Loading...
HomeMy WebLinkAbout07-03-2024 City Council Agenda PacketSaratoga City Council Agenda July 3, 2024 – Page 1 of 6 SARATOGA CITY COUNCIL REGULAR MEETING JULY 3, 2024 Public Participation Information In accordance with Saratoga City Council’s Remote Public Participation Policy, members of the public may participate in these meetings in person at the locations listed below or via remote attendance (if applicable) using the Zoom information below. In the event remote participation technology is unexpectedly unavailable, the meeting will proceed in person without remote participation. Members of the public can view and participate in the 6:00 p.m. Closed Session by: 1. Attending the meeting in person at: • City Hall Linda Callon Conference Room, located at 13777 Fruitvale Avenue, Saratoga CA 95070; OR 2. Accessing the meeting through Zoom • https://us02web.zoom.us/j/89527052458 • Webinar ID 895 2705 2458 OR • Calling 1.408.638.0968 or 1.669.900.6833 Members of the public can view and participate in the 7:00 p.m. Regular Session by: 1. Attending the meeting in person at: • Saratoga Civic Theater, Council Chambers located at 13777 Fruitvale Avenue, Saratoga CA 95070; OR 2. Accessing the meeting through Zoom • Webinar URL: https://us02web.zoom.us/j/81627041223 • Webinar ID: 816 2704 1223 • Call In: 1.408.638.0968 or 1.669.900.6833; OR 3. Viewing the meeting on Saratoga Community Access Television Channel 15 (Comcast Channel 15, AT&T UVerse Channel 99 and calling in following the direction above; OR 4. Viewing online at www.saratoga.ca.us/watch and calling in following the direction above. Written Communication Comments can be submitted in writing at www.saratoga.ca.us/comment. Written communications will be provided to the members of the City Council and included in the Agenda Packet and/or in supplemental meeting materials. Public Comment Members of the public may comment on any item for up to three (3) minutes. The amount of time for public comment may be reduced by the Mayor or by action of the City Council. Public Comment will begin with speakers attending in-person first followed by those attending via Zoom. Meeting Recording Information In accordance with the Saratoga City Council’s Meeting Recording Policy, City Council Study Sessions, Joint Meetings, Joint Sessions, Commission Interviews, Retreats, meetings with the Planning Commission, and Regular Session Meetings are recorded and made available following the meeting on the City website. Saratoga City Council Agenda July 3, 2024 – Page 2 of 6 6:00 PM CLOSED SESSION City Hall, Linda Callon Conference Room | 13777 Fruitvale Avenue, Saratoga, CA 95070 PUBLIC EMPLOYEE PERFORMANCE EVALUATION (Gov’t Code 54957) Title: City Attorney 7:00 PM REGULAR SESSION Civic Theater, Council Chambers | 13777 Fruitvale Avenue, Saratoga, CA 95070 PLEDGE OF ALLEGIANCE ROLL CALL REPORT ON POSTING OF THE AGENDA The agenda for this meeting was properly posted on June 27, 2024. REPORT FROM CLOSED SESSION ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS Any member of the public may address the City Council on matters not on the Agenda. The law generally prohibits the City Council from discussing or taking action on such items. However, the Council may instruct staff accordingly. ANNOUNCEMENTS CEREMONIAL ITEM Appointment of Heritage Preservation Commissioner Recommended Action: Adopt the Resolution appointing Bill Cooper to the Heritage Preservation Commission and direct the City Clerk to administer the Oath of Office. Staff Report Attachment A - Resolution, Heritage Preservation Commission Appointment 1. CONSENT CALENDAR The Consent Calendar contains routine items of business. Items in this section will be acted on in one motion, unless removed by the Mayor or a Council Member. Any member of the public may speak on an item on the Consent Calendar at this time, or request that the Mayor remove an item from the Consent Calendar for discussion. 1.1. City Council Meeting Minutes Recommended Action: Approve the Minutes for the June 19, 2024, City Council Regular Meeting. Staff Report Attachment A - Minutes for the June 19, 2024 City Council Regular Meeting Saratoga City Council Agenda July 3, 2024 – Page 3 of 6 1.2. Accounts Payable Check Registers Recommended Action: Review and accept the 06/13/2024 and 06/20/2024 accounts payable vendor payment check registers. Staff Report Attachment A - Check Register Reports 06-13-2024 Attachment B - Check Register Reports 06-20-2024 1.3. Treasurer’s Report for the Month Ended May 31, 2024 Recommended Action: Review and accept the Treasurer’s Report for the month ended May 31, 2024. Staff Report 1.4. Award Copier Lease Agreement Recommended Action: Adopt the Resolution to authorize the City Manager to enter into a five-year lease agreement with Toshiba Business Solutions for the City’s copier fleet in the amount of $111,820. Staff Report Attachment A – Resolution for Copier Lease Attachment B - Cost comparison of finalists Attachment C - Toshiba Contract 1.5. Extension of the agreement with Disability Access Consultants (DAC) until December 31, 2024 Recommended Action: Authorize the City Manager to execute a contract extension with Disability Access Consultants (DAC) for Americans with Disability Act (ADA) Self-Evaluation and Transition Plan until December 31, 2024. Staff Report Attachment A - Original 2023 contract with DAC Attachment B - Amendment to existing contract 1.6. Contract for IT Support Services with ZAG Technical Services Recommended Action: Authorize the City Manager to execute a three-year contract agreement with ZAG Technical Services (ZAG) for IT Support Services. Staff Report Attachment A - ZAG Technical Services Agreement 1.7. Contract for Microsoft licenses with SoftwareONE Recommended Action: Authorize the City Manager to execute a three-year Microsoft Enterprise Agreement through SoftwareONE. Staff Report Attachment A - Microsoft Enterprise Agreement Enrollment Contract Saratoga City Council Agenda July 3, 2024 – Page 4 of 6 1.8. Ordinance Amending Chapter 15 (Zoning Regulations) of the Saratoga City Code to Implement the Programs of the 2023-2031 Housing Element. Recommended Action: Waive reading and adopt the ordinance amending Chapter 15 (Zoning Regulations) of the Saratoga City Code to implement the programs of the 2023-2031 Housing Element. Staff Report Attachment A - Ordinance Amending Chapter 15 (Articles 15-46 and 15-47) 1.9. Annual Code Update for 2024 Recommended Action: Waive reading and adopt an ordinance amending City Code provisions concerning scheduling of appeal hearings (section 2-05.030); scheduling City Council meetings (2- 10.010); Commissioner qualifications and terms (2-12.020 and .030); security alarms (4- 06.110); motion picture filming (4-60.080); civil defense and disaster (Article 6-05); commercial marijuana activity (6-30.020); driveway approaches (14-25.030); Zoning Ordinance provisions pertaining to short term rentals (15-06.360), fence height at driveway intersections (15-29.010), creek setbacks (15-45.045), tree regulations (Article 15-50), and replacement housing units (15-80.150); and reorganization of certain definitions in the Sustainability Ordinance (17-10.010). Staff Report Attachment A - Annual Code Update Ordinance 2. GENERAL BUSINESS 2.1. Evacuation Route Assessment Recommended Action: Authorize the City Manager to sign an agreement with Fehr and Peers to conduct an Evacuation Route Capacity Analysis in the amount of $54,000. Staff Report Attachment A – Fehr and Peers Scope of Work 2.2. Parks Restrooms Renovations Project Award of Contract Recommended Actions: 1. Award a contract to Selway Construction in the amount of $294,999 for the Parks Restrooms Renovations Project. 2. Authorize a 15 percent contingency to execute change orders to the contract up to $44,250, for a total not to exceed $339,249. Staff Report Attachment A - Bid Tabulation Attachment B - Contract Saratoga City Council Agenda July 3, 2024 – Page 5 of 6 2.3. Agreement with Urban Planning Partners to Commence Phase 2 of Housing Element Implementation and Agreement with Lisa Wise Consulting to Develop Objective Design and Development Standards for Housing Element Implementation Recommended Actions: 1. Authorize the City Manager to execute a new contract with Urban Planning Partners for consulting services on Phase 2 of Housing Element Implementation in the amount of $67,060. 2. Authorize the City Manager to execute a new contract with Lisa Wise Consulting for consulting services to development objective design and development standards for Housing Element implementation in the amount of $82,062. Staff Report Attachment A – Proposed Lisa Wise Agreement Attachment B - Proposed UPP Agreement 2.4. Resolution Renaming the Finance Committee to Finance Advisory Committee Recommended Action: Adopt the Resolution to rename the Finance Committee to the Finance Advisory Committee. Staff Report Attachment A - Resolution Renaming Finance Committee to Advisory Committee COUNCIL ASSIGNMENTS Council Assignments CITY COUNCIL ITEMS COUNCIL COMMUNICATIONS CITY MANAGER'S REPORT ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS ADJOURNMENT CERTIFICATE OF POSTING OF THE AGENDA, DISTRIBUTION OF THE AGENDA PACKET, COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT I, Britt Avrit, City Clerk for the City of Saratoga, declare that the foregoing agenda for the meeting of the City Council was posted and available for review on June 27, 2024 at the City of Saratoga, 13777 Fruitvale Avenue, Saratoga, California and on the City's website at www.saratoga.ca.us. Signed this 27th day of June 2024 at Saratoga, California. Britt Avrit, MMC, City Clerk In accordance with the Ralph M. Brown Act, copies of the staff reports and other materials provided to the City Council by City staff in connection with this agenda, copies of materials distributed to the City Council concurrently with the posting of the agenda, and materials distributed to the City Council by staff after the posting of the agenda are available on the City website at www.saratoga.ca.us and are available for review in the office of the City Clerk at 13777 Fruitvale Avenue, Saratoga, California. Saratoga City Council Agenda July 3, 2024 – Page 6 of 6 In compliance with the Americans with Disabilities Act and the Governor’s Executive Order, if you need assistance to participate in this meeting, please contact the City Clerk at bavrit@saratoga.ca.us or calling 408.868.1216 as soon as possible before the meeting. The City will use its best efforts to provide reasonable accommodations to provide as much accessibility as possible while also maintaining public safety. [28 CFR 35.102-35.104 ADA title II] SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:City Manager’s Department PREPARED BY:Britt Avrit, MMC, City Clerk SUBJECT:Appointment of Heritage Preservation Commissioner RECOMMENDED ACTION: Adopt the Resolution appointing Bill Cooper to the Heritage Preservation Commission and direct the City Clerk to administer the Oath of Office. BACKGROUND: The City has been recruiting for a partial term on the Heritage Preservation Commission that ends December 31, 2025. After continuous recruitments, the City Council took action to temporarily waive the requirement that applicants must attend a meeting prior to being interviewed. The City Council interviewed Bill Cooper and selected him to be appointed to a partial term ending December 31, 2025. ATTACHMENT: Attachment A - Resolution, Heritage Preservation Commission Appointment 6 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA APPOINTING BILL COOPER TO THE HERITAGE PRESERVATION COMMISSION WHEREAS, a vacancy was created on the Saratoga Heritage Preservation Commission resulting from the resignation of Joseph Wherry in January 2021; WHEREAS, the City publicized the vacancy, accepted applications and the City Council conducted an interview on June 19, 2024. NOW, THEREFORE,the City Council of the City of Saratoga hereby resolves that Bill Cooper is appointed to the Heritage Preservation Commission for a partial term ending December 31, 2025. The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City Council held on the 3 rd day of July 2024, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Yan Zhao, Mayor City of Saratoga ATTEST: ____ Britt Avrit, City Clerk City of Saratoga 7 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:City Manager’s Department PREPARED BY:Britt Avrit, MMC, City Clerk SUBJECT:City Council Meeting Minutes RECOMMENDED ACTION: Approve the Minutes for the June 19, 2024, City Council Regular Meeting. BACKGROUND: Draft City Council Minutes for each Council Meeting are taken to the City Council to be reviewed for accuracy and approval. Following City Council approval, minutes are retained for legislative history and posted on the City of Saratoga website. The draft minutes are attached to this report for Council review and approval. ATTACHMENTS: Attachment A - Minutes for the June 19, 2024 City Council Regular Meeting 8 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 1 of 10 MINUTES WEDNESDAY,JUNE 19, 2024 SARATOGA CITY COUNCIL REGULAR MEETING At 6:30 p.m., the City Council held an interview for the Historic Preservation Commission. WALIA/PAGE MOVED TO APPOINT BILL COOPER TO THE HERITAGE PRESERVATION COMMISSION FOR A PARTIAL TERM ENDING DECEMBER 31, 2025.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. Mayor Zhao invited public comment. No one requested to speak. Mayor Zhao called the Regular Session to order at 7:00 p.m. ROLL CALL PRESENT: Mayor Yan Zhao, Vice Mayor Belal Aftab, Council Members Kookie Fitzsimmons, Chuck Page, Tina Walia ABSENT: None ALSO PRESENT: James Lindsay, City Manager Richard Taylor, City Attorney Leslie Arroyo, Assistant City Manager John Cherbone, Public Works Director Bryan Swanson, Community Development Director Ryan Hinchman, Administrative Services Director Britt Avrit, City Clerk REPORT ON POSTING OF THE AGENDA The City Clerk reported the agenda for this meeting was properly posted on June 13, 2024. ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS; IN-PERSON ATTENDEES The following individuals spoke at this time: Michael Saari discussed weeds in Saratoga and Santa Clara County. Eric Matthews, Sue Bozzini, Josephine Kawanami, Jean Raby, and Dennis Jamison discussed voter databases and elections. ANNOUNCEMENTS Mayor Zhaoshared information about“Let’s Hike Saratoga” event, July 4th Celebration, “America the Beautiful” event, the Saratoga Classic & Cool Car Show, and the July Summer Movie Night. 9 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 2 of 10 PUBLIC HEARINGS 2.1. Landscaping & Lighting Assessment District LLA-1 - Public Hearing for Proposition 218 Protest Election for the Annexation of a New Zone 42A (Gardiner Park) and Confirmation of Assessments for FY 24-25 Recommended Action: Conduct the public hearing and following consideration of public comments adopt the Resolution Ordering the Improvements and Confirming the Diagram and Assessments for FY 24-25. John Cherbone, Public Works Director, presented the staff report. Mayor Zhao invited public comment. No one requested to speak. Mayor Zhao continued this item until counting of the ballots was complete. The City Council returned to this item after ballots were tabulated. Britt Avrit, City Clerk, presented the results of the ballots submitted for New Zone 42A (Gardiner Park); 45 ballots received; 22 yes, 23 no. No action required; the annexation is not approved. 2.2. Landscaping & Lighting Assessment District LLA-1 - Public Hearing for Proposition 218 Protest Election for the Annexation of a New Zone 47 (Padero) and Confirmation of Assessments for FY 24-25 Recommended Action: Conduct the public hearing and following consideration of public comments adopt the Resolution Ordering the Improvements and Confirming the Diagram and Assessments for FY 24-25. John Cherbone, Public Works Director, presented the staff report. Mayor Zhao invited public comment. No one requested to speak. Mayor Zhao continued this item until counting of the ballots was complete. The City Council returned to this item after ballots were tabulated. Britt Avrit, City Clerk, presented the results of the ballots submitted for New Zone 47 (Padero); 12 ballots received; 11 yes, 1 no. RESOLUTION 24-042 PAGE/WALIA MOVED TO ACCEPT THE RESULTS OF THE BALLOTING FOR THE ANNEXATION OF A NEW ZONE 47 (PADERO) AND ADOPT THE RESOLUTION ORDERING THE IMPROVEMENTS AND CONFIRMING THE DIAGRAM AND ASSESSMENTS FOR FY 24-25.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 10 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 3 of 10 2.3. Landscaping & Lighting Assessment District LLA-1 - Public Hearing for Proposition 218 Protest Election for the Annexation of a New Zone 48 (Glen Una) and Confirmation of Assessments for FY 24-25 Recommended Action: Conduct the public hearing and following consideration of public comments adopt the Resolution Ordering the Improvements and Confirming the Diagram and Assessments for FY 24-25. John Cherbone, Public Works Director, presented the staff report. Mayor Zhao invited public comment. No one requested to speak. Mayor Zhao continued this item until counting of the ballots was complete. The City Council returned to this item after ballots were tabulated. Britt Avrit, City Clerk, presented the results of the ballots submitted for New Zone 48 (Glen Una); 58 ballots received; 40 yes, 18 no. RESOLUTION 24-043 PAGE/WALIA MOVED TO ACCEPT THE RESULTS OF THE BALLOTING FOR THE ANNEXATION OF A NEW ZONE 48 (GLEN UNA) AND ADOPT THE RESOLUTION ORDERING THE IMPROVEMENTS AND CONFIRMING THE DIAGRAM AND ASSESSMENTS FOR FY 24-25.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1. CONSENT CALENDAR Mayor Zhao invited public comment. No one requested to speak. 1.1. City Council Meeting Minutes Recommended Action: Approve the Minutes for the June 5, 2024, City Council Regular Meeting. PAGE/AFTAB MOVED TO APPROVE THE MINUTES FOR THE JUNE 5, 2024, CITY COUNCIL REGULAR MEETING.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.2. Accounts Payable Check Registers Recommended Action: Review and accept the 05/30/2024 and 06/06/2024 accounts payable vendor payment check registers. 11 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 4 of 10 PAGE/AFTAB MOVED TO REVIEW AND ACCEPT THE 05/30/2024 AND 06/06/2024 ACCOUNTS PAYABLE VENDOR PAYMENT CHECK REGISTERS.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.3. Budget Adoption for the Fiscal Year Beginning July 1, 2024 Recommended Action: Approve a Resolution adopting the City’s Budget for the fiscal year beginning July 1, 2024. RESOLUTION 24-037 PAGE/AFTAB MOVED TO APPROVE A RESOLUTION ADOPTING THE CITY’S BUDGET FOR THE FISCAL YEAR BEGINNING JULY 1, 2024.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.4. Resolution Establishing the Appropriations Limit for Fiscal Year 2024-25 Recommended Action: Adopt a Resolution establishing the City’s appropriations limit for Fiscal Year 2024-25. RESOLUTION 24-038 PAGE/AFTAB MOVED TO ADOPT A RESOLUTION ESTABLISHING THE CITY’S APPROPRIATIONS LIMIT FOR FISCAL YEAR 2024-25.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.5. Resolution to Establish the FY 2024-25 Property Tax Levy for the Arrowhead Community Facility District 2018 Bond Debt Service Recommended Action: Adopt the Resolution that sets the Fiscal Year 2024-25 property tax levy rate for the Arrowhead Community Facility District’s (CFD) 2018 Bond's debt service payment at $6,500 per parcel for the remaining eighteen (18) participating property owners. RESOLUTION 24-039 PAGE/AFTAB MOVED TO ADOPT THE RESOLUTION THAT SETS THE FISCAL YEAR 2024-25 PROPERTY TAX LEVY RATE FOR THE ARROWHEAD COMMUNITY FACILITY DISTRICT’S (CFD) 2018 BOND'S DEBT SERVICE PAYMENT AT $6,500 PER PARCEL FOR THE REMAINING EIGHTEEN (18) PARTICIPATING PROPERTY OWNERS.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.6. Resolution to Establish Fiscal Year 2024-25 Tax Levy Rate for the Library Series 2011 General Obligation Bonds Debt Service Recommended Action: Adopt the Resolution establishing the Fiscal Year 2024-25 Tax Levy Rate for the Library Series 2011 General Obligation Bonds Debt Service at $0.0040 per $100 of Secured Assessed Value. 12 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 5 of 10 RESOLUTION 24-040 PAGE/AFTAB MOVED TO ADOPT THE RESOLUTION ESTABLISHING THE FISCAL YEAR 2024-25 TAX LEVY RATE FOR THE LIBRARY SERIES 2011 GENERAL OBLIGATION BONDS DEBT SERVICE AT $0.0040 PER $100 OF SECURED ASSESSED VALUE.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.7. Theater Portable License Agreement Recommended Action: Authorize the City Manager to sign the Theater Portable License Agreement between the City of Saratoga and the South Bay Musical Theatre. PAGE/AFTAB MOVED TO AUTHORIZE THE CITY MANAGER TO SIGN THE THEATER PORTABLE LICENSE AGREEMENT BETWEEN THE CITY OF SARATOGA AND THE SOUTH BAY MUSICAL THEATRE.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.8. Santa Clara County Library District StoryWalk Memorandum of Understanding (MOU) Recommended Action: Approve the Santa Clara County Library District StoryWalk Memorandum of Understanding (MOU). PAGE/AFTAB MOVED TO APPROVE THE SANTA CLARA COUNTY LIBRARY DISTRICT STORYWALK MEMORANDUM OF UNDERSTANDING (MOU). MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.9. Ordinance for Zoning Reclassification for Saratoga Retirement Community Master Plan Update (application PDR19-0023/ARB19-0039/GEO19-0013/ZOA19-0004/ENV19- 0005; 14500 Fruitvale Avenue (397-12-012 & 397-12-019 & 397-40-006). Recommended Action: Adopt the Ordinance approving a Zoning Reclassification from R-1-40,000 to R-1-40,000 P-C (Planned Combined District) (ZOA19-0004), for 37.17 acres located at 14500 Fruitvale Avenue (APN’s 397-12-012 & 397-12-019 & 397-40-006). ORDINANCE 401 PAGE/AFTAB MOVED TO ADOPT THE ORDINANCE APPROVING A ZONING RECLASSIFICATION FROM R-1-40,000 TO R-1-40,000 P-C (PLANNED COMBINED DISTRICT) (ZOA19-0004), FOR 37.17 ACRES LOCATED AT 14500 FRUITVALE AVENUE (APN’S 397-12-012 & 397-12-019 & 397-40-006).MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, AFTAB, ZHAO. NOES: WALIA. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 13 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 6 of 10 1.10. No Parking Anytime Zone on Three Oaks Way Recommended Action: Adopt the Motor Vehicle resolution authorizing a No Parking Anytime zone on both sides of Three Oaks Way for the full length of the street. RESOLUTION MV 334 PAGE/AFTAB MOVED TO ADOPT THE MOTOR VEHICLE RESOLUTION AUTHORIZING A NO PARKING ANYTIME ZONE ON BOTH SIDES OF THREE OAKS WAY FOR THE FULL LENGTH OF THE STREET.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.11. Two-Hour Parking Zone at 12850 Saratoga Avenue Recommended Action: Adopt the Motor Vehicle resolution authorizing a two-hour parking zone on the southeast side of Saratoga Avenue in front of 12850 Saratoga Avenue for 210 feet. RESOLUTION MV 335 PAGE/AFTAB MOVED TO ADOPT THE MOTOR VEHICLE RESOLUTION AUTHORIZING A TWO-HOUR PARKING ZONE ON THE SOUTHEAST SIDE OF SARATOGA AVENUE IN FRONT OF 12850 SARATOGA AVENUE FOR 210 FEET. MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.12. Transportation Development Act (TDA) Article 3 Application for the Saratoga Avenue Walkway Project Recommended Action: Adopt a resolution supporting the Metropolitan Transportation Commission’s Transportation Development Act Article 3 Pedestrian/Bicycle Grant Application for the Saratoga Avenue Walkway Project. RESOLUTION 24-041 PAGE/AFTAB MOVED TO ADOPT A RESOLUTION SUPPORTING THE METROPOLITAN TRANSPORTATION COMMISSION’S TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 PEDESTRIAN/BICYCLE GRANT APPLICATION FOR THE SARATOGA AVENUE WALKWAY PROJECT.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 14 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 7 of 10 2. PUBLIC HEARINGS 2.4. Landscaping & Lighting Assessment District LLA-1 - Public Hearing, Approval of Engineer’s Report, and Confirmation of Assessments for FY 24-25 Recommended Action: Conduct the public hearing and following consideration of public comments adopt the Resolution Ordering the Improvements and Confirming the Diagram and Assessments for FY 24-25. John Cherbone, Public Works Director, presented the staff report. Mayor Zhao invited public comment. No one requested to speak. RESOLUTION 24-045 PAGE/FITZSIMMONS MOVED TO ADOPT THE RESOLUTION ORDERING THE IMPROVEMENTS AND CONFIRMING THE DIAGRAM AND ASSESSMENTS FOR FY 24-25 FOR LANDSCAPING & LIGHTING ASSESSMENT DISTRICT LLA- 1. MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 2.5. Introduce and Waive First Reading of an Ordinance Approving Amending Chapter 15 (Zoning Regulations) of the Saratoga City Code to Implement the Programs of the 2023- 2031 Housing Element. Recommended Action: Following the public hearing, introduce and waive the first reading of an ordinance amending Chapter 15 (Zoning Regulations) of the Saratoga City Code to implement the programs of the 2023-2031 Housing Element and direct staff to place the ordinance on the consent calendar for adoption at the next regular meeting. Bryan Swanson Community Development Director, presented the staff report. Mayor Zhao invited public comment. No one requested to speak. WALIA/AFTAB MOVED TO INTRODUCE AND WAIVE THE FIRST READING OF AN ORDINANCE AMENDING CHAPTER 15 (ZONING REGULATIONS) OF THE SARATOGA CITY CODE TO IMPLEMENT THE PROGRAMS OF THE 2023-2031 HOUSING ELEMENT AND DIRECT STAFF TO PLACE THE ORDINANCE ON THE CONSENT CALENDAR FOR ADOPTION AT THE NEXT REGULAR MEETING. MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 15 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 8 of 10 2.6. Annual Code Update for 2024 Recommended Action: Conduct the public hearing, introduce and waive the first reading of an ordinance amending City Code provisions concerning scheduling of appeal hearings (section 2-05.030); scheduling City Council meetings (2-10.010); Commissioner qualifications and terms (2- 12.020 and .030); security alarms (4-06.110); motion picture filming (4-60.080); civil defense and disaster (Article 6-05); commercial marijuana activity (6-30.020); driveway approaches (14-25.030); Zoning Ordinance provisions pertaining to short term rentals (15- 06.360), fence height at driveway intersections (15-29.010), creek setbacks (15-45.045), tree regulations (Article 15-50), and replacement housing units (15-80.150); and reorganization of certain definitions in the Sustainability Ordinance (17-10.010); and direct staff to place the ordinance on the consent calendar for adoption at the next regular meeting of the City Council. Richard Taylor, City Attorney, presented the staff report. Mayor Zhao invited public comment. No one requested to speak. WALIA/PAGE MOVED TO INTRODUCE AND WAIVE THE FIRST READING OF AN ORDINANCE AMENDING CITY CODE PROVISIONS CONCERNING SCHEDULING OF APPEAL HEARINGS (SECTION 2-05.030); SCHEDULING CITY COUNCIL MEETINGS (2-10.010); COMMISSIONER QUALIFICATIONS AND TERMS (2-12.020 AND .030); SECURITY ALARMS (4-06.110); MOTION PICTURE FILMING (4-60.080); CIVIL DEFENSE AND DISASTER (ARTICLE 6-05); COMMERCIAL MARIJUANA ACTIVITY (6-30.020); DRIVEWAY APPROACHES (14-25.030); ZONING ORDINANCE PROVISIONS PERTAINING TO SHORT TERM RENTALS (15-06.360), FENCE HEIGHT AT DRIVEWAY INTERSECTIONS (15-29.010), CREEK SETBACKS (15-45.045), TREE REGULATIONS (ARTICLE 15- 50), AND REPLACEMENT HOUSING UNITS (15-80.150); AND REORGANIZATION OF CERTAIN DEFINITIONS IN THE SUSTAINABILITY ORDINANCE (17-10.010); AND DIRECT STAFF TO PLACE THE ORDINANCE ON THE CONSENT CALENDAR FOR ADOPTION AT THE NEXT REGULAR MEETING OF THE CITY COUNCIL.MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 3. GENERAL BUSINESS 3.1. Authorize Contract for FY23/24 for Pavement Management Program Project in the Amount Not to Exceed $3,439,646 Recommended Actions: 1. Declare G. Bortolotto & Company to be the lowest responsible bidder on the project. 2. Award a Construction Contract to G. Bortolotto & Company in the amount of $3,124,646 and authorize the City Manager to execute the same. 3. Authorize staff to execute change orders to the contract up to $315,000 (10%). Emma Burkhalter, Associate Civil Engineer, presented the staff report. 16 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 9 of 10 Mayor Zhao invited public comment. No one requested to speak. PAGE/WALIA MOVED TO DECLARE G. BORTOLOTTO & COMPANY TO BE THE LOWEST RESPONSIBLE BIDDER ON THE PROJECT; AWARD A CONSTRUCTION CONTRACT TO G. BORTOLOTTO & COMPANY IN THE AMOUNT OF $3,124,646 AND AUTHORIZE THE CITY MANAGER TO EXECUTE THE SAME; AUTHORIZE STAFF TO EXECUTE CHANGE ORDERS TO THE CONTRACT UP TO $315,000 (10%).MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, PAGE, WALIA, AFTAB, ZHAO. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. COUNCIL ASSIGNMENTS Council Member Kookie Fitzsimmons Nothing to report. Council Member Tina Walia 753 Silicon Valley Clean Energy Authority Board of Directors –stated the Boardapproved maintaining the 4% discount rate for all retail rates, set expectations for 2025 power mix, allocated funding for electrification technical support for member cities, and received an update on the California Community Choice Financing Authority International Climate Bond Recognition. Cities Association of Santa Clara County Legislative Action Committee – stated the Committee had two guest speakers. Cities Association of Santa Clara County Board of Directors – stated the Board held a summer event in June. Council Member Chuck Page Nothing to report. Vice Mayor Belal Aftab Nothing to report. Mayor Yan Zhao West Valley Sanitation District Board of Directors – stated the Board held a Closed Session with nothing to report; in open session the Board amended the compensation plan for District Manager and Operating & Maintenance Units, and approved the budget. Disaster Council –stated the Disaster Council received emergency planning updatesand approved upcoming training schedules. Santa Clara County Library District Board of Directors – stated the Board adopted the FY 24/25 budget and accepted the independent audit report. CITY COUNCIL ITEMS None COUNCIL COMMUNICATIONS None. 17 Saratoga City Council Minutes ~ June 19, 2024 ~ Page 10 of 10 ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS; VIRTUAL ATTENDEES No one requested to speak. CEREMONIAL ITEM Outgoing City Manager Recognition Recommended Action: Recognize outgoing City Manager, James Lindsay The City Council recognized outgoing City Manager, James Lindsay. Assistant Sheriff Rich Urena and Under Sheriff Ken Binder, Pablo Velasquez on behalf of Assemblyman Marc Berman, and Peter Estanial on behalf of Supervisor Joe Simitian recognized James Lindsay for his service to the community. Mayor Zhao invited public comment. The following individuals spoke at this time: Howard Miller, Shozo, Emily Lo, Gene Zmabeni Fire Protection District, Jill Hunter, Manny Capello and Lisa Oakley, Mary Lynn Bernald, Mike Workman, Liz Gibbons CITY ATTORNEY'S REPORT The City Attorney recognized outgoing City Manager, James Lindsay. ADJOURNMENT Mayor Zhao adjourned the meeting at 8:56 p.m. Minutes respectfully submitted: Britt Avrit, City Clerk City of Saratoga 18 SARATOGA CITY COUNCIL MEETING DATE:July 03, 2024 DEPARTMENT:Administrative Services PREPARED BY:Vivian Lu, Accounting Technician SUBJECT: Accounts Payable Check Registers RECOMMENDED ACTION: Review and accept the 06/13/2024 and 06/20/2024 accounts payable vendor payment check registers. BACKGROUND: The accounts payable check registers report payments to vendors for goods and services properly procured and approved for payment in accordance with the City’s administrative purchasing policy. The information listed below lists vendor payments exceeding $20,000 and any checks that were voided during the time period. The complete check register(s) and summary by Fund are provided as attachments to this report. ATTACHMENTS: Attachment A - Check Register Reports Dated 06/13/2024 Attachment B - Check Register Reports Dated 06/20/2024 REPORT SUMMARY: Attached are Check Registers for: Date Ending Check # 06/13/2024 149954 149981 28 123,915.99 06/13/2024 06/06/2024 149953 06/20/2024 149982 150040 59 1,085,437.94 06/20/2024 06/13/2024 149981 Accounts Payable checks issued for $20,000 or greater: Date Check #Dept.Amount 06/13/2024 149976 Shute, Mihaly & Weinberger LLP General Fund Various April 2024 Attorney Services 59,737.18 06/20/2024 149985 AECOM Technical Services General Fund CDD May 2024 Family Vineyards Expansion 28,236.00 06/20/2024 149991 FCS International Inc General Fund CDD Pierce Rd Mountain Winery Project 31,118.60 06/20/2024 150008 SCC Office of the Sheriff General Fund PS/CMO June 2024 Law Enforcement 651,016.58 06/20/2024 150009 Orchard Keepers Inc General Fund PW May 2024 Orchard Maintenance 29,696.26 06/20/2024 150013 Precision Concrete Cutting CIP Street Projects Fund PW Citywide Sidewalk/Trip Hazard Repairs 20,160.08 06/20/2024 150017 Safety Network Traffic Signs CIP Street Projects Fund PW Citywide Road/Street Name List 20,372.81 06/20/2024 150028 Traffic Patterns LLC General Fund PW Smart Traffic Signals Maintenance 23,940.00 06/20/2024 150030 Traffic Patterns LLC General Fund PW On-call Traffic Engineer Support 24,905.00 06/20/2024 150034 US Bank Purchasing Card Various Funds Various Various City Expenses 21,432.64 06/20/2024 150036 Villalobos & Associates Various CIP Funds PW Shadow Oaks Way Crosswalk Project 58,850.00 06/20/2024 150037 Villalobos & Associates CIP Street Projects Fund PW Martha Ave Repairs Project 65,593.00 Accounts Payable checks voided during this time period: AP Date Check #Amount N/A Ending Check # Starting Check #Type of Checks Date Prior Check Register Checks ReleasedTotal Checks Amount Accounts Payable Accounts Payable Fund Purpose StatusReason Issued to Issued to 19 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 06/13/2024 CITY OF SARATOGA VENCHK11 TIME: 12:06:52 CHECK REGISTER - FUND TOTALS ACCOUNTING PERIOD: 12/24 FUND FUND TITLE AMOUNT 111 GENERAL FUND 76,552.07 214 2023 STORM FUND 3,700.00 241 ARROYO DE SARATOGA LNDSCP 233.91 242 BONNET WAY LANDSCAPE 144.04 245 FREDERICKSBURG LANDSCAPE 369.06 246 GREENBRIAR LANDSCAPE 542.89 248 LEUTAR COURT LANDSCAPE 183.34 251 MCCARTYSVILLE LANDSCAPE 491.96 252 PRIDES CROSSING LANDSCAPE 988.55 272 BELLGROVE L&L 6,515.67 273 GATEWAY L&L 1,147.45 279 BROOKVIEW L&L 314.92 292 PARAMOUNT COURT SWD 139.07 361 ARROWHEAD BOND 1,000.00 411 CIP STREET PROJECTS FUND 2,738.50 413 CIP FACILITY PROJECT FUND 1,147.23 432 CIP GRANT - PARK & TRAIL 5,000.00 435 ARPA/SLFRF FUND 9,394.95 612 WORKERS COMP FUND 82.00 623 VEHICLE & EQUIPMENT MAINT 95.19 624 BUILDING MAINTENANCE 13,135.19 TOTAL REPORT 123,915.99 20 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 06/13/2024 CITY OF SARATOGA VENCHK11 TIME: 12:06:05 CHECK REGISTER ACCOUNTING PERIOD: 12/24 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 149954 11111 06/13/24 1804 ANIXTER INC 81161 STANLEY DOOR HARDWARE 1,147.23 149954 11111 06/13/24 1804 ANIXTER INC 61133 FACILITY SUPPLIES 718.93 TOTAL CHECK 1,866.16 149955 11111 06/13/24 1804 ANIXTER INC 61133 STANLEY DOOR HARDWARES 7,391.26 149956 11111 06/13/24 641 BKF ENGINEERS 81161 GUAVA CT IMPROVEMENT 431.40 149957 11111 06/13/24 179 CIM AIR, INC 64514 HVAC MAINT-CIVIC CTR 995.00 149957 11111 06/13/24 179 CIM AIR, INC 64514 HVAC MAINT-RMOTE SITE 995.00 149957 11111 06/13/24 179 CIM AIR, INC 64514 HVAC BATTERIES INSTL 425.00 TOTAL CHECK 2,415.00 149958 11111 06/13/24 937 CITY OF SARATOGA 71124 FY23/24 DEBT MGMT SVC 1,000.00 149959 11111 06/13/24 454 GACHINA LANDSCAPE MANAGEM 81161 JUN MNTHLY WEED ABATE 901.00 149960 11111 06/13/24 1608 GREEN HALO SYSTEMS INC. 64323 MAY TRACKING FEE 223.00 149961 11111 06/13/24 1852 HOMER T HAYWARDD LUMBER C 64557 QUARRY PK SIGN POSTS 254.91 149962 11111 06/13/24 14 HYDROTEC IRRIGATION EQUIP 61141 KMP NEW TREE INSTALL 435.40 149962 11111 06/13/24 14 HYDROTEC IRRIGATION EQUIP 64549 COX AVE WATER METER 83.00 TOTAL CHECK 518.40 149963 11111 06/13/24 63 INTERSTATE TRAFFIC CONTRO 81121 HIGHWAY 9 SIGNS 1,837.50 149964 11111 06/13/24 499 CARPENTERS LOCAL 2236 (MI 21262 DED:3000 DUES 260.00 149965 11111 06/13/24 1164 MOUSER LAW FIRM 65271 MAY LEGAL SVCS 6,965.00 149965 11111 06/13/24 1164 MOUSER LAW FIRM 65273 MAY LEGAL SVCS 735.00 TOTAL CHECK 7,700.00 149966 11111 06/13/24 79 MUNISERVICES/AVENU 64154 SUTA SRVC Q4 2023 85.43 149967 11111 06/13/24 1572 NBBM SERVICES, INC 64511 JANITORIAL SERVICES 1,260.00 149968 11111 06/13/24 1745 ODP BUSINESS SOLUTIONS, L 61171 KEYBOARD TRAY 93.49 149969 11111 06/13/24 918 O'REILLY AUTO PARTS 61361 AUTO PARTS 95.19 149970 11111 06/13/24 173 PACIFIC GAS & ELECTRIC 63111 EL CAMINO GRANDE PUMP 14.19 149970 11111 06/13/24 173 PACIFIC GAS & ELECTRIC 63111 PARKS/OPEN SPACE 256.69 TOTAL CHECK 270.88 149971 11111 06/13/24 1092 PALACE ART & OFFICE SUPPL 61111 OFFICE SUPPLIES 103.65 149972 11111 06/13/24 1356 PETERSON POWER SYSTEMS, I 64519 EMER GENERATOR RPR 1,350.00 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 12050 BROOKGLN DR 50% 314.92 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 ARROYO DE SARATOGA 233.91 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 BELLGROVE 6,515.67 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 BONNET WAY 10% 144.04 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 FREDERICKSBURG 369.06 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 GATEWAY PROJECT 1,147.45 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 GREENBRIAR 542.89 21 SUNGARD PUBLIC SECTOR PAGE NUMBER: 2 DATE: 06/13/2024 CITY OF SARATOGA VENCHK11 TIME: 12:06:05 CHECK REGISTER ACCOUNTING PERIOD: 12/24 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 LEUTAR CT 183.34 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 MCCARTYSVILLE 25% 103.33 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 PARAMOUNT COURT 139.07 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 PARKS/OPEN SPACE 3,020.01 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 PRIDES CROSSING 905.55 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 MEDIANS/PARKWAYS 2,689.01 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 MED/PRKWYS 90% BONNET 457.20 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 MED/PRKWYS 50% BRKGLN 314.91 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 MCCARTYSVILLE 388.63 149973 11111 06/13/24 87 SAN JOSE WATER COMPANY 63112 MED/MCCARTYSVILLE 75% 310.00 TOTAL CHECK 17,778.99 149974 11111 06/13/24 1754 SANDIS CIVIL ENGINEERS SU 81142 VILLAGE PARKING PROJ 8,963.55 149975 11111 06/13/24 1 SANTA CLARA COUNTY - DTAC 62325 MAY PARKING CITATION 125.00 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65223 GENERAL PLAN 11,501.32 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65213 CDD 315.10 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65211 CM 1,028.90 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65217 OH/CC MEETINGS 2,637.00 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65215 PW SUB20-0003 1,363.70 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 22119 VINEYARD ENV24-0002 182.50 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65212 ADMIN SVC 83.40 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65213 CDD 9,396.40 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65219 CITY CLERK 2,807.80 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65211 CM 5,587.80 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65218 HR 111.20 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65256 NON-DEP 466.26 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65217 OH/CC MEETINGS 3,447.20 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 65215 PW SUB20-0003 3,586.20 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 22119 AHFV EIR ENV21-0011 9,922.40 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 22119 SRC ENV19-0005 6,935.00 149976 11111 06/13/24 154 SHUTE MIHALY & WEINBERGER 22119 PIERCE RD ENV24-0001 365.00 TOTAL CHECK 59,737.18 149977 11111 06/13/24 1394 ST. FRANCIS ELECTRIC, LLC 64211 SARA-SNNYVLE ST LIGHT 422.00 149978 11111 06/13/24 248 STATE OF CA FRANCHISE TAX 21252 DED:2011 FTB W/H 50.00 149979 11111 06/13/24 1261 THE FRUITGUYS 61192 EMPLOYEE WELLNESS 82.00 149980 11111 06/13/24 1851 VISHAL DHAROD 42591 WILDFIRE GRANT REIMB 5,000.00 149981 11111 06/13/24 1437 WESTFALL ENGINEERS, INC. 64583 PIERCE RD STRUCTURAL 3,700.00 TOTAL FUND 123,915.99 TOTAL REPORT 123,915.99 22 681*$5'38%/,&6(&7253$*(180%(5 '$7(&,7<2)6$5$72*$9(1&+. 7,0(&+(&.5(*,67(5)81'727$/6$&&2817,1*3(5,2' )81')81'7,7/($02817 *(1(5$/)81' 67250)81' 35,'(6&5266,1*/$1'6&$3( %(8$&+$036/ / &,3675((7352-(&76)81' &,3$'0,1352-(&76)81' 3$5.,1/,(8)((6)81' &,3*5$173$5. 75$,/ &,3*5$17$'0,1,675$71 /,$%,/,7<5,6.0*07)81' :25.(56&203)81' 2)),&(6833257 ,76(59,&(6 %8,/',1*0$,17(1$1&( :9&:3$*(1&<)81' 727$/5(3257 23 681*$5'38%/,&6(&725 3$*(180%(5 '$7( &,7<2)6$5$72*$ 9(1&+. 7,0( &+(&.5(*,67(5 $&&2817,1*3(5,2' )81'',6%856(0(17)81' &+(&.180%(5&$6+$&&7'$7(,668('9(1'25$&&7 $02817    /($),1&    /($),1& 727$/&+(&.    $7 7     $7 7     $7 7     $7 7     $7 7     $7 7     $7 7  727$/&+(&.    $662&2)%$<$5($*29$%$    $662&2)%$<$5($*29$%$ 727$/&+(&.    $(&207(&+1,&$/6(59,&(6    $111257+583     $662&,$7('6(59,&(6&203$    %5,$1)5$1.    &,7<2)&83(57,12     &,7<2)&83(57,12  727$/&+(&.    ('*(6(/(&75,&$/*5283//    ('*(6(/(&75,&$/*5283// 727$/&+(&.    )&6,17(51$7,21$/,1&     *,8/,$1, .8//6$1-26    *27*23+(56,1&    *29(510(17),1$1&(2)),&(    *5((1+$/26<67(06,1&    +$0/(7,1&    +(,':-())5(<    +,//9,(:'(6,*135,170('    +20('(327&5(',76(59,&(    +20('(327&5(',76(59,&(    +20('(327&5(',76(59,&(    +20('(327&5(',76(59,&(    +20('(327&5(',76(59,&(    +20('(327&5(',76(59,&(    +20('(327&5(',76(59,&( '(6&5,37,21 65&2'((1)25&(0(17 &2'((1)25&(0(177(&+ 0217+/<5(&85&+$5*(6 35263(&7&(17(5 %/$1(<,55,*$7,21 3563&7&75(0(5$/$50 &53<5'(0(53276/16 $/$506<6&,9,&7+75 6(1,25&(17(5$/$506 *$66(59,&(6 )<*$6758(83 (19+6(9,1(5< &200&21&(575(,0% )$&,/,7,(66833/,(6 '(35()$5% 6$5$(0(5*(1&<0*07 6$5$(0(5*(1&<0*07 +$.21(87,/,7<83* +$.21(87,/,7<83* (19352-(,5 -2%//$ 25&+$5'3(670$< )<5(1(:9,//$5,&2 -8175$&.,1*)(( 7(03/$7(6'(6,*169&6 0:(/23/$1&+. 2)),&(6833/,(6 3$5.0$,176833/,(6 0(&+$1,&66(7 )/2:(56 %($&+$030$,17633/6 3$5.0$,176833/,(6 :$6+(5+26(5((/ &21&5(7(722/6  24 681*$5'38%/,&6(&7253$*(180%(5 '$7(&,7<2)6$5$72*$9(1&+. 7,0(&+(&.5(*,67(5$&&2817,1*3(5,2' )81'',6%856(0(17)81' &+(&.180%(5&$6+$&&7'$7(,668('9(1'25$&&7'(6&5,37,21$02817 +20('(327&5(',76(59,&(9$/9(5(63,5$7256 +20('(327&5(',76(59,&()/2:(56 +20('(327&5(',76(59,&()/2:(56 +20('(327&5(',76(59,&(3$5.0$,176833/,(6 +20('(327&5(',76(59,&(%($&+$030$,17633/6 727$/&+(&. +<'527(&,55,*$7,21(48,335263(&7(0(55(3$,56 +<'527(&,55,*$7,21(48,348,723.&21752//(5 +<'527(&,55,*$7,21(48,3&6348,&.&283/(5 +<'527(&,55,*$7,21(48,3%522.*/(13.%$&.)/2: 727$/&+(&. .&63523(57,(6//&'(35()$5% .&63523(57,(6//&'(35()*(2 727$/&+(&. .(1)86213(670$1$*(0(173$5.63(670*07 .(1)86213(670$1$*(0(17&63$//1'/(3(670*07 .(1)86213(670$1$*(0(17&63:++3(670*07 .(1)86213(670$1$*(0(17&633(670*07 727$/&+(&. /2*$1 32:(////3:9&:30$</(*$/69&6 0$5,2723(7(75((&$5(,6$5$&5((.75((509 1%%06(59,&(6,1&-81:.1'3.5(675220 1%%06(59,&(6,1&-$1,725,$/6(59,&(6 5($'<5()5(6+'5,1.,1*:$7(569& 2))2)6+(5,))),6&$/69&-81/$:(1)25&( 25&+$5'.((3(56,1&0$<25&+$5'0$,17 26&$5859,=27(//(=26&$5%,*%$6,1:<75((509 3$&,),&*$6 (/(&75,&38%/,%/1'6&3/,*+76 3$/$&($57 2)),&(6833/&23<3$3(5 35(&,6,21&21&5(7(&877,1&,7<:,'(6,'(:$/.535 5((' *5$+$0,1&67633/6$63+$/7 5,&+9266758&.,1*,1&+$.21(87,/,7<83* 5,&+$5'621&2168/7,1*(195(9,(: 5,&+$5'621&2168/7,1*0$<$'5352-5(9,(:6 727$/&+(&. 6$)(7<1(7:25.75$)),&6,675((76,*11$0(/,67 6$)(7<1(7:25.75$)),&6,675((76,*11$0(/,67 6$)(7<1(7:25.75$)),&6,52$'6,*11$0(/,67 25 681*$5'38%/,&6(&7253$*(180%(5 '$7(&,7<2)6$5$72*$9(1&+. 7,0(&+(&.5(*,67(5$&&2817,1*3(5,2' )81'',6%856(0(17)81' &+(&.180%(5&$6+$&&7'$7(,668('9(1'25$&&7'(6&5,37,21$02817 6$)(7<1(7:25.75$)),&6,52$'6,*11$0(/,67 727$/&+(&. 6$1&+(=(/(&75,&,1&0,//(5(/(&75,&:25. 6$5$72*$)227+,//&/8%0(025,$/'$<(9(17 67)5$1&,6(/(&75,&//&6$5$611<9/(/,*+76 67(9(16&5((.48$55<,1&3$5.(55$1&+75/633/ 67(9(16&5((.48$55<,1&3$5.(55$1&+75/633/ 727$/&+(&. 683(5,21//&-8/$636(59,&(6 683(5,21//&),183*5$'(&2*126 727$/&+(&. 7$/,60$11(7:25.6,1&086(80(0(5$/$50535 7+()58,7*8<6(03/2<((:(//1(66 7+(+20('(327352-$1,725,$/6833/,(6 7+(+20('(327352-$1,725,$/6833/,(6 727$/&+(&. 7-&+20(%8,/'(56//&'(35()$5% 7-&+20(%8,/'(56//&'(35()$5% 7-&+20(%8,/'(56//&'(35()0:(/2 727$/&+(&. 75$)),&3$77(516//&6$5$611<9/(6,*1$/ 75$)),&3$77(516//&60$57&,7<760$,17 75$)),&3$77(516//&76&21752//(583*5$'( 75$)),&3$77(516//&75$)),&(1*,1((56357 85%$13/$11,1*3$571(560$<+286,1*(/(0(17 86%$1.385&+$6,1*&$5'392,'08/7,678%&+(&. 86%$1.385&+$6,1*&$5'392,'08/7,678%&+(&. 86%$1.385&+$6,1*&$5'3)$&,/,7,(66833/,(6 86%$1.385&+$6,1*&$5'33$,17,1*6833/,(6 86%$1.385&+$6,1*&$5'3&$3,2/2'*,1*75$9(/ 86%$1.385&+$6,1*&$5'3&281&,/07*(;30($/6 86%$1.385&+$6,1*&$5'335,17,1*6(59,&(6 86%$1.385&+$6,1*&$5'335,17,1*6(59,&(6 86%$1.385&+$6,1*&$5'338%/,&$7,21 86%$1.385&+$6,1*&$5'3/$1'6&$3(6833/,(6 86%$1.385&+$6,1*&$5'335&(9(17633/6 86%$1.385&+$6,1*&$5'3%$11(5 86%$1.385&+$6,1*&$5'3&$/&,7,(607*/,1'6$< 86%$1.385&+$6,1*&$5'3&$/&,7,(63$*(:$/,$ 26 681*$5'38%/,&6(&7253$*(180%(5 '$7(&,7<2)6$5$72*$9(1&+. 7,0(&+(&.5(*,67(5$&&2817,1*3(5,2' )81'',6%856(0(17)81' &+(&.180%(5&$6+$&&7'$7(,668('9(1'25$&&7'(6&5,37,21$02817 86%$1.385&+$6,1*&$5'3&(57(0(535(3633/6 86%$1.385&+$6,1*&$5'3&/26('6(66,210($/6 86%$1.385&+$6,1*&$5'3&05(&2*1,7,21 86%$1.385&+$6,1*&$5'3029,(1,*+76833/,(6 86%$1.385&+$6,1*&$5'3127$5<6(59,&(6 86%$1.385&+$6,1*&$5'32)),&(633/6127$5< 86%$1.385&+$6,1*&$5'362)7:$5(6833257 86%$1.385&+$6,1*&$5'3<287+*297633/6 86%$1.385&+$6,1*&$5'3-2,176(66,210($/6 86%$1.385&+$6,1*&$5'307*(;30($/661$&.6 86%$1.385&+$6,1*&$5'3&281&,/07*0($/6 86%$1.385&+$6,1*&$5'30,1,67(5,$/07*0($/6 86%$1.385&+$6,1*&$5'3&636(&85,7<69&6 86%$1.385&+$6,1*&$5'3/$1'6&$3(6833/,(6 86%$1.385&+$6,1*&$5'307*(;3/81&+ 86%$1.385&+$6,1*&$5'33/$176)/2:(56 86%$1.385&+$6,1*&$5'3&60)275$,1,1* 86%$1.385&+$6,1*&$5'3&$/3(/5$&21) 86%$1.385&+$6,1*&$5'3&$/3(/5$/$%266,(5( 86%$1.385&+$6,1*&$5'35,6.0*07127$5<69&6 86%$1.385&+$6,1*&$5'3:(//1(66*5$1761$&. 86%$1.385&+$6,1*&$5'3&$/3(/5$0&.$< 86%$1.385&+$6,1*&$5'3&(57(0(535(3633/6 86%$1.385&+$6,1*&$5'3<287+&200(9(17 86%$1.385&+$6,1*&$5'32)),&(6833/,(6 86%$1.385&+$6,1*&$5'32)),&(6833/,(6 86%$1.385&+$6,1*&$5'32)),&(6833/,(6 86%$1.385&+$6,1*&$5'33&07*(;30($/61$&. 86%$1.385&+$6,1*&$5'35(&25'$7,21)((6 86%$1.385&+$6,1*&$5'3)$&,/,7,(66833/,(6 86%$1.385&+$6,1*&$5'3$8723$57686%'5,9( 86%$1.385&+$6,1*&$5'30,6$&&21)/2'*,1* 86%$1.385&+$6,1*&$5'3/,&(16(65(1(:$/<(( 86%$1.385&+$6,1*&$5'335&07*(;30($/6 86%$1.385&+$6,1*&$5'376&07*(;30($/6 86%$1.385&+$6,1*&$5'3(03/2<((5(&2*1,7,21 86%$1.385&+$6,1*&$5'32)),&(6833/,(6 86%$1.385&+$6,1*&$5'3$3$0(0%(56+,3 86%$1.385&+$6,1*&$5'307*(;3/81&+ 86%$1.385&+$6,1*&$5'36&&+(5(&25'(5)(( 86%$1.385&+$6,1*&$5'3(1&52$&+0(17633/6 86%$1.385&+$6,1*&$5'3+$.21(&,3633/(48,3 86%$1.385&+$6,1*&$5'362)7:$5(6833257 727$/&+(&. 86%$1.385&+$6,1*&$5'3:9&:3)8(/'09)((6 86%$1.385&+$6,1*&$5'3:9&:3,17(51(7 86%$1.385&+$6,1*&$5'3:9&:307*61$&.=220 86%$1.385&+$6,1*&$5'3:9&:32)),&(6833/,(6 86%$1.385&+$6,1*&$5'3:9&:37(/(3+21( 727$/&+(&. 9,//$/2%26 $662&,$7(66+$'2:2$.6&5266:$/. 9,//$/2%26 $662&,$7(66+$'2:2$.6&5266:$/. 9,//$/2%26 $662&,$7(66+$'2:2$.6&5266:$/. 9,//$/2%26 $662&,$7(66+$'2:2$.6&5266:$/. 27 681*$5'38%/,&6(&7253$*(180%(5 '$7(&,7<2)6$5$72*$9(1&+. 7,0(&+(&.5(*,67(5$&&2817,1*3(5,2' )81'',6%856(0(17)81' &+(&.180%(5&$6+$&&7'$7(,668('9(1'25$&&7'(6&5,37,21$02817 727$/&+(&. 9,//$/2%26 $662&,$7(60$57+$$9(& *$& 9,//$/2%26 $662&,$7(60$57+$$9(& *$& 727$/&+(&. 9,5*,1,$<281*6$5$52&.'(326,75() :(679$//(<&2//(&7,216-81&63%,16 =$*7(&+1,&$/6(59,&(6,0$<,7683325769&6 727$/)81' 727$/5(3257 28 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:Administrative Services PREPARED BY:Ann Xu, Finance Manager SUBJECT: Treasurer’s Report for the Month Ended May 31, 2024 RECOMMENDED ACTION: Review and accept the Treasurer’s Report for the month ended May 31, 2024. BACKGROUND: California government code section 41004 requires that the City Treasurer submits to the City Clerk and the legislative body a written report and accounting of all receipts, disbursements, and fund balances. The Municipal Code of the City of Saratoga, Article 2-20, Section 2-20.035 designates the City Manager as the City Treasurer. This report is prepared to fulfill this requirement. The following attachments provide financial transaction data for the City of Saratoga’s Funds collectively as well as specifically for the City’s General (Operating) Fund, changes in investment pool balances, and historical investment returns. FISCAL STATEMENT: Cash and Investments Balance by Fund As of May 31, 2024, the City’s unaudited cash and investments totaled $46,249,447. The City Council’s adopted policy on the Working Capital Reserve Fund states that effective July 1, 2016: for cash flow purposes and to avoid the occurrence of dry period financing, pooled cash from all funds should not be allowed to fall below $1,000,000. The total pooled cash balance of $46.2 million exceeds the minimum amount required. Comerica Bank 960,233$ Deposit with LAIF 39,757,083$ Deposit with CalTRUST 5,532,131$ Total Cash 46,249,447$ Cash Summary 29 City’s Current Financial Position In accordance with California government code section 53646 (b) (3), the City is financially well positioned and able to meet its estimated expenditure requirements for the next six months. As of May 31, 2024, the City’s financial position (Assets $46.5M, Liabilities $6.8M,and Fund Equity $39.7M) remains very strong and there are no issues in meeting financial obligations now or in the foreseeable future. The following Fund Balance schedule represents actual funding available for all funds at the end of the monthly period. This amount differs from the above Cash Summary schedule as assets and liabilities are components of the fund balance. As illustrated in the summary below, Total Cash is adjusted by the addition of Total Assets less the amount of Total Liabilities to arrive at the Ending Fund Balance –which represents the actual amount of funds available. ATTACHMENTS: Table 1 – Change in Total Fund Balances by Fund Table 2 –Change in Total Fund Balances by CIP Project Chart 1 – Change in Investment Pool Balance by Month Table 3 – Local Agency Investment Fund (LAIF) Quarterly Apportionment Rates Table 4 – CalTRUST Liquidity Fund Quarterly Yield Rates "+ Total Cash 46,249,447$ Plus: Assets 273,906 Less: Liabilities (6,818,523) Ending Fund Balance 39,704,830$ Adjusting Cash to Ending Fund Balance 30 TABLE 1: CHANGES IN TOTAL FUND BALANCE *Negative fund balance due to authorized spending of anticipated revenues **Includes long-term debt for Arrowhead Community Facilities District Bond Fund Description Prior Year Carryforward 7/1/2023 Increase/ (Decrease) Jul-Apr Current Revenue Current Expenditure Transfer In Transfer Out Fund Balance 5/31/2024 General Fund Committed Fund Balances: Hillside Stability Reserve 1,000,000 - - - - - 1,000,000 Assigned Fund Balances: Future Capital Project Reserve 3,534,875 - - - - (1,337,000) 2,197,875 Carryforwards Reserve 100,000 - - - - - 100,000 Road and Facility Replacement Reserve 3,700,000 - - - - - 3,700,000 Unassigned Fund Balances: Working Capital Reserve 1,000,000 - - - - - 1,000,000 Fiscal Stabilization Reserve 3,150,000 - - - - - 3,150,000 Compensated Absences Reserve 330,000 - - - - - 330,000 Other Unassigned Fund Balance Reserve (Pre YE distribution)2,373,803 4,494,920 1,288,611 (2,165,096) - (2,170,876) 3,821,362 General Fund Total 15,188,678 4,494,920 1,288,611 (2,165,096) - (3,507,876) 15,299,237 Special Revenue Landscape/Lighting Districts 1,001,132 27,405 73 (27,124) - - 1,001,486 ARPA Federal Grants 6,473,435 - - - - - 6,473,435 2023 Storm Fund 200,884 (49,596) - (909) - - 150,379 Special Revenue Fund Total 7,675,451 (22,191) 73 (28,033) - - 7,625,300 Debt Service Library Bond 910,655 (311,374) 4,098 - - - 603,379 Arrowhead Bond (1,287,086) (144,241) - - - - (1,431,326) ** Debt Service Fund Total (376,431) (455,615) 4,098 - - - (827,947) Internal Service Fund Liability/Risk Management 643,207 54,888 66,486 (14,476) - - 750,105 Workers Compensation 224,868 24,361 - (5,396) - - 243,833 Office Support 162,213 10,717 1,443 (1,741) - - 172,632 Information Technology Services 710,691 243,105 1,168 (60,146) - - 894,819 Vehicle & Equipment Maintenance 268,387 (26,297) - (43,496) - - 198,594 Facility Maintenance 692,401 222,058 - (97,160) - - 817,299 Vehicle & Equipment Replacement 754,983 64,527 - - - - 819,509 Technology Replacement 908,565 121,273 - (651) - - 1,029,187 Facility FFE Replacement 855,962 197,626 - (13,821) - - 1,039,767 Internal Service Fund Total 5,221,277 912,258 69,097 (236,887) - - 5,965,745 Trust/Agency WVCWP Agency Fund 651,922 (141,775) - (59,695) - - 450,452 Trust/Agency Fund Total 651,922 (141,775) - (59,695) - - 450,452 Capital Project Street Projects 3,660,101 (1,333,489) 55,030 (196,271) 2,846,395 (57,395) 4,974,371 Park and Trail Projects 836,826 (258,715) - (85,121) 375,000 - 867,990 Facility Projects 492,336 30,883 15,954 1,923 - - 541,095 Administrative Projects 1,334,960 284,196 148,636 (22,336) 343,876 - 2,089,332 Tree Fine Projects 27,266 16,100 - (2,150) - - 41,216 Park In-Lieu Projects 1,048,701 358,535 32,343 (37,491) - - 1,402,088 CIP Grant Street Projects (81,233) 58,117 - (12,049) - - (35,164) * CIP Grant Park & Trail Projects 90,000 1,166,019 - - - - 1,256,019 CIP Grant Administrative Projects (186,987) 23,764 15,000 (16,568) - - (164,791) * CIP Grant ARPR/SLFRF Projects - (931,151) - (150,060) - - (1,081,211) * Gas Tax Fund Projects (51,189) 1,220,157 132,130 - - - 1,301,099 CIP Fund Total 7,170,781 634,416 399,093 (520,123) 3,565,271 (57,395) 11,192,044 Total City 35,531,679 5,422,013 1,760,973 (3,009,835) 3,565,271 (3,565,271) 39,704,830 31 TABLE 2: FUND BALANCES BY CIP PROJECT *Negative fund balance due to authorized spending of anticipated revenues CIP Funds/Projects Prior Year Carryforward 7/1/2023 Increase/ (Decrease) Jul-Apr Current Revenue Current Expenditure Transfer In Transfer Out Fund Balance 5/31/2024 Street Projects Annual Road Improvements 853,356 (394,324) 55,030 (120,343) 1,337,000 (57,395) 1,673,324 Roadway Safety & Traffic Calming 212,585 (260,761) - - 150,000 - 101,824 Local Roadway Safety Plan 3,047 - - - - - 3,047 Traffic Signal Controller Upgrades 80,000 (36,830) - (19,066) - - 24,104 Safe Routes to School Implementation - (22,300) - (1,400) 160,000 - 136,300 Citywide Bikeways and Sidewalk Master Plan - - - - 57,395 - 57,395 Prospect/Saratoga Median Improvement 309,379 (2,625) - - - - 306,754 Village Clock 2,560 - - - - - 2,560 Annual Infrastructure Maintenance & Repairs 72,915 (246,504) - (2,005) 250,000 - 74,407 Guava Court Curb & Gutter Replacement 252,514 - - - - - 252,514 Annual Corrugated Pipe Rehabilitation Project - (50,176) - (41,176) 300,000 - 208,648 Saratoga Village Crosswalk & Sidewalk Rehabilitation 31,724 (4,793) - - - - 26,932 Quito Road Sidewalk Improvements 43,370 - - - - - 43,370 Saratoga/Sunnyvale Road Sidewalk 92,158 - - - - - 92,158 Saratoga Sunnyvale Rd. Pathway Rehab Cox to Railroad Crossing 50,000 (50,000) - - - - - Quito Road Sidewalk Gap Closure Phase 1 182,609 - - - - - 182,609 Quito Road Sidewalk Rehabilitation Gap Closure Phase 2 300,000 - - - - - 300,000 Fourth Street Bridge Widening 95,813 (1,921) - (1,561) 42,000 - 134,331 Quito Road Bridge Replacement 127,478 - - - - - 127,478 Quito Road Bridge - ROW Acquisition 3,662 - - - - - 3,662 Bridge Rehabilitation Project Phase 1 350,000 - - - 350,000 - 700,000 Annual Retaining Wall Maintenance & Repairs 332,401 (229,432) - (3,568) 200,000 - 299,401 Mt. Eden Erosion Repair 45,344 (2,938) - (7,152) - - 35,254 Pierce Road Retaining Wall 36,881 (30,885) - - - - 5,996 Unallocated Street Funds 182,303 - - - - - 182,303 Total Street Projects 3,660,101 (1,333,489) 55,030 (196,271) 2,846,395 (57,395) 4,974,371 Parks & Trails Projects Park/Trail Repairs 150,756 (193,570) - (50,388) 250,000 - 156,798 Hakone Gardens Infrastructure Improvements (12,010) (2,400) - (1,200) 25,000 - 9,390 Hakone Pond Reconstruction 300,000 - - - - - 300,000 Beauchamps Park Playground Replacement (3,945) - - - - - (3,945) * Guava/Fredericksburg Entrance 87,035 (9,385) - - - - 77,650 Saratoga Village to Quarry Park Walkway - Design 228,989 - - - - - 228,989 Park and Trail Fire Mitigation - (53,360) - (33,533) 100,000 - 13,107 Unallocated Park Funds 86,000 - - - - - 86,000 Total Parks & Trails Projects 836,826 (258,715) - (85,121) 375,000 - 867,990 Facility Projects Open Work Space 78,100 (1,600) - - - - 76,500 Civic Theater Improvements 27,240 20,641 - (1,087) - - 46,795 PEG Funded Project 189,312 29,390 15,954 - - - 234,655 Community Center Improvement 19,484 (9,417) - - - - 10,067 Community Center Generator and EV Charging Stations 163,201 (13,132) - 4,940 - - 155,008 Library Building Exterior Maintenance 15,000 5,000 - (1,930) - - 18,070 Total Facility Projects 492,336 30,883 15,954 1,923 - - 541,095 Administrative and Technology Projects Safe Routes to School 158,755 - - - - - 158,755 City Website/Intranet 16,948 - - - - - 16,948 Software Technology Management 167,361 107,167 31,769 - - - 306,298 LLD Initiation Match Program (7,344) - - - - - (7,344) * Horseshoe Beautification 8,237 (2,017) - (177) - - 6,043 Citywide Accessibility Assessment 26,116 (29,457) - - 100,000 - 96,658 City Art Program 78,669 - - - 25,000 - 103,669 Safe Routes to School Needs Assessment 15,748 (816) - - - - 14,932 El Quito Neighborhood Improvements 284,507 - - - - - 284,507 ADA Self Assessment 320,250 (9,000) - (9,500) - - 301,750 General Plan Update 234,195 218,319 116,867 (12,659) 218,876 - 775,598 Wildfire Mitigation Program 4,067 - - - - - 4,067 Unallocated Administrative Funds 27,452 - - - - - 27,452 Total Administrative and Technology Projects 1,334,960 284,196 148,636 (22,336) 343,876 - 2,089,332 32 TABLE 2 (cont.): FUND BALANCES BY CIP PROJECT *Negative fund balance due to authorized spending of anticipated revenues CIP Funds/Projects Prior Year Carryforward 7/1/2023 Increase/ (Decrease) Jul-Apr Current Revenue Current Expenditure Transfer In Transfer Out Fund Balance 5/31/2024 Tree Fine Projects Citywide Tree Planting Program 27,266 16,100 - (2,150) - - 41,216 Total Tree Fine Projects 27,266 16,100 - (2,150) - - 41,216 Park In-Lieu Projects Orchard Irrigation & Tree Planting 3,237 - - - - - 3,237 Hakone Gardens Infrastructure 82,011 (39,783) - (13,383) - - 28,845 Hakone Gardens Neighbor Wood Fence Replacement 75,000 (69,250) - - - - 5,750 Quarry Park Maintenance Building Utility Project 35,000 - - (23,850) - - 11,150 EL Quito Park Pickleball 1,515 - - (258) - - 1,257 Joe's Trail Phase II 130,755 - - - - - 130,755 Joe's Trail Phase III 264,000 - - - - - 264,000 Trail Pet Stations 25,000 - - - - - 25,000 Saratoga Village to Quarry Park Walkway - Design 223,810 - - - - - 223,810 Village Oaks Bridge Reconstruction and Erosion Control 30,000 - - - - - 30,000 Hakone Gardens to Quarry Park Trail Gap Closure Phase 1 50,000 - - - - - 50,000 Park and Trail Fire Mitigation 100,000 (49,920) - - - - 50,080 Unallocated Park In-Lieu Funds 28,372 517,488 32,343 - - - 578,203 Total Park In-Lieu Projects 1,048,701 358,535 32,343 (37,491) - - 1,402,088 CIP Grant Street Projects Local Roadway Safety Plan (4,882) - - - - - (4,882) * Prospect/Saratoga Median Improvement (19,217) - - - - - (19,217) * Citywide Signal Upgrade II 18 - - - - - 18 Saratoga Ave Sidewalk (34,146) - - - - - (34,146) * Village Sidewalk, Curb & Gutter - Phase II Construction (91) - - - - - (91) * Saratoga Village Crosswalk & Sidewalk Rehabilitation (834) - - - - - (834) * 4th Street Bridge (31,057) 58,117 - (12,049) - - 15,011 * Quito Bridge Replacement 18,597 - - - - - 18,597 Quito Road Bridges - ROW Acquisition (9,619) - - - - - (9,619) * Total CIP Grant Street Projects (81,233) 58,117 - (12,049) - - (35,164) CIP Grant Park & Trail Projects Blue Hills Elementary Pedestrian Crossing at UPPR - 1,200,000 - - - - 1,200,000 Park and Trail Fire Mitigation 90,000 (33,981) - - - - 56,019 Total CIP Grant Park & Trail Projects 90,000 1,166,019 - - - - 1,256,019 CIP Grant Administrative Projects CDD Software/ADA 39,736 - - - - - 39,736 General Plan Update (LEAP)(226,723) 23,764 15,000 (16,568) - - (204,527) * Total CIP Grant Administrative Projects (186,987) 23,764 15,000 (16,568) - - (164,791) CIP Grant ARPA/SLFRF Projects Park Sewer Lateral Replacement - (74,859) - (8,647) - - (83,506) * Prospect Road Green Infrastructure (304,640) - - - - (304,640) * Stormwater Pollution Prevention Program Compliance (SWPPP)- (38,526) - - - - (38,526) * Saratoga Village Water Improvement - (190,479) - (141,332) - - (331,811) * Guava Ct. Improvements and Green Stormwater Infrastructure (GSI)- (317,650) - (81) - - (317,731) * Monta Vista Storm Drain Improvement - (4,997) - - - - (4,997) * Total CIP Grant ARPA/SLFRF Projects - (931,151) - (150,060) - - (1,081,211) Gas Tax Fund Projects Annual Roadway Improvements (106,552) 1,220,157 132,130 - - - 1,245,736 Prospect/Saratoga Median Improvements 48,278 - - - - - 48,278 Quito Road Bridges 7,085 - - - - - 7,085 Total Gas Tax Fund Projects (51,189) 1,220,157 132,130 - - - 1,301,099 Total CIP Funds 7,170,781 634,416 399,093 (520,123) 3,565,271 (57,395) 11,192,044 33 CHART 1: CHANGE IN INVESTMENT POOL BALANCE BY MONTH 34 TABLE 3 March June September December 1977 5.68 5.78 5.84 6.45 1978 6.97 7.35 7.86 8.32 1979 8.81 9.10 9.26 10.06 1980 11.11 11.54 10.01 10.47 1981 11.23 11.68 12.40 11.91 1982 11.82 11.99 11.74 10.71 1983 9.87 9.64 10.04 10.18 1984 10.32 10.88 11.53 11.41 1985 10.32 9.98 9.54 9.43 1986 9.09 8.39 7.81 7.48 1987 7.24 7.21 7.54 7.97 1988 8.01 7.87 8.20 8.45 1989 8.76 9.13 8.87 8.68 1990 8.52 8.50 8.39 8.27 1991 7.97 7.38 7.00 6.52 1992 5.87 5.45 4.97 4.67 1993 4.64 4.51 4.44 4.36 1994 4.25 4.45 4.96 5.37 1995 5.76 5.98 5.89 5.76 1996 5.62 5.52 5.57 5.58 1997 5.56 5.63 5.68 5.71 1998 5.70 5.66 5.64 5.46 1999 5.19 5.08 5.21 5.49 2000 5.80 6.18 6.47 6.52 2001 6.16 5.32 4.47 3.52 2002 2.96 2.75 2.63 2.31 2003 1.98 1.77 1.63 1.56 2004 1.47 1.44 1.67 2.00 2005 2.38 2.85 3.18 3.63 2006 4.03 4.53 4.93 5.11 2007 5.17 5.23 5.24 4.96 2008 4.18 3.11 2.77 2.54 2009 1.91 1.51 0.90 0.60 2010 0.56 0.56 0.51 0.46 2011 0.51 0.48 0.38 0.38 2012 0.38 0.36 0.35 0.32 2013 0.28 0.24 0.26 0.26 2014 0.24 0.22 0.24 0.25 2015 0.26 0.28 0.32 0.37 2016 0.46 0.55 0.60 0.68 2017 0.78 0.92 1.07 1.20 2018 1.51 1.90 2.16 2.40 2019 2.55 2.57 2.45 2.29 2020 2.03 1.36 0.84 0.63 2021 0.44 0.33 0.24 0.23 2022 0.32 0.75 1.35 2.07 2023 2.74 3.15 3.59 4.00 2024 4.30 Quarterly Apportionment Rates Local Agency Investment Fund 35 TABLE 4 March June September December 2019 2.50 2.37 2.06 1.69 2020 0.98 0.25 0.15 0.03 2021 0.05 0.03 0.03 0.03 2022 0.16 1.37 2.75 4.62 2023 4.59 5.06 5.44 5.69 2024 5.43 CalTRUST Liquidity Fund Quarterly Yield Rates 36 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:Finance & Administrative Services PREPARED BY:Robby Balbuena, IT Analyst Gina Scott, Administrative Analyst SUBJECT: Award Copier Lease Agreement RECOMMENDED ACTION: Adopt the resolution to authorize the City Manager to enter into a five-year lease agreement with Toshiba Business Solutions for the City’s copier fleet in the amount of $111,820. BACKGROUND: The City entered into a copier lease agreement for its fleet of four copiers in 2019, which expires September 10, 2024. The City received ten proposals in response to a Request for Proposals (RFP). Staff evaluated all proposals and attended demonstrations for the top three qualified vendors – MRC/Xerox, Pacific Office Automation, and Toshiba Business Solutions. Further evaluation determined that Toshiba Business Solutions’ proposal best met the City’s needs. The RFP for the new copier fleet lease agreement requested bids for two high-speed copiers to be in the Administrative Services Lobby and the Community Development Copy Room, and two mid-speed copiers for the Public Works Mail room and Corporation Yard. Additional staff feedback led to changing the Public Works Mail room copier from a mid-speed to a high-speed copier. All proposal finalists were adjusted to reflect three high-speed copiers and one mid-speed copier from their submitted proposed solutions. Although the MRC/Xerox proposal offered a lower combined annual lease and usage cost, Toshiba’s copiers and overall proposal provided significant benefits that outweigh the cost alone. These benefits include ease of use, excellent print quality and performance, and quality customer service and technical support. Additionally, Toshiba’s copiers included many features that staff feedback deemed valuable based on over ten years of hands-on experience using Toshiba’s copiers. 37 Notable improvements to the new copiers include: 1. Faster print and copier speeds 2. Dedicated envelope feeders for all copier locations 3. Automatic toner replenishment from Toshiba 4. Physical keypads to improve ease of use when making copies and scans Based on the evaluation of the proposals, staff recommends Toshiba Business Solutions’ proposal for the City’s copier lease agreement. FISCAL STATEMENT: Adequate funds for the agreement with Toshiba are included in the 2024-25 Office Support budget. The total contract amount for five years is approximately $111,820. Detailed costing can be found on Attachment B – Cost Comparison of finalists. ATTACHMENTS: Attachment A – Resolution for Copier Lease Attachment B –Cost comparison of finalists Attachment C – Toshiba Contract 38 RESOLUTION NO. 24-____ RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA TO APPROVE A MULTI-FUNCTION PERIPHERALS FLEET LEASE WITH TOSHIBA BUSINESS SOLUTIONS WHEREAS, the current City’s Copier Lease expires in September of 2024; and WHEREAS, the City issued a request for proposals for the replacement of the Copier Fleet which included feedback from a staff user survey; and WHEREAS, the City received ten proposals for the Multi-Function Peripherals Fleet Lease; and WHEREAS, city staff provided due diligence in evaluating all proposals incorporating feedback from references; and WHEREAS, Toshiba Business Solutions was recommended by staff to be the best-suited to meet the City’s leasing needs. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Saratoga hereby authorizes the City Manager to enter into a five-year lease agreement with Toshiba Business Solutions detailed in Attachment C in the staff report for this matter and to carry out the City’s obligations thereunder. BE IT FURTHER RESOLVED, the above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City Council held on the 3rd day of July 2024 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Yan Zhao, Mayor ATTEST: DATE: Britt Avrit, City Clerk 39 MRC/Xerox Toshiba Business Solutions Pacific Office Automation Lease Cost Annual Lease Total 6,881$ 9,818$ 9,293$ Usage Cost Aproximate Annual Usage B&W 150,000 150,000 150,000 Color 300,000 300,000 300,000 Cost Per Copy (CPC) Rate B&W 0.0045$ 0.0045$ 0.0050$ Color 0.035$ 0.032$ 0.030$ Aproximate Annual Usage x CPC B&W 675$ 675$ 750$ Color 10,500$ 9,600$ 9,000$ Total Usage Cost 11,175$ 10,275$ 9,750$ Combined Cost Lease + Usage Annual Lease + Usage 18,056$ 20,093$ 19,043$ 40 Document Checklist † Tax-Exempt Lease/Purchase Agreement – Execute signature block at the top of the first page of the Agreement. † Addendum to Tax-Exempt Lease/Purchase Agreement – If required by Lessor, this document must be executed in the presence of an attester. The attesting witness does not have to be a notary but must be present at the time of execution. The attester will execute the signature block below the Lessee’s signature block at the bottom right of the page. If computation is required, please submit a copy of the computation test with the addendum. † Property Schedule – 1) If the transaction can be designated as a “bank qualified” transaction – one where Lessee reasonably anticipates not issuing more than $10 million in tax-exempt obligations in a calendar year – then you should initial the line under this section; and 2) execute the signature block at the bottom of the page. This document must be executed in the presence of an attester. The attesting witness does not have to be a notary but must be present at the time of execution. † Property Description – Exhibit A – Execute signature block at the bottom of the page. † Amortization and Lease Payment Schedule – Exhibit B – Execute signature block at the bottom of the page. Note that the interest rate and Amortization and Lease Payment Schedule are effective so long as the Property is accepted by 7/28/2024, after which the interest rate and Amortization and Lease Payment Schedule are subject to revision to current market conditions at the actual time of acceptance. † Certificate of Acceptance – Exhibit C – 1) if billing address is different than address shown on the Agreement, fill in billing information under # 2; 2) the date that all equipment is delivered, installed and accepted is the date that should be placed on the “ACCEPTANCE DATE” line; and 3) execute signature block at the bottom of the page. † Lessee’s General and Incumbency Certificate – Exhibit D – The General Certificate must be signed by the person signing the Agreement. The Incumbency Certificate must be signed by an officer other than the person signing the Agreement. † Lessee’s Counsel’s Opinion – Exhibit E – If required by Lessor, this document will need to be executed by your attorney, dated, and placed on his/her letterhead. † Insurance Authorization and Verification – To be filled out by Lessee and returned with the executed documents. † Notification of Tax Treatment – Please provide your State Sales/Use tax Exemption Certificate, if applicable. † Form 8038-GC or G – Blank form provided to Lessee. Please consult your local legal/bond counsel or tax consultant with questions. † Original Documents – Lessor will require original documents, including original 8038 form, prior to funding. † Validation of Board Approval – If required by Lessor, a copy of board minutes or board resolution should be provided showing approval of the contract. †ŒServices and Supplies Rider – If Lessee has requested that Lessor, as a convenience to Lessee, invoice Lessee for certain service and supply payments Lessee owes to Vendor, this document must be executed by Lessee in the presence of an attester. The attesting witness does not have to be a notary but must be present at the time of execution. 41 Tax-Exempt Lease/Purchase Agreement APPLICATION NO. 3088713 ACCEPTED BY LESSOR: AGREED TO BY LESSEE: FULL LEGAL NAME FULL LEGAL NAME TOSHIBA FINANCIAL SERVICES CITY OF SARATOGA STREET ADDRESS STREET ADDRESS 1310 Madrid Street, Suite 101 13777 FRUITVALE AVE CITY STATE ZIP CITY STATE ZIP Marshall MN 56258 SARATOGA CA 95070 SIGNATURE DATE SIGNATURE DATE X PRINT NAME PRINT NAME TITLE TELEPHONE NUMBER TITLE TELEPHONE NUMBER Doc Analyst (800) 828-8246 (408) 868-1216 AGREEMENT: Lessor hereby leases to Lessee and Lessee hereby leases from Lessor all the Property described in Property Schedule incorporated herein by reference, upon the terms and conditions set forth herein and as supplemented by the terms and conditions set forth in the Property Schedule. This Tax-Exempt Lease/Purchase Agreement together with the Property Schedule shall be defined as the “Agreement.” LEASE TERM: The Lease Term of the Property listed in the Property Schedule (the “Lease Term”) shall commence upon the commencement date of the Property Schedule (the “Commencement Date”). The Lease Term shall consist of an original term (the “Original Term”), commencing on such Commencement Date and continuing through the end of Lessee’s then- current fiscal year, and a series of successive renewal terms (each, a “Renewal Term”), each contemporaneous with Lessee’s budget year, with the final Renewal Term ending as provided in the Property Schedule. This Agreement cannot be canceled or terminated by Lessee except as expressly provided herein. This Ag reement is a triple net lease. LEASE PAYMENTS: Lessee shall pay rent to Lessor for the Property in the amounts, and on the dates specified, in the Property Schedule. Lessor and Lessee intend that the obligation of Lessee to pay Lease Payments hereunder shall not in any way be construed to be a debt of Lessee in contravention of any applicable constitutional or statutory limitations or requirements concerning the creation of indebtedness by Lessee, nor shall anything contained herein constitute a pledge of the general tax revenues, funds or monies of Lessee. The interest rate and Amortization and Lease Payment Schedule are effective so long as the Property is accepted by 7/28/2024, after which the interest rate and Amortization and Lease Payment Schedule are subject to revision to current market conditions at the actual time of acceptance. NO OFFSET: SUBJECT TO THE RIGHT TO NON-APPROPRIATE, SET FORTH BELOW, THE OBLIGATIONS OF LESSEE TO PAY THE LEASE PAYMENTS DUE UNDER THE PROPERTY SCHEDULE AND TO PERFORM AND OBSERVE THE OTHER COVENANTS AND AGREEMENTS CONTAINED IN THIS AGREEMENT SHALL BE ABSOLUTE AND UNCONDITIONAL IN ALL EVENTS WITHOUT ABATEMENT, DIMINUTION, DEDUCTION, SET-OFF OR DEFENSE, FOR ANY REASON, INCLUDING WITHOUT LIMITATION, ANY DEFECTS, MALFUNCTIONS, BREAKDOWNS OR INFIRMITIES IN THE PROPERTY OR ANY ACCIDENT, CONDEMNATION OR UNFORESEEN CIRCUMSTANCES. THIS PROVISION SHALL NOT LIMIT LESSEE'S RIGHTS OR ACTIONS AGAINST ANY VENDOR. Lessee shall pay when due all taxes, fees and governmental charges assessed or levied ag ainst or with respect to the Property. LATE CHARGES: Lessee shall pay a late charge of five cents per dollar or the highest amount permitted by applicable law, whichever is lower, on all delinquent Lease Payments and interest on said delinquent amounts from the date such amounts were due until paid at the rate of 12% per annum or the maximum amount pe rmitted by law, whichever is less. MAINTENANCE OF PROPERTY: At all times during the Lease Term, Lessee shall, at Lessee’s own cost and expense, maintain, preserve, and keep the Property in good working order, and condition, and from time to time make or cause to be made all necessary and proper repairs, replacements, and renewals to the P roperty, which shall become part of the Property. The Property is and will remain personal property. INSURANCE OF PROPERTY: All risk of loss to the Property shall be borne by the Lessee. At all times during the Lease Term, Lessee shall, at Lessee’s own cost and expense, cause casualty, public liability, and property damage insurance to be carried and maintained (or shall provide Lessor with a certificate stating that adequate self-insurance has been provided) with respect to the Property, sufficient to protect the full replacement value of the Property and to protect from liability in all events for which insurance is customarily available. Lessee shall furnish to Lessor certificates evidencing such coverage throughout the Lease Term. Any insurance policy to be carried and maintained pursuant to this Agreement shall be so written or endorsed as to make losses, if any, payable to Lessee and Lessor as their respective interests may appear. All such liability insurance sh all name Lessor as an additional insured. Each insurance policy carried and maintained pursuant to this Agreement shall contain a provision to the effect that the insurance company shall not cancel the policy or modify it materially or adversely to the interest of the Lessor without first giving written notice thereof to Lessor at least 30 days in advance of such change of stat us. QUIET ENJOYMENT AND TERMINATION OF LESSOR'S INTEREST: To secure Lessee's obligations hereunder, Lessor is granted a security interest in the Property, including substitutions, repairs, replacements and renewals, and the proceeds thereof, which is a first lien thereon. Lessee hereby authorizes Lessor to file all financing statements which Lessor deems necessary or appropriate to establish, maintain and perfect such security interest. Provided there does not exist an Event of Default or Nonappropriation Event, as defined herein, the Lessee shall have the right of quiet enjoyment of the Property throughout the Lease Term. If Lessee shall have performed all of its obligations and no default shall have occurred and be continuing under this Agreement, and this Agreement shall not have been earlier terminated with respect to the Property, then, at the end of the Lease Term with respect to any item of Property, Lessor's interest in such Property shall terminate. Unless otherwise required by law, title to the Property shall be in the name of Lessee, subject to Lessor's interest hereunder. TAX EXEMPTION: The parties contemplate that interest payable under this Agreement will be excluded from gross income for federal income tax purposes under Section 103 of the Internal Revenue Code of 1986, as amended (the "Code"). The tax-exempt status of this Agreement provides the inducement for the Lessor to offer financing at the interest rate set forth herein. Therefore, should this Agreement be deemed by any taxing authority not to be exempt from taxation, Lessee agrees that the inter est rate shall be adjusted, as of the date of loss of tax exemption, to an interest rate calculated to provide Lessor or its assignee an after tax yield equivalent to the tax exempt rate and Lessor shall notify Lessee of the taxable rate. Provided, however, that the provision of the preceding sentence shall apply only upon a final determination that the interest payments are not excludable from gross income under Section 103(a) of the Code, and shall not apply if the determination is based upon the individual tax circumstances of the Lessor, or a finding that the party seeking to exclude such payments from gross income is not the owner and holder of the obligation under the Code. REPRESENTATIONS AND WARRANTIES OF LESSEE: Lessee hereby represents and warrants to Lessor that: (a) Lessee is a State, possession of the United States, the District of Columbia, or political subdivision thereof as defined in Section 103 of the Code and Treasury Regulations and Rulings related thereto, and if Lessee is incorporated, it is duly organized and existing under the Constitution and laws of its jurisdiction of incorporation and will do or cause to be done all things necessary to preserve and keep such organization and existence in full force and effect; (b) Lessee has been duly authorized by the Constitution and laws of the applicable jurisdiction and by a reso lution of its governing body (which resolution, if requested by Lessor, is attached hereto), to execute and deliver this Agreement and to carry out its obligations hereunder; (c) all legal re quirements have been met, and procedures have been followed, including public bidding, in order to ensure the enforceability of this Agreement; (d) the Property will be used by Lessee only for essential governmental or proprietary functions of Lessee consistent with the scope of Lessee's authority and will not be used in a trade or business of any person or entity, by the federal government or for any personal, family or household use. Lessee’s need for the Property is not expected to diminish during the term of the Agreement; (e) Lessee has funds available to pay Lease Payments until the end of its current appropriation DATE TITLE PRINT NAME 42 period, and it intends to request funds to make Lease Payments in each appropriation period, from now until the end of the term of this Agreement; (f) Lessee shall comply at all times with all applicable requirements of the Code, including but not limited to the registration and reporting requirements of Section 149, to maintain the federal tax-exempt status of the Agreement, and Lessee shall maintain a system with respect to this Agreement, which tracks the name, and ownership interest of each assignee w ho has both the responsibility for administration of, and ownership interest in this Agreement; (g) Lessee's exact legal name is as set forth on the first page of this Agreement. Lessee will not change its legal name in any respect without giving thirty (30) days prior written notice to Lessor. RISK OF LOSS COVENANTS: Lessee shall not be required to indemnify or hold Lessor harmless against liabilities arising from the Agreement. However, a s between Lessor and Lessee, and to the extent permitted by law, Lessee shall bear the risk of loss for, shall pay directly, and shall defend against any and all claims, liabilities, proceedings, actions, expenses, damages or losses arising under or related to the Property, including, but not limited to, the possession, ownership, lease, use or operation thereof, except that Lessee shall not bear the risk of loss of, nor pay for, any claims, liabilities, proceedings, actions, expenses, damages or losses that arise directly from events occurring after Lessee has surrendered possession of the Property in accordance with the terms of the Agreement to Lessor or that arise directly from the gross negligence or willful misconduct of the Lessor. NON-APPROPRIATION: If sufficient funds are not appropriated to make Lease Payments under this Agreement (such failure to appropriate, a “Nonappropriation Event”), this Agreement shall terminate and Lessee shall not be obligated to make Lease Payments under this Agreement beyond the then current fiscal ye ar for which funds have been appropriated. Upon such a Nonappropriation Event, Lessee shall, no later than the end of the fiscal year for which Lease Payments have been appropriated, deliver possession of the Property to Lessor. If Lessee fails to deliver possession of the Property to Lessor, the termination shall nevertheless be effective but Lessee shall be responsible for the payment of damages in an amount equal to the portion of Lease Payments thereafter coming due that is attributable to the number of days after the termination during which the Lesse e fails to deliver possession and for any other loss suffered by Lessor as a result of Lessee's failure to deliver possession as required. Lessee shall notify Lessor in writing within seven (7) days after the failure of the Lessee to appropriate funds sufficient for the payment of the Lease Payments, but failure to provide such notice shall not operate to extend the Lease Term or result in any liability to Lessee. A Nonappropriation Event shall not constitute an Event of Default hereunder. ASSIGNMENT BY LESSEE: Without Lessor's prior written consent, Lessee may not, by operation of law or otherwise, assign, transfer, pledge, hypothecate or otherwise dispose of the Property, this Agreement or any interest therein. ASSIGNMENT BY LESSOR: Lessor may assign, sell or encumber all or any part of this Agreement, the Lease Payments and any other rights or interests of Lessor hereunder without the necessity of providing notice to or obtaining the consent of Lessee; provided that Lessee shall have no obligation to make paym ents to any assignee unless and until Lessee has received notice of the name, address and tax identification number of the assignee. The initial Lessor or its assignee(s) shall maintai n a register of all assignees of this Agreement. To the extent permitted by applicable law, such assignees may include trust agents for the benefit of holders of certificates of participation. Lessee agrees that if Lessor sells, assigns or transfers this Agreement, Lessor’s assignee will have the same rights and benefits that Lessor has now and will not have to perform any of Lessor’s obligations. Lessee agrees that Lessor’s assignee will not be subject to any claims, defenses, or offsets that Lessee may have against Lessor. EVENTS OF DEFAULT: Lessee shall be in default under this Agreement upon the occurrence of any of the following events or conditions ("Events of Default"), unless such Event of Default shall have been specifically waived by Lessor in writing: (a) default by Lessee in payment of any Lease Payment or any other i ndebtedness or obligation now or hereafter owed by Lessee to Lessor under this Agreement or in the performance of any obligation, covenant or liability contained in this Agreement and the continuance of such default for ten (10) consecutive days after written notice thereof by Lessor to Lessee, or (b) any warranty, representation or statement made or furnished to Lessor by or on behalf of Lessee proves to have been false in any material respect when made or furnished, or (c) actual or attempted sale, lease or encumbrance of any of the Property, or the making of any levy, seizure or attachment thereof or thereon, or (d) dissolution, termination of existence, discontinuance of the Lessee, insolvency, business failure, failure to pay debts as they mature, or appointment of a receiver of any part of the property of, or assignment for the benefit of creditors by the Lessee, or the commencement of any proceedings under any bankruptcy, reor ganization or arrangement laws by or against the Lessee. REMEDIES OF LESSOR: Upon the occurrence of any Event of Default and at any time thereafter, Lessor may, without any further notice, exercise one or more of the following remedies as Lessor in its sole discretion shall elect: (a) terminate the Agreement and all of Lessee's rights hereunder as to any or all it ems of Property; (b) require Lessee, at Lessee’s expense, to return any or all items of Property wherever found to Lessor at such place within the United States as Lessor may designate, and for this purpose Lessor may enter upon Lessee's premises where any item of Property is located and remove such item of Property free from all claims of any nature whatsoever by Lessee and Lessor may thereafter dispose of the Property; provided, however, that any proceeds from the disposition of the Property in excess of the sum required to (i) pay to Lessor an amount equal to the total unpaid principal component of Lease Payments under the Property Schedule, including principal component not otherwise due until future fiscal years, (ii) pay any other amounts then due under the Property Schedule and this Agreement, and (iii) pay Lessor's costs and expenses associated with the disposition of the Property and the Event of Default (including attorney’s fees), shall be paid to Lessee or such other creditor of Lessee as may be entitled thereto, and further provided that no deficiency shall be allowed against Lessee, except with respect to Lessor’s costs and expenses associated with disposition of the Property; (c) proceed by appropriate court action or actions to enforce performance by Lessee of its obligations hereund er or to recover damages for the breach hereof or pursue any other remedy available to Lessor at law or in equity or otherwise; (d) declare all unpaid Lease Payments and other sums payable hereunder during the current fiscal year of the Lease Term to be immediately due and payable without any presentment, demand or protest and / or take any and all actions to which Lessor shall be entitled under applicable law. No right or remedy herein conferred upon or reserved to Lessor is exclusive of any right or remedy herein or at law or in equity or otherwise provided or permitted, but each shall be cumulative of every other right or remedy given hereunder or now or hereafter existing at law or in equity or by statute or otherwise, and may be enforced concurrently therewith or from time to time. Lessee and Lessor hereby irrevocably waive all right to trial by jury in any action, proceeding or counterclaim (whether based on contract, tort or otherwise) arising out of or relating to this Agreement. COSTS AND ATTORNEY FEES: Upon the occurrence of an Event of Default by Lessee in the performance of any term of this Agreement, Lessee agrees to pay to Lessor or reimburse Lessor for, in addition to all other amounts due hereunder, all of Lessor's costs of collection, including reasonable attorney fees, whether or not suit or action is filed thereon. Any such costs shall be immediately due and payable upon written notice and demand given to Lessee, shall be secured by this Agreement until p aid and shall bear interest at the rate of 12% per annum or the maximum amount permitted by law, whichever is less. In the event suit or action is instituted to enforce any of the terms of this Agreement, the prevailing party shall be entitled to recover from the other party such sum as the court may adjudge reasonable as attorneys' fees at trial or on appeal of such suit or action or in any bankruptcy proceeding, in addition to all other sums provided by law. NOTICES: All notices, and other communications provided for herein shall be deemed given when delivered or mailed by certified mail, postage prepaid, addressed to Lessor or Lessee at their respective addresses set forth herein or such other addresses as either of the parties hereto may designate in writing to the other from time to time for such purpose. AMENDMENTS: This Agreement may not be amended except in writing signed by both parties. CONSTRUCTION: This Agreement shall be governed by and construed in accordance with the laws of the Lessee’s State. Titles of sections of thi s Agreement are for convenience only and shall not define or limit the terms or provisions hereof. Time is of the essence under this Agreement. This Agreement shall inure to the benefit of and shall be binding upon Lessor and Lessee and their respective successors and assigns. The parties agree that: (i) this Agreement may be simultaneously executed in several counterparts, all of which shall constitute but one and the same instrument; (ii) this Agreement and any related documents hereto may be authenticated by electronic means; (iii) the “original” of this Agreement shall be the copy that bears Lessee’s manual, facsimile, scanned or electronic signature and that also bears Lessor’s manually or electronically signed signature and is held or controlled by Lessor; and (iv) to the extent this Agreement constitutes chattel paper (as defined by the UCC), a security interest may only be created in the original. Lessee agrees not to raise as a defense to the enforcement of this Agreement or any related documents that either party executed or authenticated such documents by electronic or digital means or that Lessee used facsimile or other electronic means to transmit its signature on such documents. Notwithstanding anything to the contrary herein, Lessor reserves the right to require Lessee to sign this Agreement or any related documents hereto manually and to send to Lessor the manually signed, duly executed documents via overnight courier. The words “execution,” “signed,” “signature,” and words of like import in the Agreement or any related document shall be deemed to include electronic signatures. Any provision providing that the Agreement or any related document may only be modified by written agreement shall be deemed to include an agreement authenticated by electronic means and/or existing as an electronic record. 43 APPLICATION NO. 3088713 Property Schedule to Tax-Exempt Lease/Purchase Agreement This Property Schedule is entered into pursuant to the Tax-Exempt Lease/Purchase Agreement between Lessor and Lessee. 1.Entire Agreement; Interpretation: The terms and conditions of the Tax-Exempt Lease/Purchase Agreement (the "Agreement") are incorporated herein. The Agreement, this Property Schedule and the associated documents hereto constitute the entire agreement between Lessor and Lessee with respect to the Property and supersede any purchase order, invoice, request for proposal, response or other related document. 2.Commencement Date: The Commencement Date of this Property Schedule is the date that Lessor pays Vendor for the Property. The interest rate and Amortization and Lease Payment Schedule are effective so long as the Property is accepted by 7/28/2024, after which the interest rate and Amortization and Lease Payment Schedule are subject to revision to current market conditions at the actual time of acceptance. 3.Property Description: The Property subject to this Property Schedule is described in Exhibit A, attached hereto. It includes all replacements, parts, repairs, additions, accessions and accessories incorporated therein or affixed or attached thereto and any and all proceeds of the foregoing, including, without limitation, insurance recoveries. 4.Term and Payments: Lease Term and Lease Payments are per the attached Exhibit B Amortization and Lease Payment Schedule. If the parties enter into an escrow agreement for the acquisition of the Property, then the escrow agreement shall be attached hereto as Exhibit F and in lieu of the Acceptance Date for commencement of Lease Payments, the date of deposit of the Property Cost into the escrow by Lessor shall be used. Lessee shall have the option to prepay the Lease Payments due under this Property Schedule by paying the Termination Amount shown in the attached Amortization and Lease Payment Schedule, plus any other amounts due and owing at the time of prepayment, subject to per diem adjustment. The interest rate and Amortization and Lease Payment Schedule are subject to adjustment as provided in paragraph 2, above. 5.Certificate of Acceptance: Attached as Exhibit C, hereto. 6.Expiration: Lessor, at its sole determination, may choose not to accept this Property Schedule if the fully executed, original Agreement (including this Property Schedule and all ancillary documents) are not received by Lessor at its place of business by 7/28/2024. 7.Property Cost: The total principal amount under this Property Schedule for the acquisition cost of the Property is $39,543.96. 8.Lessee’s General and Incumbency Certificate: Lessee has provided the Lessee’s General and Incumbency Certificate in the form attached as Exhibit D, hereto. 9. Lessee’s Counsel’s Opinion: If required by Lessor, Lessee has provided the opinion of its legal counsel substantially in the form as attached as Exhibit E, hereto. 10. Private Activity Issue: Lessee understands that among other things, in order to maintain the exclusion of the interest component of Lease Payments from gross income for federal income tax purposes, it must limit and restrict the rights private businesses (including, for this purpose, the federal government and its agencies and organizations described in the Code § 501(c)(3)) have to use the Property. Each of these requirements will be applied beginning on the later of the Commencement Date or date each portion of the Property is placed in service and will continue to apply until earlier of the end of the economic useful life of the Property or the date the Agreement or any tax-exempt obligation issued to refund the Property Schedule is retired (the “Measurement Period”). Lessee will comply with the requirements of Section 141 of the Code and the regulations thereunder which provide restrictions on special legal rights that users other than Lessee or a state or local government or an agency or instrumentality of a state or a local government (an “Eligible User”) may have to use the Property. For this purpose, special legal rights may arise from a management or service agreement, lease, research agreement or other arrangement providing any entity except an Eligible User the right to use the Property. Any use of the Property by a user other than an Eligible User is referred to herein as “Non-Qualified Use”. Throughout the Measurement Period, all of the Property is expected to be owned by Lessee. Throughout the Measurement Period, Lessee will not permit the Non-Qualified Use of the Property to exceed 10%. 11. Bank Qualification: Lessee designates this Agreement and Property Schedule as a "qualified tax-exempt obligation" as defined in Section 265(b)(3)(B) of the Internal Revenue Code of 1986, as amended. Lessee reasonably anticipates issuing tax-exempt obligations (excluding priv ate activity bonds other than qualified 501(c)(3) bonds and including all tax-exempt obligations of subordinate entities of the Lessee) during the calen dar year this Agreement and Property Schedule was funded, in an amount not exceeding $10,000,000. _____ Lessee initial here, if Bank Qualification is applicable. IN WITNESS WHEREOF, Lessor and Lessee have caused this Property Schedule to be executed in their names by their duly authorized representatives. TOSHIBA FINANCIAL SERVICES CITY OF SARATOGA Lessor Lessee X Signature Date Signature Date Doc Analyst Print Name Title Print Name Title X Attest By Signature Print Name Title Date Print Name Title Print Name Title 44 REV 11/19 Tax-Exempt Lease/Purchase Agreement APPLICATION NO. 3088713 Addendum (California Judicial Reference) THIS ADDENDUM, which is entered into between TOSHIBA FINANCIAL SERVICES (“Lessor”) and CITY OF SARATOGA ("Lessee"), is intended to modify and supplement Property Schedule (the “Property Schedule”) to the Tax-Exempt Lease//Purchase Agreement or Master Tax-Exempt Lease//Purchase Agreement (as applicable) between Lessor and Lessor dated as of __________________________ (the “Agreement”). Capitalized terms not otherwise defined herein shall have the meanings set forth in the Agreement. The parties wish to amend the above-referenced Agreement by adding the following language: 1. Any and all disputes, claims and controversies arising out of, connected with or relating to the Agreement or the transaction s contemplated thereby (individually, a "Dispute") that are brought before a forum in which pre-dispute waivers of the right to trial by jury are invalid under applica ble law shall be subject to the terms contained in this Addendum in lieu of the jury trial waiver otherwise provided in the Agreement. Disputes may include, without limitation, tort claims, counterclaims, claims brought as class actions, claims arising from schedules, supplements, exhibits or other documents to the Agreement executed in the futu re, disputes as to whether a matter is subject to judicial reference, or claims concerning any aspect of the past, present or future relationships arising out of or c onnected with the Agreement. 2. Any and all Disputes shall be heard by a referee and resolved by judicial reference pursuant to California Code of Civil Procedure (“CCCP”) §§ 638 et seq. The referee shall be a retired California state court judge or an attorney licensed to practice law in the State of California with at least 10 years' experience practicing commercial law. The parties shall not seek to appoint a referee that may be disqualified pursuant to CCCP §641 or 641.2 without the prior written consent of all parties. If the parties are unable to agree upon a referee within 10 calendar days after one party serves a written notice of intent for judici al reference upon the other parties, then the referee will be selected by the court in accordance with CCCP § 640(b). 3. The referee shall render a written statement of decision and shall conduct the proceedings in accordance with the CCCP, the Rules of Court, and the California Evidence Code, except as otherwise specifically agreed by the parties and approved by the referee. The referee's statement of decision shall set forth findings of fact and conclusions of law. The decision of the referee shall be entered as a judgment in the court in accordance with the provisions of CCCP §§644 and 645. The decision of the referee shall be appealable to the same extent and in the same manner that such decision would be appealable if rendered by a judge of the superior court. 4. Notwithstanding the preceding agreement to submit Disputes to a judicial referee, the parties preserve, without diminution, certain rights and remedies at law or equity and under the Agreement that such parties may employ or exercise freely, either alone or in conjunction with or during a Dispute. Each party shall have and hereby reserves the right to proceed in any court of proper jurisdiction or by self-help to exercise or prosecute the following remedies, as applicable: (A) all rights to foreclose against any real or personal property or other security by exercising a power of sale granted in the Agreement or under applicable law or by judicial foreclosure and sale, including a proceeding to confirm the sale, (B) all rights of self-help including peaceful occupation of property and col lection of rents, setoff, and peaceful possession of property, (C) obtaining provisional or ancillary remedies including injunctive relief, sequestration, garnishment, attachmen t, appointment of receiver and in filing an involuntary bankruptcy proceeding, and (D) when applicable, a judgment by confession of judgment. Preservation of these remedi es does not limit the power of a judicial referee to grant similar remedies that may be requested by a party in a Dispute. No provision in the Agreement regarding submission to jurisdiction and/or venue in any court is intended or shall be construed to be in derogation of the provisions in this Addendum for judicial reference of any Dispute. The parties do not waive any applicable federal or state substantive law except as provided herein. 5. If a Dispute includes multiple claims, some of which are found not subject to this Addendum, the parties shall stay the proceedings of the claims not subject to this Addendum until all other claims are resolved in accordance with this Addendum. If there are Disputes by or against multiple parties, some of which are not subject to this Addendum, the parties shall sever the Disputes subject to this Addendum and resolve them in accordance with this Addendum. 6. During the pendency of any Dispute that is submitted to judicial reference in accordance with this Addendum, each of the parties to such Dispute shall bear equal shares of the fees charged and costs incurred by the referee in performing the services described in this Addendum. The compensation of the referee shall not exceed the prevailing rate for like services. The prevailing party shall be entitled to reasonable court costs and legal fees, including customary attorneys’ fees, expert witness fees, paralegal fees, the fees of the referee and other reasonable costs and disbursements charged to the party by its counsel, in such amount as is determined by the referee. 7. In the event of any challenge to the legality or enforceability of this Addendum, the prevailing party shall be entitled to r ecover the costs and expenses from the non- prevailing party, including reasonable attorneys' fees, incurred by it in connection therewith. 8. THIS ADDENDUM CONSTITUTES A "REFERENCE AGREEMENT" BETWEEN THE PARTIES WITHIN THE MEANING OF AND FOR PURPOSES OF CCCP § 638. IN WITNESS WHEREOF, Lessor and Lessee have caused this Addendum to be executed in their names by their duly authorized represen tatives. TOSHIBA FINANCIAL SERVICES CITY OF SARATOGA Lessor Lessee X Signature Date Signature Date Print Name Title Print Name Title X Attest By Signature Print Name Title Print Name Title Print Name Title Date 45 REV 11/15 Tax-Exempt Lease/Purchase Agreement APPLICATION NO. 3088713 SERVICES AND SUPPLIES RIDER This Services and Supplies Rider is entered into as of _________________, 20_______ (the “Rider”), between Toshiba Business Solutions (“Vendor”), CITY OF SARATOGA (“Lessee”) and TOSHIBA FINANCIAL SERVICES (“Lessor”). WHEREAS, Lessor and Lessee have entered into that certain Property Schedule, pursuant to the Tax-Exempt Lease/Purchase Agreement, dated as of ______________________, 20_______ (the “Lease”), for the lease/purchase of certain property identified therein (the “Property”); WHEREAS, the Property is being acquired from Vendor for the lease/purchase to Lessee under the Lease; WHEREAS, Lessee has the obligation to maintain the Property under the Lease; WHEREAS, Lessee wished to engage Vendor to provide certain services and supplies, set forth in Appendix A, hereto (the “Services and Supplies”) for the compensation from Lessee to Vendor as set forth in Appendix A (the “Service and Supply Payments”); WHEREAS, Lessee and Vendor wish for Lessor to invoice Lessee for the Service and Supply Payments with the invoicing of the Lease Payments under the Lease, as well as to receive such Service and Supply Payments and forward the same to Vendor; and WHEREAS, Lessor is willing to invoice the Service and Supply Payments with the invoicing of the Lease Payments under the Lease, as well as to receive such Service and Supply Payments and forward the same to Vendor subject to the terms and conditions of this Rider. NOW THEREFORE, Vendor, Lessee and Lessor agree as follows: 1. Vendor and Lessee represent and warrant that the description of the Services and Supplies and the Service and Supply Payments attached hereto in Appendix A are true and correct. Vendor and Lessee covenant that Lessor shall be provided with a written copy of any amendment of such Services and Supplies and Service and Supply Payments. Vendor and Lessee agree and understand that Lessor shall be invoicing the Service and Supply Payments solely from the written information provided by Vendor and Lessee. 2. Subject to the terms and conditions of this Rider, Lessor agrees to bill and collect on behalf of Vendor the Service and Supply Payments as set forth in Appendix A, and any sales tax due thereon, on the dates and with the invoicing of the Lease Payments. Lessor will report and remit all sales tax collected on the Service and Supply Payments to the taxing authorities in Lessor’s name and will remit to Vendor the Service and Supply Payments actually collected by Lessor on a daily basis (not including weekends or holidays). Payments to Vendor shall be made in accordance with the written instructions on file with Lessor by Vendor. Vendor remains responsible for any income tax on its monthly receipts. Lessor shall not invoice other amounts for Service and Supply Payments absent written instruction signed by Vendor and Lessee agreeing to the revised Service and Supply Payments amounts. Vendor, at Vendor’s option, may bill Lessee for overage charges in which case any reference to meter readings or overage charges in Appendix A shall not apply. 3. If the amounts received by Lessor from the Lessee are less than the total of the Lease Payments, the Service and Supply Payments and other amounts due under the Lease, Lessor shall apply and remit monies actually collected in the following order: (i) past due Lease Payments; (ii) current Lease Payments; (iii) past due Lessor fees and surcharges (excluding late fees); (iv) past due Service and Supply Payments; (v) current Lessor fees and surcharges (excluding late fees); (vi) current Service and Supply Payments; (vii) past due Lessor late fees; and, (viii) current Lessor late fees. Any sales tax due shall be applied at the time of the respective charges for which the sales tax is applicable. Lessor reserves the right to adjust how Lessor will apply and remit monies. Any adjustment to how Lessor will apply and remit collected monies shall be communicated to Vendor. 4. Lessor shall use commercially reasonable efforts to collect Service and Supply Payments on behalf of Vendor. If Lessor is unable to collect a Lease Payment or a Service and Supply Payment from Lessee, or if there has been a default by Lessee under the Lease, Lessor may request that Vendor assume billing and collection of the Service and Supply Payment due, including collecting, reporting and remitting (in Vendor’s name) any sales or other taxes due thereon. 5. Lessee agrees and understands that Lessor is not providing any of the Services or Supplies and Lessee shall look solely to Vendor to provide said Services and Supplies. Lessee agrees and understands that notwithstanding the engagement of Vendor to provide Services and Supplies with respect to the Property that is under the Lease, and as between Lessee and Lessor, Lessee shall continue to be obligated to provide for the maintenance of the Property in accordance with the terms and conditions of the Lease. 6. LESSEE AGREES AND UNDERSTANDS THAT, SUBJECT TO THE RIGHT TO NONAPPROPRIATE, THE OBLIGATIONS OF LESSEE TO PAY THE LEASE PAYMENTS DUE UNDER THE LEASE AND TO PERFORM AND OBSERVE THE OTHER COVENANTS AND AGREEMENTS CONTAINED IN THE LEASE SHALL BE ABSOLUTE AND UNCONDITIONAL IN ALL EVENTS WITHOUT ABATEMENT, DIMINUTION, DEDUCTION, SET-OFF OR DEFENSE, FOR ANY REASON, INCLUDING WITHOUT LIMITATION, ANY DISPUTES THAT MIGHT ARISE BETWEEN THE PARTIES UNDER THIS RIDER. 7. With prior written notice, any of the parties may terminate this Rider, in which event Lessor shall provide a written accounting of the receipt and remittal of Service and Supply Payments as of the date of said termination. Any attempt by Vendor to assign or convey its rights or obligations under this Rider without Lessor’s consent shall be deemed a termination of this Rider by Vendor. 46 REV 11/15 8. Vendor hereby agrees to indemnify, defend and hold harmless Lessor and its affiliates, agents, contractors, employees, officers and directors (“Lessor Indemnitees”) from and against, any and all liabilities, obligations, losses, damages, penalties, claims act ions, suits, costs, expenses and disbursements (including, without limitation, reasonable attorneys’ fees and costs) of whatever kind or nature (“Claims”) imposed or assumed by, incurred by or asserted against any Lessor Indemnitees related to or arising out of this Services and Supplies R ider. 9. This Rider constitutes the entire agreement between Vendor, Lessee and Lessor with respect to the Services and Supplies and the Service and Supply Payments and this Rider may not be amended except in writing signed by all parties. This Rider shall be governed by and construed in accordance with the laws of the Lessee’s state. This Rider may be simultaneously executed in counterparts; each shall be an original with all being the same instrument. IN WITNESS WHEREOF, Vendor, Lessor and Lessee have caused this Services and Supplies Rider to be executed in their names by their duly authorized representatives. TOSHIBA FINANCIAL SERVICES TOSHIBA BUSINESS SOLUTIONS Lessor Vendor X Signature Signature Print Name Title Print Name Title CITY OF SARATOGA CITY OF SARATOGA Lessee Attest XX Signature Signature Print Name Title Print Name Title Print Name Title Print Name Title 47 REV 11/15 Appendix A Description of Services and Supplies Maintenance by Vendor during normal business hours, inspection, adjustment, parts replacement, drums, cleaning material required for proper operation and black toner and developer. Description of Service and Supply Payments 60 Monthly Service and Supply Payments of $ 0.00 Service and Supply Payment includes 0 B&W Pages per month Overage Charge: $ 0.0045 per B&W page billed monthly Service and Supply Payment includes 0 Color Pages per month Overage Charge: $ 0.032 per Color page billed monthly Overage Charges: Lessee shall provide periodic meter readings on the Property. If Lessee makes more than the applicable included pages in any period, Lessee agrees to pay an additional amount equal to the number of excess pages made during such period, multiplied by the applicable overage charge. Regardless of the number of pages made each period, Lessee will never pay less th an the Service and Supply Payment amount. 48 Exhibit A APPLICATION NO. 3088713 Property Description VENDOR TOSHIBA BUSINESS SOLUTIONS STREET ADDRESS CITY STATE ZIP 12657 ALCOSTA BLVE STE 100 SAN RAMON CA 94583 PROPERTY DESCRIPTION QUANTITY DESCRIPTION SERIAL NUMBER PROPERTY LOCATION 3 TOSHIBA ES 6525AC 13777 FRUITVALE AVE SARATOGA, CA 95070 1 TOSHIBA ES3525AC 19700 ALLENDALE AVENUE SARATOGA, CA 95070 LESSEE ACCEPTANCE CITY OF SARATOGA X NAME OF LESSEE SIGNATURE TITLE DATED TITLE DATED 49 Exhibit B APPLICATION NO. 3088713 Amortization and Lease Payment Schedule Term: 60 months Payment Structure: Monthly Interest Rate: 8.86% Beginning Balance includes $3,306.65 for sales tax. If the Lease Payment Dates are not defined in this Amortization and Lease Payment Schedule, the first Lease Payment shall be du e 30 days after the Commencement Date and each subsequent Lease Payment shall be due monthly thereafter. Payment No. Lease Payment Interest Portion Principal Portion Outstanding Balance Termination Amount (After Making Said Payment) Beginning Balance 39,543.96 1 818.16 291.93 526.23 39,017.73 40,188.26 2 818.16 288.04 530.12 38,487.61 39,642.24 3 818.16 284.13 534.03 37,953.58 39,092.19 4 818.16 280.19 537.97 37,415.61 38,538.08 5 818.16 276.21 541.95 36,873.66 37,979.87 6 818.16 272.21 545.95 36,327.71 37,417.54 7 818.16 268.18 549.98 35,777.73 36,851.06 8 818.16 264.12 554.04 35,223.69 36,280.40 9 818.16 260.03 558.13 34,665.56 35,705.53 10 818.16 255.91 562.25 34,103.31 35,126.41 11 818.16 251.76 566.40 33,536.91 34,543.02 12 818.16 247.58 570.58 32,966.33 33,955.32 13 818.16 243.37 574.79 32,391.54 33,363.29 14 818.16 239.12 579.04 31,812.50 32,766.88 15 818.16 234.85 583.31 31,229.19 32,166.07 16 818.16 230.54 587.62 30,641.57 31,560.82 17 818.16 226.21 591.95 30,049.62 30,951.11 18 818.16 221.84 596.32 29,453.30 30,336.90 19 818.16 217.43 600.73 28,852.57 29,718.15 20 818.16 213.00 605.16 28,247.41 29,094.83 21 818.16 208.53 609.63 27,637.78 28,466.91 22 818.16 204.03 614.13 27,023.65 27,834.36 23 818.16 199.50 618.66 26,404.99 27,197.14 24 818.16 194.93 623.23 25,781.76 26,555.21 25 818.16 190.33 627.83 25,153.93 25,908.55 26 818.16 185.69 632.47 24,521.46 25,257.10 27 818.16 181.03 637.13 23,884.33 24,600.86 28 818.16 176.32 641.84 23,242.49 23,939.76 29 818.16 171.58 646.58 22,595.91 23,273.79 50 30 818.16 166.81 651.35 21,944.56 22,602.90 31 818.16 162.00 656.16 21,288.40 21,927.05 32 818.16 157.16 661.00 20,627.40 21,246.22 33 818.16 152.28 665.88 19,961.52 20,560.37 34 818.16 147.36 670.80 19,290.72 19,869.44 35 818.16 142.41 675.75 18,614.97 19,173.42 36 818.16 137.42 680.74 17,934.23 18,472.26 37 818.16 132.40 685.76 17,248.47 17,765.92 38 818.16 127.33 690.83 16,557.64 17,054.37 39 818.16 122.23 695.93 15,861.71 16,337.56 40 818.16 117.10 701.06 15,160.65 15,615.47 41 818.16 111.92 706.24 14,454.41 14,888.04 42 818.16 106.71 711.45 13,742.96 14,155.25 43 818.16 101.45 716.71 13,026.25 13,417.04 44 818.16 96.16 722.00 12,304.25 12,673.38 45 818.16 90.83 727.33 11,576.92 11,924.23 46 818.16 85.46 732.70 10,844.22 11,169.55 47 818.16 80.06 738.10 10,106.12 10,409.30 48 818.16 74.61 743.55 9,362.57 9,643.45 49 818.16 69.12 749.04 8,613.53 8,871.94 50 818.16 63.59 754.57 7,858.96 8,094.73 51 818.16 58.02 760.14 7,098.82 7,311.78 52 818.16 52.41 765.75 6,333.07 6,523.06 53 818.16 46.75 771.41 5,561.66 5,728.51 54 818.16 41.06 777.10 4,784.56 4,928.10 55 818.16 35.32 782.84 4,001.72 4,121.77 56 818.16 29.54 788.62 3,213.10 3,309.49 57 818.16 23.72 794.44 2,418.66 2,491.22 58 818.16 17.86 800.30 1,618.36 1,666.91 59 818.16 11.95 806.21 812.15 836.51 60 818.16 6.01 812.15 0.00 0.00 49,089.60 9,545.64 39,543.96 The interest rate and Amortization and Lease Payment Schedule are effective so long as the Property is accepted by 7/28/2024, after which the interest rate and Amortization and Lease Payment Schedule are subject to revision to current market conditions at the actual time of acceptance. This Amortization and Lease Payment Schedule is hereby verified as correct by the undersigned, who acknowledges receipt of a copy. LESSEE ACCEPTANCE CITY OF SARATOGA X NAME OF LESSEE SIGNATURE TITLE DATEDTITLEDATED 51 Exhibit C APPLICATION NO. 3088713 Certificate of Acceptance This Certificate of Acceptance is pursuant to Tax-Exempt Lease/Purchase Agreement dated as of _______________________ and the related Property Schedule, between Lessor and Lessee (the "Agreement"). 1. Property Acceptance. Lessee hereby certifies and represents to Lessor that the Property referenced in the Agreement has been acquired, made, delivered, installed and accepted as of the date indicated below. Lessee has conducted such inspection and/or testing of the Property as it deems necessary and appropriate and hereby acknowledges that it accepts the Property for all purposes. Lessee will immediately begin making Lease Payments in accordance with the times and amounts specified herein. LESSOR MAKES NO (AND SHALL NOT BE DEEMED TO HAVE MADE ANY) WARRANTIES, EXPRESS OR IMPLIED, AS TO ANY MATTER WHATSOEVER, INCLUDING, WITHOUT LIMITATION, THE DESIGN, OPERATION OR CONDITION OF, OR THE QUALITY OF THE MATERIAL, EQUIPMENT OR WORKMANSHIP IN, THE PROPERTY, ITS MERCHANTABILITY OR ITS FITNESS FOR ANY PARTICULAR PURPOSE, THE STATE OF TITLE THERETO OR ANY COMPONENT THEREOF, THE ABSENCE OF LATENT OR OTHER DEFECTS (WHETHER OR NOT DISCOVERABLE), AND LESSOR HEREBY DISCLAIMS THE SAME; IT BEING UNDERSTOOD THAT THE PROPERTY IS LEASED TO LESSEE "AS IS" ON THE DATE OF THIS AGREEMENT OR THE DATE OF DELIVERY, WHICHEVER IS LATER, AND ALL SUCH RISKS, IF ANY, ARE TO BE BORNE BY LESSEE. 2. Billing Address. If billing address differs from the address listed on the Tax-Exempt Lease/Purchase Agreement please list below: BILLING NAME STREET ADDRESS CITY STATE ZIP The interest rate and Amortization and Lease Payment Schedule are effective so long as the Property is accepted by 7/28/2024, after which the interest rate and Amortization and Lease Payment Schedule are subject to revision to current market conditions at the actual time of acceptance. IN WITNESS WHEREOF, Lessee has caused this Certificate of Acceptance to be executed by their duly authorized representative. Acceptance Date CITY OF SARATOGA Lessee X Signature Print Name TitlePrint Name Title Acceptance Date 52 Exhibit D APPLICATION NO. 3088713 Lessee’s General and Incumbency Certificate GENERAL CERTIFICATE Re: Tax-Exempt Lease/Purchase Agreement and Property Schedule dated as of _____________________, between CITY OF SARATOGA, as Lessee (“Lessee”) and TOSHIBA FINANCIAL SERVICES as Lessor. The undersigned, being the duly elected, qualified and acting official of Lessee holding the title stated in the signature line below, does hereby certify as of the date of this Certificate and the date of the Agreement (as defined below), as follows: 1. If required by applicable law, Lessee did, at a meeting of the governing body of the Lessee, by resolution or ordinance duly enacted, in accordance with all requirements of law, approve and authorize the execution and delivery of the above-referenced Property Schedule (the "Property Schedule") and the Tax-Exempt Lease/Purchase Agreement (the “Agreement”) by the undersigned. 2. If the aforementioned meeting(s) was required by applicable law, the meeting(s) of the governing body of the Lessee at which the Agreement and the Property Schedule were approved and authorized to be executed was duly called, regularly convened and attended throughout by the requisite quorum of the members thereof, and the enactment approving the Agreement and the Property Schedule and authorizing the execution thereof has not been altered or rescinded. All meetings required by applicable law of the governing body of Lessee relating to the authorization and delivery of Agreement and the Property Schedule have been: (a) held within the geographic boundaries of the Lessee; (b) open to the public, allowing all people to attend; (c) conducted in accordance with internal procedures of the governing body; and (d) conducted in accordance with the charter of the Lessee, if any, and the laws of the State. 3. No event or condition that constitutes, or with the giving of notice or the lapse of time or both would constitute, an Event of Default or a Nonappropriation Event (as such terms are defined in the Agreement) exists at the date hereof with respect to this Property Schedule under the Agreement. 4. The acquisition of all of the Property under the Agreement and the Property Schedule has been duly authorized by the governing body of Lessee. 5. Lessee has, in accordance with the requirements of law, fully budgeted and appropriated sufficient funds for the current budget year to make the Lease Payments scheduled to come due during the current budget year under the Agreement and the Property Schedule and to meet its other obligations for the current budget year and such funds have not been expended for other purposes. 6. As of the date hereof, no litigation is pending, (or, to my knowledge, threatened) against Lessee in any court (a) seeking to restrain or enjoin the delivery of the Agreement or the Property Schedule or of other agreements similar to the Agreement; (b) questioning the authori ty of Lessee to execute the Agreement or the Property Schedule, or the validity of the Agreement or the Property Schedule, or the payment of principal of or interest on, the Property Schedule; (c) questioning the constitutionality of any statute, or the validity of any proceedings, authorizing the execution of the Agreement and the Property Schedule; or (d) affecting the provisions made for the payment of or security for the Agreement and the Property Schedule. IN WITNESS WHEREOF, the undersigned has signed this Certificate on the date stated below. CITY OF SARATOGA X Lessee Signature of Person to Sign Agreement Print Title of Person to Sign Agreement Print Name of Person to Sign Agreement Print Date that Above Person Signed this Certificate INCUMBENCY CERTIFICATE Re: Tax-Exempt Lease/Purchase Agreement and Property Schedule dated as of ___________________, between CITY OF SARATOGA, as Lessee (“Lessee”) and TOSHIBA FINANCIAL SERVICES as Lessor (“Agreement”). The undersigned, being the duly elected, qualified and acting Secretary, Clerk, or other duly authorized official or signatory of the Lessee does hereby certify, as of the date of this Certificate and the date of the Agreement (as defined in the General Certificate above), as follows: As of the date of the meeting(s) of the governing body of the Lessee at which the above-referenced Agreement and the Property Schedule were approved and authorized to be executed, and as of the date hereof, the below-named representative of the Lessee held and holds the office set forth below, and the signature set forth below is his/her true and correct signature. NAME OF PERSON SIGNING AGREEMENT TITLE OF PERSON SIGNING AGREEMENT SIGNATURE OF PERSON SIGNING AGREEMENT X IN WITNESS WHEREOF, the undersigned has signed this Certificate on the date stated below. X Signature of Secretary, Clerk or other duly authorized official or signatory of Lessee (Cannot be same as Person Signing Agreement) Print Title of Person who signed this Certificate Print Name of Person Signing this Certificate Print Date that Above Person Signed this Certificate Print Name of Person to Sign Agreement Print Date that Above Person Signed this Certificate Print Title of Person to Sign Agreement NAME TITLE OF PERSON SIGNING AGREEMENT OF PERSON SIGNING AGREEMENT Print Title of Person who signed this Certificate Print Name of Person Signing this Certificate Print Date that Above Person Signed this Certificate 53 APPLICATION NO. 3088713 Insurance Authorization and Verification Re: Tax-Exempt Lease/Purchase Agreement dated as of _______________________, between Lessee and Lessor. Lessor: TOSHIBA FINANCIAL SERVICES 1310 Madrid Street, Ste. 101 Marshall, MN 56258 Lessee: CITY OF SARATOGA 13777 FRUITVALE AVE SARATOGA, CA 95070 TO THE LESSEE: In connection with the above-referenced Tax-Exempt Lease/Purchase Agreement and the Property Schedule thereunder each dated _____________________ (the “Agreement”), Lessor requires proof in the form of this document, executed by both Lessee* and Lessee’s agent, that Lessee's insurable interest in the financed property (the “Property”) meets Lessor’s requirements as follows, with coverage including, but not limited to, fire, extended coverage, vandalism, and theft: LESSOR, AND ITS SUCCESSORS AND ASSIGNS, shall be covered as both ADDITIONAL INSURED and LENDER'S LOSS PAYEE with regard to all equipment financed or leased by policy holder through or from Lessor. All such insurance shall contain a provision to the effect that such insurance shall not be canceled or modified without first giving written notice thereof to Lessor and Lessee at least thirty (30) days in advance of such cancellation or modification. Lessee must carry GENERAL LIABILITY (and/or, for vehicles, Automobile Liability) in the amount of no less than $1,000,000.00 (one million dollars). Lessee must carry PROPERTY Insurance (or, for vehicles, Physical Damage Insurance) in an amount no less than the 'Insurable Value' $39,543.96, with deductibles no more than $10,000.00. *Lessee: Please execute this form and return with your document package. Lessor will fax this form to your insurance agency for endorsement. In lieu of agent endorsement, Lessee’s agency may submit insurance certificates demonstrating compliance with all requirements. Should you have any questions, please contact TOSHIBA FINANCIAL SERVICES at 800-828-8246. By signing, Lessee authorizes the Agent named below: 1) to complete and return this form as indicated; and 2) to endorse the policy and subsequent renewals to reflect the required coverage as outlined above. NAME OF AGENCY NAME OF AGENT STREET ADDRESS CITY STATE ZIP PHONE FAX E-MAIL LESSEE ACCEPTANCE CITY OF SARATOGA X NAME OF LESSEE SIGNATURE TITLE DATED TO THE AGENT: In lieu of providing a certificate, please execute this form in the space below and promptly fax it to Lessor at 866-405-8329. This fully endorsed form shall serve as proof that Lessee's insurance meets the above requirements. Agent hereby verifies that the above requirements have been met in regard to the Property listed below. AGENT ACCEPTANCE X NAME OF AGENCY SIGNATURE PRINT NAME DATED Insurable Value: $39,543.96 ATTACHED: PROPERTY DESCRIPTION FOR THE AGREEMENT. TITLE DATED 54 Form 8038-GC (Rev. October 2021) Information Return for Small Tax-Exempt Governmental Bond Issues, Leases, and Installment Sales Department of the Treasury Internal Revenue Service a Under Internal Revenue Code section 149(e) Caution: If the issue price of the issue is $100,000 or more, use Form 8038-G. a Go to www.irs.gov/Form8038GC for instructions and the latest information. OMB No. 1545-0047 Part I Reporting Authority Check box if Amended Return a 1 Issuer’s name 2 Issuer’s employer identification number (EIN) 3 Number and street (or P.O. box if mail isn’t delivered to street address) Room/suite 4 City, town, or post office, state, and ZIP code 5 Report number (For IRS Use Only) 6 Name and title of officer or other employee of issuer or designated contact person whom the IRS may call for more information 7 Telephone number of officer or legal representative Part II Description of Obligations Check one box: Single issue Consolidated return 8a Issue price of obligation(s) (see instructions) ...................8a b Issue date (single issue) or calendar date (consolidated). Enter date in MM/DD/YYYY format (for example, 01/01/2009) (see instructions) a 9 Amount of the reported obligation(s) on line 8a that is: a For leases for vehicles ..........................9a b For leases for office equipment ........................ 9b c For leases for real property ......................... 9c d For leases for other (see instructions) ......................9d e For bank loans for vehicles .........................9e f For bank loans for office equipment ...................... 9f g For bank loans for real property .......................9g h For bank loans for other (see instructions) ....................9h i Used to refund prior issue(s) ........................9i j Representing a loan from the proceeds of another tax-exempt obligation (for example, bond bank) .9j k Other ................................ 9k 10 If the issuer has designated any issue under section 265(b)(3)(B)(i)(III) (small issuer exception), check this box ....a 11 If the issuer has elected to pay a penalty in lieu of arbitrage rebate, check this box (see instructions) .......a 12 Vendor’s or bank’s name: 13 Vendor’s or bank’s employer identification number: Signature and Consent Under penalties of perjury, I declare that I have examined this return and accompanying schedules and statements, and to the best of my knowledge and belief, they are true, correct, and complete. I further declare that I consent to the IRS’s disclosure of the issuer’s return information, as necessary to process this return, to the person(s) that I have authorized above. F Signature of issuer’s authorized representative Date F Type or print name and title Paid Preparer Use Only Print/Type preparer’s name Preparer’s signature Date Check if self-employed PTIN Firm’s name a Firm’s EIN a Firm’s address a Phone no. Future Developments For the latest information about developments related to Form 8038-GC and its instructions, such as legislation enacted after they were published, go to www.irs.gov/Form8038GC. General Instructions Section references are to the Internal Revenue Code unless otherwise noted. Purpose of Form Form 8038-GC is used by the issuers of tax- exempt governmental obligations to provide the IRS with the information required by section 149(e) and to monitor the requirements of sections 141 through 150. Who Must File Issuers of tax-exempt governmental obligations with issue prices of less than $100,000 must file Form 8038-GC. Issuers of a tax-exempt governmental obligation with an issue price of $100,000 or more must file Form 8038-G, Information Return for Tax-Exempt Governmental Bonds. Filing a separate return for a single issue. Issuers have the option to file a separate Form 8038-GC for any tax-exempt governmental obligation with an issue price of less than $100,000. An issuer of a tax-exempt bond used to finance construction expenditures must file a separate Form 8038-GC for each issue to give notice to the IRS that an election was made to pay a penalty in lieu of arbitrage rebate. See the instructions for line 11, later. Filing a consolidated return for multiple issues. For all tax-exempt governmental obligations with issue prices of less than $100,000 that aren’t reported on a separate Form 8038-GC, an issuer must file a consolidated information return including all such issues issued within the calendar year. Thus, an issuer may file a separate Form 8038-GC for each of a number of small issues and report the remainder of small issues issued during the calendar year on one consolidated Form 8038-GC. However, if the issue is a construction issue, a separate Form 8038-GC must be filed to give the IRS notice of the election to pay a penalty in lieu of arbitrage rebate. For Paperwork Reduction Act Notice, see instructions.Cat. No. 64108B Form 8038-GC (Rev. 10-2021) 55 Form 8038-GC (Rev. 10-2021) Page 2 When To File To file a separate return for a single issue, file Form 8038-GC on or before the 15th day of the 2nd calendar month after the close of the calendar quarter in which the issue is issued. To file a consolidated return for multiple issues, file Form 8038-GC on or before February 15 of the calendar year following the year in which the issue is issued. Late filing. An issuer may be granted an extension of time to file Form 8038-GC under section 3 of Rev. Proc. 2002-48, 2002-37 I.R.B. 531, if it is determined that the failure to file on time isn’t due to willful neglect. Write at the top of the form, “Request for Relief under section 3 of Rev. Proc. 2002-48.” Attach to the Form 8038-GC a letter briefly stating why the form wasn’t submitted to the IRS on time. Also, indicate whether the obligation in question is under examination by the IRS. Don’t submit copies of any bond documents, leases, or installment sale documents. See Where To File next. Where To File File Form 8038-GC and any attachments at the following address. Department of the Treasury Internal Revenue Service Center Ogden, UT 84201 Private delivery services (PDS). You can use certain PDS designated by the IRS to meet the “timely mailing as timely filing/paying” rule for tax returns and payments. These PDS include only the following: • DHL Express (DHL): DHL Same Day Service. • Federal Express (FedEx): FedEx Priority Overnight, FedEx Standard Overnight, FedEx 2Day, FedEx International Priority, and FedEx International First. • United Parcel Service (UPS): UPS Next Day Air, UPS Next Day Air Saver, UPS 2nd Day Air, UPS 2nd Day Air A.M., UPS Worldwide Express Plus, and UPS Worldwide Express. The PDS can tell you how to get written proof of the mailing date. Other Forms That May Be Required For rebating arbitrage (or paying a penalty in lieu of arbitrage rebate) to the federal government, use Form 8038-T, Arbitrage Rebate, Yield Reduction and Penalty in Lieu of Arbitrage Rebate. For private activity bonds, use Form 8038, Information Return for Tax-Exempt Private Activity Bond Issues. For a tax-exempt governmental obligation with an issue price of $100,000 or more, use Form 8038-G. Rounding to Whole Dollars You may show the money items on this return as whole-dollar amounts. To do so, drop any amount less than 50 cents and increase any amount from 50 to 99 cents to the next higher dollar. For example, $1.49 becomes $1 and $2.50 becomes $3. If two or more amounts must be added to figure the amount to enter on a line, include cents when adding the amounts and round off only the total. Definitions Obligations. This refers to a single tax- exempt governmental obligation if Form 8038-GC is used for separate reporting or to multiple tax-exempt governmental obligations if the form is used for consolidated reporting. Tax-exempt obligation. This is any obligation including a bond, installment purchase agreement, or financial lease on which the interest is excluded from income under section 103. Tax-exempt governmental obligation. A tax-exempt obligation that isn’t a private activity bond (see below) is a tax-exempt governmental obligation. This includes a bond issued by a qualified volunteer fire department under section 150(e). Private activity bond. This includes an obligation issued as part of an issue in which: • More than 10% of the proceeds are to be used for any private activity business use, and • More than 10% of the payment of principal or interest of the issue is either (a) secured by an interest in property to be used for a private business use (or payments for such property) or (b) to be derived from payments for property (or borrowed money) used for a private business use. It also includes a bond, the proceeds of which (a) are to be used to make or finance loans (other than loans described in section 141(c)(2)) to persons other than governmental units and (b) exceeds the lesser of 5% of the proceeds or $5 million. Issue. Generally, obligations are treated as part of the same issue only if they are issued by the same issuer, on the same date, and as part of a single transaction, or a series of related transactions. However, obligations issued during the same calendar year (a) under a loan agreement under which amounts are to be advanced periodically (a “draw- down loan”) or (b) with a term not exceeding 270 days, may be treated as part of the same issue if the obligations are equally and ratably secured under a single indenture or loan agreement and are issued under a common financing arrangement (for example, under the same official statement periodically updated to reflect changing factual circumstances). Also, for obligations issued under a draw- down loan that meets the requirements of the preceding sentence, obligations issued during different calendar years may be treated as part of the same issue if all of the amounts to be advanced under the draw-down loan are reasonably expected to be advanced within 3 years of the date of issue of the first obligation. Likewise, obligations (other than private activity bonds) issued under a single agreement that is in the form of a lease or installment sale may be treated as part of the same issue if all of the property covered by that agreement is reasonably expected to be delivered within 3 years of the date of issue of the first obligation. Arbitrage rebate. Generally, interest on a state or local bond isn’t tax-exempt unless the issuer of the bond rebates to the United States arbitrage profits earned from investing proceeds of the bond in higher yielding nonpurpose investments. See section 148(f). Construction issue. This is an issue of tax- exempt bonds that meets both of the following conditions: 1. At least 75% of the available construction proceeds of the issue are to be used for construction expenditures with respect to property to be owned by a governmental unit or a 501(c)(3) organization, and 2. All of the bonds that are part of the issue are qualified 501(c)(3) bonds, bonds that aren’t private activity bonds, or private activity bonds issued to finance property to be owned by a governmental unit or a 501(c)(3) organization. In lieu of rebating any arbitrage that may be owed to the United States, the issuer of a construction issue may make an irrevocable election to pay a penalty. The penalty is equal to 1-1/2% of the amount of construction proceeds that do not meet certain spending requirements. See section 148(f)(4)(C) and the Instructions for Form 8038-T. Specific Instructions In general, a Form 8038-GC must be completed on the basis of available information and reasonable expectations as of the date of issue. However, forms that are filed on a consolidated basis may be completed on the basis of information readily available to the issuer at the close of the calendar year to which the form relates, supplemented by estimates made in good faith. Part I—Reporting Authority Amended return. An issuer may file an amended return to change or add to the information reported on a previously filed return for the same date of issue. If you are filing to correct errors or change a previously filed return, check the Amended Return box in the heading of the form. The amended return must provide all the information reported on the original return, in addition to the new corrected information. Attach an explanation of the reason for the amended return and write across the top “Amended Return Explanation.” Line 1. The issuer’s name is the name of the entity issuing the obligations, not the name of the entity receiving the benefit of the financing. In the case of a lease or installment sale, the issuer is the lessee or purchaser. Line 2. An issuer that doesn’t have an employer identification number (EIN) should apply for one online by visiting the IRS website at www.irs.gov/EIN. The organization may also apply for an EIN by faxing or mailing Form SS-4 to the IRS. Lines 3 and 4. Enter the issuer’s address or the address of the designated contact person listed on line 6. If the issuer wishes to use its own address and the issuer receives its mail in care of a third party authorized representative (such as an accountant or attorney), enter on the street address line “C/O” followed by the third party’s name and street address or P.O. box. Include the suite, room, or other unit number after the street address. If the post office doesn’t deliver 56 Form 8038-GC (Rev. 10-2021) Page 3 mail to the street address and the issuer has a P.O. box, show the box number instead of the street address. If a change in address occurs after the return is filed, use Form 8822, Change of Address, to notify the IRS of the new address. Note: The address entered on lines 3 and 4 is the address the IRS will use for all written communications regarding the processing of this return, including any notices. By authorizing a person other than an authorized officer or other employee of the issuer to communicate with the IRS and whom the IRS may contact about this return, the issuer authorizes the IRS to communicate directly with the individual listed on line 6, whose address is entered on lines 3 and 4 and consents to disclose the issuer’s return information to that individual, as necessary, to process this return. Line 5. This line is for IRS use only. Don’t make any entries in this box. Part II—Description of Obligations Check the appropriate box designating this as a return on a single issue basis or a consolidated return basis. Line 8a. The issue price of obligations is generally determined under Regulations section 1.148-1(b). Thus, when issued for cash, the issue price is the price at which a substantial amount of the obligations are sold to the public. To determine the issue price of an obligation issued for property, see sections 1273 and 1274 and the related regulations. Line 8b. For a single issue, enter the date of issue (for example, 03/15/2020 for a single issue issued on March 15, 2020), generally the date on which the issuer physically exchanges the bonds that are part of the issue for the underwriter’s (or other purchaser’s) funds; for a lease or installment sale, enter the date interest starts to accrue. For issues reported on a consolidated basis, enter the first day of the calendar year during which the obligations were issued (for example, for calendar year 2020, enter 01/01/2020). Lines 9a through 9h. Complete this section if property other than cash is exchanged for the obligation, for example, acquiring a police car, a fire truck, or telephone equipment through a series of monthly payments. (This type of obligation is sometimes referred to as a “municipal lease.”) Also, complete this section if real property is directly acquired in exchange for an obligation to make periodic payments of interest and principal. Don’t complete lines 9a through 9d if the proceeds of an obligation are received in the form of cash even if the term “lease” is used in the title of the issue. For lines 9a through 9d, enter the amount on the appropriate line that represents a lease or installment purchase. For line 9d, enter the type of item that is leased. For lines 9e through 9h, enter the amount on the appropriate line that represents a bank loan. For line 9h, enter the type of bank loan. Lines 9i and 9j. For line 9i, enter the amount of the proceeds that will be used to pay principal, interest, or call premium on any other issue of bonds, including proceeds that will be used to fund an escrow account for this purpose. Several lines may apply to a particular obligation. For example, report on lines 9i and 9j obligations used to refund prior issues which represent loans from the proceeds of another tax-exempt obligation. Line 9k. Enter on line 9k the amount on line 8a that doesn’t represent an obligation described on lines 9a through 9j. Line 10. Check this box if the issuer has designated any issue as a “small issuer exception” under section 265(b)(3)(B)(i)(III). Line 11. Check this box if the issue is a construction issue and an irrevocable election to pay a penalty in lieu of arbitrage rebate has been made on or before the date the bonds were issued. The penalty is payable with a Form 8038-T for each 6-month period after the date the bonds are issued. Don’t make any payment of penalty in lieu of rebate with Form 8038-GC. See Rev. Proc. 92-22, 1992-1 C.B. 736, for rules regarding the “election document.” Line 12. Enter the name of the vendor or bank who is a party to the installment purchase agreement, loan, or financial lease. If there are multiple vendors or banks, the issuer should attach a schedule. Line 13. Enter the employer identification number of the vendor or bank who is a party to the installment purchase agreement, loan, or financial lease. If there are multiple vendors or banks, the issuer should attach a schedule. Signature and Consent An authorized representative of the issuer must sign Form 8038-GC and any applicable certification. Also, write the name and title of the person signing Form 8038-GC. The authorized representative of the issuer signing this form must have the authority to consent to the disclosure of the issuer’s return information, as necessary to process this return, to the person(s) that has been designated in this form. Note: If the issuer authorizes on line 6 the IRS to communicate with a person other than an officer or other employee of the issuer (such authorization shall include contact both in writing regardless of the address entered on lines 3 and 4, and by telephone), by signing this form, the issuer’s authorized representative consents to the disclosure of the issuer’s return information, as necessary to process this return, to such person. Paid Preparer If an authorized representative of the issuer filled in its return, the paid preparer’s space should remain blank. Anyone who prepares the return but does not charge the organization shouldn’t sign the return. Certain others who prepare the return shouldn’t sign. For example, a regular, full-time employee of the issuer, such as a clerk, secretary, etc., shouldn’t sign. Generally, anyone who is paid to prepare a return must sign it and fill in the other blanks in the Paid Preparer Use Only area of the return. A paid preparer cannot use a social security number in the Paid Preparer Use Only box. The paid preparer must use a preparer tax identification number (PTIN). If the paid preparer is self-employed, the preparer should enter his or her address in the box. The paid preparer must: • Sign the return in the space provided for the preparer’s signature, and • Give a copy of the return to the issuer. Paperwork Reduction Act Notice We ask for the information on this form to carry out the Internal Revenue laws of the United States. You are required to give us the information. We need it to ensure that you are complying with these laws. You are not required to provide the information requested on a form that is subject to the Paperwork Reduction Act unless the form displays a valid OMB control number. Books or records relating to a form or its instructions must be retained as long as their contents may become material in the administration of any Internal Revenue law. Generally, tax returns and return information are confidential, as required by section 6103. The time needed to complete and file this form will vary depending on individual circumstances. The estimated burden for tax exempt organizations filing this form is approved under OMB control number 1545-0047 and is included in the estimates shown in the instructions for their information return. If you have suggestions for making this form simpler, we would be happy to hear from you. You can send us comments through www.irs.gov/FormComments. Or you can write to: Internal Revenue Service Tax Forms and Publications 1111 Constitution Ave. NW, IR-6526 Washington, DC 20224 Do not send Form 8038-GC to this address. Instead, see Where To File, earlier. 57 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:Administrative Services Department PREPARED BY:Monica LaBossiere, Human Resources Manager SUBJECT:Extension of the agreement with Disability Access Consultants (DAC) until December 31, 2024 RECOMMENDED ACTION: Authorize the City Manager to execute a contract extension with Disability Access Consultants (DAC) for Americans with Disability Act (ADA) Self-Evaluation and Transition Plan until December 31, 2024. BACKGROUND: Part 35.02 of Title II of the ADA outlines the application of the ADA and Section 504 of the Rehabilitation Act, requiring state and local governments to ensure their facilities, public rights- of-way, policies, procedures, and practices are accessible and non-discriminatory towards persons with disabilities. On May 17, 2023, the Council authorized the City Manager to execute an agreement with DAC to prepare an updated ADA Self-Evaluation and Transition Plan for the City, not to exceed $33,500. This extension will provide additional time for the City and DAC to finalize the policy and provide staff training. There are no other changes to the contract terms. ATTACHMENTS: Attachment A - Original 2023 contract with DAC Attachment B - Amendment to existing contract 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 Contractor: Project: Rev. 5/2023 City of Saratoga Contract Amendment Page 1 of 2 City of Saratoga Contract Amendment This Contract Amendment is made at Saratoga, California by and between the City of Saratoga, a municipal corporation ("City"), and _______________________________ ("Contractor"), who agree that: 1. City and Contractor entered into an agreement dated ___________________ for _______________________________________________ (“Original Agreement”) and wish to amend the Original Agreement as set forth in the provisions checked below. Terms not defined in this Contract Amendment shall have the meaning used in the Original Agreement and the provisions of the Original Agreement shall apply to interpretation and enforcement of this Contract Amendment. Amended Term. The Term of the Original Agreement commenced on the Effective Date and is hereby extended through ___________________ (insert new termination date) or the completion of the project, whichever occurs first, unless it is further extended by written mutual agreement between the parties, provided that the parties retain the right to terminate this Agreement as provided in Exhibit C to the Original Agreement. Amended Scope of Work. The Scope of Work terms included as Exhibit(s) ______________________ to the Original Agreement are hereby: supplemented with additional Scope of Works terms included as Exhibit ______ to this Contract Amendment; AND/OR extended to include providing the ongoing services referenced in the Original Agreement for the duration of the amended term. Amended Payment Terms. The first sentence of section 3 of the Original Agreement setting forth the maximum contract payment is hereby replaced with the following: City shall pay Contractor for work product produced pursuant to this agreement an amount not to exceed the total sum of $_______________________________________________ for work to be performed and any authorized reimbursable costs. AND/OR See Exhibit(s) ______ 2. All other provisions of the Original Agreement remain unchanged by this Contract Amendment. 85 Contractor: Project: Rev. 5/2023 City of Saratoga Contract Amendment Page 2 of 2 3. Exhibits. All attachments to this agreement are by this reference incorporated herein and made a part of this agreement. Additional Exhibits: IN WITNESS WHEREOF, the parties hereto have executed this Amendment. Contractor City of Saratoga Signature City Manager Date: Signer Name ATTEST: Signer Title Date: City Clerk Contract Description: Date: APPROVED AS TO FORM: City Attorney’s Office Date: 86 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:Finance & Administrative Services PREPARED BY:Leo Salindong, IT Manager SUBJECT:Contract for IT Support Services with ZAG Technical Services RECOMMENDED ACTION: Authorize the City Manager to execute a three-year contract agreement with ZAG Technical Services (ZAG) for IT Support Services. BACKGROUND: The City of Saratoga began using ZAG in 2006, to provide high-level technical assistance in the implementation of several IT projects, including server infrastructure setup, virtualization, network topology, security enhancements, emergency support services, data backup solutions, cloud service, and cybersecurity. Accessibility to ZAG’s diverse base of knowledge, skillsets, support services, and new technology information is a critical component to comprehensively managing the City’s IT Services, which is managed internally by two City staff. Having access to this high level of expertise helps to prevent or minimize potential IT issues, such as security breaches or data loss, and to assist in making informed decisions to keep the City’s network data secure. FISCAL IMPACT: Funding for this agreement with ZAG is included in the fiscal year 2024-25 IT Services budget. The total contract amount for three years is $225,000, with an amount not to exceed $75,000 per fiscal year. ATTACHMENT: Attachment A – ZAG Technical Services Agreement 87 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract Page 1 of 3 City of Saratoga Standard Services Contract This agreement is entered into at Saratoga, California by and between the City of Saratoga, a municipal corporation (“City”), and ______________________________________ (“Consultant”), who agree that: 1. Purpose of Contract. This is a contract for: The purpose of the contract is more specifically described in Exhibit A of this agreement (“Scope of Work and Payment Terms”). In the event of a conflict between (1) the “Scope of Work and Payment Terms” in Exhibit A or any of the exhibits included in Exhibit A and (2) the other terms of this agreement, the other terms of the agreement shall govern. 2. Term. Start Date: End Date: (If Start Date is left blank, start date will be date last signed below.) Or upon project completion, whichever occurs first. 3. Payment. City shall pay Consultant for work product produced and any authorized reimbursable costs pursuant to this agreement an amount not to exceed the total sum of: $___________________________________________________. If this contract is for more than one year, the maximum payment amount for each year is set forth in Exhibit A. Consultant agrees to comply with payment terms set forth in Exhibit A. Consultant is not authorized to undertake any efforts or incur any costs whatsoever under the terms of this agreement until receipt from City of a fully executed copy of this agreement. 4. Contract Administration. The authorized representatives of City and Consultant for Contract administration are listed below. The City’s Primary Representative is the Administrator. Consultant : Consultant Name: Contact Person: Street Address: 88 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract Page 2 of 3 City, State, Zip: Telephone(s): Email Address: Saratoga Business Lic. #: (Contractor shall maintain a Saratoga Business License for the Term of this agreement) City of Saratoga Department: Primary Representative: Street Address: City, State, Zip: Telephone: Email Address: 5. Addresses for Notice. Notices or communications shall be given to the parties at the addresses set forth in Section 4 (“Contract Administration”) unless otherwise designated in a written notice to the other party. In addition, notices to City shall be copied to: City Manager City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 City Clerk City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 These copies shall not constitute notice. 6. Change of Address. Any party hereto, by giving ten (10) days written notice to the other, may designate any other address as substitution of the address to which the notice or communication shall be given. 7. Insurance. Consultant agrees to procure and maintain insurance as required by the provisions set forth in Exhibit B (“Insurance”). Certificates of such insurance and copies of the insurance policies and endorsements shall be delivered to City within ten (10) days after being notified of the award of the contract, and before execution of this agreement by the City. 8. General Provisions. City and Consultant agree to and shall abide by the general provisions set forth in Exhibit C (“General Provisions”). 89 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract Page 3 of 3 9. Supplemental Provisions. If one or both boxes are checked below this agreement includes supplemental provisions described in connection with the checked box(es): This agreement is funded in whole or in part by an entity other than City. Consultant shall comply with all rules and regulations required by such funding entity. Applicable funding entity requirements are set forth in Exhibit D (“Funding Agency Requirements”). Nothing in this paragraph or in the funding entity requirements shall be construed to relieve Consultant of its duty to ensure that it is in compliance with all applicable laws and regulations. Exhibit E (“Special Requirements”) sets forth provisions regarding: 10. Exhibits. All exhibits referred to in this agreement are attached hereto and are by this reference incorporated herein and made a part of this agreement. 11. Entire agreement. This agreement supersedes any and all agreements, either oral or written, between the parties with respect to Consultant’s completion of the Scope of Work on behalf of City and contains all of the covenants and agreements between the parties with respect to the rendering of such services in any manner whatsoever. No amendment, alteration, or variation of the terms of this agreement shall be valid unless made in writing and signed by the parties hereto. 12. Authority to Execute agreement. Each individual executing this agreement represents that he or she is duly authorized to sign and deliver the agreement on behalf of the party indicated and that this agreement is binding on such party in accordance with its terms. This agreement may be executed in counterparts, each of which shall be deemed an original, but all of which taken together shall constitute one and the same instrument. IN WITNESS WHEREOF, the parties hereto have executed this agreement. Consultant City of Saratoga Signature City Manager Date: Signer Name ATTEST: Signer Title Date: City Clerk Contract Description: Date: APPROVED AS TO FORM: City Attorney’s Office Date: 90 Contractor: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit A Page 1 of 2 City of Saratoga Services Contract Exhibit A – Scope of Work and Payment Terms Consultant shall complete the scope of work and invoice the City in accordance with the payment terms shown below: AND/OR See Exhibit(s) A- incorporated by this reference. 91 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract Page 2 of 2 Payment Terms: The payments specified in this paragraph shall be the only payments to be made to Consultant in connection with Consultant’s completion of the Scope of Work pursuant to this agreement. Reimbursable expenses shall be billed only at their actual cost. Consultant shall submit all billings to City and City shall pay such billings in the manner specified in this paragraph. Payment shall be made payable to Consultant and delivered to the address specified in Section 4 on pages 1 and 2 of this agreement. The making of any payment by City, or the receipt thereof by the Consultant, shall in no way lessen the liability of the Consultant to correct or revise unsatisfactory work, even though the unsatisfactory character of such work may not have been apparent or detected at the time such payment was made. City may withhold payment to Consultant in any instance in which the Consultant has failed or refused to satisfy any material obligation provided for in this agreement. In no event shall City be liable for interest or late charges for any late payments. Consultant shall submit invoices, not more often than once a month during the term of this agreement, based on the cost for work performed in accordance with the either the hourly rates or task-based rates in the Scope of Work and authorized reimbursable expenses incurred prior to the invoice date. Invoices shall contain the following information: 1.1 Serial identifications of bills, i.e., Bill No. 1; 1.2 The beginning and ending dates of the billing period; 1.3 A summary containing the total contract amount, the amount of prior billings, the total due this period, percentage of work completed, the remaining balance available for all remaining billing periods, and a brief description of work completed during the billing period. City shall make monthly payments, based on such invoices, for satisfactory progress in completion of the Scope of Work, and for authorized reimbursable expenses incurred. City shall not be obligated to pay Consultant for work performed that falls outside the Scope of Work. -End of Exhibit A - 92 Exhibit A-1 Scope of Work Contractor shall complete the following scope of work: Emergency Support Services On a continuous basis, Contractor shall provide a dedicated telephone number with voice mail messaging and pager service, for the purpose of City contacting Contractor’s support professional. Contractor shall provide professional telephone support services within 2 hours of City contacting dedicated telephone number. Contractor may limit the number of City Staff allowed to call emergency support services to no less than 4 staff members, as designated by City. For a critical emergency, which shall be defined to include any failure of the City’s network hardware or software that causes a substantial reduction in the effective operations of the City’s computer network, Contractor shall dispatch qualified staff to City Hall for arrival within 4 hours of City contacting dedicated telephone number. Other Support Services Contractor agrees to provide support for network, server, and PC, hardware and software, installations, maintenance, upgrades, troubleshooting, and special projects at the request of the IT Manager or designee. Rate Schedule for City of Saratoga Resource Level Rate per Hour Senior Solution Architect $300 Solution Architect $250 System Engineer II $205 System Engineer I $195 Normal Hours – 6:00 AM to 5:00 PM (Occasional work before 8:00 AM allowed at normal hourly rate to minimize network disturbance, at ZAG’s discretion.) Minimum phone support time will be ¼ hour per call, at above rates. Overtime will be billed as follows: Weekdays 5:00 PM to 7:00 PM Time and one-half Weekdays 7:00 PM to 6:00 AM Double Time Weekends and City Holidays Double Time 93 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit B Page 1 of 3 City of Saratoga Design Services Contract Exhibit B – Insurance The insurance requirements listed below that have an “” indicated in the space before the requirement apply to this agreement together with the general requirements. Modifications to the below requirements are shown in Exhibit E (“Special Requirements”). Contractor shall provide its insurance broker(s)/agent(s) with a copy of these requirements and request that they provide certificates of insurance complete with copies of all required endorsements to the Primary Representative listed in section 4 on page 2. During the term of this agreement Contractor shall ensure that its broker(s)/agent(s) provide the Primary Representative with updated certificates of insurance reflecting continued satisfaction of the requirements of this agreement together with updated endorsements in the event of a change in the underlying insurance policy(ies), with copies emailed to cityhall@saratoga.ca.us. All endorsements shall be signed by a person authorized by that insurer to bind coverage on its behalf. City has the right to require Contractor’s insurer to provide complete, certified copies of all required insurance policies. As described in more detail below, the City, its officers, officials, employees, agents, and volunteers are to be covered as insureds. All certificates and endorsements must be received and approved by City before work commences. Insurance Requirements Commercial General Liability Insurance covering commercial general liability on an “occurrence” basis, including products and completed operations, property damage, bodily injury, personal injury, and advertising injury with coverage minimum limits of $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Auto Liability Insurance with coverage as indicated: $1,000,000 combined single limit for bodily injury and property damage $500,000 combined single limit for bodily injury and property damage Professional/Errors and Omissions Liability (“E&O”) with coverage as indicated: $1,000,000 per loss/ $1,000,000 aggregate $2,000,000 per loss/ $2,000,000 aggregate 94 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit B Page 2 of 3 Workers' Compensation as required by the State of California, with statutory limits, and Employer’s Liability Insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease. Contractor shall submit to City a waiver of subrogation endorsement in favor of City, its officers, officials, agents, employees, and volunteers. If Contractor is not required to maintain Workers’ Compensation Insurance pursuant to State law, Contractor shall file a verification of that fact with the Primary Representative. All subcontractors used must comply with the above requirements except as noted below: General Requirements As to all of the checked insurance requirements above, the following shall apply: 1. Additional Insured Status and Primary Coverage. Contractor shall submit to City an additional insured endorsement for its Commercial General Liability policy with coverage at least as broad as ISO form CG 20 10 for ongoing operations, and coverage at least as broad as ISO Form CG 20 37 for completed operations. For Auto Liability, the policy shall contain, or be endorsed to contain, additional insured coverage for the City, its officers, officials, employees, agents and volunteers. Any available insurance proceeds broader than or in excess of the minimum insurance coverage requirements and/or limits specified in this agreement shall be available to the additional insured. The requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured; whichever is greater. The additional insured coverage under Contractor’s policy shall be ''primary and non-contributory" and will not seek contribution from the City’s insurance or self-insurance and shall be at least as broad as ISO Form CG 20 01 04 13 and CG 20 38 04 13. This requirement does not apply to errors and omissions insurance. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, employees or volunteers. 2. Separation of Insureds. The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 3. Deductibles and Self Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials and employees; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. 4. Umbrella or Excess Insurance. The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City (if agreed to in a written contract or agreement) before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured. 95 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit B Page 3 of 3 5. Waiver of Subrogation. Contractor hereby grants to City a waiver of any right to subrogation which any insurer of Contractor may acquire against City by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether City has received a waiver of subrogation endorsement from the insurer. 6. Verification of Coverage. Contractor shall furnish the City with original certificates and amendatory endorsements effecting coverage required by this Exhibit. All certificates and endorsements are to be received and approved by the City before work commences. The City reserves the right to require at any time complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications and failure to exercise this right shall not constitute a waiver of any of City’s rights pursuant to this agreement. 7. Maintenance of Coverage. Contractor shall not cancel, assign, or change any policy of insurance required by this agreement or engage in any act or omission that will cause its insurer to cancel any insurance policy required by this agreement except after providing 30 days prior notice to the City. If an insurance policy required by this agreement is unilaterally cancelled or changed by the insurer, Contractor shall immediately provide written notice to the City and obtain substitute insurance meeting the requirements of this agreement. Nothing in this paragraph relieves Contractor of its obligation to maintain all insurance required by this agreement at all times during the term of the agreement. 8. Claims Made Policies. If any of the required policies provide claims-made coverage, the coverage shall be maintained for a period of five years after completion of the contract. Contractor may satisfy this requirement by renewal of existing coverage or purchase of either prior acts or tail coverage applicable to said five-year period. 9. Acceptability of Insurers. The policy or policies required by this agreement shall be issued by insurers admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide. 10. Subcontractors. Contractor agrees to include with all subcontractors in their subcontract the same requirements and provisions of this agreement including the indemnity and insurance requirements to the extent they apply to the scope of the subcontractor's work. Subcontractors hired by Contractor shall agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to the City under this agreement. Subcontractors shall further agree to include these same provisions with any sub-subcontractor. Contractor shall provide subcontractor with a copy of the indemnity and insurance provisions of this agreement as a part of Contractor’s subcontract with subcontractor. Contractor shall require all subcontractors to provide a valid certificate of insurance and the required endorsements included in the agreement prior to commencement of any work and will provide proof of compliance to the City. 11. Special Risks or Circumstances. City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. -End of Exhibit B- 96 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 1 of 9 City of Saratoga Services Contract Exhibit C – General Provisions 1. INDEPENDENT CONTRACTOR. City requires the services of a qualified consultant to provide the work product described in Exhibit A (“Scope of Work and Payment Terms”) because it lacks the qualified personnel to provide the specified work product. Consultant is qualified to provide the required work product and is agreeable to providing such work product on the terms and conditions in this agreement. 1.1 In General. At all times during the term of this agreement, Consultant shall be an independent contractor and shall not be an employee of City. Consultant shall complete the Scope of Work hereunder in accordance with currently approved methods and practices in Consultant's field. No relationship of employer and employee is created by this agreement between the City and Consultant or any subcontractor or employee of Consultant. City shall have the right to control Consultant only with respect to specifying the results to be obtained from Consultant pursuant to this agreement. City shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this agreement. Any terms in this agreement referring to direction from City shall be construed as providing for direction as to policy and the result of the Consultant’s work only, and not as to the means by which such a result is obtained. 1.2 Non-Exclusive Contract. Nothing contained in this agreement shall be construed as limiting the right of Consultant to engage in Consultant's profession separate and apart from this agreement so long as such activities do not interfere or conflict with the performance by Consultant of the obligations set forth in this agreement. Interference or conflict will be determined at the sole discretion of the City. 1.3 Standard of Care. Consultant shall complete the Scope of Work required pursuant to this agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Consultant is engaged in the geographical area in which Consultant practices its profession. All work product of whatsoever nature which Consultant delivers to City pursuant to this agreement shall be prepared in a substantial, first class and workmanlike manner and conform to the standards of quality normally observed by a person practicing in Consultant’s profession. 1.4 Qualifications. Consultant represents and warrants to City that the Consultant is qualified to perform the services as contemplated by this agreement and that all work performed under this agreement shall be performed only by personnel under the supervision of the Consultant as an employee or, if authorized by the Scope of Work, a subcontractor. All personnel engaged in the work shall be fully qualified and shall be authorized, licensed and certified under state and local law to perform such work if authorization, licensing or certification is required. The Consultant shall commit adequate resources and time to complete the project within the project schedule specified in this agreement. 97 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 2 of 9 1.5 Use of City Equipment. City shall not be responsible for any damage to persons or property as a result of the use, misuse or failure of any equipment used by Consultant, or by any of its employees, even though such equipment be furnished, rented or loaned to Consultant by City. 1.6 Payment of Taxes and Other Expenses. Should City, in its discretion, or a relevant taxing authority, including, but not limited to the Internal Revenue Service or the State Employment Development Division, determine that the Consultant is an employee for purposes of collection of any employment taxes, the amounts payable under this agreement shall be reduced by amounts equal to both the employee and employer portions of the tax due (and offsetting any credits for amounts already paid by the Consultant which can be applied against this liability). City shall then forward those amounts to the relevant taxing authority. Should a relevant taxing authority determine a liability for past services performed by the Consultant for City, upon notification of such fact by the City, the Consultant shall promptly remit such amount due or arrange with the City to have the amount due withheld from future payments to the Consultant under this agreement (again, offsetting any amounts already paid by the Consultant which can be applied as a credit against such liability). Any determination of employment status above shall be solely for the purposes of the particular tax in question, and for all other purposes of this agreement, The Consultant shall not be considered an employee of City. Notwithstanding the foregoing, should any court, arbitrator, or administrative authority determine that the Consultant is an employee for any other purpose, then the Consultant agrees to a reduction in the City's financial liability so that the City's total expenses under this agreement are not greater than they would have been had the court, arbitrator, or administrative authority determined that the Consultant was not an employee. 2. COMMUNICATION AND NOTICES. 2.1 Communications with Designated Administrator. The Administrator designated in Section 4 on page 1 of this agreement is authorized to receive information, interpret and define City's policies consistent with this agreement, and communicate with Consultant concerning this agreement. All correspondence and other communications shall be directed to or through the Administrator or the Administrator’s designee. 2.2 Communications and Notices on Compliance with Agreement. All notices or communication concerning a party's compliance with the terms of this agreement shall be in writing and may be given either personally, by certified mail, return receipt requested, or by overnight express carrier. The notice shall be deemed to have been given and received on the date delivered in person or the date upon which the postal authority or overnight express carrier indicates that the mailing was delivered to the address of the receiving party. The parties shall make good faith efforts to provide advance courtesy notice of any notices or communications hereunder via e-mail. However, under no circumstances shall such courtesy notice satisfy the notice requirements set forth above; nor shall lack of such courtesy 98 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 3 of 9 notice affect the validity of service pursuant to the notice requirement set forth above. 3. CONTRACTOR NOT AGENT. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Consultant shall have no authority, express or implied, pursuant to this agreement to bind City to any obligation whatsoever. 4. BENEFITS AND TAXES. Consultant shall not have any claim under this agreement or otherwise against City for seniority, vacation time, vacation pay, sick leave, personal time off, overtime, health insurance, medical care, hospital care, insurance benefits, social security, disability, unemployment, workers compensation or employee benefits of any kind. Consultant shall be solely liable for and obligated to pay directly all applicable taxes, including, but not limited to, federal and state income taxes, and in connection therewith Consultant shall indemnify and hold City harmless from any and all liability that City may incur because of Consultant's failure to pay such taxes. City shall have no obligation whatsoever to pay or withhold any taxes on behalf of Consultant. 5. ASSIGNMENT PROHIBITED. The services to be performed by the Consultant are personal in character and no party to this agreement may assign any right or obligation under this agreement. Any attempted or purported assignment of any right or obligation under this agreement shall be void and of no effect. However, with the consent of the City given in writing, Consultant is entitled to subcontract such portions of the work to be performed under this agreement as may be specified by City. 6. PERSONNEL. Consultant shall assign only competent personnel to complete the Scope of Work pursuant to this agreement. In the event that City, in its sole discretion, at any time during the term of this agreement, desires the removal of any such persons, Consultant shall, immediately upon receiving notice from city of such desire of City, cause the removal of such person or persons from work in connection with the Scope of Work. 7. CONFLICT OF INTEREST. 7.1 In General. Consultant understands that its professional responsibility is solely to City. Consultant represents and warrants that it presently has no interest, and will not acquire any direct or indirect interest, that would conflict with its performance of this agreement. Consultant shall not employ or subcontract with a person having such an interest in the performance of this agreement. 7.2 Subsequent Conflict of Interest. Consultant agrees that if an actual or potential conflict of interest on the part of Consultant is discovered after award, the Consultant will make a full disclosure in writing to the City. This disclosure shall include a description of actions, which the Consultant has taken or proposes to take, after consultation with the City to avoid, mitigate, or neutralize the actual or potential conflict. Within 45 days, the Consultant shall have taken all necessary steps to avoid, mitigate, or neutralize the conflict of interest to the satisfaction of the City. 99 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 4 of 9 7.3 Interests of City Officers and Staff. No officer, member or employee of City and no member of the City Council shall have any pecuniary interest, direct or indirect, in this agreement or the proceeds thereof. Neither Consultant nor any member of any Consultant’s family shall serve on any City board or committee or hold any such position which either by rule, practice or action nominates, recommends, or supervises Consultant's performance of the Scope of Work or authorizes funding to Consultant. 8. COMPLIANCE WITH LAWS 8.1 In General. Consultant shall keep itself fully informed of and comply with all laws, policies, general rules and regulations established by City and shall comply with the common law and all laws, ordinances, codes and regulations of governmental agencies, (including federal, state, municipal and local governing bodies) applicable to the performance of the Scope of Work hereunder. 8.2 Licenses and Permits. Consultant represents and warrants to City that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect at all times during the term of this agreement any licenses, permits, and approvals which are legally required for Consultant to practice its profession. In addition to the foregoing, Consultant shall obtain and maintain during the term hereof a valid City of Saratoga Business License. 9. WORK PRODUCT AND RECORDS 9.1 Property of City. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda or other written documents or materials prepared by Consultant (“works”) pursuant to this agreement shall become, as between Consultant and City, the property of City upon completion of the work to be performed hereunder or upon termination of this agreement. Without limiting the generality of the foregoing, if, in connection with services performed under this agreement, the Consultant or its subcontractors create artwork, copy, posters, billboards, photographs, videotapes, audiotapes, systems designs, software, reports, diagrams, surveys, source codes or any other original works of authorship, such works of authorship shall be works for hire as defined under Title 17 of the United States Code, and all copyrights in such works are the property of City. If it is ever determined that any works created by the Consultant or its subcontractors under this agreement are not works for hire under U.S. law, the Consultant hereby assigns all of its copyrights to such works to City, and grants to City a royalty-free, exclusive, and irrevocable license to reproduce, publish, use, and to authorize others to do so, all of Consultant’s rights in such works and agrees to execute any documents necessary to effectuate such assignment and license. The Consultant may retain and use copies of such works for reference and as documentation of its experience and capabilities. 9.2 Intellectual Property. Consultant represents and warrants that it has the legal right to utilize all intellectual property it will utilize in the performance of this 100 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 5 of 9 agreement. Consultant further represents that it shall ensure City has the legal right to utilize all intellectual property involved in and/or resulting from Consultant’s performance of this agreement. Consultant shall indemnify and hold City harmless from all loss and liability, including attorneys’ fees, court costs and all other litigation expenses for any infringement of the patent rights, copyright, trade secret or any other proprietary right or trademark, and all other intellectual property claims of any person or persons in consequence of the use by City, or any of its officers or agents, of articles or services to be supplied in the performance of this agreement. 9.3 Records and Audits. Contractor and its subcontractors shall establish and maintain records pertaining to this contract. Contractor’s and subcontractors’ accounting systems shall conform to generally accepted accounting principles, and all records shall provide a breakdown of total costs charged under this contract, including properly executed payrolls, time records, invoices and vouchers. Contractor shall permit City and its authorized representatives to inspect and examine Contractor’s books, records, accounts, and any and all data relevant to this Contract at any reasonable time for the purpose of auditing and verifying statements, invoices, or bills submitted by Contractor pursuant to this contract and shall provide such assistance as may be reasonably required in the course of such inspection. City further reserves the right to examine and re-examine said books, records, accounts, and data during the four-year period following the termination of this Contract; and Contractor shall in no event dispose of, destroy, alter, or mutilate said books, records, accounts, and data in any manner whatever for four years after the termination of this Contract. Pursuant to California Government Code Section 8546.7, the parties to this Contract shall be subject to the examination and audit of representative of the Auditor General of the State of California for a period of three years after final payment under the contract. The examination and audit shall be confined to those matters connected with the performance of this contract including, but not limited to, the cost of administering the contract. 9.4 Use of Recycled Paper and Electronic Documents. Consultant shall prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper. Documents shall be printed on both sides of the page and City shall be provided with electronic copies of documents (in Word or .pdf format) except where unusual circumstances make it infeasible to do so. 10. CONFIDENTIAL INFORMATION. Consultant shall hold any confidential information received from City in the course of performing this agreement in trust and confidence and will not reveal such confidential information to any person or entity, either during the term of the agreement or at any time thereafter. Upon expiration of this agreement, or termination as provided herein, Consultant shall return materials which contain any confidential information to City. Consultant may keep one copy for its confidential file. For purposes of this paragraph, confidential information is defined as all 101 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 6 of 9 information disclosed to Consultant which relates to City's past, present, and future activities, as well as activities under this agreement, which information is not otherwise of public record under California law. 11. RESPONSIBILITY OF CONSULTANT. Consultant shall take all responsibility for the work, shall bear all losses and damages directly or indirectly resulting to Consultant, to any subcontractor, to the City, to City officers and employees, or to parties designated by the City, on account of the performance or character of the work, unforeseen difficulties, accidents, occurrences or other causes to the extent predicated on active or passive negligence of the Consultant or of any subcontractor. 12. INDEMNIFICATION. Consultant and City agree that City, its employees, agents and officials shall be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys fees, litigation costs, defense costs, court costs or any other cost incurred in relation to, as a consequence of or arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part, to the performance of this agreement as set forth below. Accordingly, the provisions of this indemnity provision are intended by the parties to be interpreted and construed to provide the fullest protection possible under the law to the City. Consultant acknowledges that City would not enter into this agreement in the absence of the commitment of Consultant to indemnify and protect City as set forth below. 12.1 General Indemnity. To the fullest extent permitted by law, Consultant shall indemnify and hold harmless City, its employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs (including, without limitation, costs and fees of alternative dispute resolution and litigation) of any kind whatsoever without restriction or limitation, incurred in relation to, as a consequence of or arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part, to Consultant, or its employees, agents, or subcontractors. All obligations under this provision are to be paid by Consultant as they are incurred by the City. 12.2 Duty to Defend. In addition to Consultant’s obligation to indemnify City, Consultant shall defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its councilmembers, officers, and employees, immediately upon tender to Consultant of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Consultant are responsible for the claim does not relieve Consultant from its separate and distinct obligation to defend. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Consultant asserts that liability is caused in whole or in part by the negligence or willful misconduct of the indemnified party. If it is finally adjudicated that liability was caused solely by the negligence or willful misconduct of an indemnified party, Consultant may submit a claim to the City for reimbursement of reasonable attorneys’ fees and 102 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 7 of 9 defense costs in proportion to the established comparative liability of the indemnified party. 12.3 Limitation on Indemnity. Without affecting the rights of City under any provision of this agreement or this Section, Consultant shall not be required to defend, indemnify, and hold harmless City as set forth above for liability attributable to the sole fault of City, provided such sole fault is determined by agreement between the parties or the findings of a court of competent jurisdiction. This exception will apply only in instances where the City is shown to have been solely at fault and not in instances where Consultant is solely or partially at fault or in instances where City's fault accounts for only a percentage of the liability involved. In those instances, the obligation of Consultant will be all-inclusive and City will be held harmless, indemnified, and defended for all liability incurred, even though a percentage of the liability is attributable to conduct of the City. 12.4 Acknowledgement. Consultant acknowledges that its obligation pursuant to this Section extends to liability attributable to City, if that liability is less than the sole fault of City. Consultant has no obligation under this agreement for liability proven in a court of competent jurisdiction or by written agreement between the parties to be the sole fault of City. 12.5 Scope of Consultant Obligation. The obligations of Consultant under this or any other provision of this agreement will not be limited by the provisions of any workers' compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its employees and officials. 12.6 Subcontractors. Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section from each and every subcontractor, sub tier contractor or any other person or entity involved by, for, with or on behalf of Consultant in the performance or subject matter of this agreement. 12.7 No Waiver. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth herein is binding on the successors, assigns, or heirs of Consultant and shall survive the termination of this agreement or this Section. For purposes of Section 2782 of the Civil Code the parties hereto recognize and agree that this agreement is not a construction contract. By execution of this agreement, Consultant acknowledges and agrees that it has read and understands the provisions hereof and that this paragraph is a material element of consideration. City approval of insurance required by this agreement does not relieve the Consultant or subcontractors from liability under this Section. 12.8 Relation to Insurance Obligations. The defense and indemnification obligations of this agreement are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained in this agreement. 103 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 8 of 9 13. DEFAULT AND REMEDIES. 13.1 Events of default. Each of the following shall constitute an event of default hereunder: (a) Failure by Consultant to perform any obligation under this agreement and failure to cure such breach immediately upon receiving notice of such breach, if the breach is such that the City determines the health, welfare, or safety of the public is immediately endangered; or (b) Failure by either party to perform any obligation under this agreement and failure to cure such breach within fifteen (15) days of receiving notice of such breach (except for breaches subject to subparagraph (a), above); provided that if the nature of the breach is such that the non-breaching party determines it will reasonably require more than fifteen (15) days to cure, the breaching party shall not be in default if it promptly commences the cure and diligently proceeds to completion of the cure. 13.2 Remedies upon default. Upon any default, the non-defaulting party shall have the right to immediately suspend or terminate this agreement, seek specific performance and/or seek damages to the full extent allowed by law. City shall have the right to contract with another party to perform this agreement 13.3 No Waiver. Failure by City to seek any remedy for any default hereunder shall not constitute a waiver of any other rights hereunder or any right to seek any remedy for any subsequent default. 14. TERMINATION. The City may terminate this agreement with or without cause by providing 10 days’ notice in writing to Consultant. The City may terminate this agreement at any time without prior notice in the event that Consultant commits a material breach of the terms of this agreement. Upon termination, this agreement shall become of no further force or affect whatsoever and each of the parties hereto shall be relieved and discharged from the rights and obligations of this agreement, subject to payment for acceptable services rendered prior to the expiration of the notice of termination and delivery to City of any work in progress, completed work, supplies, equipment, and other materials produced as a part of, or acquired in connection with the performance of this agreement, and any completed or partially completed work which, if this agreement had been completed, would have been required to be furnished to City. Notwithstanding the foregoing and Section 2 on page 1, this Section and the provisions of this agreement concerning insurance (Exhibit B), Funding Agency Requirements (as set forth in Exhibit D if applicable), Work Product and Records, Confidential Information, Responsibility of Consultant, Indemnification, Default and Remedies, Litigation, and Jurisdiction and Severability shall survive termination or expiration of this agreement. 15. DISPUTE RESOLUTION. The parties shall make a good faith effort to settle any dispute or claim arising under this agreement. If the parties fail to resolve such disputes or claims, they shall submit them to non-binding mediation in California at shared expense of the parties for at least 8 hours of mediation. If mediation does not arrive at a satisfactory result, arbitration, if agreed to by all parties, or litigation may be pursued. In 104 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 9 of 9 the event any dispute resolution processes are involved, each party shall bear its own costs and attorneys’ fees. 16. LITIGATION. If any litigation is commenced between parties to this agreement concerning any provision hereof or the rights and duties of any person in relation thereto, each party shall bear its own attorneys’ fees and costs. 17. JURISDICTION AND SEVERABILITY. This agreement shall be administered and interpreted under the laws of the State of California. Jurisdiction of litigation arising from this agreement shall be in that state and venue shall be in Santa Clara County, California. 18. SEVERABILITY. If any part of this agreement is found to conflict with applicable laws, such part shall be inoperative, null and void insofar as it conflicts with said laws, but the remainder of this agreement shall be in full force and effect. 19. NOTICE OF NON-RENEWAL. Consultant understands and agrees that there is no representation, implication, or understanding that the City will request that work product provided by Consultant under this agreement be supplemented or continued by Consultant under a new agreement following expiration or termination of this agreement. Consultant waives all rights or claims to notice or hearing respecting any failure by City to continue to request or retain all or any portion of the work product from Consultant following the expiration or termination of this agreement. 20. PARTIES IN INTEREST. This agreement does not, and is not intended to, confer any rights or remedies upon any person or entity other than the parties. 21. WAIVER. Neither the acceptance of work or payment for work pursuant to this agreement shall constitute a waiver of any rights or obligations arising under this agreement. The failure by the City to enforce any of Consultant’s obligations or to exercise City's rights shall in no event be deemed a waiver of the right to do so thereafter. -End of Exhibit C- 105 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit D Page 1 of 1 City of Saratoga Services Contract Exhibit D – Funding Agency Requirements This agreement is funded in part pursuant to the contract between City and _______________________________________________ (“Funding Agency”) attached as Exhibit D-1 (“Funding Agreement”). In recognition of the Funding Agreement City and Contractor agree that: 1. All contractual provisions required by the Funding Agreement are hereby incorporated by reference. Anything to the contrary herein notwithstanding, all Funding Agreement- mandated terms shall be deemed to control in the event of a conflict with other provisions contained in this agreement. The Consultant shall not perform any act, fail to perform any act, or refuse to comply with any City requests which would cause the City to be in violation of the Funding Agreement terms and conditions. 2. If Consultant claims or receives payment from City for a service, reimbursement for which is later disallowed by the Funding Agency, the Consultant shall promptly refund the disallowed amount to City upon City’s request. At its option, City may offset the amount disallowed from any payment due or to become due to Consultant under this agreement or any other agreement. 3. City may terminate or suspend performance of this agreement if Funding Agency suspends or terminates funding pursuant to the terms of the Funding Agreement. In the event of suspension or termination City shall be obligated to fund only that portion of Consultant’s work performed prior to the suspension or termination that is not funded by the Funding Agreement. 4. By executing this agreement, the Consultant certifies that the Consultant is not suspended, debarred or otherwise excluded from participation in the program(s) supported by the Funding Agreement. Consultant acknowledges that this certification of eligibility to receive Funding Agency funds is a material term of the agreement. -End of Exhibit D- 106 Consultant: Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit E Page 1 of 1 City of Saratoga Services Contract Exhibit E – Special Requirements AND/OR See Exhibit(s) E- incorporated by this reference. -End of Exhibit E- 107 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:Finance & Administrative Services PREPARED BY:Leo Salindong, IT Manager SUBJECT:Contract for Microsoft licenses with SoftwareONE RECOMMENDED ACTION: Authorize the City Manager to execute a three-year Microsoft Enterprise Agreement through SoftwareONE. BACKGROUND: The City of Saratoga has used Microsoft’s cloud-based Office 365 licenses since 2018. Cloud- based services provide greater program stability, enhance security to the City’s email network, and position the City to benefit from future Microsoft platform products seamlessly. Additionally, the City utilizes Microsoft Windows Server licenses for various on-premises servers and databases located in the City Hall IT server room. The Microsoft Enterprise Agreement combines both cloud- based Office 365 licenses and on-premises Windows Server licenses. Microsoft does not license its software directly; its products are licensed through resellers. SoftwareONE, an authorized Microsoft Large Account Reseller, offers high-volume discount pricing for Microsoft products and services to government entities and academic institutions through a Master Microsoft Enterprise Agreement. This agreement is available only under a three- year term structure. FISCAL IMPACT: Funding for this agreement with SoftwareONE is included in the fiscal year 2024-25 IT Services budget. The total contract amount for three years is $106,488, with an amount of $35,496 per fiscal year. ATTACHMENT: Attachment A – Microsoft Enterprise Agreement Enrollment Contract 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 SARATOGA CITY COUNCIL MEETING DATE: July 3, 2024 DEPARTMENT: Community Development Department PREPARED BY: Bryan T. Swanson – Community Development Director SUBJECT: Ordinance Amending Chapter 15 (Zoning Regulations) of the Saratoga City Code to Implement the Programs of the 2023-2031 Housing Element. RECOMMENDED ACTION: Waive reading and adopt the ordinance amending Chapter 15 (Zoning Regulations) of the Saratoga City Code to implement the programs of the 2023-2031 Housing Element. DISCUSSION: At its meeting on June 19, 2024, the City Council conducted a public hearing to consider amendments to Chapter 15 (Zoning Regulations) of the Saratoga City Code to implement the programs of the 2023-2031 Housing Element. Following the hearing, the Council introduced the ordinance and directed staff to place the matter on the consent calendar for the next regular meeting of the City Council. The ordinance introduced by the City Council is included in Attachment A. If adopted by Council, it will take effect in 30 days. ATTACHMENT: Attachment A - Ordinance amending Chapter 15 (Zoning Regulations) of the Saratoga City Code. 124 ORDINANCE NO. XXX AN ORDINANCE AMENDING ARTICLES 15-46 AND 15-57 OF THE SARATOGA CITY CODE TO IMPLEMENT THE 2023-2031 HOUSING ELEMENT The City Council of the City of Saratoga finds that: 1. On March 20, 2024 the City Council adopted the 2023-2031 Housing Element for the City of Saratoga and certified the associated Final Environmental Impact Report and adopted all findings required by law. In connection with that approval, the City Council adopted Ordinance No. 399 amending the City Code and rezoning properties as required to make sites available with appropriate zoning and development standards to accommodate the portion of the City’s regional housing need for each income level that could not be accommodated on sites available under existing City zoning. 2. Ordinance No. 399 establishes nondiscretionary review for all multifamily developments including affordable housing developments. The City Council wishes to further amend the City Code to specify that this nondiscretionary review applies for housing developments with 20 percent affordability pursuant to Government Code section 65583.2, subdivisions (h) and (i). 3. On June 12, 2024, the Planning Commission held a duly noticed public hearing consistent with Section 15-85.050 of the Saratoga Municipal Code and considered the amendments proposed in this Ordinance, supporting documents, and all testimony and other evidence presented at the public hearing; and recommended that the City Council adopt the amendments. 4. On June 19, 2024, the City Council held a duly noticed public hearing consistent with Section 15-85.080 of the Saratoga Municipal Code and, after considering the supporting documents and all testimony and other evidence presented at the public hearing, introduced this Ordinance and waived the reading thereof. 5. The City Council adopted this Ordinance at a duly noticed regular meeting on July 3, 2024. Therefore, the City Council of the City of Saratoga hereby ordains as follows: Section 1. Adoption. Chapter 15 (Zoning) of the Saratoga City Code is amended as set forth in Attachment 1. Text to be added is indicated in bold double-underlined font (e.g., bold double-underlined) and text to be deleted is indicated in strikeout font (e.g., strikeout). Text in standard font is readopted by this ordinance. Text in italics (e.g., italics) is descriptive only and is not part of the amendments to the City Code. 125 2 Section 2. Severance Clause. The City Council declares that each section, sub-section, paragraph, sub-paragraph, sentence, clause and phrase of this ordinance is severable and independent of every other section, sub- section, paragraph, sub-paragraph, sentence, clause and phrase of this ordinance. If any section, sub-section, paragraph, sub-paragraph, sentence, clause or phrase of this ordinance is held invalid, the City Council declares that it would have adopted the remaining provisions of this ordinance irrespective of the portion held invalid, and further declares its express intent that the remaining portions of this ordinance should remain in effect after the invalid portion has been eliminated. Section 3. California Environmental Quality Act This ordinance is part of the project described in the Environmental Impact Report described in the Findings above. On March 20, 2024, the City Council certified the Final Environmental Impact for the Project, and adopted CEQA Findings and a Statement of Overriding Considerations for impacts that were found to be significant and unavoidable, adopted and incorporated into the project all of the mitigation measures for the project, and adopted a Mitigation Monitoring and Reporting Program. None of the amendments adopted by this ordinance require subsequent or supplemental environmental analysis under CEQA, as described in Public Resources Code Section 21166 and CEQA Guidelines Section 15162 because there has not been a substantial change to the project; a substantial change to the circumstances under which the project is being undertaken, or new information, which was not known and could not have been known at the time the environmental analysis was completed, has become available. Section 4. Publication. A summary of this ordinance shall be published in a newspaper of general circulation of the City of Saratoga within fifteen days after its adoption. Following a duly noticed public hearing the foregoing ordinance was introduced at the regular meeting of the City Council of the City of Saratoga held on the 19th day of June 2024, and was adopted by the following vote on July 3, 2024. AYES: NOES: ABSENT: ABSTAIN: SIGNED: Yan Zhao MAYOR, CITY OF SARATOGA, CALIFORNIA 126 3 ATTEST: DATE: Britt Avrit, MMC CITY CLERK APPROVED AS TO FORM: _____________________________ DATE: ________________________ Richard Taylor CITY ATTORNEY 127 4 Attachment 1 PROPOSED AMENDMENTS TO CHAPTER 15 OF THE SARATOGA MUNICIPAL CODE TO IMPLEMENT THE PROGRAMS OF THE 2023-2031 HOUSING ELEMENT The Saratoga Municipal Code is amended as set forth below. Text to be added is indicated in bold double-underlined font (example) and text to be deleted is indicated in strikeout font (example). Text in standard font is readopted by this ordinance. Text in italics (example) is explanatory and not a part of the Code or amendments. Article 15-46 -Design Review: Multi-Family Dwellings and Commercial Structures 15-46.040 - Design review findings. (a) Except as to buildings subject to Section 15-46-040(b), the Planning Commission shall not grant design review approval unless it is able to make the following findings: (1) (a)Where more than one building or structure will be constructed, the architectural features and landscaping thereof shall be harmonious. Such features include height, elevations, roofs, material, color and appurtenances. (2) (b)Where more than one sign will be erected or displayed on the site, the signs shall have a common or compatible design and locational positions and shall be harmonious in appearance. (3) (c)Landscaping shall integrate and accommodate existing trees and vegetation to be preserved; it shall make use of water-conserving plants, materials and irrigation systems to the maximum extent feasible; and, to the maximum extent feasible, it shall be clustered in natural appearing groups, as opposed to being placed in rows or regularly spaced. (4) (d)Colors of wall and roofing materials shall blend with the natural landscape and be nonreflective. (5) (e)Roofing materials shall be wood shingles, wood shakes, tile, or other materials such as composition as approved by the Planning Commission. No mechanical equipment shall be located upon a roof unless it is appropriately screened. (6) (f)The proposed development shall be compatible in terms of height, bulk and design with other structures in the immediate area. (b) For any multi-family dwelling, including any building that meets the criteria of Section 15-21.020(c), the Planning Commission shall grant design review approval if it finds that the building meets the objective design standards of this Code including, without limitation, those identified in Article 15-58. Article 15-57 - Ministerial Consideration of Qualifying Projects 15-57.010 Purpose of article. The purpose of this Article is to regulate Urban Lot Splits, and Two-Unit Residential Developments, and Three-Unit Residential Conversions, and Affordable Multi-Family Dwellings in compliance with California Government Code Sections 65583.2(h) and (i), 128 5 66452.6, 65852.21, and 66411.7 and to implement the Housing Element of the City’s General Plan, to allow for ministerial approval of certain parcel maps creating two lots, and of projects including up to two detached or attached housing units on one parcel or up to three units in an existing home, and of multifamily housing projects with at least twenty percent of the units dedicated to serving lower income households, along with ancillary uses and structures. Notwithstanding any other provisions of this Chapter, Eeligible applications under this Article shall be considered ministerially by staff, without design review or other discretionary review or a hearing. 15-57.020 Definitions. Terms used in this Article have the meanings set forth below: [Subsections (1)-(8) are not changed and are not shown here.] (9) “Affordable Multi-Family Dwelling” means a multi-family dwelling, as defined in 15- 06.240(c), including any building that meets the criteria of Section 15-21.020(c), in which at least twenty percent of the dwelling units are affordable to households of lower or very low incomes as defined in Government Code section 65584. 15-57.030 Applicability. (a) A Two-Unit Residential Development, Three-Unit Residential Conversion, or Urban Lot Split may be located on parcels within all Single-Family Residential Zoning Districts with the following exceptions: (a) (1) Any parcel where the Two-Unit Residential Development, Three-Unit Residential Conversion, or Urban Lot Split would require demolition or alteration of any of the following housing types: (i1) Housing that is subject to a recorded covenant, ordinance, or law that restricts rents to levels affordable to persons and families of moderate, low, or very low income. (2ii) Housing that is subject to any form of rent or price control through a public entity's valid exercise of its police power. (iii3) Housing that has been occupied by a tenant within the last three years. (iv4) A parcel or parcels on which an owner of residential real property has exercised the owner's rights under Chapter 12.75 (commencing with Section 7060) of Division 7 of Title 1 to withdraw accommodations from rent or lease within fifteen years before the date that the development proponent submits an application. (b2) A parcel located within a historic district or including a property included on the State's Historic Resources Inventory, as defined in Public Resources Code Section 5020.1, or within a site that is designated or listed as a city or county landmark or historic property or districts pursuant to a city or county ordinance. (c3) A parcel of one or more of the types specified in subparagraphs (B) to (K), inclusive, of Government Code Section 65913.4(a)(6). Without limiting the foregoing, the most applicable of those specifications to the City of Saratoga are the following: 129 6 (i1) A Two-Unit Residential Development, Three-Unit Residential Conversion, or Urban Lot Split may not be located on any parcel within a very high fire hazard severity zone, as determined the Department of Forestry and Fire Protection pursuant to Government Code Section 51178, or within a high or very high fire hazard severity zone as indicated on the maps adopted by the Department of Forestry and Fire Protection pursuant to Public Resources Code Section 4202. As to Two-Unit Residential Developments and Urban Lot Splits, this subsection does not apply to parcels that have been excluded from specific hazard zones by actions of the City pursuant to Government Code Section 51179(b), or parcels that have adopted fire hazard mitigation measures pursuant to existing building standards or state fire mitigation measures applicable to the development. (ii2) A Two-Unit Residential Development, Three-Unit Residential Conversion, or Urban Lot Split may not be located on any parcel located within a delineated earthquake fault zone as determined by the State Geologist in any official map published by the State Geologist, unless the development complies with applicable seismic protection building code standards adopted by the California Building Standards Commission under the California Building Standards Law (Part 2.5 (commencing with Section 18901) of Division 13 of the Health and Safety Code), and by the City of Saratoga Building Department under Chapter 12.2 (commencing with Section 8875) of Division 1 of Title 2 of the Government Code. (4d) A proposed Two-Unit Residential Development or Three-Unit Residential Conversion that allows the demolition of more than twenty-five percent of the existing exterior structural walls, unless the Two-Unit Residential Development is on a site that has not been occupied by a tenant in the last three years. (5e) For a Three-Unit Residential Conversion, any parcel located outside the R-1-20 and R- 1-40 districts. (b) An Affordable Multi-Family Dwelling may be located anywhere a multi-family dwelling is permitted. 15-57.040 Development Standards. Development pursuant to this Article shall comply with the following development standards and all Development pursuant to this Article shall comply with the following development standards and all applicable objective standards of the City Code, except as otherwise expressly provided for in this section. A project proposed as part of a Two-Unit Residential Development, Three-Unit Residential Conversion, or on a lot created by an Urban Lot Split, which does not meet the requirements of this Article may seek discretionary approval pursuant to the applicable provisions of the City Code. [Subsections (a)-(b) are not changed and are not shown here.] (c) Maximum Height. No dwelling unit constructed pursuant to this Article as part of a Two-Unit Residential Development or on a lot created by an Urban Lot Split shall exceed one story and a height of eighteen feet, except as otherwise expressly provided for in this section. No dwelling unit constructed pursuant to this Article as part of a Three-Unit Residential Conversion shall exceed the height of the original structure subject to the conversion. 130 7 (1) A proposed dwelling unit subject to this subsection (c) which is located within either the required side or rear setback area as set by the underlying zoning district shall not exceed a height of sixteen feet. [Subsections (d)-(g) are not changed and are not shown here.] (h) Off-Street Parking. One off-street parking space within an enclosed garage shall be required per unit in Two-Unit Residential Developments, Urban Lots Splits, or Three-Unit Conversion, with the exception that for Two-Unit Residential Developments and Urban Lots Splits, no off-street parking shall be required if any of the following apply: (1) The parcel is located within one-half mile walking distances or either a high-quality transit corridor, as defined in Public Resources Code Section 21155(b) of the, or a major transit stop, as defined in Public Resources Code Section 21064.3. (2) There is a designated parking area for one or more car share vehicles within one block of the parcel. [Subsections (i)-(m) are not changed and are not shown here.] 15-57.060 Tree Protection. The applicant for any project subject to this Article Urban Lot Split project, Two-Unit Residential Development, or Three-Unit Residential Conversion that would remove, damage, prune, or encroach upon a protected tree as defined in City Code section 15-50.050 shall: (a) Provide an Arborist Report and Tree Preservation plan as described in City Code sections 15- 50.130 and 140 as part of the application materials. (b) Provide a Tree Protection Security Deposit per City Code section 15-50.080. (c) Before issuance of any Certificate of Occupancy for any dwelling unit, plant new trees equal to the value of removed trees in accordance with the ISA Tree Valuation Formula contained in the April 2000 ISA Guide for Plant Appraisal. 1792121.1 131 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:City Attorney PREPARED BY:Richard Taylor, City Attorney SUBJECT:Annual Code Update for 2024 RECOMMENDED ACTION: Waive reading and adopt an ordinance amending City Code provisions concerning scheduling of appeal hearings (section 2-05.030); scheduling City Council meetings (2-10.010); Commissioner qualifications and terms (2-12.020 and .030); security alarms (4-06.110); motion picture filming (4-60.080); civil defense and disaster (Article 6-05); commercial marijuana activity (6-30.020); driveway approaches (14-25.030); Zoning Ordinance provisions pertaining to short term rentals (15-06.360), fence height at driveway intersections (15-29.010), creek setbacks (15-45.045), tree regulations (Article 15-50), and replacement housing units (15-80.150); and reorganization of certain definitions in the Sustainability Ordinance (17-10.010). DISCUSSION: At its meeting on June 19, 2024, the City Council conducted a public hearing to consider the above- referenced code amendments to clarify ambiguities, comply with state laws, and conform to new best practices that have changed since the Code was adopted. Following the hearing, the Council introduced the ordinance and directed staff to place the matter on the consent calendar for the next regular meeting of the City Council. The ordinance is included in Attachment A. If adopted it will take effect in 30 days. ATTACHMENT: Attachment A - Annual Code Update Ordinance 1796562.1 132 1 ORDINANCE NO. _____ ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SARATOGA AMENDING CITY CODE SECTIONS AMENDING CITY CODE PROVISIONS CONCERNING SCHEDULING OF APPEAL HEARINGS (SECTION 2-05.030); SCHEDULING CITY COUNCIL MEETINGS (2-10.010); COMMISSIONER QUALIFICATIONS AND TERMS (2-12.020 AND .030); SECURITY ALARMS (4-06.110); MOTION PICTURE FILMING (4-60.080); CIVIL DEFENSE AND DISASTER (ARTICLE 6-05); COMMERCIAL MARIJUANA ACTIVITY (6-30.020); DRIVEWAY APPROACHES (14-25.030); ZONING ORDINANCE PROVISIONS PERTAINING TO SHORT TERM RENTALS (15-06.360), FENCE HEIGHT AT DRIVEWAY INTERSECTIONS (15-29.010), CREEK SETBACKS (15-45.045), TREE REGULATIONS (ARTICLE 15-50), AND REPLACEMENT HOUSING UNITS (15-80.150); AND REORGANIZATION OF CERTAIN DEFINITIONS IN THE SUSTAINABILITY ORDINANCE (17-10.010) The City Council of the City of Saratoga finds that: 1.The City Code of the City of Saratoga requires periodic updates to reflects changes in law, provide clarification to the community, and provide for improved customer service and administration of City business. 2. The City Council referred the amendments to Saratoga Municipal Code Chapters 15 in this ordinance to the Planning Commission and the Planning Commission held a hearing on those amendments on May 8, 2024 and following consideration of all testimony and written materials, recommended that the City Council adopt the amendments to Chapters 15 set forth herein. 3. The City Council of the City of Saratoga held a duly noticed public hearing on June 19, 2024 and after considering all testimony and written materials provided in connection with that hearing introduced this ordinance and waived the reading thereof. Therefore, the City Council of the City of Saratoga hereby ordains as follows: Section 1. Adoption. The Saratoga City Code is hereby amended as set forth in Exhibit A. Section 2. Severance Clause. The City Council declares that each section, sub-section, paragraph, sub-paragraph, sentence, clause and phrase of this ordinance is severable and independent of every other section, sub-section, paragraph, sub-paragraph, sentence, clause and phrase of this ordinance. If any section, sub-section, paragraph, sub-paragraph, sentence, clause or phrase of this ordinance is held invalid, the City Council declares that it would have adopted the remaining provisions of this ordinance irrespective of the portion held invalid, and further declares its express intent that the remaining portions of this ordinance should remain in effect after the invalid portion has been eliminated. 133 2 Section 3. California Environmental Quality Act The proposed amendments and additions to the City Code are Categorically Exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guideline section 15061(b)(3). CEQA applies only to projects which have the potential of causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. In this circumstance the amendments to the existing City Code and related sections and additions of provisions and reference appendices to the existing Code; the amendments and additions would have a de minimis impact on the environment. Section 4. Publication. A summary of this ordinance shall be published in a newspaper of general circulation of the City of Saratoga within fifteen days after its adoption. Following a duly noticed public hearing the foregoing ordinance was introduced at the regular meeting of the City Council of the City of Saratoga held on the 19 th day of June, 2024 and was adopted by the following vote on July 3, 2024. COUNCIL MEMBERS: AYES: NOES: ABSENT: ABSTAIN: SIGNED: Yan Zhao MAYOR, CITY OF SARATOGA, CALIFORNIA ATTEST: DATE: Britt Avrit CITY CLERK APPROVED AS TO FORM: DATE: Richard Taylor, CITY ATTORNEY 134 1 Exhibit A 2024 ANNUAL CODE UDPATE The provisions of the Saratoga Municipal Code set forth below are amended or adopted as follows: Text added to existing provisions is shown in bold double-underlined text (example) and text to be deleted in shown in strikethrough (example). Text in italics is explanatory and is not an amendment to the Code except in cases where it directs renumbering of subsections not otherwise amended. Where a section being amended includes subsections that are not shown those subsections are unchanged by this ordinance. 1. Scheduling Appeal Hearings 2-05.030 – Appeals [Subsections (a)-(c) unchanged.] (d) Schedule of hearing. Upon the filing of the notice of appeal and payment of the appeal fee, or upon an appeal being initiated by members of the City Council, the City Clerk shall schedule the matter for hearing by the City Council as follows: (1) A proposed hearing date shall be set within two business days. The proposed date shall be within thirty forty-five calendar days of the date the appeal was filed, except as provided in subsection (d)(2), below. The City Clerk shall immediately inform the appellantand the applicant of the proposed date, time, and place of the hearing at an e-mail address or fax number provided to the City at the time the appeal or application was filed. If the appellant or applicant within two business days requests in writing that the proposed hearing date be extended, then the City Clerk shall set the date for the next regular meeting of the City Council occurring after the proposed date. The City Clerk shall inform the appellant and applicant of the new hearing date, time and place via e-mail or fax. (2) If it is not possible to set the proposed date in a manner that allows the City to provide any notice required by law and set the proposed date at a regularly scheduled meeting within thirty forty-five calendar days of the date the appeal was filed, the date shall be set at the first regularly scheduled Council meeting following the close of any applicable notice period. The City Clerk shall immediately inform the appellant and the applicant of the date, time, and place of the hearing at an e-mail address or fax number provided to the City at the time the appeal or application was filed. If the hearing date is set pursuant to this subsection, then neither the applicant nor appellant shall be authorized to request a changein the hearing date as described in subsection (d)(21), above. 135 2 (3) After a hearing date has been set in accordance with subsection (d)(1) or (d)(2), above, the appellant or the applicant may request in writing, and the City Clerk shall grant, a continuance of the date provided that the request for continuance is received by the City Clerk no later than fourteen twenty-one calendar days prior to the date set for hearing. The continuance shall be until the next regular meeting of the City Council occurring after the date for which the matter had been set. No further continuances may be authorized by the City Clerk. [Subsections (e)-h) unchanged.] 2. City Council Regular Meeting Dates 2-10.010 - Regular meetings. The regular meetings of the City Council shall be held on the first and third Wednesdays of each month except for the first Wednesday of January. If a regular meeting day falls on a holiday, that regular meeting unless such day is a holiday, in which case the meeting may be held on such business day as designated by the City Council or the meeting may be cancelled. The time of such regular meetings shall be 7:00 P.M., provided, however, that the City Council may meet in closed session or with Commissions and community groups, and conduct study sessions as part of the regular meeting prior to 7:00 P.M. The place shall be at City Hall in the Saratoga City Council Chambers at 13777 Fruitvale Avenue, Saratoga, California unless otherwise specified on the agenda for the meeting. Any regular meeting may be rescheduled or cancelled by action of the City Council at a regular or special meeting preceding the meeting to be rescheduled or cancelled. 3. Commissioner Qualifications 2-12.020 - Qualifications. (a) Except as provided in Section 2-12.20(b), all Commissioners shall: 1. Be a resident of the City of Saratoga; 2. Prior to being interviewed for appointment to a Commission, have attended at least one meeting of the Commission to which appointment is being sought unless an exception has been granted by the City Council; 3. Not hold any elected public office in any jurisdiction, any place or position of employment with the City of Saratoga; and4.Satisfy any additional eligibility requirements specified in the ordinance or resolution establishing the Commission. [Subsections (b)-(e) unchanged.] 4. Partial Commission Terms 2-12.030 - Term. (a) Each Commissioner shall serve a term of four years unless an alternate term is specified by the resolution or ordinance establishing the Commission. 136 3 (b) No Commissioner shall serve more than two full consecutive terms on a single Commission. A partial term served as a result of an appointment to fill an unexpired term is not considered a full term and a partial term of less than three years due to an appointment being made after a vacancy has occurred is not considered a full term. A Commissioner who has served two full consecutive terms on a Commission may not be reappointed to that Commission for at least one year following the expiration of his or her term. The limitations set forth in this subsection (b) shall not apply to the Youth Commission. (c) For each Commission, the terms of the Commissioners shall be staggered such that each year the four year terms of approximately an equal number of the Commissioners shall expire. Where a Commission has seven Commissioners, the terms of two Commissioners shall expire each year except that in the year after the firstsix Commission terms have expired, only one term shall expire. The limitations set forth in this subsection (c) shall not apply to the Youth Commission. (d) Notwithstanding subsection (a) of this Section, Section 2-15.020 regarding Planning Commissioner terms, where the terms of Commissioners on a Commission do not comply with subsection (c) of this Section, a Commissioner may be appointed to a term of greater or less than four years for the purpose of making the terms of the Commissioners on the Commission comply with subsection (c). No term shall be reduced after a Commissioner is appointed to serve the term, except as otherwise provided by this Code. For purposes of subsection (b) of this Section, a term of less than four years established pursuant to this paragraph is not a full term and a term that is more than four years at the time of appointment pursuant to this subsection (d) is a single term. 5. Security Alarms 4-06.110 - Security alarms. For every person engaged in the business of installing, selling, leasing, renting, maintaining, servicing or responding to a burglary, robbery or fire alarm system, the annual license fee shall be in the fee schedule adopted by City Council by resolution in accordance with State law. 6. Motion Picture Filming 4-60.080 - Insurance and indemnification. (a) No motion picture filming permit shall be issued until the applicant has furnished to the Community Events Official a general liability special endorsement, in the form prescribed or approved by the California Film Commission, showing comprehensive general liability insurance coverage in the amount of not less than one two million dollars, auto liability coverage for owned, non-owned, and hired autos, and and naming the City and its officers, officials, employees and volunteers as insured parties under the applicant's policy. 137 4 The endorsement shall provide for such deductibles and other coverages as specified or approved by the Community Events Official. Applicant shall maintain statutory Workers’ Compensation Insurance and Employer’s Liability Insurance with limits of at least one million dollars ($1,000,000). Applicant shall submit to City, along with the certificate of insurance, a waiver of subrogation endorsement in favor of City, its officers, officials, employees, and volunteers. Proof of Worker’s Compensation is not required if Applicant provides written verification that they have no employees. (b) Every motion picture filming permit shall be issued subject to the condition and requirement that the permittee indemnify, defend and hold the City and its officers, officials, employees and volunteers harmless from and against any and all claims, demands, costs, expenses, or liabilities arising from, or in any manner relating to, the conduct of the motion picture filming activity by the permittee and its employees, agents, contractors, subcontractors, representatives, or invitees. 7. Civil Defense and Disaster 6-05.010 Purpose of Article. This Article provides for the preparation and carrying out of plans for the protection of persons and property within the City in the event of an emergency;and for the coordination of the emergency functions of the City the direction of the emergency organization; and the coordination of the emergency functions of the City with all other public agencies, corporations, organizations and affected private persons. Any expenditure made in connection with such emergency activities, including mutual aid activities, shall be deemed conclusively to be for the direct protection and benefit of the inhabitants and property of the City. 6-05.020 Emergency defined. As used in this Article, "emergency" shall mean the actual or threatened existence of conditions of disaster or of extreme peril to the safety of persons and property within the City caused by such conditions as air pollution, fire, flood, storm, epidemic, riot or earthquake, or other conditions, including conditions resulting from war or imminent threat of war, which conditions are or are likely to be beyond the control of the services, personnel, equipment and facilities of the City, requiring the combined forces of other political subdivisions to combat. 6-05.030 Disaster Council. (a) The City of Saratoga Disaster Council (also referenced here as the Disaster Council) has been accredited by the State of California since 1947. The Disaster Council shall consists of the following members: (1) The Mayor or a City Council member designated by the Mayor shall be chairperson; (2) The City Manager Director of Emergency Services, who shall be Chair; (3) The Assistant Director of Emergency Services who shall be Vice Chair; (4) The Director of Public Works; and 138 5 (5) The Director of Community Development. (4) A representative designated by the Santa Clara County Fire Department; and (5) A representative designated by the Santa Clara County Sheriff's Office. (b) It shall be the duty of the Disaster Council, and it is hereby empowered, to develop and recommend for adoption by the City Council, the Emergency Operation Plan referenced in Section 6-05.070 and such other duties as specified in this Article. The Disaster Council shall meet at least annually upon call of the chair or, in his or her absence from the City or inability to call such meeting, upon call of the vice-chair. 6-05.040 - Disaster council powers and duties. (a) It shall be the duty of the Disaster Council, and said Council is hereby empowered, to develop and recommend for adoption by the City Council, emergency and mutual aid plans and agreements and such ordinances and resolutions and rules and regulations as are necessary to implement such plans and agreements. (b)The Disaster Council shall meet at least once per year, upon call of the Chair or, upon call of the Vice Chair (in the absence of the Chair). (c) The Disaster Council shall comply with the California Emergency Services Act and abide by the California Disaster and Civil Defense Master Mutual Aid Agreement. (d) The Disaster Council shall follow established rules and regulations relating to the various classes of disaster service workers, scope of duties of each class, and manner of registration pursuant to the provisions of Government Code § 8585.5. 6-05.040 Disaster service worker volunteers. (a) The City of Saratoga Disaster Council shall provide for the registration of disaster service worker volunteers within the City of Saratoga and comply with the then applicable rules and regulations governing disaster service worker volunteers as established by the California Emergency Council pursuant to the provisions of California Government Code Section 8585.5 as it may be amended from time to time. (b) All disaster service worker volunteers shall, as a part of the registration process, take and subscribe to an oath as required by California Government Code Sections 3102 to 3103. (c)Disaster service worker volunteer means any person registered with the Disaster Council, or the California Emergency Management Agency, or a state agency granted authority to register disaster service worker volunteers, for the purpose of engaging in disaster service pursuant to the California Emergency Services Act without pay or other consideration. 139 6 "Disaster service worker volunteer" includes public employees, performing disaster work outside their regular employment without pay, and also includes any unregistered person impressed into service during a state of war emergency, a state of emergency, or a local emergency by a person having authority to command the aid of citizens in the execution of his or her duties. Disaster service worker volunteers do not include any member registered as an active firefighting member of any regularly organized volunteer fire department, having official recognition, and full or partial support of the City or County of Santa Clara. 6-05.050 Director and Assistant Director of Emergency Services. (a) There is hereby created the office of Director of Emergency Services. The City Manager shall be the Director of Emergency Services. There is hereby created the office of aAssistant Director of Emergency Services, who shall be appointed by the Director of Emergency Services City Manager. When the Director of Emergency Services is not available, the Assistant Director of Emergency Services shall become Acting Director and assume the duties of the Director. (b) The Director of Emergency Services is hereby empowered to: (1)Request the City Council to pProclaim the existence or threatened existence of a "local emergency," if the City Council is in session, or to issue such proclamation if the City Council is not in session., if time permits, request the City Council to do so at a duly noticed meeting. Whenever a local emergency is proclaimed by the Director, the City Council shall take action to ratify the proclamation within seven days thereafter or the proclamation shall have no further force or effect. The City Council shall review the need for continuing the local emergency at least once every thirty days or such other period as may be determined by a resolution of the City Council until the City Council terminates the local emergency. The City Council shall proclaim the termination of the local emergency at the earliest possible date that conditions warrant. (2) Request the governor to proclaim a "state of emergency" when, in the opinion of the Director, the circumstances are beyond the city's capacity to adequately respond to or recover from locally available resources are inadequate to cope with the emergency. (3) Develop the Emergency Operations Plan with the assistance of emergency service chiefs for consideration by the Disaster Council, develop ancillary emergency plans as needed, and manage the emergency programs of the City. (4) Control and direct the effort of the emergency organization of the City for the accomplishment of the purposes of this Article. This responsibility includes the registration, supervision and direction of disaster service worker volunteers within the City. (54) Direct cooperation between and coordination of services and staff of the emergency organization of the City and resolve questions of authority and responsibility that may arise between them. (5) Represent the City in all dealings with public or private agencies on matters pertaining to emergencies as defined herein. 140 7 (6) Manage the emergency programs of the City with the assistance of City staff and emergency service chiefs. (7) Authorize City employees to perform any of the functions listed in subsections (b)(3) through (6). (c) In the event of the proclamation of a "local emergency" as herein provided, the proclamation of a "state of emergency" by the governor or the director of the State Office of Emergency Services, or the existence of a "state of war emergency," the Director of Emergency Services is hereby further empowered to: (1) Make and issue rules and regulations on matters reasonably related to the protection of life and property as affected by such emergency; provided, however, that such rules and regulations shall be confirmed or modified at the earliest practicable time by the City Council. (2) Obtain vital supplies, equipment and other such properties found lacking and needed for the protection of life and property and to bind the City for the fair value thereof and, if required immediately, to commandeer the same for public use; provided, however, that such actions which require expenditure of City funds shall be confirmed or modified at the earliest practicable time by the City Council. (3) Require emergency services of any City officer or employee and, in the event of the proclamation of a "state of emergency" in the County of Santa Clara or the existence of a "state of war emergency," to command the aid of as many citizens residents of the City as he deems deemed necessary in the execution of his or her the Director’s duties. Such persons shall be entitled to all privileges, benefits and immunities as are provided by State law for registered disaster service worker volunteers. (4) Requisition necessary personnel or material of any City department or agency. (5) Execute all his or her ordinary powers as City Manager, all of the special powers conferred upon him or her by this Article or by resolution or the Emergency Operations Plan pursuant hereto adopted by the City Council, all powers conferred upon him or her by any statute, by an agreement approved by the City Council and by any other lawful authority. (d) The Director of Emergency Services shall designate the order of succession to that office, to take effect in the event the Director is unavailable to attend meetings and otherwise perform his or her duties during an emergency. Such order of succession shall be approved by the City Council.The Assistant Director of Emergency Services is hereby empowered to: (1) Under the supervision of the Director and in consultation with emergency service providers, to develop emergency plans and manage the emergency programs of this jurisdiction; (2) Act on behalf of the disaster council to approve Saratoga Disaster Service Worker Volunteer training and exercises and to coordinate with the appropriate agencies and organizations; (3) Have such other powers and duties as may be assigned by the Director. 141 8 6-05.060 Emergency organization. The emergency organization of the City shall consist of all officers and employees of the City, together with those disaster service worker volunteers enrolled to aid them during an emergency, and all groups, organizations and persons who may, by agreement or operation of law, be charged with duties incident to the protection of life and property in the City during such emergency, including persons impressed into service under the provisions of subsection 6- 05.050(c)(3) of this Article. 6-05.070 Emergency Operation Plan. The Disaster Council shall be responsible for the development of the City Emergency Operation Plan, which plan shall provide for the effective mobilization of all the resources of the City, both public and private, to meet any condition constituting a "local emergency," "state of emergency" or "state of war emergency;" and shall provide for the organization, powers and duties, services and staff of the emergency organization. Such plans shall be adopted by resolution of the City Council. 6-05.080 Mutual aid. It is the purpose of the City Council in enacting this Article to facilitate the rendering of mutual aid to and for the people of the City. The Emergency Operation Plan adopted and approved by the City Council shall provide for the interchange of mutual aid and for coordination with the emergency plans of the County. 6-05.090 Expenditures. Any expenditure made in connection with emergency activities, including mutual aid activities, shall conclusively be deemed to be for the direct protection and benefit of the inhabitants and property of the City. 6-05.100 Prohibited acts during emergency. It shall be unlawful and shall constitute a misdemeanor for any person, during an emergency to: It shall be a misdemeanor, punishable by a fine of not to exceed one thousand dollars ($1,000), or by imprisonment for not to exceed six (6) months, or both, for any person, during an emergency, to: (a) Willfully obstruct, hinder or delay any member of the emergency organization in the enforcement of any lawful rule or regulation issued pursuant to this Article, or in the performance of any duty imposed upon him or her by virtue of this Article. (b) Do any act forbidden by any lawful rule or regulation issued pursuant to this Article. (c) Wear, carry or display, without authority, any means of identification specified by the emergency agency of the State as being authorized for emergency service workers. 142 9 6-05.110 Continuity of Government During an emergency, City Council may have vacancies where a Councilmember is unable to serve due to incapacitation or other situations arising from the emergency event. In order to preserve the function of local government in such a circumstance, the City will reconstitute its City Council based on the provisions of California Government Code Sections 8635 through 8644. 6-05.120 - Severability. If any provision of this chapter or the application thereof to any person or circumstances is held invalid, such invalidity shall not affect other provisions or applications, and to this end the provisions of this chapter are declared to be severable. 8. Regulation of Commercial Marijuana Activity 6-30.010 - Purpose of Article. This Article is intended to prohibit the establishment of commercial marijuana businesses and all outdoor cultivation of marijuana within the City, and to further regulate the personal indoor cultivation of marijuana authorized by state law, in order to protect the health and safety of the City's residents. This Article is intended to conform to statelaw, including the Compassionate Use Act, the Medical Marijuana Program Act, the Control, Regulate and Tax Adult Use of Marijuana Act, and the Medicinal and Adult-Use Cannabis Regulation and Safety Act. Consequently, this ordinance shall be interpreted toconform to such laws to the maximum extent feasible. In interpreting the terms of this ordinance, it is appropriate to look to the use and interpretation of those terms in applicable state law for guidance. Without limiting the generality of the foregoing, this ordinance shall not be interpreted as prohibiting patients within the city or their caregivers from purchasing by delivery sufficient medicinal marijuana to meet their demands in a timely and readily accessible manner. 6-30.020 - Definitions. The following definitions apply throughout this Article: (a) Commercial marijuana activity means the sale or exchange for valuable consideration of marijuana and marijuana products, or the provision of marijuana or marijuana products by a nonprofit, and the cultivation, possession, manufacture, distribution, processing, storing, laboratory testing, packaging, and labeling of marijuana and marijuana products intended for sale or exchange for valuable consideration or provision by a nonprofit. Commercial marijuana activity shall not include delivery of cannabis and cannabis products as "delivery" is defined in State law. (b)-(g) unchanged. 143 10 9. Street Design Standards 14-25.030 Design standards and dedication of streets. (a)-(q) unchanged (r) Driveway approaches.There shall be a minimum of one driveway approach to a lot, but no more than one driveway approach for each forty feet of lot frontage, up to a maximum of three driveway approaches for any lot intended to be developedin a single-family zoning district. Driveway approaches serving a single property shall be spaced a minimum of twenty feet apart.The subdivider may install continuous curbs, and thereafter cut out the driveway approaches after the building plans for the lot in question are completed, and all such approaches shall be subject to the provisions of the improvement agreement and bond except in the case of such approaches for which an encroachment permit has been issued pursuant to Article 10-20 in Chapter 10 of this Code. (s) unchanged. 10. Short Term Rentals 15-06.360 Hotel. "Hotel" means a structure or portion thereof or a group of attached or detached structures containing individual guest rooms or suites where lodging is provided primarily to transients for compensation for a period ofnot more than 29 consecutive days.The term includes motel, inn, tourist court, bed and breakfast establishment, short-term-rental,or similar use. 11. Height Limit at Driveway Intersections 15-29.010 Height Restrictions [Sections (a)-(e); no change.] (f)Driveway intersections.No fence, hedge, retaining wall, entryway element, pilaster, gate, or other similar element located within a triangle having sides twelve feet in length from either side of a driveway where it intersects with the edge of pavement on a street without a sidewalk (or, on a street with a sidewalk, the back of the curb)shall exceed three feet in height above the established grade of the adjoining street. Protected trees described in Section 15-50.050 of this Code are not subject to this requirement. (Remove the below illustration) (Replace with the below illustration) 144 11 [Sections (g)-(l); no change.] 12. Tree Regulation Definitions 15-50.020 Definitions [Sections (a)-(n); no change.] (o)ISA Standards means the 2001 Edition of the Pruning Standards and the Tree Valuation Formula contained in the April 2000 Guide for Plant Appraisal published by the International Society of Arboriculture.most recent edition of the Best Management Practices ANSI A300 Pruning and Managing Trees During Construction standards and the most recent edition of the Guide for Plant Appraisal published by the International Society of Arboriculture. (p)Native tree means coast live oak (Quercus agrifolia), valley oak (Quercus lobata), tanoak (Notholithocarpus densiflorus), black oak (Quercus kelloggii), blue oak (Quercus douglasii), scrub oak (Quercus dumosa), big leaf maple (Acer macrophylhlum macrophyllum), California buckeye (Aesculus californica), Douglas fir (Pseudotsuga menziesii) and coast redwood (Sequoia sempervirens). [Sections (q)-(cc); no change.] 13. Protected Tree Security Deposit 15-50.080 Determination on permit [Sections (a)-(c); no change.] (d)Security deposits and maintenance bonds. In the case of an application for, or a project involving encroachment on one or more protected trees, the applicant shall post a security deposit with the City in an amount equal to twenty-five percent to one hundred percent of the ISA valuation of the trees involved at the discretion of the approving authority; provided, however, that any project involving multiple structures or a multi-family structure shall post a 145 12 security deposit with the City in an amount equal to one hundred percent of the ISA valuation of the trees involved.proposing the removal of all protected trees or proposing work within the inner half of the optimal tree preservation zone (as defined in the ISA Best Management Practices A300 Managing Trees During Construction which is hereby adopted by reference) shall post a security deposit with the City in an amount equal to one hundred percent of the ISA valuation of the trees involved. An ISA Certified Arborist shall calculate the value of the tree/s in accordance with the Trunk Formula Method tree valuation formula contained in the ISA Guide for Plant Appraisal, which is hereby adopted by reference.The City may also require posting of a maintenance bond or security deposit of at least five years designed to ensure long term maintenance of the affected or replacement trees. Security deposits or maintenance bonds required for protected trees or replacement trees in public or private development may, in the reasonable discretion of the Community Development Director, be refunded upon a determination that the project is in compliance with the City Arborist's requirements and/or Tree Preservation Plan. In the case of violations of this Article or where replacement, restitution, or other remedy required pursuant to Section 15-50.170 cannot be made on the project site, then such payments shall be made from the deposit or bond being held before any refund is made. 14. Tree Preservation Plan Inspections 15-50.140 – Tree Preservation Plan [Sections (a)-(d); no change.] (e) At least three scheduled inspections shall be made by the City an ISA Certified Arborist to ensure compliance with the Tree Preservation Plan. The inspections shall, at a minimum include the following: (1) Initial inspection prior to any construction or grading, (2) After completion of rough grading and/or trenching, and (3) Completion of all work including planting and irrigation system installation. Other inspections may be conducted as required by the Community Development Director. 15. Tree Valuation 15-50.150 - Tree fund. [Section (a); no change.] (b)Tree valuation.Lawfully removed trees to be replaced as a condition of development approval shall be valued and their removal compensated for as follows: Trees replaced on or off site according to good forestry practices, shall provide, in the opinion of the Community Development Director, equivalent value in terms of aesthetic and environmental quality, size, height, location, appearance, and other significant beneficial characteristics of the removed tree/s. The City Arborist shall calculate the value of the removed tree/s in accordance with the ISA Tree Valuation Formula contained in the April 2000 ISA Guide for Plant Appraisal, which 146 13 is hereby adopted by reference.An ISA Certified Arborist shall calculate the value of the removed tree/s in accordance with the Trunk Formula Method tree valuation formula contained in the ISA Guide for Plant Appraisal, which is hereby adopted by reference. 16. Creek Protection Setbacks 15-45.045 - Creek protection setbacks. (a) Purpose, application.Where a protected creek passes through or along a building site or is otherwise located on the site, and in order to provide for the future protection of creeks, including creek banks and riparian habitat, a creek protection easement shall be required as set out in City Code section 14-25.065, and building setbacks for any new construction shall be measured from the top of the creek bank(s) away from the water course on the site rather than from the property lines of the site. The required setback shall be the minimum setback prescribed for the applicable zoning district. [Section (b)-(c) no change] 17. Replacement Housing Units Add the following new code section: 15-80.150 Replacement Housing Units. A housing development project proposed on a site that (i) is identified on the Housing Sites Inventory (shown in Figure 6-2 of the Housing Element of the Saratoga General Plan) and (ii) contains or contained housing of the type described in subsection (a) shall replace that housing as described in subsection (b). (a) This section shall apply to sites described in clause (i) above that either: (1) Contain rental dwelling units; or (2) In the five year period preceding the application contained rental dwelling units that (A) were vacated or demolished in that period and (B) were either (i) subject to a recorded covenant, ordinance, or law restricting rents to levels affordable to persons and families of lower or very low income; (ii) subject to any other form of rent or price control; or (iii) occupied by lower or very low income households. (b) A development subject to this section shall replace the units described in subsection (a) in the manner required by Government Code section 65915(c)(3)(B). (c) Terms used in this section and not otherwise defined herein shall have the meaning set forth in Government Code section 65915. 147 14 18. Sustainability 17-10.010 Definitions. (a) The definitions set forth in this section shall be applied throughout this Article, unless the context or the provision clearly requires otherwise. (b) The following terms are defined as set forth herein: (a)(1) Approved C&D processing facility means any of the facilities, used to process C&D debris, that have been approved by the Regional Agency. (b)(2) Cal ifornia Code of Regulations or CCR means the State of California Code of Regulations. CCR references in this Article are preceded with a number that refers to the relevant Title of the CCR (e.g., "14 CCR" refers to Title 14 of CCR). (c)(3) Cal Recycle means California's Department of Resources Recycling and Recovery, which is the Department designated with responsibility for developing, implementing, and enforcing SB 1383 Regulations on cities, counties, special districts, and other regulated entities. (d)(4) City means the City of Saratoga, California, a political subdivision of the State of California, and its duly authorized representatives. (e)(5) City enforcement official means the City manager, or other executive in charge or their authorized designee(s) who is/are partially or whole responsible for enforcing the Article. See also "Regional or County Agency Enforcement Official." (f)(6) Commercial business or commercial means a non-residential premises including a firm, partnership, proprietorship, joint-stock company, corporation, or association where business activity is conducted including, but not limited to, retail sales, services, wholesale operations, manufacturing, and industrial operations, but excluding businesses conducted upon residential property that are permitted under applicable zoning regulations and are not the primary use of the property, whether for- profit or nonprofit, strip mall, or industrial facility, or as otherwise defined in 14 CCR Section 18982(a)(6), with the exception that multi-family is excluded from the definition of commercial. (g)(7) Commercial edible food generator includes a tier one or a tier two commercial edible food generator as defined in this Article or as otherwise defined in 14 CCR Section 18982(a)(73) and (a)(74). For the purposes of this definition, food recovery organizations and food recovery services are not commercial edible food generators pursuant to 14 CCR Section 18982(a)(7). (h)(8) Community composting means any activity that composts green material, agricultural material, food material, and vegetative food material, alone or 148 15 in combination, and the total amount of feedstock and Compost on-site at any one time does not exceed one hundred cubic yards and seven hundred fifty square feet, as specified in 14 CCR Section 17855(a)(4); or, as otherwise defined by 14 CCR Section 18982(a)(8). (i)(9) Compliance review means a review of records by the City to determine compliance with this Article. (j)(10) Compost has the same meaning as in 14 CCR Section 17896.2(a)(4), which stated, as of the effective date of this Article, that "Compost" means the product resulting from the controlled biological decomposition of organic solid wastes that are source separated from the municipal solid waste stream, or which are separated at a centralized facility. (k)(11) Compostable plastics or compostable plastic means plastic materials that meet the ASTM D6400 standard for compostability, or as otherwise described in 14 CCR Section 18984.1(a)(1)(A) or 18984.2(a)(1)(C). (l)(12) Con tainer contamination or contaminated container means a container, regardless of color, that contains prohibited container contaminants, or as otherwise defined in 14 CCR Section 18982(a)(55). (m)(13) Cou nty means the County of Santa Clara, California. (n)(14) Cou nty Agency Enforcement Official means an authorized designee of the County of Santa Clara in the Public Health Department or other departments who is/are partially or whole responsible for enforcing this Article. (o)(15) Customer means the person who receives the collection contractor's services and to whom the contractor/City submits its billing invoice to and collects payment from for collection services provided to a premises. The customer may be either the occupant, owner, or other designated responsible person by the owner of the premises, as allowed under the City Code. (p)(16) Con struction and demolition debris or C&D debris means discarded building materials, packaging, debris, and rubble resulting from construction, alteration, remodeling, repair or demolition operations on any pavements, excavation projects, houses, commercial buildings, or other structures, excluding excluded materials and universal waste. C&D debris includes rocks, soils, tree remains, and other yard trimmings that result from land clearing or land development operations in preparation for construction. (q)(17) C&D hauler means the collection contractor that has been granted the exclusive or non-exclusive rights to collect C&D debris in the City through the agreement entered into by the collection contractor and the Regional Agency. 149 16 (r)(18) Covered project means and includes any project that meets the thresholds set forth in section 17-15.10. (s)(19) Designee means an entity that the City contracts with or otherwise arranges to carry out any of the City's responsibilities of this Article as authorized in 14 CCR Section 18981.2. A designee may be a government entity, a hauler, a private entity, or a combination of those entities. (t)(20) Discarded materials means recyclable materials, organic materials, and solid waste discarded by a generator for the purposes of collection and/or self-hauling, excluding excluded waste. (u)(21) Disposal or dispose (or any variation thereof) means the final disposition of solid waste or processing residue at a disposal facility. (v)(22) Dwelling unit means any individual living unit in a single-family dwelling, multi-family dwelling, structure or building, mobile home, or motor home located on a permanent site intended for, or capable of being utilized for, residential living other than a hotel or motel. (w)(23) Edible food means food intended for human consumption, or as otherwise defined in 14 CCR Section 18982(a)(18). For the purposes of this Article or as otherwise defined in 14 CCR Section 18982(a)(18), "Edible Food" is not solid waste if it is recovered and not discarded. Nothing in this Article or in 14 CCR, Division 7, Chapter 12 requires or authorizes the recovery of edible food that does not meet the food safety requirements of the California Retail Food Code. (x)(24) Enf orcement action means an action of the City or Regional Agency to address non-compliance with this Article including, but not limited to, issuing administrative citations, fines, penalties, or using other remedies. (y)(25) Excluded waste means hazardous substance, hazardous waste, infectious waste, designated waste, volatile, corrosive, medical waste, infectious, regulated radioactive waste, and toxic substances or material that facility operator(s), which receive materials from the City and its generators, reasonably believe(s) would, as a result of or upon acceptance, transfer, processing, or disposal, be a violation of local, State, or Federal law, regulation, or ordinance, including: land use restrictions or conditions, waste that cannot be disposed of in Class III landfills or accepted at the facility by permit conditions, waste that in City's,its designee's, or Regional Agency's reasonable opinion would present a significant risk to human health or the environment, cause a nuisance or otherwise create or expose the City, its designee, or Regional Agency's to potential liability; but not including de minimis volumes or concentrations of waste of a type and amount normally found in single-family or multi-family solid waste after implementation of programs for the safe collection, processing, recycling, treatment, and disposal of batteries and paint in compliance with Sections 41500 and 41802 of the California Public Resources Code. Excluded Waste 150 17 does not include used motor oil and filters, and household batteries when such materials are defined as allowable materials for collection through the City's collection programs and the generator or customer has properly placed the materials for collection pursuant to instructions provided by City, Regional Agency, or exclusive hauler for collection services. (z)(26) Exclusive hauler means the collection contractor that has been granted the exclusive rights to collect recyclable materials, organic materials, and solid waste in the City through the agreement entered into by the collection contractor and the Regional Agency"). (aa)(27) Food distributor means a company that distributes food to entities including, but not limited to, supermarkets and grocery stores, or as otherwise defined in 14 CCR Section 18982(a)(22). (bb)(28) Food facility has the same meaning as in Section 113789 of the Health and Safety Code. (cc)(29) Food recovery means actions to collect and distribute food for human consumption that otherwise would be disposed, or as otherwise defined in 14 CCR Section 18982(a)(24). (dd)(30) Food recovery organization means an entity that engages in the collection or receipt of edible food from commercial edible food generators and distributes that edible food to the public for food recovery either directly or through other entities or as otherwise defined in 14 CCR Section 18982(a)(25), including, but not limited to: (1) A food bank as defined in Section 113783 of the Health and Safety Code; (2) A nonprofit charitable organization as defined in Section 113841 of the Health and Safety code; and, (3) A nonprofit charitable temporary food facility as defined in Section 113842 of the Health and Safety Code. A food recovery organization is not a commercial edible food generator for the purposes of this Article and implementation of 14 CCR, Division 7, Chapter 12 pursuant to 14 CCR Section 18982(a)(7). If the definition in 14 CCR Section 18982(a)(25) for Food Recovery Organization differs from this definition, the definition in 14 CCR Section 18982(a)(25) shall apply to this Article. (ee)(31) Food recovery service means a person or entity that collects and transports edible food from a commercial edible food generator to a food recovery organization or other entities for food recovery, or as otherwise defined in 14 CCR Section 18982(a)(26). A food recovery service is not a commercial 151 18 edible food generator for the purposes of this Article and implementation of 14 CCR, Division 7, Chapter 12 pursuant to 14 CCR Section 18982(a)(7). (ff)(32) Food scraps means those discarded materials that will decompose and/or putrefy including: (i) all kitchen and table food waste; (ii) animal or vegetable waste that is generated during or results from the storage, preparation, cooking or handling of food stuffs; (iii) discarded paper (including paper containers and cartons) that is contaminated with food scraps and compostables; (iv) fruit waste, grain waste, dairy waste, meat, and fish waste; and, (v) vegetable trimmings, houseplant trimmings and other compostable organic waste common to the occupancy of Residential dwellings. Food scraps are a subset of food waste. Food scraps excludes fats, oils, and grease when such materials are source separated from other food scraps. (gg)(33) Food service provider means an entity primarily engaged in providing food services to institutional, governmental, commercial, or industrial locations of others based on contractual arrangements with these types of organizations, or as otherwise defined in 14 CCR Section 18982(a)(27). (hh)(34) Food-soiled paper is compostable paper material that has come in contact with food or liquid, such as, but not limited to, compostable paper plates, paper coffee cups, napkins, pizza boxes, and milk cartons. Food-soiled paper is a subset of food waste. (ii)(35) Food waste includes food scraps and food-soiled paper, and includes compostable plastics, unless [the] City, its designee, Regional Agency, or exclusive hauler excludes compostable plastics in the organic materials containers. Food waste is a subset of organic materials. (jj)(36) Generator means any person whose act first causes discarded materials to become subject to regulation under this Article of the City Code or under Federal, State, or local laws or regulations. (kk)(37) Green waste means tree trimmings, grass cuttings, dead plants, leaves, branches and dead trees (not more than three inches in diameter), garden and tree fruits and vegetables, and similar materials generated and source separated from other materials at the premises. (ll)(38) Grocery store means a store primarily engaged in the retail sale of canned food; dry goods; fresh fruits and vegetables; fresh meats, fish, and poultry; and any area that is not separately owned within the store where the food is prepared and served, including a bakery, deli, and meat and seafood departments, or as otherwise defined in 14 CCR Section 18982(a)(30). (mm)(39) Hauler route means the designated itinerary or sequence of stops for each segment of the City's collection service area, or as otherwise defined in 14 CCR Section 18982(a)(31.5). 152 19 (nn)(40) Health facility has the same meaning as in Section 1250 of the Health and Safety Code. (oo)(41) High diversion organic waste processing facility means a facility that is in compliance with the reporting requirements of 14 CCR Section 18815.5(d) and meets or exceeds an annual average Mixed Waste organic content recovery rate of fifty percent between January 1, 2022 and December 31, 2024, and 75 percent after January 1, 2025, as calculated pursuant to 14 CCR Section 18815.5(e) for organic wastereceived from the "mixed waste organic collection stream" as defined in 14 CCR Section 17402(a)(11.5); or, as otherwise defined in 14 CCR Section 18982(a)(33). (pp)(42) Hotel has the same meaning as in Section 17210 of the Business and Professions Code. (qq)(43) Inspection means a site visit where a City, its designee, or Regional Agency reviews records, containers, and an entity's collection, handling, recycling, or landfill disposal of organic waste or edible food handling to determine if the entity is complying with requirements set forth in this Article, or as otherwise defined in 14 CCR Section 18982(a)(35). (rr)(44) Large event means an event, including, but not limited to, a sporting event or a flea market, that charges an admission price, or is operated by a local agency, and serves an average of more than two thousand individuals per day of operation of the event, at a location that includes, but is not limited to, a public, nonprofit, or privately owned park, parking lot, golf course, street system, or other open space when being used for an event. If the definition in 14 CCR Section 18982(a)(38) differs from this definition, the definition in 14 CCR Section 18982(a)(38) shall apply to this Article. (ss)(45) Large venue means a permanent venue facility that annually seats or serves an average of more than two thousand individuals within the grounds of the facility per day of operation of the venue facility. For purposes of this Article and implementation of 14 CCR, Division 7, Chapter 12, a venue facility includes, but is not limited to, a public, nonprofit, or privately owned or operated stadium, amphitheater, arena, hall, amusement park, conference or civic center, zoo, aquarium, airport, racetrack, horse track, performing arts center, fairground, museum, theater, or other public attraction facility. For purposes of this Article and implementation of 14 CCR, Division 7, Chapter 12, a site under common ownership or control that includes more than one large venue that is contiguous with other Large Venues in the site, is a single large venue. If the definition in 14 CCR Section 18982(a)(39) differs from this definition, the definition in 14 CCR Section 18982(a)(39) shall apply to this Article. (tt)(46) Local education agency means a school district, charter school, or county office of education that is not subject to the control of city or county regulations related to solid waste, or as otherwise defined in 14 CCR Section 18982(a)(40). 153 20 (uu)(47) Mul ti-family residential dwelling or multi-family means of, from, or pertaining to residential premises with five or more dwelling units. Multi- Family premises do not include hotels, motels, or other transient occupancy facilities, which are considered commercial businesses. residential premises with fewer than five dwelling units shall be considered single-family. (vv)(48) MWELO refers to the Model Water Efficient Landscape Ordinance (MWELO), 23 CCR, Division 2, Chapter 2.7. (ww)(49) Non -compostable paper includes, but is not limited to, paper that is coated in a plastic material that will not breakdown in the composting process, or as otherwise defined in 14 CCR Section 18982(a)(41). (xx)(50) Non -local entity means the following entities that are not subject to the jurisdiction's enforcement authority, or as otherwise defined in 14 CCR Section 18982(a)(42): (1) Special district(s) located within the boundaries of the City, including the Saratoga Fire Protection District, West Valley Sanitary District, and Cupertino Sanitary District. (2) Federal facilities and state agencies located withinthe boundaries of the City. (3) Public universities (including community colleges) located within the boundaries of the City, including the West Valley Community College District. (yy)(51) Notice of violation (NOV)means a notice that a violation has occurred that includes a compliance date to avoid an action to seek penalties, or as otherwise defined in 14 CCR Section 18982(a)(45) or further explained in 14 CCR Section 18995.4. (zz)(52) Occupant means the person who occupies a premises. (aaa)(53) Organic materials means green waste, food waste, lumber, and wood waste. (bbb)(54) Organic materials container has the same meaning as in 14 CCR Section 18982.2(a)(29) and shall be used for the purpose of storage and collection of source separated organic materials. (ccc)(55) Organic waste means solid wastes containing material originated from living organisms and their metabolic waste products, including but not limited to food, green material, landscape and pruning waste, organic textiles and carpets, lumber, wood, paper products, printing and writing paper, manure, biosolids, digestate, and sludges or as otherwise defined in 14 CCR Section 18982(a)(46). Biosolids and digestate are as defined by 14 CCR Section 18982(a). 154 21 (ddd)(56) Organic waste generator means a person or entity that is responsible for the initial creation of organic waste, or as otherwise defined in 14 CCR Section 18982(a)(48). (eee)(57) Overage means discarded materials exceeding the container's intended capacity such that the container's lid is lifted by at least one (1) inch (or would be lifted by at least one (1) inch if there was a lid); or, (ii) discarded materials placed on top of or in the immediate vicinity of the container, excluding allowed cardboard. (fff)(58) Own er means the person(s) holding legal title to real property and/or any improvements thereon and shall include the person(s) listed on the latest equalized assessment roll of the County Assessor, or as otherwise defined in 14 CCR Section 18982(a)(57). (ggg)(59) Paper products include, but are not limited to, paper janitorial supplies, cartons, wrapping, packaging, file folders, hanging files, corrugated boxes, tissue, and toweling, or as otherwise defined in 14 CCR Section 18982(a)(51). (hhh)(60) Premises means any land or building in the City where recyclable materials, organic materials, solid waste, or C&D are generated or accumulated. (iii)(61) Printing and writing papers include, but are not limited to, copy, xerographic, watermark, cotton fiber, offset, forms, computer printout paper, white wove envelopes, manila envelopes, book paper, note pads, writing tablets, newsprint, and other uncoated writing papers, posters, index cards, calendars, brochures, reports, magazines, and publications, or as otherwise defined in 14 CCR Section 18982(a)(54). (jjj)(62) Process or processing (or any variation thereof) means the controlled separation, recovery, volume reduction, conversion, or recycling of source separated recyclable materials or source separated organic materials including, but not limited to, organized, manual, automated, or mechanical sorting, the use of vehicles for spreading of waste for the purpose of recovery, and/or includes the use of conveyor belts, sorting lines, or volume reduction equipment, or as otherwise defined in 14 CCR Section 17402(a)(20). (kkk)(63) Prohibited container contaminants means the following: (i) discarded materials placed in the recyclable materials container that are not identified as acceptable source separated recyclable materials for the City's recyclable materials container; (ii) discarded materials placed in the organic materials container that are not identified as acceptable source separated organic materials for the City's organic materials container; (iii) discarded materials placed in the solid waste container that are acceptable source separated recyclable materials and/or source separated organic materials to be placed 155 22 in City's organic materials container and/or recyclable materials container; and, (iv) excluded waste placed in any container. (lll)(64) Recovered organic waste products means products made from California, landfill-diverted recovered organic waste processed in a permitted or otherwise authorized facility, or as otherwise defined in 14 CCR Section 18982(a)(60). (mmm)(65) Recovery means any activity or process described in 14 CCR Section 18983.1(b), or as otherwise defined in 14 CCR Section 18982(a)(49). (nnn)(66) Recyclable materials means materials that are intended for the purposes of being reused or . The particular materials eligible to be recycled through the City's programs shall be specified from time to time by the Regional Agency. (ooo)(67) Recyclable materials container has the same meaning as in 14 CCR Section 18982.2(a)(5) and shall be used for the purpose of storage and collection of source separated recyclable materials. (ppp)(68) Recycled-content paper means paper products and printing and writing paper that consists of at least 30 percent, by fiber weight, postconsumer fiber, or as otherwise defined in 14 CCR Section 18982(a)(61). (qqq)(69) Regional Agency means the West Valley Solid Waste Management Authority. (rrr)(70) Regional Agency Enforcement Official means a designated enforcement official from the Regional Agency or other regional or county agency, designated by the City with responsibility for enforcing this Article in conjunction or consultation with City enforcement official. (sss)(71) Remote monitoring means the use of the internet of things (IoT) and/or wireless electronicdevices to visualize the contents of recyclable materials containers, organic materials containers, and solid waste materials containers for purposes of identifying the quantity of materials in containers (level of fill) and/or presence of prohibited container contaminants. (ttt)(72) Renewable gas means gas derived from organic waste that has been diverted from a California landfill and processed at an in-vessel digestion facility that is permitted or otherwise authorized by 14 CCR to recycle organic waste, or as otherwise defined in 14 CCR Section 18982(a)(62). (uuu)(73) Restaurant means an establishment primarily engaged in the retail sale of food and drinks for on-premises or immediate consumption, or as otherwise defined in 14 CCR Section 18982(a)(64). (vvv)(74) Rou te review means a visual inspection of containers along a hauler route for the purpose of determining container contamination, and may include 156 23 mechanical inspection methods such as the use of cameras, or as otherwise defined in 14 CCR Section 18982(a)(65). (www)(75) Salvage means the controlled removal of C&D debris from a covered project, for the purpose of reuse or storage for later reuse. (xxx)(76) SB 1383 means Senate Bill 1383 of 2016 approved by the Governor on September 19, 2016, which added Sections 39730.5, 39730.6, 39730.7, and 39730.8 to the Health and Safety Code, and added Chapter 13.1 (commencing with Section 42652) to Part 3 of Division 30 of the Public Resources Code, establishing methane emissions reduction targets in a statewide effort to reduce emissions of short-lived climate pollutants as amended, supplemented, superseded, and replaced from time to time. (yyy)(77) SB 1383 Regulations or SB 1383 Regulatory means or refers to, for the purposes of this Article, the short-lived climate pollutants: organic waste reduction regulations developed by CalRecycle that created 14 CCR, Division 7, Chapter 12 and amended portions of regulations of 14 CCR and 27 CCR. (zzz)(78) Self-hauler means a person, who hauls solid waste, organic waste or recyclable material they have generated to another person. Self-hauler also includes a person who back-hauls waste, or as otherwise defined in 14 CCR Section 18982(a)(66). Back-haul means generating and transporting Organic Waste to a destination owned and operated by the generator using the generator's own employees and equipment, or as otherwise defined in 14 CCR Section 18982(a)(66)(A). Self-hauler also includes a landscaper. (aaaa)(79) Service level refers to the size of a customer's container(s) and the frequency of collection service. (bbbb)(80) Share table has the same meaning as in Section 114079 of the Health and Safety Code. (cccc)(81) Single-family means of, from, or pertaining to any residential premises with fewer than five units. (dddd)(82) Solid waste has the same meaning as defined in State Public Resources Code Section 40191, which defines solid waste as all putrescible and nonputrescible solid, semisolid, and liquid wastes, including garbage, trash, refuse, paper, rubbish, ashes, industrial wastes, construction and demolition debris, abandoned vehicles and parts thereof, discarded home and industrial appliances, dewatered, treated, or chemically fixed sewage sludge which is not hazardous waste, manure, vegetable or animal solid and semi-solid wastes, and other discarded solid and semisolid wastes, with the exception that solid waste does not include any of the following wastes: (1) Hazardous waste, as defined in the State Public Resources Code Section 40141. 157 24 (2) Radioactive waste regulated pursuant to the State Radiation Control Law (Chapter 8 (commencing with Section 114960) of Part 9 of Division 104 of the State Health and Safety Code). (3) Medical waste regulated pursuant to the State Medical Waste Management Act (Part 14 (commencing with Section 117600) of Division 104 of the State Health and Safety Code). Untreated medical waste shall not be disposed of in a Solid Waste landfill, as defined in State Public Resources Code Section 40195.1. Medical waste that has been treated and deemed to be Solid Waste shall be regulated pursuant to Division 30 of the State Public Resources Code. (eeee)(83) Solid waste materials container has the same meaning as in 14 CCR Section 18982.2(a)(28) and shall be used for the purpose of storage and collection of Solid Waste. (ffff)(84) Source separated means materials, including commingled recyclable materials, that have been separated or kept separate from the Solid Waste stream, at the point of generation, for the purpose of additional sorting or processing those materials for recycling or reuse in order to return them to the economic mainstream in the form of raw material for new, reused, or reconstituted products, which meet the quality standards necessary to be used in the marketplace, or as otherwise defined in 14 CCR Section 17402.5(b)(4). For the purposes of this Article, source separated shall include separation of materials by the generator, property owner, property owner's employee, property manager, or property manager's employee into different containers for the purpose of collection such that source separated materials are separated from solid waste for the purposes of collection and processing. (gggg)(85) Source separated organic materials means source separated organic materials that can be placed in an organic materials container that is specifically intended for the separate collection of organic waste. (hhhh)(86) Source separated recyclable materials means source separated recyclables materials that can be placed in a recyclable materials containers that is specifically intended for the separate collection of recyclable materials (iiii)(87) State means the State of California. (jjjj)(88) Supermarket means a full-line, self-service retail store with gross annual sales of two million dollars, or more, and which sells a line of dry grocery, canned goods, or nonfood items and some perishable items, or as otherwise defined in 14 CCR Section 18982(a)(71). (kkkk)(89) Tier one commercial edible food generator means a commercial edible food generator that is one of the following: 158 25 (1) Supermarket. (2) Grocery store with a total facility size equal to or greater than ten thousand square feet. (3) Food service provider. (4) Food distributor. (5) Wholesale food vendor. If the definition in 14 CCR Section 18982(a)(73) of tier one commercial edible food generator differs from this definition, the definition in 14 CCR Section 18982(a)(73) shall apply to this Article. (llll)(90) Tier two commercial edible food generator means a commercial edible food generator that is one of the following: (1) Restaurant with two hundred fifty or more seats, or a total facility size equal to or greater than five thousand square feet. (2) Hotel with an on-site food facility and two hundred or more rooms. (3) Health facility with an on-site food facility and one hundred or more beds. (4) Large venue. (5) Large event. (6) A State agency with a cafeteria with two hundred fifty or more seats or total cafeteria facility size equal to or greater than five thousand square feet. (7) A local education agency facility with an on-site food facility. If the definition in 14 CCR Section 18982(a)(74) of tier two commercial edible food generator differs from this definition, the definition in 14 CCR Section 18982(a)(74) shall apply to this Article. (mmmm)(91) Transportation or transport means the act of conveying Collected materials from one location to another. (nnnn)(92) Universal waste means waste defined by 22 CCR Subsections 66273.1 through 66273.9, including, but not limited to batteries, fluorescent light bulbs, mercury switches, and E-waste. (oooo)(93) West Valley Clean Water Authority means the stormwater pollution prevention authority for the cities of Campbell, Monte Sereno, Saratoga, and the town of Los Gatos. 159 26 (pppp)(94) Wholesale food vendor means a business or establishment engaged in the merchant wholesale distribution of food, where food (including fruits and vegetables) is received, shipped, stored, prepared for distribution to a retailer, warehouse, distributor, or other destination, or as otherwise defined in 14 CCR Section 189852(a)(76). *** End of Amendments *** 1787458.1 160 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:City Manager’s Department PREPARED BY:Leslie Arroyo, Assistant City Manager SUBJECT:Evacuation Route Assessment RECOMMENDED ACTION: Authorize the City Manager to sign an agreement with Fehr and Peers to conduct an Evacuation Route Capacity Analysis in the amount of $54,000. BACKGROUND: With an increase in the frequency and severity of wildfires and other hazards, the State has developed new requirements for evacuationplanning. Several state laws require greater integration of resilience in local long-range planning. In accordance with these laws, the City’s recently adopted Safety Element includes the following implementation measure, with a targeted completion within one year of the Safety Element’s adoption: IM SAF-5.10b: Create and adopt an evacuation route assessment as part of the Local Hazard Mitigation Plan, to identify evacuation routes and their capacity, safety, and viability and evacuation locations under a range of emergency scenarios. To move forward with this program the City will engage Fehr and Peers to consider various factors when evaluating Saratoga’s evacuation routes, including accessibility, capacity, suitability, proximity to emergency services, and short- and long-term appropriateness. As part of its scope of work, Fehr and Peers will collaborate with City staff to evaluate thesefactors for the City’s primary evacuation routes. Fehr and Peers will also evaluate the distance people have to travel to reach evacuation locations or gateways in the city, which will assist in identifying potentially vulnerable communities that have limited accessibility. Upon authorization to proceed with the project, staff anticipates this effort will be complete within five months. FISCAL IMPACT: Funding has been appropriated for this project in the FY2024/25 operating budget. 161 ATTACHMENT: Attachment A – Fehr and Peers Scope of Work 1797555.1 162 60 S. Market Street | Suite 700 | San José, CA 95113 | (408) 278-1700 | Fax (408) 278-1717 www.fehrandpeers.com Scope of Work This scope was developed to meet the requirements of Assembly Bill (AB) 747 and AB 1409. These assembly bills require agencies to update their safety elements to identify evacuation routes and evacuation locations, and evaluate their capacity, safety, and viability under a range of emergency scenarios. The following is our proposed scope of work based on our project understanding and informed by our discussions with City of Saratoga. Task 1: AB 747 and AB 1409 Evacuation Route Capacity Analysis Fehr & Peers will organize and facilitate a workshop with City staff (planning, public works, emergency services) to identify a range of emergency scenarios – up to three likely events representing different evacuation profiles. Fehr & Peers will also lead a discussion about the key evacuation routes for these scenarios and the parameters for the evacuation analyses. We will rely on expertise from others on the project team to identify various hazard conditions and potential constraints to evacuation that ensure compliance with California Board of Forestry and Fire Protection requirements (AB 747 and AB 1409) associated with the required Safety Element review. These events are likely to include wildfires, flooding, and/or landslides as noted in the countywide Local Hazard Mitigation Plan. The selection of evacuation events to evaluate will be based on events that have the highest evacuation demand in the shortest period. Certain types of events like earthquakes do not typically include a large-scale evacuation as residents are typically told to shelter in place. The analysis will be conducted for residents evacuating designated hazard areas on City evacuation routes for evacuation scenarios based on an evacuation order being issued when all residents are at home. A qualitative discussion of potential evacuation route constraints in adjacent cities will also be provided. Fehr & Peers will then collaborate with City staff to evaluate the capacity (using volume to capacity ratios based on the number of travel lanes, roadway classifications, etc.), safety, and viability of key evacuation routes. We will also evaluate the distance people have to travel to reach evacuation locations (e.g., temporary areas of refuge, evacuation centers, evacuation endpoints) or gateways in the City, which will assist in identifying potentially vulnerable communities that have limited accessibility. To complete this task, Fehr & Peers will obtain available GIS files from City staff that include parcels, roadways, US census data, key critical facilities and infrastructure, and relevant hazard layers obtained by others. Most hazard layers will be sourced from federal, state, and regional agencies, however, if the City has specific layers of concern, these should be provided for the analysis. Fehr & Peers will summarize a citywide risk screening by identifying high, medium, and low risk corridors in the City of Saratoga based on high hazard locations (collector or arterial streets in the hazard areas identified in the Senate Bill 99 accessibility analysis in the Draft Safety Element), 163 June 24, 2024 Page 2 of 2 population density, and roadway capacity. Fehr & Peers will document compliance with AB 747 and AB 1409 requirements in Task 2. Please note that we have scope out a “high-level” assessment, using planning parameters related to hourly vehicle throughput and travel distances to assist with the evacuation route assessment. This method does not account for preparation and/or departure time over the evacuation period or time delays due to queue spill back at bottlenecks that may block other vehicles. Other, more sophisticated approaches are available (including the use of Fehr & Peers’ EVAC+ Tool which applies a dynamic traffic assignment where departure time, queues, and travel time are accounted for throughout the evacuation route network), but we have not included that into our scope. Task 2: Documentation Fehr & Peers will prepare one memorandum that documents AB 747 and AB 1409 compliance and recommends safety element policies based on the results of Task 1. The safety element policies will include evacuation implementation programs for incorporation into the Safety Element to provide compliance with AB 747 and AB 1409. These recommendations may include improved emergency response time, increased notifications, evacuation drills for residents, improved infrastructure to assist with evacuation (e.g. improved roadway network connectivity in some areas), and/or development limitations for areas where circulation constraints may affect future development. The draft memorandum will be submitted to the City for review and comment. Review comments will be incorporated into the final memorandum. Our fee estimate assumes 6 professional staff hours to respond to comments and prepare a final memorandum. Responding to comments requiring additional technical analysis or requiring more than 6 staff hours will be conducted as an additional service. Task 3: Meetings Fehr & Peers will attend up to six (6) 1-hour web-enabled project team conference calls with two staff present. Preparation for or attendance at additional meetings, public engagement, or public hearings related to the safety element will be completed as an additional service. Fee Estimate The fee to conduct the scope of work noted above will be completed on a time-and-materials basis for a not-to-exceed fee of $54,000. Any additional work requested outside of this scope of work will be scoped and budgeted on a time-and-material basis with prior authorization from the client. We can begin upon receipt of authorization to proceed with the project. We anticipate completing this effort within five months of our receipt of authorization to proceed from the City. 164 SARATOGA CITY COUNCIL MEETING DATE:July 03, 2024 DEPARTMENT:Public Works Department PREPARED BY:John Cherbone, Director SUBJECT:Parks Restrooms Renovations Project Award of Contract RECOMMENDED ACTION(S): 1) Award a contract to Selway Construction in the amount of $294,999 for the Parks Restrooms Renovations Project. 2) Authorize a 15 percent contingency to execute change orders to the contract up to $44,250, for a total not to exceed $339,249. BACKGROUND: Formal bids for the Parks Restrooms Renovations project were received and opened on June 18, 2024. Staff reviewed the four bids received and determined that the lowest bidder, Selway Construction, qualifies for the award of contract. The scope of the contract includes renovations and improvements to the restroom facilities at Congress Springs Park, El Quito Park, and Wildwood Park. The plans and specifications for the project, as noted in Attachment B, were prepared under Staff direction by Steve Benzing Architect. FISCAL IMPACT: This project is funded by American Rescue Plan Act funds. Of the approximately $340,000 needed, $237,000 is available in the Parks Restroom Improvements Capital Improvement Program (CIP) budget, and the remaining $103,000 will be transferred from the Monte Vista Storm Drain Improvements CIP budget. ATTACHMENTS: Attachment A – Bid Tabulation Attachment B – Contract 165 Congress Springs Park El Quito Park Wildwood Park Task #Task Lump Sum Bid Amount Lump Sum Bid Amount Lump Sum Bid Amount 1 Mobilization $21,626.00 $21,626.00 $21,626.00 2 Demolition $6,762.00 $7,200.00 $6,324.00 3 Debris Disposal $800.00 $800.00 $800.00 4 Temporary Facilities $560.00 $560.00 $560.00 5 Concrete (contractor shall verify w/c locations and relocate for plan dimensions as required $0.00 $0.00 $0.00 6 Metals - Miscellaneous $0.00 $0.00 $0.00 7 Miscellaneous Rough Carpentry $10,554.00 $10,554.00 $10,554.00 8 Finish Carpentry $8,864.00 $8,845.00 $8,845.00 9 Thermal and Moisture Protection $0.00 $0.00 $0.00 10 Doors and Windows (reuse existing doors)$2,149.00 $2,149.00 $2,149.00 11 Drywall $0.00 $0.00 $0.00 12 Painting & Staining $3,829.00 $3,829.00 $3,829.00 13 Floor Covering $2,364.00 $2,364.00 $2,364.00 14 Tile $16,144.00 $16,144.00 $0.00 15 Toilet Partitions $16,998.00 $16,990.00 $16,990.00 16 ADA Door Hardware $0.00 $0.00 $0.00 17 Signage $600.00 $600.00 $600.00 18 Changing Tables $3,200.00 $3,200.00 $3,200.00 19 Furnishings $0.00 $0.00 $0.00 20 Plumbing Fixtures and Faucets $13,984.00 $13,984.00 $13,984.00 21 Rough Electrical $3,968.00 $3,968.00 $3,968.00 22 Finish Electrical $3,968.00 $3,968.00 $3,968.00 23 Lighting Fixtures $5,290.00 $5,290.00 $5,290.00 24 Communication Wiring Rough & Finish $0.00 $0.00 $0.00 25 Fire Alarm $0.00 $0.00 $0.00 26 Security Wiring & Switches $0.00 $0.00 $0.00 $121,660.00 $122,071.00 $105,051.00 $348,782.00 Flashback Construction Bid Sub-Totals 166 Task #Task 1 Mobilization 2 Demolition 3 Debris Disposal 4 Temporary Facilities 5 Concrete (contractor shall verify w/c locations and relocate for plan dimensions as required 6 Metals - Miscellaneous 7 Miscellaneous Rough Carpentry 8 Finish Carpentry 9 Thermal and Moisture Protection 10 Doors and Windows (reuse existing doors) 11 Drywall 12 Painting & Staining 13 Floor Covering 14 Tile 15 Toilet Partitions 16 ADA Door Hardware 17 Signage 18 Changing Tables 19 Furnishings 20 Plumbing Fixtures and Faucets 21 Rough Electrical 22 Finish Electrical 23 Lighting Fixtures 24 Communication Wiring Rough & Finish 25 Fire Alarm 26 Security Wiring & Switches Bid Sub-Totals Congress Springs Park El Quito Park Wildwood Park Lump Sum Bid Amount Lump Sum Bid Amount Lump Sum Bid Amount $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 $2,500.00 $0.00 $0.00 $0.00 $10,000.00 $10,000.00 $10,000.00 $3,333.00 $3,333.00 $3,333.00 $5,000.00 $5,000.00 $5,000.00 $3,000.00 $3,000.00 $3,000.00 $3,500.00 $3,500.00 $3,500.00 $3,000.00 $3,000.00 $3,000.00 $2,500.00 $2,500.00 $2,500.00 $6,500.00 $6,500.00 $6,500.00 $5,000.00 $5,000.00 $5,000.00 $10,000.00 $10,000.00 $10,000.00 $4,000.00 $4,000.00 $4,000.00 $500.00 $500.00 $500.00 $1,000.00 $1,000.00 $1,000.00 $5,000.00 $5,000.00 $5,000.00 $8,000.00 $8,000.00 $8,000.00 $4,000.00 $4,000.00 $4,000.00 $2,500.00 $2,500.00 $2,500.00 $4,000.00 $4,000.00 $4,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $98,333.00 $98,333.00 $98,333.00 $294,999.00 Selway Construction 167 Task #Task 1 Mobilization 2 Demolition 3 Debris Disposal 4 Temporary Facilities 5 Concrete (contractor shall verify w/c locations and relocate for plan dimensions as required 6 Metals - Miscellaneous 7 Miscellaneous Rough Carpentry 8 Finish Carpentry 9 Thermal and Moisture Protection 10 Doors and Windows (reuse existing doors) 11 Drywall 12 Painting & Staining 13 Floor Covering 14 Tile 15 Toilet Partitions 16 ADA Door Hardware 17 Signage 18 Changing Tables 19 Furnishings 20 Plumbing Fixtures and Faucets 21 Rough Electrical 22 Finish Electrical 23 Lighting Fixtures 24 Communication Wiring Rough & Finish 25 Fire Alarm 26 Security Wiring & Switches Bid Sub-Totals Congress Springs Park El Quito Park Wildwood Park Lump Sum Bid Amount Lump Sum Bid Amount Lump Sum Bid Amount $35,000.00 $35,000.00 $35,000.00 $2,334.00 $2,334.00 $2,334.00 $1,000.00 $1,000.00 $1,000.00 $4,200.00 $4,200.00 $4,200.00 $3,000.00 $3,000.00 $3,000.00 $0.00 $0.00 $0.00 $2,000.00 $2,000.00 $2,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,000.00 $6,000.00 $6,000.00 $2,225.00 $2,225.00 $2,225.00 $1,792.00 $1,792.00 $1,792.00 $13,000.00 $7,825.00 $9,675.00 $12,985.00 $12,944.00 $10,042.00 $1,335.00 $1,335.00 $1,335.00 $500.00 $500.00 $500.00 $516.00 $516.00 $516.00 $2,109.00 $2,171.00 $1,792.00 $27,556.00 $27,834.00 $32,680.00 $11,352.00 $10,835.00 $11,835.00 $1,480.00 $1,200.00 $1,480.00 $677.50 $485.00 $677.50 $0.00 $0.00 $0.00 $22,500.00 $20,700.00 $20,700.00 $0.00 $0.00 $0.00 $151,561.50 $143,896.00 $148,783.50 $444,241.00 R.C. Benson & Sons, Inc. 168 Task #Task 1 Mobilization 2 Demolition 3 Debris Disposal 4 Temporary Facilities 5 Concrete (contractor shall verify w/c locations and relocate for plan dimensions as required 6 Metals - Miscellaneous 7 Miscellaneous Rough Carpentry 8 Finish Carpentry 9 Thermal and Moisture Protection 10 Doors and Windows (reuse existing doors) 11 Drywall 12 Painting & Staining 13 Floor Covering 14 Tile 15 Toilet Partitions 16 ADA Door Hardware 17 Signage 18 Changing Tables 19 Furnishings 20 Plumbing Fixtures and Faucets 21 Rough Electrical 22 Finish Electrical 23 Lighting Fixtures 24 Communication Wiring Rough & Finish 25 Fire Alarm 26 Security Wiring & Switches Bid Sub-Totals Congress Springs Park El Quito Park Wildwood Park Lump Sum Bid Amount Lump Sum Bid Amount Lump Sum Bid Amount $7,500.00 $7,500.00 $7,500.00 $5,000.00 $5,000.00 $5,000.00 $2,200.00 $2,200.00 $2,200.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $5,000.00 $3,000.00 $3,000.00 $3,000.00 $1,000.00 $1,000.00 $1,000.00 $6,000.00 $6,000.00 $6,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $4,000.00 $4,000.00 $4,000.00 $2,000.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $2,000.00 $39,000.00 $39,000.00 $39,000.00 $3,000.00 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $5,000.00 $1,000.00 $1,000.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $148,700.00 $148,700.00 $148,700.00 $446,100.00 Pro-Ex Construction 169 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations (Updated May 2024) CITY OF SARATOGA CONTRACT DOCUMENTS FOR PARKS RESTROOM RENOVATIONS PROJECT KEY BID DATES Date Issued: Monday June 3, 2024 Requests for Equals/Clarifications Due: Thursday June 13, 2024, at 5:00pm Bid Due: Tuesday June 18, 2024, at 2:00pm Council Award Date: Wednesday July 3, 2024 170 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations i CITY OF SARATOGA Table of Contents NOTICE INVITING BIDS ................................................................................................................. 1 INFORMATION FOR BIDDERS ..................................................................................................... 4 SCOPE AND LOCATION OF WORK ..................................................................................................... 4 INSPECTION OF WORK SITE ................................................................................................................ 4 EXAMINATION OF CONTRACT DOCUMENTS ................................................................................. 4 REPORT OF ERRORS AND OMISSIONS .............................................................................................. 4 INTERPRETATION OF CONTRACT DOCUMENTS ............................................................................ 5 BIDS .......................................................................................................................................................... 5 ADDENDA ............................................................................................................................................... 6 BID PRICES .............................................................................................................................................. 6 TAXES ...................................................................................................................................................... 7 EXPERIENCE OF BIDDERS ................................................................................................................... 7 LISTS OF SUBCONTRACTORS ............................................................................................................. 7 BID GUARANTY ..................................................................................................................................... 7 MODIFICATION OF BID ........................................................................................................................ 8 POSTPONEMENT OF OPENING ............................................................................................................ 8 NON COLLUSION AFFIDAVIT ............................................................................................................. 8 DISQUALIFICATION OF BIDDER ........................................................................................................ 8 REJECTION OF BIDS .............................................................................................................................. 8 RELIEF OF BIDDERS .............................................................................................................................. 8 COMPLETING AND SIGNING FORMS ................................................................................................. 9 DEBARRED CONTRACTORS AND SUBCONTRACTORS ................................................................. 9 PRIOR APPROVAL OF SUBSTITUTIONS ("APPROVED EQUALS") ................................................ 9 PREVAILING WAGE AND APPRENTICESHIP .................................................................................... 9 BID PROTEST PROCEDURES ...............................................................................................................10 GENERAL CONDITIONS ............................................................................................................. 12 SECTION GC-1 DEFINITIONS AND TERMS .................................................................................12 SECTION GC-2 BID REQUIREMENTS AND CONDITIONS ........................................................13 SECTION GC-3 AWARD AND EXECUTION OF CONTRACT .....................................................14 SECTION GC-4 SCOPE OF WORK ..................................................................................................15 SECTION GC-5 CONTROL OF WORK ...........................................................................................16 SECTION GC-6 CONTROL OF MATERIALS .................................................................................19 SECTION GC-7 LEGAL RELATIONS AND RESPONSIBILITY ...................................................21 SECTION GC-8 PROSECUTION AND PROGRESS .......................................................................35 SECTION GC-9 MEASUREMENT AND PAYMENT .....................................................................38 SECTION GC-10 DUST CONTROL ...................................................................................................41 SECTION GC-11 RESERVED ............................................................................................................41 SECTION GC-12 DIFFERING SITE CONDITIONS ..........................................................................41 SECTION GC-13 ARCHAEOLOGICAL EXAMINATION ...............................................................42 WAIVER AND RELEASE ............................................................................................................. 43 SPECIAL CONDITIONS ............................................................................................................... 48 STATEMENT OF EXPERIENCE AND QUALIFICATIONS .......................................................... 54 BID FORM ..................................................................................................................................... 57 CONTRACT BID .....................................................................................................................................58 BID SCHEDULE ......................................................................................................................................60 BONDS .......................................................................................................................................... 62 171 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ii BID BOND ...............................................................................................................................................63 FAITHFUL PERFORMANCE BOND .....................................................................................................65 LABOR AND MATERIALS PAYMENT BOND ....................................................................................69 CONTRACT FOR CONSTRUCTION ............................................................................................ 72 REQUIRED CERTIFICATIONS .................................................................................................... 78 BIDDER’S CHECKLIST .........................................................................................................................79 NONCOLLUSION AFFIDAVIT .............................................................................................................80 PROPOSED MAJOR MATERIAL SUPPLIERS .....................................................................................81 PROPOSED SUBCONTRACTORS ........................................................................................................82 AFFIDAVIT CONCERNING CONFLICTS OF INTEREST AND NONCOMPETITIVE PRACTICES ..................................................................................................................................................................84 FAIR EMPLOYMENT PRACTICES CERTIFICATE ............................................................................85 CONTRACTOR’S RESPONSE FORM ...................................................................................................89 A CERTIFICATION CONCERNING CONTROL OF EMPLOYEES OF CONTRACTOR ..................90 CITY OF SARATOGA DEPARTMENT OF INDUSTRIAL RELATIONS REPORTING .....................91 CITY OF SARATOGA CONTRACTOR OFF-ROAD REGULATIONS ASSURANCES .....................92 PLANS ........................................................................................................................................... 93 CITY ORDINANCE #400 (DEBRIS DISPOSAL) ........................................................................ 101 ARPA FUNDING AGREEMENT ................................................................................................. 129 172 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Notice Inviting Bids 1 NOTICE INVITING BIDS Parks Restroom Renovations Project SEALED BIDS will be received by the CITY OF SARATOGA (CITY) until 2:00pm on Tuesday June 18, 2024 for Parks Restroom Renovations Project. Sealed bids shall be submitted addressed and noted as follows: Public Works Director City of Saratoga 13777 Fruitvale Ave. Saratoga, CA 95070 Sealed Bid for: Parks Restroom Renovations Project All bids must be accompanied by bidder's security in accordance with California Public Contract Code Sections 20170 et seq. Following the closure of the bid submittal period, bids will be publicly opened and read for performing work as follows: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Parks Restroom Renovations Project according to the Contract Documents. The work to be done consists of supplying all labor, methods or processes, implements, tools, machinery, equipment and materials to complete the Parks Restroom Renovations Project and other work not specifically mentioned herein, but which may be required as directed by CITY or its designated representative. CITY hereby notifies all Bidders that it will affirmatively ensure that in regard to any contract entered into pursuant to this Invitation for Bid, Disadvantaged Business Enterprises (DBE’s) will be afforded full opportunity to submit Bids in response to this invitation and will not be discriminated against on the basis of race, color, sex, national origin, in consideration for an award. Project is to be completed within 60 working days from the date specified in the Notice to Proceed. The Contractor shall pay to the City of Saratoga the sum of One Thousand and Nine Hundred ($1,900) for each and every working day’s delay in finishing the work in excess of the working day completion time. Bidders may obtain copies of the bidding documents at the Public Works Department, City of Saratoga. A set of bid documents can be obtained from the City website at www.saratoga.ca.us, or via phone request at 1-408-868-1247, or email request at publicworks@saratoga.ca.us. 173 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Notice Inviting Bids 2 A written request can also be mailed to Attn: Public Works Department, City of Saratoga 13777 Fruitvale Avenue, Saratoga CA 95070. Requests for equals/clarifications are due: no later than 5:00 PM on Thursday June 13, 2024. Any questions concerning this bid should be addressed to Shawn Gardner, Parks Manager, Public Works Department, City of Saratoga, phone and fax (408) 868-1247 or email sgardner@saratoga.ca.us. Pursuant to California Labor Code Section 1771, the successful bidder and all subcontractors shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are available for view at the City of Saratoga Department of Public Works. Full compensation for conforming to these requirements shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor. Contractor and all subcontractors are not qualified to bid on or be listed in a bid proposal, subject to the requirements of section 4104 of the California Labor Code, and shall not engage in the performance of any work under this contract, unless currently registered and qualified to perform public work pursuant to section 1725.5 of the California Labor Code. Pursuant to California Public Contract Code Section 22300, the Contractor may, at its option, choose to substitute securities for monies earned by the Contractor and retained by CITY to ensure the performance of the Contract. Pursuant to California Public Contract Code Section 3300, CITY has determined that the Contractor shall possess a valid Class B – General Building Contractor License at the time that the bid is submitted. Failure to possess the specified license shall render the bid non-responsive. Bidders are advised to carefully review the attached sample contract document for requirements including insurance provisions, bond submittals and Department of Industrial Relations (DIR) registration and reporting needed to enter a contract with the CITY. The successful bidder will be required to furnish a payment bond in the amount equal to one hundred percent (100%) of the Contract Price, as well as a faithful performance bond, in the amount equal to one hundred percent (100%) of the Contract Price. The bonds shall be on the forms included in the Contract Documents. The successful bidder shall insure that employees and applicants for employment are not discriminated against on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status, and shall comply with the Americans with Disabilities Act. The successful bidder shall also comply with the CITY’s construction debris diversion requirements, set forth in Articles 7-05, 7-10, and 7-15 of the Saratoga Municipal Code, 174 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Notice Inviting Bids 3 as shown in City Ordinance #400, which is included in the bid documents and incorporated into the Saratoga Contract for Construction for this Project. This project is funded by federal American Rescue Plan Act (ARPA) funds, issued by the U.S Department of the Treasury. The successful bidder will comply with all rules and regulations required by this funding entity. Applicable funding entity requirements are set forth as in the ARPA Funding Agreement, which is included in the bid documents and incorporated into the Saratoga Contract for Construction for this Project. Bids will be examined and reported to the City of Saratoga City Council (Council) at a meeting within sixty (60) days of the bid opening. CITY reserves the right to reject any and all bids, or to waive any irregularities or informalities in any bid or in the bidding procedure, or to postpone the bid opening or award for good cause. No Bidder may withdraw its bid for a period of 5 calendar days after the date of opening of the bids. Each bidder will be notified of award of contract, if award is made. Contract Documents, Forms of Bid and any questions concerning this bid should be addressed to Public Works Director, City of Saratoga, via publicworks@saratoga.ca.us or (408) 868-1239. CITY OF SARATOGA Public Works Department June 3, 2024 175 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Information for Bidders 4 INFORMATION FOR BIDDERS SCOPE AND LOCATION OF WORK The work to be performed under this contract consists of the furnishing of all labor, materials, plant, equipment and services for the construction of the Project, complete, and in satisfactory operating condition, all as shown on the Contract Documents and/or as specified herein. The work is to be performed in the City of Saratoga, County of Santa Clara. INSPECTION OF WORK SITE Bidders are required to inspect the site of the work in order to satisfy themselves, by personal examination or by such other means as they may prefer, of the location of the proposed work and the actual conditions of and at the site. Bidders may apply to the Director of Public Works for additional information and explanation before submitting bids. However, no supplemental information requested or furnished shall vary the terms of the Contract Documents or affect the Contractor’s sole responsibility to satisfy itself as to the conditions of the work to be performed. No claim for additional compensation will be allowed which is based upon a lack of knowledge of the actual conditions or location of the Work. Submission of a bid by the bidder shall constitute acknowledgment that, if awarded the contract, the bidder has relied and is relying on its own examination of (a) the site of the work; (b) access to the site; (c) all other data, matters, and things requisite to the fulfillment of the work, including but not limited to the availability of labor and materials; and (d) its own knowledge of existing facilities on and in the vicinity of the site of the Project and not on any representation or warranty by CITY or its agents of the above items. Removal, relocation, or protection of existing public utilities not identified by CITY shall be done in conformance with California Government Code Section 4215. EXAMINATION OF CONTRACT DOCUMENTS Each bidder shall thoroughly examine and be familiar with legal and procedural documents, general conditions, specifications, drawings and addenda (if any). Submission of a bid shall constitute acknowledgment, upon which CITY may rely, that the bidder has thoroughly examined and is familiar with the Contract Documents. Failure or neglect of a bidder to receive or examine any of the Contract Documents shall in no way relieve the bidder of any obligation with respect to its bid or to the Contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge of any Contract Documents. REPORT OF ERRORS AND OMISSIONS Bidder shall review architectural and/or engineering plans and specifications, if any, prior to submission of the bid, and report any errors and omissions noted by the bidder to the Director of Public Works. The review by the Contractor shall be confined to the Contractor’s capacity as a contractor, and not as a licensed design professional. 176 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Information for Bidders 5 INTERPRETATION OF CONTRACT DOCUMENTS No oral representation or interpretations will be made to any bidders as to the meaning of the Contract Documents. In the event a bidder has any questions as to the meaning of any part of the Contract Documents, or if the bidder finds any error, inconsistency, or ambiguity in the Contract Documents, including any addenda, the bidder shall make a written request for clarification prior to submitting its bid. All questions and comments regarding the Contract Documents should be directed to the Director of Public Works an will only be responded to if received in writing at least five (5) working days before the bid opening date. Questions received after this date and date may not be responded to. Interpretations, where necessary, will be made in the form of an addendum to the Contract Documents and, when issued, will be sent as promptly as is practical to all parties to whom the bid documents have been issued. All such addenda shall become part of the Contract. Requests for information before or after the award of contract shall be directed to: Director of Public Works 13777 Fruitvale Avenue, CA 95070 Phone/Fax: (408) 868-1239 Email: publicworks@saratoga.ca.us BIDS Bids shall be made on the blank forms prepared by CITY, which may be removed from the bound Contract Documents. All bids shall include, in the space provided, all information requested, shall be signed by the bidder or an authorized representative thereof, and shall include the bidder's business address. Bidders must prepare and submit all required documents. Bids must be accompanied by security in accordance with California Public Contract Code Sections 20170 et seq. If the bid is made by an individual, his or her name, signature, and business address shall be shown. If the bid is made by a firm or partnership, the name and business address of the firm or partnership and the signature of at least one of the general partners shall be shown. If the bid is made by a corporation, the bid shall show the name of the corporation and the state(s) in which the corporation is incorporated; the name and business address of the corporation's local agent; and the signature of at least one officer authorized to sign on behalf of the corporation. Additionally, the bid shall include a document empowering the signatory or signatories to execute the bid and to bind the corporation. If the bid is made by a joint venture, the bid shall be signed by at least one of the joint venture firms in a format meeting with the requirements outlined above. Additionally, the bid shall include a document empowering the signatory or signatories to execute the bid and to bind the joint venture. 177 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Information for Bidders 6 Every contractor, other than a joint venture, who submits a bid, must at the time the bid is submitted have a California Contractor’s License in good standing. The license shall be in the class or classes specified in the Contract Documents. Any bid from an unlicensed contractor, other than those persons exempt under California Business & Professions Code Section 7028.15, shall be non-responsive and shall be rejected. Section 7028.15 makes it a misdemeanor for any person without a valid contractor’s license (with specified exceptions) to submit a bid to act as a contractor to a public agency. The penalties on a bidder violating these provisions are severe. Each bid shall be enclosed in a sealed envelope, labeled and delivered to the Director of Public Works at the address above. Bidders are warned against making erasures or alterations of any kind, without initialing each and every such change. Bids that contain uninitialed erasures, alterations or irregularities of any kind, or omissions, may be rejected. No oral, telegraphic, or telephone (including facsimile) bids or modifications will be considered. Each bidder shall submit with its bid a statement setting forth its experience and qualifications on the forms included in the Contract and Bidding Documents. Telephones will not be available to bidders for the preparation of the bids or for calling in bid results. Bid forms received after the designated time will not be accepted. Bidders and their authorized agents are invited to attend the bid opening. No bidder may withdraw its bid for a period of sixty (60) days after the date set for the opening of bids. CITY reserves the right to reject any or all bids; to make any awards or any rejections in what it alone considers to be in the best interest of CITY, and to waive any informalities or irregularities in the bids. ADDENDA Each bid shall include specific acknowledgment (in the space provided) of the receipt of all addenda issued during the bidding period. A bidder’s failure to acknowledge all addenda may result in the bid being rejected as not responsive. BID PRICES Bid prices shall include everything necessary for the completion of construction and fulfillment of the contract, including but not limited to furnishing all transportation, materials, equipment, tools, excavation, utilities, sheeting, shoring, bracing and supports, plant and other facilities, and all management, superintendence, permits, labor and services, except as may be provided otherwise in the Contract Documents. In the event that the product of a unit price and an estimated quantity does not equal the extended amount quoted, the unit price shall govern and the correct product of the unit price and the estimated quantity shall be deemed to be the amount bid. If the sum of the individual items does not equal the total base price, the individual item totals shall govern and the corrected sum shall be deemed to be the total base bid. 178 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Information for Bidders 7 Where there is a conflict between words and figures, the words shall govern and the figures shall be disregarded. TAXES Bid prices shall include all applicable federal, state, and local taxes. EXPERIENCE OF BIDDERS At the time of bidding, and throughout the period of the contract, each bidder shall be licensed under the provisions of the California Business and Professions Code to do the type of work contemplated for the project. The license classification shall be a Class B – General Building Contractor License. It is the intention of CITY to award a contract, if at all, to the lowest responsive responsible bidder who demonstrates the attributes of trustworthiness, as well as quality, fitness (including financial qualifications), capacity and experience to enable it to prosecute the work successfully and properly, and to complete the work within the time period named in the Contract Documents. To determine the degree of responsibility to be credited to the bidder, CITY will weigh any evidence that the bidder has performed satisfactorily other contracts of like nature and magnitude, and comparable difficulty and rates of progress, to the Work. CITY shall have sole discretion to determine what contracts are of like nature and magnitude, and comparable difficulty and rates of progress. CITY may reject bids from Contractors who cannot satisfactorily prove the experience and qualifications outlined in the Statement of Experience and Qualifications included in the Contract Documents. LISTS OF SUBCONTRACTORS On the forms provided, each bidder shall list the name and address of each subcontractor to whom the bidder proposes to sublet portions of the work in excess of one-half of one percent of the total amount of the bid or $10,000, whichever is greater. For the purpose of this paragraph, a subcontractor is defined as anyone who contracts with the Contractor to furnish materials and labor or labor only, and/or one who specially fabricates and/or installs a portion of the work or improvement according to detailed drawings contained in the Contract Documents. All listings and subsequent substitutions, if any, shall be done in conformance with the Subletting and Subcontracting Fair Practices Act, California Public Contract Code Section 4100 et seq. BID GUARANTY The bid shall be accompanied by a bid guaranty bond duly completed by a corporate surety authorized to conduct business in the State of California payable to the City of Saratoga in the sum of at least ten percent (10%) of the total amount of the bid. The bond shall be on the form included in the Contract Documents. Alternatively, a certified or cashier’s check, payable to the City of Saratoga, in the sum of at least ten percent (10%) of the total amount of the bid may be substituted for the bid guaranty bond. The amount payable to the City of Saratoga under the bid guaranty bond, or the certified or cashier’s check, as the case may be, shall be forfeited to CITY as liquidated damages in the case of the failure or neglect of the successful bidder to furnish, execute, and deliver to CITY the required performance and payment bonds and evidences of insurance, and/or to enter 179 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Information for Bidders 8 into, execute, and deliver to CITY the Agreement on the form provided herewith, within ten (10) days after being notified in writing by CITY that the award has been made. MODIFICATION OF BID Modification of a bid already received will be considered only if the modification is received prior to the deadline for receiving bids. All modifications shall be made in writing, executed, and submitted in the same form and manner as the original bid. POSTPONEMENT OF OPENING CITY reserves the right to postpone the date and time for receiving and/or opening of bids at any time prior to the date and time established in the Notice Inviting Bids. Pursuant to Public Contract Code Section 4104.5, the CITY shall extend the date and time for closing of submission of bids (the "bid deadline") by no less than seventy-two (72) hours in the event that CITY issues any material changes, additions, or deletions to the bidding documents later than seventy-two (72) hours prior to the bid deadline. NON COLLUSION AFFIDAVIT California Public Contract Code Section 7106 requires that each bidder execute a Noncollusion Affidavit on all public works contracts. Bidder shall execute the Noncollusion Affidavit included with the Contract Documents and submit it to CITY with the bid. DISQUALIFICATION OF BIDDER If there is a reason to believe that collusion exists among any of the bidders, none of the bids of the participants in such collusion will be considered, and CITY may choose to reject all bids received. REJECTION OF BIDS CITY reserves the right to reject any bids which are incomplete, obscure, or irregular; any bids which omit a bid on any one or more items for which bids are required; any bids which omit unit prices if unit prices are required; any bids in which unit prices are unbalanced in the opinion of CITY; any bids accompanied by insufficient or irregular bid guaranty; and any bids from bidders who has been delinquent or unfaithful in any former contract with CITY. CITY reserves the right to reject defective bids or to waive technical defects, as the interests of CITY may require. RELIEF OF BIDDERS Attention is directed to the provisions of California Public Contract Code Section 5100, et seq., concerning relief of bidders, and in particular to the requirement therein that if a bidder claims a mistake was made in its bid, the bidder shall give CITY written notice of the alleged mistake within five (5) calendar days after the opening of the bids, specifying in the notice, in detail, how the mistake occurred. 180 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Information for Bidders 9 COMPLETING AND SIGNING FORMS The Bidder’s attention is directed to the forms included in the Contract Documents, which must be completed and signed. FAILURE TO PROPERLY COMPLETE AND SIGN ANY FORMS MAY BE CAUSE FOR REJECTION OF A BID. DEBARRED CONTRACTORS AND SUBCONTRACTORS No contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works contract under California Labor Code Sections 1777.1 or 1777.7 can bid on, be awarded or perform work as a subcontractor on the Project. The Contractor is prohibited from letting work on the Project to a subcontractor who is ineligible to perform work on a public works project under these sections of the Labor Code. PRIOR APPROVAL OF SUBSTITUTIONS ("APPROVED EQUALS") Bidders wishing to obtain prior approval of a substitution for a specified material or system (an "approved equal") shall submit all required documentation in compliance with procedures established in the Contract Documents. Any request for an approved equal must be fully supported with technical data, test results, or other pertinent information as evidence that the substitute offered is equal to or better than the specification requirement. Prior approval requests must be received by CITY, in writing, by the deadline for submitting requests for equals/clarifications specified in the Notice Inviting Bids. If CITY determines the requested material or system is equal to that specified, CITY will notify the Bidders prior to time for submitting bids. CITY's failure to notify the Bidders of an approved equal shall be deemed a rejection of the requested substitution. PREVAILING WAGE AND APPRENTICESHIP In accordance with California Labor Code Section 1771, all contractors and subcontractors on this public work project shall pay not less than current prevailing wage rates as determined by the California Department of Industrial Relations ("DIR"). All contractors and subcontractors on this public work project shall comply with the requirements of California Labor Code Sections 1777.5 and 1777.6 in the employment of apprentices. Questions regarding general prevailing wage rates should be directed to: Department of Industrial Relations Division of Labor Statistics and Research P.O. Box 420603 San Francisco, CA 94142-0603 Phone: (415) 703-4774 Questions pertaining to apprenticeship crafts should be directed to: Department of Industrial Relations Division of Apprenticeship Standards P.O. Box 420603 San Francisco, CA 94142-0603 Phone: (415) 703-4920 181 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Information for Bidders 10 Information is also available at the Department of Industrial Relations' website: http://www.dir.ca.gov Any contractor who is awarded a public works contract is not relieved of the obligation to pay prevailing wage rates for any craft or classification not listed in the General Determinations or in any Special Determination. If a contractor intends to use a craft or classification not listed in the General Determinations or existing Special Determinations, he or she must notify CITY no later than forty-five (45) days before the bid deadline and request a Special Determination. If no determination has been made at the time the contract is awarded, the contractor shall pay the prevailing wage rate of the craft or classification most closely related to the craft or classification used. All prevailing wage rates are subject to modification pursuant to Important Notices issued by the DIR's Division of Labor Statistics and Research and recent union contract negotiations. BID PROTEST PROCEDURES Any Bid Protest must be in writing and submitted to the Public Works Director at 13777 Fruitvale Avenue, Saratoga, CA 95070 or publicworks@saratoga.ca.us, no later than 5:00 p.m. on the third business day following the date of the Bid opening (“Bid Protest Deadline”), and must comply with the following requirements: 1. Eligible Protestors. The party submitting the protest must have submitted a Bid on the Project. A subcontractor of a party filing a Bid on this Project may not submit a Bid Protest. A party may not rely on the Bid Protest submitted by another Bidder, but must timely pursue its own protest. 2. Contents of Bid Protest. The Bid Protest must be specific and contain a complete statement of the factual and legal grounds for the protest and include all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The Bid Protest must include the name, address, telephone number, and email address of the person representing the protesting party, if different than the protesting party. 3. Notification of Bid Protest. By or before the Bid Protest Deadline, the party submitting the Bid Protest must transmit the Bid Protest by fax or email to the protested bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the Bid Protest. 4. Responses to Bid Protest. The protested bidder may submit a written response to the Bid Protest. This response must be submitted to the Public Works Director at 13777 Fruitvale Avenue, Saratoga, CA 95070 or publicworks@saratoga.ca.us no later than 5 p.m. on the second business day following the Bid Protest Deadline. The response must include all supporting documentation, and any late material will not be considered. The response must include the name, address, telephone number, and email address of the person representing the responding party, if different than the responding party. 5. Notification of Response. By or before the deadline for submitting a response to the Bid Protest, the responding party must transmit the response to the Bid 182 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Information for Bidders 11 Protest by fax or email to the protesting bidder and any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the Bid Protest. 6. City Decision on Protest. City staff shall review all timely Bid Protests prior to formal award of the contract for the Project. City staff will deliver a written response to the Bid Protest via personal delivery, email, or fax, either accepting or rejecting the Bid Protest and stating the reasons for the actions taken, within 10 business days of the Bid Protest Deadline. 7. Appeal to City Council. An appeal of City staff’s decision on the Bid Protest may be made by the protesting or responding party to the City Council by filing a written notice of appeal with the City Clerk within two business days after the City delivers notice of staff’s decision regarding the Bid Protest. If an appeal is timely filed and subsequently has not been withdrawn by the protesting bidder, the City Council shall consider the Bid Protest at a noticed, public meeting. The City Council may hear the Bid Protest as part of its consideration of the award of the contract to which the Bid Protest relates or may hear the bid protest as a separate item, provided that the City Council shall decide the Bid Protest prior to awarding the contract, unless the City Council exercises its discretion to reject all bids. 8. Waiver of Irregularities. The City reserves the right, acting at its sole discretion, to waive any bid irregularity not materially affecting the bid, except where such waiver would give the low bidder an advantage or benefit not allowed other bidders. 9. Rejection of All Bids. Nothing in this section shall be construed as a waiver of the City Council’s right to reject all bids. 10. Exclusive Remedy. The procedure and time limits set forth in this Section are mandatory and are the Bidder’s sole and exclusive remedy in the event of a Bid Protest. The Bidder’s failure to fully comply with these procedures shall constitute a waiver of any right to further pursue the Bid Protest, including filing of a challenge of the award pursuant to the California Public Contracts Code, filing of a claim pursuant to the California Government Code, or filing of any other legal proceedings. 183 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 12 GENERAL CONDITIONS SECTION GC-1 DEFINITIONS AND TERMS Whenever in the Contract Documents the following terms are used, the intent and meaning shall be interpreted as follows (unless noted otherwise): Agreement – the written instruments comprising the complete and integrated contract between the City of Saratoga and the Contractor. Business day – see "working day" below Calendar day – a period of twenty-four (24) hours measured from midnight to the next midnight. If not otherwise specified in the Agreement, days shall be presumed to be calendar days. Caltrans Standard Specifications - Standard Specifications issued by the State of California, Department of Transportation, 2022 edition. Any reference therein to a State agency or officer shall be interpreted as if the corresponding City of Saratoga office or officer acting under this contract were so specified. All metric measurements or quantities in the Caltrans Standard Specifications shall be disregarded, and equivalent United States measures used. Caltrans Standard Plans - Standard Plans issued by the State of California, Department of Transportation, current edition. All metric measurements or quantities in the Caltrans Standard Plans shall be disregarded, and equivalent United States measures used. Contractor – the individual or entity with whom CITY has entered into the Agreement. Council - The City of Saratoga City Council, the governing body of the City of Saratoga. County – Santa Clara County, California. CITY – the City of Saratoga. Engineer – The Director of Public Works of the City of Saratoga, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them. Laboratory - The designated laboratory authorized by the City of Saratoga to test materials and work involved in the contract. Working day – a period comprising the normal working hours of the day and further defined in Section 1-1.07 ("Definitions") of the Caltrans Standard Specifications. Other terms appearing in the Contract Documents shall have the intent and meaning specified in Section 1-1.07 ("Definitions") of the Caltrans Standard Specifications. 184 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 13 SECTION GC-2 BID REQUIREMENTS AND CONDITIONS A. APPROXIMATE QUANTITY ESTIMATE The quantities given in the Notice Inviting Bids and in the bid and contract forms are approximate only, being given as a basis for the comparison of bids, and CITY does not, expressly or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the Work, or to omit portions of the Work, as may be deemed necessary or advisable by the Director of Public Works. B. EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK The bidder shall examine carefully the site of work contemplated and all Contract Documents, including all bid and contract forms incorporated by reference therein. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and scope of work to be performed, the quantities of materials to be furnished, and as to the requirements of the bid, plans, specifications, and the contract. If, during the course of its examination, a bidder finds facts or conditions which appear to be in conflict with the letter or spirit of the project plans and specifications, the bidder shall contact CITY for additional information and explanation before submitting its bid. Any request for information must be submitted at least ten (10) working days before the time announced for opening the bids, if any. C. QUESTIONS DURING BIDDING Any questions regarding the Contract Documents or bid forms shall be directed to the person listed in the Information For Bidders. All questions must be submitted at least ten (10) working days before the original bid deadline. D. ADDENDA When CITY deems it necessary, addenda may be issued to the Contract Documents to amend, clarify or correct matter contained therein. Such addenda shall constitute a part of the Contract Documents and shall be equally binding with them. Addenda shall be forwarded to all prospective bidders when such addenda are issued prior to receipt of bids. Bidder must acknowledge all addenda on the bid form. Failure to acknowledge all addenda issued will render the bid nonresponsive. E. BID FORM All bids must be submitted upon blank forms provided in the Contract Documents. Bids shall include all applicable taxes that the Contractor is required to pay. All bids must give the prices proposed and must be signed by the bidder and include bidder's business address. If the bid is made by an individual, his name and business address must be shown. If made by a firm or partnership, the name and business address of each member of the firm or partnership must be shown. If made by a corporation, the bid must show the name of the state(s) in which the bidder is incorporated and the names, titles, and business addresses of the corporation's president, secretary, and treasurer. All bids shall be submitted as directed in the Notice Inviting Bids under sealed cover plainly marked as a bid, and identifying the project to which the bid relates and the date of the bid opening therefor. Bids which are not properly marked may be disregarded. F. PUBLIC OPENING OF BIDS Bids will be opened and read publicly at the time and place indicated in Notice Inviting Bids. Bidders or their authorized agent are invited to be present. 185 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 14 SECTION GC-3 AWARD AND EXECUTION OF CONTRACT A. AWARD OF CONTRACT CITY reserves the right to reject any and all bids. The contract will be awarded, if at all, to the lowest responsive responsible bidder whose bid complies with all the requirements set forth in the Notice Inviting Bids and Information to Bidders and all documents referenced therein. In the event that bids are required to include prices for items that may be added to or deducted from the scope of the work of the contract for which the bid is being submitted, the lowest bid shall be the lowest bid price on the base contract those additive or deductive items that were specifically identified in the bid solicitation as being used for the purpose of determining the lowest bid price. CITY reserves the right to add to or deduct from the contract any of the additive or deductive items after the lowest responsible bidder has been determined. The contract will be awarded, if at all, within 60 calendar days after the opening of the bids. The Work will not start until CITY has successfully acquired all necessary rights of way, easements and permits to begin work on this project. B. CONTRACT BONDS The successful bidder shall furnish two separate contract bonds. Each of the bonds shall be executed in an amount equal to at least 100% of the Contract Price. One bond shall guaranty the faithful performance of the contract by the Contractor; and the other bond shall secure payment of the claims of laborers, mechanics, and material suppliers employed under the contract. The bonds shall be on the forms included in the Contract Documents. No alteration, extension of time, extra and additional work, or other change authorized by the Contract Documents will affect the obligations of the surety or sureties on the payment or performance bonds, and no notice to the surety or sureties shall be required. Any bond required herein shall be issued by a corporate surety admitted to transact surety business in the State of California and holding a valid Certificate of Authority to transact Surety Insurance in the State of California. C. EXECUTION OF THE CONTRACT The Contract shall be signed by the successful bidder and returned, together with evidence of the City of Saratoga business license required by Section GC-7(H), the Contract bonds required by Section GC-3 (B) and insurance certificate(s) required by Section GC-7 (S) of these General Conditions, after the bidder has received notice that the Contract has been awarded. No bid shall be considered binding upon the City of Saratoga until the award of the contract by the Council. D. NOTICE TO PROCEED A separate Notice to Proceed will be issued to the Contractor for this work. Within ten (10) working days from the Notice to Proceed or date specified in the Notice to Proceed, the Contractor shall commence work. Working days will be charged to the Contractor after the ten-day period has elapsed. E. FAILURE TO EXECUTE CONTRACT Failure to execute the Agreement and file acceptable performance and payment bonds and insurance as provided herein within fifteen (15) calendar days after the bidder has received notice that the 186 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 15 contract for the Work has been awarded to him, shall be just cause for the annulment of the award and the forfeiture of the bid guaranty. Upon any such failure by the successful bidder, the contract for the work may be awarded to the second lowest responsible bidder. If the second lowest responsible bidder fails to execute the Agreement and file acceptable bonds and insurance as provided herein within fifteen (15) calendar days after such bidder has received notice that the contract for the Work has been awarded to him, the contract for the Work may be awarded to the third lowest responsible bidder. Failure of the second or of the third lowest responsible bidder to whom a contract is so awarded to execute the Agreement and file acceptable bonds and insurance as provided herein within fifteen (15) calendar days after such bidder has received notice that the contract for the Work has been awarded to him shall be just cause for the annulment of the award and the forfeiture of the bid guaranty of each such bidder. F. RETURN OF BID GUARANTEES CITY will retain all bid guarantees until the Agreement for the Work has been fully executed and CITY has received the bonds and evidence of insurance required to be furnished, or CITY has acted to reject all bids. CITY will return the bid guarantees of unsuccessful bidders, other than those forfeited. SECTION GC-4 SCOPE OF WORK A. INTENT OF PLANS AND SPECIFICATIONS The intent of the Contract Documents is to prescribe the details for the construction and completion of the work the Contractor undertakes to perform. Where the plans or specifications describe portions of the work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. Unless otherwise specified, the Contractor shall furnish all labor, material, tools, equipment, flaggers, and incidentals, and do all the work involved in executing the contract in a satisfactory and workmanlike manner. B. STANDARD SPECIFICATIONS AND SPECIAL CONDITIONS All work embraced herein shall be constructed in strict accordance with the applicable codes, plans and the Caltrans Standard Specifications, where applicable. All work will be done under the inspection of CITY and the Director of Public Works and any other public agency with jurisdiction over the Project and shall be the responsibility of the Contractor. The work embraced herein shall be done in accordance with specifications approved by CITY if such work, material or equipment is not specifically detailed in the Contract Documents, Special Conditions, or accompanying plans. The parts of the Contract Documents are intended to be complementary. In case of conflict between Sections 1 through 9 of the Caltrans Standard Specifications and the General Conditions or Special Conditions of this Agreement, the General Conditions or Special Conditions shall control. In case of a conflict between the General Conditions and the Special Conditions, the Special Conditions shall control. In case of conflict between the Caltrans Standard Specifications and the other Contract Documents, the provisions of paragraph GC-5.D Coordination And Interpretation Of Plans, Standard Specifications, and Special Conditions shall apply. C. FINAL CLEAN-UP 187 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 16 Before acceptance and final payment, the Contractor shall clean the streets, roads, structures, and all ground occupied by him in connection with the Work, of all rubbish, excess materials, temporary structures, and equipment. All parts of the Work shall be left in a neat and presentable condition. Any damage to property, missing signs, mailboxes, etc. must be repaired/replaced to the satisfaction of CITY. Full compensation for final clean up shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor. D. CHANGES CITY reserves the right to make such alterations, deviations, additions to or omissions from the Contract Documents, including the right to increase or decrease the quantity of any item or portion of the Work or to omit any item or portion of the Work, as may be deemed by the Director of Public Works to be necessary or advisable and to require such extra work as may be determined by the Director of Public Works to be necessary for the proper completion or construction of the whole work. Changes in quantities shall be in accordance with the provisions of Section 9-1.06 ("Changed Quantity Payment Adjustments") of the Caltrans Standard Specifications. Any such changes will be set forth in a contract change order which will specify, in addition to the work to be done in connection with the change made, adjustment of contract time, if any, and the basis of compensation for such work. A contract change order will not become effective until approved by CITY in writing. All changes in the work shall be made as provided in the Contract Documents. Notice is hereby given that under certain circumstances, changes may require the approval of the Council, and may further require notice to affected property owners and a public hearing. E. SALVAGE FOR THE CITY The Contractor shall remove and preserve carefully any materials designated to be salvaged for the CITY and shall arrange for the delivery of those materials to the CITY as directed by the Director of Public Works. The Contractor shall be liable for any damage or destruction of materials designated for salvage. F. SEVERABILITY CLAUSE If any provision or any part of any provision of these Contract Documents is, for any reason, held to be invalid, unenforceable or contrary to any public policy, law, statute, regulation or ordinance, then the remainder of these Contract Documents shall not be affected thereby and shall remain valid and fully enforceable. G. EXTRA WORK New and unforeseen work will be classed as extra work when such work cannot be covered by any of the various items or combination of items for which there is a bid price. The Contractor shall do no extra work except upon written order from the Director of Public Works. Compensation for authorized extra work will be paid as previously agreed upon in writing, or by force account as provided in Section 9-1.04 ("Force Account") of the Caltrans Standard Specifications. SECTION GC-5 CONTROL OF WORK A. AUTHORITY OF DIRECTOR OF PUBLIC WORKS 188 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 17 The Director of Public Works shall decide all questions which may arise as to the quality or acceptability of materials furnished and work performed and as to the manner or performance and loss of progress of the work; all questions which may arise as to the interpretation of the plans and specifications; all questions as to the acceptable fulfillment of the contract on the part of the Contractor; and all questions as to compensation. The Director of Public Work’s decision shall be final and shall have authority to enforce and make effective such decisions and orders which the Contractor shall carry out promptly. B. PLANS AND WORKING DRAWINGS All authorized alterations affecting the requirements and information given on the approved plans shall be in writing. No changes shall be made to any plan or drawing without approval of the Director of Public Works. The Plans furnished consist of general drawings and show such details as are necessary to give a comprehensive idea of the construction contemplated. All authorized alterations affecting the requirements and information given on the contract plans shall be in writing. The Plans shall be supplemented by such working drawings prepared by the Contractor as are necessary to perform the Work adequately. No change shall be made by the Contractor to any working drawing after it has been approved by the Director of Public Works. It is expressly understood, however, that approval of the Contractor's working drawings shall not relieve the Contractor of any responsibility for accuracy of dimensions and details, or for mutual agreement of dimensions and details. Contractor shall be responsible for agreement and conformity of his working drawings with the Contract Documents. Full compensation for furnishing all working drawings shall be deemed included in the prices paid for the contract items of work to which such drawings relate and no separate payment will be made therefor. C. CONFORMITY WITH CONTRACT DOCUMENTS AND ALLOWABLE DEVIATIONS Work and materials shall conform to the lines, grades, cross sections, dimensions and material requirements, including tolerances, in the Contract Documents. Although measurement, sampling and testing may be considered evidence as to such conformity, the Director of Public Works shall be the sole judge as to whether the work or materials deviate from the plans and specifications, and his decision as to any allowable deviations therefrom shall be final. Deviations from the approved plans, as may be required by the exigencies of construction, will be determined in all cases by the Director of Public Works and authorized in writing. D. COORDINATION AND INTERPRETATION OF PLANS, STANDARD SPECIFICATIONS, AND SPECIAL CONDITIONS The Caltrans Standard Specifications, the Santa Clara County Standard Plans and Specifications (if any), any Special Conditions, these General Conditions, contract change orders, and all supplementary documents are essential parts of the Contract Documents, and a requirement occurring in one is binding as though occurring in all. They are intended to be cooperative, to describe, and to provide for a complete work. In the event of a conflict, the most stringent shall govern. In the event of any discrepancy between any drawing and the figures written thereon, the figures shall be taken as correct. Detail drawings shall prevail over general drawings. 189 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 18 E. ORDER OF WORK When required by the Special Conditions or Plans, the Contractor shall follow the sequence of operations as set forth therein. Full compensation for conforming with such requirements will be deemed included in the prices paid for the various contract items of work and no separate payment will be made therefor. F. SUPERINTENDENCE The Contractor shall provide competent supervision of the Work as approved by the Director of Public Works. The Contractor or designated representative shall be present at the site at all times while work is actually in progress. Before starting work, the Contractor shall designate in writing, a representative who shall have the authority to represent and act for the Contractor regarding any written or verbal directions, or requests of the Director of Public Works. Directions or requests delivered to the representative shall have the same force and effect as if delivered to the Contractor. The authorized representative shall be an employee of the Contractor’s organization and shall be shown on the Contractor’s payroll The Contractor will not designate a subcontractor as the authorized representative. Whenever the Contractor or its representative is not present on any particular part of the work where the Director of Public Works desires to give direction, the Director of Public Works will give orders which shall be received and obeyed by the superintendent or foreman who may have charge of the particular work for which the order is given. Failure of the Contractor or its representative to be present at the job site at all times when work is in progress will be deemed failure on the part of the Contractor to perform a provision of the Contract. If the Contractor or its representative is not present at the job site, the Director of Public Works may, in accordance with Section 8-1.06 (“Suspensions”) of the Caltrans Standard Specifications, suspend all work until satisfactory arrangements have been made to have a designated representative on the site at all times when work is in progress. No additional compensation or additional working days will be allowed for such suspension. All working days lost due to such suspension will be charged to the Contractor. During periods when work is suspended, arrangements acceptable to the Director of Public Works shall be made for any emergency work that is required. G. LINES AND GRADES Unless otherwise stated, stakes or marks will be set by the Contractor, as the Director of Public Works determines to be necessary to establish the lines and grades required for the completion of the Work. Stakes and marks shall be carefully protected from vandalism and preserved by the Contractor. In case such stakes and marks are lost, destroyed, or damaged, the Contractor will replace the stakes within three (3) working days. H. INSPECTION The Director of Public Works shall at all times have access to the Work during its construction and shall be furnished with every reasonable facility for ascertaining that the materials and the workmanship are in accordance with the requirements and intentions of the Contract Documents. All work done and all materials furnished shall be subject to the Engineer’s inspection. 190 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 19 The inspection of the work or materials shall not relieve the Contractor of any of its obligations to perform the Work as prescribed. Work and materials not meeting such requirements shall be made good; unsuitable work or materials may be rejected, notwithstanding that such work or materials may have been previously inspected by the Director of Public Works or that payment therefor has been included in a progress estimate. I. REMOVAL OF REJECTED AND UNAUTHORIZED WORK The Contractor shall remedy or remove and replace at its own expense and in an acceptable manner all work that has been rejected. CITY will not pay for such removal, replacement, or remedial work. Any work done beyond the lines and grades shown on the plans or established by the Director of Public Works, or any extra work done without written authority, will be deemed unauthorized work for which CITY will not pay. Upon order of the Director of Public Works, the Contractor shall remedy or remove and replace unauthorized work at the Contractor's expense. Upon failure of the Contractor to comply promptly with any order of the Director of Public Works made under this section, the Director of Public Works may cause rejected or unauthorized work to be remedied, removed, or replaced, and to deduct the costs from any monies due or to become due the Contractor. J. CHARACTER OF WORKERS If any subcontractor or person employed by the Contractor appears to CITY to be incompetent or to act in a disorderly or improper manner, he or she shall be discharged immediately on the request of CITY, and such person shall not again be employed on the Work. K. FINAL INSPECTION When the work has been completed, CITY and the Director of Public Works, or Director of Public Work’s designee, will make the final inspection. The Contractor shall request the final inspection in writing. L. STORAGE OF MATERIALS If a construction staging area is designated on the Project Plans or in the Bid Documents, the Contractor, with the approval of the Public Works Director, can use the designated staging area free of charge. If a construction staging area is not specified in the Project Documents, or should the Contractor require additional real property over that specified in the Project Documents, the Contractor shall be responsible for securing the staging area at its own expense. SECTION GC-6 CONTROL OF MATERIALS A. GENERAL The control of the materials used in the work, including but not limited to the sources, handling, testing, and rejections, shall conform to Section 6 of the Caltrans Standard Specifications. B. SAMPLES AND TESTS The source of supply of each material shall be approved by the Director of Public Works before delivery begins and before the material is used in the work. 191 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 20 Upon request of the Director of Public Works or as specified in these documents, representative material samples of the prescribed character and quality shall be submitted by the Contractor for testing or examination. No material shall be used without approval of the Director of Public Works. All tests of materials furnished by the Contractor shall be made in accordance with commonly recognized standards of national organizations, and such special methods and tests as are prescribed in the Caltrans Standard Specifications, and the Special Conditions. The cost of re-testing material or workmanship that fails to pass the first test shall be borne by the Contractor. Contractor shall submit all test results to the Director of Public Works within five (5) calendar days of the testing at no charge to CITY. Full compensation for conforming with the requirements of this section shall be deemed included in the prices paid for the various contract items of work and materials, and no separate payment will be made therefor. C. DEFECTIVE MATERIALS All materials that the Director of Public Works determines do not conform to the requirements of the Contract Documents will be rejected, whether in place or not. They shall be removed immediately from the work site, unless otherwise permitted by the Director of Public Works. No rejected material shall be used in the Work, unless the defects are corrected and the Director of Public Works gives written approval. Upon failure of the Contractor to comply promptly with any order of the Director of Public Works made pursuant to this section, the Director of Public Works may cause the removal and/or replacement of rejected material and may deduct the costs thereof from any monies due or to become due the Contractor. D. CHANGES TO SPECIFICATIONS/APPROVED EQUALS Changes to the specifications will be made by written addendum executed by the Public Works Director. Requests for approved equals or for clarification of specifications and protests of specifications must be received by CITY, in writing, by the time specified in the Instructions to Bidders prior to bid deadline or, if made after the contract is awarded, no more than fifteen days after the facts giving rise to the request came to the attention of the Contractor. Any request for an approved equal or protest of the specifications must be fully supported with technical data, test results, or other pertinent information as evidence that the substitute offered is equal to or better than the specification requirement. If CITY determines the requested material or system is equal to that specified, CITY will notify the Bidders prior to bid deadline or Contractor within thirty calendar days after receiving the request. CITY’s failure to notify the Bidders or the Contractor of an approved equal shall be deemed a rejection of the requested substitution. Wherever brand, manufacturer or product names are indicated in the specifications, they are included ONLY for the purpose of establishing identification and a general description of the item. Wherever such names appear, the term “or approved equal” should be understood to follow. It should be understood that specifying a brand name, components and/or equipment in this specification shall not relieve the supplier from its responsibility to produce the product in accordance 192 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 21 with the performance warranty and contractual requirements. The supplier is responsible for notifying CITY of any inappropriate brand name, component and/or equipment that may be called for in the specifications and to propose a suitable substitute for consideration. E. WARRANTY OF TITLE Contractor warrants to CITY and its successors and assigns that the title to the materials, supplies or equipment covered by the Contract, when delivered to CITY or to its successors or assigns, is free from all liens and encumbrances. F. WARRANTY OF FITNESS Contractor warrants that all materials, supplies and products furnished meet the requirements and conditions of the Contract Documents and are fit for the purpose intended. G. WARRANTY OF MERCHANTABILITY Contractor warrants that the goods are merchantable in accordance California Commercial Code Section 2314. In accepting this and other warranties and the materials or supplies to be manufactured or assembled pursuant to the Contract Documents, CITY does not waive any warranty, either express or implied, in California Commercial Code Sections 2312 through 2315, inclusive, or any liability of the manufacturer as determined by any decision of a court of the State of California or of the United States. SECTION GC-7 LEGAL RELATIONS AND RESPONSIBILITY A. GENERAL In connection with laws to be observed and responsibility of the Contractor, attention is directed to Section 7 ("Legal Relations and Responsibility to the Public") of the Caltrans Standard Specifications and to the laws applicable to this contract and to the Work that are referenced therein. Full compensation for conforming to the provisions of Section 7-1.03 ("Public Convenience") and Section 7-1.04 ("Public Safety") shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor. B. LAWS TO BE OBSERVED The Contractor shall keep itself fully informed of all existing and future state and federal laws and county and municipal ordinances and regulations which in any manner affect those engaged or employed in the work, or the materials used in the work, or which in any way affect the conduct of work, and of all such orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. The Contractor shall at all times observe and comply with, and shall cause all his agents and employees to observe and comply with all existing and future laws, ordinances, regulations, orders, and decrees applicable to this contract or to the Work. The Contractor shall protect and indemnify CITY, and all officers and employees thereof connected with the work, against any claim or liability arising from or based on the violation of any such law, ordinance, regulation, order, or decree, whether by CITY’s representative or its employees. If any discrepancy or inconsistency is discovered in the plans, drawings, specifications, or contract for the 193 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 22 work in relation to any such law, ordinance, regulation, order, or decree, the Contractor shall forthwith report the same to the Director of Public Works in writing. C. LABOR In connection with laws to be observed and responsibility of the Contractor, attention is directed to Section 7 ("Legal Relations and Responsibility to the Public") of the Standard Specifications and to the laws applicable to this contract and to the Work that are referenced therein. Attention is particularly directed to the subsections pertaining to Hours of Labor, Alien Labor, Labor Discrimination, Prevailing Wages, Apprentices, and the Fair Labor Standards Act. This is a public works contract within the meaning of Part 7 of Division 2 of the California Labor Code (Sections 1720 et seq.), and the Contractor and any subcontractor under him shall pay not less than the specified prevailing wage rates to all workers employed. Pursuant to the provisions of Section 1773 of the California Labor Code, the CITY has obtained the general prevailing rate of wages and employer payments for health and welfare, vacation, pension and similar purposes in the CITY of Saratoga, a copy of which is on file 13777 Fruitvale Avenue, Saratoga, California at the office of the Public Works Director, and shall be made available for viewing to any interested party upon request. In accordance with Labor Code Section 1815, the Contractor and any subcontractors shall pay all workers employed on this project 1½ the basic rate of pay for work performed in excess of specified hour limitations. Contractor and all subcontractors are not qualified to bid on or be listed in a bid proposal, subject to the requirements of section 4104 of the California Labor Code, and shall not engage in the performance of any work under this contract, unless currently registered and qualified to perform public work pursuant to section 1725.5 of the California Labor Code. Contractor represents and warrants that it is, registered and qualified to perform public work pursuant to section 1725.5 of the California Labor Code unless otherwise noted in supplemental provisions hereto. Contractor shall post at the job site the determination of the director of the prevailing rate of per diem wages together with all job site notices that are required by regulations of the DIR. As required by Labor Code Section 1773.8, the Contractor shall pay travel and subsistence payments to each worker needed to perform the Work, as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Section 1773.8. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractor and any subcontractors shall keep accurate payroll records, in accordance with Section 1776 of the Labor Code, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or subcontractor in connection with the Work and shall furnish the records specified in California Labor Code section 1776 directly to the Labor Commissioner at least monthly in a format prescribed by the Labor Commissioner and otherwise in accordance with law. Contractor or subcontractor shall, as a penalty to CITY, forfeit twenty-five dollars ($25) for each worker employed in the execution of the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of this article. 194 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 23 Attention is directed to the provisions in of the Labor Code Sections 1777.5 and 1777.6 concerning the employment of apprentices by the Contractor or any subcontractor under the Contractor. It shall be the responsibility of the Contractor to comply with and to insure that all subcontractors comply with the requirements of said sections in the employment of apprentices. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices. Pursuant to the requirements of Division 4 of the Labor Code, the Contractor will be required to secure the payment of worker’s compensation to its employees in accordance with the provisions of Section 3700 of the Labor Code. Full compensation for conforming to the requirements of this section shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor. All penalties set forth in Section 7 ("Legal Relations and Responsibilities to the Public") of the Caltrans Standard Specifications shall be payable to the City of Saratoga. D. CONTRACTOR'S LICENSING LAWS Attention is directed to the California Business and Professions Code Sections 7000 et seq. concerning the licensing of contractors. All bidders and subcontractors shall be licensed in accordance with the laws of this State and any bidder or subcontractor not so licensed is subject to penalties imposed by such laws. E. CHILD AND FAMILY SUPPORT OBLIGATIONS The contractor shall fully comply with all state and federal laws relating to child and family support enforcement, including, but not limited to, disclosure of information and compliance with earnings assignment orders, as provided in Chapter (commencing with Section 5200) of Part 5 of Division 9 of the Family Code. F. DOMESTIC MATERIALS Only such unmanufactured materials as have been produced in the United States, and only such manufactured materials as have been manufactured in the United States, substantially all from materials produced in the United States, shall be used in the performance of the contract, in accordance with the provisions of California Government Code Sections 4300 et seq. Pursuant to California Government Code Section 4304, any person who fails to comply with this section of the contract shall not be awarded any contract for the construction, alteration or repair of public works or for the purchase of materials for public use for a period of three (3) years from the date of the violation. G. PAYMENT OF TAXES The contract prices paid for the Work shall include full compensation for all taxes the Contractor is required to pay, whether imposed by federal, state or local government, including, without being limited to, federal excise tax. Taxes shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor. 195 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 24 H. PERMITS AND LICENSES The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the Work. Any construction permits required by CITY for performing any work on this project will be issued by CITY at no charge to the Contractor. The Contractor and all subcontractors shall pay all CITY business license fees. I. PATENTS The Contractor shall assume all costs arising from the use of patented materials, equipment, devices, or processes used on or incorporated in the Work. In addition to the obligations set forth in paragraph O ("Responsibility for Damage") below, the Contractor shall indemnify, defend, and hold CITY, its elected and appointed officials, and its employees harmless against any claim arising from Contractor’s work under this Agreement in which a violation of intellectual property rights, including but not limited to copyright or patent infringement, is alleged. J. SAFETY The Contractor shall be solely and completely responsible for conditions of the job site, including safety of all persons (including employees) and property on or near the Project or adjacent to the work site during the performance of the Work. This requirement shall apply continuously and not be limited to normal working hours. The duty of the Director of Public Works to conduct review of the Work does not include review or approval of the adequacy of the Contractor’s safety program, safety supervisor, or any safety measures taken in, on, or near the job site. Safety provisions shall conform to Cal-OSHA Safety Orders, and all other applicable federal, state, county, and local laws, ordinances, codes, and regulations. Where any of these are in conflict, the more stringent requirement shall be followed. The Contractor’s failure to thoroughly familiarize itself with the aforementioned safety provisions shall not relieve it from the obligation to comply with such provisions or from the penalties set forth therein. The Contractor shall develop and maintain for the duration of this contract a safety program that will effectively incorporate and implement all required safety provisions. The Contractor shall appoint a qualified employee to supervise and enforce compliance with the safety program. Information regarding the safety program shall be posted at the project site. By submitting its bid to CITY, Contractor warrants and guarantees the following, and will provide CITY with any documents referenced below within 24 hours of the request: a. The Contractor has either a written Injury and Illness Prevention Plan compliant with 8 CCR 3203, OR the Contractor has fewer than 10 employees, but agrees all work will be performed in compliance with all laws, codes, regulations and best standard practices to protect personnel, the environment, and property. b. The Contractor will provide the CITY a copy of the Contractor’s accident investigation report within 24 hours for each accident that occurs during the performance of the contract. c. The Contractor: 196 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 25 1. Has and can provide CITY a copy of the Contractor’s Heat Stress training certifications for employees if those employees occasionally work outdoors for two or more hours/day. 2. Has and can provide CITY with a copy of Contractor’s Hazard Communication program if its employees will be using any chemicals on the job. 3. Will provide CITY a copy of the SDS (Safety Data Sheet) for each chemical brought onto the site. 4. Has and can provide CITY a copy of the Hazardous Waste disposal plan for any hazardous wastes generated during the job. 5. Has and can provide CITY a copy of the Contractor’s Lockout/Tagout program if any work is to be done on any sources of hazardous energy. 6. Has and can provide CITY a copy of the Contractor’s Electrical Safety program if any electrical work is to be performed. 7. Has and can provide CITY a copy of the Contractor’s Fall Protection program if any work is to be performed that would require it. 8. Has and can provide CITY a copy of the Contractor’s Confined Space program if any confined spaces are to be entered. K. PUBLIC CONVENIENCE AND SAFETY Contractor shall submit a traffic control plan to the Director of Public Works for approval prior to start of work. The Contractor's attention is directed to Section 7-1.03 ("Public Convenience") and 7-1.04 ("Public Safety") of the Caltrans Standard Specifications. Full compensation for complying with the provisions of such subsections shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor. All signs required by the Director of Public Works shall be furnished and installed by the Contractor. The cost of furnishing, installing, maintaining, and removing such signs shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor. The Contractor shall notify the Fire Department and Sherriff’s office in writing at least 2 working days before closing any street or otherwise hindering access by emergency vehicles to any area. L. FLAGGING COSTS The costs of furnishing all flagmen and guards under the provisions of this section and Sections 7- 1.03 ("Public Convenience"), 7-1.04 ("Public Safety"), and 12-4.02C(9) ("Flagging") of the Caltrans Standard Specifications will be borne by the Contractor and shall be considered included in the prices paid for the various contract items of work; no separate payment will be made therefor. M. PRESERVATION OF PROPERTY Attention is directed to Sections 7-1.05 ("Indemnification") and 7.-1.06 (“Insurance”) and to Section 5-1.36C ("Nonhighway Facilities") of the Caltrans Standard Specifications. Contractor shall exercise 197 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 26 due care to avoid injury to existing highway improvements or facilities, utility facilities, adjacent property, and roadside trees and shrubbery that are not to be removed. Roadside trees and shrubbery; pole lines, fences; mailboxes; signs; markers and monuments; buildings and structures; conduits; pipe lines under or above ground ; sewer and water lines; all highway facilities; and any other improvements or facilities within or adjacent to the work, other than those to be removed in accordance with the plans, shall be protected from injury or damage. If ordered by the Director of Public Works, the Contractor shall provide and install suitable safeguards, approved by the Director of Public Works, to protect such objects from injury or damage. If such objects are injured or damaged by reason of the Contractor's operation, they shall be replaced or restored at the Contractor's expense. The facilities shall be replaced or restored to a condition as good as when the Contractor entered upon the work, or as good as required by the contract, if any such objects are a part of the work being performed under the contract. The Director of Public Works may make or cause to be made such temporary repairs as are necessary to restore to service any damaged highway or other facility. The cost of such repairs shall be borne by the Contractor and may be deducted from any monies due or to become due to the Contractor under the contract. It shall be the Contractor's responsibility to ascertain the existence of any underground improvements or facilities that may be subject to damage in the course of performing the Work. A minimum of forty- eight (48) hours, or two working days, prior to beginning of construction, the Contractor shall notify Underground Services Alert (USA), telephone 1-800-642-2444, to have existing facilities marked in the field. Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in protecting or repairing property as specified in this section shall be deemed included in the prices paid for the various contract items of work and no separate payment will be made therefor. N. PRE CONSTRUCTION SURVEY The Contractor shall, if required by CITY, provide pre-construction color photographs, 35mm or larger film size, of the work site including surrounding areas as stated above. Each photograph shall be marked to indicate the date, name of work, and the location where the photograph was taken. Photographs shall be taken at intervals as directed by the Director of Public Works or his designee. Prints shall be submitted in a three-ring photo album binder with clear plastic-covered fillers, four photos each side, grouped according to street, lateral, or line, and in sequence. Each group of prints shall be identified by a label that projects beyond the edge of filler and is easily recognized. Negatives may be placed within the filler sleeves or submitted separately. Approximately twenty-five (25) photographs shall be submitted to the Director of Public Works for the Director of Public Work’s approval. This approval shall be obtained before proceeding with the remaining photographs. Video may also be required if specified in the technical specifications. The photographs and/or video tapes shall be submitted to the Director of Public Works either prior to or with the first progress payment request. The progress payment request will not be considered for payment until the Director of Public Works accepts this deliverable. Full compensation for furnishing all pre-construction survey photos and/or videos shall be deemed included in the prices paid for the various contract items of work and no separate payment will be made therefor. 198 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 27 O. RESPONSIBILITY FOR DAMAGE The City of Saratoga and all officers and employees thereof connected with the Work, including but not limited to the City Council, shall not be answerable or accountable in any manner for any loss or damage that may happen to the Work or any part thereof; for any loss or damage to any of the materials or other things used or employed in performing the Work; for injury to or death of any person; or for damage to property from any cause except losses due to sole or active negligence of the City of Saratoga's officers or employees. All loss or damage arising from any unforeseen obstruction or difficulties, either natural or artificial, which may be encountered in the execution of the work, or the furnishing of the supplies, materials, or equipment, or from any action of the elements prior to final written acceptance of the work, or of the supplies, materials or equipment, or from any act or omission not authorized by the Contract Documents on the part of the Contractor or any agent or person employed by it, shall be sustained and borne solely by the Contractor. Notwithstanding any other provision of the Contract Documents, Contractor shall, to the fullest extent allowed by law, defend, indemnify and hold harmless the City of Saratoga, its elected and appointed officials, and its employees from all liability, penalties, costs, losses, damages, expenses, causes of action, claims or judgments, including attorney's fees and other defense costs, resulting from injury to or death sustained by any person (including Contractor's employees), or damage to property of any kind, or any other injury or damage whatsoever arising out of or in any way connected with the performance of the Contract, including any of the same resulting from the alleged or actual negligent acts or omissions of CITY’s officers, agents, contractors or employees; except that said indemnity shall not be applicable to injury, death or damage to property arising from the sole or active negligence or willful misconduct of CITY, its officers, agents, or employees who are directly responsible to CITY. This indemnification shall extend to claims asserted after termination of this Contract for whatever reason. Without limiting the generality of the foregoing indemnity, such indemnity obligation expressly extends to and includes any and all claims, demands, losses, damages, costs, expenses, fines, penalties, judgments or liability occasioned as a result of: a) Damages to adjacent property caused by the conduct of the Work; b) The violation by the Contractor, the Contractor’s agents, employees, or independent contractors or subcontractors, of any provisions of federal, state or local law, including applicable administrative regulations such as, without limitation, discharge permit requirements; c) Injury to or death of any person, or any property damage to property owned by any person while on or about the site or as a result of the Work, whether such persons are on or about the site by right or not, whenever the Work is alleged to have been a contributing cause in any degree whatsoever. In addition to any remedy authorized by law, so much of the money due the Contractor under and by virtue of the contract as shall be considered necessary by CITY, may be retained by CITY until disposition has been made of such suits or claims for damage. 199 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 28 P. COOPERATION Should construction be under way by CITY, other agencies or other contractors within or adjacent to the limits of the Work, or should work of any other nature be under way by other forces within or adjacent to said limits, the Contractor shall cooperate with all such other contractors or other forces to the end that any delay or hindrance to their work will be avoided. CITY reserves the right to perform other or additional work at or near the site (including material sources) at any time, by the use of other forces. Q. CONTRACTOR'S RESPONSIBILITY FOR WORK AND MATERIALS Until the final acceptance of the contract, the Contractor shall have the charge and care of the Work and of the materials to be used therein, including materials for which partial payment has been received. CITY shall not be held responsible for the care or protection of any material or parts of the Work prior to final acceptance, except as expressly provided in the Special Conditions. R. ACCEPTANCE OF CONTRACT Upon completion of the Project CITY will conduct such tests as may be required to determine to its own satisfaction that the Project is in conformance with the terms, conditions and requirements of the Contract Documents. After final inspection, CITY shall determine whether or not to accept the Project and will notify the Contractor in writing within fifteen (15) days thereof. In the event of non-acceptance, CITY shall inform the Contractor in writing of the deficiencies found. When the Director of Public Works has made the final inspection and determines that the contract has been completed in all respects in accordance with the plans and specifications, the Director of Public Works may recommend that the Council formally accept the contract. Immediately upon and after such acceptance by the Council, the Contractor will not be required to perform any further work, except completion or correction of such items as the Director of Public Works may direct, and the Contractor shall be relieved of his responsibility for injury to persons or property or damage to the Work that occurs after the formal acceptance by the Council. The formal acceptance by the Council does not relieve the Contractor of the one (1) year maintenance responsibility. S. PERSONAL LIABILITY Neither the Council, nor any other officer or authorized employee of the City of Saratoga, nor any officer or employee of any state, county, or local agency shall be personally responsible for any liability arising under or by virtue of the contract. T. INSURANCE Within ten (10) days after award of the Contract, the Contractor shall promptly obtain, at its own expense, all the insurance described in this section, and submit coverage verification for review and approval by CITY. This insurance shall be in addition to any other form of insurance or bonds required under the terms of the contract. The Notice to Proceed with the Work will not be issued, and the Contractor shall not commence work, until such insurance has been approved by CITY. Such insurance shall remain in full force and effect at all times during the prosecution of the Work and until the final completion and acceptance thereof. In addition, the Commercial General Liability Insurance shall be maintained for a minimum of five (5) 200 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 29 years after final completion and acceptance of the Work. The Notice to Proceed does not relieve the Contractor of the duty to obtain such insurance as required herein. Contractor shall require and verify that all subcontractors, or other parties hired for this work, purchase and maintain coverage for indemnity and insurance requirements as least as broad as specified in this agreement to the extent they apply to the scope of the subcontractor’s work with the same certificate of insurance requirements and naming as additional insureds all parties to this contract. Subcontractors hired by Contractor shall agree to be bound to Contractor and CITY in the same manner and to the same extent as Contractor is bound to the CITY under this agreement. Subcontractors shall further agree to include these same provisions with any sub-subcontractor. Contractor shall provide subcontractor with a copy of the indemnity and insurance provisions of this agreement as a part of Contractor’s subcontract with subcontractor. Contractor shall not allow any subcontractors to commence work until all insurance required of the subcontractor has been obtained and verified by the Contractor and submitted to CITY. Subcontractors shall furnish original certificates and endorsements as verification of insurance coverage. The liability insurance limits specified herein shall apply to all subcontractors listed in Contractor’s bid. The Contractor shall designate appropriate insurance limits for all other subcontractors. Companies writing the insurance under this article shall be authorized to do business in the State of California. Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII. Contractor shall include all costs for all insurance in its bid. Nothing contained in these insurance requirements is to be construed as limiting the extent of the Contractor's responsibility for payment of damages resulting from its operations under this Contract. Coverage required hereunder shall operate as Primary Insurance. The Contractor shall procure, pay for, and maintain throughout the duration of this Contract the following insurance coverage: Commercial General and Automobile Liability Insurance - This insurance shall protect the Contractor from claims for bodily injury and property damage which may arise because of the nature of the work or from operations under this Contract. The coverage shall be at least as broad as Insurance Services Office (ISO) Commercial General Liability coverage (occurrence Form CG 0001) and Insurance Services Office Form Number CA 0001 covering Automobile Liability, code 1 (any auto). Claims-made policies will not be accepted. a. Additional Insureds – The Commercial General Liability ("CGL") and Automobile Liability policy(ies) of insurance shall be endorsed to name as additional insureds the City of Saratoga, all of its elected and appointed officials, directors, officers, employees, agents, servants, and volunteers (each an “additional insured”) are to be covered as insureds with the same coverage and limits available to the named insured regarding: liability arising out of work or operations performed by or on behalf of the Contractor, including materials, parts, or equipment furnished in connection with such work or operations; products and completed operations of the Contractor; premises owned, occupied or used by the Contractor; or automobiles owned, leased, hired or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of the protection afforded to the CITY, its officers, officials, employees, agents or volunteers. Any available insurance 201 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 30 proceeds broader than or in excess of the minimum insurance coverage requirements and/or limits specified in this agreement shall be available to the additional insured. The requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured; whichever is greater. The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. The additional insured coverage under Contractor’s policy shall be ''primary and non- contributory" and will not seek contribution from the CITY’s insurance or self-insurance and shall be at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used. Contractor shall submit to CITY the additional insured endorsement for its CGL policy. b. Amount of Coverage – The bodily injury and property damage liability of the CGL insurance shall provide coverage in the following limits of liability: $2,000,000 per occurrence with an annual general aggregate limit of not less than $2,000,000, and $2,000,000 products and completed operations aggregate, combined single limit. The Automobile Liability insurance policy shall provide coverage of at least $2,000,000 combined single-limit per accident for bodily injury, death, or property damage, including hired and non-owned auto liability. c. Subcontractors - The CGL insurance shall not require the Contractor to have its subcontractors named as insureds in the Contractor's policy, but the insurance shall protect the Contractor from contingent liability which may arise from operations of its subcontractors. d. Included Coverage - The CGL insurance shall also include all of the following coverages: Premises – Operations; Owner's/Independent Contractors and Contractor's Protective; Products - Completed Operations; Personal Injury - (False Arrest, Libel, Wrongful Eviction, etc.); Blanket Contractual Liability, including the indemnity agreement in this contract; Separation of Insureds / Cross-Liability Provisions; Duty to Defend All Insureds; Deletion of any limitation on Coverage for Bodily Injury or Property Damage Arising Out of Subsidence or Soil or Earth Movement; A provision that the annual general aggregate and the products and completed operations annual aggregate shall apply separately to the Project; Pollution Legal Liability Endorsement; XCU - Explosion, Collapse, Underground Damage. (XCU may be deleted with CITY’s prior written approval when not applicable to operations performed by the Contractor or its sub- contractors.) e. At the option of the Contractor, primary limits may be less than required, with an Umbrella Policy or Follow-Form Excess Liability Policy providing the additional limits needed. This form of insurance will be acceptable provided that the Primary and Umbrella/Excess Policies both provide the insurance coverages herein required, including all additional insured requirements. The umbrella/excess insurance shall be provided on a “following form” basis with coverage at least as broad as provided on the underlying CGL insurance. 202 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 31 f. The certificate of insurance shall guaranty that the policy will not be amended, altered, modified, or canceled without at least thirty (30) days’ notice mailed by registered mail to the Administrative Services Director, City of Saratoga; 13777 Fruitvale Ave.; Saratoga, California 95070, and emailed to cityhall@saratoga.ca.us and to the City’s Primary Representative for this Contract. g. In accordance with Insurance Code Section 11580.04, coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where any agreement to indemnify the additional insured would be invalid under Civil Code Section 2782(b). Workers’ Compensation Insurance – California Labor Code Sections 3700 et seq. require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that code. The Contractor shall comply and shall ensure that all subcontractors comply with such provisions. In addition, the Contractor shall have and maintain Employers' Liability insurance with limits of $1,000,000 per accident for bodily injury or disease before commencing the performance of the Work. Before the Notice to Proceed is issued, the Contractor shall submit written evidence that the Contractor has obtained for the period of the Contract full Workers’ Compensation Insurance coverage for all persons whom it employs or may employ in carrying out the Work. This insurance shall be in accordance with the requirements of the most current and applicable State Workers’ Compensation Insurance Laws. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City of Saratoga for all work performed by the Contractor, its employees, agents and subcontractors, and the Contractor shall submit this waiver of subrogation to the CITY. Builder's Risk Insurance - The Contractor shall purchase and maintain "All Risk or Special Form" Builder's Risk Insurance on a replacement cost basis in an amount equal to the full replacement cost of the Work on a completed value basis, including coverage for ‘soft costs’ such as design, engineering, and construction management fees. The builder's risk insurance shall cover all risks of loss, including but not limited to fire; lightning; windstorm; hail, explosion; riot; riot attending a strike; civil commotion; smoke damage; damage by aircraft or vehicles; vandalism and malicious mischief; theft; collapse; flood; and earthquake. This insurance shall name the City of Saratoga, its elected and appointed officials, employees, agents and servants and the Contractor as insureds, as their interests may appear, and shall include coverage including, but not limited to all damages or loss to the Work; to appurtenances; to materials and equipment to be used on the Project while the same are in transit or stored on or off the project site; and/or to construction plant and temporary structures. This insurance is required only if listed as a separate bid item in the bid schedule. Coverage for acts of God, as defined in Public Contract Code Section 7105, in excess of five percent of the Contract amount is subject to separate coverage and is required only if listed as a separate bid item in the bid schedule. Builder’s Risk Insurance policies shall contain the following provisions: (1) CITY shall be named as loss payee. (2) The insurer shall waive all rights of subrogation against CITY. 203 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 32 Builder’s Risk Insurance may have a deductible clause not to exceed the following limits: (1) If, pursuant to Public Contract Code Section 7105, CITY requires coverage for any damage to the work caused by an act of God, and has set forth the amount of the work to be covered and the insurance premium for such coverage as a separate bid item, the deductible for such coverage shall not exceed five percent (5%) of the value of the Work at risk at the time of the loss. (2) All other perils: $5,000. The Contractor shall be responsible for paying any and all deductible costs. The policy shall provide CITY the right to occupy the premises without termination of the policy until acceptance of the project. Proof of Coverage - Before the Notice to Proceed is issued, the Contractor shall furnish CITY with certificate(s) evidencing issuance of all required insurance and copies of the policy declaration or information page(s) and endorsements. The certificate(s) and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates are to be on amended ACORD forms and ISO endorsement forms or equivalent endorsement forms acceptable to CITY. The certificate(s), policy declaration or information page(s), and endorsements are to be received and approved by CITY before work commences. Endorsements are not required for Workers Compensation or Builder's Risk Insurances. Such certificates of insurance shall provide that the insurance policy shall not be cancelable, nonrenewable, or otherwise be subject to material modification, except with thirty (30) days' prior written notice to CITY. Contractor shall also provide certificate(s) evidencing renewals of all insurance required herein, at least ten (10) days prior to the expiration date of any such insurance. Deductibles and Self-Insured Retentions - Any deductibles or self-insured retentions must be declared to and approved by the CITY. At the option of the CITY, either (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the CITY, its officers, officials and employees; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of CITY (if agreed to in a written contract or agreement) before the CITY’s own insurance or self-insurance shall be called upon to protect it as a named insured. Waiver of Subrogation - Contractor hereby grants to CITY a waiver of any right to subrogation which any insurer of Contractor may acquire against CITY by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether CITY has received a waiver of subrogation endorsement from the insurer. Maintenance of Coverage - Contractor shall not cancel, assign, or change any policy of insurance required by this agreement or engage in any act or omission that will cause its insurer to cancel any insurance policy required by this agreement except after providing 30 days prior notice to the CITY. If an insurance policy required by this agreement is unilaterally cancelled or changed by the insurer, Contractor shall immediately provide written notice to the CITY and obtain substitute insurance meeting the requirements of this agreement. Nothing in this paragraph relieves Contractor of its 204 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 33 obligation to maintain all insurance required by this agreement at all times during the term of the agreement. Noncompliance - If the Contractor fails to comply strictly with all requirements of this section or if CITY receives any notice that any required insurance coverage will be diminished or canceled, CITY, at its option, may, notwithstanding any other provisions of this Agreement to the contrary, immediately declare a material breach of this Agreement and suspend all further work pursuant to this Agreement. U. ABANDONMENT OR DELAY OF WORK CITY reserves the right to terminate the Contractor’s control of the Work in accordance with Section 8-1.13 (“Contractor’s Control Termination”) of the Caltrans Standard Specifications. CITY reserves the right to terminate the contract in accordance with Section 8-1.14 (“Termination of Contract”) of the Caltrans Standard Specifications. CITY also reserves the right to terminate the Contract for any of the following reasons: a. The Contractor is insolvent or has made a general assignment for the benefit of creditors, or a receiver has been appointed on account of the insolvency of the Contractor. b. The Contractor or any of its subcontractors violate any of the material provisions of the Agreement or fail to perform the Work within the time specified in the Contract Documents. c. The Contractor or any of its subcontractors should fail to make prompt payment to subcontractors or to suppliers for material or for labor. d. The Contractor or a subcontractor persistently disregards laws, ordinances, or the instructions of CITY or the Director of Public Works. e. The Contractor fails to abide by a proper stop work notice or fails to correct rejected work or materials. f. The Contractor fails to provide and keep in full force and effect all required insurance or fails to cause all subcontractors to so comply. g. The Contractor fails to supply a sufficient number of properly skilled workers or proper materials, or fails to diligently prosecute the Work. h. The Contractor commits any substantial violation of the Contract that constitutes a material breach of the Contract. CITY may, without prejudice to any other right or remedy, give written notice to the Contractor of its intention to terminate the contract. If, within seven (7) days of the delivery of such notice, the Contractor does not cease such violation or otherwise make satisfactory arrangements for a correction thereof, which arrangements are set forth in a written agreement signed by the Contractor and CITY, the Contractor’s right to complete the Work shall cease and terminate. If CITY terminates the Contractor's control for failure to correct the violation, it shall immediately give written notice of termination to the Contractor. If CITY takes over the Work, it may prosecute the same to completion by contract or by any other method it deems advisable, for the account and at the expense of the Contractor. The Contractor shall be liable to CITY for any excess costs, including management, supervision, and design support, 205 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 34 occasioned thereby. In such event, CITY may, without liability, take possession of and utilize in completing the Work, the Contractor’s materials and equipment to be incorporated into the Work, whether stored at the project site or elsewhere. Whenever the Contractor’s right to proceed is terminated, the Contractor shall not be entitled to receive any further payment until the Work is finished. If CITY terminates the Contract for cause, CITY may retain out of any funds due or to become due the Contractor the amount of the cost of completing the Work and any expenses incidental to reletting the contract or performing the Work. CITY may also hold the Contractor and the Contractor's sureties responsible for such cost and expense, and for any damages resulting from the abandonment or failure. The Contractor shall not receive any further payment until the Work is complete. V. ASSIGNMENT OF ANTI-TRUST CLAIMS In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgement by the parties. W. CONTRACTOR’S BOOKS AND RECORDS. a. Contractor and its subcontractors shall establish and maintain records pertaining to this contract. Contractor’s and subcontractors’ accounting systems shall conform to generally accepted accounting principles and all records shall provide a breakdown of total costs charged under this contract, including properly executed payrolls, time records, invoices and vouchers. b. Contractor shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks and other records or documents evidencing or relating to charges for services or expenditures and disbursements charged to CITY for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor to this Agreement. c. Contractor shall maintain all documents and records which demonstrate performance under this Agreement for a minimum period of three (3) years, or for any longer period required by law, from the date of termination or completion of this Agreement. d. Any records, data or documents required to be maintained pursuant to this Agreement shall be made available for inspection, copying or audit, at any time during regular business hours, upon written request by CITY or a designated representative for the purpose of auditing and verifying statements, performance, invoices, or bills submitted by Contractor pursuant to this contract and shall provide such assistance as may be reasonably required in the course of such inspection. Copies of such documents shall be provided to CITY for inspection at CITY’s facility when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Contractor’s address indicated for receipt of notices in the Agreement. e. Where CITY has reason to believe that such records or documents may be lost or discarded due to dissolution, disbandment or termination of Contractor’s business, CITY may, by written request, require that custody of the records be given to CITY and that the records and 206 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 35 documents be maintained at CITY’s facility. Access to such records and documents shall be granted to any party authorized by Contractor, Contractor’s representatives, or Contractor’s successor-in- interest. f. Pursuant to California Government Code Section 8546.7, the parties to this Contract shall be subject to the examination and audit of representative of the Auditor General of the State of California for a period of three (3) years after final payment under the contract. The examination and audit shall be confined to those matters connected with the performance of this contract including, but not limited to, the cost of administering the contract. SECTION GC-8 PROSECUTION AND PROGRESS A. GENERAL The prosecution and progress of the work shall conform to Section 8 of the Caltrans Standard Specifications and the Special Conditions. B. SUBLETTING AND ASSIGNMENT Attention is directed to Section 5-1.13 ("Subcontracting") of the Caltrans Standard Specifications which provides that the Contractor has responsibility for a subcontractor’s work. No subcontractors will be recognized as such, and all persons engaged in the work of construction will be deemed employees of the Contractor. The Contractor will be held responsible for all subcontractors' work, which shall be subject to the provisions of the Contract and specifications. When a portion of the work that has been subcontracted by the Contractor is not being prosecuted in a manner satisfactory to CITY, the subcontractor shall be removed immediately on the requisition of CITY and shall not again be employed on the work. Attention is directed to Section 5.1-12 ("Assignment") of the Standard Specifications. The performance of the Contract may not be assigned except upon written consent of CITY. C. COMMENCEMENT OF WORK, PROGRESS, AND TIME FOR COMPLETION The Contractor shall begin work within ten (10) working days after the date specified on the Notice to Proceed and shall diligently prosecute the same to completion within the time set forth in these Contract Documents. D. HOURS OF WORK, HOLIDAYS, AND OVERTIME The Contractor shall perform all work during the working hours of 7:30 a.m. to 5:00 p.m., Monday through Friday (unless otherwise noted below). If the Contractor wishes to work during any other hours or on weekends, the Contractor must obtain written permission from CITY. The request must be received at least two (2) working days in advance of any work. No work will be allowed on CITY holidays except in an emergency. A listing of CITY holidays is available from the City Clerk's Office 13777 Fruitvale Avenue, Saratoga, California, 95070. If Contractor requests overtime work in which CITY will incur costs, CITY reserves the right to bill the Contractor at time and one half to cover the costs incurred. 207 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 36 E. TEMPORARY SUSPENSION OF WORK In accordance with Section 8-1.06 ("Suspensions") in the Caltrans Standard Specifications, the Director of Public Works or his designee shall have the authority to suspend the Work wholly or in part, for such a period as the Director of Public Works may deem necessary. F. TIME OF COMPLETION AND LIQUIDATED DAMAGES The Contractor shall complete all or any designated portion of the work called for under the contract in all parts and requirements within the time set forth in the Special Conditions. The Contractor's attention is directed to Section 8-1.10 ("Liquidated Damages") of the Caltrans Standard Specifications which shall apply here. In addition to the foregoing liquidated damages, CONTRACTOR shall pay any fines, penalties or other monetary sanctions levied by any authority having jurisdiction over the Project on account of delays in completing the WORK not solely attributable to CITY, including but not limited to violations of discharge permit limits or other discharge restrictions. The parties to the Contract agree that in case all the work called for under the Contract is not completed before or upon the expiration of the time limit as set forth in this Agreement damage will be sustained by the CITY. The parties further agree that it is and will be impracticable to determine the actual damage that the CITY will sustain in the event of and by reason of such delay. It is therefore agreed that the Contractor will pay to the CITY the sum stated in the Notice Inviting Bids for each and every working day's delay beyond the time prescribed to complete the work. The Contractor agrees to pay such liquidated damages as herein provided, and in case the same are not paid, agrees that the CITY may deduct the amount thereof from any monies due or that may become due the Contractor under the Agreement. It is further agreed that if the work called for under the Contract is not finished and completed in all parts and requirements within the time specified, CITY shall have the right to extend the time for completion. CITY is under no obligation to extend the time for completion. If CITY decides to extend the time for completion, it shall further have the right to charge to the Contractor, his heirs, assigns or sureties, and to deduct from the final payment for the Work, all or any part, as it may deem proper, of the actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly chargeable to the Contract, and which accrue during the period of such extension, except that the cost of final surveys and preparation of final estimate shall not be included in such charges. The Contractor will not be assessed liquidated damages or the cost of engineering and inspection during a delay in the completion of the Work caused by acts of God (as defined in Public Contract Code Section 7105) or of the public enemy; fire; floods; epidemics; quarantine restrictions; strikes; freight embargoes; unusually severe weather; and/or delays of subcontractors due to such causes, provided that the Contractor within fifteen (15) days from the beginning of any such delay notifies the Director of Public Works in writing of the causes of delay. The Director of Public Works shall ascertain the facts and the extent of delay, and the Director of Public Work’s findings thereon shall be final and conclusive. Except for the additional compensation provided for in Section 8-1.07 (Delays") of the Caltrans Standard Specifications, and except as provided in Public Contract Code Section 7102, the Contractor shall have no claim for damage or compensation for any delay or hindrance. It is the intention of the above provisions that the Contractor shall not be relieved of liability for liquidated damages or engineering and inspection charges for any period of delay in completion of the work in excess of that expressly provided for in Section 8-1.10 of the Caltrans Standard Specifications. 208 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 37 G. LIMITS OF WORK The "limits of work" are shown on the plans (where applicable). The Contractor shall make its own arrangements, and pay all expenses for additional area required outside of the limits of work unless provided in the Special Conditions. H. UTILITY FACILITIES The Contractor shall protect from damage any utility facilities that are to remain in place, be installed, relocated, or otherwise rearranged. If the Contractor while performing the Work discovers utility facilities not identified in the Contract Documents with reasonable accuracy, the Contractor shall immediately notify CITY and the utility owner. CITY shall arrange the removal, relocation, or protection of existing main or trunk line utility facilities located at the site of the Work but not identified in the Contract. If the Contractor is required to locate, repair damage not due to the Contractor’s failure to exercise reasonable care, and remove or relocate existing main or trunk line utility facilities, it shall be compensated under Section 9-1.04 ("Force Account") of the Caltrans Standard Provisions, including payment for equipment on the Project necessarily idled during such work. Contractor will not be entitled to damages or additional payment for delays caused solely by the failure of CITY, or the owner of the utility, to provide for removal or relocation of existing main or trunk line utility facilities not identified in the Contract Documents, except for equipment necessarily idled during such work. Contractor will not be assessed liquidated damages for delay in completing the work solely attributable to the failure of CITY, or the owner of the utility, to provide for removal or relocation of existing main or trunk line utility facilities not indicated in the Contract Documents. The right is reserved by CITY and by the owners of facilities or their authorized agents to enter the job for the purpose of making such changes as are necessary for the rearrangement of their facilities or for making necessary connections or repairs to their properties. The Contractor shall cooperate with forces engaged in such work and shall conduct its operations in such a manner as to avoid any delay or hindrance to the work being performed by such other forces. Attention is directed to the possible existence of underground facilities not known to CITY, or in a location different from that which is shown on the plans or in the Special Conditions. The Contractor shall take all steps reasonably necessary to ascertain the exact location of all underground facilities prior to doing work that may damage such facilities or interfere with their service, including but not limited to calling USA to mark utilities. See GC-7(L). I. COMPENSATION Full compensation for conforming to the requirements of this section shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor, except that this provision does not constitute a waiver, alteration, or limitation of the applicability of California Public Contracts Code Section 7102. 209 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 38 SECTION GC-9 MEASUREMENT AND PAYMENT A. GENERAL Attention is directed to Section 9 ("Payment") of the Caltrans Standard Specifications which includes procedures for determination of payments, compensation for extra work by force account, partial payments, and final payments. B. SCOPE OF PAYMENT The Contractor shall accept the compensation provided in the Contract as full payment for furnishing all labor, materials, tools, equipment, and incidentals necessary to the completed work and for performing all work contemplated and embraced under the contract; for loss or damage arising from the nature of the work, from the action of the elements, or from any unforeseen difficulties that may be encountered during the prosecution of the work until the acceptance by CITY; for all risks of every description connected with the prosecution of the work; for all expenses incurred in consequence of the suspension or discontinuance of the work as provided in the contract; and for completing the work according to the plans and specifications. In accordance with Public Contract Code Section 9203, for any public work contract with a total cost greater than five thousand dollars ($5,000) progress payments shall not be made in excess of ninety- five percent (95%) of actual Work completed plus a like percentage of the value of material delivered on the ground or stored subject to, or under the control of, CITY, and unused. In all contracts with subcontractors, the contractor shall comply with Public Contract Code Section 7200 regarding the percentage of retention proceeds withheld. Neither the payment of any estimate nor of any retained percentage shall relieve the Contractor of any obligation to make good any defective work or material. Contractor shall submit certified payroll reports with each payment request. CITY shall review each payment request and tender payment in accordance with Public Contract Code Section 20104.50. No compensation will be made in any case for loss of anticipated profits. Contractor shall include with each estimate for payment a “Conditional Waiver and Waiver and Release Upon Progress Payment” form as prescribed in Civil Code Section 3262 signed by all subcontractors, material suppliers, equipment lessors and other parties covering labor, materials, equipment or services included in the pay estimate. Within thirty (30) days of the date CITY makes payment to the Contractor on an estimate for payment, the Contractor shall obtain and submit to Owner “Unconditional Waiver and Release Upon Progress Payment” in the form prescribed in Civil Code Section 3262 from the same subcontractors, suppliers, equipment lessors and others. These forms are included at the end of the General Conditions Section, following subsection GC-13. C. EXTRA AND FORCE ACCOUNT WORK Extra work as herein before defined, when ordered and accepted, shall be paid for under a written work order in accordance with the terms therein provided, and as provided in Section GC-4 (F) of the General Conditions. Payment for extra work will be made at the unit price or lump sum previously agreed upon in writing or by force account as provided in Section 9-1.04 ("Force Account") of the Caltrans Standard Specifications. 210 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 39 D. STOP NOTICES CITY, by and through appropriate City of Saratoga office or officers, may at its option and at any time retain out of any amounts due the Contractor, sums sufficient to cover claims stated in stop notices filed pursuant to Civil Code Sections 3179 et seq. and to provide for the cost of any litigation thereunder. E. PAYMENT Upon final approval and acceptance of the work by CITY, Contractor shall be paid all sums of money in accordance with the terms and conditions as outlined in the Contractor’s submittal of CITY’s Bid Form. No such estimate or payment shall be construed to be an acceptance of any defective work or improper materials. F. SUBSTITUTION OF SECURITIES FOR WITHHELD AMOUNTS Pursuant to Public Contract Code Section 22300, the Contractor may substitute securities for any monies retained to ensure performance. At the request and expense of the Contractor, securities equivalent to the amount retained shall be deposited with CITY, or with a state or federally chartered bank in California as the escrow agent, and CITY shall then pay such monies to the Contractor. Alternatively, the Contractor may request that CITY make payment directly to the escrow holder, to be invested at the Contractor’s expense and direction. Eligible securities shall include those listed in Government Code Section 16430, or bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and CITY. The Contractor shall be the beneficial owner of any securities substituted for monies, and shall receive any interest on such securities. Any escrow agreement shall be substantially similar in form to the form of escrow agreement included in Public Contract Code Section 22300(f). G. FINALIZING PROGRESS PAYMENT CITY shall, after the completion of all Work required under the Contract, make a final estimate of the amount of work done, and the value of such work, and CITY shall pay ninety percent (95%) of the entire sum so found to be due after deducting therefrom all previous payments and all amounts to be kept and all amounts to be retained under the provisions of the Contract Documents. H. FINAL PAYMENT The 5% retained by CITY after each progress payment is made shall be due and payable to the Contractor after the expiration of thirty-five (35) days from the date of recordation of the Notice of Completion following acceptance of the Work by CITY. It is expressly understood that said final payment or a portion thereof may not be paid to the Contractor if any stop notices are properly filed. No certificate given or payments made under the Contract, except the final certificate or final payment, shall be conclusive evidence of the performance of the Contract, either wholly or in part, against any claim of CITY, and no payments shall be construed to be acceptance of any defective work or improper materials. 211 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 40 Payment by CITY of the final undisputed amount due under the Contract, including payment based upon adjustments for any work done in accordance with any alterations of the Contract Documents, shall be contingent upon the Contractor furnishing CITY with a release of all claims against CITY arising by virtue of the contract related to those amounts. In the event the Contractor has any such claims, such claims in stated amounts may be specifically excluded by the Contractor from the release, in which case the payment by CITY may be of only undisputed amounts. I. REPAIR OR RECONSTRUCTION OF DEFECTIVE WORK If, within a period of one (1) year after final acceptance of the work performed under this contract, any structure furnished, installed, constructed, and/or caused to be installed or constructed by the Contractor, or any of the work done under this contract, fails to fulfill any of the requirements of the Contract Documents, the Contractor shall without delay and without any cost to CITY, repair, replace or reconstruct any defective or otherwise unsatisfactory part or parts of the Work. Should the Contractor fail to act promptly or in accordance with this requirement, or should the situation require that repairs or replacements be made before the Contractor can be notified, CITY may, at its option, make the necessary repairs or replacements or perform the necessary work and the Contractor shall pay to CITY the actual cost of such repairs plus 25%. J. FISCAL AGENT PAYMENT With certain exceptions, all monies for the progress payments and final payment under the contract will be sent to the Contractor. CITY will send, by first-class mail, warrants payable to the Contractor to the mailing address specified on the separate payment request certified and approved by CITY. K. CLAIMS PROCEDURES Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on public works Claims. Sections 20104 et seq., of the California Public Contract Code prescribe a process using informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. These sections shall govern public works Claims arising from this agreement after a change order duly requested has been denied by the City. The following provisions and procedures shall apply to claims under Section 9204: a) For the purposes of this section GC-9(K), the term “Claim”, “Contractor”, “Mediation”, “Public Entity” “Public works project” and “Subcontractor” shall have the meaning provided for in Public Contract Code Section 9204. b) Contractor shall submit each Claim (whether for a time extension, payment for money or damages) in writing and in compliance with Public Contract Code Section 9204. Contractor must include reasonable documentation to support each Claim. c) Upon receipt of a Claim, the City shall conduct a reasonable review and respond in writing within 45 days of receipt and shall identify in a written statement what portions of the claim are disputed and undisputed. Undisputed portions of the Claim shall be processed and paid within 60 days of the written statement. Undisputed amounts not paid in a timely manner shall bear interest at 7% per annum. The City and Contractor may mutually agree to extend the 45 day response time. d) If the City needs approval from the City Council to provide a written statement identifying the disputed portion and the undisputed portion of the claim, the 45 day response time or the 212 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 41 mutually agreed on response time may be extended to 3 days following the next duly noticed public meeting. e) If the City fails to timely respond to a Claim or if Contractor disputes the City’s response, Contractor may submit a written demand for an informal meet and confer conference with the City to settle the issues in dispute. The demand must be sent via registered or certified mail, return receipt requested. Upon receipt, the City shall schedule the conference within 30 days. f) Within 10 business days following the informal meet and confer conference, the City shall submit to Contractor a written statement describing any issues remaining in dispute and that portion which is undisputed. Undisputed portions of the Claim shall be process and paid within 60 days of the written statement. Undisputed amounts not paid in a timely manner shall bear interest at 7% per annum. The issues remaining in dispute shall be submitted to non-binding mediation. If the City and Contractor mutually agree on a mediator, each party shall pay equal portions of all associated costs. If within 10 business days, the City and Contractor cannot agree on a mediator, each party shall select a mediator (paying all costs associated with their selected mediator), and those mediators shall select a qualified neutral third party to mediate the disputed issues. The City and Contractor shall pay equal portions of all associated costs of such third party mediator. g) Unless otherwise agreed by the City and Contractor, any mediation conducted hereunder shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has commenced. The City reserves all rights and remedies that it has pursuant to the contract, at law or in equity, which are not in conflict with Public Contract Code Section 9204 or Section 20104 et seq. SECTION GC-10 DUST CONTROL The Contractor shall provide suitable means for dust control by applying either water or dust palliative for operations within the limits of the Work. Dust control work shall be performed in such manner to prevent dust at all times, including during non-working hours. Full compensation for providing dust control shall be deemed included in the prices paid for the various contract items of work, and no separate payment will be made therefor. If dust control is not performed in a manner satisfactory to the Director of Public Works, then either (i) work shall be suspended until the dust control measures are sufficient or (ii) dust control may be performed by CITY, or its designee, and CITY will deduct all costs it incurs performing dust control plus twenty-five percent (25%) from amounts due or that become due to Contractor. SECTION GC-11 RESERVED SECTION GC-12 DIFFERING SITE CONDITIONS The Contractor shall promptly, and before the following conditions are disturbed, notify CITY in writing of any: a) Material that the Contractor believes may be hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; 213 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations General Conditions 42 b) Subsurface or latent physical conditions at the site differing materially from those indicated in the Contract Documents; or c) Unknown physical conditions at the site of any unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. CITY shall promptly investigate the conditions. If it finds that such conditions do materially differ from conditions indicated in the Contract Documents or ordinarily encountered in work of this character, or do involve hazardous waste, and cause an increase or decrease in the Contractor's costs or the time needed to perform any part of the Work, CITY shall issue a change order under the provisions described in the Contract Documents. No claim of the Contractor under this clause shall be allowed unless the Contractor has given the notice required in the Contract Documents. In the event a dispute arises between CITY and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor's costs or the time needed to perform any part of the Work, Contractor shall not be excused from completing the Work as provided in the Contract Documents. The Contractor shall proceed with all work to be performed under the Contract Documents. The Contractor shall retain any and all rights provided either by the Contract Documents or by law that pertain to the resolution of disputes and protests. SECTION GC-13 ARCHAEOLOGICAL EXAMINATION If archaeological materials are uncovered during grading, trenching or other excavation, earthwork within 100 feet of these materials shall be stopped until a professional archaeologist certified by the Society of California Archaeology (SCA) and/or by the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and to suggest appropriate mitigation measures as necessary. In the event the work of archaeological examination and related work delays the Contractor's work, he shall be entitled to an extension of time to complete the work equal to the number of working days the Work is thus delayed. However, the Contractor shall have no claim for compensation as a consequence of delay of the Work for the period of time required by CITY for such archaeological examination and related work. 214 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Waiver and Release 43 WAIVER AND RELEASE 215 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Waiver and Release 44 CONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT Upon receipt by the undersigned of a check from (Maker of Check) in the sum of $ (Amount of Check) payable to (Payee or Payees of Check) and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of CITY located at (Job Description) to the following extent. This release covers a progress payment for labor, services, equipment or material furnished to (Your Customer) through (Date) only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order that has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic’s lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of this document relies on it, said party should verify evidence of payment to the undersigned. DATED: Company Name: ____________ By Its 216 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Waiver and Release 45 CONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT Upon receipt by the undersigned of a check from in the sum of $ payable to . and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of the City of Saratoga located at (Job Description). This release covers the final payment to the undersigned for all labor, services, equipment or material furnished on the job, except for disputed claims for additional work in the amount of $ . Before any recipient of this document relies on it, the party should verify evidence of payment to the undersigned. DATED: Company Name By Its 217 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Waiver and Release 46 UNCONDITIONAL WAIVER AND RELEASE UPON PROGRESS PAYMENT The undersigned has been paid and has received a progress payment in the sum of $ for labor, services, equipment or material furnished to (Your Customer) on the job of City of Saratoga located at (Job Description) and does hereby release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to (Your Customer) through (Date) only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written change order that has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic’s lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. DATED: Company Name By Its NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM. 218 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Waiver and Release 47 UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT The undersigned has been paid in full for all labor, services, equipment or material furnished to: (Your Customer) on the job of the City of Saratoga located at (Job Description) and does hereby waive and release any right to a mechanic's lien, stop notice, or any right against a labor and material bond on the job, except for disputed claims for extra work in the amount of $ . DATED: Company Name By Its NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM 219 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Special Conditions 48 SPECIAL CONDITIONS 1. SPECIAL QUALIFICATIONS Contractor is advised that in addition to the standard qualifications, the following additional specialty qualifications apply to this Contract: NONE 2. SPECIALTY WARRANTIES In addition to the standard Warranties for overall workmanship and landscaping work identified in Section 6 of the Contract for Construction, the following specialty warranties are required: NONE 3. AWARD The award of the contract, if it is to be awarded, will be to the lowest responsive responsible bidder whose proposal complies with all the requirements of the bid documents. The low bid will be determined based upon: TOTAL BID 4. ORDER of WORK The Contractor shall provide for the orderly progression of work. The Contractor is advised of the following constraints or City requirements with respect to order of work: NONE 5. LIMITS of WORK Contractor is advised that the CITY will provide off-site areas for Contractor activities as follows: Congress Springs Park, 12970 Glen Brae Drive, Saratoga CA 95070: Contractor may store equipment. 6. TESTING Contractor is advised that the following special testing requirements apply: NONE 7. SOUND CONTROL Contractor shall implement the following sound control measures: NONE 8. PERMITS AND LICENSES 220 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Special Conditions 49 The City of Saratoga will obtain the following permits in connection with the Work, if needed: No-Fee Building Permits from the City of Saratoga Building Department. Contractor shall comply with all permit conditions in performing the Work. 9. PUBLIC CONVENIENCE & SAFETY Contractor shall not perform work on the following streets or in the following areas during the periods defined below: NONE 10. HOURS of WORK Contractor is advised that operations may be performed outside the normal hours of work (7:30am to 5:00pm Monday through Friday) only as follows: NONE 11. MITIGATION MEASURES As part of the environmental review process, the City of Saratoga has agreed to the following mitigation measures, which measures are part of the Work. NONE Contractor shall comply with all mitigation measures and shall complete the mitigation measures to the satisfaction of all agencies with jurisdiction. 12. MILESTONES and SCHEDULES A. Construction Progress Schedule. The Contractor shall prepare and submit the Contractor's Initial Construction Schedule within ten (10) calendar days after the issuance of the Notice to Proceed. The Initial Construction Schedule shall be in a form acceptable to the Engineer, and shall be produced using Microsoft Projects or other software acceptable to CITY. Contractor shall provide the Initial Schedule in electronic format acceptable to CITY. Activity durations shall be the total number of actual days required to perform the work including consideration of weather impacts. Area codes shall distinguish construction activities related to individual buildings or areas within buildings (i.e. locker rooms) and site work. See Order of Work, #4 above. Contractor staff preparing schedules shall be qualified and experienced in the scheduling method specified and capable of fulfilling the scheduling requirements of this section for the duration of the contract. 221 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Special Conditions 50 The Engineer will meet with the Contractor to review and comment on the Contractor's Initial Schedule within five (5) days of its receipt. The Contractor will finalize and re-submit the schedule within five (5) days of the review meeting. Upon favorable review by the Director of Public Works, the Initial Schedule will become the project Baseline Contract Schedule. The Baseline Schedule shall not be revised without written approval of the CITY. CITY shall have the right to withhold progress payments from the Contractor at its discretion if the Contractor fails to finalize and obtain approval for the Baseline Contract Schedule within the prescribed period. Failure of the Contractor to incorporate all elements of work required for the performance of the contract or any inaccuracy in the Baseline Contract Schedule shall not excuse the Contractor from performing all work required for a completed project within the specified contract time period, notwithstanding CITY’s Representatives favorable review of the Baseline Contract Schedule. B. Monthly Interval Updates. The Contractor shall submit an updated Schedule of the work at least once each month. The schedule be submitted both on paper and in electronic format. Schedule updates are an essential part of each progress payment application. CITY will not process progress payment applications without an updated schedule in the specified format. The monthly schedule updates shall include: The Contractor's estimated percentage complete (progress) for each activity in progress. Actual start/finish dates for activities. Identification of errors, if any, from the previous updated schedule. The Schedule Update Reports shall consist of: A bar chart showing the previous month's work and a three (3) month projection of upcoming work. The data included on the bar chart shall consist of the activity number, activity description, early start and finish date, original duration, remaining duration, percent complete, and total float. A CPM tabular report sorted by responsibility, early start date that includes activity number, activity description, original duration, remaining duration, early and late start dates, early and late finish dates, total float, percent complete, activity budget cost, and activity earned cost. The Schedule Reports shall consist of: Time scaled network logic diagram(s) reflecting the activities, the interrelationships and logic ties between activities, activity duration and float. The diagram(s) shall be organized by Area. Diagrams shall be no smaller than "D" size (24" x 36") and no larger than "E" size (36" x 48"). 222 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Special Conditions 51 A CPM tabular report sorted by responsibility, early start date that includes Activity number, activity description, original duration, remaining duration, early and late start dates, early and late finish dates, total float, percent complete, activity budget cost, and activity earned cost. Contractor shall submit with each schedule update an updated electronic version. C. Short Interval Schedule Short Interval Schedules (SIS) shall be submitted to the Engineer at every weekly site meeting. The Interval shall be three weeks and shall include the past week, the week submitted and the week thereafter. The SIS may be prepared by hand. The SIS shall be based on the Contract Schedule and shall be in bar chart form. The SIS shall be in sufficient detail to evaluate the Contractor's performance in the preceding week and planned progress in upcoming weeks vis a vis the Contract Schedule and Updates thereof. D. Float Time Float or slack time is defined as the amount of time between the earliest start date and the latest start date or the earliest finish date and the latest finish date of a scheduled activity. Float or slack time is not for the exclusive use or benefit of either the Contractor or CITY. The Contractor acknowledges and agrees that actual delays affecting path of activities containing float will not have any effect upon the Contract completion date, provided that the actual delay does not exceed the float time associated with those activities. E. Construction Schedule Revisions If during the process of schedule updating it becomes apparent that the Construction Schedule no longer represents the actual prosecution and progress of the work, CITY may require the Contractor to submit a revised schedule at no additional cost to CITY. CITY shall have the right to withhold progress payments from the Contractor at its discretion, if the Contractor fails to submit a timely, detailed and workable schedule. Updating the construction schedule to reflect actual progress shall not be considered to be a revision of the Schedule. If actual progress of the Work falls fourteen (14) days behind the most recent schedule update favorably reviewed by Engineer, Contractor shall prepare and submit a recovery schedule within five (5) working days of a written request to explain and display how Contractor intends to reschedule activities (including increasing working hours, shifts, days, or equipment) to regain compliance with the Construction Schedule. F. Final CPM Schedule at Completion of Contract At the completion of the contract and prior to the release of any bonds or final payment by CITY, the Contractor shall submit a final CPM schedule, showing the actual sequence and duration of activities. G. Early Completion of Project 223 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Special Conditions 52 In the event the Contractor wishes to complete work earlier than the specified contract completion date, and CITY and Director of Public Works approve such earlier completion, the following conditions apply: Approval by CITY of Contractor's proposed earlier completion date shall not change the contract completion date. Contractor shall not, under any circumstances, receive additional compensation from CITY for indirect, general, administrative or other forms of overhead costs, for the period between the time of earlier completion proposed by the Contractor and the official contract completion date. H. Time Extension Requests The monthly Updated construction schedules submitted by the Contractor shall not show a completion date later than the Contract Time, subject to any time extensions granted by CITY. If the Contractor believes that it is entitled to an extension of the Contract Time due to a Change Order, delay/disruption or other event beyond its control, the Contractor, within ten (10) working days of the qualifying event(s), shall submit: 1. A Time Extension Request notification letter with a detailed narrative justifying the time extension requested; 2. Analysis of the delay impact, identifying all schedule activities that are affected by the subject occurrence; 3. A tabular report of the qualifying schedule the analysis is based on; and 4. A schedule analysis entitled "Time Extension Request Schedule" that incorporates the findings of the analysis of delay impact into the latest update of the project schedule. Time extension request schedules shall be time scaled, utilizing a computer generated network analysis unless otherwise approved by the Director of Public Works. The time extension request shall forecast the adjusted project completion date and impact to any intermediate milestones. Contract time extensions shall be granted only to the extent the equitable time adjustments to the activity or activities affected by a change order or delay/disruption exceed the total float of a critical activity (or path) and extend the Contract Completion Date. When Contractor does not submit a Time Extension Request within ten (10) working days, it is mutually agreed that the particular Change Order (including Proposed Change Order) or delay/disruption does not affect the construction schedule and hence no time extension is due to the Contractor. CITY shall have no obligation to consider any time extension request if the Contractor does not comply with the requirements of the Contract Documents. CITY shall not be responsible or liable to the Contractor for any constructive acceleration due to 224 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Special Conditions 53 failure of CITY to grant time extensions under the terms of this contract, should Contractor fail to comply with the time extension submission and justification requirements stated herein. 225 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Experience and Qualifications 54 STATEMENT OF EXPERIENCE AND QUALIFICATIONS 226 Selway Construction, Inc. 227 Selway Construction, Inc. 228 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bid Forms 57 BID FORM 229 Selway Construction, Inc. 230 Selway Construction, Inc. 231 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bid Forms 60 BID SCHEDULE 232 Contractor: Project: Parks Restroom Renovations Park Restroom Renovations -BID SCHEDULE Congress Springs Park El Quito Park Wildwood Park Task# TASK Lump Sum Bid Amount Lump Sum Bid Amount Lump Sum Bid Amount 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Mobilization 5000 t;oot:· >.lQIOO Demolition C3000 t3D ov S';()OD Debris Disposal �I)(){) '900V �()&O , Temporary Facilities �50b 2,;77> D Z,5"DO Concrete -Contractor shall verifyw/c locations and relocate f\[ ( 4--fV I A--NJA to for plan dimensions as required Metals -Miscellaneous {0, ()OD [) D {) T) lfJ 1 {)0 0 Miscellaneous Rough Carpentry 56?5') 1(�(3 a� 3�'333 Finish Carpentry c;oo o tnJrro �{)(JQ Thermal and Moisture Protection 3000 '()00 CJ >1 000 /21::: ovDoors and Windows. reuse existing doors "�SOO ),�DO Drywall 3VDO BOOO �,OOu Painting & Staining 2,C,{) 0 2.,-q Vu '7 , S-D0 Floor Covering (at::;OO V5l >V �,SOO Tile QJDO C:;ooo i;--1000 Toilet Partitions {O. ooo , o vnn //) 000 ' ADA Door Hardware 4 ,DOD Lf-V()D 4. f) (!)0 '700 I Signage 57/() 5:00 Changing Tables (, 0 00 I / D'CD ), ooo , Furnishings c;'/ DD 0 S-'ODD �DOu x/ vov I <R,DtJO Plumbing Fixtures and faucets '6 ODD Lf, ODORough Electrical L/.-, 000 4 ooo Finish Electrical 2, f::!JV L SvD i..500 Lighting Fixtures {.f, ObD 4, DDV e_,/1 0Du Communication wiring rough & finish fr [ fr N 1/.'r Al /f} Fire Alarm fv f A-fVJ;t IVlA Security wiring & switches (coordinate with City) f\J/A-(\(/It-Ntft BID SUB-TOTALS 98)'5]3 errs, 333 q�l 333, TOTAL BID CompanyName:Seh..tgy La.vs1r-v\,c:\-1c1v J "!:°NC.. CompanyRepresentative(Print): ?eterr Hctiv ,c: N :s company Phone L{{) g '-' '1 � L -<f'84 / CompanyRepresentative(sign):_ � Bid Schedule 61 Selway Contrauction, Inc. 233 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bonds 62 BONDS 234 235 236 237 238 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bonds 65 FAITHFUL PERFORMANCE BOND The City of Saratoga, California (“Owner”) and ______________________________________ (“Contractor”), have entered into a written agreement for furnishing of all labor, materials, equipment, transportation and services for the construction of the Parks Restroom Renovations Project (said agreement, together including all contract documents and changes thereto, the “Construction Contract”) and Contractor is required by the terms of the Construction Contract to furnish a bond for the faithful performance of all terms and conditions of the Construction Contract. NOW, THEREFORE, Contractor, as principal, and ______________________________________ (hereinafter referred to as “Surety”), as surety, are held and firmly bound unto Owner in the penal sum of ___________________________________________ Dollars ($_________________________), lawful money of the United States, for the payment of which sum well and truly to be made as provided in this Faithful Performance Bond (“Bond”) which consists of this page and the Faithful Performance Bond Terms and Conditions (consisting of 10 paragraphs) attached to this page. All notices shall be sent to the addresses below. Surety is an “admitted surety insurer” as described in California Code of Civil Procedure § 995.120. Signed this ___________ day of ___________________, 20____. Contractor as Principal (Corp. Seal) Surety (Corp. Seal) Company Name Company Name Signature Signature Print Name Print Name Title Title Street Address Street Address City, State, Zip Code City, State, Zip Code Note: Signatures of those executing for Surety and Principal must be notarized. The bond must be accompanied by a power of attorney from Surety authorizing its agent to bind it to this bond. 239 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bonds 66 Faithful Performance Bond Terms and Conditions 1. Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to Owner for the performance of the Construction Contract, which is incorporated herein by reference. 2. If Contractor timely performs each and every obligation under the Construction Contract, Surety and Contractor shall have no obligation under this Bond, except to participate in conferences as provided in Subparagraph 3.1. 3. Surety’s obligation under this Bond shall arise after: 3.1 Owner has declared a Contractor Default and has notified Contractor and Surety that Owner has declared a Contractor Default and has requested and attempted to arrange a conference with Contractor and Surety to be held not later than seven days after receipt of such notice to discuss methods of performing the Construction Contract; and 3.2 Owner has agreed to pay the Balance of the Agreement Price, as calculated under the terms of the Construction Contract, to Surety in accordance with the terms of the Construction Contract or to a contractor selected to perform the Construction Contract in accordance with the terms of the Construction Contract with Owner. The “Balance of the Agreement Price” is the total amount payable by Owner to Contractor under the Construction Contract after all proper adjustments have been made, including allowance to Contractor of any amounts received or to be received by Owner in settlement of insurance or other claims for damages to which Contractor is entitled, reduced by all valid and proper payments made to or on behalf of Contractor under the Construction Contract. 4. When Owner has satisfied the conditions of Paragraph 3, Surety shall promptly and at Surety’s expense take one of the following actions: 4.1 Arrange for Contractor, with consent of Owner, to perform and complete the Construction Contract; or 4.2 Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors; or 4.3 Obtain bids or negotiated bids from qualified contractors acceptable to Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by Owner and the contractor selected with Owner’s concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to Owner the amount of damages as described in Paragraph 6 in excess of the Balance of the Agreement Price, as calculated under the terms of the Construction Contract, incurred by Owner resulting from Contractor’s Default; or 4.4 Waive its right to perform and complete, arrange for completion, or obtain a new Contractor and with reasonable promptness under the circumstances: 240 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bonds 67 4.4.1 After investigation, determine the amount for which it may be liable to Owner and, as soon as practicable after the amount is determined, tender payment thereof to Owner; or 4.4.2 Deny liability in whole or in part and notify Owner citing specific reasons therefor. 5. If Surety does not proceed as provided in Paragraph 4 within twenty days from receipt of the notice described in paragraph 3.1 (whether or not a conference has been held pursuant to paragraph 3.1), or such longer period upon which Owner and Surety may agree in writing, Surety shall be deemed to be in default on this Bond. If the Surety proceeds as provided in Subparagraph 4.4, and Owner refuses the payment tendered or the Surety has denied liability, in whole or in part, without further notice Owner shall be entitled to enforce any remedy available to Owner. 6. After Owner has declared a Contractor Default, and if Surety elects to act under Subparagraph 4.1, 4.2, or 4.3 above, then the responsibilities of Surety to Owner shall not be greater than those of Contractor under the Construction Contract, and the responsibilities of Owner to Surety shall not be greater than those of the Owner under the Construction Contract. To the limit of the amount of this Bond, but subject to commitment by Owner of the Balance of the Agreement Price to mitigation of costs and damages on the Construction Contract, Surety is obligated without duplication for: 6.1 The responsibilities of Contractor for correction of defective work, materials and equipment and completion of the Construction Contract; 6.2 Additional legal, design professional, construction management and delay costs resulting from the Contractor’s Default, and resulting from the actions or failure to act of the Surety under Paragraph 4; and 6.3 Liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of Contractor. 7. Surety shall not be liable to Owner or others for obligations of Contractor that are unrelated to the Construction Contract, and the Balance of the Agreement Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than Owner or its heirs, executors, administrators or successors. 8. Surety hereby waives notice of any change to the Construction Contract or to related subcontracts, purchase orders and other obligations, including changes of time, alteration or addition to the terms of the Contract or the Work to be performed thereunder or the specifications accompanying the same. 9. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction. The prevailing party in any such action shall be entitled to recover its attorneys’ fees, to be taxed as an item of costs. 241 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bonds 68 10. Contractor Default is defined as a failure of the Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract. 242 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bonds 69 LABOR AND MATERIALS PAYMENT BOND The City of Saratoga, California (“Owner”) and ______________________________________ (“Contractor”), have entered into a written agreement for furnishing of all labor, materials, equipment, transportation and services for the construction of the Parks Restroom Renovations Project (said agreement, together including all contract documents and changes thereto, the “Construction Contract”) and Contractor is required by the terms of the Construction Contract to furnish a bond to secure payment for all work, labor, materials, equipment or services furnished in connection with the Construction Contract. NOW, THEREFORE, Contractor, as principal, and ______________________________________ (“Surety”), as surety, are held and firmly bound unto Claimants, as defined herein, in the penal sum of ___________________________________________ Dollars ($_________________________), lawful money of the United States, for the payment of which sum well and truly to be made as provided in this Labor and Materials Payment Bond (“Bond”) which consists of this page and the Labor and Materials Payment Bond Terms and Conditions (consisting of 12 paragraphs) attached to this page. All notices shall be sent to the addresses below. Surety is an “admitted surety insurer” as described in California Code of Civil Procedure § 995.120. Signed this ___________ day of ___________________, 20____. Contractor as Principal (Corp. Seal) Surety (Corp. Seal) Company Name Company Name Signature Signature Print Name Print Name Title Title Street Address Street Address City, State, Zip Code City, State, Zip Code Note: Signatures of those executing for Surety and Principal must be notarized. The bond must be accompanied by a power of attorney from Surety authorizing its agent to bind it to this bond. 243 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bonds 70 Labor and Materials Payment Bond Terms and Conditions 1. Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to Owner to pay for work, labor, materials, equipment, services, or other items furnished for use and actually used in the performance of the Construction Contract, which is incorporated herein by reference. 2. With respect to Owner, no obligation shall accrue if Contractor: 2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants including amounts due under the California Unemployment Insurance Code with respect to work or labor performed under the Construction Contract, or for any amounts required to be deducted, withheld, and paid over to the State of California Employment Development Department from the wages of employees of Contractor and subcontractors pursuant to Section 13020 of the California Unemployment Insurance Code with respect to such work and labor; and 2.2 Defends, indemnifies and holds Owner harmless from claims, demands, liens or suits by any person or entity whose claim, demand, lien or suit is for the payment for work, labor, materials, equipment, services or other items furnished for use in the performance of the Construction Contract, provided Owner has promptly notified Contractor and Surety of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to Contractor and Surety. 3. With respect to an individual or entity identified in California Civil Code Section 9100 (“Claimants”), no obligation shall accrue if Contractor promptly makes payment, directly or indirectly, for all sums due. Surety shall have no obligation to Claimants under this Bond until: 3.1 Claimants who are employed by or have a direct contract with Contractor have given notice to Surety and sent a copy, or notice thereof, to Owner, stating that a claim is being made under this Payment Bond and, with substantial accuracy, the amount of the claim. 3.2 Claimants who do not have a direct contract with the Contractor: 3.2.1 Have furnished written notice to Contractor and sent a copy, or notice thereof, to Owner, as required by and conforming with California Civil Code Sections 9560 and 9300 through 9306; and 3.2.2 Not having been paid within thirty (30) days of sending the required notice, have sent a written notice to Surety and sent a copy to the Owner, stating that a claim is being made under this Payment Bond and enclosing a copy of the previous written notice furnished to Contractor. 4. When the Claimant has satisfied the conditions of Paragraph 3, Surety shall promptly and at Surety’s expense take the following actions: 244 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Bonds 71 4.1 Send an answer to the Claimant, with a copy to Owner, within 20 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed. 4.2 Pay or arrange for payment of any undisputed amounts. 5. This Bond shall inure to the benefit of any of the persons and entities identified in California Civil Code Section 9100 so as to give a right of action to those persons or their assigns in any suit brought on the Bond. 6. Surety’s total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by Surety. 7. By Contractor furnishing and Owner accepting this Bond, they agree that all funds earned by Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of Contractor and Surety under this Bond, subject to the Owner’s priority to use the funds for the completion of the work or the satisfaction of Owner’s claims, including liquidated damages, under the Construction Contract. 8. Surety shall not be liable to Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. Owner shall not be liable for payment of any costs or expenses of any Claimants under this Bond, and shall have under this Bond no obligation to make payments to, give notices on behalf of, or otherwise have any obligation to Claimants under this Bond. 9. Surety hereby waives notice of any change to the Construction Contract or to related subcontracts, purchase orders and other obligations including changes of time, alteration or addition to the terms of the Construction Contract or the work to be performed thereunder of the specifications accompanying the same. 10. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction. The prevailing party in any such action shall be entitled to recover its attorneys’ fees, to be taxed as costs. 11. This Bond has been furnished to comply with California Civil Code Sections 9500 through 9566. Any provision in this Bond conflicting with those statutory requirements shall be deemed deleted and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12. Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 245 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Contract for Construction 72 CONTRACT FOR CONSTRUCTION Parks Restroom Renovations Project 246 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Contract for Construction 73 THIS CONTRACT FOR CONSTRUCTION is made and entered into this 3rd_ day of July, 2024, by and between the City of Saratoga, a municipal corporation (herein called CITY) and _Selway Construction, Inc, located at _728 Charcot Ave, San Jose CA 95131, herein called Contractor. RECITALS A. WHEREAS, the City has caused to be prepared in the manner prescribed by law, plans, specifications and other contract documents for the public work of construction [insert project name and contract number] herein described and shown and has approved and adopted the Contract Documents, including the specifications and plans, and has caused to be published in the manner and for the time required by law a Notice Inviting Bids for the work described in the Contract Documents, and B. WHEREAS, the Contractor in response to the City’s Notice has submitted to the City a sealed bid proposal accompanied by a bid guaranty in an amount not less than ten percent (10%) of the amount bid for the construction of all of the proposed work in accordance with the terms of the Contract Documents, and C. WHEREAS, the City, in the manner prescribed by law, has publicly opened, examined and declared the bids submitted and as a result has determined and declared the Contractor to be the lowest responsible bidder and has duly awarded to the Contractor a contract for all of the work and for the sum or sums named in the bid proposal and in this Contract. Accordingly, CITY and Contractor agree as follows: (1) CONTRACT SUM: CITY agrees to pay, and the Contractor agrees to accept, in full payment for the above work, the sum of Two Hundred and Ninety Five Thousand and 00/100 dollars ($295,000.00) to be paid in accordance with the Contract Documents. (2) COMPLIANCE WITH LAW: CITY is a public agency. All provisions of law applicable to public contracts are a part of this contract to the same extent as though set forth herein and will be complied with by the Contractor. (3) CONTRACT ADMINISTRATION: The authorized representatives of CITY and Contractor for Contract administration are listed below. Contractor: Contractor Name: Selway Construction, Inc. Contact Person: Peter Hawkins Street Address: 728 Charcot Avenue City, State, Zip: San Jose, CA 95131 Telephone(s): 1-408-382-9841 Email Address: peter@selwayconstruction.com 247 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Contract for Construction 74 Saratoga Bus. Lic. #: Contractor’s Lic. # and Lic. # expiration date: 1056018 / 10/31/2025 DIR Registration #: 1000515440 City of Saratoga Department: Public Works Primary Representative: Shawn Gardner Street Address: 19700 Allendale Avenue City, State, Zip: Saratoga, CA 95070 Telephone: 408-868-1247 Email Address: sgardner@saratoga.ca.us (4) CONTRACT DOCUMENTS: The following Contract Documents relating to this Contract for Construction are hereby made a part of and incorporated by reference into this Contract: • The Notice Inviting Bids • Information for Bidders • Statement of Experience and Qualifications • Bid Form • Contract Bid • Bid Schedule • Faithful Performance Bond • Labor and Materials Payment Bond • Certificate of Insurance and Endorsements, • Affidavit Concerning Conflicts of Interest and Noncompetitive Practices • Fair Employment Practices Certificate • General Conditions, Special Conditions and Attachments thereto, • State of California Department of Transportation Standard Plans, current edition • 2022 State of California Department of Transportation Standard Specifications • City of Saratoga Department of Industrial Relations Reporting 248 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Contract for Construction 75 • City of Saratoga Contractor Off-Road Regulations Assurances • City Ordinance #400 – Debris Disposal (Articles 7-05, 7-10, and 7-15 of the Saratoga Municipal Code) • ARPA Funding Agreement • Plans and Specifications prepared by Steve Benzing Architect dated 02/28/24 • Any Special Conditions, Job Scope, Technical Specifications, and Standard Details. • Supplemental agreements, certifications, and endorsements applicable to this work, with all modifications incorporated in said documents prior to receipt of the Contract Proposals. Any work called for in one contract document not mentioned in another is to be performed and executed the same as if mentioned in all Contract Documents. This Agreement (including all documents referred to above and incorporated herein) represents the entire and integrated Agreement between CITY and Contractor for the Project and supersedes all prior negotiations, representations, or agreements, either written or oral. This document may be amended only by written instrument, as provided in the General Conditions. (5) PROHIBITED INTEREST. Contractor represents that to the best of its knowledge no director, officer, or employee of CITY has any interest, contractual or non-contractual, financial or otherwise, in this transaction or in the business of Contractor. If any such interest comes to the knowledge of Contractor at any time, a full and complete disclosure of all such information shall be made in writing to CITY, even if such interest would not be considered a conflict of interest under Article IV Division 4 (commencing with Section 1090) or Division 4.5 (commencing with Section 3600) of the Government Code of the State of California. No member, officer, or employee of CITY or of any of its member jurisdictions during his/her tenure of office, or for one year thereafter, shall have any interest, direct or indirect, in this Contract or the proceeds therefrom. (6) NOTICES. Any notices to be given hereunder by either party to the other must be made in writing, signed, dated and may be effected either by personal delivery or mail. Mail shall be sent registered or certified, postage pre-paid, return receipt requested. Mailed notices shall be addressed to the parties at the addresses set forth below, but each party may change its address by written notice in accordance with this paragraph. Notices delivered personally shall be effective immediately. Notices sent by mail shall be effective one (1) day after mailing. CITY OF SARATOGA CONTRACTOR Public Works Director Peter Hawkins City of Saratoga Selway Construction 13777 Fruitvale Ave. 728 Charcot Avenue Saratoga, CA 95070 San Jose, CA 95131 (408) 868-1239 1-408-382-9841 249 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Contract for Construction 76 (7) WARRANTIES. The Contractor hereby warrants and guarantees for one (1) year from and after the date of completion of the services provided for in this Agreement that said materials and labor necessary for the Parks Restroom Renovations Project, shall operate as provided for in the Technical Specifications and Contract Documents. During the term of this warranty, Contractor shall provide all materials, parts and labor, at its own expense, which are necessary to repair and/or correct any and all defects, installation or operational failures in the equipment from any cause. Notwithstanding the foregoing, Contractor shall not be required to bear the expense of correction of any failure in the equipment that is caused solely by the negligence or willful misconduct of City. The warranties of each part or component supplied are in addition to the warranties required of Contractor in the Contract Documents. (8) WORKERS’ COMPENSATION CERTIFICATION. Pursuant to Labor Code § 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work on this Contract.” (9) WAIVER. No waiver of any breach of the terms, conditions or covenants of this contract shall be construed to be a waiver of any succeeding breach of the same or any other covenants, conditions or terms of this contract. The waiver by any party of a breach of this Contract shall not constitute a continuing waiver, or a waiver of any subsequent breach, either of the same of different provision of this Contract. (10) TIME OF THE ESSENCE. Time is of the essence in this contract. (11) CONTROLLING LAW. This contract and all matters relating to it shall be governed by the laws of the State of California. (12) ENTIRE AGREEMENT. It is expressly agreed between CITY and Contractor that this contract, including the documents listed in paragraph 3 and incorporated herein, expresses the complete agreement between the parties and supersedes all prior oral or written negotiations, agreements and understandings between them regarding the subject matter hereof. This Agreement may be amended only by written agreement between the parties as provided in the Contract Documents. CONTRACTORS ARE REQUIRED BY LAW TO BE LICENSED AND REGULATED BY THE CONTRACTORS’ STATE LICENSE BOARD WHICH HAS JURISDICTION TO INVESTIGATE COMPLAINTS AGAINST CONTRACTORS IF A COMPLAINT REGARDING A PATENT ACT OR OMISSION IS FILED WITHIN FOUR (4) YEARS OF THE DATE OF THE ALLEGED VIOLATION. A COMPLAINT REGARDING A LATENT ACT OR OMISSION PERTAINING TO STRUCTURAL DEFECTS MUST BE FILED WITHIN TEN (10) YEARS OF THE DATE OF THE ALLEGED VIOLATION. ANY QUESTIONS CONCERNING A CONTRACTOR MAY BE REFERRED TO THE REGISTRAR, CONTRACTORS’ STATE LICENSE BOARD, P.O. BOX 26000, SACRAMENTO, CALIFORNIA 95826. This Agreement is executed by CITY upon approval by the Council at its regular scheduled meeting of July 3, 2024, and the Contractor has caused this Agreement to be duly executed. 250 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Contract for Construction 77 Contractor (Contractor signature must be notarized) City of Saratoga Signature City Manager Date: Signer Name ATTEST: Signer Title Date: City Clerk Contract Description: Date: Parks Restroom Renovations – ARPA Project APPROVED AS TO FORM: City Attorney’s Office Date: 251 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Required Certifications 78 REQUIRED CERTIFICATIONS 252 Selway Construction, Inc. 253 Selway Construction, Inc. 254 Selway Construction, Inc. 255 Selway Construction, Inc. 256 Selway Construction, Inc. 257 Selway Construction, Inc. 258 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Required Certifications 85 FAIR EMPLOYMENT PRACTICES CERTIFICATE In connection with the performance of work under this contract, the Contractor agrees as follows: 1. Contractor will not because of the race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status of any person, refuse to hire or employ the person or refuse to select the person for a training program leading to employment, or bar or discharge the person from employment or from a training program leading to employment, or discriminate against the person in compensation or in terms, conditions, or privileges of employment, unless based upon a bona fide occupational qualification or applicable security regulations established by the United States or the State of California, or as otherwise provided in section 12940 of the Government Code. As provided in Labor Code section 1735, a violation of this provision is subject to all penalties imposed for a violation of Division, 2, Part 7, Chapter 1 of the Labor Code. Contractor and its Subcontractors are required to comply with all applicable federal and California laws, including the California Fair Employment and Housing Act (Government Code sections 12900 et seq.), Government Code section 11135, and Labor Code sections 1735, 1777.5, 1777.6, and 3077.5. 2. The Contractor will send to each labor union or representative of worker with which it has a collective bargaining agreement or other contract or understanding, a notice, advising the said labor union or worker’s representative of the Contractor’s commitments under this section; and the Contractor shall post copies of the notice in conspicuous places available to employees and applicants for employment. 3. The Contractor will permit access to its records of employment, employment advertisements, application forms, and other pertinent data and records by the Fair Employment Practices Commission, CITY or any other appropriate agency of the State of California designated by CITY, for the purposes of investigation to ascertain compliance with the Fair Employment Practices section of this contract. 4. A finding of willful violation of the Fair Employment Practices section of this contract or of the Fair Employment Practices Act shall be regarded by CITY as a basis for determining the Contractor to be not a “responsible Contractor” as to future contracts for which such Contractor may submit bids, for revoking the Contractor’s pre-qualification rating, if any, and for refusing to establish, re-establish or renew a pre-qualification rating for the Contractor. CITY shall deem a finding of willful violation of the Fair Employment Practices Act to have occurred upon receipt of written notice from the Fair Employment Practices Commission that it has investigated and determined that the Contractor has violated the Fair Employment Practices Act and has issued an order under Government Code §12970 or obtained a court order under Government Code §12973. Upon receipt of such written notice from the Fair Employment Practices Commission, CITY shall notify the Contractor that unless it demonstrates to the satisfaction of CITY within a stated period that the violation has been corrected, the Contractor’s pre-qualification rating will be revoked at the expiration of such period. 5. The Contractor agrees that should CITY determine that the Contractor has not complied with the Fair Employment Practices section of this contract, then pursuant to Labor Code Sections 1735 and 1775, the Contractor shall, as a penalty to CITY, forfeit, for each calendar day, or portion 259 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Required Certifications 86 thereof, for each person who was denied employment as a result of such noncompliance, the penalties provided in the labor code for violation of prevailing wage rates. Such monies may be recovered from the Contractor. CITY may deduct any such damages from any monies due the Contractor. 6. Nothing contained in this Fair Employment Practices section shall be construed in any manner of fashion so as to prevent CITY from pursuing any other remedies that may be available at law. 7. Prior to award of the contract, the Contractor shall certify to CITY that it has or will meet the following standards for affirmative compliance, which shall be evaluated in each case by CITY: a. The Contractor shall provide evidence, as required by CITY, that it has notified all supervisors, foremen and other personnel officers, in writing, of the content of the anti- discrimination clause and their responsibilities under it. b. The Contractor shall provide evidence, as required by CITY, that it has notified all sources of employee referral (including unions, employment agencies, advertisements, and the Department of Employment) of the content of the anti-discrimination clause. c. The Contractor shall file a basic compliance report as required by CITY. Willfully false statements made in such reports shall be punishable as provided by law. The compliance report shall also spell out the sources of the work force and who has the responsibility for determining whom to hire, or whether or not to hire. d. Personally, or through its representatives, the Contractor shall, through negotiations with the unions with whom it has agreements, attempt to develop an agreement which will: (1) Spell out responsibilities for nondiscrimination in hiring, referral, upgrading and training. (2) Otherwise implement an affirmative anti-discrimination program in terms of the unions’ specific areas of skill and geography, to the end that qualified minority workers will be available and given an equal opportunity for employment. e. The Contractor shall notify CITY of opposition to the anti-discrimination clause by individuals, firms or organizations during the period of its pre-qualification. 8. The Contractor will include the provisions of the foregoing Paragraphs 1 through 7 in every first-tier subcontract so that such provisions will be binding upon each subconsultant. 9. Statements and Payrolls. The Contractor shall maintain its records in conformance with the requirements in the Specifications and the following special provisions: a. The submission by the Contractor of payrolls, or copies thereof, to the awarding body, is required within two weeks of closing each pay period. Each contractor and subcontractor shall preserve their weekly payroll records for a period of three (3) years from the date of completion of the contract. 260 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations Required Certifications 87 b. The payroll records shall contain the name, address and social security number of each employee, his/her correct classification, rate of pay, daily and weekly number of hours worked, itemized deductions made, and actual wages paid. c. The Contractor shall make its payroll records available at the project site for inspection by CITY and shall permit CITY to interview employees during working hours on the job. The following certification is to be executed by every Contractor and enclosed and forwarded in a sealed envelope containing the bid. The person signing the certification shall state his/her address and official capacity. 261 Selway Construction, Inc. 262 Selway Construction, Inc. 263 Selway Construction, Inc. 264 Selway Construction, Inc. 265 266 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations PLANS 93 PLANS The Scope of Work for the Project is set forth in the following Plans. 267 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations PLANS 94 268 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations PLANS 95 269 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations PLANS 96 270 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations PLANS 97 271 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations PLANS 98 272 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations PLANS 99 273 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations PLANS 100 274 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations City Ordinance No. 400 (Debris Disposal) 101 CITY ORDINANCE #400 (Debris Disposal) 275 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)102 276 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)103 277 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)104 278 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)105 279 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)106 280 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)107 281 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)108 282 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)109 283 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)110 284 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)111 285 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)112 286 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)113 287 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)114 288 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)115 289 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)116 290 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)117 291 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)118 292 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)119 293 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)120 294 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)121 295 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)122 296 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)123 297 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)124 298 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)125 299 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)126 300 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)127 301 Contractor: Selway Construction, Inc.Project: Park Restroom Renovations City Ordinance No. 400 (Debris Disposal)128 302 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 129 ARPA FUNDING AGREEMENT 303 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 130 304 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 131 305 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 132 306 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 133 307 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 134 308 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 135 309 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 136 310 Contractor: Selway Construction, Inc. Project: Parks Restroom Renovations ARPA FUNDING AGREEMENT 137 1788001.2 311 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:Community Development Department PREPARED BY:Bryan Swanson, Community Development Director SUBJECT: Agreement with Urban Planning Partners to Commence Phase 2 of Housing Element Implementation and Agreement with Lisa Wise Consulting to Develop Objective Design and Development Standards for Housing Element Implementation RECOMMENDED ACTION: 1. Authorize the City Manager to execute a new contract with Urban Planning Partners for consulting services on Phase 2 of Housing Element Implementation in the amount of $67,060. 2. Authorize the City Manager to execute a new contract with Lisa Wise Consulting to develop Objective Design and Development Standards for Housing Element Implementation in the amount of $82,062. DISCUSSION: On March 20, 2024, the City Council adopted the City of Saratoga 2023-2031 Housing Element. Community Development Department (CDD) staff is now working to implement the Housing Element’s Programs. These Programs, listed in Section 7 of the Housing Element, are specific actions that the City is and will be taking to address present and future housing needs in Saratoga. Each Program includes a stated timeframe for implementation. The City has already completed implementation of the first phase of Housing Element Programs. In planning the next phase of Housing Element implementation, CDD has identified certain Programs for which staff can benefit from consultant support. Lisa Wise Consulting Agreement for Housing Element Implementation CDD recommends an agreement with Lisa Wise Consulting to assist the City in codifying relevant guidelines in the Single-Family Residential Design Review Handbook and in preparing objective design standards for conversion of existing single-family residences to duplexes and triplexes in the R-1-20 and R-1-40 zones outside the WUI and Very High Fire Hazard Severity Zones. Attachment A includes a detailed scope of services for the agreement. The scope of services are intended to assist the City with implementation of the following Housing Element Programs: Program 1.2-6: Conversion of Duplexes and Triplexes 312 Program 3.2-10: Modify Single-Family Residential Design Review Handbook Urban Planning Partners Agreement for Housing Element Implementation CDD recommends an agreement with UPP to assist the City in Housing Element implementation tasks involving development of new ordinances, policies, and programs, as well as outreach, engagement, education, and program management. Attachment B contains a detailed scope of services for the UPP Agreement. The scope of services are intended to assist the City with implementation of the following Housing Element Programs: Program 1.2-4: Lot Consolidation Program Program 3.1-1: Pre-Approved Plan Sets for ADUs Program 3.2-9: Modify Design Review Findings for Objectivity Program 4.3-2: Housing for Persons Employed in Saratoga Program 4.3-3: Shared Housing Program 4.3-1: Development of Housing for Extremely Low-Income Households Program 5.3-1: Fair Housing Webpage FISCAL IMPACT: Funds totaling $149,122 are available in the department’s operating budget to fund both the UPP agreement and Lisa Wise agreement. ATTACHMENTS: Attachment A – Proposed Lisa Wise Agreement Attachment B -Proposed UPP Agreement 1796858.3 313 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract Page 1 of 3 City of Saratoga Standard Services Contract This agreement is entered into at Saratoga, California by and between the City of Saratoga, a municipal corporation (“City”), and ______________________________________ (“Consultant”), who agree that: 1.Purpose of Contract. This is a contract for: The purpose of the contract is more specifically described in Exhibit A of this agreement (“Scope of Work and Payment Terms”). In the event of a conflict between (1) the “Scope of Work and Payment Terms” in Exhibit A or any of the exhibits included in Exhibit A and (2) the other terms of this agreement,the other terms of the agreement shall govern. 2. Term. Start Date:End Date: (If Start Date is left blank, start date will be date last signed below.) Or upon project completion, whichever occurs first. 3. Payment. City shall pay Consultant for work product produced and any authorized reimbursable costs pursuant to this agreement an amount not to exceed the total sum of: $___________________________________________________. If this contract is for more than one year, the maximum payment amount for each year is set forth in Exhibit A. Consultant agrees to comply with payment terms set forth in Exhibit A. Consultant is not authorized to undertake any efforts or incur any costs whatsoever under the terms of this agreement until receipt from City of a fully executed copy of this agreement. 4. Contract Administration. The authorized representatives of City and Consultant for Contract administration are listed below. The City’s Primary Representative is the Administrator. Consultant : Consultant Name: Contact Person: Street Address: 314 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract Page 2 of 3 City, State, Zip: Telephone(s): Email Address: Saratoga Business Lic. #: (Contractor shall maintain a Saratoga Business License for the Term of this agreement) City of Saratoga Department: Primary Representative: Street Address: City, State, Zip: Telephone: Email Address: 5. Addresses for Notice.Notices or communications shall be given to the parties at the addresses set forth in Section 4 (“Contract Administration”) unless otherwise designated in a written notice to the other party. In addition, notices to City shall be copied to: City Manager City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 City Clerk City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 These copies shall not constitute notice. 6. Change of Address.Any party hereto, by giving ten (10) days written notice to the other, may designate any other address as substitution of the address to which the notice or communication shall be given. 7. Insurance. Consultant agrees to procure and maintain insurance as required by the provisions set forth in Exhibit B (“Insurance”). Certificates of such insurance and copies of the insurance policies and endorsements shall be delivered to City within ten (10) days after being notified of the award of the contract, and before execution of this agreement by the City. 8. General Provisions.City and Consultant agree to and shall abide by the general provisions set forth in Exhibit C (“General Provisions”). 315 316 317 Contractor:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit A Page 1 of 2 City of Saratoga Services Contract Exhibit A – Scope of Work and Payment Terms Consultant shall complete the scope of work and invoice the City in accordance with the payment terms shown below: AND/OR See Exhibit(s)A-incorporated by this reference. 318 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract Page 2 of 2 Payment Terms: The payments specified in this paragraph shall be the only payments to be made to Consultant in connection with Consultant’s completion of the Scope of Work pursuant to this agreement. Reimbursable expenses shall be billed only at their actual cost. Consultant shall submit all billings to City and City shall pay such billings in the manner specified in this paragraph. Payment shall be made payable to Consultant and delivered to the address specified in Section 4 on pages 1 and 2 of this agreement. The making of any payment by City, or the receipt thereof by the Consultant, shall in no way lessen the liability of the Consultant to correct or revise unsatisfactory work, even though the unsatisfactory character of such work may not have been apparent or detected at the time such payment was made. City may withhold payment to Consultant in any instance in which the Consultant has failed or refused to satisfy any material obligation provided for in this agreement. In no event shall City be liable for interest or late charges for any late payments. Consultant shall submit invoices, not more often than once a month during the term of this agreement, based on the cost for work performed in accordance with the either the hourly rates or task-based rates in the Scope of Work and authorized reimbursable expenses incurred prior to the invoice date. Invoices shall contain the following information: 1.1 Serial identifications of bills, i.e., Bill No. 1; 1.2 The beginning and ending dates of the billing period; 1.3 A summary containing the total contract amount, the amount of prior billings, the total due this period, percentage of work completed, the remaining balance available for all remaining billing periods, and a brief description of work completed during the billing period. City shall make monthly payments, based on such invoices, for satisfactory progress in completion of the Scope of Work, and for authorized reimbursable expenses incurred. City shall not be obligated to pay Consultant for work performed that falls outside the Scope of Work. -End of Exhibit A - 319 Prepared by Lisa Wise Consulting, Inc. (LWC) June 19, 2024 This Draft Scope of Work, Project Budget, and Project Schedule prepared for the City of Saratoga describes a work plan for preparation of objective design standards (ODS) and other zoning amendments (Chapter 15 of the Saratoga City Ordinance) required to implement the following programs of the City of Saratoga 6 th Cycle Housing Element: Program 1.2-6: Conversion to Duplexes and Triplexes; and Program 3.2-10: Modify Single-Family Residential Design Review Handbook. The Scope of Work below describes the work by task and includes associated meetings and deliverables. All meetings are assumed to be conducted online via a video conferencing platform, unless otherwise noted. The primary goals of this work are to codify relevant guidelines in the Single-Family Residential Design Review Handbook and to allow and provide design standards for conversion of existing single-family residences to duplexes and triplexes in R-1-20 and R-1-40 zones outside the WUI and Very High Fire Hazard Severity Zones. A. Project Initiation Meeting. LWC will meet with City staff to discuss the goals and priorities for the Housing Element Implementation Project (“Project”); finalize the work program, timeline, and milestones; and clarify roles and responsibilities. At the meeting, City staff will lead a discussion of relevant single-family, duplex, and triplex development in the City. The discussion will include examples of development that are appropriate to their context and valued by the community; examples that are considered by City staff and the community to be inappropriate or problematic; recent plans or proposals that demonstrate desired elements or qualities; and expectations for codifying the existing guidelines. 320 Following the Project Initiation Meeting, LWC will prepare a comprehensive summary of the feedback received to document City staff’s direction on what is important from a design perspective to the community. B. Analysis and Recommendations Memo. LWC will analyze relevant policies, standards, and guidelines and prepare a memo that summarizes the findings and outlines recommendations for the zoning amendments. LWC will participate in up to two 1-hour working meetings with City staff during the preparation of the Analysis and Recommendations Memo. The Memo will include the following: Analysis of existing policy direction relevant to the Project, including policy direction from the General Plan, Housing Element, Specific Plans, Climate Action Plan, and other policy documents as appropriate. Analysis of existing standards relevant to the Project, including: o Relevant design standards found in Chapter 15, Zoning Regulations. o Relevant content located in the “Additional Information & Resources” on the Planning Division’s website. o SB 9 standards in Article 15-57 (Two-Unit Residential Developments and Urban Lot Splits). Analysis of the City’s existing Single-Family Residential Design Review Handbook. Recommendations for the approach, content, and organization of the ODS, including: o A comprehensive list of topics to address in the new ODS. The list will draw on topics that are addressed in the existing design guidelines and Zoning Ordinance and issues identified in the Project initiation and analysis work. (NOTE: LWC does not intend to develop standards for viewsheds or hillside guidelines, unless an Optional Task is requested or additional funding is allocated.) o Integration of the new objective standards into the existing Zoning Ordinance into Section 15.45-055 in a way that is user-friendly and intuitive. o Identify amendments elsewhere in the Zoning Ordinance needed to ensure consistency and integration of the new content into the existing Ordinance. LWC assumes that City staff will make these amendments (refer to Optional Task E if major amendments to the existing Zoning Ordinance are required). 321 After completing an Administrative Draft of the Analysis and Recommendations Memo for staff review and comment, LWC will prepare the final Analysis and Recommendations Memo based on a single set of consolidated, actionable, and non-conflicting comments from City staff. A. Working Meetings with City Staff (3). LWC will participate in up to three 1-hour working meetings with City staff during the development of the ODS. Topics will be determined in coordination with staff. B. Administrative Draft ODS Zoning Amendments. LWC will prepare draft ODS for single- family duplex, and triplex residential development. While the scope and nature of the standards will be determined in Task 1, LWC anticipates the ODS will include: 1. An illustrated set of standards for single-family development that translates existing applicable guidelines into objective requirements. Thes are intended to be applicable in, and to facilitate ministerial review and approval in, the A, R-1, HR, and R-OS zones. 2. An illustrated set of standards for conversion of existing single-family residences into duplexes and triplexes in the R-1-20 and R-1-40 districts under Housing Element Program 1.2-6. The Administrative Draft ODS amendments will be developed to replace the existing Section 15.45-055 of Chapter 15, Zoning. Task 2 Meetings Task 2 Products Task 1 Meetings Task 1 Products 322 A. Public Review Draft ODS Zoning Amendments. LWC will prepare a Public Review Draft of the ODS Zoning Amendments based on a single set of consolidated, actionable, and non-conflicting comments from City staff’s review of the Administrative Draft. A. Planning Commission Study Session. LWC will prepare materials/presentations for, and present in-person at one Planning Commission study session on the residential design standards during the preparation of the amendments or after the release of the Public Review Draft Zoning Amendments. The input gathered from the Planning Commission and community at these meetings will be reflected in the Amendments as directed by City staff. B. Hearing Draft Objective Design Standards. Based on the Planning Commission and optional City Council study session (refer to Optional Task G) on the Objective Design Standards, LWC will prepare a Hearing Draft of the ODS Zoning Amendments. The document will be produced in MS Word and PDF format. C. Planning Commission Public Hearing (1). LWC will prepare materials/presentations for, and present in-person at, a Planning Commission public hearing to support adoption of the Public Review Draft ODS Zoning Amendments. LWC will provide summary notes of the Commission’s comments and recommendations. D. City Council Public Hearing (1). LWC will prepare materials/presentations for, and present in-person at, a City Council public hearing to support adoption of the ODS Zoning Amendments. E. Final Zoning Amendments. Based on the City Council’s final review and adoption of the Zoning Amendments and final text changes provided by City staff, LWC will prepare the final ODS Zoning Amendments. The document will be produced in MS Word and PDF format for City staff and the City’s online Code publisher. Task 3 Products 323 A. Updated Standards for Accessory Dwelling Units (ADUs) and Junior Accessory Dwelling Units (JADUs). Based on the recommendations in the Analysis and Recommendations Memo (refer to Task 1B), and input and direction from City staff, LWC will prepare updated or new objective standards for ADUs and JADUs. If ADU prototype plans are available, LWC will develop standards to be complementary to them. Budget estimate: $20,000 to $35,000 – to be scoped in more detail in coordination with the City B. New Objective Design Standards for Hillside Development. Based on the recommendations in the Analysis and Recommendations Memo (refer to Task 1B), and direction from City staff, LWC will prepare standards for hillside development. Budget estimate: $15,000 to $30,000 – to be scoped in more detail in coordination with the City C. New Objective Design Standards for Viewshed Protection. Based on the recommendations in the Analysis and Recommendations Memo (refer to Task 1B) and direction from City staff, LWC will prepare standards for viewshed protection. Budget estimate: $15,000 to $30,000 – to be scoped in more detail in coordination with the City D. New Objective Design Standards to Implement the Village Design Guidelines . LWC will prepare objective design standards for development in the Saratoga Village based on the Village Design Guidelines document. Specific topics from the existing Guidelines document to be addressed in the standards will be determined in coordination with City staff. Budget estimate: TBD E. Other Required Amendments to the Existing Zoning Ordinance. LWC will complete needed additional major amendments elsewhere in the Zoning Ordinance to ensure consistency and to fully integrate the new content into the existing Ordinance if City staff are unable to make these amendments. Task 4 Meetings Task 4 Products 324 Budget estimate: $5,000 to $10,000 F. Focus Group Meetings. LWC will prepare for and conduct one-hour focus group meetings with community members knowledgeable about and/or interested in development and design in the City of Saratoga. Meetings would take place prior to the drafting of the Administrative Draft ODS Zoning Amendments with the objective of gathering insight on specific residential and Village design elements, concerns, and desires for future development. Focus group members may include representatives from neighborhood or community groups, design professionals, realtors, developers, or others as recommended by City staff. The number of focus group participants per meeting should be limited three and the number of meetings will be determined by City staff. The proposed budget for the focus groups is based on a per meeting cost. Budget estimate: $3,747 per focus group meeting G. Additional Study Sessions. LWC will prepare materials/presentations for, and present in-person at Planning Commission and/or City Council study sessions on the Public Review Draft ODS Zoning Amendments. LWC will provide summary notes of the Commission’s/Council’s comments and recommendations. Budget estimate: $4,637 per meeting 325 326 327 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit B Page 1 of 3 City of Saratoga Design Services Contract Exhibit B – Insurance The insurance requirements listed below that have an “” indicated in the space before the requirement apply to this agreement together with the general requirements. Modifications to the below requirements are shown in Exhibit E (“Special Requirements”). Contractor shall provide its insurance broker(s)/agent(s) with a copy of these requirements and request that they provide certificates of insurance complete with copies of all required endorsements to the Primary Representative listed in section 4 on page 2. During the term of this agreement Contractor shall ensure that its broker(s)/agent(s) provide the Primary Representative with updated certificates of insurance reflecting continued satisfaction of the requirements of this agreement together with updated endorsements in the event of a change in the underlying insurance policy(ies), with copies emailed to cityhall@saratoga.ca.us. All endorsements shall be signed by a person authorized by that insurer to bind coverage on its behalf. City has the right to require Contractor’s insurer to provide complete, certified copies of all required insurance policies. As described in more detail below, the City, its officers, officials, employees, agents, and volunteers are to be covered as insureds. All certificates and endorsements must be received and approved by City before work commences. Insurance Requirements Commercial General Liability Insurance covering commercial general liability on an “occurrence” basis, including products and completed operations, property damage, bodily injury, personal injury, and advertising injury with coverage minimum limits of $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Auto Liability Insurance with coverage as indicated: $1,000,000 combined single limit for bodily injury and property damage $500,000 combined single limit for bodily injury and property damage Professional/Errors and Omissions Liability (“E&O”) with coverage as indicated: $1,000,000 per loss/ $1,000,000 aggregate $2,000,000 per loss/ $2,000,000 aggregate 328 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit B Page 2 of 3 Workers' Compensation as required by the State of California, with statutory limits, and Employer’s Liability Insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease. Contractor shall submit to City a waiver of subrogation endorsement in favor of City, its officers, officials, agents, employees, and volunteers . If Contractor is not required to maintain Workers’ Compensation Insurance pursuant to State law, Contractor shall file a verification of that fact with the Primary Representative. All subcontractors used must comply with the above requirements except as noted below: General Requirements As to all of the checked insurance requirements above, the following shall apply: 1. Additional Insured Status and Primary Coverage. Contractor shall submit to City an additional insured endorsement for its Commercial General Liability policy with coverage at least as broad as ISO form CG 20 10 for ongoing operations, and coverage at least as broad as ISO Form CG 20 37 for completed operations.For Auto Liability, the policy shall contain, or be endorsed to contain, additional insured coverage for the City, its officers, officials, employees, agents and volunteers. Any available insurance proceeds broader than or in excess of the minimum insurance coverage requirements and/or limits specified in this agreement shall be available to the additional insured .The requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured; whichever is greater. The additional insured coverage under Contractor’s policy shall be ''primary and non-contributory" and will not seek contribution from the City’s insurance or self-insurance and shall be at least as broad as ISO Form CG 20 01 04 13 and CG 20 38 04 13. This requirement does not apply to errors and omissions insurance. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, employees or volunteers. 2. Separation of Insureds.The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 3. Deductibles and Self Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials and employees; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. 4. Umbrella or Excess Insurance.The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City (if agreed to in a written contract or agreement) before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured. 329 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit B Page 3 of 3 5. Waiver of Subrogation.Contractor hereby grants to City a waiver of any right to subrogation which any insurer of Contractor may acquire against City by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether City has received a waiver of subrogation endorsement from the insurer. 6. Verification of Coverage.Contractor shall furnish the City with original certificates and amendatory endorsements effecting coverage required by this Exhibit. All certificates and endorsements are to be received and approved by the City before work commences. The City reserves the right to require at any time complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications and failure to exercise this right shall not constitute a waiver of any of City’s rights pursuant to this agreement. 7. Maintenance of Coverage.Contractor shall not cancel, assign, or change any policy of insurance required by this agreement or engage in any act or omission that will cause its insurer to cancel any insurance policy required by this agreement except after providing 30 days prior notice to the City. If an insurance policy required by this agreement is unilaterally cancelled or changed by the insurer, Contractor shall immediately provide written notice to the City and obtain substitute insurance meeting the requirements of this agreement. Nothing in this paragraph relieves Contractor of its obligation to maintain all insurance required by this agreement at all times during the term of the agreement. 8. Claims Made Policies.If any of the required policies provide claims-made coverage, the coverage shall be maintained for a period of five years after completion of the contract. Contractor may satisfy this requirement by renewal of existing coverage or purchase of either prior acts or tail coverage applicable to said five-year period. 9. Acceptability of Insurers.The policy or policies required by this agreement shall be issued by insurers admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide. 10. Subcontractors. Contractor agrees to include with all subcontractors in their subcontract the same requirements and provisions of this agreement including the indemnity and insurance requirements to the extent they apply to the scope of the subcontractor's work. Subcontractors hired by Contractor shall agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to the City under this agreement. Subcontractors shall further agree to include these same provisions with any sub-subcontractor. Contractor shall provide subcontractor with a copy of the indemnity and insurance provisions of this agreement as a part of Contractor’s subcontract with subcontractor. Contractor shall require all subcontractors to provide a valid certificate of insurance and the required endorsements included in the agreement prior to commencement of any work and will provide proof of compliance to the City. 11. Special Risks or Circumstances.City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. -End of Exhibit B- 330 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 1 of 9 City of Saratoga Services Contract Exhibit C – General Provisions 1. INDEPENDENT CONTRACTOR.City requires the services of a qualified consultant to provide the work product described in Exhibit A (“Scope of Work and Payment Terms”) because it lacks the qualified personnel to provide the specified work product. Consultant is qualified to provide the required work product and is agreeable to providing such work product on the terms and conditions in this agreement. 1.1 In General. At all times during the term of this agreement, Consultant shall be an independent contractor and shall not be an employee of City. Consultant shall complete the Scope of Work hereunder in accordance with currently approved methods and practices in Consultant's field. No relationship of employer and employee is created by this agreement between the City and Consultant or any subcontractor or employee of Consultant. City shall have the right to control Consultant only with respect to specifying the results to be obtained from Consultant pursuant to this agreement. City shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this agreement. Any terms in this agreement referring to direction from City shall be construed as providing for direction as to policy and the result of the Consultant’s work only, and not as to the means by which such a result is obtained. 1.2 Non-Exclusive Contract.Nothing contained in this agreement shall be construed as limiting the right of Consultant to engage in Consultant's profession separate and apart from this agreement so long as such activities do not interfere or conflict with the performance by Consultant of the obligations set forth in this agreement. Interference or conflict will be determined at the sole discretion of the City. 1.3 Standard of Care.Consultant shall complete the Scope of Work required pursuant to this agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Consultant is engaged in the geographical area in which Consultant practices its profession. All work product of whatsoever nature which Consultant delivers to City pursuant to this agreement shall be prepared in a substantial, first class and workmanlike manner and conform to the standards of quality normally observed by a person practicing in Consultant’s profession. 1.4 Qualifications.Consultant represents and warrants to City that the Consultant is qualified to perform the services as contemplated by this agreement and that all work performed under this agreement shall be performed only by personnel under the supervision of the Consultant as an employee or, if authorized by the Scope of Work, a subcontractor. All personnel engaged in the work shall be fully qualified and shall be authorized, licensed and certified under state and local law to perform such work if authorization, licensing or certification is required. The Consultant shall commit adequate resources and time to complete the project within the project schedule specified in this agreement. 331 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 2 of 9 1.5 Use of City Equipment.City shall not be responsible for any damage to persons or property as a result of the use, misuse or failure of any equipment used by Consultant, or by any of its employees, even though such equipment be furnished, rented or loaned to Consultant by City. 1.6 Payment of Taxes and Other Expenses.Should City, in its discretion, or a relevant taxing authority, including, but not limited to the Internal Revenue Service or the State Employment Development Division, determine that the Consultant is an employee for purposes of collection of any employment taxes, the amounts payable under this agreement shall be reduced by amounts equal to both the employee and employer portions of the tax due (and offsetting any credits for amounts already paid by the Consultant which can be applied against this liability). City shall then forward those amounts to the relevant taxing authority. Should a relevant taxing authority determine a liability for past services performed by the Consultant for City, upon notification of such fact by the City, the Consultant shall promptly remit such amount due or arrange with the City to have the amount due withheld from future payments to the Consultant under this agreement (again, offsetting any amounts already paid by the Consultant which can be applied as a credit against such liability). Any determination of employment status above shall be solely for the purposes of the particular tax in question, and for all other purposes of this agreement, The Consultant shall not be considered an employee of City. Notwithstanding the foregoing, should any court, arbitrator, or administrative authority determine that the Consultant is an employee for any other purpose, then the Consultant agrees to a reduction in the City's financial liability so that the City's total expenses under this agreement are not greater than they would have been had the court, arbitrator, or administrative authority determined that the Consultant was not an employee. 2. COMMUNICATION AND NOTICES. 2.1 Communications with Designated Administrator.The Administrator designated in Section 4 on page 1 of this agreement is authorized to receive information, interpret and define City's policies consistent with this agreement, and communicate with Consultant concerning this agreement. All correspondence and other communications shall be directed to or through the Administrator or the Administrator’s designee. 2.2 Communications and Notices on Compliance with Agreement.All notices or communication concerning a party's compliance with the terms of this agreement shall be in writing and may be given either personally, by certified mail, return receipt requested, or by overnight express carrier. The notice shall be deemed to have been given and received on the date delivered in person or the date upon which the postal authority or overnight express carrier indicates that the mailing was delivered to the address of the receiving party. The parties shall make good faith efforts to provide advance courtesy notice of any notices or communications hereunder via e-mail. However, under no circumstances shall such courtesy notice satisfy the notice requirements set forth above; nor shall lack of such courtesy 332 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 3 of 9 notice affect the validity of service pursuant to the notice requirement set forth above. 3. CONTRACTOR NOT AGENT. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Consultant shall have no authority, express or implied, pursuant to this agreement to bind City to any obligation whatsoever. 4. BENEFITS AND TAXES.Consultant shall not have any claim under this agreement or otherwise against City for seniority, vacation time, vacation pay, sick leave, personal time off, overtime, health insurance, medical care, hospital care, insurance benefits, social security, disability, unemployment, workers compensation or employee benefits of any kind. Consultant shall be solely liable for and obligated to pay directly all applicable taxes, including, but not limited to, federal and state income taxes, and in connection therewith Consultant shall indemnify and hold City harmless from any and all liability that City may incur because of Consultant's failure to pay such taxes. City shall have no obligation whatsoever to pay or withhold any taxes on behalf of Consultant. 5. ASSIGNMENT PROHIBITED.The services to be performed by the Consultant are personal in character and no party to this agreement may assign any right or obligation under this agreement. Any attempted or purported assignment of any right or obligation under this agreement shall be void and of no effect. However, with the consent of the City given in writing, Consultant is entitled to subcontract such portions of the work to be performed under this agreement as may be specified by City. 6. PERSONNEL.Consultant shall assign only competent personnel to complete the Scope of Work pursuant to this agreement. In the event that City, in its sole discretion, at any time during the term of this agreement, desires the removal of any such persons, Consultant shall, immediately upon receiving notice from city of such desire of City, cause the removal of such person or persons from work in connection with the Scope of Work. 7. CONFLICT OF INTEREST. 7.1 In General.Consultant understands that its professional responsibility is solely to City. Consultant represents and warrants that it presently has no interest, and will not acquire any direct or indirect interest, that would conflict with its performance of this agreement. Consultant shall not employ or subcontract with a person having such an interest in the performance of this agreement. 7.2 Subsequent Conflict of Interest.Consultant agrees that if an actual or potential conflict of interest on the part of Consultant is discovered after award, the Consultant will make a full disclosure in writing to the City. This disclosure shall include a description of actions, which the Consultant has taken or proposes to take, after consultation with the City to avoid, mitigate, or neutralize the actual or potential conflict. Within 45 days, the Consultant shall have taken all necessary steps to avoid, mitigate, or neutralize the conflict of interest to the satisfaction of the City. 333 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 4 of 9 7.3 Interests of City Officers and Staff.No officer, member or employee of City and no member of the City Council shall have any pecuniary interest, direct or indirect, in this agreement or the proceeds thereof. Neither Consultant nor any member of any Consultant’s family shall serve on any City board or committee or hold any such position which either by rule, practice or action nominates, recommends, or supervises Consultant's performance of the Scope of Work or authorizes funding to Consultant. 8. COMPLIANCE WITH LAWS 8.1 In General.Consultant shall keep itself fully informed of and comply with all laws, policies, general rules and regulations established by City and shall comply with the common law and all laws, ordinances, codes and regulations of governmental agencies, (including federal, state, municipal and local governing bodies) applicable to the performance of the Scope of Work hereunder. 8.2 Licenses and Permits.Consultant represents and warrants to City that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect at all times during the term of this agreement any licenses, permits, and approvals which are legally required for Consultant to practice its profession. In addition to the foregoing, Consultant shall obtain and maintain during the term hereof a valid City of Saratoga Business License. 9. WORK PRODUCT AND RECORDS 9.1 Property of City.All reports, data, maps, models, charts, studies, surveys, photographs, memoranda or other written documents or materials prepared by Consultant (“works”) pursuant to this agreement shall become, as between Consultant and City, the property of City upon completion of the work to be performed hereunder or upon termination of this agreement. Without limiting the generality of the foregoing, if, in connection with services performed under this agreement, the Consultant or its subcontractors create artwork, copy, posters, billboards, photographs, videotapes, audiotapes, systems designs, software, reports, diagrams, surveys, source codes or any other original works of authorship, such works of authorship shall be works for hire as defined under Title 17 of the United States Code, and all copyrights in such works are the property of City. If it is ever determined that any works created by the Consultant or its subcontractors under this agreement are not works for hire under U.S. law, the Consultant hereby assigns all of its copyrights to such works to City, and grants to City a royalty-free, exclusive, and irrevocable license to reproduce, publish, use, and to authorize others to do so, all of Consultant’s rights in such works and agrees to execute any documents necessary to effectuate such assignment and license. The Consultant may retain and use copies of such works for reference and as documentation of its experience and capabilities. 9.2 Intellectual Property. Consultant represents and warrants that it has the legal right to utilize all intellectual property it will utilize in the performance of this 334 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 5 of 9 agreement. Consultant further represents that it shall ensure City has the legal right to utilize all intellectual property involved in and/or resulting from Consultant’s performance of this agreement. Consultant shall indemnify and hold City harmless from all loss and liability, including attorneys’ fees, court costs and all other litigation expenses for any infringement of the patent rights, copyright, trade secret or any other proprietary right or trademark, and all other intellectual property claims of any person or persons in consequence of the use by City, or any of its officers or agents, of articles or services to be supplied in the performance of this agreement. 9.3 Records and Audits.Contractor and its subcontractors shall establish and maintain records pertaining to this contract. Contractor’s and subcontractors’ accounting systems shall conform to generally accepted accounting principles, and all records shall provide a breakdown of total costs charged under this contract, including properly executed payrolls, time records, invoices and vouchers. Contractor shall permit City and its authorized representatives to inspect and examine Contractor’s books, records, accounts, and any and all data relevant to this Contract at any reasonable time for the purpose of auditing and verifying statements, invoices, or bills submitted by Contractor pursuant to this contract and shall provide such assistance as may be reasonably required in the course of such inspection. City further reserves the right to examine and re-examine said books, records, accounts, and data during the four-year period following the termination of this Contract; and Contractor shall in no event dispose of, destroy, alter, or mutilate said books, records, accounts, and data in any manner whatever for four years after the termination of this Contract. Pursuant to California Government Code Section 8546.7, the parties to this Contract shall be subject to the examination and audit of representative of the Auditor General of the State of California for a period of three years after final payment under the contract. The examination and audit shall be confined to those matters connected with the performance of this contract including, but not limited to, the cost of administering the contract. 9.4 Use of Recycled Paper and Electronic Documents.Consultant shall prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper. Documents shall be printed on both sides of the page and City shall be provided with electronic copies of documents (in Word or .pdf format) except where unusual circumstances make it infeasible to do so. 10. CONFIDENTIAL INFORMATION. Consultant shall hold any confidential information received from City in the course of performing this agreement in trust and confidence and will not reveal such confidential information to any person or entity, either during the term of the agreement or at any time thereafter. Upon expiration of this agreement, or termination as provided herein, Consultant shall return materials which contain any confidential information to City. Consultant may keep one copy for its confidential file. For purposes of this paragraph, confidential information is defined as all 335 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 6 of 9 information disclosed to Consultant which relates to City's past, present, and future activities, as well as activities under this agreement, which information is not otherwise of public record under California law. 11. RESPONSIBILITY OF CONSULTANT. Consultant shall take all responsibility for the work, shall bear all losses and damages directly or indirectly resulting to Consultant, to any subcontractor, to the City, to City officers and employees, or to parties designated by the City, on account of the performance or character of the work, unforeseen difficulties, accidents, occurrences or other causes to the extent predicated on active or passive negligence of the Consultant or of any subcontractor. 12. INDEMNIFICATION.Consultant and City agree that City, its employees, agents and officials shall be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys fees, litigation costs, defense costs, court costs or any other cost incurred in relation to, as a consequence of or arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part, to the performance of this agreement as set forth below. Accordingly, the provisions of this indemnity provision are intended by the parties to be interpreted and construed to provide the fullest protection possible under the law to the City. Consultant acknowledges that City would not enter into this agreement in the absence of the commitment of Consultant to indemnify and protect City as set forth below. 12.1 General Indemnity. To the fullest extent permitted by law, Consultant shall indemnify and hold harmless City, its employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs (including, without limitation, costs and fees of alternative dispute resolution and litigation) of any kind whatsoever without restriction or limitation, incurred in relation to, as a consequence of or arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part, to Consultant, or its employees, agents, or subcontractors. All obligations under this provision are to be paid by Consultant as they are incurred by the City. 12.2 Duty to Defend.In addition to Consultant’s obligation to indemnify City, Consultant shall defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its councilmembers, officers, and employees, immediately upon tender to Consultant of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Consultant are responsible for the claim does not relieve Consultant from its separate and distinct obligation to defend. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Consultant asserts that liability is caused in whole or in part by the negligence or willful misconduct of the indemnified party. If it is finally adjudicated that liability was caused solely by the negligence or willful misconduct of an indemnified party, Consultant may submit a claim to the City for reimbursement of reasonable attorneys’ fees and 336 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 7 of 9 defense costs in proportion to the established comparative liability of the indemnified party. 12.3 Limitation on Indemnity. Without affecting the rights of City under any provision of this agreement or this Section, Consultant shall not be required to defend, indemnify, and hold harmless City as set forth above for liability attributable to the sole fault of City, provided such sole fault is determined by agreement between the parties or the findings of a court of competent jurisdiction. This exception will apply only in instances where the City is shown to have been solely at fault and not in instances where Consultant is solely or partially at fault or in instances where City's fault accounts for only a percentage of the liability involved. In those instances, the obligation of Consultant will be all-inclusive and City will be held harmless, indemnified, and defended for all liability incurred, even though a percentage of the liability is attributable to conduct of the City. 12.4 Acknowledgement.Consultant acknowledges that its obligation pursuant to this Section extends to liability attributable to City, if that liability is less than the sole fault of City. Consultant has no obligation under this agreement for liability proven in a court of competent jurisdiction or by written agreement between the parties to be the sole fault of City. 12.5 Scope of Consultant Obligation. The obligations of Consultant under this or any other provision of this agreement will not be limited by the provisions of any workers' compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its employees and officials. 12.6 Subcontractors.Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section from each and every subcontractor, sub tier contractor or any other person or entity involved by, for, with or on behalf of Consultant in the performance or subject matter of this agreement. 12.7 No Waiver. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth herein is binding on the successors, assigns, or heirs of Consultant and shall survive the termination of this agreement or this Section. For purposes of Section 2782 of the Civil Code the parties hereto recognize and agree that this agreement is not a construction contract. By execution of this agreement, Consultant acknowledges and agrees that it has read and understands the provisions hereof and that this paragraph is a material element of consideration. City approval of insurance required by this agreement does not relieve the Consultant or subcontractors from liability under this Section. 12.8 Relation to Insurance Obligations.The defense and indemnification obligations of this agreement are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained in this agreement. 337 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 8 of 9 13. DEFAULT AND REMEDIES. 13.1 Events of default. Each of the following shall constitute an event of default hereunder: (a)Failure by Consultant to perform any obligation under this agreement and failure to cure such breach immediately upon receiving notice of such breach, if the breach is such that the City determines the health, welfare, or safety of the public is immediately endangered; or (b)Failure by either party to perform any obligation under this agreement and failure to cure such breach within fifteen (15) days of receiving notice of such breach (except for breaches subject to subparagraph (a), above); provided that if the nature of the breach is such that the non-breaching party determines it will reasonably require more than fifteen (15) days to cure, the breaching party shall not be in default if it promptly commences the cure and diligently proceeds to completion of the cure. 13.2 Remedies upon default. Upon any default, the non-defaulting party shall have the right to immediately suspend or terminate this agreement, seek specific performance and/or seek damages to the full extent allowed by law. City shall have the right to contract with another party to perform this agreement 13.3 No Waiver. Failure by City to seek any remedy for any default hereunder shall not constitute a waiver of any other rights hereunder or any right to seek any remedy for any subsequent default. 14. TERMINATION.The City may terminate this agreement with or without cause by providing 10 days’ notice in writing to Consultant. The City may terminate this agreement at any time without prior notice in the event that Consultant commits a material breach of the terms of this agreement. Upon termination, this agreement shall become of no further force or affect whatsoever and each of the parties hereto shall be relieved and discharged from the rights and obligations of this agreement, subject to payment for acceptable services rendered prior to the expiration of the notice of termination and delivery to City of any work in progress, completed work, supplies, equipment, and other materials produced as a part of, or acquired in connection with the performance of this agreement, and any completed or partially completed work which, if this agreement had been completed, would have been required to be furnished to City. Notwithstanding the foregoing and Section 2 on page 1, this Section and the provisions of this agreement concerning insurance (Exhibit B), Funding Agency Requirements (as set forth in Exhibit D if applicable), Work Product and Records, Confidential Information, Responsibility of Consultant, Indemnification, Default and Remedies, Litigation, and Jurisdiction and Severability shall survive termination or expiration of this agreement. 15. DISPUTE RESOLUTION. The parties shall make a good faith effort to settle any dispute or claim arising under this agreement. If the parties fail to resolve such disputes or claims, they shall submit them to non-binding mediation in California at shared expense of the parties for at least 8 hours of mediation. If mediation does not arrive at a satisfactory result, arbitration, if agreed to by all parties, or litigation may be pursued. In 338 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract –Exhibit C Page 9 of 9 the event any dispute resolution processes are involved, each party shall bear its own costs and attorneys’ fees. 16. LITIGATION. If any litigation is commenced between parties to this agreement concerning any provision hereof or the rights and duties of any person in relation thereto, each party shall bear its own attorneys’ fees and costs. 17. JURISDICTION AND SEVERABILITY. This agreement shall be administered and interpreted under the laws of the State of California. Jurisdiction of litigation arising from this agreement shall be in that state and venue shall be in Santa Clara County, California. 18. SEVERABILITY.If any part of this agreement is found to conflict with applicable laws, such part shall be inoperative, null and void insofar as it conflicts with said laws, but the remainder of this agreement shall be in full force and effect. 19. NOTICE OF NON-RENEWAL. Consultant understands and agrees that there is no representation, implication, or understanding that the City will request that work product provided by Consultant under this agreement be supplemented or continued by Consultant under a new agreement following expiration or termination of this agreement. Consultant waives all rights or claims to notice or hearing respecting any failure by City to continue to request or retain all or any portion of the work product from Consultant following the expiration or termination of this agreement. 20. PARTIES IN INTEREST. This agreement does not, and is not intended to, confer any rights or remedies upon any person or entity other than the parties. 21. WAIVER.Neither the acceptance of work or payment for work pursuant to this agreement shall constitute a waiver of any rights or obligations arising under this agreement. The failure by the City to enforce any of Consultant’s obligations or to exercise City's rights shall in no event be deemed a waiver of the right to do so thereafter. -End of Exhibit C- 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 SARATOGA CITY COUNCIL MEETING DATE:July 3, 2024 DEPARTMENT:Administrative Services PREPARED BY:Ryan Hinchman, Administrative Services Director SUBJECT:Resolution Renaming the Finance Committee to Finance Advisory Committee RECOMMENDED ACTION: Adopt the Resolution to rename the Finance Committee to the Finance Advisory Committee. BACKGROUND: The Finance Committee was formed in 2007 to review financial matters, the budget, and fiscal policies in preparation for City Council meetings. The Committee provides a Council perspective and guidance to staff on financial matters, and makes recommendations to the City Council. If adopted, the attached resolution would rename the Finance Committee to the Finance Advisory Committee to clarify the Committee’s advisory role. All other aspects of the Committee will remain the same. It will remain a Committee of the Whole, allowing all members of the City Council to attend and participate in meetings. However, only the Council Members assigned to the Finance Advisory Committee per the Council Assignments will be eligible to vote on agenda items. ATTACHMENTS: Attachment A – Resolution Renaming the Finance Committee to Finance Advisory Committee 372 RESOLUTION 24- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA RENAMING THE CITY COUNCIL FINANCE COMMITTEE TO FINANCE ADVISORY COMMITTEE WHEREAS, the Finance Committee was officially established as a standing committee of the City Council on September 5, 2007; and WHEREAS, since its formation, the Finance Committee has been comprised of two members of the City Council and meets to review financial matters in preparation for City Council Meetings; and WHEREAS, the Finance Committee provides a Council perspective and guidance to staff on financial matters and makes recommendations to the City Council; and WHEREAS, State regulations and the current structure of the Finance Committee only allow for participation and engagement of two members of the City Council; and WHEREAS, this resolution will rename the City Council Finance Committee to the Finance Advisory Committee. The Finance Advisory Committee will remain a committee of the Whole whereby all members of the City Council may participate and attend Committee meetings, but only the two appointed members of the Committee may take action and make recommendations to the City Council. NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby establish the new name of Finance Advisory Committee, replacing the name of Finance Committee. The Finance Advisory Committee is not authorized to take any action on behalf of, or acting as, the City Council. The Committee is a legislative body subject to the requirements of the Brown Act and all meetings of the committee shall be noticed and otherwise carried out in accordance with that and other applicable laws. The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City Council held on the 3rd day of July 2024 by the following vote: AYES: NOES: ABSENT: ABSTAIN: Yan Zhao, Mayor ATTEST: DATE: Britt Avrit, City Clerk 373 SARATOGA CITY COUNCIL COUNCIL ASSIGNMENTS Mayor Yan Zhao Hakone Foundation Board Executive Board Santa Clara County Housing and Community Development Advisory Committee Santa Clara County Library District Board of Directors West Valley Mayors and City Managers Association West Valley Sanitation District Board of Directors Council Finance Committee Vice Mayor Belal Aftab Association of Bay Area Government (ABAG) General Assembly Silicon Valley Regional Interoperability Authority Alternate Valley Transportation Authority Policy Advisory Committee Saratoga Historical Foundation Board of Directors Council Finance Committee Council Member Chuck Page Santa Clara Valley Water Commission West Valley Clean Water Program Authority Board of Directors West Valley Solid Waste Management Authority Board of Directors Saratoga Chamber of Commerce Board Saratoga Ministerial Association Council Member Tina Walia Cities Association of Santa Clara County Board of Directors Cities Association of Santa Clara County City Selection Committee Cities Association of Santa Clara County Legislative Action Committee KSAR 15 Saratoga Community Access Cable Television Foundation Board of Directors Silicon Valley Clean Energy Authority Board of Directors Council Member Kookie Fitzsimmons Hakone Foundation Board of Trustees Saratoga Area Senior Coordinating Council Board of Directors Saratoga Sister City Committee Liaison 374