will require the preparation of detailed traffic signal warrant analysis and an evaluation of the A02 -041 Report-Lwpd resulting traffic operations assuming a signal at Oak Street as well as the existing signal at Saratoga Avenue. 3. The Scheme A site should have emergency vehicle preemption installed at the Highway 9 / Saratoga Avenue intersection that would stop all four legs of the intersection, thus allowing emergency vehicles to enter directly into the intersection, essentially as a fifth leg. The same type of configuration and traffic signal operation should be provided at the future Highway 9 / Oak Street intersection if the Scheme D fire station is implemented. 4. The existing diagonal parking in front of the post office should be modified to parallel parking at the time of implementation of a westbound right turn lane on Saratoga Avenue at Highway 9. 5. The temporary station that would utilize the existing Contempo building if Scheme A is implemented, should include vehicles entering via Highway 9 and exiting on to Saratoga Avenue in the one -way driveway east of the post office. The measure is depicted on Exhibit 7 in addition to an extinguishable message sign activated by vehicle detection on the exit to warn pedestrians of approaching vehicles should be installed to minimize conflicts between exiting vehicles and pedestrians in front of the post office. 0 VI. CONCLUSION — • Both Scheme A and Scheme D can be designed to adequately and safely accommodate vehicular traffic and emergency vehicle traffic operations. Scheme A has certain advantages including being located on the lower volume, low -speed street roadway and being able to have reduced emergency vehicle response times. It also has less pedestrians in the proximity of the fire station driveway and facilitates the provision of a fourth leg at the Highway 9 / Oak Street intersection that would serve as a major access and egress point for the Saratoga Federated Church and the other public parking areas in the vicinity of the fire station. On the other hand, Scheme D may provide a stronger reason to signalize the Highway 9 / Oak Street intersection which would be helpful in negotiating with Caltrans. It also provides the ability to widen Saratoga Avenue to accommodate five parallel parking spaces along its south curb line, thus fully replacing the existing five diagonal parking spaces in front of the post office. It will also be easier to retain the existing bike lanes on the east leg of Saratoga Avenue. Neither alternative has such distinct advantages over the other alternative with regarding to traffic operations to be able to identify a preferred alternative. Other non - traffic operations considerations will need to be considered in identifying the best project alternative. A02 -041 Report-Lwpd E-1 • LIST OF EXHIBITS - EXHIBIT NO. DESCRIPTION 1. PROJECT LOCATION MAP 2. AERIAL PHOTO OF EXISTING SITE CONDITIONS 3. SCHEME A SITE PLAN 4. SCHEME D SITE PLAN 5. LEVEL OF SERVICE SUMMARY 6. SARATOGA PUBLIC SAFETY CENTER ALTERNATIVE COMPARISON SUMMARY TABLE 7. TEMPORARY FIRE STATION SARATOGA AVENUE EXIT IMPROVEMENTS A02 -041 Report-l.wpd 9" SEAGULL DR. AV. ST. Jaw KRUSLER GORDON KILUADOR AV. Am VERDE IA I.3ARA7061J It. Cox W. cT *U NTRY CLLS: T D CHATEAU cl. ONO -LTEW VIA n7• pq FELLA VINA g i AVG C7. 9 'Im tuimm "W g o4k� DR. Fs LLA LN FRANKLIN AV dt A' • WAN, ELVDIUM vr 6AMTOW m HA OLD VERDE I VISTA LN ep-1 - GP y d INCIALE I MAGNOLLACT, WALCON AV. f ER is I *lNA'rCT CT !S PRUN -s mi. .PROJECT AV G'/ DR, 7 RW 0A. WEST VALLEY COLLEGE . DR. as ULU mum" CANYON A § X HTS' Ly v IF Ali SAil MARCOS RD. 9"K '"R4 dso oo 9 jWNDY �aaF 4y te t2 VERSAILLES AWE K AV. 2 C. GL BIG rµwE ? � I � I Yn � sp, AIDENS cl Ul. NO DAME - i -- DR. DR. NO' MK DR. 61 ROBINVVY. LARK OR. RD. A -OR t 00-M! SUN Vv BE Tlm� T: / - WY.' R. D R. ON *4 MOWALVO AMORi7f - - - - - - - - - - L EXHIBIT I PROJECT LOCATION MAP GINS ASSOCIATES # irk 17 ki POST -� --� FIRE - _ OFFICE STATION Al Ap : X ' a' 1YuLr m • s y 4 t x r ,Wu ,+ yyyo- '4rn CONTEMPO' _ SARATOGA FEDERATED CHURCH NS ASSOCIATES a'4- loz � �• '°sue � o� ai _T PC7 ; \ I VE lb • Saratoga-Los Gatos/HWY 9 Source: EXHIBIT 3 ATI Architects and Engineers, SCHEME A April 11, 2002 SITE PLAN • �r Sc • e Source: ATI Architects and Engineers, April 11, 2002 J c Oak 1 Saratoga -Los Gatos/HWY 9 EXHIBIT 4 SCHEME D SITE PLAN v. a Ap U) (n O n d rr O H K • • • Notes: 1. L, T, R = Left, Through, Right. Existing 2. NB, SB, EB, WB = Northbound, Southbound, Eastbound, Westbound. Existing Existing Conditions Operational Lene Intersection N -S E -W Configuration Control AM Peak Hr PM Peak Hr Street Street Option 1: Add NB and WB Right Turn Lanes. Change East -West Signal Phasing from Split Phase to Protected. r Delay LOS Delay LOS Option 3: Option 2 plus new EB Right Turn Lane. (sec) V/C (sec) V/C 1 Saratoga -Los Gatos Big Basin Way NB'1 -L, 1 -T, 1 -T /R Signal 25.6 D 27.0 D Road (SR 9) - (SR9) - SB 1 -L, 1 -T, 1 -T /R 0.604 0.650 Saratoga - Sunnyvale Saratoga EB 1 -L, 1 -T, 1 -R C) Road Avenue WB 1 -L, 1 -T /R Improvement Option 1 23.5 C 24.2 C 0.536 0.569 Improvement Option 2 23.3 C 23.5 C 0.496 0.501 Improvement Option 3 22.8 C 23.1 C 0.496 0.501 • Notes: 1. L, T, R = Left, Through, Right. 2. NB, SB, EB, WB = Northbound, Southbound, Eastbound, Westbound. 3. Analysis uses the Santa Clara County Congestion l6nagement Program (CMP) intersection analysis methodologies, Including the 1985 Highway Capacity Manual. 4. Existing eastbound triangular island modeled as free right turn in analysis. 5. Improvement Options are as follows: 9 Option 1: Add NB and WB Right Turn Lanes. Change East -West Signal Phasing from Split Phase to Protected. r Option 2: Option 1 plus SB Right Turn Lane Option 3: Option 2 plus new EB Right Turn Lane. 6. Right turn lane improvements analyzed with right turn overlap phasing, in order to model right turns on red. C) M A01 -041 LOS.>ds - LOS • 5. ADDED RESPONSE TIME FROM HWY 9 /SARATOGA INTERSECTION DELAY (SECONDS) ADDED OVERALL RESPONSE TIME (SECONDS) 6. SIGHT DISTANCE ADEQUACY - FIRE STATION DRIVEWAY 7. IMPACT ON PARK PLACE NEIGHBORHOOD 8. PEDESTRIAN CONFLICTS AT DRIVEWAY 9. FACILITATES SOLUTIONS TO OTHER TRAFFIC PROBLEMS ON HIGHWAY 9 10. FACILITATES SOLUTIONS TO OTHER TRAFFIC PROBLEMS ON SARATOGA AVE. 11. FACILITATES FOURTH LEG AT HWY 9 /OAK TO PROVIDE SIGNALIZED ACCESS TO AND FROM PUBLIC AND CHURCH PARKING AREAS Higgins Associates 1.0 7.4 A - Saratoga Avenue 0.6 MOST RESTRICTED APPROACH APPROACH SPEED (MPH) SIGHT DISTANCE PROVIDED (FT) SIGHT DISTANCE REQUIRED (FT; SIGHT DISTANCE ADEQUATE? REMEDIAL MEASURE NB Hwy 9 Right 15 50 80 No Fire Personnel to Control Traffic Potential for Fire Trucks to use Park Place to allow a right turn Into the station if a design that does not allow WB Saratoga Left Turns is used. Sporadic pedestrian traffic 1. Signal appears to be warranted w/o Fire Station at Oak St. None Apparent Allows conversion of epsting perpendicular spaces at Post Office to 3 parallel spaces. 1. Driveway can be provided adjacent to e)asbng Contempo building. 1 04/11/2002 6.0 MOST RESTRICTED APPROACH NB Hwy 9 APPROACH SPEED (MPH) 40 SIGHT DISTANCE PROVIDED (FT) 400 SIGHT DISTANCE REQUIRED (FT; EXHIBIT 6 - SARATOGA PUBLIC SAFETY CENTER SIGHT DISTANCE ADEQUATE? Yes REMEDIAL MEASURE ALTERNATIVE COMPARISON SUMMARY TABLE PREFERRED CRITERIA SCHEME A - SARATOGA AVENUE SCHEME D - HIGHWAY 9 ALTERNATIVE 1. ADJACENT TRAFFIC VOLUMES - ADT 10,650 11,322 A - Saratoga Avenue 2. ADJACENT TRAVEL SPEEDS -MPH EB 34 NB 40 (BASED ON 85th PERCENTILE) WB 32 SB 33 AVE 33 AVE 36.5 A - Saratoga Avenue 3. QUEUE LENGTHS ON APPROACH AM AVE 1.5 AM AVE 5.6 TO HWY9 /SARATOGA AVE (VEHICLES) AM MAX 16 AM MAX 29 A - Saratoga Avenue PM AVE 1.9 PM AVE 3 PM MAX 12 PM MAX 8 4. QUEUE ON NEAR OR FAR SIDE OF STATION FAR SIDE - ALLOWS DIRECT ACCESS TO NEAR SIDE - ALLOWS DIRECT ACCESS TO Both Alternatives Equal HIGHWAY 9 /SARATOGA AVE. INTERSECTION SIGNALIZED HIGHWAY 9 /OAK ST. INTERSECTION 5. ADDED RESPONSE TIME FROM HWY 9 /SARATOGA INTERSECTION DELAY (SECONDS) ADDED OVERALL RESPONSE TIME (SECONDS) 6. SIGHT DISTANCE ADEQUACY - FIRE STATION DRIVEWAY 7. IMPACT ON PARK PLACE NEIGHBORHOOD 8. PEDESTRIAN CONFLICTS AT DRIVEWAY 9. FACILITATES SOLUTIONS TO OTHER TRAFFIC PROBLEMS ON HIGHWAY 9 10. FACILITATES SOLUTIONS TO OTHER TRAFFIC PROBLEMS ON SARATOGA AVE. 11. FACILITATES FOURTH LEG AT HWY 9 /OAK TO PROVIDE SIGNALIZED ACCESS TO AND FROM PUBLIC AND CHURCH PARKING AREAS Higgins Associates 1.0 7.4 A - Saratoga Avenue 0.6 MOST RESTRICTED APPROACH APPROACH SPEED (MPH) SIGHT DISTANCE PROVIDED (FT) SIGHT DISTANCE REQUIRED (FT; SIGHT DISTANCE ADEQUATE? REMEDIAL MEASURE NB Hwy 9 Right 15 50 80 No Fire Personnel to Control Traffic Potential for Fire Trucks to use Park Place to allow a right turn Into the station if a design that does not allow WB Saratoga Left Turns is used. Sporadic pedestrian traffic 1. Signal appears to be warranted w/o Fire Station at Oak St. None Apparent Allows conversion of epsting perpendicular spaces at Post Office to 3 parallel spaces. 1. Driveway can be provided adjacent to e)asbng Contempo building. 1 04/11/2002 6.0 MOST RESTRICTED APPROACH NB Hwy 9 APPROACH SPEED (MPH) 40 SIGHT DISTANCE PROVIDED (FT) 400 SIGHT DISTANCE REQUIRED (FT; 315 SIGHT DISTANCE ADEQUATE? Yes REMEDIAL MEASURE None Required Potential for Fire Trucks to use Park Place to allow a right turn Into the station if a pull through design is not used. r 130 pedestrians in 6 hours, many elementary students 1. May provide stronger reason to signalize Hwy 9/ Oak Street. This would improve pedestrian and vehicular access and egress for Saratoga Elementary 2. Signal appears to be warranted w/o Fire Station at Oak St. Eliminates Fire Station driveway along Saratoga Ave. 1. This will allow conversion of e)dsting perpendicular spaces at Post Office to 5 parallel spaces 1. Driveway can be provided adjacent to proposed Fire Station building. However, the oomingling of public traffic and fire station operations is not desirable. D - Highway 9 Both Alternatives Equal A - Saratoga Avenue D - Highway 9 D - Highway 9 A - Saratoga Avenue a02- 041 /summary2.)ds Saratoga Fire Station Building Rep acement ,,. Traffic Study ` Driveway Driveway Red Cure White Curb Green Curb 15 min. DriV . Ian nbyEdo P Cr. CD oo' i o bCD 10 CD o 0 - -j C4 Saratoga Avenue o y � fD C' 9 0 COD o CD o nd curb New c y sswalk n MM Edge of Pavement! Green Curb (15 min.) JL Fence or planters® � N Post Office ` N . scale: V = 20' ' Cri X77 00te: Plan is conceptual only and is not a design drawing- 0 n` y Exhibit' C PROPOSED DRIVEWAY MODIFICATIONS Z y 9 it &Peers. Associates, Inc. PC. 4 LIST OF APPENDICES APPENDIX NO. TITLE A. PEAK HOUR VOLUMES B. LEVEL OF SERVICE CALCULATIONS C. RAW PEAK HOUR TRAFFIC COUNTS D. RAW 24 -HOUR COUNTS AND SPEED DATA E. RAW RADAR SPEED SURVEY DATA F. SARATOGA PUBLIC SAFETY CENTER ALTERNATIVE COMPARISON G. HIGHWAY 9 / OAK STREET SIGNAL WARRANTS (PRELIMINARY) A02 -041 Report -l.wpd APPENDIX A - PEAK HOUR VOLUMES • • } CIO �K ,41,3,11L a; ��� fir— �l��`✓ J �`�° �� -a j Y 4 • • I ] APPENDIX B LEVEL OF SERVICE CALCULATIONS 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY ---------AM- Existing- - - - - -- Thu - Apr - -------------------------------------------------------------------------------- 11,2002- 09_16_04----------- - - - - -- Page- 1_1 - -- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap: (X): 0.604 Loss Time (sec): 12 (Y +R 4 sec) Average Delay (sec /veh): 25.8 Optimal Cycle: 50 Level of Service: D+ ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement : L - T - R L - T - R L - T - - R - - - -H L - ---------- T - R - - - - -I ------------ Control: I--------------- Protected II--------------- Protected 11=--------- Split Phase Split Phase Rights: Include Include Ignore, Include Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 1 1 0 1 0 1 1 0 II--------------- 1 0 1 0 1 II---------- 1 0 0 1 0 - - - - - I ------------ I --------------- Volume Module: AM Peak Hour II--------------- Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 570 196 60 410 140 200 220 100 95 213 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 130 620 213 65 446 152 217 239 0 103 232 48 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 130 620 213 65 446 152 217 239 0 103 232 48 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 130 620 213 65 446 152 II--------------- 217 239 0 II---------- 103 232 48 - - - - - I ------------ I--------------- Saturation Flow Module: II--------------- Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.04 1.00 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.00 1.00 Lanes: 1.00 1.47 0.53 1.00 1.48 0.52 1.00 1.00 1.00 1.00 0.83 0.17 Final Sat.: 1750 2753 946 1750 2757 942 II--------------- 1750 1900 1750 11---------- 1750 1492 308 - - - - -I ------------ I--------------- Capacity Analysis Module: II--------------- Vol /Sat: 0.07 0.23 0.23 0.04 0.16 0.16 0.12 0.13 0.00 0.06 0.16 0.16 Crit Moves * * ** * * ** * * ** * * ** Green Time: 16.5 44.7 44.7 7.4 35.7 35.7 25.0 25.0 0.0 30.8 30.8 30.8 Volume /Cap: 0.54 0.60 0.60 0.60 0.54 0.54 0.60 0.60 0.00 0.23 0.60 0.60 Delay /Veh: 38.6 23.7 23.7 48.0 27.3 27.3 34.5 34.6 0.0 26.8 31.4 31.4 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 38.6 20.1 20.1 48.0 23.2 23.2 34.5 29.4 0.0 26.8 26.7 26.7 DesignQueue: 8 28 9 4 22 7 12 13 0 5 12 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - - -PM- Existing - - - - -- -Thu Apr-11,- 2002 - 09_16_23 ----------- - - - - -- Page - - -- - -- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.650 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 27.0 Optimal Cycle: 55 Level Of Service: D+ ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - - - I ------------ Control: I--------------- Protected II --------------- II--------------- Protected Split Phase II---------- Split Phase--..... - Rights: Include Include Ignore Include Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: =---- 1 0 1 1 0 1 0 1 1 0 1 0 1 0 1 ---- II---------- 1 0 0 1 0 - - -- -1 ------- I--------------- Volume Module: PM Peak Hour II--------------- II----------- Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 235 76 82 588 206 145 218 103 124 276 57 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 105 240 78 84 600 210 148 222 0 127 282 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol,: 105 240 78 84 600 210 148 222 0 127 282 58 PCE Adj: MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 105 240 78 84 600 210 148 222 0 127 282 58 - - - - - I ------------ Saturation Flow I--------------- Module: II--------------- II--------------- II---------- Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1-800 Adjustment: 0.97 1.04 1.00 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.00 1.00 Lanes: 1.00 1.50 0.50 1.00 1.47 0.53 1.00 1.00 1.00 1.00 0.83 0.17 Final Sat.: 1750 2795 904 1750 2739 960 1750 1900 1750 1750 1492 308 - - - - - ------------ Capacity Analysis I --------------- Module: II--------------- II--------------- II---------- I Vol /Sat: 0.06 0.09 0.09 0.05 0.22 0.22 0.08 0.12 0.00 0.07 0.19 0.19 Crit Moves: * * * *. * * ** - * * ** * * ** Green Time: 11.1 44.5 44.5 7.0 40.4 40.4 21.6 21.6 0.0 34.9.34.9 34.9 Volume /Cap: 0.65 0.23 0.23 0.82 0.65 0.65 0.47 0.65 0.00 0.25 0.65 0.65 Delay /Veh: 46.0 19.7 19.7 68.1 26.5 26.5 34.3 37.7 0.0 24.8 30.3 30.3 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00' 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 46.0 16.8 16.8 68.1 22.5 22.5 34.3 32.1 0.0 24.8 25.8 25.8 DesignQueue: 6 10 3 5 28 10 8 13 0 6 14 3 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM Ex + Optionl Thu Apr 11, 2002 09:16:42 --------------- Page- 1 -1 - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin Cycle (sec): 120 Critical Vol. /Cap. (X): 0.536 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): '23.5 Optimal Cycle: 46 Level Of Service: C- Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - - - ------------ Control: I--------------- II--------------- Protected Protected II--------------- Protected II---------- Protected I Rights: Ovl Include Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 1 0 1 1 0 1 0 1 - - - - - I ------------ Volume Module: I--------------- AM II--------------- Peak Hour II--------------- II---------- Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 570 196 60 410 140 200 220 100 95 213 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 130 620 213 65 446 152 217 239 0 103 232 48 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 130 620 213 65 446 152 217 239 0 103 232 48 PCE Adj: MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 130 620 213 65 446 152 217 239 0 103 232 48 - - - - - ------------ Saturation Flow I--------------- Module: II--------------- II--------------- II---------- I Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 1.48 0.52 1.00 1.00 1.00 1.00 1.00 1.00-- - Final Sat.: 1750 3800 1750 1750 2757 942 1750 1900 1750 1750 1900 1750 - - - - - ------------ Capacity Analysis I --------------- II--------------- Module: II--------------- II---------- I Vol /Sat: 0.07 0.16 0.12 0.04 0.16 0.16 0.12 0.13 0.00 0.06 0.12 .0.03 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 16.7 45.9 63.5 7.0 36.2 36.2 27.8 37.5 0.0 17.6.27.3 34.3 Volume /Cap: 0.54 0.43 0.23 0.64 0.54 0.54 0.54 0.40 0.00 0.40 0.54 0.10 Delay /Veh: 38.3 20.9 11.5 50.4 26.9 26.9 31.8 24.9 0.0 35.9 32.0 23.9 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.8'5- 0.85 Adj Del /Veh: 38.3 17.8 9.8 50.4 22.9 22.9 31.8 21.2 0.0 35.9 27.2 20.3 DesignQueue: 8 27 7 4 22 7 11 11 0 6 12 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM Ex + Optionl Thu Apr 11, 2002 09:17:05 ------------- Page- 1 -1 - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.569 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 24.2 Optimal Cycle: 47 Level Of Service: C- Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ Control: I --------------- Protected II--------------- Protected II --------------- Protected II ---------- Protected - - - - - I Rights: Ovl Include Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 1 0 1 1 0 1 0 1 ------------ Volume Module: I --------------- PM Peak Hour II--------------- II--------------- II---------- - - - - - I Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 235 76 82 588 206 145 218 103 124 276 57 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0_.98 0.98 PHF Volume: 105 240 78 84 600 210 148 222 0 127 282 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 240 78 84 600 210 148 222 0 127 282 58 PCE Adj: MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 105 240 78 84 600 210 148 222 0 127 282 58 ------------ Saturation Flow I--------------- Module: II--------------- II--------------- II---------- - - - - - I Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 1.47 0.53 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 2739 960 1750 1900 1750 1750 1900 1750 - ------------ Capacity Analysis I--------------- Module: II--------------- II--------------- 11---------- - - - -I Vol /Sat: 0.06 0.06 0.04 0.05 0.22 0.22 0.08 0.12 0.00 0.07 0.15 0.03 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 12.7 34.6 53.4 24.2 46.2 46.2 17.8 30.4 0.0 18.8 31.3 55.5 Volume /Cap: 0.57 0.22 0.10 0.24 0.57 0.57 0.57 0.46 0.00 0.46 0.57 0.07 Delay /Veh: 41.8 24.6 14.7 30.6 22.5 22.5 38.3 29.3 0.0 35.9 30.4 13.6 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 41.8 20.9 12.5 30.6 19.1 19.1 38.3 24.9 0.0 35.9 25.9 11.6 DesignQueue: 6 12 3 5 26 9 9 11 0 7 14 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM Ex + Option2 Thu Apr 11, 2002 09:17:31 Page 1 -1 Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X):. _ 0.496 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 23.3 Optimal Cycle: 46 Level Of Service: C- Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 ------------ I - - - - - -- _------- II--------------- II--------------- II---------- - - - - -I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 570 196 60 410 140 200 220 100 95 213 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 130 620 213 65 446 152 217 239 0 103 232 48 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 130 620 213 65 446 152 217 -239 0 103 232 48 PCE Adj: 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 Final Vol.: 130 620 213 ------------I--------------- Saturation Flow Module: Sat /Lane: 1800 1800 1800 Adjustment: 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 Final Sat.: 1750 3800 1750 ------------I--------------- Capacity Analysis Module: Vol /Sat: 0.07 0.16 0.12 Crit Moves: * * ** Green Time: 18.8 39.4 58.5 Volume /Cap: 0.47 0.50 0.25 Delay /Veh: 36.0 24.8 13.7 Delay Adj: 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 Adj Del /Veh: 36.0 21.1 11.6 DesignQueue: 7 29 8 * * * * * * * * * * * * * * * * * * * * * * * * * * ** 1.00 1.00 65 1800 0.97 1..00 1750 0.04 * *1 * 9.0 0.50 42.9 1.00 1.00 42.9 4 k * * * ** 1.00 1.00 446 1800 1.06 2.00 3800 0.12 29.6 0.47 29.6 1.00 0.85 25.2 23 k * * ** 1.00 1.00 1.00 1.00 152 217 ------ 11 - - -- 1800 1800 0.97 0.97 1.00 1.00 1750 1750 ------ 11 ---- 0.09 0.12 * * ** 59.7 30.1 0.17 0.50 12.6 30.0 1.00 1.00 0.85 1.00 10.7 30.0 5 11 1.00 1.00 239 1800 1.06 1.00 1900 0:13 40.5 0.37 23.1 1.00 0.85 19.6 11 k * * ** 0.00 0.00 0 1800 0.97 1.00 1750 0.00 0.0 0.00 0.0 1.00 0.85 0:0 0 1.00 1.00 1.00 1.00 1.00 1.00 - 103 232 48 11---------- - - - - -I 1800 1800 1800 0.97 1.06 0.97 1.00 1.00 1.00 1750 1900 1750 II---------- - - - - -I 0.06 0.12 0.03 * * ** 19.0 29.5 38.5 0.37 0.50 0.09 34.7 30.3 21.6 1.00 1.00 1.00 1.00 0.85 0.85 34.7 25.7 18.4 6 12 2 k * * * * * * * * * * * * * * * *-A 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY 40 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM Ex + Option2 Thu Apr 11, 2002 09:18:01 -------- Page- 1 -1 - -- -------------------------------------------------------------------------------- - Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin Cycle (sec): 120 Critical Vol. /Cap. (X): 0.501 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 23.5 Optimal Cycle: 46 Level Of Service: C- Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - - - I ------------ Control: I--------------- Protected II --------------- Protected II--------------- Protected II---------- Protected Rights: Ovl Ovl Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 Ii---------- 1 0 1 0 1 - - - - - I ------------ Volume Module: I--------------- PM Peak Hour II--------------- II--------------- Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 235 76 82 588 206 145 218 103 124 276 57 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 105 240 78 84 600 210 148 222 0 127 282 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 105 240 78 84 600 210 148 222 0 127 282 58 PCE Adj: MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 105 240 78 84 600 210 148 222 0 127 282. 58 - - - - - ------------ Saturation Flow --------------- Module: II--------------- II--------------- II---------- I Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 - - - - - ------------ Capacity Analysis I --------------- Module: II--------------- II--------------- II---------- I Vol /Sat: 0.06 0.06 0.04 0.05 0.16 0.12 0.08 0.12 0.00 0.07 0.15 0.03 Crit Moves: Green Time: 14.4 30.7 52.0 21.5 37.8 58.1 20.3 34.5 0.0 21.3 35.5 57.0 Volume /Cap: 0.50 0.25 0.10 0.27 0.50 0.25 0.50 0.41 0.00 0.41 0.50 0.07 Delay /Veh: 39.2 27.0 15.3 32.4 25.7 13.8 35.6 26.5 0.0 33.8 27.1 13.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 39.2 22.9 13.0 32.4 21.8 11.8 35.6 22.5 0.0 33.8 23.1 11.0 DesignQueue: 6 12 3 5 29 7 8 11 0 7 14 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 40 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8--- AM- Ex- +- Option3 -- -Thu Apr -11.,- 2002 - 09_2 006 ------------ - - - -- Page - - -- - -- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin Cycle (sec): 120 Critical Vol. /Cap. (X): 0.496 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 22.8 Optimal Cycle: 46 Level Of Service: C ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - --------------- T - R II---------- L - T - - R - - - - I ------------ Control: I --------------- Protected II--------------- Protected II Protected Protected Rights: Ovl Ovl Ovl Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 II--------------- 1 0 2 0 1 II-- 1 0 ------------- 1 0 1 II 1 0 ---------- 1 0 - 1 - - - - I ------------ Volume Module: I --------------- AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 120 570 196 60 410 140 200 220 100 95 213 44 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 PHF Volume: 130 620 213 65 446 152 217 239 109 103 232 48 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 130 620 213 65 446 152 217 239 109 103 232 48 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 130 620 213 65 446 152 11--------------- 217 239 109 II---------- 103 232 - 48 - - - -I ------------ I--------------- 11--------------- Saturation Flow Module: Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 II--------------- 1750 1900 1750 II--------------- 1750 1900 1750 I --------- -.-- Capacity Analysis 1 --------------- II--------------- Module: Vol /Sat: 0.07 0.16 0.12 0.04 0.12 0.09 0.12 0.13 0.06 0.06 0.12 0.03 Crit Moves:* * ** * * ** * * ** * * ** Green Time: 18.8 39.4 58.5 9.0 29.6 59.7 30.1 40.5 59.4 19.0 29.5 38.5 Volume /Cap: 0.47 0.50 0.25 0.50 0.47 0.17 0.50 0.37 0.13 0.37 0.50 0.09 Delay /Veh: 36.0 24.6 13.7 42.9 29.6 12.6 30.0 23.1 12.4 34.7 30.3 21.6 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 AdjDel /Veh: 36.0 21.1 11.6 42.9 25.2 10.7 30.0 19.6 10.6 34.7 25.7 18.4 DesignQueue: 7 29 8 4 23 5 11 11 4 6 12 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC.., GILROY MITIG8 - PM Ex + Option3 Thu Apr 11, 2002 09:20:22----------- - - - - -- Page- 1_1 - -- -------------------------------------------------------------------------- Level Of Service Computation Report - - - - -- 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.501 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 23.1 Optimal Cycle: 46 Level Of Service: C- Approach: North Bound -- South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - - - I ------------ Control: I --------------- Protected II--------------- Protected II--------------- Protected II---------- Protected - -- -- Rights: Ovl Ovl Ovl Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 It-------- 1 0 1 ------ 0 1 II---------- 1 0 1 0 1 - - - - - I ------------ I --------------- Volume Module: PM II--------------- Peak Hour - Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 103 235 76 82 588 206 145 218 103 124 276 57 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 PHF Volume: 105 240 78 84 600 210 148 222 105 127 282 58 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol': 105 240 78 84 600 210 148 222 105 127 282 58 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 105 240 78 84 600 210 148 222 105 II---------- 127 282 58 - - - - - I ------------ Saturation Flow I--------------- Module: II--------------- II--------------- Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 II---------- 1750 1900 1750 - - - - - I ------------ Capacity Analysis I --=------------ Module: II--------------- II--------------- Vol /Sat: 0.06 0.06 0.04 0.05 0.16 0.12 0.08 0.12 0.06 0.07 0.15 0.03 Crit Moves: * * ** Green Time: 14.4 30.7 52.0 21.5 37.8 56.1 20.3 34.5 48.9 21.3.35.5 57.0 Volume /Cap: 0.50 0.25 0.10 0.27 0.50 0.25 0.50 0.41 0.15 0.41 0.50 0.07 Delay /Veh: 39.2 27.0 15.3 32.4 25.7 13.8 35.6 26.5 17.1 33.8 27.1 13.0 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 39.2 22.9 13.0 32.4 21.8 11.8 35.6 22.5 14.5 33.8 23.1 11.0 DesignQueue: 6 12 3 5 29 7 8 11 4 7 14 2 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC.., GILROY 0 Traffix 7.5.1115-(c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY -MITIG8 --- -- - AM- 2025----- -------------------------------------------------------------------------------- - - - - -- Thu - Apr -11,- 2002 - 09_22- - ----------- - - - - -- - Page 1 -1 Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec):* 120 Critical Vol. /Cap. (X): 1.026 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): Optimal Cycle: 180 Level Of Service: E Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R 11---------- L - T - R - - - - -I ------------ Control: I--------------- Protected II--------------- II--------------- Protected Split Phase Split Phase Rights: Include Include Ignore Include Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 1 1 0 II--------------- 1 0 1 1 0 11--------------- 1 0 1 0 1 II---------- 1 0 0 1 0 - - - - -I ------------ I--------------- Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 204 969 333 102 697 238 340 374 170 162 362 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 222 1053 362 111 758 259 370 407 0 176 394 81 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 222 1053 362 111 758 259 370 407 0 176 394 81 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 222 1053 362 111 758 259 II--------------- 370 407 0 II---------- 176 394 81 - - - - - I ------------ Saturation Flow I --------------- Module: II--------------- Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.04 1.00 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.00 1.00 Lanes: 1.00 1.47 0.53 1.00 1.48 0.52 1.00 1.00 1.00 1.00 0.83 0.17__ Final Sat.: 1750 2753 946 1750 2757 942 11--------------- 1750 1900 1750 II---------- 1750 1492 308 - - - - -I ------------ Capacity Analysis I--------------- Module: II--------------- Vol /Sat: 0.13 0.38 0.38 0.06 0.27 0.27 0.21 0.21 0.00 0.10 0.26 0.26 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 16.5 44.7 44.7 7.4 35.7 35.7 25.0 25.0 0.0 30.830.8 30.8 Volume /Cap: 0.92 1.03 1.03 1.03 0.92 0.92 1.01 1.03 0.00 0.39 1.03 1.03 Delay /Veh: 66.0 54.3 54.3 118.9 40.3 40.3 76.0 78.6 0.0 28.3 73.7 73.7 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.8-5- 0.85 Adj Del /Veh: 66.0 46.2 46.2 118.9 34.2 34.2 76.0 66.8 0.0 28.3 62.6 62.6 DesignQueue: 13 49 17 7 38 13 21 23 0 9 21 4 0 Traffix 7.5.1115-(c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY 0 -MITIG8 --- -- - PM 2025----- - - - - -- Thu -Apr 11, 2002 09 :23:12----------- - - - - -- Page -1 -1 ------- - - - - -- ------------- - - - - -- - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin **********************#************************** * * * * * * * * * * * * * * * * * * * * * # * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 1.105 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 67.8 Optimal Cycle: 180 Level Of Service: F ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I--------------- II--------------- II--------------- il---------- - - - - - I Control: Protected Protected Split Phase Split Phase Rights: Include Include Ignore Include Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 1 1 0 1 0 1 1 0 1 0 1 0 1 1 0 0 1 0 ------------ I--------------- il--------------- II--------------- II---------- - - - - - I Volume Module: PM Peak Hour Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 175 400 129 139 1000 350 247 371 175 211 469 97 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0_.98 0.98 PHF Volume: 179 408 132 142 1020 357 252 378 0 215 479 99 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 179 408 132 142 1020 357 252 378 0 215 479 99 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 179 408 132 142 1020 357 252 378 0 215 479 99 ------------I---------- Saturation Flow Module: Sat /Lane: 1800 1800 1800 Adjustment: 0.97 1.04 1.00 Lanes: 1.00 1.50 0.50 Final Sat.: 1750 2795 904 ------------I--------------- Capacity Analysis Module: Vol /Sat: 0.10 0.15 0.15 Crit Moves: * * ** Green Time: 11.1 33.1 33.1 Volume /Cap: 1.10 0.53 0.53 Delay /Veh: 137.2 28.4 28.4 Delay Adj: 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 Adj Del /Veh: 137.2 24.2 24.2 DesignQueue: 11 20 7 1800 1800 0.97 1.04 1.00 1.47 1750 2739 0.08 0.37 * * ** 18.4 40.4 0.53 1.10 37.1 87.6 1.00 1.00 1.00 0.85 37.1 74.5 8 50 1800 1.00 0.53 960 0.37 40.4 1.10 87.6 1.00 0.85 74.5 17 k * * * ** 1800 1800 0.97 1.06 1.00 1.00 1750 1900 0.14 0.20 * * ** 21.6 21.6 0.80 1.10 44.9 113 1.00 1.00 1.00 0.85 44.9 96.3 14 22 1800 0.97 1.00 1750 0.00 0.0 0.00 0.0 1.00 0.85 0.0 0 k * * * ** 1800 0.97 1.00 1750 0.12 34.9 0.42 26.5 1.00 1.00 26.5 10 Or***** 1800 1800 1.00 1.00 0.83 0.17 1492 308 ------ - - - - -� 0.32 0.32 * * ** 34.9 34.9 1.10 1.10 101 100.7 1.00 1.00 0.85 0.85 85.6 85.6 25 5 • Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY 0 MITIG8 - AM 2025 + Optionl Thu Apr 11, 2002 09:23:32 - - - -- Page -1 -1 ---------------------------------------------------------- - - - - -- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): - 0.911 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 33.0 Optimal Cycle: 127 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II-------------=- II ---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Include Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 1 0 1 1 0 1 0 1 ------------ I -- - - - - -- ------ II--------------- II--------------- 11---------- - - - - -I Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 •1.70 1.70 1.70 1.70 Initial Bse: 204 969 333 102 697 238 340 374 170 162 362 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 222 1053 362 111 758 259 370 407 0 176 394 81 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 222 1053 362 111 758 259 370 407 0 176 394 81 PCE Adj: 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 Final Vol.: 222 1053 362 ------------I--------------- Saturation Flow Module: Sat /Lane: 1800 1800 1800 Adjustment: 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 Final Sat.: 1750 3800 1750 ------------I--------------- Capacity Analysis Module: Vol /Sat: 0.13 0.28 0.21 Crit Moves: * * ** Green Time: 16.7 43.0 60.6 Volume /Cap: 0.91 0.77 0.41 Delay /Veh: 63.3 27.9 14.3 Delay Adj: 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 AdDDel /Veh: 63.3 23.7 12.1 DesignQueue: 13 49 13 * * * * * * * * * * * * * * * * * * * * * * * * * * ** 1.00 1.00 1.00 1.00 111 758 1800 1800 0.97 1.04 1.00 1.48 1750 2757 0.06 0.27 * * ** 9.8 36.2 0.77 0.91 55.9 38.7 1.00 1.00 1.00 0.85 55.9 32.9 7 38 1.00 1.00 259 1800 1.00 0.52 942 0.27 36.2 0.91 38.7 1.00 0.85 32.9 13 A,***** 1.00 1.00 1.00 1.00 370 407 1800 1800 0.97 1.06 1.00 1.00 1750 1900 0.21 0.21 * * ** 27.8 37.5 0.91 0.68 51.4 29.7 1.00 1.00 1.00 0.85 51.4 25.2 20 20 k * * * * * * * * ** 0.00 0.00 0 1800 0.97 1.00 1750 0.00 0.0 0.00 0.0 1.00 0.85 0.0 0 k * * * ** 1.00 1.00 - 176 1800 0.97 1.00 1750 0.10 17.6 0.68 41.9 1.00 1.00 41.9 10 k * * * ** 1.00 1.00 1.00 1.00 394 81 ------ - - - - -I 1800 1800 1.06 0.97 1.00 1.00 1900 1750 ------ - - - - -I 0.21 0.05 * * ** 27.3 37.1 0.91 0.15 50.8 22.8 1.00 1.00 0.85 0.85 43.2 19.4 21 4 . Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY 40 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM ------------------------------------------------------ 2025 + Optionl Thu Apr 11, 2002 09:23:49 - - - - -- --- - - - - -- Page -1 -1 -� - -------------------------------------------------------------------------------- - Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.967 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 38.7 Optimal Cycle: 176 Level Of Service: D- ******************************************************************************** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - - - ------------ Control: I--------------- Protected II--------------- Protected II --------------- Protected II---------- Protected I Rights: Ovl Include Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 1 1 0 1 0 1 0 1 II---------- 1 0 1 0 1 - - - - - I ------------ Volume Module: I--------------- PM Peak Hour II--------------- II--------------- Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 175 400 129 139 1000 350 247 371 175 211 469 97 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 179 408 132 142 1020 357 252 378 0 215 479 99 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 179 408 132 142 1020 357 252 378 0 215 479 99 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 Final Vol.: 179 408 132 142 1020 357 252 378 0 215 479 99 - - - - - I ------------ Saturation Flow I--------------- Module: II--------------- II--------------- II---------- Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.04 1.00 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 1.47 0.53 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 2739 960 1750 1900 1750 1750 1900 1750 - - - - - I ------------ Capacity Analysis I --------------- Module: II--------------- II--------------- II---------- Vol /Sat: 0.10 0.11 0.08, 0.08 0.37 0.37 0.14 0.20 0.00 0.12 0.25 0.06 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 12.7 33.5 52.3 25.4 46.2 46.2 17.8 30.4 0.0 18.8 31.3 56.7 Volume /Cap: 0.97 0.38 0.17 0.38 0.97 0.97 0.97 0.79 0.00 0.79 0.97 0.12 Delay /Veh: 82.4 26.7 15.7 31.2 39.8 39.8 73.0 37.6 0.0 46.6 57.0 13.5 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 82.4 22.7 13.4 31.2 33.8 33.8 73.0 32.0 0.0 .46.6 48.5 11.4 DesignQueue: 11 20 5 8 46 16 15 20 0 12 25 4 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 40 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - AM 2025 + Option2 Thu Apr 11, 2002 09:24:22 --------------- Page- 1 -1 - -- -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin Cycle (sec): 120 Critical Vol. /Cap: (X): 0.843 Loss Time (sec): 12 (Y +R 4 sec) Average Delay (sec /veh): 29.8 Optimal Cycle: 95 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - - - - - I ------------ Control: I--------------- Protected II--------------- Protected II--------------- Protected II---------- Protected Rights: Ovl Ovl Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 - - - - - ------------ Volume Module: I--------------- AM Peak Hour II--------------- II--------------- II---------- I Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 204 969 333 102 697 238 340 374 170 162 362 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0,.92 0.92 0.92 0.92 0.00 0.92 0.92 0.92 PHF Volume: 222 1053 362 111 758 259 370 407 0 176 394 81 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 222 1053 362 111 758 259 370 407 0 176 394 81 PCE Adj: MLF Adj: .1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 222 1053 362 111 758 259 370 407 0 176 394 81 - - - - - ------------ Saturation Flow --------------- Module: II--------------- II--------------- II-- _-------- I Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 - - - ------------ Capacity Analysis I --------------- Module: II--------------- II--------------- II---------- - - I Vol /Sat: 0.13 0.28 0.21 0.06 0.20 0.15 0.21 0.21 0.00 0.10 0.21 0.05 Crit Moves:* * ** * * ** * * ** * * ** Green Time: 18.8 39.4 58.5 9.0 29.6 59.7 30.1 40.5 0.0 19.0 29.5 38.5 Volume /Cap: 0.81 0.84 0.42 0.84 0.81 0.30 0.84 0.63 0.00 0.63 0.84 0.14 Delay /Veh: 48.1 32.3 15.3 66.2 36.0 13.6 42.1 26.9 0.0 39.2 41.9 22.1 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 48.1 27.4 13.0 66.2 30.6 11.5 42.1 22.9 0.0 39.2 35.6 18.8 DesignQueue: 13 51 13 7 40 9 19 19 0 10 21 4 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM ----------------------------------------------------------------------------- 2025 + Option2 Thu Apr 11, 2002 09:24:41 -Page - 1_1 -------------------------------------------------------------------------- Level Of Service Computation Report - - - - -= 1985 HCM Operations Method (Base Volume Alternative) Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Gap. (X): 0.851 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 29.8 Optimal Cycle: 98 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound - South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R - -I -------=---- Control: I--------------- Protected II--------------- Protected II-------- - - Protected - - -- 711---------- - - - Protected -- Rights: Ovl Ovl Ignore Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 - - - - - I ------------ Volume Module: I --------------- PM Peak Hour II--------------- II--------------- II---------- Base Vol: 103 235 7 -6 82 588 206 145 218 103 124 276 57 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 175 400 129 139 1000 350 247 371 175 211 469 97 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.00 0.98 0.98 0.98 PHF Volume: 179 408 132 142 1020 357 252 378 0 215 479 99 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol-: 179 408 132 142 1020 357 252 378 0 215 479 99 PCE Adj: MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 179 408 132 142 1020 357 252 378 0 215 479 99 ------------ Saturation Flow I--------------- Module: II--------------- II--------------- II---------- - - - - - I Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 - - - - - ------------ Capacity Analysis I --------------- Module: II--------------- II--------------- II---------- I Vol /Sat: 0.10 0.11 0.08 0.08 0.27 0.20 0.14 0.20 0.00 0.12 0.25 0.06 Crit Moves: * * ** * * ** - * * ** * * ** Green Time: 14.4 29.7 51.0 22.5 37.8 58.1 20.3 34.5 0.0 21.3 -35.5 58.0 Volume/Cap: 0.85 0.43 0.18 0.43 0.85 0.42 0.85 0.69 0.00 0.69 0.85 0.12 Delay /veh: 57.7 29.1 16.3 33.4 33.5 15.5 50.9 31.5 0.0 39.6 38.6 12.9 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 57.7 24.8 13.9 33.4 28.5 13.1 50.9 26.8 0.0 39.6 32.8 11.0 DesignQueue: 11 21 5 8 50 13 14 19 0 12 24 3 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY c MITIG8 - AM 2025 + Option3 Thu Apr 11, 2002 09:25:04 Page 1 -1 Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.843 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): -29.1 Optimal Cycle: 95 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- II --------------- II--------------- II---------- - - - - - I Control: Protected Protected Protected Protected Rights: Ovl Ovl Ovl Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 Volume Module: AM Peak Hour Base Vol: 120 570 196 60 410 140 200 220 100 95 213 44 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 204 969 333 102 697 238 340 374 170 162 362 75 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 PHF Volume: 222 1053 362 111 758 259 370 407 185 176 394 81 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 222 1053 362 111 758 259 370 407 185 176 394 81 PCE Adj: 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 Final Vol.: 222 1053 362 ------------I--------------- Saturation Flow Module: Sat /Lane: 1800 1800 1800 Adjustment: 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 Final Sat.: 1750 3800 1750 ------------I--------------- Capacity Analysis Module: Vol /Sat: 0.13 0.28 0.21 Crit Moves: * * ** Green Time: 18.8 39.4 58.5 Volume /Cap: 0.81 0.84 0.42 Delay /Veh: 48.1 32.3 15.3 Delay Adj: 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 Adj Del /Veh: 48.1 27.4 13.0 DesignQueue: 13 51 13 * * * * * * * * * * * * * * * * * * * * * * * * * * ** 1.00 1.00 111 1800 0.97 1.00 1750 0.06 * * ** 9.0 0.84 66.2 1.00 1.00 66.2 7 k * * * ** 1.00 1.00 758 1800 1.06 2.00 3800 0.20 29.6 0.81 36.0 1.00 0.85 30.6 40 k * * ** 1.00 1.00`1.00 1.00 1.00 1.00 259 370 407 ------11------- -- 1800 1800 1800 0.97 0.97 1.06 1.00 1.00 1.00 1750 1750 1900 ------ 11 --------- 0.15 0.21 0.21 * * ** 59.7 30.1 40.5 0.30 0.84 0.63 13.6 42.1 26.9 1.00 1.00 1.00 0.85 1.00 0.85 11.5 42.1 22.9 9 19 19 1.00 1.00 185 1800 0.97 1.00 1750 0.11 59.4 0.21 13:0 1.00 0.85 11.1 6 1.00 1.00 176 1800 0.97 1.00 1750 0.10 19.0 0.63 39.2 1.00 1.00 39.2 10 k * * * ** 1.00 1.00 1.00 1.00 394 81 ------ - - - - -I 1800 1800 1.06 0.97 1.00 1.00- 1900 1750 ------ - - - - -I 0.21 .0.05' * * ** .29.5 38.5 0.84 0.14 41.9 22.1 1.00 1.00 0.8-5 -- 0. 85 35.6 18.8 21 4 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY MITIG8 - PM 2025 + Option3 Thu Apr 11, 2002 09 :25:22----------- - - - - -- Page -1_1 -------------------------------------------------------------------------------- Level Of Service Computation Report 1985 HCM Operations Method (Base Volume Alternative) ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Intersection #1 Saratoga -Los Gatos - Saratoga - Sunnyvale /Saratoga - Big Basin ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Cycle (sec): 120 Critical Vol. /Cap. (X): 0.851 Loss Time (sec): 12 (Y +R = 4 sec) Average Delay (sec /veh): 29.1 Optimal Cycle: 98 Level Of Service: D ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R Control: Protected Protected Protected Protected Rights: Ovl Ovl Ovl Ovl Min. Green: 7 10 10 7 10 10 7 10 10 7 10 10 Lanes: 1 0 2 0 1 1 0 2 0 1 1 0 1 0 1 1 0 1 0 1 ------------ I --------------- Volume Module: PM Peak Hour II--------------- II--------------- II---------- - - - - - I Base Vol: 103 235 76 82 588 206 145 218 103 124 276 57 Growth Adj: 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 1.70 Initial Bse: 175 400 129 139 1000 350 247 371 175 211 469 97 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 PHF Volume: 179 408 132 142 1020 357 252 378 179 215 479 99 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 179 408 132 142 1020 357 252 378 179 215 479 99 PCE Adj: MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 179 408 132 142 1020 357 252 378 179 215 479 99 ------------ --------------- Saturation Flow Module: II--------------- II--------------- II---------- - - - - - I Sat /Lane: 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 Adjustment: 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 0.97 1.06 0.97 Lanes: 1.00 2.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Sat.: 1750 3800 1750 1750 3800 1750 1750 1900 1750 1750 1900 1750 ------------ I --------------- Capacity Analysis Module: II--------------- II--------------- II------- - - - - -- Vol /Sat: 0.10 0.11 0.08 0.08 0.27 0.20 0.14 0.20 0.10 0.12 0.25 0.06 Crit Moves: * * ** * * ** * * ** * * ** Green Time: 14.4 29.7 51.0 22.5 37.8 58.1 20.3 34.5 48.9 21.3 35.5 58.0 Volume /Cap: 0.85 0.43 0.18 0.43 0.85 0.42 0.85 0.69 0.25 0.69 0.85 0.12 Delay /Veh: 57.7 29.1 16.3 33.4 33.5 15.5 50.9 31.5 17.9 39.6 38.6 12.9 Delay Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ProgAdjFctr: 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 1.00 0.85 0.85 Adj Del /Veh: 57.7 24.8 13.9 33.4 28.5 13.1 50.9 26.8 15.2 39.6 32.8 11.0 DesignQueue: 11 21 5 8 50 13 14 19 7 12 24 3 ************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** 0 Traffix 7.5.1115 (c) 2001 Dowling Assoc. Licensed to HIGGINS ASSOC., GILROY • • • APPENDIX C RAW PEAK HOUR TRAFFIC COUNTS Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A - -- ! Gilroy, Ca. 95020 HWY 9 / OAK PLACE / OAK STREET Grouts, Printed - Cars - Trucks - Buses - File Name :02-041-2 Site Code : 00000002 Start Date : 03/20/2002 Page No : 1 08:00 AM 22 103 HWY 9 6 135 OAK PLACF 4 2 0 HWY 9 6 201 OAK STREET 0 226 18 5 From North 0 28 From East 08:15 AM 25 From South CI 2 13 From West yn 5 9 2 Rig Thr 12 Ped App. Rig Thr 47 Ped App. Rig Thr 431 Ped App. Rig Thr 3 Ped App. IM. Start Time ht u -1-6t Left s Total ht u 14 s Total M u Left s Total M u 2 s Total Total Factor 1.0 12 1.0 1 1.01 16 1.0 1.01 1.01 1.0 8 1.0 1 1.01 1.0 F 1.0 76 1.01 1.01 1.01 1.0 21 17 07:00 AM 7 30 4 2 43 1. 0 0 2 3 4 128 9 0 141 6 0 6 3 15 202 07:15 AM 11 47 0 3 61 3 1 1 1 6 4 171 19 0 194 6 3 5 3 17 278 07:30 AM 9 70 1 3 83 6 1 0 2 9 8 248 12 0 268 1 1 10 0 12 372 07:45 AM 16 131 4 0 151 3 2 4 0 9 10 228 21 0 259 11 2 4 0 171 436 Total 43 278 9 8 338 13 4 5 5 27 26 775 61 0 862 24 6 25 6 61 1 1288 08:00 AM 22 103 4 6 135 8 4 2 0 14 6 201 19 0 226 18 5 5 0 28 403 08:15 AM 25 87 2 13 127 5 9 2 1 17 12 188 14 0 214 47 11 15 0 73 431 08:30 AM 12 95 4 3 114 4 0 1 4 9 8 188 5 0 201 14 2 19 1 36 360 08:45 AM 17 70 5 2 94 4 4 3 1 12 9 177 16 0 202 9 7 8 0 24 332 Total 76 355 15 24 470 21 17 8 6 52 35 754 54 0 843 88 25 47 1 161' 1526 BREAK 02:15 PM 19 141 2 9 171 3 1 1 0 5 4 116 19 8 147 42 1 25 7 75 398 02:30 PM 13 139 3 0 155 7 1 3 0 11 4 119 9 0 132 13 3 14 0 30 328 02:45 PM 14 111 3 1 129 0 1 3 1 5 7 102 3 0 112 12 2 13 2 29 275 Total 46 391 8 10 455 10 3 7 1 21 1 15 337 31 8 391 67 6 52 9 134 1001 03:00 PM 12 139 3 0 154 8 1 3 1 13 8 97 9 0 114 10 1 11 4 26 307 03:15 PM 18 138 2 1 159 8 2 10 2 22 3 83 7 3 96 9 2 15 5 31 308 03:30 PM 14 152 5 3 174 4 0 8 3 15 2 114 7 0 123 20 0 20 1 41 353 03:45 PM 13 138 2 9 162 4 1 4 4 13 2 107 14 0 123 17 0 19 3 39 337 Total 57 567 12 13 649 24 4 25 10 63 15 401 37 3 456 56 3 65 13 137 1305 04:00 PM 23 180 1 0 204 2 2 6 2 12 3 100 6 1 110 15 4 12 1 32 358 04:15 PM 16 152 3 4 175 4 2 4 0 10 4 90 9 0 103 14 2 6 5 27 315 04:30 PM 16 179 4 7 206 1 0 5 1 7 0 94 13 0 107 4 2 10 5 21 341 04:45 PM 18 174 2 1 195 4 .2 6 1 13 2 102 12 0 116 10 0 5 1 16 340 Total 73 685 10 12 780 11 6 21 4 42 9 386 40 1 436 43 8 33 .12 96 1354 05:00 PM 14 182 3 1 200 1 1 3 1 6 5 82 8 0 95 13 1 10 1 25 326 05:15 PM 16 179 1 2 198 3 3 3 3 12 0 95 6 0 101 16 3 7 3 29 340 05:30 PM 17 175 1 3 196 5 3 0 3 11 4 88 7 0 99 16 4 4 0 24 330 05:45 PM 12 175 4 9 200 3 0 2 1 6 4 94 6 0 104 11 1 8 4 24 334 Total 59 711 9 15 794 12 7 8 8 35 13 359 27 0 399 56 9 29 8 102 1330 06:00 PM 18 173 5 3 199 2 2 4 0 8 3 73 11 0 87 9 0 11 2 22 316 Grand 372 316 68 85 3685 93 43 78 34 248 116 305 12 3474 343 57 262 51 713 8120 261 Apprch % 10. 85. 1.8 2.3 37. 17. 31. 13. 3 88 7.5 0.3 48. 8.0 36 7.2 1 8 5 3 5 7 .3 8 1 7 Total % 4.6 9 0.8 1.0 45.4 1.1 0.5 1.0 0.4 3.1 1.4 3.2 0.1 42.8 4.2 0.7 3.2 0.6 8.8 • u. k�k(qv • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name : 02 -041 -2 Site Code : 00000002 Start Date : 03/20/2002 Page No :2 HWY9 Out In Total 3399 3631 7030 28 38 66 13 16 29 3440 3685 7125 Right Thru Left Peds L► W (w CN � cc too fV O cc w n o r- 2 North _f0 n MM 6:00:00 PM WOOW N N- � O1'O"at r oAOO�v7 aCl) "' �°'� Cars �fD � n o rn Trucks coo o m O O N Buses A p 0. D_ NAO�w T r Left Thru Right Peds 3534 3432 6966 28 28 56 19 14 33 3581 3474 7055 Out In Total HWY9 369 3117 68 77 3 27 0 8 0 16 0 0 372 3160 68 85 259 3046 115 12 2 26 0 0 0 13 1 0 261 3085 116 12 F'eaK dour t-rom U /:UU AM to W:UU AM - F'eaK 1 Of 1 HWY 9 OAK PLACE HWY 9 OAK STREET Intersectio From North From East From South From West 6.8 Rig Thr Ped App. Rig Thr 10 Ped App. Rig Thr n Ped App. Rig Thr Ped App• Int. Start Time Volume 72 391 Left 22 496 22 16 Left 3 49 Percent 14. 78. Left 4.4 44• 32. Left 6.1 5 8 ht u s Total ht u s Total ht u 151 s Total ht u 9 s Total Total F'eaK dour t-rom U /:UU AM to W:UU AM - F'eaK 1 Of 1 865 66 0 967 Intersectio 3.7 6.8 0.0 07:30 AM 10 228 21 0 259 n Volume 72 391 11 22 496 22 16 8 3 49 Percent 14. 78. 2.2 4.4 44• 32. 16. 6.1 5 8 9 7 3 07:45 16 131 4 0 151 3 2 4 0 9 Volume Peak Factor High Int. 07:45 AM 08:15 AM Volume 16 131 4 0 151 5 9 2 1 17 Peak 0.821 0.721 Factor 36 865 66 0 967 3.7 6.8 0.0 10 228 21 0 259 07:30 AM 8 248 12 0 268 0.902 77 19 34 o 130 1642 59. 14. 26• 0.0 2 6 2 11 2 4 0 17 436 1 0.942 08:15 AM 47 11 15 0 73 0.445 • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name : 02 -041 -2 Site Code :00000002 Start Date : 03/20/2002 Paae No :3 Peak Hour From 02:00 PM to 06:00 PM - Pe Intersectio HWY9 1 14 5 22 n Out In Total 28. 10. 44. 18. Volume 921 496 1417 11 16 715 Percent 72 391 11 22 1.5 2.2 03:30 PM 100 Right Thru Left Pods 1 4 0 8 04:00 L+ oN F_ Volume 23 180 1 O w 2 North -{ c F- H -2 rn w High Int. !2002 7:30:00 AM a Q n 12002 8:15:00 AM r 0 O 5 Oa c v Cars Trucla m -i Factor 0.876 4, T r - Left Thru Right Peds 661 8651 361 0 476 967 1443 Out In Total HWY9 Peak Hour From 02:00 PM to 06:00 PM - Pe Intersectio 03:30 PM 1 14 5 22 n 50 28. 10. 44. 18. Volume 66 622 11 16 715 Percent 9.2 87. 1.5 2.2 03:30 PM 100 6 1 4 0 8 04:00 15 Volume 23 180 1 0 204 Peak Factor High Int. 04:00 PM Volume 23 180 1 0 204 Peak Factor 0.876 rkIof1 411 36 1 14 5 22 9 50 28. 10. 44. 18. 4.3 0 0 0 0 2 2 6 2 12 03:30 PM 100 6 1 4 0 8 3 15 0.833 11 411 36 1 459 47. 89. 41. 2.4 4.3 7.8 0.2 3 100 6 1 110 03:30 PM 2 114 7 0 123 0.933 66 6 57 10 139 47. 41. 4.3 7.2 15 4 12 1 32 03:30 PM 20 0 20 1 41 0.848 1 1363 358 0.952 • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A File Name Gilroy, Ca. 95020 Site Code Start Date Page No 02 -041 -2 00000002 03/20/2002 4 HWY9 Out In Total ® 715 1 1 1197 651 6221 111 16 Right Thru Left Pods 0 t-� � �� J T �a r ro North w O> It r- 2 U � — /1002 3:30:00 PM 5 Y m L /1D02 4:15:00 PM O n 7 O O ° Cars Trucks N --I ° d Buses m vm ao — 4, T r Left Thru Right Peds 36 411 111 1 710 459 1169 Out In Total HZ 9 02 -041 -2 00000002 03/20/2002 4 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 HWY 9 / OAK PLACE / OAK STREET Groups Printad- Trucks File Name :02-041-2 Site Code : 00000002 Start Date : 03/20/2002 Page No : 1 08:00 AM 0 2 HWY 9 08:15 AM 3 OAK PLACE 0 0 08:30 AM 0 HWY 9 0 0 08:45 AM OAK STREET 1 0 0 03:45 PM 0 From North 0 0 2 From East 1 0 1 From South 0 0 From West 0 0 0 Rig Thr 0 Ped App. Rig Thr 0 Ped App. Rig Thr 3 Ped App. Rig Thr 0 Ped App. Int. Start Time ht u 0 s Total ht u Left � s Total ht u Left s Total ht u Left 0 Total Total Factor 1.0 1.0 1.0 1 1.0 1.0 0 1.0 1.01 1.01 1.01 0 1.0 1.0 1 1.01 1.01 0 1.01 1.0 1 1.0 1 1.0 0 0 07:00 AM 0 1 0 0 1 0 0 0 1 1 0 4 0 0 4 0 0 0 0 0 6 07:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 07:30 AM 0 0 0 0 0 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0 2 07:45 AM 0 4 0 0 4 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 9 Total 0 6 0 0 61 0 0 0 1 1 1 0 10 1 0 11 1 0 0 0 0 01 18 08:00 AM 0 2 0 0 08:15 AM 3 2 0 0 08:30 AM 0 1 0 0 08:45 AM 0 1 0 0 - BREAK 02:15 PM 0 2 0 0 02:30 PM 0 1 0 0 02:45 PM 0 3 0 0 I Total 0 6 0 0 03:00 PM 0 0 0 0 03:15 PM 0 0 0 0 03:30 PM 0 3 0 3 03:45 PM 0 1 0 0 2 0 0 0 0 5 0 0 0 0 1 0 0 0 3 1 0 0 0 1 9 0 0 0 4 2 0 0 0 0 1 0 0 0 0 3 0 0 0 1 61 0 0 0 1 0 0 0 0 1 0 0 0 0 2 6 0 0 0 3 1 0 0 0 1 0 0 0 0 0 0 0 2 1 0 3 0 4 0 0 1 0 1 0 0 4 0 7 1 0 0 0 2 0 0 0 0 1 0 0 1 0 0 0 0 1 0 3 0 0 1 0 2 0 0 2 0 0 0 0 3 0 1 0 0 1 0 2 0 0 0 0 0 0 0 0 2 3 0 0 1 0 1 9 4 0 0 0 0 0 8 1 0 0 0 0 0 3 8 0 0 1 0 1 22 2 0 0 0 2 1 0 0 0 0 0 0 0 1 0 31 0 0 1 2 2 0 0 0 2 0 0 0 0 1 1 0 0 0 0 2 0 0 0 3 2 6 0 2 1 5 31 13 2 5 1 3 0 10 3 7 Total 0 4 0 3 71 0 0 0 7 71 0 5 0 0 51 0 0 0 6 6 25 04:00 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0. 1 1 3 04:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 2 3 3 04:30 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 3 3 4 04:45 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 Total 0 2 0 0 2 0 0 0 2 2 0 0 0 0 0 1 0 0 6 7 11 05:00 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1 2 05:15 PM 0 1 0 2 3 0 0 0 2 2 0 0 0 0 0 0 0 0 2 2 7 05:30 PM 0 1 0 2 3 0 0 0 3 3 0 1 0 0 1 0 1 0 0 1 8 05:45 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Total 0 3 0 4 7 0 0 0 6 6 0 1 0 0 1 0 1 0 3 4 18 06:00 PM 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 Grand Total 3 27 0 8 38 0 0 0 21 21 0 26 2 0 28 1 1 2 17 21 108 Apprch % 7.9 71. 0.0 21. 0.0 0.0 0.0 100 0.0 92' 7.1 0.0 4.8 4.8 9.5 81. 0 _ Total % 2.8 25. 0.0 7.4 35.2 0.0 0.0 0.0 19. 19.4 0.0 24. 1.9 0.0 25.9 0.9 0.9 1.9 15. 19.4 • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 HWY 9 / OAK PLACE / OAK STREET Groups Printed- Buses File Name :02-041-2 Site Code : 00000002 Start Date : 03/20/2002 Page No : 1 04:00 PM_ 0 1 HWY 9 04:15 PM 0 OAK PLACE 0 0 04:30 PM 0 HWY 9 0 0 04:45 PM OAK STREET 2 0 0 Total .0 From North 0 0 "` BREAK "` From East I From South I 1 From West 05:30 PM 0 0 Rig Thr 0 Ped App. Rig Thr 0.0 0.0 0.0 0.0 Ped App. Rig Thr Ped App. Rig Thr Ped App. Int. Start Time ht u Left s Total ht u Left s Total ht u Left s Total ht u Left s Total' Total Factor 1.01 1.01 1.01 1.0 1.01 1.0 .1.01 1.01 1.0 1 1.0 1 1.0 1 1.0 1.0 1 1.0 1 1.0 1 1.0 07:00 AM 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 2 07:15 AM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 2 07:30 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 BREAK - Total 0 2 0 0 21 0 0 0 0 01 0 3 0 0 31 0 0 0 0 01 5 08:00 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 08:15 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 0 0 0 1 2 08:30 AM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 1 0 0 0 1 3 "' BREAK "' Total 0 2 0 0 21 0 0 0 0 01 0 2 0 0 21 2 0 0 0 21 6 " BREAK '** 02:15 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 02:30 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 2 02:45 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 2 Total 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 1 0 0 0 1 6 03:00 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 1 03:30 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0 1 04:00 PM_ 0 1 0 0 04:15 PM 0 0 0 0 04:30 PM 0 1 0 0 04:45 PM 0 2 0 0 Total .0 4 0 0 "` BREAK "` 100 .0 0.0 0.0 0.0 0.0 0.0 05:15 PM 0 1 0 0 05:30 PM 0 0 0 0 05:45 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 2 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1 2 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0 1 0 1 0 1 0 5 01 8 0 1 0 1 0 2 J�1 "' BREAK "' Grand 0 16 0 0 16 0 0 0 0 0 1 13 0 0 14 3 0 0 0 3 33 Total Apprch % 0.0 100 .0 0.0 0.0 0.0 0.0 0.0 7.1 9 0.0 0.0 100 0.0 0.0 .0 Total % 0.0 48. 0.0 0.0 48.5 0.0 0.0 0.0 0.0 0.0 3.0 3 . 0.0 0.0 42.4 9.1 0.0 0.0 0.0 9.1 0 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 HWY 9 / SHERIFF'S DWYS / CONTEMPO DWY Groups Printed - Cars - Trucks - Buses - File Name :02-041-5 Site Code : 00000005 Start Date : 03/20/2002 Page No : 1 08:00 AM HWY 9 SHERIFF DEPT. DWY HWY 9 DRIVEWAY 0 5 From North From East From South From West 0 0 0 0 0 0 0 0 0 0 6 08:15 AM 0 0 Rig 0 0 Left 0 Rig 0 4 1 0 Left 0 2 0 0 1 0 1 7 08:30 AM Rig 0 ht 0 1 ont 0 0 0 3 0 0 into 0 0 0 0 0 0 0 4 AftOR-45 AM ht 0 inbo 0 2 0 0 ont 0 3 0 0 Dw 0 0 1 0 0 0 1 6 Total into 0 Dw 0 3 Hw 0 0 0 16 1 Start Time y Thr Left Ped App. Rig Thr Left Ped App. She he Thr Y Ped App. Y9 Thr Hw Ped App. Int. fro u s Total ht u s Total 0 u 3 s Total 8 u Y9 s Total Total 0 m 0 0 1 0 0 0 1 12 02:30 PM rf f 0 fro 0 1 fro 0 fro 0 8 1 0 Hw 0 1 0 0 0 0 0 10 - 02:45 PM Dw 0 m 0 0 m 0 m 0 6 0 0 Y9 0 0 0 0 0 0 0 6 Total y. 0 Hw 0 4 Dw 0 Dw 0 22 1 0 0 0 1 1 0 0 0 1 28 03:00 PM 0 0 Y9 0 2 Y• 0 0 0 8 1 Factor 1.0 1 1.0 1 1.0 1.01 0 1.01 1.0 1.01 1.01 03:15 PM 1.01 1.01 1.01 1.01 0 1.01 1.01 1.0.1 1.0 6 1 07:00 AM 0 0 0 0 0 8 0 2 0 10 0 0 0 0 0 0 0 0 0 0 10 07:15 AM 0 0 2 0 2 6 0 1 0 7 2 0 0 0 2 0 0 0 0 0 11 07:30 AM 0 0 0 0 0 1 0 0 0 1 3 0 0 0 3 1 0 0 0 1 5 07:45 AM 1 0 0 0 1 4' 0 1 0 5 0 0 0 0 0 0 0 1 0 1 7 Total 1 0 2 0 31 19 0 4 0 231 5 0 0 0 5 1 0 1 0 2 33 08:00 AM 0 0 0 0 0 5 0 1 0 6 0 0 0 0 0 0 0 0 0 0 6 08:15 AM 0 0 0 0 0 4 0 0 0 4 1 0 1 0 2 0 0 1 0 1 7 08:30 AM 0 0 1 0 1 3 0 0 0 3 0 0 0 0 0 0 0 0 0 0 4 AftOR-45 AM 2 0 0 0 2 3 0 0 0 3 0 0 0 0 0 1 0 0 0 1 6 Total 2 0 1 0 3 15 0 1 0 16 1 0 1 0 2 1 0 1 0 2 23 "' BREAK "' 02:15 PM 0 0 3 0 3 8 0 0 0 8 0 0 0 0 0 1 0 0 0 1 12 02:30 PM 0 0 1 0 1 8 0 0 0 8 1 0 0 0 1 0 0 0 0 0 10 - 02:45 PM 0 0 0 0 0 5 0 1 0 6 0 0 0 0 0 0 0 0 0 0 6 Total 0 0 4 0 4 21 0 1 0 22 1 0 0 0 1 1 0 0 0 1 28 03:00 PM 0 0 2 0 2 8 0 0 0 8 1 0 0 0 1 0 0 0 0 0 11 03:15 PM 0 0 0 0 0 6 0 0 0 6 1 0 0 0 1 0 0 0 0 0 7 03:30 PM .0 0 1 0 1 4 0 0 -0 4 0 0 0 0 0 0 0 0 0 0 5 03:45 PM 0 0 0 0 0 5 0 0 0 5 2 0 0 0 2 0 0 0 0 0 7 Total 0 0 3 0 3 23 0 0 0 23 4 0 0 0 4 0 0 0 0 0 30 04:00 PM 0 0 1 0 1 4 0 0 0 4 1 0 0 0 1 0 0 0 0 0 6 04:15 PM 0 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 04:30 PM 0 0 1 0 1 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2 04:45 PM 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1 Total 0 0 3 0 3 6 0 0 0 6 1 0 0 0 1 0 0 0 0 0 10 05:00 PM 0 0 0 0 0 1 0 1 0 2 0 0 0 0 0 0 0 2 0 2 4 05:15 PM 0 0 0 0 0 2 0 0 0 2 2 0 0 0 2 0 0 1 0 1 5 05:30 PM 0 0 2 0 2 3 0 1 0 4 1 0 0 0 1 0 0 2 0 2 9 05:45 PM 0 0 0 0 0 0 0 0 0 0 1 1 0 0 2 0 0 0 0 0 2 Total 0 0 2 0 2 6 0 2 0 8 4 1 0 0 5 0 0 5 0 5 20 06:00 PM 0 0 0 0 0 2 0 0 0 2 0 0 0 0 0 0 0 0 0 0 2 Grand Total 3 0 15 0 18 92 0 8 0 100 16 1 1 0 18 3 0 7 0 10 146 - -. Apprch % 16. 0.0 83. 0.0 92. 0.0 8.0 0.0 88. 5.6 5.6 0.0 30. 0.0 70 0.0 7 3 0 9 0 0 Total % 2.1 0.0 10. 12.3 63.. 0.0 5.5 0.0 68.5 11. 0.7 0.7 0.0 12.3 2.1 0.0 4.8 0.0 6.8 0.0 • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 HwY9 Site Code N�000 r-00 r` L 100 18 118 } o000 2 Q 0 0 0 0 0 L C � 18 F- > cnooco�` 6 0 0000 0000 J Ol� O O Volume y 2 � aC 0 • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 3 0 15 0 0 0 0 0 0 0 0 0 31 01 15 0 t.en i nru Len reas Dwy m9 L' T !2002 7:00:00 AM O/2002 6:00:00 PM Cans Trucks Buses Right I Right Dwfr from HS�a Sheriff DrgAds 1 1 16 0 0 0 0 0 0 0 0 0 11 1 16 0 11 18 [129 0 0 0 0 1 18 Out In Total HWY9 File Name HwY9 Site Code Out In Total 100 18 118 0 0 0 0 0 0 100 18 118 0� _ rr 6 0 3 0 15 0 0 0 0 0 0 0 0 0 31 01 15 0 t.en i nru Len reas Dwy m9 L' T !2002 7:00:00 AM O/2002 6:00:00 PM Cans Trucks Buses Right I Right Dwfr from HS�a Sheriff DrgAds 1 1 16 0 0 0 0 0 0 0 0 0 11 1 16 0 11 18 [129 0 0 0 0 1 18 Out In Total HWY9 File Name :02-041-5 Site Code : 00000005 Start Date : 03/20/2002 Paqe No : 2 a. reaK P10Ur rrOM U/ :W AM W Lrd:UIJ AM - F'ei HWY 9 From North SHERIFF DEPT. DWY From East HWY 9 From South DRIVEWAY From West n 0 a. on`°i Volume 1 0 S rr 00 Percent 333. 0.0 66. 0.0 0 0� _ rr 6 0 0000 0 7 O O Volume 0 0 2 � 0 O 0 �oo�p1 Factor 00 High Int. reaK P10Ur rrOM U/ :W AM W Lrd:UIJ AM - F'ei HWY 9 From North SHERIFF DEPT. DWY From East HWY 9 From South DRIVEWAY From West n 0 23 82. Volume 1 0 2 0 3 Percent 333. 0.0 66. 0.0 0 0 2 6 0 07:15 0 7 Rig Volume 0 0 2 0 2 Left 0 10 Factor High Int. 07:15 AM Rig 0 0 2 Left ht Rig ht ont into ht into 0 ont Dw Dw Hw 0 y Thr Ped A pp. Rig Thr Ped App. Thr Ped App. Thr Hw Ped App. IM. Start Time Left Left She he y Y9 frro u s Total ht u s Total u s Total u s Total .Total riff Dw fro m fro m fro Hw Y. Hw Dw m Y9 Dw Y9 Y. reaK P10Ur rrOM U/ :W AM W Lrd:UIJ AM - F'ei Intersectio 07:00 AM 0 5 19 0 n 0 23 82. Volume 1 0 2 0 3 Percent 333. 0.0 66. 0.0 0 0 2 6 0 07:15 0 7 07:00 AM Volume 0 0 2 0 2 Peak 0 10 Factor High Int. 07:15 AM Volume 0 0 2 0 2 iK l Or 1 0 0 0 5 19 0 4 0 23 82. 17. 0.0 0.0 0.0 0 0 0.0 0 2 0 0 2 6 0 1 0 7 07:00 AM 1 0 8 0 2 0 10 5 0 0 0 5 100 0 0.0 50. 0.0 0.0 0.0 0.0 .0 0 0 0 0 2 0 0 0 2 07:30 AM 3 0 0 0 3 1 0 1 0 2 33 0 0.0 50. 0.0 0 0 0 0 0 11 0.750 07:30 AM 1 0 0 0 1 Peak Factor 0.375 0.575 I 0.417 6 - °' 0 Q N F F- r > d D J c� 0� oh v o a� 0 Peak Hour From 02:00 PM to 06:00 PM - Pe Intersectio 02:15 PM Fht Right I Rig n 0 0 51 0 3.3 0.0 Volume 0 0 6 0 6 Percent 0.0 0.0 1000 0.0 02:15 PM 0 0 1 8 0 0 02:15 0 0 3 0 3 Volume 0 1 Peak 0.250 Factor High Int. 02:15 PM Volume 0 0 3 0 3 Peak Factor 0' • HWY s— Out In Total ® 3 1 0 2 0 Left Thru Left Pods Dwy from H19 � North 0!2002 7:00:00 AM !2D02 7:45:00 AM Cars Trucks Buses ik1of1 0 0 Fht Right I Rig Dwy from HW402D Sheriff DAWs 0 0 51 0 3.3 0.0 0 5 10 Out In Total 0 I HWY9 ik1of1 0 0 2 29 0 1 0 30 96. 0.0 3.3 0.0 — 7 0 0 0 I 8 0 0 0 8 02:15 PM 0 0 1 8 0 0 0 8 1 0 0.938 2 0 0 0 2 100 0.0 0.0 0.0 0.0 .0 .0 0 0 0 0 0 I 02:30 PM 0 1 12 1 0 0 0 1 0.813 02:15 PM 0.500 g o rr V ~2 _ rr 0 N � W a od COo 1 0 0 0 1 39 100 0.0 0.0 0.0 .0 1 0 0 0 1 12 0.813 02:15 PM 1 0 0 0 1 0.250 • • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name Site Code Start Date Page No HWY9 Out In Total Left Thru Left Pods into Dwy from '19 L+ E TQ I t0 - rr F- ca a c ° hlorth —2 ° 215:00 PM — w rT M= 3:00:00 PM o � o O � Cars � ° o Trucks � o o c Buses ° m — 0 Right Z Right into Dmy from HQAft Sheriff s 0 0 21 0 2 Out In Total HZ 9 :02-041-5 :00000005 : 03/20/2002 :4 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 HWY 9 / SHERIFF'S DWYS / CONTEMPO DWY (4m im Printae- TrurJs File Name :02-041-5 Site Code : 00000005 Start Date : 03/20/2002 Page No : 1 Grand 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 Total % • 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 HWY 9 From North SHERIFF DEPT. DWY From East HWY 9 From South DRIVEWAY From West Rig Left Rig Left ht Rig ht ont into ht into 0 ont Dw into Dw Hw H 0 y Thr Ped App. Rig Thr Ped App. Thr Ped App. Thr Hw Ped App. Int. Start Time fro u Left s Total ht u Left s Total he She u y y s Total y 9 u Y9 s Total Total � fro fro m Dw m m fro Y9 y. Hw Dw Dw Y9 Y. Factor 1.0 1.0 1 .0 1 1.0 1 1.01 1.0 1.0 1 1.0 1.0 1 1.01 1.01 1.01 1 1.0 1.0 1 1.0 1.0 Grand 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 Total % • 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Higgins Associates HWY 9 From North SHERIFF DEPT. DWY From East Civil and Traffic Engineers DRIVEWAY From West 1335 First St. Suite A File Name :02-041-5 Gilroy, Ca. 95020 Site Code : 00000005 Start Date : 03/20/2002 Page No : 1 HWY 9 / SHERIFF'S DWYS / CONTEMPO DWY Groups Printed- Buses IJKLAK Grand 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 Total % • • 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 C]tM HWY 9 From North SHERIFF DEPT. DWY From East HWY 9 From South DRIVEWAY From West Rig Rig Left Left ht Ord into ht ht into 0 oht Dw into Dw Hw 0 y Thr Ped App. Rig Thr Ped App Thr Ped App. Thr Hw Ped App. Int. Start Time fro u Left s Total ht u Left s Total She u y s Total Y9 u Y9 s Total Total riff fro fro M Dw m m fro H 9 Hw Dw y. Dw _ Y9 y. Factor 1.0 1.0 1.01 1.01 1 1.0 1 1.0 1 1.0 1 1.0 1 1 1.01 1.01 1.01 1.01 1 1.01 1.0 1.0 1.0 IJKLAK Grand 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 Total % • • 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 C]tM PARK PLACE % OAK PLACE Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A. Gilroy, Ca. 95020 [;mune Printwd_ rare - TntAm _ Ruestc - File Name :02-041-3 Site Code : 00000003 Start Date : 03/20/2002 Page No : 1 08:00 AM 4 PARK PLACE 1 0 OAK PLACE 0 7 PARK PLACE 0 7 OAK PLACE 0 0 0 0 From North 4 10 From East 14 26 From South 8 0 From West 0 9 Start Time Rig Thr Left Ped I App. Rig Thr Left Ped I App. Rig I Thr Left I Ped App. Rig Thr Left Ped App. Int. 1 ht li u 0 s I Total ht u 0 s Total ht u 0 s Total ht u 0 s Total Total Factor 1.01 1.01 1.01 1.01 0 1.0 1 1.0 1 1.0 1 1.0 1 1.01 1.01 1.01 1.01 .29 1.0 1 1.0 1 1.0 1 1.0 0 28 07:00 AM 1 0 2 0 3 0 1 0 0 1 0 0 0 0 0 0 2 5 0 0 21 07:15 AM 5 0 0 0 5 0 0 0 0 0 0 0 0 0 0 0 3 4 0 7 12 07:30 AM 3 0 0 0 3 2 2 0 0 4 0 0 0 0 0 0 2 8 0 10 17 07:45 AM 3 0 1 0 41 0 4 0 0 41 0 0 0 0 01 0 7 8 0 151 23 Total 12 0 3 0 151 2 7 0 0 91 0 0 0 0 01 0 14 25 0 391 63 08:00 AM 4 0 1 0 5 0 7 0 0 7 0 0 0 0 0 0 4 10 0 14 26 08:15 AM 8 0 1 0 9 2 9 0 0 11 0 0 0 0 0 0 6 16 0 22 42 08:30 AM 1 0 1 0 2 1 1 0 0 2 0 0 0 0 0 0 1 8 0 9 13 08:45 AM 10 0 2 0 12 1 1 0 0 2 0 0 0 0 0 0 3 12 0 15 .29 Total 23 0 5 0 28 4 18 0 0 22 0 0 0 0 0 0 14 46 0 60 110 - BREAK 17 0 4 0 21 3 7 0 0 10 0 0 0 0 0 0 20 9 0 29 60 02:15 PM 5 0 1 0 6 0 0 0 0 0 0 0 1 0 1 1 2 2 0 5 12 02:30 PM 7 0 1 0 8 1 4 0 0 5 0 0 0 0 0 0 6 2 0 8 21 02:45 PM 4 0 1 0 5 0 3 0 0 3 0 0 0 0 0 0 7 4 0 11 19 Total 16 0 3 0 19 1 7 0 0 8 0 0 1 0 1 1 15 8 0 24 52 03:00 PM 2 0 1 0 3 1 3 0 0 4 0 0 0 0 0 0 2 10 0 12 19 03:15 PM 16 0 1 0 17 0 1 0 0 1 0 0 0 0 0 0 6 4 0 10 28 03:30 PM 9 0 1 0 10 2 8 0 0 10 0 0 0 0 0 0 4 1 0 5 25 03:45 PM 5 0 1 0 6 1 0 0 0 1 0 0 0 0 0 0 5 1 0 6 13 Total 32 0 4 0 36 4 12 0 0 16 0 0 0 0 0 0 17 16 0 33 85 04:00 PM 4 0 1 0 5. 0 4 0 0 4 0 0 0 0 0 0 2 5 0 7 16 04:15 PM 4 0 1 0 5 1 4 0 0 5 0 0 0 0 0 0 7 4 0 11 21 04:30 PM 7 0 2 0 9 0 0 0 0 0 0 0 0 0 0 0 4 2 0 6 15 04:45 PM 9. 0 1 0 l0 1 2 0 0 3 0 0 0 0 0 0 2 4 0 6 19 Total 24 0 5 0 29 2 10 0 '0 12 0 0 0 0 0 0 15 15 0 30 71 05:00 PM 4 0 0 0 4 2 1 0 0 3 0 0 0 0 0 0 5 1 0 6 13 05:15 PM 5 0 2 0 7 1 3 0 0 4 0 0 0 0 0 0 5 2 0 7 18 05:30 PM 5 0 1 0 6 0 1 0 0 1 0 0 0 0 0 0 3 2 0 5 12 05:45 PM 3 0 1 0 4 0 2 0 0 2 0 0 0 0 0 0 7 4 0 11 17 Total 17 0 4 0 21 3 7 0 0 10 0 0 0 0 0 0 20 9 0 29 60 Grand Total 124 0 24 0 148 16 61 0 0 77 0 0 1 0 1 1 95 119 0 215 441 Apprch % 83 8 0.0 16 2 0.0 20. 79. 0.0 0.0 0.0 0.0 100 0.0 0.5 44. 55. 0.0 8 2 0 2 3 Total % 28. 0.0 5.4 0.0 33.6 3.6 1 . 0.0 0.0 17.5 0.0 0.0 0.2 0.0 0.2 0.2 21. 0.0 48.8 Vj • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name : 02 -041 -3 Site Code : 00000003 Start Date : 03/20/2002 Page No :2 PARK PLACE Out In Total 135 147 282 0 1 1 0 0 0 135 148 283 Right Thru Left Peds +j 1 L+ o. o� rnoo( =rnoorn 0 to o o to North o o so U o o n o °f t —► 0!2002 7:00:00 AM +—= m rn 15.s r n ~ 0!2002 5:45:00 PM 2 ° o a � voov O 0,D1 i �� ) Trucks 0 0 0 0 p °D °r o 0 0 o y Buses � °y 2 m cp m d H0000 Of0001— T r Left Thru Right Pods 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 1 1 2 0 0 0 0 0 0 1 1 2 Out In Total PAR PLACE 123 0 24 0 1 0 0 0 0 0 0 0 124 0 24 0 Peak Flour From 07:00 AM m 09:00 Ann - Peak i of i PARK PLACE OAK PLACE PARK PLACE OAK PLACE From North From East From South From West Intersectio Rig Thr Ped App. Rig Thr Ped App • Rig Thr Ped App. Rig Thr Ped App. Int. Start Time Left Left Left Volume 23 0 5 Left 28 4 18 0 0 22 ht u 0 s Total ht u 0 s Total ht u 17 s Total ht u 0.0 s Total Total Peak Flour From 07:00 AM m 09:00 Ann - Peak i of i Intersectio 08:00 AM n Volume 23 0 5 0 28 4 18 0 0 22 0 0 0 0 0 0 14 46 0 60 110 Percent 82 0.0 17 0.0 18. 81. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 23. 76. 0.0 1 9 2 8 3 7 flume Volume 8 0 1 0 9 2 9 0 0 11 0 0 0 0 0 0 6 16 0 22 42 Peak 0.655 Factor I High Int. 08:45 AM 08:15 AM 6:45:00 AM 08:15 AM Volume 10 0 2 0 12 2 9 0 0 11I 0 0 0 0 0 0 6 16 0 22 Peak 0.583 0.500 0.682 Factor • Higgins Associates Civil and Traffic Engineers. 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-3 Site Code : 00000003 Start Date : 03/20/2002 Page No :3 PARK PLAC Out In Total f 78 ® 28 23 • 0 5 0 Right Thru Left Peds L+ w 72 0 NoRh U c a — _ 312OM02 8:00:00 AM Y ° 3120/2002 8:45:00 AM r N o 7. _ 0 0 ° Trucks d Buses 0 +-, T r Left Thru Right Peds 0 0 01 0 0 0 0 Out In Total PARK PLACE Peak Hour From 02:00 PM to 05:45 PM - Pe Intersectio 02:45 PM 18 16. 83. 0.0 n 0.0 7 3 0 0 Volume 31 - 0 4 0 35 03:30 PM 88. 14 2 8 Percent 0.0 0.0 0 6 03:15 0.450 10 28 Volume 16 0 1 0 17 Peak Factor High Int. 03:15 PM Volume 16 0 1 0 17 Peak Factor 0.515 ik 1 of 1 3 15 0 0 18 16. 83. 0.0 0.0 0.0 7 3 0 0 0 0 0 1 0 0 1 03:30 PM 2 8 0 0 10 0 6 4 0.450 0 0 0 0 0 0.0 0.0 0.0. 0.0 0 0 0 0 0 0 0 0 0 0 0 19 19 0 38 91 50. 0.0 0 0.0 0 6 4 0 10 28 03:00 PM 0 2 10 0 12 0.792 10.813 • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name Site Code Start Date Page No PARK PLACE Out In Total ® 351L 57 - 31 0 4 0 - ht Thru Left Peds 1 I`-► O J I w ° North i O C CO ~2 cn (L 3120/2DO2 245:00 PM Y ° L 0/1002 3:30:00 PM r m i x O ° Cars O r ° �0 a � Buses n ° I Left Thru Right Peds 0 0 01 0 0 0 DO Out In Total PARK PLACE : 02 -041 -3 :00000003 : 03/20/2002.- :4 PARK PLACE / OAK PLACE Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. -95020 r%miirm Printwd_ TnirLm File Name : 02 -041 -3 Site Code : 00000003 Start Date : 03/20/2002 Page No : 1 - "" tJKtAK " -- 02:15 PM 1 0 0 0 11 0 0 0 0 01 0 0 0 0 01 0 0 0 0 01 1 - BREAK - Total 1 0 0 0 1 1 0 0 0 0 01 0 0 0 0 01 0 0 0 0 01 1 BREAK - Grand 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Apprch % 100 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % 1000 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1 PARK PLACE OAK PLACE PARK PLACE OAK PLACE From North From East From South From West Rig I Thr Ped App. Rig . Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Int. Start Time ht u Left s Total M u s Total M u s Total M u left s Total Total Factor 1.0 f 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 - "" tJKtAK " -- 02:15 PM 1 0 0 0 11 0 0 0 0 01 0 0 0 0 01 0 0 0 0 01 1 - BREAK - Total 1 0 0 0 1 1 0 0 0 0 01 0 0 0 0 01 0 0 0 0 01 1 BREAK - Grand 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Apprch % 100 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % 1000 0.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1 PARK PLACE / OAK PLACE Higgins Associates - Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 Mrnuna PrinFad- Rim m File Name :02-041-3 Site Code : 00000003 Start Date : 03/20/2002 Page No : 1 --- t3KE AK --- Grand 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % • • PARK PLACE OAK PLACE PARK PLACE OAK PLACE From North From East From South From West Rig Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Rig Thr Ped App. Int. Start Time ht u Left s Total ht u Left s Total ht u Left s Total ht u Left s Total -Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1..0 1.0 1.0 1 1.0 1 1.0 1 1.0 1 1 1.0 1 1.0 1 1.0 1 1.01 1 --- t3KE AK --- Grand 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Apprch % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total % • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A. _ - Gilroy, Ca. 95020 FIRE DEPT. / POST OFFICE DWYS / SARATOGA AVENUE raay,os Printad_ r-ars _ Tmnlm _ Rusaa File Name :02-041-4 Site Code : 00000004 Start Date : 03/20/2002 Page No : 1 11 08:00 AM SARATOGA AVE. 0 FIRE DEPTJ POST OFFICE DWYS 0 SARATOGA AVE. 4 0 1 0 5 From East 0 0 From South 6 12 From West 0 0 Start Time Right Thru Left Peds 2 Right Thru Left Peds gyp' Right Thru Left Peds 'gyp Int. 0 2 0 2 11 Total 1 0 12 5 Total 0 0 5 19 Total Total Factor 1.0 1.01 1.01 1.01 8 1.01 1.01 1.01 1.01 9 1.0 1.01 1.0 1.0 22 07:00 AM 0 0 4 0 4 1 0 0 0 1 8 0 0 0 8. 13 07:15 AM 0 0 2 0 2 2 0 1 0 3 8 0 0 0 8 13 07:30 AM 0 0 3 0 3 1 0 1 0 2 2 0 0 0 2 7 07:45 AM 0 0 2 0 2 2 0 0 0 2 6 0 0 0 6 10 Total 0 0 11 0 11 1 6 0 2 0 8 24 0 0 0 24 43 11 08:00 AM 0 0 1 0 1 4 0 1 0 5 6 0 0 0 6 12 08:15 AM 0 0 7 0 7 3 0 2 0 5 4 0 0 0 4 16 08:30 AM 0 0 2 0 2 11 0 1 0 12 5 0 0 0 5 19 08:45 AM 0 0 4 0 4 8 0 1 0 9 9 0 0 0 9 22 Total 0 0 14 0 14 26 0 5 0 31 24 0 0 0 24 69 - BREAK 02:15 PM 0 0 3 0 3 3 0 1 0 4 4 0 0 0 4 11 02:30 PM 0 0 3 0 3 5 0 1 0 6 12 0 0 0 12 21 02:45 PM 0 0 6 0 6 7 0 1 0 8 8 0 0 0 8 22 Total 0 0 12 0 12 15 0 3 0 18 24 0 0 0 24 54 03:00 PM 0 0 1 0 1 6 0 1 0 7 10 0 0 0 10 18 03:15 PM 0 0 3 0 3 6 0 0 0 6 9 0 0 0 9 18 03:30 PM 0 0 1 0 1 5 0 0 0 5 11 0 0 0 11 17 03:45 PM 0 0 0 0 01 3 0 1 0 4 7 0 0 0 7 11 Total 0 0 5 0 51 20 0 2 0 22 37 0 0 0 37 64 04:00 PM 0 0 3 0 3 6 0 1 0 7 5 0 0 0 5 15 04:15 PM 0 0 2 0 2 2 0 0 0 2 6 0 0 0 6 10 04:30 PM 0 0 3 0 3 4 0 1 0 5 4 0 0 0 4 12 - BREAK '** Total 0 0 8 0 81 12 0 2 0 141 15 0 0 0_ 151 37 05:00 PM 0 0 0 0 0 3 0 0 0 3 7 0 0 0 7 10 05:15 PM 0 0 1 0 1 4 0 0 0 4 3 0 0 0 3 8 05:30 PM 0 0 1 0 1 4 0 0 0 4 2 0 0 0 2 7 05:45 PM 0 0 2 0 2 2 0 1 0 3 3 0 0 0 3 8 Total 0 0 4 0 4 13 0 1 0 14 15 0 0 0 15 33 Grand Total 0 0 54 0 54 92 0 15 0 107 139 0 0 0 139 300 Apprch % 0.0 0.0 100.0 0.0 86.0 0.0 14.0 0.0 100.0 0.0 0.0 0.0 Total % 0.0 0.0 18.0 0.0 18.0 30.7 0.0 5.0 0.0 35.7 46.3 0.0 0.0 0.0 46.3 11 • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 North 012002 7:00:00 AM O/ZD02 5:45:00 PM Cars Trucla Buses 11-1 f+ Left Riaht Peds 15 92 0 0 0 0 0 0 0 15 92 0 10 93 107 300 0 0 0 0 107 300 Out In Total ZE DEPTJ POST OFRQE DW File Name :02-041-4 Site Code Ui Start Date 2 ¢ :2 From West rnoorn ¢ C� c� rn000,r A A Thru 0 o O O APP' .9 oo00a of 0 0 0 0 f ��ooin � Right a o Peds APP • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 North 012002 7:00:00 AM O/ZD02 5:45:00 PM Cars Trucla Buses 11-1 f+ Left Riaht Peds 15 92 0 0 0 0 0 0 0 15 92 0 10 93 107 300 0 0 0 0 107 300 Out In Total ZE DEPTJ POST OFRQE DW File Name :02-041-4 Site Code : 00000004 Start Date : 03/20/2002 Pace No :2 F,eaK Hour t-rOM U 1:UU AM to W:UU AM - F'eaK 1 OT 1 SARATOGA AVE. 0 SARATOGA AVE. 31 NOON 20000 From South From West a a —(D r- ,; A A Thru 0 o O O APP' .9 Thru CL 0, 0 0 0 0 �. O �OOOAi� Right F,eaK Hour t-rOM U 1:UU AM to W:UU AM - F'eaK 1 OT 1 SARATOGA AVE. FIRE DEPT) POST OFFICE DWYS SARATOGA AVE. 31 24 From East From South From West 14 Start Time Right Thru Left Peds APP' Right Thru Left Peds APP' Right Thru Left I Peds APP • Int. 9 0 0 0 High Int. Total Volume Total 0 7. 0 7 Peak Factor Total Total F,eaK Hour t-rOM U 1:UU AM to W:UU AM - F'eaK 1 OT 1 Intersection 08:00 AM 0 31 24 Volume 0 0 14 0 14 Percent 0.0 0.0 100.0 0.0 08:45 0 0 4 0 4 Volume 8 0 1 0 Peak Factor 9 0 0 0 High Int. 08:15 AM Volume 0 0 7. 0 7 Peak Factor 0.784 08:30 AM 0.500 • 26 0 5 0 31 24 0 0 0 24 69 83.9 0.0 16.1 0.0 100.0 0.0 0.0 0.0 8 0 1 0 9 9 0 0 0 9 22 0.784 08:30 AM 08:45 AM 11 0 1 0 12 9 0 0 0 9 0.646 0.667 • 0 Higgins Associates Civil and Traffic Engineers. 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-4 Site Code : 00000004 Start Date : 03/20/2002 Paae No :3 °2 cn North —2 o Q �c�i v.- 12002 8:00:00 AM G7 /7002 8:45:00 AM a a 'U v Cars ? 1. O a Trucks "' ° Ao N Buses Left R' ht Pods 5 26 0 ® 3t Out In Total FIRE DEPT] POST OFFICE DWYS Peak Hour From 02:00 PM to 05:45 PM - Peak 1 of 1 Intersection 02:30 PM 0 27 88.9 Volume 0 0 13 0 13 Percent 0:0 0.0 100.0 0.0 02:45 0 0 6 0 6 Volume 1 0 8 Peak Factor 0.844 High Int. 02:45 PM Volume 0 0 6 0 6 Peak Factor 0.542 U� 24 0 3 0 27 88.9 0.0 11.1 0.0 7 0 1 0 8 02:45 PM 7 0 1 0 8 0.844 39 0 0 0 39 100.0 0.0 0.0 0.0 8 0 0 0 8 02:30 PM 12 0 0 0 12 0.813 79 22 0.898 • • r] L Higgins Associates . Civil and Traffic Engineers 1335 First St. Suite A File Name Gilroy, Ca. 95020 Site Code Start Date Page No N s 1 2 I -, a ¢ F —1 North �2 0 0) — M 8002 2:30:00 PM (D ET �-- E /2002 3:15:00 PM w w <O� a �� m o 0 Buses r Left Ri ht Peds 3 24 0 52 27 79 Out In Total FIRE DEPT./ POST OFFlCE DWYS :02 -041 -4 :00000004 : 03/20/2002 :4 Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 FIRE DEPT. / POST OFFICE DWYS / SARATOGA AVENUE Groups Prinked- Trucks File Name : 02 -041 -4 Site Code : 00000004 Start Date : 03/20/2002 Page No : 1 bKtAK " "" Grand Total 0 0 0 0 Apprch % 0.0 0.0 0.0 0.0 Total % l�J u 01 0.0 0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0 SARATOGA AVE. FIRE DEPT) POST OFFICE DWYS SARATOGA AVE. From East From South From West Start Time Right Thru Left Peds App. Right Thru Left Peds App Right Thru Left Peds App. Ina. Total Total Total Total Total Total Factor 1.01 1.01 1.01 1.01 1.0 1.01 1.01 1.01 1 1.01 1.01 1.01 1.0 bKtAK " "" Grand Total 0 0 0 0 Apprch % 0.0 0.0 0.0 0.0 Total % l�J u 01 0.0 0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0 • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 FIRE DEPT. / POST OFFICE DWYS / SARATOGA AVENUE C:murx Printad- Rimpm File Name :02-041-4 Site Code : 00000004 Start Date : 03/20/2002 Page No : 1 ... bKtAK --- Grand Total 0 0 0 0 Apprch % 0.0 0.0 0.0 0.0 Total % 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0.0 0.0 0.0 0.0 3� SARATOGA AVE. From East FIR_ E DEPT) POST OFFICE DWYS From South SARATOGA AVE. From West Start Time Right Thru Left I Peds APp' Total Right Thru Left Peds APP' Total Right Thru Left Peds TotaAPpl l Int. ' Total Factor 1.01 1.0 1.01 1.01 1.01 1.01 1.01 1 1.01 1.01 1.01 1.01 1 ... bKtAK --- Grand Total 0 0 0 0 Apprch % 0.0 0.0 0.0 0.0 Total % 0 0 0 0 0 0.0 0.0 0.0 0.0 0 0 0 0 0 0.0 0.0 0.0 0.0 3� Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 PARK PLACE-7 SARATOGA AVENUE t'miinq PrintaA_ ram _ TniHm _ Rivgrm - File Name :02-041-7 Site Code : 00000000 Start Date : 03/20/2002 Page No : 1 08:00 AM 0 SARATOGA AVE. 2 0 PARK PLACE 11 0 2 SARATOGA AVE. 15 1 142 0 0 From East 277 08:15 AM From South 121 1 0 122 From West 0 3 Start Time Right Thru Left Peds Tophpa. Right Thru Left Peds T� Right Thru Left Peds T�otapl Total Factor 1.01 1.01 1.01 1.01 0 1.01 1.01 1.01 0 1.01 21 1.0 1.01 1.01 1.0 7 0 07:00 AM 0 41 4 0 45 0 0 0 3 3 4 83 0 0 87 135 07:15 AM 0 67 2 0 69 4 0 3 2 9 2 119 0 0 121 199 07:30 AM 0 75 3 0 78 7 0 5 0 12 1 111 0 0 112 202 07:45 AM 0 76 6 0 82 13 0 6 4 23 3 159 0 0 162 267 Total 0 259 15 0 274 24 0 14 9 47 10 472 0 0 482 803 08:00 AM 0 117 2 0 119 11 0 2 2 15 1 142 0 0 143 277 08:15 AM 0 121 1 0 122 13 0 3 1 17 8 123 0 0 131 270 08:30 AM 0 84 4 0 88 6 0 1 0 7 5 138 0 0 143 238 08:45 AM 0 76 21 0 97 12 0 7 0 19 16 123 0 0 139 255 Total 0 398 28 0 426 42 0 13 3 58 30 526 0 0 556 1040 "'BREAK 02:15 PM 0 97 6 0 103 3 0 5 0 8 8 158 0 0 166 277 02:30 PM 0 99 5 0 104 7 0 4 1 12 4 96 0 0 100 216 02:45 PM 0 110 6 0 116 1 0 7 1 9 7 107 0 0 114 239 Total 0 306 17 0 323 11 0 16 2 29 19 361 0 0 380 732 03:00 PM 0 111 2 0 113 6 0 4 0 10 7 100 0 0 107 230 03:15 PM 0 93 1 0 94 6 0 4 0 10 4 97 0 0 101 205 03:30 PM 0 109 2 0 111 4 0 4 2 10 10 112 0 0 122 243 03:45 PM 0 119 2 0 121 3 0 4 1 8 7 101 0 0 108 237 Total 0 432 7 0 439 19 0 16 3 38 28 410 0 0 438 915'- 04:00 PM 0 106 4 . 0 110 5 0 1 1 7 0 92 0 0 92 209 04:15 PM 0 91 5 0 96 0 0 1 1 2 4 60 0 0 64 162 04:30 PM 0 84 5 0 89 4 0 2 6 12 2 65 0 0 67 168 04:45 PM 0 103 6 0 109 7 0 6 0 13 2 89 0 0 91 213 Total 0 384 20 0 404 16 0 10 8 34 8 306 0 0 314 752 05:00 PM 0 94 9 0 103 8 0 1 2 11 6 85 0 0 91 205 05:15 PM 0 108 2 0 110 2 0 1 4 7 2 88 0 0 90 207 05:30 PM 0 109 4 0 113 2 0 0 3 5 2 68 0 0 70 188 05.45 PM 0 106 2 0 108 5 0 2 1 8 3 89 0 0 92 208 Total 0 417 17 0 434 17 0 4 10 31 13 330 0 0 343 808 06:00 PM 0 98 3 0 101 2 0 1 1 4 4 106 0 0 110 215 Grand Total 0 2294 107 0 2401 131 0 74 36 241 112 2511 0 0 2623 5265 Apprch % 0.0 95.5 4.5 0.0 54.4 0.0 30.7 14.9 4.3 95.7 0.0 0.0 Total % 0.0 43.6 2.0 0.0 45.6 2.5 0.0 1.4 0.7 4.6 2.1 47.7 0.0 0.0 49.8 I-] • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-7 Site Code : 00000000 Start Date : 03/20/2002 Page No : 2 PARK PLACE Out In Total 0 [10 Flo 0 0 0 'iii NN'OV Of 0000 } .}L� WFV Q J 0000 NtO d(OO5;- North ri Q 00f N N— O N= 0 r1002 7:00:00 AM + -2 N _ N C In f0 ~ OriD02 6:00:00 PM W N N NOONL r W-4 Q W-1 C2(5 O O R M ao + Truck V o rn V1ON�N� 0000 N Buses CT dam. U O O y a aan��y o_ N0000 WoVrn– +i T r Left Thm Right Peds 1219 220 438 22 0 241 460 Out In Total PARK PLACE 73 0 131 16 1 0 0 ZO 0 0 0 0 74 0 131 36 reaK rlour rfom U /:UU AM to Lrd:UU AM - reaK 1 OT 1 SARATOGA AVE. PARK PLACE SARATOGA AVE. 62 17 562 From East From South From West 0 Start Time Right Thru Left Peds App Right Thru Left Peds App Right Thru Left Peds 119 Peak Factor 0 143 277 High Int. 08:15 AM Volume 0 121 1 0 122 Peak Factor Total Total reaK rlour rfom U /:UU AM to Lrd:UU AM - reaK 1 OT 1 Intersection 07:45 AM 7 62 17 562 Volume 0 398 13 0 411 Percent 0.0 96.8 3.2 0.0 2.9 97.1 08.00 0.0 11 Volume 0 117 2 0 119 Peak Factor 0 143 277 High Int. 08:15 AM Volume 0 121 1 0 122 Peak Factor 0.842 43 0 12 7 62 17 562 0 0 579 1052 69.4 0.0 19.4 11.3 2.9 97.1 0.0 0.0 11 0 2 2 15 1 142 0 0 143 277 0.949 07:45 AM 07:45 AM 13 0 6 4 23 3 159 0 0 162 0.674 0.894 • • Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 File Name :02-041-7 Site Code : 00000000 Start Date : 03/20/2002 Paae No :3 Peak Hour From 02:00 PM to 06:00 PM - Peak 1 of 1 Intersection PARK PLACE 2 39 Volume 0 417 Out In Total 0 436 Percent 0:0 95.6 4.4 0 0 1 02:15 0 97 6 0 103 Volume m0 w Peak Factor North 1 C o^, Q F —► -2 0 Volume c to 6 IMM 7:45:00 AM M 50 .r L 0/2002 6:30:00 AM w �M �O� CO) Cars Trud6 o» m rn d Buses Cx o — *-1 T r -- Left Thru Right Pods 12 0 431 7 ® 62 92 Out In Total PARK PLACE Peak Hour From 02:00 PM to 06:00 PM - Peak 1 of 1 Intersection 02:15 PM 2 39 Volume 0 417 19 0 436 Percent 0:0 95.6 4.4 0.0 02:15 0 97 6 0 103 Volume 7 Peak Factor 4 1 12 High Int. 02:45 PM Volume 0 110 6 0 116 Peak Factor 0.940 17 0 20 2 39 43.6 0.0 51.3 5.1 3 0 5 0 8 02:30 PM 7 0 4 1 12 0.813 26 461 0 0 487 5.3 94.7 0.0 0.0 8 158 0 0 166 02:15 PM 8 158 0 0 166 0.733 962 277 0.868 • • • Higgins Associates PARK PLACE Civil and Traffic Engineers 1335 First St. Suite A File Name :02-041-7 Gilroy, Ca. 95020 Site Code : 00000000 0 r--01 10 Start Date : 03/20/2002 v o rn Page No : 4 PARK PLACE Out In Total 0 r--01 10 - v o rn o v� O Umi C V C V /1002 2:15:00 PM a E O ctOi Loy /2D02 3:00:00 PM m ,� Q j co O v ° v Cars Trucks m �d aa) Buses m 0 T r Left Thru Right Pods 20 0 171 2 Out In Total PARK PLACE Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 PARK PLACE / SARATOGA AVENUE ('muna PrirMari- Truck File Name :02-041-7 Site Code : 00000000 Start Date : 03/20/2002 Page No : 1 "" BREAK °' SARATOGA AVE. PARK PLACE SARATOGA AVE. From East From South 07:45 AM 0 From West 1 0 Start Time Right Thru Lest Peds APp' Right Thru Left Peds _ 01 Right Thti Left Peds gyp' In 1 0 41 0 0 Total 1 21 0 1 la, Total 0 1 1 7 Total Total Factor 1.01 1.01 1.01 1.01 0 1.01 1.01 1.01 1.0 0 1.01 1.01 1.01 1.0 1 07:00 AM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 07:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 "" BREAK °' 07:45 AM 0 1 1 0 21 0 0 1 1 21 0 0 0 0 _ 01 4 Total 0 3 1 0 41 0 0 1 1 21 0 1 0 0 1 1 7 08:00 AM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 08:15 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 08:30 AM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 08:45 AM 0 0 0 0 0 0 0 0 0 0 0 2 0 0 2 2 Total 0 0 0 0 0 0 0 0 1 1 0 4 0 0 4 5 ,•, BREAK ••• -- 02:30 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 02:45 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 Total 0 0 0 0 01 0 0 0 2 21 0 0 0 0 01 2 BREAK "' 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 1 03:30 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 BREAK Total 0 0 0 0 01 0 0 0 1 1 1 0 1 0 0 1 1 2 04:00 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1 2 04:15 PM 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 04:30 PM 0 2 0 0 2 0 0 0 4 4 0 0 0 0 0 6 04:45 PM 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 Total 0 4 0 0 4 0 0 0 5 5 0 3 0 0 3 12 05:00 PM 0 2 0 0 2 0 0 0 2 2 0 0 0 0 0 4 05:15 PM 0 0 0 0 0 0 0 0 4 4 0 1 0 0 1 5 05:30 PM 0 2 0 0 2 0 0 0 2 2 0 2 0 0 2 6 05:45 PM 0 0 0 0 0 0 0 0 1 1 0 1 0 0 1 2 Total 0 4 0 0 4 0 0 0 9 9 0 4 0 0 4 17 06:00 PM 0 1 0 0 1 0 0 0 1 1 0 1 0 0 1 3 Grand Total 0 12 1 0 13 0 0 1 20 21 0 14 0 0 14 48 Apprch % 0.0 92.3 7.7 0.0 0.0 0.0 4.8 95.2 0.0 100.0 0.0 0.0 Total % 0.0 25.0 2.1 0.0 27.1 0.0 0.0 2.1 41.7 43.8 0.0 29.2 0.0 0.0 29.2 �J Higgins Associates Civil and Traffic Engineers 1335 First St. Suite A Gilroy, Ca. 95020 PARK PLACE / SARATOGA AVENUE Groups Printed- Buses File Name :02-041-7 Site Code : 00000000 Start Date : 03/20/2002 Page No : 1 BREAK 07:30 AM 07:45 AM SARATOGA AVE. From East PARK PLACE From South SARATOGA AVE. From West 0 0 Start Time Right Thru Left Peds App' Total Right Thru Left Peds APP- Total Right Thru Left Peds App' Total Int. Total Factor 1.0 1.0 1.0 1.0 01 1.0 1.0 1.0 1.0 41 1.0 1.0 1.0 1.0 0 0 07:00 AM 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 BREAK 07:30 AM 07:45 AM 0 0 1 1 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 1 1 2 2 Total 0 3 0 0 31 0 0 0 0 01 0 4 0 0 41 7 08:00 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 08:15 AM 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 08:30 AM 0 1 0 0 1 0 0 0 0 0 0 2 0 0- 2 3 08:45 AM 0 4 0 0 4 0 0 0 0 0 0 2 0 0 2 6 Total 0 7 0 0 7 0 0 0 0 0 0 6 0 0 6 13 BREAK 02:15 PM 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 3 02:30 PM 0 0 0 0 0 0 0 0 0- 0 0 2 0 0 2 2 02:45 PM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 Total 0 5 0 0 5 0 0 0 0 0 0 2 0 0 2 7 03:00 PM 0 2 0 0 21 0 0 0 0 01 0 2 0 0 21 4 BREAK "' 03:30 PM 0 1 0 0 1 0 0 0 0 0 0 2 0 0 2 3 03:45 PM 0 1 0 0 1 0 0 0 0 0 0 0 0 0 0 1 Total 0 4 0 0 41 0 0 0 0 01 0 4 0 0 41 8 04:00 PM 0 2 0 0 21 0 0 0 0 01 0 1 0 0 1.1 3 BREAK "' Total 0 2 0 0 21 0 0 0 0 01 0 1 0 0 11 3 05:1155 PM 0 0 0 0 OI 0 0 0 0 0 0 1 0 0 1 1 BREAK "' Total 0 0 0 0 01 0 0 0 0 01 0 2 0 0 21 2 BREAK Grand Total 0 21 0 0 21 0 0 0 0 0 0 19 0 0 19 40 Apprch % 0.0 100.0 0.0 0.0 ( 0.0 0.0 0.0 0.0 0.0 100.0 0.0 0.0 Total % 0.0 525 0.0 0.0 52.5 0.0 0.0 0.0 0.0 0.0 0.0 47.5 0.0 0.0 47.5 0 APPENDIX D RAW 24 -HOUR COUNTS AND SPEED DATA • weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000001 Board Copyright 1998 Start Date: 03/18/2002 Other File I.D. 02 -041 -1 Street name :SARATOGA AVE. Cross street:PARK PLACE EB /WB Page 1 Begin Mon. 03/18 Tues. Wed. Thur. Fri. Sat. Sun. Week Avg. i.e EB WE EB WB EB WB EB WB EB WB EB WB EB WB EB WB 2:00 am * * * * * * 42 46 * * * * * 42 46 01:00 * * * * * * 14 25 * * * * * * 14 25 02:00 * * * + * + 5 9 + + + + + + 5 9 03:00 * * + * * * 7 6 + + + + x * 7 6 04:00 + + + + + x 8 7 * + x + x x 8 7 05:00 * * * * * * 14 12 * * * * * * 14 12 06:00 * * * * * * 71 44 * * * * * * 71 44 07 :00 + * * + + * 202 122 + + * + + * 202 122 08:00 * * * * * * 461 265 * * * * * * 461 265 09:00 * * * * * * 469 348 * ' * * * * 469 348 10:00 * * * * * * 367 290 * * * * * * 367 290 11:00 * * * * * * 342 302 * * * * * * 342 302 12:00 pm * * * * * * 322 362 * * * * * 322 362 01:00 * * * * * 345 337 * * * * * * 345 337 02:00 * * * * 374 357 * * * * * * * * 374 357 03:00 * * * * 477 392 * * * * + * * * 477 392 04:00 * * * * 379 363 * * * * * * * * 379 363 05:00 * * * * 332 387 * * * * * * * * 332 387 06:00 * * * * 323 372 * * * * * * * * 323 372 07:00 * * * * 286 346 * * * * * * * * 288 346 08:00 * * * * 199 271 * * * * * * * * 199 271 09:00 * * * * 177 218 * * * * * * * * 177 218 10:00 * * * * 181 146 * * * * * * * * 181 146 11:00 * * * * 117 ].07 * * * * * * * * 117 107 Totals 0 0 0 0 2847 2959 2669 2175 0 0 0 0 0 0 5516 5134 0 0 5806 4844 0 0 0 10650 Avg. Day .0% .0% .0% .0% 51.6% 57.6% 48.3% 42.3% .0% .0% .0% .0% .0% .0% AM Peaks 09:00 09:00 09:00 09:00 Volume 469 348 469 348 PM Peaks 03:00 03:00 01:00 12:00 03:00 03:00 Volume 477 392 345 362 477 392 ADTs 40 Weather JAMAR Technologies, Inc. 1nr. U- 10 L1 LO Counted by: TAS for Windows Site Code 000000000001 ' Board # Copyright 1998 Start Date: 03/20/2002 Other I File I.D. 02 -041 -1 Street name :SARATOGA AVE. Cross street:PARK PLACE EB Page 1 8egln 1nr. U- 10 L1 LO -31 .30 41 40 71 JO U oo I ime Total 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 2:00 03/20 01:00 + x x x x + + + + + + + x + ± 02:00 + x + + x + x x + + x + x x + 03:00 + x + + + x x + x + + + + * x 04:00 + x + x x + x x x + x x + + + 05:00 + x + x x + + + + + x + x + x 06:00 + x + + + + + x + + + + + + x 07:00 * x + x + + x + + + x + + + + 08:00 + x + + x + + x + + x + + + + 09:00 + x + + + + x + + + + x + + x 10:00 11:00 x + + + + + + + x x + + + + + 12:00 pm + + + x + x + + + + + x + + + 01:00 + x + + + x + + + + x x + + + 02:00 374 10 15 46 155 -. 110 16 1 1 0 0 1 0 0 19 03:00 477 7 17 46 195 162 20 3 2 .2 1 0 1 0 21 04:00 379 10 19 43 143 108 26 2 0 1 1 0 0 0 26 05:00 332 6 20 33 101 131 20 3 1 0 0 0 1 0 16 06:00 323 8 14 24 102 121 29 4 0 0 0 0 0 0 21 07:00 288 10 11 22 101 107 22 3 1 0 1 0 1 0 -- 9- 08:00 199 5 8 25 58 75 20 0 3 0 0 0 0 1 4 09:00 177 0 2 11 48 88 16 2 0 0 0 0 0 0 10 10:00 181 1 2 10 37 95 30 3 0 0 0 0 0 0 3 11:00 117 0 1 5 28 61 18 2 0 0 0 0 0 2 0 Day Totals 2847 57 109 265 968 1058 217 23 8 3 3 1 3 3 129 12:00 03/21 42 0 1 4 8 20 9 0 0 0 0 0 0 0 0 01:00 14 0 0 2 1 4 4 2 0 0 0 0 0 0 1 02:00 5 0 0 0 1 3 0 1 0 0 0 0 0 0 0 03:00 7 0 0 1 3 0 1 2 0 0 0 0 0 0 0 04:00 8 1 0 0 3 2 2 0 0 0 0 0 0 0 0 05:00 14 0 0 1 2 4 7 0 0 0 0 0 0 0 0 06:00 71 0 5 4 9 37 14 1 0 0 0 0 0 0 1 07:00 202 2 6 9 33 106 42 2 0 0 0 0 0 0 2 08:00 461 6 9 15 146 207 58 4 1 0 0 0 0 0 15 09:00 469 7 8 44 187 163 32 7 1 1 0 1 1 0 17 10:00 367 2 6 32 125 149 23 2 0 2 1 2 2 0 21 11:00 342 4 12 39 124 120 20 0 1 1 0 2 1 0 18 12:00 pm 322 2 9 32 107 134 20 2 1 1 1 0 0 0 13 SG1:00 345 5 9 39 127 113 17 4 0 0 1 0 0 0 30 rand Total 5516 86 174 487 1844 2120 466 50 12 8 6 6 7 3 247 Speed Statistics. 15th Percentile Speed 25 MPH Median Speed (50th percentile): 30 MPH _._. Average Speed - All Vehicles 35 MPH 85th Percentile Speed 34 MPH 95th Percentile Speed 50 MPH 10 MPH Pace Speed 26 -35 MPH Number of Vehicles in Pace 3964 Percent of Vehicles in Pace 72.16% Number of Vehicles > 35 MPH 805 Percent of Vehicles > 35 MPH: 14.65% r1 Weather JA=!AR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000001 Board # Copyright 1998 Start Date: 03/20/2002 Other File I.D. 02 -041 -1 Street name :SARATOGA AVE. Cross street:PARK PLACE WB Page 1 Begin Int. 0- 16 21 26 31 36 41 46 .51 56 61 66 71 76 i.e Total 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 2:00 03/20 * * * + * * * + t + + + x + + 01:00 + x # t # * + t + + t x # # + 02 :00 # + # # + # # * # # t # + r + 03.00 t # t + * + # x # x x * + # # 04:00 k t # t x # + # * * # x x + + 05:00 * * # + t t t # # + x # + + + 06:00 + t k * # t # t k t t # + # t 07:00 + # + * # * * # * # k t * # x 08:00 09:00 # * t t # t # # k # # t + # t 10:00 * t* t t * + t x k t x + * + 11:00 + # x t t # t t t # # t # + } 12:00 pm t * t + # t # # t + # # # x + 01.00 + + + # # # t t + t x #• + + } 02:00 357 12 39 97 131 48 8 2 2 1 0 1 2 1 13 03:00 392 5 19 85 175 67 13 3 1 0 2 2 0 2 18 04:00 363 12 23 91 140 62 8 4 1 0 3 0 0 1 1B 05:00 387 12 28 85 152 82 13 1 1 0 2 0 - 0 1 10 06:00 372 4 8 42 166 124 13 2 1 0 1 1 0 0 10 07:00 346 4 11 64 140 103 12 1 1 0 0 0 0 0 10 08:00 271 0 3 16 116 106 23 2 0 1 0 0 0 0 4 09:00 218 1 2 16 87 94 12 0 1 0 0 0 0 1 4 10:00 146 0 2 it 54 62 11 0 1 0 0 0 1 0 4 11:00 107 0 1 12 31 47 14 1 0 0 1 0 0 0 0 Day Totals 2959 50 136 519 1192 795 127 16 9 2 9 4 3 6 91 12:00 03/21 46 0 0 0 15 24 6 1 0 0 0 0 0 0 0 01:00 25 0 1 1 8 10 4 1 0 0 0 0 0 0 0 02:00 9 0 1 0 5 2 1 0 0 0 0 0 0 0 0 03:00 6 0 0 1 1 1 3 0 0 0 0 0 0 0 0 04:00 7 0 1 1 2 3 0 0 0 0 0 0 0 0 0 05:00 12 0 0 0 2 3 6 1 0 0 0 0 0 0 0 06:00 44 0 1 7 15 11 10 0 0 0 0 0 0 0 0 07:00 122 1 2 7 42 50 15 1 0 0 0 0 0 0 4 08:00 265 3 16 35 112 69 10 4 3 0 0 0 1 0 12 09:00 348 9 17 54 145 86 12 2 0 0 1 1 0 2 19 10:00 290 2 10 34 122 89 15 3 0 0 1 1 0 0 13 11:00 302 6 18 30 125 95 13 0 0 0 1 1 0 0 13 12:00 pm 362 6 22 53 163 93 13 3 0 1 0 1 0 0 7 91:00 337 6 17 - 43 141 96 11 2 2 1 0 1 0 1 16 Grand Total 5134 83 242 785 2090 1427 246 34 14 4 12 9 4 9 175 Speed Statistics. 15th Percentile Speed 22 MPH Median Speed (50th percentile): 28 MPH Average Speed - All Vehicles 32 MPH 85th Percentile Speed 33 MPH 95th Percentile Speed 40 MPH 10 MPH Pace Speed 26 -35 MPH Number of Vehicles in Pace 3517 Percent of Vehicles in Pace 68.738 Number of Vehicles > 35 MPH 507 Percent of Vehicles > 35 MPH: 9.91% Weather Counted by: Board # Other Street name Begin ime M 2: 00 am 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 pm 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 Totals . Avg. Day AM Peaks Volume PM Peaks Volume ADTs • • JAMAR Technologies, Inc. TAS for Windows Site Code : 000000000002 Copyright 1998 Start Date: 03/16/2002 File I.D. 02 -041 -2 9 /SARTOGA -LOS GATOS Cross street:OAK STREET NB /SB Page 1 n. 03/18 Tues. Wed. Thur. Fri. Sat. Sun. Week Avg. NB SB NB SB NB SB NB SB — NB SB NB SB NB SB NB SB * * * * * x 32 21 + + * * * 32 21 4 8 * * * * * * 4 8 * * + * * * 10 5 * * * * * * 10 5 + * * * * * 0 2 * * * * * * 0 2 4 3 * * * * * * 4 3 * * * * * * 25 17 * * * + * * 25 17 * * * * * * 148 59 * * * * * * 148 59 * * * * + * 600 147 + * * * * * 600 147 * * * + * * 603 341 * * * * * * 603 341 * * * * * * 498 292 * * * * * * 496 292 * * * * * * 366 310 * * * * * * 366 310 * * * * * * 392 346 * + * * * * 392 346 * * + * * * 367 378 * * * * * * 367 378 * * * * * * 64 48 * * + * * * 64 46 * * * * 425 481 * * * * * * * * 425 481 * * * * 372 555 * * * * * * * * 372 555 * * * * 338 610 * * * * * * * * 338 610 * * * * 322 633 * * * + * + + * 322 633 * * * * 260 601 * * * * * * * * 280 601 * * * * 240 358 * * * * * * * * 240 358 * * * * 148 199 * * * * * * * * 148 199 + * * * 161 189 * * * * * * * * 161 189 * * * + 94 144 * * * * * * * * 94 144 + * * * 37 45 * * * + * * * + 37 45 0 0 0 0 2417 3815 3113 1977 0 0 0 0 0 0 5530 5792 0 0 6232 5090 0 0 0 11322 0% .0% .0% .08 43.79 65.88 56.28 34.18 .0% .09 .0% .09 .0% .0% 08:00 11:00 08:00 11:00 603 346 603 346 02:00 05:00 12:00 12:00 02:00 05:00 425 633 367 376 - -- 425 633 Weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code 000000000002 Board # Copyright 1998 Start Date: 03/20/2002 Other File I.D. 02 -041 -2 Street name :HWY 9 /SARATOGA -LOS GATOS Cross street:OAK STREET SB Page 1 Begin Int. 0- 16 21 26 31 36 41 46 51 56 61 66 11 76 ime Total 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 2:00 03/20 * * * * * * * + * * + + + + + 61:00 + + + + + + + + + + + + + + + 02:00 + + + + + + * + + + + + + + + 03:00 + + + + + + + + + + + + + + + 04:00 + + + + + + + + + + + + + + + 05:00 + + + + + + + + + + + + + + + 06:00 07:00 + + + + + + + + + + + + + + + 08:00 + + + + + + + + + + + + + + + 0 9: 00 + + + + + + + + + + + + + + + 10:00 + + + + + * + + + + + + + + + 11:00 12:00 pm + + + + + + + + + + + + + + + 01:00 + + + + + + + + * + + + + + + 02:00 461 14 - 56 92 172 100 13 4 3 0 0 2 0 4 21 03:00 555 11 43 63 195 159 32 4 3 4 0 1 1 0 19 04:00 610 18 48 121 218 137 32 7 1 2 2 0 2 1 21 05:00 633 9 39 74 237 199 40 8 4 0 3 0 2 0 18 06:00 601 8 35 97 209 179 44 6 3 1 1 0 1 2 15 07:00 358 2 16 30 122 136 31 4 0 0 1 0 0 1 15 08:00 199 2 5 10 65 83 23 5 1 0 0 0 0 0 5 09:00 189 2 6 12 67 73 20 3 0 0 0 0 0 1 5 10:00 144 1 7 12 48 62 12 2 0 0 0 0 0 0 0 11:00 45 0 0 2 13 23 5 1 0 0 0 0 0 0 1 Day Totals 3815 67 255 533 .1346 1151 252 44 15 7 7 3 6 9 120 12:00 03/21 21 0 2 2 5 10 2 0 0 0 0 0 0 0 0 01:00 8 0 1 1 2 4 0 0 0 0 0 0 0 0 0 02:00 5 0 0 2 0 2 1 0 0 0 0 0 0 0 0 03:00 2 0 0 0 1 1 0 0 0 0 .0 0 0 0 0 04:00 3 0 0 0 0 2 1 0 0 0 0 0 0 0 0 05:00 17 0 2 1 7 3 3 1 0 0 0 0 0 0 0 06:00 59 2 5 9 17 20 6 0 0 0 0 0 0 0 0 07:00 147 2 13 15 36 45 17 1 4 0 1 0 0 0 13 08:00 341 18 59 47 102 66 12 5 1 0 0 0 2 2 27 09:00 292 11 28 34 82 90 22 2 2 0 0 3 2 0 16 10:00 310 5 39 33 97 96 22 2 0 0 2 0 3 1 10 11:00 346 10 36 52 113 104 17 2 1 0 1 1 0 0 9 12:00 pm 378 18 30 49 125 90 27 6 1 0 3 1 3 0 25 O01:00 48 3 4 4 24 10 2 0 0 0 0 0 0 0 1 'Grand Total 5'792 136 474 782 1957 1694 384 63 24 7 14 —6 16 12 221 Speed Statistics. 15th Percentile Speed 21 MPH Median Speed (50th percentile): 26 MPH Average Speed - All Vehicles 33 MPH 85th Percentile Speed 34 MPH 95th Percentile Speed 47 MPH 10 MPH Pace Speed 26 -35 MPH _ Number of Vehicles in Pace 3651 Percent of Vehicles in Pace 63.30% Number of Vehicles > 30 MPH 2443 Percent of Vehicles > 30 MPH: 42.358 • Weather JAMAR Technologies, Inc. Counted by: TAS for Windows Site Code : 000000000002 Board fl Copyright 1998 Start Date: 03/20/2002 Other File I.D. 02 -041 -2 Street name :HWY 9 /SARATOGA -LOS GATOS Cross street:OAK STREET NB Page 1 Begin Int. - 1 21 26 31 36 41 46 1 56 61 66 71 76 Time Total 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 12:00 03/20 * * * * * * * * * * + 01:00 02:00 + x x + + + + + + + x + x x x 03:00 04:00 x x + + x + + + + + + x + + x 05:00 x x x + + x + x x + x x x x + 06:00 + x + + x + + + + + + x + + + 07:00 '08.00 + x + x + x x x x x + + x + + 09:00 + * * * x + x x x + x + x + x 10:00 x x x + x x x + x + + x + + 11:00 x + x + + x x x + + + x x x + 12.00 pm * * * * * + + + + + + x x x + 01.00 x x + x x x + + + + x + x x + 02:00 425 19 27 33 37 132 126 25 1 1 2 3 3 1 15 03:00 372 7 22 17 16 105 152 32 4 0 0 1 1 0 15 04:00 338 8 18 27 28 85 119 25 1 0 1 2 2 2 20 05:00 322 10 12 28 28 79 116 26 5 1 0 1 1 0 15 06:00 280 5 4 16 10 88 102 25 4 0 3 1 0 3 19 07:00 240 7 16 10 24 87 71 16 1 0 0 0 0 1 7 08:00 148 2 13 9 14 48 50 11 0 0 0 0 0 0 1 09:00 161 6 10 18 17 48 55 5 2 0 0 0 0 0 0 10:00 94 0 6 4 8 30 29 12 1 1 0 0 0 0 3 11:00 37 1 2 1 3 15 9 5 0 1 0 0 0 0 0 Day Totals 2417 65 130 163 185 717 829 182 19 4 6 8 7 7 95 12:00 03/21 32 1 3 3 3 5 10 5 1 0 1 0 0 0 0 01:00 4 0 0 1 0 3 0 0 0 0 0 0 0 0 0 02:00 10 0 1 0 2 0 7 0 0 0 0 0 0 0 0 03:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 4 0 0 0 1 1 1 0 1 0 0 0 0 0 0 05:00 25 0 0 0 2 9 9 3 2 0 0 0 0 0 0 06:00 148 3 6 6 10 33 59 28 3 0 0 0 0 0 0 07:00 600 19 32 40 55 213 193 32 3 0 0 0 2 0 11 06:00 603 28 54 49 86 193 129 14 4 1 2 2 2 2 37 09:00 498 6 16 47 44 158 160 46 4 1 0 1 1 0 14 10:00 366 3 21 32 25 101 123 43 2 2 0 4 1 1 8 11:00 392 10 19 31 38 115 122 33 3 1 3 2 1 0 14 12:00 pm 4O01:00 367 18 41 64 2 4 35 4 26 12 106 19 99 18 25 2 1 0 0 0 0 0 2 0 0 0 1 0 13 3 Grand Total 5530 155 327 411 489 1673 1759 413 43 9 12 19 14 11 195 Speed Statistics. 15th Percentile Speed 23 MPH Median Speed (50th percentile): 33 MPH Average Speed - All Vehicles 37 MPH 85th Percentile Speed 39 MPH 95th Percentile Speed 47 MPH 10 MPH Pace Speed 31 -40 MPH +* Number of Vehicles in -Pace 3432 Percent of Vehicles in Pace 62.328 Number of Vehicles > 30 MPH 4146 Percent of Vehicles > 30 MPH: 75.328 • 0 APPENDIX E RAW RADAR SPEED SURVEY DATA • • • • City of Saratoga Public Safety Center Speed Study Analysis Location: Highway 9 2 2 26 2 4 Direction: NB 50th percentile speed (median): 33 mph Average Speed: 33 mph Day of the Week: Thursday 85th percentile speed (critical): 40 mph Standard Deviation: 5 mph Date: Mar. 21,2002 10 mph pace speed 2: 26 to 35 Mode': 31 mph Time of Day: 10:11 AM -10:45 AM Percent in pace speed: 72% % Exceeding Speed Limit: 70 % Posted Speed Limits: 30 mph Range of speeds: 25 to 43 36 1 2 Vehicles Observed: 50 2 78 38 3 6 Survey Data Speed Number Percent. Cumul. (mph) of Obs. of Total Percent 25 1 2 2 26 2 4 6 27 5 10 16 28 2 4 20 29 2 4 24 30 3 6 30 31 6 12 42 32 4 8 50 33 5 10 60 34 3 6 66 35 4 8 74 36 1 2 76 37 1 2 78 38 3 6 84 39 0 0 84 40 3 6 90 41 3 6 96 42 1 2 98 43 1 2 100 Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. A02441h NBI.Ouµl • UJ • City of Saratoga Public Safety Center Speed Study Analysis Location: Highway 9 2 2 24 1 2 Direction: SIB 50th percentile speed (median): 31 mph Average Speed: 30 mph Day of the Week: Thursday 85th percentile speed (critical): 33 mph Standard Deviation: 3 mph Date: Mar. 21,2002 10 mph pace speed2: 25 to 34 Mode': 33 mph Time of Day: 10:47AM - 11:20AM Percent in pace speed: 90% % Exceeding Speed Limit: 52 % Posted Speed Limie: 30 mph Range of speeds: 23 to 35 34 2 4 Vehicles Observed: 50 6 100 Survey Data Speed Number Percent. Cumul. (mph) of Obs. of Total Percent 23 1 2 2 24 1 2 4 25 4 8 12 26 2 4 16 27 5 10 26 28 5 10 36 29 1 2 38 30 5 10 48 31 8 16 64 32 3 6 70 33 10 20 90 34 2 4 94 35 3 6 100 ' ■ ■ ■ ■ ■ ■ ■■ ■fir ■M■ ■■■■ ■■■■ ■■■■■■ Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. A02-041 Mry0SB1 -OWpid • • is City of Saratoga Speed Study Analysis Location: Saratoga Ave. E/O Hwy 9 5 10 10 26 Direction: EB _ 50th percentile speed (median): 29 mph Average Speed: 30 mph Day of the Week: Thursday 85th percentile speed (critical): 34 mph Standard Deviation: 3 mph Date: Mar 21,2002 10 mph pace speed2: 25 to 34 Mode': 28 mph Time of Day: 9:06AM - 9:20Am Percent in pace speed: 92 % % Exceeding Speed Limit: 2% Posted Speed Limit: 35 mph Range of speeds: 25 to 37 4 8 Vphirlac nhcprvpri• SO 5 10 92 35 Or" Speed Number Percent. Cumul. (mph) of Obs. of Total Percent 25 5 10 10 26 4 8 18 27 5 10 28 28 9 18 46 29 5 10 56 30 3 6 62 31. 6 12 74 32 0 0 74 33 4 8 82 34 5 10 92 35 3 6 98 36 0 0 98 37 1 2 100 Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. AM-041 VogaEe+.OuOtd • • u City of Saratoga Public Safety Center Speed Study Analysis Location: Saratoga Ave E/O Hwy 9 4 4 24 1 2 Direction: WB 50th percentile speed (median): 28 mph Average Speed: 29 mph Day of the Week: Thursday 85th percentile speed (critical): 32 mph Standard Deviation: 3 mph Date: Mar. 21,2002 10 mph pace speed 2: 25 to 34 Mode: 25 mph Time of Day: 9:30AM - 10:07AM Percent in pace speed: 88 % % Exceeding Speed Limit: 2% Posted Speed Limit3: 35 mph Range of speeds: 23 to 36 34 3 6 Vehicles Observed: 50 4 98 36 1 2 Survey Data Speed Number Percent. Cumul. (mph) of Obs. of Total Percent 23 2 4 4 24 1 2 6 25 9 18 24 26 1 2 26 27 7 14 40 28 7 14 54 29 2 4 58 30 4 8 66 31 8 16 82 32 2 4 86 33 1 2 88 34 3 6 94 35 2 4 98 36 1 2 100 Notes: 1 If there is more than one mode, the highest speed is presented in the summary. 2 If there is more than one 10 mph pace speed, the average is presented in the summary. 3 Refers to speed limit as posted on day and at the location of the speed survey. A02-041SWO"SWB1 -OWgJ APPENDIX F . SARATOGA PUBLIC SAFETY CENTER ALTERNATIVE COMPARISON FIRE DEPARTMENT EMERGENCY RESPONSE CALLS - DIRECTION FROM HWY 9 / SARATOGA AVE INTERSECTION CODE 3 CALLS OF CODE 3 PERCENT DIRECTION ROUTE NUMBER OF TOTAL NORTH Saratoga - Sunnyvale Road 245 22.0% SOUTH Saratoga - Los Gatos Road (Hwy 9) 213 19.1% EAST Saratoga Avenue 410 36.8% WEST Big Basin (Hwy 9) 247 22.2% TOTAL 1,115 100.0% Based on historical data - March 18, 2001 - March 18, 2002 • 0 APPENDIX G HIGHWAY 9 /OAK STREET SIGNAL WARRANTS (PRELIlVIINARY) • C� 9 -6 TRAFFIC SIGNALS AND LIGHTING Traffic Manual 1 -1992 i Figure 9 -1 TRAFFIC SIGNAL WARRANTS CALC ArlY DATE DIST CO FIT'E,/ PM CHK DATE Major St: l /L --Critical Approach Speed �® mph Minor St: ' , Critical Approach Speed mph Critical speed of major street traffic > 40 mph — —�- � i �! ❑ or RURAL (R) In built up area of isolated community of < 10,000 pop- — — — — — — — — — ❑ ❑ URBAN (U) WARRANT 1 - Minimum Vehicular Volume *WARRANT A�elrl- 61,& 6p^ 4H-el-j 2 - Interruption of �ntinuous Traffic . MINIMUM REQUIREMENTS Pedestrian volume crossing the major street is 100 or more (80% SHOWN IN BRACKETS) (80% SHOWN IN BRACKETS) U R U R APPROACH 1 2 or more LANES 2 or more LANES Both Apprchs. 500 350 600 420 Major Street (400) (280) (480) (336) Highest Apprch. 150 105 200 140 Minor Street (120) (8 (8 1 (160) (112) *WARRANT A�elrl- 61,& 6p^ 4H-el-j 2 - Interruption of �ntinuous Traffic . WARRANT 3 - Minimum Pedestrian Volume 100% SATISFIED YES X NO 80% SATISFIED YES 0 NO U Houri� / eo?* t if 100% SATISFIED 80% SATISFIED I I �wx_a'�&t YES, NO ❑ YES' NO ❑ r Hour ��o••, ,� 100% SATISFIED YES ❑ NO REQUIREMENT MINIMUM REQUIREMENTS Pedestrian volume crossing the major street is 100 or more (80% SHOWN IN BRACKETS) Yes ❑ No hour; AM U R U I R APPROACH 1 2 or more LANES 300 feet; AM, The new traffic signal will not seriously disrupt progressive Both Apprchs. traffic flow on the major street. 5 900 630 Major Street 475� 0) (720) 504 Highest Apprch. 3 100 70 Minor Street 2) (80) (56) WARRANT 3 - Minimum Pedestrian Volume 100% SATISFIED YES X NO 80% SATISFIED YES 0 NO U Houri� / eo?* t if 100% SATISFIED 80% SATISFIED I I �wx_a'�&t YES, NO ❑ YES' NO ❑ r Hour ��o••, ,� 100% SATISFIED YES ❑ NO REQUIREMENT FULFILLED Pedestrian volume crossing the major street is 100 or more for each of any four hours or is 190 or more during any one Yes ❑ No hour; AM There are less than 60 gaps per hour in the major street traf- Yes El No ❑" fic stream of adequate length for pedestrians to cross; AM The nearest traffic signal along the major street is greater Yes ❑ No El 300 feet; AM, The new traffic signal will not seriously disrupt progressive Yes ❑ No E:1 traffic flow on the major street. -7-� yi.f The satisfaction of a warrant is not necessarily justification for a signal. Delay, congestion, confusion or other evidence of the need for right -of -way assignment must be shown. • r-� u Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9 -7 1.1992 Figure 9 -2 TRAFFIC SIGNAL WARRANTS WARRANT 4 - School Crossings WARRANT 5 - Progressive Movement Not Applicable — _ — — — — — -- — — ❑ See School Crossings Warrant Sheet ❑ SATISFIED YES ❑ NOJC MINIMUM REQUIREMENTS DISTANCE TO NEAREST SIGNAL FULFILLED > 1000 FT. N ft, S ft, E ft, W ft. YES ❑ NO ❑ ON ONE WAY ISOLATED STREETS OR STREETS WITH ONE WAY TRAFFIC SIGNIFICANCE AND ADJACENT SIGNALS ARE SO FAR APART THAT NECESSARY PLATOONING 8 SPEED CONTROL WOULD BE LOST SATISFIED ON 2 -WAY STREETS WHERE ADJACENT SIGNALS DO NOT PROVIDE NECESSARY PLATOONING AND SPEED CONTROL PROPOSED SIGNALS COULD CONSTITUTE A PROGRESSIVE SIGNAL SYSTEM ❑ ❑ W ARRANT 6 - Accident Experience Ale` 440�' SATISFIED YES ❑ NO ❑ REQUIREMENTS WARRANT FULFILLED ONE WARRANT WARRANT 1 - MINIMUM VEHICULAR VOLUME SATISFIED — — — — — — — — — — — — — — — - — — — — — — — — — — — — OR 80'x° WARRANT 2 - INTERRUPTION OF CONTINUOUS TRAFFIC YES ❑ NO ❑ SIGNAL WILL NOT SERIOUSLY DISRUUPT PROGRESSIVE TRAFFIC FLOW ❑ ❑ ADEQUATE TRIAL OF LESS RESTRICTIVE REMEDIES HAS FAILED TO REDUCE ACCIDENT FREQUENCY ❑ ❑ ACC. WITHIN A 12 MONTH PERIOD SUSCEPTIBLE OF CORR. & INVOLVING INJURY OR > $500 DAMAGE MINIMUM REQUIREMENT NUMBER OF ACCIDENTS 5 OR MORE ❑ ❑ WARRANT 7 - Systems Warrant SATISFIED YES ❑ NO K MINIMUM VOLUME REQUIREMENT I ENTERING VOLUMES - ALL APPROACHES FULFILLED DURING TYPICAL WEEKDAY PEAK HOUR VEH /HR 1000VEWHR — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — OR DURING EACH OF ANY 5 HRS. OF A SAT. AND /OR SUN. VEH /HR- YES ❑ NO ❑ CHARACTERISTICS OF MAJOR ROUTES MAJOR ST. MINOR ST. HWY. SYSTEM SERVING AS PRINCIPLE NETWORK FOR THROUGH TRAFFIC ------------------- - - - - -- - - - -- - - - -- RURAL OR SUBURBAN HWY OUTSIDE OF, ENTERING, OR TRAVERSING A CITY ----------------------------------- APPEARS AS MAJOR ROUTE ON AN OFFICIAL PLAN ANY MAJOR ROUTE CHARACTERISTICS MET, BOTH STREETS ❑ ❑ The satisfaction of a warrant Is not necessarily justification for a signal. Delay, congestion, confusion or other evidence of the need for right -of -way assigmmnent must be shown. 9 -8 TRAFFIC SIGNALS AND LIGHTING Traffic Manual t -1991 Figure 9 -3 TRAFFIC SIGNAL WARRANTS WARRANT 8 - Combination of Warrants SATISFIED YES ❑ NO ❑ REQUIREMENT WARRANT J FULFILLED TWO WARRANTS 1. MINIMUM VEHICULAR VOLUME n SATISFIED YES NO RN 2. INTERRUPTION OF CONTINUOUS TRAFFIC 80% WARRANT 9 - Four Hour Volume SATISFIED* YES ,9. NO ❑ Hour * Refer to Figure 9 -6 (URBAN AREAS) or Figure 9 -7 (RURAL AREAS) to determine if this warrant is satisfied. WARRANT 10 -Peak Hour Delay SATISFIED YES El NO ❑ (ALL PARTS MUST BE SATISFIED) . The total delay experienced for traffic on one minor street approach contro led by a STOP sign equals or exceeds four vehicle -hours for a one -lane approach and five vehicle -hours for a two -lane approach; AND YES ❑ NO ❑ 2. The volume on the same minor street approach equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND YES ❑ NO ❑ 3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches. YES ❑ NO ❑ WARRANT 11 - Peak Hour Volume SATISFIED* YES X= NO ❑ Hour * Refer to Figure 9 -8 (URBAN AREAS) or Figure 9 -9 (RURAL AREAS) to determine if this warrant is satisfied. The satisfaction of a warrant is not necessarily justification for a signal. Delay, congestion, confusion or other evidence the need for right -of -way assignment must be shown. • �J r� Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9 -9 1 -1992 Figure 9 -4 TRAFFIC SIGNAL WARRANTS (Based on Estimated Average Daily Traffic - See Note) URBAN RURAL Minimum Requirements ......................... ............................. EADT 1. Minimum Vehicular Vehicles per day on Vehicles per day on Satisfied Not Satisfied major street (total of higher - volume minor both approaches) street approach (one direction only) Number of lanes for moving traffic on each approach Urban Rural Urban Rural Major Street Minor Street 1 ....... ............................... 1....... ............................... 8,000 5,600 2,400 1,680 2 or more ........................ 1 ....... ............................... 9,600 6,720 2,400 1,680 2 or more ........................ 2 or more ......................... 9,600 6,720 3,200 2,240 1 ...... ............................... 2 or more ......................... 8,000 5,600 3,200 2,240 2. Interuption of Continuous Traffic Vehicles per day on Vehicles per day on Satisfied Not Satisfied major street (total of higher- volume minor both approaches) street approach (one direction only) Number of lanes for moving traffic on each approach Major Street Minor Street '` Urban Rural Urban Rural 1 ....... ............................... 1 ....... ............................... 12,000 8,400 1,200 850 ............... ...... 2 or more ........................ 1 ....... .......... 14,400 10,080 1,200 850 2 or more ........................ 2 or more ......................... 14,400 10,080 1,600 1,120 1 ...... ............................... 2 or more ......................... 12,000 8,400 1,600 1,120 3. Combination Satisfied Not Satisfied 2 Warrants 2 Warrants No one warrant satisfied, but following warrants fulfilled 80% or more ......... 1 2 NOTE: To be used only for NEW INTERSECTIONS or other locations where actual traffic volumes cannot be counted. 9 -10 TRAFFIC SIGNALS AND LIGHTING Traffic Manual 1 -1992 0 Figure .9 -5 SCHOOL PROTECTION WARRANTS CALC DATE DIST CO RTE PM CHK DATE Major St: Critical Approach Speed Minor St: Critical Approach Speed Critical speed of major street traffic ? 40 mph _ _ _ _ _ _ _ _ _ _ _ _ _ _ ❑ or RURAL (R) In built up area of isolated community of < 10,000 pop. _ _ _ _ _ _ _ _ _ _ ❑ ❑ URBAN (U) • FLASHING YELLOW SCHOOL SIGNALS (ALL PARTS MUST BE SATISFIED) Minimum Requirements PART A 1 11 U I R mph mph SATISFIED YES ❑ NO ❑ Vehicle Volume Each of 2 hours 200 140 School Age Pedestrians Each of 40 40 Crossing Street 2 hours 100 70 AND PART B Critical Approach Speed Exceeds 35 mph AND PART C Is nearest controlled crossing more than 600 feet away? SCHOOL AREA TRAFFIC SIGNALS (ALL PARTS MUST BE SATISFIED) Minimum Requirements / PART A 11 67R Vehicle Volume Each of 500 350 2 hours School Age Pedestrians Each of 2 hours_ 100 70 Crossing Street or 500 350 per, day SATISFIED YES ❑ NO ❑ SATISFIED YES ❑ NO ❑ SATISFIED YES ❑ NO ❑ SATISFIED SATISFIED YES ❑ NO f5? YES ❑ NO ) AND PART B �d Is nearest controlled crossing more than 600 feet away? SATISFIED YES ❑ NO Imo► 50C I = 40C WQ 300 CL �a. ar Q 0 w 200 _Zg 5;0 J 0 100 2 = 300 FIGURE 47. FOUR HOUR VOLUME WARRANT 2 OR MORE LANES & 2 OR MORE LANES 2 OR MORE LANES & 1 LANE 1 LANE & 1 LANE 400 500 600 700 800 900 1000 1100 1200 1300 1400 MAJOR STREET — TOTAL OF BOTH APPROACHES — VPH 'NOTE: 115 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 80 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE. Wt FIGURE 48. FOUR HOUR VOLUME WARRANT (COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) ,vo 1 V& v Z? gs-Z -v �- o m � IR I = 300 F- U w Q w0 Ha. cc Q 200 Ow Z2 :0 0 100 O 8 f 200 300 400 500 600 700 800 900 1000 MAJOR STREET — TOTAL OF BOTH APPROACHES — VPH 'NOTE: 80 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 60 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE. KErrH B. HIGGINS & Asso ,IATES, INC. 2 OR MORE LANES & 2 OR MORE LANES 2 OR MORE LANES & 1 LANE 1 LANE & 1 LANE 8 f 200 300 400 500 600 700 800 900 1000 MAJOR STREET — TOTAL OF BOTH APPROACHES — VPH 'NOTE: 80 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 60 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE. KErrH B. HIGGINS & Asso ,IATES, INC. A Highway 9/ Oak Street CALTRANS PEAK HOUR VOLUME SIGNAL WARRANT (Urban Areas) 700 600 x = a 500 - >aa W a 400 wW rn � 300 ix O> Z 200 x 100 - MENEM Major Street Minor Street North/South I I I MENNEN A 7-8AM 1192 55 B. 8-9AM 1289 160 C. 2 -3PM 1076 163 D. 3-4PM 1 I; i 1142 84 F. 5=6PM 1178 94 G. 0 0 H. 0 0 bi a %h' MENNEN 0 0a 0� - - -, - 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 MAJOR STREET (VPH) TOTAL OF BOTH APPROACHES Scenario Major Street Minor Street North/South East/West A 7-8AM 1192 55 B. 8-9AM 1289 160 C. 2 -3PM 1076 163 D. 3-4PM 1089 124 E. 4-5PM 1142 84 F. 5=6PM 1178 94 G. 0 0 H. 0 0 Notes: 1. 150 VPH applies as the lower threshold volume for a minor street approach with two or more lanes and 100 VPH applies as the lower threshold volume for a minor street approaching with one lane. 2. Bold line applies to intersection geometry. Higgins Associates warrants.)ds - Signal - Urban