HomeMy WebLinkAbout11-28-18 Planning Commission Agenda PacketSaratoga Planning Commission Agenda – Page 1 of 2
SARATOGA PLANNING COMMISSION
REGULAR MEETING
NOVEMBER 28, 2018
7:00 PM PLANNING COMMISSION REGULAR MEETING
Civic Theater | 13777 Fruitvale Avenue, Saratoga CA 95070
PLEDGE OF ALLEGIANCE
ROLL CALL
APPROVAL OF MINUTES
Action Minutes from the Regular Planning Commission Meeting of November 14, 2018.
Recommended Action:
Approve Minutes of November 14, 2018 meeting.
111418 Draft Minutes
ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS
Any member of the public will be allowed to address the Planning Commission for up to three
(3) minutes on matters not on this agenda. This law generally prohibits the Planning
Commission from discussing or taking action on such items. However, the Planning Commission
may instruct staff accordingly regarding Oral Communications.
REPORT ON APPEAL RIGHTS
If you wish to appeal any decision on this Agenda, you may file an Appeal Application with the
City Clerk within fifteen (15) calendar days of the date of the decision.
1. NEW BUSINESS
2. PUBLIC HEARING
Applicants and/or their representatives have a total of ten (10) minutes maximum for
opening statements. All interested persons may appear and be heard during this meeting
regarding the items on this agenda. If items on this agenda are challenged in court,
members of the public may be limited to raising only issues raised at the Public Hearing
or in written correspondence delivered to the Planning Commission at, or prior to the
close of the Public Hearing. Members of the public may comment on any item for up to
three (3) minutes. Applicants and/or their representatives have a total of five (5) minutes
maximum for closing statements.
2.1 Application PDR17-0016, VAR18-0003, ARB17-0050; 14662 Sixth Street (517-08-
002); Tri Hong/Taoliang Wang – The applicant requests Design Review approval to
construct a two-story, 27 feet tall, 3,459 square foot single-family home at 14662 Sixth
Street. The existing structures on the site will be removed. The project also includes a
request for a variance to reduce the required front yard setback from 25 feet to 15 feet
Saratoga Planning Commission Agenda – Page 2 of 2
and to reduce the required side yard setback from 10 feet to 5 feet 6 inches. Four
protected trees are requested for removal. The site is zoned RM-3,000 with a General
Plan Designation of RMF (Residential Multi-Family). Staff Contact: Christopher
Riordan (408) 868-1235 or criordan@saratoga.ca.us.
Recommended Action:
Adopt Resolution No. 18-035 approving the project subject to conditions of approval
included in Attachment 1.
Staff Report 14462 Sixth Street
Attachment 1 - Resolution
Attachment 2 - City Arborist Report
Attachment 3 - Applicants Variance Request
Attachment 4 - Neighbor Notification Forms
Attachment 5 - Story Pole Verification
Attachment 6 - Project Plans
DIRECTOR ITEMS
COMMISSION ITEMS
ADJOURNMENT
CERTIFICATE OF POSTING OF THE AGENDA
I, Janet Costa, Administrative Assistant for the City of Saratoga, declare that the foregoing
agenda for the meeting of the Planning Commission was posted and available for public review
on November 21, 2018 at the City of Saratoga, 13777 Fruitvale Avenue, Saratoga, CA 95070
and on the City’s website at www.saratoga.ca.us.
Signed this 21st day of November 2018 at Saratoga, California.
Janet Costa, Administrative Assistant
In Compliance with the Americans with Disabilities Act, if you need assistance to participate in
this meeting, please contact the City Clerk at 408/868-1269. Notification 24 hours prior to the
meeting will enable the City to make reasonable arrangements to ensure accessibility to this
meeting. [28 CFR 35.102-35.104 ADA title II]
You can also sign up to receive email notifications when Commission agendas and minutes have
been added to the City at website http://www.saratoga.ca.us/contact/email_subscriptions.asp.
NOTE: To view previous Planning Commission meetings anytime, go the City Video Archives at
www.saratoga.ca.us
Saratoga Planning Commission Agenda – Page 1 of 3
MINUTES
WEDNESDAY, NOVEMBER 14, 2018
SARATOGA PLANNING COMMISSION REGULAR MEETING
Chair Hlava called the Planning Commission Regular Meeting to order in the Civic Theater,
Council Chambers at 13777 Fruitvale Avenue in Saratoga at 7:00 p.m. and led the Pledge of
Allegiance.
ROLL CALL
PRESENT: Chair Joyce Hlava, Vice Chair Kookie Fitzsimmons, Commissioners Sunil
Ahuja, Lucas Pastuszka, Leonard Almalech, Tina Walia, Razi Mohiuddin
ABSENT: None
ALSO PRESENT: Debbie Pedro, Community Development Director
Nicole Johnson, Planner II
Christopher Riordan, Senior Planner
APPROVAL OF MINUTES
Action Minutes from the Regular Planning Commission Meeting of October 24, 2018.
Recommended Action:
Approve Minutes of October 24, 2018 meeting.
Chair Hlava requested a motion to move the minutes to the end of the meeting.
ALMALECH/MOHIUDDIN MOTIONED TO MOVE THE MINUTES TO THE END OF
THE MEETING. MOTION PASSED. AYES: HLAVA, FITZSIMMONS, AHUJA,
ALMALECH, MOHIUDDIN, PASTUSZKA, WALIA. NOES: NONE. ABSENT: NONE.
ABSTAIN: NONE.
ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS
Resident David Anderson asked about the status of the Creekside school project. Commission
directed staff to report on the status at their next meeting.
1. NEW BUSINESS
None.
2. PUBLIC HEARING
1.1 Application SUB18-0002; 15320 Peach Hill Road (517-22-112); Lands of Carey –
The applicant requests Tentative Parcel Map approval to subdivide an approximate
193,798 square foot (4.449 acre) parcel into two lots. The site is zoned R-1-40,000
(Single Family Residential) with a General Plan designation of Very Low Density
Residential (RVLD). No trees are proposed for removal. Staff Contact: Nicole Johnson
(408) 868-1209 or njohnson@saratoga.ca.us.
3
Saratoga Planning Commission Agenda – Page 2 of 3
Recommended Action:
Adopt Resolution No. 18-034 approving the project subject to conditions of approval
included in Attachment 1.
ALMALECH/PASTUSZKA MOVED TO APPROVE WITH CONDITIONS OF
APPROVAL. MOTION PASSED. AYES: HLAVA, FITZSIMMONS, AHUJA,
ALMALECH, MOHIUDDIN, PASTUSZKA, WALIA. NOES: NONE. ABSENT:
NONE. ABSTAIN: NONE.
1.2 Application ZOA18-0001 - Annual Zoning Code Amendments (CITY WIDE).
(Continued from 10/24/18 meeting). Application by the City of Saratoga to amend the
City Code. The changes include clarifying the definition of “Subterranean Structures”,
adding a definition for “Wineries” to Article 15-06 (Definitions), and correcting various
inaccurate code section references in the Zoning regulations.
Staff contact: Christopher Riordan: (408) 868-1235 criordan@saratoga.ca.us.
Recommended Action:
Adopt Resolution No. 18-025 recommending that the City Council adopt an
ordinance which includes amendments to Chapter 15 (Zoning Regulations) of the
Saratoga City Code.
MOHIUDDIN/PASTUSZKA MOTIONED TO REMOVE SUBTERRANEAN
STRUCTURE DEFINITION FROM ANNUAL CODE UPDATE FOR FUTURE
DISCUSSION. MOTION PASSED. AYES: HLAVA, FITZSIMMONS, AHUJA,
ALMALECH, MOHIUDDIN, PASTUSZKA, WALIA. NOES: NONE. ABSENT:
NONE. ABSTAIN: NONE.
AHUJA/MOHIUDDIN MOVED TO APPROVE ANNUAL CODE UPDATE
EXCLUDING SUBTERRANEAN STRUCTURE DEFINITION. MOTION
PASSED. AYES: HLAVA, FITZSIMMONS, AHUJA, ALMALECH, MOHIUDDIN,
PASTUSZKA, WALIA. NOES: NONE. ABSENT: NONE. ABSTAIN: NONE.
1.3 Application ZOA/18-0002 – Parking Ordinance Update
Changes to Chapter 15 (Zoning Regulations) of the Saratoga City Code regarding parking
regulations which includes establishing one set of parking standards for the entire C -H
District (the Village) with respect to restaurant, retail, office and personal service and to
eliminate Section 15-35.020(k), surplus parking in C-H district. Staff Contact: Sandy
Baily (408) 868-1225 or sbaily@saratoga.ca.us.
Recommended Action:
Adopt Resolution No. 18-027 recommending the City Council adopt an ordinance to
amend Chapter 15 (Zoning Regulations) of the Saratoga City Code regarding parking
regulations.
AHUJA/WALIA MOVED TO APPROVE WITH MODIFICATION. MOTION
PASSED. AYES: HLAVA, FITZSIMMONS, AHUJA, ALMALECH, MOHIUDDIN,
PASTUSZKA, WALIA. NOES: NONE. ABSENT: NONE. ABSTAIN: NONE.
4
Saratoga Planning Commission Agenda – Page 3 of 3
1. NEW BUSINESS
2.1 Planning Commission Meeting Schedule
Recommended Action:
Review and discuss the draft change to the City Code.
The Commission discussed the proposed change to the Commission meeting schedule.
Staff encouraged interested Commissioners to attend the November 21st Council
meeting to share their opinions.
DIRECTOR ITEMS
• Regarding the Creekside School project, Director Pedro reported that the City has
received no revised materials, and there has been no contact with the applicant since the
2017 Study Session. Due to lack of activity, staff will be sending the applicant a letter to
close the application.
• The Commission agreed to hold the Annual Planning Commission 2019 Work Plan
Study Session on December 11, 2018 at 5:00pm.
APPROVAL OF MINUTES
Action Minutes from the Regular Planning Commission Meeting of October 24, 2018.
Recommended Action:
Approve Minutes of October 24, 2018 meeting.
WALIA/FITZSIMMONS MOTIONED TO APPROVE PROPOSED ADDITIONS TO THE
10/24 MINUTES. MOTION PASSED. AYES: FITZSIMMONS, AHUJA, PASTUSZKA,
WALIA. NOES: HLAVA. ABSENT: NONE. ABSTAIN: ALMALECH, MOHIUDDIN.
WALIA/FITZSIMMONS MOVED TO APPROVE THE MINUTES FOR THE REGULAR
PLANNING COMMISSION MEETING OF OCTOBER 24, 2018 AS AMENDED. MOTION
PASSED. AYES: FITZSIMMONS, AHUJA, PASTUSZKA, WALIA. NOES: HLAVA.
ABSENT: NONE. ABSTAIN: ALMALECH, MOHIUDDIN.
COMMISSION ITEMS
• Commissioner Almalech read a statement regarding the 10/24 Planning Commission
meeting.
• Commissioner Ahuja shared that the month of November is the 100th year anniversary of the
ending of WWI, Veterans day, Thanksgiving, and “Movember” - Men’s Health Month.
ADJOURNMENT
MOHIUDDIN/PASTUSZKA MOVED TO ADJOURN THE MEETING AT 9:13 PM.
MOTION PASSED. AYES: HLAVA, FITZSIMMONS, AHUJA, ALMALECH, MOHIUDDIN,
PASTUSZKA, WALIA. NOES: NONE. ABSENT: NONE. ABSTAIN: NONE.
Minutes respectfully submitted:
Janet Costa, Administrative Assistant
City of Saratoga 5
REPORT TO THE
PLANNING COMMISSION
14662 Sixth Street
Meeting Date: November 28, 2018
Application: PDR17-0016/ARB17-0050/VAR18-0003
Address/APN: 14662 Sixth Street / 517-08-002
Applicant / Property Owner: Tri Hong / Taoliang Wang
From: Debbie Pedro, Community Development Director
Report Prepared By: Christopher Riordan, Senior Planner
6
Report to the Planning Commission
14662 Sixth Street – Application # PDR17-0016/ARB17-0050/VAR18-0003
November 28, 2018
Page | 2
PROJECT DESCRIPTION
The applicant is proposing a new 3,459 square foot, 27’6” tall, two-story residence. The project
also includes a variance request to reduce the width of both the required front and side yard setback
areas. Four protected trees are proposed for removal.
STAFF RECOMMENDATION
Adopt Resolution No.18-035 approving the project subject to conditions of approval included in
Attachment 1.
Pursuant to City Code Sections 15-46.040 and 15-70.020, Design Review Approval by the Planning
Commission is required because the project is a new main structure in an R-M zoning district and a
variance from the setback regulations is requested.
PROJECT DATA
Gross/Net Site Area: 5,500 sq. ft. gross/net (0.126 acres)
Average Site Slope: Level Site
General Plan Designation: RMF (Residential Multi-Family)
Zoning: Multi-Family (RM-3,000)
Proposed Allowed/Required
Proposed Building Site Coverage
Residence
Porch
Garage
Total Proposed (structures)
1,748.31 sq. ft.
24.00 sq. ft.
424.19 sq. ft.
2,196.5 sq. ft. (39.94%)
2,200 sq. ft. (40%)
Floor Area
First Story
Second Story
Garage
Total Floor Area
1,748.31 sq. ft.
1,286.21 sq. ft.
424.19 sq. ft.
3,458.71 sq. ft.
No Floor Area Standards
on RM Zoned Parcels
Height 27’6” 30’
Setbacks
Front:
Left
Right
Rear:
* Variance Requested
15’ *
5’6” *
5’6” *
25’
25’
17’
17’
20’
Grading Cut
85 CY
Fill
10 CY
Export
75 CY
No grading limit in the
RM-3,000 zoning district
7
Report to the Planning Commission
14662 Sixth Street – Application # PDR17-0016/ARB17-0050/VAR18-0003
November 28, 2018
Page | 3
SITE CHARACTERISTICS AND PROJECT DESCRIPTION
Site Description
The project is located at 14662 Sixth Street, between Big Basin Way and Saint Charles Street, in
the RM-3,000 zoning district. A purpose of the multi-family zoning district is to “preserve as
many of the desirable characteristics of single-family residential districts as possible, while
permitting higher population densities.” Located on site is an existing one-story residence with a
detached single car garage at the rear of the site. This residence was constructed circa 1918 and
both it and the detached garage are in dilapidated condition. Neither structure is listed on the City’s
Heritage Resources Inventory. The residence has a nonconforming front yard setback of 15 feet
and a side setback (on the north side) of six feet. The lot is considered substandard as it does not
meet minimum lot size and dimensions for the zoning district. The 5,500 square foot lot is 55 feet
wide by 100 feet deep while the current standard for the district are lots with a minimum of 12,000
square feet, widths of 100 feet and depths of 115 feet.
Several properties in the neighborhood within the RM-3,000 zoning district have substandard sized
lots including the adjacent lots at 14656 and 14668 Sixth Street with lot sizes of 4,500 square feet
and 5,000 square feet, respectively. The second house to the left of the subject site located at
14650 Sixth Street is in the CH-2 zoning district. It is a designated Historic Landmark and is
currently used as an office. Its height, setbacks, and site coverage are all nonconforming. The site
received a variance in 1986 for an increase in height of an additional two feet, for a total height of
27’6”, to allow underground parking. The adjacent two- story residence to the left of the subject
property at 14656 Sixth Street received Planning Commission approval in September 2013. This
project included variances to reduce the required front yard setback from 25 feet to 15 feet and the
side yard setbacks from 16 feet to six feet. In addition, the adjacent two-story residence to the
right of the site at 14668 Sixth Street received Planning Commission approval in April 1992 and
included variances to encroach into the required front, side, and rear yard setback areas.
Project Description
Architecture/Design
The proposed project would include the construction of an approximately 3,459 square foot, 27’6”
tall, two-story home with an attached two car garage. The design of the project would have an eclectic
style with some Spanish Revival architectural features and details including arched windows,
decorative sconces, wrought iron details, wood shutters, a wrought iron entrance door, and a
decorative stucco vent. The combined hipped-and-gabled roof will have regularly laid straight barrel
mission tiles with a chimney with an elaborated top. The overall building exterior will be tan colored
stucco with stone veneer wainscoting at the base of the building which would help break up the visual
mass to add a human scale to the front façade as viewed from the street.
The applicant has provided a color and materials board, which will be available for review at the
site visit and during the public hearing. Below is a list of the proposed exterior materials.
8
Report to the Planning Commission
14662 Sixth Street – Application # PDR17-0016/ARB17-0050/VAR18-0003
November 28, 2018
Page | 4
Detail Colors and Materials
Exterior Tan Colored Smooth Stucco / Brown Colored Stone Veneer
Windows Tan Colored Vinyl Windows
Doors Decorative Wrought Iron Entrance Door
White Colored Steel Carriage Style Garage Door
Roof Brown Colored Concrete Tile Roof
Trees
Four protected trees are proposed for removal. These include 1) a 15.4” Norfolk island stone pine
in good condition located in the southwest corner of the site which is in conflict with the location
of the proposed driveway, 2) a 21.4” Coast live oak in fair condition located toward the middle of
the site which is in conflict with the location of the building footprint, 3) a 11.7” Valley oak in fair
condition located adjacent to the northern property line which is in conflict with the location of the
building footprint, and 4) a 11.3” Persimmon also adjacent to the northern property line which is
in conflict with the location of the building footprint. All remaining protected trees near the project
would be protected prior to building permit issuance and throughout the duration of the project.
Tree protection fencing is required to be installed prior to the issuance of building permits. Details
of the arborist’s findings and descriptions of the trees to be removed and preserved are included in
the Arborist Report (Attachment 2).
Landscaping
New landscaping would include bark under the large oak in the front yard and flowering shrubs on
both sides of the front walkway leading to the front entrance. Planter areas located to the left of the
garage and along the right side of the driveway would include additional flowering shrubs. New trees
to replace those that are removed would be located along the rear property line and near the southern
corner of the site. Both the driveway and the walkway would be composed of paver stones. Condition
of approval #11 requires that the applicant shall demonstrate compliance with the State Water
Efficient Landscape Ordinance when the application is submitted to the Building Department.
Setbacks
The project includes a variance request to reduce the required 25’ front setback from 25’ to 15’
and a request to reduce the 17’ side yard setback to 5’6”. (Attachment #3).
The minimum width of a site in the RM-3,000 zoning district is 100 feet and its minimum lot depth
is 115’. The subject site is considered nonconforming as its site width is only 55 feet and its depth
is 100’. The reduced setbacks for a nonconforming site as listed in Section 15-65.040(b)
[Structures on Nonconforming Sites] are applicable to the site which provide a rear setback which
is 20% of the lot depth (20’). However, even though the nonconforming code section would
normally allow a reduced side setback of 10% of the site width (5’6” or 6’, whichever is greater),
the development standards for the R-M district state that the minimum side setback is to be no less
than ten feet, regardless if the site is nonconforming. In addition, an additional foot is to be added
to the side setback area for every two feet (or fraction thereof) of building height over 14'. The
proposed building height is 27’6” which would require a minimum side setback of 17’. There is
no increased second story setbacks for structures in the R-M zoning district.
9
Report to the Planning Commission
14662 Sixth Street – Application # PDR17-0016/ARB17-0050/VAR18-0003
November 28, 2018
Page | 5
As mentioned in the preceding paragraph, the site has a width of 55 feet. To meet the city code
requirements, the side setback area would be a combined width of 34 feet leaving a total of 21 feet
to construct the residence. As a point of reference, a standard two car garage has a width of 20
feet. The proposed project would have 5’6” first story side setbacks. The second story on the left
side and right side would be setback an additional five feet for a setback of 9’0”, respectively.
A 43-inch Coast live oak tree in the front yard of the adjacent site to the north at 14656 Sixth Street
is located on the common property line. The dripline of this oak tree encroaches 18’ into the front
yard of the subject site. To avoid negative impacts on the neighbor’s tree, the City Arborist
determined that the project could not be located within the tree dripline. The applicant designed
the project to avoid impacts to the tree to the maximum extent possible by positioning the building
footprint around the tree. The floor area that would have been located under the tree was located
to the southwest corner and toward the front of the site and ten feet into the front setback area.
Off-street parking is essential for this property provided the narrow width of the street. The
standard parking space depth is 18 feet. The distance from the edge of pavement to the front of
the proposed garage would be 25 feet thereby allowing sufficient space to park a vehicle in the
driveway.
Geotechnical Review
This project is not located in a geo hazard zone therefore Geotechnical review was not required.
FINDINGS
Design Review
The findings required for issuance of a Design Review approval pursuant to City Code Article 15-46
are set forth below and the Applicant has met the burden of proof to support making all of those
required findings:
(a) Where more than one building or structure will be constructed, the architectural features
and landscaping thereof shall be harmonious. Such features include height, elevations,
roofs, material, color and appurtenances. This finding is not applicable. Only one structure
is being proposed.
(b) Where more than one sign will be erected or displayed on the site, the signs shall have a
common or compatible design and locational positions and shall be harmonious in
appearance. This finding is not applicable. No signs are being proposed.
(c) Landscaping shall integrate and accommodate existing trees and vegetation to be preserved;
it shall make use of water-conserving plants, materials and irrigation systems to the
maximum extent feasible; and, to the maximum extent feasible, it shall be clustered in
natural appearing groups, as opposed to being placed in rows or regularly spaced. The home
has been designed to minimize impacts to existing trees with the trees requested for removal
kept to the minimum to construct the project. The landscaping has been designed with a
10
Report to the Planning Commission
14662 Sixth Street – Application # PDR17-0016/ARB17-0050/VAR18-0003
November 28, 2018
Page | 6
minimum amount of turf for aesthetics accompanied by mulch to minimize water usage.
Clusters of shrubs will add an attractive edge around the garage and driveway. This finding
can be made in the affirmative.
(d) Colors of wall and roofing materials shall blend with the natural landscape and be
nonreflective. The tan colored smooth stucco exterior with brown colored stone veneer accents
and a brown colored tiled roof will help the project blend with the natural surroundings. This
finding can be made in the affirmative.
(e) Roofing materials shall be wood shingles, wood shakes, tile, or other materials such as
composition as approved by the Planning Commission. No mechanical equipment shall be
located upon a roof unless it is appropriately screened. The roof will be constructed of
concrete composite tiles and no mechanical equipment will be located on the roof. This finding
can be made in the affirmative.
(f) The proposed development shall be compatible in terms of height, bulk and design with other
structures in the immediate area. As provided in the staff report, the home is in the multi-family
zoning district. The home is surrounded by high density uses including a two-story condominium
complex to the west and a lodge to the north. The home will also be located near a 27’ tall single-
family home to the left. The proposed setbacks are similar to the setbacks provided on adjacent
properties, the home’s mass has been minimized with simple and well-proportioned building
elements including plate heights and second story eave lines. The stone veneer wainscoting and
wrought-iron railing add human scale to the facade. This finding can be made in the affirmative.
Variance
Pursuant to City Code Section 15-70.060, the Planning Commission is authorized to grant variances
in order to prevent or to lessen such practical difficulties and unnecessary physical hardships that
would result from a strict or literal interpretation and enforcement of certain zoning regulations. A
practical difficulty or unnecessary physical hardship may result from the size, shape or dimensions of
a site or the location of existing structures thereon. The Applicant has met the burden of proof required
to support the application for a variance as set forth below.
(a) That because of special circumstances applicable to the property, including size, shape,
topography, location or surroundings, strict enforcement of the specified regulation would
deprive the applicant of privileges enjoyed by the owners of other properties in the vicinity
and classified in the same zoning district. City code requires properties in the RM-3,000
zoning district to have a 100-foot width and a 115-foot depth. The subject property has a
substandard width of 55 feet and a substandard depth of 100 feet. The required setbacks on this
substandard lot is 25 feet in the front, 20 feet in the rear, and 17 feet on the side. The applicant
is requesting a variance to reduce the front yard setback to 15 feet. The applicant is also
requesting a variance to reduce the side yard setbacks to 5’6”. To meet the city code
requirements, the side setback area would be a combined width of 34 feet leaving a total of 21
feet to construct the residence. As a point of reference, a standard two car garage has a width
of 20 feet. A 43-inch Coast live oak tree in the front yard of the adjacent site to the north at
11
Report to the Planning Commission
14662 Sixth Street – Application # PDR17-0016/ARB17-0050/VAR18-0003
November 28, 2018
Page | 7
14656 Sixth Street is located on the common property line. The dripline of this oak tree
encroaches 18’ into the front yard of the subject site. To avoid negative impacts on the
neighbor’s tree, the City Arborist determined that the project could not be located within the
tree dripline. The applicant designed the project to avoid impacts to the tree to the maximum
extent possible by positioning the building footprint around the tree. The floor area that would
have been located under the tree was located to the southwest corner and toward the front of
the site and ten feet into the front setback area. This finding can be made in the affirmative.
(b) That the granting of the variance will not constitute a grant of special privilege inconsistent
with the limitations on other properties in the vicinity and classified in the same zoning
district. The requested variance is consistent with other homes on the same street and with
other homes on non-conforming lots in the multi-family zoning district. The proposed front
yard setback is consistent with the existing front yard setback of the home to be replaced and
the homes on either side of the property, both of which received variance approval for reduced
front setbacks of 15 feet. The proposed side setback of 5’6” will be the same as the existing
house on the site and is generally consistent with the side setbacks of both adjacent homes
which received variance approval for reduced setbacks. This finding can be made in the
affirmative.
(c) That the granting of the variance will not be detrimental to the public health, safety or
welfare, or materially injurious to properties or improvements in the vicinity. The requested
setback variance will not create any health or safety impacts. The proposed home will replace
a dilapidated structure, thus improving the welfare of the street and the neighborhood in
general. The home will accommodate a larger family within a singl e-family dwelling,
consistent with the purpose of the multi-family zoning district. The proposed setbacks will help
accommodate a two-car garage, providing off-street parking on a narrow street. The proposed
home is 2’6” feet lower in height than the allowed maximum, minimizing its visual impact. A
portion of the first story is setback is 40 feet from the front property line, and a portion of the
second story is setback 56 feet from the front property line. This finding can be made in the
affirmative.
Neighbor Notification and Correspondence
A public notice was sent to property owners within 500 feet of the site. In addition, the public hearing
notice and description of the project was published in the Saratoga News. The applicant has provided
three completed Neighbor Notification Forms with no negative project related comments (Attachment
#4).
ENVIRONMENTAL DETERMINATION
The project is Categorically Exempt from the Environmental Quality Act (CEQA) pursuant Section
15303, “New Construction or Conversion of Small Structures”, Class 3 (a) of the Public Resources
Code (CEQA). This exemption allows for the construction of three single-family residences in a
residential area. The project, as proposed, is for the construction of a new residence in a suburban,
residential area.
12
Report to the Planning Commission
14662 Sixth Street – Application # PDR17-0016/ARB17-0050/VAR18-0003
November 28, 2018
Page | 8
ATTACHMENTS
1. Resolution of Approval No. 18-035
2. Arborist Report
3. Applicant’s Variance Request
4. Neighbor Notification Forms
5. Story Pole Verification Letter
6. Project Plans
13
RESOLUTION NO: 18-035
A RESOLUTION OF THE CITY OF SARATOGA PLANNING COMMISSION
APPROVING DESIGN REVIEW PDR17-0016, ARBORIST REPORT ARB17-0050 AND
VARIANCE VAR18-0003
14662 SIXTH STREET
APN # 517-08-002
WHEREAS, on October 5, 2017 an application was submitted by Tri Hong on behalf of
Taoliang Wang requesting Design Review, Arborist Report, and Variance approval to construct a new
3,458 square foot two-story residence with associated site improvements located at 14662 Sixth Street
(APN 517-08-002). The project also includes a variance for reduced site and front yard setbacks. A total
of four trees are proposed for removal. The site is located within the RM-3,000 zoning district.
WHEREAS, the Community Development Department completed an environmental
assessment for the project in accordance with the California Environmental Quality Act (CEQA), and
recommends that the Planning Commission determine this project Categorically Exempt.
WHEREAS, on November 28, 2018 the Planning Commission held a duly noticed public
hearing on the subject application, and considered evidence presented by City Staff, the applicant, and
other interested parties.
NOW THEREFORE, the Planning Commission of the City of Saratoga hereby finds,
determines and resolves as follows:
Section 1: The recitals set forth above are true and correct and incorporated herein by reference.
Section 2: The project is Categorically Exempt from the Environmental Quality Act (CEQA)
pursuant Section 15303, “New Construction or Conversion of Small Structures”, Class 3 (a) of the
Public Resources Code (CEQA). This exemption allows for the construction of one single-family
residence in a residential area.
Section 3: The project is consistent with the following Saratoga General Plan Policies: Land
Use Goal 13 which provides that the City shall use the Design Review process to assure that the new
construction and major additions thereto are compatible with the site and the adjacent surroundings;
Safety Element Site and Drainage Policy 3 which provides that the City shall require that landscaping
and site drainage plans be submitted and approved during Design Review for a residence prior to
issuance of permits; and Conservation Element Policy 6.0 which provides that the City shall protect the
existing rural atmosphere of Saratoga by carefully considering the visual impact of new development.
Section 4: The project is consistent with the Saratoga City Code in that the design and
improvements are consistent with the design review findings contained in Section 15-46. One building
is being constructed on the property and the architectural features and landscaping are harmonious; no
signage is being proposed; landscaping integrates and accommodates existing trees and vegetation to be
preserved with the use of water-conserving plants, materials and irrigation systems to the maximum
extent feasible, and clustered in natural appearing groups as opposed to regularly spaced; the colors of
the roofing materials blend with the natural landscape and be nonreflective; roofing materials are tile
Attachment 1
14
Lands of Wang
14462 Sixth Street Application #PDR17-0016 / ARB17-0050 / VAR18-0003
Resolution #18-035
Page | 2
with no mechanical equipment located on the roof; the development is compatible in terms of height,
bulk and design with other structures in the immediate area.
Section 5: The City of Saratoga Planning Commission hereby approves PDR17-0016,
ARB17-0050 and VAR18-0003 located at 14662 Sixth Street (APN 517-08-002), subject to the
Findings, and Conditions of Approval attached hereto as Exhibit 1.
PASSED AND ADOPTED by the City of Saratoga Planning Commission on this 28th day of
November 2018 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
____________________________
Joyce Hlava
Chair, Planning Commission
15
Lands of Wang
14462 Sixth Street Application #PDR17-0016 / ARB17-0050 / VAR18-0003
Resolution #18-035
Page | 3
Exhibit 1
CONDITIONS OF APPROVAL
PDR17-0016 & ARB17-0050 & VAR18-0003
14662 SIXTH STREET
APN # 517-08-002
GENERAL
1. All conditions below which are identified as permanent or for which an alternative period of time for
applicability is specified shall run with the land and apply to the landowner’s successors in interest
for such time period. No zoning clearance, or demolition, grading for this project shall be issued
until proof is filed with the city that a certificate of approval documenting all applicable permanent
or other term-specified conditions has been recorded by the applicant with the Santa Clara County
Recorder’s office in form and content to the Community Development Director. If a condition is not
“Permanent” or does not have a term specified, it shall remain in effect until the issuance by the City
of Saratoga of a Certificate of Occupancy or its equivalent.
2. The Owner and Applicant will be mailed a statement after the time the Resolution granting this
approval is duly executed, containing a statement of all amounts due to the City in connection with
this application, including all consultant fees (collectively “processing fees”). This approval or
permit shall expire sixty (60) days after the date said notice is mailed if all processing fees contained
in the notice have not been paid in full. No Zoning Clearance or Demolition, Grading, or Building
Permit may be issued until the City certifies that all processing fees have been paid in full (and, for
deposit accounts, a surplus balance of $500 is maintained).
3. The Project shall maintain compliance with all applicable regulations of the State, County, City
and/or other governmental agencies having jurisdiction including, without limitation, the
requirements of the Saratoga City Code incorporated herein by this reference.
4. As a condition of this Approval, Owner and Applicant hereby agree to defend, indemnify and hold
the City and its officers, officials, boards, commissions, employees, agents and volunteers harmless
from and against:
a. any and all claims, actions or proceedings to attack, set aside, void or annul any action on
the subject application, or any of the proceedings, acts or determinations taken, done or
made prior to said action; and
b. any and all claims, demands, actions, expenses or liabilities arising from or in any manner
relating to the performance of such construction, installation, alteration or grading work by
the Owner and/or Applicant, their successors, or by any person acting on their behalf.
In addition, prior to any Zoning Clearance, Owner and Applicant shall execute a separate agreement
containing the details of this required Agreement to Indemnify, Hold Harmless and Defend, which
shall be subject to prior approval as to form and content by the City Attorney.
16
Lands of Wang
14462 Sixth Street Application #PDR17-0016 / ARB17-0050 / VAR18-0003
Resolution #18-035
Page | 4
COMMUNITY DEVELOPMENT
5. The owner/applicant shall comply with all City requirements regarding drainage, including but not
limited to complying with the city approved Stormwater management plan. The project shall retain
and/or detain any increase in design flow from the site, that is created by the proposed construction
and grading project, such that adjacent down slope properties will not be negatively impacted by any
increase in flow. Design must follow the current Santa Clara County Drainage Manual method
criteria, as required by the building department. Retention/detention element design must follow the
Drainage Manual guidelines, as required by the building department.
6. The development shall be located and constructed to include those features, and only those features,
as shown on the Approved Plans received and date stamped November 1, 2018. All proposed
changes to the approved plans must be submitted in writing with plans showing the changes,
including a clouded set of plans highlighting the changes. Such changes shall be subject to approval
in accordance with City Code.
7. Prior to issuance of Building Permits, the applicant shall submit for staff approval, a Lighting Plan
for the home’s exterior and landscaped areas. Proposed exterior lighting shall be limited to full-cut
off & shielded fixtures with downward directed illumination so as not to shine on adjacent properties
or public right-of-way. All proposed exterior lighting shall be designed to limit illumination to the
site and avoid creating glare impacts to surrounding properties.
8. In order to comply with standards that minimize impacts to the neighborhood during site preparation
and construction, the applicant shall comply with City Code Sections 7-30.060 and 16-75.050, with
respect to noise, construction hours, maintenance of the construction site and other requirements
stated in these sections.
9. Prior to issuance of Building Permits, the applicant shall prepare for review and approval by City
staff a Construction Management Plan for the project which includes but is not limited to the
following:
a. Proposed construction worker parking area.
b. Proposed construction hours that are consistent with City Code.
c. Proposed construction/delivery vehicle staging or parking areas.
d. Proposed traffic control plan with traffic control measures, any street closure, hours for
delivery/earth moving or hauling, etc. To the extent possible, any deliveries, earth moving or
hauling activities will be scheduled to avoid peak commute hours.
e. Proposed construction material staging/storage areas.
f. Location of project construction sign outlining permitted construction work hours, name of
project contractor and the contact information for both homeowner and contractor.
10. All fences, walls and hedges shall conform to height requirements provided in City Code Section
15-29.
11. The final landscaping and irrigation plan submitted for Building Permit approval shall demonstrate
how the project complies with the State Water Efficient Landscape Ordinance and shall take into
account the following:
a. To the extent feasible, landscaping shall be designed and operated to treat storm water
runoff by incorporating elements that collect, detain and infiltrate runoff. In areas that 17
Lands of Wang
14462 Sixth Street Application #PDR17-0016 / ARB17-0050 / VAR18-0003
Resolution #18-035
Page | 5
provide detention of water, plants that are tolerant of saturated soil conditions and prolong
exposure to water shall be specified.
b. To the extent feasible, pest resistant landscaping plants shall be used throughout the
landscaped area, especially along any hardscape area.
c. Plant materials selected shall be appropriate to site specific characteristics such as soil type,
topography, climate, amount and timing of sunlight, prevailing winds, rainfall, air
movement, patterns of land use, ecological consistency and plant interactions to ensure
successful establishment.
d. Pest resistant landscaping plants shall be considered for use throughout the landscaped area,
especially along any hardscape area.
e. Any proposed or required under grounding of utilities shall take into account potential
damage to roots of protected trees
12. A locking mailbox approved for use by the U.S. Postal service shall be installed and in compliance
with Saratoga Municipal Code section 6-25.030. The mailbox shall be installed prior to final
inspection.
ARBORIST
13. The owner/applicant shall comply with all City Arborist requirements contained in Arborist Report
ARB17-0050 dated September 19, 2018.
FIRE DEPARTMENT
14. The owner/applicant shall comply with all Fire Department requirements.
PUBLIC WORKS
15. Applicant / Owner shall obtain an encroachment permit for any and all improvements in any City
right-of-way or City easement including all new utilities prior to commencement of the work to
implement this Design Review.
16. Owner shall remove and replace existing rolled curb fronting 14662 and replace with new vertical
curb and gutters. The new curb and gutter shall align with existing gutter fronting 14656 6th Street on
the left and 20701 6th Street on the right of the subject properties. See City of Saratoga standard
details.
17. All new/upgraded utilities shall be installed underground.
18. Applicant / Owner shall maintain the streets, sidewalks and other right of way as well as adjacent
properties, both public and private, in a clean, safe and usable condition. All spills of soil, rock or
construction debris shall be removed immediately.
19. Provide a site grading and drainage plan, prepared by a licensed Civil engineer. The Project Civil
Engineer shall design this project to comply with the grading recommendations in the geotechnical
report. The site grading plan shall include but not be limited to the following:
18
Lands of Wang
14462 Sixth Street Application #PDR17-0016 / ARB17-0050 / VAR18-0003
Resolution #18-035
Page | 6
• The ground immediately adjacent to the foundation shall be sloped away from the building
at a slope not less than 5 percent for a distance of 10 feet measured perpendicular to the face
of the wall.
• If physical obstructions or lot lines prohibit 10 feet of horizontal distance, a 5 percent slope
shall be provided to an approved alternative method of diverting water away from
foundation. Swales used for this purpose shall be sloped a minimum of 2 percent where
located within 10 feet of the building foundation
• Impervious surfaces within 10 feet of the building foundation shall be sloped a minimum of
2 percent away from the building.
20. All project that create and/or replace more than 2,500 square feet and less than 10,000 square feet of
impervious surface shall install one or more of the following site design measures:
• Direct roof runoff into cisterns or rain barrels for reuse.
• Direct roof runoff onto vegetated areas.
• Direct runoff from sidewalks, walkways, and/or patios onto vegetated areas.
• Direct runoff from driveways and/or uncovered parking lots onto vegetated areas.
• Construct sidewalks, walkways, and/or patios with permeable surfaces.
• Construct bike lanes, driveways, and/or uncovered parking lots with permeable surfaces.
21. The Owner/Applicant shall incorporate adequate source control measures to limit pollutant
generation, discharge, and runoff (e.g. landscaping that minimizes irrigation and runoff, promotes
surface infiltration where possible, minimizes the use of pesticides and fertilizers, and incorporates
appropriate sustainable landscaping practices and programs, such as Bay-Friendly Landscaping).
22. At least 48 hours prior to the commencement of any earthwork/grading activities, the
Owner/Applicant shall arrange a pre-construction meeting. The meeting shall include the City of
Saratoga Grading Inspector, the grading contractor and the project soils engineer.
23. All grading and earthwork activities shall conform to the approved plans and specifications. All
grading and earthwork activities shall be observed and approved by the soils engineer. The soils
engineer shall be notified at least 48 hours prior to any grading or earthwork activities. Unobserved
or unapproved work shall be removed and replaced under observation of the project soil engineer.
24. Construction Site Control
• Owner shall implement construction site inspection and control to prevent construction site
discharges of pollutants into the storm drains per approved Erosion Control Plan.
• The City requires the construction sites to maintain year-round effective erosion control,
run-on and run-off control, sediment control, good site management, and non-storm water
management through all phases of construction (including, but not limited to, site grading,
building, and finishing of lots) until the site is fully stabilized by landscaping or the
installation of permanent erosion control measures.
• City will conduct inspections to determine compliance and determine the effectiveness of
the BMPs in preventing the discharge of construction pollutants into the storm drain. Owner
shall be required to timely correct all actual and potential discharges observed.
25. Prior to the Building final, all Public works conditions including drainage, grading, and landscaping
of the site shall be completed per approved plans.
19
Lands of Wang
14462 Sixth Street Application #PDR17-0016 / ARB17-0050 / VAR18-0003
Resolution #18-035
Page | 7
BUILDING DEPARTMENT SUBMITTAL
26. Four (4) sets of complete construction plans shall be submitted to the Building Division. These plans
shall be subject to review and approval by the City prior to issuance of Zoning Clearance. The
construction plans shall, at a minimum include the following:
a. Architectural drawings and other plan sheets consistent with those identified as Exhibit “A” on
file with the Community Development Department.
b. All additional drawings, plans, maps, reports, notes, and/or materials required by the Building
Division.
c. This signed and dated Resolution printed onto separate construction plan pages.
d. The site plan shall contain a note with the following language: “Prior to foundation inspection
by the City, the Licensed Land Surveyor of record shall provide a written certification that all
building setbacks comply with the Approved Plans,” which note shall represent a condition
which must be satisfied to remain in compliance with this Design Review Approval.
20
Community Development Department
City of Saratoga
13777 Fruitvale Avenue
Saratoga, California 95070
ARBORIST REPORT
Application No. ARB17-0050
Prepared by Kate Bear, City Arborist Site: 14662 Sixth Street
Phone: (408) 868-1276 Owner: Taoliang Wang
Email: kbear@saratoga.ca.us APN: 517-08-002
Email: x1@wang-x1.net
Report History: Final report Date: September 19, 2018
PROJECT SCOPE:
The applicant has submitted plans to demolish the existing one story house and detached garage, and
build a new two story house with an attached two car garage.
Four protected trees (24, 26, 27 and 28) are requested for removal to construct the project, including
two oak trees growing in the middle of the site.
STATUS: Approved by City Arborist, with attached conditions.
PROJECT DATA IN BRIEF:
Tree bond – Required - $11,540
Tree fencing – Required – See Conditions of Approval and attached map.
Tree removals – Trees 24, 26, 27 and 28 are approved for removal once
building permits have been issued.
Replacement trees – Required = $14,500
ATTACHMENTS:
1 – Findings
2 – Tree Removal Criteria
3 – Tree Information
4 – Conditions of Approval
5 – Map Showing Tree Protection
Attachment 2
21
14662 Sixth Street Attachment 1
FINDINGS:
Tree Removals
According to Section 15-50.080 of the City Code, whenever a tree is requested for removal
as part of a project, certain findings must be made and specific tree removal criteria met.
Four trees (24, 26, 27 and 28) are requested for removal to construct the project. They meet
the City’s criteria allowing them to be removed and replaced as part of the project, once
building division permits have been obtained. Attachment 2 contains the tree removal
criteria for reference.
Table 1: Summary of Tree Removal Criteria that are met
Tree No. Species Criteria met Comments
24 Norfolk Island pine 1, 6, 7, 9 In conflict with driveway, leaning
26 Coast live oak 1, 7, 9 In conflict with proposed house
27 Valley oak 1, 7, 9 In conflict with proposed house
28 Persimmon 1, 7, 9 In conflict with proposed house
New Construction
Based on the information provided, and as conditioned, this project complies with the
requirements for the setback of new construction from existing trees under Section 15-
50.120 of the City Code.
Tree Preservation Plan
Section 15-50.140 of the City Code requires a Tree Preservation Plan for this project. To
satisfy this requirement the following shall be copied onto a plan sheet and included in the
final sets of plans:
1) The submitted arborist report dated July 31, 2017. It is acceptable to work with the
Project Arborist to determine which parts of the report can be left off of the plans.
2) The Project Data in Brief, the List of Trees (Table 2), the Conditions of Approval,
and the map showing tree protection from this report.
22
14662 Sixth Street Attachment 2
TREE REMOVAL CRITERIA
Criteria that permit the removal of a protected tree are listed below. This information is from Article
15-50.080 of the City Code and is applied to any tree requested for removal as part of the project. If
findings are made that meet the criteria listed below, the tree(s) may be approved for removal and
replacement during construction.
(1) The condition of the tree with respect to disease, imminent danger of falling, proximity to existing or
proposed structures and interference with utility services, and whether the tree is a Dead tree or a
Fallen tree.
(2) The necessity to remove the tree because of physical damage or threatened damage to improvements
or impervious surfaces on the property.
(3) The topography of the land and the effect of the tree removal upon erosion, soil retention and the
diversion or increased flow of surface waters, particularly on steep slopes.
(4) The number, species, size and location of existing trees in the area and the effect the removal would
have upon shade, privacy impact, scenic beauty, property values, erosion control, and the general
welfare of residents in the area.
(5) The age and number of healthy trees the property is able to support according to good forestry
practices.
(6) Whether or not there are any alternatives that would allow for retaining or not encroaching on the
protected tree.
(7) Whether the approval of the request would be contrary to or in conflict with the general purpose and
intent of this Article.
(8) Any other information relevant to the public health, safety, or general welfare and the purposes of this
ordinance as set forth in Section 15-50.010
(9) The necessity to remove the tree for economic or other enjoyment of the property when there is no
other feasible alternative to the removal.
(10) The necessity to remove the tree for installation and efficient operation of solar panels, subject to the
requirements that the tree(s) to be removed, shall not be removed until solar panels have been installed
and replacement trees planted in conformance with the City Arborist's recommendation.
23
14662 Sixth Street Attachment 3
TREE INFORMATION:
Arborist Report reviewed:
Preparer: Walter Levison, Consulting Arborist
Date of Report: July 31, 2017
An arborist report was submitted for this project that inventoried seven trees, six of which
are protected by Saratoga City Code. Information on the condition of each tree, potential
impacts from construction, suitability for preservation, appraised values and tree protection
recommendations were provided. A table summarizing information about each tree is
below.
Four trees (24, 26, 27 and 28) protected by Saratoga City Code are requested for removal to
construct this project.
Table 2: Tree information from July 31, 2017 arborist report by Walter Levison.
Tree
No. Species
Trunk
Diameter
(inches) Condition
Intensity of
Construction
Impacts
Suitability
for
Preservation
Appraised
Value
Coast live oak
23 Quercus agrifolia 23, 20.6 Good Moderate High $19,300
Norfolk Island pine
24 Araucaria heterophylla 15.4 Good High Low $2,180
Crape myrtle Not Not
25 Lagerstroemia hybrid Protected Fair High Low Protected
Coast live oak
26 Quercus agrifolia 21.4 Fair High Moderate $6,090
Valley oak
27 Quercus lobata 11.7 Fair High Moderate $4,040
Persimmon
28 Diospyrus kaki 11.3 Fair High Low $2,190
Red oak estimated
29 Quercus rubra 15 Fair Moderate High $3,780
24
14662 Sixth Street Attachment 4
CONDITIONS OF APPROVAL
1. Owner, Architect, Contractor: It is the responsibility of the owner, architect and contractor to
be familiar with the information in this report and implement the required conditions.
2. Permit:
a. Receipt of a Planning or Building permit does not relieve applicant of his responsibilities
for protecting trees per City Code Article 15-50 on all construction work.
b. No protected tree authorized for removal or encroachment pursuant to this project may be
removed or encroached upon until the issuance of the applicable permit from the building
division for the approved project.
3. Final Plan Sets:
a. Shall include the recommendations and tree information from the arborist report by
Walter Levison dated July 31, 2017 copied on a plan sheet, titled “Tree Preservation”.
b. Shall include the Project Data in Brief, the Conditions of Approval, and the map showing
tree protection sections of the City Arborist report, April 17, 2018:
4. Tree Protection Security Deposit:
a. Is required per City Ordinance 15-50.080.
b. Shall be $11,540 for tree(s) 23 and 29.
c. Shall be obtained by the owner and filed with the Community Development Department
before obtaining Building Division permits.
d. May be in the form of cash, check, credit card payment or a bond.
e. Shall remain in place for the duration of construction of the project.
f. May be released once the project has been completed, inspected and approved by the City
Arborist.
5. Tree Protection Fencing:
a. Shall be installed as shown on the attached map.
b. Shall be shown on the Site Plan.
c. Shall be established prior to the arrival of construction equipment or materials on site.
d. Shall be comprised of six-foot high chain link fencing mounted on eight-foot tall, 2-inch
diameter galvanized posts, driven 24 inches into the ground and spaced no more than 10
feet apart.
e. Shall be posted with signs saying “TREE PROTECTION FENCE - DO NOT MOVE OR
REMOVE WITHOUT APPROVAL FROM CITY ARBORIST, KATE BEAR (408)
868-1276”.
f. Wherever protection is needed outside of fences, unprocessed wood chips, or approved
equivalent, shall be placed to the edge of the tree’s canopy and to a depth of 6 inches.
g. Call City Arborist, Kate Bear at (408) 868-1276 for an inspection of tree protection
fencing once it has been installed. This is required prior to obtaining building division
permits.
h. Tree protection fencing shall remain undisturbed throughout the construction until final
inspection.
25
14662 Sixth Street Attachment 4
6. Construction: All construction activities shall be conducted outside tree protection fencing
unless permitted as conditioned below. These activities include, but are not necessarily
limited to, the following: demolition, grading, trenching for utility installation, equipment
cleaning, stockpiling and dumping materials (including soil fill), and equipment/vehicle
operation and parking.
7. Work inside fenced areas:
a. Requires field meeting with City Arborist before performing work.
b. Requires City Arborist approval prior to performing work.
c. Requires Project Arborist on site to monitor work.
8. Project Arborist:
a. Shall be Walter Levison unless otherwise approved by the City Arborist.
b. Shall visit the site every three weeks during grading, trenching or digging activities and
every six weeks after.
c. Shall provide a letter to the Applicant for the City at the end of the project. The letter
shall document the work performed around trees, include photos of the work in progress,
and provide information on the condition of the trees following construction.
d. Shall supervise any permitted pruning or root pruning of trees on site. Roots of protected
trees measuring two inches in diameter or more shall not be cut without prior approval of
the Project Arborist. Roots measuring less than two inches in diameter may be cut using a
sharp pruning tool.
9. The Project Arborist shall be on site to monitor:
a. The Project Arborist shall be on site to monitor all work within 20 feet of tree 23.
b. Installation of the columns at the driveway entrance.
c. Excavation for the foundation of the second unit, covered patio, outdoor kitchen and pool
equipment.
10. Tree removal:
a. Trees 24, 26, 27 and 28 meet the criteria for removal and may be removed once building
division permits have been obtained.
b. Should any tree be damaged beyond repair, new trees shall be required to replace the tree.
If there is insufficient room to plant the necessary number of new trees, some of the value
for trees may be paid into the City’s Tree Fund.
11. New trees:
a. New trees equal to $14,500 shall be planted as part of the project before final inspection and
occupancy of the new home. New trees may be of any species.
b. Trees permitted for removal shall be replaced on or off site according to good forestry
practices, and shall provide equivalent value in terms of aesthetic and environmental
quality, size, height, location, appearance and other significant beneficial characteristics
of the removed trees.
c. Replacement values for new trees are listed below.
15 gallon = $350 24 inch box = $500 36 inch box = $1,500
24 inch box = $5,000 60 inch box = 7,000 72 inch box = $15,000
d. At least two new trees shall be planted in the front yard. 26
14662 Sixth Street Attachment 4
e. The rest of the replacement trees may be planted anywhere on the property as long as they do
not encroach on retained trees.
f. Only drought tolerant plants that are compatible with oaks are permitted under the outer half of
the canopy of oak trees.
g. Water loving plants and lawns are not permitted under oak tree canopies.
12. Final inspection: At the end of the project, when the contractor wants to remove tree
protection fencing and have the tree protection security deposit released by the City, call City
Arborist for a final inspection.
27
23
Attachment 5
Legend
Tree Protection Fencing
14662 Sixth Street
26 27
28
29
25
24
28
Attachment 3
29
Attachment 4
30
31
32
Attachment 5
33
34
35
36
37
38
39
40
RW ENGINEERING, INC.ABBREVIATIONLEGEND56%*#4.'5564''66*564''6BASIS OF BEARINGS:SITE BENCHMARK:NOTES:41
SANTA CLARA COUNTYC-1
DATE:
SHEET NO.
SCALE:
DRAWN BY:
DESIGNED BY:RW ENGINEERING, INC.DATEBYREVISIONNO.OF SHEETSGRADING ANDDRAINAGE PLANAPN: 517-08-002SITE BENCHMARK:
6*564''6
BASIS OF BEARINGS:
DETENTION BASIN TYPICAL GRADING AROUND FOUNDATION
SWALE
42
(TO BE MAINTAINED)STABILIZED CONSTRUCTION ENTRANCE
HYDROSEEDING:
GENERAL EROSION AND SEDIMENT CONTROL NOTES:EROSION CONTROLPLANSANTA CLARA COUNTYC-2
DATE:
SHEET NO.
SCALE:
DRAWN BY:
DESIGNED BY:RW ENGINEERING, INC.DATEBYREVISIONNO.OF SHEETS
LEGEND
6*564''6 APN: 517-08-00243
Construction Best Management Practices (BMPs)
Construction projects are required to implement year-round stormwater BMPs.
Non-Hazardous Materials
Berm and cover stockpiles of sand, dirt or other construction material
with tarps when rain is forecast or when they are not in use.
Use (but don’t overuse) reclaimed water for dust control.
Ensure dust control water doesn’t leave site or discharge to storm
drains.
Hazardous Materials
Label all hazardous materials and hazardous wastes (such as
pesticides, paints, thinners, solvents, fuel, oil, and antifreeze) in
accordance with City, County, State and Federal regulations.
Store hazardous materials and wastes in water tight containers, store
in appropriate secondary containment, and cover them at the end of
every work day or during wet weather or when rain is forecast.
Follow manufacturer’s application instructions for hazardous
materials and do not use more than necessary. Do not apply
chemicals outdoors when rain is forecast within 24 hours.
Arrange for appropriate disposal of all hazardous wastes.
Waste Management
Cover and maintain dumpsters. Check frequently for leaks. Place
dumpsters under roofs or cover with tarps or plastic sheeting secured
around the outside of the dumpster. A plastic liner is recommended to
prevent leaks. Never clean out a dumpster by hosing it down on the
construction site.
Place portable toilets away from storm drains. Make sure they are in
good working order. Check frequently for leaks.
Dispose of all wastes and demolition debris properly. Recycle
materials and wastes that can be recycled, including solvents, water-
based paints, vehicle fluids, broken asphalt and concrete, wood, and
cleared vegetation.
Dispose of liquid residues from paints, thinners, solvents, glues, and
cleaning fluids as hazardous waste.
Keep site free of litter (e.g. lunch items, cigarette butts).
Prevent litter from uncovered loads by covering loads that are being
transported to and from site.
Construction Entrances and Perimeter
Establish and maintain effective perimeter controls and stabilize all
construction entrances and exits to sufficiently control erosion and
sediment discharges from site and tracking off site.
Sweep or vacuum any street tracking immediately and secure
sediment source to prevent further tracking. Never hose down streets
to clean up tracking.
Materials & Waste Management Equipment Management &
Spill Control
Maintenance and Parking
Designate an area of the construction site, well away
from streams or storm drain inlets and fitted with
appropriate BMPs, for auto and equipment parking,
and storage.
Perform major maintenance, repair jobs, and vehicle
and equipment washing off site.
If refueling or vehicle maintenance must be done
onsite, work in a bermed area away from storm drains
and over a drip pan or drop cloths big enough to collect
fluids. Recycle or dispose of fluids as hazardous waste.
If vehicle or equipment cleaning must be done onsite,
clean with water only in a bermed area that will not
allow rinse water to run into gutters, streets, storm
drains, or surface waters.
Do not clean vehicle or equipment onsite using soaps,
solvents, degreasers, or steam cleaning equipment, and
do not use diesel oil to lubricate equipment or parts
onsite.
Spill Prevention and Control
Keep spill cleanup materials (e.g., rags, absorbents and
cat litter) available at the construction site at all times.
Maintain all vehicles and heavy equipment. Inspect
frequently for and repair leaks. Use drip pans to catch
leaks until repairs are made.
Clean up leaks, drips and other spills immediately and
dispose of cleanup materials properly.
Use dry cleanup methods whenever possible
(absorbent materials, cat litter and/or rags).
Sweep up spilled dry materials immediately. Never
attempt to “wash them away” with water, or bury
them.
Clean up spills on dirt areas by digging up and
properly disposing of contaminated soil.
Report significant spills to the appropriate local spill
response agencies immediately. If the spill poses a
significant hazrd to human health and safety, property
or the environment, you must report it to the State
Office of Emergency Services. (800) 852-7550 (24
hours).
Earthmoving
Grading and Earthwork
Schedule grading and excavation work
during dry weather.
Stabilize all denuded areas, install and
maintain temporary erosion controls (such
as erosion control fabric or bonded fiber
matrix) until vegetation is established.
Remove existing vegetation only when
absolutely necessary, plant temporary
vegetation for erosion control on slopes
or where construction is not immediately
planned.
Prevent sediment from migrating offsite
and protect storm drain inlets, drainage
courses and streams by installing and
maintaining appropriate BMPs (i.e. silt
fences, gravel bags, fiber rolls, temporary
swales, etc.).
Keep excavated soil on site and transfer it
to dump trucks on site, not in the streets.
Contaminated Soils
If any of the following conditions are
observed, test for contamination and
contact the Regional Water Quality
Control Board:
Unusual soil conditions, discoloration, -
or odor.
Abandoned underground tanks. -
Abandoned wells -
Buried barrels, debris, or trash. -
If the above conditions are observed,
document any signs of potential
contamination and clearly mark them so
they are not distrurbed by construction
activities.
Landscaping
Protect stockpiled landscaping materials
from wind and rain by storing them under
tarps all year-round.
Stack bagged material on pallets and
under cover.
Discontinue application of any erodible
landscape material within 2 days before a
forecast rain event or during wet weather.
Paving
Avoid paving and seal coating in wet
weather or when rain is forecast, to
prevent materials that have not cured
from contacting stormwater runoff.
Cover storm drain inlets and manholes
when applying seal coat, slurry seal, fog
seal, or similar materials.
Collect and recycle or properly dispose of
excess abrasive gravel or sand. Do NOT
sweep or wash it into gutters.
Sawcutting & Asphalt/Concrete Removal
Protect storm drain inlets during saw
cutting.
If saw cut slurry enters a catch basin,
clean it up immediately.
Shovel or vacuum saw cut slurry deposits
and remove from the site. When making
saw cuts, use as little water as possible.
Sweep up, and properly dispose of all
residues.
Concrete Management
Store both dry and wet materials under
cover, protected from rainfall and runoff and
away from storm drains or waterways. Store
materials off the ground, on pallets. Protect
dry materials from wind.
Wash down exposed aggregate concrete
only when the wash water can (1) flow onto
a dirt area; (2) drain onto a bermed surface
from which it can be pumped and disposed
of properly; or (3) block any storm drain
inlets and vacuum washwater from the
gutter. If possible, sweep first.
Wash out concrete equipment/trucks offsite
or in a designated washout area onsite,
where the water will flow into a temporary
waste pit, and make sure wash water does
not leach into the underlying soil. (See
CASQA Construction BMP Handbook for
properly designed concrete washouts.)
Dewatering
Discharges of groundwater or captured
runoff from dewatering operations must
be properly managed and disposed. When
possible, send dewatering discharge to
landscaped area or sanitary sewer. If
discharging to the sanitary sewer, call your
local wastewater treatment plant.
Divert run-on water from offsite away from
all disturbed areas.
When dewatering, notify and obtain
approval from the local municipality before
discharging water to a street gutter or storm
drain. Filtration or diversion through a basin,
tank, or sediment trap may be required.
In areas of known or suspected
contamination, call your local agency to
determine whether the ground water must be
tested. Pumped groundwater may need to be
collected and hauled off-site for treatment
and proper disposal.
Painting Cleanup and Removal
Never clean brushes or rinse paint
containers into a street, gutter, storm
drain, or stream.
For water-based paints, paint out brushes
to the extent possible, and rinse into a
drain that goes to the sanitary sewer.
Never pour paint down a storm drain.
For oil-based paints, paint out brushes to
the extent possible and clean with thinner
or solvent in a proper container. Filter and
reuse thinners and solvents. Dispose of
excess liquids as hazardous waste.
Sweep up or collect paint chips and dust
from non-hazardous dry stripping and
sand blasting into plastic drop cloths and
dispose of as trash.
Chemical paint stripping residue and chips
and dust from marine paints or paints
containing lead, mercury, or tributyltin
must be disposed of as hazardous waste.
Lead based paint removal requires a state-
certified contractor.
Painting & Paint RemovalConcrete Management
and Dewatering
Paving/Asphalt Work
Storm drain polluters may be liable for fines of up to $10,000 per day!44
45
46
47
48
As NotedGregofSheetJobDateDrawnScaleRevision#2176GREGORY LEWIS LANDSCAPE ARCHITECT
736 Park Way Santa Cruz, CA 95065 (831) 425-4747
lewislandscape@sbcglobal.net5L0Landscape Documentation49
JTJTJTXXXXXXXXXXXXXEBEB(N)E/M (N)G/M PORCHNEW RESIDENCEGARAGEF.F. 532F.S. 531.5F.F. 533F.F. 533.5A/CA/C6 TH STREET3660
3680
PATIOF.S. 533
3660
DRIVEWAYPAVERPAVER(E)G/M
EEEEGGGGPAVERCONC.WOOD DECK3'-0"5'-6"B.S.L.5'-6"B.S.L.25'-0" B.S.L.
(TO 1ST & 2ND FLOOR)
±1
1
'
-
9
"232682728292523'-0" MIN.
10'-0" EX FENCE EX FENCE EX FENCEF.F. 533of#2176GREGORY LEWIS LANDSCAPE ARCHITECT
736 Park Way Santa Cruz, CA 95065 (831) 425-4747 1Driveway - Pavers - pattern and color to be determined later - impervious2Front walkways - Pavers - pattern and color to be determined laterimpervious3Rear Deck4Mulch top dress paths5Concrete paving - color and texture to be determined later - imperviouslewislandscape@sbcglobal.net"I have complied with the criteria of the Water Conservation in Landscaping Ordinance and appliedthem for the efficient use of water in the landscape design plan"Gregory Lewis - Landscape Architect Lic. #2176 2-6-1850
JTJTJTXXXXXXXXXXXXXEBEB(N)E/M (N)G/M PORCHNEW RESIDENCEGARAGEF.F. 532F.S. 531.5F.F. 533F.F. 533.5A/CA/C6 TH STREET3660
3680
PATIOF.S. 533
3660
DRIVEWAYPAVERPAVER(E)G/M
EEEEGGGGPAVERCONC.WOOD DECK3'-0"5'-6"B.S.L.5'-6"B.S.L.25'-0" B.S.L.
(TO 1ST & 2ND FLOOR)
±1
1
'
-
9
"232682728292523'-0" MIN.
10'-0" EX FENCE EX FENCE EX FENCEF.F. 533Cof#2176GREGORY LEWIS LANDSCAPE ARCHITECT
736 Park Way Santa Cruz, CA 95065 (831) 425-4747
lewislandscape@sbcglobal.net"I have complied with the criteria of the Water Conservation in Landscaping Ordinance and appliedthem for the efficient use of water in the irrigation design plan"Gregory Lewis - Landscape Architect Lic. #2176 2-6-1851
As NotedGregofSheetJobDateDrawnScaleRevision#2176GREGORY LEWIS LANDSCAPE ARCHITECT
736 Park Way Santa Cruz, CA 95065 (831) 425-4747
lewislandscape@sbcglobal.net5L3 DetailsWall Mount ControllerNo ScaleTrenches/LinesNo ScaleBManual Gate ValveAEShrub PlantingNo ScaleNo ScaleTree Plantingwith Filter and Regulator for DripAuto. Antisiphon ValveNo ScaleCDrip Emitter and Flush ValveD52
As NotedGregofSheetJobDateDrawnScaleRevision#2176GREGORY LEWIS LANDSCAPE ARCHITECT
736 Park Way Santa Cruz, CA 95065 (831) 425-4747 FAX 425-11075
lewislandscape@sbcglobal.netLandscape SpecificationsL453