HomeMy WebLinkAboutQuito Bridge Project POWERPOINT 11-20-19Quito Bridge Replacement Project 2014 Design Phase Complete 2016 -2020 Right of Way Current Phase 2021 Construction (12 to 18 months) 2022 Project Completion 2 2012 Environmental Complete Bridge 113 (Vessing Road) 3 Both Bridges Built 1915 Functionally Obsolete Structurally Deficient Poor Condition Rating by Caltrans Inspection Report Bridge 114 (Old Adobe Road) 4 5 •$5.0 MillionTotal Project •$4.1MillionFederal Highway Bridge Grant •$900,000Local Match •$300,000/ each Saratoga, Los Gatos, SCV Water District 6 Public Input Kick-off meeting on 11/05/2013 Public Meetings Held 4/28/2014 7/29/2014 City Staff will continue community outreach throughout the project 7 Number of parcels affected Two private parcels Right-Of-Way Takes 2,524 SF Permanent Easements 3,204 SF Temporary Construction Easements 13,387 SF 8 APN ROW Take Permanent Easement Temporary Construction Easement 397-05-028 2,139 SF 3,204 SF 11,137 SF 397-05-014 385 SF 0 2,250 SF Total =2,524 SF 3,204 13,387 SF A request for obligation with Caltrans for construction must be submitted by November 1st to be illegible for construction the following Spring. The project will be illegible to request for construction by November 1st, 2020 for a construction start in Spring of 2021. 9