HomeMy WebLinkAbout05-09-18 Planning Commission Agenda PacketSaratoga Planning Commission Agenda – Page 1 of 3
SARATOGA PLANNING COMMISSION
REGULAR MEETING
MAY 9, 2018
7:00 P.M. - PLANNING COMMISSION REGULAR MEETING
Civic Theater | 13777 Fruitvale Avenue, Saratoga CA 95070
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF MINUTES
Action Minutes from the Regular Planning Commission Meeting of April 25, 2018.
Recommended Action:
Approve Minutes of April 25, 2018 meeting.
042518 Action Minutes
ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS
Any member of the public will be allowed to address the Planning Commission for up to three
(3) minutes on matters not on this agenda. This law generally prohibits the Planning
Commission from discussing or taking action on such items. However, the Planning Commission
may instruct staff accordingly regarding Oral Communications.
REPORT ON APPEAL RIGHTS
If you wish to appeal any decision on this Agenda, you may file an Appeal Application with the
City Clerk within fifteen (15) calendar days of the date of the decision.
1. NEW BUSINESS
1.1. Proposed Capital Improvement Projects (CIP) for FY 2018/2019.
Recommended Action:
Staff recommends the Commission adopt the attached Resolution #18-006 finding the
proposed CIP projects conform to the general plan.
Staff Report CIP 2018-19
Attachment 1 Resolution CIP 18-19
Attachment 2 Project Summaries 18-19
Attachment 3 GP conformance CIP18-19
2. PUBLIC HEARING
Applicants and/or their representatives have a total of ten (10) minutes maximum for
opening statements. All interested persons may appear and be heard during this meeting
regarding the items on this agenda. If items on this agenda are challenged in court,
Saratoga Planning Commission Agenda – Page 2 of 3
members of the public may be limited to raising only issues raised at the Public Hearing or
in written correspondence delivered to the Planning Commission at, or prior to the close of
the Public Hearing. Members of the public may comment on any item for up to three (3)
minutes. Applicants and/or their representatives have a total of five (5) minutes maximum
for closing statements.
2.1. Application PDR17-0015/ARB17-0022/ARB17-0037; 20142 Williamsburg Lane (APN
386-390-024); Lands of Stetak. The applicant requests Design Review approval to construct a
new one-story single-family residence with a maximum height 19.29’. No protected trees are
requested for removal. The site is zoned R-1-12,500 and is 12,600 gross square feet in size. Staff
Contact: Christopher Riordan (408) 868-1235 or criordan@saratoga.ca.us
Recommended Action:
Adopt Resolution No.18-006 approving the project subject to conditions of approval
included in Attachment 1.
Williamsburg Lane Staff Report - Final
Attachment 1 Resolution 18-006
Attachment 2 - Arborist Report
Attachment 3 - Story Pole Certification Letter
Attachment 4 - Development Plans
2.2. Application PDR17-0023/ARB17-0061; 19891 Robin Way (APN 510-01-036);
Lands of Salek. The applicant requests Design Review approval to construct a new one-
story single-family residence with a maximum height of 23’-3 1/4”. Two trees are
proposed for removal which includes a 15” Magnolia and a 17” Mayten. The site is
zoned R-1-20,000 and is 33,350 gross square feet in size. Staff Contact: Christopher
Riordan (408) 868-1235 or criordan@saratoga.ca.us
Recommended Action:
Adopt Resolution No.18-007 approving the project subject to conditions of approval
included in Attachment 1.
Robin Way Staff Report - Final
Attachment 1 Resolution 18-007
Attachment 2 - Arborist Report
Attachment 3 - Story Pole Certification Letter
Attachment 4 - Neighbor Comments
Attachment 5 - Development Plans
DIRECTOR ITEMS
COMMISSION ITEMS
ADJOURNMENT
CERTIFICATE OF POSTING OF THE AGENDA
I, Janet Costa, Administrative Assistant for the City of Saratoga, declare that the foregoing
agenda for the meeting of the Planning Commission was posted and available for public review
on May 3, 2018 at the City of Saratoga, 13777 Fruitvale Avenue, Saratoga, CA 95070 and on the
City’s website at www.saratoga.ca.us.
Saratoga Planning Commission Agenda – Page 3 of 3
Signed this 3rd day of May 2018 at Saratoga, California.
Janet Costa, Administrative Assistant
In Compliance with the Americans with Disabilities Act, if you need assistance to participate in
this meeting, please contact the City Clerk at 408/868-1269. Notification 24 hours prior to the
meeting will enable the City to make reasonable arrangements to ensure accessibility to this
meeting. [28 CFR 35.102-35.104 ADA title II]
You can also sign up to receive email notifications when Commission agendas and minutes have
been added to the City at website http://www.saratoga.ca.us/contact/email_subscriptions.asp.
NOTE: To view previous Planning Commission meetings anytime, go the City Video Archives at
www.saratoga.ca.us
Saratoga Planning Commission Agenda – Page 1 of 3
SARATOGA PLANNING COMMISSION
REGULAR MEETING
ACTION MINUTES
APRIL 25, 2018
7:00 P.M. - PLANNING COMMISSION REGULAR MEETING
Joan Pisani Community Center, Multipurpose Room | 19655 Allendale Avenue, Saratoga CA 95070
PLEDGE OF ALLEGIANCE
ROLL CALL
PRESENT: Chair Joyce Hlava, Vice Chair Kookie Fitzsimmons, Commissioners Sunil
Ahuja, Razi Mohiuddin, Len Almalech, Tina Walia, Lucas Pastuszka
ABSENT: None
ALSO PRESENT: Debbie Pedro, Community Development Director
APPROVAL OF MINUTES
Action Minutes from the Regular Planning Commission Meeting of April 25, 2018.
Recommended Action:
Approve Minutes of April 25, 2018 regular meeting.
FITZSIMMONS/WALIA MOVED TO APPROVE THE MINUTES AS AMENDED FOR
THE REGULAR PLANNING COMMISSION MEETING OF APRIL 25, 2018. MOTION
PASSED. AYES: WALIA, HLAVA, AHUJA, FITZSIMMONS, MOHIUDDIN ALMALECH,
PASTUSZKA. NOES: NONE. ABSENT: NONE. ABSTAIN: NONE.
ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS
Any member of the public will be allowed to address the Planning Commission for up to three
(3) minutes on matters not on this agenda. This law generally prohibits the Planning
Commission from discussing or taking action on such items. However, the Planning Commission
may instruct staff accordingly regarding Oral Communications.
REPORT ON APPEAL RIGHTS
If you wish to appeal any decision on this Agenda, you may file an Appeal Application with the
City Clerk within fifteen (15) calendar days of the date of the decision.
1. NEW BUSINESS
4
Saratoga Planning Commission Agenda – Page 2 of 3
1.1 Discussion of Planning Commission meeting calendar for proposed summer and holiday
breaks.
Recommended Action:
Discussion and approval of tentative cancellations on 2018 meeting calendar.
ALMALECH MOTIONED TO CANCEL 8/8/18, 8/22/18, AND 12/26/18. MOTION
FAILED DUE TO LACK OF SECOND.
FITZSIMMONS/HLAVA MOVED TO APPROVE THE 2018 MEETING
CALENDAR APPROVING PROPOSED CANCELLATIONS; 7/25/18, 8/8/18,
AND 12/26/18. MOTION PASSED. AYES: WALIA, HLAVA, AHUJA,
FITZSIMMONS, MOHIUDDIN ALMALECH, PASTUSZKA. NOES: NONE.
ABSENT: NONE. ABSTAIN: NONE.
2. PUBLIC HEARING
Applicants and/or their representatives have a total of ten (10) minutes maximum for
opening statements. All interested persons may appear and be heard during this meeting
regarding the items on this agenda. If items on this agenda are challenged in court,
members of the public may be limited to raising only issues raised at the Public Hearing or
in written correspondence delivered to the Planning Commission at, or prior to the close of
the Public Hearing. Members of the public may comment on any item for up to three (3)
minutes. Applicants and/or their representatives have a total of five (5) minutes maximum
for closing statements.
Planning Commission Ex Parte Contacts Policy Disclosure
2.1. Accessory Dwelling Units Ordinance Update
Changes to the Accessory Dwelling Unit (ADU) Ordinance Article 15-56 pursuant to
2017 State Legislation.
Staff contact: Debbie Pedro (408) 868-1231 dpedro@saratoga.ca.us.
Recommended Action:
Approve Resolution No.18-005 recommending that the City Council adopt the
proposed ordinance amending Chapter 15 (Zoning Regulations) of the Saratoga
Municipal Code related to Accessory Dwelling Units.
WALIA/PASTUSZKA MOVED TO APPROVE AS AMENDED. MOTION
PASSED. AYES: WALIA, HLAVA, AHUJA, ALMALECH, FITZSIMMONS,
MOHIUDDIN, PASTUSZKA. NOES: NONE. ABSENT: NONE. ABSTAIN:
NONE.
DIRECTOR ITEMS
None.
COMMISSION ITEMS
Vice Chair Fitzsimmons spoke of Saratoga Rotary Art Show coming Saturday/Sunday May 5th
and 6th 10:00 AM to 5:00 PM on the lawn at West Valley College.
5
Saratoga Planning Commission Agenda – Page 3 of 3
Chair Hlava announced and invited all to the State of the City Address Saturday, April 29th from
2:00 to 4:00 at City Hall. Also mentioned Saratoga Historical Museum is hosting a fundraiser at
Dr. Head’s Estate atop Pike Road, Old Grand View Ranch on Saturday May 19th.
ADJOURNMENT
Meeting adjourned at 9:05 PM.
Minutes respectfully submitted:
Janet Costa, Administrative Assistant
City of Saratoga
6
REPORT TO THE
PLANNING COMMISSION
Meeting Date: May 9, 2018
Application: Finding of General Plan Consistency
FY 2018-2019 Capital Improvement Program (CIP)
Location / APN: Citywide
Owner / Applicant: City of Saratoga
From: John Cherbone, Public Works Director
Debbie Pedro, Community Development Director
STAFF RECOMMENDATION
Adopt Resolution 18-008 finding the CIP projects proposed for Fiscal Year 18-19 conform
to the Saratoga General Plan.
PROJECT DESCRIPTION
Nine (9) new capital projects are proposed in the upcoming Fiscal Year 2018-2019. The
Capital Improvement Program (CIP) project summaries are included in Attachment 2.
California Government Code Section 65401 states that the local planning agency should
report on the conformity of the CIP with the agency’s General Plan. However, not all
projects have a relationship to a policy in the General Plan such as maintenance work and
building remodels.
Staff reviewed the proposed projects and found that they all follow the City’s General Plan
policies therefore a conformity finding can be supported. A spreadsheet listing each project
and citing the corresponding General Plan goals, policies, and actions, can be found in
Attachment 3. The environmental determination will be addressed project by project.
ATTACHMENTS
1. Resolution 18-008
2. FY 18-19 CIP Project Summaries
3. CIP General Plan Conformity (Exhibit A)
7
RESOLUTION NO. 18-008
A RESOLUTION OF THE CITY OF SARATOGA PLANNING COMMISSION
DETERMINING THAT THE NEW FY 18-19 CIP PROJECTS CONFORM TO THE
GENERAL PLAN
WHEREAS, California Government Section 65401 requires the local planning
agency to report on the conformity of proposed public works with the adopted General Plan;
and
WHEREAS, the Planning Commission reviewed and considered the materials
submitted by the Public Works Director which include a listing of each capitol project and
the corresponding General Plan Goal and Policy, attached as Exhibit A.
NOW THEREFORE, the Planning Commission of the City of Saratoga does
hereby find that the new Capital Improvement Program projects conform to the Goals and
Policies of the City of Saratoga General Plan in that the various improvement projects
implement the programs and objectives outlined in the various General Plan Elements.
PASSED AND ADOPTED by the City of Saratoga Planning Commission, State of
California, on May 9, 2018, by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________________
Joyce Hlava
Chair, Planning Commission
Attachment 1
8
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
1
FUNDED
NEW CIP PROJECT NARRATIVES
Attachment 2
9
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
2
Project
Title Request
Funding
Request
1 Fruitvale Avenue & Allendale Avenue
Intersection Improvements
This project would fund improvements to the intersection of Fruitvale and
Allendale Avenues.
250,000
250,000$
2 Quarry Park Walkway Clearing This project would clear the walkway around the pond at Quarry Park 50,000
3 Park & Trail SafetyImprovements This project would add fencing and lighting in several City parks. 43,000
4 Quito/Pollard Roads Open Space
Improvements
This project would fund improvements to the open space area located at the
corner of Quito and Pollard Roads.
75,000
168,000$
5 Bocce Ball Court This project will fund the installation of a bocce ball court at City Hall in
conjunction with funds raised by the Senior Center
48,000
6 Senior Center Entrance Remodel This project would renovate the exterior entrance and walkways into the
Saratoga Senior Center.
50,000
7 Community Development Lobby Remodel This project would fund a remodel of the Community Development Lobby
area
150,000
8 Community Center Stage Renovation This project would renovate the stage located in the Community Center's Multi-
Purpose Room, improvements to incorporate ADA access
90,000
338,000$
9 Accessibility Assessment This project would assess compliance with accessibility requirements for City
parking areas and traffic signals.
75,000
75,000$
831,000$ TOTALS
FACILITY IMPROVEMENT PROJECTS
TOTAL FACILITY NOMINATED PROJECTS
ADMINISTRATIVE PROJECTS
TOTAL ADMINISTRATIVE NOMINATED PROJECTS
FUNDED CIP PROJECT LIST
FY 2018/19
STREET IMPROVEMENT PROJECTS
TOTAL STREETS NOMINATED FUNDING REQUESTS
PARK & TRAIL IMPROVEMENT PROJECTS
TOTAL PARKS AND TRAILS NOMINATED PROJECTS
10
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
3
STREET IMPROVEMENT PROJECTS
Project Name Fruitvale Avenue & Allendale Avenue
Intersection Improvements
Project Number 9122-010
Department Public Works Project Manager John Cherbone
Description This project would make improvements to the intersections at Fruitvale Avenue and Allendale Avenue.
Location This project is located at the intersections of Fruitvale Avenue and Allendale Avenue.
Project
Background
Fruitvale Avenue is one of several major collector streets within the City carrying high volumes of
vehicle traffic. The intersection Fruitvale Avenue and Allendale Avenue serve s as the primary access
to West Valley College, Redwood Middle School, the Post Office, Saratoga City Hall. As a result, the
intersection becomes congested with pedestrian and vehicle traffic on weekdays during school drop off
and pick up times.
This project would remove the right-turn slip lane at the intersection. Right-turn slip lanes have a small
island between the intersection and the right turn lane. While these lanes are typically installed to allow
vehicles to make right turns without entering the intersection and to increase traffic flow, they can also
make crossing the street more challenging for pedestrians. It is particularly problematic in areas near
schools were students may congregate on the right-turn slip area. Removing the right-turn slip lanes is
expected to increase pedestrian visibility and slow vehicle speeds. Eliminating the right -turn slip lanes
could also require removal and replacement of the traffic signals at the intersection.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff costs for oversight and implementation will be
incorporated into the operating budget.
Estimated Cost $250,000
11
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
4
PARK & TRAIL IMPROVEMENT PROJECTS
Project Name Quarry Park Walkway Clearing Project Number 9226-004
Department Public Works Project Manager John Cherbone
Description This project would clear a walkway around the pond at Quarry Park.
Location This project is located at Quarry Park.
Project
Background
This project will create a trail around the perimeter of Quarry Park pond by clearing overgrown brush
and vegetation.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff costs for oversight and implementation will be
incorporated into the operating budget. This project may have operational impacts as the path may
require ongoing maintenance.
Estimated Cost $50,000
12
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
5
PARK & TRAIL IMPROVEMENTS PROJECTS
Project Name Park & Trail Safety Improvements Project Number 9211-010
Department Public Works Project Manager John Cherbone
Description This project would make improvements at several City parks and at Parker Ranch Trail.
Location This project will be located at Brookglen Park, Foothill Park, Azule Park, Congress Springs Park, and
Parker Ranch Trail.
Project
Background
This project would add new security lighting at Azule Park, new fences at Brookglen Park, Foothill
Park, and Congress Springs Park, and a new set of stairs and bollards at Parker Ranch Trail.
Solar powered lighting at Azule Park would be located near the playground. The lighting is intended to
discourage after hours loitering in the park.
The new fencing will be strategically located to provide additional security at each of the parks by
creating barriers between the park users and vehicle traffic. The fences provide a physical barrier that
prevent children or objects from entering roa dway that border the parks. Proposed fences include split-
rail fencing at the front of Brookglen and Foothill Parks and a 3 to 4 foot black chain -link fence at
Congress Springs Park near the baseball warm-up area.
Additionally, the project would include installation of a new stairway and bollards at Parker Ranch in a
section where the trail grade has become very steep due to water erosion and high use. Improvements
will make the trail easier and safer for hikers to use.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff costs for oversight and implementation will be
incorporated into the operating budget. This project may have operational impacts as fencing and
lighting may require ongoing maintenance, but may also reduce damage to turf resulting from vehicles
driving through parks.
Estimated Cost $43,000
13
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
6
PARK & TRAIL IMPROVEMENT PROJECTS
Project Name Quito Road/Pollard Road Open Space
Improvements
Project Number 9219-002
Department Public Works Project Manager John Cherbone
Description This project would make improvements to the open space area at the corner of Quito Road and Pollard
Road.
Location This project will be located at Quito Road and Pollard Road.
Project
Background
This project would make improvements to the open space area at the corner of Quito Road and Pollard
Road, locally referred to as No Name Park. The property is an excess right -of-way area owned by the
City and is roughly a half acre in size. The project would include beautification, a meditation garden,
landscaping improvements with drought tolerant and/or native species, pathway enhancements, and
irrigation. With the improvements, the area would also be officially designated as a park.
This project was nominated by Mayor Mary-Lynne Bernald with support from Vice Mayor Manny
Cappello.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff costs for oversight and implementation will be
incorporated into the operating budget. This project may have operational impacts that may require
ongoing maintenance.
Estimated Cost $75,000
14
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
7
FACILITY IMPROVEMENT PROJECTS
Project Name Bocce Ball Court Project Number
Department Public Works Project Manager John Cherbone
Description
This project would fund the installation of a bocce ball court at City Hall.
Location This project is located in the patio area behind the Community Center.
Project
Background
This project would install two bocce ball courts in the patio area behind the Community Center.
This project is being nominated by the Public Works department based upon a recommendation
from several America in Bloom volunteers as an opportunity for a community beautification
project. Due to drought conditions, the lawn area i n front of City Hall has received limited
watering and much of the grass is now dead and brown during dryer months.
The estimated cost for the project is $70,000 with $22,000 being raised by t he Senior Center and a
$48,000 contribution from the City in support of this project.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff time associated with oversight and
implementation of this project will be incorporated into the operating budget. The project may
increase maintenance costs as the City will be responsible for maintaining additional landscaping,
However, the Bocce Ball court will reduce the amount of turf area in front of City Hall, therby
reducing lawn maintenance and watering costs.
Estimated Cost $70,000.
15
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
8
FACILITY IMPROVEMENT PROJECTS
Project Name Senior Center Entrance Remodel Project Number
Department Public Works Project Manager Thomas Scott
Description This project would renovate the exterior entrance and walkways to the Saratoga Senior Center.
Location This project is located at the Saratoga Senior Center.
Project
Background
The Saratoga Senior Center, operated by the Saratoga Area Senior Coordinating Council (SASCC), is
attached to the Joan Pisani Community Center. SASCC leases the Senior Center space and provides
services to older adults in the community via contract with the City. The Senior Center offers a variety
of classes and programs that keep the City’s older adults active, social, and happy. Additionally,
SASCC operates the Adult Care Center that serves less independent older adults. The Adult Care
Center is open to individuals who are 50 years or older, need assistance with activities of daily living,
and are not able to participate in other active senior programs.
The Senior Center has two dedicated entrances, one that brings visitors to the Senior Center Lobby and
another to the Adult Care Center. Currently, the entrances to the Senior Center include two ramps and
sparse landscaping. This project would contribute to the remodel of the entrance, which could include
façade improvements, landscaping changes, new signage, or walkway enhancements.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff costs for oversight and implementation is
incorporated into the operating budget. This project may have operational impacts to maintain updated
landscaping.
Estimated Cost $50,000
16
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
9
FACILITY IMPROVEMENT PROJECTS
Project Name Community Development Lobby Remodel Project Number
Department Community Development Project Manager Thomas Scott
Description
Engineering & Community Development One Stop Permit Center Lobby Remodel
Location Engineering and Community Development Offices, Saratoga City Hall, at 13777 Fruitvale Avenue.
Project
Background
The current lobby design is set up with several counter destinations to allow for planning, building,
engineering, and cashier functions:
Currently, when a customer walks into the lobby, they either identify the lobby counter area they
want and proceed toward the staff manning the counter for acknowledgement and assistance, or
staff acknowledges the customer and directs them to the correct counter, informing them that they
will be helped in order. The planning counter also utilizes a sign in sheet to help regulate customer
assistance order. There are chairs in the lobby for customers as they wait.
After staff assists a customer, the customer may need to proceed to another counter or cashier
location. Then the waiting queue in the new area begins. The customer may then need to return to
the prior counter. While staff prioritizes the customer when they return for -assistance, there may
still be a slight time delay to finalize their visit.
The proposed new One Stop Permit Center configuration will create a centralized reception area
where customers will be greeted by a staff person who will help them to determine their needs.
Once needs are determined, customers will sit at individual ergonomic desk/counters, with the
appropriate staff member based on their particular project or inquiry. The desk/counters
reconfiguration would address ADA compliance requirements and could also include space for
future installation of self-help kiosks to access electronic public information.
The lobby re-design into a One-Stop Permit Center would require the elimination of the current
counters, structural remodeling of the lobby area, and purchasing of additional service desks,
fixtures, ergonomic furniture and perhaps computer systems.
Operating
Budget Impacts
Staff time associated with oversight of this project will be incorporated into the operating budget.
Estimated Cost $150,000.
17
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
10
FACILITY IMPROVEMENT PROJECTS
Project Name Community Center - MPR Stage
Renovation
Project Number
Department Recreation & Facilities Project Manager Thomas Scott
Description
Renovate the Community Center’s Multi-Purpose Room stage
Location Multi-Purpose Room in the Joan Pisani Community Center at 19655 Allendale Avenue.
Project
Background
The current stage is approximately 20 feet by 50 feet, and about 28 inches high with a flat drop -off
front. The Multi-Purpose room and stage is used on a consistent basis for exercise classes, band
concerts, weddings, presentation/ award ceremonies, meetings, and similar activities. Storage
closets on the sides of the stage are used for supplies and equipment by the ongoing Rotary Club
and exercise class room rental organizations.
The stage is accessed on the side by steps which are narrow and not in conformity with current
code for stair tread and rise requirements. Stage access is a concern as there have been at least two
falls recently which are attributable to the challenging configurement of the stairs. Additionally,
the lack of a ramp prevents stage access for wheelchair bound or mobile -challenged attendees.
This project was developed for the installation of proper steps along the entire fron t of the stage, to
create a safe and broadly accessible stairway, and to install a ramp on one side of the stage for
ADA access. The adjoining storage units will need to be relocated and rebuilt to accommodate the
ramp. The other back stairway access will be rebuilt to code. It is anticipated the stage itself may
only need new flooring, that the structural elements will be salvageable.
Operating
Budget Impacts
Staff time associated with oversight of the project will be incorporated into the operating budget.
Estimated Cost $90,000.
18
CITY OF SARATOGA
CAPITAL PROGRAM – FUNDED NEW PROJECTS
11
ADMINISTRATIVE & TECHNOLOGY PROJECTS
Project Name Accessibility Assessment Project Number
Department Public Works Project Manager John Cherbone
Description This project would assess compliance with accessibility requirements for City parking areas and traffic
signals.
Location This is a Citywide project.
Project
Background
There are a number of regulations that help ensure people with disabilities can access buildings, parks,
parking, and other facilities. For example, there are specifications establishing minimum ratios of
accessible parking spaces in parking lots and requirements for minimum width for parking spaces and
access aisle to provide individuals in wheelchairs or with mobility limitations with sufficient room to
exit or enter vehicles.
This project would assess the City’s compliance with accessibility requirements across City parking
lots, including those owned or leased by the City, and traffic signals. Additionally, the project would
outline implementation strategies to bring the City into compliance with accessibility requirements, if
necessary.
If this project receives funding, staff recommends closing the ADA Signals and Curb Cut -Outs project
so that priories can be assessed before allocation of resources.
This project was nominated by Council Member Howard Miller with support from Vice Mayo r Manny
Cappello at the September 20, 2017 Regular City Council Meeting.
Operating
Budget Impacts
Engineering, administrative, and maintenance staff costs for oversight and implementation is
incorporated into the operating budget. This project may have operational impacts or future capital
improvement budget impacts as the assessment may recommend various improvements.
Estimated Cost $75,000
19
Exhibit "A"
Capital Improvement Plan F.Y. 18/19 Update - New Project List
NEW CIP PROJECTS
LAND USE ELEMENT OPEN SPACE ELEMENT CIRCULATION ELEMENT NOTES
STREET PROJECTS GOAL POLICY ACTION GOAL POLICY ACTION GOAL POLICY ACTION
Fruitvale/Allendale Intersection Improvments 1a, 1b, 5a 1.3, 5.5 2.1, 5.10
PARK & TRAIL PROJECTS
Quarry Park Walkway Clearing 1a, 1b, 5a, 5b 1.1, 1.3, 5.5 2.1, 5.10
Park & Trail Safety Improvements 1, 3 5a 5.14
Quito/Pollard Roads Opens Space Improvements 1, 3 3.1, 3.3 1a 1b, 5a, 5b 1.3, 5.5 2.1
FACILITY PROJECTS
Bocce Ball Court 1, 3 1.2
Senior Center Entrance Remodel No General Plan Element Identified
Community Development Lobby Remodel No General Plan Element Identified
Community Center Stage Renovation No General Plan Element Identified
ADMINISTRATIVE PROJECTS
Accessibility Assessment 1a, 1b, 5a, 5b 1.3, 5.5 5.10
GENERAL PLAN CONFORMITY
Attachment 3
20
REPORT TO THE
PLANNING COMMISSION
20142 Williamsburg Lane
Meeting Date: May 9, 2018
Application: PDR17-0022/ARB17-0037
Address/APN: 20142 Williamsburg Lane (386-39-024)
Property Owner: Robert Stetak
From: Debbie Pedro, Community Development Director
Report Prepared By: Christopher Riordan, AICP
21
Report to the Planning Commission
20142 Williamsburg Lane – Application # PDR17-0022/ARB17-0037
May 9, 2018
Page | 2
PROJECT DESCRIPTION
The applicant is proposing a new 4,029 square foot single story residence with and an attached
accessory dwelling unit (ADU). No protected trees are proposed for removal.
STAFF RECOMMENDATION
Adopt Resolution No.18-006 approving the project subject to conditions of approval included in
Attachment 1.
Pursuant to City Code Section 15-45.060 (a)(3), Design Review Approval by the Planning
Commission is required because the proposed residence would exceed a height of 18 feet.
PROJECT DATA
Gross/Net Site Area: 12,600 square feet (0.29 acres)
Average Site Slope: Level Site
General Plan Designation: M-12.5 (Medium Density Residential)
Zoning: R-1-12,500
Proposed Allowed/Required
Proposed Site Coverage
Residence
Decks/driveway/patios/walks
Total Proposed (structures)
3,977 sq. ft.
1,335 sq. ft.
5,312 sq. ft. (42%)
7,623 sq. ft.* (55%)
Floor Area
House
Garage
Total Floor Area
3,273 sq. ft.
756 sq. ft.
4,029 sq. ft.
4,081 sq. ft.*
Height
19.29’ 26’
Setbacks
Front:
Left Side
Right Side:
Rear:
25’-2”
10’-0”
12’7”
33’-10”
25’
10’
10’
25’
*Includes a one-time 10% site coverage and floor area bonus for the deed restricted ADU pursuant to City Code Section 15-56.030 (3)
SITE CHARACTERISTICS AND PROJECT DESCRIPTION
Site Description
The project site is located at 20142 Williamsburg Lane near its intersection with Fredericksburg
Drive. A 3,368 square foot one story ranch style single-family home, constructed circa 1967, is
located on site. The home has an attached three car garage facing the street which is a common
architectural element in the neighborhood. The existing home would be removed. Adjacent uses
on both sides, to the rear, and across the street are one-story single family residences. Twelve
protected trees are located on site which includes Japanese maple, Grecian Laurel, and Juniper.
22
Report to the Planning Commission
20142 Williamsburg Lane – Application # PDR17-0022/ARB17-0037
May 9, 2018
Page | 3
Project Description
The project would include the construction of a new 4,029 square feet, approximately 19 feet
tall, one-story single family residence with an attached two car garage. The accessory dwelling
unit (ADU) would be located in the rear left corner of the building footprint. The ADU would
have access from both the interior and the exterior of the residence. No trees are proposed for
removal.
Architecture/Design
The project would have a contemporary architectural style and has been designed to fit the
constraints of the site. The building footprint is rectangular in shape and occupies the majority of
the building envelope. The side gable standing seam metal roof would have a simple form with a
single ridge spanning the width of the structure. This roof which slopes toward the center of the
building is a common roof design of nearby adjacent homes. The project would have contrasting
exterior finishes and textures which would include vertical wood siding on the front elevation and
stucco on the other elevations. A stone entry element would be located to the right of the front door.
The front porch area would be enclosed by a wood fence to provide privacy and the roof of the front
porch would be made of glass to maximize natural light. The variety of exterior materials, varying
heights of the architectural features and the wide building footprint provide architectural articulation
to break up the mass of the home.
The applicant has provided a color and materials board that will be available for review at the
site visit and during the public hearing. Below is a list of the proposed exterior materials.
Detail Colors and Materials
Siding Vertical Hardie Board (taupe)
Stucco Smooth Texture (grey)
Windows Aluminum clad (match exterior color)
Doors Wood (white oak)
Roof Standing seam metal (dark grey)
Trees
No protected trees are proposed for removal. All protected trees in the vicinity of the project
would be protected prior to building permit issuance and throughout the duration of the project.
Tree protection fencing is required to be installed prior to the issuance of building permits.
Details of the arborist’s findings and descriptions of the trees to be preserved are included in the
Arborist Report (Attachment 2).
FINDINGS
The findings required for issuance of a Design Review Approval pursuant to City Code Section
Article 15-45.080 are set forth below and the Applicant has met the burden of proof to support
making all of those required findings:
a. Site development follows the natural contours of the site, minimizes grading, and is
appropriate given the property’s natural constraints.
23
Report to the Planning Commission
20142 Williamsburg Lane – Application # PDR17-0022/ARB17-0037
May 9, 2018
Page | 4
This finding can be made in the affirmative in that the project minimizes changes to the
contours of the site. Grading will be limited to contouring the site to direct water to
landscaped areas. Grading is also reduced as the new structure will be located in the same
location as the existing structure with no change in the finished floor elevation.
b. All protected trees shall be preserved, as provided in Article 15-50 (Tree Regulations). If
constraints exist on the property, the number of protected trees, heritage trees, and native
trees approved for removal shall be reduced to an absolute minimum. Removal of any
smaller oak trees deemed to be in good health by the City Arborist shall be minimized using
the criteria set forth in Section 15-50.080.
This finding can be made in the affirmative in that no protected trees are proposed for removal.
c. The height of the structure, its location on the site, and its architectural elements are
designed to avoid unreasonable impacts to the privacy of adjoining properties and to
community viewsheds.
This finding can be made in the affirmative in that the project is a single story so there will
be no elevated decks or balconies to impact the privacy of adjoining properties. The finished
floor of the new structure would be the same elevation as the existing structure and because
the proposed home would be located in approximately the same location as the existing
home there should not be an increase of views into adjacent properties. No community view
sheds are located in the vicinity of the project.
d. The overall mass and height of the structure, and its architectural elements are in scale with
the structure itself and with the neighborhood.
This finding can be made in the affirmative in that the single story residence is similar to the
surrounding residences in the neighborhood.
e. The landscape design minimizes hardscape in the front setback area and contains elements
that are complementary to the neighborhood streetscape.
This finding can be made in the affirmative in that the hardscape proposed is minimal
(existing driveway and walkway to the front door). The existing trees in the front yard will
be incorporated into the new landscape design. More than 50% of the front setback area
will be landscaped with drought resistant plants.
f. Development of the site does not unreasonably impair the ability of adjoining properties to
utilize solar energy.
This finding can be made in the affirmative in that the proposed structure has large setbacks
from buildings on adjacent properties and because the structure is limited to a night of
24
Report to the Planning Commission
20142 Williamsburg Lane – Application # PDR17-0022/ARB17-0037
May 9, 2018
Page | 5
approximately 19 feet, the structure would not unreasonably impair the utilization of solar
energy.
g. The design of the structure and the site development plan is consistent with the Residential
Design Handbook, pursuant to Section 15-45.055.
This finding can be made in the affirmative because the proposed project incorporates
applicable design policies and techniques from the Residential Design Handbook. The
overall mass and height of the structure are in scale with the neighborhood; the structure is
set back in proportion to the size and shape of the lot; site development follows contours and
is appropriate given the property’s natural constraints. In addition, the proposed materials,
colors, and details enhance the architecture in a well-composed, understated manner.
h. On hillside lots, the location and the design of the structure avoid unreasonable impacts to
ridgelines, significant hillside features, community viewsheds, and is in compliance
with Section 15-13.100.
This finding is not applicable to the project as the site is not considered a hillside lot.
Neighbor Notification and Correspondence
A public notice was sent to property owners within 500 feet of the site. In addition, the public
hearing notice and description of the project was published in the Saratoga News. The applicant
provided seven completed Neighbor Notification Forms. No neighbors expressed concerns with the
project.
ENVIRONMENTAL DETERMINATION
The project is Categorically Exempt from the Environmental Quality Act (CEQA) pursuant Section
15303, “New Construction or Conversion of Small Structures”, Class 3 (a) of the Public Resources
Code (CEQA). This exemption allows for the construction of three single-family residences in a
residential area. The project, as proposed, is for the construction of a new residence in a suburban,
residential area.
ATTACHMENTS:
1. Resolution of Approval No. 18-006
2. Arborist Report dated October 25, 2017.
3. Story Pole Certification dated April 14, 2018
4. Development Plans (received April 12, 2018)
25
RESOLUTION NO: 18-006
A RESOLUTION OF THE CITY OF SARATOGA PLANNING COMMISSION
APPROVING DESIGN REVIEW PDR17-0022 AND ARBORIST REPORT ARB17-0024
20142 WILLIAMSBURG LANE (386-39-024)
WHEREAS, on May 11, 2017 an application was submitted by Robert Stetak requesting
Design Review approval to construct a new 4,029 square foot single-story residence with an
attached accessory dwelling unit and associated site improvements located 20142 Williamsburg
Lane (APN 386-39-024). The height of the proposed residence is approximately 19 feet. No
protected trees are proposed for removal. The site is located within the R-1-12,500 Zoning District.
WHEREAS, the Community Development Department completed an environmental
assessment for the project in accordance with the California Environmental Quality Act (CEQA),
and recommends that the Planning Commission determine this project Categorically Exempt.
WHEREAS, on May 9, 2018 the Planning Commission held a duly noticed public hearing
on the subject application, and considered evidence presented by City Staff, the applicant, and other
interested parties.
NOW THEREFORE, the Planning Commission of the City of Saratoga hereby finds,
determines and resolves as follows:
Section 1: The recitals set forth above are true and correct and incorporated herein by
reference.
Section 2: The project is Categorically Exempt from the Environmental Quality Act
(CEQA) pursuant Section 15303, “New Construction or Conversion of Small Structures”, Class 3
(a) of the Public Resources Code (CEQA). This exemption allows for the construction of one
single-family residence in a residential area.
Section 3: The project is consistent with the following Saratoga General Plan Policies:
Land Use Goal 13 which provides that the City shall use the Design Review process to assure that
the new construction and major additions thereto are compatible with the site and the adjacent
surroundings; Safety Element Site and Drainage Policy 3 which provides that the City shall require
that landscaping and site drainage plans be submitted and approved during Design Review for a
residence prior to issuance of permits; and Conservation Element Policy 6.0 which provides that the
City shall protect the existing rural atmosphere of Saratoga by carefully considering the visual
impact of new development.
Section 4: The project is consistent with the Saratoga City Code in that the design and
improvements are consistent with the design review findings. The overall mass and height of the
structure are in scale with the neighborhood; the structure is set back in proportion to the size and
shape of the lot; site development follows contours and is appropriate given the property’s natural
constraints; the porch and entry are in scale with other structures in the neighborhood. In addition,
the proposed materials, colors, and details enhance the architecture in a well-composed, understated
manner.
Attachment 1
26
Lands of Stetak
20142 Williamsburg LaneApplication #PDR17-0022/ARB17-0037
Resolution #18-006
Page | 2
Section 5: The City of Saratoga Planning Commission hereby approves PDR17-0022 and
ARB17-0037 located at 20142 Williamsburg Lane (APN 386-39-024), subject to the Findings, and
Conditions of Approval attached hereto as Exhibit 1.
PASSED AND ADOPTED by the City of Saratoga Planning Commission on this 9th day of
May 2018 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
____________________________
Joyce Hlava
Chair, Planning Commission
27
Lands of Stetak
20142 Williamsburg LaneApplication #PDR17-0022/ARB17-0037
Resolution #18-006
Page | 3
Exhibit 1
CONDITIONS OF APPROVAL
PDR17-0022 & ARB17-0024
20142 WILLIAMSBURG LANE
(APN 386-39-024)
GENERAL
1. All conditions below which are identified as permanent or for which an alternative period of
time for applicability is specified shall run with the land and apply to the landowner’s
successors in interest for such time period. No zoning clearance, or demolition, grading for this
project shall be issued until proof is filed with the city that a certificate of approval documenting
all applicable permanent or other term-specified conditions has been recorded by the applicant
with the Santa Clara County Recorder’s office in form and content to the Community
Development Director. If a condition is not “Permanent” or does not have a term specified, it
shall remain in effect until the issuance by the City of Saratoga of a Certificate of Occupancy or
its equivalent.
2. The Owner and Applicant will be mailed a statement after the time the Resolution granting this
approval is duly executed, containing a statement of all amounts due to the City in connection
with this application, including all consultant fees (collectively “processing fees”). This
approval or permit shall expire sixty (60) days after the date said notice is mailed if all
processing fees contained in the notice have not been paid in full. No Zoning Clearance or
Demolition, Grading, or Building Permit may be issued until the City certifies that all
processing fees have been paid in full (and, for deposit accounts, a surplus balance of $500 is
maintained).
3. The Project shall maintain compliance with all applicable regulations of the State, County, City
and/or other governmental agencies having jurisdiction including, without limitation, the
requirements of the Saratoga City Code incorporated herein by this reference.
4. As a condition of this Approval, Owner and Applicant hereby agree to defend, indemnify and
hold the City and its officers, officials, boards, commissions, employees, agents and volunteers
harmless from and against:
a. any and all claims, actions or proceedings to attack, set aside, void or annul any action
on the subject application, or any of the proceedings, acts or determinations taken, done
or made prior to said action; and
b. any and all claims, demands, actions, expenses or liabilities arising from or in any
manner relating to the performance of such construction, installation, alteration or
grading work by the Owner and/or Applicant, their successors, or by any person acting
on their behalf.
28
Lands of Stetak
20142 Williamsburg LaneApplication #PDR17-0022/ARB17-0037
Resolution #18-006
Page | 4
In addition, prior to any Zoning Clearance, Owner and Applicant shall execute a separate
agreement containing the details of this required Agreement to Indemnify, Hold Harmless and
Defend, which shall be subject to prior approval as to form and content by the City Attorney.
COMMUNITY DEVELOPMENT
5. The owner/applicant shall comply with all City requirements regarding drainage, including but
not limited to complying with the city approved Stormwater management plan. The project shall
retain and/or detain any increase in design flow from the site, that is created by the proposed
construction and grading project, such that adjacent down slope properties will not be negatively
impacted by any increase in flow. Design must follow the current Santa Clara County Drainage
Manual method criteria, as required by the building department. Retention/detention element
design must follow the Drainage Manual guidelines, as required by the building department.
6. The development shall be located and constructed to include those features, and only those
features, as shown on the Approved Plans date stamped April 10, 2018. All proposed changes
to the approved plans must be submitted in writing with plans showing the changes, including a
clouded set of plans highlighting the changes. Such changes shall be subject to approval in
accordance with City Code.
7. Prior to issuance of Building Permits, the applicant shall submit for staff approval, a Lighting
Plan for the home’s exterior and landscaped areas. Proposed exterior lighting shall be limited to
full-cut off & shielded fixtures with downward directed illumination so as not to shine on
adjacent properties or public right-of-way. All proposed exterior lighting shall be designed to
limit illumination to the site and avoid creating glare impacts to surrounding properties.
8. In order to comply with standards that minimize impacts to the neighborhood during site
preparation and construction, the applicant shall comply with City Code Sections 7-30.060 and
16-75.050, with respect to noise, construction hours, maintenance of the construction site and
other requirements stated in these sections.
9. Prior to issuance of Building Permits, the applicant shall prepare for review and approval by
City staff a Construction Management Plan for the project which includes but is not limited to
the following:
a. Proposed construction worker parking area.
b. Proposed construction hours that are consistent with City Code.
c. Proposed construction/delivery vehicle staging or parking areas.
d. Proposed traffic control plan with traffic control measures, any street closure, hours for
delivery/earth moving or hauling, etc. To the extent possible, any deliveries, earth
moving or hauling activities will be scheduled to avoid peak commute hours.
e. Proposed construction material staging/storage areas.
f. Location of project construction sign outlining permitted construction work hours, name
of project contractor and the contact information for both homeowner and contractor.
29
Lands of Stetak
20142 Williamsburg LaneApplication #PDR17-0022/ARB17-0037
Resolution #18-006
Page | 5
10. All fences, walls and hedges shall conform to height requirements provided in City Code
Section 15-29.
11. The final landscaping and irrigation plan submitted for Building Permit approval shall
demonstrate how the project complies with the State Water Efficient Landscape Ordinance and
shall take into account the following:
a. To the extent feasible, landscaping shall be designed and operated to treat storm water
runoff by incorporating elements that collect, detain and infiltrate runoff. In areas that
provide detention of water, plants that are tolerant of saturated soil conditions and
prolong exposure to water shall be specified.
b. To the extent feasible, pest resistant landscaping plants shall be used throughout the
landscaped area, especially along any hardscape area.
c. Plant materials selected shall be appropriate to site specific characteristics such as soil
type, topography, climate, amount and timing of sunlight, prevailing winds, rainfall, air
movement, patterns of land use, ecological consistency and plant interactions to ensure
successful establishment.
d. Pest resistant landscaping plants shall be considered for use throughout the landscaped
area, especially along any hardscape area.
e. Any proposed or required under grounding of utilities shall take into account potential
damage to roots of protected trees
12. A locking mailbox approved for use by the US Postal service shall be installed and in
compliance with Saratoga Municipal Code section 6-25.030. The mailbox shall be installed
prior to final inspection.
13. This Condition is Permanent: The owner shall record a deed restriction satisfactory to the
Community Development Director restricting the rental of the accessory dwelling unit to only
households that qualify as low, very-low, or extremely-low income households as those terms
are defined in the most recent Santa Clara County Housing and Urban Development Program
Income Limits. In the event that the most recent such report is more than five years old, the
rental income limits of the accessory dwelling unit shall be in accordance with the definitions
set forth in Health and Safety Code section 50079.5, 50105, and 50106 as those sections exist as
of the effective date of this restriction. “Rental” means any agreement whereby the occupant(s)
of the accessory dwelling unit make any payment in consideration of said occupancy.
FIRE DEPARTMENT
14. The owner/applicant shall comply with all Fire Department requirements.
ARBORIST
15. All requirements in the City Arborist Report dated October 24, 2017 are hereby adopted as
conditions of approval and shall be implemented as part of the approved plans.
30
Lands of Stetak
20142 Williamsburg LaneApplication #PDR17-0022/ARB17-0037
Resolution #18-006
Page | 6
PUBLIC WORKS
16. Applicant / Owner shall obtain an encroachment permit for any and all improvements in any
City right-of-way or City easement including all new utilities prior to commencement of the
work to implement this Design Review.
17. Applicant / Owner shall remove and replace existing driveway, approach, dip and settled
asphalt with a new one conforming to existing adjoining grade. See City of Saratoga Standard
details for removal and new installation.
18. Applicant / Owner shall maintain the streets, sidewalks and other public right of way in a
clean, safe and usable condition. All spills of soil, rock or construction debris shall be
removed from the public property. All adjacent property, both public and private, shall be
maintained in a clean, safe and usable condition
19. Construction Site Control
Owner shall implement construction site inspection and control to prevent construction
site discharges of pollutants into the storm drains per approved Erosion Control Plan.
The City requires the construction sites to maintain year-round effective erosion control,
run-on and run-off control, sediment control, good site management, and non-storm water
management through all phases of construction (including, but not limited to, site
grading, building, and finishing of lots) until the site is fully stabilized by landscaping or
the installation of permanent erosion control measures.
City will conduct inspections to determine compliance and determine the effectiveness of
the BMPs in preventing the discharge of construction pollutants into the storm drain.
Owner shall be required to timely correct all actual and potential discharges observed.
20. Prior to the Building Department final, all drainage, grading, and landscaping of the site shall
be completed.
BUILDING DEPARTMENT SUBMITTAL
21. Four (4) sets of complete construction plans shall be submitted to the Building Division. These
plans shall be subject to review and approval by the City prior to issuance of Zoning Clearance.
The construction plans shall, at a minimum include the following:
a. Architectural drawings and other plan sheets consistent with those identified as Exhibit
“A” on file with the Community Development Department.
b. Arborist Report, dated October 25, 2017 printed onto a separate plan page.
c. All additional drawings, plans, maps, reports, notes, and/or materials required by the
Building Division.
d. This signed and dated Resolution printed onto separate construction plan pages.
31
Lands of Stetak
20142 Williamsburg LaneApplication #PDR17-0022/ARB17-0037
Resolution #18-006
Page | 7
e. The site plan shall contain a note with the following language: “Prior to foundation
inspection by the City, the Licensed Land Surveyor of record shall provide a written
certification that all building setbacks comply with the Approved Plans,” which note shall
represent a condition which must be satisfied to remain in compliance with this Design
Review Approval.
32
Community Development Department
City of Saratoga
13777 Fruitvale Avenue
Saratoga, California 95070
ARBORIST REPORT
Application No. ARB17-0037
Prepared by Kate Bear, City Arborist Site: 20142 Williamsburg Lane
Phone: (408) 868-1276 Owner: Robert Stetak
Email: kbear@saratoga.ca.us APN: 386-39-024
Email:rstetak@sbcglobal.net
Report History: Final report Date:October 25, 2017
PROJECT SCOPE:
The applicant has submitted plans to add on to the existing house remodel the interior. No trees are
requested for removal to construct the project.
STATUS: Approved by City Arborist, with attached conditions.
PROJECT DATA IN BRIEF:
Tree bond – Required - $3,025
Tree fencing – Required – See Conditions of Approval and attached map.
Tree removals – No trees are requested or approved for removal.
Replacement trees – Not required.
ATTACHMENTS:
1 – Findings and Tree Information
2 – Conditions of Approval
3 – Map Showing Tree Protection
1
Attachment 2
33
20142 Williamsburg Lane Attachment 1
FINDINGS:
Tree Removals - No trees are requested for removal to construct the project.
New Construction
Based on the information provided, and as conditioned, this project complies with the
requirements for the setback of new construction from existing trees under Section 15-
50.120 of the City Code.
Tree Preservation Plan
Section 15-50.140 of the City Code requires a Tree Preservation Plan for this project. To
satisfy this requirement the following shall be copied onto a plan sheet and included in the
final sets of plans:
1) The submitted arborist report dated May 16,2017; and
2) This report dated October 25, 2017.
TREE INFORMATION:
Arborist Report reviewed:
Preparer: Michael Bench, Consulting Arborist
Date of Report: May16, 2017
An arborist report was submitted for this project that inventoried 13 trees, six of which are
protected by Saratoga City Code. Information on the condition of each tree, potential
impacts from construction, suitability for preservation, appraised values and tree protection
recommendations was provided. A table summarizing information about each tree is below.
Trees 3, 4, 5, 8, 9, 12 and 13 are not protected by City Code and may be removed at any
time without a permit.
Table 1: List of protected trees and appraised values from May 16, 2017 arborist report.
Tree
No. Species
Trunk
Diameter
(inches) Condition
Intensity of
Construction
Impacts
Suitability
for
Preservation
Appraised
Values
Japanese maple
1 Acer palmatum 11, 9, 8, 8 Good High High $5,800
Grecian laurel
2 Laurus nobilis 13 Very Good Moderate Moderate $6,300
Hollywood juniper
6 Juniperus chinensis 16 Fair Low Moderate $5,800
Hollywood juniper
7 Juniperus chinensis 12 Fair Low Low $3,260
Hollywood juniper
10 Juniperus chinensis 11 Fair Low Moderate $2,750
Hollywood juniper
11 Juniperus chinensis 10 Fair Low Moderate $2,290
2
34
20142 Williamsburg Lane Attachment 2
CONDITIONS OF APPROVAL
1. It is the responsibility of the owner, architect and contractor to be familiar with the
information in this report and implement the required conditions.
2. All recommendations in the arborist report dated May 16, 2017 prepared by Michael Bench
shall become conditions of approval.
3. The arborist report dated May 16, 2017 shall be copied on to a plan sheet, titled “Tree
Preservation” and included in the final job copy set of plans.
4. This report dated July 11, 2017 shall be copied onto a plan sheet and included in the final set
of plans.
5. The designated Project Arborist shall be Michael Bench, unless otherwise approved by the
City Arborist.
6. Tree Protection Security Deposit
a. Is required per City Ordinance 15-50.080.
b. Shall be $3,025 for tree(s) 1 and 2.
c. Shall be obtained by the owner and filed with the Community Development Department
before obtaining Building Division permits.
d. May be in the form of cash, check, credit card payment or a bond.
e. Shall remain in place for the duration of construction of the project.
f. May be released once the project has been completed, inspected and approved by the City
Arborist.
7. Tree Protection Fencing:
a. Shall be installed as shown on the attached map.
b. Shall be shown on the Site Plan.
c. Shall be established prior to the arrival of construction equipment or materials on site.
d. Shall be comprised of six-foot high chain link fencing mounted on eight-foot tall, 2-inch
diameter galvanized posts, driven 24 inches into the ground and spaced no more than 10
feet apart.
e. Shall be posted with signs saying “TREE PROTECTION FENCE - DO NOT MOVE OR
REMOVE WITHOUT APPROVAL FROM CITY ARBORIST, KATE BEAR (408)
868-1276”.
f. Call City Arborist, Kate Bear at (408) 868-1276 for an inspection of tree protection
fencing once it has been installed. This is required prior to obtaining building division
permits.
g. Tree protection fencing shall remain undisturbed throughout the construction until final
inspection.
8. If contractor feels that work must be done inside the fenced area, call Project Arborist to
arrange a field meeting before performing work.
3
35
20142 Williamsburg Lane Attachment 2
9. The Project Arborist shall visit the site every six weeks. Following visits to the site, the
Project Arborist shall provide the City with a report including photos documenting the
progress of the project and noting any tree issues.
10. The Project Arborist shall be on site to monitor all work within 10 feet of tree 1.
11. The Project Arborist shall supervise any necessary pruning or root pruning of Japanese maple
tree 1.
12. No protected tree authorized for removal or encroachment pursuant to this project may be
removed or encroached upon until the issuance of the applicable permit from the building
division for the approved project.
13. Receipt of a Planning or Building permit does not relieve applicant of his responsibilities for
protecting trees per City Code Article 15-50 on all construction work.
14. All construction activities shall be conducted outside tree protection fencing. These activities
include, but are not necessarily limited to, the following: demolition, grading, trenching,
equipment cleaning, stockpiling and dumping materials (including soil fill), and
equipment/vehicle operation and parking.
15. Trenching to install utilities is not permitted inside tree protection fencing.
16. Roots of protected trees measuring two inches in diameter or more shall not be cut without
prior approval of the Project Arborist. Roots measuring less than two inches in diameter may
be cut using a sharp pruning tool.
17. Any permitted pruning or root pruning of trees on site shall be performed under the
supervision of the Project Arborist and according to ISA standards.
18. No trees are requested or approved for removal to construct this project.
19. Trees permitted for removal shall be replaced on or off site according to good forestry practices,
and shall provide equivalent value in terms of aesthetic and environmental quality, size, height,
location, appearance and other significant beneficial characteristics of the removed trees. The
value of the removed trees shall be calculated in accordance with the ISA Guide for Plant
Appraisal.
20. Should any tree be damaged beyond repair, new trees shall be required to replace the tree. If there
is insufficient room to plant the necessary number of new trees, some of the value for trees may be
paid into the City’s Tree Fund. Replacement values for new trees are listed below.
15 gallon = $350 24 inch box = $500 36 inch box = $1,500
48 inch box = $5,000 60 inch box = 7,000 72 inch box = $15,000
21. At the end of the project, when the contractor wants to remove tree protection fencing and
have the tree protection security deposit released by the City, call City Arborist for a final
inspection.
4
36
Attachment 3
Legend
Tree Canopy
Tree Protection Fence
20142 Williamsburg Lane
5
37
Attachment 3
38
39
40
41
42
43
44
45
46
47
48
49
REPORT TO THE
PLANNING COMMISSION
19891 Robin Way
Meeting Date: May 9, 2018
Application: PDR17-0023/ARB17-0061
Address/APN: 19891 Robin Way (510-01-036)
Property Owner: Mohsen & Behnaz Salek
From: Debbie Pedro, Community Development Director
Report Prepared By: Christopher Riordan
50
Report to the Planning Commission
19891 Robin Way – Application # PDR17-0023/ARB17-0061
May 9, 2018
Page | 2
PROJECT DESCRIPTION
The applicant is proposing a new 5,139 square foot single story residence. Two protected trees
are proposed for removal.
STAFF RECOMMENDATION
Adopt Resolution No.18-007 approving the project subject to conditions of approval included in
Attachment 1.
Pursuant to City Code Section 15-45.060 (a)(3), Design Review Approval by the Planning
Commission is required because the proposed residence would exceed a height of 18 feet.
PROJECT DATA
Gross/Net Site Area: 33,500 sq. ft. gross (0.77 acres) / 29,000 sq. ft. net (0.67 acres)
Average Site Slope: Level Site
General Plan Designation: RLD (Low Density Residential)
Zoning: R-1-20,000
Proposed Allowed/Required
Proposed Site Coverage
Residence
Carport
Driveway
Decks/driveway/patios/walks
Total Proposed (structures)
5,375.8 sq. ft.
260.3 sq. ft.
1,407.3 sq. ft.
3,192.5 sq. ft.
10,235.9 sq. ft. (35.2%)
13,050 sq. ft. (45%)
Floor Area
House
Garage
Total Floor Area
4,685.1 sq. ft.
453.7 sq. ft.
5,138.8 sq. ft.
5,142 sq. ft.
Height 23.27’ 26’
Setbacks
Front:
Left Side
Right Side:
Rear:
39’-0”
26’-4”
15’-0”
86’-6”
30’
15’
15’
35’
SITE CHARACTERISTICS AND PROJECT DESCRIPTION
Site Description
The project site is located at 19891 Robin Way between Hume Drive and Pepper Lane. A 4,479
square foot one story ranch style single-family home and related site improvements including a
detached garage, pool cabana, shed, and swimming pool are located on site. Adjacent uses on
both sides, to the rear, and across the street are one-story single family residences. Twenty-two
trees were inventoried by the project arborists and include Coast live oaks, Magnolia, Olive, and
Pear.
51
Report to the Planning Commission
19891 Robin Way – Application # PDR17-0023/ARB17-0061
May 9, 2018
Page | 3
Project Description
The project would include the construction of a new 5,139 square feet, approximately 23’-3” tall,
one-story single family residence with an attached two car garage and a carport. All structures
and hardscape would be removed including the existing circular driveway. Two trees are
proposed for removal.
Architecture/Design
The project would have a contemporary architectural style which is most often described as Neo-
Mediterranean. Identifying features of this architectural style include light weight tile roofs, exterior
stucco walls, and round-arched windows and doorways. The building footprint is rectangular in
shape with a wide front façade and occupies the majority of the building envelope. The height of
the building is taller at the middle of the roof above the front entry and drops in height toward the
sides. Architectural materials to support the architectural style include a concrete tile roof, smooth
stucco exterior, arched entryway and arched windows on both architectural projections flanking
opposite sides of the front entry. All remaining windows would have a square or rectangle shape.
Exterior details would include aluminum clad wood widows, precast stone moldings and window
sills, and precast stone paneling on the entry element and both the front and rear architectural
projections. The front entry door would be made of wrought iron and both garage doors would be
carriage style wood doors. The variety of exterior materials, varying heights of the architectural
features and the wide building footprint provide architectural articulation to break up the mass of the
home.
The applicant has provided a color and materials board that will be available for review at the
site visit and during the public hearing. Below is a list of the proposed exterior materials.
Detail Colors and Materials
Stucco Smooth Texture (dark tan)
Windows Aluminum clad wood (light tan)
Doors Wrought Iron Front Entrance Door
Wood Carriage Style Garage Doors
Roof Concrete Tile (Dark Brown)
Trees
Two protected trees are proposed for removal. These include 15” Magnolia along the right
property line in poor condition and a 17” Mayen at the rear of the building footprint which is also
in poor condition. All remaining protected trees in the vicinity of the project would be protected
prior to building permit issuance and throughout the duration of the project. Tree protection
fencing is required to be installed prior to the issuance of building permits. Details of the
arborist’s findings and descriptions of the trees to be preserved are included in the Arborist
Report (Attachment 2).
52
Report to the Planning Commission
19891 Robin Way – Application # PDR17-0023/ARB17-0061
May 9, 2018
Page | 4
FINDINGS
The findings required for issuance of a Design Review Approval pursuant to City Code Section
Article 15-45.080 are set forth below and the Applicant has met the burden of proof to support
making all of those required findings:
a. Site development follows the natural contours of the site, minimizes grading, and is
appropriate given the property’s natural constraints.
This finding can be made in the affirmative in that the project minimizes changes to the
contours of the site. Grading will be limited to contouring the site to direct water to
landscaped areas. Grading is also reduced as the new structure will be located in the same
location as the existing structure with no significant change in the finished floor elevation.
b. All protected trees shall be preserved, as provided in Article 15-50 (Tree Regulations). If
constraints exist on the property, the number of protected trees, heritage trees, and native
trees approved for removal shall be reduced to an absolute minimum. Removal of any
smaller oak trees deemed to be in good health by the City Arborist shall be minimized using
the criteria set forth in Section 15-50.080.
This finding can be made in the affirmative in that the number of trees to be removed are being
kept to a minimum and are limited to two non-native trees in poor overall condition. Neither of
the two trees to be removed is a native tree and includes a 15” Magnolia and a 17” Mayen. All
remaining protected trees in the vicinity of the project would be protected prior to building
permit issuance and throughout the duration of the project. Tree protection fencing is
required to be installed prior to the issuance of building permits and shall remain in place
for the duration of the project.
c. The height of the structure, its location on the site, and its architectural elements are
designed to avoid unreasonable impacts to the privacy of adjoining properties and to
community viewsheds.
This finding can be made in the affirmative in that the project is a single story so there will
be no elevated decks or balconies to impact the privacy of adjoining properties. The finished
floor of the new structure would be the same elevation as the existing structure and because
the proposed home would be located in approximately the same location as the existing
home there should not be an increase of views into adjacent properties. No community view
sheds are located in the vicinity of the project.
d. The overall mass and height of the structure, and its architectural elements are in scale with
the structure itself and with the neighborhood.
This finding can be made in the affirmative in that the single story residence is similar to the
surrounding residences in the neighborhood. The height of the building is concentrated
toward the center of the building footprint and is lower at both sides to increase
compatibility with neighboring one story homes. Two homes on the opposite side of Robin
53
Report to the Planning Commission
19891 Robin Way – Application # PDR17-0023/ARB17-0061
May 9, 2018
Page | 5
Way have been recently been remodeled and are consistent in mass and architectural style
as the proposed home.
e. The landscape design minimizes hardscape in the front setback area and contains elements
that are complementary to the neighborhood streetscape.
This finding can be made in the affirmative in that the hardscape proposed is minimal
(existing driveway and walkway to the front door). The existing trees in the front and rear
yard will be incorporated into the new landscape design. More than 50% of the front
setback area will be landscaped with drought resistant plants.
f. Development of the site does not unreasonably impair the ability of adjoining properties to
utilize solar energy.
This finding can be made in the affirmative in that the proposed structure has large setbacks
from buildings on adjacent properties, the design of the tallest parts of the structure are
located at the center of the site with the lower portions of the building at both side property
lines, the structure would not unreasonably impair the utilization of solar energy.
g. The design of the structure and the site development plan is consistent with the Residential
Design Handbook, pursuant to Section 15-45.055.
This finding can be made in the affirmative because the proposed project incorporates
applicable design policies and techniques from the Residential Design Handbook. The
overall mass and height of the structure are in scale with the neighborhood; the structure is
set back in proportion to the size and shape of the lot; site development follows contours and
is appropriate given the property’s natural constraints. In addition, the proposed materials,
colors, and details enhance the architecture in a well-composed, understated manner.
h. On hillside lots, the location and the design of the structure avoid unreasonable impacts to
ridgelines, significant hillside features, community viewsheds, and is in compliance
with Section 15-13.100.
This finding is not applicable to the project as the site is not considered a hillside lot.
Neighbor Notification and Correspondence
A public notice was sent to property owners within 500 feet of the site. In addition, the public
hearing notice and description of the project was published in the Saratoga News. The adjacent
neighbor to the right at 19861 Robin Way submitted written project related comments with
concerns related to 1) the location and noise of the existing air conditioning condensers and 2) that
the northeast property corner is not consistent where she believes it to be located. (Attachment 4)
The existing air conditioning condensers would be removed as part of the project. The City Code
includes regulations which prohibit the location of air conditioning condensers within the 15’ side
setback area. The project would locate the new condensers adjacent to the right side of the building
54
Report to the Planning Commission
19891 Robin Way – Application # PDR17-0023/ARB17-0061
May 9, 2018
Page | 6
and would be setback at least 24 feet from the property line as depicted on the site plan. In addition,
the noise emitted by the new condensers must not exceed the maximum noise levels per City Code
Article 7-30 (Noise Control). The applicant submitted a boundary survey prepared by a
professional land surveyor which is included in the development plans. No evidence of incorrect
property corner locations was determined by the surveyor. The boundary survey does depict the
location of the existing side fence along the common property line between the subject site and
19861 Robin Way and this fence is located at least two feet onto the subject site. No other
neighbors expressed concerns with the project.
ENVIRONMENTAL DETERMINATION
The project is Categorically Exempt from the Environmental Quality Act (CEQA) pursuant Section
15303, “New Construction or Conversion of Small Structures”, Class 3 (a) of the Public Resources
Code (CEQA). This exemption allows for the construction of three single-family residences in a
residential area. The project, as proposed, is for the construction of a new residence in a suburban,
residential area.
ATTACHMENTS:
1. Resolution of Approval No. 18-007
2. Arborist Report dated April 17, 2018
3. Story Pole Certification dated April 14, 2018
4. Neighbor Comments, received February 7, 2018
5. Development Plans (received April 23, 2018)
55
RESOLUTION NO: 18-007
A RESOLUTION OF THE CITY OF SARATOGA PLANNING COMMISSION
APPROVING DESIGN REVIEW PDR17-0023 AND ARBORIST REPORT ARB17-0061
19891 ROBIN WAY (510-01-036)
WHEREAS, on December 18, 2017 an application was submitted by Mohsen and Behnaz
Salek requesting Design Review approval to construct a new 5,139 square foot single-story
residence with associated site improvements located 19891 Robin Way (APN 510-01-036). The
height of the proposed residence is approximately 23 feet. Two protected trees are proposed for
removal. The site is located within the R-1-20,000 zoning district.
WHEREAS, the Community Development Department completed an environmental
assessment for the project in accordance with the California Environmental Quality Act (CEQA),
and recommends that the Planning Commission determine this project Categorically Exempt.
WHEREAS, on May 9, 2018 the Planning Commission held a duly noticed public hearing
on the subject application, and considered evidence presented by City Staff, the applicant, and other
interested parties.
NOW THEREFORE, the Planning Commission of the City of Saratoga hereby finds,
determines and resolves as follows:
Section 1: The recitals set forth above are true and correct and incorporated herein by
reference.
Section 2: The project is Categorically Exempt from the Environmental Quality Act
(CEQA) pursuant Section 15303, “New Construction or Conversion of Small Structures”, Class 3
(a) of the Public Resources Code (CEQA). This exemption allows for the construction of one
single-family residence in a residential area.
Section 3: The project is consistent with the following Saratoga General Plan Policies:
Land Use Goal 13 which provides that the City shall use the Design Review process to assure that
the new construction and major additions thereto are compatible with the site and the adjacent
surroundings; Safety Element Site and Drainage Policy 3 which provides that the City shall require
that landscaping and site drainage plans be submitted and approved during Design Review for a
residence prior to issuance of permits; and Conservation Element Policy 6.0 which provides that the
City shall protect the existing rural atmosphere of Saratoga by carefully considering the visual
impact of new development.
Section 4: The project is consistent with the Saratoga City Code in that the design and
improvements are consistent with the design review findings. The overall mass and height of the
structure are in scale with the neighborhood; the structure is set back in proportion to the size and
shape of the lot; site development follows contours and is appropriate given the property’s natural
constraints; the porch and entry are in scale with other structures in the neighborhood. In addition,
the proposed materials, colors, and details enhance the architecture in a well-composed, understated
manner.
Attachment 1
56
Lands of Salek
19891 Robin Way Application #PDR17-0023ARB17-0061
Resolution #18-007
Page | 2
Section 5: The City of Saratoga Planning Commission hereby approves PDR17-0023 and
ARB17-0061 located at 19891 Robin Way (APN 510-01-036), subject to the Findings, and
Conditions of Approval attached hereto as Exhibit 1.
PASSED AND ADOPTED by the City of Saratoga Planning Commission on this 9th day of
May 2018 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
____________________________
Joyce Hlava
Chair, Planning Commission
57
Lands of Salek
19891 Robin Way Application #PDR17-0023ARB17-0061
Resolution #18-007
Page | 3
Exhibit 1
CONDITIONS OF APPROVAL
PDR17-0023 & ARB17-0061
19891 ROBIN WAY
(APN 510-01-036)
GENERAL
1. All conditions below which are identified as permanent or for which an alternative period of
time for applicability is specified shall run with the land and apply to the landowner’s
successors in interest for such time period. No zoning clearance, or demolition, grading for this
project shall be issued until proof is filed with the city that a certificate of approval documenting
all applicable permanent or other term-specified conditions has been recorded by the applicant
with the Santa Clara County Recorder’s office in form and content to the Community
Development Director. If a condition is not “Permanent” or does not have a term specified, it
shall remain in effect until the issuance by the City of Saratoga of a Certificate of Occupancy or
its equivalent.
2. The Owner and Applicant will be mailed a statement after the time the Resolution granting this
approval is duly executed, containing a statement of all amounts due to the City in connection
with this application, including all consultant fees (collectively “processing fees”). This
approval or permit shall expire sixty (60) days after the date said notice is mailed if all
processing fees contained in the notice have not been paid in full. No Zoning Clearance or
Demolition, Grading, or Building Permit may be issued until the City certifies that all
processing fees have been paid in full (and, for deposit accounts, a surplus balance of $500 is
maintained).
3. The Project shall maintain compliance with all applicable regulations of the State, County, City
and/or other governmental agencies having jurisdiction including, without limitation, the
requirements of the Saratoga City Code incorporated herein by this reference.
4. As a condition of this Approval, Owner and Applicant hereby agree to defend, indemnify and
hold the City and its officers, officials, boards, commissions, employees, agents and volunteers
harmless from and against:
a. any and all claims, actions or proceedings to attack, set aside, void or annul any action
on the subject application, or any of the proceedings, acts or determinations taken, done
or made prior to said action; and
b. any and all claims, demands, actions, expenses or liabilities arising from or in any
manner relating to the performance of such construction, installation, alteration or
grading work by the Owner and/or Applicant, their successors, or by any person acting
on their behalf.
58
Lands of Salek
19891 Robin Way Application #PDR17-0023ARB17-0061
Resolution #18-007
Page | 4
In addition, prior to any Zoning Clearance, Owner and Applicant shall execute a separate
agreement containing the details of this required Agreement to Indemnify, Hold Harmless and
Defend, which shall be subject to prior approval as to form and content by the City Attorney.
COMMUNITY DEVELOPMENT
5. The owner/applicant shall comply with all City requirements regarding drainage, including but
not limited to complying with the city approved Stormwater management plan. The project shall
retain and/or detain any increase in design flow from the site, that is created by the proposed
construction and grading project, such that adjacent down slope properties will not be negatively
impacted by any increase in flow. Design must follow the current Santa Clara County Drainage
Manual method criteria, as required by the building department. Retention/detention element
design must follow the Drainage Manual guidelines, as required by the building department.
6. The development shall be located and constructed to include those features, and only those
features, as shown on the Approved Plans date stamped April 23, 2018. All proposed changes
to the approved plans must be submitted in writing with plans showing the changes, including a
clouded set of plans highlighting the changes. Such changes shall be subject to approval in
accordance with City Code.
7. Prior to issuance of Building Permits, the applicant shall submit for staff approval, a Lighting
Plan for the home’s exterior and landscaped areas. Proposed exterior lighting shall be limited to
full-cut off & shielded fixtures with downward directed illumination so as not to shine on
adjacent properties or public right-of-way. All proposed exterior lighting shall be designed to
limit illumination to the site and avoid creating glare impacts to surrounding properties.
8. In order to comply with standards that minimize impacts to the neighborhood during site
preparation and construction, the applicant shall comply with City Code Sections 7-30.060 and
16-75.050, with respect to noise, construction hours, maintenance of the construction site and
other requirements stated in these sections.
9. Prior to issuance of Building Permits, the applicant shall prepare for review and approval by
City staff a Construction Management Plan for the project which includes but is not limited to
the following:
a. Proposed construction worker parking area.
b. Proposed construction hours that are consistent with City Code.
c. Proposed construction/delivery vehicle staging or parking areas.
d. Proposed traffic control plan with traffic control measures, any street closure, hours for
delivery/earth moving or hauling, etc. To the extent possible, any deliveries, earth
moving or hauling activities will be scheduled to avoid peak commute hours.
e. Proposed construction material staging/storage areas.
f. Location of project construction sign outlining permitted construction work hours, name
of project contractor and the contact information for both homeowner and contractor.
59
Lands of Salek
19891 Robin Way Application #PDR17-0023ARB17-0061
Resolution #18-007
Page | 5
10. All fences, walls and hedges shall conform to height requirements provided in City Code
Section 15-29.
11. The final landscaping and irrigation plan submitted for Building Permit approval shall
demonstrate how the project complies with the State Water Efficient Landscape Ordinance and
shall take into account the following:
a. To the extent feasible, landscaping shall be designed and operated to treat storm water
runoff by incorporating elements that collect, detain and infiltrate runoff. In areas that
provide detention of water, plants that are tolerant of saturated soil conditions and
prolong exposure to water shall be specified.
b. To the extent feasible, pest resistant landscaping plants shall be used throughout the
landscaped area, especially along any hardscape area.
c. Plant materials selected shall be appropriate to site specific characteristics such as soil
type, topography, climate, amount and timing of sunlight, prevailing winds, rainfall, air
movement, patterns of land use, ecological consistency and plant interactions to ensure
successful establishment.
d. Pest resistant landscaping plants shall be considered for use throughout the landscaped
area, especially along any hardscape area.
e. Any proposed or required under grounding of utilities shall take into account potential
damage to roots of protected trees
12. A locking mailbox approved for use by the U.S. Postal service shall be installed and in
compliance with Saratoga Municipal Code section 6-25.030. The mailbox shall be installed
prior to final inspection.
13. This Condition is Permanent: The project includes a carport on the west side of the building.
The carport is unenclosed so its floor area is not included in the maximum allowable floor area.
This carport is to remain unenclosed and additional exterior walls are not to be added which
would cause the project to exceed the maximum allowable floor area for the site.
FIRE DEPARTMENT
14. The owner/applicant shall comply with all Fire Department requirements.
ARBORIST
15. All requirements in the City Arborist Report dated April 17, 2018 are hereby adopted as
conditions of approval and shall be implemented as part of the approved plans.
PUBLIC WORKS
16. Applicant / Owner shall obtain an encroachment permit for any and all improvements in any
City right-of-way or City easement including all new utilities prior to commencement of the
work to implement this Design Review.
60
Lands of Salek
19891 Robin Way Application #PDR17-0023ARB17-0061
Resolution #18-007
Page | 6
17. All new/upgraded utilities shall be installed underground.
18. Applicant / Owner shall maintain the streets, sidewalks and other right of way as well as
adjacent properties, both public and private, in a clean, safe and usable condition. All spills
of soil, rock or construction debris shall be removed immediately.
19. Applicant / Owner shall submit a site plan and associated calculations for storm water
treatment measures in compliance with NPDES Permit No. CAS612008, November 19, 2015
Provision C.3.i. Required Site Design Measures for Small Projects and Detached Single-Family
Home Projects. Applicant / Owner shall require all development projects, which create and /or
replace greater or equal 2,500 square feet to 10,000 square feet of impervious surface, and
detached single-family home projects, which create and or replace 2,500 square feet or more of
impervious surface, to install one or more of the following site design measures including:
1. Direct runoff onto vegetated areas
2. Direct runoff from sidewalks, walkways, and/or patios onto vegetated areas.
3. Direct runoff from driveways and/or uncovered parking lots onto vegetated areas.
4. Construct sidewalks, walkways, and/or patios with permeable surfaces.
5. Bio retention basin.
20. The Owner/Applicant shall incorporate adequate source control measures to limit pollutant
generation, discharge, and runoff (e.g. landscaping that minimizes irrigation and runoff,
promotes surface infiltration where possible, minimizes the use of pesticides and fertilizers,
and incorporates appropriate sustainable landscaping practices and programs, such as Bay-
Friendly Landscaping). Revise plan C-1 to accommodate bio retention basin.
21. At least 48 hours prior to the commencement of any earthwork/grading activities, the
Owner/Applicant shall arrange a pre-construction meeting. The meeting shall include the
City of Saratoga Grading Inspector, the grading contractor and the project soils engineer.
22. All grading and earthwork activities shall conform to the approved plans and specifications.
All grading and earthwork activities shall be observed and approved by the soils engineer.
The soils engineer shall be notified at least 48 hours prior to any grading or earthwork
activities. Unobserved or unapproved work shall be removed and replaced under observation
of the project soil engineer.
23. Construction Site Control
Owner shall implement construction site inspection and control to prevent construction
site discharges of pollutants into the storm drains per approved Erosion Control Plan.
The City requires the construction sites to maintain year-round effective erosion control,
61
Lands of Salek
19891 Robin Way Application #PDR17-0023ARB17-0061
Resolution #18-007
Page | 7
run-on and run-off control, sediment control, good site management, and non-storm water
management through all phases of construction (including, but not limited to, site
grading, building, and finishing of lots) until the site is fully stabilized by landscaping or
the installation of permanent erosion control measures.
City will conduct inspections to determine compliance and determine the effectiveness of
the BMPs in preventing the discharge of construction pollutants into the storm drain.
Owner shall be required to timely correct all actual and potential discharges observed.
24. Prior to the Building final, all Public works conditions including drainage, grading, and
landscaping of the site shall be completed per approved plans.
BUILDING DEPARTMENT SUBMITTAL
25. Four (4) sets of complete construction plans shall be submitted to the Building Division. These
plans shall be subject to review and approval by the City prior to issuance of Zoning Clearance.
The construction plans shall, at a minimum include the following:
a. Architectural drawings and other plan sheets consistent with those identified as Exhibit “A”
on file with the Community Development Department.
b. Arborist Report, dated April 17, 2018 printed onto a separate plan page.
c. All additional drawings, plans, maps, reports, notes, and/or materials required by the
Building Division.
c. This signed and dated Resolution printed onto separate construction plan pages.
d. The site plan shall contain a note with the following language: “Prior to foundation
inspection by the City, the Licensed Land Surveyor of record shall provide a written
certification that all building setbacks comply with the Approved Plans,” which note shall
represent a condition which must be satisfied to remain in compliance with this Design
Review Approval.
62
Community Development Department
City of Saratoga
13777 Fruitvale Avenue
Saratoga, California 95070
ARBORIST REPORT
Application No. ARB17-0061
Prepared by Kate Bear, City Arborist Site: 19891 Robin Way
Phone: (408) 868-1276 Owner:Mohsen and Behnaz Salek
Email: kbear@saratoga.ca.us APN: 510-01-036
Email:msalek45@yahoo.com
Report History: Final report Date: April 17, 2018
PROJECT SCOPE:
The applicant has submitted plans to demolish the existing house and build a new single story house
with an attached two car garage. The pool that will filled in and removed.
Two trees protected by Saratoga City Code (7 and 19) are requested for removal to construct the
project.
STATUS: Approved by City Arborist, with attached conditions.
PROJECT DATA IN BRIEF:
Tree bond – Required - $23,400
Tree fencing – Required – See Conditions of Approval and attached map.
Tree removals – Trees 7 and 19 are approved for removal once building permits
have been issued.
Replacement trees – Required = $6,450
ATTACHMENTS:
1 – Findings and Tree Information
2 – Tree Removal Criteria
3 – Conditions of Approval
4 – Map Showing Tree Protection
1
Attachment 2
63
19891 Robin Way Attachment 1
FINDINGS:
Tree Removals
According to Section 15-50.080 of the City Code, whenever a tree is requested for removal
as part of a project, certain findings must be made and specific tree removal criteria met.
Two trees (7 and 19) are in conflict with the project. They meet the City’s criteria allowing
them to be removed and replaced as part of the project, once building division permits have
been obtained. Attachment 2 contains the tree removal criteria for reference.
Table 1: Summary of Tree Removal Criteria that are met
Tree No. Species Criteria met Comments
7 Saucer magnolia 1, 4, 6, 7, 9 In decline
19 Mayten 1, 4, 6, 7, 9 Decay at base of trunk
New Construction
Based on the information provided, and as conditioned, this project complies with the
requirements for the setback of new construction from existing trees under Section 15-
50.120 of the City Code.
Tree Preservation Plan
Section 15-50.140 of the City Code requires a Tree Preservation Plan for this project. To
satisfy this requirement the following shall be copied onto a plan sheet and included in the
final sets of plans:
1)The recommendations and tree information from the submitted arborist report dated
April 6, 2017;
AND
2)The Project Data in Brief, the Conditions of Approval, and the map showing tree
protection from this report.
TREE INFORMATION:
Arborist Report reviewed:
Preparer: Kevin Kielty, Kielty Arborist ServicesLLC
Date of Report: April 6, 2015, updated December 19, 2017
An arborist report was submitted for this project that inventoried 22 trees, 16 of which are
protected by Saratoga City Code. Information on the condition of each tree, potential
impacts from construction, suitability for preservation, appraised values and tree protection
recommendations was provided. A table summarizing information about each tree is below.
Two trees (7 and 19) protected by Saratoga City Code are requested for removal to
construct this project.
2
64
19891 Robin Way Attachment 1
TREE INFORMATION continued:
Table 2: Tree information from December 19, 2017 updated arborist report.
3
65
19891 Robin Way Attachment 1
Table 3: Tree values from December 19, 2017 updated arborist report.
4
66
19891 Robin Way Attachment 2
TREE REMOVAL CRITERIA
Criteria that permit the removal of a protected tree are listed below. This information is from Article
15-50.080 of the City Code and is applied to any tree requested for removal as part of the project. If
findings are made that meet the criteria listed below, the tree(s) may be approved for removal and
replacement during construction.
(1) The condition of the tree with respect to disease, imminent danger of falling, proximity to existing or
proposed structures and interference with utility services, and whether the tree is a Dead tree or a
Fallen tree.
(2) The necessity to remove the tree because of physical damage or threatened damage to improvements
or impervious surfaces on the property.
(3) The topography of the land and the effect of the tree removal upon erosion, soil retention and the
diversion or increased flow of surface waters, particularly on steep slopes.
(4) The number, species, size and location of existing trees in the area and the effect the removal would
have upon shade, privacy impact, scenic beauty, property values, erosion control, and the general
welfare of residents in the area.
(5) The age and number of healthy trees the property is able to support according to good forestry
practices.
(6) Whether or not there are any alternatives that would allow for retaining or not encroaching on the
protected tree.
(7) Whether the approval of the request would be contrary to or in conflict with the general purpose and
intent of this Article.
(8) Any other information relevant to the public health, safety, or general welfare and the purposes of this
ordinance as set forth in Section 15-50.010
(9) The necessity to remove the tree for economic or other enjoyment of the property when there is no
other feasible alternative to the removal.
(10) The necessity to remove the tree for installation and efficient operation of solar panels, subject to the
requirements that the tree(s) to be removed, shall not be removed until solar panels have been installed
and replacement trees planted in conformance with the City Arborist's recommendation.
5
67
19891 Robin Way Attachment 3
CONDITIONS OF APPROVAL
1. Owner, Architect, Contractor: It is the responsibility of the owner, architect and contractor to
be familiar with the information in this report and implement the required conditions.
2. Permit: Receipt of a Planning or Building permit does not relieve applicant of his
responsibilities for protecting trees per City Code Article 15-50 on all construction work.
3. Final Plan Sets:
a. Shall include the recommendations and tree information from the arborist report by
Kevin Kielty dated April 6, 2015 and updated December 19, 2017.
b. Shall include the recommendations and tree information copied on a plan sheet, titled
“Tree Preservation”.
c. Shall include the Project Data in Brief, the Conditions of Approval, and the map showing
tree protection sections of the City Arborist report, April 17, 2018:
4. Tree Protection Security Deposit:
a. Is required per City Ordinance 15-50.080.
b. Shall be $23,400 for tree(s) 1 – 5, 9, 13 and 16.
c. Shall be obtained by the owner and filed with the Community Development Department
before obtaining Building Division permits.
d. May be in the form of cash, check, credit card payment or a bond.
e. Shall remain in place for the duration of construction of the project.
f. May be released once the project has been completed, inspected and approved by the City
Arborist.
5. Tree Protection Fencing:
a. Shall be installed as shown on the attached map.
b. Shall be shown on the Site Plan.
c. Shall be established prior to the arrival of construction equipment or materials on site.
d. Shall be comprised of six-foot high chain link fencing mounted on eight-foot tall, 2-inch
diameter galvanized posts, driven 24 inches into the ground and spaced no more than 10
feet apart.
e. Shall be posted with signs saying “TREE PROTECTION FENCE - DO NOT MOVE OR
REMOVE WITHOUT APPROVAL FROM CITY ARBORIST, KATE BEAR (408)
868-1276”.
f. Call City Arborist, Kate Bear at (408) 868-1276 for an inspection of tree protection
fencing once it has been installed. This is required prior to obtaining building division
permits.
g. Tree protection fencing shall remain undisturbed throughout the construction until final
inspection.
6. Construction: All construction activities shall be conducted outside tree protection fencing
unless permitted as conditioned below. These activities include, but are not necessarily
limited to, the following: demolition, grading, trenching for utility installation, equipment
cleaning, stockpiling and dumping materials (including soil fill), and equipment/vehicle
operation and parking.
6
68
19891 Robin Way Attachment 3
7. Work inside fenced areas:
a. Requires field meeting with City Arborist before performing work.
b. Requires City Arborist approval prior to performing work.
c. Requires Project Arborist on site to monitor work.
8. Project Arborist:
a. Shall be Kevin Kielty unless otherwise approved by the City Arborist.
b. Shall visit the site every three weeks during grading, trenching or digging activities and
every six weeks thereafter.
c. Shall provide a letter to the Applicant to provide to the City following each site visit. The
letter shall document the work performed around trees, include photos of the work in
progress, and provide information on the condition of the trees following construction.
d. Shall supervise any permitted pruning or root pruning of trees on site. Roots of protected
trees measuring two inches in diameter or more shall not be cut without prior approval of
the Project Arborist. Roots measuring less than two inches in diameter may be cut using a
sharp pruning tool.
e. Shall monitor all work within 15 feet of trees 1 – 5, 13 and 16.
9. Tree removal:
a. Trees 7 and 19 meet the criteria for removal and may be removed and replaced once
Building Division permits have been obtained.
b. Replacement values for new trees are listed below.
15 gallon = $350 24 inch box = $500 36 inch box = $1,500
48 inch box = $5,000 60 inch box = 7,000 72 inch box = $15,000
c. Tree(s) authorized for removal or encroachment pursuant to this project may NOT be
removed or encroached upon until the issuance of the applicable permit from the building
division for the approved project.
d. Should any tree be damaged beyond repair, new trees shall be required to replace the tree.
If there is insufficient room to plant the necessary number of new trees, some of the value
for trees may be paid into the City’s Tree Fund.
10. New trees:
a. New trees equal to $6,450 shall be planted prior to completion of construction.
b. Trees shall be replaced on site according to good forestry practices, and shall provide
equivalent value in terms of aesthetic and environmental quality, size, height, location,
appearance and other significant beneficial characteristics of the removed trees.
c. Only drought tolerant plants that are compatible with oaks are permitted under the outer
half of the canopy of oak trees on site.
11. Final inspection: At the end of the project, when the contractor wants to remove tree
protection fencing and have the tree protection security deposit released by the City, call City
Arborist for a final inspection.
7
69
Attachment 4
2
3
4 5
6
7
8
9
10
11
18
17
13 15 14
16
19
Legend
Tree Protection Fencing
20
22
21
12
19891 Robin Way
8
70
Story Pole Certification
占軽重甫韓雪塾撰董
山鳩a亡jon: 1 9891恥bin潮ay
轟醒睡撃軍諒鶉臨縄
丁重鞄転郭鳴娃鵜野無理連繋龍三
要事重藍藻震霊醒韓堅塁襲撃悪霊雷撃塞整翼基盤罷艶曇整襲董襲撃襲聾義認塞韮閣窪嚢曇繋撃聾芦塞
∈重野聾謹垂轟恕罷≡轟産婆轟醸墓誌軽霞主書誌認高麗軍醒誼露諦看護辞麗垂謹野轟等寒害腎重患寵轟
証19務i Ro断n Way.蒔e塙fy the s軸γ PO量鎧拙b筑antialty ⊂Onform廟th the plans p「ovided by
G’し輔打撃鎧垣露出輪講重篤暁筆出土鎮ま」曇れ-鴫ゼ離乳謎め咄盲軸屯a膿=捌聞流o鵬遜る蚤Sh脚
霞露露露悪
了二重三と一つ///シ//乙__年中8
韮謹睦聾圭輩毒聾蓋露顎聖餐撃蓮襲琵羅題蓮
愚説蓮垂範密葬認諾寵藷幕藩酷襲韓董罷一基藷闇重量罷彊糞輩鬱 を開脚
Attachment 3
71
Attachment 4
72
73
74
75
76
77
78
79
80
81
82
83
84
85