Loading...
HomeMy WebLinkAbout09-22-2010 Planning Commission PacketTable of Contents Agenda 2 September 8, 2010 Action Minutes 4 APPLICATION PDR10-0014 (503-21-021) T-Mobile (Sutro Consulting) 13750 Prune Blossom Staff Report 6 Resolution 10 Neighbor comments, public hearing notice, and mailing labels 15 Radio Frequency Analysis 19 APPLICATION PDR10-0010 (517-14-045)Cross/Garcia 20640 Sigal Drive Staff Report 25 Attachment 1 33 Attachment 2 45 Attachment 3 50 Attachment 4 59 Attachment 5 60 Attachment 6 72 1 CITY OF SARATOGA PLANNING COMMISSION AGENDA DATE: Wednesday, September 22, 2010 - 7:00 p.m. PLACE: Council Chambers/Civic Theater, 13777 Fruitvale Avenue, Saratoga, CA TYPE: Regular Meeting ROLL CALL Commissioners - Chair Mary-Lynne Bernald, Vice-Chair- Douglas Robertson, Joyce Hlava, David Reis, Linda Rodgers, Tina K. Walia and Yan Zhao PLEDGE OF ALLEGIANCE MINUTES Action Minutes from the Regular Planning Commission Meeting of September 8, 2010 ORAL COMMUNICATION Any member of the Public will be allowed to address the Planning Commission for up to three minutes on matters not on this agenda. The law generally prohibits the Planning Commission from discussing or taking action on such items. However, the Planning Commission may instruct staff accordingly regarding Oral Communications under Planning Commission direction to Staff. ORAL COMMUNICATIONS- PLANNING COMMISSION DIRECTION TO STAFF REPORT OF POSTING AGENDA Pursuant to Government Code 54954.2, the agenda for this meeting was properly posted on September 16, 2010 REPORT OF APPEAL RIGHTS If you wish to appeal any decision on this Agenda, you may file an “Appeal Application” with the City Clerk within fifteen (15) calendar days of the date of the decision, pursuant to Municipal Code 15-90.050 (b). All interested persons may appear and be heard at the above time and place. Applicants/Appellants and their representatives have a total of ten minutes maximum for opening statements. Members of the Public may comment on any item for up to three minutes. Applicant/Appellants and their representatives have a total of five minutes maximum for closing statements. PUBLIC HEARING 1. APPLICATION PDR10-0014 (503-21-021) T-Mobile (Sutro Consulting) 13750 Prune Blossom - The applicant is requesting Design Review approval for a wireless telecommunication antenna on a new wood utility pole. The new pole will replace an existing pole with an increase in height from 29 feet, eight inches to approximately 41 feet, six inches (41’6”) maximum. The added height will provide separation from existing power lines and increase the wireless coverage area. The associated electronic equipment would be located in a ground mounted cabinet near the pole. The applicant will provide a four foot sidewalk clearance surrounding the pole. The facility is considered a “micro site” because the antennas and associated equipment are smaller in size than a standard wireless facility. (Cynthia McCormick) 2. APPLICATION PDR10-0010 (517-14-045) Cross/Garcia 20640 Sigal Drive - The applicant is requesting approval of a Design Review application to construct a 6,341 square foot, approximately 26 feet tall, two-story Spanish Eclectic designed single-family home. The existing house on the lot will be removed. The project will include a deed restricted secondary dwelling unit. (Christopher A. Riordan, AICP) 2 DIRECTORS ITEM COMMISSION ITEMS COMMUNICATIONS ADJOURNMENT TO NEXT MEETING - Wednesday, October 13, 2010 at 7:00 p.m. in the Council Chambers/Civic Theater 13777 Fruitvale Avenue, Saratoga, CA In compliance with the Americans with Disabilities Act (ADA), if you need special assistance to participate in this meeting, please contact the City Clerk at (408) 868-1269 or ctclerk@saratoga.ca.us. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting (28 CFR 35.102-35.104 ADA Title II). POSTING Certificate of Posting of Agenda: I, Abby Ayende, Office Specialist for the City of Saratoga, declare that the foregoing agenda for the meeting of the Planning Commission of the City of Saratoga was posted on September 16, 2010, at the office of the City of Saratoga, 13777 Fruitvale Avenue, Saratoga, CA 95070 and was available for public review at that location. The agenda is also available on the City’s website at www.saratoga.ca.us If you would like to receive the Agenda’s via e-mail, please send your e-mail address to planning@saratoga.ca.us NOTE: To view previous Planning Commission meetings anytime, go the City Video Archives at www.saratoga.ca.us 3 CITY OF SARATOGA PLANNING COMMISSION AGENDA DATE: Wednesday, September 08, 2010 - 7:00 p.m. PLACE: Council Chambers/Civic Theater, 13777 Fruitvale Avenue, Saratoga, CA TYPE: Regular Meeting ROLL CALL Commissioners - Chair Mary-Lynne Bernald, Vice-Chair- Douglas Robertson, Joyce Hlava, David Reis, Linda Rodgers, Tina K. Walia and Yan Zhao PLEDGE OF ALLEGIANCE MINUTES Action Minutes from the Regular Planning Commission Meeting of August 11, 2010 (Approved 5:0:1(Hlava-abstain) ORAL COMMUNICATION Any member of the Public will be allowed to address the Planning Commission for up to three minutes on matters not on this agenda. The law generally prohibits the Planning Commission from discussing or taking action on such items. However, the Planning Commission may instruct staff accordingly regarding Oral Communications under Planning Commission direction to Staff. ORAL COMMUNICATIONS- PLANNING COMMISSION DIRECTION TO STAFF REPORT OF POSTING AGENDA Pursuant to Government Code 54954.2, the agenda for this meeting was properly posted on September 1, 2010 REPORT OF APPEAL RIGHTS If you wish to appeal any decision on this Agenda, you may file an “Appeal Application” with the City Clerk within fifteen (15) calendar days of the date of the decision, pursuant to Municipal Code 15-90.050 (b). All interested persons may appear and be heard at the above time and place. Applicants/Appellants and their representatives have a total of ten minutes maximum for opening statements. Members of the Public may comment on any item for up to three minutes. Applicant/Appellants and their representatives have a total of five minutes maximum for closing statements. PUBLIC HEARING 1. APPLICATION GPA10-0001 (City-Wide) City of Saratoga, 13777 Fruitvale Avenue - The project would update the Circulation and Scenic Highway Element of the City of Saratoga General Plan. The amendments include updates to descriptive information, clarification of existing policies, changes to the bicycle facilities maps to reclassify or remove certain existing bike routes; identifying new bike routes, bike lanes, and bike trails; identifying future bike routes and conceptual alignments of proposed future bike trails, and identifying existing and proposed trails within maps. The project also includes conforming amendments to the City’s Open Space and Conservation Element. The project would not result in physical changes or construction. (Michael Fossati) (Negative Declaration and Circulation Element – Approved 7:0) 4 DIRECTORS ITEM COMMISSION ITEMS COMMUNICATIONS ADJOURNMENT TO NEXT MEETING – ADJOURNED 9:45 PM - Wednesday, September 22, 2010 at 7:00 p.m. in the Council Chambers/Civic Theater 13777 Fruitvale Avenue, Saratoga, CA In compliance with the Americans with Disabilities Act (ADA), if you need special assistance to participate in this meeting, please contact the City Clerk at (408) 868-1269 or ctclerk@saratoga.ca.us. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting (28 CFR 35.102-35.104 ADA Title II). POSTING Certificate of Posting of Agenda: I, Abby Ayende, Office Specialist for the City of Saratoga, declare that the foregoing agenda for the meeting of the Planning Commission of the City of Saratoga was posted on September 1, 2010, at the office of the City of Saratoga, 13777 Fruitvale Avenue, Saratoga, CA 95070 and was available for public review at that location. The agenda is also available on the City’s website at www.saratoga.ca.us If you would like to receive the Agenda’s via e-mail, please send your e-mail address to planning@saratoga.ca.us NOTE: To view previous Planning Commission meetings anytime, go the City Video Archives at www.saratoga.ca.us 5 Application PDR10-0014; 13750 Prune Blossom REPORT TO THE PLANNING COMMISSION Meeting Date: September 22, 2010 Application Type / No: Design Review / PDR10-0014 Location / APN: 13750 Prune Blossom / 503-21-021 Applicant: T-Mobile (Sutro Consulting) Staff Planner: Cynthia McCormick, Assistant Planner, AICP Department Head: John F. Livingstone, AICP 13750 Prune Blossom 6 Application PDR10-0014; 13750 Prune Blossom EXECUTIVE SUMMARY CASE HISTORY Application filed: 07/01/10 Application complete: 08/30/10 Notice published: 09/07/10 Mailing completed: 09/01/10 Posting completed: 09/16/10 PROJECT DESCRIPTION The applicant is requesting Design Review approval for a wireless telecommunication antenna on a new wood utility pole. The new pole will replace an existing pole with an increase in height from 29 feet, eight inches to approximately 41 feet, six inches (41’6”) maximum. The added height will provide separation from existing power lines and increase the wireless coverage area. The associated electronic equipment would be located in a ground mounted cabinet near the pole. The applicant will provide a four foot sidewalk clearance surrounding the pole. The facility is considered a “micro site” because the antennas and associated equipment are smaller in size than a standard wireless facility. PERMANENT CONDITIONS No permanent conditions of approval are required. STAFF RECOMMENDATION Approve the Design Review application by adopting the attached Resolution. 7 Application PDR10-0014; 13750 Prune Blossom PROJECT DATA ZONING: R1-12,500 GENERAL PLAN DESIGNATION: M-12.5 MEASURE G: Not applicable. ENVIRONMENTAL DETERMINATION The proposed project, which includes installation of new cellular equipment, is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 of the Guidelines for Implementation of CEQA. This Class 3 exemption applies to new construction and installation of small, new equipment and facilities in small structures. PROJECT DISCUSSION Project Description The applicant is requesting Design Review approval for a wireless telecommunication antenna on a new wood utility pole. The new pole will replace an existing pole with an increase in height from 29 feet, eight inches to approximately 41 feet, six inches (41’6”) maximum. The added height will provide separation from existing power lines and increase the wireless coverage area. The associated electronic equipment would be located in a ground mounted cabinet near the pole. The applicant will provide a four foot sidewalk clearance surrounding the pole. The facility is considered a “micro site” because the antennas and associated equipment are smaller in size than a standard wireless facility. Proposed Exterior Materials and Colors The antenna and equipment will be painted to match the color of the pole, as shown in Exhibit B. The new wood pole will look like the existing pole in terms of colors and materials. Noise-Generating Devices Associated equipment will be housed within a cabinet, reducing any noise impacts. The facility will be required to comply with City noise standards. Location and Alternative Sites The applicant considered three sites in the vicinity. PG&E determined that the subject site was preferred for both safety and security reasons. Site Description and Surrounding Land Uses The facility is located on Saratoga-Sunnyvale Road (parallel to Prune Blossom Road) between Verde Vista Lane and Mina Way. It is surrounded by residential uses. 8 Application PDR10-0014; 13750 Prune Blossom Correspondence and Neighbor Review The public hearing notice was mailed to property owners within 500 feet of the subject property. The applicant also distributed information to nine adjacent property owners. Only one response was returned to the applicant. This neighbor indicated that the additional eight feet of pole was “OK” as long as additional overhead wires are not installed. Staff has informed the neighbor that no overhead wires would be installed as part of this proposal, and the neighbor is satisfied. Staff has not received any additional comments. (Attachment 2) FCC Requirements Under the Telecommunications Act of 1996, the Federal Communications Commission (FCC) has exclusive jurisdiction over RF emissions from personal wireless antenna facilities. The City can evaluate and regulate only the aesthetic aspects of wireless installations. Any concerns regarding health or safety aspects of the wireless sites are not within the purview of the Planning Commission. Pursuant to its authority under federal law, the FCC has established rules to regulate the safety of emissions from these facilities. The applicant has provided a Radio Frequency (RF) Analysis (Attachment #3) which concludes that the proposed telecommunications facility will comply with the FCC’s current prevailing standard for limiting human exposure to RF energy, and no significant impact on the general public is expected. A condition has been added to the attached resolution that the applicant must meet all requirements established by the FCC. STAFF RECOMMENDATION Staff recommends the Planning Commission approve the proposed wireless facility (Application PDR10-0014) by adopting the attached Resolution. ATTACHMENTS 1. Resolution of Approval 2. Neighbor comments, public hearing notice, and mailing labels 3. Radio Frequency Analysis 4. Reduced Plans, Exhibit "A" 5. Photo simulations, Exhibit "B" 9 CITY OF SARATOGA PLANNING COMMISSION RESOLUTION NO. FOR APPROVAL OF DESIGN REVIEW Application # PDR 10-0014 T-Mobile (Sutro Consulting) The City of Saratoga Planning Commission finds and determines as follows with respect to the above-described application: I. Project Summary The City of Saratoga Planning Commission has received an application for Design Review (PDR) approval for the Project shown in Exhibit "A" date and Photo Simulations denominated Exhibit “B” stamped September 13, 2010, incorporated by this reference. The applicant is requesting Design Review approval for a wireless telecommunication antenna on a wood utility pole. The antennas would be placed at the top of the pole and the associated equipment would be placed in a cabinet on the ground. The foregoing use will be described as the “Project” in this Resolution. II. Design Review Requirement City Code Section 15-46.020(a)(7) requires Design Review Approval for any new antenna facility operated by a public utility for transmitting and receiving cellular telephone and wireless communication. This Design Review Approval requirement implements the Saratoga General Plan, including but not limited to: Land Use Goal 13 which provides that the City shall use the Design Review process to assure that new construction and major additions thereto are compatible with the site and the adjacent surrounding. III. Planning Commission Review On September 22, 2010 the Planning Commission held a duly noticed Public Hearing on the Project at which time all interested parties were given a full opportunity to be heard and to present evidence and argument. The Planning Commission considered the Project, the staff report on the Project, CEQA documentation, correspondence, presentation from the Applicant and the public, and all testimony and other evidence presented at the Public Hearing. IV. Environmental Review The Project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines (14 C.C.R. Section 15303). Class 3 exemptions include installation of equipment and facilities, such as wireless facilities. V. Design Review Findings The findings required for issuance of a Design Review Approval pursuant to City Code Section 15- 46.040 are set forth below and the Applicant has met the burden of proof to support making all of those required findings: (a) Where more than one building or structure will be constructed, the architectural features and landscaping thereof shall be harmonious. Such features include height, elevations, roofs, 10 2 Application No. PDR 10-0014 material, color, and appurtenances. This finding can be made in the affirmative. No buildings are associated with this project. The new utility pole is similar in height and color to other poles in the vicinity. (b) Where more than one sign will be erected or displayed on the site, the sign shall have a common or compatible design theme and locational positions and shall be harmonious in appearance. This finding is not applicable because no signs are proposed. (c) Landscaping shall integrate and accommodate existing trees and vegetation to be preserved; it shall make use of water-conserving plants, materials and irrigation systems to the maximum extent feasible; and, to the maximum extent feasible, it shall be clustered in natural appearing groups, as opposed to being placed in rows or regularly spaced. This finding can be made in the affirmative. The applicant will provided landscape screening around the proposed cabinet. The owner is responsible for the maintenance of existing landscaping. (d) Colors of wall and roofing materials shall blend with the natural landscape and be nonreflective. The cabinet will be painted to blend with the natural landscape. (e) Roofing materials shall be wood shingles, wood shakes, tile, or other materials such as composition as approved by the Planning Commission. No mechanical equipment shall be located upon a roof unless it is appropriately screened. This finding is not applicable because no roofing is proposed and no equipment will located on a roof. The proposed equipment will be placed in a cabinet on the ground. (f) The proposed development shall be compatible in terms of height, bulk, and design with other structures in the immediate area. This finding can be made in the affirmative. The new utility pole is similar in height and color to other poles in the vicinity. VI. Project Approval After careful consideration of the application, site plan, architectural drawings, and other materials and exhibits and evidence submitted to the City in connection with this matter, the project is approved subject to the conditions set forth below. CONDITIONS OF APPROVAL A. GENERAL 1. The Planning Commission shall retain continuing jurisdiction over the Design Review and may, at any time, modify, delete, or impose any new conditions of the permit to preserve the public health, safety, and welfare. 11 3 Application No. PDR 10-0014 2. Conditions may be modified only by the planning commission unless modification is expressly otherwise allowed by the city code including but not limited to section 16-05.035, as applicable. 3. The Community Development Director shall mail to the Owner/Applicant a notice in writing, on or after the time this Resolution of Approval is duly executed by the City, containing a statement of all amounts due to the City in connection with this application, including all consultant fees (collectively “processing fees”). This approval or permit shall expire sixty (60) days after the date said notice is mailed if all processing fees contained in the notice have not been paid in full. No Zoning Clearance or Demolition, Grading, or Building Permit may be issued until the Community Development Director certifies that all processing fees have been paid in full (and, for deposit accounts, a surplus balance of $500 is maintained). 4. A Building Permit must be issued and construction commenced within 36 months from the date of adoption of this Resolution and the Design Review will expire unless extended in accordance with the City Code. 5. The facility shall at all times operate in compliance with all applicable regulations of the State, County, City and/or other governmental agencies having jurisdictional authority over the facility pertaining to, but not limited to, health, sanitation, safety, and water quality issues. The Project shall maintain compliance with all applicable requirements of the State, County, City and other governmental entities having jurisdiction. 6. Prior to issuance of any demolition, grading, or building permit to implement this Design Review approval the Applicant shall obtain a “Zoning Clearance” from the Community Development Director by submitting final plans for the requested permit to the Community Development Department for review to ascertain compliance with the requirements of this Resolution. 7. Agreement to Indemnify, Hold Harmless and Defend City as to Action Challenging Approval of Application and as to Damage from Performance of Work Authorized by Design Review Approval. As a condition of this Approval, Owner and Applicant hereby agree to defend, indemnify and hold the City and its officers, officials, boards, commissions, employees, agents and volunteers harmless from and against: a. any and all claims, actions or proceedings to attack, set aside, void or annul any action on the subject application, or any of the proceedings, acts or determinations taken, done or made prior to said action; and b. any and all claims, demands, actions, expenses or liabilities arising from or in any manner relating to the performance of such construction, installation, alteration or grading work by the Owner and/or Applicant, their successors, or by any person acting on their behalf. In addition, prior to any Zoning Clearance from the Community Development Director, Owner and Applicant shall execute a separate agreement containing the details of this required 12 4 Application No. PDR 10-0014 Agreement to Indemnify, Hold harmless and Defend, which shall be subject to prior approval as to form and content by the Community Development Director. B. COMMUNITY DEVELOPMENT 8. Compliance with Plans. The facility shall be operated, located and constructed to include those features, and only those features, as shown on the Approved Plans denominated Exhibit "A" and Photo Simulations denominated Exhibit “B” date stamped July 27, 2010, incorporated by this reference. All proposed changes to the Approved Plans must be submitted in writing with plans showing the changes, including a clouded set of plans highlighting the changes. Such changes shall be subject to the requisite prior City approval. 9. Landscaping. Landscaping shall be installed to completely screen the equipment cabinet from off-site views, per the satisfaction of the Community Development Director. 10. Safety Fencing During Construction. During all phases of construction, the Applicant shall install and maintain temporary safety fencing to restrict or prevent public access to active on-site construction activities, materials, or chemicals. 11. Governmental entities. All applicable requirements of the State, County, City and other Governmental entities must be met. 12. Federal Communications Commission (FCC) Verification. The owner and/or Applicant for this Project shall contact the FCC and verify whether there are any required permits from said Commission. If required by the FCC, prior to issuance of Zoning Clearance for any proposed equipment installations (or if none, prior to commencement of the approved use), the Owner and/or Applicant shall submit to the Community Development Department documentation from the FCC showing proof of compliance of the proposed use and/or development with the FCC's requirements. 13. Fire Agency Conditions. Applicant shall comply with all Fire Agency Conditions. 14. Building Department. Applicant shall comply with all building standards including any improvements necessary to comply with the building code. 13 5 Application No. PDR 10-0014 PASSED AND ADOPTED by the City of Saratoga Planning Commission this 22nd day of September 2010 by the following vote: AYES: NOES: ABSENT: ABSTAIN: ___________________________________ Mary-Lynne Bernald Chair, Planning Commission ATTEST: ___________________________________ John F. Livingstone, AICP Secretary to the Planning Commission ACCEPTANCE BY APPLICANT AND OWNER This permit is hereby accepted upon the express terms and conditions hereof, and shall have no force or effect unless and until agreed to, in writing, by the Applicant and Property Owner or Authorized Agent. The undersigned hereby acknowledges the approved terms and conditions and agrees to fully conform to and comply with said terms and conditions within the time required in this Resolution by the City of Saratoga Planning Commission. __________________________________ ____________________________ Applicant Date __________________________________ ____________________________ Property Owner or Authorized Agent Date 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74