Loading...
HomeMy WebLinkAboutCity Council Resolution 25-059, 2025 Building Code AdoptionRESOLUTION NO. 25-059 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA MAKING FINDINGS OF FACT REGARDING THE NEED FOR THE MODIFICATIONS TO THE PROVISIONS OF THE 2025 CALIFORNIA BUILDING STANDARDS CODE MADE IN THE SARATOGA CITY CODE WHEREAS, California Health and Safety Code Section 18938 makes certain provisions published in the California Building Standards Code pursuant to Health and Safety Code Section 17922 applicable to all occupancies throughout the state and effective one hundred eighty days after publication by the California Building Standards Commission (“Commission”), or at a later date established by the Commission; and WHEREAS, Health and Safety Code Section 17958 permits cities to amend the requirements of the California Building Standards Code in accordance with Health and Safety Code Sections 17958.5 and 17958.7; and WHEREAS, Health and Safety Code Section 17958.5 permits cities in adopting provisions of the California Building Standards Code to make such modifications in such provisions as the city determines, pursuant to Health and Safety Code Section 17958.7, are reasonably necessary because of local climatic, geological, or topographical conditions; and WHEREAS, Health and Safety Code Section 17958.7 requires that a city, before making modifications pursuant to Health and Safety Code Section 17958.5, must make an express finding that such modifications are reasonably necessary because of local climatic, geological, or topographical conditions; and WHEREAS, under Health and Safety Code Section 17958.7, modifications pursuant to Health and Safety Code Section 17958.5 may not become effective until the required findings and the modifications have been filed with the Commission; and WHEREAS, human activities that release greenhouse gases into the atmosphere contribute to the increase of the worldwide average temperature, drought conditions, and duration of fire seasons; and WHEREAS, according to the California Department of Forestry and Fire Protection, nine of the ten largest wildfires in California history have occurred since 2017, destroying nearly 10,000 structures and burning more than 4.5 million acres; and WHEREAS, the City of Saratoga is situated along a wildland-urban interface and as a result is extremely vulnerable to wildfires and firestorms; and WHEREAS, Sections 17958, 17958.5 and 17958.7 of the Health and Safety Code as modified by AB 130 allow local jurisdictions to make changes to state building standards affecting residential units so long as those changes meet one or more conditions; and Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 2 WHEREAS, one of the conditions added by AB 130 in Sections 17958, 17958.5 and 17958.7 of the Health and Safety Code is that the changes are necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025, and that permits mixed-fuel residential construction consistent with federal law while also incentivizing all-electric construction as part of an adopted greenhouse gas emissions reduction strategy; and WHEREAS, pursuant to Sections 17958, 17958.5 and 17958.7 of the Health and Safety Code as modified by AB 130, the City’s proposed two-way air conditioning and electric-readiness changes to building standards affecting residential units in the 2025 California Energy Code and 2025 California Green Building Standards Code are necessary to implement the City’s local code amendment; and WHEREAS, pursuant to Sections 17958, 17958.5 and 17958.7 of the Health and Safety Code as modified by AB 130, the City’s local code amendment is adopted to align with the City’s General Plan while permitting mixed-fuel residential construction and incentivizing all-electric construction as part of the City’s adopted greenhouse gas emission reduction strategy stated in its Climate Action Plan; and WHEREAS, the City’s General Plan, which was adopted in March 2024, includes relevant City policies with which the City’s proposed local code amendment align, including Goal LU-15: “Support regional efforts to improve air quality by reducing greenhouse gas emissions from both stationary and non-stationary sources”; Policy LU-6.5: “[e]ncourage the use of renewable energy resources and energy conservation”; Goal SAF-2: “[e]nsure residents and businesses are protected from seismically induced hazards”; and Policy SAF- 6.1: “[c]ollaborate with local, regional, state, and/or federal jurisdictions on agencies on climate resiliency and adaptation strategies”; and WHEREAS, the City’s adopted greenhouse gas reduction strategy in its Climate Action Plan, adopted in 2020, “establishes greenhouse gas reduction targets that reflect statewide goals” and establishes strategies to achieve those targets, including “[c]ontinued reductions in natural gas consumption in residential and commercial buildings”; and WHEREAS, consistent with the City’s adopted greenhouse gas reduction strategy in its 2020 Climate Action Plan and the City’s 2024 General Plan, the proposed two-way air conditioning and electric-readiness changes to the 2025 California Energy Code and 2025 California Green Building Standards Code establish requirements for existing single-family structures which will encourage electrification of existing buildings, thereby reducing greenhouse gas emissions from residential buildings in the City; and WHEREAS, consistent with the requirements of AB 130, the proposed two-way air conditioning and electric-readiness changes imposed by this ordinance permit mixed-fuel residential construction; and Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 3 WHEREAS, consistent with the requirements of AB 130, the proposed two-way air conditioning and electric-readiness changes imposed by this ordinance incentivize all- electric construction by encouraging the cost-effective installation of electric space conditioning appliances and reducing barriers to future electrification of various appliances types; and WHEREAS, the most cost-effective time to improve the energy efficiency and encourage electrification of existing structures is during significant alterations and additions, when electrical infrastructure may be installed alongside other significant improvements; and WHEREAS, following adoption of this Ordinance, the City will submit the local amendments to the 2025 California Building Standards Code and required findings to the CBSC for filing, in accordance with Health & Safety Code Section 17958.7(a); and WHEREAS, Public Resources Code section 25402.1(h)(2) and Section 10-106 of the 2025 California Administrative Code allow a local government to modify the state energy standards when the government finds that its modifications are cost-effective and the California Energy Commission finds that the modifications will require the diminution of energy consumption levels permitted by the Energy Code; and WHEREAS, staff has reviewed the cost-effectiveness studies prepared by the California Statewide Codes and Standards Reach Code Program and finds them sufficient to show that the local two-way air conditioning modifications will comply with the requirements of Public Resources Code section 25402.1(h)(2) and Section 10-106 of the 2025 California Administrative Code; and WHEREAS, based on these studies, the City Council finds that the local two-way air conditioning modifications are cost-effective and will required buildings to be designed to consume no more energy than permitted by the California Energy Code; and WHEREAS, following adoption of this Ordinance, the City will submit the local amendments to the energy standards in the 2025 California Green Building Standards Code along with the required findings to the California Energy Commission, in accordance with Public Resources Code Section 25402.1(h)(2) and Section 10-106 of the 2025 California Administrative Code (Cal. Code Regs. Title 24, Part 1); and WHEREAS, the City Council of the City of Saratoga (“City Council”) intends to adopt an ordinance adopting by reference certain provisions of the California Building Standards Code and making modifications to certain of those provisions pursuant to Health and Safety Code Section 17958.5 (“Building Regulations Adoption Ordinance”); and WHEREAS, the City Council has reviewed Attachment 1, which sets forth the reasons for the proposed modifications to the California Building Standards Code contained in the Building Regulations Adoption Ordinance. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 4 NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby declare and find that: 1. The changes to the provisions of the California Building Standards Code set forth in the Building Regulations Adoption Ordinance are reasonably necessary because of local climatic, geological, or topographical conditions set forth in Attachment 1 in accordance with Health and Safety Code Section 17958.7; and 2. in accordance with Health and Safety Code Sections 17958, 17958.5, and 17958.7, as modified by AB 130, the City Council finds that the changes affecting residential units in the provisions of the California Building Standards Code set forth in the Building Regulations Adoption Ordinance satisfy one or more of the conditions added by AB 130; and 3. in accordance with Health and Safety Code Sections 17958, 17958.5, and 17958.7, as modified by AB 130, the City Council finds that the two-way air conditioning and electric-readiness changes to building standards affecting residential units in the 2025 California Energy Code and 2025 California Green Building Standards Code are necessary to implement the City’s local code amendment adding a two-way air conditioning and electric-readiness requirement, and that the local code amendment is adopted to align with the City’s General Plan adopted in March 2024, permits mixed-fuel residential construction consistent with federal law, and incentivizes all-electric construction, as part of the City’s adopted greenhouse gas emissions reduction strategy in its 2020 Climate Action Plan; and 4. in accordance with Public Resources Code Section 25402.1(h)(2) and Section 10-106 of the 2025 California Administrative Code (Cal. Code Regs. Title 24, Part 1), the City Council finds that the City’s two-way air conditioning reach code modifications to the energy standards in the California Green Building Standards Code (Cal. Code Regs. Title 24, Part 11) (“CALGreen”) are cost-effective, and that the modifications will require the diminution of energy consumption levels permitted by the Energy Code; and 5. a copy of this Resolution, including Attachment 1, shall be filed with the California Building Standards Commission in accordance with Health and Safety Code Section 17958.7; and 6. a copy of this Resolution, including Attachment 1, shall be filed with the California Energy Commission in accordance with Public Resources Code Section 25402.1(h)(2). Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 5 PASSED AND ADOPTED by the City Council of the City of Saratoga at a regular meeting of the Saratoga City Council held on the 5th day of November by the following vote: AYES: COUNCIL MEMBERS FITZSIMMONS, WALIA, ZHAO, VICE MAYOR PAGE, MAYOR AFTAB NOES: NONE ABSENT: NONE ABSTAIN: NONE Belal Y. Aftab, Mayor ATTEST: Britt Avrit, MMC, City Clerk Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 6 ATTACHMENT 1 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA BUILDING CODETO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA The City of Saratoga makes the following findings regarding the need for amending the 2025 California Building Code: FINDING 1: CLIMATIC CONDITIONS: The City of Saratoga experiences low humidity, high winds, and warm temperatures during the summer months creating conditions are particularly conducive to the ignition and spread of grass, brush, and structure fires. FINDING 2: TOPOGRAPHICAL CONDITIONS: The remoteness and steepness of hillside areas in the City along with long, narrow roadways significantly impact the ability of emergency responders to extinguish or control wildland or structure fires. The landscape of Saratoga also includes steep slopes susceptible to erosion, especially during the rainy season. Areas of critically expansive soil and other unstable soil conditions create a need for soil retention and the diversion or increased flow of surface waters, particularly on steep slopes. FINDING 3: GEOLOGICAL CONDITIONS: The City of Saratoga’s dense population is in an area of high seismic activity, as indicated by the United States Geological Survey and the California Division of Mines and Geology. Recent earthquake activities, including the 1989 Loma Prieta earthquake, have indicated that the lack of adequate design and detailing endangered building occupants and the occupants of nearby structures. The City’s proximity to active earthquake faults also means that building work must be completed in a timely fashion to minimize the danger to the public health, safety, and welfare. Since the City is divided by a freeway and highway, a major earthquake would significantly impact the ability of fire crews to respond to emergencies should one or more roadways be blocked or damaged due to bridge collapse or debris from falling structures. Additionally, fire suppression capabilities will be severely limited should the water system be extensively damaged during the seismic event. Pursuant to AB 130, codified in Health & Safety Code Sections 17958, 17958.5 and 17958.7, the City also finds that its local changes or modifications to building standards in the California Building Code applicable to residential units satisfy one or more of the following conditions: AB 130 CONDITION 1: The changes or modifications are substantially equivalent to changes or modifications that were previously filed by the City Council of the City of Saratoga and were in effect as of September 30, 2025. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 7 AB 130 CONDITION 2: The California Building Standards Commission deems those changes or modifications necessary as emergency standards to protect health and safety. AB 130 CONDITION 3: The changes or modifications relate to home hardening. AB 130 CONDITION 4: The building standards relate to home hardening and are proposed for adoption by a fire protection district pursuant to Section 13869.7. AB 130 CONDITION 5: The changes or modifications are necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025, and that permits mixed-fuel residential construction consistent with federal law while also incentivizing all-electric construction as part of an adopted greenhouse gas emissions reduction strategy. AB 130 CONDITION 6: The changes or modifications are related to administrative practices, are proposed for adoption during the intervening period pursuant to Section 18942, and exclusively result in any of the following: (A) Reductions in time for a local agency to issue a post entitlement permit. (B) Alterations to a local agency’s post entitlement fee schedule. (C) Modernization of, or adoption of, new permitting platforms and software utilized by the local agency. (D) Reductions in cost of internal operation for a local agency. (E) Establishment, alteration, or removal of local programs related to enforcement of building code violations or complaints alleging building code violations. The table below describes the City of Saratoga’s amendments to specific provisions of the 2025 California Building Code and states which of the findings above and other conditions make the amendment reasonably necessary. To the extent the amendments to the 2025 California Building Code are applicable to residential units, the table also states which AB 130 conditions the amendments meet. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 8 Amended Sections of the 2025 CA Building Code Applicable Section of City Building Code Ordinance Explanation Findings of Necessity & AB 130 Conditions (where relevant) 105.5, 105.5.1 16-15.020 Amends the 2025 Building Code section regarding expiration of permits when work is not timely commenced or completed, and clarifies the procedure for recommencing work after issuance of a new permit. Finding No. 3. Given the City of Saratoga’s adjacency to active earthquake faults capable of producing substantial seismic events, building work must be completed in a timely fashion to minimize the danger to the public health, safety, and welfare. AB 130 Conditions 1, 6(D), 6(E). The changes to this section clarify existing practices in effect in the City as of September 30, 2025. Additionally, the changes are proposed during the intervening period (between the three years when the CBSC publishes its updates), are related to administrative practices regarding permit expiration dates, will reduce the City’s cost of internal operations by eliminating outstanding abandoned permits, and will alter the City’s program related to its enforcement of building code violations or complaints alleging violations 109.2 16-15.030 Amends a provision in the 2025 Building Code to make it clear the city can prescribe reasonable fees to defray the cost of regulation. Adds provisions for permit, investigation, plan review, and other additional fees. Finding Nos. 1-3. The City’s local climatic, topographic, and geological conditions require it to adopt local modifications to the state building standards. The City may prescribe fees to defray the cost of enforcing building code rules and regulations. These fees will be set by the City Council of Saratoga to ensure they are reasonably necessary given the cost of regulation to the City. AB 130 Conditions 1 and 6(B). The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 9 Additionally, the changes are proposed during the intervening period, are related to administrative practices regarding permit expiration dates, relate to the City’s post entitlement fee schedule. 1505.1.1 16-15.040(a) Amends the 2025 Building Code section regarding roof coverings in the WUI, requiring all new structures and all existing roofs undergoing at least a 10 percent replacement to install a minimum of a Class A roof and comply with the WUI Code. Finding Nos. 1 and 2. In order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, mitigation measures such as the installation of fire-retardant Class A roofing are necessary in the WUI. AB 130 Conditions 1 and 3: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening. 1505.1.2 16-15.040(b) Amends the 2025 Building Code to retain the Saratoga Code’s provisions for Class A roof coverings for all new structures and all existing roofs undergoing at least a 10 percent replacement. Finding Nos. 1 and 2. In order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, mitigation measures such as the installation of fire-retardant Class A roofing are necessary. AB 130 Conditions 1 and 3: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening. 903.2 16-15.050 Amends the 2025 Building Code regarding fire sprinklers to include City Finding No. 1. Amendment to be consistent with Fire District amendments. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 10 definitions of new buildings. AB 130 Conditions 1 and 3: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening. 903.2.11.7 16-15.060 Amends the 2025 Building Code regarding fire sprinklers for chemical fume hood protection. Finding No.3 Amendment to be consistent with Fire District amendments 907.8 16-15.070 Amends the 2022 CA Building Code regarding inspection, testing and maintenance of fire alarm and fire detection systems Finding No.3 Amendment to be consistent with Fire District amendments AB 130 Conditions 1 and 3: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening. 1705.3 16-15.080 Adds language excepting special inspections and tests for specific designs depending on Seismic Design Category. Finding No. 3. In order to improve quality control during construction to allow for special inspection and exceptions to special inspection for seismic concerns. AB 130 Condition 1: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 11 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA RESIDENTIAL CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA The City of Saratoga makes the following findings regarding the need for amending the 2025 California Residential Code: FINDING 1: CLIMATIC CONDITIONS: The City of Saratoga experiences low humidity, high winds, and warm temperatures during the summer months creating conditions that are particularly conducive to the ignition and spread of grass, brush, and structure fires. FINDING 2: TOPOGRAPHICAL CONDITIONS: The remoteness and steepness of hillside areas in the City along with long, narrow roadways significantly impact the ability of emergency responders to extinguish or control wildland or structure fires. The landscape of Saratoga also includes steep slopes susceptible to erosion, especially during the rainy season. Areas of critically expansive soil and other unstable soil conditions create a need for soil retention and the diversion or increased flow of surface waters, particularly on steep slopes. FINDING 3: GEOLOGICAL CONDITIONS: The City of Saratoga’s dense population is in an area of high seismic activity, as indicated by the United States Geological Survey and the California Division of Mines and Geology. Recent earthquake activities, including the 1989 Loma Prieta earthquake, indicated that the lack of adequate design and detailing endangered building occupants and the occupants of nearby structures. The City’s proximity to active earthquake faults also means that building work must be completed in a timely fashion to minimize the danger to the public health, safety, and welfare. Since the City is divided by a freeway and highway, a major earthquake would significantly impact the ability of fire crews to respond to emergencies should one or more roadways be blocked or damaged due to bridge collapse or debris from falling structures. Additionally, fire suppression capabilities will be severely limited should the water system be extensively damaged during the seismic event. Pursuant to AB 130, codified in Health & Safety Code Sections 17958, 17958.5 and 17958.7, the City also finds that its local changes or modifications to building standards in the California Residential Code applicable to residential units satisfy one or more of the following conditions: AB 130 CONDITION 1: The changes or modifications are substantially equivalent to changes or modifications that were previously filed by the City Council of the City of Saratoga and were in effect as of September 30, 2025. AB 130 CONDITION 2: The California Building Standards Commission deems those changes or modifications necessary as emergency standards to protect health and safety. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 12 AB 130 CONDITION 3: The changes or modifications relate to home hardening. AB 130 CONDITION 4: The building standards relate to home hardening and are proposed for adoption by a fire protection district pursuant to Section 13869.7. AB 130 CONDITION 5: The changes or modifications are necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025, and that permits mixed-fuel residential construction consistent with federal law while also incentivizing all-electric construction as part of an adopted greenhouse gas emissions reduction strategy. AB 130 CONDITION 6: The changes or modifications are related to administrative practices, are proposed for adoption during the intervening period pursuant to Section 18942, and exclusively result in any of the following: (A) Reductions in time for a local agency to issue a post entitlement permit. (B) Alterations to a local agency’s post entitlement fee schedule. (C) Modernization of, or adoption of, new permitting platforms and software utilized by the local agency. (D) Reductions in cost of internal operation for a local agency. (E) Establishment, alteration, or removal of local programs related to enforcement of building code violations or complaints alleging building code violations. The table below describes the City of Saratoga’s amendments to specific provisions of the 2025 California Residential Code and states which of the findings above and other conditions make the amendment reasonably necessary. To the extent the amendments to the 2025 California Residential Code are applicable to residential units, the table also states which AB 130 conditions the amendments meet. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 13 Amended Sections of the 2025 Residential Code Applicable Section of Saratoga Building Code Ordinance Explanation Findings of Necessity & AB 130 Conditions R114.1 16-18.020 Amends the 2025 Residential Code to clarify that the building official is authorized to issue a stop work order for any work regulated by the code that is performed contrary to the Saratoga Municipal Code, in addition to state law. Finding Nos. 1, 2 and 3. In order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, and given the City of Saratoga’s adjacency to active earthquake faults capable of producing substantial seismic events, building work must be completed in a safe fashion to minimize the danger to the public health, safety, and welfare. AB 130 Conditions 1 and 6(E). The changes to this section clarify existing practices in effect in the City as of September 30, 2025. Additionally, the changes are proposed during the intervening period (between the three years when the CBSC publishes its updates), are related to administrative practices regarding enforcing code violations, and will alter the City’s program related to its enforcement of building code violations or complaints alleging violations. R309.1, R309.2 16-18.030 Amends the 2025 Residential Code’s provisions for automatic fire sprinkler systems in townhouses and in one- and two-family dwellings to clarify when automatic fire sprinkler systems are required. Finding Nos. 1 and 2. In order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, mitigation measures such as automatic sprinkler systems are necessary. The ability of automatic sprinklers to get water on a fire early also reduces the fire flow demand and the need for multiple hydrants. AB 130 Conditions 1 and 3: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 14 R330.3.1 16-18.040 Aligns the language with section 1207.11 of the CFC for clarification. Findings Nos. 1 and 2 and 3. This is clarifying language to align with the same requirement of the California Fire Code C. AB 130 Conditions 1 and 4: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening and were recommended by a fire district. R330.4 16-18.040 Aligns the language with section 1207.11 of the CFC for clarification. Findings Nos. 1 and 2 and 3. This is clarifying language to align with the same requirement of the CFC. AB 130 Conditions 1 and 4: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening and were recommended by a fire district. 330.7 16-18.040 Amends the 2025 Residential Code for Energy storage systems to clarify when a listed heat detector or fire sprinkler may be used. Findings Nos. 1 and 2. In order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, mitigation measures such as smoke alarms, listed heat alarms, listed heat detectors, or automatic sprinkler systems are necessary. This amendment allows additional fire detection devices in lieu of prescribed heat alarms. The ability of automatic sprinklers to get water on a fire early also reduces the fire flow demand and the need for multiple hydrants. AB 130 Conditions 1 and 4: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening and were recommended by a fire district. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 15 R403.1.3 16-18.050 Amends the 2025 Residential Code regarding plain concrete. Finding No. 3. This amendment is made to be consistent with Tri Chapter Uniform Code Committee amendment 3 that modifies the plain concrete provisions in CBC Section 1908.1,8 and American Concrete Institute 318 Section 22.10.1. This proposed amendment addresses the problem of poor performance of plain or under-reinforced concrete footings during a seismic event. This amendment reflects the recommendations by the Structural Engineers Association of Southern California (SEAOSC) and the Los Angeles City Joint Task Force that investigated the poor performance of plain and under- reinforced concrete footings observed in 1994 Northridge earthquake. AB 130 Condition 1: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 16 Table R602.10.3(3), and R602.10.4.5 16-18.060 Amends the 2025 Residential Code regarding Seismic Design Categories D0, D1, and D2 Finding No. 3. The amendment addresses the problem of poor performance of gypsum wallboard and Portland cement plaster as wall bracing materials in high seismic areas. This amendment reflects the recommendations by the Structural Engineers Association of Southern California (SEAOSC) and the Los Angeles City Joint Task Force that investigated the poor performance of these bracing materials that were observed in 1994 Northridge earthquake. AB 130 Condition 1: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. R902.1.1 16-18.070 Amends the 2025 Residential Code section regarding roof coverings in the WUI, to retain the Saratoga Code’s provisions for all new structures and all existing roofs undergoing at least a 10 percent replacement to install a minimum of a Class A roof and comply with the WUI Code. Finding Nos. 1 and 2. In order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, mitigation measures such as the installation of fire- retardant Class A roofing are necessary in the WUI. AB 130 Conditions 1 and 3: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening. R902.1.2 16-18.070 Amends the 2025 Building Code to retain the Saratoga Code’s provisions for Class A roof coverings for all new structures and all existing roofs undergoing at least a 10 percent replacement. Finding Nos. 1 and 2. In order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, mitigation measures such as the installation of fire-retardant Class A roofing are necessary. AB 130 Conditions 1 and 3: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 17 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA FIRE CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA The City of Saratoga makes the following findings regarding the need to amend the 2025 California Fire Code: Finding No. 1 – Climatic Conditions: The City of Saratoga experiences low humidity, high winds, and warm temperatures during the summer months creating conditions which are particularly conducive to the ignition and spread of grass, brush, and structure fires. Finding No. 2 – Topographical Conditions: The remoteness and steepness of hillside areas in the City along with long, narrow roadways significantly impact the ability of emergency responders to extinguish or control wildland or structure fires. Finding No. 3 – Geological Conditions: The City of Saratoga’s dense population is in an area of high seismic activity, as indicated by the United States Geological Survey and the California Division of Mines and Geology. Recent earthquake activities, including the 1989 Loma Prieta earthquake indicated that the lack of adequate design and detailing endangered building occupants and the occupants of nearby structures. The City’s proximity to active earthquake faults also means that building work must be completed in a timely fashion to minimize the danger to the public health, safety, and welfare. Since the City is divided by a freeway and highway, a major earthquake would significantly impact the ability of fire crews to respond to emergencies should one or more roadways be blocked or damaged due to bridge collapse or debris from falling structures. Additionally, fire suppression capabilities will be severely limited should the water system be extensively damaged during the seismic event. Therefore, in order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, mitigation measures are necessary such as but not limited to; automatic fire suppression systems, controls for hazardous materials, safety provisions in buildings for firefighters and additional fire hydrants. Pursuant to AB 130, codified in Health & Safety Code Sections 17958, 17958.5 and 17958.7, the City also finds that its local changes or modifications to building standards in the California Fire Code applicable to residential units satisfy one or more conditions. The changes to the building standards contained in the California Fire Code applicable to residential are all justified under Condition 3 (“The changes or modifications relate to home hardening”), Condition 4 (“The building standards relate to home hardening and are proposed for adoption by a fire protection district pursuant to Section 13869.7”), and, in many cases, Condition 1 (“The changes or modifications are substantially equivalent to changes or modifications that were previously filed by the City Council of the City of Saratoga and were in effect as of September 30, 2025”). Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 18 Additions and deletions to the 2025 California Fire Code are hereby determined to be reasonably necessary based on the above findings and apply to following amended, added, or deleted sections: Amended Sections of the 2025 CA Fire Code Applicable Section of Saratoga Building Code Ordinance EXPLANATION Findings of Necessity & AB 130 Conditions Table 105.5.9 16-20.050 Permit amounts for compressed gasses Finding: Admin AB 130 Condition: 3, 4 Table 105.5.22 16-20.050 Permit amounts for hazardous materials Finding: Admin AB 130 Condition: 3, 4 105.56.60 16-20.050 Operational permits Finding: Admin AB 130 Condition: 3, 4 105.56.61 16-20.050 Operational permits Finding: Admin AB 130 Condition: 3, 4 105.6.4 16-20.050 Construction permits Finding: 3 AB 130 Condition: 3, 4 108.2.1 16-20.050 Construction permit fees Finding: Admin AB 130 Condition: 1, 3, 4 108.2.2 16-20.050 Operational permit fees Finding: Admin AB 130 Condition: 1, 3, 4 109.5 16-20.050 Final inspection Finding: Admin AB 130 Condition: 1, 3, 4 113.4 16-20.050 Violation penalties Finding: Admin AB 130 Condition: 1, 3, 4 113.5 16-20.050 Abatement of Hazard Finding: Admin AB 130 Condition: 1, 3, 4 202 16-20.060 Definitions Finding: Admin AB 130 Condition: 1, 3, 4 503.1.1 16-20.090 Buildings and facilities Finding: Admin AB 130 Condition: 1, 3, 4 503.2.1 16-20.090 Dimensions Finding: Admin AB 130 Condition: 1, 3, 4 503.2.4 16-20.090 Turning radius Finding: Admin AB 130 Condition: 1, 3, 4 503.2.7 16-20.090 Grade Finding: Admin AB 130 Condition: 1, 3, 4 503.5 16-20.090 Required gates or barricades Finding: Admin5001.2.2.2 AB 130 Condition: 1, 3, 4 503.6 16-20.090 Security gates Finding: Admin AB 130 Condition: 1, 3, 4 Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 19 504.5 16-20.090 Access control devices Finding: 2, 3 AB 130 Condition: 1, 3, 4 505.1 16-20.090 Address identification Finding: Admin AB 130 Condition: 1, 3, 4 510.1 16-20.090 Emergency responder radio coverage in new buildings Finding: Admin AB 130 Condition: 1, 3, 4 510.1.1 16-20.090 Obstruction by new buildings Finding: Admin AB 130 Condition: 1, 3, 4 510.3.1 16-20.090 Permit required Finding: Admin AB 130 Condition: 1, 3, 4 510.4 16-20.090 Technical requirements Finding: Admin AB 130 Condition: 1, 3, 4 510.5 16-20.090 Installation requirement Finding: Admin AB 130 Condition: 1, 3, 4 510.5.2 16-20.090 Approval prior to installation Finding: Admin AB 130 Condition: 1, 3, 4 510.5.4 16-20.090 Acceptance test procedure Finding: Admin AB 130 Condition: 1, 3, 4 703.3 16-20.105 Fire resistant joints Finding: Admin AB 130 Condition: 1, 3, 4 901.6.2 16-20.120 Integrated testing Finding: Admin AB 130 Condition: 1, 3, 4 901.6.2.1 16-20.120 High-rise buildings Finding: Admin AB 130 Condition: 1, 3, 4 901.6.2.2 16-20.120 Smoke control systems Finding: Admin AB 130 Condition: 1, 3, 4 901.6.3 16-20.120 Records Finding: Admin AB 130 Condition: 1, 3, 4 903.2 16-20.120 Where required Finding: 2, 3 AB 130 Condition: 1, 3, 4 903.2.11.7 16-20.120 Chemical fume hood fire protection Finding: 3 AB 130 Condition: 1, 3, 4 907.8 16-20.120 Inspection, testing and maintenance Finding: Admin AB 130 Condition: 1, 3, 4 909.22.1 16-20.120 Schedule Finding: Admin AB 130 Condition: 1, 3, 4 1202.1 16-20.125 Definitions Finding: Admin AB 130 Condition: 1, 3, 4 1207.1.7 16-20.125 Large -scale fire test Finding: Admin AB 130 Condition: 1, 3, 4 1207.2.2.1 16-20.125 Ongoing inspection and testing Finding: Admin Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 20 AB 130 Condition: 1, 3, 4 1207.5.2 16-20.125 Maximum allowable quantities Finding: Admin AB 130 Condition: 1, 3, 4 1207.5.5 16-20.125 Fire suppression systems Finding: Admin AB 130 Condition: 1, 3, 4 1207.11.3 16-20.125 Location Finding: Admin AB 130 Condition: 1, 3, 4 1207.11.6 16-20.125 Fire detection Finding: Admin AB 130 Condition: 3, 4 Chapter 11 16-20.130 Construction Requirements for Existing Buildings Finding: Admin AB 130 Condition: 1, 3, 4 3303.5 16-20.140 Fire watch Finding: Admin AB 130 Condition: 1, 3, 4 3303.7 16-20.140 Fire walls Finding: 2, 3 AB 130 Condition: 1, 3, 4 3307.1.2 16-20.140 Stairways required Finding: Admin AB 130 Condition: 1, 3, 4 3307.1.4 16-20.140 Required means of egress Finding: 2, 3 AB 130 Condition: 1, 3, 4 3307.6 16-20.140 Fire Department access roadways Finding: 2, 3 AB 130 Condition: 3, 4 3313.1 16-20.140 Completion before occupancy Finding: Admin AB 130 Condition: 1, 3, 4 4103.1 16-20-150 Portable unvented heaters Finding: Admin AB 130 Condition: 3, 4 4103.1.2.1. 1 16-20-150 Prohibited locations Finding: Admin AB 130 Condition: 3, 4 4106.1 16-20-150 Immersion Heaters Finding: Admin AB 130 Condition: 3, 4 5001.2.2.2 16-20.160 Health Hazards Finding: Admin AB 130 Condition: 1, 3, 4 5002.1 16-20.160 Definitions Finding: Admin AB 130 Condition: 1, 3, 4 5003.1.3.1 16-20.160 Toxic, highly toxic, moderately toxic gases Finding: 3 AB 130 Condition: 1, 3, 4 5003.1.5 16-20.160 Health hazards- other Finding: 3 AB 130 Condition: 1, 3, 4 5003.1.6 16-20.160 Additional spill control and secondary containment requirements Finding: 3 AB 130 Condition: 1, 3, 4 5003.2.2.1 16-20.160 Design and construction Finding: 3 AB 130 Condition: 1, 3, 4 5003.2.2.2 16-20.160 Additional regulation for supply piping for heat hazard materials Finding: 3 AB 130 Condition: 1, 3, 4 5003.5.2 16-20.160 Ventilation ducting Finding: 3 Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 21 AB 130 Condition: 1, 3, 4 5003.5.3 16-20.160 “H” occupancies Finding: 3 AB 130 Condition: 1, 3, 4 5003.10.4 16-20.160 Elevators utilized to transport hazardous material Finding: Admin AB 130 Condition: 1, 3, 4 5004.2.1 16-20.160 Spill control for hazardous material liquids Finding: Admin AB 130 Condition: 1, 3, 4 5004.2.2.2 16-20.160 Incompatible materials Finding: Admin AB 130 Condition: 1, 3, 4 5402.1 16-20.165 Definition Finding: Admin AB 130 Condition: 1, 3, 4 5601.1.3 16-20.170 Fireworks Finding: Admin AB 130 Condition: 1, 3, 4 5704.2.7.5. 8 16-20.180 Overfill Prevention Finding: Admin AB 130 Condition: 1, 3, 4 5704.2.7.5. 9 16-20.180 Automatic Filling of Tanks Finding: Admin AB 130 Condition: 1, 3, 4 5704.2.9.6. 1 16-20.180 Locations where above-ground tanks are prohibited Finding: Admin AB 130 Condition: 1, 3, 4 5706.2.4.4 16-20.180 Locations where above-ground tanks are prohibited Finding: Admin AB 130 Condition: 1, 3, 4 5707.3.3 16-20.180 Site plan Finding: Admin AB 130 Condition: 1, 3, 4 5806.2 16-20.190 Limitations on cryogenic fluids Finding: Admin AB 130 Condition: 1, 3, 4 6001.1 16-20.195 Scope Finding: Admin AB 130 Condition: 1, 3, 4 6002.1 16-20.195 Definitions Finding: Admin AB 130 Condition: 3, 4 6004.1 16-20. 195 General Finding: Admin AB 130 Condition: 1, 3, 4 6004.1.1 16-20. 195 Special limitations for indoor storage and use occupancy Finding: Admin AB 130 Condition: 1, 3, 4 6004.1.1.1 16-20. 195 Group A, E, I or U occupancies Finding: Admin AB 130 Condition: 1, 3, 4 6004.1.1.2 16-20. 195 Group R occupancies Finding: Admin AB 130 Condition: 1, 3, 4 6004.1.1.3 16-20. 195 Offices, retail sales and classrooms Finding: Admin AB 130 Condition: 1, 3, 4 6004.2 16-20. 195 Indoor storage and use Finding: Admin AB 130 Condition: 1, 3, 4 6004.2.1 16-20. 195 Applicability Finding: Admin AB 130 Condition: 1, 3, 4 6004.2.1.4 16-20. 195 Quantities Finding: Admin AB 130 Condition: 1, 3, 4 Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 22 6004.4 16-20. 195 General indoor requirements Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.1 16-20. 195 Cylinder and tank location Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.2 16-20. 195 Ventilated areas Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.3 16-20. 195 Piping and controls Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.4 16-20. 195 Gas rooms Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.5 16-20. 195 Treatment rooms Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.5.1 16-20. 195 Design Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.5.2 16-20. 195 Performance Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.5.3 16-20.195 Sizing Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.5.4 16-20. 195 Stationary tasks Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.5.5 16-20. 195 Portable tanks and cylinders Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.6 16-20.195 Emergency power Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.6.1 16-20. 195 Fail-safe systems Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.7 16-20.195 Automatic fire detection systems Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.8 16-20. 195 Gas detection system Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.8.1 16-20. 195 Alarms Finding: Admin AB 130 Condition: 1, 3, 4 6004.4.8.2 16-20. 195 Shut off gas supply Finding: Admin AB 130 Condition: 1, 3, 4 6104.2 16-20.200 Maximum capacity within established limits Finding: Admin AB 130 Condition: 1, 3, 4 6405.3.1 16-20.210 Silane distribution systems auto shut down Finding: Admin AB 130 Condition: 1, 3, 4 Appendix B 16-20.220 B105.2 16-20. 220 Buildings other than one- and two- family dwellings Finding: 2, 3 AB 130 Condition: 1, 3, 4 C102.1 16-20. 220 Minimum number of fire hydrants for a building Finding: 2, 3 AB 130 Condition: 1, 3, 4 Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 23 Appendix D 16-20. 220 D103.1 16-20. 220 Delete D103.1 Finding: 2, 3 AB 130 Condition: 1, 3, 4 D103.2 16-20. 220 Grade Finding: 2, 3 AB 130 Condition: 1, 3, 4 D103.3 16-20. 220 Turning radius Finding: 2, 3 AB 130 Condition: 1, 3, 4 D103.4 16-20. 220 Dead ends Finding: 2, 3 AB 130 Condition: 1, 3, 4 D103.6 16-20. 220 Signs Finding: 2, 3 AB 130 Condition: 1, 3, 4 Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 24 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA PLUMBING CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA No findings are necessary because the 2025 California Plumbing Code is being adopted without modification. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 25 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA MECHANICAL CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA No findings are necessary because the 2025 California Mechanical Code is being adopted without modification. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 26 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA ELECTRICAL CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA No findings are necessary because the 2025 California Electrical Code is being adopted without modification. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 27 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA GREEN BUILDING STANDARDS CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA The City of Saratoga makes the following findings regarding the need for amending the 2025 California Green Building Code: FINDING 1: CLIMATIC CONDITIONS: The City of Saratoga experiences low humidity, high winds, and warm temperatures during the summer months creating conditions are particularly conducive to the ignition and spread of grass, brush, and structure fires. FINDING 2: TOPOGRAPHICAL CONDITIONS: The remoteness and steepness of hillside areas in the City along with long, narrow roadways significantly impact the ability of emergency responders to extinguish or control wildland or structure fires. The landscape of Saratoga also includes steep slopes susceptible to erosion, especially during the rainy season. Areas of critically expansive soil and other unstable soil conditions create a need for soil retention and the diversion or increased flow of surface waters, particularly on steep slopes. FINDING 3: GEOLOGICAL CONDITIONS: The City of Saratoga’s dense population is in an area of high seismic activity, as indicated by the United States Geological Survey and the California Division of Mines and Geology. Recent earthquake activities, including the 1989 Loma Prieta earthquake, have indicated that the lack of adequate design and detailing endangered building occupants and the occupants of nearby structures. The City’s proximity to active earthquake faults also means that building work must be completed in a timely fashion to minimize the danger to the public health, safety, and welfare. Since the City is divided by a freeway and highway, a major earthquake would significantly impact the ability of fire crews to respond to emergencies should one or more roadways be blocked or damaged due to bridge collapse or debris from falling structures. Additionally, fire suppression capabilities will be severely limited should the water system be extensively damaged during the seismic event. Pursuant to AB 130, codified in Health & Safety Code Sections 17958, 17958.5 and 17958.7, the City also finds that its local changes or modifications to building standards in the California Green Building Standards Code applicable to residential units satisfy one or more of the following conditions: AB 130 CONDITION 1: The changes or modifications are substantially equivalent to changes or modifications that were previously filed by the City Council of the City of Saratoga and were in effect as of September 30, 2025. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 28 AB 130 CONDITION 2: The California Building Standards Commission deems those changes or modifications necessary as emergency standards to protect health and safety. AB 130 CONDITION 3: The changes or modifications relate to home hardening. AB 130 CONDITION 4: The building standards relate to home hardening and are proposed for adoption by a fire protection district pursuant to Section 13869.7. AB 130 CONDITION 5: The changes or modifications are necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025, and that permits mixed-fuel residential construction consistent with federal law while also incentivizing all-electric construction as part of an adopted greenhouse gas emissions reduction strategy. AB 130 CONDITION 6: The changes or modifications are related to administrative practices, are proposed for adoption during the intervening period pursuant to Section 18942, and exclusively result in any of the following: (A) Reductions in time for a local agency to issue a post entitlement permit. (B) Alterations to a local agency’s post entitlement fee schedule. (C) Modernization of, or adoption of, new permitting platforms and software utilized by the local agency. (D) Reductions in cost of internal operation for a local agency. (E) Establishment, alteration, or removal of local programs related to enforcement of building code violations or complaints alleging building code violations. The table below describes the City of Saratoga’s amendments to specific provisions of the 2025 California Green Building Standards Code and states which of the findings above and other conditions make the amendment reasonably necessary. To the extent the amendments to the 2025 California Green Building Standards Code are applicable to residential units, the table also states which AB 130 conditions the amendments meet. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 29 Amended Sections of the 2025 Green Building Standards Code Applicable Section of Saratoga Building Code Ordinance Explanation Findings of Necessity & AB 130 Conditions (where relevant) 4.303.50 16-49.020 Require new construction one- and two-family dwellings to be equipped with a demand hot water circulation system Finding No. 1. The proposed local amendments support the City’s sustainability goals, including the Council’s Goal to reduce greenhouse gas (GHG) emissions. This amendment, aimed at reducing GHG emissions, addresses the City’s climatic conditions. AB 130 Condition 1: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. 4.305.1 16-49.020 Require new construction one- and two-family dwellings to install piping to permit future use of a graywater system Finding No. 1. The proposed local amendments support the City’s sustainability goals, including the Council’s Goal to reduce greenhouse gas (GHG) emissions. This amendment, aimed at reducing GHG emissions, addresses the City’s climatic conditions. AB 130 Condition 1: The changes to this section were previously adopted in 2022 and were in effect in the City as of September 30, 2025. A4.204.1 16-49.030 When an air conditioning unit is being replaced, require that a heat pump be installed as the primary hearing source or require that the air conditioner meet additional requirements. Finding No. 1. The proposed local amendments support the City’s sustainability goals, including the Council’s Goal to reduce greenhouse gas (GHG) emissions. This amendment, aimed at reducing GHG emissions, addresses the City’s climatic conditions. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 30 AB 130 Condition 5: The proposed modifications to the Green Building Standards Code are necessary to implement Saratoga’s local code amendment, which aligns with the City’s General Plan adopted in March 2024, permits mixed-fuel construction consistent with federal law and incentivizes all-electric construction as part of the City’s adopted greenhouse gas emissions reductions strategy in the City’s Climate Action Plan adopted in 2020. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 31 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA ENERGY CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA The City of Saratoga makes the following findings regarding the need for amending the 2025 California Energy Code: FINDING 1: CLIMATIC CONDITIONS: The City of Saratoga experiences low humidity, high winds, and warm temperatures during the summer months creating conditions are particularly conducive to the ignition and spread of grass, brush, and structure fires. FINDING 2: TOPOGRAPHICAL CONDITIONS: The remoteness and steepness of hillside areas in the City along with long, narrow roadways significantly impact the ability of emergency responders to extinguish or control wildland or structure fires. The landscape of Saratoga also includes steep slopes susceptible to erosion, especially during the rainy season. Areas of critically expansive soil and other unstable soil conditions create a need for soil retention and the diversion or increased flow of surface waters, particularly on steep slopes. FINDING 3: GEOLOGICAL CONDITIONS: The City of Saratoga’s dense population is in an area of high seismic activity, as indicated by the United States Geological Survey and the California Division of Mines and Geology. Recent earthquake activities, including the 1989 Loma Prieta earthquake, have indicated that the lack of adequate design and detailing endangered building occupants and the occupants of nearby structures. The City’s proximity to active earthquake faults also means that building work must be completed in a timely fashion to minimize the danger to the public health, safety, and welfare. Since the City is divided by a freeway and highway, a major earthquake would significantly impact the ability of fire crews to respond to emergencies should one or more roadways be blocked or damaged due to bridge collapse or debris from falling structures. Additionally, fire suppression capabilities will be severely limited should the water system be extensively damaged during the seismic event. Pursuant to AB 130, codified in Health & Safety Code Sections 17958, 17958.5 and 17958.7, the City also finds that its local changes or modifications to building standards in the California Energy Code applicable to residential units satisfy one or more of the following conditions: AB 130 CONDITION 1: The changes or modifications are substantially equivalent to changes or modifications that were previously filed by the City Council of the City of Saratoga and were in effect as of September 30, 2025. AB 130 CONDITION 2: The California Building Standards Commission deems those changes or modifications necessary as emergency standards to protect health and safety. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 32 AB 130 CONDITION 3: The changes or modifications relate to home hardening. AB 130 CONDITION 4: The building standards relate to home hardening and are proposed for adoption by a fire protection district pursuant to Section 13869.7. AB 130 CONDITION 5: The changes or modifications are necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025, and that permits mixed-fuel residential construction consistent with federal law while also incentivizing all-electric construction as part of an adopted greenhouse gas emissions reduction strategy. AB 130 CONDITION 6: The changes or modifications are related to administrative practices, are proposed for adoption during the intervening period pursuant to Section 18942, and exclusively result in any of the following: (A) Reductions in time for a local agency to issue a post entitlement permit. (B) Alterations to a local agency’s post entitlement fee schedule. (C) Modernization of, or adoption of, new permitting platforms and software utilized by the local agency. (D) Reductions in cost of internal operation for a local agency. (E) Establishment, alteration, or removal of local programs related to enforcement of building code violations or complaints alleging building code violations. The table below describes the City of Saratoga’s amendments to specific provisions of the 2025 California Energy Code and states which of the findings above and other conditions make the amendment reasonably necessary. To the extent the amendments to the 2025 California Energy Code are applicable to residential units, the table also states which AB 130 conditions the amendments meet. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 33 Amended Sections of the 2025 Energy Code Applicable Section of Saratoga Building Code Ordinance Explanation Findings of Necessity & AB 130 Conditions (where relevant) 100.0, 100.1(b), 150.0(w), 150.2(b) 16-51.020 Modifies the Energy Code to require that single-family building remodels include electric-readiness measures. Finding No. 1. The proposed local amendments support the City’s sustainability goals, including the Council’s Goal to reduce greenhouse gas (GHG) emissions. This amendment, aimed at reducing GHG emissions, addresses the City’s climatic conditions. AB 130 Condition 5: The proposed modifications to the Energy Code are necessary to implement Saratoga’s local code amendment, which aligns with the City’s General Plan adopted in March 2024, permits mixed-fuel construction consistent with federal law and incentivizes all-electric construction as part of the City’s adopted greenhouse gas emissions reductions strategy in the City’s Climate Action Plan adopted in 2020. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 34 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA WILDLAND-URBAN INTERFACE CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA The City of Saratoga makes the following findings regarding the need for amending the 2025 California Wildland-Urban Interface (“WUI”) Code: FINDING 1: CLIMATIC CONDITIONS: The City of Saratoga experiences low humidity, high winds, and warm temperatures during the summer months creating conditions are particularly conducive to the ignition and spread of grass, brush, and structure fires. FINDING 2: TOPOGRAPHICAL CONDITIONS: The remoteness and steepness of hillside areas in the City along with long, narrow roadways significantly impact the ability of emergency responders to extinguish or control wildland or structure fires. The landscape of Saratoga also includes steep slopes susceptible to erosion, especially during the rainy season. Areas of critically expansive soil and other unstable soil conditions create a need for soil retention and the diversion or increased flow of surface waters, particularly on steep slopes. FINDING 3: GEOLOGICAL CONDITIONS: The City of Saratoga’s dense population is in an area of high seismic activity, as indicated by the United States Geological Survey and the California Division of Mines and Geology. Recent earthquake activities, including the 1989 Loma Prieta earthquake, have indicated that the lack of adequate design and detailing endangered building occupants and the occupants of nearby structures. The City’s proximity to active earthquake faults also means that building work must be completed in a timely fashion to minimize the danger to public health, safety, and welfare. Since the City is divided by a freeway and highway, a major earthquake would significantly impact the ability of fire crews to respond to emergencies should one or more roadways be blocked or damaged due to bridge collapse or debris from falling structures. Additionally, fire suppression capabilities will be severely limited should the water system be extensively damaged during the seismic event. Pursuant to AB 130, codified in Health & Safety Code Sections 17958, 17958.5 and 17958.7, the City also finds that its local changes or modifications to building standards in the California WUI Code applicable to residential units satisfy one or more of the following conditions: AB 130 CONDITION 1: The changes or modifications are substantially equivalent to changes or modifications that were previously filed by the City Council of the City of Saratoga and were in effect as of September 30, 2025. AB 130 CONDITION 2: The California Building Standards Commission deems those changes or modifications necessary as emergency standards to protect health and safety. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 35 AB 130 CONDITION 3: The changes or modifications relate to home hardening. AB 130 CONDITION 4: The building standards relate to home hardening and are proposed for adoption by a fire protection district pursuant to Section 13869.7. AB 130 CONDITION 5: The changes or modifications are necessary to implement a local code amendment that is adopted to align with a general plan approved on or before June 10, 2025, and that permits mixed-fuel residential construction consistent with federal law while also incentivizing all-electric construction as part of an adopted greenhouse gas emissions reduction strategy. AB 130 CONDITION 6: The changes or modifications are related to administrative practices, are proposed for adoption during the intervening period pursuant to Section 18942, and exclusively result in any of the following: (A) Reductions in time for a local agency to issue a post entitlement permit. (B) Alterations to a local agency’s post entitlement fee schedule. (C) Modernization of, or adoption of, new permitting platforms and software utilized by the local agency. (D) Reductions in cost of internal operation for a local agency. (E) Establishment, alteration, or removal of local programs related to enforcement of building code violations or complaints alleging building code violations. The table below describes the City of Saratoga’s amendments to specific provisions of the 2025 California WUI Code and states which of the findings above and other conditions make the amendment reasonably necessary. To the extent the amendments to the 2025 California WUI Code are applicable to residential units, the table also states which AB 130 conditions the amendments meet. Amended Sections of the 2025 WUI Code Applicable Section of Saratoga Building Code Ordinance Explanation Findings of Necessity & AB 130 Conditions (where relevant) 101.2 16-52.020 Modifies the WUI Code to clarify that the Code’s provisions apply to additions or alterations. Finding Nos. 1 and 2. Given the City’s climatic and topographic conditions, which contribute to the risk of fires, particularly in the WUI, these amendments to clarify the scope of the WUI Code are necessary to minimize the risks to persons and property due to potential response delays Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 36 and compromised fire suppression capabilities. AB 130 Condition 3: The changes relate to home hardening in the WUI by clarifying that alterations and additions are subject to the WUI Code provisions. 101.3.1 16-52.030 Modifies the WUI Code to modify exceptions to the scope of the code. Finding Nos. 1 and 2. Given the City’s climatic and topographic conditions, which contribute to the risk of fires, particularly in the WUI, these amendments to clarify the scope of the WUI Code are necessary to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities. AB 130 Condition 1 and 3: The changes relate to home hardening in the WUI by clarifying the scope of the WUI Code provisions. Exceptions 1.1-1.4 were previously adopted in 2022 as modifying Chapter 49 of the California Fire Code, and were in effect in the City as of September 30, 2025. 507.1 16-52.050 Modifies the WUI Code provision regarding roof coverings in the WUI, requiring all new structures and all existing roofs undergoing at least a 10 percent replacement to install a minimum of a Class A roof. Finding Nos. 1 and 2. In order to minimize the risks to persons and property due to potential response delays and compromised fire suppression capabilities, mitigation measures such as the installation of fire-retardant Class A roofing are necessary in the WUI. AB 130 Conditions 1 and 3: These requirements were previously adopted in 2022 and were in effect in the City as of September 30, 2025. Additionally, the changes relate to home hardening. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 37 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA REFERENCED STANDARDS CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA No findings are necessary because the 2025 California Referenced Standards Code is being adopted without modification. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 38 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA HISTORICAL BUILDING CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA No findings are necessary because the 2025 California Historical Building Code is being adopted without modification. Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140 Resolution No. 25-059 Page 39 FINDINGS REGARDING THE NEED FOR AMENDMENTS TO PROVISIONS IN THE 2025 CALIFORNIA EXISTING BUILDING CODE TO BE ADOPTED BY REFERENCE IN THE CITY CODE OF THE CITY OF SARATOGA No findings are necessary because the 2025 California Existing Building Code is being adopted without modification. 1971558.3 Docusign Envelope ID: 7DF955B0-7B42-44F8-9D0E-9F04CEF14140