HomeMy WebLinkAbout1 - Street Projects Section
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
347
STREET IMPROVEMENT PROJECTS
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
348
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
349
STREETS PROGRAM
PROGRAM DIRECTORY
STREET PROGRAM SUMMARY PAGE
Program Summary 351
Project List Summary 352
Project Funding Summary 353
Operating Budget Impact 354
STREET REPAIR AND RESURFACING PROJECTS
9111-003 Annual Roadway Improvements 356
ROADWAY SAFETY PROJECTS
9121-001 Roadway Safety & Traffic Calming 360
9121-003 ADA Signal Lights & Curb Cut-outs 362
9122-005 Highway 9 Safety Improvements – Phase IV 364
9122-006 Prospect Road Improvements 366
9122-007 Citywide Signal Upgrades Project - Phase II 368
9122-008 Big Basin Way Turnaround – Design 370
STREET LANDSCAPE & BEAUTIFICATION IMPROVEMENTS
9138-001 Village LED Streetlights 374
SIDEWALK, CURBS & STORM DRAIN PROJECTS
9141-005 Annual Infrastructure Maintenance and Repairs 378
9142-004 Village Pedestrian Enhancements – Phase I Design 380
9142-005 Saratoga Avenue Sidewalk 382
9142-011 Village Pedestrian Improvements - Phase II (Blaney Plaza) 384
9142-013 Quito Road Paseo Olivos Curb & Gutter 386
9142-014 Big Basin Way Sidewalk Repairs 388
9142-015 El Camino Grande Storm Drain Repair 390
9142-017 Long Term Trash Plan Storm Drain Capture Devices 392
9142-018 Wildcat Creek Outfall Repair 394
9142-019 Village Crosswalk and Sidewalk Rehabilitation 396
9142-020 Quito Road Sidewalk Improvements – Design 398
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
350
BRIDGE AND RETAINING WALLS
9152-001 Fourth Street Bridge Widening 402
9152-002 Quito Road Bridges Replacement – Preliminary Engineering 404
9152-004 Quito Road Bridges Replacement – ROW Acquisition 408
9153-003 Annual Retaining Wall Maintenance and Repairs 410
9153-004 Bainter Avenue Retaining Wall 412
STREET UNDERGROUNDING PROJECTS
9171-001 Rule 20A Electric Undergrounding Conversion Projects 416
9171-002 Quito Road Electric Undergrounding Project 418
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
351
STREET IMPROVEMENTS
PROGRAM SUMMARY
The Capital Improvement Plan’s Streets Program provides for a safe and functional roadway and pedestrian street system. Proj ects within
the Street Program are classified by their primary scope of work into six project categories:
Street Resurfacing, Repair & Maintenance Projects
Roadway Safety Improvements
Street Landscape & Beautification Improvements
Sidewalks, Curbs & Storm Drain Improvements
Bridge & Hillside Support Projects
Utility Undergrounding Projects
Street Resurfacing, Repair & Maintenance Projects – consist of projects that primarily repave and improve roadway surfaces. Projects
include resurfacing for neighborhood, collector, and arterial streets on a priority basis. Funding is added to the ongoing street resurfacing
project each year as available. Individual Street Repair & Resurfacing projects may be established when grants are provided for
specifically identified sections of roadway.
Roadway Safety Improvements – consists of projects that improve roadway safety factors. Roadway safety improvement projects include
small site-specific improvement items that include signs, striping, and curbs as directed by the Traffic Safety Co mmission; ADA projects
for accessibility enhancements, such as curb ramps and audible signals; refuge lanes for traffic merging; railroad crossing i mprovements;
radar feedback signs; and larger safety projects, such as the bicycle and pedestrian safety improvements made to Highway 9.
Street Landscape & Beautification Improvements – consist of projects that improve the visual component of streets. This includes median
landscape improvements, city entrance signs, tree lighting, sidewalk furniture, and accessories such as trash receptacles and news rack
stands.
Sidewalk, Curbs, Gutters & Storm Drains – consist of sidewalk improvement and repair projects; curb, gutter, and storm drain
improvements; and pedestrian safety improvement projects. These projects are both general and specific, depending on funding sources.
Bridge & Hillside Support Projects – consist of projects that repair, replace, or rehabilitate deficient bridge structures or provide support
for hillside roadways. Bridge structures fall under the guidance of federal and state regulations, and are often funded by these regulatory
agencies, such as Caltrans or the Federal Highway Bridge Replacement and Rehabilitation Program (HBBR). Hillside Support pro jects are
generally funded through transfers from the General Fund.
Utility Undergrounding Projects – consist of projects that move aboveground utilities underground, such as electric, cable, and telephone
lines. Funding for these projects varies, but a significant funding source is Pacific Gas, & Electric’s Rule 20A Program.
The following pages include a list of the Street Program’s capital projects, summary funding by account classification, and i ndividual
project pages for each of the funded projects in this capital program.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
352
PROJECT LIST SUMMARY
New projects for FY 2018/19 include:
Closed or unfunded projects in FY 2017/18 include:
CDBG – ADA Signal Lights
Highway 9 Safety Improvements – Phase IV
Village LED Streetlights
Village Sidewalk & Pedestrian Enhancements
Village Sidewalk & Pedestrian Improvements
Quito Road/Paseo Olivos Curb & Guttter
Wildcat Creek Outfall Repair
Bainter Avenue Retaining Wall
PY FY Total
Expended 2017/18 Expended Project
STREETS PROJECT EXPENDITURE SUMMARY To Date Estimated To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expenditures
Street Repair & Resurfacing Projects
9111-003 Annual Roadway Improvements 1,366,319 1,709,353 3,075,672 2,755,709 - - - - 5,831,381
Roadway Safety Improvements
9121-001 Roadway Safety & Traffic Calming 526,691 - 526,691 165,514 50,000 50,000 50,000 50,000 892,205
9121-003 CDBG - ADA Signal Lights 188,286 - 188,286 closed - - - - 188,286
9122-005 Highway 9 Safety Improvements - Phase IV 875,325 228,436 1,103,760 closed - - - - 1,103,760
9122-006 Prospect Road Improvements 327,118 1,487,497 1,814,614 4,247,715 - - - - 6,062,329
9122-007 Citywide Signal Upgrade Project Phase II 1,207 - 1,207 498,793 - - - - 500,000
9122-008 Big Basin Way Turn Around - Design - 50,000 50,000 - - - - - 50,000
Street Landscape & Beautification Projects
9138-001 Village LED Streetlights 440,247 - 440,247 closed - - - - 440,247
Sidewalks, Curbs & Gutters
9141-005 Infrastructure Maintenance and Repairs 165,850 205,165 371,015 317,502 200,000 200,000 200,000 200,000 1,488,517
9142-004 Village S/W & Pedestrian Enhancements 1,153,793 - 1,153,793 closed - - - - 1,153,793
9142-005 Saratoga Avenue Sidewalk 210,281 1,980 212,261 71,281 - - - - 283,542
9142-011 Village S/W & Pedestrian Improvements 1,045,349 75,866 1,121,215 closed - - - - 1,121,215
9142-013 Quito Road /Paseo Olivos Curb & Gutter - 40,000 40,000 closed - - - - 40,000
9142-014 Big Basin Way Sidewalk Repairs - - - 183,990 - - - - 183,990
9142-015 El Camino Grande Storm Drain Pump 7,493 38,869 46,362 353,639 - - - - 400,000
9142-017 Long Term Trash Plan Capture Devices - 13,000 13,000 17,000 - - - - 30,000
9142-018 Wildcat Creek Outfall Repair - 40,000 40,000 closed - - - - 40,000
9142-019 Saratoga Village C/W & S/W Rehabilitation - - - 382,000 - - - - 382,000
9142-020 Quito Road Sidewalk Improvements - Design - 7,370 7,370 42,630 - - - - 50,000
Bridges & Retaining Walls
9152-001 4th Street Bridge Widening 1,078 - 1,078 585,922 - - - - 587,000
9152-002 Quito Road Bridges 994,684 - 994,684 242,425 - - - - 1,237,109
9152-004 Quito Road Bridges - ROW 31,567 26,476 58,043 341,957 - - - - 400,000
9153-003 Annual Retaining Wall Maint & Repairs 31,045 336,830 367,875 222,125 200,000 200,000 200,000 200,000 1,390,000
9153-004 Bainter Avenue Retaining Wall 20,083 189,917 210,000 closed - - - - 210,000
Utility Undergrounding Project
9171-001 Rule 20A Fund Project - - - - - - - - -
9171-002 Quito Road Undergrounding Project - - - 98,744 - - - - 98,744
Total Project Expenditures 19,623,140 4,450,759 24,073,899 10,526,946 450,000 450,000 450,000 450,000 36,400,845
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
353
STREET IMPROVEMENT PROGRAM FUNDING SUMMARY
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREETS FUND
State Roadway Allocations 580,665 - 580,665 - - - - - 580,665
Road/Refuse Impact Fees 2,686,557 351,300 3,037,856 351,300 - - - - 3,389,156
CIP Project Reimbursements 311,576 241,021 552,597 77,510 - - - - 630,108
Contributions/Assessments 836,590 - 836,590 - - - - - 836,590
Transfer In - General Fund 4,666,478 1,634,000 6,300,478 450,000 250,000 250,000 250,000 250,000 7,750,478
Transfer In - Other CIP 1,353,283 - 1,353,283 - - - - - 1,353,283
Transfer In - Gas Tax 90,000 - 90,000 - - - - - 90,000
GRANT FUND
Federal Grants 2,902,054 241,039 3,143,093 5,495,657 - - - - 8,638,750
State Grants 727,360 23,000 750,360 - - - - - 750,360
Local Grants - - - 400,000 - - - - 400,000
Transfer In - Other CIP 466,818 - 466,818 - - - - - 466,818
GAS TAX FUND
Gas Tax Revenue 7,125,813 638,551 7,764,364 749,393 - - - - 8,513,757
Loan Repayment - 34,752 34,752 34,752 - - - - 69,504
RMRA - 174,341 174,341 507,630 - - - - 681,971
Transfer In - Other CIP 967,404 482,000 1,449,404 - - - - - 1,449,404
TOTAL REVENUES 22,714,597 3,820,004 26,534,601 8,066,242 250,000 250,000 250,000 250,000 35,600,845
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREETS FUND
Salary & Benefits 661,987 - 661,987 - - - - - 661,987
Site Acquisition & Prep 21,184 2,760 23,944 791 - - - - 24,734
Materials & Supplies 403,916 60,023 463,939 250,000 - - - - 713,939
Fees & Expenses 33,387 1,607 34,995 - - - - - 34,995
Consultant/Contract Svs 558,587 137,725 696,312 20,158 - - - - 716,470
Project Equip & Fixtures 17,088 11,384 28,472 - - - - - 28,472
Construction Expenses 5,263,509 1,870,076 7,133,585 2,154,337 250,000 250,000 250,000 250,000 10,287,922
Reimbursable Expenses 2,228 - 2,228 - - - - - 2,228
Transfers Out 1,394,955 764,580 2,159,534 - - - - - 2,159,534
GRANT FUND
Site Acquisition & Prep 118,619 21,305 139,925 3,850 - - - - 143,774
Materials & Supplies 150,936 - 150,936 - - - - - 150,936
Fees & Expenses 9,807 - 9,807 - - - - - 9,807
Consultant/Contract Svs 237,541 4,114 241,655 99,248 - - - - 340,903
Construction Expenses 3,022,149 217,600 3,239,749 5,862,834 - - - - 9,102,583
Reimbursable Expenses 41,107 - 41,107 - - - - - 41,107
Transfers Out 466,818 - 466,818 - - - - - 466,818
GAS TAX FUND
Site Acquisition & Prep 11,435 - 11,435 - - - - - 11,435
Materials & Supplies 151,992 30,812 182,804 - - - - - 182,804
Fees & Expenses 28,494 (1,793) 26,701 - - - - - 26,701
Consultant/Contract Svs 407,068 70,649 477,718 - - - - - 477,718
Project Equip & Fixtures 35,013 - 35,013 - - - - - 35,013
Construction Expenses 5,270,471 777,916 6,048,387 2,135,728 - - - - 8,184,115
Transfers Out 1,314,850 482,000 1,796,850 - - - - - 1,796,850
TOTAL EXPENDITURES 19,623,140 4,450,759 24,073,899 10,526,946 250,000 250,000 250,000 250,000 35,600,844
FY Total
2017/18 Estimated Project
TOTAL ALL FUND SUMMARY Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
BEGINNING BALANCE 3,091,457 2,460,703 - - - -
Revenues & Transfers In 22,714,597 3,820,004 26,534,601 8,066,242 250,000 250,000 250,000 250,000 35,600,845
Expenditures & Transfers Out19,623,140 4,450,759 24,073,899 10,526,946 250,000 250,000 250,000 250,000 35,600,845
ENDING BALANCE 3,091,457 2,460,703 2,460,703 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
354
OPERATING BUDGET IMPACTS
Note - Operating Budget impacts identify staff time cost for project management, inclusive of oversight, design, grant reporting, and miscellaneous
maintenance.
5 Years
Operating
2018/19 2019/20 2020/21 2021/22 2022/23 Costs
Street Repair and Resurfacing
9111-003 Annual Roadway Improvements 167,801 171,996 176,296 180,703 185,221 882,016
Roadway Safety Improvements
9121-001 Roadway Safety & Traffic Calming 10,827 11,098 11,375 11,659 11,951 56,910
9122-006 Prospect Road Improvements 188,819 - - - - 188,819
9122-007 City-wide Sign Upgrade - Phase II 16,722 - - - - 16,722
9122-008 Big Basin Way Turnaround - Design - - - - - -
Sidewalks, Curbs & Gutters - - - - -
9141-005 Infrastructure Maintenance & Repairs 19,333 19,817 20,312 20,820 21,340 101,622
9142-014 Big Basin Way Sidewalk Repairs 6,168 - - - - 6,168
9142-015 El Camino Grande Storm Drain Repair 11,856 - - - - 11,856
9142-017 LT Trash Plan Storm Drain Capture Device 834 - - - - 834
9142-019 Village C/W & S/W Rehabilitation 12,806 - - - - 12,806
9142-020 Quito Road S/W Improvements - Design - - - - - -
Bridges & Retaining Walls
9152-001 Fourth Street Bridge Widening - - - - - -
9152-002 Quito Road Bridges Replacement 8,127 - - - - 8,127
9152-004 Quito Road Bridges - ROW Acquisition 11,464 - - - - 11,464
9153-003 Annual Retaining Wall Maint & Repairs 9,874 10,121 10,374 10,633 10,899 51,900
Utility Undergrounding Project
9171-002 Quito Road Electric Undergrounding - - - - - -
Total - Street Projects 464,631$ 213,031$ 218,356$ 223,815$ 229,411$ 1,349,244$
Staff time
No impact to operating budget
No impact to operating budget
Staff time
Staff time
Staff time
Staff time
No impact to operating budget
Staff time
Staff time
Staff time
Staff time
Staff time
Staff time
No impact to operating budget
Improvement Projects Operational Impacts
Staff time
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
355
STREET REPAIR & RESURFACING PROJECTS
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
356
STREET REPAIR & RESURFACING PROJECTS
Project Name Annual Roadway Improvements Project Number 9111-003
Department Public Works Project Manager John Cherbone
Description This project funds ongoing street resurfacing and maintenance in order to maintain the City’s
pavement infrastructure.
Location This Citywide project is conducted throughout the fiscal year.
Project
Background
Every two to three years, an engineering consultant conducts an assessment of City roads
using the Paving Condition Index (PCI). The City uses this assessment to prioritize resurfacing
of streets and arterial roads. The PCI is based on a scale of 0 to 100, with the overall score
used to indicate the average of the City’s road conditions. The scale ranges from 0 for roads
which have failed, to 100 for roads in excellent condition. Scores are classified into five
categories:
Category Score
“Very Poor” 0-25
“Poor” 25-49
“Good” 50-69
“Very Good” 70-89
“Excellent” 90-100
As of 2017, the City’s overall PCI is 71. With a total of 135 miles of roadway in Saratoga,
contractors perform most street resurfacing work; staff conducts minor repairs to roadways
when practical. Resurfacing streets on a regular basis extends the lifetime of the roadways and
minimizes the need for larger and more costly projects in the future. Keeping the streets in
good condition also reduces liability risks and staff time for minor repairs.
This project is funded in part by Santa Clara County Measure B Sales Tax and state funds from
Road Repair and Maintenance fees and Gasoline Tax proceeds. Although collection of the half-
cent Measure B sales tax began in April 2017, funds are being held in an escrow account
pending the outcome of a legal challenge.
Operating
Budget
Impacts
Engineering, administrative, and maintenance staff costs for project oversight and
implementation of $_______ will be incorporated into the Fiscal Year 2018/19 operating
budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
357
STREET REPAIR & RESURFACING PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Project Development Ongoing Prepare plans and specifications
Begin Bid Process Ongoing Invite contractors to bid on the project
Contract Award Ongoing Award contract
Estimated Construction Start Ongoing Construction project begins
Estimated Completion Date Ongoing Specified project work is completed
ANNUAL ROADWAY IMPROVEMENTS 9111-003
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
VTA-Measure B Sales Tax - - - - - - - - -
Road/Refuse Impact Fees 351,300 351,300 702,600 351,300 - - - - 1,053,900
Project Reimbursements 6,500 - 6,500 - - - - - 6,500
Transfers In - General Fund 550,000 295,000 845,000 - - - - - 845,000
Transfers In - Other CIP 630,648 - 630,648 - - - - - 630,648
TOTAL 1,538,448 646,300 2,184,747 351,300 - - - - 2,536,048
GAS TAX FUND
Gas Tax - HUTA 502,409 516,827 1,019,236 515,032 - - - - 1,534,268
Gas Tax - 7360 (TCR swap)80,656 121,724 202,380 234,361 - - - - 436,741
State - Loan Repayment - 34,752 34,752 34,752 - - - - 69,504
Road Maintenance Repair - 174,341 174,341 507,630 - - - - 681,971
Transfers In 572,850 - 572,850 - - - - - 572,850
TOTAL 1,155,915 847,644 2,003,559 1,291,775 - - - - 3,295,334
TOTAL REVENUES 2,694,362 1,493,944 4,188,306 1,643,075 - - - - 5,831,381
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND EXP
Materials & Supplies 92,006 53,683 145,690 250,000 - - - - 395,690
Consultant/Contract Svs 5,760 - 5,760 - - - - - 5,760
Project Equip & Fixtures 16,319 11,384 27,703 - - - - - 27,703
Construction Expenses 584,631 424,448 1,009,080 497,815 - - - - 1,506,894
Transfers Out - 600,000 600,000 - - - - - 600,000
TOTAL 698,717 1,089,516 1,788,233 747,815 - - - - 2,536,047
GAS TAX EXP
Materials & Supplies 1,021 30,812 31,833 - - - - - 31,833
Fees & Expenses 2,500 (2,500) - - - - - - -
Consultant/Contract Svs 455 4,545 5,000 - - - - - 5,000
Construction Expenses 663,627 104,979 768,606 2,007,895 - - - - 2,776,501
Transfers Out - 482,000 482,000 - - - - - 482,000
TOTAL 667,602 619,837 1,287,439 2,007,895 - - - - 3,295,334
TOTAL EXPENDITURES 1,366,319 1,709,353 3,075,672 2,755,709 - - - - 5,831,381
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
358
STREET REPAIR & RESURFACING PROJECTS
ANNUAL ROADWAY IMPROVEMENTS – CONT’D
Prior FY
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance 839,731 - - - - - -
Revenues & T/I 1,538,448 646,300 2,184,747 351,300 - - - - 2,536,047
Expenditures & T/O 698,717 1,089,516 1,788,233 747,815 - - - - 2,536,047
Ending Balance 839,730.95 396,515 - - - - -
GAS TAX FUND
Beginning Balance 488,313 716,120 - - - - -
Revenues & T/I 1,155,915 847,644 2,003,559 1,291,775 - - - - 3,295,334
Expenditures & T/O 667,602 619,837 1,287,439 2,007,895 - - - - 3,295,334
Ending Balance 488,313 716,120 716,120 - - - - - -
TOTAL BALANCE 1,328,043 1,112,635 716,120 - - - - - -
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
359
ROADWAY SAFETY PROJECTS
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
360
ROADWAY SAFETY PROJECTS
Project Name Roadway Safety & Traffic Calming Project Number 9121-001
Department Public Works Project Manager Mainini Cabute
Description In conjunction with the Traffic Safety Commission (TSC), this project funds traffic calming
improvements that include the installation of roadway devices that enhance pedestrian and
roadway safety.
Location This is a Citywide project; locations vary depending on prioritized projects for the year.
Project
Background
This project represents an annual transfer of $50,000 of City funds in order to make roads
safer. The focus of these projects is to decrease driver speed and make pedestrians more
visible, resulting in the reduction of the number of accidents in the City.
The Traffic Safety Commission (TSC) and staff meet on a bi-monthly basis to review and
assess traffic concerns throughout the City. Concerned residents may also attend these
meetings to provide input and request improvements. Most TSC recommended
improvements are small and fall within the scope of the operating budget. Occasionally, more
costly remediation is warranted and roadway safety and traffic calming funds are used. The
most common uses of these funds are for traffic calming improvements such as speed
humps, radar signs, median chokers, bulb-outs, and enhanced crosswalks. The TSC reviews
the Unfunded CIP traffic projects each year and prioritizes according to safety and proximity
to schools.
Projects completed in Fiscal Year 2017/18 include traffic-calming measures and bicycle
improvements on Allendale Avenue from Chester Avenue to Quito Road, lighted crosswalks
installed on McCoy Avenue and Cox, an enhanced crosswalk at Herriman and Lexington Court,
and other improvements as identified by the TSC and the City Traffic Engineer .
In Fiscal Year 2018/19, projects include enhanced crosswalks installed Fruitvale and Douglass
Lane and Cox Avenue and Cumberland Drive, as well as other improvements identified by the
TSC and the City Traffic Engineer.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff costs for project oversight and
implementation of $_____ will be incorporated into the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
361
ROADWAY SAFETY PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Project Development Ongoing Prepare plans and specifications
Begin Bid Process Ongoing Invite contractors to bid on the project
Contract Award Ongoing Award contract
Estimated Construction Start Ongoing Construction project begins
Estimated Completion Date Ongoing Project is completed
ROADWAY SAFETY & TRAFFIC CALMING 9121-001
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Project Reimbursement 850 - 850 - - - - - 850
Transfers In - General Fund 591,355 50,000 641,355 50,000 50,000 50,000 50,000 50,000 891,355
Transfers In - Other CIP - - - - - - - - -
Transfers In - CDBG - - - - - - - - -
Trasnfers In - L&L - - - - - - - - -
TOTAL REVENUES 592,205 50,000 642,205 50,000 50,000 50,000 50,000 50,000 892,205
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Materials & Supplies 64,837 - 64,837 - - - - - 64,837
Fees & Expenses 310 - 310 - - - - - 310
Consultant/Contract Svs 143,982 - 143,982 - - - - - 143,982
Construction Expenses 317,561 - 317,561 165,514 50,000 50,000 50,000 50,000 683,075
TOTAL EXPENDITURES 526,691 - 526,691 165,514 50,000 50,000 50,000 50,000 892,205
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
BEGINNING BALANCE 65,514 115,514 - - - - -
Revenues & T/I 592,205 50,000 642,205 50,000 50,000 50,000 50,000 50,000 892,205
Expenditures & T/O 526,691 - 526,691 165,514 50,000 50,000 50,000 50,000 892,205
ENDING BALANCE 65,514 115,514 115,514 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
362
ROADWAY SAFETY PROJECTS
Project Name ADA Signal Lights & Curb Cut-outs Project Number 9121-003
Department Public Works Project Manager Macedonio Nunez
Description This project will complete ADA improvements to existing signalized intersections throughout
Saratoga.
Location This project will upgrade the 15 signalized intersections with traffic signals throughout the
City.
Project
Background
Replacing the pushbuttons at the City’s 15 signalized intersections with “vibro-tactile”
buttons will enhance safety for visually impaired pedestrians. A vibro-tactile type of
pedestrian signal has pushbuttons that vibrate when the “WALK” signal is on, indicating to
visually impaired pedestrians when to cross the street.
This project will also make the intersection’s ramps, curbs, and crosswalks ADA compliant.
Crosswalks will be added or repainted where needed; and ramps and curbs will be rebuilt to
meet accessibility standards. These improvements will reduce City liability associated with
pedestrian accidents.
The City has completed installations at four intersections; Saratoga-Sunnyvale Road and Reid
Lane, Herriman Avenue, and Blauer Drive, and Cox Avenue and Sea Gull Way. Future
improvements are planned on Saratoga-Sunnyvale Road at Pierce Road, Cox Avenue, and Sea
Gull Way, on Fruitvale Avenue at Saratoga Avenue and Allendale Avenue, on Saratoga Avenue
at Scotland Drive, Dagmar Drive and Bellgrove Circle, on Quito Road at Allendale Avenue and
Pollard Road, and on Prospect Road and Miller Avenue.
Contractors perform improvements and upgrades. As Community Development Block Grant
(CDBG) funding becomes available, more intersections will be upgraded until all City
signalized intersections have been completed.
This project is recommended to be closed pending the prioritization of accessibility projects.
Operating
Budget Impacts
There will be no impact to the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
363
ROADWAY SAFETY PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Project Development 2011 Prepare plans and specifications
Begin Bid Process April 2018 Invite contractors to bid on the project
Contract Award July 2018 Award contract
Estimated Construction Start August 2018 Construction project begins
Estimated Completion Date June 2019 Project is completed
ADA SIGNAL LIGHTS & CURB CUT-OUTS 9121-003
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfer In - From General Fund188,286 - 188,286 - - - - - 188,286
TOTAL 188,286 - 188,286 - - - - - 188,286
GRANT FUNDS
CDBG - ADA Grant - - - - - - - - -
TOTAL - - - - - - - - -
TOTAL REVENUES 188,286 - 188,286 - - - - - 188,286
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Fees & Expenses 1,023 - 1,023 - - - - - 1,023
Consultant/Contract Svs 83,816 - 83,816 - - - - - 83,816
Construction Expenses 103,447 - 103,447 - - - - - 103,447
TOTAL 188,286 - 188,286 - - - - - 188,286
GRANT FUNDS
Construction Expenses - - - - - - - - -
TOTAL - - - - - - - - -
TOTAL EXPENDITURES 188,286 - 188,286 - - - - - 188,286
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
BEGINNING FUND BAL - - - - - -
Revenues & T/I 188,286 - 188,286 - - - - - 188,286
Expenditures & T/O 188,286 - 188,286 - - - - - 188,286
ENDING FUND BALANCE - - - - - - - - -
GRANT FUNDS
BEGINNING BALANCE - - - - - - -
Revenues & T/I - - - - - - - - -
Expenditures & T/O - - - - - - - - -
ENDING BALANCE - - - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
364
ROADWAY SAFETY PROJECTS
Project Name Highway 9 Safety Improvements –
Phase IV
Project Number 9122-005
Department Public Works Project Manager John Cherbone
Description A multi-agency pedestrian improvement project to enhance the safety of the Highway 9
corridor, which links the communities of Saratoga, Monte Sereno, and Los Gatos.
Location This project will complete improvements to two segments of pedestrian pathways started in
Phase II along Highway 9 between Fruitvale Avenue in Saratoga and Greenwood Road in Monte
Sereno.
Project
Background
Phase IV of this project will continue bicycle and pedestrian improvements along the Highway
9 corridor from Saratoga to Los Gatos. Improvements became a priority following several
serious accidents on Highway 9.
Phase IV improvements include, construction of a retaining wall to widen the shoulder for
pedestrian pathways and other pedestrian improvements on Highway 9 from Fruitvale Avenue
to El Camino Grande in Saratoga and from Daves Avenue to Greenwood Road in Monte Sereno.
These improvements were designed during Phase II, which included installation of pedestrian
pathways, curbs, retaining walls, driveway modifications, crosswalks, signage, and striping
between Saratoga and Los Gatos on Highway 9 in addition to the design work. A significant
portion of funding for this project will be coming from a federal Highway Safety Improvement
Grant (HSIP) administered by the California Department of Transportation (Caltrans). As with
Phase II of the Highway 9 safety improvements project, the City of Saratoga will be the lead
agency for Phase IV.
The construction contract was awarded on December 7, 2016 and was completed in December
2017; however, it will remain open until all grant administration is completed.
This project is funded through grants, reimbursements from other agencies and a transfer of
surplus funds ($58,396) remaining in Phase II ($45,079) and Phase III ($13,317) in Fiscal Year
2014/15.
Operating
Budget Impacts
Engineering and administrative staff costs for grant administration of $______ will be
incorporated into the Fiscal Year 2018/19 operating budget. There will be a minimal increase
in maintenance costs. However, the improvements will increase safety on Highway 9 for
pedestrians, bicyclists and commuters, reduce accidents, and, therefore, reduce liability risk.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
365
ROADWAY SAFETY PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Bid Process April 2016 Council approves plans and authorizes bidding the project
Contract Award December 2016 Council awards contract
Estimated Construction Start December 2016 Construction project begins
Estimated Completion Date May 2017 Project is completed
HIGHWAY 9 SAFETY IMPROVEMENTS PHASE IV 9122-005
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Project Reimbursements 43,847 11,517 55,364 - - - - - 55,364
Transfers In - Other CIP 58,396 - 58,396 - - - - - 58,396
Transfers In - Gas Tax 90,000 - 90,000 - - - - - 90,000
TOTAL 192,243 11,517 203,760 - - - - - 203,760
GRANT FUND
Federal - HSIP Grant 757,391 142,609 900,000 - - - - - 900,000
TOTAL 757,391 142,609 900,000 - - - - - 900,000
TOTAL REVENUES 949,634 154,126 1,103,760 - - - - - 1,103,760
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Fees & Expenses 3,776 - 3,776 - - - - - 3,776
Consultant/Contract Svs 30,024 5,991 36,015 - - - - - 36,015
Construction Expenses 84,133 51,429 135,562 - - - - - 135,562
Transfers Out - 28,407 28,407 - - - - - 28,407
TOTAL 117,934 85,827 203,760 - - - - - 203,760
GRANT FUND
Fees & Expenses 6,493 - 6,493 - - - - - 6,493
Construction Expenses 750,898 142,609 893,507 - - - - - 893,507
TOTAL 757,391 142,609 900,000 - - - - - 900,000
TOTAL EXPENDITURES 875,325 228,436 1,103,760 - - - - - 1,103,760
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
BEGINNING FUND BAL 74,309 - - - - - -
Revenues & T/I 192,243 11,517 203,760 - - - - - 203,760
Expenditures & T/O 117,934 85,827 203,760 - - - - - 203,760
ENDING FUND BALANCE 74,309 - - - - - - - -
GRANT FUND
BEGINNING BALANCE - - - - - - -
Revenues & T/I 757,391 142,609 900,000 - - - - - 900,000
Expenditures & T/O 757,391 142,609 900,000 - - - - - 900,000
ENDING FUND BALANCE - - - - - - - - -
ENDING BALANCE 74,309 - 900,000 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
366
ROADWAY SAFETY PROJECTS
Project Name Prospect Road Improvements Project Number 9122-006
Department Public Works Project Manager Macedonio Nunez
Description This project will improve the Prospect Avenue corridor through the addition of roadway
medians, sidewalks, bicycle loops, and ADA ramps to increase pedestrian and bicycle access.
Location Project work will occur along a 1.9-mile section of Prospect Road between Saratoga/Sunnyvale
Rd and Lawrence Expressway.
Project
Background
This project will improve the safety of the road by physically reducing the width of the road,
channeling vehicles into defined turn lanes, reducing the threat of vehicles crossing the center
lane, and creating safer pedestrian crossings. Improvements to existing pedestrian, bicycle
and VTA bus stop facilities, will enhance pedestrian accessibility and provide a safe and
convenient walking and bicycling experience. The scope of the project includes the following:
Installation of sidewalk at several identified gaps, and several ADA compliant ramps
at several locations along Prospect Road.
Installation of bicycle detector loops at all the signalized intersections within the
project limits, and “Green” bike lanes at the heavily congested intersections of
Prospect Road and Saratoga Sunnyvale Road and Prospect Road and Lawrence
Expressway.
Installation of new bus pads and accessibility improvements at three VTA bus stops
on Prospect Road.
Installation of several new landscaped medians and improvements to existing
medians on Prospect Road.
A continuous Class II bicycle lane along the entire length of the segment.
A $4.2 million OBAG grant and $544,825 from City Gas Tax monies fund this project.
Operating
Budget Impacts
Engineering and administrative staff costs for project oversight and implementation of
$______ will be incorporated into the Fiscal Year 2018/19 operating budget. Once completed,
there will be a minimal increase in maintenance costs. However, the improvements will
increase safety for pedestrians, bicyclists and commuters, reduce accidents, and, therefore,
reduce liability risk.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
367
ROADWAY SAFETY PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase April 2015 Prepare plans and specifications
Begin Bid Process March 2017 Council authorizes bidding the project
Contract Awarded July 2017 Council approved vendor
Estimated Construction Start November 2017 Construction project begins
Estimated Completion Date September 2017 Project is completed
PROSPECT ROAD IMPROVEMENTS 9122-006
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Project Reimbursment - 229,504 229,504 - - - - - 229,504
Transfers In - General Fund - 600,000 600,000 - - - - - 600,000
TOTAL STREET FUND - 829,504 829,504 - - - - - 829,504
GRANT FUND
State - BEP Grant - - - 4,206,000 - - - - 4,206,000
TOTAL GRANT FUND - - - 4,206,000 - - - - 4,206,000
GAS TAX
Transfers In - Other CIP 544,825 482,000 1,026,825 - - - - - 1,026,825
TOTAL GAS TAX FUND 544,825 482,000 1,026,825 - - - - - -
TOTAL REVENUES 544,825 1,311,504 1,856,329 4,206,000 - - - - 5,035,504
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Fees & Expenses - 568 568 - - - - - 568
Consultant/Contract Svs - 36,331 36,331 - - - - - 36,331
Construction Expenses - 750,850 750,850 41,755 - - - - 792,605
TOTAL STREET FUND - 787,749 787,749 41,755 - - - - 829,504
GRANT FUND
Fees & Expenses 40 - 40 - - - - - 40
Construction Expenses - - - 4,205,960 - - - - 4,205,960
TOTAL GRANT FUND 40 - 40 4,205,960 - - - - 4,206,000
GAS TAX FUND
Site Acquisition & Prep 60 - 60 - - - - - 60
Fees & Expenses 21,035 707 21,742 - - - - - 21,742
Consultant/Contract Svs 281,502 62,474 343,977 - - - - - 343,977
Construction Expenses 24,480 636,566 661,047 - - - - - 661,047
TOTAL GAS TAX FUND 327,077 699,748 1,026,825 - - - - - 1,026,825
TOTAL EXPENDITURES 327,118 1,487,497 40 4,247,715 - - - - 5,035,504
`
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
368
ROADWAY SAFETY PROJECTS
PROSPECT ROAD IMPROVEMENTS (CONTINUED)
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance - 41,755 - - - - -
Revenues & T/I - 829,504 829,504 - - - - - 829,504
Expenditures & T/O - 787,749 787,749 41,755 - - - - 829,504
ENDING BALANCE - 41,755 41,755 - - - - - -
GRANT FUND
Beginning Balance (40) (40) - - - - -
Revenues & T/I - - - 4,206,000 - - - - 4,206,000
Expenditures & T/O 40 - 40 4,205,960 - - - - 4,206,000
Ending Balance (40) (40) (40) - - - - - -
GAS TAX FUND
Beginning Balance 217,748 - - - - - -
Revenues & T/I 544,825 - 1,026,825 - - - - - -
Expenditures & T/O 327,077 - 1,026,825 - - - - - 343,977
Ending Balance 217,748 217,748 - - - - - - (343,977)
ENDING BALANCE 217,708 41,715 41,715 - - - - - -
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
369
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
370
ROADWAY SAFETY PROJECTS
Project Name Citywide Signal Upgrade Project - Phase
II
Project Number 9122-007
Department Public Works Project Manager Macedonio Nunez
Description This project continues the development of a citywide master signal system to standardize and
coordinate the City’s traffic signals and allow real-time monitoring and control along
Saratoga’s major traffic corridors. The project also allows for future regional integration.
Location This Citywide project will incorporate all City owned signals in Saratoga.
Project
Background
The City’s signal timing settings at intersections were last coordinated in approximately 2001.
Subsequently, the City of Saratoga received a Regional Signal Timing Program (RSTP) grant
from VTA in 2006 to conduct a citywide signal timing study. Phase I of the project included
developing updated signal coordination plans during the morning, afternoon, and evening
periods for the signalized intersections in the City of Saratoga.
Phase I: Upgrade hardware and software at all City signals, and provide inter-connect
hardware with wire and wireless technology. This phase is complete.
Phase II: Install a Traffic Management System at City Hall, and communication equipment in
all signals along Saratoga Avenue between Fruitvale Avenue and Cox Avenue . Inter-connect
signals along Coordination Corridors and coordinate with the Management System. With the
Traffic Management System, City engineers will be able to manage signal coordination to
improve traffic flow at some of the City’s busiest intersections. Additionally, the system will
be able to monitor live traffic patterns and adjust signal phasing as needed.
A $400,000 VTA grant and a $100,000 transfer from other CIP projects fund this project.
Operating
Budget Impacts
Engineering and administrative staff costs for project oversight and implementation of
$______ will be incorporated into the Fiscal Year 2018/19 operating budget. The new system
will reduce call-out expenses for traffic signal maintenance costs, as staff will be able to
manage signal-timing changes.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
371
ROADWAY SAFETY PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase March 2018 Prepare plans and specification
Begin Bid Process May 2018 Council authorizes bidding the project
Contract Awarded November 2018 Council approves vendor
Estimated Construction Start April 2019 Construction project begins
Estimated Completion Date August 2019 Project is completed
CITYWIDE SIGNAL UPGRADE PROJECT PHASE II 9122-007
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
GRANT FUNDS
Local - VTA Grant - - - 400,000 - - - - 400,000
TOTAL - - - 400,000 - - - - 400,000
GAS TAX FUND
Transfer In - Gas Tax 100,000 - 100,000 - - - - - 100,000
TOTAL 100,000 - 100,000 - - - - - 100,000
TOTAL REVENUES 100,000 - 100,000 400,000 - - - - 500,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
GRANT FUNDS
Consultant/Contract Svs 965 - 965 - - - - - 965
Construction Expenses - - - 399,035 - - - - 399,035
TOTAL 965 - 965 399,035 - - - - 400,000
GAS TAX FUND
Consultant/Contract Svs 241 - 241 - - - - - 241
Construction Expenses - - - 99,759 - - - - 99,759
TOTAL 241 - 241 99,759 - - - - 100,000
TOTAL EXPENDITURES 1,207 - 1,207 498,793 - - - - 500,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
GRANT FUNDS
BEGINNING BALANCE (965) (965) - - - - -
Revenues & T/I - - - 400,000 - - - - 400,000
Expenditures & T/O 965 - 965 399,035 - - - - 400,000
ENDING BALANCE (965) (965) (965) - - - - - -
GAS TAX FUND
BEGINNING FUND BAL - 99,759 99,759 - - - - -
Revenues & T/I 100,000 - 100,000 - - - - - 100,000
Expenditures & T/O 241 - 241 99,759 - - - - 100,000
ENDING FUND BALANCE 99,759 99,759 99,759 - - - - - -
ENDING FUND BALANCE 98,794 98,794 100,000 - - - - - 100,000
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
372
ROADWAY SAFETY PROJECTS
Project Name Big Basin Way Turnaround - Design Project Number 9122-008
Department Public Works Project Manager John Cherbone
Description This project will fund the design of a turnaround on Big Basin Way to improve traffic
circulation through Saratoga Village.
Location The Turnaround is located just past the corner of 6th Street and Big Basin Way.
Project
Background
Vehicles travelling westbound on Big Basin Way through Saratoga Village towards Hakone
Gardens have limited opportunities to turnaround after passing 6 th Street. The City has
received numerous complaints about drivers attempting to turnaround after 6th Street,
disrupting traffic or creating a hazard. This project would improve traffic circulation in the
Saratoga Village area and reduce traffic disruptions and hazards.
This project will be completed in two phases: design and construction.
A $50,000 allocation from the CIP Reserve funds the design phase of this project. Total design
costs are estimated to be $20,000
The estimated cost for the construction phase is $175,000. Additional funding is needed for
the construction phase of the project.
Operating
Budget Impacts
Engineering and administrative staff costs for project oversight and implementation will be
incorporated into the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
373
ROADWAY SAFETY PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase July 2017 Begin preparing design and plans
Design Contract Awarded July 2017 Contract awarded to BKF Engineers
End Design Phase April 2018 Complete project design plans
Begin Bid Process TBD Council authorizes bidding for the project
Construction Contract Awarded TBD Council awards construction contract
Estimated Construction Start TBD Construction begins
Estimated Completion Date TBD Project is complete
BIG BASIN WAY TURNAROUND - DESIGN 9122-008
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund - 50,000 50,000 - - - - - 50,000
TOTAL REVENUES - 50,000 50,000 - - - - - 50,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Consultant/Contract Svs - 18,643 18,643 - - - - - 18,643
Transfers Out - 31,357 31,357 - - - - - 31,357
TOTAL EXPENDITURES - 50,000 50,000 - - - - - 50,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
BEGINNING BALANCE - - - - - - -
Revenues & T/I - 50,000 50,000 - - - - - 50,000
Expenditures & T/O - 50,000 50,000 - - - - - 50,000
ENDING BALANCE - - - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
374
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
375
STREET LANDSCAPE & BEAUTIFICATION IMPROVEMENTS
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
376
STREET LANDSCAPE & BEAUTIFICATION IMPROVEMENTS
Project Name Village LED Street Lights Project Number 9138-001
Department Public Works Project Manager Macedonio Nunez
Description Replacement of existing High Pressure Sodium (HPS) street lights with LED lights in the
Village.
Location This project is located in Saratoga Village.
Project
Background
The Federal Energy Independence and Security Act of 2007 established the Energy Efficiency
Community Block Grant (EECBG) program. The purpose of this program is to reduce fossil
fuel emissions in an environmentally sustainable manner, reduce energy consumption, and
improve energy efficiency in the building, transportation, and other appropriate sectors. The
program received funding as a result of the passage of the American Recovery and
Reinvestment Act of 2009.
Large municipalities, Indian tribes, and states received a direct allocation of EECBG funds for
energy efficiency projects from the California Energy Commission. Saratoga was eligible to
receive just over $169,000 for cost effective energy efficiency projects. In December 2009,
Council adopted a resolution authorizing use of these funds to replace the current High
Pressure Sodium street lights in the Village with light-emitting diode (LED) street lights.
In addition, $250,900 of the CMAQ grant awarded for Village Pedestrian Enhancements
projects has been designated for this phase of the project. The required local match for this
grant is funded from the City’s CIP funds.
The installation of the LED street lights was completed in 2012.
In FY 2016/17, the project was closed and outstanding grant obligations were completed in
FY 2017/18.
Operating
Budget Impacts
Th ere is no impact to the Fiscal Year 2018/19 operating budget. In previous years, the City
spent $5,000 annually to maintain the High Pressure Sodium lights in the Village area. The
LED lights have a much longer lifespan than High Pressure Sodium lights leading to decreases
in both regular maintenance and replacement costs. Additionally, LED lights use 50% less
energy to power leading to lower PG&E billing rates. The project also qualified for a rebate
from PG&E.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
377
STREET LANDSCAPE & BEAUTIFICATION IMPROVEMENTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Submit Grant January 2010 City submits EECBG grant application
Contract Award April 2012 Award construction contract
Estimated Construction Start May 2012 Construction project begins
Estimated Completion Date July 2012 Final reports submitted to the CEC
Project Completion June 2018 Project completed. Final administrative tasks complete
VILLAGE LED STREET LIGHTS 9138-001
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - Other CIP 32,500 - 32,500 - - - - - 32,500
TOTAL STREET FUND 32,500 - 32,500 - - - - - 32,500
STREET GRANT FUND
Federal - Energy Comm PT 407,747 - 407,747 - - - - - 407,747
TOTAL GRANT FUND 407,747 - 407,747 - - - - - 407,747
TOTAL REVENUES 440,247 - 440,247 - - - - - 440,247
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Fees & Expenses 513 - 513 - - - - - 513
Consultant/Contract Svs 345 - 345 - - - - - 345
Construction Expenses 31,504 - 31,504 - - - - - 31,504
Reimbursable Expenses 138 - 138 - - - - - 138
TOTAL STREET FUND 32,500 - 32,500 - - - - - 32,500
GRANT FUND
Materials & Supplies 143,439 - 143,439 - - - - - 143,439
Fees & Expenses 1,770 - 1,770 - - - - - 1,770
Consultant/Contract Svs 8,280 - 8,280 - - - - - 8,280
Construction Expenses 233,585 - 233,585 - - - - - 233,585
Reimbursable Expenses 20,673 - 20,673 - - - - - 20,673
TOTAL GRANT FUND 407,747 - 407,747 - - - - - 407,747
TOTAL EXPENDITURES 440,247 - 440,247 - - - - - 440,247
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
BEGINNING BALANCE - - - - - - -
Revenues & T/I 32,500 - 32,500 - - - - - 32,500
Expenditures & T/O 32,500 - 32,500 - - - - - 32,500
ENDING BALANCE - - - - - - - - -
GRANT FUND
BEGINNING BALANCE - - - - - - -
Revenues & T/I 407,747 - 407,747 - - - - - 407,747
Expenditures & T/O 407,747 - 407,747 - - - - - 407,747
ENDING BALANCE - - - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
378
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
379
SIDEWALKS, CURBS & STORM DRAINS
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
380
SIDEWALKS, CURBS & STORM DRAINS
Project Name Annual Infrastructure Maintenance and
Repairs
Project Number 9141-005
Department Public Works Project Manager Rick Torres
Description This project funds infrastructure maintenance related to sidewalks, curbs and gutters, storm
drains and bridges.
Location This is a citywide project.
Project
Background
Storm drains: Storm drains are inspected by the City of Saratoga Public Works Department
and West Valley Sanitation District to identify failures, or potential failures. Sections of storm
drains that have failed, which often results in flooding, are either replaced or repaired to
prevent future failures.
Curbs and Gutters: Curbs and gutters need to be maintained on a regular basis. Ongoing
repairs prevent flooding through improved water runoff. Additionally, well maintained curbs
and gutters improve pedestrian and bicycle safety by reducing tripping hazards. Damage to
curbs and gutters is most frequently caused by tree roots or impact from a heavy vehicle.
Sidewalks: Sidewalk repairs ensure that the City’s sidewalks are maintained in good
condition, minimizing the need for larger and more costly improvement projects in the
future. Additionally, repairs to City sidewalks minimize tripping hazards and reduce liability
risk. Approximately 35,000 square feet of sidewalk is repaired each year. There a re
approximately 17 linear miles of sidewalk in Saratoga.
Bridges: Each year Caltrans inspects all bridges in the state, including 12,200 bridges owned
by local government agencies. Caltrans provides repair recommendations, determines the safe
load capacity of all bridges, and assists in specifications and estimates for bridge
maintenance projects.
Annual upgrades and repairs to the City’s various infrastructure helps to keep them
functioning properly, thereby reducing expenses associated with failure to those systems. In
FY 2017/18, projects included; sidewalk repairs on Via Real Drive and Via Arriba Drive, and
storm drain, curb and gutter repairs on Quito Road. Additionally, trip hazard repairs were
made throughout the City.
Operating
Budget Impacts
Engineering, administrative and maintenance staff costs for project oversight and
implementation of $______ will be incorporated into the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
381
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Estimated Completion Date Ongoing
ANNUAL INFRASTRUCTURE MAINTENANCE AND REPAIRS 9141-005
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund 200,000 200,000 400,000 200,000 200,000 200,000 200,000 200,000 1,400,000
Transfers In - Other CIP 88,517 - 88,517 - - - - - 88,517
TOTAL REVENUES 288,517 200,000 488,517 200,000 200,000 200,000 200,000 200,000 1,488,517
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2011/12 2012/13 2013/14 2014/15 Expended
CIP STREET FUND
Materials & Supplies 556 4,073 4,629 - - - - - 4,629
Construction Expenses 165,294 201,092 366,386 317,502 200,000 200,000 200,000 200,000 1,483,888
TOTAL EXPENDITURES 165,850 205,165 371,015 317,502 200,000 200,000 200,000 200,000 1,488,517
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2011/12 2012/13 2013/14 2014/15 Activity
CIP STREET FUND
BEGINNING FUND BAL 122,667 117,502 - - - - -
Revenues & T/I 288,517 200,000 488,517 200,000 200,000 200,000 200,000 200,000 1,488,517
Expenditures & T/O 165,850 205,165 371,015 317,502 200,000 200,000 200,000 200,000 1,488,517
ENDING FUND BALANCE 122,667 117,502 117,502 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
382
SIDEWALKS, CURBS & STORM DRAINS
Project Name Village Sidewalk & Pedestrian
Enhancements Phase I - Design
Project Number 9142-004
Department Public Works Project Manager Macedonio Nunez
Description This project funds sidewalk and pedestrian safety improvements in the Village.
Location This project is located at several locations in Saratoga Village; Big Basin Way and Highway 9,
Big Basin Way and Blaney Plaza, Big Basin Way and 3rd Street, and Big Basin Way and 4th Street.
Project
Background
In 2008, the City entered into a contract with Gates and Associates for design improvements
to the Village that would increase pedestrian safety and the beauty of the City’s downtown
area. The design included pedestrian bulb-outs and enhanced crosswalks that will make
pedestrians more visible to drivers. Plans also included additional landscaping, benches, and
bike racks.
Following the award of the contract to Gates and Associations for design work, the City held
two community meetings to communicate the purpose of the project and to seek public input
on the design of the sidewalk and pedestrian improvements. A conceptual design was
presented to Council in April 2009 and the detailed design was completed during Fiscal Year
2009/10. Construction began in the same fiscal year.
Actual work on the project was completed in FY 14/15. In FY 17/18 grant requirements have
been completed and the project is now closed.
Operating
Budget Impacts
There will be no impact to the Fiscal Year 2018/19 operating budget . The City will be
responsible for maintaining additional landscaping, bulb outs, crosswalks, and other features.
However, the project will also make significant improvements to pedestrian safety in the
Village by increasing visibility of pedestrians.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
383
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase October, 2008 Prepare plans and specifications
Begin Bid Process April, 2010 Council approves plans and authorizes bidding the project
Contract award May, 2010 Council awards contract
Estimated Construction Start June, 2010 Construction project begins
Estimated Completion Date July, 2015 Project is complete. Final administrative tasks nearly
complete
VILLAGE SIDEWALK & PEDESTRIAN IMPROVEMENTS 9142-004
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Contributions / Donations 737,846 - 737,846 - - - - - 737,846
Transfers In - Other CIP 80,764 - 80,764 - - - - - 80,764
TOTAL STREET FUND 818,610 - 818,610 - - - - - 818,610
GRANT FUND
State MTC (TDA)335,184 - 335,184 - - - - - 335,184
TOTAL GRANT FUND 335,184 - 335,184 - - - - - 335,184
TOTAL REVENUES 1,153,793 - 1,153,793 - - - - - 1,153,793
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Materials & Supplies 33,072 - 33,072 - - - - - 33,072
Fees & Expenses 6,200 - 6,200 - - - - - 6,200
Consultant/Contract Svs 46,523 - 46,523 - - - - - 46,523
Construction Expenses 449,249 - 449,249 - - - - - 449,249
Reimbursable Expenses 1,143 - 1,143 - 1,143
Transfers Out 282,422 - 282,422 - - - - - 282,422
TOTAL STREET FUND 818,610 - 818,610 - - - - - 818,610
GRANT FUND
Consultant/Contract Svs 12,202 - 12,202 - - - - - 12,202
Construction Expenses 321,808 - 321,808 - - - - - 321,808
Reimbursable Expenses 1,174 - 1,174 - - - - - 1,174
TOTAL GRANT FUND 335,184 - 335,184 - - - - - 335,184
TOTAL EXPENDITURES 1,153,793 - 1,153,793 - - - - - 1,153,793
Prior FY Total
Year 2017/18 Estimated Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance - - - - - - -
Revenues & T/I 818,610 - 818,610 - - - - - 818,610
Expenditures & T/O 818,610 - 818,610 - - - - - 818,610
ENDING FUND BALANCE - - - - - - - - -
GRANT FUND
Beginning Balance - - - - - - -
Revenues & T/I 335,184 - 335,184 - - - - - 335,184
Expenditures & T/O 335,184 - 335,184 - - - - - 335,184
ENDING FUND BALANCE - - - - - - - - -
ENDING BALANCE - - - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
384
SIDEWALKS, CURBS & STORM DRAINS
Project Name Saratoga Avenue Sidewalk Project Number 9142-005
Department Public Works Project Manager Macedonio Nunez
Description This project will install new sections of sidewalk on Saratoga Avenue.
Location New sidewalk sections will be located along Saratoga Avenue between Heritage Oak and
Orchard Road.
Project
Background
Since 1992, the City has been adding new sections of sidewalk along Saratoga Avenue, using
Transit Development Act (TDA) funds to create a continuous sidewalk between the Village
and Quito Road. Each year, approximately $25,000 of TDA grant funding is awarded. After
several years, when sufficient amount of funds have accumulated, the City identifies the
pathway sections to complete along Saratoga Avenue and uses the funding to fill these gaps.
Sidewalks offer a number of benefits. They provide a safe path for pedestrians, away from
the roadway. The sidewalk also allows residents in wheelchairs or other wheeled devices to
travel in the City. Furthermore, extension of the City’s sidewalk system increases the City’s
walk-ability and adds to the recreational opportunities available to residents.
This project has been ongoing since 1992 and will continue until all sidewalk gaps are closed.
Additional funding needs to be identified and secured in order to close the final sidewalk
gaps located on Saratoga Avenue near La Paloma and Lutheria Way. In FY 2017/18, sidewalks
were installed from La Paloma Place to Park Place.
Work for this project is conducted by a contractor and managed by City staff.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff costs for project oversight and
implementation of $______ will be incorporated into the Fiscal Year 2018/19 operating
budget. The project will make significant improvements to pedestrian safety on Saratoga
Avenue. Extending the existing sidewalk will increase maintenance costs.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
385
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Estimated Completion Date Ongoing Project is ongoing
SARATOGA AVENUE SIDEWALK 9142-005
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
GRANT FUND
State MTC (TDA)260,542 23,000 283,542 - - - - - 283,542
TOTAL REVENUES 260,542 23,000 283,542 - - - - - 283,542
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
GRANT FUND
Consultant/Contract Svs 7,600 1,980 9,580 - - - - - 9,580
Construction Expenses 201,955 - 201,955 71,281 - - - - 273,235
Reimbursable Expenses 727 - 727 - - - - - 727
TOTAL EXPENDITURES 210,281 1,980 212,261 71,281 - - - - 283,542
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
GRANT FUND
BEGINNING BALANCE 50,261 71,281 - - - - -
Revenues & T/I 260,542 23,000 283,542 - - - - - 283,542
Expenditures & T/O 210,281 1,980 212,261 71,281 - - - - 283,542
ENDING BALANCE 50,261 71,281 71,281 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
386
SIDEWALKS, CURBS & STORM DRAINS
Project Name Village Sidewalk & Pedestrian
Enhancements Phase II – Const
Project Number 9142-011
Department Public Works Project Manager Macedonio Nunez
Description This project funds the second phase of sidewalk and pedestrian safety improvement
construction in the Village.
Location This project is located in Saratoga Village at Big Basin Way and Highway 9 at Blaney Plaza; Big
Basin Way and 5th Street; Big Basin Way and 6th Street; and Big Basin Way just past Highway 9.
Project
Background
The Village is the historical downtown center of Saratoga and is the main corridor for local
retail and professional offices. Businesses found along this road include fine restaurants,
salons, galleries, home furniture show rooms, bakeries, coffee shops, banks, and delicatessens.
As a shopping and dining destination, there is a good deal of pedestrian traffic as shoppers
and diners enjoy the Village’s ambiance.
In 2008, the City entered into a contract with Gates and Associates to design improvements to
the Village that would increase pedestrian safety and the beauty of the City’s dow ntown area.
The design included pedestrian bulb-outs and enhanced crosswalks that will make pedestrians
more visible to drivers. Plans also included additional landscaping, benches, and bike racks.
Following the award of contract with Gates and Associates for design work, the City held two
community meetings to explain the purpose of the project and seek public input on the design
of the sidewalk and pedestrian improvements. A conceptual design was presented to the City
Council in April 2009.
Phase I of construction began in June, 2010. Phase II focused on the area near Blaney Plaza.
The renovation of Blaney Plaza included, enhanced crosswalks, sidewalk and safety
improvements, and additional parking. Improvements to the sidewalk on Spur Road across
from Blaney Plaza are being considered. The improved enhancements to pedestrian safety and
appearance of the Saratoga Village may make it a more popular retail and dining destination.
A $776,000 Federal Congestion Mitigation and Air Quality (CMAQ) grant and $345,115 from
other CIP projects funded this project.
Operating
Budget
Impacts
There will be no impact to the Fiscal Year 2018/19 operating budget . Upon completion, the
City will be responsible for maintaining additional landscaping, bulb outs, crosswalks, and
other features.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
387
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase May 2011 Prepare plans and specifications
Design Approval February 2012 Council approves plans
Begin Bid Process April 2013 Council authorizes bidding the project
Contract Award August 2013 Council awards contract
Estimated Construction Start May 2014 Construction project begins
Estimated Completion Date May 2018 Project is completed
VILLAGE SIDEWALK & PEDESTRIAN ENHANCEMENTS PHASE II – CONSTRUCTION 9142-011
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - Other CIP 345,115 - 345,115 - - - - - 345,115
TOTAL STREET FUND 345,115 - 345,115 - - - - - 345,115
GRANT FUND
Federal - CMAQ PT 701,109 74,991 776,100 - - - - - 776,100
TOTAL GRANT FUND 701,109 74,991 776,100 - - - - - 776,100
TOTAL REVENUES 1,046,224 74,991 1,121,215 - - - - - 1,121,215
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Materials & Supplies 3,505 - 3,505 - - - - - 3,505
Fees & Expenses 2,484 - 2,484 - - - - - 2,484
Consultant/Contract Svs 5,824 875 6,699 - - - - - 6,699
Construction Expenses 299,928 - 299,928 - - - - - 299,928
Transfers Out 32,500 - 32,500 - - - - - 32,500
TOTAL STREET FUND 344,240 875 345,115 - - - - - 345,115
GRANT FUND
Materials & Supplies 6,837 - 6,837 - - - - - 6,837
Fees & Expenses 610 - 610 - - - - - 610
Consultant/Contract Svs 13,261 - 13,261 - - - - - 13,261
Construction Expenses 680,401 74,991 755,392 - - - - - 755,392
TOTAL GRANT FUND 701,109 74,991 776,100 - - - - - 776,100
TOTAL EXPENDITURES 1,045,349 75,866 1,121,215 - - - - - 1,121,215
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance 875 - - - - - -
Revenues & T/I 345,115 - 345,115 - - - - - 345,115
Expenditures & T/O 344,240 875 345,115 - - - - - 345,115
ENDING FUND BALANCE 875 - - - - - - - -
GRANT FUND
Beginning Balance - - - - - - -
Revenues & T/I 701,109 74,991 776,100 - - - - - 776,100
Expenditures & T/O 701,109 74,991 776,100 - - - - - 776,100
ENDING FUND BALANCE - - - - - - - - -
ENDING BALANCE 875 - - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
388
SIDEWALKS, CURBS & STORM DRAINS
Project Name Quito Road Paseo Olivos Curb and
Gutter
Project Number 9142-013
Department Public Works Project Manager Rick Torres
Description This project will install a new curb and gutter system and replace damaged asphalt at Quito
Road and Paseo Olivos.
Location This project is located on the southwest and northwest corners of Quito Road and Paseo
Olivos.
Project
Background
There are currently no storm drains installed on the corner of Quito Road and Paseo Olivos.
As a result, water collects at the corner, creating potential traffic hazards, and undermines
the roadway.
In Fiscal Year 2016/17, the scope of the project was revised from a storm drain project to a
curb and gutter project. The requirements for obtaining an encroachment permit from the
City of San Jose were becoming too prohibitive for the project to proceed in its original scope
and budget. The revised project will install a gutter through the intersection of Paseo Olivos
and Quito Road allowing the water to runoff into an existing City storm drain located north of
this intersection.
$40,000 from Gas Tax revenue funds this project.
This project was completed in FY 2017/18.
Operating
Budget Impacts
There will be no impact to the Fiscal Year 2018/19 operating budget. Installation of the
gutter will reduce the need for continuous repair of damaged asphalt and lower the City’s
liability risk.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
389
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Project Development November 2016 Prepare Plans & Specifications
Contract Award January 2017 Vendor selected
Estimated Construction Start July 2017 Construction project begins
Estimated Completion Date May 2018 Project is complete
QUITO ROAD PASEO OLIVOS STORM DRAIN 9142-013
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
GAS TAX FUND
Transfers In Gas Tax 40,000 - 40,000 - - - - - 40,000
TOTAL GAS TAX FUND 40,000 - 40,000 - - - - - 40,000
TOTAL REVENUES 40,000 - 40,000 - - - - - 40,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
GAS TAX FUND
Consultant/Contract Svs - 3,630 3,630 - - - - - 3,630
Construction Expenses - 36,370 36,370 - - - - - 36,370
TOTAL GAS TAX FUND - 40,000 40,000 - - - - - 40,000
TOTAL EXPENDITURES - 40,000 40,000 - - - - - 40,000
Prior FY Total
Year 2017/18 Project
407,068 Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
GAS TAX FUND
Beginning Balance 40,000 - - - - - -
Revenues & T/I 40,000 - 40,000 - - - - - 40,000
Expenditures & T/O - 40,000 40,000 - - - - - 40,000
Ending Balance 40,000 - - - - - - - -
ENDING BALANCE 40,000 - - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
390
SIDEWALKS, CURBS & STORM DRAINS
Project Name Big Basin Way Sidewalk Repairs Project Number 9142-014
Department Public Works Project Manager Macedonio Nunez
Description This project will repair and replace sidewalk, curb, and gutter along Big Basin Way, on an as
needed basis, to reduce tripping hazards and beautify the village.
Location Th is project is located on Big Basin Way between 6th street and Saratoga-Sunnyvale Road.
Project
Background
The Village is the historical downtown center of Saratoga and is the main corridor for local
retail and professional offices. Businesses found along this thoroughfare road include fine
restaurants, salons, galleries, home furniture show rooms, wine tasting rooms, bakeries,
banks, and delis. As a shopping and dining destination, there is a good deal of pedestrian
traffic as shoppers and diners enjoy the Village’s ambiance.
This project will improve patron safety along this major active corridor and enhance
Saratoga’s pedestrian-friendly environment through ensuring a safe and convenient walking
experience. This project provides funding for rehabilitation of any sidewalk, curb, and gutter
along the Saratoga Village that is deteriorating, or considered a potential tripping hazard.
A $163,000 STP OBAG grant and gas tax revenues of $20,990 fund this project.
Operating
Budget Impacts
Engineering and administrative staff costs for project oversight and implementation of $_____
will be incorporated into the Fiscal Year 2018/19 operating budget. Upon completion, costs
for minor repairs will be reduced, and liability risks will be lowered with infrastructure in new
condition and in compliance with current standards.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
391
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Design Phase September 2015 Prepare plans and specifications
Contract Award May 2018 Council awards contract
Estimated Construction Start June 2018 Construction Begins
Estimated Completion Date August 2018 Project is completed
BIG BASIN WAY SIDEWALK REPAIRS 9142-014
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
GRANT FUND
State - STP OBAG Grant - - - 163,000 - - - - 163,000
TOTAL GRANT FUND - - - 163,000 - - - - 163,000
GAS TAX FUND
Gas Tax 20,990 - 20,990 - - - - - 20,990
TOTAL GAS TAX FUND 20,990 - 20,990 - - - - - 20,990
TOTAL REVENUES 20,990 - 20,990 163,000 - - - - 183,990
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
GRANT FUND
Construction Expenses - - - 163,000 - - - - 163,000
TOTAL GRANT FUND - - 163,000 - - - - 163,000
GAS TAX FUND
Construction Expenses - - - 20,990 - - - - 20,990
TOTAL GAS TAX FUND - - - 20,990 - - - - 20,990
TOTAL EXPENDITURES - - - 183,990 - - - - 183,990
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP GRANT FUND
Beginning Balance - - - - - - - -
Revenues & T/I - - - 163,000 - - - - 163,000
Expenditures & T/O - - - 163,000 - - - - 163,000
Ending Balance - - - - - - -
GAS TAX FUND
Beginning Balance - 20,990 - - - - -
Revenues & T/I - - 20,990 - - - - - 20,990
Expenditures & T/O - - - 20,990 - - - - 20,990
Ending Balance - - 20,990 - - - - - -
ENDING BALANCE - - 20,990 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
392
SIDEWALKS, CURBS & STORM DRAINS
Project Name El Camino Grande Storm Drain Pump Project Number 9142-015
Department Public Works Project Manager Poh Yee
Description This project will install a storm drain system at El Camino Grande.
Location This project is located on El Camino Grande, Saratoga-Los Gatos Road, Austin Way and
Bountiful Acres Way.
Project
Background
This is the second part of the Monte Vista Drive/El Camino Grande area storm drain
improvements. This section of the roadway receives a large amount of storm water runoff
from Monte Vista Drive and El Camino Grande. In the initial development of the area, no
storm drain system was constructed. The increase in home construction led to a decrease in
surface area that could absorb water runoff. Without a proper storm drain system in place,
flooding could occur resulting in erosion and possible street failure.
The drainage issues were partially resolved with the installation of a storm drain pump at
Monte Vista Drive. A second pump is needed at El Camino Grande to draw water across
Highway 9 to the closest storm drain located near Bountiful Acres Way.
In Fiscal Year 2016/17, the estimated costs were revised from $150,000 to $361,000 due to an
increase in the scope of the project. The project was partially funded through a $255,000
transfer from the General Fund.
For Fiscal Year 2017/18, the project costs were revised from $361,000 to $400,000 due to
increases in labor and material costs.
A $400,000 allocation from the CIP Reserve funds this project.
Operating
Budget Impacts
Engineering and administrative staff costs for project oversight and implementation of
$______ will be incorporated into the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
393
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Design Phase March 2017 Prepare plans and specifications
Begin Bid Process July 2017 Finalize plans and bid project
Estimated Construction Start September 2017 Begin Construction
Estimated Completion Date December 2017 Project Complete
EL CAMINO GRANDE STORM DRAIN PUMP 9142-015
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund 255,000 145,000 400,000 - - - - - 400,000
TOTAL REVENUES 255,000 145,000 400,000 - - - - - 400,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Materials & Supplies - 2,267 2,267 - - - - - 2,267
Consultant/Contract Svs 7,493 32,093 39,585 - - - - - 39,585
Construction Expenses - 4,510 4,510 353,639 - - - - 358,149
TOTAL EXPENDITURES 7,493 38,869 46,362 353,639 - - - - 400,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
BEGINNING BALANCE 247,508 353,639 - - - - -
Revenues & T/I 255,000 145,000 400,000 - - - - - 400,000
Expenditures & T/O 7,493 38,869 46,362 353,639 - - - - 400,000
ENDING BALANCE 247,508 353,639 353,639 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
394
SIDEWALKS, CURBS & STORM DRAINS
Project Name Long-Term Trash Plan Storm Drain
Capture Devices
Project Number 9142-017
Department Public Works Project Manager Mainini Cabute
Description This project will install 4 storm drain full capture devices in areas that have the highest
density of trash to implement the City’s Long Term Trash Plan (LTTP).
Location Identified locations include 3 locations on Prospect Road and 1 on Saratoga-Sunnyvale Road
near Prospect Road.
Project
Background
The Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES)
Permit for Phase I communities in the San Francisco Bay (Order R2 -2009-0074), also known as
the Municipal Regional Permit (MRP), became effective on December 1, 2009. Provision C.10.c
of the MRP requires Permittees to submit a Long-Term Trash Load Reduction Plan (Long-Term
Plan) by February 1, 2014. Long-Term Plans must describe control measures that are currently
being implemented, including the level of implementation, and additional control measures
that will be implemented and/or require an increased level of implementation designed to
attain a 70% trash load reduction by July 1, 2017, and 100% by July 1, 2022.
The City submitted a Long-Term Trash Plan (LTTP) in compliance with MRP provision C.10.c.
The goal of the Long-Term Trash Plan is to solve trash problems in receiving waters by
reducing the impacts associated with trash in discharges from the City’s storm sewer system
that are regulated by NPDES Permit requirements. To meet permit requirements, the City
proposed installing 15 storm drain full capture devices.
The City developed the LTTP using a regionally consistent outline and guidance developed by
the Bay Area Stormwater Management Agencies Association (BASMAA) and reviewed by San
Francisco Bay Regional Water Quality Control Board staff.
A $30,000 allocation from the CIP Reserve funded the purchase of 15 storm drain capture
based on initial projections. However, a more detailed analysis of litter hot spo ts revealed on
4 full-capture devices would be needed. The revised cost estimate is now $13,000.
Operating
Budget Impacts
Engineering, administrative and maintenance staff costs for project oversight and
implementation of $____ will be incorporated into the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
395
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Project Purchase March 2018 Purchase full capture devices
Estimated Completion Date September 2018 Complete installation of capture devices
LONG-TERM TRASH PLAN STORM DRAIN CAPTURE DEVICES 9142-017
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund 30,000 - 30,000 - - - - - 30,000
TOTAL REVENUES 30,000 - 30,000 - - - - - 30,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Construction Expenses - - - 17,000 - - - - 17,000
Transfers Out - 13,000 13,000 - - - - - 13,000
TOTAL EXPENDITURES - 13,000 13,000 17,000 - - - - 30,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
BEGINNING BALANCE 30,000 17,000 - - - - -
Revenues & T/I 30,000 - 30,000 - - - - - 30,000
Expenditures & T/O - 13,000 13,000 17,000 - - - - 30,000
ENDING BALANCE 30,000 17,000 17,000 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
396
SIDEWALKS, CURBS & STORM DRAINS
Project Name Wildcat Creek Outfall Repair Project Number 9142-018
Department Public Works Project Manager John Cherbone
Description This project will replace a 36-inch rusted corrugated metal storm drain outfall pipe.
Location This project is located at Gardiner Park.
Project
Background
The City of Saratoga owns the outfall pipe and storm drain structure.
A site assessment by Santa Clara Valley Water District (SCVWD) staff revealed the outfall pipe
located at Gardiner Park was severely corroded, and recommended replacing the outflow pipe
to prevent failure and erosion of creek banks due to flooding.
After the assessment, SCVWD recommended using their Stream Maintenance Program (SMP)
permit procedure to fix the outfall, and committed to providing the planning, design, and
construction services similar to the Padero Court project. The new outlet pipe will extend the
useful life of the storm drain structure.
Although the outfall pipe and storm drain system are the property of the City of Saratoga,
SCVWD offered to pay for half of the cost of repairs, as this repair will prevent a failure that
would cause stream bank erosion, resulting in an even more costly repair project. The Water
District will also manage the project.
The project is complete and payment has been made to SCVWD.
A $40,000 allocation from the CIP Reserve funds this project.
Operating
Budget Impacts
There will be no impact to the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
397
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Design Phase To Be Determined SCVWD will design.
Estimated Construction Start To Be Determined Construction Begins
Estimated Completion Date June 2016 Project is complete.
WILDCAT CREEK OUTFALL REPAIRS 9142-018
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund 40,000 - 40,000 - - - - - 40,000
TOTAL REVENUES 40,000 - 40,000 - - - - - 40,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Construction Expenses - 40,000 40,000 - - - - - 40,000
TOTAL EXPENDITURES - 40,000 40,000 - - - - - 40,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
BEGINNING BALANCE 40,000 - - - - - -
Revenues & T/I 40,000 - 40,000 - - - - - 40,000
Expenditures & T/O - 40,000 40,000 - - - - - 40,000
ENDING BALANCE 40,000 - - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
398
SIDEWALKS, CURBS & STORM DRAINS
Project Name Saratoga Village Crosswalk & Sidewalk
Rehabilitation
Project Number 9142-019
Department Public Works Project Manager Macedonio Nunez
Description This project will improve crosswalks and sidewalks in Saratoga Village.
Location This project is located in Saratoga Village, between 5th and 6th Streets on Big Basin way.
Project
Background
The Village, Saratoga’s historical downtown, offers a number of shops, restaurants, salons,
and office space. The City has been making a number of improvements to the Village to make
it more walkable destination. These improvements included installation of pedestrian bulb-
outs and enhanced crosswalks to make pedestrians more visible, as well as installation of
benches, bike racks, and aesthetic improvements and a renovation of Blaney Plaza that make
the Village a more desirable place to gather.
This project would continue improvements on Big Basin way at 5th Street and 6th Street.
Similar to the first phase of the Village Sidewalk & Pedestrian Enhancements, this project
would install bulb outs, enhanced crosswalks, decorative landscaping, and benches near 5th
Street and 6th Street.
An OBAG grant of $338,000 and City matching funds from the CIP Reserve of $44,000 fund
this project.
Operating
Budget Impacts
Engineering and administrative staff costs for project oversight and implementation of
$______ will be incorporated into the Fiscal Year 2018/19 operating budget. Upon completion,
the City will be responsible for maintaining additional landscaping, bulb-outs and other
features.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
399
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Design Phase August 2010 Minor revisions to Master Plan, if required
Contract Awarded March 2019 Award contract for construction
Estimated Construction Start June 2019 Begin construction
Estimated Construction End Dec 2019 Complete construction
Project Closeout Feb 2020 Council authorizes to close project
SARATOGA VILLAGE CROSSWALK & SIDEWALK REHABILITATION 9142-019
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund - 44,000 44,000 - - - - - 44,000
TOTAL STREET FUND - 44,000 44,000 - - - - - 44,000
GRANT FUND
Federal - CMAQ Grant - - 338,000 - - - - 338,000
TOTAL GRANT FUND - - - 338,000 - - - - 338,000
TOTAL REVENUES - 44,000 - 338,000 - - - - 382,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Construction Expenses - - - 44,000 - - - - 44,000
TOTAL STREET FUND - - - 44,000 - - - - 44,000
GRANT FUND
Construction Expenses - - - 338,000 - - - - 338,000
TOTAL GRANT FUND - - - 338,000 - - - - 338,000
TOTAL EXPENDITURES - - - 382,000 - - - - 382,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance - 44,000 44,000 44,000 44,000 44,000 44,000 44,000
Revenues & T/I - 44,000 - - - - - - 44,000
Expenditures & T/O - - - - - - 44,000
Improvement Projects - 44,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000
CIP GRANT FUND
Beginning Balance - - - - - - -
Revenues & T/I - - - 338,000 - - - - 338,000
Expenditures & T/O - - - 338,000 - - - - 338,000
Ending Balance - - - - - - - -
ENDING BALANCE - 44,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
400
SIDEWALKS, CURBS & STORM DRAINS
Project Name Quito Road Sidewalk Improvements -
Design
Project Number 9142-020
Department Public Works Project Manager John Cherbone
Description This project will fund the design phase of sidewalk improvements on Quito Road.
Location This project is located on Quito Road between Highway 85 and Allendale Avenue.
Project
Background
Quito Road travels from Lawrence Expressway to Highway 9. The road serves as a connection
to several local schools in Saratoga and nearby cities. Currently, sidewalks are located along
the east side of Quito. In 2015 and 2016, the Traffic Safety Commission (TSC) received
numerous complaints from residents who felt unsafe walking along Quito Road.
Subsequently, the TSC assessed Quito Road and recommended filling sidewalk gaps.
The project will include the design of new segments of sidewalk on Quito Road and
reconstruction of existing facilities to improve pedestrian safety and access in the area.
A $50,000 allocation from the CIP reserve initially funds the design phase of this project. The
design phase includes a topographical plan of the area. Depending on the outcome of the
topography work, staff may be able to complete design in-house. However, if a contract
consultant completes design, then costs are estimated at $150,000. The construction phase
of this project is currently on the Unfunded Projects list.
Operating
Budget Impacts
Engineering and administrative staff costs of $_____ will be incorporated into the Fiscal Year
2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
401
SIDEWALKS, CURBS & STORM DRAINS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase July 2019 Begin design phase and award design contract
Estimated Start Date August 2019 Begin design phase
End Design Phase January 2020 Complete design phase
QUITO ROAD SIDEWALK IMPROVEMENTS 9142-020
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund - 50,000 50,000 - - - - - 50,000
TOTAL REVENUES - 50,000 - - - - - - 50,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Consultant/Contract Svs - 7,370 7,370 - - - - - 7,370
Construction Expenses - - - 42,630 - - - - 42,630
TOTAL EXPENDITURES - 7,370 - 42,630 - - - - 50,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance - 42,630 42,630 - - - - 42,630
Revenues & T/I - 50,000 - - - - - - 50,000
Expenditures & T/O - 7,370 42,630 - - - - 50,000
Improvement Projects - 42,630 42,630 - - - - - 42,630
ENDING BALANCE - 42,630 42,630 - - - - - 42,630
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
402
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
403
BRIDGE & RETAINING WALL PROJECTS
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
404
BRIDGE & RETAINING WALL PROJECTS
Project Name Fourth Street Bridge Widening Project Number 9152-001
Department Public Works Project Manager Macedonio Nunez
Description This project will fund the preliminary engineering and environmental, right-of-way
acquisition, and construction phases of widening the 4th Street bridge in Saratoga.
Location This project is located on 4th Street near Wildwood Park in the Saratoga Village.
Project
Background
The 4th Street Bridge was constructed in 1939 and crosses Saratoga Creek near the entrance to
Wildwood Park. This project will widen the bridge to accommodate a sidewalk for pedestrian
traffic, as well as make structural improvements to bring the bridge in compliance with
current standards.
A California Department of Transportation review of Saratoga bridges in 2004 listed the 4th
Street Bridge as being in “generally good condition”. There are 20 bridges located in the City.
Nine of these bridges pass over Saratoga Creek.
A $487,000 Federal Highway Bridge Replacement and Rehabilitation (HBRR) program grant
and $100,000 allocation from the CIP Reserve currently fund this project.
This project will be completed in three phases; preliminary engineering and environmental,
right-of-way acquisition, and construction with an estimated cost of $1.41 million.
The Preliminary Engineering and Environmental phase will include survey work, constraint
analysis, environmental review and design with an estimated cost of $$284,829.
The Right-of-way acquisition phase will include the acquisition, or obtaining rights to access
property needed to widen the bridge, with an estimated cost of $11,147.
The Construction phase will include work on widening the bridge with an estimated cost of
$1,114,700.
The project has sufficient funding for the preliminary engineering and environmental, right-
of-way acquisition, and a small portion of the construction phase. Additional funding will be
needed to complete the construction phase of this project.
Operating
Budget Impacts
There will be no impact to the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
405
BRIDGE & RETAINING WALL PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase May 2018 Prepare plans and specifications
Right of Way Acquisition October 2019 Complete right of way negotiations and acquisition
Begin Bid Process January 2020 Council approves plans and authorizes bidding the
project
Contract Award March 2020 Council awards contract
Estimated Construction Start June 2020 Construction project begins
Estimated Completion Date August 2021 Project is completed
FOURTH STREET BRIDGE WIDENING 9152-001
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund 100,000 - 100,000 - - - - - 100,000
TOTAL STREET FUND 100,000 - 100,000 - - - - - 100,000
GRANT FUND
Federal - HBRR 1,078 - 1,078 485,922 - - - - 487,000
TOTAL GRANT FUND 1,078 - 1,078 485,922 - - - - 487,000
TOTAL REVENUES 101,078 - 101,078 485,922 - - - - 587,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Site Acquisition & Prep - - - 791 - - - - 791
Consultant/Contract Svs - - - 20,158 - - - - 20,158
Construction Expenses - - - 79,051 - - - - 79,051
TOTAL STREET FUND - - - 100,000 - - - - 100,000
GRANT FUND
Site Acquisition & Prep - - - 3,850 - - - - 3,850
Consultant/Contract Svs 1,078 - 1,078 99,248 - - - - 100,326
Construction Expenses - - - 382,824 - - - - 382,824
TOTAL GRANT FUND 1,078 - 1,078 485,922 - - - - 487,000
TOTAL EXPENDITURES 1,078 - 1,078 585,922 - - - - 587,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance 100,000 100,000 - - - - -
Revenues & T/I 100,000 - 100,000 - - - - - 100,000
Expenditures & T/O - - - 100,000 - - - - 100,000
ENDING FUND BALANCE 100,000 100,000 100,000 - - - - - -
GRANT FUND
Beginning Balance - - - - - - -
Revenues & T/I 1,078 - 1,078 485,922 - - - - 487,000
Expenditures & T/O 1,078 - 1,078 485,922 - - - - 487,000
ENDING FUND BALANCE - - - - - - - - -
ENDING BALANCE 100,000 100,000 100,000 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
406
BRIDGE & RETAINING WALL PROJECTS
Project Name Quito Road Bridges Project Number 9152-002
Department Public Works Project Manager Macedonio Nunez
Description This project funds the preliminary engineering and environmental and construction phases of
the removal and replacement of two bridges on Quito Road.
Location This project is located on two sections of Quito Road along the border of Saratoga and Los
Gatos.
Project
Background
The California Department of Transportation (Caltrans) conducted a structural assessment of
the two bridges on Quito Road and rated them in need of replacement. Additionally, the
bridges are not wide enough to meet current Caltrans standards for roadway size.
This project will rebuild the bridges, bringing the width of the Quito Road bridges in
compliance with State roadway standards, which will ultimately increase safety for people
using Quito Road.
Both bridges pass over San Tomas Creek, which flows through Saratoga, Campbell, Los Gatos,
Monte Sereno, San Jose, and Santa Clara. As these two bridges fall along the city limit lines of
Saratoga and Los Gatos and along the San Tomas Creek, Los Gatos, Saratoga, and the Santa
Clara Valley Water District all share in the boundaries and responsibilities.
As Saratoga holds the primary share of allocated responsibility, the City agreed to manage
this bridge replacement project. There are a total of 20 bridges in Saratoga. Four of these
bridges pass over San Tomas Creek.
The total cost of this project is approximately $5.01 million over three phases. Funding to
remove and replace the existing bridges comes primarily from a $4.12 million Federal
Highway Bridge Replacement and Rehabilitation (HBRR) Program Grant, and allocated grant
match contributions of approximately $300,000 apiece through a co-operative agreement
between the Santa Clara Valley Water District, Los Gatos, and Saratoga.
Design work is complete. The City is now in the process of acquiring right-of-way from
residential properties before construction can commence.
Operating
Budget Impacts
Engineering and administrative staff costs for project oversight and implementation of $_____
will be incorporated into the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
407
BRIDGE & RETAINING WALL PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase January 2013 Prepare plans and specifications
End Design Phase October 2014 Plans and specifications complete
Contract Award April 2018 Council awards contract
Estimated Construction Start July 2018 Construction project begins (pending right-of-way acquisitions)
Estimated Completion Date August 2019 Project is completed
QUITO ROAD BRIDGES – PROJECT ENGINEERING 9152-002
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Project Reimbursements 188,318 - 188,318 77,510 - - - - 265,828
Transfers In - Other CIP 15,023 - 15,023 - - - - - 15,023
Transfers In - General Fund 155,659 - 155,659 - - - - - 155,659
TOTAL 358,999 - 358,999 77,510 - - - - 436,510
GRANT FUND
Federal - HBRR 671,600 - 671,600 - - - - - 671,600
TOTAL 671,600 - 671,600 - - - - - 671,600
GAS TAX FUND
Gas Tax Revenues 129,000 - 129,000 - - - - - 129,000
TOTAL 129,000 - 129,000 - - - - - 129,000
TOTAL REVENUES 1,159,599 - 1,159,599 77,510 - - - - 1,237,109
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Site Acquisition & Prep 19,356 - 19,356 - - - - - 19,356
Materials & Supplies 165 - 165 - - - - - 165
Fees & Expenses 485 - 485 - - - - - 485
Consultant/Contract Svs 45,237 - 45,237 - - - - - 45,237
Construction Expenses 89,333 - 89,333 235,340 - - - - 324,673
Reimbursable Expenses 714 - 714 - - - - - 714
Transfers Out 45,880 - 45,880 - - - - - 45,880
TOTAL 201,169 - 201,169 235,340 - - - - 436,510
GRANT FUND
Site Acquisition & Prep 104,513 - 104,513 - - - - - 104,513
Materials & Supplies 660 - 660 - - - - - 660
Fees & Expenses 207 - 207 - - - - - 207
Consultant/Contract Svs 182,798 - 182,798 - - - - - 182,798
Construction Expenses 366,685 - 366,685 - - - - - 366,685
Reimbursable Expenses 16,736 - 16,736 - - - - - 16,736
Transfers Out - - - - - - - -
TOTAL 671,601 - 671,600 - - - - - 671,600
GAS TAX FUND
Site Acquisition & Prep 11,375 - 11,375 - - - - - 11,375
Materials & Supplies 87 - 87 - - - - - 87
Fees & Expenses 413 - 413 - - - - - 413
Consultant/Contract Svs 110,039 - 110,039 - - - - - 110,039
Construction Expenses - - - 7,085 - - - - 7,085
TOTAL 121,915 - 121,915 7,085 - - - - 129,000
TOTAL EXPENDITURES 994,685 - 994,684 242,425 - - - - 1,237,109
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
408
BRIDGE & RETAINING WALL PROJECTS
QUITO ROAD BRIDGES – PROJECT ENGINEERING 9152-002
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance 157,830 358,999 436,510 436,510 436,510 436,510 -
Revenues & T/I 358,999 - 358,999 77,510 - - - - 436,510
Expenditures & T/O 201,169 - - - - - 436,510
Improvement Projects 157,830 157,830 358,999 436,510 436,510 436,510 436,510 436,510 -
GRANT FUND
Beginning Balance - - - - - - -
Revenues & T/I 671,600 - 671,600 - - - - - 671,600
Expenditures & T/O 671,601 - 671,601 - - - - - 671,600
ENDING FUND BALANCE - - - - - - - - -
GAS TAX FUND
Beginning Balance 7,085 7,085 - - - - -
Revenues & T/I 129,000 - 129,000 - - - - - 129,000
Expenditures & T/O 121,915 - 121,915 7,085 - - - - 129,000
ENDING FUND BALANCE 7,085 7,085 7,085 - - - - - -
ENDING BALANCE 164,915 164,915 358,999 436,510 436,510 436,510 436,510 436,510 -
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
409
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
410
BRIDGE & RETAINING WALL PROJECTS
Project Name Quito Road Bridges – ROW Acquisition Project Number 9152-004
Department Public Works Project Manager Macedonio Nunez
Description This project funds the fair market value acquisition of a minimal amount of right of way
easements.
Location This project is located on two sections of Quito Road along the border of Saratoga with Los
Gatos.
Project
Background
The California Department of Transportation (CalTrans) conducted a structural assessment of
the two bridges on Quito Road and rated them in need of replacement. Additionally, the
bridges are not wide enough to meet current CalTrans standards for roadway use.
This project will rebuild the bridges, bringing the bridge widths into compliance with State
roadway standards, and ultimately increasing safety for people using Quito Road.
Both bridges pass over San Tomas Aquinas Creek, which flows from the San Francisco Bay in
Santa Clara, through San Jose, Campbell, Los Gatos, Monte Sereno, and heads in Saratoga. The
two bridges cross the San Tomas Aquinas creek along the city limits of Saratoga and Los
Gatos, therefore the cities of Saratoga and Los Gatos, along with the Santa Clara Valley Water
District all share in the boundaries and responsibilities of bridge maintenance. A cooperative
agreement between the three agencies has been executed with Saratoga named as the lead
agency.
The Project Engineering phase of this project has been ongoing and is nearing completion.
This phase will fund the acquisition of 4,532 square feet of easements from three privately
owned parcels adjoining the existing right of way, in order to meet applicable bridge
standards.
A $354,120 Federal Highway Bridge Replacement and Rehabilitation (HBBR) Program Grant
and $45,880 from the three cooperating agencies fund this phase of the project.
Operating
Budget Impacts
Engineering and administrative staff costs for project oversight and implementation of
$______ will be incorporated into the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
411
BRIDGE & RETAINING WALL PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Contract Award April 2016 Award contract
Right of Way Acquisition April 2016 Begin right-of-way negotiations
Estimated Completion Date May 2018 Project complete
QUITO ROAD BRIDGES – ROW ACQUISITION 9152-004
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - Other CIP 45,880 - 45,880 - - - - - 45,880
TOTAL 45,880 - 45,880 - - - - - 45,880
GRANT FUND
Federal - HBRR 27,947 23,439 51,386 302,735 - - - - 354,120
TOTAL 27,947 23,439 51,386 302,735 - - - - 354,120
TOTAL REVENUES 73,827 23,439 97,266 302,735 - - - - 400,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Site Acquisition & Prep 1,828 2,760 4,588 - - - - - 4,588
Fees & Expenses 89 - 89 - - - - - 89
Consultant/Contract Svs 1,471 276 1,748 - - - - - 1,748
Construction Expenses - - - 39,222 - - - - 39,222
Reimbursable Expenses 233 - 233 - - - - - 233
TOTAL 3,621 3,037 6,658 39,222 - - - - 45,880
GRANT FUND
Site Acquisition & Prep 14,107 21,305 35,412 - - - - - 35,412
Fees & Expenses 687 - 687 - - - - - 687
Consultant/Contract Svs 11,357 2,134 13,490 - - - - - 13,490
Construction Expenses - - - 302,735 - - - - 302,735
Reimbursable Expenses 1,796 - 1,796 - - - - - 1,796
TOTAL 27,947 23,439 51,385 302,735 - - - - 354,120
TOTAL EXPENDITURES 31,567 26,476 58,043 341,957 - - - - 400,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance 42,259 39,222 - - - - -
Revenues & T/I 45,880 - 45,880 - - - - - 45,880
Expenditures & T/O 3,621 3,037 6,658 39,222 - - - - 45,880
Improvement Projects 42,259 39,222 39,222 - - - - - -
GRANT FUND
Beginning Balance - - - - - - -
Revenues & T/I 27,947 23,439 51,386 302,735 - - - - 354,120
Expenditures & T/O 27,947 23,439 51,385 302,735 - - - - 354,120
ENDING FUND BALANCE - - - - - - - -
ENDING BALANCE 42,259 39,222 39,222 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
412
BRIDGE & RETAINING WALL PROJECTS
Project Name Annual Retaining Wall Maintenance &
Repairs
Project Number 9153-003
Department Public Works Project Manager Emma Burkhalter
Description This project will fund the maintenance and repairs of city-owned retaining walls.
Location This project is located Citywide.
Project
Background
In FY 2014/15, the City Geologist inspected a City-owned retaining wall along a portion of
Damon Lane after staff noticed the wall had started to lean downhill towards the roadway.
The wall is approximately 40 to 50 years old and located within the public right -of-way on
Damon Lane.
Following inspection, the City Geologist recommended replacing the wall as soon as possible
due to the high likelihood of failure in the event of a landslide. If the wall fails, damage to the
roadway would be severe restricting traffic flow to one lane.
Due to the winter storms in FY 2016/17, Council determined that an annual appropriation
was necessary in order to address the maintenance and repairs of city-owned retaining walls
throughout the City and expanded the scope of this project to include retaining walls
citywide.
In FY 2017/18, repairs to the Damon Lane retaining wall were completed.
FY 2018/19 repairs include retaining walls located in the Saratoga Heights area and Mount
Eden Estates.
An annual $200,000 transfer from the General Fund funds this project.
Operating
Budget Impacts
Engineering, administrative and maintenance staff costs for project oversight and
implementation of $______ will be incorporated into the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
413
BRIDGE & RETAINING WALL PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Estimated Completion Date Ongoing
ANNUAL RETAINING WALL MAINTENANCE AND REPAIRS 9153-003
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund 190,000 200,000 390,000 200,000 200,000 200,000 200,000 200,000 1,390,000
TOTAL 190,000 200,000 390,000 200,000 200,000 200,000 200,000 200,000 1,390,000
TOTAL REVENUES 190,000 200,000 390,000 200,000 200,000 200,000 200,000 200,000 1,390,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Fees & Expenses - 1,039 1,039 - - - - - 1,039
Consultant/Contract Svs 31,045 22,165 53,210 - - - - - 53,210
Construction Expenses - 313,626 313,626 222,125 200,000 200,000 200,000 200,000 1,335,751
TOTAL 31,045 336,830 367,875 222,125 200,000 200,000 200,000 200,000 1,390,000
TOTAL EXPENDITURES 31,045 336,830 367,875 222,125 200,000 200,000 200,000 200,000 1,390,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance 158,955 - - - - - -
Revenues & T/I 190,000 200,000 390,000 200,000 200,000 200,000 200,000 200,000 1,390,000
Expenditures & T/O 31,045 336,830 367,875 222,125 200,000 200,000 200,000 200,000 1,390,000
ENDING FUND BALANCE 158,955 22,125 - - - - -
ENDING BALANCE 158,955 22,125 - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
414
BRIDGE & RETAINING WALL PROJECTS
Project Name Bainter Avenue Retaining Wall Project Number 9153-004
Department Public Works Project Manager Iveta Harvancik
Description This project will fund the repair and reinforcement of a retaining wall.
Location This project is located on Bainter Avenue.
Project
Background
A landslide compromised a portion of Bainter Avenue during the winter storms of 2015.
The City Geologist recommended repair and reinforcement of the existing retaining wall as
soon as possible due to the high likelihood of failure in the event of further landslide.
A $210,000 allocation from the General Fund Hillside Reserve funds this project.
This project was completed in September 2017 and will be closed.
Operating
Budget Impacts
There will be no impact to the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
415
BRIDGE & RETAINING WALL PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase September 2016 Prepare plans and specifications
Begin Bid Process May 2017 Select contractor
Contract Award June 2017 Award contract
Estimated Construction Start July 2017 Begin construction
Estimated Completion Date December 2017 Project complete
BAINTER AVENUE RETAINING WALL 9153-004
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Transfers In - General Fund 210,000 - 210,000 - - - - - 210,000
TOTAL 210,000 - 210,000 - - - - - 210,000
TOTAL REVENUES 210,000 - 210,000 - - - - - 210,000
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Fees & Expenses 269 - 269 - - - - - 269
Consultant/Contract Svs 19,814 13,981 33,795 - - - - - 33,795
Construction Expenses - 84,120 84,120 - - - - - 84,120
Transfers Out - 91,816 91,816 - - - - - 91,816
TOTAL 20,083 189,917 210,000 - - - - - 210,000
TOTAL EXPENDITURES 20,083 189,917 210,000 - - - - - 210,000
Prior FY Total
Year 2017/18 Project
Activity Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
Beginning Balance 189,917 - - - - - -
Revenues & T/I 210,000 - 210,000 - - - - - 210,000
Expenditures & T/O 20,083 189,917 210,000 - - - - - 210,000
ENDING FUND BALANCE 189,917 - - - - - -
ENDING BALANCE 189,917 - - - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
416
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
417
UTILITY UNDERGROUNDING PROJECTS
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
418
UTILITY UNDERGROUNDING PROJECTS
Project Name Rule 20A Undergrounding Project Project Number 9171-001
Department Public Works Project Manager Poh Yee
Description This project will fund undergrounding of utilities in Saratoga.
Location One or more locations for this project are to be determined.
Project
Background
Each year, Pacific Gas & Electric (PG&E) allocates undergrounding work credits to Saratoga and
other municipalities to provide funding for undergrounding utilities. The credits for these
allocations are provided through PG&E’s Rule 20A program, which is an electric tariff filed
with the California Public Utilities Commission. As a re sult of the Rule 20A program, PG&E is
able to annually fund relocation of approximately 30 miles of overhead utilities underground.
Rule 20A funding comes from electricity rate payers.
Before Rule20A work credits can be used, proposed undergrounding projects must be
approved by PG&E. Projects must reduce an unusually heavy concentration of overhead power
lines, be conducted on arterial streets with high pedestrian or vehicular traffic, or be done on
roads that are in a civic, recreational, or scenic area.
Due to the very high cost of undergrounding, Saratoga has been collecting Rule 20A credits
over the past few years to allow for a more substantial undergrounding project in the City.
Operating
Budget Impacts
Moving overhead utilities underground will make the City more attractive and will reduce
safety risks associated with down power lines. As fallen power lines can be especially
problematic during winter storms, undergrounding the lines would reduce emergency staff
costs and liability. Project management costs for this project will be included in the operating
budget when it becomes active. There is no impact to the Fiscal Year 2017/18 Operating
Budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
419
UTILITY UNDERGROUNDING PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase TBD Prepare plans and specifications in conjunction with PG&E
Estimated Construction Start TBD PG&E begins construction
Estimated Completion Date TBD PG&E completes construction
RULE 20A ELECTRIC UNDERGROUND CONVERSION PROJECTS 9171-001
As of March 31, 2017, $3,765,917 of work credit funding is available from PG&E for utility undergrounding work
funded and completed by PG&E. Additional funds accumulate each year. The City does not receive cash funds for
this work; therefore the work credit amount is not included in the CIP financial schedules.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
420
UTILITY UNDERGROUNDING PROJECTS
Project Name Quito Road Undergrounding Project Project Number 9171-002
Department Public Works Project Manager Poh Yee
Description This project will fund undergrounding of utilities on Quito Road in Saratoga.
Location Undergrounding work would take place on Quito Road near Twin Creeks Road.
Project
Background
Several years ago, because of fees collected for a subdivision, the City received funds to
underground utilities on Quito Road near Twin Creeks Road. In recent years, municipalities
and Pacific Gas & Electric (PG&E) have started moving overhead utility lines underground.
Due to the high costs of undergrounding, transferring the overhead utilities at this location
will have to be incorporated into a larger undergrounding project.
Moving overhead utilities underground will make the City more attractive and will reduce
safety risks associated with down power lines. Fallen power lines can be especially
problematic during winter storms.
Operating
Budget Impacts
There will be no impact to the Fiscal Year 2018/19 operating budget.
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
421
UTILITY UNDERGROUNDING PROJECTS
PROJECT TIMELINE
PROJECT COMPONENT TIMELINE DESCRIPTION
Begin Design Phase TBD Prepare plans and specifications
Begin Bid Process TBD Council approves plans and authorizes bidding the
project
Contract Award TBD Council awards contract
Estimated Construction Start TBD Construction project begins
Estimated Completion Date TBD Project is completed
QUITO ROAD UNDERGROUNDING PROJECT 9171-002
Prior FY Total
Year 2017/18 Funded Project
REVENUES Funded Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Funding
CIP STREET FUND
Community Benefit Assess 98,744 - 98,744 - - - - - 98,744
TOTAL REVENUES 98,744 - 98,744 - - - - - 98,744
Prior FY Total
Year 2017/18 Expended Project
EXPENDITURES Expended Actuals To Date 2018/19 2019/20 2020/21 2021/22 2022/23 Expended
CIP STREET FUND
Construction Expenses - - - 98,744 - - - - 98,744
TOTAL EXPENDITURES - - - 98,744 - - - - 98,744
FY Total
2017/18 Estimated Project
Actuals Total 2018/19 2019/20 2020/21 2021/22 2022/23 Activity
CIP STREET FUND
BEGINNING FUND BAL 98,744 98,744 - - - - -
Revenues & T/I 98,744 - 98,744 - - - - - 98,744
Expenditures & T/O - - - 98,744 - - - - 98,744
ENDING BALANCE 98,744 98,744 98,744 - - - - - -
Budgeted for Fiscal Year
Budgeted for Fiscal Year
Budgeted for Fiscal Year
CITY OF SARATOGA
CAPITAL PROGRAM – STREET IMPROVEMENTS
422