HomeMy WebLinkAboutCity Council Resolution 26-052, DR Tentative Map Masson Estates
RESOLUTION NO 26-052
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA
UPHOLDING APPEAL APCC26-0003 AND APPROVING APPLICATIONS FOR DESIGN
REVIEW AND A TENTATIVE MAP FOR THE MASSON ESTATES PROJECT
LOCATED ON PIERCE ROAD
PROJECT NO. MISC23-0011 AND SUB26-0002
(APN 503-46-005)
WHEREAS, the California Legislature adopted the Housing Accountability Act (HAA) to
“significantly increase the approval and construction of new housing for all economic segments of
California’s communities by meaningfully and effectively curbing the capability of local
governments to deny, reduce the density for, or render infeasible housing development projects…”;
and
WHEREAS, the Builder’s Remedy is a provision of the HAA that is applicable to
qualifying housing development projects when a preliminary application is submitted after the
State’s deadline for Housing Element adoption and before the City adopted a substantially
compliant Housing Element; and
WHEREAS, on July 20, 2023, a preliminary application (MISC23-0011) was submitted by
Chateau Masson, LLC (applicant) for Design Review and Tentative Map approval to subdivide an
existing 72.45-acre site located on Pierce Road (APN 503-46-005) into 25 parcels and the
construction of 25 new single-family dwellings of which five will be affordable to low-income
households (the “Project”). The proposed improvements to the site also require Arborist Review,
Geotechnical Review, and Environmental Review for the entirety of the proposed project; and
WHEREAS, the preliminary application was submitted before the City adopted a
substantially compliant General Plan Housing Element, and 20% of the total units will be affordable
to lower-income households. Therefore, the project qualifies as a Builder’s Remedy project
pursuant to the HAA; and
WHEREAS, the Builder’s Remedy provision of the HAA prohibits the City from relying
on subjective standards or on inconsistency with zoning and General Plan standards as a basis for
denial of a qualifying project; and
WHEREAS, the Community Development Department completed an Environmental
Impact Report (EIR) for the Project in compliance with the California Environmental Quality Act
(CEQA), Public Resources Code Section 2100 et seq. the Guidelines for Implementation of the
California Environmental Quality Act (14 Cal. Code Regs. Section 15000 et seq.) (the “CEQA
Guidelines”), and any local procedures adopted thereto; and
WHEREAS, on July 8, 2026 the Planning Commission held a duly noticed public hearing
to take public testimony on the Project and the EIR, and all pertinent maps, documents, exhibits,
and oral and written public comments on the Project; and voted to deny the project as it could not
make all the required findings to adopt a Statement of Overriding Considerations to certify the EIR.
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 2
WHEREAS, on July 13, 2026, an appeal to the City Council (APCC26-0003) of the
Planning Commission’s decision to deny the application was filed by Masson Estates, LLC
(“Appellant”)
WHEREAS, on August 19, 2026, the City Council:
a. Held a duly noticed public hearing to take public testimony and consider this Resolution,
the Environmental Impact Report on the Project, and all pertinent maps, documents, exhibits, and
oral and written public comments; and
b. Certified the EIR as adequate and complete in compliance with the California
Environmental Quality Act (CEQA) and the CEQA Guidelines, adopted a Mitigation Monitoring
and Reporting Program (MMRP), and has made findings that the EIR is adequate and complete for
consideration in making a decision on the merits of the Project and adopted a Statement of
Overriding Considerations.
NOW THEREFORE, the City Council of the City of Saratoga hereby finds, determines,
and resolves as follows:
Section 1. The foregoing recitals are true and correct and are incorporated by reference.
Section 2. The City of Saratoga City Council adopts Design Review Findings in the
affirmative as outlined in City Code Section 15-45.080 on the basis of the application and the
evidence submitted, including, but not limited to, the following:
1. Site development follows the natural contours of the site, minimizes grading, and is
appropriate given the property’s natural constraints. The grading and drainage plan estimates
a combined cut and fill of 37,141 cubic yards of grading for the project as a whole. The overall
slope of the site is 47%, the project was not designed to minimize grading, and the development
will occur on areas of steep slopes. This finding regarding site development cannot be made in
the affirmative. However, under the Builder’s Remedy provisions of the HAA, such
inconsistency with the City’s design review standards may not be the basis for disapproving
the project.
2. All protected trees shall be preserved, as provided in Article 15-50 (Tree Regulations). If
constraints exist on the property, the number of protected trees, heritage trees, and native
trees approved for removal shall be reduced to an absolute minimum. Removal of any smaller
oak trees deemed to be in good health by the City Arborist shall be minimized using the
criteria set forth in Section 15-50.080. The Biological Resources Section of the Environmental
Impact Report indicates that of the 682 trees located in the Development Area of the site a total
of 367 trees are expected to be removed. The species of the trees to be removed include coast
live oaks, California buckeye, and California Laurel. The removal of protected trees will require
a tree removal, pruning, or encroachment permit issued by the City Arborist. This finding to
reduce the removal of trees can be made in the affirmative in that the trees to be removed are
the minimum required to construct the project and are located in the areas of the proposed new
roads, building pads, and stormwater retention areas. Protected trees in the areas of
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 3
construction that are not to be removed will be protected by fencing during construction of
the project.
3. The height of the structure, its location on the site, and its architectural elements are designed
to avoid unreasonable impacts to the privacy of adjoining properties and to community
viewsheds. This finding can be made in the affirmative. There are no identified community
viewsheds in the vicinity of the project. The project will include 25 single-family residential
structures that will be a combination of both two and three stories in height. With the exception
of the residence proposed for Lot 24, the remainder of the proposed structures will have
setbacks that are less than the minimum required in the HR zoning district. The Landscape
Plans (Sheets L-1 thru L-5 of the Development Plans) illustrate that existing trees will be
located in the majority of the side yards between the homes which should reduce unreasonable
privacy impacts to adjoining properties. In those instances where there is a lack of trees
separating the sites, these homes have been designed without side-facing balconies and with
windows that are smaller in size and minimal in number. Existing vegetation both onsite and
offsite will screen views of nearby homes that are not part of the development.
4. The overall mass and height of the structure, and its architectural elements are in scale with
the structure itself and with the neighborhood. The proposed single-family residential
structures are not consistent with the finding regarding massing, height, and scale. Each of the
homes have the same or similar setbacks for each of the floors resulting in massing that is
unarticulated which reinforces the vertical appearance of each structure. The architectural
elements of height and massing of each structure are in scale with the project overall but are not
in scale with existing homes on Saratoga Heights Drive and Masson Court. As a result, this
finding about the scale of the structures and their architectural elements cannot be made in the
affirmative. However, under the Builder’s Remedy provisions of the HAA, the inability to
make this finding in the affirmative may not be the basis for disapproving the project.
5. The landscape design minimizes hardscape in the front setback area and contains elements
that are complementary to the neighborhood streetscape. This finding can be made in the
affirmative in that the landscape plan for the project illustrates that the setback area for each of
the lots, with the exception of Lots 1-7 due to their size and minimum setbacks, will be
landscaped. Landscaping will include both existing trees and new trees including western
redbud and coast live oak, and drought resistant shrubs. Additional landscaping will also be
located adjacent to all access driveways and interior roads. The perimeters of retention areas will
be landscaped with shrubs and groundcovers to soften their appearance. Each of the homes will
be similarly landscaped which will offer a consistent appearance that is complementary to the
streetscape of the development.
6. The design of the structure and the site development plan is consistent with the Residential
Design Handbook, pursuant to Section 15-45.055. The proposed project is not consistent with
applicable design policies and techniques from the Residential Design Handbook regarding
building massing, height, and scale as well as those pertaining to privacy and setbacks.
However, under the Builder’s Remedy provisions of the HAA, such inconsistency may not
be the basis for disapproving the project.
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 4
7. On hillside lots, the location and the design of the structure avoid unreasonable impacts to
ridgelines, significant hillside features, community viewsheds, and is in compliance
with Section 15-13.100. This finding is applicable to the project as the zoning is HR and the
average slope of the site is 47%. The project will not be located on a ridgeline and there are no
identified significant hillside features on the site. The project is not in compliance with City
Code Section 15-13.100 in that the project includes structures that exceed two stories in height.
As a result, this finding cannot be made in the affirmative. However, under the Builder’s
Remedy provisions of the HAA, such inconsistency may not be the basis for disapproving
the project.
Section 3. The City of Saratoga City Council adopts the following tentative map findings in
the negative as outlined in City Code Section 14-20.070(b). The findings are written in the
negative, consistent with the Subdivision Map Act.
1. That the proposed map is not consistent with the General Plan and any applicable
specific plans. The proposed map is consistent with many of the applicable provisions of
the General Plan. However, the project’s density of 1.36 dwelling units/acre (“du/acre”)
exceeds the maximum density of 0.50 du/acre permitted under the Residential Hillside
Conservation (RHC) land use designation in the General Plan. As a result, the proposed
project’s density is not consistent with the applicable General Plan land use designation.
However, under state law, the project’s inconsistency with the General Plan land use
designation is not a basis for denying the project. The proposed resolution therefore does
not make this negative finding.
2. That the design or improvements of the proposed subdivision are not consistent with the
General Plan and any applicable specific plan. The design or improvements of the
proposed subdivision are consistent with some provisions of the General Plan. The
subdivision is consistent with Land Use Element Policy LU-1.1: Affirm that the city shall
continue to be predominately a community of single-family detached residences and Land
Use Element Policy LU-6.2: Development proposals shall incorporate stormwater quality
features, including but not limited to grassy bioswales, to project surface and subsurface
water quality. Some of the proposed residential structures are three stories in height which
does not conform to the General Plan policy of limiting single-family residential structures
to no more than two stories. However, under the Builder’s Remedy provisions of the HAA,
such inconsistency may not be the basis for disapproving the tentative map; the proposed
resolution therefore does not make this negative finding.
3. That the site is not physically suitable for the type of development proposed. The project
site is physically suitable for the subdivision of the 72-acre site into 25 single-family lots.
The EIR prepared for the project analyzed the project’s potential impacts on biological
resources and geology and determined that with adequate mitigation measures the project’s
impacts would be less than significant. The proposed resolution therefore does not make
this negative finding.
4. The site is not physically suitable for the proposed density of development. The site is
currently vacant and will be subdivided into 25 single-family lots. The site is physically
suitable for the proposed density of development. The site has a General Plan Designation
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 5
of RHC which has a maximum density of .50 dwelling units per acre. The project proposes
1.36 dwelling units per acre. However, under state law, the project’s inconsistency with the
General Plan land use designation is not a basis for denying the project. The EIR prepared
for the project did not determine that the project site was not physically suitable for the
proposed density. The proposed resolution therefore does not make this negative finding.
5. That the design of the subdivision is likely to cause substantial environmental damage or
substantially and avoidably injure fish or wildlife or their habitat. The design of the
subdivision is not likely to cause substantial environmental damage or substantially and
avoidably injure fish or wildlife or their habitat. The EIR prepared for the project considered
the potential that the project would cause such impacts and determined that with the
application of identified mitigation measures, impacts would be less than significant, with
the exception of emergency access, response and evacuation; wildland fires; exposure of
project occupants to pollutant concentrations from wildfire; conflict with an applicable land
use plan or policy; and vehicle miles traveled. The proposed CEQA findings include a
Statement of Overriding Considerations explaining why the benefits of the project outweigh
these significant environmental impacts. The proposed resolution therefore does not make
this negative finding.
6. That the design of the subdivision is likely to cause serious health or safety problems. The
proposed project has been reviewed by the Santa Clara County Fire Department, the City
Geologist, City of Saratoga Planning Department, Public Works, and Engineering; none has
found any likely serious health or safety problems. All structural improvements to the
property will be reviewed by the Community Development Department’s Building Division.
The EIR prepared for the project found that the project would have significant impacts
related to emergency access, response and evacuation. The proposed CEQA findings
include a Statement of Overriding Considerations explaining why the benefits of the project
outweigh these significant environmental impacts. . The proposed resolution therefore does
not make this negative finding.
7. That the design of the subdivision will conflict with easements acquired by the public at
large for access or use. The design of the subdivision would not conflict with easements for
access or use. Access to the newly created lots will be provided by a series of private streets
and from Pierce Road. There are no access easements in the area that would be affected by
the subdivision. The proposed resolution therefore does not make this negative finding.
8. That a proposed subdivision of land which is subject to a contract executed pursuant to
the Williamson Act will result in the creation of parcels to sustain their agricultural use.
This finding for denial cannot be made. The project site is not subject to a Williamson Act
contract.
9. That the discharge of waste from the proposed subdivision into an existing community
sewer system would result in violation of existing requirements. This finding for denial
cannot be made. The proposed project includes the necessary improvements to the sewer
system to accommodate the increased development.
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 6
10. That the City Engineer has not found that the subdivision as proposed, meets the
requirements of Section 14-20.050(b)(2) nor identified conditions or improvements that
would ensure the development of the subdivision meets the requirements of that section.
The City Engineer has reviewed the application, including all proposed improvements,
and determined, taking into account conditions of approval, (a) that the project will not
interfere with the natural drainage of surface water from the land constituting and
surrounding the subdivision, (b) that the project’s structures and improvements will be
adequately supported by the surface and subsurface soil so there will be no hazard to
occupants and property therein, (c) that the project will not create an unreasonable risk
and hazard to adjoining persons or property by reason of fire, flood, sedimentation,
landslide, or other calamity and will not create an unreasonable traffic hazard, and (d) that
existing infrastructure is adequate to serve the proposed development without diminution
of service to existing uses.
Section 4: The City Council of the City of Saratoga hereby upholds the appeal and
approves Design Review (MISC23-0011) and Tentative Map (SUB26-0002) applications for
Masson Estates as shown on the Project Plans dated June 13, 2024 and included as Exhibit C.1, and
subject to the Conditions of Approval included as Exhibit 1 to the resolution, which is attached
herein.
The above and foregoing resolution was passed and adopted at a regular meeting of the Saratoga
City Council held on the 19th day of August 2026 by the following vote:
AYES: COUNCIL MEMBERS AFTAB, FITZSIMMONS, ZHAO, VICE MAYOR
WALIA, MAYOR PAGE
NOES:
ABSENT:
ABSTAIN:
______________________________
Chuck Page, Mayor
ATTEST:
____________________________
Britt Avrit, MMC, City Clerk
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 7
Attachment 1
CONDITIONS OF APPROVAL
APPLICATION NO. MISC23-0011 / SUB26-0002 / ENV24-0001
MASSON ESTATES / PIERCE ROAD
(APN 503-46-005)
A. GENERAL
1) Conformance with Approved Plans. The approval for MISC23-0011/SUB26-
0002/ENV24-0001 is granted to subdivide into 25 lots and construct 25 single-family homes
and associated site improvements on an existing 73.45-acre parcel located on Pierce Road,
Saratoga, California, Assessor Parcel No. 503-46-005, as shown on Project Plans dated June
13, 2024 prepared by the Dahlin Group for Chateau Masson and approved by the City
Council on August 19, 2026 consisting of 178 sheets (the “Approved Plans”, Exhibit C.1).
Build-out of the project shall conform to the approved plans, except as otherwise specified in
these conditions or as provided in the City Code. Prior to Building Permit submittal, the
applicant shall notify the Planning Division in writing of any proposed adjustment or
modification to the plans, and shall include a clouded set of the approved plans highlighting
the changes, which shall be considered by the Community Development Director or
designee, may require separate discretionary approval, and shall conform to all City, State,
and Federal requirements, including subsequent City Code requirements or policies adopted
by the City Council.
2) Applicant (owner) shall comply with and implement all applicable mitigation measures
identified in the 2040 General Plan EIR and all measures in the Mitigation Monitoring and
Reporting Program for the Masson Estates Project. Where there are differences between
these Conditions of Approval and such mitigation measures the stricter requirement shall be
applicable.
3) Amounts Due. The Applicant will be electronically mailed a statement after this approval is
duly executed, containing a statement of all current amounts due to the City in connection
with this application, including all consultant fees (collectively “processing fees”). This
approval or permit shall expire sixty (60) days after the date said notice is electronically
mailed if all processing fees contained in the notice have not been paid in full. No Zoning
Clearance or Demolition, Grading, or Building Permit may be issued until the City certifies
that all processing fees have been paid in full (and, for deposit accounts, a surplus balance of
$500 is maintained, to account for invoices received from external agencies and consultants,
post entitlement).
4) Permit Expiration. Except for subdivisions, this approval shall expire 24 months from the
date on which the approval became effective, unless prior to such expiration date a building
permit is issued for the improvements constituting the subject of this approval and
construction thereof commenced and progressed diligently toward completion by
maintaining an active Building Permit with ongoing inspections, or a certificate of occupancy
issued for such improvements. This approval may be extended for a single period of time not
exceeding twelve months. The application for extension shall be filed at least 60 days prior to
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 8
the expiration date and shall be accompanied by the payment of a fee in accordance with the
City’s adopted Fee Schedule. A public hearing shall be conducted on the application for
extension in accordance with City Code Section 15-46.050. For subdivisions, the tentative
map shall expire in accordance with State law.
5) Regulatory Compliance. The Project shall comply with all applicable regulations of the
State, County, City and/or other governmental agencies having jurisdiction.
6) Revocation/Enforcement. If Applicant, property owner, or tenant fails to comply with any
of the conditions of this permit, the Applicant and property owner shall be subject to permit
revocation or enforcement actions pursuant to the City Code. All costs associated with any
such actions shall be the responsibility of the property owner / Applicant.
7) Indemnification. Applicant shall sign the “Indemnification Agreement” attached herein as
Exhibit C.2.
B. COMMUNITY DEVELOPMENT
A. Community Development
When
Required/
Time for
Compliance
Condition of Approval
Ongoing CD-1. The development shall be located and constructed to include those
features, and only those features as shown on the plans approved by the City
Council and on file with the Community Development Department (Exhibit
C.1). All proposed changes to the approved plans must be submitted in writing
with plans showing the changes, including a clouded set of plans highlighting
the changes. Such changes shall be subject to approval in accordance with
applicable City Code.
At the time of
first building
permit submittal
CD-2. Building Submittal. Complete construction plans shall be submitted to
the Building Division. These plans shall be subject to review and approval by
the City. The construction plans (“the Building Submittal”) shall, at a
minimum include the following:
a) Architectural drawings and other plan sheets consistent with Exhibit A
submitted June 2024.
b) Arborist report dated June 11, 2024.
c) The signed and dated Resolution or Community Development Department
Director Determination approving the Project, printed onto separate
construction plan pages.
d) Additional plan pages identified in these Conditions of Approval.
e) All additional drawings, plans, maps, reports, notes, and/or materials required
by the Building Division, including those listed on a building permit submittal
building division checklist, website, or as applicable.
At the time of
first building
CD-3. The Building Submittal shall include a Lighting Plan for the exterior and
landscaped areas. This plan should include photometric contours,
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 9
permit submittal manufacturer’s specifications on the fixtures, and mounting heights. Proposed
exterior lighting shall be limited to full-cut-off & shielded fixtures with
downward directed illumination so as not to shine on adjacent properties or
public right-of-way. All proposed exterior lighting shall be designed to limit
illumination to the site and avoid creating glare impacts to surrounding
properties. Such lighting shall not conflict with drainage plans, landscape plans,
tree locations, parking spaces, or any other such land use concerns.
At the time of
first building
permit submittal
CD-4. The Building Submittal shall include a final landscaping and irrigation
plan, that implements City Arborist and stormwater requirements and
demonstrates how the project complies with the State Water Efficient
Landscape Ordinance and shall take into account the following:
a) To the extent feasible, landscaping shall be designed and operated to treat
stormwater runoff by incorporating elements that collect, detain and
infiltrate runoff. In areas that provide detention of water, plants that are
tolerant of saturated soil conditions and prolong exposure to water shall be
specified.
b) To the extent feasible, pest resistant landscaping plants shall be used
throughout the landscaped area, especially along any hardscape area.
c) Plant materials selected shall be appropriate to site specific characteristics
such as soil type, topography, climate, amount and timing of sunlight,
prevailing winds, rainfall, air movement, patterns of land use, ecological
consistency and plant interactions to ensure successful establishment.
At the time of
first building
permit submittal
CD-5. Fencing and Walls. The Building Submittal shall include all proposed
fencing and walls, including their height and materials, and all such fencing and
walls shall comply with City Code.
At the time of
first building
permit submittal
CD-6. The Building Submittal shall include a letter from the project architect,
certifying that the architectural design shown in the building permit plans
match Exhibit A. Any changes must be clearly noted and shall be subject to
Condition CD-1 above. The project architect shall also certify that the structural
plans are consistent with the architectural plans. In the event of a discrepancy
between the structural plans and the architectural plans, the architectural plans
shall take precedence, and revised structural drawings shall be submitted to the
Building Division.
At the time of
first building
permit submittal
CD-7. The Building Submittal shall include a plan sheet(s) that includes a
reproduction of all mitigation measures and conditions of approval, as adopted
by the City Council.
Prior to issuance
of any grading
or building
permit
CD-8. Existing Violations. Prior to issuance of grading or building permits,
Applicant/owner shall correct all violations of the applicable City Code, if any,
existing on the project property.
Prior to issuance
of first building
or grading
permit
CD-9. The Building Submittal shall include a final Construction Management
Plan for the project which includes, but is not limited to, the following:
a) Proposed construction worker parking area.
b) Proposed construction hours that are consistent with applicable City Code.
c) Proposed construction/delivery vehicle staging or parking areas.
d) Proposed traffic control plan with traffic control measures, any street
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 10
closure, hours for delivery/earth moving or hauling, etc. The traffic control
plan should prevent congestion, traffic conflicts, and potential safety issues
by scheduling any deliveries, earth moving or hauling activities to avoid
peak commute hours, to the extent feasible.
e) Proposed construction material staging/storage areas.
f) Location of project construction sign outlining permitted construction work
hours, name of project contractor and the contact information for both
homeowner and contractor. The project construction sign should be
designed to be readable from 5 feet away.
All parking, storage, and staging areas shall be located on the Project site and
shall be sited in a manner that minimizes adverse effects on traffic circulation
and adjoining properties.
Prior to
commencement
of any
earthwork or
grading
activities
CD-10. Applicant shall arrange a pre-construction meeting, attended by all
individuals needed to ensure building division processes, conditions of
approval, and mitigation measures are understood and met. The pre-
construction meeting shall be held at least two full City business days prior to
the start of any earthwork activities.
Upon
completion of
rough grading
work and at the
final completion
of the project
CD-11. Upon completion of the rough grading work and at the final completion
of the project, the final grading reports are to be submitted to the City per
section 16-17.150 of the City Code.
Ongoing during
construction
CD-12. Construction Air Quality Controls. To minimize potential
construction-related impacts to air quality, Applicant shall require all
construction contractors to implement the basic construction mitigation
measures recommended by the Bay Area Air Quality Management District
(BAAQMD) and shall include the following language on any grading, site
work, and construction plans issued for the project site. “During earth-moving,
grading, and construction activities, Applicant shall implement the following
basic control measures at the construction site:
a. All exposed surfaces (e.g. parking areas, staging areas, soil piles, graded areas,
and unpaved access roads) shall be watered two times per day;
b. All haul trucks transporting soil, sand, or other loose material onsite or offsite
shall be covered;
c. All visible mud or dirt tracked out onto adjacent public roads shall be
removed using wet power vacuum street sweepers at least once per day. The
use of dry power sweeping is prohibited;
d. All vehicle speeds on unpaved roads or pathways shall be limited to 15 miles
per hour;
e. All roadways, driveways, and sidewalks to be paved shall be completed as
soon as possible. Building pads shall be laid as soon as possible after grading
unless seeding or soil binders are used;
f. Idling times shall be minimized either by shutting equipment off when not in
use or reducing the maximum idling time to 5 minutes (as required by the
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 11
California airborne toxics control measure Title 13, Section 2485 of California
Code of Regulations [CCR]). Clear signage shall be provided for construction
workers at all access points;
g. All construction equipment shall be maintained and properly tuned in
accordance with manufacturer’s specifications. All equipment shall be
checked by a certified visible emissions evaluator; and
h. Post a publicly visible sign with the telephone number and person to contact at
the lead agency regarding dust complaints. This person shall respond and take
corrective action within 48 hours. The Air District’s phone number shall also
be visible to ensure compliance with applicable regulations.
Ongoing during
construction
CD-13. Unknown Well. If a previously unknown well is encountered during
project implementation, it shall be properly destroyed under a permit obtained
from the Santa Clara Valley Water District (Valley Water) or registered with
Valley Water and protected from damage.
Ongoing during
construction
CD-14. All collection of discarded materials and construction and demolition
debris shall be in accordance with City Code section 7-05.080. West Valley
Collection & Recycling is the exclusive roll-off and debris box provider for the
City of Saratoga.
Prior to first
foundation
inspection
CD-15. Setback Certification. A Licensed Land Surveyor shall provide a
written certification that all building setbacks are per the approved plans.
Prior to final
inspection
CD-16. Underground Utilities. All new/upgraded utilities shall be installed
underground per section 15-80.040 of the City Code. Tree preservation
measures shall be implemented in conformance with Arborist conditions of
approval, as applicable.
Prior to final
inspection
CD-17. Building Height Certification. All proposed buildings shall have the
building height consistent with plans set submitted June 2024 and certified by a
licensed architect.
Prior to final
inspection
CD-18. Landscaping Installation / Bond. All landscaping shall be installed or a
bond satisfactory to the Community Development Department valued at 150%
of the estimated cost of the installation of such landscaping shall be provided to
the City.
Prior to final
inspection
CD-19. Water Efficient Landscape Certificate of Completion. A certificate of
completion, on such forms as may be prescribed, shall be filed with the
Community Development Department prior to final building permit approval,
demonstrating compliance with the Water Efficient Landscape Ordinance.
Prior to final
inspection
CD-20. Locking Mailbox. A locking mailbox approved for use by the U.S.
Postal service shall be installed and in compliance with City Code section 6-
25.030.
Project Specific
At the time of
first building
permit
CP-1. MMRP Project Manager. The Applicant shall identify a Project Manager
responsible for ensuring compliance with the Mitigation Monitoring and
Reporting Program (MMRP) for the Project. The MMRP Project Manager shall
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 12
submittal. attend the pre-construction meeting and shall coordinate any mitigation
monitoring with the Community Development Director, or designee, prior to
issuance of a Zoning Clearance, Grading Permit, or Building Permit, whichever
comes first. The MMRP Project Manager shall ensure that mitigation measures
that must be implemented prior to submittal of building plans, have been
completed and reviewed by the Planning Division.
Prior to
recordation of
the Final Map
or issuance of
building/grading
permits,
whichever
comes first
CP-2. Covenants, Conditions, and Restrictions: If any Conditions of Approval
imposed by the City on the Project will be implemented by the Homeowner’s
Association (“HOA”), then the CC&Rs shall demonstrate the HOA’s authority
and duty to implement those conditions. A copy of the CC&Rs shall be
provided to the City Attorney for approval as to this requirement and may only
be recorded after such approval is granted.
Prior to
recordation of
the Final Map
CP-3. Park and Recreation Dedication and Fees. A fee in-lieu of parkland
dedication pursuant to City Code Section 14-25.080 or 15-58.020(h) shall be
paid, as established by the City's Fee Schedule as of July 20, 2023.
Prior to
thirteenth
building permit
submittal
CP-4. Affordable Units. Prior to the Building Submittal that includes a request for
the thirteenth building permit within the subdivision, applicant shall include in a
Building Submittal requests for the five dwelling units on Lots 1-4 and 8, which
shall be subject to Condition CD-6.
Prior to final
map recordation
CP-5. For each of Lots 1-4 and 8, the owner shall execute and record a deed
restriction approved by the Community Development Director requiring
compliance with City Code section 15-82.050 and restricting the dwelling unit to
purchase by households that qualify as low-income (80% of the Area Median
Income) as those terms are defined in the City Code section 15-82.020. The deed
restriction shall additionally provide that the applicant shall be responsible for the
City's costs in preparing the Agreement and any instruments required to be
recorded, and that the applicant shall indemnify and hold the City harmless
against any and all claims and harms arising from the applicant's compliance with
the City’s BMR Guidelines. The deed restriction shall have a term of forty-five
years.
B. City Arborist
When Required/
Time for
Compliance
Condition of Approval
Prior to and during
site development
AR-1 All City Arborist requirements, dated June 18, 2026, and included as
Attachment #7, are hereby adopted as conditions of approval and shall be
implemented as part of the approved plans.
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 13
C.1 Stormwater and Drainage
When
Required/Deadline
Condition of Approval
At the time of first
building permit
submittal
ENG-1 Stormwater Information. The Building Submittal shall include a
final Storm Water Management Plan with calculations and design consistent
with the report submitted to the City December 2023 that calculates the
amount of impervious surface created by the development, including the
existing impervious area, proposed impervious area, and proposed pervious
area. If the City determines that the development is subject to the current
National Pollutant Discharge Elimination System Permit (“NPDES Permit”)
issued to the City, the City shall require the owner (applicant) to provide a
stormwater treatment plan, as described below.
Prior to issuance of
any grading or
building permits
ENG-2 State General Construction Activity Permit. The Applicant shall
comply with the State General Construction Activity Permit requirements,
including paying fees, filing a Notice of Intent and providing a Storm Water
Pollution Prevention Plan (“SWPPP”) as described in the current NPDES
Permit. The Applicant shall provide the City with a copy of the filed Notice
of Intent and SWPPP or a declaration that the project is not subject to the
State General Construction Activity Permit requirements. At the time of first
building permit
submittal
ENG-3 Stormwater Treatment Plan for Regulated Projects. The Building
Submittal shall include a plan containing stormwater treatment measures
that satisfy the requirements of the current NPDES Permit and the
SCVURPPP standards. The plan shall contain a detailed description of all
required stormwater treatment measures, a schedule for perpetual
maintenance and inspection, and an estimate of
projected maintenance costs. Prior to final map
approval or at the
time of first
building permit
submittal,
whichever is sooner
ENG-4 Stormwater Covenant and Fee for Regulated Projects. The
Applicant shall enter into a Covenant and Agreement for Stormwater
Treatment Measures Construction, Inspection, and Maintenance with the
City, which shall be applicable to all the Applicant’s successors and assigns
and allow the City to conduct inspections to ensure that the stormwater
treatment measures installed by the Applicant comply with the NPDES
Permit, the SCVURPPP standards, and the terms of the Covenant, and
require the owner of the property to timely correct all actual and potential
discharges.
The covenant shall require the property owner to waive the owner’s right,
and the right of any of the owner’s successors in interest, to protest the
annexation of the property or any portion thereof into the applicable
Saratoga Landscape and Lighting Assessment District No. 1 for the purpose
of providing for the maintenance of all stormwater treatment measures
included in the stormwater treatment plan approved by the Public Works
Director.
For subdivisions where the property owner chooses not to waive this rights
described above, the Covenant and Agreement shall make the owner and the
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 14
owner’s successors in interest financially responsible for the maintenance of
all stormwater treatment measures described in the stormwater treatment
plan approved by the Public Works Director and shall authorize the City
take all measures necessary to ensure adequate funding for and operation of
those measures.
The Applicant shall pay the Public Works inspection fee as set out in the
applicable fee schedule for the inspection of stormwater treatment measures.
Prior to final map
approval or
submittal of any
grading or building
permit, whichever
comes first
ENG-5 Drainage and Grading Regulations. Plans shall demonstrate
compliance with all drainage and lot grading requirements set forth in
section 16-17.120 of the City Code.
Prior to final map
approval or
submittal of
building or grading
permit, whichever
comes first
ENG-6 Plans showing work affecting any street, sidewalk, driveway, storm
drain facility, street lighting, or other subdivision improvement shall
demonstrate compliance with the standard specifications of the State
Department of Transportation dated 2022, and any subsequent amendments
thereto, the "Saratoga Street and Storm Drain Improvement Standards -
1974," as updated and available on the City's website, the "ANSI RP-8-05,"
and otherwise be in accordance with section 14.30-010 of the City Code.
Prior to final map
approval
ENG-7 Drainage Standards. All plans shall demonstrate compliance with
the storm drain system specifications set forth in section 14-30.030 of the
City Code, including the installation of equipment that meet the
requirements of the City Engineer.
C.2 Engineering
When
Required/Deadline
Condition of Approval
General ENG-8. This Tentative Map is approved for all boundary lines, easements,
rights-of-way, and construction of off-site improvements as shown on the
project plans specifically labeled as Exhibit A of this Resolution. Ongoing ENG-9. The applicant agrees that if any of the conditions or limitations of the
Final Map are held to be invalid by a court of competent jurisdiction, that
holding will render the Final Map to be null and void.
Ongoing ENG-10. Plans showing work affecting any street, sidewalk, driveway, storm
drain facility, street lighting, or other subdivision improvement shall
demonstrate compliance with the standard specifications of the State
Department of Transportation dated 2022, and any subsequent amendments
thereto, the "Saratoga Street and Storm Drain Improvement Standards - 1974,"
as updated and available on the City's website, the "ANSI RP-8-05," and
otherwise be in accordance with section 14.30-010 of the City Code.
Immediately upon
approval
ENG-11. Owner and Applicant shall furnish proof of insurance coverage and
a written indemnity agreement, in accordance with Section 14-05.055 of the
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 15
Municipal Code to hereby agree to defend, indemnify and hold the City and its
officers, officials, boards, commissions, employees, agents and volunteers
harmless from and against:
a. any and all claims, actions or proceedings to attack, set aside, void or annul
any action on the subject application, or any of the proceedings, acts or
determinations taken, done or made prior to said action; and
b. any and all claims, demands, actions, expenses or liabilities arising from or
in any manner relating to the performance of such construction,
installation, alteration or grading work by the Owner and/or Applicant,
their successors, or by any person acting on their behalf.
Prior to Final Map
Approval
ENG-12. Prior to Final Map recordation, the applicant shall provide written
proof to the Community Development Director and City Engineer that each
condition of approval has been satisfied.
Prior to Building
Permit Issuance
ENG-13. Prior to approval of Improvement Plans, or Final Map recordation,
whichever occurs, first, the applicant shall consult with all affected utility
providers and submit a utility plan to the Community Development Director
for review and approval. The plan must include:
a. Demonstration that all proposed utilities will be placed underground;
b. The size and location of all above ground utility cabinets and underground
utility vaults;
c. The screening design and location for all above ground utility equipment
by method of walls/fencing, landscaping or a combination of both;
d. A minimum of three feet of clearance between all above ground utility
equipment and screening; and
e. Access panels oriented away from public rights-of-way.
Prior to Building
Permit Issuance
ENG-14. Prior to approval of Improvement Plans, street names shall be
included on the final set of Improvement Plans/Final Map.
Prior to Final Map
Approval
ENG-15. The applicant shall submit deeds with the Final Map for all parcels
or rights-of-way proposed to be dedicated to the City with the Final Map.
Prior to Final Map
Approval
ENG-16. The applicant is required to form a Homeowners’ Association
(HOA) for the Project site. The applicant shall prepare a Declaration of
Covenants, Conditions and Restrictions (CC&Rs) and submit them to the City
Attorney, Community Development Director and City Engineer for review
and approval. The CC&Rs shall include a clause prohibiting the amendment,
revision, or deletion of any sections in the CC&Rs without the prior written
consent of the City. The applicant must have the approved CC&Rs recorded
with the Santa Clara County Recorder’s Office concurrent with the Final Map.
Said HOA must ensure long term maintenance and operation for all
community/common property.
Prior to Final Map
Approval
ENG-17. The applicant shall submit a Final Map based upon a field survey
prepared by a Licensed Land Surveyor or a Registered Civil Engineer who
may also practice surveying, and must record the Final Map prior to the
issuance of a Certificate of Occupancy.
Prior to Final Map
Approval
ENG-18. The applicant shall consult with the U.S. Postal Service and shall
prepare a design for the installation of mailboxes within the subdivision and
shall submit the plan to the City Engineer and Director of Community
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 16
Development for review and approval. The plan shall include permanent
foundations and design features compatible with the project. Upon City
approval, the applicant shall submit the plan to the U.S. Postal Service for
review and approval and shall incorporate the approved plan on the final map.
Prior to Final Map
Approval
ENG-19. Designate all private streets as an Access Easement to allow access
for emergency vehicles to the satisfaction of the City Engineer.
At Final Map
submittal
ENG-20. Final Map shall be in substantial conformance with the approved
Tentative Map and accompanied by the additional documents required by
Section 14-40.020 of the Municipal Code. The Final Map shall contain all of
the information required in Section 14-40.030 of the Municipal Code and shall
be accompanied by the following items:
A. Two copies of map checking calculations.
B. Preliminary Title Report for the property dated within ninety (90) days of
the date of submittal for the Final Map.
C. Two copies of each map referenced on the Final Map.
D. Two copies of each document/deed referenced on the Final Map.
E. Two copies of any other map, document, deed, easement or other resource
that will facilitate the examination process as requested by the City
Engineer.
Prior to Final Map
Approval
ENG-21. Interior monuments shall be set at each lot corner either prior to
recordation of the Final Map or some later date to be specified on the Final
Map. If the owner (applicant) chooses to defer the setting of interior
monuments to a specified later date, then sufficient security as determined by
the City Engineer shall be furnished prior to Final Map approval, to guarantee
the setting of interior monuments.
At Final Map
submittal
ENG-22. The owner (applicant) shall submit engineered improvement plans to
the City Engineer in conformance with the approved Tentative Map and in
accordance with the design and improvement requirements of Chapter 14 of
the Municipal Code. The improvement plans shall be reviewed and approved
by the City Engineer and the appropriate officials from other public agencies
having jurisdictional authority, including public and private utility providers,
prior to approval of the Final Map.
Prior to Final Map
Approval
ENG-23. The applicant shall pay all delinquent taxes prior to Final Map
approval and provide a County tax payment certificate or letter.
At the time of first
building permit
submittal
ENG-24. Applicant / Owner shall obtain an encroachment permit for all
improvements in any City right-of-way or City easement including all new
utilities prior to commencement of the work to implement this Design Review.
Prior to Final
Inspection
ENG-25. Damages to driveway approach, curb and gutter, public streets, or
other public improvements during construction shall be repaired prior to final
inspection.
During Site ENG-26. Applicant / Owner shall maintain the streets, sidewalks and other
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 17
Development right-of-way as well as adjacent properties, both public and private, in a clean,
safe and usable condition. All spills of soil, rock or construction debris shall be
removed immediately.
Prior to Issuance of
a Grading or
Building Permit
ENG-27. Prior to land disturbing activities and if before Improvement Plan
approval, the applicant shall submit to the City Engineer for review and
approval, a grading plan with an Erosion and Sediment Control Plan (ESCP).
The ESCP shall address erosion, sediment and dust best management practices
(BMPs), construction activities BMPs, construction phasing and post-
construction controls. If the project is subject to coverage under the State of
California National Pollutant Discharge Elimination System (NPDES) General
Permit for Storm Water Discharges Associated with Construction and Land
Disturbance Activity, the applicant shall submit proof of coverage such as a
WDID number issued by the State.
Prior to Building
Permit Issuance
ENG-28. The applicant shall submit to the City Engineer for review and
approval an Improvement Plan, which has been be designed in accordance
with City of Saratoga Improvement Standards and specifications in effect as of
July 20, 2023, tentative map, and tentative map conditions of approval.
Prior to Final
Inspection
ENG-29. The applicant shall install all on-site utilities (water, sewer and
drainage), streets and public improvements in accordance with the approval
documents.
Prior to Issuance of
a Grading Permit
ENG-30. Prior to the issuance of a Grading Permit or approval of
Improvement Plans, the applicant shall prepare grading plans that indicate the
proposed pad elevations and show existing elevations around the project
boundary. The grading plans shall also clearly identify all existing water,
sewer and water utilities within the boundaries of the project (including the
adjoining public right-of-way). The plans shall identify existing utilities in
plan view and in profile view where grading activities will modify existing site
elevations over top of or within 15 feet of the utility. Any utilities that could
potentially be impacted by the project shall be clearly identified along with the
proposed protection measures. The applicant shall be responsible for taking
measures and incurring costs associated with protecting the existing water,
sewer and recycled water utilities to the satisfaction of the City Engineer.
Prior to Issuance of
a Grading Permit
ENG-31. The grading plan shall demonstrate that where lots abut the
subdivision boundary, the elevation between existing and proposed grades
shall be kept to 0.5 feet maximum, where feasible, and that the grading of lots
will be designed so that all areas drain to the street and that slopes between lots
will not exceed two feet horizontal to each foot vertical (2:1 maximum). If the
grade difference for the lots along the subdivision boundary adjoining existing
lots is greater than 0.5 feet, retaining walls or acquisition of adjacent slope
rights will be used and any retaining walls greater than one foot in height will
be decorative cement block material in construction. The grading plans shall
be accompanied with engineered structural calculations for all retaining walls
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 18
greater than four feet in height. The applicant shall indicate on the plans that
all retaining walls will be constructed of rockery, split-faced block, keystone,
or cast-in-place concrete with a fascia treatment.
At the Time of First
Building Permit
Submittal
ENG-32. In conjunction with Grading or Improvement Plans, the applicant
shall submit a plan to minimize off-site dust from grading activities on the
project site. The plan may include features such as:
• Spraying water on all exposed earth surfaces during clearing,
grading, earth moving and other site preparation activities
throughout the day.
• Using tarpaulins or other similar covers on all stockpiled earth
material and on all haul trucks.
• Sweeping the adjacent street frontages at least once a day or as
needed to remove silt and other dirt, which is evident from
construction activities.
• Ensuring that construction vehicles are cleaned prior to leaving the
construction site to prevent dust and dirt from being tracked offsite.
The City shall have the authority to stop all grading operations if in the
opinion of City staff, inadequate dust control measures are being
practiced or excessive wind conditions are contributing to fugitive dust
emissions.
At the Time of First
Building Permit
Submittal
ENG-33. At the time of design approval of Improvement Plans, the applicant
shall submit the following: two (2) full-size bond paper sets, two (2) half-size
bond paper sets, two separate set of drawings in AutoCAD and PDF form.
The AutoCAD format shall be compatible with AutoCAD 14 or higher and
include all “XREF” and support files. The submitted electronic copies shall be
labeled with the name and/or address of the project. The PDF files shall
include a file for the total project (all sheets) and files for each individual sheet
with the file labeled with the project name and sheet number. The same
requirements will be placed upon the “As-built” or Record Drawings upon
improvement plan acceptance. At “as-built” or Record Drawing stage, one (1)
full-size bond paper shall be submitted to the City Engineer for review. Upon
comment and review by the City, the final Record Drawings, with each sheet
notated as “Record Drawing” and signed and dated by the engineer, shall be
submitted as one full size bond set and a set of drawings in AutoCAD and
PDF. The AutoCAD format shall be compatible with AutoCAD 14 or higher
and include all “XREF” and support files.
Prior to Building
Permit Issuance
ENG-34. The applicant shall submit the design for any permanent entry
signage and monuments as part of the project’s Improvement and Landscape
Plans to the City Engineer and Community Development Director for review
and approval. Any such improvements shall be maintained by the HOA.
Prior to Issuance of
a Grading Permit
ENG-35. Prior to the issuance of a Grading Permit, the applicant shall install
on the site a weather-resistant sign (wooden surface with vinyl or painted
lettering, or a City Community Development Department approved
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 19
alternative). The sign shall measure four feet tall and eight feet wide, and shall
be four feet above grade, and shall include the following verbiage:
“This project is being constructed by (CONTRACTOR NAME) as
approved by the City of Saratoga is in conformance with federal, state
and local air quality and stormwater pollution prevention requirements.
Any observed violations should be reported to: (Company Contact
Person and Company Phone Number). This sign is required by the
City of Saratoga, Community Development Department, to protect the
natural resources of the citizens of Saratoga.”
The sign shall remain in place until the last final inspection of the last structure
within the project takes place.
Prior to Final Map
Approval
ENG-36. The applicant shall provide Public Utility Easements (PUE) along
and/or within the public street and private alleys, as shown on the map cross-
sections, unless otherwise approved by the City Engineer.
Prior to Building
Permit Issuance
ENG-37. Conditions Requested by Other Agencies or Utilities. The applicant
shall comply with all conditions regarding improvements, whether on-site or
off-site requested by other Agencies or Utilities having jurisdiction over the
project. Prior to issuance of city permits, the applicant must present evidence
of permit approval by any such agencies, as required for any activities within
jurisdictional areas of said agencies.
Prior to Grading
Permit Issuance
ENG-38. Final construction plans shall comply with all City requirements
regarding drainage, including but not limited to complying with the city
approved Stormwater management plan. The project shall retain and/or
detain any increase in design flow from the site, that is created by the
proposed construction and grading project, such that adjacent downslope
properties will not be negatively impacted by any increase in flow. Design
must follow the current Santa Clara County Drainage Manual method
criteria, as required by the building department. Retention/detention element
design must follow the Drainage Manual guidelines, as required by the
building department. If not all stormwater can be retained on-site due to
topographic, soils or other constraints, and if complete retention is not
otherwise required by the NPDES Permit Standards, the Project shall be
designed to retain on-site the maximum reasonably feasible amount of
stormwater and to direct all excess stormwater away from adjoining property
and toward stormwater drains, drainageways, streets or road right-of- ways
and otherwise comply with the applicable NPDES Permit Standards, and the
applicable City Codes in effect July 20, 2023.
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 20
D. Public Works
When
Required/
Time for
Compliance
Condition of Approval
Prior to final
map approval
or submittal of
any grading or
building
permit,
whichever
comes first.
PW-1. The owner (applicant) shall provide Irrevocable Offers of Dedication for
all required easements and/or rights-of-way on the Final Map, in substantial
conformance with the approved Tentative Map, prior to Final Map approval.
Additional easements for storm water drainage and treatment facilities shall be
dedicated on the Final Map as needed.
Prior to final
map approval
or submittal of
any grading or
building
permit,
whichever
comes first.
PW-2. The owner (applicant) shall provide an irrevocable Offer of Dedication
for a 10-foot-wide pedestrian and equestrian trail easement for any parts of the
proposed pedestrian and equestrian trail (described in PW-4(a)) that will
encroach on the subject property.
Prior to final
map approval
or submittal of
any grading or
building
permit,
whichever
comes first.
PW-3. Pierce Road is a Hillside Collector, per City Code Section 14-10.320,
Table 1. The Right-of-Way half-width shall be 25 feet throughout. The Final
Map shall dedicate right-of-way as necessary to achieve a 25-foot half-width and
include an area as necessary for any part of the proposed retaining wall and
retaining wall maintenance area and/or adjoining trail beyond the edge of the
right-of-way.
Prior to final
map approval
or submittal of
any grading or
building
permit,
whichever
comes first
PW-4. The owner (applicant) shall submit engineered improvement plans to the
City Engineer in conformance with the approved Tentative Map and in
accordance with the design and improvement requirements of Chapter 14 of the
Municipal Code. The improvement plans shall be reviewed and approved by the
City Engineer and the appropriate officials from other public agencies having
jurisdictional authority, including public and private utility providers, prior to
approval of the Final Map. Improvement requirements shall include, but not be
limited to:
a. A new pedestrian and equestrian trail through the property that serves the
purposes of the Segment 57 of the 2021 Trails Master Plan in the Open Space
Element of the 2040 General Plan. The south end of the trail shall be built to
accommodate future connections to all proposed trails intended to join with this
trail as shown in the Trails Master Plan map.
b. Overlay of Pierce Road for its full width for the frontage as shown on
Tentative Map submitted June 2024.
c. Redesign and construction of storm drain outfall facilities for the full length of
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 21
Pierce Road fronting parcel 503-46-005.
.Prior to final
map approval
or submittal of
any grading or
building
permit,
whichever
comes first
PW-5. The owner (applicant) shall enter into an written agreement with the City:
requiring the owner (applicant) to construct a retaining structure (a shear pin and
tie beam wall) for stabilizing the portion of Pierce Road adjacent to the property
between Masson Court and Vintage Lane that is subject to ground movement;
and requiring the owner (applicant) and City each to pay 50% of the cost to
construct the retaining structure, with the owner (applicant) paying 100% of
those design and construction costs upfront, with later 50% reimbursement by
City. The City shall prepare engineered construction plans for the retaining
structure, consistent with the retaining structure recommended in Cotton Shires
and Associates’ December 18, 2024 “Evaluation of Pierce Road Distress
Limits”.
Prior to first
subdivision
improvement
plan
resubmittal.
PW-6. The owner (applicant) shall pay the Subdivision Improvement Plan
Checking and Inspection fees, determined by the Saratoga Fee Schedule in effect
as of July 20, 2023, at the time Improvement Plans are submitted for review.
Prior to final
map approval
or submittal of
any grading or
building
permit,
whichever
comes first.
PW-7. The owner (applicant) shall enter into a Subdivision Improvement
Agreement with the City in accordance with Section 14-60.010 of the Municipal
Code prior to Final Map approval.
Prior to final
map approval
or submittal of
any grading or
building
permit,
whichever
comes first.
PW-8. The owner (applicant) shall furnish security in accordance with Section
14-60.020 of the Municipal Code prior to Final Map approval.
Prior to final
map approval
PW-8. The owner (applicant) shall pay the applicable Park Development fee as
set out in the fee schedule effective as of July 20, 2023, prior to Final Map
recordation
Prior to
commencement
of site work,
grading, or
construction.
PW-10. The owner (applicant) shall develop and submit to the Public Works
Director for approval, a detailed stormwater treatment measure(s), maintenance
plan and maintenance cost estimate. The maintenance plan shall include a
detailed description of, and schedule for, long-term maintenance activities. Prior
to Final Map approval, the owner (applicant) shall enter into a Covenant and
Agreement for Stormwater Treatment Measures Construction, Inspection, and
Maintenance with the City.
Prior to
commencement
of site work,
PW-11. The owner (applicant) shall enter into an agreement with the City,
waiving the owner/applicant’s right, and the right of the owner/applicant’s
successor(s) in interest, to protest the annexation of the property or any portion
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 22
grading, or
construction.
thereof into the Saratoga Landscape and Lighting Assessment District No. 1 for
the purpose of providing for the maintenance of any landscape stormwater
treatment systems and/or hydromodification controls developed on the property,
or enter into a maintenance agreement with the City making the property owners
responsible for the same.
Prior to
commencement
of site work,
grading, or
construction.
PW-12. The owner (applicant) shall secure all necessary permits from the City
and any other public agencies, including public and private utility providers,
prior to commencement of subdivision improvement construction. Copies of
permits other than those issued by the City shall be provided to the City
Engineer.
Prior to
commencement
of site work,
grading, or
construction.
PW-13. The owner (applicant) shall implement a fuel reduction project for fire
mitigation covering the full parcel 503-46-005, prior to Certificate of
Occupancy.
E. Fire Department
When Required/
Time for
Compliance
Condition of Approval
Prior to
commencement
of site work,
grading, or
construction.
FIRE-1. Review of this Developmental proposal is limited to acceptability of
site access and water supply and may include specific additional requirements
as they pertain to fire department operations and shall not be construed as a
substitute for formal plan review to determine compliance with adopted
model codes. Prior to performing any work, the applicant shall make
application to, and receive, from, the Building Department all applicable
construction permits.
Prior to Building
Permit Issuance
Fire-2. Planning / Building permit plan set shall note that an approved
exception request / AMMR is included with the plan submittal.
Prior to Building
Permit Issuance
Fire-3. A copy of the Exception Request / Alternate Means/Methods
application form, with approved signature, and the related comments shall be
made part of the Planning / Building permit drawing set, to be routed to Santa
Clara County Fire Department for final approval.
Prior to Building
Permit Issuance
Fire-4. Proposed mitigations shall be included in “Preliminary Fire Protection
Plan” at time of Planning Submittal.
Prior to
commencement
of site work,
grading, or
construction.
FIRE-5. The subject property is located within the Very High Fire Hazard
Severity Zone (VHFHSZ) of the Local Responsibility Area (LRA). Pursuant
to California Public Resources Code (PRC) 4290, the California Board of
Forestry and Fire Protection is required to “…adopt regulations implementing
minimum fire safety standards related to defensible space” applicable to “the
perimeters and access to all residential, commercial, and industrial building
construction.” In 2018, the Legislature passed and the Governor signed SB
901 (Dodd), which expanded the applicability of the regulations promulgated
under PRC 4290 to land in the Local Responsibility Area (LRA) Very High
Fire Hazard Severity Zone. All comments below that result from PRC 4290
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 23
are identified by **. Where a conflict exists between local & 4290
requirements, the more stringent requirement shall apply.
Prior to
commencement
of site work,
grading, or
construction.
FIRE-6. ** Dead-end Roads: (a) The maximum length of a dead-end road, including all dead-end roads accessed from that dead-end road, shall not exceed the following cumulative lengths, regardless of the number of parcels served: parcels zoned for less than one acre - 800 feet. Parcels zoned for 1 acre to 4.99 acres - 1,320 feet. Parcels zoned for 5 acres to 19.99 acres - 2,640 feet. Parcels zoned for 20 acres or larger - 5,280 feet. All lengths shall be measured from the edge of the road surface at the intersection that begins the road to the end of the road surface at its farthest point. Where a dead-end road crosses areas of differing zoned parcel sizes requiring different length limits, the shortest allowable length shall apply. California Code of Regulations, Title 14, Division 1.5, Chapter 7, Subchapter 2, Articles 1-5, § 1273.08. -Sheets 5-10 demonstrate emergency vehicle access easement roads that eliminates dead end road condition. -Access road to meet minimum width, turning radii, slope and loading capacity requirements.
Prior to
commencement
of site work,
grading, or
construction.
FIRE-7. Fire Hydrant Systems Required: Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, onsite fire hydrants and mains shall be provided where required by the fire code official. Exception: For Group R-3 and Group U occupancies, equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3, the distance requirement shall be not more than 600 feet [CFC, Section 507.5.1]. NOTE: Hydrants shall be installed prior to combustible construction. -Hydrants shown on sheet 6.
Prior to
commencement
of site work,
grading, or
construction.
FIRE-8. Based on pre-liminary information, the minimum required fire flow for this project is 2,250 Gallons Per Minute (GPM) at 20 psi residual pressure. Since an automatic fire sprinkler system will be installed, the fire flow will be reduced by 50%, establishing a required adjusted fire flow of 1,125 GPM at 20 psi residual pressure. Note: The minimum required number and spacing of the hydrants shall be in accordance with CFC Table C105.1 as amended by SCCFD. -New hydrants shall meet the minimum required fire flow. Fire flow may increase once all information is provided but current fire flow requirements are 1,125 gallons per minute at 20 psi.
Prior to
commencement of
site work, grading,
or construction.
FIRE-9. Fire Apparatus Access Roadway Required: Provide an access roadway with a paved all-weather surface, a minimum unobstructed width of 20 feet, vertical clearance of 13 feet 6 inches, minimum circulating turning radius of 50 feet outside and 30 feet inside, and a maximum slope of 15%. Installations shall conform to Fire Department Standard Details and Specifications sheet A-1. CFC Sec. 503. -Turning radii shall comply with 50' outside / 30' inside. -Slope percentages shown on sheet 6-9.
Prior to
commencement
of site work,
grading, or
FIRE-10. Approved automatic sprinkler systems in new and existing buildings and structures shall be provided in the locations described in this Section or in Sections 903.2.1 through 903.2.18. Sprinklers shall be provided for all new residences.
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621
Resolution 26-052
Page 24
construction.
Prior to
commencement
of site work,
grading, or
construction.
FIRE-11. Fire Department Turnaround Required: Provide an approved fire department engine driveway turnaround with a minimum radius of 40 feet outside. Maximum grade in any direction shall be a maximum of 5%. Installations shall conform with Fire Department Standard Details and Specifications D-1. CFC Sec. 503. Show compliance turnaround on plans. -Turnaround A proposed on all dead end roads and driveways that exceed 150 feet.
Prior to
commencement
of site work,
grading, or
construction.
FIRE-12. Early Warning Fire Alarm System Required: Installation of an early warning fire alarm system in accordance with the provisions of this Article is required as a condition for the granting of any building or other permit under Chapter 16 in each of the following cases: 1) All new residential structures classified as “R” occupancies in the most recent version of the California Building Code, commercial structures and community facilities located within the designated Wildland-Urban Interface Fire Area. -EWAS shall be required for all new residences.
F. Geotechnical
When
Required/Time
for
Compliance
Condition of Approval
At the time of
first building
permit
submittal
GEO-1. Geotechnical Clearance. All requirements in the Geotechnical
memorandum dated July 12, 2024, are hereby adopted as conditions of approval
and shall be implemented as part of the Building Permit submittal. The
applicant shall obtain geotechnical clearance for the building submittal, from the
City’s Geotechnical consultant, prior to issuance of building permits.
G. Surveyor
When
Required/Time
for
Compliance
Condition of Approval
Prior to
building permit
submittal
Tract (Final) Map. The applicant shall submit a Tract Map and all related
requirements in a format acceptable to the City for recordation to the
satisfaction of the City Surveyor and approval by the City Engineer and pay all
related fees/deposits, per the fee schedule in effect July 20, 2023. The executed
Tract (Final) Map shall be recorded prior to building permit submittal.
Docusign Envelope ID: BDD43C0B-5B37-8C32-8153-87F9314BA621