Loading...
HomeMy WebLinkAbout11-05-2014 Item 3 VTA Presentation SlidesSR 85 Express Lanes Update Saratoga City Council Presentation November 5, 2014 Outline • Silicon Valley Express Lanes (SVEL) Program • Project Background • Project Update • SVEL Implementation Plan 2 3 SR 85 Express Lanes 4 Project Background The project proposes to: • Convert the existing high-occupancy vehicle (HOV) lanes on SR 85 from U.S. 101 in South San Jose to U.S. 101 in Mountain View to Express Lanes – about 24 miles of conversion in each direction. • Add a second Express Lane between SR 87 and I-280 – about 10 miles in each direction; and • Add an auxiliary lane on northbound SR 85 between South De Anza Boulevard and I-280. Public comment period – Dec 30, 2013 – Feb 28, 2014 5 Project Update • Moving forward with environmental document. • Nov. 6, 2014 – VTA Board to support project incremental approach to implement single lane conversion only and receive an information item on a noise reduction study along SR 85. • Noise Reduction Efforts: • Phase 1: Noise Reduction Study • Phase 2: Noise Reduction Pilot Project • Phase 3: Noise Reduction Projects 6 Project Update • Spring 2015 – Caltrans to approve final environmental document. • 2015 – Phases 3 and 4 design to begin. 7 SVEL Implementation Plan 8