HomeMy WebLinkAbout10-02-2013 Written Communications -redactedSaratoga Ciyic'TWVa r & mpit?i Plan 0 City Council October 2, 2017 purpose • To Review Input from the Public, Users, & Staff regarding the Existing Facility • To Review Conceptual Design Options & Cost Models for Renovating the Civic Theater & Council Chambers U Shared Understanding of the Opportunities and Constraints of Renovating the Civic Theater & Council Chambers Y.rc \I. }1 EI, •'I ^ur1N f -IT E(rEn IErICE i PrRFes� Plan ��I�d ✓�- � -- ��� °ice - -- 10/2/2013 The City of Saratoga is engaging in a Civic Theater / Council Chambers Master Plan process to determine public.interestin possible. Improvements to the 50- year -old facility. This process has reached out to facility users and the community. Now based on input, the consultant team has developed three master plan options and cost models. '. iti5.l .r rl n E1 1 .w•`11 r +FN F"rFxIENCF 1BID2, AGENDA U Review Agenda U Review Staff,. User, &Community Input U Discuss Design Approach J Present Conceptual Designs U Present Cost Model Summary CI Conclusion I. +..i 51 u1•1 EN ✓I nC`�rM EilI a E %PER IEN CE € §tin9 FAdRips PE E � 1 + rf — •ele .iii- -i,C -�z�; ,; k.� - Fxistin9 P901tim al 10/2/2013 M1 -- Building Plan DRESSINGROOMS r STAGE p 1W1 'IIIC;L ! CITY �i` ice. ~. •.n,s+,"I'ir STAFF + LOBBY l 2 Existig9 SQnoj iRs§ S4!f!!I<!?IY O Prepared by Staff ❑ Excluded Seismic or Structural Studies ❑ Included Information on: • Slte Access Interior • Signage Lighting • Parking Mec arical • landscape Electrical • Site Drainage. Plumbing • Utilities Code Compliance • Accessibility Life Safety. Circumstances Security I,r �. 0 Ni'Qr.•J NFt•i + En PF %IF NEE 2 Rrp.mli lg RRRm APm!s 10/2/2013 FaRtrX F 4,0A S CS '+ems Backstage Storage a f+%U der Stage Storage 1 Cotii[ol Booth., 3 0 WIS "q 99n4itim 5"Mmary ❑ Built in 1964 for $168,000 ❑ 7,436 SF existing building with 299 seats • Primary Users • City Council& Planning Commission( Alternating Wednesdays) • Two Theater Companies(" 160days /year) • Numerous Upgrades & Improvements • Doors Electrical Upgrades • Counter - Weight system Renovated Seating • Sound System Stage Flooring Lighting Systems rll'Si' ?I+ INVI ?nrIM E4. f \PE I'IEll l'E e Rrp.mli lg RRRm APm!s 10/2/2013 FaRtrX F 4,0A S CS '+ems Backstage Storage a f+%U der Stage Storage 1 Cotii[ol Booth., 3 Eka140!Rq — Staff ?P'PV • Appreciate • Highly Used Facility Excellent Tenants • -Feel Generally Satisfied with Facility • Challenges • Too Few.Restrooms • Man Hours .RequiredEvery Week to Switch Setup of Stage Area • Presentation Setup Inadequate for Viewing • No Real Orchestra Pit — Sound& Sight Line Issue • Inadequate .Storage • Undersized, Noisy Lobby Height of Stage for Council &.Commission Meetings • ADA Issues Ix:i.�r rt, :.!a• +Nt +fWr n Ex PE a. E N C E am 95MI'M 0M Evaluation Vision & Priorities Schedule Reflecting Saratoga 10/2/2013 aI T Diffumt Nggda .>v r CounciC /c, •Commission � ti3;v y. +•. ni >vl.. rl cm.xc nr�rt Ex o-E r.lENCt � a e Sharedy other Us* eate TNe titComm nity' d5 Needs r Eka140!Rq — Staff ?P'PV • Appreciate • Highly Used Facility Excellent Tenants • -Feel Generally Satisfied with Facility • Challenges • Too Few.Restrooms • Man Hours .RequiredEvery Week to Switch Setup of Stage Area • Presentation Setup Inadequate for Viewing • No Real Orchestra Pit — Sound& Sight Line Issue • Inadequate .Storage • Undersized, Noisy Lobby Height of Stage for Council &.Commission Meetings • ADA Issues Ix:i.�r rt, :.!a• +Nt +fWr n Ex PE a. E N C E am 95MI'M 0M Evaluation Vision & Priorities Schedule Reflecting Saratoga 10/2/2013 aI T EvaImi -09m - V's—pu ImIT Maintain Size Parking • Theater Use • Rental Cost • Challenges • Restrooms - Too Few& Inadequately Sized Man Hours Required Every Week to Switch Setup of Stage Area Presentation Setup Inadequate for Viewing No Real Orchestra Pit -Sound &SightLine Issue Undersized Lobby ADA Issues • Limited time for General Community. Use • FL loo, Change Is a Tripping Hazard + 'Ir+: a n y r, 4 III1 ♦ Ex PEA I N C e J• rt: ' a 4 Evalgg tiq • What do you appreciate about the current facility? • What do you not want to lose? ❑ What does not work In the current facility? CI What needs Improvement? ni >vl.. rl cm.xc nr�rt Ex o-E r.lENCt � a e EvaImi -09m - V's—pu ImIT Maintain Size Parking • Theater Use • Rental Cost • Challenges • Restrooms - Too Few& Inadequately Sized Man Hours Required Every Week to Switch Setup of Stage Area Presentation Setup Inadequate for Viewing No Real Orchestra Pit -Sound &SightLine Issue Undersized Lobby ADA Issues • Limited time for General Community. Use • FL loo, Change Is a Tripping Hazard + 'Ir+: a n y r, 4 III1 ♦ Ex PEA I N C e J• rt: ' a 4 Evait��tiQr1 - Pu�li� InRmx I] Appreciate /Do not lose Convenient & close Size & intimacy • Higher podium allows bener visibility Ability to see lout theater High. quality Reasonable price t+l']1 "1N '' ^WVl r. t. :. F: Ftlr EaPEFIENCE ma U 0 Vision & Priorities U Describe your ideal experience working with the facilities J What do believe are the three most critical needs (related to using the facility) for the next 10 years? � e � ­11111's :N�'.> NM r—, • E.(PEFI.FNLE El Change • . Auditorium - Raking is nolsufficient for seating • Add Orchestra Pit • Increase Fly Space - Currently on 16' • Out side Access for Actors Set. Designers Having Enough Space • Update Control Room Restrooms are Insufficient in Number Parking is a Problem — Quantity of Parking Stage Too High for Council /Commission • Sound System • More Cameras :n.f.l cr f, : [- FEKIENCE 10/2/2013 11r4 (a V! §IQ,n §� Fri4rMe§ - u §er I11W O Theater • Orchestra Pit • Better & More Restrooms (including Backstage) • Air Conditioner Time & Space C1 Council / Commission I] Most Critical Needs • Presentation Setup • ADA —Access & Restrooms • Better & More Restrooms (Including Backstage) • Height of Stage Floor (for Commission & Council Meetings) • More Open Time for Community • Lobby (Size, Floor, & Restrooms) • ADA Access • Improved Presentation Capabili ties. • Control Booth Access •�r . I�•v1111,111 Ex r • E %F Ee I EWC[ 111]'.I�t rl= 1FV.�f+FNr - F>PE RIENCE El Change • . Auditorium - Raking is nolsufficient for seating • Add Orchestra Pit • Increase Fly Space - Currently on 16' • Out side Access for Actors Set. Designers Having Enough Space • Update Control Room Restrooms are Insufficient in Number Parking is a Problem — Quantity of Parking Stage Too High for Council /Commission • Sound System • More Cameras :n.f.l cr f, : [- FEKIENCE 10/2/2013 11r4 0 Visi4n $4 P_ ftriti!p§ = PO4 W"t O Separate Council Meetings from Theater as Separate Facility W, •I -'SI hII , LII.IPr N•I EI. EAFFRIENCE is 5 (a _ Vision; & Priorities - Stat( Input Cl Current Theater is Working Well • Good Revenue Stream with Responsible Users • Only SomeTweaks Needed 4 0 Two Primary Uses (Theater & Council) are in Conflict for Time & Space I] Most Critical Needs • ADA —Access & Restrooms • Height of Stage Floor (for Commission & Council Meetings) • Lobby (Size, Floor, & Restrooms) • Improved Presentation Capabili ties. K-111 •�r . I�•v1111,111 Ex r • E %F Ee I EWC[ 0 Visi4n $4 P_ ftriti!p§ = PO4 W"t O Separate Council Meetings from Theater as Separate Facility W, •I -'SI hII , LII.IPr N•I EI. EAFFRIENCE is 5 901f,Stin9 5 FMgA. 0 CI How should the Civic Theater & Council Chambers facilities reflect Saratoga? e i O rylcy..W crl t•I Rri :iW ELI •' FkR EP 1'EHCE Reflecting Saratoga - Public Input ❑ Foot Paths, Blcycle.to Events ❑ Places to Walk Around ❑ Leisurely Beautiful Views, Night Sky CI Oasis - No Strip Mall Environment ❑ Very Rural Environment • Blend into Environment • Use of Redwood Paneling or Spanish Influence ❑ Parking Not Too Visible from Street Y,ISSI �i IV Eil��. .•��.i ri.rHf �� EcV ERIE:I�E 113' - �Phed�le ❑ 16 Weeks Available (2 Shows Plus December or August) ❑ Very Limited Cl Multiple Phases in Order of Priority b I "i:tr 6Ri �'Ik••'1: +rNt FY-EERI ENCE 10/2/2013 Construction, Scheduling When Is the best time frame for renovation work? ❑ Season? ❑ How Long? ❑. Different for different part ofthe facility? ur, Ex OERIEHCE Resign ARRMIA Types of Improvements Review Improvements Matrix al 2 C liefi.ectt^9 S�SRtRge - �lsprr xnnt{t ❑ Scenic & Peaceful ❑ Rural J Earth Tones ❑ Natural Materials ❑ Blends In • Better Signage • Quaint rp 1 .• f: l+•'I lil'•nnN'•r N EKRE RIEMCE Construction, Scheduling When Is the best time frame for renovation work? ❑ Season? ❑ How Long? ❑. Different for different part ofthe facility? ur, Ex OERIEHCE Resign ARRMIA Types of Improvements Review Improvements Matrix al 2 C 1 111j Toilets 3:201 -300 '3 urinals 2: 201 -300 2 I! Lavatories 2:201 -500 2 Toilets 6:201 -300 6 ] Lavatories 4:201 -300 4 2:251 -500 2 ftmtxi g fixture wunt Wsed on 2017 CBC II I: I,:•N -, N V I Y. 0 f l rl C l l r Eh f E P.I ErI CE � 1f � 1 2 3_ an2 Improyeinept - Structural Triggers • Upgrade Structure to Current Code If • Increase Gravity Load More than 5% • Additional Lateral Load Separate Additions That Serve Main Function of Existing Building • Structural Analysis Required If Significant Improvement (50%or more of market value of structure) s� M�SSI •,!N L�+���..�N1, LI,T [ < /EX IFfI L'E Fire Protection. &Ahateinent 0 N1.1 l+rl ,I in: li +Irh' F�PFIIIEN'_E ammumrs Mgtri�; 0 Mir NONE 10/2/2013 IMUQveme11t - AD6 Applies for Alterations Affecting Main Function U 20% or greater of cost of alterations towards ADA improvements U Excludes alterations only affecting • Windows, Hardware, Operating Controls, Electrical Outlets, &'Signs • Mechanical Systems, Electrical System, :.5e%rk � M075 4�g19n QRUMA �x D QOPM P - MRVY §ellting ACg?. O000rtunities ! ADA Improvements Nauman 5eating count Co•,ered AccerstorAetots Less Setupfgreakdowo Time Adequate Ruarn for Orchestra New Ticket & Concessions Area Constraints Setup /Breakdown During Performance Weeks Smal�le+rgStage aJUADAACCess'y� � s j[ADARes[rDOjn` 10/2/2013 MRt !0,0400, i"A SrP,R O Civil Engineering & Assessment • Exterior Ramps • Utilities &Infrastructure • Sltelmprovements for Additions O Landscape Design Associated with the Improvements U Fire Suppression System Size.& Capacity for New Sprinklers Assessment • r,i., ri + �h il nrNr E RERiENr 'E D 1111104 11111111 0iRYS ON ao Ems . 4�g19n QRUMA �x D QOPM P - MRVY §ellting ACg?. O000rtunities ! ADA Improvements Nauman 5eating count Co•,ered AccerstorAetots Less Setupfgreakdowo Time Adequate Ruarn for Orchestra New Ticket & Concessions Area Constraints Setup /Breakdown During Performance Weeks Smal�le+rgStage aJUADAACCess'y� � s j[ADARes[rDOjn` 10/2/2013 Qptkgg A - MOO, �eZin9 ft,,l, 1 --Add Restruotos & Storage 2-Re ove Lobby Restrmums & Expand s • � Se -;ling Ar•.a 3 Add Lift & Stairs 1P -emovc gd91no d- Remove Rrstrnom$ A& rl - 'l irket /foncPSSlnn Area ..• � °.u. 5 -Remodel Restrooms & DressingAooms 6 -Add Covered Walkway T-, 7- Modify Stage &Seating to & Accommodate Council Platform QP09n, Ek - Modify- Stage �Reno_v'YAdd.•�S DRe A R prDf ; 1 - Add Re:strooms $ $toraga 2 - Remove Lobby Rmtrooms & Expand Searing A- 3 -Add L+It & Slurs (Remove griping) n •- Remove ReSUNM , Add Ti,ket/r—n—si.n At- 5 - Remodel Re: Unent, & Dmssing Rooms 6 -Add Covered Walk-vay 7 -Add. Sound /Light Vestibules 11 -Re -rake. Seating Area 9 - Modify .Stage & Seating to Add a Lift (Council /Stage /orchestra Pit) fRA7A-AZM�W LT:, 4goA@�RO -PI N MRt !0,0400, i"A SrP,R O Civil Engineering & Assessment • Exterior Ramps • Utilities &Infrastructure • Sltelmprovements for Additions O Landscape Design Associated with the Improvements U Fire Suppression System Size.& Capacity for New Sprinklers Assessment • r,i., ri + �h il nrNr E RERiENr 'E D Qptkgg A - MOO, �eZin9 ft,,l, 1 --Add Restruotos & Storage 2-Re ove Lobby Restrmums & Expand s • � Se -;ling Ar•.a 3 Add Lift & Stairs 1P -emovc gd91no d- Remove Rrstrnom$ A& rl - 'l irket /foncPSSlnn Area ..• � °.u. 5 -Remodel Restrooms & DressingAooms 6 -Add Covered Walkway T-, 7- Modify Stage &Seating to & Accommodate Council Platform QP09n, Ek - Modify- Stage �Reno_v'YAdd.•�S DRe A R prDf ; 1 - Add Re:strooms $ $toraga 2 - Remove Lobby Rmtrooms & Expand Searing A- 3 -Add L+It & Slurs (Remove griping) n •- Remove ReSUNM , Add Ti,ket/r—n—si.n At- 5 - Remodel Re: Unent, & Dmssing Rooms 6 -Add Covered Walk-vay 7 -Add. Sound /Light Vestibules 11 -Re -rake. Seating Area 9 - Modify .Stage & Seating to Add a Lift (Council /Stage /orchestra Pit) fRA7A-AZM�W LT:, 4goA@�RO -PI N 90,Rn e = MOKY �$ARF. Opportunities ADA Improvements Maintain Seating Court f nvemd Acres, for Acinr s Lr -Ys Setup/Breakdewn Truh Adequate Rcnm for Orchestra Orchestra Pit Improved Sight Lines Constraints Setup /Breakdown During Performance Weeks AbA Access .: e s PRORn P - Nsw 5rRwil PhgmPfrs Cost MR01 Opportunities ADA IMPPpPemen , Maln!ain SeiTJng Count Cor Ld Access fur Actors Lens Setup /Bm�kd— lime r A?equateROOns for Orihostra Shared Restrooms New Space for Recreational Programs Constraints Separate Location for Large Council Meetings/Announcements �RePov /Ada' i`.. ���I�1 ADAAccess � �� jADP Restroom_s�, ° E, , PORn 1 —Add Restrooms — Nr:rrtovn Lpbby Restroors &Expand SenUng Area '1— Add Uft & Stairs (Remove LxiSring) <I —Add S.—OU?ht Vestibules d — R.enwdcl Restroum &. Uressalg Rooms 6 —Add Dressing Rooms to Replace Accessory Structure 7 -Add New Council Chambers & Storage B - Add Restroom (at Council Level) 9 — Remodel to Dressing Room 10 — Remove Seating to Accommodate Orchestra �'fLtii bK2ADA'Attessu�t a s • � DADA Reitidoms�° !} 81,095 9sMRnI5 10/2/2013 �frf _ Ji.I y �'. 0. A I I L Option A Option B Option C Modify Seating Area Modify Stage New Council Chambers 0 WhAt is o QW MR40? ❑ Hard Costs Hard Costs +Soft Costs =Total • Demolition Project Costs • Construction • Unit Costs • Escalation. ❑ Soft Costs • Planning& Building Department Permits • Professional Services • Printing& Plotting • Fundraising Consultant • Furniture, Fixtures & Equipment • Contingency N�•:�i•i: l':, i..;,N�!r- E %IEFiENCE Wont WA the QFS MON Baseoi op? J Conceptual Narrative of Design Options ❑ Size of Demolition /Addition /Remodel ❑ Quantity & Type of Equipment & Fixtures 'I ir117h - 111 vl1...lh h::it E \PEPIEIh CF ON W :' WiRn ? - NCVV, c WWI �htaMOLerS �.. Building & Site $ 2.34.M General Conditions, Bonds &.Insurance 21% $ 0.35 M Contractor's Overhead &Profit or Fee 6% $0.16M Construction Cost for 2013 S 2.86 M Design Contingency 20% $ 057 M, Escalation to August 2016 12% $ 0.41 M Hard Cost Total for 2016 $ 3.84 M Design & Engineering Fees. 20% $'0.77M Owner Contingency 10% $0.46M Cost Model Total for 2016 $ 5.07 M Summary Details on Page 15 10/2/2013 tin", �953 MOO k2Sciosi9nA Option B - Modify Stage • Owner Supplied .& Installed Furniture, Fixtures, Furnishings, & Equipment Option A - Modify Seating Area • Theatrical Equipment Except as Specifically • Relocation of Theatrical Equipment during Construction • Relocation of Portable Buildings or Utilities $ 2.28-M Building & Situ 21'% $1.49'V General Conditions; Bonds .& Insurance 21% $ 0.31 M Contractor's Overhead& Profit or Fee 7% $ 0.13 M Construction Cost for 2013 A / t h. '1 F"PE AIENGE $ 1.93 M Design Contingency 20% $ 039M Escalation to August 2016 12% $ 0.28M Hard Cost Total for 2016 _ 20% $.2.59 M Design &.Engineering Fees 20% $ 0.52.M Owner Contingency 10% $ 0.31 M Cost Model Total for 2016 $ 3.42 M Summary Details on Page 4 :' WiRn ? - NCVV, c WWI �htaMOLerS �.. Building & Site $ 2.34.M General Conditions, Bonds &.Insurance 21% $ 0.35 M Contractor's Overhead &Profit or Fee 6% $0.16M Construction Cost for 2013 S 2.86 M Design Contingency 20% $ 057 M, Escalation to August 2016 12% $ 0.41 M Hard Cost Total for 2016 $ 3.84 M Design & Engineering Fees. 20% $'0.77M Owner Contingency 10% $0.46M Cost Model Total for 2016 $ 5.07 M Summary Details on Page 15 10/2/2013 pee!Ogn �a Option A Option B Option C Modify Seating Area Modify Stage New Council Chambers $3.42.M $4.92M $5.07M p9n yA 'r 0 ArA e�D94. Q N 4 f s r 10 •.P� �953 MOO k2Sciosi9nA Option B - Modify Stage • Owner Supplied .& Installed Furniture, Fixtures, Furnishings, & Equipment • Theatrical Equipment Except as Specifically • Relocation of Theatrical Equipment during Construction • Relocation of Portable Buildings or Utilities $ 2.28-M • Title 24 Energy Compliance 21'% EJ Seismic Upgrade to Current Codes 'Contractors Overhead& Profit or Fee ❑ Construction Management Fees $ 0.16 M Cl Dry Rot or Termite Damage Repairs ❑ Hazardous Material Abatement or Disposal Design Contingency A / t h. '1 F"PE AIENGE 0 pee!Ogn �a Option A Option B Option C Modify Seating Area Modify Stage New Council Chambers $3.42.M $4.92M $5.07M p9n yA 'r 0 ArA e�D94. Q N 4 f s r 10 •.P� .�yF'7w �����`��� Option B - Modify Stage �+.•- „ Building &Site $ 2.28-M General Conditions, Bonds & Insurance 21'% $ 0:34 M 'Contractors Overhead& Profit or Fee 6% $ 0.16 M Construction Cost. for 2013 $ 2.77M Design Contingency 20% $ 0.56M Escalation to August 2016 12% $ 0.16M Hard Cost Total for 2016 $ 3.73 M Design & Engineering Fees 20% $ 0.75 M, - Owner Contingency 101/0 $ 0.45M Cost Model Total for 2016 $ 4.92 M Summary Details on Page 17 pee!Ogn �a Option A Option B Option C Modify Seating Area Modify Stage New Council Chambers $3.42.M $4.92M $5.07M p9n yA 'r 0 ArA e�D94. Q N 4 f s r 10 J NW §M§ Clarification & Revisions Based on Council Direction Submission of Master Plan Report & Documentation to the City 10/2/2013 11 Table of Contents Saratoaa Civic Theater Master Plan PAGE Introduction................................:...:............................ ..............................2 I Executive Summary ................................................... ..............................3 Narratives.................................................................... ..............................5 • Architecture .................................................. ..............................5 • Site ........................... ............................... ..........5 ............................ • Theater ........................................................... ..............................5 • Structural ....................................................... ..............................5 • Heating, Ventilating & Air Conditioning . .............................32 • Plumbing ...................................................... .............................34 • Electrical Design ......................................... .............................34 i IV. Schedule & Cost Model Summary ......................... .............................35 V. Appendix .................................................................... .............................39 • Detailed Cost Model Anderson Brule Architects DRAFT - September 25, 2013 Saratoaa Civic Theater Master Plan I. Introduction The City of Saratoga is considering modifications to the existing civic theater built in 1964 to better accommodate the needs of the City and theater users. The building is part of the City of Saratoga Master Plan initiated in 2001, but was not analyzed in detail as a part of that effort. The purpose of the study provided by Anderson Brule Architects includes the following: • Outline of current utilization of the facility • Improvement options to improve current joint use by City and theater user groups of existing facility. • Budget estimates for evaluation of each option to allow for decision- making on next steps. Design Narratives are provided for use in the preparation of a Conceptual Cost Model. Architectural, structural, theatrical, mechanical, plumbing, and electrical narratives have been prepared specific to the 3 options included within this report. The narratives outline quality and conceptual information for each of the conceptual building systems based upon the existing conditions and current codes requirements. The existing facility, built in 1964, does not meet the current code requirements. Based on the Existing Conditions Report provided by the City staff and on a site walk- through review of the Theater, basic accessibility upgrades and plumbing fixture counts will be necessary in all options presented within this report. Anderson Brule Architects DRAFT -September 25, 2013 Saratoga Civic Theater Master Plan Executive Summary Introduction The Saratoga Civic Theater and Council Chambers is approximately 7,400 square feet. A large lobby and 299 fixed seats house constitute the public areas. The approximately 1,800 SF stage accommodates theater performances, council and commission meetings, and other community events and activities. On a yearly basis, the Theater accommodates two theater companies with a total of six performances in addition to weekly City Council and Planning Commission meetings. The Theater's stage area currently lacks flexibility for configuration layouts for the use by the Theater users and the City staff. In addition, the lack of adequate storage for the separate users is also a concern. Finally, the undersized restroom facilities are not capable of supporting the theater's full occupancy load. Program The proposed program includes three options as follows: • Option A - Modification of the seating area • Option B - Modification of the stage & seating areas, addition of an orchestra pit. • Option C - Addition of an assembly space for City /Theater use, a storage area, and a dressing room. All options include upgrades of the facilities to meet current ADA and plumbing fixtures count code requirements. Narratives Narratives included in this document outline the architectural character and quality of the proposed options along with the conceptual direction for building systems. The addition would relate to the existing character of the existing facility. The proposed options outline modifications within the existing building and additions directly attached to the existing structure. This report does not include an option for separate, new facility. Conceptual Costs A Conceptual Cost Model was developed for each of the options proposed within this document. A summary of the Cost Model for each option is included in this report. The detailed Cost Model is included as a separate report. Conceptual Schedule The maximum duration of time the building can be closed for construction within a year is no longer than 16 weeks. This construction duration is limited by the length of time the performance companies currently renting the theater can be displaced. Typically, neither company uses the facility during the months of August and December. Each company could also forego one of their six -week shows at the facility while it was closed for construction. By adding the twelve weeks gained by foregoing Anderson Brule Architects DRAFT - September 25, 2013 Saratoga Civic Theater Master Plan II. Executive Summary one show for each company, this allows the building to be closed for construction for a total of 16 weeks or 4 months. This document and associated estimate are based on the assumption that the majority of infrastructures and utilities affecting the use of the facility would occur during the 16 -week "closed for construction" period; the remainder of the improvements would take place outside this period and allow for concurrent use of the facility. In the proposed options, it is assumed that modifications to the orchestra pit, elevators /lifts additions, re raking of the seating area / relocation of the seating, major mechanical work, lobby and control booths modifications, and fire sprinkler system addition would occur during the 16 weeks period as such activities would not allow use of the building. na Anderson Brule Architects DRAFT - September 25, 2013 4 Architecture Building Exterior Building Interior Option A Saratoga Civic Theater Master Plan- III. Narratives For- all renovations and additions outline in the narrative, exterior finishes shall match the existing building finishes. All exterior modifications will be limited to building the additions described in the "Building Interior" section of the narrative. All options include upgrades of the facilities to meet current ADA and plumbing fixtures count code requirements. The following elements are common to options A, B and C outlined below: A. Addition of restrooms to meet current code requirements. Toilets 6:201 -300 6 Lavatories 4: 201 -300 4 2 _..._..__...__..._.. ---.........._ ......:.......... ..............,- ..._.__._...._. - __�;. — -- ----....__._...:.....__ ..._._._._...._._._._..... - -_.. Drinking Fountains 2: 251 -500 2 B. ADA upgrades to meet current code requirements. - Accessible control booths - Accessible stage area - Accessible house seating - Accessible public entrance The following architectural narrative outlines modifications and additions to the existing theater building. Subsequent sections of this, narrative provide additional detail for the same changes as they pertain to each discipline. Concept Modification of the stage Narrative The following modifications /improvements are proposed: 1. Removal of the stage apron & stairs leading to center stage The modification of the stage apron allows for a meeting space configuration in front of the stage for City Council and Planning Commission meetings. The stage apron is currently Anderson Brule Architects DRAFT - September 25, 2013 5 Saratoga Civic Theater Master Plan- III. Narratives Architecture protruding into the seating area and the City Council and planning commission are currently setup on the stage, approximately 3 feet above the first audience seats. Based on the original building drawings, the stage is a wood frames structure on wood posts with concrete pier foundations. The underside of the stage is an open plenum approximately 3 feet above compacted soil. Work includes: Removal of the stage wood floor and sub floor 4' -0" from the center of the apron Removal of the supporting posts and associated piers in the footprint of the apron - Installation of a new subfloor and floor at the lower floor level Front of stage vertical panels (infill over edge wood framed wall under the stage) Electrical and data outlets provisions included at face of stage. 2. Remove front two rows of center seating To allow for the new meeting setup outlined in item 1 above, the two center front rows will be removed. The meeting space created is approximately 1.5' deep from the stage edge to the first front row seat. Work includes: - Removal of 26 fixed seats (2 rows of 13 seats each) - Repair /replace flooring 3. Allow for removable platform and ramp for council podium. 12' x 24' removable platform 1.8" above floor finish in front of the stage (portable staging system) with ADA compliant ramp. 4. Remove lobby restrooms Demolish all existing restrooms in lobby to allow for additional seats in house & concession /ticket space. Work includes: - Demolition of all restroom walls, ceiling, existing MEP fixtures and utilities - New wall between house and lobby - New finishes on both sides of house /lobby wall, new finishes in entire lobby. coo It Anderson Brul6 Architects DRAFT - September 25, 2013 1. Saratoga Civic Theater Master Plan- III. Narratives Architecture New flooring and base on house side(carpet) New flooring and base on lobby side (VCT or sheet vinyl). - Ceiling patching on both sides of the house /lobby wall 5. Add seating at rear of house Relocation of 24 fixed theater seats 6. Add lift and stairs to control booth ADA accessible path. to control booths. Work includes: - Demolition of existing ship ladder & walls - Demolition of "tickets space - Demolition of exterior doors and storefront - Exterior wall infill to match existing adjacent - Addition of wheelchair lift and stairs - Full height wall enclosure for separation from public area - Framing / patching of control booth floor, finishes, and walls. - Allowance for control booths doors /frames /hardware upgrades. 7. Add restrooms and storage on parking lot side of buildina New 1,220 SF wood framed structure adjacent to existing facility connected to existing lobby. Restrooms: 500 SF Storage: 340 SF Exiting corridor: 75 SF Lobby extension: 320 SF Work includes: - Demolition of lobby exterior wall to provide connection to new restrooms - New lobby finishes - Walls and ceiling patching in lobby - New lobby extension in front of restrooms with exterior storefront to ADA ramp and landing. - Women's restrooms (5 toilets, 3 lavatories) - Men's restrooms (2 toilets, 2 urinals, 2 lavatories) - 2 Drinking fountains - Mansard roof to match existing - Parking lot: removal of seven parking spaces (paving, curbs, patching, etc) - Modification of planter islands in parking lot to provide Anderson Brule Architects DRAFT -September 25, 2013 7 Saratoga Civic Theater Master Plan- III. Narratives Architecture seven replacement parking spaces 8. Add lift at stage (accessibility) Addition of a lift and stairs at stage left for ADA access from the seating area to the stage area. Lift serving seating area, storage, and stage levels. Framed wall for lift enclosure. 9. Remodel /reconfigure dressing room area with new accessible restrooms - Demolition of Dressing rooms - Demolition of existing non ADA compliant restrooms - Addition of 2 single occupancy ADA restrooms (2 x 70SF, the floor and wainscots, painted gypsum board wall and ceilings) - Addition of a door in exterior wall to access dressing modular located in the back of the existing facility. - Addition of 40' x 6' covered walkway to access adjacent portable building - Remodel of dressing room into two smaller dressing rooms (new VCT flooring, painted walls, mirrors, etc). 10. Add ticket /concession area - Demolish existing lobby single occupancy restrooms - New ticket concession room in existing lobby with full height wood framed walls, hard lid ceiling. - Single door. - Interior 4' wide x 3' tall pass through with ADA counter - Exterior 2' wide x 3' pass through window with ADA counter - Patching of exterior wall - Built -in counters (2' deep x 20 LF) Total area: approximately 100 SF. coo Anderson Brule Architects DRAFT - September 25, 2013 Option A Saratoga Civic Theater Master Plan- III. Narratives Summary 44, 4 - I Y yrnl - � f � I I - 0 r� li I U i o 0 Renov. /Add. -APA Access AQA °'Rg, tr66 Q 1 -Add Restrooms & Storage 2 - Remove Lobby Restrooms & Expand Seating Area 3 - Add Lift & Stairs (Remove Existing) 4 - Remove Restroom & Add Ticket /Concession Area 5 - Remodel Restrooms & Dressing Rooms 6 -Add Covered Walkway 7 - Modify Stage & Seating to Accommodate Council Platform Anderson Brule Architects DRAFT - September 25, 2013 9 Saratoga Civic Theater Master Plan- III. Narratives Option A I Analysis Opportunities ADA Improvements Maintain Seating Count Covered Access for Actors Less Setup /Breakdown Time Adequate Room for Orchestra New Ticket & Concessions Area Constraints Setup /Breakdown During Performance Weeks Smaller Stage Option B Concept Modification of,the stage & seating areas, addition of an orchestra pit) Narrative 1. Removal of the stage apron & stairs leading to center stage The modification of the stage apron allows for a meeting space configuration in front of the stage for City Council and Planning Commission meetings. The stage apron is currently protruding into the seating area and the City Council and planning commission are currently setup on the stage, approximately 3 feet above the first audience seats. Based on the original building drawings, the stage is a wood frames structure on wood posts with concrete pier foundations. The underside of the stage is an open plenum approximately 3 feet above compacted soil. Work includes: - Removal of the stage wood floor and sub floor 4' -0" from the center of the apron - Removal of the supporting posts and associated piers in the footprint of the apron - Installation of a new subfloor and floor at the lower floor level - Front of stage vertical panels (infill over edge wood framed wall under the stage) - Electrical and data outlets provisions included at face of stage. 2. Remove front two rows of center seating A Anderson Brule Architects DRAFT- September 25, 2013 10 Saratoga Civic Theater Master Plan- III. Narratives To allow for the new meeting setup outlined in item 1 above, the two center front rows will be removed. The meeting space created is approximately 15' deep from the stage edge to the first front row seat. Work includes: - Removal of 26 fixed seats (2 rows of 13 seats each) - Repair /replace flooring 3. Add orchestra pit - Addition of an orchestra pit approximately 19' x 23', with floor finish approximately 7' -0" below stage (same floor elevation as existing storage area under the stage). See item 4 for floor construction. - Connection by "tunnel" from stage lift (see item 12) through existing storage room located under the stage. Passage should be 4' wide minimum with finished walls, ceiling and floor. Passage to have door to isolate storage from orchestra pit. 4. Add platform lift (council /orchestra / staae extension - Addition of a 12' x 24' motorized platform. System capable to provide a minimum of 3 elevation configurations: at orchestra pit elevation (see item 3'), 18" above lower seating area level, and at stage level. See theatrical narrative for additional information. 5. Re -rake seating area (see separate diagrams) - Rebuild seating area floor to provide better views of the stage for spectators. New slope over existing floor system (to be verified based on further evaluation of the as built conditions). - Two rows of seats in the back of the house above lobby elevation; side steps access. - New carpets, wall patching, new aisles lighting, new electrical /data wall outlets. - Area: approximately 2,000 SF. 6. Remove lobby restroom`s Demolish all existing restrooms in lobby to allow for additional seats in house & concession /ticket space. Work includes: - Demolition of all restroom walls, ceiling, existing MEP fixtures and utilities - New wall between house and lobby - New finishes on both sides of house /lobby wall, new Anderson Brule Architects DRAFT - September 25, 2013 11 Saratoga Civic Theater Master Plan- III. Narratives finishes in entire lobby. New flooring and base on house side(carpet) New flooring and base on lobby side (VCT or sheet vinyl). Ceiling patching on both sides of the house /lobby wall Add sound /light vestibules - Addition on 2 sound /light vestibules at existing public entrance from lobby to seating area. - Full height 1 -hr rated wood framed walls, hard lid ceilings, and carpet floors. - New single acoustical 1 -hr fire doors with actuators (replacement of 2 existing doors + 2 new doors) - Each Sound /light lock: approximately 50 SF 8. Add ticket /concession area - Demolish existing lobby single occupancy restrooms - New ticket concession room in existing lobby with full height wood framed walls, hard lid ceiling. - Single door. - Interior 4' wide x 3' tall pass through with ADA counter - Exterior 2' wide x 3' pass through window with ADA counter - Patching of exterior wall - Built -in counters (2' deep x 20 LF) - Total area: approximately 100 SF. 9. Add seating at rear of house Relocation of 24 fixed theater seats. 10. Add lift and stairs to control booth ADA accessible path to control booths. Work includes: - Demolition of existing ship ladder & walls - Demolition of "tickets" space - Demolition of exterior doors and storefront - Exterior wall infill to match existing adjacent - Addition of wheelchair lift and stairs - Full height wall enclosure for separation from public area - Framing / patching of control booth floor, finishes, and walls. - Allowance for control booths doors /frames /hardware upgrades. 11. Add restroom and storage on parking lot side of building New 1,220 SF wood framed structure adjacent to existing Anderson Brule Architects DRAFT -September 25, 2013 12 Saratoga Civic Theater Master Plan- III. Narratives facility connected to existing lobby. Restrooms: 500 SF Storage: 340 SF Exiting corridor: 75 SF Lobby extension: 320 SF Work includes: - Demolition of lobby exterior wall to provide connection to new restrooms - New lobby finishes - Walls and ceiling patching in lobby - New lobby extension in front of restrooms with exterior storefront to ADA ramp and landing. - Women's restrooms (5 toilets, 3 lavatories) - Men's restrooms (2 toilets, 2 urinals, 2 lavatories) - 2 Drinking fountains - Mansard roof to match existing - Parking lot: removal of seven parking spaces (paving, curbs, patching, etc) - Modification of planter islands in parking lot to provide seven replacement parking spaces 12. Add lift at stage (accessibility) Addition of a lift and stairs at stage left for ADA access from the seating area to the stage area. Lift serving seating area, storage, and stage levels. Framed wall for lift enclosure. 13. Remodel /reconfigure dressing room area with new accessible restrooms - Demolition of Dressing rooms - Demolition of existing non ADA compliant restrooms - Addition of 2 single occupancy ADA restrooms (2 x 70SF, the floor and wainscots, painted gypsum board wall and ceilings) - Addition of a door in exterior wall to access dressing modular located in the back of the existing facility. - Addition of 40' x 6' covered walkway to access adjacent portable building - Remodel of dressing room into two smaller dressing rooms (new VCT flooring, painted walls, mirrors, etc). Anderson Brule Architects DRAFT - September 25, 2013 13 Option B Saratoaa Civic Theater Master Plan- III. Narratives Summary iRenov.%A'dd °. 1 - Add Restrooms & Storage 2 - Remove Lobby Restfooms & Expand Seating Area 3 -Add Lift & Stairs (Remove Existing) 4- Remove Restroom & Add Ticket /Concession Area 5 - Remodel Restrooms '&'Dressing'Rooms :6 -Add Covered Walkway 7 -Add Sound /Light Vestibules 8 -Re -rake Seating,Area 9 - Modify Stage & Seating to Add a Lift (Council /Stage /Orchestra .Pit) Anderson Brule Architects DRAFT - September 25, 2013 14 Saratoaa Civic Theater Master Plan- III. Narratives Option B I Analysis Opportunities ADA Improvements Maintain Seating Count Covered Access for Actors Less Setup /Breakdown Time Adequate Room for Orchestra Orchestra Pit Improved Sight Lines Constraints Setup /Breakdown During Performance Weeks Option C Concept Addition of an assembly space for City /Theater use, a storage area, and a dressing room. Narrative 1. Remove first row of center seating - Removal of 26 fixed seats (1 rows of 13 seats) - Repair /replace flooring 2. Remove house side lobby restrooms Demolish existing restrooms in lobby near seating area to allow for additional seats in house. Work includes: - Demolition of all walls, ceiling, existing MEP fixtures and utilities - New wall between house and lobby - New finishes on both sides of house /lobby wall. - New flooring and base on house side(carpet) - New flooring and base on lobby side (VCT or sheet vinyl). - Ceiling patching on both sides of the house /lobby wall 3. Add seating at rear of house Relocation of 24 fixed theater seats. 14. Add lift and stairs to control booth ADA accessible path to control booths. Work includes: - Demolition of existing ship ladder & walls - Demolition of "tickets" space - Demolition of exterior doors and storefront - Exterior wall infill to match existing adjacent - Addition of wheelchair lift and stairs Anderson Brule Architects DRAFT - September 25, 2013 15 Saratoga Civic Theater Master Plan- III. Narratives - Full height wall enclosure for separation from public area Framing / patching of control booth floor, finishes, and walls. Allowance for control booths doors /frames /hardware upgrades. 4. Add sound /light vestibules - Addition on 2 sound /light vestibules at existing public entrance from lobby to seating area. - Full height 1 -hr rated wood framed walls, hard lid ceilings, and carpet floors. - New single acoustical 1 -hr fire doors with actuators (replacement of 2 existing doors + 2 new doors) - Each Sound /light lock: approximately 50 SF 5. Add restrooms on parking lot side of building with ramped corridor New 860 SF wood framed structure adjacent to existing facility connected to existing lobby and theater seating area. Exit corridor /slope corridor /(E) lobby connection: 430 SF Restrooms: 430 SF Work includes: - Demolition of lobby exterior wall to provide connection to restrooms - Sloped 5' wide ADA corridor connecting lobby to front of the house - Acoustical 1 hr fire rated doors at front of house. - New lobby finishes - Walls and ceiling patching in lobby - New exterior storefront to ADA ramp and landing. - Women's restrooms (5 toilets, 3 lavatories) - Men's restrooms (2 toilets, 2 urinals, 2 lavatories) - 2 Drinking fountains - Mansard roof to match existing 6. Add lift at stage (accessibility) Addition of a lift and stairs at stage left for ADA access from the seating area to the stage area. Lift serving seating area, storage, and stage levels. Framed wall for lift enclosure. 7. Remove seatina area stairs to stage Demolition of stairs from seating area to center stage. Patch edge of stage and flooring. coo Anderson Brul6 Architects DRAFT - September 25, 2013 16 Saratoga Civic Theater Master Plan- III. Narratives 8. Remodel /reconfigure dressing room area with new accessible restrooms - Demolition of Dressing rooms - Demolition of existing non ADA compliant restrooms - Addition of 2 single occupancy ADA restrooms (2 x 70SF, tile floor and wainscots, painted gypsum board wall and ceilings) - Addition of a door in exterior wall to access dressing modular located in the back of the existing facility. - Addition of 40' x 6' covered walkway to access adjacent portable building - Remodel of dressing room into two smaller dressing rooms (new VCT flooring, painted walls, mirrors, etc). 9. Add council, storage, and restrooms at lower house level on parking lot side of the facility New 1,750 SF wood framed structure adjacent to existing facility's stage area. Council /Planning Commission chamber: 1,380 SF Storage: 300 SF Restrooms: 70 SF, 1 toilet, 1 lavatory Work includes: - VCT /sheet linoleum flooring, painted walls, acoustical ceiling tiles - A/V system (A /V, 2 screens) - 25% allowance for wall openings with motorized shades - 1 unisex ADA restroom (tile floor and wainscots, painted gypsum board wall and ceilings) - Mansard roof to match existing 10. Allow for removable platform and ramp for council podium 12' x 24' removable platform 18" above floor finish in front of the stage (portable staging system) with ADA compliant ramp. 11. Add dressing rooms at stage level on stage side of facility New 460 SF wood framed structure adjacent to existing facility's stage area. Work includes: - VCT /sheet linoleum flooring, painted walls, acoustical ceiling tiles Anderson Brule Architects DRAFT - September 25, 2013 17 Saratoqa Civic Theater Master Plan- III. Narratives - 25% allowance for wall openings with manual shades Mansard roof to match existing Exterior stairs access to the back of the building. 12. Convert storage area behind stage to green room Convert 200 SF portion of existing storage room into greenroom. - VCT /sheet linoleum flooring - Painted walls and ceiling - New lighting - Exterior stairs access to the back of the building. Anderson Brule Architects DRAFT - September 25, 2013 18 Option C Saratoga Civic Theater Master Plan- 11.1. Narratives .Rehbv : /Ad`d! ADAALess, DADA- Restrooms 1 Add Restrooms 2 - Remove Lobby Restrooms & Expand Seating Area 3— Add Lift & Stairs (Remove Existing) 4-A ' dd Sound /Light Vestibules 5 - Rmodel Restrooms & Dressing Rooms 6 - Add Dressing :Rooms to_Replace Accessory Structure 7'- Add New Council Chambers & Storage &= Add Restroom (at Council Level) 9 - Remodel to Dressing Room 10 - Remove Seating to Accommodate Orchestra Anderson Brule Architects DRAFT - September 25, 2013 19 Option C n Saratoga Civic Theater Master Plan- III. Narratives Analysis Opportunities ADA Improvements Maintain Seating Count Covered Access for Actors Less Setup /Breakdown Time Adequate Room for Orchestra Shared Restrooms New Space for Recreational Programs Constraints Separate Location for Large Council Meetings /Announcements Anderson Brule Architects DRAFT - September 25, 2013 20 Site Saratoga Civic Theater Master Plan- III. Narratives Introduction Parking is highly used for theater events and other events that occur on and around the civic campus. User needs indicate that design options should not reduce the number of parking spots available. site All site modifications will be limited to building the additions described in the "Building Interior" section of the narrative. Some of the building additions include a limited reconfiguration of parking in order to maintain the total number of parking spots on site. Theater Existing Conditions The existing theatre shows signs of age but is generally well - maintained and certainly well -used. It has some serious shortcomings for the current users, as it has no orchestra pit and no scenery handling .capability (no fly tower for vertical movement of scenery.) Both elements are important to light opera and musical comedy, which is what each group produces, but they have managed to adapt and create successful productions within those limitations. The 299 -seat size suits each group and they have said they very i much want to maintain that number; no more or less. The sightlines are barely adequate to slightly inadequate, except for the intrusion of the conductor and musicians, who are placed on the floor in front of the stage at the same elevation as the first row of seats and create an obstacle to good viewing of the stage. Users have reported a tripping hazard where the flat seating ramp begins to slope upward. Users also report that the acoustics are adequate. The ADA compliance is inadequate. These requirements listed below are not met by the current configuration: The control suite is not accessible There is no'accessible path from seating to stage, which is required. There is no accessible path directly from seats to stage, which is required when there is an equivalent ambulatory path (the steps from front row area to stage.) The dressing rooms and backstage toilet are not accessible. There are no hearing -aid compatible assistive listening devices available. Anderson Brule Architects DRAFT - September 25, 2013 21 Theater Saratoga Civic Theater Master Plan- III. Narratives The backstage area is insufficient for performer support (dressing rooms) so the users have installed a trailer behind the building for dressing, costume storage, and green room. There is insufficient offstage space for the scenery generally used for large -scale musical theatre, and much of that space is used for the council dais Theatrical Equipment: There is no capability of moving scenery vertically. There is a system of pulleys that can be used to raise and lower lighting and scenery battens for installation and strike, but it must be manually rigged to each pipe to be lowered, and is limited to the 5 installed lines. This is not a situation that can be remedied without raising the stage roof. Performance lighting: There are not enough circuits or power to light the productions per industry standards. A complete investigation into existing conditions, power available, etc., would be required before any remedy can be proposed. Front -of -house lighting pipes are inadequate for use and inaccessible without scaffolding. House lighting: Inefficient. Control is obsolete. Upgrading may be difficult due to reported fragility and obsolescence of wiring over house ceiling. House ceiling is inaccessible except via scaffold from sloped seating area, so any repairs and maintenance are onerous. Front of house: Ticket booth and concessions areas are inadequate; booth is too small and concessions must be set up and taken down for each performance. Area for displaying at lobby is inadequate. There are no sound /light lock vestibules between lobby and stage, which is very distracting when persons enter house during performance. This usually means that latecomers can't be seated until a scene change, and as there is no video feed from stage to lobby this is a drawback for patrons and staff. Proposed Options i Option A - Stage is permanently smaller by area of apron - Does not improve sightlines or eliminate tripping hazard - Removal of seats provides more room for musicians. Seats [Mali, Anderson Brule Architects DRAFT - September 25, 2013 22 Saratoga Civic Theater Master Plan- III. Narratives Theater - - - - are regained at rear. Count remains effectively the same - Eliminates need to tear down scenery each week - Still requires some changeover labor (move instruments, lights, stands, install chamber equipment) - Improves accessibility greatly - New backstage toilets improve accessibility but trailer still required for dressing Option B - Stage is permanently smaller by area of apron. - Creation of pit /council chambers improves audience experience for performance and meetings. - Reduces changeover labor (same as above) - Re- raking of floor improves sightlines, accessibility, eliminates tripping hazard. - Number of seats remains effectively the same. - Added restrooms improves experience for all users. - Increased storage reduces labor for theatre users. - Stage lift increases flexibility for all uses. Stage lift: A stage lift, as manufactured by GALA Industries of Montreal or Serapid can provide push- button adjustability of floor elevation for orchestra pits and stages. This is equipment is well- tested in use and generally provides many years of repair. -free operation. If such a lift traveled from a pit elevation equal to the existing I basement storage to stage level, it could be used for musicians, council and as a stage extension, and the council dais might even be stored in the basement to push on /off the lift. Access issues still need to be addressed for convenience, exiting and ADA compliance. Option C - Number of seats remains effectively the same - Accessibility is improved for all users - Sound /light vestibules improve patron experience - Addition creates rehearsal /green room space for theatre users - Separating council from theatre eliminates changeover for all users - Dressing room addition has better access to stage and Anderson Brule Architects DRAFT - September 25, 2013 23 Saratoga Civic Theater Master Plan- Ill. Narratives Theater allows for removal of trailer Structural Introduction The scope of our study was limited to the following: • Review existing drawings for the Saratoga Civic Theater. • Attend a full design team meeting and building walk- through to observe field conditions and compare them with the drawings. • Identify structural implications of proposed renovation measures. • A detailed seismic evaluation was not included in this study. i Our study has not included geotechnical engineering services. If a detailed seismic evaluation were to be performed in the future, or if foundation evaluation or strengthening were performed, then geotechnical input would be required. Existing Conditions The Saratoga Civic Theater is a one story theater adjacent to, and structurally connected with, a one story City office building. Subsequent to the original construction, the one story city hall building was constructed next to the theater. It appears to be structurally connected to the Theater based on visual inspection, but we have not had access to any of the existing drawings for the addition. The footprint of Saratoga Civic Theater is approximately 68 ft in the north -south direction and 1 16' in the east -west direction. The original construction drawings for Saratoga Civic Theater are dated February 2, 1964. The Theater is used as a theater by two theater groups as well as the city council chamber for public meetings. Additionally, the front lobby is used for some public activities, such as a chess club. Saratoga Civic Theater is a wood framed building with a plywood shear wall lateral system. The roof spans over the theater with glulam beams and no interior columns. The perimeter walls, as well as some interior walls at steps in the roof, are bearing walls. The main theater floor spans to frequently spaced wood posts in typical U90 Anderson Brule Architects DRAFT - September 25, 2013 24 Saratoga Civic Theater Master Plan - III. Narratives Structural bays of 6 ft in the north - south direction and 4 ft in the east -west direction. The posts are supported on spread footings. We visited the site.on August 13, 2013. Although much of the structure is concealed behind finishes, it appears that the building was constructed in general accordance with the original drawings. The Saratoga Civic Theater appears to be well maintained and in good condition given its age and use. The following describes previous structural modifications: Neighboring buildings abut the Saratoga 'Civic Theater. As mentioned above, the City office building seems to be structurally connected to the theater, therefore the buildings must be considered together when seismic behavior is evaluated. The City Hall is on the north side of the building, and an existing temporary structure is on the west side of the building, neither of which are seismically connected to the Theater. The Saratoga Civic Theater is located in a region of high seismicity. A detailed seismic evaluation is outside the scope of this study; however, a wood building designed to the 1961 Uniform Building Code is unlikely to meet all aspects of the current code. Most of the potential modifications under consideration are unlikely to trigger a seismic upgrade per Section 3404 of the California Building Code with the exception of the two possible additions. Whether or not to seismically separate these additions should be studied in the future. Recommendations The following describes the structural implications of the potential renovation measures under consideration: Possible Modifications Applicable to All Schemes - An addition to the existing theater for new toilets would be a one -story, wood framed building with plywood shear walls. The foundations would be grade beams below the perimeter walls. Whether or not to seismically separate this addition from the main building should be studied in the future. - Removal of the existing lobby toilets and remodeling of the dressing rooms would involve demolition of existing wood Anderson Brule Architects DRAFT - September 25, 2013 25 Saratoaa Civic Theater Master Plan- III. Narratives Structural partitions, and reframing with new partitions. These walls are not bearing walls. - Adding a new stair to the sound and lights booth would require reframing the existing floor around a new stair opening. The stair would be of wood construction. - A new lift to the sound and light booth would require cutting an opening in the existing concrete floor. A concrete pit for the lift would be required. - A new lift to the stage that also serves the basement below would require cutting an opening in the main theater floor and the stage, and reframing around the openings. The excavation for the pit would be deep enough to require shoring during excavation and construction of concrete walls and slabs. The existing concrete basement wall would be sawcut and removed over the width of the lift. Depending on the final location of the pit, some amount of underpinning or shoring of the existing foundations may be required. Scheme A - Modifications to the existing stage platform apron would entail demolishing and reframing portions of the existing wood stage. Some reframing of the main theater floor may be required to receive a removable stage. Scheme B - See Scheme A for modifications to the existing stage. - Adding an orchestra pit and corridor to the existing basement would entail cutting an opening in the existing wood floors, and removing the existing wood posts and spread footings within the new pit footprint. The floors would require reframing with new posts and spread footings. The excavation for the pit would be deep enough to require shoring during excavation and construction of concrete walls and slabs. The pit and corridor would undermine the existing foundations, so underpinning will be required. Modifying the existing floor rake would require demolishing the existing wood framed floor and supporting posts, and EA Anderson Brule Architects DRAFT - September 25, 2013 26 Saratoga Civic Theater Master Plan- III. Narratives Structural reframing to the new slopes. Scheme C An addition to the existing theater would be a one story, wood framed building. Since the addition is at the stage level, a wood floor at the stage level that spans to wood posts similar to the current construction would be required. The foundations would be spread footings and grade beams. Whether to seismically separate the addition from the main building should be studied in the future. Executive Summary Most of the modifications being considered have relatively minor structural implications, such as reframing of wood construction in local areas and construction of depressed concrete areas below the current floor level. Where additions would be constructed, the issue of seismic separation /strengthening would need to be studied in the future. Where depressed concrete areas would be deep, the issue of underpinning adjacent to existing foundations would need to be studied in the future as well. Heating, Ventilating and Air Conditioning Observations The building is served by a 30 ton, 1.2,000 CFM split -dx air conditioning system. The supply air handler is located in the mechanical room. The condensing unit is located on an outdoor pad adjacent to the building. The air handler includes outside air economizer controls. The air handler serves rooftop supply air ductwork that serves the stage, seating, foyer and lobby areas. Each area has a dedicated heating water coil to provide temperature control. The heating water is provided by a 600 MBH gas fired boiler located in the mechanical room. The return air ductwork is located below the floor and includes a return air fan located in the mechanical room. The restrooms have ceiling mounted exhaust fans. The split -dx air handler and condensing unit appear to be in good operating condition and are not at end of life. The heating water boiler appears to be in good operating condition and is not at end NNICHOID n: A Anderson Brule Architects DRAFT - September 25, 2013 27 Saratoqa Civic Theater Master Plan- III. . Narratives Heating, Ventilating and Air Conditioning of life. The return air fan appears to have been originally provided with the building and is at end of life. The restroom exhaust fans appear to be inadequate. We experienced objectionable odors in the surrounding areas during our site visit. The control rooms have very minimal air conditioning that is inadequate. The city has commented that the HVAC system is not operating sufficiently. We have reviewed the system sizing and it is adequate for the building use. Further investigation is required to define any issues with the existing HVAC system. Option A Upgrades - Existing split -dx air handler and condensing unit to remain. - Existing heating water boiler to remain. - Replace the existing 9,000 CFM return air cabinet fan with new to match. - Provide new 1,300 CFM rooftop exhaust fan and ductwork to serve the new restrooms in the parking lot area. - Provide new 400 CFM rooftop exhaust fan and ductwork to serve the new restrooms and dressing rooms. - Provide new ductwork and distribution to the control rooms to provide adequate cooling. - Revise supply and return air grille locations as required for the architectural revisions. Option B Upgrades - Existing split -dx air handler and condensing unit to remain. - Existing heating water boiler to remain. - Replace the existing 9,000 CFM return air cabinet fan with new to match. - Revise main return duct routing below the floor to accommodate the new orchestra pit. - Provide new 1,300 CFM rooftop exhaust fan and ductwork to serve the new restrooms in the parking lot area.. - Provide new 400 CFM rooftop exhaust fan and ductwork to serve the new restrooms and dressing rooms. - Provide new ductwork and distribution to the control rooms to provide adequate cooling. - Revise supply and return air grille locations as required for the Anderson Brule Architects DRAFT - September 25, 2013 28 Saratoga Civic Theater Master Plan- III. Narratives Heating_, Ventilating_ and Air_ Conditioning architectural revisions. Option C Upgrades - Existing split -dx air handler and condensing unit to remain. - Existing heating water boiler to remain. Replace the existing 9,000 CFM return air cabinet fan with new to match. - Provide new 7.5 ton rooftop gas /electric air conditioning unit and distribution ductwork to serve the new building. Provide new 2 ton wall mounted split -dx heat pump to serve the new Green Room. Install new condensing unit on the roof. Plumbing Provide new 800 CFM rooftop exhaust fan and ductwork to serve the new restrooms in the parking lot area. Provide new 550 CFM rooftop exhaust fan and ductwork to serve the new restrooms and dressing rooms and the new restroom in the Council Chamber addition. Replace the two existing restroom exhaust fans with new 150 CFM higher performance ceiling fans. Provide new ductwork and distribution to the control rooms to provide adequate cooling. i Revise supply and return air grille locations as required for the architectural revisions. Observations The building is served by a 1 -1/2" domestic cold water line, 4" sanitary waste and a 1 -1 /4" medium pressure gas line. The existing restrooms in the lobby area include floor mounted flush valve toilets, wall mounted flush valve urinals and lavatories with manual faucets. A 20 gallon electric water heater provides hot water to the lavatories. The stage restroom is very small and is not ADA compliant. The plumbing systems appear to be in good working order. Option A Upgrades - Provide new 1.28 gallon per flush floor mounted tank type water closets, 0.125 gallon per flush wall mounted urinals with manual flush valves and wall mounted lavatories with 0.5 GPM manual faucets as indicated on the architectural � ®e Anderson Brule Architects DRAFT - September 25, 2013 29 Saratocia Civic Theater Master Plan- III. Narratives Plumbing - - - sketches. Provide ADA compliant fixtures and insulation for all accessible fixtures shown on the architectural sketches. Provide new 1 -1 /4" Type L copper water piping, 4" cast -iron waste and 2-1/2" cast -iron vent piping to serve the new restrooms in the parking lot area. Connect the new water and waste to the existing mains. Provide new vent through roof. Provide new 20 gallon, 6 kW water heater and 3/4" insulated hot water piping to serve new restroom lavatories. Provide one floor drain in each restroom. - Provide new 3/4" Type L copper water piping, 4" cast -iron waste and 2" cast -iron vent piping to serve the new restrooms in the dressing room area. Connect the new water and waste to the existing mains. Provide new vent through roof. Provide new 3 kW insta -hot water heater at each lavatory. - Provide two 3" rainwater leaders and overflow drains with piping daylighting above grade to serve the new restroom building. - Remove existing fixtures and associated piping no longer used. Option B Upgrades - Provide new 1.28 gallon per flush floor mounted tank type water closets, 0.125 gallon per flush wall mounted urinals with manual flush valves and wall mounted lavatories with 0.5 GPM manual faucets as indicated on the architectural sketches. Provide ADA compliant fixtures and insulation for all accessible fixtures shown on the architectural sketches. Provide new 1 -1 /4" Type L copper water piping, 4" cast -iron waste and 2-1/2" cast -iron vent piping to serve the new restrooms in the parking lot area. Connect the new water and waste to the existing mains. Provide new vent through roof. Provide new 20 gallon, 6 kW water heater and 3/4" insulated hot water piping to serve new restroom lavatories. Provide one floor drain in each restroom. - Provide new 3/4" Type L copper water piping, 4" cast -iron waste and 2" cast -iron vent piping to serve the new restrooms in the dressing room area. Connect the new water and waste to the existing mains. Provide new vent through roof. Provide new 3 kW insta -hot water heater at each lavatory. - Provide two 3" rainwater leaders and overflow drains with piping daylighting_ above grade to serve the new restroom ® ® A Anderson Brule Architects DRAFT - September 25, 2013 30 Saratoga Civic Theater Master Plan - III. Narratives Plumbing building. - Remove existing fixtures and associated piping no longer used. Option C Upgrades - Provide new 1.28 gallon per flush floor mounted tank type water closets, 0.125 gallon per flush wall mounted urinals with manual flush valves and wall mounted lavatories with 0.5 GPM manual faucets as indicated on the architectural sketches. Provide ADA compliant fixtures and insulation for all accessible fixtures shown on the architectural sketches. - Provide new 1 -1 /4" Type L copper water piping, 4" cast -iron waste and 2-1/2" cast -iron vent piping to serve the new restrooms in the parking lot area. Connect the new water and waste to the existing mains. Provide new vent through roof. Provide new 20 gallon, 6 kW water heater and 3/4" insulated hot water piping to serve new restroom lavatories. Provide one floor drain in each restroom. - Provide new 1" Type L copper water piping, 4" cast -iron waste and 2" cast -iron vent piping to serve the new restrooms in the dressing room area and council chambers. Connect the new water and waste to the existing mains. Provide new vent through roof. Provide new 3 kW insta -hot water heater at each lavatory. - Replace the existing gas pressure regulator at the back of the building to accommodate the added rooftop unit gas load. Provide new 1" gas line from new regulator to the now rooftop A/C unit on the new building. - Provide two 3" rainwater leaders and overflow drains with piping daylighting above grade to serve the new restroom building. - Provide 3/4" condensate drain piping from the new rooftop A/C unit to the new restroom lavatory drain tailpiece. - Provide 3/4" condensate drain piping from the new wall mounted heat pump in the Green room to the existing floor drain in the boiler room. - Remove existing fixtures and associated piping no longer used. A Anderson Brule Architects DRAFT - September 25, 2013 31 Saratoqa Civic Theater Master Plan- III. Narratives Electrical Observations - The existing building is served from an existing PG &E pad mounted transformer number 2062 located right outside of the building. The secondary of the transformer powers the building main switchboard via underground utility service at 120 /208volt, 3- phase, 4 -wire system. - The existing main service switchboard "MSB" is located inside the building at the back of the stage in a storage area. The PG &E smart meter number is 1009505393. - The existing main service switchboard is the original switchboard. The switchboard is an older GE board. The bus rating of the switchboard indicates 500ampeerre. However the main breaker states 1000ampere. The existing available electrical drawings states 1000amp frame, 500amp trip. We will assume the switchboard is 500amp at 120 /208volt, 3- phase, 4 -wire. We recommend the city to confirm the trip rating to be 500amp. Although the switchboard is reaching the end of its useful life, it appears to be in working condition. - The report provided by the city indicates the switchboard will be replaced with a new one. - There are four existing branch circuit panelboards labeled panel board A, B, C & D on walls throughout the building that provide necessary power for all equipment and devices in the building. - The city is planning to add a new Natural Gas powered generator to provide backup power for the site. It should be noted that Generators using natural gas only cannot be used as emergency panel for life safety. An alternate fuel will be required to meet the requirements of the code. - Emergency lighting presently is by combination exit lights and emergency heads throughout the building. Some of the existing fixtures are old and are not recommended to be reused for the new construction. - According to the report provided some of the fixtures are replaced with new LED, and compact fluorescent fixtures. There are also down light fixtures with very inefficient incandescent lamps. Theatrical and stage lighting control is via stage dimming control panels. The lighting control is via local wall switches for each area. Theatrical lighting has its own lighting control and dimmer system. Lighting system as installed may not meet current Title 24 requirements. Exterior lighting is a combination of wall mounted fixture on Anderson Brule Architects DRAFT - September 25, 2013 32 Saratoaa Civic Theater Master Plan- III. Narratives Electrical the building walls and pole mounted fixtures around the site. The building has an existing Fire Alarm Control Panel with manual pull stations and horn /strobe. Challenges / Concerns - We do not have any loading information on the existing main switchboard. To make sure the new project loads do not overload the existing system. We recommend to contact PG&E and request a 12 months peak demand data or to provide 30 days load reading. The existing panelboards will be modified to add additional circuit breakers for new loads. A new panelboard may be required for one of the options. - Some of the existing light fixtures are old and should be replaced with new efficient fixtures suitable for today's environment. New low voltage lighting control panel with automatic shutoff and day lighting will be required per current Title 24 requirements. - The exterior lighting shall be further reviewed at night time to see the foot - candle level. Additional light pole or wall packs may be required to provide the minimum lighting level required by code. - New emergency and exit lighting with battery pack will be required per new layout. - Replace existing outdoor receptacles and any receptacles within six feet of sink with a ground fault circuit interrupter type receptacle. - Existing receptacles and light switches throughout the building shall be provided with circuit identification. - Provide labeling for all disconnect switches, starters, panelboards, etc. - A new Fire alarm system may be required if the expansion / remodel exceed the capacity of the existing fire alarm panel to provide complete coverage for the building. Option A Upgrades - Provide new branch circuits from the nearest existing panelboards for new / modified lighting and all new equipment requiring power. - Provide new lighting and receptacles for the architectural Anderson Brule Architects DRAFT - September 25, 2013 33 III. Narratives Electrical Saratoga Civic Theater Master Plan- revisions. - Modify existing fire alarm initiating and warning devices as required by the new changes. New lighting will be of energy saving type meeting the requirements of Title 24. LED and fluorescent fixtures will be-used as much as possible. - Provide new feeder from existing main switchboard for the new electric lift. Option B Upgrades - Provide new branch circuits from the nearest existing panelboards for new / modified lighting and all new equipment requiring power. - Provide new lighting and receptacles for the architectural revisions. - Modify existing fire alarm initiating and warning devices as required by the new changes. New lighting will be of energy saving type meeting the requirements of Title 24. LED and fluorescent fixtures will be used as much as possible. - Provide new feeder from existing main switchboard for the new electric lift. Option C Upgrades - A new 100amp, 120 /208volt. 3- phase, 4 -wire panelboard fed from the main switchboard will. be required to power the new HVAC equipment Provide new branch circuits from the nearest existing panelboards for new / modified lighting and all new equipment requiring power. Provide new lighting and receptacles for the architectural revisions. Modify existing fire alarm initiating and warning devices as required by the new changes. New devices will be required for all new spaces. - New lighting will be of energy saving type meeting the requirements of Title 24. LED and fluorescent fixtures will be used as much as possible. - Provide new feeder from existing main switchboard for the new electric lift. coo Anderson Brule Architects DRAFT - September 25, 2013 34 Saratoga Civic Theater Master Plan - DRAFT IV. Conceptual Cost Model & Schedule L Cost Model Assumptions A Conceptual Cost Model is intended to be a budgetary tool for understanding what the costs on a project could be, even when little detailed information is known. It is a proactive look at costs, and does not consider design documents or materials, as no design work is complete. In contrast, a Cost Estimate defines specific quantities of known materials and systems to assess the actual cost of the project. This type of estimation can only be achieved when the design and documentation for a project has proceeded beyond the Conceptual Design stage of development. This Cost Model is not intended to be a Cost Estimate, but rather is intended to provide Budgetary Numbers for the work anticipated. This Cost Model does not Include: • Cost of Financing • Moving Expenses • Temporary Operational Expenses • Regulatory Fees • Staff Management Time A preliminary construction schedule was developed The components of a Conceptual Cost Model include: • Hard Costs = The direct costs to construct a building or structure, otherwise known as "brick and mortar" costs. o Includes Building and Site Costs, Design Contingency, Contractor Overhead and Profit • Soft Costs = Expenses, other than hard costs, incurred in developing a project o Includes Design Fees, Permits and Testing and Inspections o Furniture and Fixtures are included in the soft cost allowance, but equipment is quoted separately as a separate line item • Escalation • The determination of the escalation percentage is estimated from historic data gathered for similar projects in a similar region • This component relies on an assumption of project time frame, which can be unpredictable as the project develops • Contingencies o These contingencies are meant to help with Anderson Brule Architects DRAFT - September 25, 2013 35 Saratoga Civic Theater Master Plan - DRAFT IV. Conceptual Cost Model & Schedule Cost Model Assumptions management of expectations and account for the financial impact of surprises that may arise throughout the project. o Typical contingencies are: ■ Design: Different numbers are held at different phases of the project, and as more detail is developed and a more accurate cost estimate can be made, contingency percentages can be reduced. ■ Owner Contingency: Held by the client for unforeseen items such as infrastructure issues, etc. Anderson Brule Architects DRAFT - September 25, 2013 36 I Saratoga Civic Theater Master Plan - DRAFT IV. Conceptual Cost Model & Schedule Conceptual Cost -Model Summary j Option A - Modifying Seat Area i Multiplier i Cost Building & Site $ 1.49 M General Conditions, Bonds & Insurance 21% $ 0.31 m ................................................................................................................... ......................... ; .......................................... Contractor's Overhead & Profit or Fee 7% $ 0.13 M Construction Cost for 2013 $ 1.93 M Design Contingency 20% $ 0.39 M ................................................................................................................................................ ............................ ........................................... Escalation to August 2016 12% $ 0.28 M Hard Cost Total for 2016 $ 2.59 M ................. m-.; ............... ......................................................................... .............. .............................. ............. Design & Engineering Fees 20% $ 0.52 M ................................ .............................................. ............................ .......................................... Owner Contingency 10% $ 0.31 M ............................ L ................................ . ........ Cost Model Total for 2016 $ 3.42 M .......................................................................................................................................................................................................................... 10-o 17 —AP-k- Renov./Add, - ADA,Access, ADA Restrpoms L Anderson BruI6 Architects August 14, 2013 37 Saratoga Civic Theater Master Plan - DRAFT IV. Conceptual Cost Model& Schedule Option B — Modifying Stage Multiplier j Cost Building & Site General Conditions, Bonds & Insurance 21% $ 0.34 M ......... .................................. I .................................................................................................... 4 ............................. ..... .................................... Contractor's Overhead & Profit or Fee 6% $ 0.16 M Construction Cost for 2013 $ 2.77 M Design Contingency 20% $ 0.56rV1 ................................................................................................................................................. ............................ .......................................... Escalation to August 2016 12% $ 0.16 M Hard Cost Total for 2016 $ 3.73 M .......... ................ I ........................................................................................................ ............................ .......................................... Design & Engineering Fees 20%:: $ 0.75 M ► ................................... d, ............................................................................................................ ................... ....... --; ................... ...................... 4 Owner Contingency 10% $ 0.45 M ................................................................................................................................................ ............................ .......................................... Cost Model Total for 2016 $ 4.92 M L.............................................................................................................................................................................. .......................................... ;:0 Renov./Add. ADA Access ADA Restrooms 01 1. Anderson BruI6 Architects August 14, 2013 38 N Saratoaa Civic Theater Master Plan - DRAFT IV. Conceptual Cost Model& Schedule Option. C -New Council Chambers I Multiplier Cost Building & Site General Conditions, Bonds & Insurance 21% $ 0.35 M .......... ; ........................................................................................................................... ............................ ......... ....... Contractor's Overhead & Profit or Fee 6% $ 0.16 M Construction Cost for 2013 $ 2.86 M I Design Contingency 20% 1 $ 0.57 M ................................................................................................................................................ ..................... ...... ............................... ; .......... Escalation to August 2016 12% $ 0.41 M I Hard Cost Total for 2016 $ 3.84 M ............ ; .................................................................................................................................... ............................ ........ ................................. Design & Engineering Fees 20% $ 0.77M .......................................................................... m ..................................................................... ........................... . ........................................... Owner Contingency 10% $ 0.46M ............................ .......................................... Cost Model Total for 2016 $ 5.07 M .............................................................................................................................................................................. .......................................... ie Anderson BruI6 Architects August 14, 2013 Renov. /Add. -ADAiAcce;7s7 I =ms 39 City of Saratoga Council Chambers /Civic Theater Master Plan 9/3/13 Design Scheme Priority User Benefit Impact o v E c o n r3 U o o 0 0; CL Q v cn m a v "u 3 o o �, �. n°, Qj cc vim, u u c a oa j Co ¢ N N V z Z Facility Improvement: cc X X X X 1 Upgrade /Enlarge public restrooms X X X X X X X X X 2 Upgrade backstage restrooms X X X X X X X X 3 New ADA entrances to the seating area X X X X X 4 Install assisted listening devices system & A/V Upgrade X X X X X X X X 5 Upgrade.access for Control booths X X X X X X X X 6 Provide ADA seating to current code X X X X X X X X 7 ADA lift to stage from seating area _ X X X X X X _ _ 8 Replace Smoke Hatches over stage X X X X X X X _ X 9 Resolve Height difference between Council and Public X _ X _ Speakers (solution varies by design) _ X 10 Improve Presentation system X X X X X X 11 HVAC Upgrades= New HVAC System _ X X X X _ X 12 Replace Windows /Install dual pane glazing X X X X X _ 13 Improve House lighting X X X X _ X 14 Addition for dressing room area X X X X X 15 Add third controller at control booth for house lights X X X X 16 Install a covering over the back area between portable X X and the theater X X _ X 17 Sound /Light vestibules at seating-area entry doors X X _ _ X _ 18 Install a changeable multi -use monument sign in the X X X lawn area X X X _ X 19 Update lobby floor finishes _ X X X X X X_ 20 Improve Ticketing and Concessions X X X X 21 Green Room /Classroom /Council Chambers Addition X X X X X X X 22 Add a concession area and new ticket office with lobby X PA system X X 23 Provide Orchestra Pit X X _ X X* X* X* X 24 Electrical Upgrades X X X X X X X 25 Remodel Existing Space for Storage for City & Theater X X X X X Uses X 26 Enlarge Lobby X X X X _ X 27 Construct Fly Tower X X X X _ 28 Correct slope /rake of house floor X X X X X X 29 Video monitors mounted to the lobby walls X X X X 30 Replace stage lighting over seating.area- front of house X _ CONCEPTUAL DESIGN COST MODEL for Saratoga Civic Theater Master Plan Saratoga, California 2013 - 1013 - 001.000 Anderson Brule' Architects 325 South First Street, 4th Floor San Jose, California 95113 Tel: (408) 535 -2955 Fax: (408) 298-1887 September 4, 2013 �Q GWH 9157 Moondancer CA Circle Roseville, CA 95747 O�CONSTRUCTION W 1 (916) 742 -1770 COST CONSULTING C 1 (916) 945 -6066 Saratoga Civic Theater Master Plan Saratoga, California CONTENTS Basis of Cost Model Exclusions Areas- Existing Building Option A Summary and Budget Estimates Option B Summary and Budget Estimates Option C Summary and Budget Estimates. o GWH CONSTRUCTION COST CONSULTING Conceptual Design Cost Model September 4, 2013 2 3 4 -16 17 -24 25-39 k. Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 BASIS OF COST MODEL Cost Model Prepared From Drawings issued for Conceptual Design Existing building drawings A:1 -13 S:1 -7 P: 1, 2 M:1 -4 E:1 -4 Floor Plans for Options A, B, C - 3 sheets Existing Conditions Report Design Narrative Site visit and building tour - August 19, 2013 Discussions with the Project Architect Estimate Assumptions and Clarifications A start date of August 2016 A construction period of 8 months. The building will be closed for 4 months, and open during 4 months of construction The general contract will be competitively bid There will not be small business set aside requirements The contractor will be required to pay prevailing wages There are no phasing requirements Parking lot adjacent to the theater will be available to the contractor for staging of material and equipment during construction The contractor will have full access to the site during normal business. hours The building will be closed during construction ° GWH CONSTRUCTION �o o Page 1 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 EXCLUSIONS Owner supplied and installed furniture, fixtures, furnishings and equipment Theatrical equipment except specifically noted in the estimate Relocation of theatrical equipment or television equipment during construction Relocation of portable buildings or utilities Title 24 Energy Compliance Seismic upgrade to current codes Dry rot or termite damage repairs Hazardous material abatement or disposal Accelerated schedule, overtime or restrictions on the contractor's working hours Testing and inspection fees Construction management fees Scope change or change order contingencies Assessments, taxes, finance, legal and development charges Builder's risk or other Owner provided insurance program o° GWH CONSTRUCTION COST CONSULTING Page 2 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga , California September 4, 2013 EXISTING BUILDING AREAS (Excludes Building Additions) Enclosed Areas Basement 400 Main Floor and Stage 71340 Upper Level 140 SF SUBTOTAL, Enclosed Area 7,880 SF Covered area SUBTOTAL, Covered Area @ % Value TOTAL GROSS FLOOR AREA 7,880 SF o° GWH '�aVCONSTRUCTION COST CONSULTING Page 3 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION A SUMMARY Option A Modification Budgets 1 Remove Stage Apron and Stairs 2 Remove Front Two Rows of Center Seating 3 Removable Platform and Ramp for Council Podium 4 Remove Lobby Restrooms 5 Add Seating at Rear of House 6 Add Lift and Stair to Control Booth 7 Add Restrooms and Storage at Parking Side of Building 8 Add Lift.at Stage 9 Remodel /Reconfigure Dressing Room Area with Restrooms 10 Add Ticket /Concession Area 11 Plumbing Modifications 12 Heating, Ventilating and Air Conditioning Modifications 13 Electrical Modifications 14 Fire Protection 15 Temporary Construction $x1,000 30 5 25 96 3 99 528 193 148 41 0 25 116 132 50 SUBTOTAL BUILDING & SITE 1,491 General Conditions, Bonds and Insurance 21.00% 313 Contractor's Overhead & Profit or Fee 7.00% 126 CONSTRUCTION COST - September 2013 1,930 Design Contingency 20.00% 386 Escalation to Start Date (August 2016) 12.00% 278 SUBTOTAL HARD COST - August 2016 2,594 Design Fees (Per Architect) 20.00% 5.19 Owner's Contingency 10.00% 311 TOTAL 3,424 o° GWH �mc CONSTRUCTION Page 4 COST CONSULTING g Saratoga Civic Theater Master Plan Saratoga, California OPTION A 1. Remove Stage Apron and Stairs Demolition Stage steps Apron floor structure including support structure below Floor structure Wood framed floor structure infill including support structure below Miscellaneous framing modifications Finishes Infill wall at edge of stage T -0" high including wood panel finish Patch carpet flooring Miscellaneous patch and repair of existing finishes Electrical Power strip with power and data outlets at front of stage 2. Remove Front Two Rows of Center Seatin Demolition Remove fixed seating Finishes Patch wood flooring Conceptual Design Cost Model September 4, 2013 Quantity unit Rate Total 2 EA 600.00 1,200 72 SF 20.00 1,440 144 SF 25.00 3,600 1 LS 1,000.00 1,000 42 LF 300.00 12,600 200 SF 10.00 2,000 1 LS 1,000.00 1,000 36 LF 200.00 7,200 30,040 26 EA 75.00 1,950 300 SF 10.00 3,000 4,950 o° GWH �UCONSTRUCTION Page 5 COST CONSULTING g Saratoga Civic Theater Master Plan Saratoga, California OPTION A Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 3. Removable Platform and Ramp for Council Podium Platform and ramp Removable platform 12'x 24' including ramp and ramp railings (platform 18" high) 1 LS 14,000.00 14,000 Platform railings —allow 1 LS 4,000.00 4,000 Platform skirting - allow 1 LS 1,000.00 1,000 Storage trolleys and carts 1 LS 1,000.00 1,000 Structural modifications Miscellaneous framing modification to floor structure at platform - allow 1 LS 3,000.00 3,000 Finishes Patch carpet flooring at structural modifications 1 LS 2,000.00 2,000 25,000 4. Remove LobbV Restrooms Demolition Restrooms including partitions, finishes, mechanical and electrical systems Lobby restrooms 2 EA 2,500.00 5,000 House side restrooms 2 EA 4,000.00 8,000 Partitions Full height theater wall including wood stud framing, sound insulation, gypsum board and paint 500 SF 22.00 11,000 Finishes - house side Wood flooring including base 200 SF 25.00 5,000 Wood paneling at walls 500 SF 30.00 15,000 Miscellaneous patching of existing finishes 1 LS 5,000.00 5,000 Finishes - lobby side Replace flooring - allow 1,400 SF 15.00 21,000 Tackable wall surface - allow 600 SF 20.00 12,000 Patch and paint existing walls and ceilings 1 LS 5,000.00 5,000 Miscellaneous patching of existing finishes 1 LS 2,000.00 2,000 Equipment Miscellaneous equipment and accessories 1 LS 5,000.00 5,000 Heating, ventilating and air conditioning Minor HVAC modifications 250 SF 4.00 1,000 Z7 %j tw*WH CONSTRUCTION Page 6 COST CONSULTING g Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION A Quantity Unit Rate Total Electrical Provide bridge wiring to maintain power /communications for devices to remain 250 SF 4.00 1,000 Misc. electrical requirements 1 LS 100.00 100 Fire protection Fire sprinkler system - with building system With Building System 96,100 S. Add Seating at Rear of House Theater seating Reinstall fixed theater seating at rear of house 24 EA 125.00 3,000 3,000 6. Add Lift and Stair to Control Booth Demolition Interior construction Main level 1 LS 3,000.00 3,000 Control booth level 1 LS 2,000.00 2,000 Floor and roof structure Cut opening in concrete slab, install lift pit 1 EA 10,000.00 10;000 Modify control booth floor for lift and stair 1 LS 5,000.00 5,000 Partitions Wood stud partitions including sound insulation, gypsum board and paint 300 SF 15.00 4,500 Modify existing partitions Main level 1 LS 3,000.00 3,000 Control booth level 1 LS 3,000.00 3,000 Interior door - single 1 EA 2,200.00 2,200 Allowance for door modifications at control booth 1 LS 5,000.00 5,000 Finishes Stair and lift area 1 LS 5,000.00 5,000 Control booth level 1 LS 5,000.00 5,000 Patch and repair existing lobby finishes damaged during construction 1 LS 3,000.00 3,000 o GWH CONSTRUCTION Page 7 COST CONSULTING g Saratoga Civic Theater Master Plan Saratoga, California OPTION A Conceptual Design Cost Model September 4, 2013 o° GWH 'KNUCONSTRUCTION Page 8 COST CONSULTING g Quantity Unit Rate Total Equipment Relocation of theatrical equipment or television equipment - by Owner NIC Miscellaneous equipment and accessories 1 LS 5,000.00 5;000 Stairs and lifts Motorized lift including enclosure - two levels 1 EA 25,000.00 25,000 Wood framed stair including railings 1 EA 10,000.00 10,000 Heating, ventilating and air conditioning Minor HVAC modifications 200 SF 10.00 2,000 Electrical Connect wheelchair lift 1 EA 1,600.00 1,600 Lighting, convenience power, systems 200 SF 20.00 4,000 Misc. electrical requirements 1 LS 560.00 560 Fire protection Fire sprinkler system - with building system With Building System 98,860 7. Add Restrooms and Storage at Parking Side of Building Demolition Entrance door, sidelight and wall 1 LS 3,000.00 3,000 Miscellaneous building demolition 1 LS 2,000.00 2,000 Foundations Crawl space excavation and disposal 140 CY 50.00 7,000 Perimeter wall footing and stem wall, interior post foundations 1,220 SF 25.00 30,500 Floor and roof structures Wood framed structures including sheathing Floor 1,220 SF 15.00 18,300 Flat roof 1,220 SF 13.00 15,860 Tie floor and roof structure to existing construction 154 LF 25.00 3;850 o° GWH 'KNUCONSTRUCTION Page 8 COST CONSULTING g Saratoga Civic Theater Master Plan Saratoga, California OPTION A Exterior Wood framed exterior walls including insulation and finish Mansard roof and soffit detail including framing and finishes to match existing, 6' -9" x 4' -6" Exterior doors Single Double - entrance Storefront - allow Tie walls to existing walls Roofing Membrane roofing including insulation and flashing Tie roofing to existing building Miscellaneous flashing, vents, caulking and sealants Partitions Wood stud partitions including sound insulation, gypsum board and paint Furring Standard Plumbing Interior doors Single Double Finishes Floor, wall and ceilings Restrooms Storage, and corridor Lobby extension - allow Patch and repair existing lobby finishes Equipment Toilet partitions Urinal screen Vanities Toilet accessories Miscellaneous equipment and accessories z ° GWH OVCONSTRUCTION COST CONSULTING Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 1,400 SF 30.00 42,000 93 LF 350.00 32,550 1 EA 3,000.00 3,000 1 EA 6,000.00 6,000 250 SF 90.00 22,500 1 LS 3,000.00 3,000 1,220 SF 15.00 18,300 77' LF 25.00 1,925 1 LS 5,000.00 5,000 400 SF 9.00 3,600 1,040 SF 14.00 14,560 100 SF 20.00 2,000 2 EA 2,200.00 4,400 1 EA 3,200.00 3,200 500 SF 65.00 32,500 415 SF 25.00 10,375 320 SF 50.00 16,000 1 LS 3,000.00 3,000 7 EA 1,100.00 7,700 1 EA 400.00 400 14 LF 300.00 4,200 1 LS 5,000.00 5,000 1 LS 5,000.00 5,000 Page 9 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION A Quantity Unit Rate Total Plumbing Watercloset with associated piping 7 EA 3,800.00 26,600 Urinal with associated piping 2 EA 4,400.00 8,800 Lavatory with associated piping 5 EA 4,600.00 23,000 Drinking fountain with associated piping 2 EA 5,700.00 11,400 Floor drain with associated piping 2 EA 2,500.00 5,000 Electric water heater, 20 gallon, 6 kW 1 EA 5,500.00 5,500 Roof and overflow drain with piping 4 EA 1,600.00 6,400 Relocate rain water leader 1 EA 1,500.00 1,500 Heating, ventilating and air conditioning Exhaust fan (1'300 cfm), ductwork and controls 1,220 SF 5.00 6;100 HVAC system 1,220 SF 10.00 12,200 Electrical Modify distribution, add breakers as required 1,220 SF 1.00 1,220 Grounding 1,220 SF 0.65 793 Supply, install light fixtures 1,220 SF 10.00 12,200 Lighting wiring 1,220 SF 1.S0 1,830 Lighting controls 1,220 SF 1.50 1,830 Convenience power 1,220 SF 2.00 2,440 Fire alarm 1,220 SF 2.00 2,440 Security at exterior doors 1,220 SF 1.50 1,830 CCTV at exterior door 1,220 SF 2.00 2,440 Misc. electrical requirements 1 LS 2,700.00 2,700 Relocate exterior wall /soffit mounted light fixtures 2 EA 1,000.00 2,000 Fire protection Fire sprinkler system 1,220 SF 7.50 9,150 Sitework Remove entrance planters and steps 1 LS 3,000.00 3,000 Remove paving and landscaping 2,000 SF 2.00 4,000 New entrance paving, steps and railings 1 LS 6,000.00 6,000 Modify existing railings 1 LS 1,000.00 1,000 Replace paving and landscaping damaged during construction 1,000 SF 10.00 10,000 Modify parking lot planting islands to create 7 new parking spaces - allow 1 LS 10,000.00 10,000 Miscellaneous site lighting and drainage modifications - allow 1 LS 10,000.00 10,000 Utility modifications - allow 1 LS 10,000.00 10,000 528,093 GWH COST ONSULTING Page 10 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION A o GWH O� COST CONSULTING Page 11 Quantity Unit Rate Total 8. Add Lift at Stage Demolition Cut opening in seating floor structure and stage floor structure for lift 2 EA 2,500.00 5,000 Cut opening in basement retaining wall 1 EA 6,000.00 6,000 Miscellaneous demolition 1 LS 5,000.00 5,000 Foundations Cut opening in concrete slab, install lift pit 1 EA 10,000.00 10,000 Shoring of excavation 200 SF 100.00 20,000 Excavation and required backfill - by hand 1 LS 10,000.00 10,000 Underpin /shoring theater exterior wall at lift 20 LF 1,000.00 20,000 Retaining walls Concrete retaining walls dowelled to existing basement walls 200 SF 90.00 18,000 Floor structures Reframe seating area and stage floor structures around new openings 2 EA 2,500.00 5,000 Partitions Allowance for interior partitions or doors associated with the lift and stair 1 LS 15,000.00 15,000 Finishes Miscellaneous finishes associated with the lift and stair 1 LS 5,000.00 5,000 Patch existing finishes at seating area and stage 1 LS 5,000.00 5,000 Patch existing finishes at basement 1 LS 5,000.00 5,000 Equipment Miscellaneous equipment and accessories 1 LS 5,000.00 5,000 Wheelchair lift Motorized lift including enclosure - three levels 1 EA 25,000.00 25,000 Stair (not detailed) Wood framed stair to basement, seating area and stage including railings, and associated demolition and structural modifications 1 LS 25,000.00 25,000 Heating, ventilating and air conditioning Miscellaneous HVAC modifications 1 LS 2,000.00 2,000 o GWH O� COST CONSULTING Page 11 Saratoga Civic Theater Master Plan Saratoga, California OPTION A Electrical Connect wheelchair lift Remove, relocate existing electrical to accommodate new lift Misc. electrical allow Fire protection Fire sprinkler system- with building system 9. Remodel /Reconfieure Dressine Room Area with Restrooms Demolition Dressing rooms Restrooms Miscellaneous demolition Exterior wall Cut opening in exterior wall, install door and frame - single Covered walkway Covered walkway to portable building - allow Paving and landscaping modifications for covered walkway - allow Partitions Wood stud partitions including sound insulation, gypsum board and paint Interior doors - single Finishes Floor, wall and ceilings Restrooms Dressing rooms and hallway Miscellaneous patching of existing finishes Equipment Toilet room accessories Mirrors at dressing rooms Miscellaneous equipment and accessories Plumbing Watercloset with associated piping Lavatory with associated piping Floor drain with associated piping Electric instantaneous water heater Z7, GWH CONSTRUCTION COST CONSULTING Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate 1 EA 1,600.00 1 LS 2,500.00 1 LS 2,500.00 Witt Total 1,600 2,500 2,500 Building System 192,600 3 EA 1,000.00 3,000 2 EA 2,500.00 5,000 1 LS 1,000.00 1,000 1 EA 5,000.00 5,000 240 SF 150.00 36,000 1 LS 5,000.00 5,000 900 SF 14.00 12,600 4 EA 2,200.00 8,800 140 SF 75.00 10,500 230 SF 25.00 5,750 1 LS 2,000.00 2,000 2 EA 1,000.00 2,000 2 EA 500.00 1,000 1 LS 2,000.00 2,000 2 EA 3,800.00 7,600 2 EA 4,600.00 9,200 2 EA 2,500.00 5,000 2 EA 750.00 1,500 Page 12 Saratoga Civic Theater Master Plan Saratoga, California OPTION A. Heating, ventilating and air conditioning Exhaust fan (400 cfm), ductwork and controls HVAC modifications Relocate exterior wall mounted condenser piping Electrical Provide new light fixtures Add light fixtures at new covered walkway Lighting wiring Lighting controls Convenience power, add /relocate as required Fire alarm, add /relocate devices as required Security at exterior door Misc electrical requirements Fire protection Fire sprinkler system - with building system 10. Add Ticket /Concession Area Demolition Restroom demolition - see lobby restroom demolition Exterior Cut opening in exterior wall, install pass- through window with ADA counter, 24" x 36" Patch stonework at wall Partitions Wood stud partition including sound insulation, gypsum board and paint Interior door - single Pass - through window with ADA counter, 48" x 36 Finishes Flooring including base Patch and paint existing walls Hard lid ceiling Patch lobby finishes Equipment Built -in counter Miscellaneous equipment and accessories o° GWH VCONSTRUCTION COST CONSULTING i Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 370 SF 5.00 1,850 370 SF 10.00 3,700 1 LS 5,000.00 5,000 370 SF. 10.00 3,700 3 EA 650.00 1,950 370 SF 4.00 1,480 370 SF 3.00 1,110 370, SF 3.00 1,110 370 SF 6.00 2,220 1 EA 2,000.00 2,000 1 LS 1,350.00 1,350 With Building System 148,420 Lobby Restroom Demolition 1 EA 4,000.00 4,000 1 LS 2,000.00 2,000 400 SF 14.00 5,600 1 EA 2,200.00 2,200 1 EA 3,000.00 3,000 100 SF 10.00 1,000 1 LS 1,000.00 1,000 100 SF 25.00 2,500 1 LS 1,500.00 1,500 20 LF 400.00 8,000 1 LS 2,000.00 2,000 Page 13 Saratoga Civic Theater Master Plan Saratoga, California OPTION A Heating, ventilating and air conditioning Modify HVAC system for ticket /concession area Electrical Provide new light fixtures Lighting wiring Lighting controls Convenience power, add /relocate as required Fire alarm, add /relocate devices as required Security, panic button (if required) CCTV camera (if required) Telephone /data outlets, box and conduit only Add data cabling /terminations, assume 3 cables /location Misc. electrical requirements Fire protection Fire sprinkler system - with building system 11. Plumbing Modifications All plumbing modifications included with detailed estimates 12. Heating, Ventilating and Air Conditioning Modifications HVAC Replace (E) 9000 cfm return air fan with new Provide duct & distribution to control rooms Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 100 SF 12.50 1,250 100 SF 10.00 1,000 100 SF 3.00 300 100 SF 3.00 300 100 SF 6:00 600 100 SF 6.00 600 1 EA 1,000.00 1,000 1 EA 1,800.00 1,800 1 EA 220.00 220 1 EA 720.00 720 1 LS 650.00 650 With Building System 41,240 With Detailed Estimates 0 1 EA 15,000.00 15,000 700 SF 14.00 9,800 24,800 GWH CONSTRUCTION Page 14 COST CONSULTING g Saratoga Civic Theater Master Plan Saratoga, California OPTION A 13. Electrical Modifications Electrical Connect new return air fan Connect new rooftop exhaust fan serving parking lot restrooms Connect new exhaust fan serving restrooms and dressing rooms Connect new water heater Connect Insta -hot water heaters Replace some existing light fixtures with new (some fixtures already replaced), allow Replace lighting wiring as required, assume existing can be partially re -used Upgrade emergency lighting Add exterior wall packs, allow Add new low voltage lighting control panel Misc. lighting control upgrades Replace outdoor receptacles with gfi type, replace indoor receptacles with gfi type where appropriate Provide circuit identification throughout building Provide labeling for panelboards, disconnect switches, motor starters etc Provide new fire alarm control panel if new capacity exceeds that of existing Fire alarm reprogramming Connections to sprinkler system Add Assistive Listening Misc. electrical requirements GWH aCONSTRUCTION COST CONSULTING Conceptual Design Cost Model September 4, 2013 1 Quantity Unit Rate Total 1 EA 1;500.00 1,500 1 EA 2,000.00 2,000 1 EA 1,500.00 1,500 1 EA 750.00 750 4 EA 500.00 2,000 75 EA 470.00 35,250 1 LS 10,000.00 10,000 1 LS 5,500.00 5,500 6 EA 1,000.00 6,000 1 EA 7,500.00 7,500 1 LS 5,000.00 5,000 1 LS 2,500.00 2,500 1 LS 7,500.00 7,500 1 LS 500.00 500 1 EA 10,000.00 10,000 1 LS 1,500.00 1,500 1 LS 1,500.00 1,500 1 LS 5,000.00 5,000 1 LS 10,000.00 10,000 115,500 o° Page 15 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION A o GWH CONSTRUCTION Page 16 COST CONSULTING g Quantity Unit Rate Total 14. Fire Protection Fire sprinkler system Fire sprinkler system throughout existing building at all levels (exposed and concealed) 7,880 SF 8.00 63,040 Incoming service -and riser - allow 1 LS 25,000.00 25,000 Patch site work at new service 1 LS 5,000.00 5,000 Remove and replace interior finishes as required for access 7,880 SF 5.00 39,400 132,44.0 15. Temporary Construction Temporary Interior dust curtains, finish protection and protection of existing construction 1 LS 20,000.00 20,000 Exterior closures and weather protection 1 LS 5,000.00 5,000 Site barriers and barricades 1 LS 10,000.00 10,000 Scaffolding and lifts 1 LS 15,000.00 15,000 50,000 o GWH CONSTRUCTION Page 16 COST CONSULTING g Saratoga Civic Theater Master Plan Conceptual Design Cost Model September 4, 2013 OPTION B SUMMARY Option B Modification Budgets $x1,000 1 Remove Stage Apron and Stairs 30 2 Remove Front Two Rows of Center Seating 0 3 Add Orchestra Pit 322 4 Add Motorized Platform Lift 185 5 Re -rake Seating Area 252 6 Remove lobby Restrooms 96 7 Add Sound /Light Locks 43 8 Add Ticket /Concession Area 41 9 Add Seating at Rear of House 0 10 Add Lift and Stair to Control Booth 99 11 Add Restrooms and Storage at Parking Side of Building 528 12 Add Lift at Stage 193 13 Remodel /Reconfigure Dressing Room Area with Restrooms 148 14 Plumbing Modifications 0 15 Heating, Ventilating-and Air Conditioning Modifications 25 16 Electrical Modifications 116 17 Fire Protection 132 18 Temporary Construction 65 SUBTOTAL BUILDING & SITE 2,275 General Conditions, Bonds and Insurance 15.00% 341 Contractor's Overhead & Profit or Fee 6.00% 157 CONSTRUCTION COST - September 2013 2,773 Design Contingency 20.00% 555 Escalation to Start Date (August 2016) 12.00% 399 SUBTOTAL HARD COST - August 2016 3,727 Design Fees (Per Architect) 20.00% 745 Owner's Contingency 10.00% 447 TOTAL 4,919 o° GWH CONSTRUCTION Page 17 COST CONSULTING g Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION B Quantity Unit Rate Total 1. Remove Stage Apron and Stairs Similar to Option A, Item #1 (see page 5 For further detail) 1 LS 30,040.00 30,040 30,040 2. Remove Front Two Rows of Center Seating Removal of seating included with Re- raking of seating area RE -Rake Seating Area y ° GWH CONSTRUCTION Page 18 "� � COST CONSULTING g 0 3. Add'Orchestra Pit Demolition Portion of stage floor including supporting structure below 300 SF 10.00 3,000 Portion of seating floor including supporting structure below 300 SF 10.00 3,000 Retaining wall and footing 30 LF 250.00. 7,500 Cut door opening in basement retaining wall 1 EA 6,000.00 6,000 Miscellaneous demolition 1 LS 5,000.00 5,000 Foundations Temporary shoring 500 SF 100.00 50,000 Excavation and disposal - by hand 150 CY 150.00 22,500 Wall footing for new retaining walls 100 LF 150.00 15,000 Underpin and rebuild supporting spread footings and posts below existing stage and seating area floor to remain - allow 1 LS 20,000.00 20,000 Pit, foundations or supporting structure for motorized platform - allow 1 LS 15,000.00 15,000 Retaining walls Concrete retaining walls dowelled to existing basement walls 600 SF 90.00 54,000 y ° GWH CONSTRUCTION Page 18 "� � COST CONSULTING g Saratoga Civic Theater Master Plan Saratoga, California OPTION B Floor structures Concrete slab at orchestra pit Wood framed stage floor structure including supporting structure Modify existing floor framing Waterproofing Miscellaneous waterproofing at orchestra slab and retaining walls Partitions Interior door to basement - single Railing wall at seating area Removable railing at stage level Finishes Floor, wall and ceiling finishes at orchestra pit New stage flooring at rebuilt stage floor structure Patch floor at stage and seating area Equipment Miscellaneous equipment and accessories Heating, ventilating and air conditioning HVAC for pit area Main duct relocation below floor Electrical Remove, relocate existing electrical as required Add lighting, power etc as required Misc. electrical requirements Fire protection Fire sprinkler system at pit area Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 600 SF 25.00 15,000 300 SF 30.00 9,000 1 LS 5,000.00 5,000 1 LS 10,000.00 10,000 1 EA 2,500.00 2,500 50 LF 300.00 15,000 25 LF 250.00 6,250 440 SF 25.00 11,000 300 SF 20.00 6,000 1 LS 5,000.00 5,000 1 LS 3,000.00 3,000 440 SF 15.00 6,600 1 LS 16,000.00 16,000 440 SF 5.00 2,200 440 SF 10.00 4,400 1 LS 575.00 575 440 SF 7.50 3,300 321,825 o° GWH CONSTRUCTION Page 19 COST CONSULTING g Saratoga Civic Theater Master Plan Saratoga, California OPTION B Conceptual Design Cost Model September 4, 2013 GWH CONSTRUCTION Page 20 "' COST CONSULTING g Quantity unit Rate Total 4. Add Motorized Platform Lift Motorized platform lift Platform lift pit, foundations or support structure - see Orchestra pit estimate Orchestra Pit Motorized platform 12' x 24' including finishes 1 LS 175,000.00 175,000 Electrical Connect stage lift 1 EA 5,000.00 5,000 Modify existing electrical as required to accommodate new stage lift 290 SF 15.00 4,350 Misc. electrical requirements 1 LS 935.00 935 185,285 S. Re -rake Seating Area Demolition Floor structure including supporting structure below 2,000 SF 10.00 20,000 Seating area flooring outside floor structure removal area 900 SF 3.00 2,700 Seating 293 EA 75.00 21,975 Miscellaneous demolition 1 LS 5,000.00 5,000 Floor structure Wood framed floor structure (sloped and including support structure below 2,000 SF 30.00 60,000 Side steps and railings 2 EA 2,500.00 5,000 Finishes Replace hardwood and carpet flooring - entire . seating area 2,900 SF 15.00 43,500 Patch wall finishes 1 LS 15,000.00 15,000 Equipment Reinstall theater seating 293 EA 125.00 36,625 Raise wall mounted items at back wall of theater 1 LS 5,000.00 5,000 GWH CONSTRUCTION Page 20 "' COST CONSULTING g Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION B Quantity Unit Rate Total Electrical Provide new aisle lighting 2,000 SF 10.00 20,000 Provide new power outlets 2,000 SF 2.00 4,000 Provide new telephone /data outlets, including cabling 2,000 SF 5.00 10,000 Misc. electrical requirements 1 LS 3,400.00 3,400 252,200 6. Remove Lobby Restrooms Similar to Option A, Item #4 (see page 6 For further detail) 1 LS 96,100.00 96,100 96,100 7. Add Sound /Light Locks Demolition Door and frame.- single 2 EA 200.00 400 Flooring 100 SF 5.00 500 Partitions Wood stud partition including sound insulation, gypsum board and paint - rated 600 SF 19.00 11,400 Acoustical fire -rated door with actuators - single 4 EA 4,000.00 16,000 Finishes Flooring including base 100 SF 15.00 1,500 Hard lid ceiling 100 SF 25.00 2,500 Patch lobby finishes 1 LS 2,000.00 2,000 Equipment Miscellaneous equipment and accessories 1 LS 3,000.00 3,000 Heating, ventilating and air - conditioning Minor HVAC modifications 100 SF 12.50 1,250 Electrical Add, relocate existing electrical as required 100 SF 25.00 2,500 Misc. electrical requirements 1 LS 250.00 250 Fire protection Fire sprinkler system 100 SF 15.00 1,500 42,800 z5� G3WH 00 CONSTRUCTION OS CONSULTING Page 21 Saratoga Civic Theater Master Plan Saratoga, California OPTION B 8. Add Ticket /Concession Area Similar to Option A, Item #10 (see page 13 For further detail) 9. Add Seating at Rear of House Relocation of seating included with Re- raking of seating area 10. Add Lift and Stair to Control Booth Similar to Option A, Item #6 (see page 7 For further detail) 11. Add Restrooms and Storage at Parking Side of Building Similar to Option A, Item #7 (see page 8 For further detail) 12. Add Lift at Stage Similar to Option A, Item #8 (see page 11 For further detail) �? GWH CONSTRUCTION " COST CONSULTING Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 1 LS 41,240.00 41,240 41,240 RE -Rake Seating Area 0 1 LS 98,860.00 98,860 98,860 1 LS 528,093.00 528,093 528,093 1 LS 192,600.00 192,600 192,600 Page 22 Saratoga Civic Theater Master Plan Saratoga, California OPTION B 13. Remodel /Reconfigure Dressing Room Area with Restrooms Similar to Option A, Item #9 (see page 12 For further detail) 14. Plumbing Modifications All plumbing modifications included with detailed estimates 15. Heating, Ventilating and Air Conditioning Modifications Similar to Option A, Item #12 (see page 14 For further detail) 16. Electrical Modifications Similar to Option A, Item #13 (see page 15 For further detail) 17. Fire Protection Similar to Option A, Item #14 (see page 16 For further detail) o° GWH CONSTRUCTION COST CONSULTING Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 1 LS 148,420:00 148,420 148,420 With Detailed. Estimates 0 1 LS 24,800.00 24,800 24,800 1 LS 115,500.00 115,500 115,500 1 LS 132,440.00 132,440 132,440 Page 23 Saratoga Civic Theater Master Plan Saratoga, California OPTION B 18. Temporary Construction Temporary Interior dust curtains, finish protection and protection of existing construction Exterior closures and weather protection Site barriers and barricades Scaffolding and lifts ° GWH 7a17 CONSTRUCTION COST CONSULTING Quantity Unit 1 LS 1 LS 1 LS 1 LS Conceptual Design Cost Model September 4, 2013 Rate 30,000.00 5,000.00 10,000.00 20,000.00 Total 30,000 5,000 10,000 20,000 65,000 Page 24 Saratoga Civic Theater Master Plan OPTION C SUMMARY Option C Modification Budgets 1 Remove Front Two Rows of Center Seating 2 Remove House Side Lobby Restrooms 3 Add Seating at Rear of House 4 Add Sound /Light Locks 5 Add Restrooms at Parking Side of Building with Ramped Corridor 6 Add Lift at Stage 7 Remove Seating Area Stairs to Stage 8 Remodel /Reconfigure Dressing Room Area with Restrooms 9 Add Council, Storage and Restroom at Parking Lot Side of building 10 Removable Platform and Ramp for Council Podium 11 Add Dressing Rooms at Stage Side of Building 12 Convert Storage Area to Green Room 13 Add Lift and Stair to Control Booth 14 Plumbing Modifications 15 Heating, Ventilating and Air Conditioning Modifications 16 Electrical Modifications 17 Fire Protection 18 Temporary Construction Conceptual Design Cost Model 'September 4, 2013 $x1,000 2 88 2 43 426 193 7 144 717 20 195 44 99 0 26 130 132 75 SUBTOTAL BUILDING & SITE 2,343 General Conditions, Bonds and Insurance 15.00% 351 Contractor's Overhead & Profit or Fee 6.00% 162 CONSTRUCTION COST - September 2013 2,856 Design Contingency 20.00% 571 Escalation to Start' Date (August 2016) 12.00% 411 SUBTOTAL HARD COST - August 2016 3,838 Design Fees (Per Architect) 20.00% 768 Owner's Contingency 10.00% 461 TOTAL 5,067 o° GWH OoCONSTRUCTION CO T CONSULTING Page 25 Saratoga Civic Theater Master Plan Saratoga, California OPTION C Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 1. Remove Front Row of Center Seating Demolition Remove fixed seating 13 EA 75.00 975 Finishes Patch hardwood flooring, 100 SF 10.00 1,000 1,975 2. Remove House Side Lobby Restrooms Demolition Restrooms including partitions, finishes, mechanical and electrical systems House side restrooms only 2 EA 4,000.00 8,000 Partitions Full height theater wall including wood stud framing, sound insulation, gypsum board and paint 500 SF 22.00 11,000 Finishes - house side Carpet flooring including base 200 SF 10.00 2,000 Wood paneling at walls 500 SF 30.00 15,000 Miscellaneous patching of existing finishes 1 LS 5,000.00 5,000 Finishes - lobby side Replace flooring - allow 1,400 SF 15.00 21,000 Tackable wall surface - allow 600 SF 20.00 12,000 Patch and paint existing walls and ceilings 1 LS 5,000.00 5,000 Miscellaneous patching of existing finishes 1 LS 2,000.00 2,000 Equipment Miscellaneous equipment and accessories 1 LS 5,000.00 5,000 Heating, ventilating and air conditioning Minor HVAC modifications 250 SF 4.00 1,000 Electrical Provide bridge wiring to maintain power /communications for devices to remain 250 SF 4.00 1,000 Misc. electrical requirements 1 LS 100.00 100 Fire protection Fire sprinkler system - with building system With Building System 88,100 / GWH CONSTRUCTION COST CONSULTING Page 26 g Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION C Quantity Unit Rate Total 3. Add Seating at Rear of House Theater seating Reinstall fixed theater seating at rear of house 13 EA 125.00 1,625 1,625 4. Add Sound /Light Locks Similar to Option B, Item #7 (see page 21 For further detail) 1 LS 42,800.00 42,800 42,800 5. Add Restrooms at Parking Side of Building with Ramped Corridor Demolition Entrance door, sidelight and wall 1 LS 3,000.00 3,000 Miscellaneous building demolition 1 LS 2,000.00 2,000 Lobby restroom finishes, equipment and fixtures 1 EA 2,500.00 2,500 Foundations Crawl space excavation and disposal 100 CY 50.00 5,000 Perimeter wall footing and stem wall, interior post foundations 860 SF 25.00 21,500 Floor and roof structures Wood framed structures including sheathing Floor 860 SF 15.00 12,900 Flat roof 860 SF 13.00 11,180 Premium for sloped corridor floor 1 LS 3,000.00 3,000 Tie floor and roof structure to existing construction 154 LF 25.00 3,850 Exterior Wood framed exterior walls including insulation and finish -1,200 SF 30.00 36,000 Mansard roof and soffit detail including framing and finishes to match existing, 6' -9" x 4' -6" 75 LF 350.00 26,250 Exterior door - single 2 EA 3,000.00 6,000 Storefront - allow 100 SF 90.00 9,000 Tie walls to existing walls 1 LS 3,000.00 3,000 o° GWH Oo COST o SULT NG Page 27 Saratoga Civic Theater Master Plan Saratoga, California OPTION C Roofing Membrane roofing including insulation and flashing Tie roofing to existing building Miscellaneous flashing, vents, caulking and sealants Partitions Wood stud partitions including sound insulation, gypsum board and paint Standard Corridor Handrails at ramps - allow Interior door - single Finishes Floor, wall and ceilings Restrooms Corridor Replace finishes at existing lobby restrooms Patch and repair existing lobby finishes Equipment Toilet partitions Urinal screen Vanities Toilet accessories Replace toilet accessories at existing lobby Restrooms Miscellaneous equipment and accessories Plumbing Watercloset with associated piping Urinal with associated piping Lavatory with associated piping Drinking fountain with associated piping Floor drain with associated piping Electric water heater, 20 gallon, 6 kW Roof and overflow drain with piping Relocate rain water leader Replace plumbing fixture at existing lobby restrooms Heating, ventilating and air conditioning Exhaust fan (800 cfm), ductwork and controls HVAC system o° GWH CONSTRUCTION COST CONSULTING Conceptual Design Cost Model ' September 4, 2013 Quantity Unit Rate Total 860 SF 15.00 12,900 77 LF 25.00 1,925 1 LS 5,000.00 5,000 200 SF 14.00 2,800 900 SF 17.00 15,300 4 EA 1,000.00 4,000 2 EA 2,200.00 4,400 430 SF 65.00 27,950 415 SF 25.00 10,375 100 SF 75.00 7,500 1 LS 3,000.00 3,000 6 EA 1,100.00 6,600 1 EA 400.00 400 14 LF 300.00 4,200 1 LS 4,000.00 4,000 1 LS 2,000.00 2,000 1 LS 5,000.00 5,000 6 EA 3,800.00 22,800 1 EA 4,400.00 4,400 5 EA 4,600.00 23,000 2 EA 5,700.00 11,400 2 EA 2,500.00 5,000 1 EA 5,500.00 5,500 4 EA 1,600.00 6,400 1 EA 1,500.00 1;500 4 EA 2,500.00 10,000 860 SF 5.0.0 4,300 860 SF 10.00 8,600 Page 28 Saratoga Civic Theater Master Plan Saratoga, California OPTION C Electrical Modify distribution, add breakers as required Grounding Supply, install light fixtures Lighting wiring Lighting controls Convenience power Fire alarm Security at exterior doors CCTV at exterior door Misc. electrical requirements Relocate exterior wall /soffit mounted light fixtures Fire protection, Fire sprinkler system Sitework Remove entrance planters and steps Remove paving and landscaping Modify existing railings Replace paving and landscaping damaged during construction Modify parking lot planting islands to create 7 new parking spaces - allow Miscellaneous site lighting and drainage modifications - allow Utility modifications - allow 6. Add Lift at Stage Similar to Option A, Item #8 (see page 11 For further detail) o GWH OaCONSTRUCTION COST CONSULTING i Conceptual Design Cost Model September 4, 2013 Quantity unit Rate Total 860 SF 1.00 860 860 SF 0.65 559 860 SF 10.00 8,600 860 SF 1.50 1,290 860 SF 1.50 1,290 860 SF 2.00 1,720 860 SF .2.00 1,720 860 SF 1.50 1,290 860 SF 2.00 1,720 1 LS 1,900.00 1,900 2 EA 1,000.00 2,000 860 SF 7.50 6,450 1 LS 3,000.00 3,000 1,300 SF 2.00 2,600 1 LS 1,000.00 1,000 500 SF 10.00 5,000 1 LS 10,000.00 10,000 1 LS 5,000.00 5,000 1 LS 5,000.00 5,000 426,429 1 LS 192,600.00 192,600 192,600 Page 29 Saratoga Civic Theater Master Plan Saratoga, California OPTION C 7. Remove Seating Area Stairs to Stage Demolition Steps Finishes Infill wall at edge of stage T -0" .high including wood panel finish Patch carpefflooring Miscellaneous patch and repair of existing 8. Remodel /Reconfieure Dressing Room Area with Restrooms Demolition Dressing rooms Restrooms Miscellaneous demolition Exterior wall Cut opening in exterior wall, install door and frame - single Covered walkway Covered walkway to portable building - allow Paving and landscaping modifications for covered walkway - allow Partitions Wood stud partitions including sound insulation, gypsum board and paint Interior doors - single Finishes Floor, wall and ceilings Restrooms Dressing rooms and hallway Miscellaneous patching of existing finishes Equipment Toilet room accessories Mirrors at dressing rooms Miscellaneous equipment and accessories - ° GWH CONSTRUCTION COST CONSULTING Conceptual Design Cost Model ' September 4, 2013 Quantity Unit Rate 2 EA 600.00 14 LF 40 SF 1 LS 300.00 10.00 1,000.00 3 EA 1,000.00 2 EA 2,500.00 1 LS 1,000.00 1 EA 5,000.00 240 SF 150.00 1 LS 5,000.00 900 SF 14.00 4 EA 2,200.00 140 SF 230 SF 1 LS 2 EA 2 EA 1 LS 75.00 25.00 2,000.00 1,000.00 1,000.00 2,000.00 Total 1,200 4,200 400 1,000 6,800 3,000 5,000 1,000 5,000 36,000 5,000 12,600 8,800 10,500 5,750 2,000 2,000 2,000 2,000 Page 30 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION C Quantity Unit Rate Total Plumbing Watercloset with associated piping 2 EA 3,800.00 7,600 Lavatory with associated piping 2 EA 4,600.00 9,200 Floor drain with associated piping ' 2 EA 2,500.00 5,000 Electric instantaneous water heater 2 EA 750.00 1,500 Heating, ventilating and air conditioning Exhaust fan (400 cfm), ductwork and controls 370 SF 5.00 1,850 HVAC modifications 370 SF 10.00 3,700 Wall mounted condenser piping relocation - see dressing room addition Dressing Room Addition Electrical Provide new light fixtures 370 SF 10.00 3,700 Add light fixtures at new covered walkway 3 EA 650.00 1,950 Lighting wiring 370 SF 4.00 1,480 Lighting controls 370 SF 3.00 1,110 Convenience power, add /relocate as required 370 SF 3.00 1,110 Fire alarm, add /relocate devices as required 370 SF 6.00 2,220 Security at exterior door 1 EA 2,000.00 2,000 Misc electrical requirements 1 LS 1,350.00 1,350 Fire protection Fire sprinkler system - with building system With Building. System 144,420 9. Add Council, Storage and Restrooms at Parking Side of Building Relocation of portable trailer _ by Owner NIC Demolition Mansard roof detail 40 LF 100.00 4,000 Miscellaneous demolition 1 LS 3,000.00 3,000 Foundations Perimeter wall footing and stem wall foundations 1,750 SF 25.00 43,750 Floor and roof structures Wood framed structures including sheathing Floor 1,750 SF 15.00 26,250 Flat roof 1,750 SF 13.00 22,750 Tie floor and roof structure to existing construction 80 LF 25.00 2,000 o° GWH �0 coos CONSULTING Page 31 Saratoga Civic Theater Master Plan Saratoga, California OPTION C Exterior walls Wood framed exterior walls including insulation and finish Mansard roof and soffit detail including framing and finishes to match existing, 6' -9" x 4' -6" Exterior entrance door - double Windows with motorized shades - allow Tie walls to existing walls Roofing Membrane roofing including insulation and flashing Tie roofing to existing building Miscellaneous flashing, vents, caulking and sealants Partitions Wood stud partitions including sound insulation, gypsum board and paint - standard Interior door Single Double Finishes Floor wall and ceiling finishes Council chambers Restrooms Storage Refinish existing exterior wall now interior wall Equipment Audio- visual equipment allowance Projection screens Council desk - existing. Toilet room accessories Miscellaneous equipment and accessories Plumbing Watercloset with associated piping Lavatory with associated piping Floor drain with associated piping Electric instantaneous water heater Gas regulator and gas line to rooftop unit Condensate drain trap and CD drain line Roof and overflow drain with piping Relocate rain water leaders o° GWH CONSTRUCTION COST CONSULTING Conceptual Design Cost Model September 4, 2013 Quantity unit Rate Total 2,400 SF 30.00 72,000 135 LF 350.00 47,250 1 EA 6,000.00 6,000 300 SF 125.00 37,500 1 LS 2,000.00 .2,000 1,750 SF 15.00 26,250 SO LF 25.00 1,250 1 LS 5,000.00 5,000 800 SF 14.00 11,200 2 EA 2,200.00 4,400 1 EA 3,200.00 3,200 1,380 SF 30.00 41,400 70 SF 85.00 5,950 300 SF 20.00 6,000 500 SF 9.00 4,500 1 LS 100,000.00 100,000 2 EA 5,000.00 10,000 Existing 1 LS 2,000.00 2,000 1 LS 5,000.00 5,000 1 EA 3,800.00 3,800 1 EA 4,600.00 4,600 1 EA 2,500.00 2,500 1 EA 750.00 750 1 EA 3,000.00 3;000 1 EA 750.00 750 4 EA 1,600.00 6,400 2 EA 1,500.00 3,000 Page 32 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION C Quantity Unit Rate Total Heating, ventilating and air conditioning Rooftop ACU (7.5 ton), distribution, controls 1,750 SF 23:00 40,250 Exhaust register with duct 1 EA 900.00 900 Electrical Distribution 1,750 SF 5.00 8,750 Grounding 1,750 SF 0.65 1,138 Supply, install lighting fixtures 1,750 SF 15.00 26,250 Lighting wiring 1,750 SF 3.40 5,950 Lighting controls 1,750 SF 3.00 5,250 Convenience power 1,750 SF 3.00 5,250 Fire alarm 1,750 SF 3.00 5,250 Telephone /data outlets, box and conduit only 1,750 SF 1.50 2,625 Telephone /data cable, terminations 1,750 SF 4.00 7,000 Security 1,750 SF 3.00 5,250 CCTV 1,750 SF 3.00 5,250 AV rough -in 1,750 SF 2.00 3,500 Misc. electrical requirements 1 LS 8,150.00 8,150 Relocate exterior wall /soffit mounted light fixture ' 1 EA 1,000.00 1,000 Relocate fire alarm bell 1 EA 1,000.00 1,000 Fire protection Fire sprinkler system 1,750 SF 7.50 13,125 Sitework Remove steps 1 LS 3,000.00 3,000 Remove paving and landscaping 3,500 SF 2.00 7,000 New entrance paving, steps and railings 1 LS 6,000.00 6,000 Replace paving and landscaping damaged during construction 1,800 SF 10.00 18,000 Modify parking lot planting islands to create 7 new parking spaces - allow 1 LS 10,000.00 10,000 Miscellaneous site lighting and drainage modifications - allow 1 LS 5,000.00 5,000 Utility modifications - allow 1 LS 5,000.00 5,000 717,338 Z ° GWH 0V coos co SULT NG Page 33 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION C Quantity Unit Rate Total 10. Removable Platform and RamD for Council Podium Platform and ramp Removable platform 12'x 24' including ramp and ramp railings ( platform 18" high) 1 LS 14,000.00 14,000 Platform railings —allow 1 LS 4,000.00 4,000 Platform skirting - allow 1 LS 1,000.00 1,000 Storage trolleys and carts 1 LS 1,000.00 1,000 20,000 11. Add Dressine Rooms at Staee Side of Buildin Relocation of portable trailer - by Owner NIC Demolition Mansard roof detail 30 LF 100.00 3,000 Miscellaneous demolition 1 LS 2,000.00 2,000 Foundations Perimeter wall footing and stem wall foundations 460 SF 35.00 16,100 Floor and roof structures Wood framed structures including sheathing Floor 460 SF 15.00 6,900 Flat roof 460 SF 13.00 5,980 Tie floor and roof structure to existing construction 60 LF 25.00 1,500 Exterior walls Wood framed exterior walls including insulation and finish 900 SF 30.00 27,000 Mansard roof and soffit detail including framing and finishes to match existing, 6' -9" x 4' -6" 45 LF 350.00 15,750 . Exterior door - single 1 EA 3,000.00 3,000 Windows with manual shades - allow 150 SF 100.00 15,000 Modify /patch exterior wall at removed mansard 30 LF 50.00 1,500 Modify or relocated exhaust louver at mechanical room 1 LS 5,000.00 5,000 Tie walls to existing walls 1 LS 1,000.00 .1,000 o° GWH CONSTRUCTION Page 34 COST CONSULTING g Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION C Quantity Unit Rate Total Roofing Membrane roofing including insulation and flashing 460 SF 15.00 6,900 Tie roofing to existing building 2S LF 25.00 625 Miscellaneous flashing, vents, caulking and sealants 1 LS 3,000.00 3,000 Finishes Floor wall and ceiling finishes 460 SF 20.00 9,200 Refinish existing exterior wall now interior walls 2S0 SF 9.00 2,250 Equipment Mirrors at dressing room area 1 LS 2,000.00 2,000 Miscellaneous equipment and accessories 1 LS 2,000.00 2,000 Plumbing Roof and overflow drain with piping 2 EA 1,600.00 3,200 Relocated rain water leader 2 EA 1,500.00 3,000 Heating, ventilating and air conditioning Exhaust fan (550 cfm),.ductwork, controls 460 SF 5.00 2,300 HVAC system 460 SF 10.00 4,600 Relocated pad mounted condensing unit including piping to mechanical room 1 LS 10,000.00 10,000 Electrical Distribution 460 SF 5.00 2,300 Grounding 460 SF 0.65 299 Supply, install lighting fixtures 460 SF 10.00 4,600 Lighting wiring 460 SF 3.00 1,380 Lighting controls 460 SF 2.00 920 Convenience power 460 SF 2.25 1,035 Fire alarm 460 SF 2.2S 1,035 Telephone /data outlets, box and conduit only 460 SF 1.00 460 Telephone /data cable, terminations 460 SF 3.00 1,380 Security 460 SF 2.00 920 CCTV at exterior door 460 SF 5.00 2,300 Misc. electrical requirements 1 LS 1,660.00 1,660 Relocate exit light 1 EA 1,000.00 1,000 Fire protection Fire sprinkler system 460 SF 7.50 3,450 o° GWH 17 CONSTRUCTION CO T CONSULTING Page 35 Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION C Z°GWH CONSTRUCTION Page 36 COST CONSULTING g Quantity Unit Rate Total Sitework. Relocate storm drain inlet 1 LS 5,000.00 5,000 Remove paving and landscaping 800 SF 2.00 1,600 Replace paving and landscaping damaged during construction 300 SF 10.00 3,000 Exit stair and platform including railings 1 LS 10,000.00 10;000 195,144 12. Convert Storage Area to Green Room Demolition Miscellaneous demolition of finishes and lighting 200 SF 10.00 2,000 Exterior walls Cut opening in exterior wall, install door and frame - single 1 EA 5,000.00 5,000 Finishes Flooring including base 200 SF 10.00 2,000 Patch and paint existing walls and ceilings 1 LS 3,000.00 3,000 Equipment Mirrors 1 LS 1,000.00 1,000 Privacy curtain 1 EA 5,000.00 5,000 Miscellaneous equipment and accessories 1 LS 1,000.00 1,000 Plumbing Condensate drain trap and CD drain line 1 EA 600.00 600 Heating, ventilating and air conditioning Split dx -heat pump, wall type, 2 ton w/ RS /RL 1 EA 7,500.00 7,500 Electrical Supply, install new lighting fixtures 200 SF 7.00 1,400 Lighting wiring 200 SF 3.00 600 Lighting controls 200 SF 4.00 800 Convenience power 200 SF 4.00 800 Fire alarm 200 SF 2.25 450 Telephone /data outlets, box and conduit only 200 SF 1.00 200 Telephone /data cable, terminations 200 SF 3.00 600 Security 200 SF 5.00 1,000 Misc. electrical requirements 1 LS 625.00 625 Z°GWH CONSTRUCTION Page 36 COST CONSULTING g Saratoga Civic Theater Master Plan Saratoga, California OPTION C Fire protection Fire sprinkler system - with building system Site Exit stair and platform including railings 13. Add Lift and Stair to Control Booth Similar to Option A, Item #6 (see page 7 For further detail) 14. Plumbing Modifications All plumbing modifications included with detailed estimates 15. Heatine. Ventilatine and Air Conditionine Modifications HVAC Replace (E) 9000 cfm return air fan with new Provide duct & distribution to control rooms Replace (E) restroom fan w/ ISO cfm ceiling fan Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total With Building System 1 LS 10,000.00 10,000 43,575 1 LS 98,860.00 98,860 98,860 With Detailed Estimates 0 1 EA 15,000.00 15,000 700 SF 14.00 9,800 2 EA 800.00 1,600 26,400 o° GWH DCONSTRUCTION a 37 COST CONSULTING Page Saratoga Civic Theater Master Plan Conceptual Design Cost Model Saratoga, California September 4, 2013 OPTION C Quantity Unit Rate Total 16. Electrical Modifications Electrical New 100A panelboard, feeder 1 EA 8,500.00 8,500 Connect new return air fan 1 EA 1,500.00 1,500 Connect new rooftop exhaust fan serving parking lot restrooms 1 EA 2,000.00 2,000 Connect new exhaust fan serving restrooms and dressing rooms 1 EA 1,500.00 1,500 Connect new water heater 1 EA 750.00 750 Connect Insta -hot water heaters 4 EA 500.00 2,000 Connect split system unit 1 EA 2,000.00 2,000 Connect new rooftop AC unit 1 EA 2,000.00 2,000 Replace some existing light fixtures with new (some fixtures already replaced), allow 75 EA 470.00 35,250 Replace lighting wiring as required, assume existing can be partially re -used 1 LS 10,000.00 10,000 Upgrade emergency lighting 1 LS 5,500.00 5,500 Add exterior wall packs, allow 6 EA 1,000.00 6,000 Add new low voltage lighting control panel 1 EA 7,500.00 7,500 Misc. lighting control upgrades 1 LS 5,000.00 5,000 Replace outdoor receptacles with gfi type, replace indoor receptacles with gfi type where appropriate 1 LS 2,500.00 2,500 Provide circuit identification throughout building 1 LS 7,500.00 7,500 Provide labeling for panelboards, disconnect switches, motor starters etc 1 LS 500.00 500 Provide new fire alarm control panel if new capacity exceeds that of existing 1 EA 10,000.00 10,000 Fire alarm reprogramming 1 LS 1,500.00 1;500 Connections to sprinkler system 1 LS 1,500.00 1,500 Add Assistive Listening 1 LS 5,000.00 5,000 Misc. electrical requirements 1 LS 11,800.00 11,800 129,800 17. Fire Protecti Similar to Option A, Item #14 (see page 16 For further detail) 1 LS 132,440.00 132,440 132,440 z0` GWH ��CONSTRUCTION COST CONSULTING Page 38 Saratoga Civic Theater Master Plan Saratoga, California OPTION C 18. Temporary Construction Temporary Interior dust curtains, finish protection and protection of existing construction Exterior closures and weather protection Site barriers and barricades Scaffolding and lifts o° GWH O CONSTRUCTION COST CONSULTING Conceptual Design Cost Model September 4, 2013 Quantity Unit Rate Total 1 LS 25,000.00 25,000 1 LS 10,000.00 10,000 1 LS 15,000.00 15,000 1 LS 25,000.00 25,000 75,000 Page 39 City of Saratoga Speaker Card Please Mote: City Council meetings are both live and delayed broadcast. This card will help the meeting run smoothly, but you are not required to orovide anv informat/on you do not wish to provide. Please see reverse side of this card for Speaker Guidelines. I would like to speak about: Agenda Item? Yes No Agenda Item number - Support Oppose Neutral Date: I O I al I - Name: (4 RI, Mel Group /Organization: Address: (optional) _ Telephone: (optional) Email: (optional) City of Saratoga - Speaker Card Please Note: City Council meetinqs are both live and delayed broadcast This card will help the meeting run smoothly, but you are not required to Provide any information you do not wish to provide Please see reverse side of this card for Speaker Guidelines / would like to speak about: Agenda Item? Yes Support Date: Z L3 Name: o� Group /Organization: Address: (optional) Telephone: (optional) Email: (optional) No %r Agenda Item number. Oppose Neutral City of Saratoga - Speaker Card Please Note: City Council meetings are both live and delayed broadcast. This card will help the meeting run smoothly, but you are not required to provide any information you do not wish to provide. Please see reverse side of this card for Speaker Guidelines. I would like to speak about: Agenda Item? Yes No Agenda Item number Support Oppose Date: OC It- Name: ( ('-, -« K I Group /Organization: Address :(optional) Telephone :(optional) Email (optional) Neutral Speaker Guidelines • If you are attending a meeting of the City Council or other City Committee, Commission, or Board ( "Legislative Body ") and would like to address the officials, please complete the information on the reverse side of this card and give it to the City Clerk in advance of the meeting. • Speakers are customarily allotted up to three (3) minutes; however, the Legislative Body may limit the number of speakers and length of time allowed to each speaker to ensure adequate time for all items on the Agenda. • Speakers are asked to address specific Agenda items when those items are before the Legislative Body rather than during the Oral Communications portion of the meeting. • Completion of this form is voluntary. You may attend and participate in the meeting regardless of whether or not you complete this document. Its purpose is to aid staff in compiling complete and accurate records; however, this card will become part of the Public Record. In accordance with the Public Records Act, any information you provide on this form is available to the public. You may elect not to include your address and telephone number. • Groups /Organizations that are supporting or opposing issues are urged to select one spokesperson. • City Council meetings are both live and delayed broadcast. Thank you for your courtesy and cooperation. City of Saratoga - Speaker Card Please Note: City Council meetings are both live and delayed broadcast. This card will help the meeting run smoothly but you are not required to provide any information Vou do not wish to provide. Please see reverse side of this card for Speaker Guidelines._ 1 would like to speak about: Agenda Item? Yes No Support Oppose Agenda Item number Date: -772-,L5 M Name: � Group /Organization: Address: (optional) Telephone:(optional) Neutral Email: (optional) - --- Speaker Guidelines • If you are attending a meeting of the City Council or other City Committee, Commission, or Board ( "Legislative Body ") and would like to address the officials, please complete the information on the reverse side of this card and give it to the City Clerk in advance of the meeting. • Speakers are customarily allotted up to three (3) minutes; however, the Legislative Body may limit the number of speakers and length of time allowed to each speaker to ensure adequate time for all items on the Agenda. • Speakers are asked to address specific Agenda items when those items are before the Legislative Body rather than during the Oral Communications portion of the meeting. • Completion of this form is voluntary. You may attend and participate in the meeting regardless of whether or not you complete this document. Its purpose is to aid staff in compiling complete and accurate records; however, this card will become part of the Public Record. In accordance with the Public Records Act any information you provide on this form is available to the public. You may elect not to include your address and telephone number. • Groups /Organizations that are supporting or opposing issues are urged to select one spokesperson, • City Council meetings are both live and delayed broadcast. Thank you for your courtesy and cooperation.