HomeMy WebLinkAbout06-04-2008 City Council Agenda Packet (2)
AGENDA
SPECIAL MEETING
SARATOGA CITY COUNCIL
JUNE 4, 2008
SPECIAL MEETING – 5:30 P.M. – ADMINISTRATIVE CONFERENCE ROOM
13777 FRUITVALE AVENUE.
CALL MEETING TO ORDER – 5:30 P.M.
REPORT OF CITY CLERK ON POSTING OF AGENDA
(Pursuant to Gov’t. Code 54954.2, the agenda for this meeting was properly posted on
May 29, 2008.)
COMMUNICATIONS FROM PUBLIC
ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS
Any member of the public will be allowed to address the City Council for up to three (3)
minutes on matters not on this agenda. The law generally prohibits the council from
discussing or taking action on such items. However, the Council may instruct staff
accordingly regarding Oral Communications under Council Direction to Staff.
CLOSED SESSION – 5:30 P.M.
ADMINISTRATIVE CONFERENCE ROOM, 13777 FRUITVALE AVENUE.
ANNOUNCEMENT OF CLOSED SESSION ITEMS
Conference with Legal Counsel – Anticipated Litigation: Significant exposure to
litigation pursuant to Government Code section 54956.9(b): (1 item)
ADJOURNED TO CLOSED SESSION
OPEN SESSION – 6:00 P.M.
ADMINISTRATIVE CONFERENCE ROOM, 13777 FRUITVALE AVENUE.
CALL MEETING TO ORDER – 6:00P.M.
1. Joint Meeting with the Parks and Recreation Commission.
Recommended Action:
Informational only.
1
2
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), if you need special assistance to participate
in this meeting, please contact the City Clerk at (408) 868-1269 or ctclerk@saratoga.ca.us. Notification 48
hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to
this meeting (28 CFR 35.102-35.104 ADA Title II).
Certificate of Posing of Agenda:
I, Ann Sullivan, Acting City Clerk for the City of Saratoga, declare that the foregoing agenda for the
meeting of the City Council of the City of Saratoga was posted on May 29, 2008, at the office of the City of
Saratoga, 13777 Fruitvale Ave., Saratoga, CA 95070 and was available for public review at that location.
The agenda is also available on the City’s website at www.saratoga.ca.us
Signed this 29th day of May 2008 at Saratoga, California.
Ann Sullivan, CMC, Acting City Clerk
AGENDA
REGULAR MEETING
SARATOGA CITY COUNCIL
Wednesday, June 4, 2008
REGULAR MEETING – 7:00 P.M. – CIVIC THEATER/COUNCIL CHAMBERS
AT 13777 FRUITVALE AVENUE
PLEDGE OF ALLEGIANCE
ROLL CALL
REPORT OF CITY CLERK ON POSTING OF AGENDA
(Pursuant to Gov’t. Code 54954.2, the agenda for this meeting was properly posted on
May 29, 2008)
COMMUNICATIONS FROM COMMISSIONS & PUBLIC
Oral Communications on Non-Agendized Items
Any member of the public will be allowed to address the City Council for up to three (3)
minutes on matters not on this agenda. The law generally prohibits the council from
discussing or taking action on such items. However, the Council may instruct staff
accordingly regarding Oral Communications under Council Direction to Staff.
Oral Communications - Council Direction to Staff
Instruction to Staff regarding actions on current Oral Communications.
Communications from Boards and Commissions
Council Direction to Staff
Instruction to Staff regarding actions on current Communications from Boards &
Commissions.
ANNOUNCEMENTS
CEREMONIAL ITEMS
1. Appointment of Library Commissioner and Oath of Office
Recommended action:
Adopt the attached resolution appointing one new member to the Library
Commission and direct the Acting City Clerk to administer the Oath of Office.
2. Appointment of Eleven Youth Commissioners and Oath of Office
Recommended action:
Adopt the attached resolution appointing eleven members to the Youth Commission
and direct Acting City Clerk to administer the Oath of Office.
3. Commendations Honoring Four Outgoing Youth Commissioners
Recommended action:
Present commendations.
SPECIAL PRESENTATIONS
CONSENT CALENDAR
The Consent Calendar contains routine items of business. Items in this section will be
acted in one motion, unless removed by the Mayor or a Council member. Any member of
the public may speak to an item on the Consent Calendar at this time, or request the
Mayor remove an item from the Consent Calendar for discussion. Public Speakers are
limited to three (3) minutes.
4. Joint Study Session Minutes - May 13, 2008
Recommended action:
Approve minutes.
5. City Council Minutes – Special Meeting May 20, 2008
Recommended action:
Approve minutes.
6. CIP Special Meeting Minutes - May 21, 2008
Recommended action:
Approve minutes.
7. City Council Minutes - May 21, 2008
Recommended action:
Approve minutes.
8. Review of Accounts Payable Check Registers
Recommended action:
That the City Council accepts the Check Registers for the following Accounts
Payable cycles:
May 15, 2008
May 22, 2008
9. Treasurer's Report for the Month ended December 31, 2007
Recommended action:
Accept Treasurer's Report for the month ended December 31, 2007
10. Fiscal Year 2008/09 Gann Appropriation Limit
Recommended action:
Adopt resolution approving the Gann Appropriations Limit for FY 2008/09
11. Resolution Calling the General Municipal Election - November 4, 2008
Recommended action:
That City Council adopts the Resolution Calling the General Municipal Election for
November 4, 2008.
12. Approval of an Ordinance Requiring Supervision by a Parent or Guardian of
Alcoholic Beverage Possession or Consumption by a Person Under Twenty-one and
Imposing a Fee for the Costs of Providing a Second Police Response to Public
Disturbances
Recommended action:
Approve the ordinance requiring supervision by a parent or guardian of alcoholic
beverage possession or consumption by a person under twenty-one and imposing a
fee for the costs of providing a second police response to public disturbances.
13. Joint Exercise of Powers Agreement and Cooperation Agreement to undertake
activities pursuant to Title I of the Housing and Community Development Act
Recommended action:
That the City Council approve the attached resolution authorizing the Mayor to enter
into a Joint Exercise of Powers Agreement and Cooperation Agreement (JPA) to
undertake or to assist in the undertaking of essential activities pursuant to Title I of
the Housing and Community Development Act, as amended for the period of October
1, 2008 to September 30, 2011.
PUBLIC HEARINGS
Applicants/Appellants and their representatives have a total of ten minutes maximum for
opening statements. Members of the public may comment on any item for up to three
minutes. Applicant/Appellants and their representatives have a total of five minutes
maximum for closing statements. Items requested for continuance are subject to
Council’s approval at the Council meeting
14. Resolution Ordering the Abatement of a Public Nuisance by Removal of Hazardous
Vegetation (Brush)
Recommended action:
Open public hearing; listen to public testimony and close public hearing. Adopt
resolution over-ruling objections and ordering hazardous vegetation abatement
(brush).
OLD BUSINESS
15. Adoption of Fiscal Year 2008/09 Operating & Capital Budget
Recommended action:
Adopt resolution approving the Proposed FY 2008/09 Operating and Capital Budgets,
directing staff to incorporate within the final adopted budget any changes related to
minor corrections, carry forward appropriations, refined estimates, grant approvals,
claim reimbursements, pass-through appropriations, or additional direction from
Council upon adoption of the budget.
NEW BUSINESS
16. Prospect Road Median Improvement Project – Master Plan Approval
Recommended action:
Approve Master Plan for Prospect Road Median Improvement Project.
17. Independent Contractor Agreement with LSA Associates for Environmental
Consultant Services and Metropolitan Planning Group, Inc. for Land-Use Planning
Consultant Services.
Recommended action:
1. Authorize the City Manager to execute an agreement with LSA Associates (LSA)
to prepare environmental documents for land development applications within the
City of Saratoga (City). The agreement would include a three year contract with an
option of two additional years of service if approved by the City Council.
2. Authorize the City Manager to execute an agreement with Metropolitan Planning
Group (M-Group) for land-use planning consultant services within the City. The
Agreement would include a three year contract with an option of two additional years
of service if approved by the City Council.
ADHOC & AGENCY ASSIGNMENT REPORTS
Mayor Ann Waltonsmith
Association of Bay Area Government
Comprehensive County Expressway Planning Study Advisory Board (PAB)
Hakone Foundation Executive Committee
Santa Clara County Emergency Council
SASCC
West Valley Mayors and Mangers Association
Sister City Liaison
Council Finance Committee
Highway 9 Safety AdHoc
TEA AdHoc
Vice Mayor Chuck Page
Chamber of Commerce
Hakone Executive Board
West Valley Sanitation District
West Valley Solid Waste Joint Powers Association
Council Finance Committee
Village AdHoc
Valley Transportation Authority PAC
Councilmember Kathleen King
Peninsula Division, League of California Cities
Santa Clara County Cities Association
City School AdHoc
TEA AdHoc
Councilmember Jill Hunter
Historic Foundation
KSAR
Library Joint Powers Association
Santa Clara County Valley Water Commission
Village AdHoc
Councilmember Aileen Kao
County HCD Policy Committee
Northern Central Flood Control Zone Advisory Board
Santa Clara County Cities Association-Joint Economic Development Policy Committee
(JEDPC)
City School AdHoc
Highway 9 Safety AdHoc
CITY COUNCIL ITEMS
CITY MANAGER’S REPORT
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), if you need special
assistance to participate in this meeting, please contact the City Clerk at (408) 868-1269.
Notification 48 hours prior to the meeting will enable the City to make reasonable
arrangements to ensure accessibility to this meeting (28 CFR 35.102-35.104 ADA Title
II)
Certificate of Posting of Agenda:
I, Ann Sullivan, Acting City Clerk for the City of Saratoga, declare that the foregoing
agenda for the meeting of the City Council of the City of Saratoga was posted on May 29,
2008, of the City of Saratoga, 13777 Fruitvale Ave., Saratoga, CA 95070 and was
available for public review at that location. The agenda is also available on the City’s
website at www.saratoga.ca.us
Signed this 29th day of May 2008 at Saratoga, California.
Ann Sullivan, CMC
Acting City Clerk
NOTE: To view current or previous City Council meetings anytime, go to the City
Video Archives at www.saratoga.ca.us
CITY OF SARATOGA
CITY COUNCIL MEETING CALENDAR 2008
6/4 Regular Meeting – Joint Meeting with Parks and Recreation Commission
6/18 Regular Meeting – Joint Meeting with HOA Presidents
7/2 Regular Meeting – Joint meeting with Heritage Preservation Commission
and Historic Foundation
7/16 Regular Meeting – Joint meeting with SASCC
8/6 Regular Meeting – Joint Meeting with Hakone Foundation
8/20 Summer Recess – No Meeting
9/3 Regular Meeting – Joint Meeting with West Valley Board of Trustees
9/17 Regular Meeting – Joint Meeting with Saratoga Union Elementary School
District
10/1 Regular Meeting – Joint Meeting with Montalvo Arts
10/15 Regular Meeting – Joint Meeting with Los Gatos-Saratoga Union High
School District
11/5 Regular Meeting –Joint Meeting with the Saratoga Ministerial Association
11/19 Regular Meeting – Joint Meeting with Mountain Winery
12/3 Regular Meeting – Reorganization
12/17 Regular Meeting – Traffic Safety Commission
AGENDA
REGULAR MEETING
SARATOGA CITY COUNCIL
Wednesday, June 4, 2008
REGULAR MEETING – 7:00 P.M. – CIVIC THEATER/COUNCIL CHAMBERS
AT 13777 FRUITVALE AVENUE
PLEDGE OF ALLEGIANCE
ROLL CALL
REPORT OF CITY CLERK ON POSTING OF AGENDA
(Pursuant to Gov’t. Code 54954.2, the agenda for this meeting was properly posted on
May 29, 2007)
COMMUNICATIONS FROM COMMISSIONS & PUBLIC
Oral Communications on Non-Agendized Items
Any member of the public will be allowed to address the City Council for up to three (3)
minutes on matters not on this agenda. The law generally prohibits the council from
discussing or taking action on such items. However, the Council may instruct staff
accordingly regarding Oral Communications under Council Direction to Staff.
Oral Communications - Council Direction to Staff
Instruction to Staff regarding actions on current Oral Communications.
Communications from Boards and Commissions
Council Direction to Staff
Instruction to Staff regarding actions on current Communications from Boards &
Commissions.
ANNOUNCEMENTS
CEREMONIAL ITEMS
1. Appointment of Library Commissioner and Oath of Office
Recommended action:
Adopt the attached resolution appointing one new member to the Library
Commission and direct the Acting City Clerk to administer the Oath of Office.
2. Appointment of Eleven Youth Commissioners and Oath of Office
Recommended action:
1
Adopt the attached resolution appointing eleven members to the Youth Commission
and direct Acting City Clerk to administer the Oath of Office.
3. Commendations Honoring Four Outgoing Youth Commissioners
Recommended action:
Present commendations.
SPECIAL PRESENTATIONS
CONSENT CALENDAR
The Consent Calendar contains routine items of business. Items in this section will be
acted in one motion, unless removed by the Mayor or a Council member. Any member of
the public may speak to an item on the Consent Calendar at this time, or request the
Mayor remove an item from the Consent Calendar for discussion. Public Speakers are
limited to three (3) minutes.
4. Joint Study Session Minutes - May 13, 2008
Recommended action:
Approve minutes.
5. City Council Minutes – Special Meeting May 20, 2008
Recommended action:
Approve minutes.
6. CIP Special Meeting Minutes - May 21, 2008
Recommended action:
Approve minutes.
7. City Council Minutes - May 21, 2008
Recommended action:
Approve minutes.
8. Review of Accounts Payable Check Registers
Recommended action:
That the City Council accepts the Check Registers for the following Accounts
Payable cycles:
May 15, 2008
May 22, 2008
9. Treasurer's Report for the Month ended December 31, 2007
Recommended action:
Accept Treasurer's Report for the month ended December 31, 2007
10. Fiscal Year 2008/09 Gann Appropriation Limit
Recommended action:
Adopt resolution approving the Gann Appropriations Limit for FY 2008/09
2
11. Resolution Calling the General Municipal Election - November 4, 2008
Recommended action:
That City Council adopts the Resolution Calling the General Municipal Election for
November 4, 2008.
12. Approval of an Ordinance Requiring Supervision by a Parent or Guardian of
Alcoholic Beverage Possession or Consumption by a Person Under Twenty-one and
Imposing a Fee for the Costs of Providing a Second Police Response to Public
Disturbances
Recommended action:
Approve the ordinance requiring supervision by a parent or guardian of alcoholic
beverage possession or consumption by a person under twenty-one and imposing a
fee for the costs of providing a second police response to public disturbances.
13. Joint Exercise of Powers Agreement and Cooperation Agreement to undertake
activities pursuant to Title I of the Housing and Community Development Act
Recommended action:
That the City Council approve the attached resolution authorizing the Mayor to enter
into a Joint Exercise of Powers Agreement and Cooperation Agreement (JPA) to
undertake or to assist in the undertaking of essential activities pursuant to Title I of
the Housing and Community Development Act, as amended for the period of October
1, 2008 to September 30, 2011.
PUBLIC HEARINGS
Applicants/Appellants and their representatives have a total of ten minutes maximum for
opening statements. Members of the public may comment on any item for up to three
minutes. Applicant/Appellants and their representatives have a total of five minutes
maximum for closing statements. Items requested for continuance are subject to
Council’s approval at the Council meeting
14. Resolution Ordering the Abatement of a Public Nuisance by Removal of Hazardous
Vegetation (Brush)
Recommended action:
Open public hearing; listen to public testimony and close public hearing. Adopt
resolution over-ruling objections and ordering hazardous vegetation abatement
(brush).
OLD BUSINESS
15. Adoption of Fiscal Year 2008/09 Operating & Capital Budget
Recommended action:
Adopt resolution approving the Proposed FY 2008/09 Operating and Capital Budgets,
directing staff to incorporate within the final adopted budget any changes related to
minor corrections, carry forward appropriations, refined estimates, grant approvals,
claim reimbursements, pass-through appropriations, or additional direction from
Council upon adoption of the budget.
3
NEW BUSINESS
16. Prospect Road Median Improvement Project – Master Plan Approval
Recommended action:
Approve Master Plan for Prospect Road Median Improvement Project.
17. Independent Contractor Agreement with LSA Associates for Environmental
Consultant Services and Metropolitan Planning Group, Inc. for Land-Use Planning
Consultant Services.
Recommended action:
1. Authorize the City Manager to execute an agreement with LSA Associates (LSA)
to prepare environmental documents for land development applications within the
City of Saratoga (City). The agreement would include a three year contract with an
option of two additional years of service if approved by the City Council.
2. Authorize the City Manager to execute an agreement with Metropolitan Planning
Group (M-Group) for land-use planning consultant services within the City. The
Agreement would include a three year contract with an option of two additional years
of service if approved by the City Council.
ADHOC & AGENCY ASSIGNMENT REPORTS
Mayor Ann Waltonsmith
Association of Bay Area Government
Comprehensive County Expressway Planning Study Advisory Board (PAB)
Hakone Foundation Executive Committee
Santa Clara County Emergency Council
SASCC
West Valley Mayors and Mangers Association
Sister City Liaison
Council Finance Committee
Highway 9 Safety AdHoc
TEA AdHoc
Vice Mayor Chuck Page
Chamber of Commerce
Hakone Executive Board
West Valley Sanitation District
West Valley Solid Waste Joint Powers Association
Council Finance Committee
Village AdHoc
Valley Transportation Authority PAC
Councilmember Kathleen King
Peninsula Division, League of California Cities
Santa Clara County Cities Association
City School AdHoc
TEA AdHoc
4
Councilmember Jill Hunter
Historic Foundation
KSAR
Library Joint Powers Association
Santa Clara County Valley Water Commission
Village AdHoc
Councilmember Aileen Kao
County HCD Policy Committee
Northern Central Flood Control Zone Advisory Board
Santa Clara County Cities Association-Joint Economic Development Policy Committee
(JEDPC)
City School AdHoc
Highway 9 Safety AdHoc
CITY COUNCIL ITEMS
CITY MANAGER’S REPORT
ADJOURNMENT
In compliance with the Americans with Disabilities Act (ADA), if you need special
assistance to participate in this meeting, please contact the City Clerk at (408) 868-1269.
Notification 48 hours prior to the meeting will enable the City to make reasonable
arrangements to ensure accessibility to this meeting (28 CFR 35.102-35.104 ADA Title
II)
Certificate of Posting of Agenda:
I, Ann Sullivan, Acting City Clerk for the City of Saratoga, declare that the foregoing
agenda for the meeting of the City Council of the City of Saratoga was posted on May 29,
2008, of the City of Saratoga, 13777 Fruitvale Ave., Saratoga, CA 95070 and was
available for public review at that location. The agenda is also available on the City’s
website at www.saratoga.ca.us
Signed this 29th day of May 2008 at Saratoga, California.
Ann Sullivan, CMC
Acting City Clerk
5
NOTE: To view current or previous City Council meetings anytime, go to the City
Video Archives at www.saratoga.ca.us
5/2 Regular Meeting – Joint meeting with Mt. Winery
5/16 Regular Meeting – Joint Meeting with Traffic Safety Commission
6/6 Regular Meeting – Joint Meeting with Planning Commission
6/20 Regular Meeting – Joint Meeting with Villa Montalvo
7/4 Holiday – Meeting Cancelled
7/18 Regular Meeting – Joint Meeting with Hakone Foundation
8/1 Regular Meeting – Joint Meeting with Chamber of Commerce
8/15 Summer Recess – Meeting Cancelled
9/5 Regular Meeting – Joint Meeting with West Valley Board of Trustees
9/19 Regular Meeting
10/3 Regular Meeting
10/17 Regular Meeting
11/7 Regular Meeting
11/21 Regular Meeting
12/5 Regular Meeting – Reorganization
12/19 Regular Meeting
CITY OF SARATOGA
CITY COUNCIL MEETING CALENDAR 2007
6
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: City Manager’s Office CITY MANAGER: Dave Anderson
PREPARED BY: Ann Sullivan, Acting City Clerk DIRECTOR:
SUBJECT: Appointment of Library Commissioner and Oath of Office
RECOMMENDED ACTION:
Adopt the attached resolution appointing one new member to the Library Commission and direct
the Acting City Clerk to administer the Oath of Office.
REPORT SUMMARY:
The attached resolution appoints Javed Khan to the Library Commission. The term for this
commissioner will expire on October 1, 2011.
Upon direction from the City Council the Oath of Office will be administered by the Acting City
Clerk and signed by the new Commissioners.
FISCAL IMPACTS:
N/A
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
Appointment will not be made to the Library Commission.
ALTERNATIVE ACTION:
N/A
FOLLOW UP ACTION:
Update City’s Official Roster.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
Posting of the agenda.
7
ATTACHMENTS:
Attachment 1 – Resolution of Appointment
Attachments 2-14 – Oath of Office
8
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SARATOGA APPOINTING ONE NEW MEMBER TO
THE LIBRARY COMMISSION
WHEREAS, one vacancy was created on the Library Commission resulting from the
expired term of Vandana Thirumale; and
WHEREAS, a notice of vacancy was posted, applications were received, interviews have
been conducted, and it is now appropriate to fill the vacancy.
NOW, THEREFORE, the City Council of the City of Saratoga hereby resolves that the
following appointment was made for term expiring October 1, 2011;
Javed S. Khan
The above and foregoing resolution was passed and adopted at a Regular meeting of the Saratoga
City Council held on the 4th day of June 2008 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
______________________________
Ann Waltonsmith, Mayor
ATTEST:
____________________________
Ann Sullivan, Acting City Clerk
9
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Javed S. Khan
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
10
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: City Manager’s Office CITY MANAGER: Dave Anderson
PREPARED BY: Ann Sullivan, Acting City Clerk DIRECTOR:
SUBJECT: Appointment of Eleven Youth Commissioners and Oath of Office
RECOMMENDED ACTION:
Adopt the attached resolution appointing eleven members to the Youth Commission and direct
the Acting City Clerk to administer the Oath of Office.
REPORT SUMMARY:
The attached resolution appoints Aditya Dev, Kaitlin Finch, Tara Fatemi, Sammy Rao, Elena
Reese, Natalie Tkolcevic and Cynthia Zhou to fill the expired terms of Shireen Gupta, Kelly
Langstaff, Ellil Rezaii, and Ted Scalvos; plus three additional new commission positions; and
the re-appointment of Justin El-Diwany, Kia Fariba, Cory Rateau, and Tiffany Tseng to the
Youth Commission. The terms for these commissioners will expire on July 1, 2010.
Upon direction from the City Council the Oath of Office will be administered by the Acting City
Clerk and signed by the new Commissioners.
FISCAL IMPACTS:
N/A
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
Appointments will not be made to the Youth Commission.
ALTERNATIVE ACTION:
N/A
FOLLOW UP ACTION:
Update City’s Official Roster.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
11
Posting of the agenda.
ATTACHMENTS:
Attachment 1 – Resolution of Appointment
Attachments 2-14 – Oath of Office
12
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SARATOGA APPOINTING SEVEN NEW MEMBERS
AND THE REAPPOINTMENT OF FOUR MEMBERS TO
THE YOUTH COMMISSION
WHEREAS, eight vacancies were created on the Youth Commission resulting from the
expired terms of Justin El-Diwany, Kia Fariba, Shireen Gupta, Kelly Langstaff, Cory Rateau,
Elli Rezaii, Ted Scalvos, and Tiffany Tseng ; and
WHEREAS, Council created three new Youth Commissioner positions on May 20,
2008; and
WHEREAS, a notice of vacancy was posted, applications were received, interviews
have been conducted, and it is now appropriate to fill the vacancies.
NOW, THEREFORE, the City Council of the City of Saratoga hereby resolves that the
following appointments were made for terms expiring July 1, 2010;
Aditya Dev
Justin El-Diwany
Kia Fariba
Kaitlin Finch
Tara Fatemi
Sammy Rao
Cory Rateau
Elena Reese
Natalie Tkolcevic
Tiffany Tseng
Cynthia Zhou
The above and foregoing resolution was passed and adopted at a Regular meeting of the Saratoga
City Council held on the 4th day of June 2008 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
______________________________
Ann Waltonsmith, Mayor
ATTEST:
____________________________
Ann Sullivan, Acting City Clerk
13
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Aditya Dev
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
14
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Justin El-Diwany
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
15
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Kia Fariba
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
16
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Kaitlin Finch
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
17
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Tara Fatemi
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
18
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Sammy Rao
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
19
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Cory Rateau
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
20
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Elena Reese
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
21
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Natalie Tkolcevic
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
22
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Tiffany Tseng
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
23
STATE OF CALIFORNIA
COUNTY OF SANTA CLARA
I do solemnly swear (or affirm) that I will support and defend the Constitution of
the United States and the Constitution of the State of California against all
enemies, foreign and domestic; that I will bear true faith and allegiance to the
Constitution of the United States and the Constitution of the State of California;
that I take this obligation freely, without any mental reservation or purpose of
evasion; and that I will faithfully discharge the duties upon which I am about to
enter.
__________________________
Cynthia Zhou
Commissioner
Subscribed and sworn to before me on
This 4th day of June 2008.
__________________________
Ann Sullivan, CMC
Acting City Clerk
24
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
ORIGINATING DEPT: City Manager’s Office CITY MANAGER:
PREPARED BY: DEPT HEAD:
Ann Sullivan, Acting City Clerk Dave Anderson, City Manager
SUBJECT: Commendations Honoring Four Outgoing Youth Commissioners
RECOMMENDED ACTION:
Present commendations.
REPORT SUMMARY:
Attached are commendations honoring outgoing Youth Commissioners:
Shireen Gupta, Kelly Langstaff, Elli Rezaii, and Ted Scalvos,
FISCAL IMPACTS:
N/A
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
N/A
ALTERNATIVE ACTION:
N/A
FOLLOW UP ACTION:
N/A
ADVERTISING, NOTICING AND PUBLIC CONTACT:
Posting of the agenda.
ATTACHMENTS:
Attachment A – Copy of Commendations.
25
CITY OF SARATOGA
RESOLUTION OF THE CITY COUNCIL
COMMENDING
SHIREEN GUPTA
WHEREAS, Shireen Gupta was first appointed to the Saratoga
Youth Commission in June 2006; and
WHEREAS, Shireen has demonstrated his leadership skills and
capabilities while participating on the following:
2007-2008: Treasurer & Publicity Committee
2006-2007: Dance Committee
2005-2006: Volunteer at events
WHEREAS, the City Council of the City of Saratoga is proud of the
citizens who contribute time and talent to our community.
NOW, THEREFORE, BE IT RESOLVED, that Shireen Gupta is hereby
commended and thanked for his hard work and dedication on the Youth
Commission; and
BE IT FURTHER RESOLVED that we wish him well in the future.
WITNESS MY HAND AND THE SEAL OF THE CITY OF
SARATOGA on this 4th day of June 2008.
______________________
Ann Waltonsmith, Mayor
City of Saratoga
26
CITY OF SARATOGA
RESOLUTION OF THE CITY COUNCIL
COMMENDING
KELLY LANGSTAFF
WHEREAS, Kelly Langstaff was first appointed to the Saratoga
Youth Commission in June 2006; and
WHEREAS, Kelly has demonstrated his leadership skills and capabilities
while participating on the following:
2007-2008: Secretary & Dance Committee
2006-2007: Dance & Vidi Committee
WHEREAS, the City Council of the City of Saratoga is proud of the
citizens who contribute time and talent to our community.
NOW, THEREFORE, BE IT RESOLVED, that Kelly Langstaff is
hereby commended and thanked for his hard work and dedication on the
Youth Commission; and
BE IT FURTHER RESOLVED that we wish him well in the future.
WITNESS MY HAND AND THE SEAL OF THE CITY OF
SARATOGA on this 4 June 2008.
______________________
Ann Waltonsmith, Mayor
City of Saratoga
27
RESOLUTION OF THE CITY OF SARATOGA
CITY COUNCIL
COMMENDING YOUTH COMMISSIONER
ELLI REZAII
WHEREAS, Elli Rezaii was first appointed to the Saratoga Youth
Commission in June 2003; and
WHEREAS, Elli has demonstrated his leadership skills and
capabilities while participating on the following:
2007-2008: Vice-Chair, Special Events & Dance Committee
2006-2007: Secretary& Dance Committee
2005-2006: Dance Committee
2004-2005: Dance Committee
2003-2004: Secretary, Fundraising & Dance Committee
WHEREAS, the City Council of the City of Saratoga is proud of the
citizens who contribute their time and talent to our community.
NOW, THEREFORE, BE IT RESOLVED, that Elli Rezaii is hereby
commended and thanked for his hard work and dedication on the Youth
Commission; and
BE IT FURTHER RESOLVED that we wish him well in the future.
WITNESS MY HAND AND THE SEAL OF THE CITY OF
SARATOGA on this 4th day of June 2008.
______________________
Ann Waltonsmith, Mayor
City of Saratoga
28
CITY OF SARATOGA
RESOLUTION OF THE CITY COUNCIL
COMMENDING
TED SCALVOS
WHEREAS, Ted Scalvos was first appointed to the Saratoga Youth
Commission in June 2002; and
WHEREAS, Ted has demonstrated his leadership skills and capabilities
while participating on the following:
2007-2008: Chair & Dance Committee
2006-2007: Dance Committee
2005-2006: Treasurer & Special Events Committee
2004-2005: Dance Committee
2003-2004: Dance Committee
2002-2003: Dance Committee
WHEREAS, the City Council of the City of Saratoga is proud of the
citizens who contribute time and talent to our community.
NOW, THEREFORE, BE IT RESOLVED, that Ted Scalvos is hereby
commended and thanked for his hard work and dedication on the Youth
Commission; and
BE IT FURTHER RESOLVED that we wish him well in the future.
WITNESS MY HAND AND THE SEAL OF THE CITY OF
SARATOGA on this 4th day of June 2008.
______________________
Ann Waltonsmith, Mayor
City of Saratoga
29
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: City Manager’s Office CITY MANAGER: Dave Anderson
PREPARED BY: Ann Sullivan, Acting City Clerk DIRECTOR: Dave Anderson
SUBJECT: City Council and Planning Commission Joint Study Session Minutes –
May 13, 2008
RECOMMENDED ACTION:
Approve minutes.
REPORT SUMMARY:
Approve minutes as submitted for the following City Council Meeting:
Joint Study Session Meeting – May 13, 2008
FISCAL IMPACTS:
N/A
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
N/A
ALTERNATIVE ACTION:
N/A
FOLLOW UP ACTION:
Retain minutes for legislative history.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
N/A
ATTACHMENTS:
Attachment A – Minutes from May 13, 2008
30
MINUTES
CITY COUNCIL/PLANNING COMMISSION
JOINT STUDY SESSION
MAY 13, 2008
Mayor Waltonsmith called the Joint Study Session meeting to order at 6:00PM.
ROLL CALL
PRESENT: Councilmembers:
Jill Hunter, Aileen Kao, Kathleen King,
Vice Mayor Chuck Page, Mayor Ann Waltonsmith
Planning Commissioners:
Yan Zhao, Linda Rodgers, Susie Nagpal, Robert Kundtz, Joyce
Hlava, Chair Manny Cappello
ABSENT: Planning Commissioner Rishi Kumar
ALSO
PRESENT:
Dave Anderson, City Manager
Richard Taylor, City Attorney
Ann Sullivan, Acting City Clerk
John Livingstone, Community Development Director
REPORT OF CITY CLERK ON POSTING OF AGENDA FOR MARCH 19, 2008
Ann Sullivan, Acting City Clerk, reported that pursuant to Government Code Section
54954.2, the agenda for the meeting of May 13, 2008, was properly posted on May 8,
2008.
COMMUNICATIONS FROM COMMISSIONS & PUBLIC
The following people requested to speak at tonight’s meeting:
Priscilla Ho – referred to the last joint meeting she had attended regarding the topic of
“How to Guide Home Builders to Qualify Architect and Designers” and the difference it
makes. She noted the experiences she and her family had experienced during the
application and design process with the Saratoga Community Development Department
for their new home and stated that it had been a very positive experience and she
commended Director John Livingstone and his department staff.
COMMUNICATIONS FROM BOARDS AND COMMISSIONS
Commissioner Joyce Hlava addressed the Council and Planning Commission noting an
informational Housing Element meeting has been scheduled for June 17, 2008 at the
North Campus; and a follow-up meeting on August 5, 2008 highlighting the results of the
June 17, 2008 meeting. She stated that the consultant would provide a draft of the
Housing Element sometime in late 2008 or early January 2009 and then bring it to the
Planning Commission. She also noted that they hope to see more people attend these
meetings and become more familiar with the Housing Element as well as the Planning
Commission’s role in the Housing Element. 31
ORAL COMMUNICATION and COUNCIL DIRECTION TO STAFF
None
JOINT MEETING AGENDA ITEM:
1. Review Permitted and Conditional Use Permits (CUP) Requirements for
Commercial Districts in the City.
Community Development Director John Livingstone presented staff report noting that
based on Council feedback from the February 2008 Council Retreat this item was
scheduled as a study session with the Planning Commission to review permitted and
conditional uses in the commercial zoning districts.
Director Livingstone noted this is a fact-finding meeting where the City Council and
Planning Commission could discuss the item and ask questions as well as receive input
from members of the public attending the meeting. Director Livingstone explained the
various permitted uses and conditional uses for each zoning district, and noted the
Planning Commission must approve conditional uses. He also explained that because of
unusual characteristics, conditional uses require special considerations with respect to the
objectives of the Zoning Ordinance and the effects on surrounding properties.
There was lengthy discussion between Council and Planning Commission.
Mayor Waltonsmith invited public comments.
The following people spoke on this item:
Gene Zambetti addressed the Council and Planning Commissioners on the CH-1 and CH-
2 Zoning Districts. He also stated that the Conditional Use Permit (CUP) process takes
too long to approve and is too costly.
Thor Wiles noted that he works in commercial real estate and that it is his job to bring the
interested party to the vacant buildings. He stated that the problems he is faced with is
telling an interested party how much time and money it takes to go through the CUP
request process and not know the results for several months. He noted some communities
have “accelerated reviews”; which helps provide some comfort to the potential lessee.
Lea Ann Hernandez commented on the lengthy process for the CUP requests and stated
there is a great need for improvement in the processing of permits.
Paul Hernandez commented on the experience he had regarding signage and the high fees
he was required to pay for the type of sign he wanted to install. In addition, he was told
he would have to use an architect to design the sign, which he felt was unnecessary; there
would be an additional fee for the CUP and an additional fee for the variance – due to the
fact that his business was in the CH-2 District.
Steve Calli addressed the Council and Planning Commission on the costly and lengthy
use permit process and that there is no guarantee that your application will be approved.
He also stated he would like to see a market in the Village, and suggested having an
32
outdoor cafe with music on the corner of Fourth and Big Basin. He thought this would be
a perfect location for attracting people and the music would help create a warm inviting
atmosphere.
Mayor Waltonsmith closed the public comment.
There was additional discussion between Council, Planning Commission members, and
staff regarding businesses in the Village and what can be done to be more business
friendly.
Mayor Waltonsmith polled the Council and Planning Commissioners regarding their
suggestions for the Village and the CUP requirements. The following was stated:
Councilmembers -
Chuck Page:
o Village businesses should remain open later in the day – would generate more
sales dollars.
o We need to define which businesses we don’t want to see more of.
o Create a Planning Commission/Council AdHoc to research Village needs.
o If research money is allocated - use money responsibly.
o Bring back Dave Kilbourne – performed Village Study several years ago.
o Use Buxton Survey data.
Jill Hunter:
o Not opposed to subsidizing certain use permit fees.
o City should work closely with Buy & Save market in the Village.
o Encourage certain businesses, such as: garden shop, family restaurant, breakfast
restaurant, ice cream shop.
o Supports Steve Calli’s suggestion regarding the outdoor cafe area on the corner of
Fourth & Big Basin.
o Medical offices at end of Big Basin.
o Feels we have enough restaurants in the Village.
o Saratoga wineries need to be more involved in the Village activities.
Kathleen King:
o Does not want to see more nail salons and real estate firms.
o Likes idea of a regulatory committee.
o Would like to see a bakery, garden shop and ice cream shop in the Village.
o Supports idea to use some General Funds to subsidize specific permit fees.
o Willing to lower some fees to attract specific businesses.
o Not in favor of creating an Economic Development Coordinator position.
o Supports having a committee to study CH-2 District.
o Likes the idea of the outdoor corner café.
o Some type of exercise place for kids.
Aileen Kao:
o Would like to utilize the Buxton Survey data.
o In favor of sub-committee to research types of businesses needed in Saratoga in
general, not just in the Village.
o In favor of subsidizing certain permit fees.
33
Planning Commissioners –
Joyce Hlava:
o Interested in streamlining the CUP application process.
o Create a Planning Commission Subcommittee to go through CUP applications.
o Improvement of the CH-2 District
o Fee subsidy.
o Would like to see a Trader Joes, art and movie house.
Manny Cappello:
o City of San Jose implemented a Fast Track process, we could consider that.
o Conditional Use Permit for restaurants was not a requirement.
o Should limit nail salons and real estate businesses in the Village.
o Feels it is easier to determine types of businesses we no longer need more of –
such as nail salons and real estate, versus what we do want to see in the Village.
The businesses we want less of, should be required to apply for a Conditional Use
Permit;.
o Believes that most businesses do not want to have to go through the CUP process.
o If we eliminate the CUP requirement, we would not have to subsidize or reduce
fees; this would eliminate the uncertainty and time element for the CUP applicant.
Suzie Nagpal:
o Feels that a good mix of businesses is not a result of the market place, it is the
result of planned development.
o Feels there has to be some process involved and we could define that process.
o Cannot just let the market place take control.
o Agrees with having a sub-committee to research types of businesses we want.
o Agrees with a Fast Track process.
o Agrees with the idea of not requiring use permits for certain business – such as a
bakery.
o Need more activities for children.
Linda Rodgers:
o Would like to explore the idea of taking out some of the requirements in the
Conditional Use Permit and putting those into an Ordinance as a Permanent Use
Condition for restaurants, retail, personal services, etc.
o Feels the permit process needs to be streamlined.
Yan Zhao:
o Should waive the CUP process for specific businesses, such as restaurants,
bakery, personal services, if they meet the pre-established criteria. This would
eliminate the lengthy permit process.
City Manager Dave Anderson suggested that as a catalyst to all the suggestions, we bring
back Dave Kilbourne to assist in working out the process, form a committee to work on
the specific concerns, including the use permit process and the types of businesses that
are needed in the community.
Mayor Waltonsmith noted that the City of Saratoga needs something that stands out from
all the other towns and cities and that it will attract people from all over. She also agreed
with the suggestion that the businesses need to stay open later in the day to attract more
business. She noted the following recommendations from the Council and Planning
Commissioners:
34
1) Organize a subcommittee to determine types of shops/businesses the Village
needs.
2) Bring back Dave Kilbourne to assist in determining the types of business we need
not only in the Village but in all the business areas of the community.
3) Have public involvement.
4) Look at subsidizing specific use permit fees.
5) Have a small regulatory group look into the Fast Track process.
6) Look into the CH-2 District.
7) Look into Steve Calli’s suggestion for the outdoor corner cafe with music.
8) Bring the Planning Commissioners up to date with the Buxton Study data and
work with the Buxton representatives utilizing the data from the survey.
9) Have a small group look into the suggestion to have an Ordinance with pre-
established business criteria.
There was additional discussion and the group concluded to form two committees
consisting of the following members:
CH-2 District Committee: Councilmember Kathleen King
Planning Commissioner Joyce Hlava
Village Economic Development Committee: Vice Mayor Chuck Page
Councilmember Jill Hunter
Planning Commissioner Suzie Napgpal
Planning Commissioner Linda Rodgers
Direction to Staff:
Get price quote for Dave Kilbourne to come back, meet with Economic Development
Committee and provide input.
Notice committee meetings.
Mayor Waltonsmith adjourned the Study Session at 8:20 PM.
Respectfully submitted by:
Ann Sullivan, CMC
Acting City Clerk
35
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: City Manager’s Office CITY MANAGER: Dave Anderson
PREPARED BY: Ann Sullivan, Acting City Clerk DIRECTOR: Dave Anderson
SUBJECT: City Council Minutes – May 20, 2008
RECOMMENDED ACTION:
Approve minutes.
REPORT SUMMARY:
Approve minutes as submitted for the following City Council Meeting:
Special Meeting – May 20, 2008
FISCAL IMPACTS:
N/A
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
N/A
ALTERNATIVE ACTION:
N/A
FOLLOW UP ACTION:
Retain minutes for legislative history.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
N/A
ATTACHMENTS:
Attachment A – Minutes from May 20, 2008
36
MINUTES
CITY COUNCIL SPECIAL MEETING
YOUTH COMMISSION INTERVIEWS
MAY 20, 2008
Mayor Waltonsmith called the Special Meeting to order at 5:00PM.
ROLL CALL
PRESENT: Councilmembers:
Jill Hunter, Aileen Kao, Vice Mayor Chuck Page, and
Mayor Ann Waltonsmith
ABSENT: Councilmember Kathleen King
ALSO
PRESENT:
Michael Taylor, Recreation Department Director
Adam Henig, Recreation Department Supervisor
Mayor Ann Waltonsmith called the Special Meeting to order at 5:00p.m.
Councilmembers proceeded to interview 41 candidates for the eight vacancies on the
Youth Commission.
At the conclusion of the interview process, Council participated in a dialog regarding the
number of qualified candidates for the Youth Commission and it was the consensus of
the Council that the commission, which now consisted of thirteen commissioners, should
be increased to sixteen commissioners. Therefore, Council unanimously agreed to:
o Reappoint Commissioners Justin El-Diwany, Kia Fariba, Cory Rateau, and
Tiffany Tseng to serve another two-year term.
o Appoint new members, including the addition of three more members to replace
Shireen Gupta, Kelly Langstaff, Elli Rezaii, and Ted Sclavos: Aditya Dev, Kaitlin
Finch, Tara Fatemi, Sammy Rao, Elena Reese, Natalie Tkolcevic, and Cynthia
Zhou.
The terms of these newly appointed commissioners will be affective from July 1, 2008 to
July 1, 2010.
Mayor Waltonsmith adjourned the special meeting at 10:00p.m.
Respectfully submitted,
Ann Sullivan, CMC
Acting City Clerk
37
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: City Manager’s Office CITY MANAGER: Dave Anderson
PREPARED BY: Ann Sullivan, Acting City Clerk DIRECTOR: Dave Anderson
SUBJECT: CIP Special Meeting Council Minutes – May 21, 2008
RECOMMENDED ACTION:
Approve minutes.
REPORT SUMMARY:
Approve minutes as submitted for the following City Council Meeting:
CIP Special Meeting – May 21, 2008
FISCAL IMPACTS:
N/A
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
N/A
ALTERNATIVE ACTION:
N/A
FOLLOW UP ACTION:
Retain minutes for legislative history.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
N/A
ATTACHMENTS:
Attachment A – Minutes from CIP Special Meeting – May 21, 2008
38
MINUTES
SARATOGA CITY COUNCIL
CIP SPECIAL MEETING
MAY 21, 2008
The City Council held a Special Meeting at 5:30 p.m. in the Administrative Conference
Room to conduct an interview for one opening on the Library Commission.
Applicant Javed S. Khan was interviewed and Council unanimously appointed Javed
Khan to fill a vacancy on the Library Commission, which ends October 2011.
The City Council met in Closed Session in the Administrative Conference Room at
5:40p.m.
ANNOUNCEMENT OF CLOSED SESSION
Conference with Legal Counsel – Significant exposure to litigation: Pursuant to
Government Code 54956.9 (b) (1 Item)
MAYOR’S REPORT ON CLOSED SESSION
Mayor Waltonsmith stated there was no reportable information
The City Council held a CIP Study Session at 6:00 p.m. in the Administrative Conference
Room.
PRESENT: Councilmembers:
Jill Hunter, Aileen Kao, Kathleen King,
Vice Mayor Chuck Page, Mayor Ann Waltonsmith
ABSENT: None
ALSO
PRESENT:
Dave Anderson, City Manager
John Cherbone, Public Works Director
Mary Furey, Administrative Services Director
Ann Sullivan, Acting City Clerk
Shawn Gardner, Park Lead Worker
39
Public Works Director John Cherbone presented the staff report.
Director Cherbone noted that at the May 7, 2008 CIP Study Session Council directed
staff to:
o Preliminarily fund two Operational Efficiency (OE) Projects: 1) Community
Development Document Imaging Project at $600,000; and 2) City Website
Upgrade Project at $50,000 for a total of $110,000.
o Gather additional information regarding City hall Solar Project.
o Develop a list of building efficiency projects to add to the Operational Efficiency
(OE) Project List.
o Have Parks & Recreation Commission and the Pedestrian, Equestrian, Bicycle,
and Trails Advisory Committee prioritize Park & Trail Projects for 2008/09.
Director Cherbone noted the total funding available for Operational Efficiency (OE)
Projects (CIP) is $600,000 minus the $110,000 for the preliminary funded projects.
There was lengthy discussion regarding the CIP and funding options; at the Council
Retreat in February 2008 the carryover amount was estimated to be $1.7 million. After
the final audit it was determined to be $1.551 million; therefore, the policy articulated at
the Council Retreat needs to be modified in one of two ways outlined below:
Option 1:
1) Reduce allocations to CIP and OE reserves.
2) Live with slightly lower Undesignated Fund Balance (FB).
CIP = $600,000
OE = $600,000
Undesignated (FB) = $351,000 (reduced to $350,000)
TOTAL = $1,551,000
Option 2:
Split CIP, OE, and FB
CIP = $525,500
OE = $525,500
Undesignated (FB) = $500,000
$1,551,000
Mayor Waltonsmith invited public comment.
The following people spoke:
40
Cindy Ruby, Chair of the Saratoga Foothill Club, addressed the Council regarding
renovation of the Historic Building and the need for an ADA compliant ramp to the
building. She noted the total cost of the renovation will be $200K. They plan to do fund
raising events and asked the Council to consider them for some grant funding.
Ms. Sun stated she would like the Council to consider having a community center that
everyone can use, such as a gym, and recommended Council set aside funds for this
purpose.
Amari Thomas, United Way representative, spoke to the Council regarding a grant from
the Council and thanked them for their generosity.
Discussion regarding the various projects, funding options and community grants.
Council agreed to go with Option 1 for Fiscal Year 2008/09 and to raise the undesignated
fund balance to $500,000 for the following Fiscal Year 2009/2010.
Council also directed staff to schedule an additional CIP Study Session (separate from a
scheduled Council meeting date) to continue CIP discussion and make final
recommendations.
Mayor Waltonsmith adjourned the CIP Study Session at 6:58PM.
Respectfully submitted,
Ann Sullivan, CMC
Acting City Clerk
41
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: City Manager’s Office CITY MANAGER: Dave Anderson
PREPARED BY: Ann Sullivan, Acting City Clerk DIRECTOR: Dave Anderson
SUBJECT: City Council Minutes – May 21, 2008
RECOMMENDED ACTION:
Approve minutes.
REPORT SUMMARY:
Approve minutes as submitted for the following City Council Meeting:
Regular Meeting – May 21, 2008
FISCAL IMPACTS:
N/A
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
N/A
ALTERNATIVE ACTION:
N/A
FOLLOW UP ACTION:
Retain minutes for legislative history.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
N/A
ATTACHMENTS:
Attachment A – Minutes from May 21, 2008
42
MINUTES
SARATOGA CITY COUNCIL MEETING
MAY 21, 2008
Mayor Waltonsmith called the Regular City Council meeting to order at 7:05PM and led
the Pledge of Allegiance.
ROLL CALL:
PRESENT: Councilmembers Jill Hunter, Aileen Kao, Kathleen King, Vice
Mayor Chuck Page, and Mayor Waltonsmith
ABSENT: None
ALSO Dave Anderson, City Manager
PRESENT: Richard Taylor, City Attorney
Ann Sullivan, Acting City Clerk
Michael Taylor, Recreation Department Director
Mary Furey, Administrative Services Director
John Cherbone, Public Works Director
REPORT OF CITY CLERK ON POSTING OF AGENDA
Ann Sullivan, Acting City Clerk, reported that Pursuant to Gov’t. Code 54954.2, the
agenda for the meeting of May 21, 2008 was properly posted on May 15, 2008.
Mayor Waltonsmith asked for a moment of silence in honor of the earthquake victims in
China and the cyclone victims in Myanmar.
ORAL COMMUNICATIONS
Citizen Ray spoke about the land being cleared for housing development in the Town of
Los Gatos; the dead pines on Highway 9; and the bicycle path along Highway 9 and how
nice it was to see bicyclists using the newly completed bike path.
Sue Barrera addressed the Council regarding the newly extended hours at the Saratoga
Library stating the library will be open seven days a week through June 2010; and she
thanked the Friends of the Library for making this possible.
COUNCIL DIRECTION TO STAFF
No direction given to staff.
ANNOUNCEMENTS
Vice Mayor Page announced the achievements of the Odyssey of the Mind students from
various schools. He noted Sacred Heart School has three teams that are competing and
have moved through the State level and will be competing in the upcoming World
competition. These three teams are made up of fourth, fifth, sixth and seventh graders. He
also noted a proclamation has been done commending these students.
Councilmember Jill Hunter commented on how beautiful the Gateway medians look and
commended the City for the great job staff has done on the medians.
43
Councilmember Kathleen King noted that Fred Andres had called her and wanted to
thank the City for the great improvements to the Gateway medians. She recommended he
call John Cherbone and let him know his appreciation.
CEREMONIAL ITEMS
1. PROCLAMATION DECLARING MAY 18-24, 2008 AS NATIONAL PUBLIC
WORKS WEEK.
Mayor Waltonsmith read the proclamation. Public Works Director John Cherbone
was present to receive the proclamation.
SPECIAL PRESENTATIONS
2. WEST VALLEY COLLEGE PRESENTATION – COLLEGE ENTRANCE
IMPROVEMENTS
STAFF RECOMMENDATION:
Accept oral report by West Valley College and provide direction.
Phil Hartley, West Valley College President, gave presentation. Mr. Hartley noted
the college is involved in major reconstruction in various areas on the campus and
that construction on a new “formal” entrance will begin in approximately 8 weeks.
This new formal entrance to the college will be a four-lane entrance off Fruitvale
Avenue and will be located further down Fruitvale Avenue near the baseball field and
away from Redwood Middle School; which will help alleviate the traffic congestion
in that area.
CONSENT CALENDAR
3. CITY COUNCIL MINUTES – MAY 7, 2008
STAFF RECOMMENDATION:
Approve minutes.
KING/KAO MOVED TO APPROVE CITY COUNCIL MINUTES OF MAY 7,
2008. MOTION PASSED 5 – 0.
4. REVIEW OF ACCOUNTS PAYABLE CHECK REGISTERS
STAFF RECOMMENDATION:
Accept the Check Registers for the following Accounts Payable cycles: April 24,
2008, May 1, 2008, and May 8, 2008.
KING/KAO MOVED TO ACCEPT CHECK REGISTERS FOR APRIL 24, 2008,
MAY 1, 2008 AND MAY 8, 2008. MOTION PASSED 5 – 0.
44
5. TRANSPORTATION DEVELOPMENT ACT (TDA) ARTICLE 3
APPLICATION FOR THE SARATOGA AVENUE WALKWAY PROJECT
AND HIGHWAY 9 BICYCLE SAFETY IMPROVEMENTS – PHASE 3
DESIGN
STAFF RECOMMENDATION:
Adopt resolution supporting the Metropolitan Transportation Commission’s
Transportation Development Act Article 3 Pedestrian/Bicycle Grant Application.
RESOLUTION: 08 - 032
KING/KAO MOVED TO ADOPT RESOLUTION SUPPORTING THE
METROPOLITAN TRANSPORTATION COMMISSION’S
TRANSPORTATION DEVELOPMENT ACT ARTICLE 3
PEDESTRIAN/BICYCLE GRANT APPLICATION. MOTION PASSED 5 – 0.
PUBLIC HEARINGS
6. APPROVAL OF AN ORDINANCE REGARDING SUPERVISION BY
PARENT OR GUARDIAN OF ALCOHOLIC BEVERAGE POSSESSION OR
CONSUMPTION BY PERSONS UNDER TWENTY-ONE AND IMPOSING A
FEE FOR THE COSTS OF PROVIDING A SECOND POLICE RESPONSE
TO PUBLIC DISTURBANCES.
STAFF RECOMMENDATION:
Introduce and waive the first reading of the attached ordinance regarding supervision
of certain social gatherings and cost recovery for public disturbances requiring a
second police response and direct staff to place the matter on the consent calendar at
the next City Council meeting.
City Attorney Richard Taylor presented the staff report.
Mayor Waltonsmith opened the public hearing for comments:
Seeing none, the Mayor closed the public hearing comments.
KAO/KING MOVED TO WAIVE THE FIRST READING OF THE
ATTACHED ORDINANCE REGARDING SUPERVISION OF CERTAIN
SOCIAL GATHERINGS AND COST RECOVERY FOR PUBLIC
DISTURBANCES REQUIRING A SECOND POLICE RESPONSE AND
DIRECT STAFF TO PLACE THE MATTER ON THE CONSENT
CALENDAR AT THE NEXT CITY COUNCIL MEETING; WITH TWO
MODIFICATIONS: 1) INCLUSION OF DEPUTIES OF THE COUNTY
SHERIFF’S OFFICE OR OHER LAW ENFORCEMENT PERSONNEL
PERFORMING SERVICES IN THE CITY; AND 2) THE STRIKE OUT TEXT
SHOWN IN THE INTRODUCTORY MATERIAL OF THE ORDINANCE TO
BE ADDED TO THE ORDINANCE, SHOULD BE DELETED FROM THE
ORDINANCE . MOTION PASSED 5 – 0.
45
7. FISCAL YEAR 2008-09 PROPOSED OPERATING & CAPITAL BUDET
PUBLIC HEARING.
STAFF RECOMMENDATION:
Conduct a public hearing on the proposed FY 2008/09 Operating & Capital Budget,
and provide direction to staff for budget adoption on June 4, 2008.
Administrative Services Director Mary Furey presented the staff report.
There was Council discussion regarding the proposed budget with questions
presented on various budget line items. Director Mary Furey provided clarity
regarding the questions presented by Council.
Mayor Waltonsmith opened the hearing for public comment.
Donna Paisley – expressed her concerns regarding the results of the California
Healthy Kids Survey in which many students expressed safety concerns on campus.
Ms. Paisley stated there is a need for an SRO officer to serve the Saratoga schools.
Cindy Ruby – urged the Council to consider community grants as a built in budget
policy. She stated the Foothill Club house is undergoing extensive renovation and
asked the Council to consider funding support to install the ADA compliant ramp to
the Foothill Club house.
Mary Ellen Comport – asked for City support to help maintain the Foothill Club
building.
Mayor Waltonsmith closed the public hearing.
Council direction to staff regarding the proposed Operating and Capital Budget:
o Increase the Community Grants appropriation by the $22,000 remaining in FY
2008/08 Council Discretionary Funds, booking it to an “unspecified grant
recipient” account until decision made in FY 2008/09 in September/October.
o Council Policy established on community grants amount to match CDBG
public service grant amount and allocate as a follow-up to the CDBG hearing
process.
o Include explanatory notes in the Prior Year Accounting Structure Comparison
graph.
o Include use of carry forward and designated funds in General Fund revenue
schedule.
o Include both pie and bar chart for General Fund category schedule.
o Identify reason for Training & Meetings category increase.
o Identify Recreation Department’s cost recovery breakdown.
o Correct prior year information on Community Events schedule.
o Follow up with Council on the amount of Property Tax % that the City
receives.
o Establish Council Budget Policy direction for:
1) Year End Fund Balance reserves as follows:
Fund Undesignated Fund Balance at $500,000
Divide remaining year-end undesignated funds between:
¾ Designated for Capital Projects, and
46
¾ Designated for Operational Efficiencies
2) Establish goal of $1,000,000 revenue appropriation for CIP
Streets/Pavement Management Program.
3) $300,000 appropriation from TEA proceeds transferred to CIP
Streets/Pavement Management program, revert to General Fund.
PAGE/KING MOVED TO RAISE CIP BUDGET AMOUNT FOR
STREETS/PAVEMENT MANGEMENT PROGRAM FROM $600,000 TO AN
ESTABLISHED GOAL OF $1,000,000 – FUNDED BY 1) GAS TAX
REVENUES; 2) ROAD IMPACT FEES; 3) STATE & FEDERAL GRANTS.
MOTION PASSED 5 – 0
Council also gave direction to City Manager Dave Anderson to negotiate the cost of a
DARE Officer, with the cost to be shared equally by the elementary, middle and high
schools – three ways.
Council discussed the Community Grant program and agreed to match CDBG funds
with Community Grant funding each year; and establishing this as a Council Policy.
Contract funding would not fall into this category.
Council asked what the Council Contingency fund balance was for the current Fiscal
Year. Director Mary Furey noted there was a balance of $22,068.
It was the consensus of the Council to allocate the remaining undesignated funds
from Council Contingency for this Fiscal Year to next Fiscal Year 2008/09.
Mayor Waltonsmith declared a 5 minute break at 10:00PM.
Mayor Waltonsmith reconvened the meeting at 10:05PM.
OLD BUSINESS
None
NEW BUSINESS
8. RELOCATION OF COAST LIVE OAK TREE FROM THE HERITAGE
ORCHARD TO WEST VALLEY COLLEGE.
STAFF RECOMMENDATION:
Accept report and provide direction to staff.
Public Works Director John Cherbone presented the staff report.
There was discussion regarding the possibility of signage being placed at the site of
the Coast Live Oak tree in the Orchard during the removal process; indicating that the
cost of the tree removal project was being funded by West Valley College (WVC).
Director Cherbone noted that could be done if Council decides to approve the
removal of the tree.
47
Council also discussed the possibility of having a plaque stating where the tree came
from if it is relocated to the proposed site on the WVC campus. Director Cherbone
noted that could be done as well.
KAO/PAGE MOVED TO APPROVE THE RELOCATION OF THE COAST
LIVE OAK TREE FROM THE HERITAGE ORCHARD TO A PRE-
ESTABLISHED LOCATION AT THE WEST VALLEY COLLEGE’S MAIN
ENTRANCE OFF FRUITVALE AVENUE. MOTION PASSED 4 -1-0 WITH
COUNCILMEMBER HUNTER OPPOSING.
9. BUS SHELTER FEASIBILITY.
STAFF RECOMMENDATION:
Receive report and provide direction to staff.
Public Works Director John Cherbone presented the staff report.
Director Cherbone noted he proposed the use of four bus shelters in the CIP, which
could be increased or decreased, based on Council’s decision if they decide to install
bus shelters.
There was discussion regarding the location of covered bus shelters in the City and
whether to have free bus shelters with advertisement versus bus shelters with no
advertisement. There was discussion regarding the type of bus shelters – wooden or
metal design.
Councilmember Jill Hunter opposes metal bus shelters with advertisement.
Vice Mayor Page noted he is impartial, however, he prefers not to destroy trees in
order to install bus shelters and that you could create your own bus shelters without
advertisement. He also noted you could put a matching trash can next to the bus
shelter.
Councilmember King stated she agrees with Vice Mayor Page regarding the
placement of a trash can next to the bus shelter and that it needs to be a large enough
one to accommodate the amount of trash disposed of near bus shelters.
Councilmember Kao inquired if the City could specify the type of advertisements on
bus shelters and stated she didn’t have a specific preference of the type of bus shelter.
Council directed staff to place the bus shelter item on the CIP for future discussion.
ADHOC & AGENCY ASSIGNMENT REPORTS
Mayor Ann Waltonsmith – reported on:
Association of Bay Area Government – will be meeting next month.
Comprehensive County Expressway Planning Study Advisory Board (PAB) – will meet
on Thursday, May 22nd.
Hakone Foundation Executive Committee – the Executive Committee and Board met.
The Design Committee meeting went well and the new Visitor’s Center will be placed at
the top of the parking lot near the bamboo area. Phil Boyce’s term as president is up and
Marty Matsual will be assuming the role of President of the Hakone Board.
48
SASCC – will be meeting next Wednesday and will be electing their new Board.
West Valley Mayors and Managers Association – meets next week and Vice Mayor Page
will be attending in her place.
Sister City Liaison – will not be having a welcome reception for the three exchange
students at City Hall this year. They will be having a less formal reception in another
manner.
Vice Mayor Chuck Page – reported on:
Chamber of Commerce – attended a meeting with the Chamber and they expressed an
interest in the Buxton Report. They are also preparing for the Taste of Saratoga event and
are looking for artists and volunteers.
West Valley Sanitation District – noted they are going through their budget cycle and will
be meeting again next week.
Councilmember Kathleen King – reported on:
Peninsula Division, League of California Cities – annual dinner scheduled in Redwood
City in June and should be represented by the City.
Santa Clara County Cities Association – noted that Mayor Waltonsmith attended the last
meeting since she was unable to attend.
City School AdHoc – noted they had a very good meeting with John Nolan, Facilities
Manager for the Campbell Union School District and was sad to hear that is retiring. She
noted all weather turf will be installed on the soccer field in the back field, and
renovation of the baseball fields. She noted the school is willing to renegotiate athletic
field use times as well as athletic events held under the lights – if the teams are willing to
pay for the electricity. She also suggested doing a commendation for the Campbell
School District recognizing the excellent working relationship with Prospect High
School.
TEA AdHoc – noted Jim Beall suggested the possibility of paying ERAF up front in
exchange for getting the ERAF
Councilmember Jill Hunter – reported on:
Historic Foundation – April Halberstadt has resigned from the Board and the Board will
be recruiting for a replacement.
KSAR – has hired a new employee, Ruth Fetzer, to work 20 hours a week.
Councilmember Aileen Kao – reported on:
Northern Central Flood Control Zone Advisory Board – will meet on May 28th and the
Airport Land Use Committee meets the same day. If the two meetings are at the same
time she would need a volunteer to attend one of the meetings.
CITY COUNCIL ITEMS
Councilmember King announced the Cemetery District has selected their new Board and
noted that HPC Commissioner Jim Sorden was selected for the Board and recommended
someone notify Jim Sorden and let him know that there may be issue of incompatibility
of office and he may need to make a choice of which entity he wants to serve on if he
hasn’t already been sworn in as a Cemetery Board member.
49
City Manager Dave Anderson stated he would call Jim Sorden and let him know of the
potential for incompatibility of office.
Vice Mayor Chuck Page announced he will have to resign from the Solid Waste JPA
because of his new employment. He stated he would need a replacement prior to the next
JPA meeting, which is in November; or the Alternate could assume the position.
Page also announced the City of Saratoga has a new Starbucks – located in the Safeway
store at Argonaut Shopping Center.
Mayor Waltonsmith announced she will be writing a letter of condolences to the
Mianyang and the Chengdu Mayors regarding the devastating earthquakes and loss of
life. She also commented on how nice the “newly painted lady” – the Victorian Warner
Hutton House looked.
CITY MANAGER’S REPORT
City Manager Dave Anderson noted that one more date for the CIP Study Session needs
to be established for Council to meet and make final CIP budget recommendations.
ADJOURNMENT
PAGE/HUNTER MOVED TO ADJOURN THE REGULAR MEETING AT
11:00PM. MOTION PASSED 5 – 0.
Respectfully submitted:
Ann Sullivan, CMC
Acting City Clerk
50
Dave Anderson
Melanie Whittaker Anil Paul
RECOMMENDED ACTION:
That the City Council accepts the Check Registers for the following Accounts Payable payment cycles:
May 15, 2008
May 22, 2008
REPORT SUMMARY:
Attached are the Check Registers for:
Date
Ending Check
No.
05/15/08 107824 107863 40 $97,498.38 05/15/08 05/08/08 107821
05/22/08 107864 107940 77 $490,399.12 05/22/08 05/15/08 107863
Total $587,897.50
AP Date Check No. Issued to Dept.Amount
05/15/08 107827 Public Works $12,676.95
05/15/08 107851 Various $10,430.76
05/15/08 107862
West Valley
Collections Public Works $14,472.69
05/22/08 107883
Community
Development $309,499.10
05/22/08 107884 Public Works 37, 149.00
05/22/08 107886 CIP $20,653.38
05/22/08 107938 Public Works $21,061.00
Quadalupe Landfill Rate Adj. YE
2007-2008
Shed - Paseo Presado
Shed - Glen Brae Dr
Shed - Glen Brae Dr
General
Various
Debris Boxes - Sara/Sunnyvale Rd
Monthly Gas & Electric Services
2 Chevy Trucks
General
Law Enforcement - Monthly
Services
Construction on Fellowship Hall -
North CampusCRW Industries North Campus
West Valley Collections General
Accounts Payable
Pacific Gas & Electric
Courtesy Chevrolet Equipment Replacement
American Carports, Inc General
Starting
Check
No.
AGENDA ITEM:
ACCOUNTING SUPERVISOR:
County of SC-Office of
The Sheriff
DEPARTMENT:
PREPARED BY:
SARATOGA CITY COUNCIL
Finance & Administrative Services
Accounts Payable
Checks
Released
June 4, 2008
Total Checks
MEETING DATE:
Date
SUBJECT: Review of Accounts Payable Check Registers.
Ending
Check No.
CITY MANAGER:
Purpose
Prior Check Register
Amount
The following is a list of Accounts Payable checks issued for more than $10,000 and a brief description of the expenditure:
Fund
Type of Checks
C:\DOCUME~1\cboyer\LOCALS~1\Temp\Staff Report51
The following is a list of Accounts Payable checks that were voided or manually issued:
AP Date Check No. Issued to Amount
5/13/2008 107809 S.A.S.C.C VOID -1268.00
5/13/2008107822 Orchard Supply Facilities Supplies 902.98
5/13/2008107823 Orchard Supply Supplies - Park & Street 468.54
The following is a list of cash reduction by fund:
Fund #AP 5/15 AP 5/24 Total
001 General 46,610.98 401,675.65 448,286.63
201 Manor Drive Landscape 57.17 57.17
202 Ferdericksburg Landscape -
203 Greenbriar Landscape -
204 Quito Lighting 1,075.70 1,075.70
205 Azule Lighting 233.76 233.76
206 Sarahills Lighting 254.19 254.19
207 Village Lighting 711.42 711.42
209 McCartysville Landscape 18.34 18.34
210 Tricia Woods Landscape 9.17 35.03 44.20
211 Arroyo de Saratoga Landscape -
212 Leutar Court Landscape -
215 Bonnet Way Landscape -
216 Beauchamps Landscape 38.06 154.07 192.13
217 Sunland Park Landscape 320.61 320.61
222 Prides Crossing Landscape 28.28 95.58 123.86
224 Village Commercial Landscape 1,808.30 723.80 2,532.10
225 Saratoga Legends Landscape 325.41 325.41
226 Bellgrove Landscape 256.69 256.69
227 Cunningham/Glasgow Landscp 120.67 120.67
228 Kerwin Ranch Landscape 504.61 504.61
229 Tollgate LLD 23.89 23.89
231 Horseshoe Landscape/Lighting 170.24 170.24
232 Gateway Landscape 8.87 8.87
233 Carnelian Glen 72.96 72.96
270 CDBG Administration -
271 Saratoga Housing & Rehab.Prg.-
320 Library Expansion Cap Prg.1,500.00 1,500.00
400 Library Bond Debt Service -
501 Equipment Replacement ISF 37,149.00 37,149.00
502 Information Technology 3,811.68 3,811.68
503 Facility Improvement 12,937.14 12,029.03 24,966.17
504 Facilities 6,421.14 6,421.14
505 Information Technology 140.05 140.05
506 Office Stores Fund 339.03 297.90 636.93
510 Liability/Risk Mgt -
511 Workers' Comp -
701 Traffic Safety -
702 Highway 9 Safety -
704 -
706 Sidewalk Annual Project -
708 -
Description
Fund Description
Annual Street Resurfacing
Saratoga Sunnyvale PH 2 C:\DOCUME~1\cboyer\LOCALS~1\Temp\Staff Report52
The following is a list of cash reduction by fund: (cont.)
Fund #AP 5/15 AP 5/24 Total
716 Highway 9/Oak Pedestrain -
720 KSAR/CATV Agency Fund -
724 Village Newsrack Enclosures -
726 2 Solar Radar Feedbacks -
727 El Quito Area Curb Replacement -
731 Storm Drain Upgrades -
732 Median Landscape/Irrigation -
734 Civic Center Landscape 2,024.29 2,024.29
735 Village Lights (Zone 7A)-
736 Village Trees Lighting -
738 Cox Ave Railroad Crossing -
739 5,150.30 5,150.30
744 Village Sidewalk, Curb/Gutter 2,396.66 2,396.66
746 Saratoga-Sunnyvale Gateway -
747 -
748 El Ca Grante/Monta Vista -
749 Sara-Sun Gateway Sidewalk -
751 Financial System Upgrade 5,390.00 5,390.00
752 -
755 Warner Hutton House Improv.-
760 Facility Projects 10,885.21 4,467.99 15,353.20
761 -
762 North Campus/19848 Prospect 20,653.38 20,653.38
766 Historical Park Fire Alarm 6,250.00 6,250.00
778 -
780 -
783 -
785 541.25 180.00 721.25
786 -
788 -
789 -
790 -
791 -
792 -
793 -
794 -
795 -
796 -
797 San Marcos OP Space Trail -
97,498.38 490,399.12 587,897.50
ALTERNATIVE ACTION:
N/A
FOLLOW UP ACTION:
N/A
ADVERTISING, NOTICING AND PUBLIC CONTACT:
N/A
El Quito Park Improvement
Fire Alarm McWill&Book Go
Prospect Road Medians
Heritage Orchard Path
Alternative Soccer Field
Trail Segment #3 Repair
TOTAL
Beauchamp Park Fund
Parks/Trails Repair
Wildwood Park Improvement
Teerlink Ranch Trail Repair
Carnelian Glen Footbridge
UPRR/De Anza Trail
Citywide Tree Replanting
Kevin Moran
Hakone Garden D/W
Document Imaging Project
Wildwood Park - Wtr/Seat
Fund Description
Sara-Sun ADA Curb Ramps
C:\DOCUME~1\cboyer\LOCALS~1\Temp\Staff Report53
ATTACHMENTS:
Check Registers in the A/P Checks By Period and Year report format
C:\DOCUME~1\cboyer\LOCALS~1\Temp\Staff Report54
55
56
57
58
59
60
61
62
63
64
65
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: Finance & Administrative Services CITY MANAGER: Dave Anderson
PREPARED BY: Ann Xu, Accountant DEPT HEAD: Mary Furey,
Finance & Admin. Services Director
SUBJECT: Treasurer’s Report for the Month Ended December 31, 2007
RECOMMENDED ACTION
The City Council accept the Treasurer’s Report for the month ended December 31, 2007.
REPORT SUMMARY
California government code section 41004 requires that the City Treasurer (the Municipal Code of the
City of Saratoga, Article 2-20, Section 2-20.035, designates the City Manager as the City Treasurer)
submit to the City Clerk and the legislative body a written report and accounting of all receipts,
disbursements, and fund balances.
Section 41004. Regularly, at least once each month, the City Treasurer shall submit to the City
Clerk a written report and accounting of all receipts, disbursements, and fund balances. He shall
file a copy with the legislative body.
The following attachments provide various financial data and analysis for the City of Saratoga’s Funds
collectively as well as specifically for the City’s General (Operating) Fund, including an attachment from
the State Treasurer’s Office of Quarterly LAIF rates from the 1st Quarter of 1977 to present.
FISCAL IMPACT
Cash and Investments Balance by Fund
As of December 31, 2007, the City had $481,924 in cash deposit at Comerica bank, $13,576,771 on
deposit with LAIF (included Library GO Bonds), and $1,244 in cash with fiscal agents for the Public
Financing Authority Bond account and the Library GO Bond. Council Policy on operating reserve funds,
adopted on April 20, 1994, states that: for cash flow purposes, to avoid occurrence of dry period
financing, pooled cash from all funds should not be allowed to fall below $2,000,000. The total pooled
cash balance as of December 31, 2007 is $14,059,939 and exceeds the minimum limit required.
66
Treasurer’s Report for the Month Ended December 31, 2007 … (contd.)
MONTHLY EFFECTIVE YIELD (MEY)
For the quarter ending December, 2007 LAIF investment income declined by $28,240 over the previous
quarter due to declining short term interest rates and lower investment balance.
LAIF has forecasted rise in long term interest rates. In line with its forecast it has increased the holding
term of its investments from 183 (2007) to 204 (2008) days an increase of 21 days.
Cash Summary
Unrestricted Cash
Comerica Bank 481,924$
Deposit with LAIF 13,576,771$
14,058,695$
Restricted Cash
Fiscal Agents 1,244$
1,244$
Total 14,059,939$
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION
The City would not be in compliance with Government Code Section 41004.
ALTERNATIVE ACTION
N/A
FOLLOW UP ACTION
N/A
ADVERTISING, NOTICING AND PUBLIC CONTACT
N/A
ATTACHMENTS
A – Cash Balances by Fund
B – Change in Total Fund Balances by Fund
C – Cash and Investments by CIP Project
D – Change in Total Fund Balances by CIP Project
E – Local Agency Investment Fund (LAIF) Quarterly Apportionment Rates
67
ATTACHMENT A
The following table summarizes the City’s total cash and investment balances by Fund.
Fund Types Fund Description
Cash & Investment
Balance at
December 31, 2007
General General Fund 1,000,347$
Reserved Fund Balance
Petty Cash Reserve 1,300$
Retiree Medical Reserve 62,500$
Designated Reserves:
Designated for Economic Uncertainty 1,500,000$
Designated for Operations 2,688,037$
Designated for Carryforwards 253,875$
Designated for Grants 80,000$
Designated for CIP - Radar Signs 47,000$
Designated for Special Project Reserve 450,000$
Special Revenue Landscape and Lighting 269,445$
Development Services 1,997,401$
Enviromental Programs 710,667$
Development Fees 118,923$
SHARP loan 99,762$
Capital Project Park Development Fund 28,507$
Library Expansion Capital Project Fund 688,310$
Street Projects 1,362,831$
Park and Trail Projects 1,433,208$
Facility Improvement Projects 392,311$
Adminstrative Projects 164,381$
Debt Service Library Bond 107,378$
Internal Service Equipment Replacement 92,575$
IT Replacement 307,638$
Facility Improvement 80,565$
Equipment Maintenance 18,899$
Information Technology Services 20,778$
Office Stores Fund 15,395$
Liability/Risk Management 13,850$
Workers Compensation 20,392$
Trust/Agency Leonard Road (3,469)$
Public Financing Authority 1,244$
KSAR - Community Access TV 35,889$
Total City 14,059,939$
68
ATTACHMENT B
CHANGES IN TOTAL FUND BALANCE
The following table presents the ending Fund Balances for the City’s major fund types as at December
31, 2007. This table excludes Trust and Agency funds where the City acts merely as a third party
custodian of an outside party’s funds.
Fund Description
Fund
Balance
07/01/07
Inc/(Dec)
Jul-Nov Revenues Expenditures Transfers
Fund
Balance
12/31/07
General
Undesignated Unreserved Balance 1,928,665 (1,809,485) 2,130,869 1,193,965 1,056,085
Reserved Fund Balance:-
Petty Cash Reserve 1,300 - - - 1,300
Retiree Medical Reserve 62,500 - - - 62,500
Designated Fund Balances:-
Designated Economic Uncertainty 1,500,000 - - - 1,500,000
Designated for Operations 2,688,036 - - - 2,688,036
Designated for Grants 80,000 - - - 80,000
Designated for CIP Radar Signs 47,000 - - - 47,000
Designated for Special Projects 450,000 - - - 450,000
Designated for Claims 38,695 38,695
Designated for Development 1,355,080 - - - 1,355,080
Designated for Environmental 710,668 - - - 710,668
Special Revenue
Landscape/Lighting 316,077 (86,781) 51,841 11,692 269,445
SHARP Loan 89,588 7,855 2,319 - 99,762
Capital Project
Park Development 209,087 (184,860) - (4,280) 28,507
Library Expansion 684,553 (1,244) 4,829 - 688,138
Street Projects 2,141,646 100,900 0 808,389 - 1,434,156
Park and Trails 1,298,728 334,237 - 52,383 - 1,580,582
Facility Improvements 441,991 (48,450) - 1,232 - 392,309
Adminstrative Projects - 167,746 - 3,364 - 164,381
Debt Service
Library Bond 746,556 (644,842) 5,497 - 107,212
Internal Service Fund
Equipment Replacement 8,572 50,000 50,000 15,999 92,574
Technology Replacement 352,280 (57,668) 13,026 - 307,638
Building Maintenance (15,617) (50,362) 178,463 61,994 50,490
Equipment Maintenance - (20,122) 49,310 10,289 18,899
Information Technology Services - (44,151) 92,452 27,033 21,268
Stores Fund - 1,344 16,250 2,200 15,395
Liability/Risk Management - (55,651) 72,159 2,657 13,850
Workers Compensation - (40,083) 61,750 1,274 20,392
Total City 15,135,405 (2,381,618) 2,728,766 2,188,192 - 13,294,362
69
ATTACHMENT C
CASH AND INVESTMENTS BALANCES BY CIP PROJECT
The following table details the cash balances for each project in the Streets, Parks & Trails, Facility
Improvements, and Administrative Project Program Funds.
CIP Funds/Projects
Cash & Investment
Balance at
December 31, 2007
Street Projects
Traffic Safety 28,577
Highway 9 Safety Project 58,960
Annual Street Resurfacing Project (114,775)
Sidewalks Yearly Project 98,980
Saratoga Sunnyale Road Resurfacing (29,094)
Fourth Street Bridge 100,000
Highway 9 and Oak Place Pedestrian Sign (164,891)
Quito Road Bridge Replacement 9,730
Quito Road Bridge Construction 113,859
Village Newsrack Enclosur (1,849)
Solar Power Radar Feedback Signs 50,550
El Quito Area Curb Replacement 96,183
Sobey Road Culvert Repair 150,000
Median Repairs(Landscape/Irrig.)4,021
Village Improvements 50,000
Village Trees & Lights at Sidestreets 31,965
Cox Ave Railroad Crossing Upgrade (25,956)
Prospect Road Median 45,619
City Entrance Sign/Monument 13,467
Village-Streetscape Impv (Sidewalk, Curbs)707,069
Saratoga-Sunnyvale/Gateway (15,383)
Saratoga-Sunnyvale ADA Curb Ramps (2,130)
Storm Drain @ El Camino / Mt Vista 85,321
Saratoga-Sunnyvale/Gateway Sidewalk 72,607
Total Street Projects 1,362,831$
Parks & Trails
Beauchamp Park Fund 13,362
Wildwood Park - Water Feature/Seating 7,935
Historical Park Landscape 37,200
Citywide Tree Replanting 91,200
Hakone Garden D/W 164,283
Carnelian Glen Footbridge (2,903)
DeAnza Trail (210,707)
Kevin Moran Improvements 1,087,462
West Valley Soccer Field 143,370
Park/Trail Repairs 37,014
Heritage Orchard Path 25,000
Trail Segment #3 Repair 10,832
Teerlink Ranch Trail 22,242
San Marcos OP Space Trail 981
CIP Allocation Fund 5,939
Total Parks & Trails 1,433,208$
Facility Improvements
Civic Center Landscape 49,708
Warner Hutton House Improvements 22,396
Facility Projects (250)
Fire Alarm at McWilliams & Museum 20,387
North Campus - 19848 Prospect Road 293,808
Historical Park Fire Alarm System 6,262
Total Facility Improvements 392,311$
Administrative Projects
Financial System Upgrade 70,734
Document Imaging Project 93,647
Total Administrative Projects 164,381$
Total CIP Funds 3,352,731$
70
ATTACHMENT D
FUND BALANCES BY CIP PROJECT
The following table details the fund balances for each project in the Streets, Parks & Trails, Facility
Improvements, and Administrative Project Program Funds.
CIP Funds/Projects
Fund
Balance
07/01/07
Inc/(Dec)
Jul-Nov Revenues Expenditures Transfers
Fund
Balance
12/31/07
Street Projects
Traffic Safety 41,355 (12,779) - - 28,577
Highway 9 Safety Project 58,960 - - - 58,960
Annual Street Resurfacing Project 438,338 24,069 0 578,452 (116,044)
Sidewalks Yearly Project 108,605 (9,625) - - 98,980
Saratoga Sunnyale Road Resurfacing - 194,527 - 151,028 43,499
Fourth Street Bridge 100,000 - - - 100,000
Highway 9 and Oak Place Pedestrian Sign (164,891) - - - (164,891)
Quito Road Bridge Replacement 9,730 - - - 9,730
Quito Road Bridge Construction 113,859 - - - 113,859
Village Newsrack Enclosur - - - 1,849 (1,849)
Solar Power Radar Feedback Signs 15,000 47,000 - 11,450 50,550
El Quito Area Curb Replacement 213,179 (109,132) - 7,864 96,184
Sobey Road Culvert Repair 150,000 - - - 150,000
Storm Drain Upgrades 11,314 - - 11,314 0
Median Repairs(Landscape/Irrig.)4,021 - - - 4,021
Village Improvements 50,000 - - - 50,000
Village Trees & Lights at Sidestreets 7,000 32,920 - 7,955 31,965
Cox Ave Railroad Crossing Upgrade 24,392 (50,348) - - (25,956)
Prospect Road Median 50,000 - - 4,381 45,619
City Entrance Sign/Monument 13,467 - - - 13,467
Village-Streetscape Impv (Sidewalk, Curbs) 737,846 - - 30,777 707,069
Saratoga-Sunnyvale/Gateway 74,148 (89,531) - - (15,383)
Saratoga-Sunnyvale ADA Curb Ramps - (350) - 1,780 (2,130)
Storm Drain @ El Camino / Mt Vista 85,321 - - - 85,321
Saratoga-Sunnyvale/Gateway Sidewalk - 74,148 - 1,541 72,607
Total Street Projects 2,141,646 100,900 0 808,389 - 1,434,156
Parks & Trails
Beauchamp Park Fund - 13,362 - - 13,362
Wildwood Park - Water Feature/Seating - 9,199 - 1,264 7,935
Historical Park Landscape - 37,200 - - 37,200
Citywide Tree Replanting - 92,059 - 859 91,200
Hakone Garden D/W 164,283 - - - 164,283
Carnelian Glen Footbridge - - - 2,903 (2,903)
DeAnza Trail (184,219) 141,312 - 20,426 (63,332)
Kevin Moran Improvements 1,112,298 (16,214) - 8,623 1,087,462
West Valley Soccer Field 155,868 (8,009) - 4,490 143,370
Park/Trail Repairs 44,558 (7,433) - 111 37,014
Heritage Orchard Path - 25,000 - - 25,000
Trail Segment #3 Repair - 12,632 - 1,800 10,832
Teerlink Ranch Trail - 30,000 - 7,758 22,242
San Marcos OP Space Trail - 5,130 - 4,149 981
CIP Allocation Fund 5,939 - - - 5,939
Total Parks & Trails 1,298,728 334,237 - 52,383 - 1,580,582
Facility Improvements
Civic Center Landscape 63,703 (13,997) - - 49,706
Warner Hutton House Improvements 25,000 (2,605) - - 22,395
Facility Projects - (250) - - (250)
Fire Alarm at McWilliams & Museum 25,000 (4,613) - - 20,387
North Campus - 19848 Prospect Road 322,025 (26,986) - 1,232 293,808
Historical Park Fire Alarm System 6,262 - - - 6,262
Total Facility Improvements 441,991 (48,450) - 1,232 - 392,309
Administrative Projects
Financial System Upgrade - 70,734 - - 70,734
Document Imaging Project - 97,011 - 3,364 93,647
Total Administrative Projects - 167,746 - 3,364 - 164,381
Total CIP Funds 3,882,365 554,433 0 865,369 - 3,571,429
71
ATTACHMENT E
72
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: Finance & Admin Services CITY MANAGER: Dave Anderson
PREPARED BY: Mary Furey DIRECTOR: Mary Furey
SUBJECT: Fiscal Year 2008/09 Gann Appropriation Limit
RECOMMENDED ACTION
Adopt resolution approving the Gann Appropriations Limit for FY 2008/09.
REPORT DISCUSSION
On November 6, 1979, California voters approved Proposition 4, commonly known as the Gann
Spending Limitation Initiative, establishing Article XIIIB of the California State Constitution. This
proposition, which became effective in fiscal year 1980/81, mandated an appropriations (spending) limit
on the amount of tax revenues that the State and most local government jurisdictions may appropriate
within a fiscal year. This limit grows annually by a population and cost-of-living factor.
The State Appropriation Limit was since modified by two subsequent initiatives - Proposition 98 in 1988
and Proposition 111 in 1990. Proposition 98 established the return of tax revenues exceeding
appropriation limit levels to the State of citizens through a process of refunds, rebates, or other means.
Proposition 111 allowed more flexibility in the appropriation calculation factors.
Only tax proceeds are subject to this limit. Charges for services, fees, grants, loans, donations and other
non-tax proceeds are excluded. Exemptions are also made for voter-approved debt which existed prior to
January 1, 1979, and for the cost of compliance with court or Federal government mandates.
The City Council adopts an annual resolution establishing an appropriations limit for the following fiscal
year using population and per capita personal income data provided by the State of California’s
Department of Finance. Each year’s limit is based on the amount of tax proceeds that were authorized to
be spent in fiscal year 1978/79, with inflationary adjustments made annually to reflect increases in
population and the cost of living.
The California Department of Finance distributes the annual percentage change per capita personal
income and the percentage population change within the City and the County to jurisdictions on May 1st
each year. Saratoga’s percentage increase in population change is combined with the change in per capita
income to determine the City’s appropriation factor. The current year’s appropriation limit is then
increased by this appropriation factor to calculate the Gann Appropriation Limit for the following fiscal
year. The calculation for the FY 2008/09 limit is as follows:
73
% Increase in Change in 2007/08 2008/09
County Per Capita Appropriation Appropriation Appropriation
Population Income Factor Limit Limit
1.0172 X 1.0131 = 1.0305 X 28,837,681$ = 29,717,961$
FY 2008/09 Calculation
Summary:
The Gann Appropriation Limit establishes the maximum amount of tax revenue proceeds the City may
appropriate in the following fiscal year. The City’s proposed budget for FY 2008/09 anticipates
$10,181,000 in tax revenues, which is $19,536,961 less than the appropriation limit of $29,717,961.
Conclusion:
It is recommended that the Council adopt the resolution approving the FY 2008/09 Gann Appropriation
Limit of $29,717,961
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION
The City will not be in compliance with Article XIIIB of the State of California Constitution.
ALTERNATIVE ACTION
N/A
FOLLOW UP ACTION
N/A
ADVERTISING, NOTICING AND PUBLIC CONTACT
N/A
ATTACHMENTS
A - Gann Appropriation Limit Factors and Calculation
B – Resolution
74
Attachment A
For Beginning County City Per Ending %
YE Population Population Capita Limit
Limit Factor Factor Income Limit Increase
1994 13,202,594 1.0171 1.0053 1.0272 13,793,609 4.48%
1995 13,793,609 1.0160 1.0050 1.0071 14,113,809 2.32%
1996 14,113,809 1.0170 1.0227 1.0472 15,115,486 7.10%
1997 15,115,486 1.0108 1.0071 1.0467 15,992,250 5.80%
1998 15,992,250 1.0216 1.0289 1.0467 17,222,848 7.69%
1999 17,222,848 1.0212 1.0154 1.0415 18,317,873 6.36%
2000 18,317,873 1.0173 1.0072 1.0453 19,478,927 6.34%
2001 19,478,927 1.0163 1.0055 1.0491 20,768,439 6.62%
2002 20,768,439 1.0147 1.0055 1.0782 22,721,701 9.40%
2003 22,721,701 1.0125 1.0191 0.9873 23,092,833 1.63%
2004 23,092,833 1.0079 1.0029 1.0231 23,694,794 2.61%
2005 23,694,794 1.0072 1.0000 1.0328 24,471,983 3.28%
2006 24,471,983 1.0112 1.0124 1.0526 26,078,624 6.57%
2007 26,078,624 1.0118 1.0034 1.0396 27,203,516 4.31%
2008 27,203,516 1.0152 1.0138 1.0442 28,837,681 10.58%
2009 28,837,681 1.0172 1.0077 1.0131 29,717,961 9.24%
% Increase in Change in 2007/08 2008/09
County Per Capita Appropriation Appropriation Appropriation
Population Income Factor Limit Limit
1.0172 X 1.0131 = 1.0305 X 28,837,681$ = 29,717,961$
2008/09 2008/09 Percentage
Tax Appropriation of
Revenues Limit Limit
10,181,000 / 29,717,961$ = 34%
APPROPRIATION LIMIT FACTORS
AppropriationAppropriation
June 30
Percentage of Appropriation
FY 2008/09 Calculation
75
Attachment B
RESOLUTION NO._______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA
ESTABLISHING THE FISCAL YEAR 2008/09 GANN LIMIT APPROPRIATION
FOR THE CITY OF SARATOGA
WHEREAS, the City of Saratoga has established its Base Year Appropriation Limit as
$5,961,747 in Fiscal Year 1978/79; and
WHEREAS, the cumulative changes to population and to the California per capita personal
income since the Base Year established the revised Proposition 111 Fiscal Year 1996/97 Appropriation
Limit as $16,153,314, and
WHEREAS, to the best of the City’s knowledge and belief, the State Department of Finance
figures provided to the City in response to Proposition 111 passed by the voters in June 1990, reflects the
appropriate statistics relevant to the calculation of the Fiscal Year 2008/09 Appropriation Limit, which
includes:
• County population adjustments for the year ended December 31, 2007 equal to 1.72%, and
• City population adjustment for the year ended December 31, 2007 equal to 1.31%, and
• Change in California per capita cost of living for fiscal year 2008/09 equal to 4.29%
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga hereby
resolves that, based on the foregoing figures and the provisions of the Article XIIIB of the Constitution of
the State of California, the following figure accurately represents the Fiscal Year 2008/09 Appropriation
Limit for the City of Saratoga at: $29,717,961
The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City
Council held on the 4th day of June 2008 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
___________________
Ann Waltonsmith, Mayor
ATTEST:
_____________________________
Ann Sullivan, Acting City Clerk
76
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM: _________
ORIGINATING DEPT: City Manager’s Office CITY MANAGER:
PREPARED BY: DEPT HEAD:
Ann Sullivan, Acting City Clerk Dave Anderson, City Manager
SUBJECT: Resolution Calling the General Municipal Election – November 4, 2008
RECOMMENDED MOTION:
That City Council adopts the Resolution Calling the General Municipal Election for
November 4, 2008.
REPORT SUMMARY
The following report recommends Council adoption of the attached resolution (Attachment 1),
calling the General Municipal Election for two (2) City Council seats.
The resolution specifies the County’s responsibility throughout the filing and election process.
An election calendar highlighting dates of interest to candidates and the public is attached to this
report as references. (Attachment 2)
DISCUSSION:
Pursuant to Election Code commencing with Section 10400, the City Council hereby requests
the Board of Supervisors of the County of Santa Clara to order the consolidation of the general
and special municipal election to be conducted within the boundaries of the City of Saratoga on
November 4, 2008, with respect to which the Board of Supervisors of the County of Santa Clara
has the power to order a consolidation. The City Council further consents to and orders the
consolidation of the general and special municipal election hereby called with the statewide
general election.
Upon consolidation, the consolidation election shall be held and conducted, election officers
appointed, voting precincts designated, ballots printed, polls opened at 7:00 a.m. and closed at
8:00 p.m., ballots counted and returned, returns canvassed, and all other proceedings in
connection with the election shall be regulated and done by the Registrar of Voters of the County
of Santa Clara in accordance with the provisions of law regulating consolidated elections.
77
The nomination period for the 2008 General Municipal Election calls for the filing period of
July 14, 2008 – August 8, 2008, except that if an incumbent elective officer does not file within
the period, the voters shall have until 5 p.m. on Wednesday August 13, 2008 to nominate
candidates other than incumbents.
A General Municipal Election hereby is called to be held in and for the City of Saratoga on
Tuesday, November 4, 2008 to elect two (2) Councilmembers, each for a full term of four (4)
years.
In accordance with the California Elections Code Section 13307b), the County Registrar of
Voters is required to provide all election material to be printed in English and Spanish, including
instructions and words to the measure.
The resolution provides the following:
1. Call for the General Municipal Election for election of certain officers for November 4,
2008 to be consolidated with the Santa Clara County Registrar of Voters.
2. Requests to the governing body of any political subdivision holding elections on
November 4, 2008, that such election be consolidated with Saratoga’s Municipal
Election, under the administration of the County of Santa Clara Registrar of Voters
office.
3. Determining that the length of candidate’s statements shall not exceed four hundred (400)
words in length, that candidates desiring to distribute a candidate’s statement shall pay
the pro rated share of the estimated fee per candidate is $2,600.
4. Under Section 10228 of the Election Code there is a required filing fee of $25, which
covers the City costs of processing nomination paper.
FISCAL IMPACT
Election costs have risen since the last General Election and the Registrar of Voters Office
estimates the cost of the 2008 Election for the City of Saratoga to be approximately $34,500.
The Registrar of Voters has based its increased charges per registered voter on several factors
including: printing of bilingual ballots, publication of legal notices, postal rate increase, cost of
living in personnel costs, bilingual recruitment of polling place workshops in targeted precincts,
increased absentee voting, materials and supplies, and DRE (Electronic Voting Equipment
Recovery Fee).
ADVERTISING, NOTICING AND PUBLIC CONTACT:
Publish Notice of Election in the Saratoga News and posting of the Council Agenda.
FOLLOW UP ACTIONS:
2
78
3
A certified copy of adopted Resolution Calling the General and Municipal Election shall be
forwarded to the Santa Clara County Board of Supervisors and Santa Clara County Registrar of
Voters no later than July 2, 2008.
ATTACHMENTS:
1. Resolution
2. General Municipal Election Calendar
3. Notice of Election for Publication
79
RESOLUTION 08-
RESOLUTION OF THE CITY OF SARATOGA ORDERING AND
CALLING A GENERAL MUNICIPAL ELECTION TO BE HELD IN
THE CITY OF SARATOGA ON NOVEMBER 4, 2008; FOR THE
ELECTION OF CERTAIN OFFICERS; REQUESTING THE
SERVICES OF THE REGISTRAR OF VOTERS; REQUESTING
CONSOLIDATION OF ELECTIONS AND SPECIFYING CERTAIN
PROCEDURES FOR THE CONSOLIDATION OF ELECTIONS AND
DETERMINING TO LEVY THE COST OF CANDIDATES'
STATEMENTS; REQUIRING PAYMENT OF CANDIDATES’
FILING FEES; AND PROVIDING FOR
GIVING NOTICE OF ELECTION
WHEREAS, California Election Code Section 1301 provides that the general
election for the City of Saratoga can be held on the day of the statewide general election;
WHEREAS, pursuant to Part 3 of Division 10 of the California Elections Code, a
general election may be consolidated with a statewide election; and
WHEREAS, a statewide election will be held on November 4, 2008;
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Saratoga:
1. A general municipal election is hereby called to be held in and for the City of
Saratoga on Tuesday, November 4, 2008 to elect two (2) Council Members,
each for a full term of four (4) years.
2. Pursuant to Election Code commencing with Section 10400, the City Council
hereby request the Board of Supervisors of the County of Santa Clara to order
the consolidation of the general municipal election to be conducted within the
boundaries of the City of Saratoga on November 4, 2008, with respect to
which the Board of Supervisors of the County of Santa Clara has the power to
order a consolidation. The City Council further consents to and orders the
consolidation of the general municipal election hereby called with the
statewide general election. Upon consolidation, the consolidated election
shall be held and conducted, election officers appointed, voting precincts
designated, ballots printed, polls opened at 7:00 a.m. and closed at 8:00 p.m.,
ballots counted and returned, returns canvassed, and all other proceedings in
connection with the election shall be regulated and done by the Registrar of
Voters of the County of Santa Clara in accordance with the provisions of law
regulating consolidated elections.
80
3. The City Clerk is hereby authorized and directed to publish a notice of general
municipal election within the time and in the manner specified in Elections
Code Section 12109. The City Clerk is further authorized and directed to do
all other things required by law to hold the general election above provided.
4. Pursuant to Section 13307 of the Elections Code, the City Council hereby
determines to levy against each candidate availing himself or herself of the
service of including a candidate’s statement not to exceed four hundred (400)
words in length in the voter’s pamphlet, the actual prorated cost of printing,
handling and translating the candidate statement, incurred by the City of
Saratoga. The estimated cost per candidate for a four hundred (400) word
candidate’s statement is $2,600, in addition to the $25.00 filing fee. The City
Clerk shall provide written notice to such effect with each set of nomination
papers issued and shall require payment of the estimated pro rata share at the
time the candidate statement is filed.
5. The City Clerk is hereby authorized and directed to certify to the adoption of
the resolution and to transmit a certified copy to the Board of Supervisors of
the County of Santa Clara and to the Registrar of Voters of the County of
Santa Clara.
PASSED AND ADOPTED at a regular meeting of the City of Saratoga this 4th
day of June 2008 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
SIGNED:
__________________________________
ANN WALTONSMITH,
MAYOR OF THE CITY OF SARATOGA
SARATOGA, CALIFORNIA
ATTEST:
_________________________________
ANN SULLIVAN,
ACTING CITY CLERK OF THE CITY OF SARATOGA
SARATOGA, CALIFORNIA
81
82
83
84
NOTICE OF ELECTION
Notice is hereby given that a General Municipal Election will be held in the City of
Saratoga on Tuesday, November 4, 2008, for the following offices; Two (2)
Councilmembers, each for a full four-year term. The polls will be open between the
hours of 7:00 a.m. and 8:00 p.m.
Individuals interested in running for office may obtain nomination papers from and file
them in the City Clerk’s Office, 13777 Fruitvale Avenue, Saratoga, CA. The nomination
period is open from 8:00 a.m. July 14, 2008 through 5:00 p.m. August 8, 2008.
Candidates must be registered voters within the corporate limits of the City of Saratoga.
If an incumbent who is eligible to run for office does not file nomination papers by
August 8, the deadline will be extended to August 13, 2008.
/s/Ann Sullivan
Acting City Clerk
(Pub SN 06/18/08)
85
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: City Manager CITY MANAGER: Dave Anderson
PREPARED BY: Richard Taylor DIRECTOR: Dave Anderson
____________________________
SUBJECT: Approval of an Ordinance Requiring Supervision by a Parent or Guardian of
Alcoholic Beverage Possession or Consumption by a Person Under Twenty-one and
Imposing a Fee for the Costs of Providing a Second Police Response to Public
Disturbances.
RECOMMENDED ACTION:
Approve the ordinance requiring supervision by a parent or guardian of alcoholic
beverage possession or consumption by a person under twenty-one and imposing a fee
for the costs of providing a second police response to public disturbances.
BACKGROUND:
At its meeting of May 21, 2008 after a pubic hearing the City Council introduced and waived the
first reading of the attached ordinance and directed staff to place the matter on the consent
calendar for the June 4, 2008 meeting. The attached ordinance would make minor amendments
to the City Code to bring it in conformity to comparable provisions in the Los Gatos and Monte
Sereno Codes. This would help avoid confusion as to the standards applicable to social
gatherings in the area.
FOLLOW-UP ACTIONS:
Publish ordinance in the Saratoga News.
ATTACHMENTS:
1. Ordinance.
86
ORDINANCE
AN ORDINANCE AMENDING THE SARATOGA MUNICIPAL CODE TO AMEND AND CLARIFY
EXISTING PROVISIONS OF THE CITY CODE REQUIRING SUPERVISION BY PARENT OR
GUARDIAN OF ALCOHOLIC BEVERAGE POSSESSION OR CONSUMPTION BY PERSONS UNDER
TWENTY-ONE AND IMPOSING A FEE FOR THE COSTS OF PROVIDING A SECOND POLICE
RESPONSE TO PUBLIC DISTURBANCES POSING A THREAT TO THE PUBLIC PEACE, HEALTH,
SAFETY OR GENERAL WELFARE
THE CITY COUNCIL OF THE CITY OF SARATOGA DOES ORDAIN AS FOLLOWS:
WHEREAS, the City of Saratoga wishes to discourage underage drinking and to hold the hosts
of parties constituting a public disturbance who fail to respond to police directions such that a
second response is required responsible for the costs to the community.
THEREFORE the City Council hereby ordains as follows:
Section 1. Adoption.
The Saratoga City Code is hereby amended as set forth below. Words shown in bold underlined
text (example) are added to the Code and words shown in strikeout (example) are deleted from
the Code. Words in standard font are unchanged from the existing Code.
A. Section 6-15.120 of the City Code is amended as follows:
6-15.120 Certain social gatherings unlawful. Supervision by parent or guardian of alcoholic
beverage possession or consumption by persons under twenty-one.
(a) No person under the age of twenty-one (21) years shall have in his or her possession
possess or consume any alcoholic beverage at any place not open to the public, unless that
person is being supervised by his or her the person’s parent or legal guardian.
(b) No person shall suffer, permit, allow, or host a social gathering at his or her the person’s
place of residence where one (1) or more persons under the age of twenty-one (21) years are
present and alcoholic beverages are in the possession of, or being consumed by, any person
under the age of twenty-one (21) years and there who is not being supervised no supervision by
his or her the parent or legal guardian of each of the participants under the age of twenty-one
(21).
(c) Any violation of person violating this Section shall constitute section is guilty of a
misdemeanor.
B. Section 6-15.120 of the City Code is amended as follows:
6-15.130 Disturbance requiring a second police response.
(a) When Where a disturbance occurs at a premises which is determined by a police officer to
constitute and a police officer at the scene determines that there is a threat to the public
1
87
2
peace, health, safety or general welfare, and a second response by police personnel to such
disturbance is made, the police personnel utilized during the second response shall be deemed to
be on special security assignment over and above the services normally provided. The the person
in charge of the premises and the person responsible for the event, or, if either of those persons is
a minor, then the parents or legal guardians of that minor, shall will be held jointly and severally
liable for the cost of providing police personnel on special security assignment, such cost to be
determined according to rates and charges as established from time to time by resolution of the
City Council. over and above the services normally provided by the police. The police
personnel utilized during a second response after the first warning to control the threat to
the public peace, health, safety or general welfare shall be deemed to be on special security
assignment over and above the services normally provided. The costs of such special
security assignment shall include the costs of police response, damage to City property and
injuries to City personnel.
(b) This section shall not impose a requirement of a second response by police to a
disturbance where a determination is made that termination of the disturbance is necessary
on the first response to keep the peace and ensure the health, safety and general welfare of
the public. The fees imposed for a second response to such a disturbance will be established
by the City Council by resolution.
(c) References to “police” in this Code refer to all deputies of the County Sheriff and other
law enforcement officials performing police services in the City.
Section 2. Publication.
This ordinance or a comprehensive summary thereof shall be published in a newspaper of
general circulation of the City of Saratoga within fifteen days after its adoption.
The foregoing ordinance was introduced and read at the regular meeting of the City Council of
the City of Saratoga held on the 21st day of May, 2008, and was adopted by the following vote
following a second reading on the 4th day of June, 2008:
COUNCIL MEMBERS:
AYES:
NAYS:
ABSENT:
ABSTAIN:
SIGNED: ATTEST:
_________________________________ _____________________________
Ann Waltonsmith, Ann Sullivan,
MAYOR OF THE CITY OF SARATOGA ACTING CLERK OF THE CITY OF
SARATOGA
APPROVED AS TO FORM:
__________________________________
Richard Taylor, CITY ATTORNEY
88
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: Community Development CITY MANAGER: Dave Anderson
PREPARED BY: Shweta Bhatt, Associate Planner DIRECTOR: John Livingstone
SUBJECT: Joint Exercise of Powers Agreement and Cooperation Agreement to undertake
activities pursuant to Title I of the Housing and Community Development Act
RECOMMENDED ACTION(S):
That the City Council approve the attached resolution authorizing the Mayor to enter into a Joint
Exercise of Powers Agreement and Cooperation Agreement (JPA) to undertake or to assist in the
undertaking of essential activities pursuant to Title I of the Housing and Community
Development Act, as amended for the period of October 1, 2008 to September 30, 2011.
BACKGROUND:
The City of Saratoga has participated with Santa Clara County in the Community Development
Block Grant (CDBG) Program since 1975. The City of Saratoga is not eligible to apply directly
for CDBG funds because the population is under the 50,000 person threshold. Thus, if the City
desires to participate and receive CDBG funds from the County, the City must enter into a JPA
with the County and other participating cities.
The current JPA does not expire until September 30, 2008; however, the County has requested a
signed commitment by participating cities by June 20, 2008, so that the signed agreements may
be forwarded to HUD in a timely manner. The new JPA has not dramatically changed from the
current JPA. It still covers very basic contract compliance material. The City Attorney reviewed
the Agreement and found it to be in order.
FISCAL IMPACTS:
There is a positive fiscal impact to the City in signing the JPA for the period of October 1, 2008
to September 30, 2011. The City under the new JPA will be eligible each fiscal year for
approximately $140,000 in new CDBG funds to allocate to eligible CDBG activities.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
N/A
ALTERNATIVE ACTION(S):
Do not participate in the new JPA, thus excluding the City from securing CDBG funds for
eligible housing and community development projects.
Page 1 of 2
89
Page 2 of 2
FOLLOW UP ACTION(S):
Forward four signed original copies of the JPA and Resolution to Santa Clara County
ATTACHMENTS:
1. Resolution
2. Joint Powers Agreement
90
RESOLUTION NO: ____________
RESOLUTION AUTHORIZING THE CITY MANAGER
OF THE CITY OF SARATOGA TO ENTER INTO A
JOINT EXERCISE OF POWERS AGREEMENT AND
COOPERATION AGREEMENT TO UNDERTAKE
OR TO ASSIST IN THE UNDERTAKING OF
ESSENTIAL ACTIVITIES PURSUANT TO
TITLE I OF THE HOUSING AND COMMUNITY
DEVELOPMENT ACT OF 1974, AS AMENDED
FOR THE PERIOD OF OCTOBER 1, 2008- SEPTEMBER 30, 2011
WHEREAS, Congress has enacted the Housing and Community Development Act of 1974, as
amended;
WHEREAS, Title I of the Act provides for a program of Community Development Block Grants;
WHEREAS, Title I of the Act makes entitlement grants available to cities with a population of
50,000 or more persons and to counties that qualify as an urban county;
WHEREAS, the City of Saratoga is not eligible to apply directly for entitlement funds under the
Act but may, by entering into a cooperation agreement with County, qualify County as an urban county
applicant and may thereby receive such funds;
WHEREAS, the parties hereto wish to enter into an agreement to enable the County of Santa
Clara to apply for and receive entitlement funds as an urban county and to establish the respective rights
and obligations of the contracting parties to such funds;
NOW, THEREFORE, BE IT RESOLVED that the Saratoga City Council does hereby authorize the
City Manager to enter into a Joint Exercise of Powers Agreement and Cooperation Agreement with the
County of Santa Clara. To Undertake or to Assist in the Undertaking of Essential Activities Pursuant to
Title I of the Housing and Community Act of 1974, as Amended for the Period of October 1, 2008 –
September 30, 2011.
PASSED AND ADOPTED at a regular meeting of the Saratoga City Council of the City of
Saratoga this 4th day of June 2008 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
BY: _____________________________________
_________________________________________
MAYOR (Ann Waltonsmith)
City Council
ATTEST:
_______________________________________
CITY CLERK JPA Resolution 5/21/08
1
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
Housing and Community Development Program October 1, 2008 – September 30, 2011
5/21/08
91
JOINT EXERCISE OF POWERS AGREEMENT AND
COOPERATION AGREEMENT TO UNDERTAKE
OR TO ASSIST IN THE UNDERTAKING OF
ESSENTIAL ACTIVITIES PURSUANT TO
TITLE I OF THE HOUSING AND COMMUNITY
DEVELOPMENT ACT OF 1974, AS AMENDED,
FOR THE PERIOD OF OCTOBER 1, 2008 TO SEPTEMBER 30, 2011
This Agreement (“Agreement”) is entered into by and between the County of Santa
Clara (”County”) and Saratoga (“City”) relating to essential community development
and housing assistance activities funded by the Federal government.
RECITALS
a. That Congress has enacted the Housing and Community Development
Act of 1974, as amended;
b. That Title I of the Act provides for a program of Community Development
Block Grants;
c. That Title I of the Act makes entitlement grants available to cities with a
population of 50,000 or more persons and to counties that qualify as an
Urban County;
d. That City is not eligible to apply directly for entitlement grants under the
Act but may, by entering into a cooperation agreement with County,
qualify County as an Urban County applicant and may thereby receive
such funds;
e. That the parties hereto wish to enter into this Agreement to enable the
County of Santa Clara to apply for and receive entitlement funds as an
Urban County and to establish the respective rights and obligations of the
contracting parties to such funds.
NOW, THEREFORE, THE PARTIES HERETO AGREE AS FOLLOWS:
1. Authorities.
This Agreement is made pursuant to Section 6500 et. seq. of the California Government
Code and constitutes an exercise of powers common to both City and County, each
being empowered to carry out the purposes of the grant in their own jurisdictions.
1
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
Housing and Community Development Program October 1, 2008 – September 30, 2011
5/21/08
92
This Agreement is further made pursuant to the Housing and Community
Development Act of 1974, as amended.
All provisions contained in this Agreement that refer to the Housing and Community
Development Act of 1974, as amended, which provides for the distribution of CDBG
funds, shall also refer to the HOME Program under Title II (the Home Investment
Partnerships Act) of the National Affordable Housing Act of 1990, as amended.
2. Definitions.
For purposes of simplicity and clearer understanding, some of the definitions below
have been shortened or rephrased from those set forth in the Act and Regulations
thereunder. In the event of any conflict between the definitions in this Agreement and
those set forth in the Act and Regulations, the latter shall govern.
a. “Act”: Title I of the Housing and Community Development Act of 1974,
P.L. 93-383, as amended.
b. “Applicant”: the County of Santa Clara applying as an Urban County.
c. “Regulations”: the rules and regulations of the U.S. Department of
Housing and Urban Development; particular reference is made to those
regulations stated in 24 Code of Federal Regulations Part 570 (containing
the general regulations of Community Development Block Grants) and
Part 58 (containing the regulations on the Federal Environmental Review
Procedures).
d. “County”: the County of Santa Clara through action by its Board of
Supervisors.
e. “Board of Supervisors”: the County’s legislative body which is the legal
recipient of the Community Development Block Grant from HUD and is
legally responsible for the administration of the Urban County HCD
Program.
f. “City”: is the city or town that is a party to this Agreement; such city or
town may be referred to as a “Non-Entitlement City,” that is, a city which
cannot directly apply for or receive funds through cooperation agreements
with the HUD.
g. “Urban County”: a county that is (1) in a metropolitan area;
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
2
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
93
(2) authorized by state law to undertake essential community
development and housing assistance activities within its unincorporated
areas, and (3) has a population of 200,000 or more within its
unincorporated areas and units of general local government (cities) within
the county with which it entered into cooperation agreements to
undertake or to assist in the undertaking of eligible activities.
h. “Urban County Staff”: HCD staff persons of the County and cities
participating in the Urban County HCD Program.
i. “Application”: the application for a grant to be submitted by the County,
as an Urban County, for entitlement funds under Title I of the Act.
j. “HUD”: the United States Department of Housing and Urban
Development.
k. “HCD”: Housing and Community Development, the Urban County’s
program to address housing and community development needs of lower
income persons in the County of Santa Clara.
l. “CDBG”: Community Development Block Grant, a federal program
administered by HUD which provides funding to eligible entitlement
Cities and Urban Counties to address housing and community
development needs of lower income persons.
m. “Grant”: the CDBG funds allocated by HUD to the County of Santa Clara
as the legal recipient of the Community Development Block Grant for the
Urban County.
n. “HOME”: the HOME Investment Partnership Program, a federal
program administered by HUD to assist in addressing the affordable
housing needs of lower income persons in Santa Clara County through
such means as new housing development and construction;
acquisition and rehabilitation of existing housing units; and provision of
emergency rent subsidies.
o. “HCD Advisory Committee”: an advisory committee established by the
Board of Supervisors of the County to advise the Board of Supervisors on
CDBG and HOME funding activities. Its role is to recommend policies to
the Board of Supervisors on the planning, monitoring, and evaluation of
the CDBG and HOME-funded projects of the HCD Program and the
development of a comprehensive coordinated housing and community
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
3
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
94
development plan, as well as recommend awarding loans and grants to
agencies and non-profit organizations.
p. “Public Participation Plan”: the plan adopted by the Board of Supervisors
of the County which outlines the opportunities and process for citizen
input on matters pertaining to planning, monitoring, and evaluation of the
Urban County HCD projects.
q. “Project Proposals”: requests for an allocation of CDBG or HOME funds
submitted by eligible applicants to implement specific eligible CDBG or
HOME activities, as defined by HUD.
r. “Consolidated Plan”: describes the housing conditions and goals to
address the housing needs of lower income persons, and identifies specific
housing actions to be taken by the Urban County to address its housing
needs. The Consolidated Plan also serves as a guide for HUD in the
distribution of assisted housing resources to communities.
s. “OAH”: Office of Affordable Housing, the office established by the
County of Santa Clara Board of Supervisors to operate the County’s
housing programs and to assist in the development of affordable housing
for low and lower income residents of Santa Clara County.
3. Purpose of Agreement.
This Agreement is formed to meet the requirements and purposes of the Act and
Regulations with respect to the application for an entitlement grant pursuant to Title I
of the Act and to establish the respective rights of the parties to such grant.
The purpose of this Agreement shall be accomplished in the manner hereinafter set
forth.
4. Cooperation Agreement.
a. The parties hereto agree to cooperate in undertaking, or assist in the
undertaking of essential activities as defined in the Act and Regulations
thereunder for the term of this Agreement. More specifically, the parties
hereto agree to cooperate in undertaking, or to assist in the undertaking,
community renewal and lower income housing assistance activities.
b. City and County will take all actions within their power to assure
compliance with the Urban County’s certification required by Section
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
4
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
95
104(b) of Title I of the Housing and Community Development Act of 1974,
as amended, including provisions of Title VI of the Civil Rights Act of
1964; Title VIII of the Civil Rights Act of 1968; Section 109 of Title I of the
Housing and Community Development Act of 1974, and other applicable
laws and requirements of the application and grant.
c. City and County agree, pursuant to 24 CFR 570.501(b) that cities are
subject to the same requirements applicable to subrecipients, including the
requirement of a written agreement as set forth in 24 CFR 570.503. City
understands and agrees that should it fail to comply with such
requirements or with the terms of this Agreement, that funds which may
be allocated to City during the effective dates of this Agreement may be
terminated, or reduced or otherwise limited in accordance with the Act
and Regulations.
d. All units of general local government participating in this Agreement
understand and agree that they may not apply for grants under the Small
Cities or State CDBG Programs from appropriations for fiscal years
during the period in which they are participating in the Urban County’s
CDBG Program.
e. All units of general local government (i.e. Cities and the County)
participating in this Agreement understand and agree that they may not
participate in a HOME program except through the Urban County.
f. The County will submit to the City the Joint Exercise of Powers
Agreement and Cooperation Agreement to be signed by the City if it
chooses to participate in the Urban County Program. If a City decides not
to participate in the Urban County program by not signing a Joint Exercise
of Powers Agreement and Cooperation Agreement, it may not be eligible
to receive Urban County entitlement CDBG funding for three successive
program years commencing on October 1, 2008 and ending September 30,
2011.
g. Upon qualifying, the County will remain an Urban County (including its
unincorporated areas and the included units of general local government)
for a period of three years. That is, during the three year qualification
period no included units of general local government can be removed
from the Urban County, nor can any additional units of general local
government generally be included in the Urban County during that
period. To assure that included units of general local government remain
an effective part of the Urban County for the entire three year qualification
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
5
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
96
period, this cooperation Agreement between the Urban County and its
included units of general local government covers three successive
program years.
h. All units of general local government participating in this Agreement
understand and agree that this Agreement remains in effect until the
CDBG and HOME funds and income received with respect to the three-
year qualification period (and in any successive qualification periods
under agreements that provide for automatic renewals) are expended and
the funded activities completed, and that the County and participating
units of general local government may not terminate or withdraw from
this Agreement while this Agreement remains in effect.
i. All units of general local government participating in this Agreement
have adopted and are enforcing a policy prohibiting the use of excessive
force by law enforcement agencies within their own jurisdiction against
any individuals engaged in non-violent civil rights demonstrations.
j. All units of general local government participating in this Agreement
have adopted and are enforcing a policy of enforcing applicable state and
local laws against physically barring entrance to or exit from a facility or
location which is the subject of such non-violent civil rights
demonstrations within jurisdictions.
5. Administration of Agreement.
a. The officers and agents of both parties will cooperate in furnishing
information and assistance necessary for the preparation, completion and
filing of the County’s application with HUD in accordance with the
requirements of the Act and the Regulations. In accordance with such
cooperation, the City shall annually furnish the County with the City’s
local plan and process for citizen participation in the development of the
City’s project proposals requested to be funded with Urban County CDBG
funds. The City’s local citizen participation commitments will be
incorporated into the official Urban County Public Participation Plan.
b. The City shall, prior to the final project proposal submission deadline
approved by the County, submit project proposal requests for CDBG
funding to the County in the format developed by the County. These
project proposals will include a description of the project’s activities, the
Urban County’s need the project is addressing, a detailed time schedule
for the implementation of the project’s activities, and other data items
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
6
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
97
needed in the evaluation of the project proposal. These project proposals
must be formally approved by the City council for transmittal to the
County and be developed and reviewed during the local citizen
participation process.
c. The City shall submit to the County all necessary information required for
the completion of a Consolidated Plan in the form required by HUD. This
information will detail the City’s commitments to providing housing
assistance to low and very low income persons within the City. The local
commitments to housing assistance by the cities will be incorporated into
the Urban County’s Consolidated Plan, which will be reviewed by HUD
to determine the local commitments to address housing needs of low to
very low income persons.
d. The County shall not alter or amend the information furnished to County
by cities in compliance with the Act and Regulations and consistent with
identified Urban County needs and priorities, the County shall have full
authority and necessary control of the preparation and filing of it’s
Application for Federal Assistance to HUD and of other papers and
documents in support thereof.
6. Term of Agreement.
This Agreement shall become effective upon full execution by the governing bodies of
County and of City and it shall remain in full force and effect through September 30,
2011.
7. Project Proposals.
Any and all project proposals for eligible HCD activities totally within the sphere of
influence of a city must be submitted to the City and considered as a part of the City’s
project proposal development process. No project proposals may be submitted directly
to the County by applicants other than cities for activities to be conducted totally within
the sphere of influence of a city unless applicant has notified the City of their intentions
in writing.
Project proposals of a countywide nature may be submitted directly to the County
during its funding cycle. Cities shall have the right to review and comment on all
project proposals for the funding of countywide HCD eligible activities.
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
7
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
98
8. Grant Disbursement.
a. City understands and agrees that CDBG and HOME funds disbursed
under this Agreement are the obligation of County and that such
obligation of the County is dependent upon the qualification of the
County as an Urban County applicant and upon the availability of federal
funds to implement Title I of the Act. Funds disbursed to the City will be
expended on eligible activities which have been approved by the Board of
Supervisors and described in the adopted Urban County HCD Plan. The
HCD Plan includes a description of prioritized needs, strategies to address
the needs, and a project funding submission and evaluation process. This
process will be used to evaluate all project proposals according to their
ability to address the adopted, prioritized needs and other criteria
described in the adopted Urban County HCD Plan.
Parties hereto agree that Urban County funding will be prohibited for
activities in or in support of any participating City that does not
affirmatively further fair housing within its own jurisdiction or that
impedes the County’s actions to comply with its fair housing certification.
b. Housing has been identified as the highest priority need within the Urban
County by the HCD Advisory Committee and the Board of Supervisors;
therefore, the City and the County agree that all funds allocated on a
competitive basis will be utilized for housing activities as set forth below.
Housing needs include but are not limited to housing rehabilitation,
activities to increase the supply of new affordable housing, and housing-
related services which increase the availability and/or affordability of
new and existing housing.
c. After the deadline for submission of project proposals, the Urban County
staff, composed of members of the County and City HCD staffs, will
evaluate the project proposals according to the approved criteria and
make recommendations on projects to be funded. These
recommendations will be reviewed by the HCD Advisory Committee and
the Board of Supervisors.
d. The Urban County staff report and the HCD Advisory Committee
recommendations will be reviewed at a public hearing before the Board of
Supervisors. Should there be a difference of opinion between the HCD
Advisory Committee and the Board of Supervisors on projects to be
funded, the HCD Advisory Committee and the Board of Supervisors will
hold meetings to resolve the differences. The meetings will continue until
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
8
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
99
mutual agreement is reached. Voting separately, when a majority of the
HCD Advisory Committee and a majority of the Board of Supervisors
vote to accept specific project proposals, mutual agreement is achieved. It
is understood and agreed that as legal recipient of the grant, the County,
through its Board of Supervisors, must officially approve the mutually
agreed upon project proposals to be included in the application in order to
ensure that the program submitted to HUD is consistent with the
County’s adopted housing and community development plan.
e. Upon approval of the CDBG and HOME application and the release of
funds by HUD, the City may begin implementation of approved activities.
Information on the progress of approved activities will be submitted to the
County on a quarterly basis during the program year the activities are
being carried out. This information will be included in the Urban
County’s monitoring reports which are reviewed by HUD during the
program year. Projects which fail to meet schedules according to the
approved time schedule will be evaluated according to the process
detailed in the approved Urban County CDBG and HOME
Reprogramming Guidelines.
9. Areas of Housing Authority Operation.
Nothing herein shall affect the rights and obligations of the parties with respect to any
agreement which the City may have with the Housing Authority of the County of Santa
Clara (HACSC).
10. Services, Equipment and Property; Reimbursement.
County shall provide or be primarily responsible for providing the services, equipment
and other property necessary for the planning, preparation and filing of the CDBG
application and for the administration of the grant funds subject to the right of the
County to seek reimbursement for actual expenses and costs of furnishing such
services, equipment and property. Subject to the provisions of the application or of the
grant award made thereon, all property furnished by County as herein-above described
shall belong to County during the term of this Agreement and after its termination.
At the termination of the CDBG program, all property and equipment acquired with
CDBG funds will be subject to the requirements and conditions of OMB Circular A-102
Attachment N, Property Management Standards.
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
9
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
100
11. Program Income.
a. The City shall report to the County any gross income directly generated
from the use of CDBG funds.
b. Any such program income generated by the City must be reported to the
County and may be either paid to the County or the City may retain the
program income subject to requirements set forth in Santa Clara County
Community Development Block Grant Program Reallocation Guidelines
and in accordance with all CDBG requirements.
c. Any program income the City is authorized to retain may only be used for
eligible activities in accordance with all CDBG requirements as may
apply.
d. The County has the responsibility for monitoring and reporting to HUD
on the use of any such program income, thereby requiring appropriate
record keeping and reporting by the City as may be needed for this
purpose.
e. In the event of close-out or change in status of the City, any program
income that is on hand or received subsequent to close-out or change in
status shall be paid to the County, with the exception of program income
generated by an approved rehabilitation program and held in a revolving
loan fund. Such revolving loan fund amounts shall be maintained and
used for housing rehabilitation activities that meet all existing and
subsequent HUD regulations and requirements. All rehabilitation
activities must benefit low and moderate income households.
The purpose of this provision is to enable the City to continue a housing
rehabilitation program in the event of close-out or a change in status of the
City. Such program income shall not be used for any purpose other than
housing rehabilitation for the benefit of low and very low income
households. On an annual basis the City shall submit to the County
written certification that such program income shall be used for these
established housing rehabilitation purposes.
12. Revolving Loan Fund.
a. The City is allowed to retain a separate fund in conjunction with a single
family home rehabilitation program for eligible activities in accordance
with all CDBG requirements as may apply. The Revolving Loan Fund
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
10
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
101
cash balance must be held in an interest bearing account and the interest
must be remitted to the County annually. The County, in turn, remits the
interest to HUD.
b. Eligible activities may be funded only through loans, which, in turn,
generate payments to the fund for use in carrying out the same activities.
13. Records.
City and County shall maintain appropriate books, records, files, and accounts relating
to the receipt and disbursement of the grant funds, including records in accordance
with 24 CFR Sec 570.503 as they relate to the application, acceptance, and use of federal
funds for this federally assisted program and any other records imposed by County’s
contract with HUD. All such books, records, files and accounts shall be made available
for inspection at reasonable times and places by authorized representatives of City,
County, and Department of Housing and Urban Development or any other person
authorized by the Act or the Regulations.
14. County Disbursement of Funds.
The Director of Finance of the County shall receive and have custody of all funds until
disbursal of such funds to be made in a manner designated by the County. County
shall, by a date no later than 7 days after receipt of the current year funding money,
notify City of the manner of disbursal of such funds.
15. Contractual Obligations.
It is expressly understood and agreed that, as the applicant to HUD, County must take
the full responsibility and assume all obligations of an applicant under the Act and that
HUD will look only to the County in this regard. However, County assumes no
responsibility nor liability towards City for any failure to include City in the application
as a result of City’s failure to supply County with information necessary to prepare and
file the application, or as a result of City’s failure to supply County with such
information, upon designated dates, or as a result of City’s failure to comply with the
Act and the Regulations.
16. Indemnification.
In lieu of and notwithstanding the pro rata risk allocation which might otherwise be
imposed between the Parties pursuant to Government code Section 895.6, the Parties
agree that all losses or liabilities incurred by a party shall not be shared pro rata but
instead the County and City agree that pursuant to Government Code Section 895.4,
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
11
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
102
each of the parties hereto shall fully indemnify and hold each of the other parties, their
officers, board members, employees and agents, harmless from any claim, expense or
cost, damage or liability imposed for injury (as defined by Government code Section
810.8) occurring by reason of the negligent acts or omissions or willful misconduct of
the indemnifying party, its officers, employees or agents, under or in connection with or
arising out of any performance of obligations required by this Agreement, the Act,
Application, Regulations or other applicable laws relating to this Agreement delegated
to such party under this Agreement. No party, nor any officer, board member,
employee or agent thereof shall be responsible for any damage or liability occurring by
reason of the negligent acts or omissions or willful misconduct of the other parties
hereto, their officer, board members, employees or agents, under or in connection with
or arising out of any performance of obligations required by this Agreement, the Act,
Application, Regulations or other applicable laws relating to this Agreement delegated
to such other parties under this Agreement.
17. Discretionary Actions.
Nothing herein contained shall be construed to prohibit the City from exercising its
discretion on any legislative quasi-judicial and/or administrative matter (including but
not limited to any action involving zoning of General Plan amendments).
Nothing herein shall compel the City to take any action on any matter save and except
as expressly required in this Agreement. It is understood and agreed that the City does
not by this Agreement commit itself or delegate the exercise of any of its police powers
in any matter whatsoever save and except as expressly set forth in this Agreement.
18. Timeliness.
When any action is required hereunder upon request for action on a document or
material furnished by the County to the City said request for action on a document or
material shall be furnished at least 30 days prior to the date said action is required in
order to allow sufficient time for the City to review and act on said document or
material.
Time is of the essence in this Agreement.
19. Severability.
Should any part, term, provision of this Agreement be judicially determined to be
illegal or in conflict with any law of the State of California or any law of the United
States, or should any part, term, or provision of this Agreement be otherwise rendered
unenforceable or ineffectual, the validity of the remaining portions or provisions shall
not be affected thereby.
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
12
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
103
20. Section Headings.
All section headings contained herein are for the convenience of reference only and are
not intended to define or limit the scope of any provision of this Agreement.
21. Notices.
Any notice, tender, or delivery to be given hereunder by either party to the other may
be effected by personal delivery in writing or by certified mail, return receipt requested.
Mailed notices shall be addressed as set forth below. Each party may change its address
by written notice in accordance with this Section.
IN WITNESS WHEREOF, parties hereto have executed this Agreement on the
dates set forth below.
CITY/TOWN OF SARATOGA COUNTY OF SANTA CLARA
By: ____________________________ By: ________________________
____________________________ ___________________________
Ann Waltonsmith, Mayor Pete McHugh, Chair
City Council Board of Supervisors
Attest: Attest:
By: ___________________________ By: ___________________________
City Clerk Clerk, Board of Supervisors
Approved as to form and legality: Approved as to form and legality:
By: ___________________________ By: ___________________________
City Attorney Deputy County Counsel
Date: __________________________
jnb/jpa 2009 – 2011
Final - 5/21/08
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
13
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
104
County of Santa Clara – Office of Affordable Housing Joint Powers Agreement
Housing and Community Development Program October 1, 2005 – September 30, 2008
5/21/08
14
105
sSARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
ORIGINATING DEPT: City Manager’s Office CITY MANAGER:
PREPARED BY: DEPT HEAD:
Ann Sullivan, Acting City Clerk Dave Anderson, City Manager
SUBJECT: Resolution Ordering the Abatement of a Public Nuisance by Removal of
Hazardous Vegetation (Brush)
RECOMMENDED ACTION:
Open public hearing; listen to public testimony; and close public hearing. Adopt resolution
overruling objections and ordering hazardous vegetation abatement (brush).
REPORT SUMMARY:
The focus of this program is the identification of perennial vegetation, brush, trees, and shrubs in
designated high fire hazard areas and removal according to fire department requirements to
lower the threat of wildfire in the hillside areas.
The required posting and publishing for this hearing has been done. Property owners have been
noticed by mail by the Santa Clara County Fire Department to remove brush in accordance with
fire safety standards. Those properties not in compliance are listed in Attachment B. Council is
considering authorizing the Office of the Agricultural Commissioner to enter such properties,
abate the nuisance and place the cost of abatement on a lien against their property. This hearing
is an opportunity for those objecting to the potential charges to come forward and be heard.
The City annually declares hazardous vegetation (brush) a nuisance due to fire danger and enters
into a contract (along with other municipalities) with the Office of the Agricultural
Commissioner to abate the hazardous vegetation (brush) not removed by property owners.
FISCAL IMPACTS:
None to the City. Office of the Agricultural Commissioner covers its costs from administrative
portion of fee charged to property owner.
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
Abatement process by the Office of the Agricultural Commissioner will not proceed. It would
be necessary to depend upon the property owners to take care of their own abatement.
ALTERNATIVE ACTION:
None.
FOLLOW UP ACTION:
Upon adoption, the Office of the Agricultural Commissioner will begin abatement.
106
ADVERTISING, NOTICING AND PUBLIC CONTACT:
A Notice of Public Hearing was published in the Mercury News as required by law.
ATTACHMENTS:
Attachment A – Resolution
Attachment B – Letter from Santa Clara County Fire Department to property owners
Attachment C– Legal Notification to Public
Attachment D – 2008 Brush Program Commencement Report
107
RESOLUTION
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF SARATOGA
OVERRULING OBJECTIONS AND ORDERING
ABATEMENT OF HAZARDOUS VEGETATION (BRUSH) AS A PUBLIC NUISANCE
WHEREAS, hazardous vegetation (brush) is declared a nuisance and will be abated by the
Office of the Agricultural Commissioner and the cost thereof made a lien upon the private properties from
which they are removed if the owners thereof fail to do so; and
WHEREAS, the County Fire Marshall has given Notice to all property owners found in non-
compliance; and
WHEREAS, pursuant to said resolution and notice, the Saratoga City Council conducted a public
hearing this date with respect thereto, at which time all property owners having any objections to the
proposed destruction or removal of such attest:
RESOLVED, by the City Council of the City of Saratoga hazardous vegetation (brush) is
declared a nuisance and will be abated by the Office of the Agricultural Commissioner and the cost
thereof made a lien upon the private properties from which they are removed if the owners thereof fail to
do so, and a hearing was held on June 4, 2008, during which all property owners having any objections to
the proposed destruction or removal of such hazardous vegetation (brush) were heard and given due
consideration; and
NOW, THEREFORE, IT IS ORDERED by the City Council of the City of Saratoga, that
hazardous vegetation (brush) is authorized to be abated by the Office of the Agricultural Commissioner
and the cost thereof made a lien upon the private properties from which they are removed if the owners
thereof fail to do so.
The above and foregoing resolution was passed and adopted by the Saratoga City Council at a regular
meeting held on the 4th day of June 2008, by the following vote:
AYES:
NAYES:
ABSENT:
ABSTAIN:
Ann Waltonsmith, Mayor
ATTEST:
Ann Sullivan,
Acting City Clerk
108
109
110
111
112
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: Finance & Admin Services CITY MANAGER: Dave Anderson
PREPARED BY: Mary Furey DIRECTOR: Mary Furey
SUBJECT: Adoption of Fiscal Year 2008/09 Operating & Capital Budget
RECOMMENDED ACTION
Adopt resolution approving the Proposed FY 2008/09 Operating and Capital Budgets, directing staff to
incorporate within the final adopted budget any changes related to minor corrections, carryforward
appropriations, refined estimates, grant approvals, claim reimbursements, pass-through appropriations, or
additional direction from Council upon adoption of the budget.
BACKGROUND
The City’s Proposed Operating and Capital Budgets reflect both revenue and expenditure appropriations
within the General Fund, Special Revenue Funds, Internal Service Funds, several Trust and Debt Service
Funds, and the Capital Improvement Funds to provide for the City’s service operations, administration,
obligations, and infrastructure improvement projects.
The City’s Operating Budget document is structured into a departmental format which defines
departmental oversight, key program services, and significant projects or initiatives for the fiscal year.
Summary level revenue and expenditure budget appropriations and assigned personnel schedules for
proposed, current and prior years are included within each departmental program to identify the resources
used to provide these services and operations, and for historical reference.
The City’s Capital Budget document is structured into four program areas, (Streets, Parks & Trails,
Facilities, and Administrative Projects) which are then categorized by the type of infrastructure
improvement, and then further by facility or site in the Parks & Trails and Facilities Programs. Capital
Improvement Projects represent a multi-year plan for major capital expenditures and related funding
sources, to improve and maintain the various types of City’s infrastructure.
The Financial Summaries section of the budget document, compiles the individual financial and staffing
information into summary schedules to provide users with an overview of funding sources and uses from
different perspectives, including departmental, fund type, and category.
REPORT DISCUSSION
A public hearing was held on May 21, 2008 to review the City of Saratoga’s Proposed FY 2008/09
Operating and Capital Budget and obtain community input. The FY 2008/09 Proposed Operating Budget
sustains service levels, operations, and obligations as are currently in place, with few changes other than
escalating operating cost and contract and consultant service increases the City grapples with each year.
Notable additions to the FY 2008/09 operating budget includes $40,000 budgeted for the City’s biennial
113
election costs and another $40,000 budgeted for an update of the 1995 Village Economic Development
study. Notable operating budget reductions include the elimination of an Engineer position, the under-
filling of the IT Technician position with an IT Intern for the fiscal year, and downgrading one Recreation
Supervisor to a Recreation Coordinator position. Staff continues to seek out opportunities to increase
operational efficiencies and reduce service costs on an ongoing basis, in order to provide the best use of
City resources.
Budget Hearing Follow-Up
With the review and consideration of the proposed budget on May 21st, Council requested follow-up
information be provided for the following:
1. Identify the City’s revenue share from Property Taxes paid by Saratoga residents
The City receives approximately 5.45% of the 1% Ad Valorem Property Tax rate paid by Saratoga
residents to the County. (About 5 ½ cents of every dollar paid for Property Tax.) The amount of
Property Tax receipts is lower than the 7% minimum services City tax rate due to the State’s ERAF
and AB8 allocation funding shifts.
The City’s 5.45% in the schedule below represents the largest tax rate area in the City based on the
1% Ad Valorem Property Tax (excludes bonds and special assessment taxes). The City of Saratoga
has 56 separate tax rate areas that have slightly different tax rates, resulting from the allocations for
different local agency jurisdictions.
Property Tax Allocation Schedule
Per Santa Clara County FY 2007/08 Property Tax Rate Book Estimates
Agency Allocation % Allocatio $
Schools 54.24% 50,603,800
Santa Clara County 13.00% 12,132,400
ERAF 10.75% 10,030,400
Saratoga Fire District 10.23% 9,544,800
City of Saratoga 5.45% 5,089,500
Other Special Districts 4.71% 4,397,300
Santa Clara Valley Water District 1.61% 1,501,500
Totals 100.00% 93,299,600
n
FY 2007/08 Saratoga Property Tax Allocations
*per SCC estimated assessments
$1,501,500
$4,397,300
$9,544,800
$10,030,400
$12,132,400
$5,089,500
$50,603,800
0 10,000,00
0
20,000,0
00
30,000,0
00
40,000,0
00
50,000,0
00
60,000,0
00
SCVWD
Other Special Districts
City of Saratoga
Saratoga Fire District
ERAF
Santa Clara County
Schools
114
2. Identify reason for the Training & Meetings category increase (from FY 2007/08 budget of $186,500
to FY 2008/09 budget of $246,500)
The increase reflected a categorization error in this schedule – approximately $70,000 of budgeted
expenditures were incorrectly linked to the Training & Meetings category. The schedule was
corrected to reflect budgeted expenditures into their appropriate categories (i.e. fees & charges).
3. Identify Recreation Department’s Cost Recovery breakdown
Under past Council direction, the Recreation Department has worked under a modified 100% cost
recovery mandate. The cost recovery mandate as presented under the prior financial structure
allowed for the offset of recreation service’s expenditures against the department’s General Fund
revenues, exempting the Teens Program and Facilities Program expenditures. Under this modified
cost recovery, the department reflects better than 100% cost recovery – there is a net operating profit,
as illustrated below.
Departmental Revenues
Recreation Services 837,000
Teen Services 20,000
Facility Services 175,000
Total Departmental Revenues 1,032,000
Departmental Expenditures (net of exempt expenditures)
Recreation Services (net of indirect expenses)1,004,731
Teen Services exempt
Facility Services exempt
Total Departmental Expenditures 1,004,731
Net Cost Recovery 27,269
Recreation Cost Recovery Breakdown
FY 2008/09
4. Incorporated the following presentation changes for current and future proposed and adopted budget
document presentations:
a. Include explanatory note in the Prior Year Accounting Structure Comparison graph
b. Include use of carryforward and designated funds in the General Fund revenue schedules
c. Include use of pie charts in General Fund graphs
d. Correct prior year Community Events funding schedule amounts and allocation as annual
grant amounts
5. Under Community Grants:
a. Carryforward the remaining Council Discretionary Funds ($22,068) to an unspecified grant
recipient appropriation until allocation decision made by Council in FY 2008/09
To be reflected in the carryforward funding and expenditure appropriations schedule in adopted
budget
b. For future years budget process, Council to appropriate the (City funded) Community Grant
amount to match the CDBG Public Service Grant amount, and subsequently allocate
Community Grant funds as a follow-up to the CDBG hearing process.
To be incorporated into next year’s CDBG and budget process
115
6. Council established the following budget policies (the first two policies to be incorporated effective
with the FY 20008/09 budget, and the third was set as a standard year-end fund balance
distribution policy for future years budget)s:
a. Establish CIP Streets / Pavement Management program funding goal of $1,000,000
b. Revert $300,000 appropriation from TEA proceeds transferred to CIP Streets/Pavement
Management program back to General Fund
c. Establish Year End Fund Balance reserves to be distributed as follows:
Fund the Undesignated Fund Balance at $500,000
Divide remaining Year End undesignated funds between Designated for Capital Projects
and Designated for Operational Efficiencies
FY 2008/09 Budget Appropriations
The Operating & Capital Budget’s Financial Summaries include schedules which illustrate summary level
revenue and expenditures information. This first schedule on the following page illustrates the City’s
total activity by fund within the fund groups, beginning with July 1, 2008 estimated fund balance, adding
and subtracting all budgeted activity, and ending with the June 30, 2009 estimated fund balance.
This Total Fund Summary schedule categorizes the City’s different funds by function. Operating Funds
support the City’s general operations, restricted revenue programs and services, and internal support
services. Debt Service Funds account for the funding and payment of the City’s bond debt, and Trust &
Agency Funds account for funds held in a trustee capacity; not to be used for City purposes. Capital
Funds are used to account for major acquisition and construction expenditures, in order to separate one-
time activity from ongoing operating activities.
As shown, the budgeted Total Revenues and Transfers-In exceed Total Expenditures and Transfers-Out in
FY 2008/09. However, this may not occur each year as funds other than the General Fund may be
budgeted at a net operating loss. This would occur, for example, in a replacement Internal Service Fund,
where funding receipts may be less than amounts budgeted for replacement during a fiscal year.
Of particular note on this schedule, is that the Capital Projects Funds reflect preliminary information at
this time. If Council provides further direction with adoption of the budget, additional projects or funding
allocations will be incorporated into the CIP final budget. And, as funding allows, projects may be added
during the fiscal year through budget adjustments.
Also of note in this category, is that CIP funds are considered multi-year operations, whereas the other
fund types are annual operating budgets. In a Capital Budget, year-end project balances are automatically
carried forward as appropriations into the following fiscal year. Therefore, the expenditure and/or
completion of projects and the funding allocated to the projects are unknown and variable at budget time.
As shown in this schedule, and for presentation simplicity, only the proposed year’s revenues are shown
as expended during the fiscal year. Actual expenditures are expected to vary from budget.
116
Total Fund Summary
Source and Use of Funds
Revenues Expenditures Use of Estimated
Fund Balance && Carryforward / Fund Balance
Fund Category 7/1/2008 Transfers In Transfers Out Fund Balance 6/30/2009
Operating Funds
General Fund
Primary General Fund 6,585,262$ 17,099,596$ 17,086,338$ 125,000$ 6,723,520$
Development Reserve Fund 621,711 - - (50,000) 571,711
Environmental Reserve Fund 679,917 - - (75,000) 604,917
Special Revenue Funds
Landscape & Lighting Districts 65,603 447,150 442,896 - 69,857
CDBG Program Fund - 140,203 140,203 - -
Housing & Rehabilitation Pgm 89,588 13,000 13,000 - 89,588
Internal Service Funds
Equipment Replacement Funds 75,358 200,000 136,500 - 138,858
IT Equipment Replacement 1 235,973 51,303 55,400 - 231,876
Building Maintenance 49,623 807,081 807,081 - 49,623
Equipment Maintenance 14,229 264,000 247,905 - 30,324
IT Services 29,262 403,946 403,946 - 29,262
Office Stores Fund 10,000 67,000 60,000 - 17,000
Risk Management/Liability Ins 54,703 342,468 336,268 - 60,903
Workers Compensation 38,013 270,920 260,920 - 48,013
Total Operating Funds 8,549,243$ 20,106,667$ 19,990,457$ -$ 8,665,453$
Debt Service
2001 Series GO Bonds 741,357 1,015,000 1,017,956 - 738,401
Total Debt Service 741,357$ 1,015,000$ 1,017,956$ -$ 738,401$
Trust & Agency Funds
Library Capital Improvement 2 642,554 19,500 50,000 - 612,054
KSAR 37,362 42,500 42,500 - 37,362
Total Trust & Agency Funds 679,916$ 62,000$ 92,500$ -$ 649,416$
Capital Funds 3
Street Projects 7,062,136 1,949,993 1,949,993 - 7,062,136
Park & Trail Projects 4,051,637 - - - 4,051,637
Facility Projects 339,429 166,607 166,607 - 339,429
Administrative Projects 168,634 110,000 110,000 - 168,634
Total Capital Funds 11,621,836$ 2,226,600$ 2,226,600$ -$ 11,621,836$
TOTAL ALL FUNDS 21,592,352$ 23,410,267$ 23,327,513$ -$ 21,675,105$
117
General Fund
The General Fund is the main operating fund used to account for the majority of the City’s operations.
The following two charts provide a graphical overview of the FY 2008/09 budgetary appropriations for
General Fund revenues and expenditures by category. The schedules below each graph provide summary
level financial data for the proposed budget year (gray column), as well as the current and two prior fiscal
years for historical reference.
General Fund Revenues & Transfers In
By Category
FY 2008/09
Property Tax in
Lieu of VLF
14.0%
Property Tax
33.7%
Sales Tax
5.8%
Franchise Fee Tax
9.4%
Fund Transfers In
0.9%
Other Sources
1.5%
Interest & Rental
Income
5.3%
Charge for
Services
12%
Intergovtl
3%
Fees,
Licenses
& Permits
11%
Business/
Other Taxes
2.9%
Transient
Occupancy Tax
1.0%
FY 2005/06 FY 2006/07 FY 2007/08 FY 2007/08 FY 2008/09 2008/09
Revenue Category Actuals Actuals Adjusted Estimated Proposed %
Property Tax 4,017,306$ 5,422,446$ 5,303,000$ 5,583,951$ 5,770,000$ 33.7%
Property Tax in Lieu of VLF 2,124,059 2,154,998 2,200,000 2,410,475 2,400,000 14.0%
Sales Tax 988,132 994,680 985,900 985,900 986,000 5.8%
Franchise Fee Tax 1,040,424 1,187,806 1,599,335 1,601,704 1,604,000 9.4%
Transient Occupancy Tax 163,222 195,261 165,000 170,000 170,000 1.0%
Business/Other Taxes 635,158 510,063 570,000 495,000 500,000 2.9%
Fees, Licenses & Permits 1,647,702 1,512,578 1,418,140 1,622,975 1,832,975 10.7%
Intergovernmental 1,005,157 546,893 428,144 464,697 480,700 2.8%
Charge for Services 2,770,535 2,330,748 2,200,500 1,685,896 2,036,500 11.9%
Interest & Rental Income 707,530 825,566 1,041,516 991,589 908,489 5.3%
Other Sources 367,948 531,667 244,600 280,150 257,200 1.5%
Total Revenues 15,467,173$ 16,212,706$ 16,156,135$ 16,292,337$ 16,945,864$ 99.1%
Fund Transfers In 698,882 671,046 150,011 165,011 153,732 0.9%
Total Revenues & Transfers 16,166,055$ 16,883,752$ 16,306,146$ 16,457,348$ 17,099,596$ 100.0%
Funding from Use of Deposits/Carryforwards/Designated Funds
Theater Surcharge Deposit - - - - 43,500
Funding Carryforward - - 80,000 80,000 48,500
Designated for Development - - 99,447 99,447 75,000
Designated for Environmental - - 40,000 40,000 50,000
Designated for CIP - 110,000
Total Operating Sources 16,166,055 16,883,752 16,525,593 16,676,795 17,426,596
118
General Fund Expenditures & Transfers Out
By Category
FY 2008/09
Materials &
Supplies
1.7%
Fees & Charges
4.6%
Consultant &
Contract Services
37.2%
Fund Transfers
Out:
1.5%Internal Services
Charges
12.8%
Community
Grants & Events
1.2%
Meetings, Events
& Training
0.9%
Salary & Benefits
40.1%
FY 2005/06 FY 2006/07 FY 2007/08 FY 2007/08 FY 2008/09 FY 2008/09
Expenditure Category Actuals Actuals Adjusted Estimated Proposed %
Salary & Benefits 4,789,125$ 5,498,589$ 6,452,445$ 6,242,201$ 6,855,135$ 40.1%
Materials & Supplies 262,208 367,590 321,075 319,517 284,525 1.7%
Fees & Charges 788,502 755,036 723,335 679,827 790,054 4.6%
Consultant & Contract Services 5,562,330 6,010,291 6,130,317 5,710,221 6,350,268 37.2%
Meetings, Events & Training 123,364 152,940 175,950 125,676 160,050 0.9%
Community Grants & Events 123,867 177,045 195,686 198,186 203,464 1.2%
Infrastructure/Bldg Projects 296,341 1,439,066 - - - 0.0%
Fixed Assets 1,366 204,913 32,000 17,450 - 0.0%
Internal Services Charges 85,600 55,600 2,053,479 2,053,479 2,189,342 12.8%
Total Expenditures 12,032,703$ 14,661,070$ 16,084,287$ 15,346,557$ 16,832,838$ 98.5%
Fund Transfers Out:1,674,695 3,016,991 837,257 790,257 253,500 1.5%
Total Expenditures & Transfers 13,707,398$ 17,678,061$ 16,921,544$ 16,136,814$ 17,086,338$ 100.0%
The proposed FY 2008/09 General Fund budget appropriations reflect net revenues over expenditures of
approximately $340,000. Funding sources incorporates the use of deposits, carryforward funding, and
designated fund balance for specific expenditure uses and transfers-out into, as well as the reduction in
CIP Transfers-Out per Council’s direction to suspend the $300,000 transfer to the CIP Streets/Pavement
Management projects in light of allocating designated funding for this purpose.
Overall, General Fund revenues increased 4.89%, while General Fund expenditures increased 4.65% from
the prior year’s budget. This net overall increase showcases staff’s diligence in refining operations and
holding the line on costs. The primary cost drivers for budgetary increases each year continues to be the
labor costs - both in employee costs, and in consultant and contract services costs. The Sheriff’s contract
reflects this each year, with considerable cost increases incorporated into the budget – for this next year,
we’ll see an increase of about $243,000; 6.5% more for the same level of services in the FY 2007/08
budget. Fees and charges in FY 2008/09 also escalated significantly, particularly environmental program
fees and county administration fees the City is obligated to pay. Budgetary impacts are also being felt
119
with rising energy prices, resulting in higher costs for vehicle fuel, city infrastructure and facility power,
and particularly from those cost of services which are also being impacted, such as street sweeping
contract services.
Changes as a result of direction from Council and/or identified by staff as a clean-up item will be included
in the final budget, per Council’s adoption of the FY 2008/09 Operating & Capital Budget resolution at
the June 4, 2008 Council Meeting.
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION
The City would not adopt an Operating & Capital Budget for FY 2008/09.
ALTERNATIVE ACTION
N/A
FOLLOW UP ACTIONS
1. Prepare FY 2008/09 Adopted Operating & Capital Summary and Detail Budget documents as
directed by Council.
2. Re-open City budget after State adopts their budget:
a. If State budget includes takeaways or significant fee impacts to the City’s budget, staff will
propose alternatives for re-balancing the budget.
b. If State budget does not take City funds, then Council will consider adding one Community
Service Officer (CSO) position and provide for 1/3 cost sharing for an School Resource Officer
(SRO) position from un-appropriated operating budget funds.
ADVERTISING, NOTICING AND PUBLIC CONTACT
N/A
ATTACHMENTS
A: Resolution to Adopt the Fiscal Year 2008/09 Operating & Capital Budget
120
Attachment A
A RESOLUTION OF
THE CITY COUNCIL OF THE CITY OF SARATOGA
ADOPTING THE FISCAL YEAR 2008/09 OPERATING & CAPITAL BUDGET
WHEREAS, the City Council held a public hearing on the Proposed Operating & Capital Budget
for Fiscal Year 2008/09 on May 21, 2008;
WHEREAS, Section 2-20.050(i) of the Code of the City of Saratoga requires the City Manager
to prepare and submit the proposed annual budget to the City Council for its approval;
WHEREAS, the City Manager did submit a proposed budget for FY 2008/09 to the City
Council; and
WHEREAS, the City Council has considered and reviewed the proposed budget during a public
hearing; and
WHEREAS, the Planning Commission is to conduct an annual review of the proposed Capital
Improvement Plan for consistency with the City’s general plan; and
WHEREAS, the City Council gave staff direction to adopt the Fiscal Year 2008/09 operating and
capital budgets as proposed;
NOW THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga hereby
adopts the Fiscal Year 2008/09 Operating & Capital Budget as shown in the Total Fund Summary –
Source and Use of Funds schedule in the budget adoption report;
AND BE IT FURTHER RESOLVED, that the final adopted budget includes carry-forward
appropriations for prior year capital projects, identified funding for specified expenditures, grants, and
pass-through balances; that capital projects are in compliance with the General Plan; that there be carried
forward from the prior year within each fund an amount sufficient to cover approved outstanding
encumbrances as of June 30, 2008;
AND BE IT FURTHER RESOLVED, that the City Council hereby directs staff that any
changes or impacts resulting from: Council approval of the meet and confer process or management
compensation plan; from classification adjustments or miscellaneous corrections; from changes due to
more refined estimates, grant approvals, or claim reimbursements; from development fee based pass-
through budget appropriations; or from further City Council consensus direction received on June 4, 2008
be incorporated within the final Fiscal Year 2008/09 Operating & Capital Budgets;
121
AND BE IT FURTHER RESOLVED, that the Finance and Administrative Services Director is
directed to record these changes into the City’s Accounting records in accordance with appropriate
accounting practices.
The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City
Council held on the 4th day of June, 2008, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Ann Waltonsmith, Mayor
City of Saratoga
ATTEST:
Ann Sullivan,
Acting City Clerk of the City of Saratoga
122
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: Public Works CITY MANAGER: Dave Anderson
PREPARED BY: Iveta Harvancik DIRECTOR: John Cherbone
Senior Engineer Public Works Director
SUBJECT: Prospect Road Median Improvement Project – Master Plan Approval
RECOMMENDED ACTION:
Approve Master Plan for Prospect Road Median Improvement Project.
REPORT SUMMARY:
Background:
The 1.9 mile section of Prospect Road, between Saratoga Avenue and Saratoga-Sunnyvale Road, is a four
lane major arterial with the centerline of the road forming the boundary between Saratoga and San Jose.
Currently the majority of Prospect Road is devoid of landscaped medians with the exception of existing
medians located between Saratoga Creek and Johnson Avenue and some “hardscape” type medians near
Highway 85. The existing landscaped medians were installed approximately 20 years ago and are located
within the section of Prospect Road that is entirely with the city limits of Saratoga.
In 2001 the City adopted a five year Capital Improvement Plan (CIP), which included a median improvement
project on Prospect Road between Saratoga Avenue and Saratoga-Sunnyvale Road. The project was supported
by area residents in both Saratoga and San Jose as illustrated in the petition form signed by approximately 270
residents. Additionally, a similar petition signed by San Jose residents was submitted to the City of San Jose.
Because the City shares operation of Prospect Road with the City of San Jose, Council directed that the cost of
the project be shared evenly between the two jurisdictions. Subsequently the City Council appropriated funds
in the amount of $25,000 for creation of a median Master Plan with the caveat that San Jose would share in
the cost. Unfortunately, the City could not convince San Jose to participate in the project and in 2005 the
design funds were allocated to other City projects.
At the November 15, 2006, City Council Meeting, Council formed an Ad-Hoc comprised of Council
Members King and Waltonsmith to reopen discussions with San Jose in particular Pete Constant, the
newly elected San Jose Council Member representing this area, to discuss the merits of the project and
explore cost sharing. Additionally, Council appropriated $50,000 towards developing a Median Master
Plan for the corridor during the 2006 CIP update.
123
Numerous meetings and discussions have taken place with the City of San Jose and Pete Constant to
develop a cost sharing agreement. Unfortunately, because of tough budget times in San Jose an agreement
to cost share could not be developed. However, San Jose has agreed to support the project in principle by
signing a letter of understanding and providing in-house staff support connected to the Master Plan
design.
Discussion:
At the August 1, 2007 City Council Meeting, Council approved a Professional Services Agreement with
Callander Associates, Landscape Architecture, Inc. to prepare a Median Master Plan for Prospect Road
including a cost estimate for project construction.
The City held two community meetings with Mayor Waltonsmith and Council Member Hunter
representing Saratoga and Mary Anne Groen attending on behalf of the City of San Jose. About 25
residents of both cities attended each meeting and provided valuable input. A draft Master Plan was
developed and revised based on public input and review by staff from both cities.
The Master Plan, if approved by City Council, will be a benefit for future grant applications for the
project.
Therefore, staff recommends that the Council approve the Prospect Road Median Master Plan.
FISCAL IMPACTS:
No funding sources have been identified for the project construction at this time but the City staff will
take advantage of applicable grant opportunities as they become available.
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
Prospect Road Median Master Plan will not be approved and likelihood of receiving grant funds will
decrease.
ALTERNATIVE ACTION:
None in addition to the above.
FOLLOW UP ACTION:
City staff will be searching for applicable grant opportunities.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
All residents providing their contact information during the Master Plan development were notified about
this meeting.
ATTACHMENTS:
124
1. Master Plan (hard copy to be delivered prior to Council Meeting)
125
1
SARATOGA CITY COUNCIL
MEETING DATE: June 4, 2008 AGENDA ITEM:
DEPARTMENT: Community Development CITY MANAGER: Dave Anderson
PREPARED BY: Michael Fossati DIRECTOR: John F. Livingstone, AICP
SUBJECT: Independent Contractor Agreement with LSA Associates for Environmental
Consultant Services and Metropolitan Planning Group, Inc. for Land-Use
Planning Consultant Services
RECOMMENDED ACTION:
1. Authorize the City Manager to execute an agreement with LSA Associates (LSA) to prepare
environmental documents for land development applications within the City of Saratoga
(City). The agreement would include a three year contract with an option of two additional
years of service if approved by the City Council.
2. Authorize the City Manager to execute an agreement with Metropolitan Planning Group (M-
Group) for land-use planning consultant services within the City. The agreement would
include a three year contract with an option of two additional years of service if approved by
the City Council.
REPORT SUMMARY:
In past years, the City has utilized environmental and land-use planning consultants for a variety
of development projects, on a contractual basis. Environmental services include preparation of
environmental assessments and documents required by California Environmental Quality Act
(CEQA), including Initial Studies, Negative Declarations, Mitigated Negative Declarations, and
Environmental Impact Reports. Land-use planning services include processing and reviewing
development permits, such as Administrative Design Review and Planning Commission Design
Review projects. Contracts with consultants are currently drafted with one year expiration dates.
The following report discusses the option to prequalify and establish contractual agreements with
professional environmental and planning consultants. These agreements would include a three
year contract with an option of two additional years of service. The proposed method of having
consultants prequalified will save the City time and possibly money. Furthermore, Staff believes
offering contracts for longer durations will lure more competitive bids for consultant services.
There is also a benefit to having a firm working on several projects with the City over time,
gaining experience with the community.
126
2
CURRENT PROCESS:
In order to process applications that require an environmental review, City Staff must execute a
Request for Proposal (RFP) for environmental consultant services. Environmental consultant
service contracts are awarded on a “case-by-case” basis. The RFP process includes a minimum
two weeks to prepare the RFP, one month to advertise the RFP, two weeks to review submitted
proposals, and one month for City Council to approve the execution of a contract. This RFP
process can add a minimum of two to three months to a project timeline.
Similar to the environmental consultant RFP, planning consultant contracts are awarded through
the same process. Rather than a “case-by-case” basis, planning consultant contracts are awarded
annually. The proposed process would eliminate this and save the applicant time.
PROPOSED PROCESS:
With the aim of attracting more competitive proposals while decreasing staff time dedicated to
drafting RFPs for future projects, Staff recommends obtaining environmental and land-use
planning consultant services for longer periods, such as three to five years.
The City solicited proposals from private firms for environmental and land-use planning
services. The City requested proposals from twelve environmental and eleven land-use planning
consultants.
The solicitation was drafted as an RFP. The RFP included a scope of work, detailing the City’s
projected workload for the next three to five years. All services requested would be on an “as-
needed” basis, dependent on development applications received by the City. As of May 22,
2008, the City received six proposals from environmental and five proposals from land-use
planning firms.
City staff reviewed all proposals in detail and rated them on the following parameters:
• Cost • Location
• Scope of Work • Qualifications
• Experience • Service
Based on review and discussion within the Community Development Department, using
parameters addressed on the attached matrix (ATTACHMENT 4), LSA was chosen as the
environmental consultant and M-Group as the land-use planning consultant. Contracts with LSA
and M-Group would be valid for three years with the option of extension for additional two
years, per City Council approval at a subsequent City Council meeting.
127
3
FISCAL IMPACTS:
In the contract for environmental consultant services, the consultant will perform work on a time
and materials basis, at the discretion of the Community Development Director. The consultant
will be utilized on development projects requiring a more thorough environmental analysis
above the requirements of categorical exemptions allowed by CEQA. All environmental
services will be charged directly to the applicant, without the need for supplemental City
funding.
Land-use planning consultant services are used on an “as-needed” basis to supplement the City’s
Development Review practice of processing planning applications in a timely manner.
Application fees are based upon hourly costs for these services which incorporates average staff
and consultant hourly billing rates. Funds are budgeted for these services on an ongoing basis
each year, with the expenses incurred directly correlating to Development Review Fee revenues.
Fifty-Two Thousand Five Hundred Dollars ($52,500) is budgeted for these services for FY
2008/09. Complex projects which would be in addition to the $52,500 budget would be charged
directly to the applicant on a time and materials basis, the same as the environmental consultant
services.
Although contractual agreements will be completed, funding will be appropriated in future year
budgets for both environmental and planning consultants, on an “as-needed” basis.
CONSEQUENCES OF NOT FOLLOWING RECOMMENDED ACTION:
Without contract planning services, the City will have difficulty completing essential planning
and development functions in a timely manner.
ALTERNATIVE ACTION:
Consider using existing staff for all planning services directly related to the City. This could
lead to a significant time constraints on existing and future environmental and land-use planning
project submittals and difficulty meeting the Permit Streamlining Act.
FOLLOW UP ACTION:
Execute the contract agreement for both environmental and land-use planning services.
ADVERTISING, NOTICING AND PUBLIC CONTACT:
Notice of the Agenda Item was properly posted.
128
4
ATTACHMENTS:
1. Resolution
2. Environmental Planning Services Contract
3. Land-Use Planning Services Contract
4. Environmental and Land-Use Planning Matrix
5. LSA Proposal
6. M-Group Proposal
129
5
ATTACHMENT – 1
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA
DIRECTING STAFF TO PROCEED WITH AUTHORIZING FOR ENVIRONMENTAL
AND CURRENT LAND-USE CONSULTANT PLANNING SERVICES
WHEREAS, the City of Saratoga currently has a need for environmental and current
land-use planning services; and
WHEREAS, the City Council desires to maintain the current level of service regarding
land-use development applications, afforded to the City of Saratoga community.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SARATOGA, CALIFORNIA, THAT;
1. The City Manager is hereby directed to execute an agreement with LSA Associates to
prepare environmental documents for land development applications within the City of
Saratoga (City) with an agreement would include a three year contract with an option of
two additional years of service if approved by the City Council;
2. The City Manager is hereby directed to execute an agreement with Metropolitan Planning
Group for land-use planning consultant services with an agreement that would include a
three year contract with an option of two additional years of service if approved by the
City Council.
The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga
City Council held on the 4th day of June, 2008 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
______________________________
Ann Waltonsmith, Mayor
ATTEST:
_____________________________
Ann Sullivan, Acting City Clerk
130
ATTACHMENT – 2
CITY OF SARATOGA
STANDARD
INDEPENDENT CONTRACTOR AGREEMENT
THIS AGREEMENT is made at Saratoga, California by and between the CITY
OF SARATOGA, a municipal corporation ("City"), and LSA Associates, Inc.,
("Contractor"), who agree as follows:
RECITALS
WHEREAS, City requires the services of a qualified contractor to provide the
work product described in Exhibit A of this Agreement; and
WHEREAS, City lacks the qualified personnel to provide the specified work
product; and
WHEREAS, Contractor is duly qualified to provide the required work
product; and
WHEREAS, Contractor is agreeable to providing such work product on the
terms and conditions hereinafter set forth.
NOW THEREFORE, the parties hereto agree as follows:
1. RESULTS TO BE ACHIEVED Subject to the terms and conditions
set forth in this Agreement, Contractor shall provide to City the work
product described in Exhibit A ("Scope of Work"). Contractor is not
authorized to undertake any efforts or incur any costs whatsoever under the
terms of this Agreement until receipt of a fully executed Purchase Order
from the Finance Department of the City of Saratoga.
2. TERM The term of this Agreement commences on June 1,
2008, and extends through June 30, 2011 or the completion of the project,
whichever occurs first, unless it is extended by written mutual agreement
between the parties, provided that the parties retain the right to terminate
this Agreement as provided in Exhibit D at all times.
131
City of Saratoga/Standard Contract Agreement Page 2 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
3. PAYMENT City shall pay Contractor for work product produced
pursuant to this Agreement at the time and in the manner set forth in
Exhibit B ("Payment"). The payments specified in Exhibit B shall be the only
payments to be made to Contractor in connection with Contractor's
completion of the Scope of Work pursuant to this Agreement. Contractor
shall submit all billings to City in the manner specified in Exhibit B; or, if no
manner is specified in Exhibit B, then according to the usual and customary
procedures and practices which Contractor uses for billing clients similar to
City.
4. FACILITIES AND EQUIPMENT Except as set forth in Exhibit C
("Facilities and Equipment"), Contractor shall, at its sole cost and expense,
furnish all facilities and equipment, which may be required for completing
the Scope of Work pursuant to this Agreement. City shall furnish to
Contractor only the facilities and equipment listed in Exhibit C according to
the terms and conditions set forth in Exhibit C.
5. GENERAL PROVISIONS City and Contractor agree to and shall
abide by the general provisions set forth in Exhibit D ("General Provisions").
In the event of any inconsistency between said general provisions and any
other terms or conditions of this Agreement, the other term or condition
shall control insofar as it is inconsistent with the General Provisions.
6. EXHIBITS All exhibits referred to in this Agreement are attached
hereto and are by this reference incorporated herein and made a part of this
Agreement.
7. CONTRACT ADMINISTRATION This Agreement shall be
administered on behalf of City by Mary Furey, ("Administrator"). The
Administrator has complete authority to receive information, interpret and
define City's policies consistent with this Agreement, and communicate with
Contractor concerning this Agreement. All correspondence and other
communications shall be directed to or through the Administrator or his or
her designee.
8. NOTICES All notices or communication concerning a party's
compliance with the terms of this Agreement shall be in writing and may be
given either personally, by certified mail, return receipt requested, or by
overnight express carrier. The notice shall be deemed to have been given
and received on the date delivered in person or the date upon which the
postal authority or overnight express carrier indicates that the mailing was
delivered to the address of the receiving Party. The Parties shall make good
faith efforts to provide advance courtesy notice of any notices or
communications hereunder via telefacsimile. However, under no
132
City of Saratoga/Standard Contract Agreement Page 3 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
circumstances shall such courtesy notice satisfy the notice requirements set
forth above; nor shall lack of such courtesy notice affect the validity of
service pursuant to the notice requirement set forth above. Any Party
hereto, by giving ten (10) days written notice to the other, may designate any
other address as substitution of the address to which the notice or
communication shall be given. Notices or communications shall be given to
the Parties at the addresses set forth below until specified otherwise in
writing:
Notices to Contractor shall be sent to:
Judith H. Malamut, AICP
LSA Associates, Inc.
2215 Fifth Street
Berkeley, CA 94710
Notices to City shall be sent to:
Michael Fossati
City of Saratoga
13777 Fruitvale Avenue
Saratoga, CA 95070
With a copy (which copy shall not constitute notice) to:
City Clerk
City of Saratoga
13777 Fruitvale Avenue
Saratoga, CA 95070
9. ENTIRE AGREEMENT This Agreement supersedes any and all
agreements, either oral or written, between the parties hereto with respect to
Contractor's completion of the Scope of Work on behalf of City and contains
all of the covenants and agreements between the parties with respect to the
rendering of such services in any manner whatsoever. Each party to this
Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone
acting on behalf of any party, which are not embodied herein, and that no
other agreement, statement or promise not contained in this Agreement
shall be valid or binding. No amendment, alteration, or variation of the
terms of this Agreement shall be valid unless made in writing and signed by
the parties hereto.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement.
133
City of Saratoga/Standard Contract Agreement Page 4 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
CONTRACTOR:
By: ________________________________ Date: _________________
Print Name: _________________________
Position: ____________________________
CITY OF SARATOGA, a municipal corporation
By: __________________________________ Date: __________________
Name: _______________________________
Title: _______________________________
APPROVED AS TO FORM:
By:_______________________________ Date:___________________
City Attorney
APPROVED AS TO BUDGET AUTHORITY AND INSURANCE:
By:_______________________________ Date: __________________
Administrative Services Director
Attachments
Exhibit A -- Scope of Work
Exhibit B -- Contract Payment and Reporting Schedule
Exhibit C -- Facilities and Equipment
Exhibit D -- General Provisions
Exhibit E -- Insurance Requirements
134
City of Saratoga/Standard Contract Agreement Page 5 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
EXHIBIT A
SCOPE OF WORK
Provide environmental planning services as assigned by Community
Development Director.
135
City of Saratoga/Standard Contract Agreement Page 6 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
EXHIBIT B
PAYMENT
1. TOTAL COMPENSATION Consultant services would be
requested on an “as needed basis” to assist staff therefore the City shall pay
Contractor based on time and materials in accordance with the hourly rates
set forth below. For each project undertaken pursuant to this agreement
City and Contractor shall develop and agree to a scope of work and a total
project cost which shall be approved by the Community Development
Director. The total cost of any project may not exceed that authorized by
the Community Development Director.
2. INVOICES Contractor shall submit invoices, not more often than
once a month during the term of this Agreement, based on the cost for work
performed and reimbursable expenses incurred prior to the invoice date.
Invoices shall contain the following information:
a. Serial identifications of bills, i.e., Bill No. 1;
b. The beginning and ending dates of the billing period;
c. A summary containing the total contract amount, the amount
of prior billings, the total due this period, and the remaining
balance available for all remaining billing periods.
3. MONTHLY PAYMENTS City shall make monthly payments, based
on such invoices, for satisfactory progress in completion of the Scope of
Work, and for authorized reimbursable expenses incurred.
4. REIMBURSABLE EXPENSES There shall be no right to
reimbursement of expenses incurred by Contractor except as specified in
Exhibit A to this Agreement.
5. BILLING RATES City shall make payments, based on such rates as
demonstrated below.
Principal Planner $155/hour
Senior Planner $150/hour
Associate Planner $115/hour
Planner $90/hour
Assistant Planner $75/hour
Senior Biologist $95/hour
Senior Wildlife Biologist $85/hour
Botanist/Arborist $80/hour
136
City of Saratoga/Standard Contract Agreement Page 7 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
Senior AQ/Noise Planner $120/hour
AQ/Noise Analyst $90/hour
Principal/Cultural $155/hour
Cultural Resource Manager $70/hour
137
City of Saratoga/Standard Contract Agreement Page 8 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
EXHIBIT C
FACILITIES AND EQUIPMENT
City shall furnish physical facilities such as desks, filing cabinets,
and conference space, as may be reasonably necessary for Contractor's use
while consulting with City employees and reviewing records and the
information in possession of City. The location, quantity, and time of
furnishing said physical facilities shall be in the sole discretion of City. In
no event shall City be obligated to furnish any facility which may involve
incurring any direct expense, including, but not limiting the generality of
this exclusion, long-distance telephone or other communication charges,
vehicles, and reproduction facilities. Contractor shall not use such services,
premises, facilities, supplies or equipment for any purpose other than in the
performance of Contractor's obligations under this Agreement.
138
City of Saratoga/Standard Contract Agreement Page 9 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
EXHIBIT D
GENERAL PROVISIONS
1. INDEPENDENT CONTRACTOR At all times during the term of
this Agreement, Contractor shall be an independent contractor and shall not
be an employee of City. Contractor shall complete the Scope of Work
hereunder in accordance with currently approved methods and practices in
Contractor's field. City shall have the right to control Contractor only with
respect to specifying the results to be obtained from Contractor pursuant to
this Agreement. City shall not have the right to control the means by which
Contractor accomplishes services rendered pursuant to this Agreement.
Likewise, no relationship of employer and employee is created by this
Agreement between the City and Contractor or any subcontractor or
employee of Contractor. Nothing contained in this Agreement shall be
construed as limiting the right of Contractor to engage in Contractor's
profession separate and apart from this Agreement so long as such activities
do not interfere or conflict with the performance by Contractor of the
obligations set forth in this Agreement. Interference or conflict will be
determined at the sole discretion of the City.
2. STANDARD OF PERFORMANCE Contractor shall complete the
Scope of Work required pursuant to this Agreement in the manner and
according to the standards observed by a competent practitioner of the
profession in which Contractor is engaged in the geographical area in which
Contractor practices its profession. All work product of whatsoever nature
which Contractor delivers to City pursuant to this Agreement shall be
prepared in a substantial, first class and workmanlike manner and conform
to the standards of quality normally observed by a person practicing in
Contractor's profession.
3. TIME Contractor shall devote such time to the Scope of Work
pursuant to this Agreement as may be reasonably necessary for satisfactory
performance of Contractor's obligations pursuant to this Agreement.
4. CONTRACTOR NO AGENT Except as City may specify in writing,
Contractor shall have no authority, express or implied, to act on behalf of
City in any capacity whatsoever as an agent. Contractor shall have no
authority, express or implied, pursuant to this Agreement to bind City to
any obligation whatsoever.
139
City of Saratoga/Standard Contract Agreement Page 10 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
5. BENEFITS AND TAXES Contractor shall not have any claim under
this Agreement or otherwise against City for seniority, vacation time,
vacation pay, sick leave, personal time off, overtime, health insurance,
medical care, hospital care, insurance benefits, social security, disability,
unemployment, workers compensation or employee benefits of any kind.
Contractor shall be solely liable for and obligated to pay directly all
applicable taxes, including, but not limited to, federal and state income
taxes, and in connection therewith Contractor shall indemnify and hold City
harmless from any and all liability that City may incur because of
Contractor's failure to pay such taxes. City shall have no obligation
whatsoever to pay or withhold any taxes on behalf of Contractor.
6. ASSIGNMENT PROHIBITED No party to this Agreement may assign
any right or obligation pursuant to this Agreement. Any attempted or
purported assignment of any right or obligation pursuant to this Agreement
shall be void and of no effect. However, with the consent of the City given in
writing, Contractor is entitled to subcontract such portions of the work to be
performed under this Agreement as may be specified by City.
7. PERSONNEL
a. Qualifications. Contractor shall assign only competent personnel
to complete the Scope of Work pursuant to this Agreement. In the
event that City, in its sole discretion, at any time during the term
of this Agreement, desires the removal of any such persons,
Contractor shall, immediately upon receiving notice from city of
such desire of City, cause the removal of such person or persons.
b. Employment Eligibility. Contractor shall ensure that all
employees of Contractor and any subcontractor retained by
Contractor in connection with this Agreement have provided the
necessary documentation to establish identity and employment
eligibility as required by the Immigration Reform and Control Act
of 1986. Failure to provide the necessary documentation will
result in the termination of the Agreement as required by the
Immigration Reform and Control Act of 1986.
8. CONFLICT OF INTEREST
a. In General. Contractor represents and warrants that, to the best
of the Contractor's knowledge and belief, there are no relevant
facts or circumstances which could give rise to a conflict of
interest on the part of Contractor, or that the Contractor has
already disclosed all such relevant information.
b. Subsequent Conflict of Interest. Contractor agrees that if an
140
City of Saratoga/Standard Contract Agreement Page 11 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
actual or potential conflict of interest on the part of Contractor is
discovered after award, the Contractor will make a full disclosure
in writing to the City. This disclosure shall include a description
of actions, which the Contractor has taken or proposes to take,
after consultation with the City to avoid, mitigate, or neutralize the
actual or potential conflict. Within 45 days, the Contractor shall
have taken all necessary steps to avoid, mitigate, or neutralize the
conflict of interest to the satisfaction of the City.
c. Interests of City Officers and Staff. No officer, member or
employee of City and no member of the City Council shall have any
pecuniary interest, direct or indirect, in this Agreement or the
proceeds thereof. Neither Contractor nor any member of any
Contractor's family shall serve on any City board or committee or
hold any such position which either by rule, practice or action
nominates, recommends, or supervises Contractor's operations or
authorizes funding to Contractor.
9. COMPLIANCE WITH LAWS
a. In General. Contractor shall observe and comply with all laws,
policies, general rules and regulations established by City and
shall comply with the common law and all laws, ordinances, codes
and regulations of governmental agencies, (including federal, state,
municipal and local governing bodies) applicable to the
performance of the Scope of Work hereunder, including, but not
limited to, all provisions of the Occupational Safety and Health Act
of 1979 as amended.
b. Licenses and Permits. Contractor represents and warrants to
City that it has all licenses, permits, qualifications and approvals
of whatsoever nature which are legally required for Contractor to
practice its profession. Contractor represents and warrants to City
that Contractor shall, at its sole cost and expense, keep in effect at
all times during the term of this Agreement any licenses, permits,
and approvals which are legally required for Contractor to practice
its profession. In addition to the foregoing, Contractor shall obtain
and maintain during the term hereof a valid City of Saratoga
Business License.
c. Funding Agency Requirements. To the extent that this
Agreement may be funded by fiscal assistance from another entity,
Contractor shall comply with all applicable rules and regulations
to which City is bound by the terms of such fiscal assistance
program.
141
City of Saratoga/Standard Contract Agreement Page 12 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
d. Drug-free Workplace. Contractor and Contractor's employees and
subcontractors shall comply with the City's policy of maintaining a
drug-free workplace. Neither Contractor nor Contractor's
employees and subcontractors shall unlawfully manufacture,
distribute, dispense, possess or use controlled substances, as
defined in 21 U.S. Code Section 812, including marijuana, heroin,
cocaine, and amphetamines, at any facility, premises or worksite
used in any manner in connection with performing services
pursuant to this Agreement. If Contractor or any employee or
subcontractor of Contractor is convicted or pleads nolo contendere
to a criminal drug statute violation occurring at such a facility,
premises, or worksite, the Contractor, within five days thereafter,
shall notify the City.
e. Discrimination Prohibited. Contractor assures and agrees that
Contractor will comply with Title VII of the Civil Rights Act of 1964
and other laws prohibiting discrimination and that no person
shall, on the grounds of race, creed, color, disability, sex, sexual
orientation, national origin, age, religion, Vietnam era veteran's
status, political affiliation, or any other non-merit factors be
excluded from participating in, be denied the benefits of, or be
otherwise subjected to discrimination under this Agreement.
10. DOCUMENTS AND RECORDS
a. Property of City. All reports, data, maps, models, charts,
studies, surveys, photographs, memoranda or other written
documents or materials prepared by Contractor pursuant to this
Agreement shall become the property of City upon completion of
the work to be performed hereunder or upon termination of this
Agreement.
b. Retention of Records. Until the expiration of five years after the
furnishing of any services pursuant to this Agreement, Contractor
shall retain and make available to the City or any party designated
by the City, upon written request by City, this Agreement, and
such books, documents and records of Contractor (and any books,
documents, and records of any subcontractor(s)) that are
necessary or convenient for audit purposes to certify the nature
and extent of the reasonable cost of services to City.
c. Use Of Recycled Products. Contractor shall prepare and submit
all reports, written studies and other printed material on recycled
paper to the extent it is available at equal or less cost than virgin
paper.
d. Professional Seal. Where applicable in the determination of the
142
City of Saratoga/Standard Contract Agreement Page 13 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
contract administrator, the first page of a technical report, first
page of design specifications, and each page of construction
drawings shall be stamped/sealed and signed by the licensed
professional responsible for the report/design preparation. The
stamp/seal shall be in a block entitled "Seal and Signature of
Registered Professional with report/design responsibility" as per
the sample below.
______________________________
Seal and Signature of Registered Professional
with report/design responsibility.
11. CONFIDENTIAL INFORMATION Contractor shall hold any
confidential information received from City in the course of performing this
Agreement in trust and confidence and will not reveal such confidential
information to any person or entity, either during the term of the Agreement
or at any time thereafter. Upon expiration of this Agreement, or termination
as provided herein, Contractor shall return materials which contain any
confidential information to City. Contractor may keep one copy for its
confidential file. For purposes of this paragraph, confidential information is
defined as all information disclosed to Contractor which relates to City's
past, present, and future activities, as well as activities under this
Agreement, which information is not otherwise of public record under
California law.
12. RESPONSIBILITY OF CONTRACTOR Contractor shall take all
responsibility for the work, shall bear all losses and damages directly or
indirectly resulting to Contractor, to any subcontractor, to the City, to City
officers and employees, or to parties designated by the City, on account of
the performance or character of the work, unforeseen difficulties, accidents,
occurrences or other causes predicated on active or passive negligence of
the Contractor or of any subcontractor.
13. INDEMNIFICATION Contractor and City agree that City, its
employees, agents and officials shall, to the fullest extent permitted by law,
be fully protected from any loss, injury, damage, claim, lawsuit, cost,
expense, attorneys fees, litigation costs, defense costs, court costs or any
other cost arising out of or in any way related to the performance of this
Agreement. Accordingly, the provisions of this indemnity provision are
intended by the parties to be interpreted and construed to provide the fullest
protection possible under the law to the City. Contractor acknowledges that
City would not enter into this agreement in the absence of the commitment
of Contractor to indemnify and protect City as set forth below.
143
City of Saratoga/Standard Contract Agreement Page 14 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
a. Indemnity. To the fullest extent permitted by law, Contractor
shall defend, indemnify and hold harmless City, its employees,
agents and officials, from any liability, claims, suits, actions,
arbitration proceedings, administrative proceedings, regulatory
proceedings, losses, expenses or costs of any kind whatsoever
without restriction or limitation, incurred in relation to, as a
consequence of or arising out of or in any way attributable
actually, allegedly or impliedly, in whole or in part, to the
performance of this Agreement. All obligations under this
provision are to be paid by Contractor as they are incurred by the
City.
b. Limitation on Indemnity. Without affecting the rights of City
under any provision of this agreement or this section, Contractor
shall not be required to indemnify and hold harmless City as set
forth above for liability attributable to the sole fault of City,
provided such sole fault is determined by agreement between the
parties or the findings of a court of competent jurisdiction. This
exception will apply only in instances where the City is shown to
have been solely at fault and not in instances where Contractor is
solely or partially at fault or in instances where City's fault
accounts for only a percentage of the liability involved. In those
instances, the obligation of Contractor will be all-inclusive and
City will be indemnified for all liability incurred, even though a
percentage of the liability is attributable to conduct of the City.
c. Acknowledgement. Contractor acknowledges that its obligation
pursuant to this section extends to liability attributable to City, if
that liability is less than the sole fault of City. Contractor has no
obligation under this agreement for liability proven in a court of
competent jurisdiction or by written agreement between the
parties to be the sole fault of City.
d. Scope of Contractor Obligation. The obligations of Contractor
under this or any other provision of this Agreement will not be
limited by the provisions of any workers' compensation act or
similar act. Contractor expressly waives its statutory immunity
under such statutes or laws as to City, its employees and officials.
e. Subcontractors. Contractor agrees to obtain executed indemnity
agreements with provisions identical to those set forth here in this
section from each and every subcontractor, sub tier contractor or
any other person or entity involved by, for, with or on behalf of
Contractor in the performance or subject matter of this Agreement.
In the event Contractor fails to obtain such indemnity obligations
from others as required here, Contractor agrees to be fully
responsible according to the terms of this section.
f. In General. Failure of City to monitor compliance with these
144
City of Saratoga/Standard Contract Agreement Page 15 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
requirements imposes no additional obligations on City and will in
no way act as a waiver of any rights hereunder. This obligation to
indemnify and defend City as set forth herein is binding on the
successors, assigns, or heirs of Contractor and shall survive the
termination of this agreement or this section. For purposes of
Section 2782 of the Civil Code the parties hereto recognize and
agree that this Agreement is not a construction contract. By
execution of this Agreement, Contractor acknowledges and agrees
that it has read and understands the provisions hereof and that
this paragraph is a material element of consideration. City
approval of the insurance contracts required by this Agreement
does not relieve the Contractor or subcontractors from liability
under this paragraph.
14. INSURANCE REQUIREMENTS Contractor shall procure and
maintain for the duration of the contract insurance as set forth in Exhibit E.
The cost of such insurance shall be included in the Contractor's bid.
15. DEFAULT AND REMEDIES
a. Events of default. Each of the following shall constitute an event
of default hereunder:
1. Failure to perform any obligation under this Agreement and
failure to cure such breach immediately upon receiving notice
of such breach, if the breach is such that the City determines
the health, welfare, or safety of the public is immediately
endangered; or
2. Failure to perform any obligation under this Agreement and
failure to cure such breach within fifteen (15) days of receiving
notice of such breach, if the breach is such that the City
determines that the health, welfare, or safety of the public is
not immediately endangered, provided that if the nature of the
breach is such that the City determines it will reasonably
require more than fifteen (15) days to cure, Contractor shall not
be in default if Contractor promptly commences the cure and
diligently proceeds to completion of the cure.
b. Remedies upon default. Upon any Contractor default, City shall
have the right to immediately suspend or terminate the Agreement,
seek specific performance, contract with another party to perform
this Agreement and/or seek damages including incidental,
consequential and/or special damages to the full extent allowed by
law.
c. No Waiver. Failure by City to seek any remedy for any default
145
City of Saratoga/Standard Contract Agreement Page 16 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
hereunder shall not constitute a waiver of any other rights
hereunder or any right to seek any remedy for any subsequent
default.
16. TERMINATION Either party may terminate this Agreement with or
without cause by providing 10 days notice in writing to the other party. The
City may terminate this Agreement at any time without prior notice in the
event that Contractor commits a material breach of the terms of this
Agreement. Upon termination, this Agreement shall become of no further
force or affect whatsoever and each of the parties hereto shall be relieved
and discharged here-from, subject to payment for acceptable services
rendered prior to the expiration of the notice of termination.
Notwithstanding the foregoing, the provisions of this Agreement concerning
retention of records, City's rights to material produced, confidential
information, contractor's responsibility, indemnification, insurance, dispute
resolution, litigation, and jurisdiction and severability shall survive
termination of this Agreement.
17. DISPUTE RESOLUTION The parties shall make a good faith effort to
settle any dispute or claim arising under this Agreement. If the parties fail
to resolve such disputes or claims, they shall submit them to non-binding
mediation in California at shared expense of the parties for at least 8 hours
of mediation. If mediation does not arrive at a satisfactory result,
arbitration, if agreed to by all parties, or litigation
may be pursued. In the event any dispute resolution processes are involved,
each party shall bear its own costs and attorneys fees.
18. LITIGATION If any litigation is commenced between parties to
this Agreement concerning any provision hereof or the rights and duties of
any person in relation thereto, each party shall bear its own attorneys' fees
and costs.
19. JURISDICTION AND SEVERABILITY This Agreement shall be
administered and interpreted under the laws of the State of California.
Jurisdiction of litigation arising from this Agreement shall be in that state
and venue shall be in Santa Clara County, California. If any part of this
Agreement is found to conflict with applicable laws, such part shall be
inoperative, null and void insofar as it conflicts with said laws, but the
remainder of this Agreement shall be in full force and effect.
20. NOTICE OF NON-RENEWAL Contractor understands and agrees
that there is no representation, implication, or understanding that the City
will request that work product provided by Contractor under this Agreement
be supplemented or continued by Contractor under a new agreement
146
City of Saratoga/Standard Contract Agreement Page 17 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
following expiration or termination of this Agreement. Contractor waives all
rights or claims to notice or hearing respecting any failure by City to
continue to request or retain all or any portion of the work product from
Contractor following the expiration or termination of this Agreement.
21. PARTIES IN INTEREST This Agreement is entered only for the
benefit of the parties executing this Agreement and not for the benefit of any
other individual, entity or person.
WAIVER. Neither the acceptance of work or payment for work pursuant to
this Agreement shall constitute a waiver of any rights or obligations arising
under this Agreement. The failure by the City to enforce any of Contractor's
obligations or to exercise City's rights shall in no event be deemed a waiver
of the right to do so thereafter.
147
City of Saratoga/Standard Contract Agreement Page 18 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
EXHIBIT E
INSURANCE
Please refer to the insurance requirements listed below. Those that have an
“X” indicated in the space before the requirement apply to Contractor's
Agreement (ignore any not checked).
Contractor shall provide its insurance broker(s)/agent(s) with a copy of
these requirements and request that they provide Certificates of Insurance
complete with copies of all required endorsements to: Administrative
Services Officer, City of Saratoga, 13777 Fruitvale Avenue, Saratoga, CA
95070.
Contractor shall furnish City with copies of original endorsements affecting
coverage required by this Exhibit E. The endorsements are to be signed by a
person authorized by that insurer to bind coverage on its behalf. All
endorsements and certificates are to be received and approved by City before
work commences. City has the right to require Contractor's insurer to
provide complete, certified copies of all required insurance policies,
including endorsements affecting the coverage required by these
specifications.
X Commercial General/Business Liability Insurance with coverage as
indicated:
X $1,000,000 per occurrence/$2,000,000 aggregate limits for
bodily injury and property damage
___ $ ____________ per occurrence bodily injury/$ ___________ per
occurrence property damage
___ Coverage for X, C, U hazards MUST be evidenced on the
Certificate of Insurance
___ If the standard ISO Form wording for "OTHER INSURANCE", or
other comparable wording, is not contained in Contractor's
liability insurance policy, an endorsement must be provided
that said insurance will be primary insurance and any
insurance or self-insurance maintained by City, its officers,
employees, agents or volunteers shall be in excess of
Contractor's insurance and shall not contribute to it.
X Auto Liability Insurance with coverage as indicated:
X $1,000,000 combined single limit for bodily injury and property
damage
148
City of Saratoga/Standard Contract Agreement Page 19 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
___ $ ____________ per person/$__________ per accident for bodily
injury
___ $ ____________ per occurrence for property damage
___ $ 500,000 combined single limit for bodily injury and property
damage
___ Garage keepers extra liability endorsement to extend coverage
to all vehicles in the care, custody and control of the contractor,
regardless of where the vehicles are kept or driven.
Professional/Errors and Omissions Liability with coverage as
indicated:
$1,000,000 per loss/ $2,000,000 aggregate
___ $5,000,000 per loss/ $5,000,000 aggregate
Contractor must maintain Professional/Errors & Omissions Liability
coverage for a period of three years after the expiration of this
Agreement. Contractor may satisfy this requirement by renewal of
existing coverage or purchase of either prior acts or tail coverage
applicable to said three year period.
X Workers' Compensation Insurance
X Including minimum $1,000,000 Employer's Liability
The Employer's Liability policy shall be endorsed to waive any right of
subrogation as respects the City, its employees or agents.
The Contractor makes the following certification, required by section 1861 of
the California Labor Code:
I am aware of the provisions of Section 3700 of the Labor Code which
require every employer to be insured against liability for workers'
compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before
commencing the performance of the work of this contract
X Additional Insured Endorsement(s) for Commercial General/Business
Liability coverage naming the City of Saratoga, its officers, employees
and agents as additional insured.
(NOTE: additional insured language on the Certificate of Insurance is
NOT acceptable without a separate endorsement such as Form CG 20
10)
X The Certificate of Insurance MUST provide 30 days notice of
cancellation, (10 days notice for non-payment of premium). NOTE: the
following words must be crossed out or deleted from the standard
cancellation clause: ". . . endeavor to . . ." AND ". . . but failure to
149
City of Saratoga/Standard Contract Agreement Page 20 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
mail such notice shall impose no obligation or liability of any kind
upon the company, its agents or representatives."
___ All subcontractors used must comply with the above requirements
except as noted below:
As to all of the checked insurance requirements above, the following shall
apply:
a. Deductibles and Self-Insured Retentions. Any deductibles or
self-insured retentions must be declared to and approved by the
City. At the option of the City, either (1) the insurer shall reduce
or eliminate such deductibles or self-insured retentions as
respects the City, its officers, officials and employees; or (2) the
Contractor shall procure a bond guaranteeing payment of losses
and related investigations, claim administration and defense
expenses.
b. City as Additional Insured. The City, its officers, officials,
employees and volunteers are to be covered as insureds as
respects: liability arising out of activities performed by or on
behalf of the Contractor; products and completed operations of the
Contractor, premises owned, occupied or used by the Contractor,
or automobiles owned, leased, hired or borrowed by the
Contractor. The coverage shall contain no special limitations on
the scope of the protection afforded to the City, its officers,
officials, employees or volunteers.
c. Other Insurance Provisions. The policies are to contain, or be
endorsed to contain, the following provisions:
1. Any failure to comply with reporting provisions of the policies
shall not affect coverage provided to the City, its officers,
officials, employees or volunteers.
2. The Contractor's insurance shall apply separately to each
insured against whom claim is made or suit is brought, except
with respect to the limits of the insurer's liability.
3. Coverage shall not be suspended, voided, canceled by either
party, reduced in coverage or in limits except after thirty (30)
150
City of Saratoga/Standard Contract Agreement Page 21 of 21
D:\MyDocuments\RFP info\Standard Contract 08-09 LSA - FINAL.doc
days' prior written notice by certified mail, return receipt
requested, has been given to the City.
d. Acceptability of Insurers. Insurance is to be placed with
insurers with a Bests' rating of no less than A: VII
151
ATTACHMENT – 3
CITY OF SARATOGA
STANDARD
INDEPENDENT CONTRACTOR AGREEMENT
THIS AGREEMENT is made at Saratoga, California by and between the CITY
OF SARATOGA, a municipal corporation ("City"), and Metropolitan Planning
Group, ("Contractor"), who agree as follows:
RECITALS
WHEREAS, City requires the services of a qualified contractor to provide the
work product described in Exhibit A of this Agreement; and
WHEREAS, City lacks the qualified personnel to provide the specified work
product; and
WHEREAS, Contractor is duly qualified to provide the required work
product; and
WHEREAS, Contractor is agreeable to providing such work product on the
terms and conditions hereinafter set forth.
NOW THEREFORE, the parties hereto agree as follows:
1. RESULTS TO BE ACHIEVED Subject to the terms and conditions
set forth in this Agreement, Contractor shall provide to City the work
product described in Exhibit A ("Scope of Work"). Contractor is not
authorized to undertake any efforts or incur any costs whatsoever under the
terms of this Agreement until receipt of a fully executed Purchase Order
from the Finance Department of the City of Saratoga.
2. TERM The term of this Agreement commences on July 1,
2008, and extends through June 30, 2011 or the completion of the project,
whichever occurs first, unless it is extended by written mutual agreement
between the parties, provided that the parties retain the right to terminate
this Agreement as provided in Exhibit D at all times.
152
City of Saratoga/Standard Contract Agreement Page 2 of 21
My Documents/Contracts
03/15/01
3. PAYMENT City shall pay Contractor for work product produced
pursuant to this Agreement at the time and in the manner set forth in
Exhibit B ("Payment"). The payments specified in Exhibit B shall be the only
payments to be made to Contractor in connection with Contractor's
completion of the Scope of Work pursuant to this Agreement. Contractor
shall submit all billings to City in the manner specified in Exhibit B; or, if no
manner is specified in Exhibit B, then according to the usual and customary
procedures and practices which Contractor uses for billing clients similar to
City.
4. FACILITIES AND EQUIPMENT Except as set forth in Exhibit C
("Facilities and Equipment"), Contractor shall, at its sole cost and expense,
furnish all facilities and equipment, which may be required for completing
the Scope of Work pursuant to this Agreement. City shall furnish to
Contractor only the facilities and equipment listed in Exhibit C according to
the terms and conditions set forth in Exhibit C.
5. GENERAL PROVISIONS City and Contractor agree to and shall
abide by the general provisions set forth in Exhibit D ("General Provisions").
In the event of any inconsistency between said general provisions and any
other terms or conditions of this Agreement, the other term or condition
shall control insofar as it is inconsistent with the General Provisions.
6. EXHIBITS All exhibits referred to in this Agreement are attached
hereto and are by this reference incorporated herein and made a part of this
Agreement.
7. CONTRACT ADMINISTRATION This Agreement shall be
administered on behalf of City by Mary Furey, ("Administrator"). The
Administrator has complete authority to receive information, interpret and
define City's policies consistent with this Agreement, and communicate with
Contractor concerning this Agreement. All correspondence and other
communications shall be directed to or through the Administrator or his or
her designee.
8. NOTICES All notices or communication concerning a party's
compliance with the terms of this Agreement shall be in writing and may be
given either personally, by certified mail, return receipt requested, or by
overnight express carrier. The notice shall be deemed to have been given
and received on the date delivered in person or the date upon which the
postal authority or overnight express carrier indicates that the mailing was
delivered to the address of the receiving Party. The Parties shall make good
faith efforts to provide advance courtesy notice of any notices or
153
City of Saratoga/Standard Contract Agreement Page 3 of 21
My Documents/Contracts
03/15/01
communications hereunder via telefacsimile. However, under no
circumstances shall such courtesy notice satisfy the notice requirements set
forth above; nor shall lack of such courtesy notice affect the validity of
service pursuant to the notice requirement set forth above. Any Party
hereto, by giving ten (10) days written notice to the other, may designate any
other address as substitution of the address to which the notice or
communication shall be given. Notices or communications shall be given to
the Parties at the addresses set forth below until specified otherwise in
writing:
Notices to Contractor shall be sent to:
Geoff I. Bradley
400 West Evelyn Avenue
Sunnyvale, CA 94086
Notices to City shall be sent to:
Michael Fossati
City of Saratoga
13777 Fruitvale Avenue
Saratoga, CA 95070
With a copy (which copy shall not constitute notice) to:
City Clerk
City of Saratoga
13777 Fruitvale Avenue
Saratoga, CA 95070
9. ENTIRE AGREEMENT This Agreement supersedes any and all
agreements, either oral or written, between the parties hereto with respect to
Contractor's completion of the Scope of Work on behalf of City and contains
all of the covenants and agreements between the parties with respect to the
rendering of such services in any manner whatsoever. Each party to this
Agreement acknowledges that no representations, inducements, promises or
agreements, orally or otherwise, have been made by any party, or anyone
acting on behalf of any party, which are not embodied herein, and that no
other agreement, statement or promise not contained in this Agreement
shall be valid or binding. No amendment, alteration, or variation of the
terms of this Agreement shall be valid unless made in writing and signed by
the parties hereto.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement.
154
City of Saratoga/Standard Contract Agreement Page 4 of 21
My Documents/Contracts
03/15/01
CONTRACTOR:
By: ________________________________ Date: _________________
Print Name: _________________________
Position: ____________________________
CITY OF SARATOGA, a municipal corporation
By: __________________________________ Date: __________________
Name: _______________________________
Title: _______________________________
APPROVED AS TO FORM:
By:_______________________________ Date:___________________
City Attorney
APPROVED AS TO BUDGET AUTHORITY AND INSURANCE:
By:_______________________________ Date: __________________
Administrative Services Director
Attachments
Exhibit A -- Scope of Work
Exhibit B -- Contract Payment and Reporting Schedule
Exhibit C -- Facilities and Equipment
Exhibit D -- General Provisions
Exhibit E -- Insurance Requirements
155
City of Saratoga/Standard Contract Agreement Page 5 of 21
My Documents/Contracts
03/15/01
EXHIBIT A
SCOPE OF WORK
Work on projects assigned by the Community Development Director.
156
City of Saratoga/Standard Contract Agreement Page 6 of 21
My Documents/Contracts
03/15/01
EXHIBIT B
PAYMENT
1. TOTAL COMPENSATION City shall pay Contractor an amount
not to exceed the total sum of fifty two thousand five hundred dollars
($52,500) for work to be performed and reimbursable costs incurred
pursuant to this Agreement. The total sum stated above shall be the total
which City shall pay for the work product to be provided by Contractor
pursuant to this Agreement. For each project undertaken pursuant to this
agreement City and Contractor shall develop and agree to a scope of work
and a total project cost which shall be approved by the Community
Development Director. The total cost of any project may not exceed that
authorized by the Community Development Director.
2. INVOICES Contractor shall submit invoices, not more often than
once a month during the term of this Agreement, based on the cost for work
performed and reimbursable expenses incurred prior to the invoice date.
Invoices shall contain the following information:
a. Serial identifications of bills, i.e., Bill No. 1;
b. The beginning and ending dates of the billing period;
c. A summary containing the total contract amount, the amount
of prior billings, the total due this period, and the remaining
balance available for all remaining billing periods.
3. MONTHLY PAYMENTS City shall make monthly payments, based
on such invoices, for satisfactory progress in completion of the Scope of
Work, and for authorized reimbursable expenses incurred.
4. REIMBURSABLE EXPENSES There shall be no right to
reimbursement of expenses incurred by Contractor except as specified in
Exhibit A to this Agreement.
5. BILLING RATES City shall make payments, based on such rates as
demonstrated below.
FY 08‐09 FY 09‐10 FY 10‐11
Principal Planner $125 $131 $138
157
City of Saratoga/Standard Contract Agreement Page 7 of 21
My Documents/Contracts
03/15/01
Senior Planner $100 $105 $110
Associate Planner $85 $89 $93
Assistant Planner $70 $74 $78
Planning Tech/Admin $60 $63 $66
158
City of Saratoga/Standard Contract Agreement Page 8 of 21
My Documents/Contracts
03/15/01
EXHIBIT C
FACILITIES AND EQUIPMENT
City shall furnish physical facilities such as desks, filing cabinets,
and conference space, as may be reasonably necessary for Contractor's use
while consulting with City employees and reviewing records and the
information in possession of City. The location, quantity, and time of
furnishing said physical facilities shall be in the sole discretion of City. In
no event shall City be obligated to furnish any facility which may involve
incurring any direct expense, including, but not limiting the generality of
this exclusion, long-distance telephone or other communication charges,
vehicles, and reproduction facilities. Contractor shall not use such services,
premises, facilities, supplies or equipment for any purpose other than in the
performance of Contractor's obligations under this Agreement.
159
City of Saratoga/Standard Contract Agreement Page 9 of 21
My Documents/Contracts
03/15/01
EXHIBIT D
GENERAL PROVISIONS
1. INDEPENDENT CONTRACTOR At all times during the term of
this Agreement, Contractor shall be an independent contractor and shall not
be an employee of City. Contractor shall complete the Scope of Work
hereunder in accordance with currently approved methods and practices in
Contractor's field. City shall have the right to control Contractor only with
respect to specifying the results to be obtained from Contractor pursuant to
this Agreement. City shall not have the right to control the means by which
Contractor accomplishes services rendered pursuant to this Agreement.
Likewise, no relationship of employer and employee is created by this
Agreement between the City and Contractor or any subcontractor or
employee of Contractor. Nothing contained in this Agreement shall be
construed as limiting the right of Contractor to engage in Contractor's
profession separate and apart from this Agreement so long as such activities
do not interfere or conflict with the performance by Contractor of the
obligations set forth in this Agreement. Interference or conflict will be
determined at the sole discretion of the City.
2. STANDARD OF PERFORMANCE Contractor shall complete the
Scope of Work required pursuant to this Agreement in the manner and
according to the standards observed by a competent practitioner of the
profession in which Contractor is engaged in the geographical area in which
Contractor practices its profession. All work product of whatsoever nature
which Contractor delivers to City pursuant to this Agreement shall be
prepared in a substantial, first class and workmanlike manner and conform
to the standards of quality normally observed by a person practicing in
Contractor's profession.
3. TIME Contractor shall devote such time to the Scope of Work
pursuant to this Agreement as may be reasonably necessary for satisfactory
performance of Contractor's obligations pursuant to this Agreement.
4. CONTRACTOR NO AGENT Except as City may specify in writing,
Contractor shall have no authority, express or implied, to act on behalf of
City in any capacity whatsoever as an agent. Contractor shall have no
authority, express or implied, pursuant to this Agreement to bind City to
any obligation whatsoever.
160
City of Saratoga/Standard Contract Agreement Page 10 of 21
My Documents/Contracts
03/15/01
5. BENEFITS AND TAXES Contractor shall not have any claim under
this Agreement or otherwise against City for seniority, vacation time,
vacation pay, sick leave, personal time off, overtime, health insurance,
medical care, hospital care, insurance benefits, social security, disability,
unemployment, workers compensation or employee benefits of any kind.
Contractor shall be solely liable for and obligated to pay directly all
applicable taxes, including, but not limited to, federal and state income
taxes, and in connection therewith Contractor shall indemnify and hold City
harmless from any and all liability that City may incur because of
Contractor's failure to pay such taxes. City shall have no obligation
whatsoever to pay or withhold any taxes on behalf of Contractor.
6. ASSIGNMENT PROHIBITED No party to this Agreement may assign
any right or obligation pursuant to this Agreement. Any attempted or
purported assignment of any right or obligation pursuant to this Agreement
shall be void and of no effect. However, with the consent of the City given in
writing, Contractor is entitled to subcontract such portions of the work to be
performed under this Agreement as may be specified by City.
7. PERSONNEL
a. Qualifications. Contractor shall assign only competent personnel
to complete the Scope of Work pursuant to this Agreement. In the
event that City, in its sole discretion, at any time during the term
of this Agreement, desires the removal of any such persons,
Contractor shall, immediately upon receiving notice from city of
such desire of City, cause the removal of such person or persons.
b. Employment Eligibility. Contractor shall ensure that all
employees of Contractor and any subcontractor retained by
Contractor in connection with this Agreement have provided the
necessary documentation to establish identity and employment
eligibility as required by the Immigration Reform and Control Act
of 1986. Failure to provide the necessary documentation will
result in the termination of the Agreement as required by the
Immigration Reform and Control Act of 1986.
8. CONFLICT OF INTEREST
a. In General. Contractor represents and warrants that, to the best
of the Contractor's knowledge and belief, there are no relevant
facts or circumstances which could give rise to a conflict of
interest on the part of Contractor, or that the Contractor has
already disclosed all such relevant information.
161
City of Saratoga/Standard Contract Agreement Page 11 of 21
My Documents/Contracts
03/15/01
b. Subsequent Conflict of Interest. Contractor agrees that if an
actual or potential conflict of interest on the part of Contractor is
discovered after award, the Contractor will make a full disclosure
in writing to the City. This disclosure shall include a description
of actions, which the Contractor has taken or proposes to take,
after consultation with the City to avoid, mitigate, or neutralize the
actual or potential conflict. Within 45 days, the Contractor shall
have taken all necessary steps to avoid, mitigate, or neutralize the
conflict of interest to the satisfaction of the City.
c. Interests of City Officers and Staff. No officer, member or
employee of City and no member of the City Council shall have any
pecuniary interest, direct or indirect, in this Agreement or the
proceeds thereof. Neither Contractor nor any member of any
Contractor's family shall serve on any City board or committee or
hold any such position which either by rule, practice or action
nominates, recommends, or supervises Contractor's operations or
authorizes funding to Contractor.
9. COMPLIANCE WITH LAWS
a. In General. Contractor shall observe and comply with all laws,
policies, general rules and regulations established by City and
shall comply with the common law and all laws, ordinances, codes
and regulations of governmental agencies, (including federal, state,
municipal and local governing bodies) applicable to the
performance of the Scope of Work hereunder, including, but not
limited to, all provisions of the Occupational Safety and Health Act
of 1979 as amended.
b. Licenses and Permits. Contractor represents and warrants to
City that it has all licenses, permits, qualifications and approvals
of whatsoever nature which are legally required for Contractor to
practice its profession. Contractor represents and warrants to City
that Contractor shall, at its sole cost and expense, keep in effect at
all times during the term of this Agreement any licenses, permits,
and approvals which are legally required for Contractor to practice
its profession. In addition to the foregoing, Contractor shall obtain
and maintain during the term hereof a valid City of Saratoga
Business License.
c. Funding Agency Requirements. To the extent that this
Agreement may be funded by fiscal assistance from another entity,
Contractor shall comply with all applicable rules and regulations
to which City is bound by the terms of such fiscal assistance
program.
162
City of Saratoga/Standard Contract Agreement Page 12 of 21
My Documents/Contracts
03/15/01
d. Drug-free Workplace. Contractor and Contractor's employees and
subcontractors shall comply with the City's policy of maintaining a
drug-free workplace. Neither Contractor nor Contractor's
employees and subcontractors shall unlawfully manufacture,
distribute, dispense, possess or use controlled substances, as
defined in 21 U.S. Code Section 812, including marijuana, heroin,
cocaine, and amphetamines, at any facility, premises or worksite
used in any manner in connection with performing services
pursuant to this Agreement. If Contractor or any employee or
subcontractor of Contractor is convicted or pleads nolo contendere
to a criminal drug statute violation occurring at such a facility,
premises, or worksite, the Contractor, within five days thereafter,
shall notify the City.
e. Discrimination Prohibited. Contractor assures and agrees that
Contractor will comply with Title VII of the Civil Rights Act of 1964
and other laws prohibiting discrimination and that no person
shall, on the grounds of race, creed, color, disability, sex, sexual
orientation, national origin, age, religion, Vietnam era veteran's
status, political affiliation, or any other non-merit factors be
excluded from participating in, be denied the benefits of, or be
otherwise subjected to discrimination under this Agreement.
10. DOCUMENTS AND RECORDS
a. Property of City. All reports, data, maps, models, charts,
studies, surveys, photographs, memoranda or other written
documents or materials prepared by Contractor pursuant to this
Agreement shall become the property of City upon completion of
the work to be performed hereunder or upon termination of this
Agreement.
b. Retention of Records. Until the expiration of five years after the
furnishing of any services pursuant to this Agreement, Contractor
shall retain and make available to the City or any party designated
by the City, upon written request by City, this Agreement, and
such books, documents and records of Contractor (and any books,
documents, and records of any subcontractor(s)) that are
necessary or convenient for audit purposes to certify the nature
and extent of the reasonable cost of services to City.
c. Use Of Recycled Products. Contractor shall prepare and submit
all reports, written studies and other printed material on recycled
paper to the extent it is available at equal or less cost than virgin
paper.
163
City of Saratoga/Standard Contract Agreement Page 13 of 21
My Documents/Contracts
03/15/01
d. Professional Seal. Where applicable in the determination of the
contract administrator, the first page of a technical report, first
page of design specifications, and each page of construction
drawings shall be stamped/sealed and signed by the licensed
professional responsible for the report/design preparation. The
stamp/seal shall be in a block entitled "Seal and Signature of
Registered Professional with report/design responsibility" as per
the sample below.
______________________________
Seal and Signature of Registered Professional
with report/design responsibility.
11. CONFIDENTIAL INFORMATION Contractor shall hold any
confidential information received from City in the course of performing this
Agreement in trust and confidence and will not reveal such confidential
information to any person or entity, either during the term of the Agreement
or at any time thereafter. Upon expiration of this Agreement, or termination
as provided herein, Contractor shall return materials which contain any
confidential information to City. Contractor may keep one copy for its
confidential file. For purposes of this paragraph, confidential information is
defined as all information disclosed to Contractor which relates to City's
past, present, and future activities, as well as activities under this
Agreement, which information is not otherwise of public record under
California law.
12. RESPONSIBILITY OF CONTRACTOR Contractor shall take all
responsibility for the work, shall bear all losses and damages directly or
indirectly resulting to Contractor, to any subcontractor, to the City, to City
officers and employees, or to parties designated by the City, on account of
the performance or character of the work, unforeseen difficulties, accidents,
occurrences or other causes predicated on active or passive negligence of
the Contractor or of any subcontractor.
13. INDEMNIFICATION Contractor and City agree that City, its
employees, agents and officials shall, to the fullest extent permitted by law,
be fully protected from any loss, injury, damage, claim, lawsuit, cost,
expense, attorneys fees, litigation costs, defense costs, court costs or any
other cost arising out of or in any way related to the performance of this
Agreement. Accordingly, the provisions of this indemnity provision are
intended by the parties to be interpreted and construed to provide the fullest
protection possible under the law to the City. Contractor acknowledges that
City would not enter into this agreement in the absence of the commitment
164
City of Saratoga/Standard Contract Agreement Page 14 of 21
My Documents/Contracts
03/15/01
of Contractor to indemnify and protect City as set forth below.
a. Indemnity. To the fullest extent permitted by law, Contractor
shall defend, indemnify and hold harmless City, its employees,
agents and officials, from any liability, claims, suits, actions,
arbitration proceedings, administrative proceedings, regulatory
proceedings, losses, expenses or costs of any kind whatsoever
without restriction or limitation, incurred in relation to, as a
consequence of or arising out of or in any way attributable
actually, allegedly or impliedly, in whole or in part, to the
performance of this Agreement. All obligations under this
provision are to be paid by Contractor as they are incurred by the
City.
b. Limitation on Indemnity. Without affecting the rights of City
under any provision of this agreement or this section, Contractor
shall not be required to indemnify and hold harmless City as set
forth above for liability attributable to the sole fault of City,
provided such sole fault is determined by agreement between the
parties or the findings of a court of competent jurisdiction. This
exception will apply only in instances where the City is shown to
have been solely at fault and not in instances where Contractor is
solely or partially at fault or in instances where City's fault
accounts for only a percentage of the liability involved. In those
instances, the obligation of Contractor will be all-inclusive and
City will be indemnified for all liability incurred, even though a
percentage of the liability is attributable to conduct of the City.
c. Acknowledgement. Contractor acknowledges that its obligation
pursuant to this section extends to liability attributable to City, if
that liability is less than the sole fault of City. Contractor has no
obligation under this agreement for liability proven in a court of
competent jurisdiction or by written agreement between the
parties to be the sole fault of City.
d. Scope of Contractor Obligation. The obligations of Contractor
under this or any other provision of this Agreement will not be
limited by the provisions of any workers' compensation act or
similar act. Contractor expressly waives its statutory immunity
under such statutes or laws as to City, its employees and officials.
e. Subcontractors. Contractor agrees to obtain executed indemnity
agreements with provisions identical to those set forth here in this
section from each and every subcontractor, sub tier contractor or
any other person or entity involved by, for, with or on behalf of
Contractor in the performance or subject matter of this Agreement.
In the event Contractor fails to obtain such indemnity obligations
from others as required here, Contractor agrees to be fully
165
City of Saratoga/Standard Contract Agreement Page 15 of 21
My Documents/Contracts
03/15/01
responsible according to the terms of this section.
f. In General. Failure of City to monitor compliance with these
requirements imposes no additional obligations on City and will in
no way act as a waiver of any rights hereunder. This obligation to
indemnify and defend City as set forth herein is binding on the
successors, assigns, or heirs of Contractor and shall survive the
termination of this agreement or this section. For purposes of
Section 2782 of the Civil Code the parties hereto recognize and
agree that this Agreement is not a construction contract. By
execution of this Agreement, Contractor acknowledges and agrees
that it has read and understands the provisions hereof and that
this paragraph is a material element of consideration. City
approval of the insurance contracts required by this Agreement
does not relieve the Contractor or subcontractors from liability
under this paragraph.
14. INSURANCE REQUIREMENTS Contractor shall procure and
maintain for the duration of the contract insurance as set forth in Exhibit E.
The cost of such insurance shall be included in the Contractor's bid.
15. DEFAULT AND REMEDIES
a. Events of default. Each of the following shall constitute an event
of default hereunder:
1. Failure to perform any obligation under this Agreement and
failure to cure such breach immediately upon receiving notice
of such breach, if the breach is such that the City determines
the health, welfare, or safety of the public is immediately
endangered; or
2. Failure to perform any obligation under this Agreement and
failure to cure such breach within fifteen (15) days of receiving
notice of such breach, if the breach is such that the City
determines that the health, welfare, or safety of the public is
not immediately endangered, provided that if the nature of the
breach is such that the City determines it will reasonably
require more than fifteen (15) days to cure, Contractor shall not
be in default if Contractor promptly commences the cure and
diligently proceeds to completion of the cure.
b. Remedies upon default. Upon any Contractor default, City shall
have the right to immediately suspend or terminate the Agreement,
seek specific performance, contract with another party to perform
this Agreement and/or seek damages including incidental,
166
City of Saratoga/Standard Contract Agreement Page 16 of 21
My Documents/Contracts
03/15/01
consequential and/or special damages to the full extent allowed by
law.
c. No Waiver. Failure by City to seek any remedy for any default
hereunder shall not constitute a waiver of any other rights
hereunder or any right to seek any remedy for any subsequent
default.
16. TERMINATION Either party may terminate this Agreement with or
without cause by providing 10 days notice in writing to the other party. The
City may terminate this Agreement at any time without prior notice in the
event that Contractor commits a material breach of the terms of this
Agreement. Upon termination, this Agreement shall become of no further
force or affect whatsoever and each of the parties hereto shall be relieved
and discharged here-from, subject to payment for acceptable services
rendered prior to the expiration of the notice of termination.
Notwithstanding the foregoing, the provisions of this Agreement concerning
retention of records, City's rights to material produced, confidential
information, contractor's responsibility, indemnification, insurance, dispute
resolution, litigation, and jurisdiction and severability shall survive
termination of this Agreement.
17. DISPUTE RESOLUTION The parties shall make a good faith effort to
settle any dispute or claim arising under this Agreement. If the parties fail
to resolve such disputes or claims, they shall submit them to non-binding
mediation in California at shared expense of the parties for at least 8 hours
of mediation. If mediation does not arrive at a satisfactory result,
arbitration, if agreed to by all parties, or litigation
may be pursued. In the event any dispute resolution processes are involved,
each party shall bear its own costs and attorneys fees.
18. LITIGATION If any litigation is commenced between parties to
this Agreement concerning any provision hereof or the rights and duties of
any person in relation thereto, each party shall bear its own attorneys' fees
and costs.
19. JURISDICTION AND SEVERABILITY This Agreement shall be
administered and interpreted under the laws of the State of California.
Jurisdiction of litigation arising from this Agreement shall be in that state
and venue shall be in Santa Clara County, California. If any part of this
Agreement is found to conflict with applicable laws, such part shall be
inoperative, null and void insofar as it conflicts with said laws, but the
remainder of this Agreement shall be in full force and effect.
167
City of Saratoga/Standard Contract Agreement Page 17 of 21
My Documents/Contracts
03/15/01
20. NOTICE OF NON-RENEWAL Contractor understands and agrees
that there is no representation, implication, or understanding that the City
will request that work product provided by Contractor under this Agreement
be supplemented or continued by Contractor under a new agreement
following expiration or termination of this Agreement. Contractor waives all
rights or claims to notice or hearing respecting any failure by City to
continue to request or retain all or any portion of the work product from
Contractor following the expiration or termination of this Agreement.
21. PARTIES IN INTEREST This Agreement is entered only for the
benefit of the parties executing this Agreement and not for the benefit of any
other individual, entity or person.
WAIVER. Neither the acceptance of work or payment for work pursuant to
this Agreement shall constitute a waiver of any rights or obligations arising
under this Agreement. The failure by the City to enforce any of Contractor's
obligations or to exercise City's rights shall in no event be deemed a waiver
of the right to do so thereafter.
168
City of Saratoga/Standard Contract Agreement Page 18 of 21
My Documents/Contracts
03/15/01
EXHIBIT E
INSURANCE
Please refer to the insurance requirements listed below. Those that have an
“X” indicated in the space before the requirement apply to Contractor's
Agreement (ignore any not checked).
Contractor shall provide its insurance broker(s)/agent(s) with a copy of
these requirements and request that they provide Certificates of Insurance
complete with copies of all required endorsements to: Administrative
Services Officer, City of Saratoga, 13777 Fruitvale Avenue, Saratoga, CA
95070.
Contractor shall furnish City with copies of original endorsements affecting
coverage required by this Exhibit E. The endorsements are to be signed by a
person authorized by that insurer to bind coverage on its behalf. All
endorsements and certificates are to be received and approved by City before
work commences. City has the right to require Contractor's insurer to
provide complete, certified copies of all required insurance policies,
including endorsements affecting the coverage required by these
specifications.
X Commercial General/Business Liability Insurance with coverage as
indicated:
X $1,000,000 per occurrence/$2,000,000 aggregate limits for
bodily injury and property damage
___ $ ____________ per occurrence bodily injury/$ ___________ per
occurrence property damage
___ Coverage for X, C, U hazards MUST be evidenced on the
Certificate of Insurance
___ If the standard ISO Form wording for "OTHER INSURANCE", or
other comparable wording, is not contained in Contractor's
liability insurance policy, an endorsement must be provided
that said insurance will be primary insurance and any
insurance or self-insurance maintained by City, its officers,
employees, agents or volunteers shall be in excess of
Contractor's insurance and shall not contribute to it.
X Auto Liability Insurance with coverage as indicated:
X $1,000,000 combined single limit for bodily injury and property
damage
169
City of Saratoga/Standard Contract Agreement Page 19 of 21
My Documents/Contracts
03/15/01
___ $ ____________ per person/$__________ per accident for bodily
injury
___ $ ____________ per occurrence for property damage
___ $ 500,000 combined single limit for bodily injury and property
damage
___ Garage keepers extra liability endorsement to extend coverage
to all vehicles in the care, custody and control of the contractor,
regardless of where the vehicles are kept or driven.
Professional/Errors and Omissions Liability with coverage as
indicated:
$1,000,000 per loss/ $2,000,000 aggregate
___ $5,000,000 per loss/ $5,000,000 aggregate
Contractor must maintain Professional/Errors & Omissions Liability
coverage for a period of three years after the expiration of this
Agreement. Contractor may satisfy this requirement by renewal of
existing coverage or purchase of either prior acts or tail coverage
applicable to said three year period.
X Workers' Compensation Insurance
X Including minimum $1,000,000 Employer's Liability
The Employer's Liability policy shall be endorsed to waive any right of
subrogation as respects the City, its employees or agents.
The Contractor makes the following certification, required by section 1861 of
the California Labor Code:
I am aware of the provisions of Section 3700 of the Labor Code which
require every employer to be insured against liability for workers'
compensation or to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such provisions before
commencing the performance of the work of this contract
X Additional Insured Endorsement(s) for Commercial General/Business
Liability coverage naming the City of Saratoga, its officers, employees
and agents as additional insured.
(NOTE: additional insured language on the Certificate of Insurance is
NOT acceptable without a separate endorsement such as Form CG 20
10)
X The Certificate of Insurance MUST provide 30 days notice of
cancellation, (10 days notice for non-payment of premium). NOTE: the
170
City of Saratoga/Standard Contract Agreement Page 20 of 21
My Documents/Contracts
03/15/01
following words must be crossed out or deleted from the standard
cancellation clause: ". . . endeavor to . . ." AND ". . . but failure to
mail such notice shall impose no obligation or liability of any kind
upon the company, its agents or representatives."
___ All subcontractors used must comply with the above requirements
except as noted below:
As to all of the checked insurance requirements above, the following shall
apply:
a. Deductibles and Self-Insured Retentions. Any deductibles or
self-insured retentions must be declared to and approved by the
City. At the option of the City, either (1) the insurer shall reduce
or eliminate such deductibles or self-insured retentions as
respects the City, its officers, officials and employees; or (2) the
Contractor shall procure a bond guaranteeing payment of losses
and related investigations, claim administration and defense
expenses.
b. City as Additional Insured. The City, its officers, officials,
employees and volunteers are to be covered as insureds as
respects: liability arising out of activities performed by or on
behalf of the Contractor; products and completed operations of the
Contractor, premises owned, occupied or used by the Contractor,
or automobiles owned, leased, hired or borrowed by the
Contractor. The coverage shall contain no special limitations on
the scope of the protection afforded to the City, its officers,
officials, employees or volunteers.
c. Other Insurance Provisions. The policies are to contain, or be
endorsed to contain, the following provisions:
1. Any failure to comply with reporting provisions of the policies
shall not affect coverage provided to the City, its officers,
officials, employees or volunteers.
2. The Contractor's insurance shall apply separately to each
insured against whom claim is made or suit is brought, except
with respect to the limits of the insurer's liability.
171
City of Saratoga/Standard Contract Agreement Page 21 of 21
My Documents/Contracts
03/15/01
3. Coverage shall not be suspended, voided, canceled by either
party, reduced in coverage or in limits except after thirty (30)
days' prior written notice by certified mail, return receipt
requested, has been given to the City.
d. Acceptability of Insurers. Insurance is to be placed with
insurers with a Bests' rating of no less than A: VII
172
AT
T
A
C
H
M
E
N
T
‐
4
En
v
i
r
o
n
m
e
n
t
a
l
Pl
a
n
n
e
r
Co
n
s
u
l
t
a
n
t
s
Ex
p
e
r
i
e
n
c
e
S
c
o
p
e
of
Wo
r
k
C
o
s
t
s
Lo
c
a
t
i
o
n
Jo
n
e
s
an
d
St
o
k
e
s
N/
A
N
/
A
N/
A
Wi
l
l
d
a
n
$1
4
5
‐
Pr
i
n
c
i
p
a
l
*
$1
2
5
‐
Se
n
i
o
r
$1
1
0
‐
As
s
o
c
i
a
t
e
$1
0
0
‐
As
s
i
s
t
a
n
t
$8
0
‐
Pl
a
n
Te
c
h
.
LS
A
As
s
o
c
i
a
t
e
s
$1
1
5
‐
As
s
o
c
i
a
t
e
*
$1
5
5
‐
Pr
i
n
c
i
p
a
l
$1
5
0
‐
Se
n
i
o
r
$9
0
‐
Pl
a
n
n
e
r
$7
5
‐
As
s
i
s
.
Pl
a
n
n
e
r
RB
F
Co
n
s
u
l
t
i
n
g
$1
9
8
‐
Sr
.
PM
*
$1
8
5
‐
PM
$1
5
5
‐
Se
n
i
o
r
Pl
a
n
n
e
r
$1
4
0
‐
Pr
o
j
e
c
t
Pl
a
n
n
e
r
La
m
p
h
i
e
r
‐Gr
e
g
o
r
y
$1
9
0
‐
Pr
i
n
c
i
p
a
l
$1
6
5
‐
Pr
i
n
c
i
p
a
l
*
$1
5
0
‐
Se
n
i
o
r
Pl
a
n
n
e
r
$1
3
0
‐
As
s
o
c
.
Pl
a
n
n
e
r
$1
1
0
‐
Pl
a
n
n
e
r
Ci
r
c
l
e
P
o
i
n
t
$2
4
0
‐
Pr
i
n
c
i
p
a
l
$1
8
0
‐
Se
n
i
o
r
PM
*
$1
4
0
‐
PM
$1
2
0
‐
Se
n
i
o
r
As
s
o
c
.
$9
5
‐
As
s
o
c
.
Pl
a
n
n
e
r
Ba
s
e
d
in
Sa
n
Jo
s
e
.
25
ye
a
r
s
‐
Wo
r
k
e
d
wi
t
h
si
m
i
l
a
r
‐si
z
e
d
ju
r
i
s
d
i
c
t
i
o
n
s
CE
Q
A
/ NE
P
A
do
c
u
m
e
n
t
a
t
i
o
n
,
Ne
g
a
t
i
v
e
an
d
Mi
t
i
g
a
t
e
d
,
Ne
g
a
t
i
v
e
De
c
l
a
r
a
t
i
o
n
s
,
In
i
t
i
a
l
St
u
d
y
,
et
c
.
Ba
s
e
d
in
Oa
k
l
a
n
d
.
21
ye
a
r
s
‐
Wo
r
k
e
d
wi
t
h
si
m
i
l
a
r
‐si
z
e
d
ju
r
i
s
d
i
c
t
i
o
n
s
CE
Q
A
/ NE
P
A
do
c
u
m
e
n
t
a
t
i
o
n
,
Ne
g
a
t
i
v
e
an
d
Mi
t
i
g
a
t
e
d
,
Ne
g
.
De
c
.
,
In
i
t
i
a
l
St
u
d
y
,
et
c
.
Ba
s
e
d
in
Sa
n
Fr
a
n
c
i
s
c
o
.
Op
t
e
d
‐Ou
t
of
RF
P
Ba
s
e
d
in
Sa
c
r
a
m
e
n
t
o
.
Ba
s
e
d
in
Be
r
k
e
l
e
y
.
38
ye
a
r
s
‐
Wo
r
k
e
d
wi
t
h
si
m
i
l
a
r
‐si
z
e
d
ju
r
i
s
d
i
c
t
i
o
n
s
32
ye
a
r
s
‐
Wo
r
k
e
d
wi
t
h
si
m
i
l
a
r
‐si
z
e
d
ju
r
i
s
d
i
c
t
i
o
n
s
25
ye
a
r
s
‐
Wo
r
k
e
d
wi
t
h
si
m
i
l
a
r
‐si
z
e
d
ju
r
i
s
d
i
c
t
i
o
n
s
CE
Q
A
/ NE
P
A
do
c
u
m
e
n
t
a
t
i
o
n
,
Ne
g
a
t
i
v
e
an
d
Mi
t
i
g
a
t
e
d
,
Ne
g
a
t
i
v
e
De
c
l
a
r
a
t
i
o
n
s
,
In
i
t
i
a
l
St
u
d
y
,
et
c
.
CE
Q
A
/ NE
P
A
do
c
u
m
e
n
t
a
t
i
o
n
,
Ne
g
a
t
i
v
e
an
d
Mi
t
i
g
a
t
e
d
,
Ne
g
a
t
i
v
e
De
c
l
a
r
a
t
i
o
n
s
,
In
i
t
i
a
l
St
u
d
y
,
et
c
.
CE
Q
A
/ NE
P
A
do
c
u
m
e
n
t
a
t
i
o
n
,
Ne
g
a
t
i
v
e
an
d
Mi
t
i
g
a
t
e
d
,
Ne
g
a
t
i
v
e
De
c
l
a
r
a
t
i
o
n
s
,
In
i
t
i
a
l
St
u
d
y
,
et
c
.
* Pe
r
pr
o
p
o
s
a
l
,
bo
l
d
ti
t
l
e
in
d
i
c
a
t
e
s
st
a
f
f
pe
r
s
o
n
pr
i
m
a
r
i
l
y
in
ch
a
r
g
e
of
en
v
i
r
o
n
m
e
n
t
a
l
re
v
i
e
w
ap
p
l
i
c
a
t
i
o
n
s
17
3
PM
C
$1
9
0
‐
Pr
i
n
c
i
p
a
l
*
$1
7
5
‐
Bi
o
.
Di
r
e
c
t
o
r
$1
3
0
‐
PM
/ Se
n
i
o
r
Pl
a
n
$1
2
0
‐
Se
n
i
o
r
Bi
o
.
$9
5
‐
As
s
o
c
.
Pl
a
n
n
e
r
$8
5
‐
As
s
i
s
.
Pl
a
n
n
e
r
13
ye
a
r
s
‐
Wo
r
k
e
d
wi
t
h
si
m
i
l
a
r
‐si
z
e
d
ju
r
i
s
d
i
c
t
i
o
n
s
CE
Q
A
/ NE
P
A
do
c
u
m
e
n
t
a
t
i
o
n
,
Ne
g
a
t
i
v
e
an
d
Mi
t
i
g
a
t
e
d
,
Ne
g
a
t
i
v
e
De
c
l
a
r
a
t
i
o
n
s
,
In
i
t
i
a
l
St
u
d
y
,
et
c
.
Ba
s
e
d
in
Oa
k
l
a
n
d
.
* Pe
r
pr
o
p
o
s
a
l
,
bo
l
d
ti
t
l
e
in
d
i
c
a
t
e
s
st
a
f
f
pe
r
s
o
n
pr
i
m
a
r
i
l
y
in
ch
a
r
g
e
of
en
v
i
r
o
n
m
e
n
t
a
l
re
v
i
e
w
ap
p
l
i
c
a
t
i
o
n
s
17
4
Cu
r
r
e
n
t
Pl
a
n
n
i
n
g
Co
n
s
u
l
t
a
n
t
s
Ex
p
e
r
i
e
n
c
e
S
c
o
p
e
of
Wo
r
k
C
o
s
t
s
(p
e
r
Ho
u
r
)
L
o
c
a
t
i
o
n
La
t
a
Va
s
u
d
e
v
a
n
$9
0
‐
Se
n
i
o
r
*
M ‐Gr
o
u
p
$1
2
5
‐
Pr
i
n
c
i
p
a
l
$1
0
0
‐
Se
n
i
o
r
*
$8
5
‐
As
s
o
c
i
a
t
e
$7
0
‐
As
s
i
s
t
a
n
t
$6
0
‐
Pl
a
n
n
i
n
g
Te
c
h
.
Wi
l
l
d
a
n
$1
4
5
‐
Pr
i
n
c
i
p
a
l
$1
2
5
‐
Se
n
i
o
r
$1
1
0
‐
As
s
o
c
i
a
t
e
*
$1
0
0
‐
As
s
i
s
t
a
n
t
$8
0
‐
Pl
a
n
Te
c
h
.
RB
F
Co
n
s
u
l
t
i
n
g
$1
5
5
‐
Se
n
i
o
r
Pl
a
n
n
e
r
*
$1
4
0
‐
Pr
o
j
e
c
t
Pl
a
n
n
e
r
$1
1
1
‐
Pl
a
n
n
e
r
*
$8
8
‐
As
s
i
s
t
a
n
t
Pl
a
n
n
e
r
PM
C
$1
9
0
‐
20
0
‐
PM
$1
5
0
‐17
0
‐
Sr
.
As
s
o
c
.
$1
2
0
‐
13
0
‐
Sr
.
Pl
a
n
n
e
r
$9
0
‐
$1
2
0
‐
As
s
o
c
.
Pl
.
*
$7
5
‐
$8
5
‐
As
s
i
t
.
Pl
.
13
ye
a
r
s
Pr
o
c
e
s
s
i
n
g
de
v
e
l
o
p
m
e
n
t
pe
r
m
i
t
s
,
su
b
d
i
v
i
s
i
o
n
s
,
si
t
e
pl
a
n
an
d
de
s
i
g
n
re
v
i
e
w
,
co
u
n
t
e
r
as
s
i
s
t
a
n
c
e
,
pu
b
l
i
c
pr
e
s
e
n
t
a
t
i
o
n
s
.
Ba
s
e
d
in
Oa
k
l
a
n
d
.
38
ye
a
r
s
Pr
o
c
e
s
s
i
n
g
en
t
i
t
l
e
m
e
n
t
pe
r
m
i
t
s
,
De
s
i
g
n
Re
v
i
e
w
,
Su
b
d
i
v
i
s
i
o
n
s
,
Us
e
Pe
r
m
i
t
s
,
De
v
e
l
o
p
m
e
n
t
Pe
r
m
i
t
s
,
et
c
.
Ba
s
e
d
in
Sa
c
r
a
m
e
n
t
o
.
25
ye
a
r
s
G
e
n
e
r
a
l
Pl
a
n
s
,
EI
R
'
s
,
Sp
e
c
i
f
i
c
Pl
a
n
s
,
Ar
e
a
Pl
a
n
s
,
En
v
i
r
o
n
m
e
n
t
a
l
en
t
i
t
l
e
m
e
n
t
s
Ba
s
e
d
in
Oa
k
l
a
n
d
.
7 ye
a
r
s
C
o
m
m
e
r
c
i
a
l
/
R
e
s
i
d
e
n
t
i
a
l
de
v
e
l
o
p
m
e
n
t
ap
p
l
i
c
a
t
i
o
n
s
.
Si
n
g
l
e
‐
Fa
m
i
l
y
Ap
p
l
i
c
a
t
i
o
n
s
.
CD
B
G
.
An
n
e
x
a
t
i
o
n
s
,
Te
n
t
a
t
i
v
e
Ma
p
s
.
Et
c
.
Ba
s
e
d
in
Pa
l
o
Al
t
o
.
15
ye
a
r
s
Co
m
m
e
r
c
i
a
l
/
R
e
s
i
d
e
n
t
i
a
l
de
v
e
l
o
p
m
e
n
t
ap
p
l
i
c
a
t
i
o
n
s
.
Si
n
g
l
e
‐
Fa
m
i
l
y
Ap
p
l
i
c
a
t
i
o
n
s
.
CD
B
G
.
An
n
e
x
a
t
i
o
n
s
,
Te
n
t
a
t
i
v
e
Ma
p
s
.
Et
c
.
Ba
s
e
d
in
Mo
u
n
t
a
i
n
View.
* Pe
r
pr
o
p
o
s
a
l
,
bo
l
d
ti
t
l
e
in
d
i
c
a
t
e
s
st
a
f
f
pe
r
s
o
n
pr
i
m
a
r
i
l
y
in
ch
a
r
g
e
of
de
v
e
l
o
p
m
e
n
t
re
v
i
e
w
ap
p
l
i
c
a
t
i
o
n
s
17
5
May 2008
STATEMENT OF QUALIFICATIONS
ENVIRONMENTAL PLANNING SERVICES
176
STATEMENT OF QUALIFICATIONS
Submitted to:
City of Saratoga
Community Development Department
13777 Fruitvale Avenue
Saratoga, CA 95070
Prepared by:
LSA Associates, Inc.
2215 Fifth Street
Berkeley, CA 94710
510.540.7331
May 2008
ENVIRONMENTAL PLANNING SERVICES
177
May 6, 2008
Michael Fossati, Assistant Planner
City of Saratoga
Community Development Department
13777 Fruitvale Avenue
Saratoga, CA 95070
Subject: Statement of Qualifications to Provide Environmental Planning Services
Dear Mr. Fossati:
LSA Associates, Inc. (LSA) is pleased to submit this Statement of Qualifications to Provide Environmental
Planning Services. Our key qualifications for conducting this work are: (1) our staff, who are adept at
interpreting and implementing planning and environmental review regulations; (2) our solid understanding
of CEQA and the environmental review process; and (3) our keen awareness of issues that are important to
residents in Saratoga, and the ability to customize our planning assistance accordingly.
LSA has 32 years of experience providing environmental planning services for public and private sector
clients throughout the State. In addition to our well-respected expertise in preparing analyses required by
CEQA and NEPA, we have local in-house experts in the fields of biology, cultural resources, air quality,
noise, hazardous materials, and transportation who are available to prepare technical studies, review
environmental documents and development plans, and advise on permitting issues in these areas when
required for a project. We are currently providing on-call or contract planning services to the cities of
Berkeley, Belmont, Millbrae, East Palo Alto, Colma and San Mateo County.
As you may know, we have worked closely with the Saratoga Public Works Department over the past three
years to prepare the environmental documentation for the Saratoga de Anza Trail and Kevin Moran Park.
We hope our work on these projects has shown you LSA’s commitment to fair and objective environ-
mental review, sound research and writing, availability to attend meetings and discuss project issues,
commitment to submitting work products on time, and knowledge of local conditions and community
expectations.
We think that our experience can help the City balance its workload while providing the utmost service to
the public and applicants. We look forward to discussing our qualifications with you in more detail.
Sincerely,
LSA ASSOCIATES, INC.
Judith H. Malamut, AICP Adam Weinstein
Principal Associate
178
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) i
TABLE OF CONTENTS
I. INTRODUCTION.......................................................................................................................1
II. QUALIFICATIONS, EXPERIENCE, AND REFERENCES.....................................................5
III. HOURLY RATES.......................................................................................................................15
IV. INSURANCE..............................................................................................................................17
V. CLIENTS ....................................................................................................................................21
TABLES
Table 1: Hourly Billing Rates for Assigned Personnel......................................................................15
Table 2: Hourly Billing Rates by Job Classification .........................................................................16
Table 3: Direct Expenses...................................................................................................................17
Table 4: Insurance Coverage.............................................................................................................19
Table 5: Current Clients.....................................................................................................................21
APPENDIX
RESUMES
179
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) ii
180
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 1
I. INTRODUCTION
The City of Saratoga (City) Community Development Department is seeking consultants to provide
environmental and planning services on two levels:
• Preparation of environmental review documents, including Initial Studies, Negative Declarations,
Environmental Impact Reports (EIRs), and technical environmental analyses that are informed by
an understanding of the General Plan, Residential Design Guidelines and other guiding
documents; and
• Coordination of staff planning services for presentations and/or hearings, including preparation of
planning-related applications and special projects, and staff reports necessary for project review.
The City is seeking firms with broad knowledge and experience in preparing California
Environmental Quality Act (CEQA) documents and taking projects through the environmental review
process. Potential projects are expected to include rezoning, subdivision, and mixed use projects that
could be exempt from CEQA or require documentation ranging from an Initial Study/Mitigated
Negative Declaration (MND) to an EIR.
LSA Associates, Inc. (LSA) would like to be pre-qualified to assist the City in conducting
environmental review and specific planning assignments. We understand that the City would like a
three-year commitment and could extend the contract an additional two years.
A. PROJECT TEAM
LSA has assembled a well-qualified team with local experience that will provide the full range of
required expertise. Our Project Manager, planners, and technical specialists are familiar with the City
of Saratoga through LSA’s work as lead environmental consultant for the Saratoga de Anza Trail
Environmental Review and the Kevin Moran Park Improvement Project Initial Study Mitigated
Negative Declaration. Adam Weinstein, Associate, who served as Project Manager for the two
projects in Saratoga listed above and collaborated closely with the Public Works Department, will
serve as Project Manager and day-to-day point of contact for as-needed environmental review
assignments. Adam has eight years experience preparing CEQA documents and a comprehensive
understanding of the environmental review process and planning issues that are specific to Saratoga.
He has managed the environmental analyses for a variety of projects, including numerous residential
projects (urban and rural), mixed use projects, private school projects, and public works projects
(roads, bridges, parks, and dams). His work will be reviewed and guided by Judith Malamut, AICP,
Principal. With 20 years of experience, Judith’s activities with LSA include project management for
CEQA documents, resource management plans, policy planning, environmental analysis, and open
space and recreation planning. Much of Judith’s planning and environmental review work in recent
years has been focused on projects in San Jose, the Peninsula, and the East Bay.
181
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 2
Brief descriptions of the qualifications and experience of LSA’s key personnel are described in
Chapter II. More detailed resumes are provided in the Appendix to this proposal.
B. KEY STRENGTHS
Key strengths that LSA brings to the City of Saratoga are as follows:
• Knowledge of the City. LSA is highly knowledgeable of the City’s environmental context and
planning issues through our previous environmental review work for the City. We are keenly
aware of the issues that are of most interest to Saratoga residents and have successfully addressed
project-specific concerns raised by local community groups. We have assigned the staff who
contributed to our previous Saratoga projects to the current effort – including planners and
biologists.
• Senior staff involvement. LSA is committed to the use of senior-level staff. For any project that
LSA undertakes, the LSA team will be directed by a principal of the firm, and managed by a
senior project manager. The management team will oversee the project, coordinate with City
staff, and ensure that all tasks are completed in an efficient, cost-effective, and timely manner.
• Responsiveness to community concerns and consideration for community involvement. We
understand that any development in an established residential community like Saratoga will raise
concerns about quality of life issues. We believe that it is important to respond to these concerns
in a way that the community can easily understand. In addressing environmental and quality of
life issues, LSA is adept at helping community members understand the environmental review
process and expectations for public input, and differentiating between project merits and project-
related environmental issues. Through our documents and our interaction with the public, we
clarify the latter distinction such that, as much as possible, comments received during the CEQA
process focus on the adequacy of the environmental analysis and not the merits of the project.
• Proactive contract planning. LSA staff have a broad-based planning background and are experts
in interpreting and implementing local, State, and federal planning, development, and
environmental review regulations. Our contract planning staff is adept at quickly learning and
applying local planning policies and regulations. Over the past two years LSA has provided
contract planning services to the cities of Belmont, Berkeley, East Palo Alto, Lodi, Martinez,
Millbrae, San Pablo; the Town of Colma; and the County of San Mateo.
• Preparation of well-written, defensible, and publicly accessible CEQA documents. LSA
produces legally-sound CEQA documents that are also written in a manner that makes them easy
to read and understandable to a diverse reviewing audience – including planners, designers,
attorneys, decision makers, members of the community, and local interest groups. We provide
informative graphics that support the analysis and make the documents more interesting to read.
We also strive to provide adequate background information to help interested individuals and
community groups understand topics that do not always fall within the requirements of CEQA
(e.g., socio-economic issues, property rights/values, and policy consistency). Simple attributes
such as clear formatting, a well-organized heading structure, and explicit descriptions of project
impacts and mitigation measures help our documents reach a broader audience.
• Integrated planning and management approach. LSA’s principals and staff are trained as
planners, environmental analysts, and policy analysts, bringing an enhanced set of skills and
viewpoints to environmental review and planning projects. Our combined expertise allows us to
182
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 3
work closely with City staff, refine the project description to meet environmental review needs,
and develop feasible and effective mitigation measures.
• Understanding of City staff needs. Through our experience working with public agencies, we
know that City staff can be stretched thin by the time and effort required to manage the envi-
ronmental review process. We believe that the ability of LSA staff to work independently of, but
in close communication with, staff is one of our greatest assets. We routinely assist staff with
public noticing, the preparation of staff reports, findings/statements of overriding considerations,
and presentations for public hearings. We are adept at responding to questions from decision-
making bodies about complex projects and environmental issues.
183
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 4
184
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 5
II. QUALIFICATIONS, EXPERIENCE, AND REFERENCES
As prime consultant, LSA will manage the as-needed environmental planning contract, assemble
project teams according to the needs of each unique assignment, be responsible for the accuracy and
quality of all technical documentation, and attend public hearings. This section presents a firm
description, qualifications of key personnel, relevant experience, and references.
A. FIRM DESCRIPTION
LSA provides multi-disciplinary land use and environmental planning services. As planners and
environmental analysts, we are active in all aspects of community development, land use planning,
and public involvement. As technical specialists, we provide expertise in transportation, air quality,
noise, biological resources, water quality, hazards, and cultural resources. LSA has extensive
experience providing services for both the public and private sectors and our understanding of both
development planning and the public interest results in realistic and fair recommendations. We offer
efficient and responsive support to State, regional, and local government, private sector, and
institutional clients.
LSA has 11 offices located in Berkeley, South San Francisco, Point Richmond, Fresno, Rocklin, San
Luis Obispo, Irvine, Carlsbad, Riverside, and Palm Springs, California, and Ft. Collins, Colorado.
LSA presently employs more than 250 professionals.
B. KEY PERSONNEL
LSA will assign the following staff to Saratoga projects.
• Adam Weinstein, Associate, is the designated Project Manager
for preparation of environmental review documents. Adam’s
primary responsibilities include managing a number of diverse
projects including EIRs, Initial Studies, Negative Declarations,
National Environmental Policy Act (NEPA) studies, and
planning policy analyses. Adam served as Project Manager for
environmental review of the Saratoga de Anza Trail and the
Kevin Moran Park Improvement Project. He is currently
managing the following projects: San Pablo Avenue
Streetscape Improvement Project Initial Study for the City of
El Cerrito; 1300 El Camino Real Mixed Use Development EIR
for the City of Menlo Park; and the Bentley School Conditional
Use Permit EIR for the City of Oakland. Adam’s
responsiveness and problem-solving abilities have resulted in repeat business from Bay Area
cities such as Menlo Park, Saratoga, Benicia, Emeryville, Oakland, and El Cerrito.
As the day-to-day Project
Manager, Adam will oversee the
environmental review effort of
specific projects. Adam will be the
primary point of contact with the
City and project team. His
management tasks include budget
and schedule control, report
preparation, and meeting/hearing
attendance.
185
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 6
Judith Malamut, AICP, Principal, will serve as Principal-in-
Charge. She has over 20 years of experience; her activities with
LSA focus on project management for environmental review
documents, policy planning, environmental analysis, and open
space and recreational planning. She is currently managing the
Sierra Point Biotech Project EIR and Opus Office Development
EIR for the City of Brisbane; the Prewett Park Community Center
Project IS/MND for the City of Antioch; and the Watson Park
Remedial Action Plan and Master Plan IS/MND for the City of
San Jose Parks, Recreation and Neighborhood Services. Judith’s
ability to guide clients through the environmental process and her
thoughtful approach to problem-solving has resulted in multiple
assignments from long-term clients, such the cities of Berkeley,
Livermore, San Jose, Fairfield, and Brisbane, and California State
University. In addition to the work cited above, she is currently managing the Wildfire Hazard
Reduction and Resource Management Plan and EIR for the East Bay Hills Parks for the East Bay
Regional Park District.
There are several staff members who would be available to provide project planning services for
CEQA documents and projects related to implementation of General Plan, Specific Plan, and
residential design guidelines, special projects, and application processing.
• Catherine Barber, Senior Planner, is available to serve as Project Planner. Ms. Barber has over
10 years of experience in the planning field. She has extensive experience as a municipal planner
with an emphasis on current planning and development. Her customer service skills have been
strengthened through working the public information counter for the cities of San Jose,
Burlingame, Millbrae, and the City and County of San Francisco. She has extensive experience in
community facilitation and participation, and has worked closely with citizens, homeowners and
developers alike. Catherine has a broad range of experience with CEQA and excellent technical
writing skills developed through the preparation of environmental documents, staff reports, and
policy documents.
• Hannah Young, Planner, is well-versed in CEQA and contract planning. Her current CEQA
assignments include San Francisco General Hospital Rebuild Program EIR for the City and
County of San Francisco; 1300 El Camino Real Mixed Use Project EIR for the City of Menlo
Park; 19th Street Residential Tower Project EIR for the City of Oakland; and Sierra Point Biotech
Project EIR for the City of Brisbane. She provides planning and technical assistance to project
managers on a variety of environmental documents, including master environmental assessments,
initial studies, environmental impact reports, and general plans. As a contract planner for the City
of Berkeley, she prepares and processes the planning entitlements for commercial and residential
planning applications. Hannah has provided staff support or contract planning services for the
cities of Belmont, Martinez, and San Pablo.
• Daniel Rinzler, Assistant Planner, will assist with planning and environmental review projects.
He researches and writes the land use, policy, aesthetics, and public services sections of
environmental review documents. He recently assisted Adam with the Kevin Moran Park
Improvement Project Initial Study/Mitigated Negative Declaration and the Downtown Berkeley
BART Preliminary Environmental Assessment Report for the City of Berkeley as a subconsultant
to Community Design + Architecture. He is also contributing to the Japantown Corporation Yard
As Principal-in-Charge, Judith will
provide input on and monitor the
scope, budget, and scheduling of
specific projects. She will be
ultimately responsible for the
quality of all project work, and will
review all in-house prepared text,
tables, and graphics before these
materials are presented to the City
as administrative review
documents.
186
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 7
Redevelopment Project EIR for the City of San Jose and the San Francisco General Hospital
Rebuild Program EIR.
LSA has a wealth of expertise in conducting biology, air quality and noise, and cultural resources
technical studies. The senior staff described below are responsible for preparing technical studies and
selecting appropriate staff necessary to support project teams.
• Leslie Allen, Senior Biologist, is a specialist in wetland permitting and general biology and
ecology. At LSA she conducts wetland delineations and prepares permit applications for
submittal to the Corps of Engineers, Regional Water Quality Control Board, the California
Coastal Commission, and City and County governments to address impacts to jurisdictional
wetlands and waters. She also manages and prepares permitting documents for a variety of
projects affecting the aquatic and terrestrial habitats of endangered species. Leslie develops and
implements mitigation and management plans that enhance, restore or create habitats for
mitigation and/or restoration purposes, including seasonal wetlands, riparian streams, salt and
brackish marshes, and uplands (grassland, rock outcrops, scrub). With Matt Ricketts, she
conducted the biological resources study (delineation and reconnaissance-level Biological
Assessment) for the Saratoga de Anza Trail.
• Matt Ricketts, Senior Wildlife Biologist, serves as project manager and lead biologist for a wide
range of projects His duties at LSA include biological surveys and impact assessments for
special-status wildlife species, preconstruction surveys for nesting birds, and preparation of both
reconnaissance-level and formal (e.g., Endangered Species Act Section 7) biological assessments.
He has also prepared numerous biological resource sections and impact analyses in accordance
with CEQA. Matt worked with Leslie Allen on the biological resources documentation for the
Saratoga de Anza Trail, where Saratoga Creek was a critical biological issue in terms of riparian
habitat, California red-legged frog, and non-anadromous steelhead.
• Tim Milliken, Botanist, specializes in vascular and non-vascular plant ecology, botanical
surveys, and arboriculture. He is a Certified Arborist, proficient in native plant identification, and
an experienced restoration biologist. Tim conducts tree surveys and rare plant surveys, prepares
planting plans, and monitors native habitat restorations. He has experience in preparing
vegetation management plans and has served as an urban forestry consultant.
• Amy Fischer, Senior Planner, is LSA’s senior technical task manager for transportation, air
quality and noise analysis for environmental review and planning documents in the Bay Area. In
addition to directing the research and field measurements for stand-alone technical studies, she
also summarizes existing traffic, noise and air quality analyses for incorporation into EIR
sections. Amy prepared the preliminary Air Quality, Noise and Transportation technical studies
for the Pilgrim Haven Nursing Home project in Los Gatos; a retail parking study in Union City;
and an acoustical analysis for a residential project in Fremont. She also prepared the air quality,
noise, and transportation analyses for the Kevin Moran Park Improvement Project Initial
Study/Mitigated Negative Declaration and the Saratoga de Anza Trail Environmental Review.
She previously prepared the De Anza College Transit Center Air Quality Analysis for the Santa
Clara Valley Transportation Authority; the air quality and noise analysis for the Gateways Rede-
velopment EIR for the City of Santa Rosa, the 1300 El Camino Mixed Use Project EIR for the
City of Menlo Park and the Benicia Business Park EIR for the City of Benicia. Amy regularly
appears at workshops and public hearings to discuss air quality, noise, and transportation
technical analyses in relation to CEQA.
187
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 8
• Philip Ault, Analyst, prepares the noise and air quality sections of EIRs, under the direction of
Amy Fischer. Phil is a key member of LSA’s environmental technical staff and is primarily
responsible for the measurement, assessment, and reporting of noise and air quality impacts for a
variety of projects. He is proficient with the use of the Federal Highway Administration (FHWA)
Highway Traffic Noise Prediction Model (FHWA RD-77-108), SOUND32 noise model, Traffic
Noise Model (TNM) 2.5, URBEMIS 2002 and CALINE4. He is also responsible for measuring
noise with the Larson Davis models 720 and 824 noise meter. Phil prepares stand-alone noise and
air quality studies.
• Christian Gerike, Principal, will oversee cultural resources evaluations. Christian has 28 years
experience conducting and directing records searches, research, surveys, excavations, evaluations,
and mitigation projects in the areas of prehistoric and historical archaeology and historical
architecture to address the requirements of CEQA and Section 106 of the National Historic
Preservation Act. He has directed projects throughout most of California in urban, rural, and
wilderness settings. Christian has completed the Advisory Council on Historic Preservation’s
course on Federal Projects and Historic Preservation Law, and a Caltrans sponsored workshop on
accounting procedures. Some of his recent CEQA projects include the cultural resources sections
for the City Center Estates Focused EIR for the City of Fremont; the North Main Street
Development Projects EIR for the City of Milpitas; and 221 First Street Mixed Use Project for
the City of Benicia. These projects evaluated the impacts of demolishing or preserving older
buildings. He also recently advised the Palo Alto Housing Corporation regarding the historical
context and the CEQA implications of a structure that the Corporation proposed to demolish.
Christian will be assisted by Timothy Jones, Cultural Resources Manager.
C. RELEVANT EXPERIENCE
LSA is currently undertaking or has successfully completed numerous environmental review
documents in recent years for residential projects, infill projects, mixed use projects, and public
works-related projects. Below, we summarize a selected group of projects, some of which also
entailed contract project management, staff reports, and application processing.
Saratoga Experience
Kevin Moran Park Improvement Project
Initial Study/Mitigated Negative Declaration
for the City of Saratoga. Kevin Moran Park, a 10-
acre community park, is named in memory of a
Saratoga resident who was killed at a Vietnam
War demonstration at UC-Santa Barbara in 1970.
LSA prepared an Initial Study/Mitigated Negative
Declaration to evaluate the environmental effects
of a City proposal to develop 4 acres of the park,
currently consisting of remnant orchard trees, with
new park facilities, including turf areas, bocce
courts, and a meditation garden. Although the park
project was relatively small, it generated a large
amount of controversy, especially among residents
adjacent to the park who were concerned about
188
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 9
traffic and increased noise levels at the park. The environmental review of the park project conducted
by LSA focused on the potential for burrowing owl to occur on the site, possible increases in noise
and traffic, and soil contamination associated with historic agricultural activities. Using empirical
data and modeling, LSA demonstrated that the park project would not result in significant
environmental effects or otherwise degrade the quality of life in the neighborhood.
Saratoga de Anza Trail Environmental Review
for the City of Saratoga as a subconsultant to
Shute, Mihaly and Weinberger, LLC. The
Saratoga de Anza Trail is a 1.6-mile component of
a regional bike and pedestrian trail that is
proposed to extend through the cities of
Cupertino, Saratoga, and Campbell, and the Town
of Los Gatos along utility and railroad rights-of-
way. In Saratoga, the trail has been subject to
considerable debate, and residents who live near
the corridor are concerned that the project will
intrude on their privacy, diminish property values,
and bring crime to the area. Working closely with the law firm Shute, Mihaly and Weinberger, LSA
conducted a one-day trail user survey and a comprehensive environmental evaluation of the trail
project to satisfy both CEQA and NEPA requirements. In the environmental documents prepared for
the project, LSA developed innovative mitigation measures to address project concerns such as at-
grade rail crossings, soil contamination, and impacts to creeks. These mitigation measures were later
incorporated into the project to reduce the environmental impacts of the trail. Using case studies of
other railroad corridor trail projects, LSA demonstrated that the trail would not pose safety risks to
users, or endanger property and privacy.
CEQA and Project Planning
Clarke and Weeks Townhomes Project
Contract Planning and CEQA Analysis for the
City of East Palo Alto. The proposed project is the
redevelopment of an underutilized 2.58-acre site,
located on Weeks Street east of Clarke Avenue.
The site would be developed with 55 two- and
three-story townhome units. LSA was responsible
for preparing the CEQA analysis, including an
Initial Study and a Focused EIR, and serving as adjunct planning staff responsible for preparing all
staff reports and associated documents for the Planning Commission and City Council. The majority
of potentially significant impacts would be mitigated to a less-than-significant level via
implementation of the mitigation measures recommended in the Initial Study, included as an
appendix to the Focused EIR. The EIR analysis was limited to cultural resources, including the
historical significance of the Runnymede-era farmhouse located on the project site. Demolition of this
historic resource was determined to be a significant unavoidable impact.
189
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 10
1300 El Camino Real Project EIR for the City of
Menlo Park. El Camino Real is one of the main
commercial corridors in Menlo Park, and has been
identified by the City as an appropriate place for
infill development. LSA is currently preparing an
EIR analyzing the effects of a redevelopment
project along El Camino Real, and within walking
distance of the Menlo Park Caltrain station, that
would include a grocery store/market, office
space, and fitness center. Key issues that are
addressed in the EIR include: the effects of railroad and traffic-related noise on the project; the
relationship of the project to the adjacent Derry Lane project (subject of a concurrent City project
evaluated by LSA); and the exposure of surrounding residential uses (including a senior housing
facility) to increased shade and shadow.
511 and 555 West Campbell Avenue Water Supply Wells and
Housing Project IS/MND for the City of Campbell. LSA
prepared an Initial Study/Mitigated Negative Declaration for a 40-
unit affordable housing development on one of the last remaining
infill sites in the City of Campbell. The project also included the
demolition and removal of water supply infrastructure and the
construction of three new water supply wells, pump stations,
piping, and associated structures. LSA’s analysis focused on
several key environmental constraints of the site, including the
site’s location adjacent to a busy freeway, lack of connectivity to
the surrounding neighborhood, and the presence of a 1947
farmstead. Numerous community and agency concerns were
addressed in the IS/MND, including the compatibility of the
affordable housing development with the surrounding medium-
density residential neighborhood, the effects of ongoing water
pumping activity on the proposed residences, and traffic volumes on local roadways. LSA prepared a
comprehensive IS/MND that included specific, easily-enforceable mitigation measures to reduce the
impacts of the project on the surrounding neighborhood and future site occupants.
Windrush School Initial Study/Mitigated
Negative Declaration for the City of El Cerrito.
Windrush School is an independent elementary
and middle school on a 4-acre hillside site in the
City of El Cerrito. In 2006 and 2007, the school
developed a four-phase, 20-year Master Plan to
accommodate a growing student body and an
expanding curriculum, and to better connect the
lower and upper portions of the campus. LSA
prepared a comprehensive Initial Study/Mitigated
Negative Declaration that included an analysis of
the environmental effects of the Master Plan.
During LSA’s preliminary historical research, it was discovered that two of the existing school
buildings were constructed in 1935 for use by the Chung Mei Home for orphaned Chinese-American
190
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 11
“We love LSA’s work. They have
been extremely helpful in
managing current planning
projects and have provided a
welcome relief to my staff.”
Debbie Sanderson, Principal
Planner, City of Berkeley
boys. At the request of the City, LSA prepared a historical resources evaluation of the existing
campus buildings to determine if they would be eligible for the California Register of Historic
Resources. After undertaking archival research, interviewing community members familiar with the
history of the school, and studying the architecture of the buildings themselves, LSA determined that
the entire campus is eligible for listing on the California Register. However, LSA found that the
design elements of the Master Plan would protect the integrity of the historic campus, and that no
significant impacts would result from the project.
Tresch Galleria Mitigated Negative Declaration for the City of Novato. LSA completed
environmental analysis of a proposed 7,500 square foot building on a site in downtown Novato. The
project would include office, retail, and residential space. Mitigation measures for noise were
included as part of the project.
West Branch Library Expansion CEQA Documentation for the Berkeley Public Library. LSA
prepared an IS/MND for the proposed renovation and expansion of the West Branch of the Berkeley
Public Library. Located on University Avenue near San Pablo Avenue, the West Branch is the second
largest of four branch libraries and is a designated local landmark. Built in 1923 in the Classical
Revival style, the library has undergone previous modifications that almost completely destroyed its
original architectural character. The library seeks additional space to house an expanding collection
and accommodate reader areas, community meeting and special program rooms and staff work areas.
Contract Planning
City of Millbrae Contract Planning Services: LSA has assisted the City of Millbrae with staffing
the public information counter as well as the processing of development applications while the City
was recruiting employees for the Planning Division. This work included: plan checking building
permit applications to determine consistency with the zoning code regulations, and review and
processing of sign permits, business license applications and home occupation permits. LSA also took
on permit processing and project management of new applications for development, including Design
Review projects for new construction and additions as well as conditional use permits. The duties
included a complete plan check of the plans to determine compliance with the zoning code and
Design Guidelines, as a well as making all necessary site visits, preparing staff reports, working with
neighbors and presenting the projects to the Planning Commission. After completing this 7- month
assignment LSA was called back by the City of Millbrae to continue assisting staff with current
planning projects, as well as to assist with their zoning code update. LSA is currently working with
City Staff to assess and revise zoning definitions, update zoning maps and add new modern land use
terms to their code.
City of Berkeley Contract Planning Services: LSA was selected
by the City of Berkeley to be part of a rotating list of consultants to
facilitate the flow of development applications. To date, LSA has
assumed all project management functions for over a dozen
applications, including meetings with applicants, architects and
engineers; determining application completeness; assessing project
conformance with applicable Zoning Ordinance provisions and
General Plan policies; developing recommendations to the Zoning Adjustments Board; preparing the
public hearing notice and staff reports; attending public hearings to present recommendations and
191
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 12
“LSA Associates has been
providing contract planning
services to our agency for about
a year now, and I have nothing
but praise for their services.
They quickly learned our
regulations and procedures, and
began almost immediately to
process permits with minimal
supervision, as if they had been
on-staff for some time. They have
been extremely professional,
organized and responsive,
working cooperatively with
applicants and in-house staff,
preparing staff reports, and
presenting projects and
negotiating solutions at public
hearings. I highly recommend
LSA Associates.” Lisa Aozasa,
Senior Planner, Current
Planning, San Mateo County
answer questions; and communicating with City staff, applicant, and concerned neighbors as
necessary. A selected list of projects includes:
• 1799 Fourth Street, Unit F (restaurant expansion)
• 1007 Heinz Street (existing private school improvements)
• 2599 Telegraph Avenue (tattoo and piercing art studio)
• 2437 Sixth Street (four dwelling units)
• 2501 Telegraph Avenue (Peet’s coffee retail sales)
• 2129 Durant Avenue (full service restaurant)
• 2020-2026 Addison Street (Freight & Salvage theater relocation)
San Mateo County Contract Planning Services: In order to
efficiently address a backlog of current planning applications, the
County of San Mateo sought contract planning assistance from
LSA. Since joining the San Mateo County team in June 2005, LSA
has been assigned 24 applications, including Use Permits for
wireless communications facilities, a new residence in the Coastal
Zone, and renewal of permits for a private religious school. Duties
included review of project application materials for completeness,
evaluation of the proposals for compliance with applicable policy
documents and codes, and creation of a staff report and
presentation of recommendations to the Zoning Hearing Officer,
Planning Commission and Board of Supervisors. LSA has become
an important resource to the County for contract planning services,
as evidenced by an extension and augmentation of the original
contract.
City of Martinez Contract Planning Services:. When the City of
Martinez was short-staffed, the City retained LSA to provide
planning staff on an interim basis. LSA sent trained staff to work
for an average of 16 hours per week for three months. Duties included writing staff reports for the
zoning administrator and planning commission hearings on various development applications. Under
the direction of the Deputy Director of Planning, LSA’s planner worked with applicants to build their
understanding of the development process, reviewed permit applications for completeness, drafted
correspondence, public notices, staff reports, conditions of approval, and resolutions, presented staff
reports at zoning administrator hearings, and answered questions from the public at the planning
counter. LSA also worked with the City to achieve a long-awaited update of the zoning map. LSA
converted the City’s old zoning map into an ArcGIS format for integration with Planning Department
data and created a legible map for public use that was also posted to the City’s website.
D. REFERENCES
We encourage you to contact our references regarding the quality of our work, management of budget
and schedule, and attentiveness to project needs.
192
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 13
Richard Taylor, Attorney
Shute, Mihaly & Weinberger LLP
415-552-7272
rtaylor@smwlaw.com
Carmen Borg, AICP
Shute, Mihaly & Weinberger LLP
415-552-7272
cborg@smwlaw.com
John Cherbone, Public Works Director
City of Saratoga Public Works Department
408-868-1239
jcherbone@saratoga.ca.us
Kristin Borel, Administrative Analyst
City of Saratoga Public Works Department
408-868-1258
kborel@saratoga.ca.us
Melanie Mintz, Capital Improvement Program Manager
City of El Cerrito
510-215-4339
mem@ci.el-cerrito.ca.us
Megan Fisher, Assistant Planner
City of Menlo Park
650-330-6737
mefisher@menlopark.org
Steve Ross, Principal Planner
City of Berkeley
510-981-7430
sdross@ci.berkeley.ca.us
David Petrovich, City Planner
City of Millbrae
650-259-2443
dpetrovich@ci.millbrae.ca.us
Andrew Brozyna, Acting Principal Engineer
City of Milpitas
408-586-3315
abrozyna@ci.milpitas.ca.gov
193
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 14
194
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 15
III. HOURLY RATES
Hourly rates for assigned personnel are shown below. A table with LSA’s labor classifications, hourly
rates and direct expenses is shown on the next page.
Table 1: Hourly Billing Rates for Assigned Personnel
Name Title Hourly Rate
Adam Weinstein Associate $115
Judith Malamut Principal $155
Catherine Barber Senior Planner $150
Hannah Young Planner $90
Daniel Rinzler Assistant Planner $75
Leslie Allen Senior Biologist $95
Matt Ricketts Senior Wildlife Biologist $85
Tim Milliken Botanist/Arborist $80
Amy Fischer Senior AQ/Noise Planner $120
Phil Ault AQ/Noise Analyst $90
Christian Gerike Principal/Cultural $155
Tim Jones Cultural Resources Manager $70
LSA bills monthly for progress payment based on work completed to date. Terms are net 30 days.
LSA offers a one percent discount on invoices paid within 30 days of the invoice date. A service
charge of 1.5 percent of the invoice amount (18 percent annual rate) may be applied to all accounts
not paid within 30 days of invoice date.
195
LS
A
A
S
S
O
C
I
A
T
E
S
,
I
N
C
.
ST
A
T
E
M
E
N
T
O
F
Q
U
A
L
I
F
I
C
A
T
I
O
N
S
MA
Y
2
0
0
8
EN
V
I
R
O
N
M
E
N
T
A
L
P
L
A
N
N
I
N
G
S
E
R
V
I
C
E
S
CI
T
Y
O
F
S
A
R
A
T
O
G
A
O:
\
P
R
O
P
O
S
A
L
\
0
8
0
2
1
-
S
a
r
a
t
o
g
a
E
n
v
i
r
o
n
m
e
n
t
a
l
\
S
a
r
a
t
o
g
a
S
O
Q
-
1
.
d
o
c
(
5
/
6
/
2
0
0
8
)
16
Ta
b
l
e
2
:
H
o
u
r
l
y
B
i
l
l
i
n
g
R
a
te
s
b
y
J
o
b
C
l
a
s
s
i
f
i
c
a
t
i
o
n
Jo
b
C
l
a
s
s
i
f
i
c
a
t
i
o
n
Pl
a
n
n
i
n
g
En
v
i
r
o
n
m
e
n
t
a
l
Tr
a
n
s
p
o
r
t
a
t
i
o
n
Ai
r
/
N
o
i
s
e
Cu
l
t
u
r
a
l
R
e
s
o
u
r
c
e
s
Bi
o
l
o
g
y
GI
S
Hourly Rate Range a
Pr
i
n
c
i
p
a
l
Pr
i
n
c
i
p
a
l
Pr
i
n
c
i
p
a
l
Pr
i
n
c
i
p
a
l
Pr
i
n
c
i
p
a
l
Pr
i
n
c
i
p
a
l
Pr
i
n
c
i
p
a
l
$125–250
As
s
o
c
i
a
t
e
As
s
o
c
i
a
t
e
As
s
o
c
i
a
t
e
As
s
o
c
i
a
t
e
As
s
o
c
i
a
t
e
As
s
o
c
i
a
t
e
As
s
o
c
i
a
t
e
$75–200
Se
n
i
o
r
Pl
a
n
n
e
r
Se
n
i
o
r
En
v
i
r
o
n
m
e
n
t
a
l
Pl
a
n
n
e
r
Se
n
i
o
r
T
r
a
n
s
p
o
r
t
a
t
i
o
n
Pl
a
n
n
e
r
/
E
n
g
i
n
e
e
r
Se
n
i
o
r
A
i
r
Q
u
a
l
i
t
y
/
No
i
s
e
S
p
e
c
i
a
l
i
s
t
Se
n
i
o
r
C
u
l
t
u
r
a
l
Re
s
o
u
r
c
e
s
M
a
n
a
g
e
r
Se
n
i
o
r
B
i
o
l
o
g
i
s
t
/
Bo
t
a
n
i
s
t
/
W
i
l
d
l
i
f
e
Bi
o
l
o
g
i
s
t
/
E
c
o
l
o
g
i
s
t
/
S
o
i
l
Sc
i
e
n
t
i
s
t
/
H
e
r
p
e
t
o
l
o
g
i
s
t
/
Ar
b
o
r
i
s
t
Se
n
i
o
r
G
I
S
Sp
e
c
i
a
l
i
s
t
$65–175
Pl
a
n
n
e
r
En
v
i
r
o
n
m
e
n
t
a
l
Pl
a
n
n
e
r
Tr
a
n
s
p
o
r
t
a
t
i
o
n
Pl
a
n
n
e
r
/
E
n
g
i
n
e
e
r
Ai
r
Q
u
a
l
i
t
y
/
N
o
i
s
e
Sp
e
c
i
a
l
i
s
t
Cu
l
t
u
r
a
l
R
e
s
o
u
r
c
e
s
Ma
n
a
g
e
r
Bi
o
l
o
g
i
s
t
/
B
o
t
a
n
i
s
t
/
Wi
l
d
l
i
f
e
B
i
o
l
o
g
i
s
t
/
Ec
o
l
o
g
i
s
t
/
S
o
i
l
S
c
i
e
n
t
i
s
t
/
He
r
p
e
t
o
l
o
g
i
s
t
/
A
r
b
o
r
i
s
t
GI
S
S
p
e
c
i
a
l
i
s
t
$50–125
As
s
i
s
t
a
n
t
Pl
a
n
n
e
r
As
s
i
s
t
a
n
t
En
v
i
r
o
n
m
e
n
t
a
l
Pl
a
n
n
e
r
As
s
i
s
t
a
n
t
Tr
a
n
s
p
o
r
t
a
t
i
o
n
Pl
a
n
n
e
r
/
E
n
g
i
n
e
e
r
Ai
r
Q
u
a
l
i
t
y
/
N
o
i
s
e
An
a
l
y
s
t
Cu
l
t
u
r
a
l
R
e
s
o
u
r
c
e
s
An
a
l
y
s
t
As
s
i
s
t
a
n
t
B
i
o
l
o
g
i
s
t
/
Bo
t
a
n
i
s
t
/
W
i
l
d
l
i
f
e
Bi
o
l
o
g
i
s
t
/
E
c
o
l
o
g
i
s
t
/
S
o
i
l
Sc
i
e
n
t
i
s
t
/
H
e
r
p
e
t
o
l
o
g
i
s
t
/
Ar
b
o
r
i
s
t
As
s
i
s
t
a
n
t
G
I
S
Sp
e
c
i
a
l
i
s
t
$50–100
Fi
e
l
d
S
e
r
v
i
c
e
s
Fi
e
l
d
Di
r
e
c
t
o
r
$50–100
Se
n
i
o
r
F
i
e
l
d
Cr
e
w
/
F
i
e
l
d
Cr
e
w
$35–80
Of
f
i
c
e
S
e
r
v
i
c
e
s
Re
s
e
a
r
c
h
As
s
i
s
t
a
n
t
/
Te
c
h
n
i
c
i
a
n
$25–50
Gr
a
p
h
i
c
s
$70–100
Of
f
i
c
e
As
s
i
s
t
a
n
t
$40–75
Wo
r
d
Pr
o
c
e
s
s
i
n
g
/
Te
c
h
n
i
c
a
l
Ed
i
t
i
n
g
$60–90
a
Th
e
h
o
u
r
l
y
r
a
t
e
f
o
r
w
o
r
k
i
n
v
o
l
v
i
n
g
a
c
t
u
a
l
e
x
p
e
n
s
e
s
i
n
c
o
u
r
t
,
g
i
v
i
n
g
d
e
p
o
s
i
t
i
o
n
s
o
r
s
i
m
i
l
a
r
e
x
p
e
r
t
t
e
s
t
i
m
o
n
y
,
w
i
l
l
b
e
b
i
l
l
e
d
a
t
$2
5
0
p
e
r
h
o
u
r
r
e
g
a
r
d
l
e
s
s
o
f
j
o
b
cl
a
s
s
i
f
i
c
a
t
i
o
n
s
.
19
6
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 17
Table 3: Direct Expenses
Unit Cost
Reproduction $0.10 per page
Color Reproduction (8.5 x 11) $1.00 per page
Color Reproduction (11 x 17) $3.00 per page
Mileage
Road $0.505 per mile
Off-Road $0.655 per mile
Facsimile $1.00 per page
CD Production $5.00 per CD
Plotting $5.00 per linear ft.
Diazo Printing $0.20 per sq. ft.
Film (developing billed separately as a direct cost) $5.00 per roll
Disposable camera and film (developing billed separately as a direct cost) $10.00 per camera
Search of Specialized Data Bases $100.00 per inquiry
GPS Unit $100.00 per day
Aerial Photos $200.00 per photo
197
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 18
198
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 19
IV. INSURANCE
LSA maintains appropriate professional liability insurance, errors and omissions insurance, and
workers’ compensation insurance coverage. Our coverage is shown in Table 4.
Table 4: Insurance Coverage
Coverage
Insurance
Company Limit(s) Deductible
Bests’
Rating
Additional
Insured
Primary
Wording
Waiver of
Subrogation
Cross
Liability/
Severability
of Interest
Commercial
General
Liability
Zurich American
Insurance
Company
$1,000,000
ea. occurrence
$2,000,000
aggregate
none A:XV OK OK OK OK
Automobile
Liability
Hartford Fire Ins.
Co.
$1,000,000
per accident
none A+:XV OK OK OK OK
Workers’
Comp. and
Employer’s
Liability-CA
American
Automobile Ins.
Co. (Fireman’s
Fund)
Workers’ Comp:
Statutory Employer’s
Liability: $1,000,000
none A:XV NO NO YES
Blanket
Coverage
NO
Excess
Liability
Steadfast
Insurance
Company
$1,000,000 per
occurrence and in the
aggregate. Excess
coverage over General
Liability, Automobile
Liability and
Employer’s Liability.
$10,000 A:XV Follows form
of underlying
coverage,
but no
endorsement
is issued
NO NO NO
Professional
Liability (also
known as Errors
& Omissions)
including
Contractors’
Pollution Legal
Liability
Zurich American
Insurance
Company
$2,000,000 per claim
$4,000,000 aggregate
$50,000 per
claim
A:XV NO NO - all
professiona
l liability
policies are
excess of
any other
valid &
collectible
insurance
NO NO
199
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 20
200
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 21
V. CURRENT CLIENTS
A list of current clients for the Berkeley and South San Francisco offices is shown in Table 5.
Table 5: Current Clients
Public Private
City of Albany American Land Lease
City of Antioch Barnard, Dunkelberg and Company
City of Belmont Bentley School
City of Benicia Community, Design + Architecture
City of Berkeley Diamond J Corporation
City of Brisbane DMJM Harris
Town of Colma Dokken Engineering
City of Concord The Dutra Group
Contra Costa Community College District Forest City Residential
East Bay Regional Park District Guadalupe Valley Quarry
City of East Palo Alto Langley Hill Quarry
City of El Cerrito Luce, Forward, Hamilton & Scripps, LLC
City of Emeryville Rajappan & Mayer Engineers
City of Fairfield Rockaway Beach Corporation
City of Fremont RRM Design Group
City of Livermore Sacramento Mutual Housing Association
City of Menlo Park San Leandro Rock Co.
City of Millbrae Shute, Mihaly & Weinberger LLP
City of Milpitas Syar Industries, Inc.
City of Oakland West Coast Aggregates
City of Oakley Williams & Dame Development, Inc.
County of San Benito
City and County of San Francisco
San Francisco Public Utilities Commission
City of San Jose
County of San Mateo
City of Saratoga
County of Yolo
Company-wide, LSA has several thousand active contracts.
201
LSA ASSOCIATES, INC. STATEMENT OF QUALIFICATIONS
MAY 2008 ENVIRONMENTAL PLANNING SERVICES
CITY OF SARATOGA
O:\PROPOSAL\08021-Saratoga Environmental\Saratoga SOQ-1.doc (5/6/2008) 22
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
May 7, 2008 Response to RFP
M ETROPOLITAN P LANNING G ROUP, I NC.
P R O P O S A L
CURRENT PLANNING CONSULTING SERVICES • CITY OF SARATOGA
400 west evelyn avenue • sunnyvale california 94086
T 408 730 4106 • F 408 730 5186 • www.mplanninggroup.com
228
City of Saratoga
May 7, 2008
M‐ Group
1 100% Recycled Paper Proposal
SUMMARY INFORMATION
Firm: Metropolitan Planning Group, Inc. (M‐Group)
Address: 400 west evelyn avenue
sunnyvale california 94086
Contact: T 408 730 4106
F 408 730 5186
Webpage: www.mplanninggroup.com
Project Manager: Heather Bradley, Senior Planner
Key personnel: Geoff Bradley, Principal
Karen Hong, Associate Planner
Judie Gilli, Associate Planner
Estimated Project Timeline: July 1 st 2008 – June 30th 2011 (36 months)
Optional Extension: July 1 st 2011 – June 30th 2013 (24 months)
M ‐Group Billing Rates: $ 100.00 – 110.00/hour (Senior Planner)
(Please see table on page 23 for more detail)
229
City of Saratoga
May 7, 2008
M‐ Group
2 100% Recycled Paper Proposal
CURRENT PLANNING SERVICES CONSULTANT
INTRODUCTION TO THE M ‐GROUP TEAM
Metropolitan Planning Group, Inc. (“M‐Group”) proposes to serve as the
City’s consulting Planner for a three year period with an optional extension
of two years.
M ‐GROUP BACKGROUND
M ‐Group was created in order to bring innovative and effective planning
solutions to a wide range of public and private clients. M ‐Group has
provided high caliber professional planning services to many of the
communities in the Bay Area Metropolitan region.
All of the planners in M ‐Group have a wide range of public sector and
private experience that adds value and perspective to our work. M ‐Group
city planners have experience working and consulting for the following
numerous public agencies in the Bay Area; as both regular city staff and
consultants.
Our Public Sector experience includes work with the following public
agencies:
City of Burlingame
City of Cupertino
City of Daly City
City of Foster City
City of Fremont
Town of Los Gatos
City of Milpitas
City of Monte Sereno
City of Mountain View
City of Palo Alto
City of Redwood City
City of San Carlos
City of San Mateo
City of Santa Clara
City of Saratoga
City of Sunnyvale
City of Vallejo
Town of Woodside
230
City of Saratoga
May 7, 2008
M‐ Group
3 100% Recycled Paper Proposal
This blend of experience creates a dynamic and multifaceted approach that
spans the range of city planning experience. This allows us to offer
innovative and effective city planning solutions. Our work culture is one of
teamwork, collaboration and open communication. We believe this
represents a new design on urban planning.
SERVICES
The company brings together experienced city planners under one roof so
that we can effectively offer a range of services including:
Community Visioning
Policy Planning
Environmental Process Management
Urban Design
Transit Oriented Development
Development Review
Project Management
Entitlement Services
Visioning – M ‐Group is able to work with communities to establish a
common vision for the future. This becomes the foundation for successful
planning.
Policy Planning – The planners at M ‐Group have real‐world experience
crafting General Plans, Zoning Codes, Design Guidelines, Area Plans and
Precise Plans that help communities achieve their established goals.
Environmental Process Management – M ‐Group staff has experience
managing complex environmental analyses for large‐scale urban projects.
Urban Design – M ‐Group provides design services, including site design and
feasibility studies to help plan proposed developments within existing
developed settings. Whether it is design for a new infill housing
development, or redevelopment of an existing industrial complex, we offer
assistance with site design and feasibility studies. We also offer streetscape
urban design services to bring unique, pedestrian‐friendly environments to
our communities.
231
City of Saratoga
May 7, 2008
M‐ Group
4 100% Recycled Paper Proposal
Design Guidelines – Our experienced city planners include staff specializing
in urban design, design review, and graphic design for Design Guidelines.
Specifically, our staff has extensive and in‐depth knowledge of design
guidelines and design review services in nearby jurisdictions with similar
goals for residential and commercial development. Our staff has the graphic
expertise to produce clear, concise diagrams and drawings, and user‐
friendly documents with thoughtful layouts to convey City guidelines
unambiguously.
Transit Oriented Development – M ‐Group planners have first‐hand
experience guiding Transit Oriented Development projects to completion,
ranging from the transformation of the Crossings neighborhood and the
cutting edge Whisman Station in Mountain View, to the award‐winning Park
Tower Place townhomes in Campbell.
Development Review – With our depth of experience in numerous Bay Area
public agencies, we know first hand what the issues are that drive a
successful development review process. With a focus on efficient, timely
delivery of services, and a commitment to quality results, our experienced
staff can plug into any planning department in the Bay Area and provide a
seamless extension of staff resources.
Project Management – M ‐Group is capable of organizing and managing
resources to complete a quality project within a defined scope, under time
and cost constraints. We focus on optimizing resources to achieve project
goals, and we consciously seek to build long‐term relationships with our
clients, create consensus and add value to the agencies and firms we work
with. We also have extensive experience managing complex projects that
require significant environmental review.
232
City of Saratoga
May 7, 2008
M‐ Group
5 100% Recycled Paper Proposal
PROPOSAL
M ‐Group proposes the following Scope of Work in response to the request
from the City of Saratoga to provide current planning services on an “as‐
needed basis”.
The City of Saratoga is a rural community in the western area of the Santa
Clara valley characterized by a charming downtown, breathtaking
mountains, lush creeks, beautiful residential neighborhoods and high
caliber public and private schools. The residents of the City have a strong
sense of community and desire to maintain the rural atmosphere of their
neighborhoods and preserve the health of the natural environment that
makes Saratoga so unique.
M ‐Group proposes the following scope of work to assist with the ongoing
staffing needs within the Planning Division of the Community Development
Department:
1. Review and analyze current planning projects including but not limited
to Design Review applications, Conditional Use Permits, Sign permits,
Subdivision Map applications, Lot Line adjustments, with accompanying
environmental review.
2. Develop and maintain professional relationships with City Staff,
applicants and interested members of the community.
3. Plan, organize and co‐ordinate project conditions and review with City
Staff.
4. Discuss project complexities and potential impacts with neighbors and
interested members of the community.
5. Prepare Staff Reports and make project presentations to the Heritage
Preservation Commission, Planning Commission, and City Council.
6. Ensure implementation of the Zoning Ordinance, General Plan, Specific
Plans and Residential Design Guidelines.
7. Manage project implementation beyond the approval stage through
final permit, ensuring implementation of project specific conditions.
8. M ‐Group Staff will at all times maintain a high level of customer service,
strong work ethic and excellent technical and interpersonal skills.
233
City of Saratoga
May 7, 2008
M‐ Group
6 100% Recycled Paper Proposal
M ‐Group anticipates providing 10 to 20 hours per week as needed. A
minimum of 8 hours per week will allow for full allocation of staff.
CONCLUSION
M ‐Group proposes to provide Heather Bradley, Senior Planner, to meet the
City’s Current Planning Consulting service needs. Key personnel who are
also available to meet the City’s needs as necessary are; Geoff Bradley,
Principal, Karen Hong, Associate Planner, and Judie Gilli, Associate Planner.
M ‐Group believes that this scope of work will allow the City to be confident
that the additional staffing needs of the Planning Division will be met and
the Staff and public’s expectations for quality city planning services will be
exceeded.
234
City of Saratoga
May 7, 2008
M‐ Group
7 100% Recycled Paper Proposal
EXCEPTIONS
BILLING AND PAYMENTS
M ‐Group will bill the City of Saratoga on an hourly as needed basis for
services. M ‐Group bills clients on a monthly basis at the first of the month
for accrued hours and appreciates payment within 30 days. Reimbursables,
if any, are billed separately. The firm’s rate schedule is attached.
FINANCIAL STABILITY, CAPACITY AND RESOURCES
M ‐Group is a fully incorporated firm, formed by Whitney McNair, AICP, and
Geoff I. Bradley, both partners with over 15 years of city planning
experience each, in both private and public sectors. M ‐Group has the
financial stability, capacity and resources to meet the planning consultant
needs of the client.
The firm is diversified with a balance of public and private sector clients,
and based on a carefully planned, detailed business plan. The firm is
financially secure in terms of monthly cash flow as well as working capital.
INSURANCE
M ‐Group has business liability coverage through Hartford Casualty
Insurance Company. Under this plan, we have liability and medical expenses
coverage in the amount of $2,000,000, workers compensation coverage in
the amount of $1,000,000 and errors and omissions coverage in the amount
of $1,000,000.
EXCEPTIONS
M ‐Group is not requesting any exceptions to the City of Saratoga’s standard
contract provisions.
235
City of Saratoga
May 7, 2008
M‐ Group
100% Recycled Paper Proposal 8
PUBLIC AGENCY CLIENTS AND PRIVATE CLIENTS
M ‐Group is currently working for the following Public Agencies and private
clients:
Public Agencies
City of Burlingame
City of Daly City
City of Fremont
City of Foster City
City of Milpitas
City of Monte Sereno
City of Palo Alto
City of San Carlos
City of San Mateo
City of Santa Clara
City of Saratoga
City of Redwood City
City of Vallejo
Private Clients
Sand Hill Development
Trinity Church of Sunnyvale
M ‐Group has previously worked for the additional following Public Agencies
and private clients:
Public Agencies
City of Cupertino
City of Mountain View
City of Sunnyvale
Town of Los Gatos
Town of Woodside
Private Clients
Santa Clara Development
Company
Dostart Development
Corporation
Dr. Young & Associates
SRM Development
KB Urban
The Riding Group
Taylor Woodrow Homes
Dollinger Properties
Skip Reid Builders
Prometheus
Sweeney & Company
Dr. Gary Gold
Steve Dostart
Broadreach Capital
Nick Gera
Castle Companies
236
City of Saratoga
May 7, 2008
M‐ Group
9 100% Recycled Paper Proposal
CONSULTANT EXPERIENCE AND PROJECT STAFFING
M ‐Group looks forward to providing a seamless extension of planning staff
to provide excellent customer service, efficient project management and
effective communication of application details to City Staff, Council,
Commissions and the community. M ‐Group has put together a team of four
members who possess the required expertise and background qualifications
to contribute to the staffing needs of the City of Saratoga.
PROJECT MANAGER
Heather Bradley, Senior Planner
Heather Bradley has over 15 years of planning experience with seven of
those years working for the community of Saratoga. She has experience with
the City both as a consultant and regular City staff planner. There she has
gained valuable experience working on residential hillside development
ranging from single‐family design review to fifteen lot subdivisions and a 10
unit Artists in Residency project at the historic Villa Montalvo. She has
experience serving as Secretary to the Historic Preservation Commission for
several years and as primary planner for development projects in the
Historic Village downtown. She has unique insight into the complexities of
hillside and other residential development and the effects on neighboring
residents and the community. She also has over five years of Residential
Design Review experience for the City of Sunnyvale implementing their
Single Family Residential Design Guidelines adopted in 2001.
Ms. Bradley has experience working closely with developers, landowners,
neighbors, geologists, arborists, biologists, and engineers to balance the
impacts of development on surrounding neighborhoods. She also has
experience managing and preparing the environmental review documents
for subdivisions and developments with a high degree of public scrutiny and
interest.
237
City of Saratoga
May 7, 2008
M‐ Group
10 100% Recycled Paper Proposal
The following are relevant examples of projects for which Ms. Bradley worked as a City
staff planner:
Hayfield Estates Subdivision – Property formerly the site of the Hayfield Estate,
residence and outbuildings designed by Julia Morgan. Property was developed by Pinn
Brothers Construction, creating 15 lots on an approximately 20‐acre site adjacent to
Wildcat Creek with slopes ranging from approximately 10 to 20 percent. Located at
Spaich Court at La Paloma and Hayfield Court at Douglass Lane, Saratoga.
Development Issues:
Wildcat Creek
Creek Protection Setbacks
Historic Home Preservation
Traffic
Pedestrian Access
Tree Preservation
Design Review
Project Site – Hayfield Estate Subdivision
238
City of Saratoga
May 7, 2008
M‐ Group
11 100% Recycled Paper Proposal
Les Chateaux Dame deNamur Subdivision – Property formerly the site of the Sisters of
Notre Dame deNamur convent. Property developed by Sobrato Development, created 11
lots on an approximately 23 acres with slopes ranging from 10 to 30+ percent. The
project included creation of a pedestrian path with road improvements and a retaining
wall on Bohlman Road which preserved several dozen mature Oak and Redwood trees.
Located at Cuvilly Way at Bohlman Road, Saratoga.
Development Issues:
Historic Evaluation
Cemetery Expansion Issues
Tree Preservation
Difficult Road and Access Issues
Steep Slopes
Subdivision Design
Project Site – Les Chateaux Dame deNamur Subdivision
239
City of Saratoga
May 7, 2008
M‐ Group
12 100% Recycled Paper Proposal
Artists in Residency Cottages at Villa Montalvo – Property formerly a vacant hillside
within the California State Historic Landmark ‐ Villa Montalvo Park. Project developed as
a collaborative with the Villa Montalvo Association and a design team of 11
internationally renowned architects, created 20 artist cottages (in 10 buildings) and one
common building. Site approximately 10 acres characterized by steep slopes over 30
percent with a creek and seasonal stream running along two sides of the hillside.
Development Issues:
Overall Use Permit Consistency
Noise Concerns
Grading
Biotic Resources
Tree Preservation
Architectural Review
Geological issues with Slope Stability
Project Site – Artists in Residency Cottages at Villa Montalvo
240
City of Saratoga
May 7, 2008
M‐ Group
13 100% Recycled Paper Proposal
The following are relevant examples of projects for which Ms. Bradley worked with the
City of Saratoga as a contract planner:
Tollgate Building – A Mixed Use Development on Big Basin at Sixth Street, developed by
Gene Zambetti. Property formerly a single family residence adjacent to Saratoga Creek,
located between a multi‐unit residential development and a law office. Project included a
retail/office building at the front of the lot and a two unit residential building at the rear.
Development Issues:
Overall Use Permit Consistency
Pedestrian access
Grading
Architectural Review
Geological issues with Slope Stability
Impacts to views and privacy
Project Site – Tollgate Building
241
City of Saratoga
May 7, 2008
M‐ Group
14 100% Recycled Paper Proposal
Brookside Townhomes. A development at Saratoga‐Sunnyvale Road and Arbeleche Lane
– Development of a twenty unit townhome project on a property formerly the site of a
twenty unit apartment complex adjacent to Saratoga Creek. The property was developed
by JSM Enterprises. Proposed development included demolition of existing structures,
design review of multi‐unit structures, removal and relocation of ordinance protected
trees, realignment of the access road. Project included environmental review and
Mitigated Negative Declaration.
Development Issues:
Architectural Design Review and Use Permit consistency
Creek and biotic impacts
Grading and Geological issues with Slope Stability
Impacts to views and privacy
Relocation of existing residents
Project Site – Brookside Townhomes
242
City of Saratoga
May 7, 2008
M‐ Group
15 100% Recycled Paper Proposal
Sam Cloud Barn Addition – Retail/Office building adjacent to the Historic Sam Cloud Barn
at 3rd Street and Big Basin Way ‐ Project development by Sam Cloud Barn LLC. The
project site was a steeply sloped vacant lot located between the rear of a commercial
building and a public parking lot. The development included design review use permit
and variance approval of a new multi‐story retail and office building in the historic
Saratoga Village.
Development Issues:
Architectural Design Review
Compatibility with the neighboring historic structure
Variance analysis
Grading and Geological issues with Slope Stability
Impacts to available parking and neighboring businesses
Relocation of residents
Project Site – Sam Cloud Barn Addition
243
City of Saratoga
May 7, 2008
M‐ Group
16 100% Recycled Paper Proposal
The following is a relevant examples of a project for which Ms. Bradley worked as a
consulting planner for the City of Redwood City:
Laurel Way Subdivision – Proposal for an 18 lot subdivision with one common lot in the
Emerald Hills neighborhood of Redwood City. Project includes construction of a new
access road and building site approvals on a steeply sloped and heavily wooded 5.1 acre
site. Development applicant Laurel Way Joint Venture comprised of 16 landowners.
Development Issues:
Environmental Impact Report required
Grading and Geologic Stability
Hydrology and Storm Drainage
Preservation of mature trees
Preservation of view
Construction of retaining walls
Neighborhood input/Community Workshops
Project Site – Laurel Way Subdivision
244
City of Saratoga
May 7, 2008
M‐ Group
17 100% Recycled Paper Proposal
KEY PERSONNEL
Geoff Bradley, Principal
Geoff has over 15 years of professional public and private experience
working with a variety of architectural, planning, development firms and
public agencies. This includes 10 years of public sector experience with Bay
Area planning and redevelopment agencies. Geoff has worked with
numerous jurisdictions throughout the Bay Area. He has been involved in
downtown revitalization, major commercial, mixed‐use, transit oriented
projects, as well as updates of General Plans and Zoning Codes.
Geoff combines creative problem solving with the ability to work with a
wide variety of stakeholders to achieve community goals.
Karen Hong, Associate Planner
Karen Hong worked on a number of public and private sector projects
including design review and project management. She has experience as
both an architect and Urban Planner. Karen is currently preparing illustrated
residential design guidelines for the City of Monte Sereno, as well as serving
as consulting Planning Staff in the City of San Carlos and managing
Administrative Design Review applications for the City of Saratoga.
Judie Gilli, Associate Planner
Judie Gilli has over nine years of professional planning experience including
three years with the City of Los Gatos, and three years with the San Jose
Redevelopment Agency. Judi has experience managing Administrative Design
Review applications for the City of Saratoga and is currently serving as
consulting Planning Staff in the Cities of Milpitas and Palo Alto.
245
City of Saratoga
May 7, 2008
M‐ Group
18 100% Recycled Paper Proposal
STAFF QUALIFICATIONS
HEATHER BRADLEY
Planning Professional
Collaborative planning professional with over fifteen years experience
in private and public sector planning. Highly skilled in oral and written
communication with a very strong design and development review
capability.
Professional Experience
Metropolitan Planning Group, Senior Planner
Provide on-going professional planning services to a variety of
cities including Sunnyvale and Saratoga. Development review of
complex and often controversial projects.
City of Sunnyvale, Contract Planner
Negotiate with Developers and Home Owners for Modifications to
Development Plans. Conduct Design Review for Commercial and
Residential Projects. Staff Public Counter and provide public
information.
City of Saratoga, Contract Planner
Conduct design review for residential projects. Staff the Heritage
Preservation Commission. Analyze Projects for Conformance to
Preservation Ordinance and State Standards, Coordinate Meetings and
Site Visits.
City of Saratoga, Associate Planner
Manage Current Planning Projects including numerous hillside
developments. Conduct Design Review for Commercial and
Residential Projects. Present Staff Reports and Recommendations to
Planning Commission and City Council. Prepare Planning Brochures
of Various Zoning Regulations for Public Counter. Coordinate the
Preparation of EIR’s and Traffic Studies. Staff the Heritage
Preservation Commission. Analyze Projects for Conformance to
Preservation Ordinance and State Standards.
Crawford Multari & Starr, Planner
Prepare Residential Site Design Plans. Facilitate Public
Workshops. Prepare Plan Graphics & GIS Maps for Zoning
Code Updates.
Profile
EXPERIENCE
2006 to Present
Senior Planner
Metropolitan Planning
Group, Inc. (M-Group)
2002-2006
Contract Planner
City of Sunnyvale
2000-2001
Contract Planner
City of Saratoga
1997-2000
Associate Planner
City of Saratoga
1995-1997
Assistant Planner
City of Saratoga
1993-1995
Planner
Crawford Multari & Starr
EDUCATION
Bachelor of Science in City
and Regional Planning
California Polytechnic State
University, San Luis
Obispo
1992
OTHER EXPERIENCE
Housing Assistant
City of Sunnyvale
246
City of Saratoga
May 7, 2008
M‐ Group
19 100% Recycled Paper Proposal
GEOFF I. BRADLEY
Principal
Geoff Bradley has a background in planning and architecture,
with a particular emphasis on policy planning and design review.
In 2006, he and Whitney McNair, AICP, formed Metropolitan
Planning Group (M-Group) with a focus on policy planning,
development review, urban design, project management and
visioning for public and private clients.
Planning Professional
Results-oriented planning professional with over fifteen years
experience in private and public sector planning. Highly
motivated with ability to combine creative ideas and analytical
decision-making. Strong communicator with excellent written,
presentation skills and design background.
Areas of Special Expertise
Visioning
General Plan and Zoning Code Updates
Ordinance Preparation
Site Planning/Urban Design
Public Speaking
Architectural Design Review
Professional Experience
Metropolitan Planning Group, Principal
Manage Professional Planning firm offering a wide array of
services to public and private clients. Recent client services
include development review for the cities of Cupertino,
Mountain View, Milpitas and Vallejo. Oversaw preparation of
Policy Planning documents including Specific Plans, Green
Building ordinances and Design Guidelines. Private sector
entitlement services for mixed-use, senior housing, churches,
schools and regional shopping centers.
Profile
EXPERIENCE
2006 to date
Principal
Metropolitan Planning
Group, Inc. (M-Group)
2005-2006
Forward Planning Manager
KB Home
2000-2005
Senior Planner
City of Campbell
1997-2000
Redevelopment
Coordinator City of
Campbell
1995-1997
Associate Planner
City of Sunnyvale
1990-1995
Associate Planner
RRM Design Group
1985-1987
Morris Skenderian &
Associates
EDUCATION
Master of Science in
Architecture
California Polytechnic State
University, San Luis
Obispo
2005
Bachelor of Science in City
and Regional Planning
California Polytechnic State
University, San Luis
Obispo
1992
Landscape Architecture
and Urban Studies
University of Sheffield,
United Kingdom
1989
247
City of Saratoga
May 7, 2008
M‐ Group
20 100% Recycled Paper Proposal
GEOFF I. BRADLEY (continued)
City of Campbell, Senior Planner
Managed all functions of the Planning Division including
supervision of professional and administrative staff of both
Current and Advanced Planning sections. Managed day-to-day
operation of the Planning Division. Staffed the Heritage
Preservation Board, Planning Commission and City Council.
Directed a comprehensive update of the General Plan and
Zoning Code including EIR. Managed the entitlements for high
profile commercial, industrial, residential and mixed including
Marriott hotel, Kohl’s, Bed Bath & Beyond, Water Tower Place,
downtown Master Development site.
City of Campbell, Redevelopment Coordinator
Managed the downtown revitalization program. Created and
evaluated development pro-formas for new development.
Initiated and implemented the highly successful weekly Farmers’
Market. Managed the Downtown parking structure project and
the Storefront Improvement Program. Recruited numerous retail
and restaurant businesses in the downtown.
City of Sunnyvale, Associate Planner
Responsible for the processing of large, complex residential,
commercial and industrial development projects. Prepared and
presented staff reports to the Planning Commission and City
Council. Coordinated preparation of CEQA documents.
RRM Design Group, Associate Planner
Prepared site and architectural designs for residential,
commercial and recreational uses, coordinated and conducted
public outreach efforts including workshops and design
charettes, wrote and illustrated Specific Plans and Design
Guidelines. Prepared streetscape and urban design studies for
cities and counties.
MEMBERSHIPS
American Planning
Association (APA)
Campbell Bicycle Advisory
Committee
AWARDS
1999 – San Jose Mercury
News
Design a monument to
Silicon Valley
Grand Prize Winner
1996 – Shop Sunnyvale
Logo Design Contest
1987 – Pratt Institute
National Talent Search
248
City of Saratoga
May 7, 2008
M‐ Group
21 100% Recycled Paper Proposal
KAREN HONG
Professional Experience
Metropolitan Planning Group, Associate Planner
Worked on a number of public and private sector projects
including design review and project management.
Boston Redevelopment Authority, City Planner, Intern
Assisted mediation among various city agency officials,
consultant groups, and citizen groups. Collaborated with curator
and artists for Boston Art Windows, set up public art exhibition
downtown. Coordinated publicity for downtown and
neighborhood projects, including websites and press releases.
Conferred with consultants on strategic plans and
implementation for Boston neighborhoods. Advised developers
and landowners on zoning regulations and design guidelines.
SmithGroup Inc, Architect, Intern
Led a project under broad supervision of partner, designed floor
plan, met one-on-one with client-director and city planner to
address project constraints. Collaborated with firm partners and
architects to produce project plans for medical and research
facilities. Held discussions with engineering consultants to ensure
construction feasibility. Prepared construction drawing sets,
design reports, and 3D models.
Professor Richard Meier, UC Berkeley, Researcher &
Illustrator
Researched topics on city planning, sustainability and future
studies. Illustrated themes, concepts, and statistics for published
research papers.
Profile
EXPERIENCE
2007 to Present
Associate Planner
Metropolitan Planning
Group, Inc. (M-Group)
Jun 2006-Aug 2006
City Planner, Intern
Boston Redevelopment
Authority, Boston, MA
Feb 2005 – Aug 2005
Architect, Intern
Smith Group, Inc., San
Francisco, CA
Sep 2002 – Feb 2005
Researcher & Illustrator
Prof. Richard Meier, U.C.
Berkeley
EDUCATION
Master of Urban Planning
Harvard University
Graduate School of Design
2007
Bachelor of Arts in
Architecture
University of California,
Berkeley
2005
Minor in City and Regional
Planning
2005
249
City of Saratoga
May 7, 2008
M‐ Group
22 100% Recycled Paper Proposal
JUDIE SOO GILLI
Professional Experience
Metropolitan Planning Group, Associate Planner
Conduct development review applications for various cities in the
Bay Area, including residential, commercial and mixed-use
projects. Process entitlements for a variety of national and local
developers.
Town of Los Gatos, Assistant Planner
Reviewed development applications in accordance with the Town’s
General Plan, Zoning Ordinance and Development Standards for
residential, hillside and commercial projects. Coordinated with
other Town departments to provide a seamless review process for
applicants. Prepared staff reports for the planning Commission
and Town Council on various development applications and land
use permits. Assisted in the development of a specific plan for 40-
acre area (North 40 Specific Plan).
Redevelopment Agency of the City of San Jose, Development
Specialist
Project planner for current planning entitlements in Downtown
San Jose including site development, planned development, and
conditional use permits for commercial and residential projects.
Reviewed and analyzed development proposals for Zoning and
General Plan compliance.
Prepared staff reports for consideration by Planning Commission,
Historic Landmark Commission, City Council and Redevelopment
Board. Coordinated with other City departments through the
review process. Responsible for the coordination of the
entitlement process with redevelopment agreements. Prepared a
request for qualifications (RFQ) for the Downtown’s Mixed Use
EIR.
Brian Kangas Foulk, Assistant Planner
Conducted research, field visits and investigation necessary for
planning application submittals. Prepared tentative, final maps and
feasibility studies for subdivision projects. Created conceptual
subdivision designs and parking lot configurations for commercial
and residential projects and conducted slope analysis. Served as the
Construction Impact Coordinator for the Bay Meadows
Development project in San Mateo.
Profile
EXPERIENCE
2006 to Present
Associate Planner
Metropolitan Planning
Group, Inc. (M-Group)
2003-2006
Assistant Planner
City of Los Gatos
2000-2003
Development Specialist
Redevelopment Agency of
the City of San José
1998-2000
Assistant Planner
Brian Kangas Foulk
EDUCATION
Bachelor of Science in City
and Regional Planning
California Polytechnic State
University, San Luis
Obispo
1998
250
City of Saratoga
May 7, 2008
M‐ Group
23 100% Recycled Paper Proposal
METROPOLITAN PLANNING GROUP RATE SCHEDULE
Principal Planner $125/hour
Senior Planner $100/hour
Associate Planner $85/hour
Assistant Planner $70/hour
Planning Tech/Admin $60/hour
Reimbursables billed separately.
Effective April 25, 2007
M ‐Group proposes to maintain the current rate schedule as shown above to
remain constant through FY 08‐09 (until June 30th, 2009). A 5% annual
increase thereafter is proposed as shown below:
FY 08‐09 FY 09‐10 FY 10‐11
Principal Planner $125 $131 $138
Senior Planner $100 $105 $110
Associate Planner $85 $89 $93
Assistant Planner $70 $74 $78
Planning Tech/Admin $60 $63 $66
251
City of Saratoga
May 7, 2008
M‐ Group
24 100% Recycled Paper Proposal
EVIDENCE OF INSURANCE
Evidence of Insurance for the City of Saratoga:
Policy Effective: February 1, 2008 to February 1, 2009.
M ‐Group is currently in the process of obtaining the updated insurance
form.
252
City of Saratoga
May 7, 2008
M‐ Group
100% Recycled Paper Proposal 25
253