HomeMy WebLinkAbout06-27-1995 CITY COUNCIL STAFF REPORTSSARATOGA CITY COUNCIL
EXECUTIVE SUMMARY NO. -?. S —19 AGENDA ITE
MEETING DATE: JUNE 27, 1995
ORIGINATING DEPT.: PUBLIC WORKS
CITY MGR.:
DEPT. HEAD
SUBJECT: Award of a construction contract to improve the overflow
parking area behind the Community Center
Recommended Motion(s):
1. Move to accept the proposal from O'Grady Paving, Inc. to pave
the Community Center rear parking area and authorize staff to issue
a Purchase Order for the work in the amount of $25,750.
2. Authorize staff to execute change orders to the work up to an
amount of $3,500.
Report Summary: Included in the current year's priorities for
street maintenance activities is the paving of the rear (overflow)
parking area behind the Community Center adjacent to the City's
Corporation Yard. Currently this area is unimproved, but routinely
serves a number of visitors to the Community Center when the multi-
purpose room is rented for large functions such as weddings, as
well as patrons of the Civic Theatre. In its present condition,
the overflow parking area is very unsightly and becomes difficult
to use during periods of inclement weather when the ground becomes
saturated and muddy due to inadequate drainage of the area.
Initially, staff planned to include the paving of the overflow
parking area in last summer's pavement overlay contract let as part
of the Pavement Management Program. However, when West Valley
College first approached the City about locating a Compressed
Natural Gas (CNG) fueling station on City property, the paving work
was postponed because the overflow parking area was considered as
a potential site for the fueling station and it was not quite known
how the area might need to be improved to also accommodate the
fueling station. Additionally, it was not clear at the time
whether the grant funds acquired by West Valley College for the CNG
fueling station could be used to defray the costs of site
preparation work such as paving the overflow parking area.
Since then, staff has developed a conceptual plan for siting the
fueling station on property that is both inside and outside of the
Corporation Yard fence, and has learned that the Clean Air Grant
funds obtained by the College District cannot be used to pave the
overflow parking area even though it will be used to provide access
to the fueling station. The grant funds may only be used to pay
for site improvements directly associated with installing the
fueling station such as a concrete pad for the compressor unit,
bollards to protect the sequencing and dispensing units, and
required safety and warning signs.
As a result, staff has now solicited bids to pave the overflow
parking area using the informal bidding procedures prescribed in
Article 12 -15 of the City Code. Three contractors responded with
bid proposals which are attached to this report. The lowest bid,
which staff believes is responsive to the City's request, was
submitted by O'Grady Paving, Inc. of Mt. View for $25,750. Staff's
estimate for this work is $27,250. Because O'Grady Paving has
successfully worked for the City on several previous occasions, it
is recommended that the City Council accept their proposal and
authorize staff to issue a Purchase Order for the work in the
amount of $25,750. Further, it is recommended that the Council
authorize staff to execute changes to the Purchase Order up to an
amount of $3,500 to cover any additional work due to unexpected
conditions which might arise during the construction.
If the Council approves the above recommendations, the work should
begin shortly after the July 4 holiday and is expected to last for
no more than ten days. Afterwards, final preparations for siting
and accepting delivery of the CNG fueling station will be made. A
future report addressing issues specific to the fueling station
with recommendations for additional Council actions is anticipated
to be placed on the agenda for your July 19 meeting.
Fiscal Impacts: Sufficient funds for paving the overflow parking
area exist in the FY 94 -95 budget in Activity 31 (Street
Maintenance), Account 4530 (Repair /Maintenance). In the budget
proposals reviewed by the City Council over the past several
months, it was assumed that $40,000 would be expended in FY 94 -95
for this work.
Further, it will be staff's intention to recover the entire cost of
improving the overflow parking area through the sale of CNG fuel to
West Valley College and the Post Office. Essentially, staff would
develop a pricing scheme which would amortize the cost of the
improvements over a 5 -7 year period and include the cost in the
price per therm of CNG fuel sold to the College and Post Office.
Based on preliminary estimates which assume 40 vehicles utilizing
the fueling station each with 15 therm fuel capacities and each
filling up an average of 1.5 times per week, the additional price
per therm to recover the cost of the parking lot improvements would
be in the range of 8G to 124 per therm. On top of this, there
would be a markup to recover the City's costs to operate the
fueling station plus a small profit too.
Advertising, Noticing and Public Contact: Nothing additional.
Consequences of Not Acting on the Recommended Motions: The proposal
from O'Grady Paving, Inc. would not be accepted and staff would not
issue a Purchase Order to them for the work. The City Council may
select one of the other bidders to perform the work, or reject all
of the proposals in which case the work would not be performed and
the installation of the fueling station would be delayed. At this
time, the College has completed conversion of 15 of the 16 vehicles
they intend to run on CNG fuel, and the Post Office has secured 25
CNG vehicles for the Saratoga branch.
Follow Up Actions: A Purchase Order for $25,750 will be issued to
O'Grady Paving, Inc. for the work.
Attachments: 1. Bid proposals (3).
2. Plan of overflow parking area.
L 5
City Of Saratoga
Street:
13777 Fruitvale
City, State, and Zip Code
Saratoga, CA 95070
Proposal
O'Grady Paving, Inc.
License #201696
2513 Wyandotte St
MOUNTAIN VIEW, CALIFORNIA 94043
(415) 966 -1926
A= .
Jack Burbank
Jab Name:
Reconstruct P -Lot
Job location:
Corporation Yard
June 8, 1995
Phone:
Job Number.
Sal
O'Grady Paving, Inc. is pleased to submit the following bid price for the above referenced project. We will provide all
labor, equipment and materials to complete the work.
Base Bid:
1. We will grind and place onsite approximately 100 CY of AC grindings.
2. We will grade and compact the existing subgrade approximately 14,500 SF.
3. We will furnish, spread and roll an 3" thickness of baserock to approximately 14,500 SF.
4. We will furnish, spread and roll an 2" thickness of hot asphalt to approximately 14,500 SF.
5. We will furnish, spread and roll an 1 1/2" thickness of hot asphalt to approximately 4,550 SF.
BidPrice ......................................................................................... ..............................$ 25,750.00
Special Conditions:
All necessary soil testing are to be furnished by others. Price is based on one move in.
We exclude striping.
We Propose hereby to furnish material and labor - complete in accordance with.above specifications for the sum of:
twenty five thousand and seven hundred fifty Dollars Dollars 25 750 nn
Payment to be made as follows:
All Material is guaranteed to be as specified. All work to be completed
in a
workmanlike manner according to standard practices. Any alteration
or
deviation from above specifications involving extra costs will be
executed only upon written orders, and will become an extra charge
over and above the estimate. All agreements contingent upon strikes,
accidents or delays beyond our control. Owner to . carry fire, tornado
and other necessary insurance. Our workers are fully covered by
Authorized,Y / A,
Signature /mac
Note: This Proposal may be wkdrAwt by us if not
accepted
within 60 days
Acceptance Of Proposal The above prices, specifications
and conditions are satisfactory and are hereby accepted. You
are authorized to do the work as specified. Payment will be Signature
made as outlined above.
Date of Acceptance: Signature
JU 1 1.4 '95 17:01 EL CAMINO PAVINi= P. 2
froposat Page No. of Pages
A
UT EL CAMINO PAVING, INC. wE ARE N07
IMPORTANT
RE PANS BLE FOR ANY
P.O. Box 62319 DAMAGES OR EXPENSES INCURRED,
SUNNYVALE, CALIFORNIA 94088 DUE TO ANY UNDERGROUND WATER,
(408) 980 -9933 GAS, ELECTRIC, ETC., CONSTRUCTION
(415) 985 -7283 NOT CLEARLY MARKED ON PLAN OR
iATTN: JACK BURBANK State License #329094 STAKED OUT ON JOB SITE.
PROPOSAL SUBMITTED TO ~— PHONE DATE
Sli1EEIF
CITY OF SARATOGA 408/867 -3438 JUNE 14 1995
ET JOB NAME
.13777 FRUITVALE AVENUE * PARKING LOT NEAR CORPORATION YARD
city, STATE AND ZIP COOE JOB LOCATION
'3ARATOGA CA 95878 fe ALLENDALE AVENUE SARATOGA
ARCHITECT DATE Of PLANS
JOB PHONE
DID NO. 95 -1
kze hereby submit specifications and estimates for
GRADE AND PAVE: APPROXIMATELY 14,580 SO. FT.
OVERLAY:, APPROXIMATELY 41550 SO. FT.
EL CAMINO PAVING, INC,. TO GRIND UP EXISTING ASPHALT OIL AND SCREENINGS
AND LEAVE IN PLACE. ROUGH GRADE SITE. PREPARE AND COMPACT SUBGRADE.
PLACE AND COMPACT 540 TONS OF CLASS II A.B. AT 2 INCHES AND 4 INCHES.
PRIME COAT SAME. PLACE PETROMAT WITH AR -4000 ON EXISTING ASPHALT. PAVE
THE GRADED PARKING LOT WITH 2 INCHES OF HOT ASPHALTIC CONCRETE AND 1 -1/2
INCHES FOR THE OVERLAY OF EXISTING ASPHALT„ FOG SEAL NEW PAVING AND
OVERLAY.
EXCLUSIONS: FEES, PERMITS, ENGINEERING,. BONDS, STRIPING
NOTE: ASPHALT PRICES ARE BASED ON OIL PRICES IN EFFECT AS OF APRIL 1, 1995.
ANY INCREASES IN OIL PRICES WILL BE REFLECTED AT THE TIME OF PIAVING.
THANK YOU FOR CONSIDERING US FOR THIS PROJECT.
PLEASE SIGN AND RETURN WHITE COPY TO INDICATE ACCEPTANCE_
L—jo log Mnj noncom Rance with an of th rnu�f� nor_ reels to i)ay contractors' reasonable attorn '
We f ropot hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:
THIRTY THOUSAND TWO HUNDRED TWENTY —FOUR AND 30, 224.138
Payment to be made as follows: dollars ($ ) .
NET 10TH OF MONTH FOLLOWING BILLING OF EL CAMINO PAVING INC.fsT WORK.
MONTHLY SERVICE CHARGE OF 1-1/2% APPLIED TO ALL PAST DUE ACCOUNTS.
All matefiel iS guafant/ed to be As specified. All work to be completed in a workmanlike
manner according to standard practices. Any alteration or de'voatWn from above specdica- Authoriie0
tions involving extra costs will be executed only upon .Written orders, and will become an Signalure:
extra charge over and above the estimate. Alt agreements cont,ngent upon stpkes, accidents 4. DJLUJL#4
or delays beyond our eonvot. Owner to carry fire, tornado ind other necessary insurance. Note: This M4145al ay be 38
Out workers are fully corerld by workmen',; compensation Insurdnca. withdrawn by us if not accepted within ,rove
Arrepunte of f roposid --The above prices, specifications
and conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as Specified. Payment will be made as outlim-A above.
Date of Acceptance: Signature
VENABLES, INC.
GENERAL ENGINEERING CONTRACTORS
June 6, 1995
City of Saratoga
13777 Fruitvale Avenue
Saratoga, CA 95070
Attn: Jack Burbank
Re: Saratoga City Hall Parking Lot Improvements - Saratoga, CA
.............................................................................................................. ...............................
We are pleased to submit our bid for the grading and paving on the above referenced
Our Proposal Includes:
1. Rip and scarify existing asphalt and dirt areas.
2. Sawcut of pavement edge to provide smooth transition to existing pavement.
3. Subgrade and compaction of existing soils.
4. Import, place and compact 2" baserock.
5. Apply prime oil over baserock areas.
6. Apply AR 4000 oil and petromat fabric at existing parking lot..
7. Place and compact 2" asphalt at new parking lot area.
8. Place and compact 1 -1/2" asphalt at existing parking lot area.
9. Construct asphalt swale down creek embankment. (All handwork)
10. Fog seal all new pavement areas.
Proposal Price: $ 30,750.00
.............................................................................................................. ...............................
Our Proposal Excludes:
Engineering; staking; layout; soils testing; permits; fees; bonds; other trades patching and
spoils; reworking unsuitable or over - optimum materials; soil stabilization and fabrics;
handling of hazardous or contaminated materials; dewatering; all clearing and grubbing;
utility capping, relocation or removal; barricades; fencing; striping, signs and bumpers;
landscape grading; import or export of soil materials; buried debris and / or utilities
removal or repair; erosion control; soil sterilization and weedkiller; headerboards; all else
not mentioned in includes.
Page 1 of 2
DURAN & VENABLES INCORPORATED
2700 SCOTT BLVD. • P.O. BOX 640 • SANTA CLARA, CA 95052 -0640
(408) 727 -2046 • CA. LIC. 375068 A
VENABLES, INC.
GENERAL ENGINEERING CONTRP.CTORS
June 6, 1995
We look forward to working with you on this project and signing a mutually satisfactory
contract. If you have any questions, please do not hesitate to call.
Sincerely,
Duran & Venables, Inc.
4 ndy
a eyuk'
Estimator
Page 2 of 2
DURAN & VENABLES INCORPORATED
2700 SCOTT BLVD. • P.O. BOX 640 • SANTA CLARA, CA 95052 -0640
(408) 727 -2046 • CA. LIC. 375068 A
NO
I I ,
1
Co RP.
YARD
r
W
II/
eft
�a
d
d
�X
I
X
�v
x
y
mtoo*i
r
41 P
6�
/ scACE=
Y I ' oo
si I
V �
f �f
I
1
SARATOGA CITY COUNCIL
EXECUTIVE SUMMARY NO. ;� S) 9 AGENDA ITE
MEETING DATE: JUNE 27, 1995 CITY MGR.:
ORIGINATING DEPT.: PUBLIC WORKS DEPT. HEAD
SUBJECT: Award of construction contracts for Village Parking
District No. 1 improvements
Recommended Motion(s
1. Move to accept the proposal from B &B Landscape Contractors, Inc.
to install landscape improvements in Village Parking District No.
1 and direct staff to issue a Purchase Order for the work in the
amount of $16,385.
2. Move to authorize staff to execute changes to the Purchase Order
up to an amount of $2,500.
3. Move to accept the proposal from B &B Concrete Construction Co.
to build a dumpster enclosure in Village Parking District No. 1 and
direct staff to issue a Purchase Order for the work in the amount
of $8,300.
4. Move to authorize staff to execute changes to the Purchase Order
up to an amount of $1,500.
Report Summary: The FY 94 -95 budget includes $40,000 in Activity 56
(Landscaping & Lighting Assessment District), Account 6715 (Land
Improvements) to upgrade the existing landscaping, build a dumpster
enclosure, and reseal the parking lots in Village Parking District
No. 1. Earlier this year, the parking lots were resealed and
restriped in conjunction with the slurry seal contract let for the
Pavement Management Program, and tree trimming and other tree
maintenance work recommended by the City Arborist was completed.
Recently, staff solicited separate bids for the remaining
landscaping improvements which involves upgrades to the existing
planting and irrigation system, and for the construction of a
masonry block dumpster enclosure using the informal bidding
procedures contained in Article 12 -15 of the City Code. A summary
of the bids received for both the landscaping improvements and the
dumpster enclosure is contained in the attached memo from the Parks
Superintendent dated June 15.
B &B Landscape Contractors, Inc. of Santa Clara, the contractor
which recently completed the landscaping along Cox Avenue,
submitted the lowest bid of $16,385 for the landscaping
improvements. As staff believes that this bid is responsive to the
City's request, and since the contractor has successfully worked
for the City very recently, it is recommended that the Council
accept the proposal from B &B Landscape Contractors, Inc. and direct
staff to issue a purchase order to them in the amount of $16,385
for the work. Further, it is recommended that the Council
authorize staff to execute changes to the purchase order up to an
amount of $2,500 to cover any unforeseen circumstances which may
arise during the course of the work.
As for the dumpster enclosure, the low bid of $8,300 was submitted
by B &B Concrete Construction Co. of San Jose (no relation to B &B
Landscape Contractors) . This is the same contractor presently
working for the City on the Saratoga - Sunnyvale Rd. improvements and
staff believes that this bid is responsive to the City's request
and represents a fair price for the work involved. Consequently,
staff recommends that the Council accept this proposal and direct
staff to issue a purchase order in the amount of $8,300 to B &B
Concrete Construction Co. to build the dumpster enclosure.
Further, it is recommended that Council authorize staff to execute
changes to the purchase order up to an amount of $1,500 also to
cover any unforeseen circumstances which may arise during
construction of the enclosure.
If the above recommendations are approved, all of the work should
be complete during the first half of August.
Fiscal Impacts: As noted above. The work is funded through the
Landscaping & Lighting Assessment District LLA -1, Zone 24.
Advertising, Noticing and Public Contact: Nothing additional.
Consequences of Not Acting on the Recommended Motions: Depends on
what the Council may decide. Some or all of the work would not be
done or would be done by different contractors.
Follow Up Actions: The purchase orders will be issued and the
contractors will be authorized to proceed with the work.
Attachments: 1. Memo from Parks Superintendent dated June 15
summarizing the bids received.
2. Landscaping improvement bids (3).
3. Dumpster enclosure bids (2).
TO: Larry Perlin
FROM: Bob Rizzo ,� �/t/
DATE: 06/15/95
SUBJECT: Landscape Improvements Parking District #1 -Bid Proposals
Staff recently requested and received bid proposals for landscape
improvements to Parking District #1 in the Village. As you know
this project includes improvements to the landscaping and
irrigation system in the parking lots on both sides of Fourth
Street adjacent to Wildwood Park. This project includes
construction of a small trash enclosure with a chain link gate.
Staff requested bid proposals from five (5) landscape constractors
who recently have done work or are now working on projects for the
City. Staff has received only three (3) firm proposals for the
landscape improvements and two (2) proposals for construction of
the trash enclosure.
Summary of Landscape Bid Proposals:
B & B Landscape Contractors, Inc. $ 16,385
Blossom Valley Landscaping 21,619
John Clay General Engineering Contractors 25,700
Diablo Landscape No Bid
G. Cantanese Landscape Services No Bid
The contractors that did not bid, stated due to their workload,
they could not bid at this time.
Summary of Trash Enclosure Bids: (only bids received)
B & B Concrete Construction Company $ 8,300
James A. Savattone 11,344
If you have any questions, please contact me.
jw
B &B
Landscape Contractors, Inc.
312 Brokaw Road
Santa Clara, CA 95050
(408) 980 -8244
Fax (408) 980 -1232
BID PROPOSAL
FOR
CITY OF SARATOGA
PARKING DISTRICT #1
LANDSCAPE IMPROVEMENTS
BASE BID SUMMARY
Item
Estimated
No.
Item Description
Unit
Quantity
Total
1.
Clearing and site preparation
LS
1
$ -
including weed barriers
2.
Soil Preparation
LS
-
3.
Imported topsoil
LS
(indicate $ 251cy sandy loam
topsoil in place)
4.
Construct boulder retainer wall
LS
5.
Irrigation system complete,
LS
including pavement cutting and
restoration
6.
Planting complete
LS
1
4,e3O �• ,
7.
Mulch and spreading
LS
1
8OO.
8.
30 day maintenance period
LS
1
yDU• ,
TOTAL BASE BID - ITEMS 1- 8
LS
$ /6, 38s;' -
Add Alternate: Fencing for trash enclosure
LS
$ 93000, -
���� >✓ �22,,�g -L- June 2, 1995
B & B Landscape Contractors, Inc.
George Brunn, President
M�
BID PROPOSAL
FOR
CITY OF SARATOGA
PARKING DISTRICT #1
LANDSCAPE IMPROVEMENTS
BASE BID
SUMMARY
Item
Item Description
Unit
Estimated
Total
No.
Quantity
1.
Clearing and site
preparation,
LS
1
$1,574.00
including weed barriers
2.
Soil Preparation
LS
1
660.00
3.
Imported topsoil
12 C. Y.
1
396.00
(indicate $33 /CY
sandy loam
topsoil in place)
4.
Construct boulder
retainer wall
LS
1
3,749.00
5.
Irrigation System
complete,
LS
1
9,560.00
including pavement
cutting and
restoration
6.
Fencing for trash
enclosure
LS
1
1,950.00
7.
Planting complete
LS
1
1,926.00
8.
Mulch and spreading
LS
1
1,508.00
9.
30 day maintenance
period
LS
1
296.00
TOTAL
BASE BID - ITE14S 1--9
$21, 619.00
Bidders must provide bids for all Base Bid items for this bid proposal to be
considered complete. Partial bid proposals will not be accepted.
The City will award the contract to the lowest responsible bidder. The lowest
bidder will be determined on the basis of the total of the Base Bid items alone.
If the sum of the individual items totals does not equal the total base bid, the
individual item total shall govern and the corrected sum shall be deemed to be
the total base bid.
BLOSSOM VALLEY.LANDSCAPING, INC.
BID PROPOSAL
FOR
CITY OF SARATOGA
PARKING DISTRICT 01
LANDSCAPE IMPROVEMENTS
BASE BID SUMMARY
Item
Item Description Unit
Estimated
TOW
Noy
5.
Quantity
LS
I.
Clearing and site preparation, LS
1
e
00
including weed barriers
/ �a°
restoration
CV
00
2.
Soil Preparation LS
1
1
3.
Imported topsoil LS
1
0
1 g p O
i
(indicate $ yS /CY sandy loam
8.
Mulch and spreading
LS
topsoil in place)
/800
4.
Construct boulder retainer wall
LS
5.
Irrigation System complete,
LS
1
S,
including pavement cutting and
/ �a°
restoration
6.
Fencing for trash enclosure
LS
1
e a+
ISoo
7.
Planting complete
L5
i
qVio o
8.
Mulch and spreading
LS
1
/800
9. 30 day maintenance period LS 1 .61!
go °
n
TOTAL BASE BID - ITEMS 1--9 ;Y700
Bidders must provide bids ;for all Base Bid items for this bid proposal to be
considered complete. Partial bid proposals will not be accepted.
The City will award the contract to the lowest responsible bidder. The lowest
bidder will be determined on the basis of the total of the Base Bid items alone.
If the sum of the individual items totals does not equal the total base bid, the
individual item total shall govern and the corrected sum shall be deemed to be
the total base bid.
,B&B`CONCRETE TEL :408- 279 -2286 May 22'95 15:32 No.007 P.01
4
PROPOSAL
B & B CONCRETE CONSTRUCTION COMPANY, INC.
A GENERAL ENGINEERING FIRM
211 RYLAND * SAN JOSE, CALIFORNIA 95110 * 408- 279 -2277 * LICENSE 440332
PROPOSAL SUBMITTED TO:
CITY OF SARATOGA
ADDRESS:
13777 FRUITVALE AVENUE
CITY, STATE, ZIP:
SARATOGA, CA 95070
ATTN: HOWARD LEWIS
ARCHITECT:
DATE:
MAY 19, 1995
JOB NAME:
4TH STREET TRASH ENCLOSURE
JOB LOCATION:
SARATOGA
DATE OF PLANS: PHONE:
BASE BID PER DRAWINGS BY MARVIN KIKKEBY.
PRICE. INCLUDES FOOTING (NOT SHOWN), REBAR, VINYL COATED FENCE INCLUDING
LOCK BOX, BLOCK WORK.
ADD FOR ALTERNATE TO ADD WOOD ROOF OVER ENCLOSURE. $3,600.00
We propose hereby to furnish material and labor - -- complete in accordance with the above specifications,
for the sum of; SEE, ABOVE
PAYMENT TO BE MADE. AS FOLLOWS: UPON COMPLETION
All material is guaranteed to bo as spocitiod: All work R, b complydee in 9 workmaniike tnanner ac- wrdhaa to standard practices.
Any alteration or deviation from above spc,,ilicati��ns invalvici, cx,ra costs will be executed cr.!y written orders, and will
becotne an extra charge over and above the eslisna:.. All cuntin�eut upur, strik +,-v, ncciilrrzts or delays Nyond our
control. Owner to carry fire, tornado, and oJlcr ue=Rary insurance. Our worker, ate fully coverts! by Worker's Compensation
Authorized
This proposal
is valid for 30 days,
ACCEPTK CE OF PROP��thufized : The above prices, specifications and conditions are satisfactory and are
hereby accepted. You arc to do work as specified. Payment will be made as outlined above.
DATE OF ACCEPTANCE: SIGNATURE
Post-it' Fax Note 7671
Date
papes�
From
Cc,/Dopl.1/� � r.�wrf moo.
Movie #
Phone Y
Fax #
. 1
' 055/ 26/ 5995 09:06 4084769751
Jas
PAGE 02
Jaynes A. Sovattone Engineering Contractor Lic.No, 287738 2827 S. Rodeo Gulch #4, Soquel, CA 95073 408 -476 -5946 FAX 408.476-975'.
May 25, 1995
Howard Lewis
Public Works
City of Saratoga
13777 Fruitvale avenue
Saratoga, Ca., 95070
Re: price Quotation for Trash enclosure and Roof structure.
Dear Mr. Lewis:
As regards your FAX of 5 -19 -95 the following is presented;
Trash Enclosure; per your drawing with 1' X 2' footing continueous, 4 11concrete
slab over 3/4" rock, massonary block to be supplied by owner, gates Incl.
Price ............... . .......... . .......... .. ....... .511,344.00
Roof Structure; per your drawing. No painting
Price ............... . .......... * , ........ ,. ....... 55,105.00
Respectfully Yours;
A. Savattone