HomeMy WebLinkAboutCity Council Resolution 26-039, Amending Fee Schedule, Arborist Plan Check FeeRESOLUTION NO. 26-039
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA
AMENDING THE CITY FEE SCHEDULE EFFECTIVE JULY 1, 2026
WHEREAS, the City Council annually adopts a resolution that establishes fees for the
ensuing fiscal year; and
WHEREAS, the City Council of the City of Saratoga adopted Resolution No. 26-021 on
April 15, 2026, establishing the Annual Fee Schedule for Fiscal Year 2026-27; and
WHEREAS, the City Arborist must review all projects that propose construction within
five feet of the canopy dripline of a protected tree; and
WHEREAS, modifying the fee schedule to charge a standard flat fee for Arborist review
of building plans will minimize delays in processing building permit applications by eliminating
the need to execute a deposit agreement and refund unspent deposit funds; and
WHEREAS, this resolution creates a new cost recovery flat fee for Arborist review based
on the average time for Arborist review of building permits.
NOW, THEREFORE BE IT RESOLVED, that the City Council of the City of Saratoga does
hereby amend the current Fee Schedule effective July 1, 2026, as shown in the attachment.
The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga
City Council held on the 17th day of June 2026 by the following vote:
AYES: COUNCIL MEMBERS AFTAB, FITZSIMMONS, ZHAO, VICE MAYOR
WALIA, MAYOR PAGE
NOES:
ABSENT:
ABSTAIN:
Chuck Page, Mayor
ATTEST:
Britt Avrit, MMC, City Clerk
Docusign Envelope ID: F5D530F7-9101-801B-8070-E041663130F5
2 PLANNING
A Arborist Services
Arborist Consultant Services/ Field Inspections Actual Costs Actual Cost
Arborist Review (Building Permit) Each $830
Arborist Review (Planning Entitlement) Deposit +
Surcharge
$1,500 +
18.75%
Tree Appeal, Arborist Review Each $295
Tree Removal Permit Each $151
Tree Removal Permit, After-the-Fact (Up to 3 trees) Flat $658
Tree Removal Permit, After-the-Fact (4 or more) Deposit +
Surcharge
$1,500 +
18.75%
B Planning Applications / Permits 1
Annexation Request Deposit +
Surcharge
$5,000 +
18.75%
Appeal of Admin Decision to Planning Commission 2 Each $579
Appeal from Planning Commission to City Council 3 Each $811
Application Extension Request Each $1,552
BMR Program / Administration Fee Actual Costs Actual Cost
Complex Project Actual Costs Actual Cost
Conditional Use Permit, Administrative Each $3,244
Conditional Use Permit, Planning Commission Each $5,200
Design Review, Administrative Each $4,557
Design Review4, Ministerial Review Each $4,557
Design Review, Planning Commission Each $8,010
Fence Exception, Planning Commission Each $2,131
General Plan Amendment Deposit +
Surcharge
$3,500 +
18.75%
Historic Compliance Review (staff review) Each $904
Historic Designation No Charge No Charge
Historic Permit (HPC review) Each $362
Historic Property Mills Act Application Actual Costs Actual Cost
Historic Review Appeal Each $2,151
Lot Line Adjustment/Merger/Reversion to Acreage 5 Each $2,770
1 See Appendix 1 for informa�on on fee waivers
2 per City Code Section 15-90.010
3 per City Code Section 15-09.020 or other appeals per City Code Section 2-05.030
4 Review for consistency with the City’s Objec�ve Design Standards
5 Waive applica�on costs associated with lot mergers, in an amount not to exceed $5,000, for projects that provide
a minimum of 20% deed restricted units affordable to low and every-low income households. Additional
engineering fees are charged for City Engineer and Surveyor work in conjunction with development application
reviews
Resolution 26-039
Page 2
Docusign Envelope ID: F5D530F7-9101-801B-8070-E041663130F5
Modification of Approved Application Review Each $2,685
Pre-Applica�on Review Per Hour $482
Property Profile Each $122
Sign Permit, Administra�ve Review Each $359
Sign Permit, Planning Commission Review Each $2,131
Sound Wall Application Review Each $767
Stormwater Compliance Review Each $300
Subdivision Final Map6 Deposit +
Surcharge
$7,648
+18.75%
Subdivision Tentative Map, 4 or fewer lots Base $5,440
Subdivision Tentative Map, 5 or more lots Base $6,710
SB9 Urban Lot Split Each $4,687
SB9 Two Unit Development Each $6,076
Temporary Use, Administrative Review Each $504
Temporary Use, Planning Commission Review Each $3,075
Variance Each $3,555
Waiver Request (Annexation) Each $563
Water Efficiency Landscape Review Deposit +
Surcharge
$2,500 +
18.75%
Williamson Act Contract Application / Cancellation Deposit +
Surcharge
$5,000 +
18.75%
Zoning Clearance, Minor Each $121
Zoning Clearance, Major (up to 3 reviews) Each $1,447
Zoning Ordinance / Map Amendment
Deposit +
Surcharge
$3,500 +
18.75%
C Environmental Review Services / Fees
CEQA Document Preparation Fee7 Actual Costs Actual Cost
Department of Fish & Game Fees8 Actual Costs Actual Cost
Monitoring of Mitigation Measures Actual Costs Actual Cost
Preliminary Environmental Assessment Review Deposit +
Surcharge
$1,500 +
18.75%
D Other Services/Fees
Certificate of Compliance Deposit $2,500
City Attorney Services Actual Costs +
Surcharge
Actual Cost
+18.75%
Engineering Review Deposit $3,500
6 Review for project consistency with federal and state Na�onal Pollu�on Discharge Elimina�on System (per City
Code Ar�cle 7-12.005)
7 CEQA Exemp�on, Nega�ve Declara�on, Mi�gated Nega�ve Declara�on, Environmental Impact Report
8 htps://wildlife.ca.gov/Conserva�on/Environmental-Review/CEQA/Fees
Resolution 26-039 Page 3Docusign Envelope ID: F5D530F7-9101-801B-8070-E041663130F5
Geotechnical Review Deposit $5,000
Noticing Services (Mailing List) Actual Costs Actual Cost
Planning Inspections Each $208
Special Reports and Studies Actual Costs Actual Cost
Stormwater Compliance Inspections 9 Deposit $25,000
Traffic Review Deposit $2,500
Tree Fines (Per code section 15-50.170)10 Penalty
Vendor Surcharge Surcharge 18.75%
9 Upon Initial Approval - Stormwater engineer’s es�mate of inspec�on costs over 30 years, with the ini�al payment
not to exceed $25,000 for single family homes.(1) Following Initial Approval - $25,000 to be paid at such �me that
less than $5000 remains for future inspec�ons.(2) No fee shall be due if an alternate long term inspec�on funding
mechanism has been approved by the owner and City. (3) Stormwater engineer’s cost es�mate shall be approved
by the City Engineer and the Public Works Director and shall include all items of work related to the inspec�on of
stormwater treatment measures.
10 Illegal pruning, encroachment, damage, or removal
Resolution 26-039 Page 4Docusign Envelope ID: F5D530F7-9101-801B-8070-E041663130F5