A RESOLUTION OF THE CITY OF SARATOGA CITY COUNCIL
ADOPTING THE MITIGATED NEGATIVE DECLARATION AND DESIGN REVIEW
(PDR13-0028),LOCATED AT 19700 PROSPECT ROAD(386-35-070)FOR
CONGREGATION BETH DAVID
WHEREAS, an application was submitted by Joel Karr, representing Congregation Beth
David, for a Zoning Amendment and Design Review approval, to allow the expansion of its
Synagogue by 6,577 sq. ft., for a total square foota.ge of approxirriately 28,748 sq. ft. and to increase
the height of the existing structure from 30 feet to 41 feet to accommodate the proposed central
rotunda, which would be constructed of steel and glass shaped into a cylinder structure with the
symbol of the "Star of David" capping the top of the cylinder. The foregoing work is described as
the"Project"in this Resolution; and
WHEREAS,on July 23, 2014,the Planning Commission held a duly noticed public hearing
and recommended approval by the City Council on the subject application, and considered evidence
presented by City Staff,the applicant,and other interested parties.
WHEREAS, on August 20, 2014, the City Council held a duly noticed public hearing and
recommended approval by the City Council on the subject application, and considered evidence
presented by City Staff,the applicant, and other interested parties.
NOW THEREFORE, the City Council of the City of Saratoga hereby fmds, determines
and resolves as follows:
Section 1: The recitals set forth above are true and correct and incorporated herein by
reference.
Section 2: The Community Development Department completed an Initial Study and
Mitigated Negative Declaration for the project pursuant to the requirements of the California
Environmental Quality Act (CEQA, Public Resources Code sections 21000-21177), CEQA
Guidelines (14 California Code of Regulations sections 15000-15387), and any other applicable
requirements. The intent to adopt the Mitigated Negative Declaration (MND) were duly noticed
and circulated for a 20-day public review period from July 2, 2014 —July 22, 2014. All Interested
Parties desiring to comment on the MND were given.the opportunity to submit written and oral
comments on the adequacy of the MND up to and including the close of the Public Hearing on
Project before the Planning Commission on July 23, 2014.
Section 3: The project is consistent with the Saratoga General Plan Policies LU 4 in that the
City shall continue to provide sufficient land area for public, quasi-public and similar land uses in
Saratoga.
Section 4: The project is consistent with the Saratoga City Code Section 15-46.040 in that
where more than one building or structure will be constructed, the architectural features and
landscaping thereof shall be harmonious, and where more than one sign will be erected or displayed
on the site, the signs shall have a common or compatible design and locational positions and shall
be harmonious in appearance. Such features include height, elevations, roofs, material, color and
appurtenances, and landscaping shall integrate and accommodate existing trees and vegetation to be
preserved; it shall make use of water-conserving plants, materials and irrigation systems to the
maximum extent feasible; and, to the maximum extent feasible, it shall be clustered in natural
appearing groups, as opposed to being placed in rows or regularly spaced, and that colors of wall
and roofing materials shall blend with the natural landscape and be nonreflective, and the roofing
materials shall be wood shingles, wood shakes, tile, or other materials such as composition as '
approved by the Planning Commission, and that no mechanical equipment shall be located upon a
roof unless it is appropriately screened, and that the proposed development shall be compatible in
terms of height,bulk and design with other structures in the immediate area. ,
Section 5: The project is consistent with the Saratoga City Code in that the removal of six
protected trees meets the criteria established in Section 15-50.080(a). ;
Section 6: The City of Saratoga City Council adopts the Mitigated Negative Declaration
ENV 13-0004 and approves application PDR13-0028 for the project located at 19700 Prospect
Road, subject to the Conditions of Approval attached hereto as Exhibit A.
PASSED AND ADOPTED by the City of Saxatoga City Council on this 20th day of August 2014 by
the following vote:
AYES: Mayor Emily Lo, Vice Mayor Howard Miller,Council Member Manny Cappello,
Chuck Page,Jill Hunter
NOES: None
ABSENT: None
i
ABSTAIN: None
-�-�._� - .
Emily Lo,Mayor
ATTEST:
Vi,'H� K��ul 1.'I��.�� DATE: ��td/�u l�
C � s 1 Bothelio, City Clerk � �
�
�
;
�
Ea�hibit 1
CONDITIONS OF APPROVAL
ENV13-0004,PDR13-0028
19700 PROSPECT ROAD (386-35-070)
CONDITIONS OF APPROVAL
A. GENERAL
1. All conditions below which are identified as permanent or for which an alternative period of
time for applicability is specified shall run with the land and apply to the landowner's
successors in interest for such time period. No zoning clearance, or demolition, or grading for
this project shall be issued until proof is filed with the city that a certificate of approval
documenting all applicable permanent or other term-specified conditions has been recorded by
the applicant with the Santa Clara County Recorder's office in form and content to the
Community Development Director.
2. If a condition is not"Permanent"or does not have a term specified,it shall remain in effect until
the issuance by the City of Saratoga of a Certificate of Occupancy or its equivalent.
3. The Owner and Applicant will be mailed a statement, after the time the Resolution granting this
approval is duly executed, containing a statement of all amounts due to the City in connection
with this application, including all consultant fees (collectively "processing fees"). This
approval or permit shall expire sixty (60) days after the date said notice is mailed if all
processing fees contained in the notice have not been paid in full. No Zoning Clearance or
Demolition, Grading, or Building Permit may be issued until the processing fees have been paid
in full(and,for deposit accounts, a surplus balance of$500 is maintained).
4. The Project shall maintain compliance with all applicable regulations of the State, County, City
and/or other governmental agencies having jurisdiction including, without limitation, the
requirements of the Saratoga Zoning Regulations incorporated herein by this reference.
5. As a condition of this Approval, Owner and Applicant hereby agree to defend, indemnify and
hold the City and its officers, officials, boards, commissions, employees, agents and volunteers
harmless from and against:
a. any and all claims, actions or proceedings to attack, set aside, void or annul any action on
the subject application, or any of the proceedings, acts or determinations taken, done or
made prior to said action; and
b. any and all claims, demands, actions, expenses or liabilities arising from or in any manner
relating to the performance of such construction, installation, alteration or grading work by
the Owner and/or Applicant,their successors, or by any person acting on their behalf.
In addition, prior to any Zoning Clearance from the Community Development Director, Owner
and Applicant shall execute a separate agreement containing the details of this required
Agreement to Indemnify, Hold Harmless and Defend, which shall be subject to prior approval
as to form and content by the City Attorney.
COMMUNITY DEVELOPMENT
6. Compliance with Plans. The development shall be located and constructed to include those
features, and only those features, as shown on the Approved Plans dated June 19, 2014
denominated E�ibit "A". All proposed changes to the Approved Plans must be submitted in
writing with plans showing the changes, including a clouded set of plans highlighting the
changes. Such changes shall be subject to approval in accordance with Condition No. 4,above.
7. Building Division Submittal. Four (4) sets of complete construction plans shall be submitted
to the Building Division. These plans shall be subject to review and approval by the City prior to
issuance of Zoning Clearance. The construction plans shall, at a minimum include the
following:
a. Architectural drawings and other plan sheets consistent with those identified as Exhibit"A"
on file with the Community Development Department and referenced in Condition No. 6
above;
b. A note shall be included on the site plan stating that no construction equipment or private
vehicles shall be parked or stored within the root zone of any Ordinance-protected tree on
the site;
c. City Arborist Reports dated July 7, 2014, and all other future updated reports onto separate
construction plan pages;
d. This signed and dated Resolution printed onto separate construction plan pages;
e. All additional drawings, plans, maps, reports, and/or materials required by the Building
Division.
8. Lighting. Exterior lighting shall be shielded so as not to shine on adjacent properties or public
right-of-way.
9. Maintenance of Construction Project Sites. Because this Design Review Approval
authorizes a project which requires a Building Permit, compliance with City Code Section 16-
75.050 governing maintenance of construction project sites is required.
10. Stormwater Mitigation. The project sponsor shall prepare a Storm Water Pollution Prevention
Plan (SWPPP) designed to reduce potential impacts to surface water quality through the
construction of the proposed project. It is not required that the SWPPP be submitted to the
Regional Water Quality Control Board (Water Board), but it must be maintained on-site and
made available to Water Board or City staff upon request. The SWPPP shall include specific
and detailed Best Management Practices (BMPs) designed to mitigate construction-related
pollutants. At a minimum, BMPs shall include practices to minunize the contact of construction
materials, equipment, and maintenance supplies (e.g., fuels, lubricants, paints, solvents, and
adhesives) with storm water. Ingress and egress from construction sites shall be carefully
controlled to minimize off-site tracking of sediment. Vehicle and equipment wash-down
facilities shall be designed to be accessible and functional during both dry and wet conditions.
The SWPPP shall specify a monitoring program to be implemented by the construction site
supervisor, and shall include both dry and wet weather inspections.
11. Parking Agreement. Prior to obtaining zoning clearance, the applicant shall provide a shared
parking agreement between Congregation Beth David and Church of the Ascension, and
provide sufficient documentation demonstrating the agreement, to the satisfaction of the
Community Development Department.
12. Effective Date. The effective date of the design review approval shall be the same as the
effective date of the ordinance implementing the Planned-Combined District on this property.