Loading...
HomeMy WebLinkAbout03-03-1989 City Council Agenda - Policy development ConferencePOLICY DEVELOPMENT CONFERENCE AGENDA TIME: 3:00 p.m., Friday, March 3, 1989 8:30 a.m., Saturday, March 4, 1989 Place: The Inn at Saratoga 20645 Fourth Street, Saratoga 1. Should the City increase its code enforcement services and /or become proactive in citing violators? 2. What should the City's future policy be in providing school crossing guards? 3. How should the City modify its current open space policies to define the City's open space expectations? 4. Current status and future actions - Village Plan Implementa- tion. 5. Should the City create an amnesty program to clean up ex- pired permits? 6. Should the City set up a standard for property maintenance and enforce such standards for individual properties? 7. What policy changes should the City be considering as it revises its General Plan Housing Element this year? 8. What policy changes and facilities should the City be con- sidering as it revises its General Plan Circulation Element this year? 9. Should the City be considering ways to minimize residential overcrowding through intensification of residential space on an individual lot basis and through resubdivision of exist- ing parcels on a neighborhood basis? 10. What is the long range future for Hakone Gardens and what roles are the City and the Foundation, respectively, to play in creating that long range future? 11. Should the City develop and implement a riding and hiking trail maintenance program? 12. To what extent should the City expand its Landscape and Lighting Maintenance District to include new areas in the City and to maintain the Village improvements? 13. Should the City reinstitute an annual cleanup campaign? 14. How should the City develop a curbside recycling program? �� � � �ol� �� �• .,fir ,� �, t l,cf %,. l.1 Policy Development Conference AGENDA March 3 -4, 1989 Page Two 15. Should the City actively pursue improved public transit service in Saratoga. 16. What should the City's policy be toward funding social service agencies which serve Saratoga residents? 17. What should the City's future role and policy be for sup- porting and staffing community access television? 18. What should the City be doing to promote community consensus over major issues? 19. Should the City sponsor an annual festival centered around Hakone Gardens? 20. a. Should the City continue the Utility Users Tax? b. How can the tax be extended? (confidential report) 21. Should the City provide funding for continued use of the California Conservation Corps for City projects? 22. Should the City light and landscape City entrance signs? 23. What should be included in the total master plan for the Civic Center and how should it be funded? 24. Should the early warning fire alarm ordinance be expanded? 25. Should the City consider funding a school resource officer with the City of Cupertino? 26. Should future staffing include: 1) more crossing guards, 2) a third CSO, 3) a part -time emergency services coordinator, 4) a public information officer, 5) maintenance staff for Hakone Gardens, 6) recreation coordinator to full -time, 7) contracting for landscape maintenance? 27. Should the 1989 -1991 Legislative Calendar address the following? 28. Should the following Capital Projects be considered in the next five year plan: c' C� (9��� o9 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 COUNCIL MEMBERS: February 24, 1989 Karen Anderson Martha Clevenger To: City Manager David Moyles Donald Peterson Francis Stutzman From: Community Services Director Subject: Policy Development Agenda, Code Enforcement (Reference Agenda Item #1) ISSUE "Should the City increase its code enforcement services and /or become proactive in citing violators ?" BACKGROUND The City's Community Service Officer (CSO) program was implemented in March of 1984 after two years of planning. Two full -time CSO positions provide law enforcement assistance to the Sheriff's Office as well as code enforcement. The CSO's perform law enforcement tasks which do not require a sworn officer in an effort to reduce law enforcement costs. In 1986, the emphasis of the program changed from law enforcement to code enforcement in response to City Council direction. DISCUSSION Before a discussion of proactive code enforcement takes place, a brief review of our existing code enforcement situation is warranted. Current Council Policy Our understanding of the current Council policy is that code enforcement should be generally reactive. This policy was first established by the Council in 1986, and then reaffirmed by the Council during the policy development process in the beginning of 1987. However, the Council has changed since then, and a re- examination of that policy is appropriate at this time. The current policy followed is that code enforcement personnel will not specifically spend time looking for code violations. Rather, they respond to violations on a complaint basis. However, there is a proactive element to this policy in that code enforcement personnel will cite violations which they incidentally run across in the course of handling their caseload. Staff also proactively enforced the City's business license regulations in 1988, which is a form of selective proactive enforcement discussed in greater detail later in this report. Policy Issue: "Should the City services and /or violators ?" February 24, 1989 Page Two increase its code enforcement become proactive in citing This report will also examine the policy and fiscal impacts of moving in a proactive direction, as well as outlining the implications of intensifying our reactive enforcement effort to improve the effectiveness of code enforcement in Saratoga. Existing Level of Service Saratoga's ratio of code enforcement personnel to population is low; there are two Community Service Officers (CSO's) to serve a city of 30,000. In addition, our existing CSO's are responsible for law enforcement tasks. Generally, an appropriate staff to population ratio is one code enforcement officer for each 10,000 in population. Therefore, our existing staff is required to follow a policy of reactive code enforcement not out of choice, but rather out of necessity. Moreover, there is consistently a backlog of cases waiting in line for attention which carries over from one month to the next throughout the year. CSO's currently respond to an average of 381 requests for service each month; 210 are law enforcement related while the remaining 171 are code enforcement complaints. However, it is noteworthy that three times the amount of staff time is spent on an average code enforcement complaint in comparison to a typical law enforcement referral. Proactive Enforcement At its extreme, a proactive approach to code enforcement would involve staff patrolling, street by street, the neighborhoods of Saratoga in search of violations of all aspects of the City's Municipal Code, rather than responding to complaints. Advantages There are advantages to proactive code enforcement. One would be the enforcement of municipal code uniformly throughout the City. Another would be that neighbors would not have to "rat" on one another in order to see the municipal code enforced. However, this level of and approach to code enforcement comes with a significant price. Disadvantages There are a number of disadvantages to proactive enforcement. One would include the inability to respond to complaints. It would be difficult to respond to complaints while at the same time looking aggressively for new violations. Such a disadvantage may be of a short term nature because, at least in theory, as violations are hit preemptively, the number of complaints would diminish over time. Policy Issue: "Should the City services and /or violators ?" February 24, 1989 Page Three Fiscal Impacts increase its code enforcement become proactive in citing Another disadvantage is of a fiscal nature. To be done properly, a proactive code enforcement approach would require twice the staff currently authorized (if code enforcement was uniformly proactive rather than selectively proactive). In addition, there would be a loss of savings realized from CSO law enforcement involvement. Currently, CSO's cost the City $24 per hour (including uniforms, salary, and all benefits) while Sheriff Officers cost the City $55 per hour. To the extent CSO's are able to relieve Sheriff's deputies from having to respond to Saratoga assignments from outside of the City, there is a net savings of $31 per hour. The final fiscal impact of increased code enforcement involves other elements of the City organization. Many code enforcement matters also involve staff from the planning and building departments in addition to the field personnel. Public Relations The final disadvantage to proactive code enforcement involves its effect on public relations. This, from my point of view, should be of greatest concern to the Council. Public relations has been, and continues to be, generally, a strong consideration in the operation of our CSO program. CSO's try to first warn violators before resorting to citations or a criminal complaint. This is done because most responsible parties generally are not aware they were violating a local ordinance. Voluntary compliance is achieved without resorting to legal action 80% of the time, although this approach requires more expenditures of staff time on the front end. Since most code violations occur on private property, there is a predictable resentment of an official from the City showing up one day insisting that certain action be taken in response to a condition which may have existed for many years. Proactive code enforcement may result in the City being perceived as heavy handed, aggressive, over regulatory, and "nit- picky ". Because the Saratoga community existed long before City incorporation, there are a number of situations where technical violations have existed for years, but have never been brought to the City's attention because no one was bothered by them. To what extent do we wish to arouse controversy where none existed? Selective Proactive Enforcement Short of all out proactive code enforcement, the Council may wish staff to focus on proactive enforcement within certain areas. Examples include, R.V., parking, business licenses (which were Policy Issue: "Should the City increase its code enforcement services and /or become proactive in citing violators ?" February 24, 1989 Page Four proactively enforced this year), zoning codes, dumping, etc. However, recognize that any proactive enforcement may be at the expense of follow -up activity in response to existing complaints. Alternatives to Proactive Enforcement An alternative to proactive code enforcement would be to educate the community regarding the nature and application of the City's codes. This could be done through an improved public awareness program, using the City's newsletter and the production of pamphlets. There is evidence that the approach could be quite effective given the high level of voluntary compliance the staff is already able to achieve in the field. It appears that willful disregard of the City's ordinance is very much the exception to the rule, and there are existing legal mechanisms to effectively handle these exceptions. Evidence that the community responds to stories appearing in the City's Newsletter can be observed in the statistics concerning R.V. storage. Typically, the City receives an average of three such complaints per month. But when the story about the ordinance concerning the storage of R.V.'s appeared in the City's Newsletter, the number of complaints increased five times in January, and is projected to be even higher in February. However, such a public awareness campaign is meaningless if the City does not have the resources to follow -up on the new complaints generated. Effective code enforcement can occur with the right balance between publicity and personnel to back it up. Otherwise, the City's credibility may be compromised. PREPARED BY: Todd W. Arg jm:1 A U a & (O�V� 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 COUNCIL MEMBERS: Karen Anderson February 24, 1989 Martha Clevenger David Moyles Donald Peterson To: City Manager Francis Stutzman From: Community Services Director Subject: Policy Development Agenda; Crossing Guards (Reference Item #2) ISSUE "What should the City's future policy be in providing school crossing guards ?" BACKGROUND The Saratoga school crossing guard program used to be administered by West Valley College under contract with the City until the City took over the program in 1984. Since doing so, the City has been paying relatively less for the program than it was contractually with the College. Six crossing guard positions have been authorized each year in the budget. Historically, the City has consistently experienced problems in filling all positions authorized in the budget. Position salaries have been increased and an additional $1,000 was spent last year in recruitment advertising. None of these efforts have yielded much in terms of the desired results to fill all authorized positions. In addition, the Campbell Union School District informed the City they intend to request more guards since they are phasing out their busing program due to fiscal constraints. DISCUSSION Following are the current crossing guard locations authorized by Council and the status of each location: Location Serving Status 1. Highway 9 at Oak Saratoga School Vacant 2. Reid at Lynde Foothill School Filled 3. Quito at Pollard Marshall Lane School Filled 4. Quito at Westmont Marshall Lane School Vacant 5. Cox at Darian Argonaut /Blue Hills Schools Filled 6. Fruitvale at Allendale Redwood Jr. High School Filled t% Pal-icy issue: "What should the City's future policy be in providing school crossing guards ?" February 24, 1989 Page Two In 1988, the Campbell Union School District requested another crossing guard. The City attempted to accommodate their request by changing guard locations. However, the City also informed the District that their assistance would be needed in recruiting personnel for guard positions if they are to remain filled. To date, no such assistance has been rendered. In January of this year, we were contacted by the City of Campbell which is now experiencing similar problems in keeping their positions filled. They indicated they are re- examining their policies in light of the problems they are experiencing, and wondered what Saratoga was doing. The administration of the school crossing guard program has had a significant impact on staff. Besides the aggravation of unsuccessful recruitment efforts, the supervision of the guards is very time consuming. Many of the guards are late in getting their timesheets in, for example. In such circumstances, a CSO has to go to their home to pick up the late timesheet, and it then must be specially processed through the finance department. Admonishment is not as severe as it should be due to fear that the City might alienate the guard and lose the position. Following are some of the issues to consider in the context of a re- examination of our crossing guard program. 1) What are the legal ramifications of either eliminating the program, or turning it over to the schools to administer with the City paying the cost? 2) What are the political implications of eliminating the program? 3) Should the City be in a position of offering a blank check to the schools; that the City should finance a guard at any location when so demanded by the schools? 4) Should the salaries of the guards be increased? There is the theory that a person can be found to do any job if the price is right. 5) Are the crossing guards appropriate for older, high - school aged youth? 6) Are there other locations in the City where crossing guards may be more appropriate? 7) Do the number of youths using the program justify the cost? Policy Issue: "What should the City's future policy be in providing school crossing guards ?" February 24, 1989 Page Three 8) What kind kind of liability exposure does the City accept in connection with offering such a service? 9) Is the City the appropriate agency to offer such a service, or should it be the responsibility of the Sheriff's Office or the schools? 10) Are school crossing guards really needed at intersections which are either signalized or have signals located within 100 yards of a given location? Current salaries for crossing guards start at $6 per hour and go up to $7.50 per hour. If the City elects to continue the program in- house, consideration should be given to increasing the salaries to a point where authorized positions are filled with competent personnel. Experience has taught us that spending revenue on extensive outreach and recruitment efforts does not yield the desired results. In terms of reviewing existing locations and developing standards for crossing guard placement, this might be a task appropriately referred to the City's Public Safety Commission. The Commission has previously been active in recommending improved recruitment procedures. PREPARED BY: Todd W. Arg jm:2 G�B��s off ���i° � °Oo C�L� 3• 13777 FRUITVALE AVENUE • SARATOGA. CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO: Mayor & City Council FROM: Stephen Emslie, Planning Director SUBJECT: Open Space Policies DATE: 2/24/89 In recent times, open and scenic land on the periphery of the Santa Clara Valley has become increasingly rare. A variety of factors well known to the Council such as escalating land values, increased demand for luxury housing and build out in the valley have produced pressures to develop Saratoga's hillsides, orchards and agricultural lands. This report summarizes the existing open space policies, analyzes policy revisions to correct deficiencies, and provides the possible framework of policy alternatives to assist in the Council's definition of open space and park land objectives. Most importantly, this report suggests methods to implement City Council policy and to achieve its objectives in preserving the natural environment that is Saratoga. Background The City's open space policy is contained in its Open Space Element of the General Plan. This element was first adopted in the 1974 after the element was mandated by State law in 1973. The element was revised once in 1981 and constitutes the City's current open space policy. The Open Space Element accomplishes three (3) primary functions: defines open space classifications; inventories existing open and recreational spaces; and identifies areas where additional open space is needed. The existing open space element does not include an implementation program to further the City's objective to preserve its natural resources. The Open Space Element relies heavily on the large residential lots and large amounts of private open space in the hillsides now outside of the City's jurisdiction Sphere of Influence, and the Williamson Act contracts as existing factors that serve to meet the City's future open space needs. The complete text of the Open Space Element is attached for Council review. However, the following excerpts from the element expound on the emphasis and direction of 1 the current policies: "The County -wide standards indicate that the proportion of designated park land to population in Saratoga is very low (about 40% of what it should be). However, open space is somewhat relative and should be viewed from the perspective of the particular City and its environment" (page 3 -27, paragraph 3). The element then cites that the mountain areas adjacent to the City, the low density residential development and the various school sites all contribute to compensate for Saratoga's open space deficit. "Privately owned land accounts for the majority of open space within Saratoga, and is a valuable open space asset to all residents of Saratoga and adjacent communities as a visual backdrop" (page 3 -26, paragraph 2). The element indicates that the hillsides within the City limits are protected by the NHR district and Specific Plan which makes extensive use of open space easements as a means to protect visually sensitive hillsides. Lands outside of the NHR plan area are not specifically addressed through policy statements, zoning requirements or exactions. "The Saratoga 1974 General Plan relied heavily on existing schools for provision of open space and recreational and community facilities. Dispersal of these sites throughout the City is important for convenient access by all residents. Any proposed change in the use of a school facility should be carefully studied by the City and the affected residents" (page 3 -30, paragraph 4). While the 1981 version recalls that the 1974 General Plan emphasized school sites as open space resources, this recent version also cites school property as a community open space resource. The current element indicates that the City should encourage school properties to remain under public ownership but provides marginal guidance when sites must be sold. "The City obtained its first park 18 years ago. Much of the park acquisition and development has come from park dedication fees. These are fees collected from developers on a per unit basis. Future development and acquisition will continue to utilize park development fees as well as revenue sharing and various park bond monies from the State." The Open Space Element cites only the existing park dedication or Quimby Act fees collected as the means to fund acquisition of new park land and open space. Since the current policies indicate that the City meets the community needs through existing park land, large lot zoning and undeveloped hillsides outside of the City limit, it would follow that policies are not aggressive in terms of new acquisition. The existing element provides a detailed inventory which itemizes the acreage provided by both school sites and other land uses and is F also attached for Council's reference. Primarily sources of open space are derived from Williamson Act contracts, publically owned property such as MROSD, public parks such as Villa Montalvo, Sanborn Park and Stevens Creek Park, and City owned parks. This inventory omits other areas of open space such as private recreational uses such as the Saratoga Country Club and Brookside Tennis Club. Analysis The existing Open Space Element relies on existing conditions to meet the community's needs for open space and to preserve the unique character that is Saratoga. The existing policies provide minimal direction regarding methods to promote the provision of open space through land use policy and exactions. Moreover, the existing element pays little attention to implementation policies. In order for staff to begin preliminary work to correct these deficiencies, City Council should outline its definition of goals and objectives and discuss the appropriate implementation techniques. Staff can identify three broad policy objectives in increasing order of City involvement. The following is intended to facilitate Council discussion and formulation of Council's goals in revising current open space policy: Goal A: The City of Saratoga desires to preserve open space wherever possible. Possible Implementation Methods: 1. Require open space easements dedicated to private property owners or homeowners associations that restrict useage of scenic or environmentally sensitive land. 2. Develop subdivision standards that require findings demonstrating open space preservation. 3. Utilize park dedication fees (or accept dedications of lands where appropriate) to acquire and develop open and recreational spaces. 4. Encourage and support the acquisition and maintenance of scenic lands by public agencies and community organizations such as the Mid Peninsula Recreation and Open Space District. Goal B: In addition to preserving open City shall also attempt to acquire greenbelt of public land in the scenic or adjacent to the City. Possible Implementation Methods: space wherever possible, the hillside lands to form a northwestern hillsides within 1. Adopt development policies which limit development in scenic or environmentally sensitive areas currently outside of the City limits. 3 2. Expand the City's Sphere of Influence to include lands which are visual sensitive to Saratoga. 3. Locate alternative funding sources at Federal, State and local levels for the acquisition of scenic or environmentally sensitive lands. 4. Encourage the formation of a local land trust whose sole purpose shall be to identify and accept the dedication of scenic lands to Saratoga. 6. Consider alternative development techniques such as transfer of density and clustering, when site conditions permit, and do not conflict with other policies of the General Plan. Goal C: The City shall aggressively pursue acquisition of public lands throughout the City where such land can be identified as having scenic, recreational or educational value to the community. Possible Implementation Methods: 1. Investigate the feasibility of requesting voter approval of local revenue sources such as special assessment districts both locally and City wide; tax overrides; and the issuance of general obligation bonds for the purpose of funding land acquisition and its maintenance. 2. Develop an operating program to maintain public land and the public's access to it. 3. Encourage the formation of a land trust whose task it shall be to accept dedications of public land, and to accept donations, grants and loans for acquiring land. 4. Develop a plan for exercising the City's Naylor Act rights which entitle the City to acquire portions of surplus school districts' lands at reduced land value. 5. Consider open space users fees to generate revenue for land acquisition. Findings and Conclusions The City's desire to revise its open space policy is clear. What is not clear is the extent to which the City desires to be involved in promoting the open space issue. While the Goal A has marginal impact on public open space acquisition, it demands the fewest resources. Conversely, the aggressive policy mentioned in Goal C would make a tremendous impact and also demands maximum City resources. The policy in Goal B facilitates acquisitions by using a variety of resources not necessarily monetary. For example, land use policy and regulation can cost the City nothing to implement but can greatly influence land either preserved or acquired by the City. 4 Further, community based organizations can be very influential in securing questionable building area exists. Stephihi Ems e Planning Director SE /dsc Attachments A:memocc2 5 such as open space trusts, dedication of land where OPEN SPACE /RECREATION ELEMENT In 1970, the State Legislature added Open Space to the list of mandatory General Plan Elements. The intent of the legislature was to insure that: 1) cities and counties recognize that open space land is a limited and valuable resource, which must be conserved wherever possible and 2) every local jurisdiction will prepare and carry out an Open Space Plan which, along with state and regional Open Space Plans, will accomplish the objectives of a comprehensive Open Space Program. State law required adoption of an Open Space Element or "Local Open Space Plan" by December 31, 1973 for cities and counties. Zoning provisions and other development regulations must be con- sistent with the Open Space Element. Saratoga adopted its Open Space Element August 7, 1974 along with the rest of the 1974 General Plan. The Element was updated in 1981 and is the City's plan for the comprehensive and long -range preservation and con- servation of open space land. Under the provisions of Governmental Code Section 65563 (b) "open -space land is any parcel or area of land or water which is essentially unimproved and devoted to an open -space use as defined on a local, regional or state Open Spaced Plan" as any of the following: Open Space for Preservation of Natural -Human Resources - Lands for preservation as open space because of unique or unusual natural or man -made features that would be difficult or impossible to duplicate. Subclassifications include: A. Lands, marsh and water areas for fish and wildlife refuge. Such lands are essential to the life cycle of natural species or natural processes. B. Notable geological features such as earthquakes faults, landslides, unusual formations and other elements that are.of educational or scientific value. C. Historical and cultural sites associated with the history, tradition and culture of the region and of enough significance to merit preservation or restoration. D. Natural amenities such as ridge lines and major topographic features that are visible from major population centers or that are accessible to large groups of people. Open Space for Managed Resource Production - Lands for resource production are those lands that are capable of producing a natural product at costs that yield a break -even return on land and labor, assuming a system of land value taxation based on current use 3 -24 rather than on the value land might have under developed, urban use conditions: Subclassifications include: A. Prime agriculatural lands and lands for specialty crops which include all lands suitable for specialty or high value crops such as flowers, vegetables orchards or wine grapes. B. Lands for grazing which include both cultivated pasture and other grasslands with slopes under 30 percent. C. Lands for mineral production on which would be found, in marketable quantity, minerals such as salt rock, aggregate or sand. D. Lands for water supply including both watershed and reservoir areas, and lands for ground water recharge. Open Space for Outdoor Recreation - Lands for outdoor recreation suitable for passive and active outdoor recreational pursuits. Subclassifications include: A. Lands for developed recreation uses such as local or regional parks, school grounds and trail systems. B. Lands for water - oriented recreation such as areas adjacent to rivers, creeks and lakes. C. Lands for natural environmental experience which include significant land forms, or lands with significant aesthetic features. D. Lands for scenic and recreation travel where both scenic and natural values are present together with adequate access and low traffic congestion. Open Space for Health, Welfare and Public Safety - Lands where development could cause a long -term deterioration of the general public welfare or threat to public safety. Subclassifications are: A. Land to protect the quality of water resources (including both ground water resources and reservoirs). B. Open areas to preserve airshed quality where development would result in unusual and serious degradation of the overall air quality. C. Flood control reservoirs, flood plains, drainage channels and areas below dams where flooding or hazards related to the failure of flood control facilities would present a signifi- cant hazard. 3 -25 D. Areas with unstable soils or geologic structure where the risk of land movement is usually high. Saratoga has open space lands in all four categories in addition to existing parklands and numerous acres of privately owned open space within the western hillsides. Privately owned open -space constitutes a fifth category. Privately owned land accounts for the majority of open space within Saratoga, and is a valuable open space asset to all residents of Saratoga and adjacent communities as a visual backdrop. Much of the private open space in the western hillsides is or will be protected through open space easements which were placed or will be placed on the land during the subdivision or building site approval process. Approximately 334 acres of land is currently dedicated to open space easement within the western hillside. For more information on the open space easements in the western hillsides, the reader should refer to the Northwestern Hillside Specific Plan. EXISTING OPEN SPACE LAND USES Santa Clara County There are three major Santa Clara County parks readily access- ible to Saratoga residents. Of the three existing parks, the Montalvo Arboretum is highly specialized. The main function of this park is as an arboretum and wild life preserve. The other two County parks are multiple purpose open space and recreation areas. They,provide a resource for camping, hiking and day long excursions, as well as protecting water sheds, wildlife and valuable timber and ground cover. The County park facilities available to City residents follow: Montalvo Arboretum contains 175 acres of woodlands in the hills straddling the southern boundary between the City and the County. This land is owned by the Montalvo Association, which occupies the Villa and provides cultural activities and programs. The park is maintained by the County with Federal assistance. Nature walks are a major activity at this facility. Stevens Creek is a multiple purpose park in Cupertino's Sphere of Influence. It is accessible to Saratoga residents by trail and scenic highway. Potential exists for expanding this park into the Saratoga Sphere of Influence. The park contains 655 acres. Sanborn County Park is currently a part of a larger regional park called "Skyline ". The Skyline Park contains 1,000 acres and extend from Sanborn Park to Skyline Boulevard. Skyline Park is one of a series of multiple - purpose parks which complements Castle Rock State Park and creates an undeveloped corridor along the scenic mountain highways. One of the sources of open space protection is through the Midpenninsula Regional Open Space District (MROSD) which is a 3 -26 governmental agency dedicated to the protection of open space lands. Saratoga has approximately 320 acres within its Sphere of Influence under the ownership control of the MROSD. The MROSD provides a valuable service by protecting through purchasing critical open space areas within Saratoga's Urban Service Area and Sphere of Influence. City of Saratoga Saratoga's existing open space includes: Developed park land 79 acres Open space provided by schools 151 acres Orchards (excludes lands with Tentative Map Approval) 130 acres Creek bed 36 acres Vacant land 1,167 acres Additional designated park land on 1974 General Plan 19 acres Currently, all of this land, except the developed parks and creeks is potentially developable. However, some of the lands under Williamson Act contract (approximately 220 acres) may not develop for the next ten years. Under the provisions of AB 2074 (Robinson) owners of lands under Williamson Act may opt to cancel their contracts on a one -time basis if they select to do so before May 31, 1982. Encouragement should be given to all farmers to keep their lands under the Williamson Act contract. The County -wide standards indicate that the proportion of desig- nated park land to population in Saratoga is very low (about 40$ of what it should be). However, open space is somewhat relative and should be viewed from the perspective of the particular City and its environment. Open space in Saratoga includes more than designated parks. It includes mountain areas which are not physically a part of the incorporated City, but visually and psychologically are a part. The extremely low density residential development in parts of the City provides both visual and useable open space. The schools within Saratoga provide valuable active recreational areas for the residents. With declining enrollments, the school districts are being forced to consider various options to raise funds to include selling school sites. The school districts should be encouraged to maintain their playground area and building if economically feasible. There are areas of the City without sufficient quantities of local open space. Mainly, these areas are in the northern part of the City where, 20 years ago, development was permitted on small lots without park land or open space. It is important that active and passive recreation open space be provided on a neighbor- hood basis in these areas in some reasonable proportions to the density of the population of the area. 3 -27 PRIVATE OPEN SPACE The institutionally owned private open space includes sites owned by churches and church schools, the 80 acre site of the Odd Fellows Home, the six acre site of the Saratoga Horticultural Foundation, and the Montalvo Arboretum with its 175 acre site dis- cussed under County Parks. The open space of each of these institutions, except the Horticultural Foundation, is used for passive activities. The Horticultural Foundation site is not open to the public, but provides lush vegetation in a residential area. Private residential open space includes all the residential building sites which are one acre or larger. On these sites the structure covers only a small portion of the site with the rest generally visually open. A large amount of the acreage in the City is occupied by homes on lots one acre or larger. About 222 acres of the 268 acres of agricultural zoned land in the City of Saratoga is designated as agricultural preserve under the Williamson Act. This designation means that the owner has signed a contract with the City to retain his land in agricultural use for at least 10 years in exchange for the property being taxed on the basis of the value of its annual production rather than its assumed highest and best land use. These contracts are automati- cally renewed annually so that the 10 year period is maintained. SPHERE OF INFLUENCE The Sphere of Influence provides an important backdrop of open space for the City. It is tangibly, as well as aesthetically, valuable to each resident of the City. It is the responsibility of the City to protect this quality, not by taking action, but by thinking ahead to the best future for the area in relation to the City's future goals. Two of the three County parks available to Saratoga residents are wholly or partially in the Sphere of Influence. Sanborn, enlarged to 1,000 acres since 1974 extends to Skyline Boulevard, and is completely in the Sphere of Influence. A small portion of Montalvo Arboretum is in the City but the majority of the 175 acres is in the Sphere. The 677 acre Stevens Creek Park is in Cupertino's Sphere of Influence but in the past it has been suggested that it be extended into the Saratoga Sphere. Other open space land is maintained by the Midpenisula Regional Open Space District. The Sphere of Influence ultimately will be tranversed by a park system which will form a corridor for the scenic mountain highways of the Peninsula. Thus, much of the area at the most westerly limit of the Sphere of Influence will be devoted to public open space. However, there are other lands that are developable or potentially developable. 3 -23 Extending the same ratio of open space to population for those areas of the City where lots are an acre or more in size is less realistic. To a considerable extent, residents with large lots are providing their own open space. In short, in Saratoga the criteria for amount and location of the needed open space must be flexible, depending on the part of the City being considered. Accepting this concept of available open space, it is necessary to review the existing open space and its location to identify areas where more open space should be preserved or acquired within the City. Parks The City obtained its first park about 18 years ago. Much of the park acquisition and development has come from park dedication fees. These are fees collected from developers on a per unit basis. Future development and acquisition will continue to utilize park development fees as well as revenue sharing and various park bond monies from the state. Although the parks generally are well distributed throughout the City, it appears the large triangular Saratoga-Sunnyvale- Cox- Saratoga residential area is in the need of activity- oriented facilities, somewhere in the vicinity of Argonaut School. The following table lists the City parks and their locations: TAB LE 16 Saratoga Parks, 1981 Park Acreage Location Azule 4.1 Goleta & Knollwood Brookglen .7 Brookglen Court Central 13.9 Saratoga & Fruitvale Congress Springs* 9.7 Glenbrae Drive El Quito ** 6.3 Cox & Paseo Presada Foothill 0.8 Seaton & Tranworth Gardiner 2.2 Portos & Wildcat Hakone 15.5 Big Basin Way & Tollgat Historical Park 1.0 Sara. -L.G. and Oak Plac Kevin Moran 10.3 Scully Avenue Wildwood 4.0 Fourth Street TOTAL 68.5 * An additional 10 acre portion of the Transportation corridor adjacent ** to the park has been leased from Cal Trans since 1976. Lease from Moreland School District 3 -29 SCHOOL SITES Saratoga is served by nine school districts: five elementary districts, two high school districts, and two community college districts. But whereas there were twelve public schools (in addition to West Valley College) operating in Saratoga at the time of the adoption of the 1974 General Plan, only nine of these schools are still open and the closure of another is pending. The strength of school district identification with the City of Saratoga varies with the proportion of the district's schools that are located within the City. If all or most of a district's schools are situated within a single municipality, then the school district and the city government share a common constituency. This circumstance tends to facilitate coordinated planning. On the other hand, it is difficult to plan for the best interests of Saratoga residents when the school site serving their neighbor- hood is one in a school district which has the majority of schools and constituents in another city or cities. The Saratoga 1974 General Plan relied heavily on existing schools for provision of open space and recreational and community facilities. Dispersal of these sites throughout the City is important for convenient access by all residents. Any proposed change in the use of a school facility should be carefully studied by the City and the affected residents. The City's first goal with respect to surplus schools should be to encourage the site to remain in public ownership, thus being available for present or future public use. The zoning ordinance shall allow the school to be used for an interim alternative use, without extensive exterior modifications, in a manner compatible with the neighborhood and remunerative to the school district. If it is determined that the surplus school must be sold, then the City's second goal is to work with the school district and residents to assure that the new use is of optimum benefit to the community. The public hearing process shall be used to deter- mine the type of use most suitable for the site and to specify criteria by which the Planning Commission shall evaluate projects proposed for the site. To assure the continued suitability of the land use, the use may have to be subject to the granting of a use permit. In addition to these public school facilities, Saratoga also contains the Notre Dame Novitiate with 54 acres of primarily undeveloped land adjacent to the City's Madronia Cemetery. The Saratoga campus of West Valley Community College includes 135 acres readily accessible to Saratoga residents. Much of the West Valley site is covered by buildings and parking, by using low profile buildings and landscaping, an effort has been made to produce a pedestrian oriented indoor /outdoor environment. 3-30 Currently, over 800 acres in the Sphere of Influence are preserved under the Williamson Act. Since much of the agricultural land lacks access or is subject to high earthquake hazard, it is unlikely that it will be developed in the near future. Residential structures are generally widely disbursed in the Sphere and on large acreages. As a result, the need for local or neighbor- hood open space is not a factor. It is important to recognize the need for open space designation in the Sphere of Influence. There are areas which now lack access and where, given current technology, it would be prohibitively expensive to extend the sewer and water facilities necessary for development. This does not mean that this situation will not change 20 to 30 years hence. Consideration must be given to long -term uses of areas which now look beyond the possibility of development. Their vacant status must not be assumed. With the San Andreas fault zone bisecting the Sphere of Influence, much of the area is considered unstable. Most of the Sphere also is formed by excessively steep slopes. These areas will never be capable of supporting urbanization and will thus remain generally open. Resource Related Open Space Saratoga will be the beneficiary of some open space as a result of policies and actions of other agencies. Some lands will be kept in their natural state to provide watersheds, others as rights -of- way for utility lines. Still others will be maintained as timber- land and sources of potentially scarce resources such as gravel. All of these resources are dealt with specifically in other special elements of the General Plan, such as seismic safety, conservation and safety. What is important to note here, is that while the primary function of these uses may not be open space, the secondary effect will be to provide in some cases large expanses of undevelop- ed and untouched open space. These areas should be considered a part of Saratoga's inventory of open space. Active and Passive Recreation City, County and State parks are usually developed with human recreation as a primary proposed use. Facilities are provided for camping and picknicking. Trails for hiking, bicycling, and horse- back riding serve as links between and through the open spaces. In 1977 the City adopted the Master Trails and Paths Plan which amended the Circulation Element. This plan was coordinated to compliment the existing County Trails and Pathways Master Plan. Trails increase the feeling of open space and add to the visual beauty of the City in a way that the resident can make use of. Trails can also make parks in the Sphere of Influence, such as 3 -31 Sanborn and Stevens Creek Park, more accessible to bikers and hikers. Many proposed trails are planned to link up with other county or neighboring city trails to provide a network that will reach into the Santa Cruz mountains and all the way to the Pacific Ocean. Trail systems are links between public facilities and give people the alternative of a pleasant and different kind of mobility than that provided by the automobile. The Montalvo Arboretum Nature Trail is a hiking trail which passes through areas of a dry chaparral, woodlands, and a redwood grove. The Lookout Trail leads to a high point where there is a sweeping view of the Santa Clara Valley. Animal and bird life abound in this Audubon Society Sanctuary and a further educational experience is provided by markers indicating the popular and botanical names of trees and their places of origin. Although many visitors use the arboretum, the potential educational and recreational services it provides for school children have not been developed. The Santa Clara Bike Route System Plan uses rights -of -ways of freeways, expressways, streets, flood control and utility rights - of ways to traverse the urban areas of Santa Clara County. Because of obvious need, and in order to implement the plan quickly, existing roads are being used as interim routes until separate paths can be provided. By the use of local gas tax funds, it has been possible to install bike route signs and to mark lanes for bikes on existing roads. The Saratoga Public Works Department and Bicycle Route Committee studied the feasibility of incorporating a "Demonstration Bike Route System" of lanes and paths into the City transportation network. Implementation of the demonstration plan is taking place gradually, based on priorities established by the City Council. The local system is designed to form links with the County Bike Route System. Hakone Park is the only City park which is more of a passive than active recreation area. Sites designated for development as City parks, but not yet developed, can often be used now for active recreation; however, in Saratoga many of these undeveloped areas are not presently available for active use because of the high brush and grass covering them. In addition, several of the future parks have a very bumpy terrain which would require grading before they could be used as playing fields. Gardiner Park site bordering the Wildcat Creek is the only site now available and in use as an outdoor walking and biking resource. City parks and park sites comprise 78.5 acres or about 1% of Saratoga's total area. However, more important than area devoted to City parks is the consideration of how well these parks serve the needs of the people and how well they serve as enjoyable open space. Few of the existing parks are provided with any kind of play equip- ment or courts for ball games. Wildwood Park has some play equip- ment. However, the neighborhood schools provide this resource for active or strenuous recreation. 3 -32 The City parks and park sites that are accessible neighborhood parks are Kevin Moran, Azule Park Site, Brookglen /Cox Site, E1 Quito Park Site, Congress Springs Park Site, Foothill Park Site and Gardiner Park Site. Wildwood Park is accessible for neighborhood use and as a downtown shoppers' park. Hakone Gardens is not a neighborhood park -- it is situated in a very low density area and is not intended for active recreational use. The Community Garden, although excellent as a recreational resource, is not accessible as a neighborhood resource. 3 -33 TAB LE 17 OPEN SPACE PROVIDED BY SCHOOL SITES IN SARATOGA, 1981 School 1. West Valley College 2. Saratoga High School (Los Gatos Joint Union High School District) 3. Prospect High School (Campbell Union H.S. District) 4. Surplus site (Fremont Union H.S. District) (Saratoga Elementary School District:) 5. Redwood School 6. Foothill School 7. Argonaut School 8. Saratoga School 9. Congress Springs School Acreage Covered Acreage Devoted Total by Buildings & to Open Space Acreage Parking Lots and Recreation Uses 135.0 105.0 30.0 38.0 22.0 16.0 34.9 16.2 18.7 48.0 - - 17.71 6.13 11.58 10.96 3.24 7.72 11.50 4.49 7.01 6.10 1.58 4.52 9.92 3.57 6.35 Proposed General Plan change to Medium Density 1982 3 -34 (Moreland Union School District:) 10. El Quito Park School 12.1 5.0 7.1 11. Brookview School 12.2 4.5 7.7 (Cupertino Union School District:) 12. Hansen School 8.70 1.67 7.03 13. Blue Hills School 10.57 2.61 7.96 14. Marshall Lane School 10.0 1.29 8.71 (Campbell Elementary School District) 15. Sacred Heart School 10.6 1.29 8.71 16. Saint Andrews School 6.8 4.8 2.0 Proposed General Plan change to Medium Density 1982 3 -34 TAB LE 18 INVENTORY OF OPEN SPACE LANDS Open Space for Preservation in Natural Human Resource Open Space Managed Resource Production Open Space Recrea- tion (includes Parks and School) Open Space for Health, Welfare & Public Safety Open Space Under Priva Ownership West Valley Freeway 32 8 School Sites 151 Private Lands: Residential 9 242 Commercial 12 Designated Scenic Easement or Open Space Easement in Western Hillsides 334 Williamson Act 223 Orchards /Vineyard 62 Geologic areas in Western Hillside 11 Flood Plain 90 Villa Montalvo 175 MROSD (Sphere of Influence) 319 Reservoir 14 Creeks 36 City owned Lands (Undeveloped Parks) 7 3-35 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO FROM SUBJECT City Council City Engineer rp DATE: 2 -24 -89 Policy Development Agenda Background #4 Strategy to Implement the Future Village Plan Policy Issue At what speed shall we proceed to implement the Village Plan. With the completion of the several major construction projects this year the next steps will be to complete the Village Plan improvements. You will need to determine the scheduling of these items. They are as follows: 1. Tree planting. 2. Parking directional signs. 3. New trash containers. 4. Benches. 5. Newspaper stand enclosures. 6. Kiosk at 3rd Street. 7. Fourth Street sidewalk. 8. Parking Districts. 9. Pedestrian Plaza. In addition, property owner improvements are 1. Flower boxes. 2. Benches. 3. 3 kiosks. 4. Miscellaneous beautification. The property owner improvements are of course to be installed at the discretion of the owner. However, those items that compliment the City installed improvements should be promoted, perhaps by the Merchants Association, to be installed at the same time. This would be particularly true of the benches and the kiosks. 1 Referring to the above list of improvements, Item 2, the parking directional signs, should be implemented immediately following the Caltrans Reconstruction of Big Basin Way. Posts for these signs should be set during the Caltrans work so as to not require removing portions of that work to install the signs. This cost can be absorbed in the Street Maintenance Budget. Item No. 7, the Fourth Street sidewalk is already budgeted for 89 -90. Item No. 1, the tree planting, is also budgeted for fiscal 89 -90. We have negotiated with Caltrans to remove the existing undesireable trees in their contract and provide tree wells for all trees along with electrical conduit and water stubbed into each tree well. The balance of items i.e., 3 through 6 & 9 are nominal cost items and may be covered by the cities commitment of funds for the Village items which is already $200,000 for Big Basin Reconstruction, $15,000 Fourth Street sidewalk and $10,000 street trees. Item No. 9, Pedestrian Plaza, is currently in the 91 -92 CIP. It is dependent on cooperation of property owner or acquisition of property. It may be something that would be included in any establishment of Village Parking District No. 5. This proposed district would not provide for any new spaces inasmuch as it involves 2 totally developed parking lots. In fact the Pedestrian Plaza would actually reduce parking slightly. That being the case, its sole purpose would be to allow for intensification of of density of the area. Parking District No. 6 which would be located at the southerly end of Big Basin Way and substantially below the street would probably be of limited value to the existing Village. For it to have a significant value, the area southerly of Fifth Street would have to be intensified commercially so that the property fronting that proposed parking would use it. It should be determined if either of these proposed parking districts 5 or 6 are worth pursueing and if so when should the process begin. Parking District #3 was discussed and worked on for twenty -five years prior to its recent implementation. That much time and effect should not be expended on future districts. K, 09WA @9 gz_�3_�I�Q)gz %640 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO: City Manager DATE: 2 -24 -89 FROM: Chief Building Inspector SUBJECT: Background Note: Policy Issues - Should the City create an amnesty program to clean up expired permits? Implementation of an amnesty program for expired building permits would have several positive affects on the City. Presently, the city Code contains specific provisions for the expiration of permits. These provisions allow for a one time extension. However, all permits expire, by default, two (2) years from the date of issuance of permits. When a permit expires, work may not continue and no inspection may be conducted until a new_ permit has been issued. The issuance of a new permit can, and often does, create numerous problems for the applicant and the City. Prior to the issuance of a new permit the applicant is required to obtain a zoning approval through the Planning Department. Older projects may not conform to current zoning regulations which take presidency over the regulation at the time the previous (expired) permit was issued. It is difficult to obtain strict compliance with the new regulations, particularly if there are non conformities to set - backs, square footage and height requirements. The issuance of a new permit is greatly impacted by State regulations. By definition, the new permit must comply with current State building code regulations, which includes Title 24 Energy Standards. Once again, older projects will not comply with the new standards. Insulation, appliance efficiency, allowable glazing and lighting allowance requirements, to mention a few, have changed drastically in the last ten (10) years. Scenario: A home owner, who is selling his home, arrives at City Hall and wants to find out the requirements for finaling the eight hundred (800) square foot addition to his house. The addition was completed ten years ago but the contractor didn't obtain the required final inspection. The owner wants to clear up this problem and complete the sale of the house. Subsequently, the owner discovers his permit has expired and a new permit must be issued. Furthermore, he discovers that the new permit requires compliance with the new City zoning and building regulations. Upon review of this addition, City Staff explain that, according to new regulations, he must reduce the square footage by fifty square feet, cut off three feet of the addition (since it encroaches into the side set- back), add insulation to all the additions walls and ceiling and replace the furnace with a more efficient model. The owner smiles, says "Thank You" and leaves city Hall never to be seen again. I believe a well publicized amnesty program will create a needed awareness in the community concerning home owner responsibility as it relates to permits. Amnesty for expired permits would 1. help clean -up our old files 2. provide an avenue for frustrated home owners to obtain necessary final inspections 3. generate revenue in the form of reinstatement fees, 4. assist City Staff with handling the new verses old regulation problems 5. show a genuine willingness by the City to address this growing problem and 6 prompt home owners to investigate the stasis of permits. C�B�� off ����'OO C�L� � ✓ 13777 FRUITVALE AVENUE • SARATOGA. CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO FROM SUBJECT Mayor & City Council Stephen Emslie, Planning Director Property Maintenance Standards DATE: 2/24/89 The question before the City Council is whether or not standards for property maintenance should be established and enforced for residential and commercial properties. Background This suggested program comes to the City Council by way of the Planning Commission who has become increasingly concerned regarding the deterioration of the City's neighborhoods and their commercial centers. The Planning Commission views this item as a code enforcement program rather than expansion of the housing rehabilitation program discussed previously. Primarily, the Planning Commission requests that the Council consider establishing improved standards and a streamlined process for resolution of disputes. The Planning Commission has noted maintenance programs to improve the residential areas have been implemented to this report area examples of main - adopted by the cities of Dublin and reference. Analysis that successful property quality of commercial and in other cities. Attached tenance ordinances recently San Leandro for Council's While other cities have demonstrated success in implementing property maintenance standards, the process to implement maintenance regulations is expected to be controversial. The issues inherent in a discussion of maintenance standards are subjective, difficult to quantify and strike an emotional chord with those who disagree with the objectives. While a discussion considering additional maintenance regulations can be fraught with controversy and emotion, the process to enforce the regulations is equally controversial and in addition, is time consuming and costly. As the Council is aware, workload to enforce 1 Memo to Mayor & City Council Re: Property Maintenance Standards regulations of current codes suggests that additional personnel is desirable. Additional and more complicated regulation for property maintenance will increase demands on code enforcement resources. Additionally, there is a spillover effect to other departments. The Planning, Building and Maintenance Departments should expect to review increased applications for nonconforming structures and uses as well as respond to questions involving public jurisdiction and its maintenance obligation. There is a distinction between residential and commercial properties which has significance in considering the maintenance question. Residential property maintenance standards often are the most disputed and controversial. Commercial properties are less so because generally commercial properties rely on visual appearance to attract customers. For the most part, commercial centers are managed by real estate professionals who may be as concerned as the City regarding the appearance of the property. Clearly, there are notable exceptions to this observation when commercial properties are not in direct competition with other cities, the incentive to maintain high standards is not present. Saratoga has examples of both well and marginally maintained commercial property which has caused the Planning Commission to request Council consideration of this program. Findings In considering the Planning Commission suggestion, staff has made the following findings which the Council may take in to account when deciding to move forward on this item. 1. The establishment of maintenance standards should reflect a pervasive community concept of how its properties are to appear. The standards should attempt to address the "lowest common denominator" especially in residential areas and not attempt to implement ideals that are unrealistic and unattainable. 2. Commercial properties should be considered separately from residential properties. The maintenance issues are distinct to each land use. Should there be Council reluctance to initiate the program, the commercial standards and enforcement can be tried first. 3. Any decision to proceed should evaluate costs and staff levels. 4. The Council should bear in mind maintains public nuisance standards ;when the public's health and safety Stephen Emsli,e `Planning Director 2 that the City currently which enable the City to act is in question. i City of San Leandro �---� Civic Center, 835 E. 14th Street i San Leandro, California 94577 I The enclosed information includes instituting the Neighborhood Preservation used in the enforcement of this ordinance - •�vG1yCV FES 1IS09 PLA-MMIG DEPT the City of San Leandro Ordinance Program and a packet of sample letters The ordinance was adopted by the City Council in response to a community desire to retain the integrity and quality of San Leandro neighborhoods. The ordinance prohibits the storage of certain items in view of the public street for an unreasonable period of time. If the items are not removed by the property owner following various notifications by the City, the City can physically remove the items in violation, billing the owner for removal and administrative costs. Unpaid bills become liens on the property. The Neighborhood Preservation Ordinance has been extremely successful. Since its inception in March 1987, more than 400 residential properties have been brought into compliance. It has been well received by both landlords and tenants, by property owners and by the community as a whole. The program has encouraged clean -up of properties by owners who would not btherwise have been able to improve their properties. As a result of this program, the City has been able to introduce housing rehabilitation programs to low income housing persons for a variety of housing improvements. Finally, it has improved a number of neighborhoods by removing those conditions which were beginning to cause blight and property degradation. Based on the success of the program, we are now expanding it to our industrial and commercial areas at the request of the Chamber of Commerce and the Manufacturers Association. The program was initially developed and enforced by the City Manager's Office. It has been transferred to the Community Standards Section of the Community Development Department's Planning Division. For further information regarding this program, please call Alice Calvert, Community Standards Coordinator, at 577 -3457. Very truly yours, Richard H. Randall City Manager 5N-4 Dave Karp, Mayor `— o low City Council: John E. Faria; Bob Glaze; William F. Jardin; ' = Linda Perry; Anthony B. Santos; Edwin J. Suchman; Dick Randall, City Manager CITY OF SAN LEANDRO - NEIGHBORHOOD PRESERVATION PROGRAM Background The development of the Neighborhood Preservation Ordinance was in response to public concerns regarding residential properties which violate accepted neighbor- hood standards for appearance. These violations generally include the accumula- tion of materials, equipment, and other items which create a public nuisance, making the property clearly out of conformity with the adjacent properties. The Neighborhood Preservation Ordinance was designed to focus on those types of public nuisances in which the City previously had limited ability to enforce abatement. The Neighborhood Preservation Ordinance is a valuable tool in the pre- vention of the deterioration of residential neighborhoods resulting from the accumulation on private property of litter, debris, overgrown vegetation, and dis- carded or inappropriately stored household items. This ordinance provides for enforcement in those few cases when voluntary abatement of the public nuisance cannot be obtained. The types of public nuisance that can be abated under this proposed ordinance include: >> Debris, clotheslines, junk, trash >> Lumber, salvable materials >> Machinery >> Broken or discarded furniture >> Overgrown vegetation; dead, decayed, diseased trees >> Graffiti » Boats, trailers, vehicle parts, and camper shells which are abandoned or partially disassembled City staff conducted a careful analysis of the required implementation steps and impact on personnel to implement and administer the program. The results of this analysis appear in the following section of this report. Initial Program Operations The formal abatement process requires substantial documentation and follow -up site visitations in those cases where residents or property owners resist attempts to gain voluntary compliance with the ordinance. As the program has developed, and the number of formal abatements have increased as public knowledge of the ordinance expanded, it became necessary to utilize a part -time seasonal assistant and part -time clerical support in addition to existing staff. -2- Quality Control In San Leandro, we believe it is critical that the City Manager's Office initially maintain control of both the number and degree of severity of those cases chosen for immediate attention under the provisions of this ordinance. For this reason, it was necessary to ensure that an acceptable, effective standard and application of enforcement be maintained within a case load that can be reasonably managed given existing personnel. Experience with the ordinance in San Leandro shows that approximately one dozen locations are the optimum number that can effectively be managed under this program at any given time. Role of Homeowners' Associations The role of the various homeowners' associations is to bring potential viola- tions of the ordinance to the City's attention. Cases for investigation under this ordinance are prioritized by City staff based on severity, existing case load, etc. The homeowners' associations are valuable to the program in that they seek compliance with the ordinance by making their membership aware of the purpose and provisions of the ordinance. Evaluation Period After approximately six months of implementation of the ordinance, City staff will conduct an evaluation of the Neighborhood Preservation Ordinance. The find- ings of this evaluation will be reported to the City Council along with any recommendations that staff may believe to be warranted to improve the intent and /or implementation of the ordinance. The City Manager's Office received approximately 100 calls from citizens in the first few week's of the program. At this writing, approximately 70 properties have been processed under the provisions of the ordinance with 30 properties achieving compliance by improving their appearance and condition. Financial Impact Costs to the City of San Leandro thusfar to implement the enforcement of the Neighborhood Preservation Ordinance are minimal. In the 1981 -1988 City Budget,. $25,000 has been included to fund the transition of the administration of the Neighborhood Preservation Ordinance to the Community Development Department. For further information, contact Alice Calvert, Community Standards Coordinator, at 577 -3457. / 1-0 APpIL 1987 NEW9LMEtt VOLUME 18, NtlMUNt 1'6 CITY ENACTS NEIGHBORHOOD PRESERVATION ORDINANCE An ordinance designed to help preserve the character and quality of San Leandro's residential neighbor- hoods was recently adopted by the City Council. Entitled the Neighbor. hood Preservation Ordinance, it enables the City to abate undesirable conditions on private residential pro- perty where the owner falls to s& dress these conditkm In a finely, manner. The ordinance was developed In response to public conoem arising from Instances of property owners failing to adhere to accepted corn munity standards relating to neigh- borhood appearance. The ordinance targets conditions which fall to con- form to those of adjacent properties and conditions which create a public nuisance. Under the new ordinance, the City can abate conditions of debris or litter of various types, discarded furniture and large appliances, overgrown vegetation, graffiti, and abandoned boats and camper shells which are visible to the street. Attractive nuisances, dangerous to' children, and abandoned or partially cow structed buildings also qualify for abatement under ordinance. Property owners and tenants whose properties violate the condl- tione of the ordinance will be given adequate notice and time to remove the nuisance and comply with the or- dinance. Low Income residents may apply for rehabilitation loans to make necessary Improvements to bring their properties Into compliance. Pro- ... rty owners will also have an oppor- - I - tunity to appeal the Notice to Abate at a hearing before the City Manager s Neighborhood Preservation Commit tee. The City will assist homeowners and residents In every way poss►Me so that enforcement of this ordinance will only be necessary In those few in stances when voluntary abatement of the public nuisance cannot be obtaawi The cooperation of all San Leanry o residents in keeping their properties :. free of any undesirable conditions will result in a better community for all of Its residents. For more Information about this ordinance, call the City's Community. Relations Representative at 577.3358. Summary of Neighborhood Preservation Ordinance Chapter 1 of Title III of the San Leandro Municipal Code declares that certain conditions existing on residential property are nuisances. In general, the ordinance declares conditions which exist in the front or side yards to be nuisances. The following language is taken directly from the ordinance and defines what is a nuisance: (a) The accumulation of dirt, litter or debris on the property which is visible from a public street; (b) Clotheslines or clothes hanging in front yards, sideyards, porches or balconies and visible from a public street; (c) Trash, garbage or refuse cans, bins, boxes or other such containers stored in front or side yards and visible from a public street; (d) Packing boxes, lumber, junk, trash, salvage materials, or other debris kept on the property for an unreasonable period and visible from a public street; (e) Attractive nuisances dangerous to children and visible from a public street, including abandoned, broken or neglected equipment, machinery, refrigerators and freezers, hazardous pools, ponds and excavations; (f) - Broken or discarded furniture, household equipment and furnishings or shopping carts stored on the property for unreasonable periods and visible from a public street; (q) Overgrown vegetation likely to harbor rats, vermin and other nuisances causing detriment to neighboring properties or property' values or obstructing necessary view of drivers on public streets or private driveways and visible from a public street; (h) Dead, decayed, diseased or hazardous trees, weeds or other vegetation constituting unsightly appearance, dangerous to public safety and welfare or detrimental to neighboring properties or property values and visible from a public street; (i) Graffiti or other words, lettering or drawings which remain on the exterior of any building or fence for an unreasonable period and are visible from a public street; (j) Boats, trailers, vehicle parts or other articles of personal property which are abandoned or left in a state of partial construction or repair for an unreasonable period of time in front yards, sideyards, driveways, sidewalks or walkways and are visible from a public street; (k) Camper shells which are left for an unreasonable period of time in front yards, driveways, sideyards, sidewalks or walkways and are visible from a public street; and (1) Buildings which are abandoned, boarded up, partially destroyed, or left in a state of partial construction for an unreasonable period of time and such buildings which are unpainted or where the paint on the building exterior is mostly worn off. If one of these conditions is found by the City Manager (or his designated representative, the Community Standards Coordinator) to exist on any residential property the City Manager can declare such condition to be a nuisance and order that it be abated (removed, repaired or rehabilitated) within a certain period of time. If the owner does not comply, a hearing will be held before a committee appointed by the City Manager to determine whether the condition is a nuisance under the ordinance. The property owner will be advised of this hearing and will have the opportunity to present evidence at the hearing. If the committee determines that a nuisance exists it must make findings and an order which will require that the condition be abated within a specified time period. If the owner does not comply the City Manager is authorized to have the necessary work done to abate the nuisance and the cost can ultimately be made a lien against the property. If the owner disagrees with the committee's decision he or she my appeal to the City Council which then holds a hearinq. If the Council finds the condition is a nuisance and orders it abated and the owner doesn't promptly comply the City Manager can have the work done and charge the property owner. If the city does the work itself all the city's costs can be made a lien against the property following a hearing before the City Council. CITY of DURM P.O. Soot 2340 DubUn, CA 94H® ORDINANCE NO. 13 -88 AN ORDINANCE OF THE CITY OF DUBLIN RELATING TO PROPERTY MAINTENANCE AND REPEALING ORDINANCE NO. 7 -88 The City Council of the City of Dublin does ordain as follows: ARTICLE 1. DEFINITIONS Section 1.1: BACK YARD. "Back yard" shall mean that portion of property between a building and the back property line. Section 1.2: BUILDING. "Building" shall mean any house, garage, duplex, apartment, condominium, stock cooperative, and other residential and non - residential structures. Section 1.3: CITY. "City" shall mean the City of Dublin. Section 1.4: CITY MANAGER. "City Manager" shall mean the City Manager or his designees. Section 1.5: FRONT YARD. "Front yard" shall mean that portion of property between the street and a building. Section 1.6: OWNER. "Owner" shall mean any person owning property, as shown on the last equalized assessment roll for City taxes or the lessee, tenant or other person having control or possession of the property. Section 1.7: PERSON. "Person" shall mean any individual, partnership, corporation, association or other organization, however formed. Section 1.8: PROPERTY. "Property" shall mean (a) all non- residential zoned real property and any building located on such property (referred to as "non- residential property ") and (b) front yards, the unfenced portions of side yards, the unfenced portion of back yards of corner lots, driveways, walkways, and sidewalks of all residential real property and shall include any building located on such property (referred to herein as "residential property "). Section 1.9: SIDE YARD. "Side yard" shall mean that portion of property between a building and the side property line. -1- ftwi-W AD ARTICLE 2. NUISANCES Section 2.1: UNLAWFUL RESIDENTIAL PROPERTY NUISANCE. It -shall be unlawful for any person owning, leasing, renting, occupying or having charge or possession of any residential property in the City to maintain or to allow to be maintained such property in such manner that any of the following conditions are found to exist thereon, for an unreasonable period of time and are visible from a public street, except.as may be allowed by any other provision of law; including provisions of City ordinances: (a) The accumulation of dirt, litter or debris; (b) Clotheslines or clothes hanging in front yards; (c) Boxes, bins, containers, fire wood, lumber, junk, trash, salvage materials, or other similar materials; (d) Attractive nuisances dangerous to children including abandoned, broken, or neglected equipment, machinery, refrigerators and freezers, hazardous pools, ponds, and excavations; (e) Broken or discarded furniture, household equipment and furnishings or shopping carts; (f) Overgrown vegetation likely to harbor rats, vermin and other nuisances dangerous to public health, safety, and welfare, or obstructing a necessary view of drivers on public streets or private driveways; (g) Weeds, dead, decayed, diseased or hazardous trees, and other vegetation constituting an unsightly appearance or dangerous to public health, safety and welfare; (h) Graffiti on the exterior of any building, fence or other structure; (i) Vehicle parts or other articles of personal property which are abandoned or left in a state of partial construction or repair; (j) Mobilehomes, recreational vehicles, utility trailers, unmounted campertops, boats, cars, trucks, or other vehicles, that are parked or stored in violation of Ordinance 3 -86 and /or Ordinance 28 -87; and /or -2- (k) Buildings which are abandoned, boarded up, partially destroyed, or left in a state of partial construction and such buildings which are unpainted or where the paint on the building exterior is mostly worn off. Section 2.2: UNLAWFUL NON- RESIDENTIAL PROPERTY NUISANCE. It shall be unlawful for any person owning, leasing, renting, occupying or having charge or possession of any non - residential property in the City to maintain or to allow to be maintained such property in such manner that any of the following conditions are found to exist thereon for an unreasonable period of time and are visible from a public street, except as may be allowed by any other provision of law including provisions of City ordinances: (a) The accumulation of dirt, litter, or debris; (b) Boxes, bins, containers,.fire wood, lumber, junk, trash, salvage materials, or other similar materials; (c) Attractive nuisances dangerous to children including abandoned, broken, or neglected equipment, machinery, refrigerators and freezers, hazardous pools, ponds, and excavations; (d) Broken or discarded furniture, household equipment and furnishings or shopping carts; (e) Overgrown vegetation likely to harbor rats, vermin and other nuisances dangerous to public health, safety, and welfare, or obstructing a necessary view of drivers on public streets or private driveways; (f) Weeds, dead, decayed, diseased or hazardous trees, and other vegetation constituting an unsightly appearance or dangerous to public health, safety and welfare; (g) Vehicle parts or other articles of personal property which are abandoned or left in a state of partial construction or repair; (h) Mobilehomes, recreational vehicles, utility trailers, unmounted campertops, boats, cars, trucks, or other vehicles, that are parked or stored in violation of Ordinance 3 -86 and /or Ordinance 28 -87. (i) Graffiti on the exterior of any building, fence or other structure; -3- (j) Buildings which are abandoned, boarded up, partially destroyed, or left in a state of partial construction and such buildings which are unpainted or where the paint on the building exterior is mostly worn off. Section 2.3: DECLARATION OF PUBLIC NUISANCE. Any property found to be maintained in violation of sections 2.1 or 2.2 is hereby declared to be a public nuisance and shall be abated by rehabilitation, removal, demolition, or repair pursuant to the procedures set forth herein. The procedures for abatement set forth herein shall not be exclusive and shall not in any manner limit or restrict the City from enforcing other City ordinances or abating public nuisances in any other manner provided by law. ARTICLE 3. ABATEMENT PROCEDURE Section 3.1: NOTIFICATION OF NUISANCE. Whenever the City Manager determines that any property within the City is being maintained contrary to one or more of the provisions of Sections 2.1 or 2.2, he shall give written notice ( "Notice to Abate ") to the owner of said property stating the section(s) being violated. Such notice shall set forth a reasonable time limit, in no event less than seven (7) calendar days, for correcting the violation(s) and may also set forth suggested methods of correcting the same. Such notice shall be served upon the owner in accordance with provisions of Section 3.3 covering service in person or by mail. Section 3.2: ADMINISTRATIVE HEARING TO ABATE NUISANCE. In the event said owner shall fail, neglect or'refuse to comply with the "Notice to Abate ", the City Manager shall conduct an administrative hearing to ascertain whether said violation constitues a public nuisance. Section 3.3: NOTICE OF HEARING. Notice of said hearing shall be served upon the owner not less than seven (7) calendar days before the time fixed for hearing. Notice of hearing shall be served in person, by first class mail, or by certified mail to the owner's last known address. Service shall be deemed complete at the time notice is personally served or deposited in the mail. Failure of any person to receive notice shall not affect the validity of any proceedings hereunder. Notice shall be substantially in the format set forth below: "NOTICE OF ADMINISTRATIVE HEARING ON ABATEMENT OF NUISANCE This is a notice of hearing before the City Manager (or his designees) to ascertain whether certain property situated in -4- the City of Dublin, State of California, known and designated as (street address) ' in said City, and more particulary described as (assessor's parcel number) constitutes a public nuisance subject to abatement by the rehabilitation of such property or by the repair or demolition of buildings situated thereon. If said property, in whole or part, is found to constitute a public nuisance as defined in this Ordinance and if the same is not promptly abated by the owner, such nuisance may be abated by municipal authorities, in which case the cost of such rehabilitation, repair,._.or demolition will be assessed upon such property and such costs, together with interest thereon, will constitute a lien upon such property until paid; in addition, you may be cited for violation of the provisions of _ the City ordinances and subject to a fine. Said alleged conditions consist of the following: The method(s) of abatement are: All persons having an interest in said matters may attend the hearing and their testimony and evidence will be heard and given due consideration. Dated this day of 19_. Time and Date of Hearing: Location of Hearing: City Manager -5- Section 3.4: ADMINISTRATIVE HEARING BY CITY MANAGER. At the time stated in the notice, the City Manager shall hear and consider all relevant evidence, objections or protests, and shall receive testimony under oath relative to such alleged public nuisance and to proposed rehabilitation, repair, removal or demolition of such property. Said hearing may be continued from time to time. If the City Manager finds that that there is sufficient cause or repair the same, the City Ma an order, which shall specify t method(s) of abatement and the commenced and completed. The c right to appeal set forth in Se and order shall be served on al accordance with the provisions copy of the findings and order posted on or near the property. such public nuisance does exist and to rehabilitate, demolish, remove nager shall prepare findings and he nature of the nuisance, the time within which the work shall be rder shall include reference to the ction 3.6. A copy of the findings 1 owners of the subject property in of Section 3.3. In addition, a shall be forthwith conspicuously Section 3.5: PROCEDURE. NO APPEAL. In the absence of any appeal, the property shall be rehabilitated, repaired, removed or demolished in the manner and means specifically set forth in said findings and order. In the event the owner fails to abate the nuisance as ordered the City Manager shall cause the same to be abated by City employees or private contract. The costs shall be billed to the owner, as specified in Section 3.10. The City Manager is expressly authorized to enter upon said property for such purposes. Section 3.6: APPEAL PROCEDURE. HEARING BY CITY COUNCIL.The owner may appeal the City Manager's findings and order to the City Council ( "Council ") by filing an appeal with the City Clerk within seven (7) calendar days of the date of service of the City Manager's decision. The appeal shall contain: (a) A specific identification of the subject property; (b) The names and addresses of all appellants; (c) A statement of appellant's legal interest in the subject property; (d) A statement in ordinary and concise language of the specific order or action protested and the grounds for appeal, together with all material facts in support thereof; We (e) The date and signatures of all appellants; and (f) The verification of at least one appellant as to the truth of the matters-stated in the appeal. As soon as practicable after receiving the appeal, the City Clerk shall set a date for the Council to hear the appeal which date shall be not less than seven (7) calendar days nor more than thirty (30) calendar days from the date the appeal was filed. The City Clerk shall give each appellant written notice of the time and the place of the hearing at least five (5) calendar days prior to the date of the hearing, either by causing a copy of such notice to be delivered to the appellant personally or by mailing a copy thereof, postage prepaid, addressed to the appellant at his address shown on the appeal. Continuances of the hearing may be granted by the Council on request of the owner for good cause shown, or on the Council's own motion. Section 3.7: DECISION BY COUNCIL. Upon the conclusion of the hearing, the Council shall determine whether the property or any part thereof, as maintained, constitutes a public nuisance. If the Council so finds, the Council shall adopt a resolution declaring such property to be a public nuisance, setting forth its findings and ordering the abatement of the same by having such property rehabilitated, repaired, removed or demolished in the manner and means specifically set forth in said resolution. The resolution shall set forth the time within which such work shall be completed by the owner, in no event less than thirty (30) days. The decision and order of the Council shall be final. Section 3.8: SERVICE OF ORDER TO ABATE. A copy of the resolution of the Council ordering the abatement of said nuisance shall be served upon the owner(s) of said property in accordance with the provisions of Section 3.3. Upon abatement in full by the owner, the proceedings hereunder shall terminate. Section 3.9: HEARING PROCEDURE BEFORE CITY MANAGER AND COUNCIL. All hearings shall be tape recorded. Hearings need not be conducted according to the technical rules of evidence. Hearsay evidence may be used for the purpose of supplementing or explaining any direct evidence, but shall not be sufficient in itself to support a finding unless it would be admissible over objection in civil actions in courts of competent jurisdiction in -7- this state. Any relevant evidence shall be admitted if it is the type of evidence on which reasonable persons are accustomed to rely in the conduct of serious affairs, regardless of the existence of any common law or statutory rule which might make improper the admission of such evidence over objection in civil actions in courts of competent jurisdiction in this state. Oral evidence shall be taken only on oath or affirmation. Irrelevant and unduly repetitious evidence shall be excluded. Section 3.10: ABATEMENT BY CITY. If such nuisance is not abated as ordered within said abatement period, the City Manager shall cause the same to be abated by City employees or private contract. The City Manager is expressly authorized to enter upon said property for such purposes. The cost, including incidental expenses, of abating the nuisance shall be billed to the owner and shall become due and payable 30 days thereafter. The term "incidental expenses shall include, but not be limited to, personnel costs, both direct and indirect, including attorney's fees; costs incurred in documenting the nuisance; the actual expenses and costs of the City in the preparation of notices, specifications and contracts, and in inspecting the work; and the costs of printing and mailing required hereunder. A person shall not obstruct, impede, or interfere with the City Manager, or his representative, or with any person who owns, or holds any interest or estate in any property in the performance of any necessary act, preliminary to or incidental, carrying out an abatement order issued pursuant to Section 3.4 and 3.7 of this ordinance. Section 3.11: LIMITATION OF FILING JUDICIAL ACTION. Any action appealing the Council s decision and order shall be commenced within thirty (30) calendar days of the date of service of the decision. Section 3.12: DEMOLITION. No property shall be found to be a public nuisance under Sections 2.1(k) or 2.2(j) and ordered demolished unless the order is based on competent sworn testimony and it is found that in fairness and in justice there is no way other than demolition reasonably to correct such nuisance. Section 3.13: NOTICE OF _INTENT TO DEMOLISH. A copy of any order or resolution requiring abatement by demolition under Section 3.4 or 3.8 shall be forthwith recorded with the Alameda County Recorder. ARTICLE 4. LIEN PROCEDURE Section 4.1: RECORD OF COST OF ABATEMENT. The City Manager shall keep an account of the cost, including incidental expenses, of abating such nuisance on each separate lot or parcel of land where the work is done by the City and shall render an itemized report in writing to the City Council showing the cost of abatement, including the rehabilitation, demolition or repair of said property, including any salvage value relating thereto; provided that before said report is submitted to the City Council, a copy of the same shall be posted for at least five (5) days upon or in front of such property, together with a notice of the time when said report shall be heard by the City Council for confirmation. A copy of said report and notice shall be served upon the owners of said property in accordance with the provisions of Section 3.3 at least five (5) calendar days prior to submitting the same to the City Council. Proof of said posting and service shall be made by affidavit filed with the City Clerk. Section 4.2: ASSESSMENT LIEN. The total cost for abating such nuisance, as so confirmed by the City Council, shall constitute a special assessment against the respective lot or parcel of land to which it relates, and upon recordation in the office of the County Recorder of a Notice of Lien, as so made and confirmed, shall constitute a lien on said property for the amount of such assessment. After such confirmation and recordation, a certified copy of the Council's decision shall be filed with the Alameda County Auditor - Controller on or before August 1 of each year, whereupon it shall be the duty of said Auditor - Controller to add the amounts of the respective assessments to the next regular tax bills levied against said respective lots and parcels of land for municipal purposes and thereafter said amounts shall be collected at the same time and in the same manner as ordinary municipal taxes are collected, and shall be subject to the same penalties and the same procedure and sale in case of delinquency as provided for ordinary municipal taxes. All laws applicable to the levy, collection and enforcement of municipal taxes shall be applicable to such special assessment. In the alternative, after such recordation, such lien may be foreclosed by judicial or other sale in the manner and means provided by law. Such Notice of Lien for recordation shall be in form substantially as follows: . _._......_��.........�..�., s —ate rM`a a_gM'.�e�•w •a.. v... �TVa:' a. Yf�2 >.:E21 "1Si;�C.RR'�f4*�'.�:..�. .... ...- ..-. "NOTICE OF LIEN (Claim of City of Dublin) Pursuant to the authority vested by the provisions of Section of Dublin Ordinance No. , the City Manager of the City of Dublin did on or about the _day of , 19 , cause the property hereinafter described to be rehabilitated or the building or structure on the property hereinafter described, to'be repaired or demolished in order to abate a public nuisance on said real property; and the City Council of the City of Dublin did on the day of , 19 , assess the cost of such rehabilitation, repair or demolition upon the real property hereinafter described; and the same has not been paid nor any part thereof; and that said City of Dublin does hereby claim a lien on such rehabilitaton, repair, or demolition in the amount of said assessment, to wit: the sum of $ : and the same, shall be a lien upon said real property until the same has been paid in full and discharged of record. The real property hereinabove mentioned, and upon which a lien is claimed, is that certain parcel of land lying and being in the City of Dublin, County of Alameda, State of California, and particularly described as follows: (description) Dated this day of , 19_• City Manager, City of Dublin" ARTICLE 5. MISCELLANEOUS Section 5.1: ALTERNATIVE ACTIONS AVAILABLE; VIOLATION AN INFRACTION. Nothing in this Ordinance shall be deemed to prevent the Council from ordering the commencement of a civil proceeding to abate a public nuisance pursuant to applicable law or from pursuing any other remedy available under applicable law. Violation of the provisions of this Ordinance constitues an infraction. The City Manager is designated as the enforcement authority. -10- Section 5.2: VIOLATION AND PENALTIES. (a) Any person, firm, or corporation violating or causing, or permitting to be violated any of the provisions of this Ordinance shall be deemed guilty of an infraction. (b) Any person, firm, or corporation convicted of an infraction under the provisions of this Ordinance shall be punishable as provided in Government Code § 36900. Any violation beyond the third conviction within a one -year period may be charged by the District Attorney as a misdemeanor and the penalty for conviction of the same shall be subject to a fine or imprisonment or both not to exceed the limits set forth in California Penal Code Section 19. (c) Each person, firm, or corporation shall be guilty of a separate offense for each and every day during any portion of which any violation of any provision of this Ordinance is committed, continued or permitted by such person and shall be punishable accordingly. (d) The City Manager shall have the power to designate by written order that particular officers or employees shall be authorized to enforce particular provisions of this Ordinance. Officers or employees so designated shall have the authority to arrest persons who violate any of said provisions. Section 5.3: REPEAL OF ORDINANCE NO. 7 -88. Ordinance No. 7 -88 is hereby repealed. Section 5.4: EFFECTIVE DATE AND POSTING OF ORDINANCE. This Ordinance shall take effect and be in force thirty 30) days from and after the date of its passage. The-City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) public places in the City of Dublin in accordance with Section 36933 of the Government Code of the State of California. -11- PASSED AND ADOPTED by the City Council of the City of Dublin on this 9th day of May , 1988, by the following vote: AYES: Councilmembers Hegarty, Moffatt, Snyder, Vonheeder and Mayor Jeffery NOES: None ABSENT: None ATTEST: LWI&I i _�� ' fit _/� IgIIIIII 11,111 illlllllw''�111111��ll -12- Mayor 13777 FRUITVALE AVENUE • SARATOGA. CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO: Mayor and City Council DATE: 2/24/89 FROM: Stephen Emslie, Planning Director SUBJECT: Housing Element Policies The State of California requires that cities update their housing element policy every five years. Saratoga last revised its housing element in 1984; therefore our housing element must be reviewed in 1989 to be consistent with State law. Background State housing element law was first enacted in the early 1980's when California cities were required to develop and adopt housing policy to meet a quantified goal. The responsibility for establishing the housing allocation was given to the region's council of governments, ABAG. Every five years when the periodic housing element review is due, ABAG determines the total housing need for its region. ABAG then distributes the regional need among various jurisdictions within the region for review and comment. The Council is aware that ABAG uses a complex formula to determine each jurisdiction's allocation based on a variety of factors including demand, proximity to job centers and the availability of suitable sites. As the Council will recall, the City recently reviewed ABAG's preliminary housing allocation and requested revisions to lower the number of units Saratoga should provide in its housing policy. The Staff has recently received word from ABAG that the downward adjustments requested by the Council will be made in a revised housing allocation now being prepared. While it seems that the numbers the City will need to address in the forthcoming revisions are in keeping with the realistic goals, the task of reviewing housing policy remains. The latest version of the Housing Element contains six policy directives as well as a quantified goal for providing a set number of units for both new construction and rehabilitation. Each goal is summarized as follows: Goal No. 1: Promote the opportunity for all residents to have a sound home and satisfying environment. 1 Policies implementing this goal emphasize cooperation with the County and non - profit housing organizations as well as promoting opportunities for senior and handicapped housing. Goal No. 2: Maintain and enhance the character, quality and livability of the City's residential neighbors. This goal is implemented through policies which encourage the rehabilitation of existing housing, protection of rental housing and "lower valued" housing, as well as the maintenance of the low density single family character of Saratoga. Goal No. 3: Insure that new housing shall be compatible with the existing natural and constructed environment. This goal is implemented by establishing policies that identify seismic and geologic problem and require development to respect the natural features to the extent possible. Goal No. 4: Conserve our finite natural resources by stressing the importance of energy efficiency in housing. Policies which implement this goal include encouraging the incorporation of passive and active heating systems (without the removal of trees), and promoting the use of conservation techniques which are in keeping with the aesthetic goals of the City. Goal No. 5: Saratoga shall continue to support the State's goal of providing decent housing and a suitable living environment. This section's policies deal exclusively with fair housing programs and anti - discrimination legislation. Goal No. 6: Affirm that the City shall continue to be predominantly a community of single family detached residences. This section states that there should be no expansion of industrial land or change of zone for undeveloped single family sites. The Housing Element also provides quantified objectives addressing new construction and rehabilitation. The policies state that Saratoga should be able to produce, through private housing development 30 units per year in the "above moderate" income category. This equates to a total of 150 new units in the five year life span of the current element. The rehabilitation goal states that the SHARP program will arrest housing deterioration by refurbishing 20 units per year for a total of 100 rehabilitated units. ANALYSIS The fundamental goals set forth in the current version of the Housing Element are reflective of the concern to preserve Saratoga's rural residential character. However a discussion of housing policy 2 in the state of California must address housing allocations determined on a regional basis. The staff's preliminary review of the housing conditions and expected growth indicate that with the development of the Masson property including the senior care facilities this city will be able to reasonably approach ABAG's allocation. Staff also expects that the SHARP program will contribute to fulfilling this City's housing need. While the goal of 20 rehabilitated units per year has not been attained in the last five years, four to five units per year have benefited from the low cost loans provided by the program. Staff is beginning to research methods to improve the public's awareness of the program in order to increase the rehabilitation of housing stock. The following are items which may increase the number of units rehabilitated each year: 1. Rather than target areas which could benefit from the SHARP program through direct mail, staff would utilize more wide spread techniques such as radio and television community awareness messages. This approach may create less of a chance to stigmatize a specific neighborhood and may increase the public's acceptance of the program; 2. Include SHARP information in the forth coming heritage resource inventory to capture the appropriate audience. 3. Utilize existing contacts with the Community Center and senior programs to again capture the right group who would might benefit from the program; 4. Cooperate with the Code Enforcement personnel to provide information regarding the program when violations are noted. The HCD funds utilized by the SHARP program exceeds $200,000 per year. While the majority of the funds are earmarked for the loan program, portions are set aside to off set staff costs in administering the program. Therefore, the continuance of the program not only is an important factor in achieving our housing goals, but provides the City with the resources necessary to provide a noteworthy service. FTVnTVM9 Staff finds that the existing policy framework provides the necessary guidance to fulfill the mandated housing allocation. The primary focus of the upcoming revision should emphasize the efforts made to attract senior housing which will be soon realized at the Masson site, and to augment the public's awareness of the programs available for rehabilitation. ,,9tep`fien1tmslie Planning Director 3 I 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO: Mayor and City Council DATE: 2/24/89 FROM: Stephen Emslie, Planning Director SUBJECT: Circulation Element Update As the Council is aware, preliminary staff work has begun to revise the City's Circulation Element. The City Council will recall that a joint meeting with the Planning Commission to review circulation policies was held late last year. BACKGROUND In October of last year, staff presented an outline of areas suggested to be addressed in the draft Circulation Element. To summarize, staff proposed that the draft address: the classification of the City's street system; the current physical condition of the street system; heritage lanes and scenic corridors; alternate transportation modes; expanded policies regarding bicycle, pedestrian and equestrian paths; and existing circulation policy in other elements including the land use and specific plan elements. Lastly, staff indicated that the suggested policy discussion was predicated on the inclusion of sound implementation techniques. In review, the Council and the Planning satisfaction with the City's current street and felt that no modifications in this regard observed that particular emphasis should be the City's recreational circulation system policy. ANALYSIS Commission expressed classification system were necessary. Staff placed on expanding of and refining existing Since the October meeting, staff has begun to formulate draft revisions in accordance with Council's preliminary direction. In light of Council's direction, staff reviewed the existing policies in the 1983 element and noted no deficiencies or recommendations for changes in policy direction as stated in the existing element. The Council may wish to refer to the complete element, which is attached for further information. 1 For the most part Staff sees the draft Circulation Element as providing the necessary studies and data base to refine policies, programs and improvements which may be inconsistent after the General Plan studies are complete. For example, staff has observed that several plan lines adopted for major arterials call for large dedications for once anticipated road widenings. Since current policy indicates that the rural character of Saratoga should be reflected in its street system, amendments to vestigial requirements are appropriate in the draft element. The draft Circulation Element will also emphasize the need for expanded policy discussion regarding the level of public transit and the accessibility of transportation alternatives. As the Council is aware, a concerted effort at the policy level may be necessary to affect a meaningful change in agency transit policy. One area where staff finds the existing element lacking is with respect to recreational trails and open space planning. The city's trail section is one area where expansion is needed in order to implement current goals and objectives. Further staff finds that the trails plan relates strongly to the discussion regarding open space. The public's access to open space amenities will be greatly enhanced through a well conceived trails system. Additionally, emphasis should also be placed on developing a policy statement regarding the maintenance of the City's expanded trail system and evaluation of effects on the levels of existing services. Lastly the draft element should expand on the implementation measures currently found in the element. The purpose of clear implementation will be to clarify which improvements are necessary so that opportunity to require trails improvements will not be overlooked. For example, implementation policies should locate trails and require private developers to install necessary improvements when applications are proposed. Additionally, meaningful implementation measures will also facilitate the City's acquisition of grant money when it is available. By demonstrating a comprehensive implementation system to State agencies administering recreation programs, the City will be in a favorable position to receive grant funds. Stephen Emslie Planning Director Attachments SE 2 I (01 t:3 tju4 - P t44A CIRCULATION AND SCENIC HIGHWAY ELEMENT (CI) A circulation element consisting of the general location and extent of existing and proposed major thoroughfares, trans- portation routes, terminals, and other local public utilities and facilities, all correlated with the land use element of the plan. A scenic highway element for the development, establishment, and protection of scenic highways pursuant to the provisions of Article 2.5 (commencing with Section 260) of Chapter 2 of Division 1 of the Streets and Highways Code. CI.1.0 Promote a balanced transportation system in Saratoga with attention to energy efficient transportation. CI.1.1 The City shall encourage and participate in the County -wide implementation of a variety of modes of transport to serve Saratoga. CI.1.1 (Imp) (The policy is specific and does not require an implementation measure.) CI.1.2 The City shall work toward improved public transit, including more frequent service and access to the village. CI.1.2 (Imp) Coordinate with County Transit on City efforts necessary to increase transit availability. CI.1.3 The West Valley Corridor right -of -way shall be designated as a public use corridor. CI.1.3 (Imp) (The policy is specific and does not require an implementation measure.) CI.2.0 Facilitate the safe movement of vehicular traffic within and through the City, taking into consideration the environmental, historical, and residential integrity of the City. CI.2.1 The City shall require public right -of -way to be offered and all private roads designated as collectors. CI.2.1 (Imp) (The policy is specific and does not require an implementation measure.) CI. 2.2 For safety, every new or developing public or pri- vate cul -de -sac greater than 500 feet in length, and every new and developing residential area in the City with more than 15 residential lots on a cul -de -sac should have a primary and an emergency access. NW-1 CI. 3.0 CI.2.2 (Imp) Modify Subdivision Ordinance accordingly. CI.2.3 Through collector streets shall be designed and aligned to minimize adverse impacts on the character of residential neighborhoods through which they pass. CI.2.3 (Imp) Circulation design guidelines should be developed to be distributed to residential developers. CI.2.4 The major traffic generators in the City should be provided with adequate access which is the least disruptive to local neighborhoods. CI.2.4 (Imp) Circulation design guidelines should be developed to be distributed to commercial, in- dustrial and institutional developers. CI.2.5 Assessment Districts formed to improve existing streets shall be encouraged. CI.2.5 (Imp) (The policy is specific and does not require an implementation measure.) CI.2.6 If it is unlikely that a substandard street will be totally improved, the City should take a deferred development agreement as a condition of approval for infill projects rather than requiring improvements concurrent with development. CI.2.6 (Imp) Modify Subdivision Ordinance accordingly. CI.2.7 Prior to further development of major residential (4 or more single - family units; 8 or more multi- family units) or major commercial (more than 30 person occupancy) projects along the City's major arterials, the impacts of increased traffic shall be studied and a plan for minimizing these impacts shall be developed to the extent feasible. CI.2.7 (Imp) (The policy is specific and does not require an implementation measure.) Protect the aesthetic, historic and remaining rural qualities of Saratoga through street design and landscaping. CI.3.1 Minimum City street standards shall be adopted based on location, terrain, character of areas and the anticipated function of the roadway. 2 -7 CI.3.1 (Imp) Develop general street standard criteria based on varying physical factors and make part of the Subdivision Ordinance. CI.3.2 Conventional City street development standards, as described in the City's Subdivision Ordinance, should be allowed to vary in order to preserve environmentally sensitive roadside features where traffic safety will permit such variations. CI.3.2 (Imp) Modify Subdivision Ordinance accordingly. CI.3.3 The function of a street shall be recognized in ad- vance of construction, and design criteria used to minimize disruption to the area caused by through or heavy traffic. CI.3.3 (Imp) Implement through Subdivision Ordinance CI.3.4 The City shall encourage the planting of trees and plan the development of landscaped medians along major arterials. CI.3.4 (Imp) (The policy is specific and does not require an implementation measure.) Strive for aesthetically pleasing views from all roads in Saratoga and the Sphere of Influence. CI.4.1 The City shall adopt an ordinance requiring the re- view of the design, appearance, and setbacks of all new fences, walls, and accessory structures that would be visible from, and on lots adjacent to, the City's arterial streets prior to the construction or issuance of building permits for those new fences, walls and accessory structures. The purpose of this ordinance is the enhancement of the scenic character of the views from these roads. CI.4.1 (Imp) (The policy is specific and does not require an implementation measure.) CI.4.2 The City shall rigorously enforce ordinances to pre- vent the use of non - conforming roadside signs on all roads and highways within the City. This shall include the use of all signs whether they be erected by private individuals or business enterprises. CI.4.2 (Imp) Implement through Sign Ordinance. Re- duce authorization time limits for signs in the scenic highway corridor. CI.4.3 The City shall require increased setbacks of up to 100 feet for structures, walls or fences to be located on lots adjacent to officially designated scenic highways where it is determined by the City that such increased setbacks are necessary to preserve the scenic qualities of the highway. MW CI.4.3 (Imp) Modify Zoning Ordinance accordingly. CI.4.4 The setback and landscaping requirements established in the Zoning Ordinance for commercial and multi - family residential structures on corner lots adjacent to arterial streets may be increased to reduce the visual impact of such structures and to enhance the appearance of important intersections. The City shall determine the extent and configuration of the landscaped areas necessary to create attractive developments on such corner lots through the design review process. CI.4.4 (Imp) Modify Zoning Ordinance accordingly. CI.5.0_ Use presently planned street capacities in determining land uses and acceptable development densities. If it is determined that existing streets need to be improved to accommodate a project, such improvements shall be in place or bonded for prior to issuance of building permits. CI.5.1 The City shall require adequate access in keeping with the density of development. CI.5.1 (Imp) Implement through. Subdivision Ordinance. CI.5.2 The City level of periods. to lower be chang, shall be shall establish a minimum acceptable service for city streets during peak travel Development which will have the potential the level of service below the standard shall ad so that the acceptable level of service maintained. CI.5.2 (Imp) Develop level of service criteria based on accepted traffic engineering methods. Ser- vice criteria shall be developed for arterials, collectors, and feeder streets and made part of the Circulation Element of the General Plan. CI.6.0 Integrate safe bicycling, walking, and horseback riding into the total transportation system. CI.6.1 Bicycle lanes shall be designated only where a road can accommodate them safely. CI.6.1 (Imp) Modify trails and pathways portion of General Plan to include bicycle lanes and implement safety criteria. CI.6.2 Parking shall be prohibited in designated bicycle lanes on thoroughfares and collector streets. CI.6.2 (Imp) Adopt required ordinance. CI.6.3 Where economically feasible, the bicycle route system should connect with the bicycle routes of adjacent communities, thereby increasing their accessibility to Saratogans. NMI C ;.3 (Imp) udy existin Bicycle route systems and determine the necessary modifications appropriate to the City's adopted trails and pathways. CI.6.4 Rights -of -way of the West Valley Corridor, express- way, Santa Clara Valley water District and utilities shall be used for trails wherever feasible. CI.6.4 (Imp) (The policy is specific and does not require an implementation measure.) CI.6.5 Encourage equestrian and pedestrian trails and path- ways along roadways in areas where safety and aesthetics permit. Equestrian pathways should relate to the equestrian zones. CI.6.5 (Imp) Review trails and pathways portion of General Plan to ensure consistency with this policy. CI.6.6 Motorized vehicular traffic shall be prohibited on trails, pathways, parks and dedicated open space areas except for maintenance and emergency purposes. CI.6.6 (Imp) Develop, adopt and enforce an ordinance prohibiting motorized vehicles on trails, pathways and parks. CI.6.7 Assure implementation of the City's trails system by requiring trail dedication, construction, and a method of trail maintenance as part of the sub- division or site approval. CI.6.7 (Imp) Implemented through Subdivision Ordinance. CI.6.8 Trails, sidewalks or separated pathways should be pro- vided in areas where needed to provide safe pedestrian access to schools, along arterial streets and along collector streets. CI.6.8 (Imp) Review trails and pathways plan to determine if adequate access is provided to schools and along streets. CI.6.9 Encourage the trails policies noted in the Specific Plan for the Northwest Hillsides. CI.6.9 (Imp) Include these policies as part of the Circulation Element. CI.6.10 Bike paths should be placed on both sides of Saratoga - Sunnyvale Road where traffic safety permits. CI.6.10 (Imp) (The policy is specific and does not require an implementation measure.) 2 -10 CI.6.11 The City will retain all existing and dedicated trails and pathways until it is determined that these trails and pathways are not necessary to accomplish the goals of the trails and pathway plan of the circulation element. CI.6.11 (Imp) (The policy is specific and does not require an implementation measure.) CI.6.12 Review the present equestrian zones and analyze their consistency with the trails and pathways plan of the circulation element. CI.6.12 (Imp) (The policy is specific and does not require an implementation measure. CI.7.0 Develop a circulation plan to show logical means of egress and ingress to undeveloped areas of the City and its Urban Service Area. CI.8.0 Encourage the preservation of the width and appearance of those roads designated as heritage resources by the City. CI.8.1 Encourage residents of streets and roads believed to have historic merit to nominate those rights of way for designation as heritage lanes. CI.8.1 (Imp) Implement through Heritage Preservation Commission. CI.8.2 The designation of heritage lane shall not preclude City action necessary to guarantee safe access for emergency vehicles while maintaining the integrity of the existing heritage lane. CI.8.2 (Imp) Implement through Subdivision Ordinance. CI.9.0 Minmize the City's financial risks for maintenance of streets and roads. CI.9.1 Prior to accepting any dedication of streets, the financial risks of maintenance costs shall be evaluated. Based on this evaluation, the City shall determine if the dedication of the street will be accepted. CI.9.1 (Imp) (The policy is specific and does not require an implementation measure.) 2 -11 CI.10.0 Traffic impacts that could create excessive noise, safety hazards, and air pollution shall be mitigated. The City shall use the standards established by the State of Cali- fornia and in effect on February 14, 1983, to determine what constitutes excessive noise, safety hazards, and air pollution until the City adopts its own standards or more restrictive standards are adopted by the State. 2 -12 09'xy� o2 O&M&'900Z 13777 FRUITVALE AVENUE • SARATOGA. CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO: Mayor and City Council DATE: 2/24/89 FROM: Stephen Emslie, Planning Director SUBJECT: Residential Overcrowding The recent past indicates that pressures to maximize development in residential neighborhoods is intense. Staff is asking whether Council is interested in evaluating additional measures to check overcrowding and intensification in the City's neighborhoods. BACKGROUND The Planning Commission has spent great effort recently to reduce residential mass and bulk through a variety of means. First, floor area ratios for residential construction and additions are stricter and deviation from these standards are more difficult to obtain. Secondly, the residential design manual provides proactive guidance to the residential builder and architect so that City objectives are incorporated initially into the proposal. However recent trends indicate that intensification is occurring in other ways. Staff has noted a significant increase in the frequency of requests for intensiffcation in established areas which are not associated with a specific design review application. Primarily, this increase is attributable to the impetus to maximize development given Saratoga's high land values. Staff has noted that intensification can take a variety of forms which can be identified as follows: 1. Re- subdivision of improved lots; 2. Basements and underground excavations; 3. Removal of older, traditional homes to construct larger homes; and 4. Extensive remodel of older traditional homes. The lot split trend is characterized by the occurrence of developed lots which are larger than the minimum sized required for its zone district. In many established neighborhoods there exist older 1 structures often constructed in conjunction with the prior agricultural use. This older structure is on a larger lot and is now surrounded by a housing tract. In many cases, the lots proposed for subdivision will conform with the minimum standards such as lot width, depth and frontage, but will not be compatible with the surrounding neighborhood. Additionally, the resulting lots often appear forced into the topography and setting, and are not conducive to the preservation of neighborhood character. The proliferation of basements as either additions to existing homes or modifications to approved but not constructed homes is also a developing trend. The Council should note that basements are not included in floor area calculations because they do not contribute to the mass and bulk of a structure. This alternative enables builders to add significant area which will not count toward floor area allowances. Residential "tear downs" or "scrapes" as well as extensive remodel of existing structures are also seen in Saratoga. However, this activity is limited to the older neighborhoods surrounding the Village and the Springer area. Since the majority of Saratoga's housing stock is relatively new, the residential tear down problem is not as widespread. Nevertheless, when such activity is proposed it does occur in an area like the Village where exceptional concerns such as historic preservation, compatibility and privacy are common. ANAT.VGTG Staff has refined several suggested techniques which the Council may to consider as appropriate methods to address the problems of residential over crowding: 1. Revise the City's Minor Subdivision Ordinance to require new proposals to adhere to more stringent requirements. Examples of possible revisions would include requirements to maintain not only minimum slope in building areas but also in required yards and setbacks. 2. Revise the City's Historic Preservation Ordinance to encompass sites and neighborhoods which do not currently meet the historic criteria as historic resources. This is a concept currently under consideration by the Historic Preservation Commission who are defining Heritage Lanes and Districts in conjunction with the publication of the Resource Inventory. 3. Revise zoning and subdivision standards to preclude re- subdivision of property previously developed. 2 4. Revise design review procedures to address the concern regarding basements. The revisions contemplated would allow the Director to determine if review of the basement before the Planning Commission is required when intensity concerns are present. — 2x� Step en Emsle Planning Director SE 3 /O. 0919W (02 O&M ° 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867-3438 Date: February 24, 1989 To: City Council From: City Manager COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman Subject: Background Note: Policy Issue: What is the long range future for Hakone Garden and what roles are the City and the Foundation, respectively, to play in creating that long range future? Two years ago the Council funding the Master Plan a the Foundation to discuss Kizuna -en was built as a c the Japan Foundation. It the Master Plan. A challe by Dr. Nagai to build construction to start in matching funds can be sec modification to the Master cultural center building. Board has written a lett communications process, access road to Hakone to b on -site conference and me of the garage into a gift discussed a similar issue relating to id established an annual meeting with .)rogress in this area. Since that time )operative effort between the City and represented the first step in creating ige grant of $250,000 has been offered the cultural center building with late 1989 or early 1990 provided the zred. Council has recently approved a Plan which fixes the location for the One member of the Hakone Foundation Dr, as part of the policy development Suggesting that the City expand the a able to handle tour buses, to improve ?ting facilities, and to turn one -half shop. Others have written suggesting the City remove some of the old parking lot area and landscape the area as a foreground for Kizuna -en. These issues and the challenge grant City is to develop both a strategy development. A division of labor determined. Should the Foundation improvements to Hakone or should the items and if so, which ones? require resolution if the and a capital budget for and effort needs to be be responsible for all �ity be responsible for some Policy Issue: What is the long range future for Hakone Garden and what roles are the City and the Foundation, respectively, to play in creating that long range future? February 24, 1989 Page Two While most of these items could probably be left to discuss in July when the annual meeting generally takes place, the issue regarding funding of the cultural center needs to be built into the capital budget for 1989 -1991. Waiting until July could impact how priorities for other projects are treated. While staff is prepared to go forward with whatever decisions Council makes, time is a factor and firm direction is needed so that proper planning can begin. arry P. Peacock, City Manager jm REPORT TO MAYOR AND CITY COUNCIL FROM: SUBJECT: Director of Maintenance BACKGROUND DATE: 2/24/89 Backaround Nogi - 12ji2v Issue Should the City Develop and Implement a Riding and Hiking Trail Maintenance Program? Although the full extent of existing trails is not known, they are primarily located in and around the Parker Ranch development and in the Pierce Road /Mt. Eden Valley area. Staff has reviewed the condition of existing equestrian /pedestrian trails in the City. For sake of definition this report concerns itself only with the basically unimproved trails utilized by hikers and horse riders that are on City rights -of -way and easements. Since the City has not been active in the maintenance of these trails, we do not know the amount of use they get from either hikers or riders. To determine what other agencies are doing in this regard, we have contacted the Town of Los Gatos, the cities of San Jose, Los Altos Hills, Campbell and the Mid - Peninsula Park District. The City of Campbell has no "unimproved trails" that they maintain. They do have a heavily used bycycle /wal king/ jogging path which has an asphaltic concrete surface. They report it is a maintenance nightmare, with litter and dog droppings needing daily cleanup and vandalism repair almost as frequent. The Town of Los Gatos utilizes a semi -hard surfacing on all of its trails and pathways. They maintain these trails on an as needed basis, but report that it is fairly regular. The rest of the agencies we contacted all have unimproved trails meeting the definition of this report. Those agencies all maintain on an as needed basis after a once a year (early spring) concerted effort of trail repair. The Mid - Peninsula Pa__. District, %�,___ch has the i,._st trails in the area, has what we consider the best approach to repair and maintenance. Once a year (early spring) their rangers report on all trail deficiencies in their area. Major repairs are contracted for with private contractors. They then utilize volunteers from hikers and horsemen groups and prisoners under the Public Service Program (P.S.P.) from the Correctional Department to work with their regular staff for one month of concerted maintenance. None of the agencies contacted, except Campbell, pick up animal feces. However, most of their trails are in undeveloped and rustic areas. All do regular or semi - regular debris clean up. CONSIDERATIONS 1. What is the extent of the City's existing and near future trail? 2. How much use are they getting and how much would they get if they were well maintained? 3. What are the legal ramifications of the City maintaining the trails? 4. What would be the start -up cost to provide trail maintenance? 5. How extensive should trail maintenance be? 6. Should the City require trails to be surfaced? Some of these questions are rather easily answered. The City attorney believes the City would not incur additional liability by _performing trail maintenance. If anything, liability would be reduced by a good faith effort of maintenance. Start u_D cost would be minimal. A capital of $6,500 for a small loader (Bobcat) could be required since most of the trails are too narrow to use standard width equipment. The repair of some erosion Droblems may have to be contracted for. Utilization of P.S.P. and volunteer workers will reduce the annual cost of maintenance. However, City crews will be needed as truck and equipment operators as well as inspectors, crew leaders, etc. It aDDears that hard or well defined surface treatment of trails require more extensive maintenance. Natural trails or trails with chips or tree bark spread to control erosion and weed growth aDDear to be a better solution. SUGGESTED APPROACH 1. During the upcoming summer and fall, collect data on the extent and condition of existing trails. 2. During the same period, survey the trails for use. 3. Before the end of the calendar year, develop a complete program of trail maintenance and adjust the budget to cover cost called for by the program for the balance of fiscal year 1989/90 and for fiscal 1990/91. 4. The program should provide for: a. The purchase of necessary capital equipment. b. A once -a -year major repair and cleanup utilizing the P.S.P., volunteers and City crews. C. The contracting of major repairs that cannot be done by the above. d. Monthly litter patrols by the P.S.P. e. As needed, rapair and maintenance as reported by users and residents. (This should include picking up of horse droppings in front yards and on public streets.) L= • 1:3777 FRUITVALE AVENUE • SARATOGA. CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO: City Council DATE: 2-23-89 FROM: City Engineer SUBJECT: Policy Development Agenda Background #12 Landscape and Lighting District Expansion ----------- - - - - -- - -- ---- - - - - -- Policy Issue• To what extent should the City expand its Landscape and Lighting Maintenance District to include new areas in the City and to maintain the Village improvements. Following is a list of areas where either exists or should be installed that are candidates for inclusion into the landscape and Lighting Maintenance District. 1. South side of Prospect Road between Saratoga - Sunnyvale Road and Saratoga Creek. 2. North side of Prospect Road between Johnson Avenue and Saratoga Creek. 3. North and South side of Cox Avenue between Route 85 and Saratoga Creek. 4. North side of Cox Avenue and west side of Saratoga Avenue at the northwest corner of that intersection. 5. West side of Saratoga - Sunnyvale Road between E1 Dorado Court and Brandywine Drive between Reid Lane and Verde Vista Lane. 6. East side of Saratoga - Sunnyvale Road between Herriman Avenue and Miljevich Drive. 7. Corner of Elva Avenue, Canyon View Drive & Michaels Drive. 8. Corner of Seagraves Avenue, Loma Rio and Squirrel Hollow. 9. West side of Saratoga Avenue at Worden Lane. 1 10. East side of Saratoga Avenue at Shadow Oaks, (both intersections), and between Scotland Drive and Dagmar Drive. 11. East side of Fruitvale Avenue and north side of Allendale Avenue at the north east corner of that intersection. 12. West side of Fruitvale Avenue between Douglass Lane and Montauk Drive and at Saratoga -Los Gatos Road. 13. East side of Fruitvale Avenue beween San Marcus Road and Three Oaks Way. 14. Northwest corner of Montpere Drive and Quito Road. 15. Islands in Sobey Meadows. 16. Northwest corner of Quito Road and Pollard Road. 17. Village Parking District #2. 18. Village Parking District #3. 19. Village Parking District #4. In addition to the above list there is the question of a City -wide district for the purpose of maintaining the several existing and proposed median areas. There are some of the areas listed where the existing landscaping is being adequately maintained by the fronting homeowners associations who may not want to be bothered with a district. These should be left alone at least until all others have been annexed. These are 10 (southerly intersection), 12 & 15, possibly some others also. There is a great deal of staff work to accomplish the annexation of all of the candidate areas, particularly those that will involve a large annexation area, i.e. all of Prides Crossing. Also some areas are either not planted or the landscaping is in disrepair. In either of these cases additional staff time will be required to design and install or to administer the design and installation of new or updated landscaping. If the Council determines to proceed with a program that would result in all of the above listed areas and any others I would suggest the following: V, 1. Prioritize the areas to be annexed. 2. Direct the City Engineer to establish a program of annexing as many of these areas at the top of the list as staff time will allow every year, probably 2 -4 until all have been annexed. 3. If Number 2 seems to be too slow, direct City Engineer to solicit consultant proposals to complete this list faster and budget funds accordingly. Whatever you decide I would suggest that the top priority to be the three Village Parking Districts #2, 3, & 4. They can be annexed this year within the existing staffing constraints. This would also be consistent with the other efforts in the Village this year. 3 Z. L NOW ft Or ill 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 COUNCIL MEMBERS: February 24, 1989 Karen Anderson Martha Clevenger To: City Manager David Moyles Donald Peterson Francis Stutzman From: Community Services Director Subject: Policy Development Agenda; Annual Clean -up Campaign (Reference Item #13) ISSUE "Should the City reinstitute an annual cleanup campaign ?" BACKGROUND The City, through Green Valley Disposal, used to offer clean -up campaigns twice annually until unlimited collection services replaced the metered -can system in 1983. Annual clean -ups are still offered in the City's hard -to -serve areas, which are still on a metered -can system. The annual clean -up campaigns were eliminated in the flat land areas because it was felt that weekly trash pick -up of unlimited quantities would accomplish the same objectives; in other words, semi - annual clean -ups were replaced with weekly clean -ups. DISCUSSION Although unlimited collection implies any amount of trash set out would be collected, there are rules which govern what is collectible and what is not. In summary, the items which are NOT collectible are: a) Items or containers in excess of 70 lbs. b) Cans over 32 gallons in size. c) Bundles of brush or yard clippings in excess of three feet in length. d) Cartons in excess of three feet in length. e) Dirt, rock, and /or concrete. Therefore, an annual or semi- annual clean -up would include these items listed above in addition to sofas, water heaters, and large amounts of uncut brush, for example. There are three ways of providing the service. They are: 1) Through the placement of 30 yard bins throughout the City. 2) Use of Green Valley trucks and resources. 3) Force account, using City employees and resources. Policy Issue: Should the City reinstitute an annual cleanup campaign ?" February 24, 1989 Page Two Option #1 would involve the placement of 20 extra large 30 -yard bins throughout the City. Residents would be asked to take their otherwise uncollectible items to the location nearest them. Semi - annual costs would be roughly $7,000; or, if done once annually, $3,500. Option #2 would involve the use of Green Valley resources to provide an extra curbside pick -up of otherwise uncollectible items. Since regular trash collection efforts would be occurring at the same time, there would be some overtime involved. Rough cost estimates would be $25,000 semi - annually or $12,500 annually. These figures are based on the cost of clean -ups in Los Gatos (which has a metered -can system) but have been adjusted downward for Saratoga based on the anticipated reduced volume of material collected because of Saratoga's unlimited collection service. Option #3 would involve 12 City employees using four City trucks and tractor - loaders (to get heavy material into the trucks) over a two -week period. The maintenance department provided the following cost estimate for this service: Labor: $23,040 Trucks: 8,000 Loaders: 6.400 Total $37,440 If the Council decided it wished to pursue such a service option, there are two ways it could be financed. 1) Surcharge added on, or built into refuse bill. 2) Annual appropriation from the City's general fund. If the costs were made a part of the refuse bill, they would appear as follows based on the option selected: Option Monthly Rate Adjustment per Household Drop -off boxes Semi - annual: $.06 Annual: $.03 Green Valley pick -up Semi - annual: $.24 Annual: $.12 City pick -up Semi annual: $.35 Annual: $.18 There is a question concerning whether such an annual clean -up program is needed, even though the costs appear small. Perhaps an item in the City Newsletter could provide a better assessment of public opinion. Policy Issue: Should the City reinstitute an annual cleanup campaign ?" February 24, 1989 Page Three Another factor to consider is that the refuse bill may be going up significantly this calendar year. For one, large increases in landfill disposal costs together with the fact that Green Valley has not had a rate increase in almost two years mean that a rate increase of over 20% is projected before the end of this fiscal year. In addition, the financing of the curbside recycling program before the end of the calendar year will require between an $.80 to $1.50 monthly surcharge on the rubbish bill. Therefore, sensitivity to making other additions to the monthly bill is justified. Todd W. Argo jm:13 09,2W o §&UU'XQ)(5& 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman February 24,1989 To: City Manager From: Community Services Director Subject: Policy Development Agendas Curbside Recycling (Reference Item #14) Issue "How should the City develop a curbside recycling program ?" Background In September of 1987, the Council held a study session on curbside recycling in response to a staff recommendation to consider implementing such a program in Saratoga. At a subsequent meeting, the Council authorized staff to pursue exploring the feasibility of offering such a service to Saratoga residents. Other West Valley cities also began to express an interest in curbside recycling. Seeing the writing on the wall, Green Valley submitted a proposal to the West Valley cities to offer such a service in early 1988. At the same time, a Performance Audit was undertaken by Arthur Young & Associates which included an assessment of Green Valley's curbside recycling proposal. Toward the end of September, 1988, Arthur Young submitted their report to the West Valley cities wherein they recommended that the cities develop a Request For Proposals (RFP) and go out to bid for a recycling program operator. In October, the City Managers of the West Valley cities met and directed their Rate Review Committee to develop such a document. Since that time, the Committee has been working toward that end. It It Policy Issue: "How should the City develop a curbside recycling program ?" February 24, 1989 Page Two Current Status After many generations of draft RFP's, the Committee finally completed a document which will be sent to the City Manager's for review by the end of February. If acceptable, the RFP will be presented to each of the involved City Council's during their second meeting in March; for Saratoga, this would be on March 15. If authorized by Council, the RFP would be released on April 3. It is projected that the West Valley cities will see a curbside recycling program implemented by the end of the current calender year. Prepared by: Todd NIB CAB as �s o4 ���'OO C�� �� ✓ 13777 FRUITVALE AVENUE • SAR,ATOGA, CALIFORNIA 95070 (408) 887 -3438 MEMORANDUM TO FROM SUBJECT: Mayor and City Council Stephen Emslie, Planning Director Improved Public Transit DATE: 2/24/89 --------------- - - - - -- The policy question before the Council is deciding to actively pursue improved transit service in Saratoga. BACKGROUND As the Council is aware, the Santa Clara Transportation Authority has begun to re- evaluate its bus routes and service changes throughout the system. A report was prepared by a contract consultant, ATE and presented to the Operations Committee of the Transportation Agency. A series of workshops and hearings before the County Transit Operations Committee were held which staff attended. Staff prepared a Council response to the proposed changes which were transmitted to the County Transit staff. The revisions proposed are summarized in the report dated 11/21/88 attached for reference. Santa Clara County Transit has recently responded to the Council's comments regarding the bus route changes. County Transit's response details the findings of the contract consultant and which ones are supported by their staff. The response also indicates that the complete transit proposal will be reviewed by County Transit in March /April. Staff is preparing a Council Report and draft correspondence for transmittal to County Transit prior to adoption of the final service changes. ANALYSIS The City of Saratoga has long been concerned regarding the inadequacy of public transit services provided in our City. Being on the periphery of the service area, Saratoga represents the beginning and end of service routes. County Transit has been reluctant to improve service to peripheral areas because ridership figures do not justify improved service. However, staff maintains that although ridership at route terminii may be low, many riders 1 are added as buses traverse the City. Clearly, many riders attributed to Cupertino and San Jose begin (or end) their trip within Saratoga. Should the Council feel that pursuit of improved transit service is desirable, further staff analysis regarding Saratoga's use of public transit will be necessary. Staff's preparation of reports and presentations to County Transit should point to inherent deficiencies in accounting for ridership, and request improvements to existing service levels. Council's discussion of a decision to pursue improved transit service should also include a policy stance regarding support of County Transit efforts in securing funding at State and Federal levels. The Council may wish to indicate strongly that Saratoga support for County Transit efforts will depend on measurable increases to service provided its residents. Steph n Emsli Planning Director 2 ..��� -�.� CITY of SARATO GA Santa Clara County Transit District Route Study P.O. Box 4009 Milpitas, CA. 95035 -2009 Attn: Mike Aro, Room 101 Dear Mr. Aro: The Saratoga City Council reviewed the Comprehensive Operational Analysis (COA) report by ATE Management at its November 16, 1988 meeting. The only route in Saratoga with a proposed segment change is Line 54. The Council has no comments to offer at this time -:on the change, but encourages you to do special outreach to the riders in Saratoga who may be affected by the change. Thank you for the opportunity to review and comment on the report. Sincerely, V aw-tl Valerie You Associate P nner VY /dsc 13777 FRUIT%'ALE.-\VENUE . SA1- ATOG,V ('ALIFORNIA 95070 3 (4081 867 3438 o o COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles November 21, 1988 Donald Peterson Francis Stutzman Santa Clara County Transit District Route Study P.O. Box 4009 Milpitas, CA. 95035 -2009 Attn: Mike Aro, Room 101 Dear Mr. Aro: The Saratoga City Council reviewed the Comprehensive Operational Analysis (COA) report by ATE Management at its November 16, 1988 meeting. The only route in Saratoga with a proposed segment change is Line 54. The Council has no comments to offer at this time -:on the change, but encourages you to do special outreach to the riders in Saratoga who may be affected by the change. Thank you for the opportunity to review and comment on the report. Sincerely, V aw-tl Valerie You Associate P nner VY /dsc 4 SARATOGA fY COUNCIL EXECUTIVE SUMMARY NO. MEETING DATE: November 16, 1988 ORIGINATING DEPT.: * Planning AGENDA ITEM: CITY MGR. APPROVAL SUBJECT: Review and comment on Santa Clara County Transit Comprehensive Operational Analysis Report Recommended Motion: Report Summary: Review report, formulate comments, direct staff to prepare letter of response. Santa Clara County Transit is requesting input on a Comprehensive Operational Analysis of the basic route network. Of the six routes serving Saratoga, only one route is proposed for modification. County Transit is doing special outreach to persons affected by that change. The COA is a short range program to be implemented from 1989 to 1991. Fiscal Impacts: None. Attachments: Staff report with maps. 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO: City Council FROM: Valerie Young Associate Planner DATE: November 16, 1988 SUBJECT: Review and comment on Santa Clara County Transit Comprehensive Operational Analysis Report Background The Santa Clara County Transit Board has contracted with ATE Management, Inc. to conduct a comprehensive operational analysis (COA) of the basic route network, for the purpose of identifying ways to restructure the bus system to make it more direct, streamlined, and efficient. The need for the restructuring effort was identified as a priority by the Transportation 2000 Plan. The recommendations in the COA report are subject to extensive public and jurisdictional review prior to approval and implementation. A workshop was held on November 9 for the Transit District Board, Transportation Commissioners and City Planning Staffs. In addition, five community public meetings will be held in late November, and County Transit has undertaken a significant effort to notify riders and impacted parties regarding the COA. They are also available to meet with City Councils to discuss the report. The following is a summary of the report and its recommendations, particularly as they relate to County Transit Service in Saratoga. The COA is comprised of three basic components: Immediate Phase, Short Range and Long Range Plans. The Immediate Phase Plan, the largest section of the document, covers service revisions to the local route network which can be implemented in 1989. The emphasis was placed on modifying the system rather than completely overhauling it. The modifications are designed to enhance route directness and identity, work toward a more effective grid network and better match service levels with demand. The Short and Range Plans build on the Immediate Phase Plan, targeting T2000 priority service improvements that can be implemented in 1990 -91. These include revisions to Express routes and full integration of the bus system with the LRT system. 1 There are currently six bus routes serving Saratoga. The attachedo Map A shows the configuration of all of the routes in Saratoga; the remaining maps show each of the routes individually. No immediate, short or long -term changes to any of the existing route segments in Saratoga are proposed, except to Line 54. In addition, no new routes in Saratoga are proposed. Each of the routes are described more fully below: Line 26 - This line is an east -west route between East San Jose and Campbell with its primary alignment on Curtner, Tully, Union, Bascom, and Campbell. It is also a north -south route between Campbell and the Moffett Park /Lockheed area with its primary alignment on Miller, Wolfe, and Fair Oaks. The line travels through Saratoga on Prospect Road between Saratoga Avenue and Miller; average monthly boardings at stops in Saratoga is 1,740. Line 27 - This line is an east -west route providing connections between Saratoga and Los Gatos, and serving the southeast portion of San Jose with its primary alignment along Blossom Hill. The line travels through Saratoga on Saratoga -Los Gatos Road to Saratoga Avenue and along Fruitvale to West Valley College; average monthly boardings at stops in Saratoga is the highest of all the lines serving the community, 6,980. Line 53 - This line is a lengthy north -south neighborhood feeder route with a number of schools along its route, terminating in commercial centers at both ends. The line travels through Saratoga on Prospect Road between Saratoga - Sunnyvale Road and Saratoga Avenue; average monthly boardings at stops in Saratoga is 110. Line 54 - This line is a north -south route running through Saratoga, Cupertino and Sunnyvale. The line travels through Saratoga on Saratoga - Sunnyvale Road, with the southern end serving Fruitvale Avenue and West Valley College via a one -way counterclockwise loop on alternate trips. Average monthly boardings on stops in Saratoga is 6,920. This line has an immediate phase recommendation to delete the segment in Saratoga that travels on Saratoga -Los Gatos Road and the southern end of Allendale. This segment has very low ridership, and a portion of it is also served by Line 27. To improve route identity, bi- directional service and convenience, the COA recommends that all trips to West Valley College from this line should travel from the intersection of Hwy 85 and Hwy 9 in downtown Saratoga in both directions via Saratoga Avenue and Fruitvale. No other immediate, short or long -term changes are proposed for the segment in Saratoga. Line 57 - These are major north -south routes providing main line and service on Bowers, Kiely, and Saratoga Avenue. The Line 58 southern end of the lines serve West Valley College; Line K 57 travels on Quito and Allendale and Line 58 uses Saratoga and Fruitvale. The northern terminus of Line 57 is the Tasman -Great America area (with some peak period trips to and through Lockheed); the northern terminus of Line 58 is the community of Alviso with some connections to portions of the Golden Triangle area. Average monthly boardings on stops in Saratoga is 2,880 on Line 57 and 2,920 on Line 58. During the COA data - gathering process, many communities asked the County Transit staff to study special service requests. The City of Saratoga asked for a study of the potential for another east -west route in Saratoga, possibly along Cox Avenue, and the potential for expanded service on Quito south to Saratoga -Los Gatos Road. In response to these requests, the COA report states the following: Cox Avenue - "While the street exhibits some grid characteristics, it does not exhibit strong transit potential. In addition, neither end ties into any other east -west streets so that an adequate grid route in this portion of the County can be designed. Layout of existing routes in this area is good, and deviations from them to serve Cox would destroy their design integrity and inconvenience current users. Cox cannot generate sufficient ridership to require a route of its own. Another issue is the impending construction of Hwy 85, which will cut through Cox. COA recommendations have avoided, wherever possible, orientation of bus routes in the construction corridor." Quito Road - 11 ... currently served between Saratoga and Allendale by Line 57. The remaining segment, from Allendale to Saratoga -Los Gatos, is low density and relatively high income. It is also narrow, curvy and operationally unsafe with no opportunities for bus stop placement. Quito Road does not warrant bus service at this time." Saratoga also asked for consideration of an east -west connection from Quito to Pollard, since the only existing Saratoga -Los Gatos service is via Saratoga -Los Gatos Road (Line 27). While this request was not addressed in the COA report, County Transit staff have indicated that the route was not.considered at this time again because of Hwy 85 construction through that route. Action by the Council County Transit staff is requesting that all input on the COA report be submitted by December 16, 1988. After reviewing all the input received, they will develop a set of staff recommendations to go with the report. Another round of community meetings is scheduled for February, with Board of Supervisors adoption tentatively set for April, 1989. 3 The intent and scope of the COA report is a short -term implementation program, from 1989 to 1991. The goal is to establish a more efficient and direct base route network within that time frame, which can then be expanded and enhanced once the changes are implemented. The portion of Line 54 to be deleted serves the southern end of Fruitvale, between West Valley College and Hwy 9. This segment has two stops (Crisp and San Marcos) which are served only on alternate routes; boardings and alightings are extremely low. The affected users of this segment are at the Oddfellows Home. County Transit staff is doing special outreach to the Oddfellows to solicit their input on the proposed change. Because only one of the routes serving Saratoga has a segment change, staff recommends that it is not necessary for the Council to hold a public hearing on this item in addition to those already scheduled by County Transit. Council should formulate its comments on the report and direct staff to forward a letter to County Transit. If additional time is needed, the item can be continued to the December 7th meeting, still leaving time to meet the December 16th deadline. U (A WV_A/ Valerie Youn Associate Pla er VY /dsc Attachments: 1. Map A - Transit routes in Saratoga 2. Route Maps 4 p MA(P — _ f 0 0 � c o 00 0 - .� O . o J SARATOGA 0 t I O O� AA e�e .-.p 1 o v� ,O O 1� pp O 41 o p,i lop 'E �i I I i "; L, i K -\ �-:- 2l0 � (� I fst✓ Z"1 ARTERIAL STRUT (tij� S`� ��P0" (( (� �v-,, 0 V - � L- ��• COLLECTOR STREET 0000 FuTum rREtNMr a i r LINE 26 - CURRENT nwe lo[ n Y1 w w ,(qPNN �pq. SARATOGA West West Valley Valley e HosPltal Almaden p LOS �� Plasm Oakridga BLOSSOM HILL v GATOS- Plaza-6 'q ��Mail • ALMADEN 0 63 BLOSSOM HILL 0 O� --Park 6 Ride Lot LOS GATOS N J LINE 27 - CURRENT /PROPOSED POUGHKEEPSIE ULM. ...A ENDICOTT RALEIGH m t Santa Teresa -a► Hospital r`CIR. 0 Z SAN JOSE A •j•,.• WWOO..... triPs c: yd OO.... )ng ted tat yet CUPERTINO EXHIBIT A Sohodubd W" only I rmin DOW EVELYN 411J SUNNYVALE LINE 53 - CURRENT /PROPOSED A -109 SANTA CLARA .e. -' EXHIBIT A -4j t ST. .soon. ; JAVA s3RD .....�...... � ............... � s .'... �:n:; y VM WAW PM STH: n;� �= Peak Hours OnW ' m O • G H'� i • SUNNYVALE: AM Peak : Trips Onlr�,: N ; I ease...: T •.� 11 TH M:.•' : a TASMAN 3 Sunnyvale DDo A -W to OLIVE WASHINGTON 2 0 S nnywIs a = 0 Center r z CUPERTINO y � � � a z� McCLELLAN p Q Para Lot SARATOGA LINE 54 - CURRENT trips only 0 4111 Wed Valley Col legs 0 JAVA <PM 5THG...... } ........ AM )m- n� •••; Wee • 0 i S PEYkk Hours Only • SUNNYVALE c s m TASMAN GROSS J OLIVE a s 7 / Sunnyvale Main -n DOW o vnIs w Center z CUPERTINO ca r McCLELLAN Ride Lot SARATOGA Lm'SOSO J;ALLENDALE 0, WON Val lay LINE 54 PROPOSED IMMEDIATE PHASE A -114 I� L FnTRTT e_aa LINE 57 - CURRENT A -127 r. wnp� IA :E 0 OP r , N LINE 58 - CURRENT EXHIBIT A -s' ALVISO =vs Hospital • T rc Kaiser N Hospital M ab SAN JOSE • "* D�isarat� A -132 Tasman LRT Station River Oaks LRT Station SANTA CLARA Kaiser Hospits SAN SARAMGA EXHIBIT A -S. Lmmmp LINE 58 - PROPOSED IMMEDIATE PHASE A -133 Irchard RT Station .ARA County of Santa Clara California January 25, 1989 Valerie Young, Associate Planner City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 Subject: Revised Bus Route Change Proposals Dear Ms. Young, Transportation Agency 1555 Berger Drive San Jose, California 95112 Mailing Address: P.O. Box 4009 Milpitas, CA 95035 -2009 IRECra ED 0 r i �C9 PLANNING DEP T. Last October your city received a copy of a report prepared by ATE Management Inc. for Santa Clara County Transit. It contained specific route and service changes.which ATE recommended as a result of their Comprehensive Operations Analysis of County Transit's bus system. In an accompanying letter, we had requested that your city submit any comments on ATE's report by December 1, 1988. A subsequent letter extended this response deadline to December 16, 1988. The.service change proposals recommended by the consultants have received extensive public and jurisdictional review. Seven public meetings were conducted throughout the county between November 17 and December 7, 1988. County Transit staff was available at these meetings to explain the consultants' proposals and receive public input. After reviewing all comments received from city staff, political representatives, interested parties and the general public, County Transit has developed a modified set of service change proposals. This revised plan is described in the enclosed brochure entitled "Revised Bus Route Change Proposals" which is currently being distributed on board all County Transit bus routes and sent to a mailing list of approximately 900 interested parties. Also enclosed is a route by route summary of the differences between County Transit's proposals and those recommended by ATE. A revised list of streets where new bus service would be added or existing service deleted is also included. A second round of public meetings have been scheduled to solicit comments on the modified plan. The dates and locations of these seven meetings are listed in the beginning of the brochure. The proposals will be presented for final approval in March /April, 1989; the tentative dates for these meetings are also provided in the brochure. Should you have any questions about the modified proposals please call Patti Guasch or myself at (408) 299 -4901. We would also be happy to meet with you or other representatives of your city at any time to discuss this revised plan. Sincerely, A" Mike Aro Service Development Manager MA /gz cc: Revised Route Study File Enclosures ® An Equal Opportunity Employer MAJOR DIFFERENCES BETWEEN ATE'S SERVICE CHANGE PROPOSALS AND COUNTY TRANSIT STAFF'S RECOMMENDATIONS (IMMEDIATE & SHORT RANGE PHASES) LINE ATE RECOMMENDATION STAFF RECOMMENDATION 10 This is basically the same Staff is proposing that new route as ATE's proposed Line 10 operate between the Line E. Franklin Mall in Santa Clara, the San Jose Airport and down- town San Jose. The routing would be the same as ATE's proposed Line E except that it would operate via 1st St. instead of Guadalupe. Line 10 should operate from 5:30 am to 11:30 pm, seven days a week with 30 minute frequencies during the day and 60 minute frequencies in the evening. 11 Extend to Milpitas and Agree with new routing; rename Evergreen College. to Line 77. Operate route 7 days a week. 13 This is a modified version of ATE's Long Range proposed Line D. 15 Weekday service would operate at 60 minute frequencies instead of 30 during the midday. Saturday and Sunday service would be dis- continued. 17 Routing changes would eliminate service to: Montebello /Santa Barbara area. Chestnut /Luchessa Agree, except northbound weekend service should turn back at Lundy and Hostetter. Staff is proposing that new Line 13 operate between Almaden/ Camden and New Almaden. Service should operate at 30 minute frequencies between Almaden /Camden and Almaden /McKean, with select trips extended to New Almaden. Weekday service would operate from 6:OOam to 8:OOpm; weekend service should operate from 9:OOam to 6:OOpm. Agree Disagree. Saturday and Sunday service should be retained. Disagree. Retain existing routing in this area. Disagree. Retain existing routing in this area. LINE ATE RECOMMENDATION STAFF RECOMMENDATION 17 Delta /E1 Dorado area Disagree. Retain existing routing in this area. Rossi /Southside. Agree. Kaiser Hospital - would Agree. instead serve the new South Valley Hospital when it opens. Line 17 would operate as Agree. one -way loop (except for one afternoon reverse trip) at 60 minute frequencies. Sunday service would be dis- Disagree. Sunday service should be continued. retained. 21 Not part of ATE's recom- Line 21 would be replaced by revised mendations. Line 64. 22 Route would operate directly Disagree. Existing routing to the on The Alameda and E1 Camino Franklin Mall area should be retained. eliminating service to the Franklin Mall area. 23 North end of the route would terminate at San Antonio Shopping Center. 24 Routing changes would eliminate service to: Downtown Los Altos California CalTrain Station Foothill Jr. College Stanford University. 25 Deviated Trips to San Jose City College would be eliminated. All trips would serve the Alma LRT Station when extension to Alma is completed. 26 Weekday deviations to the Sunnyvale CalTrain Station would be eliminated. Agree. Disagree. Retain existing routing through this area. Disagree. Retain existing select trips to the California CalTrain Station. Agree. Agree. Agree. Agree. Agree. . LINE ATE RECOMMENDATION STAFF RECOMMENDATION 32 Weekday service would Agree operate at 60 minute frequencies instead of 30 minutes during the midday. 34 Weekday service would operate at 60 minute frequencies all day. Saturday service would be discontinued. 35 Upgraded to become the "main activity" route in Palo Alto, replacing service currently provided by Line 23 north of San Antonio Shopping Center. Disagree. Thirty minute service should be retained during the peak hours. Agree. Agree. Weekday service would Agree. operate at 30 minute frequencies during the day, and 60 minutes in the evenings. Saturday and Sunday service would be provided at 60 minute frequencies along the entire route. Disagree. Saturday and Sunday service should operate at 30 minute frequencies. Additionally, Sunday service should terminate at San Antonio Shopping Center and not continue to Foothill College. Existing service into Agree that Line 35 should not be Menlo Park via Middlefield routed into Menlo Park. A minimum Rd. would be eliminated. level of service to Menlo Park is under consideration, but the specific details are still being developed. 37 West end of the route would be extended to Good Samaritan Hospital via Leigh and Branham. Eastern part of the route would operate from Monterey/ Senter through downtown San Jose to the San Jose CalTrain Station (instead of Eastridge) via McLaughlin. Snell /Hillcap /Hillsdale routing would be discontin- ued. Disagree. Western terminal should remain at Bascom and Camden. Disagree. Eastern terminal should be at Monterey and Senter. Agree. . LINE ATE RECOMMENDATION STAFF RECOMMENDATION 37 Service west of Monterey Hwy Agree. would operate weekdays from 6:OOam to 8:OOpm at 30 minute frequencies during the day, and 60 minute frequencies in the evening. Weekend service would operate from 7:OOam to 8:OOpm at 60 minute frequencies. 38 Not in ATE's recommendations. Staff - -is proposing that new Line This routing is part of ATE's 38 operate primarily on Branham proposal for Line 72. between Monterey /Senter and Los Gatos Community Hospital, replacing current Line 72 service. 43 Route would be discontinued. 50 Loop on the northern end of the route would be discon- tinued. Service would be discon- tinued on Villa, Escuela and California. 52 Peak hour trips to Moffett/ Ames would be eliminated. Saturday service would be discontinued. Service should be provided on week- days from 6:OOam to 8:OOpm at 30 minute frequencies. Weekend ser- vice should operate from 7:OOam to 8:OOpm at 60 minute frequencies. Disagree. Route should be retained. Agree. Agree. Agree. Agree. 54 Routing on Saratoga -Los Agree. Gatos Rd. and Fruitvale between Saratoga -Los Gatos Rd. and Allendale would be eliminated. Weekday am peak hour routing Agree. on Moffett Park and Borregas and around the perimeter of lockheed would be eliminated. 55 Routing at the northern end Disagree. Routing near Tasman/ of the line near Tasman/ Great America should remain Great America would be virtually the same with some minor modified. peak hour directional /layover modifications. LINE ATE RECOMMENDATION 55 All trips would serve the Lakehaven and Sandia residential areas on both sides of Lawrence Expwy. 56 Minor routing change in the north San Jose industrial area. 57 Weekday peak hour service to Lockheed /Moffett Park would be eliminated. STAFF RECOMMENDATION Disagree. Routing in this area should remain unchanged. Disagree. Routing should remain as is. Agree. Routing at the northern end Disagree. Routing near Tasman/ of the line near Tasman/ Great America should remain Great America would be virtually the same with some minor modified. peak hour directional /layover modifications. 58 The northern end of the line would terminate at First and Montague. New Line B would provide service between Alviso and the Tasman light rail station on 1st. St. 60 Weekday peak hour service to Lockheed /Moffett Park would be eliminated. Disagree. Route should continue operating into Alviso, but via 1st /Taylor instead of Lafayette/ Gold. Agree. Routing at the northern end Disagree. Routing near Tasman/ of the line near Tasman/ Great America should remain Great America would be virtually the same with some minor modified. peak hour directional /layover modifications. 61 Route would be discontinued. Agree. 62 All trips would operate via Agree. Union and Branham to Good Samaritan Hospital with every other trips continuing to Los Gatos. New Line A would replace Line 62 service on Bascom between Union and Good Samaritan. 63 Four morning and four after- Disagree. New Line 13 should operate noon trips would be extended this service. to serve the Harry Rd. area in Almaden Valley, replacing service currently provided by Line 64. Service would operate on San Agree. Fernando between the San Jose CalTrain Station and Sixth. LINE ATE RECOMMENDATION STAFF RECOMMENDATION 64 The northern end of Line 64 Agree that existing service north would terminate in downtown of downtown should be replaced by San Jose. Lines 10 and 65. From downtown, Line 64 should be extended to east San Jose replacing Line 21. Would no longer operate south of Almaden and Via Valiente with service to the Harry Rd. area provided by select trips on Line 63. New Almaden would no longer be served. Agree that Line 64 should no longer operate south of Almaden and Via Valiente. However staff is proposing that all day service to the Harry Rd. area be provided by new Line 13 instead of Line 63, with select trips continuing to New Almaden. 65 Service would be extended Agree, except route should operate to the First and Gish area via 5th instead of 3rd and 4th. via 3rd and 4th Streets, replacing service currently provided by Lines 64 and 85. 67 Route would operate from Disagree. Route should operate from Santa Teresa and Bernal to Santa Teresa /Bernal to Almaden Expwy/ downtown San Jose. Foxworthy. Current Line 67 service to Lincoln /Curtner should be reduced to select weekday trips. Two morning and three after- Agree. noon trips on weekdays and all weekend trips would be extended from Bernal & Santa Teresa to serve the Flintwell & Silver Leaf area. Weekday service would operate from 6:OOam to 8:OOpm at 30 minute frequencies. Weekend service would operate from 8:OOam to 7:OOpm. Saturday service would operate every 30 minutes. Sunday service would operate every 60 minutes. 68 Not in ATE's Recommenda- tions. 69 New Line A would operate from Good Samaritan Hospital to Alviso via Bascom and Lafayette. It would replace Line 62 service on Bascom be- tween Union & Good Samaritan. Agree. Should be extended to the San Jose CalTrain Station via Santa Clara St. Agree with new routing; rename to Line 69. LINE ATE RECOMMENDATION 69 Service would be provided on weekdays from 5:30am to 7:OOpm at 30 minute frequen- cies, and on weekends from 9:OOam to 6:OOpm at 60 min- ute frequencies. 70 Service would operate on Jackson and Flickinger between Story & Hostetter, replacing Line 74. 72 Route would operate between Westgate and downtown San Jose. Service would be provided on Senter instead of McLaughlin. New service would be introduced between Los Gatos Community Hospital and Westgate via San Tomas Aquino. STAFF RECOMMENDATION Agree. Agree. Disagree. Route should operate be- tween Monterey /Senter and downtown San Jose. Line 72 should continue to operate via McLaughlin. Existing service on Senter between Capitol and Tully should be provided by new Line 73. Existing service between Monterey /Senter & Los Gatos Communi- ty Hospital should be provided by new Line 38. No new service should be would be introduced between Los Gatos Community Hospital and Westgate. Weekday service should operate from 5:30am to 9:30pm at 15 minute frequen- cies during peak hours and 30 minute frequencies at other times. Weekend service should operate from 7:30am to 8:30pm at 30 minute frequencies. 73 Not in ATE's recommendation. Staff is proposing that new Line 73 This routing is part of operate primarily on Senter between ATE's proposal for Line 72. downtown San Jose and Monterey Hwy, replacing portions of current Lines 72 and 83. 74 Service would operate on Capitol between Story and Abel, replacing Line 70. Weekday peak hour service would operate at 15 minute frequencies instead of 30. 77 Extend (Line 11) to Milpitas and Evergreen College. Service should be provided on week- days from 6:OOam to 8:OOpm at 30 minute frequencies. Weekend service should operate from 7:OOam to 8:OOpm at 60 minute frequencies. Agree. Agree. Agree with routing change; rename Line 11 to Line 77. Operate route 7 days a week. Agree, except northbound weekend service should turnback at Lundy and Hostetter. LINE ATE RECOMMENDATION 77 Weekday service would operate from 5:30am to 8:OOpm at 30 minute frequencies. Weekend service would operate from 7:OOam to 8:OOpm at 60 minute frequencies. 81 The route would operate via Benton between the Alameda and Kiely. The route would operate on Park between Almaden Blvd. and The Alameda, replacing Line 87. Every other peak hour west- bound trip would terminate in downtown San Jose. Peak hour service would operate at 15 minute frequencies between East San Jose and downtown San Jose, and at 30 minutes frequencies between Vallco and downtown San Jose. STAFF RECOMMENDATION Agree. Disagree. ATE's proposed routing via Benton is not feasible due to future closing of the Alameda at Santa Clara University. Line 81 should operate via Park and Newhall to Monroe instead of the current routing via the Alameda, Franklin/ Benton, Lafayette and Homestead. Line 81 should replace Line 87 service on Park between Almaden Blvd. and Newhall. Agree. 82 When light rail is extended Agree. to Alma, all trips would serve the Alma Light Rail Station via Lelong. 83 Route would operate between Good Samaritan Hospital and Lincoln /Curtner, with sel- ected trips extended to Hilltop Manor. The area between downtown San Jose and Senter /Tully would be served by revised Line 72 on 10th and 11th Sts. The area between Lincoln /Curtner and downtown San Jose would be served by modifications to Line 67. Service would operate at 60 minute frequencies on weekdays from 6:OOam to 7:OOpm, and on weekends from 9:OOam to 6:OOpm. Disagree. Route should operate be- tween Good Samaritan Hospital and downtown San Jose, with selected trips extended to Hilltop Manor. The area between downtown San Jose and Senter and Tully should be served by new Line 73 on 10th and 11th Sts. Line 67 should terminate at Almaden Expwy /Foxworthy and Line 83 service between Lincoln /Curtner and downtown San Jose should be retained. Add- itionally, Line 83 should serve the Alma Light Rail Station via Alma, Lelong and willo,.7 when light rail is extended to Alma. Agree. LINE ATE RECOMMENDATION STAFF RECOMMENDATION 84 During peak hours, service Agree. would operate at 60 minute frequencies instead of 30. Saturday service would be Agree. discontinued. 85 Routing north of downtown Disagree. Route should continue to would be modified to operate operate on 13th St. between Julian/ on 11th St. instead of 13th St. James and Hedding. between Julian /St. James and Hedding. The new eastern terminal would be located at 10th and Hedding. The portion of the route along 4th to Gish and 1st would be re- placed by the modified Line 65. Weekend service would operate at 60 minute frequencies instead of 30. 86 Service between Stanford Shopping Center and Stanford University would be discontinued and replaced by the modified Line 35. Line 86 would operate via Meadow, Fabian and Charleston to San Antonio. Line 88 would serve Louis between Meadow and Charleston. 87 Route would operate as a clockwise loop in Santa Clara, providing daily service at 30 minute frequencies. Weekday service would operate from 6:OOam to 7:OOpm. Weekend service would operate from 9:OOam to 6:OOpm. McLaughlin would be served by Line 37 between San Antonio and Capitol. Park would be served by changes to Line 81. Service on Bonita, Herald and Appian would be dis- continued. Agree. Agree. Agree. Agree, except routing on Harrison Block, Anna and McCormick should be eliminated. Also, Line 87 should operate directly on Monroe between Forest and Harrison. McLaughlin should be served by Line 72 between San Antonio and Capitol. Agree. Agree. LINE ATE RECOMMENDATION STAFF RECOMMENDATION 88 Sunday service would be Disagree. discontinued. retained. The current Sunday routing Agree. would also be observed on Saturday. Service would be provided Agree. on Louis between Meadow and Charleston. Line 86 would serve Meadow, Fabian and Charleston. 301 Route would be discontinued. Agree. Sunday service should be 303 The northern terminal would Disagree. Line 303 should not be be the new Alma Transit truncated at the Alma Transit Station when the extensions Station. The route should be dis- of light rail and CalTrain continued when the entire light are completed. rail line is completed. A This new line would operate from Good Samaritan Hospital to Alviso via Bascom and Lafayette. Service would be provided on weekdays from 5:30am to 7:OOpm at 30 minute frequencies, and on weekends from 9:OOam to 6:OOpm at 60 minute frequencies. Agree, except designate as new Line 69. B A new shuttle route operat- Disagree. Regular, daily service ing four trips each weekday between Alviso and light rail should between Alviso and light be provided by Line 58 via Taylor rail at 1st /Tasman. and 1st streets. E This new route would connect the Franklin Mall in Santa Clara, and the San Jose Air- port and Coleman Ave. with downtown San Jose. Service would operate from 5:30am to 11:30pm, seven days a week with 30 minute frequencies during the day and 60 minute frequencies in the evening. Agree, except route should be designated as Line 10. Also, the route should operate via 1st St. instead of Guadalupe. SANTA CLARA COUNTY TRANSPORTATION AGENCY STAFF RECOMMENDATIONS IMMEDIATE PHASE PROPOSED STREET SEGMENT DELETIONS TO COUNTY TRANSIT ROUTE NETWORK REVISED ROUTE COMMUNITY STREET SEGMENT 11 San Jose o San Antonio (between King & Jackson) 17 Gilroy o Southside, Rossi, Arroyo Circle 25 San Jose o Kingman 35 Menlo Park o Middlefield (between University and Ravenswood), Ravenswood, Merrill 37 San Jose o Hillcap, Snell (between Capitol and Hillsdale) 50 Mtn. View o Escuela (between California and Villa), Villa (between Escuela and Bailey) 52 Mtn. View o Whisman (between Middlefield and Central) 54 Sunnyvale o Borregas (between Moffett Park and Java) Saratoga o Fruitvale (.between Saratoga -Los Gatos and Allendale) 61 San Jose o Ross Sunnyvale o Stewart (between Wolfe and Santa Trinita), Oakmead (between Lawrence and Arques) 72 Campbell o Parr 83 San Jose o Union (between Branham and Los Gatos - Almaden) Leigh (between Branham and Los Gatos - Almaden), Willowmont, Electra, Cherry (between Kimberly and Hillsdale), 7th (between San Carlos and Reed), Alma (between 7th and Senter) 87 Santa Clara o McCormick San Jose o San Antonio (between 24th & Bonita) o Bonita (between San Antonio & Herald) o Appian (between Lotus & McLaughlin) o Herald ROUTE COMMUNITY 10 San Jose ose 17 Gilroy 67 San Jose 69 San Jose SANTA CLARA COUNTY TRANSPORTATION AGENCY STAFF RECOMMENDATIONS IMMEDIATE PHASE PROPOSED STREET SEGMENT ADDITIONS TO COUNTY TRANSIT ROUTE NETWORK REVISED STREET SEGMENT o Third (between Santa Clara and San Fernando) o Fourth (between Santa Clara and San Fernando) o Leavesley (between Murray and San Ysidro) o San Ysidro (between Leavesley and Wheeler Hospital) o Monterey (between Flintwell and Ford) o Bascom (between Naglee and Santa Clara city limits) Santa Clara o Washington /Lafayette (between San Jose city limits and Homestead) o Lafayette (between Benton and Central Expressway) o Lafayette (between Aldo and Montague Expressway) 72 San Jose o McLaughlin (between San Antonio and William) 77 San Jose o Yerba Buena (between San Felipe and Silver Creek) o Silver Creek (between Capitol Expressway and Yerba Buena) o Lundy (between McKay and Trade Zone) Milpitas o Milpitas Boulevard (between Montague Expressway and Calaveras) o Milpitas Boulevard (between Escuela and Jacklin) 81 Santa Clara o Benton (between Jefferson and Monroe) o Monroe (between Newhall and Bellomy) I a p 1 @4 (911uy� o9 � ° ° �'QCVA � 13777 FRUITVALE AVENUE • SARAI'OGA, CALIFORNIA 95070 (408) 867 -3438 COUNCIL MEMBERS: Karen Anderson Martha Clevenger February 24, 1989 David Moyles Donald Peterson To: City Council Francis Stutzman From: Administrative Assistant Subject: Policy Agenda Item - Parameters for Future Decisions regarding Human Services Funding Background During the Public Hearing on January 18 for determining the 89/90 CDBG allocation, Council made a commitment to fund several human service agencies from the City's general fund. Since funding outside agencies with unrestricted funds is a departure from past practice, staff believes that it is important for the Council to consider the development of a policy which will address the parameters for future funding of human service agencies. It can be expected that shrinking federal funds will compel more local agencies of all kinds to apply for funding from the City's general revenues in the coming years. Each year in the Block Grant proposal process more new agencies submit proposals, and the amount of funds requested including SASCC has been approximately $100,000 yearly. From 86/87 to 89/90, funding for outside agencies has grown from $7,000 to $12,850. Funding to SASCC has more than doubled in the same time, from $30,055 to $65,000. In prior years, Federal and County restrictions on the use of CDBG funds have of necessity served as the primary criteria for consideration of proposals. In developing a City policy we will need to consider the following: 1) process for soliciting /ac- cepting proposals, 2) proposal format, 3) criteria for determining which types of programs to support, 4) the extent of program monitoring required, and 5) annual spending limits. Policy Agenda Item - Parameters for Future Decisions regarding Human Services Funding February 24, 1989 Page Two History of funding of human services to date. Agency 89/90 88/89 87/88 86/87 Project Match $ 1,850 $ 1,850 0 0 Food Bank 2,000 2,000 0 0 Live Oak Adult Day Care Services 3,000 3,000 3,000 3,000 Long Term Ombudsman 2,000 2,000 2,000 0 Transit Assist 4,000 4,000 4,000 4,000 SASCC operating 35,000* 35,000 31,000 30,055 SASCC day care 30,000 ** 20,000 ** 10,000 Total $77,850 $67,850 $50,000 $37,055 All funding from CDBG, except as noted: *$22,350 or more from CDBG, remainder general fund * *all from general fund Agency 85/86 84/85 83/84 82/83 Live Oak Adult Day Care Services $ 1,700 $ 1,750 Long Term Ombudsman 2,000 1,750 VITA 4,200 4,200 Community Garden 800 550 Youth Science Inst. 3,000 SASCC operating 28,000* 25,000* $20,000 ** $20,000 ** Total $36,700 $36,250 $20,000 $20,000 All funding from Revenue Sharing, except as noted: *$5,000 in Revenue Sharing, remainder CDBG * *CDBG During the years that Revenue Sharing was used, the City Council made a determination on the funding requests as a part of the budget formulation. There was no formalized criteria, other than that the program benefit Saratoga residents. No monitoring or evaluations were done to ensure that the funds were being used in accordance with the grant. Revenue Sharing was also used for organizations which have since become integrated into the budget as general fund expenses: Saratoga Community Library, Saratoga Chamber of Commerce, Saratoga Sister City Committee and the Volunteer Saratoga program. Since the end of the Federal Revenue Sharing program, human services agencies have made application for City support through the CDBG process. Policy Agenda Item - Parameters for Future Decisions regarding Human Services Funding February 24, 1989 Page Three Process. Format and Criteria By surveying other cities in the county, it has become clear that there are many different approaches to the funding of human service agencies, and many of the cities are currently evaluating their process and criteria. In general, cities have been using general funds rather than CDBG funds for this type of activity. Due to the limited projects for which Saratoga is able to use CDBG funds, the Council will probably want to continue to grant CDBG funds up to the maximum allowed and use general funds to supplement them. Therefore, it would seem appropriate to continue to consider all human service agency proposals within the context of the CDBG solicitation /determination process. The proposal application form (attached). which we have been using the last few years for CDBG proposals provides for inclusion of necessary information on which to make a funding decision. The cover letter (attached) soliciting proposals could be modified to indicate that proposals will be considered for alternative funding if it is available. The current practice is to send this letter to all agencies which have previously applied for funds or have requested application materials. Most of the other cities have citizen advisory committees which take testimony and make recommendations to the Councils on fund- ing requests. Since the Saratoga Council is accustomed to participating directly in this process, there probably is no need to set up a separate body at this time, although it is an option to consider if the number and variety of applicants increases greatly. One of my primary reasons in recommending to the Council the use of general fund money for the small grants to outside agencies was to enable us to create a process that would be less time consuming and burdensome for both the agency and city staff than the CDBG process is. I believe that once an agency is well established in its program delivery and a relationship has been formed with the program director, we can use an informal monitor- ing and reporting system that is tailored to the particular program. The general practice in other cities is to do no monitoring, or only a year -end evaluation, for grants of less than $5,000 or $10,000. Policy Agenda Item - Parameters for Future Decisions regarding February 24, 1989 Human Services Funding Page Four Criteria will need to be developed to determine eligibility for funding once the strict guidelines of the CDBG program concerning income levels and demographics of beneficiaries do not need to apply. Recent allocations have primarily provided basic social services to the elderly and /or handicapped population in Sarato- ga. The Council will also want to determine if you wish to expand support into the areas of educational or cultural activi- ties, or stay with programs which serve more basic needs. Sample policies from the City of Cupertino and the City of Sunnyvale are attached. Annual Spending Level The previous tables of annual spending for human services agen- cies show a sharp increase in the last two years, not only due to SASCC's operation of the Day Care Center, but also to funding of additional agencies. While these dollar amounts do not look very large taken by themselves, they do indicate that the City has taken on a significant increase in social services spending. Without the cap imposed in previous years by the availability of restricted funds, it becomes necessary to consider this spending in the overall context of City revenues and expenditures as a guideline for future spending commitments. One way to approach setting an annual spending level for all human services support is to relate past allocations to revenues. Using actual and projected revenues for the years 85/86 to 89/90, the percentage allocated to human services from all sources is as follows: Total Revenues* (incl. restricted) Includes Without SASCC SASCC General Revenues* only Includes Without SASCC SASCC 85/86 .53 8 .14 % .676% .178% 86/87 .50 .095 .676 .128 87/88 .64 .116 .8 .15 88/89 .857 .16 1.0 .22 89/90 .966 .159 1.3 .217 *Revenue figures have been adjusted to delete large one -time projected revenues such as sale of Cox property. Policy Agenda Item - Parameters for Future Decisions regarding Human Services Funding February 24, 1989 Page Five The level of support allocated in the last two years has taken over 1% of general revenues. The Council may wish to consider this 1% of projected general revenue as an annual cap for future spending. If the Council prefers to consider funding to SASCC as a separate item, the percentage of support to revenue is .159% of total or .217% of general revenues. The figure of .2% of pro- jected general revenue could be used as an annual target amount. Carolyn ing Jm Attachments: A. B. C. D. E. Proposal Solicitation Letter Application Forms City of Cupertino Policy Statement City of Sunnyvale Human Services Policy City of Sunnyvale Outside Groups Funding Policy �A A � Qq November 4, 1988 13777 FRL'IT\'.-\LE AVENUE . SARATOGA, CALIFORNIA 95070 (408) 867 -3438 Ann Marquart Operation Sentinel 860 Escondido Road Stanford, CA 94305 Dear Ms. Marquart,: COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman The City of Saratoga is inviting all interested parties to submit proposals for projects to be funded with Housing and Community Development Act (HCDA) Block Grant monies for FY 1989 -90. The deadline for us to receive a proposal for consideration in the allocation process for 1989 -90 funding is January 6, 1989. The City Council is scheduled to hold a public hearing on January 18, 1989, at which time we expect the allocations will be made. A CDBG Project Proposal Submittal Form is enclosed. not hesitate to contact me if you have any questions. Sincerely, Carolyn King Administrative Assistant jm Enclosure Please do City of Saratoga CDBG Project Proposal Submittal Form HCDA Program Year 15 (Fiscal Year 1989 -90) Instruction Sheet 1. Applicants are to prepare a separate proposal for each service area for which funding is sought. Proposals should be precise, clear, and limited to four typewritten pages of narrative, plus attachments. 2. Mail or deliver proposal by January 6 1989 to: Administrative Assistant 13777 Fruitvale Avenue Saratoga, CA 95070 Call Carolyn King at (408) 867 -3438 if you have any questions. 1 Each applicant must indicate on the cover page the name of the applicant organization and other identifying information, including address, telephone number and contact person. Each proposal must be signed by the proponent. A. Description of Applicant Agency 1. Describe your_ agency's organizational structure and geographical location. 2. Describeyour agency's service capabilities, types and quantities of service provided currently, and discuss background in providing the type of service being proposed. B. Pro ect Purpose and Objective 1. Identify the specific needs that the project is designed to meet. 2. Specify project objectives. The target population should be indicated relative to socioeconomic levels, number to be served, geographic location of populations, etc. 3. Identify, in measurable terms, the desired outcomes and benefits,of the project. 4. Describe your approach for meeting the objectives. 5. Indicate alternatives considered and demonstrate .why the approach you are proposing is the most cost- effective. C. Pro ect Beneficiaries: All CDBG- funded activities must princ pal y benerr-t--a—nU extend maximum feasible priorities to persons of low and moderate income (80% or less of the Santa Clara County median income). 1. Identify the total population residing within the service area. 2. Identify total number of low and moderate income persons residing within the service area. 3. Show the total percent of low to moderate income residents compared to the total number of residents residing within the service area. 4. Show the total number of elderly persons within the service area. 5. Show the total number of handicapped persons within the service area. 6. Show all data sources for questions (1) through (5) above. 2 D. Pro ect Management 1. Discuss how the project will be administered. 2. Describe the staff who will work on the project. Include, as attachment to your proposal, job descriptions and resumes if staff has been designated. 3. Outline the tasks to be undertaken in the project and time lines for each task. Please include as attachments to your proposal a Project Work Plan, Proposed Implementation Time Schedule and Monthly Project Budget. 4. Describe the mechanism and time frames that your agency will use to monitor the project's progress and evaluate its effectiveness. Mandatory Inclusions - Cover sheet with identifying information and signature of applicant. - Description of Applicant Agency. - Project Purpose and Objectives. - Pro ect Management. - Completed Project Work Plan. - Completed Monthly Project Budget. - Completed Proposed Implementation Time Schedule. 3 City of Saratoga Community Development Block Grant Program FIFTEENTH PROGRAM YEAR FY 1989 -1990 PROJECT PROPOSAL COVER PAGE APPLICANT ORGANIZATION NAME ADDRESS NAME /TITLE OF PROPONENT SIGNATURE TELEPHONE NUMBER PROJECT NAME DOLLAR AMOUNT OF CDBG FUNDS REQUESTED $ PROJECT ABSTRACT (Limit statement to space provided.) . Agency Name Project 1987 1 LINE. ITEM JUL PUG SEP SALARIES Personnel seneflts OFFICE EXPENSE Rent Telephone Postage Printing Supplies Travel Utilities Equipment Duls and Subscriptions OTHER EXPENSES Accounting Services Contract Services Insurance Conferences Miscellaneous TOTAL HCD MONTHLY PROJECT BUDGET FIFTEENTH PROGRAM YEAR 1989/90 OCT I NOV I DEC I 1JAN DATE F;8 MAR I APR MAY JUN TOTAL PROPOSED IMPLEMENTATION ACTIVITY TIME SCHEDULE List in detail the major activities to be undertaken to implement the project and the scheduled time they will begin and-be completed. Once approved, projects will be closely monitored during implementation "according to this time schedule: PROJECT: ORGANIZATION: Program Year Date Prepared opal ea ny: PROJECT NAME PROJECT NUMBER Responsible Staff Person(s) and Approximate Percentage of Time Allocated to Activity PROJECT WORK PLAN Fifiteen.th Program Year 1989 -90 FY Activity for Period (1 month or 3 month period) City of Saratoga Products or Milestones for POLICY STATEMENT ............... HUMAN SERVICES ANWTHE CITY OF CUPERTINO The City of Cupertino recognizes the need for human service programs in the areas of dependency avoidance services, health services, individaul and family services, justice rehabilitation, transportation services and leisure services. It is the City's belief that human services cannot be confined to the city limits. The City's main responsibility, therefore, is for identifying needs and coordinating and evaluating programs to alleviate social problems in Cupertino. As a result, the City has had a minimum role as a provider gen- erally passing through Federal funds; for example, the construction of the Senior Community Center and the expenditure of HCD funds. At the present time, all levels of government are facing considerable fiscal constraints requiring the control of the level of services, not the expansion or development of new services. And so, private and non - profit agencies should be encouraged to support needed services. Notwithstanding the above, the City of Cupertino recognizes its citizens' needs for human services and will, as it is fiscally able, provide some assistance to human service agencies where direct benefit to City residents can be documented. Any human service which would receive any financial assistance from the City of Cupertino must at a minimum meet the following criteria: 1. Is there a need for the service? (25 points) 2. Is the proposal the best way to meet the need? (25 points) 3. Is this a duplication of existing services? (10 points) 4. Has the organization making the application demonstrated effectiveness in providing the service? (15 points) 5. Is the unit cost of service reasonable? (25 points) ENCLOSURE VI Policy 5.1.3 COUNCIL POLICY FORM SUBJECT: Human Services Policy POLICY PURPOSE: The City of Sunnyvale has recognized the need for Human Services and has provided or supported such. services in the areas of transit, nutrition, law enforcement, training, special recreational programs and housing facilities. The City establishes this Human Services Po I icy to insure that Human Services are identified and provided in the most efficient and effective manner. POLICY STATEMENT: I. City shall seek to have as many Human Service needs as possible met through other resources in the following priority: o self -help o private non -profit organizations 0 other government agencies 11. City shall assume an advocate role to manage the use of its resources to meet Human Services needs in Sunnyvale in the following areas: o Encourage and advocate coordination and cooperation among organizations providing Human Services in Sunnyvale; o Advocate, encourage, and wherever possible, facilitate the co- location of Human Services providers; o Actively pursue the cooperation of Federal, State, County and other agencies to enhance the quality and availability of Human Services to Citizens of Sunnyvale. III. The City may assume the role of a direct service provider of Human Services when: o Specifically targeted intergovernmental funds (such as CETA, CDBG) are available for which the City could most cost - effectively administer_ the Human Services programs (rather than outside groups) to address significant community needs; direct service provider role will terminate when such funds are no longer available; or o Specific community needs are identified and the General Plan, City policies or action plans provide for the City to take on such a role. IV. The City may assume the role of an indirect service provider of Human Services when: Policy 5.1.3 o Specifically targeted intergovernmental funds G.e. CETA, CDBG) are available to the City but another agency could most cost - effectively administer the Human Services Program to be addressed by the funds. Funding to the provider will terminate when such funds are no longer available, or the provider can no longer provide the service, or the specific community need has been fulfilled or the City determines to take on the service directly. V. The City may provide limited financial assistance to qualified outside groups if: o The program proposed for funding does not duplicate existing services, addresses a significant community need or facilitates the co- location of Human Service providers in the City of Sunnyvale; augments (but does not duplicate) service provided directly by the City, provides the service at a cost lower than the City can provide or is the most logical service provider; and provision of such services is compatible with the City's General Plan, policies or action plans; and o The program for which funding is requested qualified u�der the City's Outside Agencies Funding Policy. VI. The City will annually review prevailing conditions of human needs within the City and give appropriate attention to Human Services Policies in City Planning. Report to Council No. 81 -617 Approved by City Council on October 13, 1981 Deputy City Clerk Certification ENCLOSURE VII Policy 5.1.4 COUNCIL POLICY FORM SUBJECT: Outside Groups Funding Policy The subsections of this policy are provisions intended to implement its purpose. These subsections are as follows: o Policy Purpose o Policy Statement o Proposal Funding Categories o Application Policy Statement o Evaluation Process o Coordinated Funding Schedule POLICY PURPOSE: The purpose of this policy is to establish guidelines for funding programs /services for the City which may be provided by outside groups. This policy is necessary to: I. Provide a cost- effective approach to provision of City services by establishing a process through which outside groups can be funded to provide needed service; 11. Establish a methodology by which programs /services proposed by outside groups can be assessed; III. Establish an evaluation system which assures equity in the process of funding considerations by Council; IV. Establish the type of funding commitment which the City will provide. POLICY STATEMENT: The City will consider funding outside groups if the programs proposed conform to the "Proposal Funding Categories" criteria below. Groups qualifying under the funding criteria will be evaluated in relation to existing City policies. PROPOSAL FUNDING CATEGORIES: Programs for which funding is requested must qualify in one of the criteria below. Proposals not fitting into these categories will not be evaluated nor considered for funding: 1. Seed Program,. Funding for start -up of new programs designed to meet a signs scant community need or problem. Proposers must demonstrate a high probability that funding can be sustained beyond the commitment of City funds. Initial funding for seed programs is limited to one year; second year funding is possible if program demonstrates good performance, proposer has-continued need for start -up funds and proposer has developed future commitments for on -going funding. Policy 5.1.4 PP�rojjecct�t. Funding of one -time projects designed to address a significant community neefor problem. Funding of such projects shall be limited to a specific time - frame, usually not more than one year. 111. Emergency. Funding of operational programs offered in the community which meet aexisting need. Proposers and programs qualifying under this criterion must demonstrate 1) good performance of current programs; 2) that financial difficulties will largely curtail the services to City residents; and 3) a reasonable probability that future funding to continue the program can be obtained from other sources. Funding for programs qualifying under this criterion shall be limited to one year. IV. Indirect City Program. Funding of programs and services to address identified community needs or problems (in City General Plans or other policies) through direct financial support and /or in -kind contributions. Programs /services funded under this criterion must represent a service which can be more cost effectively operated by the proposer (than the City) or, because of its role in the community, is the most logical service provider. Funding may be provided on a multi-year basis, but is not guaranteed. Continued funding is contingent upon City budget limitations and proposer's previous program performance. Proposer must demonstrate good faith efforts to secure funding for programs /services from other sources. APPLICATION POLICY STATEMENT: The City wishes to consider funding of needed and appropriate services in an orderly and rational manner. In order to determine which agencies should be awarded funding, the Council has adopted a formalized application procedure and form to be used for all outside groups desiring to act as a service provider and requesting funding from the City to do so. All groups requesting City funding under this policy will be required to submit a complete application by specifiers due dates. Public notice of the availability of requests and the specified dates will be provided in ample time for applications to be prepared. All applicants desiring a grant from the City to provide recreational, social, human or other services will be required to comply with the application procedure and time schedule. All applications will have to meet the three (3) following criteria: I. Provide a service consistent with an existing recognized City need, policy, goal or objective. 11. Request funds for a program or project within one of the four identified funding categories (see above); and III. Have completed the application process and the application has been determined to be accurate and complete. EVALUATION PROCESS: To assure that all applications for City funding receive due consideration and to ensure that Council is provided with the information it needs to make its funding decisions, the following evaluation process will be applied to requests received: 12 Policy 5.1.4 I. Applications not received by the due date will be rejected. Applicants submitting applications which are incomplete will have three (3) working days from notification by staff to correct any deficiencies, or their applications will not receive further evaluation. II. Staff will determine proposal eligibility based on guidelines provided in this policy. Proposals not qualifying will be recommended to Council for rejection and will not receive further evaluation. III. Applications qualified for consideration will be brought forth to Council, with a staff recommendation as to the appropriate citizen's advisory body which would evaluate the proposal. IV. Staff will prepare a technical evaluation of the applications before submitting to the advisory committees. V. The advisory groups will conduct formal evaluations of the applications, including the opportunity for each group to present its program to the advisory committee for evaluation. Staff and advisory committees will make recommendations to the City Manager and Council such that the proposals will be in rank order of priority. VI. The City Manager will review the proposals and recommend to Council which programs should be funded , taking into consideration other budget priorities. The advisory committees will develop evaluation criteria appropriate to their areas of concern. Staff and the advisory committees will apply these criteria to all applications reviewed. In general, these evaluation criteria include (but not be limited to), the following guidelines: Critical Evaluation Factors. Each of these factors must be met for the program to receive a recommen at ion for City funding. o The organization must meet minimum eligibility standards to receive funding. (Reference: Attachment 1) o The organization and its program must have demonstrated good performance and capability to effectively provide this program. o The organization and its program must deliver services in a cost - effective manner. o The organization must be an appropriate agency to deliver this program. o The program is not a duplication of services provided in the some service area. o The organization and its programs must have a good management system, especially financial management. -3- Policy 5.1.4 o The proposed program has a contingency plan for funding if City support is limited or eliminated in the future (critical for seed programs). Favorable Evaluation Factors. The proposed program must address one or more of t e following actors, particularly the first four, to receive a positive recommendation. Programs that meet all or several of the criteria are in a stronger position to receive a positive recommendation. o The proposed program addresses or relates directly to a general plan policy or action statement. o The proposed program is a needed enhancement of an existing City program or program direction and can be better performed by an outside group than the City directly. o City practice is to fund programs which address similar needs. o The program has a diverse funding base, as opposed to reliance upon City funds to support its operation. o The extent to which City funds arse leveraged with other funds to provide services. It is very favorable if City funding requested for the program is limited to 10% or less of program budget. Other Funding Guidelines. These guidelines are applied to the recommendation regarding the amount of funding for the program, after it has been determined that funding is recommended. All Programs o Funding is not to exceed the benefits provided to Sunnyvale residents. (Funding may not exceed the pro -rata share of Sunnyvale residents relative to the overall budget.) o Travel expenses must clearly indicate in- county versus out -of- county travel. o The "surplus" or "contingency fund" of the organization should be used to fund programs in lieu of City funds to the extent it exceeds reasonable limits based upon the activities of the organization and its program. Generally, the surplus should not exceed three months operating budget. Indirect City Programs o If there are no significant service level changes in terms of the type or quantity of services provided, subsequent years funding will be limited to the inflationary adjustment used in preparing the City budget. Additional units of service demand of the type approved in previously considered programs, will be favorably considered. Changes or enhancements in the type of services provided will be independently considered in the same fashion as a new application. -4- Policy 5.1.4 Co- Sponsored Clubs o Youth sports groups are to be subsidized at the rate of $2.86 per participant in the base year of 1985/86, with adjustments for inflation made for the base year, except that the general provisions regarding surplus funds will take precedence. o The amount of subsidy for any sports /recreation group is not to exceed on amount equivalent to that which is raised from its membership through fees, less fee waivers for economically disadvantaged members. o Non - expendable equipment purchases exceeding $200 should be considered as "project" costs and funded separately from indirect City programs. Only extraordinary (from normal operations) one -time equipment purchases will be considered for funding under project funding for indirect City programs. Human Services Policy. In addition to the evaluation criteria noted above, the City has an adopted ' uman ervices Policy" that is applicable to the evaluation of outside group applications. The Human Services Policy is to be considered by staff and advisory groups in making recommendations to Council. Based upon the above criteria (as appropriate) and any additional criteria developed by staff and advisory bodies, proposals will be rated and recommended for funding. Those funded will receive specific performance standards upon which on -going performance can be evaluated. In addition, the advisory committees will be charged with monitoring and evaluation of programs funded. Past performance is an important factor in the decision to fund programs. COORDINATED CALENDAR: In order to show the relationship between the funding cycle for outside groups and the City budget process, a coordinated calendar will be prepared annually. This calendar shows the integration of requests from groups requesting funding from the Community Development Block Grant Funds, Revenue Sharing Funds, City General Fund (including in -kind contributions) of other resources available to the City. Report to Council No. 81 -617 Approved by Council on October 13, 1981 Amended by Council on November 25, 1986 Deputy City Clerk Certification &V,&A2& 4, -5- U, /7 ("� C 92 0 ° 'OOZ 13777 FRUI "I'VALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867-3438 COUNCIL MEMBERS: Karen Anderson February 24, 1989 Martha Clevenger David Movies To: City Manager Donald Peterson Francis Stutzman From: Community Services Director Subject: Policy Development Agenda; CATV Community Access (Reference Item #17) ISSUE "What should the City's future role and policy be for supporting and staffing community access television ?" BACKGROUND In 1985, staff successfully negotiated the donation of video production equipment from Hearst Cablevision to the City when Hearst purchased the Saratoga cable television system from Video Engineering. The equipment, valued at $40,000, was of a portable nature designed to produce local programs in Saratoga which would be televised over cable TV. Hearst also agreed to reserve Channel 6 exclusively for this purpose. In 1986, the City negotiated an agreement with West Valley College to share equipment resources. West Valley had the studio and editing equipment while the City had portable production equipment. Shortly thereafter, a policy board was formed (with representatives from the City (2), College (2), and community at large (3); (total of 7 members) to determine the appropriateness of programs for airing, and set overall policy for the channel. With the assistance of the City Attorney, the policy board incorporated into the Saratoga Community Access CATV Foundation and was recognized by the State in February of 1988 and by the Federal Government (as being tax exempt) in January of 1989. The policy board then became the Board of Directors to the Foundation. In 1987, the City began lobbying Hearst to increase the franchise fee it pays the City from 3% to 5% of gross annual revenues, with the understanding that the City would use the additional revenue to support community television activities. In March of 1988, Hearst consented to the increase voluntarily, and the revised ordinance amending the franchise fee was approved by the City Council, taking effect in April of 1988. Policy Issue: February 24, Page Two "What should the City's future role and policy be for supporting and staffing community access television ?" 1989 At the request of the Foundation, the City started advancing quarterly payments based on estimates of the funding the City anticipated receiving, so the Foundation could hire a part -time staff person. In the Fall of 1988, West Valley College sent the Foundation a proposal to hire a full -time staff person paid for by the College, with half the position's cost reimbursed by the Foundation. The full -time position would work half -time for the College on educational and instructional activities, and half- time for the foundation in support of the activities of the Saratoga TV Unit. The Foundation approved the College's proposal in October of 1988. Although the Foundation's Board had hoped the position would be filled shortly after their approval of the College's proposal, the establishment of the position in the College's personnel system has proved to be more time consuming than originally anticipated. The College currently estimates that they will start recruitment in the Spring of this year. At this point, the Foundation Board is supposed to be involved in the selection of the individual to be hired, although the details of this have not been determined yet. DISCUSSION The role of the City with regards to the operation of Channel 6 should be re- examined. The College would like to control the Channel, and has referred to is as the West Valley TV Station in the past to the press. However, with the City's involvement in KSAR activities comes responsibility for program content as was evidenced by the controversy which erupted over the station's coverage of the Highway 85 issue and its free speech message policy. As it stands now, neither the City nor the College has control over station activities, although each has influence. Station control is currently vested in the Foundation's Board of Directors. The role of the College will become more apparent during the 1989/91 fiscal years. For example, the new part -time employee of the Foundation will technically be an employee of the College. An examination of the City's policy role would, therefore, be appropriate at this time. Besides being perceived as partly responsible for program content by some, City involvement with the channel has other impacts on this organization. One such impact is the involvement of my time in support of channel operations. Currently, I perform the following administrative tasks for the channel: Policy Issue: "What should the City's future role and policy be for supporting and staffing community access television ?" February 24, 1989 Page Three a. Scheduling monthly meeting for the TV Unit crew. b. Preparing agendas and leading the discussions. C, Organizing the assignments of the volunteers to specific productions. d. Matching the training needs of individual volunteers with the resources of the City and College. e. Interviewing and assigning new recruits to the TV Unit. f. Scheduling volunteers to do the actual cable casting (i.e. physically putting the program on Channel 6). g. Coordinating the placement of announcements on the Channel 6 community bulletin board. h. Recruitment, screening, and interviewing of applicants for the Foundation Board of Directors. i. Scheduling of meetings and preparation of the agenda for the Policy Board meetings. j. Coordinating much of the Foundation's business with the City and other outside agencies. In addition, th the Foundation mailings. The amount of time status with the Government. a City has been and the TV uni City Attorney in helping the State, and its providing clerical support to both t, and paying the postage for all has also invested a considerable Foundation achieve its non - profit tax - exempt status with the Federal However, a lot of the demand on staff time will significantly decrease when the franchise fee - financed staff person is engaged in the Spring. Once the Foundation (and the TV unit) are no longer dependent on the City for support, the City's role with the activity of the channel may substantially decrease. From one perspective, the decrease in the City's involvement with the channel would free up resources which could then be used in other areas. However, there are certain considerations to ponder. The City has made a significant investment in the creation and development of the channel, and has an interest in what happens to the station in the future. The concept of a community access channel was conceived solely by the City, and the initial efforts to establish the channel were solely the City's. The City has recruited the volunteers which operate the channel and produce the shows. Therefore, the City deserves a lot of credit for developing and providing this new service to the residents of Saratoga. It is unlikely that such acknowledgments would be given the exposure they deserve if the channel becomes dominated by the College. In addition, it should be recognized that the mission of the College transcends beyond the community of Saratoga. Policy Issue: "What should the City's future role and policy be for supporting and staffing community access television ?" February 24, 1989 Page Four In summary, there are clearly some advantages and disadvantages to be considered in determining what the appropriate role for the City should be with regard to the community access channel. I lean toward favoring the maintenance of the balance between the College, the City, and the community, which was envisioned when I first recommended that the policy board be created. Although no one has, nor probably will ever suggest that the City give up its seats on the Foundation Board, it may become necessary for the City to become more assertive if the objective is to maintain the balance as it currently exists in light of the diminishing involvement of the City, and increasing involvement of the College. These matters are key policy issues which will greatly affect staff's direction and degree of involvement with the channel in the future. PREPARED BY: Todd W. Arg jm:17 13777 FRUITVALE AVENUE' • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 Date: February 23, 1989 To: City Council From: Director of Recreation COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman Subject: Background Note: Policy Issue: Should the City sponsor an annual festival centered around Hakone Gardens? An annual festival at Hakone Gardens in great way to highlight this unique park. one day special events such as parades, J Day festivals. The City could coordinate of the Sister City organization, Bamboo Foundations. August or September would be a Many cities in the area sponsor aly 4th celebrations and Founder's the event with the strong support Society and the Hakone Gardens If the City Council wishes to sponsor a Hakone Gardens Festival, I would recommend for the first year a one day program. The main expense for this event would be staff costs, although, it is expected volunteers would be used heavily. Material and operation expenses, depending on the size of the festival, could range from $200 - $500. Another consideration is the parking constraints at Hakone Gardens. At some point a shuttle service might need to be considered. Plans for three different types of festivals are listed below. Also, you will find estimated expenses for each plan which includes personnel, operating and material costs. Option 1: One Day Festival • Nodati Tea Ceremony • Ikebana demonstration • Docent tours - scheduled every 30 -45 minutes • Refreshments - Japanese tea and rice crackers Estimated Expense: $550 Option 2: One Day Expanded Festival • Nodati Tea Ceremony • Ikebana demonstration -Docent tours - scheduled every 30 -45 minutes • Martial arts demonstration • Taiko drummers • Refreshment area featuring a variety of Japanese desserts & tea • Evening Moon Viewing Ceremony Estimated Expense: $1100 1 Policy Issue: Should the City sponsor an annual festival centered around Hakone Gardens? February 23, 1989 Page Two option 3: Two Day Festival • Docent tours every 30 -45 minutes • Nodati Tea Ceremony • Ikebana demonstration • Martial Arts demonstration • Taiko drummers • Special children tours /storytelling /show • Dancers /music • Oragami demonstration • Japanese cooking demonstration • Japanese artists • Offer posters /post cards of Hakone • Bonsai display /demonstration • Refreshments: desserts, catered bento lunches, etc. • Evening Moon Viewing Ceremony Estimated Expense: $2500 Jo Pisani, Director of Recreation pe 2 0 0 A t 0 o� a 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 February 24, 1989 To: City Council From: City Manager COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman Subject: Background Note: Policy Issue: Shall the City continue to levy the current Utility Users Tax past July 1, 1990? ------------------------------------------------------------ - - - - -- BACKGROUND: In April of 1985 the City Council adopted ordinance 38.131 which imposed a user tax on electricity and gas use of 3.5% of the charges made for electrical and gas service. This was a general tax which under the law in effect at the time did not require voter approval. The purpose of the tax was to provide funding for the City's Pavement Management Program; a systematic city -wide program to maintain all City streets in the most cost effective manner possible. The Program, originally established for the 1983 -84 fiscal year was developed by Harris and Associates in May 1983 and was revised and updated in May 1987. Harris estimates the replacement value of the City's streets at $37.8 million. If the City were to do nothing to maintain its 245 travel lane miles of public streets, the average cost per square yard of pavement would be $0.843 annually in 1987 dollars. With a program of asphalt overlays every ten years, the prices decreases to $0.677 annually in 1987 dollars. With pavement management the price decreases to $0.365 annually in 1987 dollars. NONE OF THESE PROGRAM COST OPTIONS ALLOW THE CITY TO "FIX IT AND FORGET ABOUT IT ". The do nothing option is based on a 20 year design life cycle for reconstructed pavement. The overlay option is based on an asphalt overlay of all streets based on a 10 year design life. In the first instance, the annual cost is placed at $1,891,769. In the second instance the annual cost is $1,519,593. Pavement Management is calculated to cost $821,000 annually. Clearly the most cost effective option for maintaining the City's street system. So Pavement Management was instituted in fiscal 1983 -84. It became apparent that existing gas tax revenues and other existing revenue sources could not fulfill even the PMP requirement to adequately maintain the street system without severely cutting back other City services. A major effort was undertaken to pass a special tax to fund pavement management at the required level in 1984 (See Resolution No. 2127 for statement of City Council intent). The tax measure ultimately failed to win the necessary 2/3's voter approval for a special levy, and as cited above, in 1985 the Council took action to levy the utility users tax. Policy Issue: Shall the City continue to levy the current Utility Users Tax past July 1, 1990? February 24, 1989 Page Two Current Status of the T_4,x_ and the Program: Since passage of the tax, each budget, beginning in July 1985, has used the proceeds from the tax and state gas tax proceeds to fund the Pavement Management Program. 1985 -86 $ 434,232 (UUT) 484,770 (SGT) Total $ 919,002 1986 -87 $ 499,929 (UUT) 503,985 (SGT) Total $1,003,914 1987 -88 $ 526,682 (UUT) 473,806 (SGT) Total $1,000,488 1988 -89 $ 547,749 (UUT) 478,515 (SGT) Total $1,026,264 TOTAL $3,949,668 DIFFERENCE $ 904,706 (maintenance) 557,880 (overlay) $1,462,586 ($543,584) $ 690,000 (maintenance) 412,840 (overlay $1,102,840 ($ 98,926) $ 884,219 442,200 $1,326,419 $ 528,443 459,853 $ 988,296 $4,880,141 (maintenance) (overlay) (maintenance) (overlay) ($325,931) $ 37,968 ($930,473) In 1989 -90 (the final year of the tax under the current sunset provision) the tax is estimated to generate $569,659. State gas taxes are estimated to generate $495,445 for a total of $1,065,104. For 1989 -90 pavement management is expected to cost $968,509. Pavement Management, during the first five years is expected to require about $835,000 in funds from sources other than the gas tax and utility users tax primarily because the first three years were "catch up" years where much deferred maintenance was undertaken along with the programmed work. Looking ahead, using the Harris study and our own historic costs, the staff currently projects the following total PMP costs: Year Maintenance Overlay Total 1989 -90 $ 542,187 $ 426,322 $ 968,509 1990 -91 732,061 426,322 1,158,383 1991 -92 614,164 426,322 1,040,486 1992 -93 1,039,992 426,322 1,466,314 1993 -94 913,589 426,322 1,339,911 1994 -95 1,067,744 426,322 1,494,066 1995 -96 1,154,622 426,322 1,580,944 Total $6,064,359 $2,984,254 $9,048,613 Policy Issue: Shall the City continue to levy the current Utility Users Tax past July 1, 1990? February 24, 1989 Page Three For the same period UUT revenues and SGT revenues are projected as follows: ear UUT SGT Total 1989 -90 $ 569,659 $ 495,445 $1,065,104 1990 -91 592,445 495,785 1,088,230 1991 -92 616,143 495,785 1,111,928 1992 -93 640,789 495,785 1,136,574 1993 -94 666,420 495,785 1,162,205 1994 -95 693,077 495,785 1,188,862 1995 -96 720,800 495,785 1,216,585 Total $4,499,333 $3,470,155 $7,969,488 The revenue shortfall of $1,079,125 is about the same on an annualized basis as for the first five years of the program. During the first five years the shortfall was assisted by one time additional gas tax revenues from the State and drawing down the revenues of the State Gas Tax Fund. The prospect for additional funding at this time is unclear even though there are proposals for a -gas tax increase being made at the State level. However, the record indicates it was never the intention that the UUT when combined with the gas tax would totally fund Pavement Management. That is why business license taxes were doubled in 1985 to $75.00 and the sale of surplus property at Cox and Saratoga /Sunnyvale Road was authorized. Given these circumstances, no increase in the UUT is recommended to make up this revenue shortfall. Analysis and Options: In order for the City Council to plan its financial future, a decision must be made soon as to whether the City Council should either extend or remove altogether the sunset provision contained in Section 5- 30.160 SMC. o The prime policy question is-- Should the tax be extended and if so how? In order to answer the question completely, the first subset of the question is- -Does the City need this source of revenue? As you know, the UUT is now tied to the trial court funding property tax transfer which phases in in fiscal 1992 -93 for Saratoga. The Finance Director and I have run a forecast of revenues through 1996 and our projections with and without trial court funding and the UUT are as follows: Policy- sue: Shall the City continue to levy Utility Users Tax past July 1, 1990? February 24, 1989 Page Four Year 1990 -91 1991 -92 1992 -93 1993 -94 1994 -95 1995 -96 Total With $ 9,408,891 9,434,152 9,646,653 10,329,267 10,991,620 11.848,634 $61,659,217 Without $ 8,816,445 8,768,244 8,788,162 9,189,031 9,511,948 9,962.946 $55,036,776 the current Difference ($ 592,446) ( 665,908) ( 858,491) ( 1,140,236) ( 1,479,672) j 1,885,688) ($6,622,441) Obviously the revenue difference continues to grow beyond 1996 but this illustrates the revenue impact pretty clearly. If the expected cost of operations is factored in, along with the proposed capital projects, including the Civic Center and SW /NE Road, the City's fund balance by July 1, 1996 will fall some $2,575,211 below current requirements per Council policy. A closing funds balance of $2,441,349 would exist as opposed to $9,063,788 with the extra revenue. Required fund balance for July 1, 1996, is projected at $5,016,560. Beyond 1997 the City would find itself in an overall deficit position and services would have to be cut or added taxes imposed through voter approval. If the City extend the unlimited. one would leaving the were to cut tax, there Certain se result in City no bet These include: services and capital projects rather than is a lot of flexibility, but it is not rvices are tied to revenues and a cut in a corresponding reduction in the other, ter off. o the Community Environment Program - -fees are tied to permits and must, under law, not exceed the cost of the service - -in round numbers this is about $1,000,000 for fiscal 1989. o the Recreation Services - -fees generate about $275,000 a year and equal expenses for fiscal 1989. o Assessment Districts - -these are legal obligations and revenues offset debt service and operations costs. They total $264,182 for fiscal 1989 but jump to $536,479 in fiscal 1990 because of Parking District #3. o several Community Support activities are also in this category -- franchise administration, HCDA administration and Community Access TV. They total about $63,000 for fiscal 1989. Policy Issue: Shall the City continue to levy the current Utility Users Tax past July 1, 1990? February 24, 1989 Page Five When these areas are factored out (they total $1,874,479) of the projected operating budget for 1991, cuts can only come from the remaining $5.4 million or capital projects. Candidates for cuts include Public Safety, Maintenance, Senior and Volunteer Services, Community Groups, Sister City, Paratransit, Library Services, General Government and Intergovernmental Services. The cuts would have to be about 11% overall ($600,000). As the years progress the cuts would have to become larger and larger reaching about 21% in 1996. Capital projects are another potential area for cutting. Not doing the Civic Center saves about $300,000 a year. Canceling the median improvement program saves about $200,000 a year. Not doing the signals at Kirkmont and Seagull saves about $220,000. Not improving pedestrian facilities saves about $37,000 a year. However, certain projects such as parks and SW /NE road are financed from restricted funds. The money cannot be used for any other purpose. These total over $2.6 million between 1990 and 1996. In short, operations could remain at existing levels for perhaps two or three years if all discretionary capital projects were canceled. After that, operational cuts would have to be phased in in those areas which do not create offsetting revenue. If some capital projects were to remain for funding, operational cuts would have to begin in 1991 rather than in 1993 or 1994. IT IS MY CONCLUSION THE CITY CANNOT AFFORD TO DO WITHOUT THIS SOURCE OF REVENUE WHICH, WHEN COMBINED WITH TRIAL COURT FUNDING, WILL CLIMB TO $2,000,000 IN FISCAL 1997. SARATOGA COULD LIMP ALONG FOR A WHILE BUT WOULD FACE MAJOR BUDGET PROBLEMS BY 1993 or 1994. arry . Peacock, City Manager jm REPORT TO MAYOR AND CITY COUNCIL DATE: 2/22/89 %FROM: Director of Maintenance ai. SUBJECT: Backsr°uud_Note 12jigv_,I§ sue - Should the City provide funding for continued use of the California Conservation for City projects? In contact with representatives of the California Conservation Corps (CCC) to further define this item for Council, we were told the CCC has not altered their position and does not charge contributing agencies an hourly rate for their service. What the CCC is asking for are items that can be used in their training at the Agnew facility (i.e. gloves, shovels, hand tools) and some specific classroom items like computers. The director did emphasize that projects are not assigned to a sponsor by the size of their contribution, but as to the benefits to the corps and its members. 491 REPORT TO MAYOR AND CITY COUNCIL Director of Maintenance 2/24/89 Backaround Note: Policy- Issue - Should the City Light and Landscape City Entrance Signs? During the oast several years, since the installation of the entrance signs on Saratoga Avenue and Saratoga - Sunnyvale Road, we have received numerous suggestions that they be lighted at night and landscaped so they stand out in the daylight. In response to those suggestions, we have developed cost information. The cost of bringing underground electricity to the Saratoga Avenue entrance sign and installing a 100 -watt high pressure sodium light will be approximately $1,600. The cost of installing an appropriate planting area will be about $500. The annual cost of energy and replacement of annuals would be approximately $300 per year. The cost of providing lights at the Saratoga - Sunnyvale Road and Prospect Avenue entrance will be about $700. The construction of a Dlanter and olanting annuals will be about $200. The annual cost of energy and replacement of annuals would be approximately $250 per year. An option to the City making the complete installation as outlined would be to install the power and lighting during our next budget year but wait until the drought situation is resolved and then seek the assistance of a service club for installation of the planter and plantings on an annual basis. This would not only reduce the funds needed for construction, but also the ongoing replacement of annuals. ,» 1:3777 FRUITVALE AVENUE • SARATOGA. CALIFORNIA 95070 (408) 867 3438 February 24, 1989 To: City Council From: City Manager COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman Subject: Background Note: Policy Issue What should be included in the total master plan for the Civic Center and how should it be funded? Council will have a study session on this item on March 7, 1989. This note will serve as background for both that meeting and your policy development meeting. The project consists of the following elements: 1. Add a new wing to City Hall. This will be located in front of the current City Hall and will form a large courtyard between the buildings. The addition is planned for 4630 square feet and is expected to cost $511,000. 2. Remodel of the existing City Hall. The remodel would house Planning, Engineering and Building functions plus all employee facilities. The area to be remodeled is 7120 square feet and is expected to cost $589,000. 3. Remodel existing landscape and parking. The remodel would totally redo the site; place the main entrance on Allendale, add about 35 new parking spaces and create a creekside park behind the buildings. Cost to redo the site is estimated at $585,000. 4. Remodel of the Community Center. This would be an interior job only making better use of existing space and providing better offices for staff. The area to be remodeled is 2572 square feet and is expected to cost $67,000. 5. Remodel and Expansion of Maintenance Building. This will place all maintenance office personnel in one location and allow us to get rid of the office trailer. The remodel and addition cover an area of 1780 square feet and is expected to cost $119,000. 6. Remodel and Addition to Community Theater. This will replace the existing dressing room trailer with permanent dressing rooms behind the stage area. The cost is estimated at $182,000. We have also been considering expansion of Policy Issue: What should be included in the total master plan for the Civic Center and how should it be funded? February 24, 1988 Page Two seating on the main level and a redo of the lobby area. These costs have not been calculated as yet but they are not part of the $182,000. About 50 more seats could be added to the theatre on the main floor. 7. Add a new Meeting Chambers. This would be located in front of the theatre and include a main floor area of 2400 square feet. Seating would be portable so the area could be used for recreation classes, meetings, receptions, dining, etc. It is planned for use by all City Commissions and the Council, thus freeing up other facilities for further community use. The chambers is planned to be about 5000 square feet in size and is expected to cost $739,000. Adding in architect's fees brings the total cost to $3,000,000. If the theatre addition includes extra seating, etc., the price would be somewhat higher. For budget purposes I have placed the total cost at $3.5 million. It is estimated that construction will take 14 months if the project is built all at once. Establishing need. Based on the studies staff has done over the past two years which Council reviewed in the fall of 1987, there is no doubt that these additions and remodels are necessary for the City to be able to serve the public in as an efficient and effective a manner as possible. The staff is not expected to grow much over the next twenty years but as you know, the City faces continued increased mandates from the state and federal government and expectations from Saratoga's citizens to deliver better service. The current building complex has evolved over the past thirty years and by my count has grown by additions at least six times. Expanding the civic center is not a new deal. And the City is going to be here long after all of us are long gone. So it makes sense to add to the staff quarters and do so from a master planned base. The theatre could continue to limp along but since the temporary dressing rooms have sort of become permanent, it makes sense to integrate them into the rest of the building to better serve our tenants, the theatre groups. Adding seating is a greater risk. Only one of the three groups indicates they could sell the extra seats. To do a major addition does not seem to be cost effective unless the City plans to get into the performing arts business in a big way. And I don't see that happening. The site improvements not only provide much needed parking, but also will add significantly to the beauty of the civic center, integrate the architecture with the landscape and place the Warner Hutton House in truly appropriate surroundings. Policy Issue: What should be included in the total master plan for the Civic Center and how should it be funded? February 24, 1988 Page Three The meeting chambers is the final component. I don't know of another city in California of our size and age which doesn't have its own meeting chambers. The design will place Council and Commissioners in much closer proximity to the public giving a feeling of intimacy rather than distance. The chambers will be equipped for media presentations, no more portable screens and viewgraphs setting on the stage. With a flat floor and removable seating, the chamber can become a major new meeting and activity space for the community, something which is in short supply in Saratoga, and free up space in the Community Center to expand recreation use. The Finance Advisory Committee has reviewed financing and has concluded, on the basis of work done by the members of the Committee and staff, that construction should be done all at once and financing should be through Certificates of Participation. There are cost advantages in terms of increased rental and reduced cost which total some $500,000 over a phased construction option. Further, based on a $3,150,000 financing package over 20 years, the cash flow position of the City is equal after twenty years as opposed to a phased, pay -as- you -go method. A copy of the analysis is included at the end of this note. Harry 1. Peacock, City Manager jm:5 Enclosure 1 -26 -89 CIVIC CENTER EXPANSION CASH FLOW ANALYSIS YEAR INITIAL 1 PHASE NET INT NET INT CASH 1 PH CASH FLOW 1 PH 1 3,268.00 298.72 250.47 2 3,219.75 290.32 247.11 3 3,176.55 272.39 244.98 4 3,149.14 272.19 242.68 5 3,119.63 271.58 240.25 6 3,088.30 275.55 237.27 7 3,050.02 273.75 234.19 8 3,010.47 271.50 231.04 9 2,970.01 273.80 227.44 10 2,923.64 275.28 223.40 11 2,871.76 270.92 219.39 12 2,820.23 276.07 214.61 13 2,758.78 275.12 209.51 14 2,693.17 273.35 204.12 15 2,623.94 271.03 198.48 16 2,551.40 272.89 192.20 17 2,470.71 273.46 185.35 18 2,382.60 272.92 177.96 19 2,287.65 271.27 170.09 20 2,186.47 248.50 163.48 TOTAL 2,623.94 5,480.55 4,314.01 ASSUMED NIC OF 7.4239% RESULTS IN SARATOGA INVESTMENT PORTFOLIO 0 YEAR END YEAR INITIAL 5 PHASE NET INT YEAR END ASSUMED I CASH CASH 5 PH CASH FLOW 5 PH CASH 0.084354 3,219.75 1 3,268.00 647.00 221.09 2,842.09 3,176.55 2 2,842.09 1,087.00 148.05 1,903.14 3,149.14 3 1,903.14 212.00 142.65 1,833.80 3,119.63 4 1,833.80 1,083.00 63.33 814.13 3,088.30 5 814.13 239.00 48.51 623.64 3,050.02 6 623.64 0.00 52.61 676.25 3,010.47 7 676.25 0.00 57.04 733.29 2,970.01 8 733.29 0.00 61.86 795.15 2,923.64 9 795.15 0.00 67.07 862.22 2,871.76 10 862.22 0.00 72.73 934.96 2,820.23 11 934.96 0.00 78.87 1,013.82 2,758.78 12 1,013.82 0.00 85.52 1,099.34 2,693.17 13 1,099.34 0.00 92.73 1,192.08 2,623.94 14 1,192.08 0.00 100.56 1,292.63 2,551.40 15 1,292.63 0.00 109.04 1,401.67 2,470.71 16 1,401.67 0.00 118.24 1,519.91 2,382.60 17 1,519.91 0.00 128.21 1,648.12 2,287.65 18 1,648.12 0.00 139.03 1,787.14 2,186.47 19 1,787.14 - 0.00 150.75 1,937.90 2,101.45 20 1,937.90 0.00 163.47 2,101.37 3,268.00 2,101.37 A BEP OF 8.4354% FOR THE oguy� @g 0gmZ11�a0z 4 * 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 MEMORANDUM TO: City Manager FROM: Chief Building Inspector DATE: 2 -24 -89 SUBJECT: Background Note: Policy Issue - Should the Early Warning Fire Alarm Ordinance be modified to change installation requirements? The Early Warning Fire alarm Ordinance is one of our best tools in protecting life. To change /modify the ordinance would require our closest scrutiny. Should the fire ordinance be changed to include structures which are presently excluded? I am confident that the installation of a early warning fire alarm system in all new structures (commercial and /or residential) would enhance life safety protection. However, a fire suppression system (fire sprinklers) would also create enhanced protection. The optimum would be the installation of both systems. Many jurisdictions have adopted ordinances requiring the installation of fire sprinklers in conjunction with early warning. Existing structures which are expanded by less then fifty percent (50%), and are exempt from the requirement of the ordinance, would share the same benefits as new protected structures if provided with protection. Presently, the triggering mechanism for requiring the early warning fire alarm in a single family dwelling is the square footage of the structure. If a new structure or an existing structure, which is expanded by fifty percent or more, has five thousand (5000) or more square feet in gross floor area, the structure must be provided with early warning. Homes which predate the early warning ordinance may expand by less than fifty percent (50 %) and exceed five thousand square feet in gross floor area. Example: A home, which predates the early warning ordinance, has a total gross floor area of forty eight hundred square feet (4800 sq. ft.). A permit is obtained to expand by forth nine percent (49 %) . Upon completion, the new square footage will be seven thousand one hundred fifty two (7152). Clearly, this does not meet the intent of the ordinance and should be considered when changing the ordinance. I am working closely with both Central and Saratoga Fire Districts to determine if the five thousand square foot figure may require reduction to more closely meet their current fire fighting capabilities. Several concerns come to mind, all except life safety are costs in terms of time and money. If our goal is to provide more comprehensive life and structure safety, it is important that our ordinance be cost effective to the home owner. If installation of an early warning system is too cost prohibitive, the public will possibly take a position against an ordinance modification, regardless of its enhancement of life safety. A comprehensive study into the possibility of increasing the fire /life safety sphere of influence in new and remodeled structures will provide us with the necessary information to answer the question of changing the early warning ordinance. �� o �r -P, Oguw D 13777 FRUITVALE AVENUE_ • SARATOGA. CALIFORNIA 95070 (408) 867 -3438 COUNCIL MEMBERS: February 24, 1989 Karen Anderson Martha Clevenger To: City Manager David Moyles Donald Peterson Francis Stutzman From: Community Services Director Subject: Policy Development Agenda; Sheriff SRO /Project DARE (Reference Item #25) ISSUE "What is the feasibility of providing a School Resource Officer (SRO) and a Project "Drug Abuse Resistance Education" (DARE) Program to our local schools, and sharing the costs with Cupertino ?" BACKGROUND The School Resource Officer (SRO) program and the Drug Abuse Resistance Education Program (Project DARE) are really two distinct programs as they have been proposed in the past, although there may be the option of consolidating the two. The SRO program was first proposed for funding to both the Cities of Cupertino and Saratoga in early 1986. It would have involved an officer being dedicated to the high schools. It involved officers getting to know students in a friendly rather than an adversarial way. It was proposed that the SRO would also follow - up on truancies, and hold regular meetings with parents, etc. The cost to Saratoga was estimated at $61,000 annually. That same year, the program was turned down by the Saratoga Council for three basic reasons: 1. The SRO program would benefit students outside Saratoga who attended local high schools; there was the perception that it was not fair for local taxpayers to shoulder all of the cost for a program with shared benefit. 2. Because the program involved educational elements and addressed truancy, there was the feeling that it should be funded either in whole or in part by the schools. 3. The program was presented by the Sheriff's Department to the City at a time which was off the City's budget cycle; there was the feeling that such a new level of service (and new cost) should be considered only in the context of the City's budget development process where it would fairly compete with other budgetary needs identified. Policy Issue: "What is the feasibility of providing a School Resource Officer (SRO) and a Project "Drug Abuse Resistance Education" (DARE) Program to our local schools, and sharing the costs with Cupertino ?" February 24, 1989 Page Two The City of Cupertino also rejected the proposal although it is not clear whether it was ever presented to their City Council. The Project DARE service was first offered by the Sheriff's Department to school agencies in 1987, at no charge. The program involves only sixth grade students, and consists of one hour of classroom instruction to students per week, over a 17 week period. One officer from the Westside Station provides this training by invitation on a first -come, first -serve basis to any elementary school within the West Valley contract cities and incorporated portions of the County. According to the Commander of the Westside Station, the Sheriff's Office was invited to give a presentation to a group of Saratoga educators in 1987 soon after the service was offered. However, there was no interest expressed in taking advantage of the service, largely because the group had decided to pursue the "Here's Looking at Year 2000" program. This latter program involved extended training to teachers to provide their own substance abuse training and more effectively handle such problems in their classrooms. DISCUSSION The City of Cupertino is not currently considering any SRO program, although the Cupertino School District is. It is not known how the District plans on funding the position. The position would involve an officer who would serve as both a high school resource officer and a Project DARE trainer. To the knowledge of the Westside Station Commander, there is no plan to propose sharing the cost with Saratoga; the position is intended to be dedicated to Cupertino. If the Council is interested in pursuing a SRO and /or providing Project DARE locally, there are a number of options which can be considered. OPTION 1. Encourage local elementary schools to request Project DARE training from the Sheriff's Office. The service is still available from the Sheriff's Office, although there is now a waiting list. The chief advantage to this option is its cost to the City; $0. The disadvantage is that there are seven public and two private elementary schools in Saratoga. Therefore, the service would not be available on a consistent basis due to demand for it elsewhere in the West Valley region. Policy Issue: "What is the feasibility of providing a School Resource Officer (SRO) and a Project "Drug Abuse Resistance Education" (DARE) Program to our local schools, and sharing the costs with Cupertino ?" February 24, 1989 Page Three OPTION 2. Fund the training of an existing Saratoga Officer in Project DARE instruction, and utilize that officer to provide the service on a part -time basis. This would supplement the existing service provided by the Sheriff's Office, and make it more available to Saratoga. The chief advantage is that this approach would involve an initial one -time expenditure for training, and then utilize existing police resources to provide the service. There are two main disadvantages to this approach. First, the service level still would not be sufficient to provide the program to all the schools, all the time. Second, the officer would be providing the service rather than patrolling, meaning that there would be a reduction in one level of service in order to increase another. OPTION 3. Add an additional full -time officer to provide Project DARE training to the local schools. The chief advantage to this approach is that it would effectively provide the desired delivery of service to the local schools on a consistent basis. The chief disadvantage is the cost; roughly $65,00 per year. OPTION 4. Reconsider the Sheriff's SRO proposal, at an estimated cost of $65,000. This would provide the SRO service to local high schools, but would not address the Project DARE program at the local level. OPTION 5. Provide two dedicated officers; one for Project DARE and the other as a high school SRO, at an estimated cost of $130,000 annually. This would provide the highest level of service at the highest cost of all options identified. OPTION 6. Provide an SRO who also provides Pra }ect DARE training, at an estimated annual cost of $65,000. This is the modified SRO, or compromise option. It attempts to address needs in two related areas with one position. This is similar to the approach currently being pursued by the Cupertino Unified School District. In examining options #2 through #6 above, the Council should also consider what role the school agencies should play in providing the funding. As I pointed out in my staff report in 1986, the argument can be made that public safety and law enforcement are municipal responsibilities. Still, the argument can also be made that the schools could participate to the extent the program is designed to have some education elements. Still another important policy consideration is to what degree does the City wish to use its allocation for police services on crime prevention as opposed to conventional enforcement? This is really the core of the policy issue being considered. Policy Issue: February 24, Page Four "What is the feasibility of providing a School Resource Officer (SRO) and a Project "Drug Abuse Resistance Education" (DARE) Program to our local schools, and sharing the costs with Cupertino ?" 1989 Crime statistics suggest that juvenile crime. The City's "deterrence" than "prevention" is will prevention programs be expense of deterrence, dollar the answer is probably no; over PREPARED BY: Todd W. Arg jm:25 Saratoga does have a problem with approach has been more one of in the past. The key issue here as effective if financed at the for dollar? Over the short term the long term it is maybe. c7 4 • O 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 867 -3438 February 24, 1989 To: City Council From: City Manager COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman Subject: Background Note: Policy Issue: Several proposals for increased staffing have been received by the City. Which proposals should the Council approve? In the numerous documents received for agenda building, several contained proposals for increased staffing. These proposals are to. 1. increase the number of crossing guards provided by the City; 2. hire a third Community Service Officer; 3. hire a part -time emergency services coordinator; 4. hire a full -time Public Information Officer; 5. increase the Japanese Garden Caretaker position to full -time from 3/4 time; and 6. increase the Recreation Coordinator position to full -time from four days a week. Crossing Guards. The City continues to receive requests for more guards from the school districts as enrollments change and transportation support is cut. The school district in the latter case is transferring the cost burden at least partially to the City. I feel it is time for the City to: 1) make a comprehensive review of the locations where guards are needed by the Public Safety Commission and a recommended comprehensive policy on where guards will be used, if they can be recruited; and 2) require school district recruitment and cost sharing. Recruitment to be required for all guard vacancies and cost sharing for guard locations not included in the City policy. Coordination with other cities may also be desired where streets are located in more than one city. Community Service Officer. This has been discussed in the past year and is recommended by the Public Safety Commission. The job would be assigned responsibility as follows: Code and Law Enforcement - 1/2 time Neighborhood Watch Program - 1/4 time Emergency Preparedness - 1/4 time Policy Issue: Several proposals for increased staffing have been received by the City. Which proposals should the Council approve? February 24, 1989 Page Two Both of the current CSO's are dedicated, efficient, responsive, and overworked. Even with the clerical support added over the past two years, the workload has out -paced the personnel especially since we have brought parking ticket and false alarm administration in- house. The added revenue from tickets, alarm fines and new business licenses has more than paid for the increased staffing as the monthly CSO reports show. In my view the CSO program is essentially self- sustaining from a revenue producing and cost avoidance perspective. So this should be more a service consideration than a budget consideration. I agree a third CSO should be recruited. But the job assignments proposed are not entirely satisfactory to me. Neighborhood Watch is now supported by the Sheriff's Office at no cost to Saratoga (that's right - -some things in life are still free). If we start using the CSO's, the Sheriff's efforts may disappear. From the staff perspective we don't think we could do a better job than the Sheriff is doing. Staff also feels that the Emergency Services function probably requires a sixteen hour a week effort rather than ten hours a week. The remaining three days would allow us to have Sunday coverage for one shift a week and two shift coverage the other six days. Currently we have no Sunday coverage and single shift coverage on Saturday and Monday. For the two days a week the CSO is not on shift, he or she would work on emergency preparedness and not be in uniform. Also, this way, no third CSO car would be necessary, a cost savings of about $8,000 a year. Emergency Services Coordinator. I believe this recommendation was meant as a backup proposal should the City Council not agree to the hiring of a third CSO. If the City is going to take emergency preparedness seriously, it needs someone working about two days a week to organize and train the staff and work with the community on household emergency preparedness, plus coordinate emergency planning with other agencies. No one currently has the time available to do that job and volunteers cannot provide either the commitment in time or continuity such an effort requires. If a third CSO is not hired and emergency preparedness is to receive priority status, someone needs to be hired on a part -time basis. Public Information Officer. Valerie Young, Associate Planner, has made this recommendation and suggested that she be given the job on a phased -in basis over six months. The proposal is for this person to handle all public information activity for the City. This would include the two newsletters (currently done by the Administrative Assistant), Cable TV (currently done by the Community Services Director), recreation catalog (currently done by the Recreation Director), publicity and arrangements for meetings (currently done by the Deputy City Clerk), arranging ceremonial and special events (currently done by the February 24, Page Three Several proposals for increased staffing have been received by the City. Which proposals should the Council approve? 1989 Administrative Assistant and Deputy City Clerk), handle news release and other general publicity (currently handled by the City Manager) and a number of other associated duties handled by a variety of current staff. A copy of Ms. Young's proposal dated February 2, 1989, was included in your bound material for the Agenda Building Conference. There are both advantages and disadvantages to Ms. Young's proposal. Creating a focal point for public information activities would, I think, further our philosophy of customer service, citizen awareness and participation, and serve to enhance the overall image of Saratoga. It also has the potential of taking some of the workload off of both the Administrative Assistant and the Community Services Director and make them available for other assignments, both general and specific in nature. Further, the problem of the drought, the construction of projects in the Village and along Saratoga /Sunnyvale Road, and the design and construction of the freeway mean, as far as I and the City Engineer are concerned, that a lot of staff time will be taken up performing a public information function over the next four years. Time which will take us away from other duties since they are not continually recurring activities for which staffing has been provided. It is easy to see how this could be a full -time job for someone on staff if it is to be done well. However, in order to be able to deal with at least some of this activity, there are options. If we had the space, we could add a full -time secretary to be shared by the Community Services Director and the Finance Director for instance. This would free up a lot of the City Manager's Secretary's time to handle routine personnel administration allowing the Administrative Assistant a lot more time to take on additional public information responsibilities. This secretary could also relieve the Deputy City Clerk of some of her records management chores and give her more time to work on ceremonial -type duties. The secretary could also be assigned duties to centralize our customer service referral system thereby improving our customer service response efforts. Ms. Young's reassignment would require, I think, a replacement in Planning, where she is a most effective and valued employee. I sense a desire on her part to branch out into more general administrative work either here or elsewhere. Her leaving would be a real loss to our organization in my view. However, over the long term, I do not see the essential need for a full -time public information officer in a City the size of Saratoga. Conversely, the solid waste problem and state mandates for our dealing with said problem in terms of recycling, household hazardous waste disposal and other considerations which Policy Issue: Several proposals for increased staffing have been received by the City. Which proposals should the Council approve? February 24, 1989 Page Four are on the horizon portend a major new responsibility on the City. Currently, this area is handled by the Community Services Director and I do not see how he will be able to handle an expanded role here without having to give up some of his other responsibilities. In short, we may be facing the need to add to our administrative staff. Previously, our focus has been to add only operational people or people to support operating forces. That focus may have to be reconsidered. I have been long- winded on this proposal I know. But it has stimulated my thinking on the challenges the City is likely to face in the next four years. Unfortunately, time has not allowed me to consult with everyone who could be affected by this change. So I do not have a solid recommendation. Council should review the points I have considered so far and decide whether I should spend more time on this particular staffing issue. Japanese Garden Caretaker. The Maintenance Director and our Japanese Garden Specialist have both indicated that the increased popularity of the Garden in terms of both visitors and scheduled events makes it necessary to place the Caretaker on full -time status. The Caretaker was moved from 1/2 time status to 3/4 time status on July 1, 1987. Prior to that time the position had been set at 1/2 time since July 18, 1983. This change would increase personnel costs at Hakone by about $5,000 a year. As you know, revenue from Hakone covers only a small portion of the costs to maintain (about 22 %). However, revenue for 1988 was up by $6,500 over 1987 and 1986 (a strong indication that activity has increased) from $22,500 to almost $29,000. On that basis it seems justified to increase this position to full -time. Recreation Coordinator. This job was created last year at the 80% level to run our sports leagues and to staff the proposed Youth Commission. Our programs continue to grow and the Recreation Director has recommended increasing this job to full - time to keep up with the demand for new and expanded programs. As you know, the Recreation Department continues to pay for all of its direct costs through fees charged. Only the volunteer coordinator and Youth Commission are cost centers where operating revenue is not realized. Recreation revenue continues to increase at a projected rate of 10% a year. Our limits to expand are constrained more by lack of facilities and staffing levels rather than on demand for recreation services. Warner Hutton will help add facilities in late 1989 and if the Civic Center is expanded, still more facilities will be available by mid -1991. As long as revenues continue to cover costs, I see no reason to "rein-in" the Director or the Department by holding down the size of the operating staff. Policy Issue: Several proposals for increased staffing have been received by the City. Which proposals should the Council approve? February 24, 1989 Page Five In summary I recommend: 1. Crossing Guards - Do not add until there is a total review of the subject. 2 CSO - Do hire; 60% Code and law enforcement, 40% Emergency Prep. 3. Emergency Preparedness Coordinator - Hire only if CSO is not hired. 4. Public Information Officer - We probably need to do something but I'm not sure what. 5. Japanese Garden Caretaker - Increase from 75% to full -time. 6. Recreation Coordinator - Increase from 80% to full -time. �/� �? Qf4-t� arry 0. Peacock, City Manager jm:7 WA a7. � 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 � o o , (408) 867-3438 Febrry 24 , 1989 COUNCIL MEMBERS: To: City Council From: City Manager Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman Subject: Background Note: Policy Issue: What items should be included on the City Attorney's legislative calendar for the next two years? ----------------------------------------------------------------- 1. Develop a cost recovery ordinance for DUI arrests as some other cities are doing? 2. Develop a cost recovery ordinance for repeat calls for parties as Los Altos has done recently? 3. Should the Building Code be amended to improve requirements for fire retardant roofing? 4. Should there be an ordinance which limits parking of and storage of boats, R.V.'s, campers, and trailers in areas visible from the street as some other cities do? 5. Should there be an ordinance which limits the use of front yard areas for auto repair? 6. Should the City create a new sign ordinance and an associated enforcement program? 7. Should the City continue to research programs for historical preservation incentives? 8. Should the City limit front yard parking to designated areas? 9. Should the City have a lighting standards ordinance? 10. Should the City reconsider its front yard height limit on fences in hillside areas? 11. Should the City add new standards for expeditious completion of approved projects? 12. Should the City adopt a water conservation ordinance? 13. To what extent can and should the City control the sale and possession of certain firearms? Harry Y. Peacock, City Manager jm:4 g SA�q� T LjF . R QA 1�-e, COMUW (02 0&m° UQ)oz 1:3777 FRUITVALE AVENUE • SARA'I'OGA, CALIFORNIA 95070 (408)867-:3438 February 24, 1989 To: City Council From: City Manager COUNCIL MEMBERS: Karen Anderson Martha Clevenger David Moyles Donald Peterson Francis Stutzman Subject: Background Note: Policy Issue: Should the following Capital Projects be considered in the next five year plan? ------------------------------------------------------------- - - - - -- Proposed Projects: 1. More Jogging and bike paths. Revision of the Circulation Element this year should determine what new paths or old paths never implemented should be pursued. An implementation plan similar to that done for the Village should indicate priorities for development over the next five years. Funds should be set aside annually in anticipation of the implementation plan and then modified as plans, costs and revenues are developed. 2. Improved library landscaping. $30,000 is currently planned to redo the library landscaping in fiscal 1991 -92. That is still more than two years away. Should this be moved up a year? 3. Improve facilities on Fruitvale without widening. This would include pathways, medians and parkways. The Fruitvale median was programmed for 1989 -90 but the Saratoga /Sunnyvale Road medians won't be done until mid -1990 now pushing this project back to a mid -1991 completion date. Critical here is the opening of the freeway in mid -1993. All improvements should be in place by that time. This should be studied and a timetable set to complete by the end of 1992. 4. Begin work on the Kevin Moran Master Plan. $450,000 is programmed for Kevin Moran in 1991 -92. Planning should begin now so we know what kind of park will be developed and what actual costs will be. 5. Begin work on a Plan for Beauchamp park site. This park is not currently in the five year plan. Construction should, therefore, not occur until 1992 -93 at the earliest. Planning should probably wait for a year or two until the entire neighborhood is built out and plans for Kevin Moran are solid. Phase in plan for 1992 -93 at $150,000 for planning purposes. Speed up if another state bond issue is passed. Policy Issue: Should the following Capital Projects be considered in the next five year plan? February 24, 1989 Page Two 6. Provide funds to match Nagai gift for H e. If desired, $250,000 should be placed in 1989 -90 capital budget. 7. Improve Hakone by expanding access road, improve meeting facilities, add & gift shop in part of current garage. Meeting facilities will come with cultural center - upgrade of current buildings is not planned. Access road improvement to scale desired could be very costly (over $100,000); garage gift shop would require upgrading to meet codes. All these depend on decision as to role of City in financing and constructing Hakone improvements. 8. Start to plan future library expansion. This should only be pursued if County is willing and able to help fund (Monte Sereno should be involved too) and feels added space is needed. Planning horizon is probably beyond five years. Library bond debt service continues through 2002. 9. Fill in walkway gaps on arterial streets. $170,000 planned for these items over-the next three years. Implementation plan should be developed this year and construction completed by the end of 1992 to account for freeway opening. 10. Complete computer upgrade. Most of this would not be capital costs since it would involve replacement of five year old PC's. New capital cost for more computers will probably not be more than $20,000. Include in 1989 -90 budget. 11. Improve Wildwood Park. Planned for 1989 -90. Grant application already filed. New facilities such as amphitheatre would be beyond scope of this project. 12. Replace park play structures. Planned for 1989 -90. Grant application already filed. 13. Upgrade irrigation systems for existing medians on Prospect. Saratoga and Fruitvale Avenues. Should upgrading take place ahead of completion of median master plan? - Probably not. This would push this item out of the five year time horizon because Prospect medians won't be started until 1993 -94 after freeway is done 14. Underground utilities on St. Charles Street. Already planned for next undergrounding project which should start in 1990 -91 if advanced funding can be secured. 15. Expand Civic Center. This is subject to a separate policy report. Policy Issue: Should the following Capital Projects be considered in the next five year plan? February 24, 1989 Page Three 16. Develop SW NE Road. By 1996 we expect to have about $1.4 of the $2.1 million price tag collected from the Hillside development fees. This is outside the five year time horizon but should be something the City keeps in mind for planning purposes. Based on our current planning, here is how the current capital projects are distributed: FY 1989 -90 FY 1990 -91 Quito Road Bridges $595,705 Quito Road Bridges $599,600 Pavement Management 426,322 Pavement Management 426,322 Median S/S North 792,000 Traffic Controllers 24,000 Median S/S South 300,000 Fruitvale Median 450,000 Sarahills Drive 169,100 Civic Center 1,750,000 Kirkmont Signal 110,000 Pedestrian Fac. 60.000 Seagull Signal 110,000 Total $3,309,922 Wildwood Park 30,000 City Hall 1,750,000 Big Basin Imp. 200,000 4th Street Sidewalks 15,000 Play Equipment 61,000 Traffic Controllers 24.000 Total $4,583,127 FY 1991 -92 FY 1992 -93 Pavement Mgmt. $426,322 Pavement Management $426,322 Traffic Controllers 24,000 Kevin Moran Park 450,000 Pierce Road Bridge 250,000 Total $876,322 Pedestrian Facilities 110,000 Library Landscape 30,000 Village Plaza 8,000 Total $848,322 FY 1993 -94 Pavement Mgmt. $426,322 Prospect Median -Phase I 400,000 Total $826,322 Harry . Peacock, City Manager jm:6 �s CAL_, r CITY of S ATOGA REPORT TO MAYOR AND CITY COUNCIL FROM: Dan Trinidad SUBJECT: Landscaoe Maintenance Services FINDINGS AND CONCLUSIONS DATE: February 23, 1989 With the added landscaped areas, the increased use in the Parks and the desire for an improved level of care, the need for added landscape maintenance he1D is evident. Staff has determined that one of the most cost effective ways to add to our maintenance capabilities and to improve quality of the City's landscaped areas is to contract out for the maintenance of the landscaping of..the Civic Center Complex. We have received an estimate of $1000 per month for full landscape service of the Civic Center. By modification in job assignments of existing personnel, all of the City's landscaping will be improved. RECOMENDED ACTION Include $12,000 in the Fiscal Year Budget and direct staff not to Droceed with competitive bidding or agreements until the current drought situation is resolved. BACKGROUND The Maintenance Department is responsible for the landscape care of all City parks, the Civic Center complex, the Library, the landscaped medians, the existing Parking Districts, and the Historical Park complex on Saratoga -Los Gatos Road. We currently have six full -time Parks Maintenance Workers responsible for this care. This does not include the special situation and Deovle we have at Hakone Gardens. The responsibilities of the parks maintenance workers include tree, shrubbery, ground cover, grass, and facility and general debris clean up and care. They do all necessary pruning, mowing, fertilizing, irrigating and repairing playground facilities. They also maintain the irrigation system including the control clocks, piping, and heads. 1 Our Darks maintenance workers are, for the most part, highly trained in the varied skills of landscape maintenance. They are diverse in their background and knowledge. Diversity is important since landscape maintenance requirements of the City differs greatly from those of a private owner. The City's landscapings are used not only provide aesthetic scenery but are also highly utilized as public recreation facilities. Large groups of people use the Darks for both unorganized and organized sports and games. This highly intensive use compacts the soil and severely damages the grass. The environment of the medians is such that maintaining planting is extremely difficult. Irrigation is difficult since runoff Dresents a hazard to traffic and speeds the deterioration of the pavement. The closeness of traffic makes all activity on the medians very dangerous. Vandals are extremely destructive to trees and sprinkler system at all public facilities. During the past several years use of the Darks has increased dramatically. Numerous facilities have been added to our Darks. New restrooms, tennis courts, and ballfields have given them the drawing power we have long sought. Expanded recreation activities at Congress Springs, E1 Quito, and Kevin Moran Parks are now being provided by the City. Along with the increased usage have come greater demands for a higher level of care. The desire to have all landscaping be in first class condition at all times is a goal that has not been fully met. With the recent addition of the new landscaped median on Saratoga - Sunnyvale Road, the northern extension of the median on Saratoga Avenue, the median on Fruitvale Avenue, and the landscaping within Parking District #2, a total of 0.97 acres have been added to the area we maintain. It is unreasonable to believe we can take on these additional areas and improve the level of care without increasing our maintenance capabilities. In analyzing the facilities we maintain, the activities taking place, and the desire for improved level of care, -we have determined, that at the minimum, an additional approximate one half Derson, or equivalent, is needed at this time (not considering the current drought situation). This does not take into consideration the two DroDosed new medians on Saratoga - Sunnyvale Road, any future landscaping around the Warner Hutton House, or other future improvements at any other location. The City currently maintains 34.2 acres of Darks, 8.9 acres of open space including 1.78 acres at the Civic Center, and 7.8 acres of landscaped medians and parkways. It takes approximately 541 hours Der year to maintain one acre of medians, 187 hours for an acre of Dark, and 307 hours to maintain an acre of open space. Pa ANALYSIS In order to react to this present need we have investivated several methods of dealing with our department's shortcomings. The options we see are: 1. Maintain status quo. 2 Add a half -time person to the parks maintenance staff. 3. Supplement or replace the current staff with contracted private landscape maintenance service. Maintain Status ouo - As stated earlier, with the increases both in physical improvements and in use of the facilities the quality of care will continue to decline. In the current state, we are not meeting the desired level of care. With the additions described I do not believe this to be a viable option. Add to Parks Maintenance Staff - The beginning salary of a Parks Maintenance Worker I is approximately $1,750 per month. Fringe Benefits and other indirect costs about double that amount. Therefore, if we added a half -time position, the annual cost to the City will be approximately $21,000 and will _provide approximately 900 productive hours. date serg - Because of the diversity required by our responsibilities, it would be difficult to replace our in -house staff with private contracts. The current full -time workers are employees who know the responsibilities of their job. However, improvements can be made in their job assignments which would give the City more flexibility and better coverage of the parks, medians and other landscaped areas. In reviewing the various areas which require landscape care, several methods of utilizing private contractors were considered. We looked at the several large parks, (Congress Springs, Kevin Moran, and E1 Quito), the Saratoga Avenue median, and the Civic Center complex. We evaluated contracting for full service of those areas as well as lawn mowing service only. In order to facilitate cost comparisons we asked Industrial Landscape Services of San Jose to submit proposals for the various areas. We chose them because of outstanding reputation in the field of professional landscape maintenance. The following is a tabulation of their proposals for monthly charges: MOW ONLYm FDLL IEW"B Congress Springs Park $ 710 $1351 E1 Quito Park $ 365 $ 590 Kevin Moran Park $ 345 $ 575 Saratoga Ave. Median Island $1273 $1636 Civic Center Complex $1000 3 Considering the "Mow Only" option for the three large parks would cost $1420 monthly. Saratoga Avenue median mowing would be $1273. Because of possible conflicts in responsibilities between City crews and the contractor, we feel that full service at an isolated location is preferred. We therefore believe contracting for "Full Service" landscape care of the Civic Center Complex is the best choice. Since the Civic Center is about 1.78 acres, this will free up approximately 546 manhours to reassign to other locations, which is the apuroximate need for the 0.97 acres of new landscaping. While this is not quite the equivalent of a half -time person, it should provide the needed time to maintain the above described new landscaping at a cost of only $12,00 per year. When the proposed medians are completed on Saratoga - Sunnyvale Road we will be able to make a similar analysis to this with some history of contracting our landscape maintenance. 4