Loading...
HomeMy WebLinkAboutITEM 2.1 Appellant Saratoga-Trail-Map_201118_18221 City of Saratoga General Plan Open Space and Recreation Element Saratoga Creek Development Location Proposed Trail Congress Springs Park Brookglen Park 85 Joe’s Trail 2 Missed Opportunity for Saratoga Creek Trail? Land deeded to the public in cooperation with SCVWD Proposed Trail Saratoga Creek SCVWD Easement Development Location SCVWD requested dedication of creek-bed land Incomplete public road Improvements Palm Villas Sturla Abrams The Vineyard 3 Official Parcel Map Reflects Prior Creek Dedications Land deeded to SCVWD Palm Villas Sturla SCVWD Easement Land deeded to the public in cooperation with SCVWD 4 Palm Villas Development Would Block Continuation of Creek Right of Way Saratoga Creek Proposed Trail SCVWD Easement SCVWD requested dedication of creek-bed land Land deeded to the public in cooperation with SCVWD 5 Saratoga Creek Trail Can Be Established Next to the Vineyards Congress Springs Park Brookglen Park Proposed Trail Saratoga Creek 85 Joe’s Trail Development Location Development Location Land deeded to SCVWD Land deeded to the public in cooperation with SCVWD 6 City of Saratoga Letter 7 Buildings on Parcel 2 Do Not Comply With City Setback Requirements Insufficient or no landscape bufferPrivate street serves 5 parcels. Setback is required from edge of street to loading area Parking Lot Parking Lot 8 Palm Villas’ Landscaping Does Not Comply With City Code Landscape plan violates 10 ft. requirement for front yard setback 9 Palm Villas’ Underground Parking Is Extremely Constrained 10 Illegal Delivery Turnaround on Public Street 11 Illegal Delivery Turnaround on Private Street 12 Corrections to Developer’s Metro Exhibit LF-2 13 Dangerous Sightlines From Underground Parking Ramp 14 Violations of City Laws Promoted by City Staff to Ensure Developer’s Desired Profit Code Description Violation Implementation Requirement OSC 5.6 City requires the dedication of trails in the development and subdivision entitlement process. City fails to comply with its mandatory policy of the General Plan by not enforcing a dedication requirement for the public trail on Lot 1. Section 15-35.020(h) Off-street parking spaces shall be located on the same site as the use for which the spaces are required, or on an adjacent site. Public street separates the two development lots. Section 15-35.050(g) Off-street loading spaces shall be located on the same site as the use for which the loading spaces are required, or on an adjacent site. Public street separates the two development lots. Section 15-35.040(e) Each parking space shall be independently accessible. 20 parking spaces are included in two parking lifts. None of the spaces in the parking lifts are independently accessible. Section 15-35.040(i) No more than 25% of the parking spaces may be compact spaces. Project includes 48 total spaces and 26 (or 54%) compact spaces, including compact spaces in parking lifts. Sections 15-06.587 and 15-06.660 Setback must be measured from street, not lot line; driveways that serve 5 lots are categorized as streets. Access driveway on Lot 2 serves five parcels and is therefore a street. Yet, the building’s setback is measured from the lot line, not the street. 15 Violations of City Laws Promoted by City Staff to Ensure Developer’s Desired Profit Code Description Violation Sections 15-46.035(a) and 15-18.080(a)(3) Setbacks must be measured from the top of the creek bank. Minimum rear setback is 25’ plus 1’ for each 2’ of structure height above 14’. Rear setback provided is 25’ from top of bank. Yet the required setback is 33’ from top of creek bank. Section 15-18.100(b) 10 feet of the required front setback area shall be landscaped and permanently maintained. Neither front setback area complies with this requirement. Section 15-35.070(b)Sufficient room for turning and maneuvering vehicles shall be provided on the site. Developer proposes that truck seeking to access loading zone will turn around in public street. Onsite turnaround template blocks access easement of adjoining owners. Onsite turnaround is impossible. Maneuvering into the loading space is impossible, either back-in or forward entry. Section 15-35.070(h)Loading area must be screened by solid wall or fence. Loading zone will be open to view while fences are moved to allow truck ingress and egress. Section 15-35.070(h)Loading area shall not be located in a required front, side or rear setback area. Loading facility is illegally located within the required side setback area. Section 14-25.030 Public street must be improved by developer to its full width to all applicable lot lines. Developer not intending to improve public street to boundary line with Abrams 10-acre parcel, requiring Abrams to trespass on Palm Villas property when street is completed. 16 Site Plan Parcel 1 17 Site Plan Parcel 2