Loading...
HomeMy WebLinkAboutCity Council Resolution 26-008, Denying the Appeal 13785 Saratoga AvenueRESOLUTION NO 26-008 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA DENYING APPEAL APCC26-0001, AND APPROVING A TENTATIVE PARCEL MAP SUB23-0003 AND CITY ARBORIST APPROVAL ARB25-0047 LOCATED AT AT 13785 SARATOGA AVENUE (APN 393-45-008) WHEREAS, on February 21, 2023, an application (SUB23-0003) was submitted by Mark and Michele Brading for Tentative Parcel Map approval to subdivide an existing 2.32-acre parcel located at 13785 Saratoga Avenue into three parcels. WHEREAS, on May 6, 2025, an application (ARB25-0047) was submitted by Mark and Michele Brading for City Arborist review of nine protected trees proposed for removal related to tentative map improvement for site access and Santa Clara County Fire Department emergency vehicle turnaround requirements. WHEREAS, on January 14, 2026, the Planning Commission held a duly noticed public hearing on the applications, and considered evidence presented by City Staff, the applicant, the property owners, and other interested parties. WHEREAS, the Planning Commission approved Tentative Parcel Map (SUB23-0003) and City Arborist Recommendation for Approval (ARB25-0047). WHEREAS, on January 21, 2026, an appeal to the City Council was filed by several adjacent property owners (“Appellants”). WHEREAS, on March 4, 2026, following a duly noticed public hearing where the City Council conducted a de novo review of the appeal, at which all interested parties were given a full opportunity to be heard and to present evidence, the City Council considered the application, Tentative Parcel Map, City Arborist Recommendation, CEQA documentation, and other materials, exhibits, and evidence presented by City Staff, the appellant, the applicant, and other interested parties. WHEREAS, the Community Development Department recommends that the City Council determine that this Project is categorically exempt under CEQA Guidelines Sections 15302 (Replacement or Reconstruction), 15303 (New Construction or Conversion of Small Structures), and 15315 (Minor Land Divisions). NOW THEREFORE, the City Council of the City of Saratoga hereby denies the Appellants’ appeal, affirms the decision of the Planning Commission of the City of Saratoga on January 14, 2026, and approves the applicant’s Tentative Parcel Map and City Arborist recommendation for the removal of nine protected trees application and further finds, determines, and resolves as follows: Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 2 Section 1: The recitals set forth above are true and correct and incorporated herein by reference. The documents constituting the record of proceedings upon which this decision is based are located in the City of Saratoga Department of Community Development and are maintained by the Director of that Department. Section 2: The proposed project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to sections 15302 (Replacement or Reconstruction), 15303 (New Construction or Conversion of Small Structures), and 15315 (Minor Land Divisions). Section 3: The proposed Tentative Parcel Map is consistent with the following Saratoga General Plan Policies: Land Use Policy LU-1.1 which affirms that the city shall continue to be predominately a community of single-family detached structures; Land Use Policy LU-1.2 that states that all residential development proposals will be reviewed to ensure consistency with Land Use Element Goals and Policies; Land Use Policy LU-1.3 that all undeveloped sites zoned single- family detached residential remain so designated; Open Space and Conservation Policy OSC-2.1 to maintain the predominantly small-town residential character of Saratoga, which includes a mix of larger residential parcels, long established neighborhoods, scenic hillsides, and open space areas. Section 4: The City Council shall not approve any tentative map if the Commission finds the proposal supports any of the following nine findings [City Code Section 14-20.070(b)]. Staff has provided evidence that does not support any of the findings. (1) That the proposed map is not consistent with the General Plan and any applicable specific plans. The proposed tentative map is consistent with the General Plan and any applicable specific plans in that the proposed parcels are consistent with the General Plan designations of Residential Low Density (RLD) and Medium Density Residential (M-10) defined as 2.18 dwelling units per net acre and 4.35 dwelling units per net acre, respectively. Parcel One is consistent with the minimum lot size required by the R-1-20,000 zoning district and Parcels Two and Three are consistent with the minimum lot size required by the R-1-10,000 zoning district. Proposed lot dimensions including width, depth and frontage meet or exceed the minimums required by the City Code. (2) That the design or improvements of the proposed subdivision are not consistent with the General Plan and any applicable specific plan. The design or improvements of the proposed subdivision are consistent with the General Plan and any applicable specific plan in that the design or improvements of the proposed subdivision are consistent with the General Plan. The proposed parcel sizes, configuration, access and building envelopes are consistent with the zoning regulations and are compatible with the existing densities in the project vicinity. The proposed building envelopes are sufficient in size and dimensions to accommodate a single-family residence. Building envelopes provided on the proposed tentative map indicate that required setbacks can be provided to meet the development regulations. All existing structures on site are to remain. Design review approval shall be required, as applicable in the city code, for a new single-family residence on Parcel Two and Three. At the time an application to construct a single-family residence is filed with the planning department the mass, bulk, view, privacy and compatibility issues of the proposed residence with the existing neighborhood and residences shall be examined. Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 3 (3) That the site is not physically suitable for the type of development proposed. The site is suitable for the type of development proposed in that the proposed building envelopes and the surrounding areas have a minimum percentage of slope of less than 10%. The subdivision will not impose features on the proposed parcels regarding size or shape that may constrain future development on the site. (4) That the site is not physically suitable for the proposed density of development. The site is physically suitable for the proposed density of development in that the site currently has one existing single-family home and accessory structures located on site and all structures will remain. The subdivision application would result in the potential addition of two additional single-family residences. Approximately two dwelling units are permitted consistent with the general plan maximum dwelling unit per acre designation of 2.18 dwelling units per net acre for Parcel One and one dwelling unit per site are permitted consistent with the general plan maximum dwelling unit per acre designation of 4.35 dwelling units per net acre for Parcels Two and Three. The potential for the construction of a new single-family home on Parcel Two and Three is consistent with the surrounding uses and densities in the area. Densities in the immediate surrounding area are predominantly characterized by low-density single-family residential uses. (5) That the design of the subdivision is likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. The design of the subdivision is not likely to cause substantial environmental damage or substantially and unavoidably injure fish or wildlife or their habitat in that the proposed project, which includes subdivision of one lot into three lots is categorically exempt from the Environmental Quality Act (CEQA) pursuant to sections 15302, 15303, and 15315 of the Guidelines for the Implementation of CEQA. The Class 2 exemption (Replacement or Reconstruction) applies to the replacement of an existing structure, located on the same site as the existing structure, with substantially the same purpose and capacity as the structure replaced. The Class 3 exemption (New Construction or Conversion of Small Structures) applies to the construction and location of limited numbers of new, small structures, including street improvements and accessory structures. The Class 15 exemption (Minor Land Divisions) can be applied to the division of property in urbanized areas zoned for residential use into four or fewer parcels when the division is in conformance with the General Plan and zoning no variances or exceptions are required, all services and access to the proposed parcels to local standards are available, the parcel was not involved in a division of a larger parcel within the previous 2 years, and the parcel does not have an average slope of greater than 20 percent. (6) That the design of the subdivision is likely to cause serious health or safety problems. The design of the subdivision is not likely to cause serious health or safety problems in that the proposed project is consistent with the zoning and subdivision regulations in the City Code and General Plan. The Tentative Map has been reviewed by West Valley Sanitary District, Santa Clara County Fire Department, Pacific Gas & Electric, Planning Department and Public Works Engineers. All structural improvements to the property will be reviewed by the Community Development Department. The project site is in Zone AE on the Flood Insurance Maps by FEMA. Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 4 (7) That the design of the subdivision will conflict with easements for access or use. The design of the subdivision would not conflict with easements for access or use. Access to both parcels would be provided by both public and private streets. There are no access easements in the area that would be affected by the subdivision. (8) That a proposed subdivision of land which is subject to a contract executed pursuant to the Williamson Act. The proposed subdivision of land is not subject to a contract pursuant to the Williamson Act in that the project site is not under a Williamson Act contract. (9) That the discharge of waste from the proposed subdivision into an existing community sewer system would result in violation of existing requirements. The discharge of waste from the proposed subdivision into an existing community sewer system would not result in violation of existing requirements in that the West Valley Sanitary District operates a sewer line in this area of Saratoga Avenue. Section 5: The City Council of the City of Saratoga hereby approves Tentative Parcel Map Application SUB23-0003 and City Arborist recommendation to remove nine protected trees located at 13785 Saratoga Avenue (APN 393-45-008). The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga City Council held on the 4th day of March 2026 by the following vote: AYES: COUNCIL MEMBERS AFTAB, ZHAO, VICE MAYOR WALIA, MAYOR PAGE NOES: NONE ABSENT: NONE RECUSED: COUNCIL MEMBER FITZSIMMONS ______________________ Chuck Page, Mayor Attest: _______________________ Britt Avrit, MMC, City Clerk Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 5 EXHIBIT 1 CONDITIONS OF APPROVAL SUB23-0003 / ARB25-0047 13785 SARATOGA AVENUE (APN 393-45-008) A. GENERAL 1. All conditions below that are identified as permanent or for which an alternative period for applicability is specified shall run with the land and apply to the landowner’s successors in interest for such time. No zoning clearance, or demolition, grading for this project shall be issued until proof is filed with the city that a certificate of approval documenting all applicable permanent or other term-specified conditions has been recorded by the applicant with the Santa Clara County Recorder’s office in form and content to the Community Development Director. If a condition is not “Permanent” or does not have a term specified, it shall remain in effect until the issuance by the City of Saratoga of a Certificate of Occupancy or its equivalent. 2. The Owner and Applicant will be mailed a statement after the time the Resolution granting this approval is duly executed, containing a statement of all amounts due to the City in connection with this application, including all consultant fees (collectively “processing fees”). This approval or permit shall expire sixty (60) days after the date said notice is mailed if all processing fees contained in the notice have not been paid in full. No Zoning Clearance or Demolition, Grading, or Building Permit may be issued until the City certifies that all processing fees have been paid in full (and, for deposit accounts, a surplus balance of $500 is maintained). 3. The Project shall maintain compliance with all applicable regulations of the State, County, City and/or other governmental agencies having jurisdiction including, without limitation, the requirements of the Saratoga City Code incorporated herein by this reference. 4. As a condition of this Approval, Owner and Applicant hereby agree to defend, indemnify, and hold the City and its officers, officials, boards, commissions, employees, agents, and volunteers harmless from and against: a. all claims, actions, or proceedings to attack, set aside, void or annul any action on the subject application, or any of the proceedings, acts or determinations taken, done, or made prior to said action; and b. all claims, demands, actions, expenses, or liabilities arising from or in any manner relating to the performance of such construction, installation, alteration, or grading work by the Owner and/or Applicant, their successors, or by any person acting on their behalf. In addition, prior to any Zoning Clearance, Owner and Applicant shall execute a separate agreement containing the details of this required Agreement to Indemnify, Hold Harmless and Defend, which shall be subject to prior approval as to form and content by the City Attorney. Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 6 B. COMMUNITY DEVELOPMENT DEPARTMENT 5. An application for Design Review shall be submitted for any new single-family home to be constructed on Parcels Two and Three. 6. The applicant shall submit for Arborist Review for any future Design Review application that includes proposed removals of any ordinance-sized trees per Saratoga Municipal Section 15- 50. 7. The tentative map shall expire 24 months from the date on which it was approved unless a final map is approved by the City Council prior to the date of expiration. An extension of the expiration date may be granted by the Planning Commission for a period not exceeding 36 months. The application for extension with the payment of a fee shall be filed prior to the expiration date. Extension of tentative map approval is not a matter of right, and the Planning Commission may deny the application. C. WEST VALLEY SANITATION DISTRICT 8. The developer is required to pay all applicable fees prior to the recordation of the Final Map. The fees will be determined upon submittal of the improvement plan. District approval will be in the form of sewer connection permits after payment of fees. D. PACIFIC GAS AND ELECTRIC 9. The developer is to submit a completed application for service, approved site, utility and elevation plans, appropriate engineering, and pay all fees prior to gas and electric service being provided. All necessary Public Utilities Easements or Rights of Way must be secured by the applicant prior to the installation of service. The gas and electric service facilities will be installed under the applicable rules and tariffs in effect at the time of application. E. ENGINEERING 10. Each sheet shall be stamped and signed by a California State Licensed Land Surveyor. 11. Prior to issuance of a Grading or Building Permit, a final Stormwater Management Plan shall be submitted for review and approval demonstrating how all storm water will be retained on- site and in compliance with the NPDES Permit Standards. If not all stormwater can be retained on-site due to topographic, soils or other constraints, and if complete retention is not otherwise required by the NPDES Permit Standards, the Project shall be designed to retain on-site the maximum reasonably feasible amount of stormwater and to direct all excess stormwater away from adjoining property and toward stormwater drains, drainageways, streets or road right-of- ways and otherwise comply with the NPDES Permit Standards and applicable City Codes. 12. Disposition and treatment of stormwater shall comply with the applicable requirements of the National Pollution Discharge Elimination System ("NPDES") Permit issued to the City of Saratoga and the implementation standards established by the Santa Clara Valley Urban Runoff Pollution Prevention Program (collectively the "NPDES Permit Standards"). Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 7 13. For single-family home projects that create and/or replace between 2,500 SF and 10,000 SF of impervious surface, Owner / Applicant shall provide the Small Projects Worksheet and implement at least one of the (1) Low Impact Development (LID) Site Design Measures listed on the form. The Worksheet is available on the City’s Stormwater Pollution Prevention webpage. 14. The Owner / Applicant shall incorporate adequate source control measures to limit pollutant generation, discharge, and runoff (e.g. landscaping that minimizes irrigation and runoff, promotes surface infiltration where possible, minimizes the use of pesticides and fertilizers, and incorporates appropriate sustainable landscaping practices and programs, such as Bay- Friendly Landscaping). 15. All building and construction-related activities shall adhere to New Development and Construction – Best Management Practices (BMPs) as adopted by the City for the purpose of preventing storm water pollution. Prior to issuance of any grading or building permits, Owner / Applicant shall prepare an Erosion Control Plan implementing the following: • Construction site inspection and control to prevent construction site discharges of pollutants into the storm drains per approved. • Year-round effective erosion control, run-on and run-off control, sediment control, good site management, and non-storm water management through all phases of construction (including, but not limited to, site grading, building, and site finishing) until the site is fully stabilized by landscaping or the installation of permanent erosion control measures is complete. • Details for all erosion control measures. 16. City will conduct inspections to determine compliance and determine the effectiveness of the BMPs in preventing the discharge of construction pollutants into the storm drain. The owner shall be required to timely correct all actual and potential discharges observed. 17. Prior to issuance of any grading or building permits, Owner / Applicant shall prepare a Grading and Drainage Plan. The Grading and Drainage Plans shall conform to the Approved Development Plans, as modified per these conditions of approval. The Grading and Drainage Plans shall clearly indicate and/or implement the following: • On-site stormwater retention and pollution control, in compliance with the Low Impact Development (LID) Site Design Measures listed on the Small Project Worksheet. • Show all drainage facilities, locations of downspouts, area drains, path and direction of drainage swales and other surface or underground drainage features. • Maximum depth and volumes of cut and fill • All hardscape and landscape features (labeled and detailed as needed) • Detailed grading information, including but not limited to pad and finish floor elevations, trenching locations, accurate tree canopy/dripline, and any other necessary details. • Positive drainage away from structures in conformance with the current California Building Code and the City’s Municipal Code; and away from property lines. Sufficient spot elevations shall be provided. Slopes and direction of flow shall be clearly indicated. • A breakdown of new and replaced impervious areas for NPDES requirements. Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 8 18. Prior to issuance of any grading or building permits, the Project soils engineer shall review and approve the design and details of all drainage features infiltrating into the soils, such as, but not limited to, the infiltration basin and pervious concrete/pavers. 19. Prior to issuance of any grading or building permits, Owner / Applicant shall prepare a Demolition Plan. The Demolition Plan shall conform to the Approved Development Plans, as modified per these conditions of approval. The Demolition Plan shall clearly indicate and/or implement the following: • Note on plans that West Valley Collection & Recycling shall be used during construction, as they are the exclusive roll-off and debris box provider for the City of Saratoga. 20. Prior to issuance of any grading or building permits, Owner / Applicant shall prepare a Utility Plan showing utilities serving the residential structures. Show existing and proposed mains/pipelines and all connection points (sewer, water, power, etc.). If utilities are to remain, and will not be capped or replaced, please add a note to that effect on the plans. All new/upgraded utilities shall be installed underground. Utility information may be combined with Grading and Drainage plan in a clear and legible manner. 21. Applicant / Owner shall secure all necessary permits from the City and any other public agency, including utility providers, prior to commencement of construction. Copies of permits other than those issued by the City shall be provided to the City Engineer. 22. Applicant / Owner shall comply with all conditions regarding on-site or off-site improvements as may be requested by other Agencies or Utility Companies having jurisdiction over the Project site. Prior to issuance of City permits, the applicant must present evidence of permit approval by any such agencies, as required for any activities within jurisdictional areas of said agencies. 23. Prior to the Building final, all Public Works conditions shall be completed per approved plans. 24. Prior to submitting the Final Map to the City Engineer for examination, the owner (applicant) shall cause the property to be surveyed by a Licensed Land Surveyor or an authorized Civil Engineer. The submitted map shall show the existence of a monument at all external property corner locations, either found or set. The submitted map shall also show monuments set at each new corner location, angle point, or as directed by the City Engineer, all in conformity with the Subdivision Map Act and the Professional Land Surveyors Act. 25. The owner (applicant) shall submit a Final Map in substantial conformance with the approved Tentative Map, along with the additional documents required by Section 14-40.020 of the Municipal Code, to the City Engineer for examination. The Final Map shall contain all of the information required in Section 14-40.030 of the Municipal Code and shall be accompanied by the following items: a. Map checking calculations. b. Preliminary Title Report for the property dated within ninety (90) days of the date of submittal for the Final Map. Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 9 c. Each map referenced on the Final Map. d. Each document/deed referenced on the Final Map. e. Any other map, document, deed, easement or other resource that will facilitate the examination process as requested by the City Engineer. f. Approved Tentative Map. 32. The applicant shall pay a Map Checking fee, as determined by the City Engineer, at the time of submitting the Final Map for examination. 33. Interior monuments shall be set at each lot corner either prior to recordation of the Final Map or some later date to be specified on the Final Map. If the owner (applicant) chooses to defer the setting of interior monuments to a specified later date, then sufficient security as determined by the City Engineer shall be furnished prior to Final Map approval, to guarantee the setting of interior monuments. 34. The owner (applicant) shall provide Irrevocable Offers of Dedication, if required, for all easements and/or rights-of-way on the Final Map, in substantial conformance with the approved Tentative Map and conditions of approval, prior to Final Map approval. 35. The owner (applicant) shall submit engineered improvement plans to the City Engineer in conformance with the approved Tentative Map and in accordance with the design and improvement requirements of Chapter 14 of the Municipal Code. The improvement plans shall be reviewed and approved by the City Engineer and the appropriate officials from other public agencies having jurisdictional authority, including public and private utility providers, prior to approval of the Final Map. 36. The owner (applicant) shall pay a Subdivision Improvement Plan Checking fee, as determined by the Public Works Director, at the time Improvement Plans are submitted for review. 37. The owner (applicant) shall furnish a written indemnity agreement and proof of insurance coverage, in accordance with Section 14-05.050 of the Municipal Code, prior to Final Map approval. 38. Prior to Final Map approval, the owner (applicant) shall furnish the City Engineer with satisfactory written commitments from all public and private utility providers serving the subdivision guaranteeing the completion of all required utility improvements to serve the subdivision. 39. The owner (applicant) shall secure all necessary permits from the City and any other public agencies, including public and private utility providers, prior to commencement of subdivision improvement construction. Copies of permits other than those issued by the City shall be provided to City Engineer. 40. All building and construction-related activities shall adhere to New Development and Construction - Best Management Practices as adopted by the City for the purpose of preventing storm water pollution. On-site drainage system(s) shall include the alternatives included in section C.3.i of the Municipal Regional NPDES Permit. Drainage plan shall be required at the time of parcels’ development or re-development. Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Resolution 26-008 Page 10 41. An Encroachment Permit issued by the Public Works Department is required for all new improvements in any portion of the public right-of-way or of a public easement prior to commencement of the work in the public right-of-way or public easement. F. PUBLIC WORKS 42. The owner (applicant) shall provide Irrevocable Offers of Dedication for all required easements and/or rights-of-way on the Final Map, in substantial conformance with the approved Tentative Map, prior to Final Map approval. Additional easements for storm water drainage and treatment facilities shall be dedicated on the Final Map as needed. 43. The owner (applicant) shall pay the applicable Park Development fee prior to Final Map approval. 44. The owner (applicant) shall enter into an agreement with the City, waiving the owner/applicant’s right, and the right of the owner/applicant’s successor(s) in interest, to protest the annexation of the property or any portion thereof into the Saratoga Landscape and Lighting Assessment District No. 1 for the purpose of providing for the maintenance of any landscape stormwater treatment systems and/or hydromodification controls developed on the property, or enter into a maintenance agreement with the City making the property owners responsible for the same. 45. The owner (applicant) shall secure all necessary permits from the City and any other public agencies, including public and private utility providers, prior to commencement of subdivision improvement construction. Copies of permits other than those issued by the City shall be provided to the City Engineer. 46. The owner (applicant) shall pay an amount equal to the cost of installing a new asphalt sidewalk, landscape strip, and asphalt berm for the property’s full Saratoga Avenue frontage, prior to issuance of the initial building permit for Lots Two or Three. G. SANTA CLARA COUNTY FIRE DEPARTMENT 30. Fire Department project review comments dated May 12, 2025 included as Attachment A. H. CITY ARBORIST 31.City Arborist project review comments dated October 17, 2025 included as Attachment B I. CITY GEOLOGIST 32. City Geologist project review comments dated October 17. 2025, included as Attachment C. 2030742.1 Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 BLDG PERMIT No. 207925PLAN REVIEW No. DEVELOPMENTAL REVIEW COMMENTS Plans and Scope of Review: This project shall comply with the following: The California Fire (CFC) & Building (CBC) Code, 2022 edition, as adopted by the City of Saratoga Municipal Code (SMC) and, California Code of Regulations (CCR). The scope of this project includes the following: Review of a tentative map for the subdivision of one parcel into three parcels. Plans Status: Plans are APPROVED with the following conditions . Plan Review Comments: 1.Review of this Developmental proposal is limited to acceptability of site access, water supply and may include specific additional requirements as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work, the applicant shall make application to, and receive from, the Building Department all applicable construction permits. 2.Fire Department (Engine) Driveway Turnaround Required:(As Noted on Sheet1) Provide an approved fire department engine driveway turnaround with a minimum radius of 40 feet outside. Maximum grade in any direction shall be a maximum of 5%. Installations shall conform with Fire Department Standard Details and Specifications D-1. CFC Sec. 503 Driving surface shall be capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds (34050 kg). Turnaround shall be shared with both parcel 2 and parcel 3 without any obstruction. 3.Requirements for design and construction - Bridges/Culvert and elevated surfaces. Where a bridge or an elevated surface is part of a fire apparatus access road, the bridge shall be constructed and maintained in City Y E PLANS Y E SPECS Y E NEW Y E RMDL CONST. TYPE BY PAGE SEC/FLOOR OCCUPANCY LOADAREA Westfall Engineers ApplicantName TENTATIVE MAP NAME OF PROJECT LOCATION Y E AS 2OF1 DATE 05/12/2025STG Ip, Kenny PROJECT DESCRIPTION Residential Development TABULAR FIRE FLOW REDUCTION FOR FIRE SPRINKLERS REQUIRED FIRE FLOW @ 20 PSI PROJECT TYPE OR SYSTEM Tentative Map Saratoga Avenue13785 Saratoga ATTACHMENT AResolution 26-008 Page 11Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 BLDG PERMIT No. 207925PLAN REVIEW No. DEVELOPMENTAL REVIEW COMMENTS accordance with AASHTO HB-17. Bridges and elevated surfaces shall be designed for a live load sufficient to carry the imposed loads of fire apparatus. Vehicle load limits shall be posted at both entrances to bridges when required by the fire code official. Where elevated surfaces designed for emergency vehicle use are adjacent to surfaces which are not designed for such use, approved barriers, approved signs or both shall be installed and maintained when required by the fire code official. CFC 503.2.6. Sign shall be provided for existing bridge when parcel 2 and parcel 3 getting developed. Bridge shall be reviewed during new parcel development. 4.Fire Apparatus (Engine)Access Driveway Required:  (As Noted on Sheet1) An access driveway shall be provided having an all-weather surface of either asphalt, concrete or other engineered surface capable of supporting 75,000 pounds and approved by a civil engineer. It shall have a minimum unobstructed width of 12 feet, vertical clearance of 13 feet 6 inches, minimum turning radius of 20 feet inside and 40 feet outside, and a maximum slope of 15%. The angle of approach to a driveway shall be designed and constructed with a maximum 5% slope for a minimum of 20ft. Installations shall conform to Fire Department Standard Details and Specifications sheet D-1. 5. Full plan review for water and access is still required and is to be completed upon development of the new parcels. This review shall not be construed to be an approval of a violation of the provisions of the California Fire Code or of other laws or regulations of the jurisdiction.  A permit presuming to give authority to violate or cancel the provisions of the fire code or other such laws or regulations shall not be valid.  Any addition to or alteration of approved construction documents shall be approved in advance. [CFC, Ch.1, 105.3.6] City Y E PLANS Y E SPECS Y E NEW Y E RMDL CONST. TYPE BY PAGE SEC/FLOOR OCCUPANCY LOADAREA Westfall Engineers ApplicantName TENTATIVE MAP NAME OF PROJECT LOCATION Y E AS 2OF2 DATE 05/12/2025STG Ip, Kenny PROJECT DESCRIPTION Residential Development TABULAR FIRE FLOW REDUCTION FOR FIRE SPRINKLERS REQUIRED FIRE FLOW @ 20 PSI PROJECT TYPE OR SYSTEM Tentative Map Saratoga Avenue13785 Saratoga Resolution 26-008 Page 12Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Community Development Department 13777 Fruitvale Avenue Saratoga, CA 95070 www.saratoga.ca.us/171/trees 408.868.1276 CITY OF SARATOGA ARBORIST APPROVAL Conditions of Approval and Tree Protection Plan Prepared by Christina Fusco, City Arborist Application No. ARB25-0047 Phone: (408) 868-1276 Address: 13785 Saratoga Avenue Email: cfusco@saratoga.ca.us Owner: Mark and Michelle Brading APN: 393-45-008 Date: October 17, 2025 PROJECT SCOPE: The applicant has submitted plans to subdivide two lots into three lots and build a bridge and firetruck turnaround. Ten trees are requested for removal to construct the project, and nine trees are approved for removal to construct the project. PROJECT DATA IN BRIEF: Tree security deposit – Required - $57,215 Tree protection – Required – See Conditions of Approval and attached map. Tree removals – Trees #22-25, 33-35, 38, and 40 meet the criteria for removal and may be removed once building division permits have been issued. Replacement trees – Required = $40,790 ATTACHMENTS: 1 – Findings and Tree Information 2 – Tree Removal Criteria 3 – Conditions of Approval 4 – Map Showing Tree Protection 1 of 8 ATTACHMENT BResolution 26-008 Page 13Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 13785 Saratoga Avenue Attachment 1 FINDINGS: Tree Removals According to Section 15-50.080 of the City Code, whenever a tree is requested for removal as part of a project, certain findings must be made and specific tree removal criteria met. Nine trees are in conflict with the new house, and meet the City’s criteria allowing them to be removed and replaced as part of the project, once building division permits have been obtained. Attachment 2 contains the tree removal criteria for reference. Table 1: Summary of Tree Removal Criteria that are met Tree No. Species Criteria met Comments 22 California Bay Umbellularia californica 4, 6, 7, 9 In conflict with firetruck turnaround 23 Cottonwood Populus fremontii 1, 4, 6, 7, 9 In footprint of firetruck turnaround 24 California Bay Umbellularia californica 4, 6, 7, 9 In footprint of firetruck turnaround 25 Coast Redwood Sequoia sempervirens 1, 4, 6, 7, 9 In footprint of firetruck turnaround 33 California Bay Umbellularia californica 4, 6, 7, 9 In footprint of proposed driveway 34 California Bay Umbellularia californica 4, 6, 7, 9 In conflict with proposed driveway 35 California Bay Umbellularia californica 4, 6, 7, 9 In footprint of proposed driveway 38 Coast Redwood Sequoia sempervirens 4, 6, 7, 9 In footprint of firetruck turnaround 40 Coast Live Oak Quercus agrifolia 4, 6, 7, 9 In footprint of firetruck turnaround New Construction Based on the information provided, and as conditioned, this project complies with the requirements for the setback of new construction from existing trees under Section 15-50.120 of the City Code. Tree Preservation Plan Section 15-50.140 of the City Code requires a Tree Preservation Plan for this project. To satisfy this requirement the following shall be copied onto a plan sheet and included in the final sets of plans: 1)The tree information and recommendations from the submitted arborist report dated April 7, 2025; 2)The Project Data in Brief, the Conditions of Approval, and the map showing tree protection from this report dated October 17, 2025. 2 of 8 Resolution 26-008 Page 14Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 13785 Saratoga Avenue Attachment 1 TREE INFORMATION: Project Arborist: Kaitlyn Meyer Date of Report: April 7, 2025 Number of protected trees inventoried: 19 Number of protected trees requested for removal: 9 A table summarizing information about each tree is below. Table 2: Tree information from submitted arborist report dated April 7, 2025. 3 of 8 Resolution 26-008 Page 15Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Br a d i n g R e s i d e n c e r e v . 0 4 / 0 7 / 2 0 2 5 Nu m b e r Co m m o n N a m e Bo t a n i c a l N a m e DB H (i n c h e s ) m a t h . DB H (i n c h e s ) He i g h t (f e e t ) Sp r e a d (f e e t ) Co n d i t i o n Ag e Sp e c i e s To l e r a n c e 6X D B H * (f e e t ) TP Z m u l t . Fa c t o r Id e a l T P Z Ra d i u s ( f t ) Im p a c t Le v e l * * Su i t a b i l i t y Ra t i n g Re m o v e / Pr e s e r v e Ap p r a i s a l Re s u l t 22 Ca l i f o r n i a B a y Um b e l l u l a r i a c a l i f o r n i c a 29 29 55 30 GO O D MA T U R E MO D E R A T E 15 12 29 HI G H LO W RE M O V E ( X ) $1 1 , 6 0 0 23 Co t t o n w o o d Po p u l u s f r e m o n t i i 24 24 55 20 VE R Y P O O R OV E R M A T U R E LO W 12 18 36 SE V E R E LO W RE M O V E ( X ) $5 0 0 24 Ca l i f o r n i a B a y Um b e l l u l a r i a c a l i f o r n i c a 35 35 60 35 GO O D MA T U R E MO D E R A T E 18 12 35 SE V E R E LO W RE M O V E ( X ) $1 6 , 9 0 0 25 Co a s t R e d w o o d Se q u o i a s e m p e r v i r e n s 26 26 65 20 PO O R MA T U R E HI G H 13 8 17 SE V E R E LO W RE M O V E ( X ) $3 , 7 7 0 26 Co a s t R e d w o o d Se q u o i a s e m p e r v i r e n s 49 49 90 25 GO O D MA T U R E HI G H 25 8 33 HI G H MO D E R A T E PR E S E R V E $4 0 , 2 0 0 28 Co a s t L i v e O a k Qu e r c u s a g r i f o l i a 34 34 55 60 GO O D MA T U R E HI G H 17 8 23 MO D E R A T E HI G H PR E S E R V E $2 8 , 7 0 0 29 Al m o n d W i l l o w Sa l i x t r i a n d r a 20 20 50 25 PO O R MA T U R E MO D E R A T E 10 12 20 MO D E R A T E LO W PR E S E R V E $2 , 0 3 0 30 Co t t o n w o o d Po p u l u s f r e m o n t i i 16 . 5 16 . 5 65 20 FA I R MA T U R E LO W 8 15 21 MO D E R A T E MO D E R A T E PR E S E R V E $2 , 7 6 0 31 We s t e r n S y c a m o r e Pl a t a n u s r a c e m o s a 45 45 75 60 GO O D MA T U R E MO D E R A T E 23 12 45 SE V E R E LO W PR E S E R V E * $2 7 , 5 0 0 32 Bl ac k w o o d A c a c i a Ac a c i a m e l a n o x y l o n 13 13 50 25 FA I R MA T U R E LO W 7 15 16 LO W MO D E R A T E PR E S E R V E $6 5 0 33 Ca l i f o r n i a B a y Um b e l l u l a r i a c a l i f o r n i c a 19 19 55 40 GO O D MA T U R E MO D E R A T E 10 12 19 SE V E R E LO W RE M O V E ( X ) $4 , 9 8 0 34 Ca l i f o r n i a B a y Um b e l l u l a r i a c a l i f o r n i c a 10 10 40 20 GO O D MA T U R E MO D E R A T E 5 12 10 HI G H LO W RE M O V E ( X ) $1 , 3 8 0 35 Ca l i f o r n i a B a y Um b e l l u l a r i a c a l i f o r n i c a 10 . 5 10 . 5 40 20 GO O D MA T U R E MO D E R A T E 5 12 11 SE V E R E LO W RE M O V E ( X ) $1 , 5 2 0 36 Bi g l e a f M a p l e Ac e r m a c r o p h y l l u m 11 . 5 11 . 5 30 20 VE R Y P O O R MA T U R E MO D E R A T E 6 12 12 VE R Y L O W LO W PR E S E R V E $1 6 0 37 Bl a c k w o o d A c a c i a Ac a c i a m e l a n o x y l o n 14 14 60 30 FA I R MA T U R E LO W 7 15 18 LO W MO D E R A T E PR E S E R V E $7 6 0 38 Co a s t R e d w o o d Se q u o i a s e m p e r v i r e n s 8 8 40 10 FA I R YO U N G HI G H 4 6 4 SE V E R E LO W RE M O V E ( X ) $6 3 0 39 Co a s t L i v e O a k Qu e r c u s a g r i f o l i a 30 30 40 45 PO O R MA T U R E HI G H 15 8 20 MO D E R A T E LO W PR E S E R V E $1 0 , 5 0 0 40 Co a s t L i v e O a k Qu e r c u s a g r i f o l i a 12 12 20 20 GO O D MA T U R E HI G H 6 8 8 SE V E R E LO W RE M O V E ( X ) $2 , 5 1 0 41 Al m o n d W i l l o w Sa l i x t r i a n d r a es t . 1 8 18 50 20 PO O R MA T U R E MO D E R A T E 9 12 18 VE R Y L O W LO W PR E S E R V E $1 , 1 7 0 KE Y : TO T A L A P P R A I S E D V A L U E $1 5 7 , 0 5 0 # Ne i g h b o r i n g / C i t y S t r e e t T r e e VA L U E O F T R E E S T O R E M A I N $8 5 , 7 6 0 Re m o v a l R e q u e s t RE P L A C E M E N T V A L U E $40 , 7 9 0 * SE C UR I T Y D E P O S I T ( 5 0 % ) $57 , 2 1 5 * SE E G L O S S A R Y F O R D E F I N I T I O N O F T E R M S TR E E I N V E N T O R Y - 1 3 7 8 5 S a r a t o g a A v e , S a r a t o g a , C A pg . 1 9 TR E E I M P A C T A S S E S S M E N T * 6 X D B H i s t h e d i s t a n c e f r o m t r u n k f a c e t o t r a n s v e r s e r o o t c u t ( i . e . t r e n c h i n g p a s t a t r e e ) , t h a t r e s u l t s i n ap p r o x i m a t e l y 2 5 % r o o t l o s s . M o r e t h a n 2 5 % r o o t l o s s i s l i k e l y t o r e s u l t i n t h e d e c l i n e a n d / o r i n s t a b i l t y o f a tr e e . T h e C i t y A r b o r i s t c o m m o n l y u s e s t h i s n u m b e r a s t h e s e t b a c k t h e y r e q u i r e f r o m e x c a v a t i o n w o r k t o a t r e e to b e p r e s e r v e d o n t h e c l i e n t ' s p r o p e r t y . N e i g h b o r i n g t r e e s a r e t y p i c a l l y h e l d t o a h i g h e r s t a n d a r d t o e n s u r e pr e s e r v a t i o n w i t h n o m o r e t h a n 1 0 % a n t i c p a t e d r o o t l o s s . S e e " i d e a l T P Z " c o l u m n f o r r e c o m m e n d e d s e t b a c k fr o m s i g n i f i c a n t e x c a v a t i o n w o r k . S p e c i a l c o n s t r u c t i o n m e a s u r e s a r e r e c o m m e n d e d f o r w o r k w i t h i n t h e s e se t b a c k s . ** A S S U M E S S T A N D A R D A N D S P E C I A L T R E E P R O T E C T I O N M E A S U R E S A R E F O L L O W E D . No t e : N u m b e r i n g s t a r t s a t # 2 2 . # 2 7 i n t e n t i o n a l l y s k i p p e d . Pr e p a r e d b y B u s a r a F i r e s t o n e IS A B o a r d C e r t i f i e d M a s t e r A r b o r i s t # W E - 8 5 2 5 B RC A # 7 5 8 4 o f 8 Resolution 26-008 Page 16 Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 13785 Saratoga Avenue Attachment 2 TREE REMOVAL CRITERIA Criteria that permit the removal of a protected tree are listed below. This information is from Article 15- 50.080 of the City Code and is applied to any tree requested for removal as part of the project. If findings are made that meet the criteria listed below, the tree(s) may be approved for removal and replacement during construction. (1)The condition of the tree with respect to disease, imminent danger of falling, proximity to existing or proposed structures and interference with utility services, and whether the tree is a Dead tree or a Fallen tree. (2)The necessity to remove the tree because of physical damage or threatened damage to improvements or impervious surfaces on the property. (3)The topography of the land and the effect of the tree removal upon erosion, soil retention and the diversion or increased flow of surface waters, particularly on steep slopes. (4)The number, species, size and location of existing trees in the area and the effect the removal would have upon shade, privacy impact, scenic beauty, property values, erosion control, and the general welfare of residents in the area. (5)The age and number of healthy trees the property is able to support according to good forestry practices. (6)Whether or not there are any alternatives that would allow for retaining or not encroaching on the protected tree. (7)Whether the approval of the request would be contrary to or in conflict with the general purpose and intent of this Article. (8)Any other information relevant to the public health, safety, or general welfare and the purposes of this ordinance as set forth in Section 15-50.010 (9)The necessity to remove the tree for economic or other enjoyment of the property when there is no other feasible alternative to the removal. (10)The necessity to remove the tree for installation and efficient operation of solar panels, subject to the requirements that the tree(s) to be removed, shall not be removed until solar panels have been installed and replacement trees planted in conformance with the City Arborist's recommendation. (11)The necessity to remove a tree following the creation of defensible space within 100 feet of a structure located within the Wildland Urban Interface, in accordance with defensible space standards established by CAL FIRE or as determined by Santa Clara County Fire Department, and that risk of increased wildfire cannot reasonably be addressed through maintenance or without tree removal. (12)Monterey pine (Pinus radiata) or blue gum (Eucalyptus globulus) located within the Wildland Urban Interface Area as defined in section 16-20.150 of this Code. 5 of 8 Resolution 26-008 Page 17Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 DA T E : re v . 0 4 / 0 3 / 2 5 TP Z E L E M E N T S D R A W N : K. M E Y E R IS A - C E R T I F I E D A R B O R I S T #W E - 1 4 9 9 2 A BA S E M A P : S I T E P L A N by W E S T F A L L E N G I N E E R S (0 3 / 2 0 2 5 ) AR B O R I S T R E P O R T pg . 2 0 TREE PROTECTION ZONE MAP 13785 SARATOGA AVE, SARATOGA, CA 2 6 NO T E : T R E E S # 3 6 A N D # 4 1 W E R E P L A C E D B Y P R O J E C T AR B O R I S T A N D L O C A T I O N S A R E A P P R O X I M A T E . TP Z M A P L E G E N D : PR O T E C T E D T R E E T O R E M A I N NE I G H B O R I N G / C I T Y S T R E E T T R E E TR E E P R O T E C T I O N F E N C I N G ( S E E S P E C . ) n PR O T E C T E D T R E E T O R E M O V E n n 28 TP Z N O T E : D E N S E B R U S H A N D C R E E K T O C O M P L E T E T P Z EN C L O S U R E S N E A R T R E E S # 2 9 , # 3 0 A N D # 3 2 . Tr e e p r o t e c t i o n f e n c i n g r e q u i r e m e n t s a s r e q u i r e d b y t h e C i t y o f S a r a t o g a : 1. Si x - f o o t h i g h c h a i n l i n k f e n c i n g m o u n t e d o n e i g h t - f o o t t a l l , 2 - i n c h d i a m e t e r g a l v a n i z e d p o s t s , d r i v e n 24 i n c h e s i n t o t h e g r o u n d a n d s p a c e d n o m o r e t h a n 1 0 f e e t a p a r t . 2. Fe n c e s m u s t b e p o s t e d w i t h s i g n s s a y i n g : “T R E E P R O T E C T I O N F E N C E – D O N O T M O V E O R R E M O V E W I T H O U T A P P R O V A L F R O M CI T Y A R B O R I S T , C H R I S T I N A F U S C O – 4 0 8 8 6 8 - 1 2 7 6 . ” 3. Th e C i t y r e q u i r e s t h a t t r ee p r o t e c t i o n f e n c i n g b e i n s t a l l e d b e f o r e a n y e q u i p m e n t c o m e s o n s i t e an d i n s p e c t e d b y t h e C i t y A r b o r i s t b e f o r e i s s u a n c e o f p e r m i t s . 4. Tr e e p r o t e c t i o n f e n c i n g i s r e q u i r e d t o r e m a i n i n p l a c e t h r o u g h o u t c o n s t r u c t i o n . 5. Th e T R E E P R O T E C T I O N Z O N E i s t h e d i s t a n c e f r o m t h e t r u n k t o a p o i n t t h a t i s f i v e f e e t b e - yo n d t h e c a n o p y o f a t r e e p r o t e c t e d b y C i t y c o d e . T r e e p r o t e c t i o n f e n c i n g s h a l l b e l o c a t e d a s c l o s e t o th i s l o c a t i o n a s p o s s i b l e w h i l e s t i l l a l l o w i n g r o o m f o r c o n s t r u c t i o n t o o c c u r . 2 3 2 5 2 4 3 8 4 0 4 1 3 9 3 5 3 3 3 4 3 1 3 7 36 no t r e e , s t u m p no t r e e , s t u m p 3 0 2 9 2 2 3 2 6 o f 8 Resolution 26-008 Page 18 Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 13785 Saratoga Avenue Attachment 3 CONDITIONS OF APPROVAL 1)Owner, Architect, Contractor: It is the responsibility of the owner, architect, and contractor to be familiar with the information in this report and implement the required conditions. 2)Permit: a)Receipt of a Planning or Building permit does not relieve the applicant of their responsibilities for protecting trees per City Code Article 15-50 on all construction work. b)No protected tree authorized for removal or encroachment pursuant to this project may be removed or encroached upon until the issuance of the applicable permit from the building division for the approved project. c)No protected tree not included in this report has been requested or approved for encroachment. 3)Final Plan Sets: a)Shall include the tree information, protection recommendations, and map showing tree protection from the arborist report by Kaitlyn Meyer dated April 7, 2025 copied onto a plan sheet. b)Shall include the Project Data in Brief and Conditions of Approval sections of the City Arborist report dated October 17, 2025. 4)Tree Protection Security Deposit: a)Is required per City Ordinance 15-50.080. b)Shall be $57,215 for trees #26, 28-32, 36, 37, 39, and 41. c)Shall be obtained by the owner and filed with the Community Development Department before obtaining Building Division permits. d)May be in the form of cash, check, or a bond. e)Shall remain in place for the duration of construction of the project. f)May be released once the project has been completed, inspected and approved by the City Arborist. 5)Tree Protection Fencing: a)Shall be installed as shown on the attached map. b)Shall be shown on the Site Plan. c)Shall be established prior to the arrival of construction equipment or materials on site. d)Shall be comprised of six-foot high chain link fencing mounted on 2-inch diameter galvanized posts, driven into the ground and spaced no more than 10 feet apart. e)Shall be posted with signs saying, “TREE PROTECTION FENCE - DO NOT MOVE OR REMOVE WITHOUT APPROVAL FROM CITY ARBORIST, CHRISTINA FUSCO (408) 868-1276”. f)A letter/email shall be provided to the City from the project arborist confirming the correct installation of the tree protection fencing once it has been installed, including photos. This is required prior to obtaining building division permits. g)Tree protection fencing shall remain undisturbed throughout the construction until final inspection. 6)Construction: All construction activities shall be conducted outside tree protection fencing unless permitted as conditioned below. These activities include, but are not necessarily limited to, the 7 of 8 Resolution 26-008 Page 19Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 13785 Saratoga Avenue Attachment 3 following: demolition, grading, trenching for utility installation, equipment cleaning, stockpiling and dumping materials (including soil fill), and equipment/vehicle operation and parking. 7)Work inside fenced areas: a)Requires a field meeting and approval from City Arborist before performing work. b)Requires Project Arborist on site to monitor work. 8)Project Arborist: a)Shall be Kaitlyn Meyer unless otherwise approved by the City Arborist. b)Shall visit the site every two weeks during grading, trenching or digging activities and every six weeks thereafter. A letter/email shall be provided to the City after each inspection which documents the work performed around trees, includes photos of the work in progress, and provides information on tree condition during construction. c)Shall supervise any permitted pruning or root pruning of trees on site. Roots of protected trees measuring two inches in diameter or more shall not be cut without prior approval of the Project Arborist. d)The Project Arborist shall be on site to monitor all work within 30 feet of trees #26 and 31. e)The recommendations from the submitted arborist report dated April 7, 2025 are conditions of approval for the project. 9)Tree removal: Trees #22-25, 33-35, 38, and 40 meet the criteria for removal and may be removed once building division permits have been obtained. 10)New trees: a)New trees equal to $40,790 shall be planted as part of the project before final inspection and occupancy of the new home. New trees may be of any species and planted anywhere on the property as long as they do not encroach on retained trees. Replacement values for new trees are listed below. 15 gallon = $350 24 inch box = $500 36 inch box = $1,500 48 inch box = $5,000 60 inch box = 7,000 72 inch box = $15,000 b)Trees shall be replaced on or off site according to good forestry practices and shall provide equivalent value in terms of aesthetic and environmental quality, size, height, location, appearance, and other significant beneficial characteristics of the removed trees. c)Three trees must be selected from the City's List of Natives. 11)Damage to protected trees that will be retained: Should any protected tree be damaged beyond repair, new trees shall be required to replace the tree. If there is insufficient room to plant the necessary number of new trees, some of the value for trees may be paid into the City’s Tree Fund. Replacement values for new trees are listed above. a)Should any protected tree be damaged beyond repair: i)New trees shall be required to replace the tree(s) equal to the assessed value of the damaged/removed tree(s). Replacement values for new trees are listed below. ii)A payment shall be made to the City Tree Fund equal to the assessed value of the damaged/removed trees. 12)Final inspection: At the end of the project, when the contractor wants to remove tree protection fencing and have the tree protection security deposit released by the city, call City Arborist for a final inspection. Before scheduling a final inspection from the City Arborist, have the project arborist do an inspection, prepare a letter with their findings, and provide that letter to the city for the project file. 8 of 8 Resolution 26-008 Page 20 Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 (408) 868-1274 MEMORANDUM TO: Christopher Riordan, Senior Planner DATE: October 17, 2025 FROM: Cotton, Shires and Associates, Inc., City Geotechnical Consultant SUBJECT: Supplemental Geologic and Geotechnical Peer Review (S6075A) RE: Brading; 3 Lot Subdivision GEO24-0002 13785 Saratoga Avenue (APN: 393-45-008 and 393-45-041) At your request, we have completed a supplemental geologic and geotechnical peer review of the subject applications using: •Supplemental Geologic and Geotechnical Evaluation (letter) prepared by C2Earth, dated September 11, 2025; •Geologic and Geotechnical Study (report) prepared by C2Earth, dated July 12, 2023; and •Tentative Map (3 sheets) prepared by Westfall Engineers, Inc., dated August 2025. In addition, we have reviewed pertinent technical documents and maps from our office files and performed a recent site visit. DISCUSSION The Applicant proposes to subdivide two existing lots (APN: 393-45-008 and 393-45-041) to create three new parcels. The proposed new parcels will be 1.41-acres (Parcel 1), 0.409-acre (Parcel 2) and 0.505 acre (Parcel 3). APN: 393-45-008 is currently developed with a single family residence and detached garage. We understand that the existing improvements will remain on APN: 393-45-008 and based on the referenced Tentative Map APN: 393-45-008 will become Parcel 1. Proposed Parcels 2 and 3 will be primarily located on the current APN: 393-45-041. Saratoga Creek separates the two existing Lots (APN: 393-45-008 and 393-45-041) and we understand that a new 14-foot wide clear-span bridge is proposed to provide access to proposed Parcels 2 and 3. No development plans were provided for our review, however, preliminary building envelopes are shown on the referenced Tentative Map based on front, side and rear setbacks. The property is located within a California Geological Survey liquefaction hazard zone, but is not located within a California Geological Survey earthquake-induced landslide hazard zone. The project is not located within a State designated Alquist Priolo/ Fault Rupture zone. ATTACHMENT CResolution 26-008 Page 21 Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Christopher Riordan October 17, 2025 Page 2 S6075A In our previous peer review letter, dated May 30, 2025, we recommended the Geotechnical Consultant review the current Tentative Map and evaluate whether additional subsurface exploration is warranted to develop geotechnical recommendation for the revised bridge location. We also recommended that the Geologic and Geotechnical Consultant evaluate the proposed new bridge site for scour hazards, and provide suitable foundation recommendations. In addition, we recommended that the Consultant evaluate the near vertical creek bank at the northwest margin of proposed Parcel 3 and develop a recommendation for a setback from the top of the creek bank to protect future development from possible creek bank failures. We further recommended that the Consultant evaluate the potential for lateral spreading and surface ejecta to impact proposed bridge abutments and Parcels 2 and 3, and opine if a shallow foundation alternative is viable for the calculated magnitude of lateral spreading. We also recommended that the Geotechnical Consultant provide their calculated magnitude of remaining liquefaction induced settlement, “ . . if the alluvial soil is removed and replaced as engineered fill…” as well as other liquefaction related hazards in the underlying alluvium. We refer to our May 30, 2025 peer review letter for a description of the site conditions and discussion of the previously completed subsurface investigation and geotechnical evaluation. SUPPLEMENTAL INVESTIGATION AND GEOTEHCNICAL EVALUATION The Geotechnical Consultant completed a supplemental subsurface investigation including completing additional site reconnaissance, logging of one supplemental boring, and preparing additional engineering geologic cross sections. The supplemental boring (Boring B-7) was located in the vicinity of the eastern abutment for the proposed bridge. In Boring B-7 the Consultant logged 2.5 feet of fill overlying 10.5 feet loose to medium dense silty sand (alluvium). Below a depth of 13 feet the Consultant logged medium dense to very dense gravelly sand and sandy gravel (alluvium). Groundwater was observed at 14 feet in Boring B-7. During their site reconnaissance the Consultant mapped the near vertical bank of the creek adjacent to Parcel 3. The Consultant made the following observations and provided the following conclusions: “The northern portion of the bank exposes a thin veneer of residual soil over Santa Clara formation bedrock; towards the south, the bedrock dips beneath the bottom of the creek channel, and is overlain by alluvium which is exposed in the southern portion of the creek bank.” “…we observed localized undercutting of the bank from past creek erosion, the limits of which are shown on Figures 1 and 4.” “On the basis of our observations, we judge that, unless mitigated with creek bank stabilization measures, additional erosion and scour is likely to occur along this portion of the bank, and such scour may result in localized failures of the bank.” “…without mitigation, we recommend that the setback at the top of the creek bank be equal to the nearest height of the bank (ranging from 10 to 13½ feet), as conceptually shown on Figure 1.” The Consultant provided recommendations for a gabion basket retaining wall to mitigate creek scour and stabilize the creek bank in the vicinity of Parcel 3. Based on their supplemental investigation the Consultant provided revised recommendations for the proposed bridge including the following: Resolution 26-008 Page 22Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Christopher Riordan October 17, 2025 Page 3 S6075A “We recommend that the bridge abutments be supported on drilled, straight-shaft, skin friction piers that gain support in the underlying alluvium (or deeper Santa Clara formation bedrock).” “Drill piers for the bridge abutments a minimum of 24 inches in diameter, and embed them a minimum of 8 feet into the underlying alluvium and a minimum of 5 feet below the bottom of the adjacent creek channel, whichever is greater.” “Neglect any portion of the piers in fill or alluvial soil, and any point-bearing resistance for support.” CONCLUSIONS AND RECOMMENDED ACTION The proposed subdivision is constrained by seismically induced settlement (liquefaction and dry densification), very loose to loose surficial soil, the active Saratoga Creek channel and associated bank failures, and strong seismic ground shaking. The Applicant’s Geologic and Geotechnical Consultant (C2Earth) performed a supplemental geotechnical investigation and provided revised geotechnical recommendations that addressed several of the comments provided in our May 30, 2025 peer review letter. However, our comments regarding supplemental liquefaction analysis to address the potential for lateral spreading or supplemental evaluation of pier embedment into potentially liquifiable soils have not been addressed. These unaddressed items do not appear to impact the feasibility of the proposed subdivision, however, they should be address prior to Geotechnical Clearance for subdivision level improvements (i.e. bridge, roads, utilities, etc.) and prior to Geotechnical Clearance for development of the individual lots. We recommend Geotechnical Clearance for the proposed Tentative Map with the following condition: 1.Supplemental Geotechnical Evaluation – The Consultant should understand that piers embedded into soils subject to liquefaction (and not extending a suitable depth into non-liquefiable soils) is not the standard of practice within the City. Furthermore, typically reduced skin friction and lateral resistance values are calculated for piers passing through liquefiable soils. Prior to Geotechnical Approval of subdivision level improvements or development of the individual lots the Geotechnical Consultant should evaluate their pier recommendations where potentially liquefiable soils are anticipated, and provide suitable recommendations and design criteria to ensure adequate pier capacity during and after an earthquake triggering liquefaction. We also recommend that the Geotechnical Consultant evaluate the potential for lateral spreading and surface ejecta to impact proposed bridge abutments and Parcels 2 and 3, and opine if a shallow foundation alternative for the residences is viable for the calculated magnitude of lateral spreading. The Geotechnical Consultant should also provide their calculated magnitude of remaining liquefaction induced settlement, “ . . if the alluvial soil is removed and replaced as engineered fill…” as well as other liquefaction related hazards in the underlying alluvium. The results of the Supplemental Geotechnical Evaluation shall be summarized by the Project Geotechnical Consultant in a report update letter and submitted to the City for review by the City Geotechnical Consultant and City Engineer prior to issuance of Geotechnical Clearance for subdivision level improvements or development of the individual lots. Resolution 26-008 Page 23Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518 Christopher Riordan October 17, 2025 Page 4 S6075A LIMITATIONS This supplemental geologic and geotechnical peer review has been performed to provide technical advice to assist the City in its discretionary permit decisions. Our services have been limited to review of the documents previously identified, and a visual review of the property. Our opinions and conclusions are made in accordance with generally accepted principles and practices of the geotechnical profession. This warranty is in lieu of all other warranties, either expressed or implied. DTS:AM Resolution 26-008 Page 24Docusign Envelope ID: 47CD2230-1330-4BE1-9181-1782C6590518