Loading...
HomeMy WebLinkAbout09-02-2026 City Council Meeting Agenda Packet, amended 09-02-2026Saratoga City Council Meeting Agenda – September 2, 2026 - Page 1 of 5 SARATOGA CITY COUNCIL REGULAR MEETING September 2, 2026 AMENDED AGENDA • 09-02-2026 PARKS & RECREACTION INTERVIEW TIMES CORRECTED • 09-02-2026 ITEM 2.2 SUPPLEMENTAL REPORT ADDED • 09-02-2026 ITEM 2.3 SUPPLEMENTAL REPORT ADDED Public Participation Information Members of the public may participate in this meeting in person at the location listed below or via remote attendance (if applicable) using the Zoom information below. Members of the public can view and participate in the 5:00 p.m. Commission Interviews by: 1. Attending the meeting in person at: • City Hall Linda Callon Conference Room, located at 13777 Fruitvale Avenue, Saratoga CA 95070 OR 2. Accessing the meeting through Zoom: • Webinar URL: https://us02web.zoom.us/j/82342704483 • Webinar ID 823 4270 4483 OR • Call In: 1.408.638.0968 or 1.669.900.6833 (*6 to unmute; *9 to raise hand) Members of the public can view and participate in the 6:00 p.m. Closed Session by: 1. Attending the meeting in person at: • City Hall Linda Callon Conference Room, located at 13777 Fruitvale Avenue, Saratoga 95070 OR 2. Accessing the meeting through Zoom: • Webinar URL: https://us02web.zoom.us/j/89527052458 • Webinar ID 895 2705 2458 OR • Call In: 1.408.638.0968 or 1.669.900.6833 (*6 to unmute; *9 to raise hand) Members of the public can view and participate in the 7:00 p.m. Regular Session by: 1. Attending the meeting in person at: • Saratoga Civic Theater, Council Chamber located at 13777 Fruitvale Avenue, Saratoga CA 95070; OR 2. Accessing the meeting through Zoom • Webinar URL: https://us02web.zoom.us/j/81627041223 • Webinar ID: 816 2704 1223 OR • Call In: 1.408.638.0968 or 1.669.900.6833 (*6 to unmute; *9 to raise hand); OR 3. Viewing the meeting on Saratoga Community Access Television Channel 15 (Comcast Channel 15, AT&T UVerse Channel 99 and calling in following the direction above; OR 4. Viewing online at www.saratoga.ca.us/watch and calling in following the direction above. Saratoga City Council Meeting Agenda – September 2, 2026 - Page 2 of 5 Written Communication Comments can be submitted in writing via the Council Comments Form. Written communications will be provided to the members of the City Council and included in the Agenda Packet and/or in supplemental meeting materials. Public Comment Members of the public may comment on any item for up to three (3) minutes. The amount of time for public comment may be reduced by the Mayor or by action of the City Council. Public Comment will begin with speakers attending in-person first followed by those attending via Zoom. Meeting Recording Information In accordance with the Saratoga City Council’s Meeting Recording Policy, City Council Study Sessions, Joint Meetings, Joint Sessions, Commission Interviews, Retreats, meetings with the Planning Commission, and Regular Session Meetings are recorded and made available following the meeting on the City website. 5:00 PM COMMISSION INTERVIEWS City Hall, Linda Callon Conference Room | 13777 Fruitvale Avenue, Saratoga, CA 95070 Time Name Commission Vacancies Incumbent 5:05 p.m. Siana Smith Library & Public Art 2 full terms Yes 5:15 p.m. Jeri Bromley Library & Public Art 2 full terms Yes 5:25 p.m. Jim Cargill Parks & Recreation 1 full term Yes 5:35 p.m. Sunitha Ayers Parks & Recreation 1 full term No 6:00 PM CLOSED SESSION City Hall, Linda Callon Conference Room | 13777 Fruitvale Avenue, Saratoga, CA 95070 PUBLIC EMPLOYEE PERFORMANCE EVALUATION (Government Code 54957) Title: City Attorney 7:00 PM REGULAR SESSION Saratoga Civic Theater, Council Chambers | 13777 Fruitvale Avenue, Saratoga, CA 95070 PLEDGE OF ALLEGIANCE ROLL CALL REPORT ON POSTING OF THE AGENDA The agenda for this meeting was properly posted on August 27, 2026. ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS Any member of the public may address the City Council on matters not on the Agenda. The law generally prohibits the City Council from discussing or taking action on such items. However, the Council may instruct staff accordingly. ANNOUNCEMENTS Saratoga City Council Meeting Agenda – September 2, 2026 - Page 3 of 5 CEREMONIAL ITEM National Preparedness Month Proclamations Recommended Action: Recognize September as National Preparedness Month and recognize the Old Oak Way, Garrod Heights, and Saratoga Heights HOA Firewise communities for their efforts to prepare for and reduce wildfire risk. National Preparedness Month Proclamation Garrod Heights National Preparedness Month Proclamation Old Oak Way National Preparedness Month Proclamation Saratoga Heights HOA SPECIAL PRESENTATION Valley Transportation Authority (VTA) Presentation Recommended Action: Receive report from Valley Transportation Authority (VTA) VTA Presentation 1. CONSENT CALENDAR The Consent Calendar contains routine items of business. Items in this section will be acted on in one motion, unless removed by the Mayor or a Council Member. Any member of the public may speak on an item on the Consent Calendar at this time, or request that the Mayor remove an item from the Consent Calendar for discussion. 1.1 City Council Meeting Minutes Recommended Action: Review and approve the Minutes for the August 11, 2026, City Council Special Meeting and the August 19, 2026, City Council Meeting. Staff Report Attachment A - Minutes for the August 11, 2026 City Council Special Meeting Attachment B - Minutes for the August 19, 2026 City Council Meeting 1.2 Accounts Payable Check Registers Recommended Action: Review and accept the 08/13/2026 and 08/20/2026 accounts payable vendor payment check registers. Staff Report Attachment A - Check Registers Dated 08-13-2026 P13 Attachment B - Check Registers Dated 08-13-2026 P02 Attachment C - Check Registers Dated 08-20-2026 1.3 Treasurer's Report for the Month Ended July 31, 2026 Recommended Action: Review and accept the Treasurer's Report for the month ended July 31, 2026. Staff Report Saratoga City Council Meeting Agenda – September 2, 2026 - Page 4 of 5 1.4 Response to 2025-2026 Civil Grand Jury of Santa Clara County Report "Pothole Damage: Improving Claims Processes within Santa Clara County" Recommended Action: Approve the draft response to the 2025-2026 Civil Grand Jury of Santa Clara County Report "Pothole Damage: Improving Claims Processes within Santa Clara County." Staff Report Attachment A - City of Saratoga Draft Response Attachment B - Civil Grand Jury Report Pothole Damage - Improving Claims Processes within Santa Clara County 1.5 Response to 2025-2026 Civil Grand Jury of Santa Clara County Report "VTA's Management and Oversight of BART Silicon Valley Phase II" Recommended Action: Approve the draft response to the 2025-2026 Civil Grand Jury of Santa Clara County Report "VTA's Management and Oversight of BART Silicon Valley Phase II." Staff Report Attachment A - City of Saratoga draft response Attachment B - Civil Grand Jury Report VTA's Management and Oversight of BART Silicon Valley Phase II 1.6 Saratoga Support for AB 1761 (Rogers) on Data Transparency Recommended Action: Approve Saratoga’s support of AB 1761 (Rogers), which would require the California Public Utilities Commission to ensure all data used to calculate charges related to the Power Charge Indifference Adjustment (PCIA) is provided to load-serving entities and ratepayer advocates. Staff Report Attachment A - City of Saratoga Letter of Support Attachment B - AB 1761 Fact Sheet 1.7 Transportation Impact Fee Study Contract Recommended Action: Approve an $85,000 contract with Fehr and Peers for a Transportation Impact Fee (TIF) study, plus a 10% contingency. Staff Report Attachment A - Contract with Fehr and Peers 2. GENERAL BUSINESS 2.1 VTA Bus Pilot Program Recommended Action: Receive report on resident-led bus pilot initiative program in Saratoga. Staff Report Attachment A - Bus Pilot Initiative 2.2 Alternative Policing Services Ad Hoc Committee Recommended Action: Appoint two Council representatives to an Ad-Hoc Committee to review alternative policing services in Saratoga. Staff Report Supplemental Report (added 09-02-2026) Saratoga City Council Meeting Agenda – September 2, 2026 - Page 5 of 5 2.3 The Future of the Blossom Festival Recommended Action: Provide direction to staff on whether the City should explore options to continue the Saratoga Blossom Festival. Staff Report Supplemental Report (added 09-02-2026) 2.4 Cities Association of Santa Clara County Recommended Action: Discuss Saratoga’s continued involvement in the Cities Association of Santa Clara County (CASCC) JPA. Staff Report Attachment A - Joint Powers Agreement for the Cities Association of Santa Clara County Attachment B - CASCC FY2026-27 Membership Dues COUNCIL ASSIGNMENTS 2026 Council Assignments CITY COUNCIL ITEMS COUNCIL COMMUNICATIONS CITY MANAGER'S REPORT CITY ATTORNEY'S REPORT ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS ADJOURNMENT CERTIFICATE OF POSTING OF THE AGENDA, DISTRIBUTION OF THE AGENDA PACKET, COMPLIANCE WITH AMERICANS WITH DISABILITIES ACT I, Britt Avrit, City Clerk for the City of Saratoga, declare that the foregoing agenda for the meeting of the City Council was posted and available for review on August 27, 2026 at the City of Saratoga, 13777 Fruitvale Avenue, Saratoga, California and on the City's website at www.saratoga.ca.us. Signed this 27th day of August 2026 at Saratoga, California. Britt Avrit, City Clerk In accordance with the Ralph M. Brown Act, copies of the staff reports and other materials provided to the City Council by City staff in connection with this agenda, copies of materials distributed to the City Council concurrently with the posting of the agenda, and materials distributed to the City Council by staff after the posting of the agenda are available on the City website at www.saratoga.ca.us and are available for review in the office of the City Clerk at 13777 Fruitvale Avenue, Saratoga, California. In compliance with the Americans with Disabilities Act, if you need assistance to participate in this meeting, please contact the City Clerk at bavrit@saratoga.ca.us or call 408.868.1216 as soon as possible before the meeting. The City will use its best efforts to provide reasonable accommodations to provide as much accessibility as possible while also maintaining public safety. [28 CFR 35.102-35.104 ADA title II] PROCLAMATION OF THE CITY COUNCIL OF THE CITY OF SARATOGA RECOGNIZING SEPTEMBER 2026 AS NATIONAL PREPAREDNESS MONTH WHEREAS, each year, the Federal Emergency Management Agency recognizes September as National Preparedness Month; and WHEREAS, the 2026 theme of National Preparedness Month is “Americans Stand Ready,” encouraging individuals and communities to take responsibility for preparing for disasters, protecting family and friends, and helping their communities become more resilient; and WHEREAS, a large-scale emergency or disaster could strike at any moment, whether it be a power outage, wildfire, earthquake, landslide, or flood; and WHEREAS, the prevalence of major disasters has increased, with multiple large-scale fires across the State of California in recent history; and WHEREAS, these disasters are a poignant reminder of our vulnerability to the dangers and devastation disasters can bring; and WHEREAS, Saratoga is strengthened by residents and community groups who prepare year- round to help protect their neighbors and community in the event of a disaster; and WHEREAS, the National Fire Protection Association’s Firewise USA® program encourages communities to work together to adapt to living with wildfire and take action to reduce wildfire risks and losses; and WHEREAS, the Garrod Heights Firewise USA® recognized community demonstrates the spirit of preparedness and civic responsibility by bringing neighbors together to learn about wildfire risks, reduce hazards, and strengthen the resilience of their neighborhood; and WHEREAS, it is incumbent upon us all, both as individuals and families and collectively as organizations, businesses, cities, towns, counties, states, and the nation, to prepare ourselves and our communities. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga does hereby proclaim September 2026 as National Preparedness Month and recognizes the Garrod Heights Firewise USA® recognized community for its commitment to wildfire preparedness, community resilience, and helping Saratoga stand ready for emergencies. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA this 2nd day of September 2026. ___________________________ Chuck Page, Mayor City of Saratoga 5 PROCLAMATION OF THE CITY COUNCIL OF THE CITY OF SARATOGA RECOGNIZING SEPTEMBER 2026 AS NATIONAL PREPAREDNESS MONTH WHEREAS, each year, the Federal Emergency Management Agency recognizes September as National Preparedness Month; and WHEREAS, the 2026 theme of National Preparedness Month is “Americans Stand Ready,” encouraging individuals and communities to take responsibility for preparing for disasters, protecting family and friends, and helping their communities become more resilient; and WHEREAS, a large-scale emergency or disaster could strike at any moment, whether it be a power outage, wildfire, earthquake, landslide, or flood; and WHEREAS, the prevalence of major disasters has increased, with multiple large-scale fires across the State of California in recent history; and WHEREAS, these disasters are a poignant reminder of our vulnerability to the dangers and devastation disasters can bring; and WHEREAS, Saratoga is strengthened by residents and community groups who prepare year- round to help protect their neighbors and community in the event of a disaster; and WHEREAS, the National Fire Protection Association’s Firewise USA® program encourages communities to work together to adapt to living with wildfire and take action to reduce wildfire risks and losses; and WHEREAS, the Old Oak Way Firewise USA® recognized community demonstrates the spirit of preparedness and civic responsibility by bringing neighbors together to learn about wildfire risks, reduce hazards, and strengthen the resilience of their neighborhood; and WHEREAS, it is incumbent upon us all, both as individuals and families and collectively as organizations, businesses, cities, towns, counties, states, and the nation, to prepare ourselves and our communities. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga does hereby proclaim September 2026 as National Preparedness Month and recognizes the Old Oak Way Firewise USA® recognized community for its commitment to wildfire preparedness, community resilience, and helping Saratoga stand ready for emergencies. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA this 2nd day of September 2026. ___________________________ Chuck Page, Mayor City of Saratoga 6 PROCLAMATION OF THE CITY COUNCIL OF THE CITY OF SARATOGA RECOGNIZING SEPTEMBER 2026 AS NATIONAL PREPAREDNESS MONTH WHEREAS, each year, the Federal Emergency Management Agency recognizes September as National Preparedness Month; and WHEREAS, the 2026 theme of National Preparedness Month is “Americans Stand Ready,” encouraging individuals and communities to take responsibility for preparing for disasters, protecting family and friends, and helping their communities become more resilient; and WHEREAS, a large-scale emergency or disaster could strike at any moment, whether it be a power outage, wildfire, earthquake, landslide, or flood; and WHEREAS, the prevalence of major disasters has increased, with multiple large-scale fires across the State of California in recent history; and WHEREAS, these disasters are a poignant reminder of our vulnerability to the dangers and devastation disasters can bring; and WHEREAS, Saratoga is strengthened by residents and community groups who prepare year- round to help protect their neighbors and community in the event of a disaster; and WHEREAS, the National Fire Protection Association’s Firewise USA® program encourages communities to work together to adapt to living with wildfire and take action to reduce wildfire risks and losses; and WHEREAS, the Saratoga Heights HOA Firewise USA® recognized community demonstrates the spirit of preparedness and civic responsibility by bringing neighbors together to learn about wildfire risks, reduce hazards, and strengthen the resilience of their neighborhood; and WHEREAS, it is incumbent upon us all, both as individuals and families and collectively as organizations, businesses, cities, towns, counties, states, and the nation, to prepare ourselves and our communities. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Saratoga does hereby proclaim September 2026 as National Preparedness Month and recognizes the Saratoga Heights HOA Firewise USA® recognized community for its commitment to wildfire preparedness, community resilience, and helping Saratoga stand ready for emergencies. WITNESS MY HAND AND THE SEAL OF THE CITY OF SARATOGA this 2nd day of September 2026. ___________________________ Chuck Page, Mayor City of Saratoga 7 Saratoga City Council September 2, 2026 1 Local Investment Plan Framework 8 2 VTA in the City of Saratoga In Saratoga, VTA operates the following transit service: Through 2016 Measure B and other sources, VTA also funds and delivers: West Valley College Transit Center Route 37 (Local Bus) Route 57 (Frequent Bus) Route 26 (Frequent Bus) Route 56 (Local Bus) Local Streets & Roads ($7.2M) Bike / Ped Program ($283K) 9 3 SB 63: 5-County Regional Measure On August 7th of 2025, the VTA Board voted unanimously to join the 5-county regional transportation sales tax measure. 1/2 cent rate 14-year term 10.38-percent to Caltrain 5-percent to MTC’s Transit Transformation Action Plan 0.25-percent for administration $264 million annually to Santa Clara County The regional measure is a citizen’s initiative, meaning 50-percent plus one is required for voter approval (not two-thirds). 10 4 SB 63: 5-County Regional Measure Under the SB63 enabling legislation, regional measure funds may be used for… “…public transit expenses and roadway re-pavement projects on roads served by fixed-route transit.” 11 5 Three Primary Outcomes: Grow ridership Increase productivity Enhance the customer experience Including safety, security and cleanliness Leading to the goal of Financially Sustainability. Local Investment Plan Framework 12 6 Investment Framework – Board Action On June 4th, the VTA Board of Directors approved the draft local Investment Plan Framework. Board action included discussion on a variety of VTA programs and strategies based on the three primary outcomes of ridership, productivity, and customer experience. 13 7 Investment Framework – Process and Updates The initial Local Investment Plan is the beginning of a 14-year program of projects, not an end point. Next steps include: Conduct more detailed analysis on each category – including geographical equity, community needs, state of good repair & financial sustainability Develop a 4-year rolling program for projects/programs that best meet goals Use KPIs to track performance and pivot if projects are not meeting goals Create a public dashboard to track how projects/programs are performing 14 8 Stay Engaged: This is Our Local Investment Plan Investment.Plan@vta.org 15 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: City Manager’s Department PREPARED BY: Britt Avrit, MMC, City Clerk SUBJECT: City Council Meeting Minutes RECOMMENDED ACTION: Review and approve the Minutes for the August 11, 2026, City Council Special Meeting and the August 19, 2026, City Council Meeting. BACKGROUND: Draft City Council Meeting Minutes are presented to the City Council for review and approval. Following City Council approval, minutes are retained for legislative history and posted on the City of Saratoga website. The draft minutes are attached to this report for Council review and approval. ATTACHMENTS: Attachment A - Minutes for the August 11, 2026 City Council Special Meeting Attachment B - Minutes for the August 19, 2026 City Council Meeting 16 Saratoga City Council Minutes ~ August 11, 2026 ~ Page 1 of 2 MINUTES WEDNESDAY, AUGUST 11, 2026 SARATOGA CITY COUNCIL SPECIAL MEETING At 5:00 p.m., the City Council held a Closed Session for Exposure to Litigation. Vice Mayor Walia invited public comment. No one requested to speak. Mayor Page called the Special Meeting to order at 6:10 p.m. ROLL CALL PRESENT: Mayor Chuck Page, Vice Mayor Tina Walia, Council Members Belal Aftab, Kookie Fitzsimmons, Yan Zhao ABSENT: None ALSO PRESENT: Leslie Arroyo, City Manager Richard Taylor, City Attorney Ryan Hinchman, Administrative Services Director Britt Avrit, City Clerk REPORT ON POSTING OF THE AGENDA The City Clerk reported the agenda for this meeting was properly posted on August 7, 2026. REPORT FROM CLOSED SESSION Mayor Page stated the City Council held a Closed Session at 5:00 p.m. with no reportable action. AGENDA ITEM 1. Santa Clara County Sheriff Contract FY 2026-27 Service Levels Recommended Action: Receive update on negotiations of the Santa Clara County Sheriff's law enforcement agreement and provide direction to staff on the City's preferred law enforcement service level for FY 2026 - 27. Leslie Arroyo, City Manager, presented the Staff Report. Mayor Page invited public comment. No one requested to speak. ZHAO/WALIA MOVED TO MOVE FORWARD WITH PROPOSED OPTION B AS PRESENTED IN THE STAFF REPORT AS THE CITY'S PREFERRED LAW ENFORCEMENT SERVICE LEVEL FOR FY 2026-27. MOTION PASSED BY THE FOLLOWING VOTE: AYES: FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: AFTAB. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 17 Saratoga City Council Minutes ~ August 11, 2026 ~ Page 2 of 2 ADJOURNMENT Mayor Page adjourned the meeting at 6:59 p.m. Minutes respectfully submitted: Britt Avrit, MMC, City Clerk City of Saratoga 18 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 1 of 10 MINUTES WEDNESDAY, AUGUST 19, 2026 SARATOGA CITY COUNCIL REGULAR MEETING At 5:00 p.m., the City Council held a Closed Session for Anticipated Litigation. Mayor Page invited public comment. The following individual spoke at this time: Dave At 6:00 p.m., the City Council held a Joint Session with the Santa Clara County Sheriff’s Office. Mayor Page invited public comment. The following individuals spoke at this time: Glen Hendricks, Bill Dalton Mayor Page called the Regular Session to order at 7:09 p.m. ROLL CALL PRESENT: Mayor Chuck Page, Vice Mayor Tina Walia, Council Members Belal Aftab, Kookie Fitzsimmons, Yan Zhao ABSENT: None ALSO PRESENT: Leslie Arroyo, City Manager Richard Taylor, City Attorney Ryan Hinchman, Administrative Services Director John Cherbone, Public Works Director Bryan Swanson, Community Development Director Britt Avrit, City Clerk REPORT ON POSTING OF THE AGENDA The City Clerk reported the agenda for this meeting was properly posted on August 13, 2026. REPORT FROM CLOSED SESSION Mayor Page stated the City Council held a Closed Session at 5:00 p.m. with no reportable action. REPORT FROM JOINT SESSION Mayor Page stated the City Council held a Joint Session at 6:00 p.m., with the Santa Clara County Sheriff’s Office. Captain Neil Valenzuela provided information regarding the discussion during the Joint Session. ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS; IN-PERSON ATTENDEES Bill Dalton discussed the Assistant City Manager position. Jacqui Holmes discussed enforcement issues in the City. 19 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 2 of 10 Ilaria Keogh discussed concerns with businesses in Saratoga. Mr. Chen discussed demolition of the track at West Valley College. Matt Bordoni discussed destroying the track at West Valley College. Stan Bogosian discussed issues with access to the City’s website. ANNOUNCEMENTS Mayor Page shared information about Coffee with the Mayor, Saratoga’s 70th Birthday Celebration, and Commission openings. CEREMONIAL ITEM 2026 Annual Community Awards Recommended Action: Recognize the recipients of the 2026 Annual Community Awards for their outstanding service, dedication, and contributions to the Saratoga community, including Firefighter of the Year, Deputy of the Year, Businessperson of the Year, Citizen of the Year, and Community Organization of the Year. The City Council recognized Captain Matthew Freeman as Firefighter of the Year. The City Council recognized Deputy Alexander Rockich as Deputy of the Year. The City Council recognized Cody Teerlink as Businessperson of the Year. The City Council recognized Ismar Maslić as Citizen of the Year. The City Council recognized Tylor Taylor and the SASCC team as Community Organization of the Year. Mayor Page invited public comment. No one requested to speak. 1. CONSENT CALENDAR Mayor Page invited public comment. The following individual spoke at this time: Stan Bogosian Vice Mayor Walia requested Items 1.14 and 1.15 be removed for separate discussion. 1.1 City Council Meeting Minutes Recommended Action: Review and approve the Minutes for the July 1, 2026, City Council Meeting. ZHAO/FITZSIMMONS MOVED TO REVIEW AND APPROVE THE MINUTES FOR THE JULY 1, 2026, CITY COUNCIL MEETING. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 20 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 3 of 10 1.2 Accounts Payable Check Registers Recommended Action: Review and accept the 06/25/2026, 07/09/2026, 07/16/2026, 07/23/2026, 07/30/2026, and 08/06/2026 accounts payable vendor payment check registers. ZHAO/FITZSIMMONS MOVED TO REVIEW AND ACCEPT THE 06/25/2026, 07/09/2026, 07/16/2026, 07/23/2026, 07/30/2026, AND 08/06/2026 ACCOUNTS PAYABLE VENDOR PAYMENT CHECK REGISTERS. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.3 Treasurer's Report for the Month Ended June 30, 2026 Recommended Action: Review and accept the Treasurer's Report for the month ended June 30, 2026. ZHAO/FITZSIMMONS MOVED TO REVIEW AND ACCEPT THE TREASURER'S REPORT FOR THE MONTH ENDED JUNE 30, 2026. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.4 Award of Contract Backfill Janitorial Services Recommended Action: Approve the proposed contract with YN Maintenance LLC for janitorial services and authorize the acting City Manager to execute the same. ZHAO/FITZSIMMONS MOVED TO APPROVE THE PROPOSED CONTRACT WITH YN MAINTENANCE LLC FOR JANITORIAL SERVICES AND AUTHORIZE THE ACTING CITY MANAGER TO EXECUTE THE SAME. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.5 Amend City Council Policy 010-Teleconference Meeting Policy Recommended Action: Amend City Council Policy 010-Teleconference Meeting Policy. ZHAO/FITZSIMMONS MOVED TO AMEND CITY COUNCIL POLICY 010- TELECONFERENCE MEETING POLICY. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.6 City Irrigation Maintenance Service Contracts for FY 2026-27 Recommended Actions: 1. Approve a contract with Dinsmore Landscape Company in the amount of $59,280 for FY 2026-27 Irrigation Maintenance and Repair Services for City-owned Landscaped Areas. 2. Approve a contract with Dinsmore Landscape Company in the amount of $59,280 for FY 2026-27 Irrigation Maintenance and Repair Services for Citywide Landscape and Lighting Districts (LLAD). 21 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 4 of 10 ZHAO/FITZSIMMONS MOVED TO APPROVE A CONTRACT WITH DINSMORE LANDSCAPE COMPANY IN THE AMOUNT OF $59,280 FOR FY 2026-27 IRRIGATION MAINTENANCE AND REPAIR SERVICES FOR CITY-OWNED LANDSCAPED AREAS, AND APPROVE A CONTRACT WITH DINSMORE LANDSCAPE COMPANY IN THE AMOUNT OF $59,280 FOR FY 2026-27 IRRIGATION MAINTENANCE AND REPAIR SERVICES FOR CITYWIDE LANDSCAPE AND LIGHTING DISTRICTS (LLAD). MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.7 Lynx Technologies, Inc. Geographic Information System Consultant Contract Amendment Recommended Action: Authorize the City Manager to execute a contract amendment with Lynx Technologies, Inc. for Geographic Information System (GIS) Consultant services in the amount of $37,500 for Fiscal Year (FY) 2026-27, bringing the contract total amount to $75,000. ZHAO/FITZSIMMONS MOVED TO AUTHORIZE THE CITY MANAGER TO EXECUTE A CONTRACT AMENDMENT WITH LYNX TECHNOLOGIES, INC. FOR GEOGRAPHIC INFORMATION SYSTEM (GIS) CONSULTANT SERVICES IN THE AMOUNT OF $37,500 FOR FISCAL YEAR (FY) 2026-27, BRINGING THE CONTRACT TOTAL AMOUNT TO $75,000. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.8 Contracts for Bellgrove Park Playground Replacement Recommended Actions: 1. Approve a contract with Specified Play Equipment Co. (SpecPlay) in the amount of $130,289.03 and authorize a 10% contingency on the contract. 2. Approve a contract with Playgrounds Unlimited in the amount of $100,530 for the Bellgrove Park Playground CIP and authorize a 20% contingency on the contract. ZHAO/FITZSIMMONS MOVED TO APPROVE A CONTRACT WITH SPECIFIED PLAY EQUIPMENT CO. (SPECPLAY) IN THE AMOUNT OF $130,289.03 AND AUTHORIZE A 10% CONTINGENCY ON THE CONTRACT, AND APPROVE A CONTRACT WITH PLAYGROUNDS UNLIMITED IN THE AMOUNT OF $100,530 FOR THE BELLGROVE PARK PLAYGROUND CIP AND AUTHORIZE A 20% CONTINGENCY ON THE CONTRACT. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.9 FY 2026-27 Budget Amendment Recommended Action: Adopt the Resolution amending the City’s Budget for the fiscal year beginning July 1, 2026. RESOLUTION 26-047 ZHAO/FITZSIMMONS MOVED TO ADOPT THE RESOLUTION AMENDING THE CITY’S BUDGET FOR THE FISCAL YEAR BEGINNING JULY 1, 2026. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 22 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 5 of 10 1.10 No Parking Anytime Zone on Chester Avenue and Arcadia Palms Drive Recommended Action: Adopt the Motor Vehicle Resolution authorizing a No Parking Anytime zone on both sides of Chester Avenue between Allendale Avenue and Arcadia Palms Drive and on both sides of Arcadia Palms Drive for its full length. RESOLUTION MV-342 ZHAO/FITZSIMMONS MOVED TO ADOPT THE MOTOR VEHICLE RESOLUTION AUTHORIZING A NO PARKING ANYTIME ZONE ON BOTH SIDES OF CHESTER AVENUE BETWEEN ALLENDALE AVENUE AND ARCADIA PALMS DRIVE AND ON BOTH SIDES OF ARCADIA PALMS DRIVE FOR ITS FULL LENGTH. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.11 Final Map Approval for Two Lots Located at 19200 Shubert Drive Recommended Action: Adopt the Resolution granting final map approval of parcel map application No. ULS25 -0018 for two lots located at 19200 Shubert Drive (APN: 389-04-013). RESOLUTION 26-048 ZHAO/FITZSIMMONS MOVED TO ADOPT THE RESOLUTION GRANTING FINAL MAP APPROVAL OF PARCEL MAP APPLICATION NO. ULS25-0018 FOR TWO LOTS LOCATED AT 19200 SHUBERT DRIVE (APN: 389-04-013). MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.12 Final Map Approval for Two Lots Located at 12468 Ted Avenue Recommended Action: Adopt the Resolution granting final map approval of parcel map application No. ULS25-0020 for two lots located at 12468 Ted Avenue (APN: 386-53-027). RESOLUTION 26-049 ZHAO/FITZSIMMONS MOVED TO ADOPT THE RESOLUTION GRANTING FINAL MAP APPROVAL OF PARCEL MAP APPLICATION NO. ULS25-0020 FOR TWO LOTS LOCATED AT 12468 TED AVENUE (APN: 386-53-027). MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.13 Final Map Approval for Two Lots Located at El Camino Senda Recommended Action: Adopt the Resolution granting final map approval of parcel map application No. ULS22 -0018 for two lots located at El Camino Senda (APN: 397-08-090). RESOLUTION 26-050 23 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 6 of 10 ZHAO/FITZSIMMONS MOVED TO ADOPT THE RESOLUTION GRANTING FINAL MAP APPROVAL OF PARCEL MAP APPLICATION NO. ULS22-0018 FOR TWO LOTS LOCATED AT EL CAMINO SENDA (APN: 397-08-090). MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.14 Santa Clara Law Enforcement Contract Recommended Action: Authorize the City Manager to execute a five-year agreement with the Santa Clara County Sheriff's Office. WALIA/PAGE MOVED TO AUTHORIZE THE CITY MANAGER TO EXECUTE A FIVE- YEAR AGREEMENT WITH THE SANTA CLARA COUNTY SHERIFF'S OFFICE. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 1.15 League of California Cities Action Alert on Wildfire Liability Recommended Action: Approve Saratoga's support of the League of California Cities position on Wildfire Liability. WALIA/ZHAO MOVED TO APPROVE SARATOGA'S SUPPORT OF THE LEAGUE OF CALIFORNIA CITIES POSITION ON WILDFIRE LIABILITY. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 2. PUBLIC HEARING 2.1 APCC26- 0003 - Appeal of the Planning Commission decision not to certify an Environmental Impact Report and deny applications for Design Review and a Tentative Map for a 25-lot residential subdivision located on a 72.45-acre parcel on Pierce Road. Recommended Actions: 1. Conduct a public hearing and de novo review and uphold appeal APCC26 -0003, thereby approving applications MISC23- 0011, SUB26-0002, and ENV24 -0001 to subdivide into 25 lots an existing 72.45-acre parcel located on Pierce Road (APN 503-46-005) and take the following actions: 2. Adopt the Resolution making the appropriate CEQA findings, adopting a Statement of Overriding Considerations, certifying the Final Environmental Impact Report, and adopting a Mitigation Monitoring and Reporting Program for the Project; and 3. Adopt the Resolution to conditionally approve an application for Design Review and a Tentative Map to subdivide a 72.45-acre parcel into 25 lots and construct 25 single-family dwellings for Masson Estates (MISC23-0011, SUB26-0002) located on Pierce Road (APN 503-46-005). Christopher Riordan, Senior Planner, presented the Staff Report. Mayor Page requested a recess at this time. Mayor Page reconvened the meeting at 9:10 p.m. 24 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 7 of 10 The Appellant provided a presentation. Mayor Page invited public comment. The following individuals spoke: Dave Rossi, Stan Bogosian, Becky Rhodes, Richard Larson, Sonny Yeoh, Suman Goel, Manoj Goel, Glenn Hendricks, Glenda Aune, David Aune, Xavier Casanova, Bill Dalton, Mohini Balakrishnan, Mona Kaur, Sophia Kao, Sabrina Venskus, Nikil Balakrishnan, Balu Balakrishnan, Mahal Mohan, residents, Rafik Bawa, Tylee, Holden Veena Iyer, PFiphone Mayor Page requested a recess at this time. Mayor Page reconvened the meeting at 11:15 RESOLUTION 26-051 RESOLUTION 26-052 AFTAB/FITZSIMMONS MOVED TO UPHOLD APPEAL APCC26 -0003, THEREBY APPROVING APPLICATIONS MISC23- 0011, SUB26-0002, AND ENV24 -0001 TO SUBDIVIDE INTO 25 LOTS AN EXISTING 72.45-ACRE PARCEL LOCATED ON PIERCE ROAD (APN 503-46-005), ADOPT THE RESOLUTION MAKING THE APPROPRIATE CEQA FINDINGS, ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS, CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT, AND ADOPTING A MITIGATION MONITORING AND REPORTING PROGRAM FOR THE PROJECT; AND ADOPT THE RESOLUTION TO CONDITIONALLY APPROVE AN APPLICATION FOR DESIGN REVIEW AND A TENTATIVE MAP TO SUBDIVIDE A 72.45-ACRE PARCEL INTO 25 LOTS AND CONSTRUCT 25 SINGLE-FAMILY DWELLINGS FOR MASSON ESTATES (MISC23- 0011, SUB26-0002) LOCATED ON PIERCE ROAD (APN 503-46-005). MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 3. GENERAL BUSINESS 3.1 Purchase of Electrical Equipment for the Warner Hutton House and Joan Pisani Community Center to Support Facility Electrification. Recommended Action: Approve the purchase of electric equipment for the Warner Hutton House, Civic Center Theater, and Joan Pisani Community Center in the amount of $ 95,100 with ZH Mechanical Inc., to replace existing aging gas appliances to support the electrification of City facilities, consistent with the City's Climate Action Plan. Francisco Alvarez, Facilities Manager, presented the Staff Report. Mayor Page invited public comment. No one requested to speak. 25 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 8 of 10 WALIA/ZHAO MOVED TO APPROVE THE PURCHASE OF ELECTRIC EQUIPMENT FOR THE WARNER HUTTON HOUSE, CIVIC CENTER THEATER, AND JOAN PISANI COMMUNITY CENTER IN THE AMOUNT OF $ 95,100 WITH ZH MECHANICAL INC., TO REPLACE EXISTING AGING GAS APPLIANCES TO SUPPORT THE ELECTRIFICATION OF CITY FACILITIES, CONSISTENT WITH THE CITY'S CLIMATE ACTION PLAN. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 3.2 Designation of League of California Cities Annual Conference Voting Delegate and Alternate(s) Recommended Action: Designate the City of Saratoga’s voting delegate and alternate voting delegate(s) for the 2026 League of California Cities Annual Conference. Britt Avrit, City Clerk, presented the Staff Report. Mayor Page invited public comment. No one requested to speak. ZHAO/AFTAB MOVED TO DESIGNATE MAYOR PAGE AS THE CITY OF SARATOGA’S VOTING DELEGATE AND VICE MAYOR WALIA AS THE ALTERNATE VOTING DELEGATE FOR THE 2026 LEAGUE OF CALIFORNIA CITIES ANNUAL CONFERENCE. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, ZHAO, WALIA, PAGE. NOES: FITZSIMMONS. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. 3.3 Annual Code Update for 2026 Recommended Action: Review the proposed cleanup amendments to the City Code and direct staff to prepare an ordinance implementing the amendments that the City Council would like brought forward for consideration by the City Council. Richard Taylor, City Attorney, presented the Staff Report. Council Member Fitzsimmons stated she needed to recuse herself from discussion of item no. 21 in the Staff Report due to a possibility of a conflict of interest and left the dais at this time. Mayor Page invited public comment. No one requested to speak. AFTAB/ZHAO MOVED TO INCLUDE ITEM NO. 21 IN THE ANNUAL CODE UPDATE AS PROPOSED. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, , ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: FITZSIMMONS. ABSENT: NONE. 26 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 9 of 10 Council Member Fitzsimmons returned to the dais at this time. Mayor Page invited public comment. No one requested to speak. WALIA/AFTAB MOVED TO PREPARE AN ORDINANCE IMPLEMENTING THE REMAINING AMENDMENTS AS PROPOSED IN THE STAFF REPORT. MOTION PASSED BY THE FOLLOWING VOTE: AYES: AFTAB, FITZSIMMONS, ZHAO, WALIA, PAGE. NOES: NONE. ABSTAIN: NONE. RECUSED: NONE. ABSENT: NONE. COUNCIL ASSIGNMENTS Council Member Belal Aftab Nothing to report Council Member Yan Zhao Valley Transportation Authority Policy Advisory Committee – stated she attended the meeting with nothing to report. West Valley Sanitation District Board of Directors – stated she attended the meeting with nothing to report. Council Member Kookie Fitzsimmons Nothing to report Vice Mayor Tina Walia Cities Association of Santa Clara County Executive Committee – stated she attended the meeting with nothing to report. Cities Association of Santa Clara County Legislative Action Committee – stated the Committee discussed several bills and recommended them. Cities Association of Santa Clara County Board of Directors – stated Pamela Wu has been hired as Interim Executive Director, a Study Session was held regarding e-bikes, a guest presenter discussed a transportation ballot measure, and the Board took positions on the bills recommended by the Legislative Action Committee. Mayor Chuck Page Silicon Valley Clean Energy Authority Board of Directors – stated he was unable to attend this meeting because he was attending a meeting with Congressman Liccardo and Supervisor Abe- Koga. CITY COUNCIL ITEMS Walia/Page requested the City Council consider writing a letter supporting AB1761. Aftab/Walia requested the City Council consider discussing the future of data centers in Saratoga. COUNCIL COMMUNICATIONS None 27 Saratoga City Council Minutes ~ August 19, 2026 ~ Page 10 of 10 CITY MANAGER’S REPORT None CITY ATTORNEY'S REPORT None ORAL COMMUNICATIONS ON NON-AGENDIZED ITEMS; VIRTUAL ATTENDEES None ADJOURNMENT Mayor Page adjourned the meeting at 12:01 a.m. Minutes respectfully submitted: Britt Avrit, MMC, City Clerk City of Saratoga 28 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: Administrative Services PREPARED BY: Shannda Markee, Accounting Technician SUBJECT: Accounts Payable Check Registers RECOMMENDED ACTION: Review and accept the 08/13/2026 and 08/20/2026 accounts payable vendor payment check registers. BACKGROUND: The accounts payable check registers report payments to vendors for goods and services properly procured and approved for payment in accordance with the City’s administrative purchasing policy. The information listed below lists vendor payments exceeding $20,000 and any checks that were voided during the time period. The complete check register(s) and summary by Fund are provided as attachments to this report. ATTACHMENTS: Attachment A - Check Register Reports Dated 08/13/2026 Period 13 Attachment B - Check Register Reports Dated 08/13/2026 Period 02 Attachment C - Check Register Reports Dated 08/20/2026 Period 02 REPORT SUMMARY: Attached are Check Registers for: Date Ending Check # Accounts Payable 08/13/2026 154844 154881 38 413,484.40 08/13/2026 08/06/2026 154843 Accounts Payable 08/20/2026 154882 154922 41 227,816.64 08/20/2026 08/13/2026 154881 Accounts Payable checks issued for $20,000 or greater: Date Check #Dept.Amount 08/13/2026 154845 SCC Office of the Sheriff General Fund ASD FY2025-26 Law Enforcement Overage 152,818.00 08/13/2026 154853 US Bank Purchasing Card Various Funds Various June 2026 Various City Expenses 22,759.59 08/13/2026 154855 Villalobos & Associates CIP Street Projects Fund PW Congress Springs Park Landscaping Project 69,400.00 08/13/2026 154869 SCC Firesafe Council General Fund CMO Wildfire Prevention FY 2026/2027 50,000.00 08/13/2026 154876 US Bank Purchasing Card Various Funds Various July 2026 Various City Expenses 21,562.46 08/13/2026 154879 West Valley Community Services General Fund CMO Community Support Services 28,000.00 08/20/2026 154904 Pacific Gas & Electric Various Funds Various Gas & Electric Expenses 25,080.27 08/20/2026 154907 Pacific Gas & Electric Various Funds Various Gas & Electric Expenses 34,632.40 08/20/2026 154910 San Jose Water Company Various Funds Various Water Services 33,541.65 08/20/2026 154918 Urban37, Inc Various Funds Various July 2026 Building Plan Review 29,138.74 Accounts Payable checks voided during this time period: AP Date Check #Amount 04/30/2026 154215 Han Lo Check lost in the mail 1,621.50 Ending Check # Starting Check #Type of Checks Date StatusReason Issued to Issued to Prior Check Register Checks ReleasedTotal Checks Amount Fund Purpose Reissued 29 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 08/13/2026 CITY OF SARATOGA VENCHK11 TIME: 10:51:46 CHECK REGISTER - FUND TOTALS ACCOUNTING PERIOD: 2/27 FUND FUND TITLE AMOUNT 111 GENERAL FUND 252,423.17 411 CIP STREET PROJECTS FUND 205.24 431 CIP GRANT - STREET REPAIR 1,207.26 612 WORKERS COMP FUND 28.51 622 IT SERVICES 127.68 623 VEHICLE & EQUIPMENT MAINT 1,730.15 624 BUILDING MAINTENANCE 1,080.72 713 WVCWP AGENCY FUND 2,734.80 TOTAL REPORT 259,537.53 30 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 08/13/2026 CITY OF SARATOGA VENCHK11 TIME: 10:50:58 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 154844 11111 08/13/26 1465 CONTRACTOR COMPLIANCE & M 81161 VILLAGE CROSSWALK & SIDEW 205.24 154844 11111 08/13/26 1465 CONTRACTOR COMPLIANCE & M 81161 VILLAGE CROSSWALK & SIDEW 1,207.26 TOTAL CHECK 1,412.50 154845 11111 08/13/26 1 COUNTY OF SCC-OFFICE OF S 64811 25-26 LAW ENF OVERAGE 152,818.00 154846 11111 08/13/26 1596 EVANS & DE SHAZO, INC. 64548 ORCHARD BARN - HISTORIC P 1,438.00 154847 11111 08/13/26 1563 LOGAN & POWELL, LLP 65282 WVSA APR LEGAL SVCS 1,224.49 154848 11111 08/13/26 1732 NWESTCO LLC 62144 JUNE 2026 DO INSPECT 230.00 154849 11111 08/13/26 111 SARATOGA HISTORICAL FOUND 68524 COM EVNT GRANT BLFEST 100.00 154850 11111 08/13/26 1360 SITEONE LANDSCAPE SUPPLY, 61341 LANDSCAPE SUPPLIES 3,048.86 154851 11111 08/13/26 549 TURF STAR, INC 61348 PRK SUPPLY DCK PULLEY 1,842.02 154851 11111 08/13/26 549 TURF STAR, INC 61348 PRK SUPPLY DECK ADJT 467.77 154851 11111 08/13/26 549 TURF STAR, INC 61348 PRKS AERATOR REPAIR 300.00 154851 11111 08/13/26 549 TURF STAR, INC 61348 PRK BCKLAP ANNL SVC 2,839.99 TOTAL CHECK 5,449.78 154852 391 US BANK PURCHASING CARD P VOID: MULTI STUB CHECK 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61133 FACILITIES SUPPLIES 288.64 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61172 FURN & EQUPT 216.09 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 64611 VEHICLE REPAIRS 1,441.25 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61362 FUEL 58.90 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61165 YOUTH COMM 514.73 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 66111 MEETING EXPENSE 601.85 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 OFFICE SUPPLIES 49.46 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 66131 COMM RECOGN DINNER 7,568.80 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61341 LANDSCAPE SUPPLIES 1,230.81 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61165 YOUTH COMM -4.32 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61154 YTH GOVT SUPP 60.31 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 OFFICE SUPPLIES 146.41 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 66111 MEETING EXPENSE 11.50 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61133 FACILITIES SUPPLIES 105.66 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61323 PAINT SUPPLIES 471.57 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 66131 COMM RECOGN DINNER 4,068.80 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61192 WELLNESS SUPPLY 28.51 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61116 RECOGN SUPPLIES 201.33 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 OFFICE SUPPLIES 600.00 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 66321 ORAL BRD EXP 177.91 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 OFFICE SUPPLIES 91.87 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 64136 PHOTOGRAPHY SVCS 40.29 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61133 FACILITIES SUPPLIES 176.72 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 OFFICE SUPPLIES 141.33 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61316 UNIFORMS 636.55 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61133 FACILITIES SUPPLIES 38.13 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61211 IT SUPPLIES 119.18 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 66212 TRVL/LODG TOLL FEE 8.50 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 62251 PROF DUES 150.00 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61331 STREETS SUPPLIES 158.51 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 66111 MEETING SUPPLIES 162.13 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61341 LANDSCAPE SUPPLIES 1,914.62 31 SUNGARD PUBLIC SECTOR PAGE NUMBER: 2 DATE: 08/13/2026 CITY OF SARATOGA VENCHK11 TIME: 10:50:58 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 64221 VILLAGE REPS 36.29 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 EMPLOYEE RECOGN 259.44 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 61154 YTH GOVT SUPP 707.82 154853 11111 08/13/26 391 US BANK PURCHASING CARD P 66111 MEETING SUPPLIES 280.00 TOTAL CHECK 22,759.59 154854 11111 08/13/26 391 US BANK PURCHASING CARD P 66211 WVSA CONF/TRAINING 925.00 154854 11111 08/13/26 391 US BANK PURCHASING CARD P 63213 WVSA INTERNET 142.51 154854 11111 08/13/26 391 US BANK PURCHASING CARD P 61171 WVSA OFF EQPT/SFTWR 139.40 154854 11111 08/13/26 391 US BANK PURCHASING CARD P 63211 WVSA PHONE BILL 303.40 TOTAL CHECK 1,510.31 154855 11111 08/13/26 1524 VILLALOBOS & ASSOCIATES 64548 L& M TO INSTALL DG AT CS 69,400.00 154856 11111 08/13/26 500 WILLIAM FONG 43481 REF TRP#26-0176 146.00 TOTAL FUND 259,537.53 TOTAL REPORT 259,537.53 32 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 08/13/2026 CITY OF SARATOGA VENCHK11 TIME: 11:12:37 CHECK REGISTER - FUND TOTALS ACCOUNTING PERIOD: 2/27 FUND FUND TITLE AMOUNT 111 GENERAL FUND 115,653.96 411 CIP STREET PROJECTS FUND 1,006.47 414 CIP ADMIN PROJECTS FUND 475.00 611 LIABILITY /RISK MGMT FUND 14,000.00 612 WORKERS COMP FUND 2,262.77 621 OFFICE SUPPORT 1,407.53 622 IT SERVICES 3,526.19 623 VEHICLE & EQUIPMENT MAINT 53.21 624 BUILDING MAINTENANCE 7,027.69 713 WVCWP AGENCY FUND 8,534.05 TOTAL REPORT 153,946.87 33 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 08/13/2026 CITY OF SARATOGA VENCHK11 TIME: 11:11:12 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 154857 11111 08/13/26 1092 AAA WORKSPACE 61111 FIN OFFICE SUPPLIES 3.96 154857 11111 08/13/26 1092 AAA WORKSPACE 61111 FIN OFFICE SUPPLIES 29.67 154857 11111 08/13/26 1092 AAA WORKSPACE 61111 HR OFFICE SUPPLIES 40.79 154857 11111 08/13/26 1092 AAA WORKSPACE 61111 FIN OFFICE SUPPLIES 44.61 TOTAL CHECK 119.03 154858 11111 08/13/26 1881 BAY AREA BACKFLOW INC 64549 SRA/SNYVL BKFLW REP 574.00 154858 11111 08/13/26 1881 BAY AREA BACKFLOW INC 64549 SRASNVL BKFL TESTING 141.00 154858 11111 08/13/26 1881 BAY AREA BACKFLOW INC 64549 SRASNVL BKLFW TESTING 141.00 TOTAL CHECK 856.00 154859 11111 08/13/26 511 CATHOLIC CHARITIES OF SC 68351 OMBUDSMAN GRANT 26/27 5,000.00 154860 11111 08/13/26 188 CITY OF CAMPBELL-FINANCE 64311 WVSA JAN-JUL25 IT SVC 6,226.04 154861 11111 08/13/26 500 CONGREGATION BETH DAVID 68521 COM EVNT GRNT FY26-27 1,600.00 154862 11111 08/13/26 1152 CORODATA RECORDS MANAGEME 62631 JULY RECORDS STORAGE 326.71 154863 11111 08/13/26 1 COUNTY OF SCC-OFFICE OF S 68582 26-27CAR SHW LAW ENFR 11,699.00 154864 11111 08/13/26 349 DUNCAN PRINTING CO INC 64121 FY26-27 DOOR SIGNAGE 1,080.82 154865 11111 08/13/26 63 INTERSTATE TRAFFIC CONTRO 81121 VEH DECALS/STICKERS 44.00 154866 11111 08/13/26 500 KOOKIE FITZSIMMONS 66213 MILES 7/1/26-7/29/26 17.08 154867 11111 08/13/26 1133 LANE IRRIGATION EQUIPMENT 61341 IRR SUPPLY SPRNK LIDS 128.53 154868 11111 08/13/26 1182 ORCHARD CITY LOCK & SAFE, 61341 PARKS KEYS 899.03 154869 11111 08/13/26 1185 SANTA CLARA COUNTY FIRESA 68141 WILDFIRE PREV FY26-27 50,000.00 154870 11111 08/13/26 313 BAY AREA NEWS GROUP 62321 LL 0006974895 150.15 154870 11111 08/13/26 313 BAY AREA NEWS GROUP 62132 LL 0006982091 464.10 TOTAL CHECK 614.25 154871 11111 08/13/26 1941 SYL CONSTRUCTION INC. 62419 CARN/SRASNVL CURB REP 14,000.00 154872 11111 08/13/26 500 THOMAS FELDMAN 68353 NBHD WATCH GRANT RMB 300.00 154873 11111 08/13/26 1468 UNITED WAY BAY AREA 68341 FY26-27 COMM SUPP GRT 2,000.00 154874 391 US BANK PURCHASING CARD P VOID: MULTI STUB CHECK 154875 391 US BANK PURCHASING CARD P VOID: MULTI STUB CHECK 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61133 FACILITIES SUPPLIES 1,578.36 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61313 UNIFORM SUPPLIES 1,867.36 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 68619 CTY ANNIV SUPP 657.88 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 81121 CIP PUBLIC ART SUPP 475.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61354 EMER PREP SUPPLY 112.54 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61341 LANDSCAPE SUPPLIES 270.85 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 66211 TRAIN/CONF 754.26 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61165 YOUTH COMM 119.92 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 64134 GRAPHIC/LAYOUT SVCS 1,100.00 34 SUNGARD PUBLIC SECTOR PAGE NUMBER: 2 DATE: 08/13/2026 CITY OF SARATOGA VENCHK11 TIME: 11:11:12 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61113 BOOKS/PUBLICATIONS 700.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 68651 OUTDR MOVIE NGHT 133.42 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61323 PAINT SUPPLIES 337.80 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61133 FACILITIES SUPPLIES 77.54 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61192 WELLNESS SUPPLY 2,262.77 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 62251 PROF DUES 300.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 62211 LEAGUE CA CITIES 725.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 68619 CTY ANNIV SUPP 211.86 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 66211 TRAIN/CONF 600.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 64136 PHOTOGRAPHY SVCS 13.21 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 OFFICE SUPPLIES 242.84 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61278 SOFTWARE 347.96 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61151 COMM ART SUPP 24.08 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61113 BOOKS/PUBLICATIONS 37.64 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61133 FACILITIES SUPPLIES 37.28 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 62251 PROF DUES 100.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 66211 TRAIN/CONF 550.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61112 POSTAGE 36.15 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 MEETING SUPPLIES 415.38 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 22119 DEP LLA26-0001 110.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61323 PAINT SUPPLIES 218.22 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61133 FACILITIES SUPPLIES 208.49 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61211 IT SUPPLIES 275.28 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 66212 TRVL/LODG TOLL FEE 525.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 62251 PROF DUES 130.00 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61172 FURN & EQUIPT 329.20 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 81121 PROJ CON SUPPLY 962.47 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61313 UNIFORM SUPPLIES 2,237.74 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61316 UNIFORM SUPPLIES 76.55 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 66111 MEETING SUPPLIES 200.42 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 OFFICE SUPPLIES 29.59 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61361 AUTO SUPPLIES 53.21 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61313 UNIFORM SUPPLIES 536.27 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61162 TRAFF SAFETY COMM 134.74 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 61167 PRKS REC COMM 135.82 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 66111 MEETING SUPPLIES 220.16 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 68619 CTY ANNIV SUPP 1,036.20 154876 11111 08/13/26 391 US BANK PURCHASING CARD P 64323 SOFTWARE 54.00 TOTAL CHECK 21,562.46 154877 11111 08/13/26 391 US BANK PURCHASING CARD P 66211 WVSA CONF/TRAINING 2,150.00 154877 11111 08/13/26 391 US BANK PURCHASING CARD P 61171 WVSA OFF EQPT/SFTWR 98.99 154877 11111 08/13/26 391 US BANK PURCHASING CARD P 61111 WVSA OFFICE SUPPLIES 9.62 154877 11111 08/13/26 391 US BANK PURCHASING CARD P 62171 WVSA VEH SUPPLIES 49.40 TOTAL CHECK 2,308.01 154878 11111 08/13/26 1524 VILLALOBOS & ASSOCIATES 64529 CITY HALL AWNING REP 2,800.00 154879 11111 08/13/26 510 WEST VALLEY COMMUNITY SER 68311 FY26-27 COMM SUPP GRT 28,000.00 154880 11111 08/13/26 1678 WILINE NETWORKS INC. 63213 AUG ISP SERVICE 2,595.91 154881 11111 08/13/26 1894 YN MAINTENANCE SERVICES L 64511 8/3-8/9/26 JANIT SVCS 1,770.00 TOTAL FUND 153,946.87 35 SUNGARD PUBLIC SECTOR PAGE NUMBER: 3 DATE: 08/13/2026 CITY OF SARATOGA VENCHK11 TIME: 11:11:12 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT TOTAL REPORT 153,946.87 36 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 08/20/2026 CITY OF SARATOGA VENCHK11 TIME: 11:51:13 CHECK REGISTER - FUND TOTALS ACCOUNTING PERIOD: 2/27 FUND FUND TITLE AMOUNT 111 GENERAL FUND 151,132.63 233 SARAHILLS LIGHTING DIST 255.01 241 ARROYO DE SARATOGA L&ALPR 984.72 242 BONNET WAY LANDSCAPE 92.53 244 CUNNINGHAM/GLASGOW L&ALPR 9.61 245 FREDERICKSBURG L&ALPR 508.39 246 GREENBRIAR L&ALPR 5,421.61 248 LEUTAR COURT LANDSCAPE 253.71 249 MANOR DRIVE LANDSCAPE 2,470.00 251 MCCARTYSVILLE L&ALPR 828.10 252 PRIDES CROSSING L&ALPR 2,556.91 257 COVINA L&ALPR 930.00 271 BEUACHAMPS LANDSCAPE 72.87 272 BELLGROVE L&ALPR 18,249.00 273 GATEWAY LANDSCAPE 3,411.23 274 HORSESHOE DRIVE L&ALPR 9.59 276 TOLLGATE LANDSCAPE 23.68 279 BROOKVIEW L&ALPR 468.31 292 PARAMOUNT COURT SD&L&ALPR 553.02 311 2001 LIBRARY GO BONDS 825.00 411 CIP STREET PROJECTS FUND 7,264.51 414 CIP ADMIN PROJECTS FUND 615.81 612 WORKERS COMP FUND 328.00 622 IT SERVICES 1,198.77 623 VEHICLE & EQUIPMENT MAINT 3,929.67 624 BUILDING MAINTENANCE 16,768.07 632 IT EQUIPMENT REPLACEMENT 6,407.10 713 WVCWP AGENCY FUND 2,248.79 TOTAL REPORT 227,816.64 37 SUNGARD PUBLIC SECTOR PAGE NUMBER: 1 DATE: 08/20/2026 CITY OF SARATOGA VENCHK11 TIME: 11:49:10 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 154882 11111 08/20/26 546 ASSOC OF BAY AREA GOV/ABA 63111 GAS SERVICE 1,203.81 154883 11111 08/20/26 1187 ASSOCIATED SERVICES COMPA 61133 FACILITIES SUPPIES 109.90 154884 11111 08/20/26 1881 BAY AREA BACKFLOW INC 64549 WDSIDE DR BCKFLW TEST 141.00 154885 11111 08/20/26 188 CITY OF CAMPBELL-FINANCE 62624 WVSA SEPT 2026 LEASE 2,248.79 154886 11111 08/20/26 1951 CLASSIFIED SOUND 68619 ANNV CELEB PA SYSTEM 800.00 154887 11111 08/20/26 930 COLE SUPPLY COMPANY, INC. 64551 PARKS RESTRM SUPPLIES 1,090.16 154888 11111 08/20/26 1 COUNTY OF SCC-OFFICE OF S 64811 JUNE26 SUPP LAW ENFRC 817.50 154888 11111 08/20/26 1 COUNTY OF SCC-OFFICE OF S 64811 JUL26 SUPP LAW ENFORC 797.50 TOTAL CHECK 1,615.00 154889 11111 08/20/26 1717 DINSMORE LANDSCAPE COMPAN 64549 MED LOC IRR MAINT 4,940.00 154889 11111 08/20/26 1717 DINSMORE LANDSCAPE COMPAN 64549 LLA IRR MAINT 2026-27 2,470.00 154889 11111 08/20/26 1717 DINSMORE LANDSCAPE COMPAN 64549 LLA IRR MAINT 2026-27 2,470.00 154889 11111 08/20/26 1717 DINSMORE LANDSCAPE COMPAN 64549 JUNE26 PRKS T&M TEMP 2,205.90 TOTAL CHECK 12,085.90 154890 11111 08/20/26 341 DU-ALL SAFETY, LLC 66211 JULY26 FRKLFT TRAING 2,150.00 154891 11111 08/20/26 1940 FRUIT GUYS, LLC (FG NEWCO 61192 JULY WELLNESS SUPPLY 82.00 154891 11111 08/20/26 1940 FRUIT GUYS, LLC (FG NEWCO 61192 AUG WELLNESS SUPPLY 82.00 154891 11111 08/20/26 1940 FRUIT GUYS, LLC (FG NEWCO 61192 AUG WELLNESS SUPPLY 82.00 154891 11111 08/20/26 1940 FRUIT GUYS, LLC (FG NEWCO 61192 AUG WELLNESS SUPPLY 82.00 TOTAL CHECK 328.00 154892 11111 08/20/26 454 GACHINA LANDSCAPE MANAGEM 81161 AUG 26 RD WD ABATEMNT 1,023.09 154893 11111 08/20/26 1926 HARBOR IT, LLC 61279 WRELSS NETWRK EQUIP 6,407.10 154893 11111 08/20/26 1926 HARBOR IT, LLC 64315 AUG IT SUPPORT SVCS 978.00 154893 11111 08/20/26 1926 HARBOR IT, LLC 64315 IT SUPPORT SERVICES 168.75 TOTAL CHECK 7,553.85 154894 11111 08/20/26 1123 IMPERIAL SPRINKLER SUPPLY 61341 PARKS TOOLS/SUPPLIES 322.67 154894 11111 08/20/26 1123 IMPERIAL SPRINKLER SUPPLY 61341 PARKS TOOLS/SUPPLIES 167.92 154894 11111 08/20/26 1123 IMPERIAL SPRINKLER SUPPLY 61341 PARKS TOOLS/SUPPLIES 1,073.10 154894 11111 08/20/26 1123 IMPERIAL SPRINKLER SUPPLY 61341 PARKS TOOLS/SUPPLIES 3,861.04 154894 11111 08/20/26 1123 IMPERIAL SPRINKLER SUPPLY 61341 PARKS TOOLS/SUPPLIES 260.93 154894 11111 08/20/26 1123 IMPERIAL SPRINKLER SUPPLY 64549 PARKS TOOLS/SUPPLIES 280.01 154894 11111 08/20/26 1123 IMPERIAL SPRINKLER SUPPLY 64549 PARKS TOOLS/SUPPLIES 1,426.23 TOTAL CHECK 7,391.90 154895 11111 08/20/26 63 INTERSTATE TRAFFIC CONTRO 81121 STREETS SIGNAGE 123.75 154895 11111 08/20/26 63 INTERSTATE TRAFFIC CONTRO 81121 STREETS SIGNAGE 5,930.10 TOTAL CHECK 6,053.85 154896 11111 08/20/26 500 ISABELLA WANG 81121 ANNV CELEB UTILY BOX 600.00 154897 11111 08/20/26 500 JUAN P JUAREZ JR 66211 CWEA CERT RENEW FEE 118.00 154898 11111 08/20/26 500 LEE GAZLAY 68353 NBHD WATCH GRANT RMB 300.00 38 SUNGARD PUBLIC SECTOR PAGE NUMBER: 2 DATE: 08/20/2026 CITY OF SARATOGA VENCHK11 TIME: 11:49:10 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 154899 11111 08/20/26 1750 MARIO TOPETE TREE CARE, I 64581 AUG 26 TREE RMVL 8,400.00 154899 11111 08/20/26 1750 MARIO TOPETE TREE CARE, I 64581 JULY 26 TREE RMVL 890.00 TOTAL CHECK 9,290.00 154900 11111 08/20/26 1164 MOUSER LAW FIRM 65271 JULY 26 EMPLYMNT LAW 1,080.00 154901 11111 08/20/26 1572 NBBM SERVICES, INC 64551 AUG 26 PRKS JANIT SVC 5,254.00 154902 11111 08/20/26 1070 OMEGA INDUSTRIAL SUPPLY, 61341 PRKS VEH CLN SUPPLIES 3,853.14 154902 11111 08/20/26 1070 OMEGA INDUSTRIAL SUPPLY, 61341 PRKS VEH CLN SUPPLIES 298.97 TOTAL CHECK 4,152.11 154903 11111 08/20/26 1087 OSCAR URVIZO TELLEZ/OSCAR 64581 AUG CITYWDE TREE RESP 4,725.00 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 BUILDINGS 13,722.34 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 TRAFFIC SIGNALS 2,120.45 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 CITYWIDE STT LIGHTS 1,079.77 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 PARKS/OPEN SPACE 1,786.85 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 VILLAGE LIGHTING 4,148.16 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 AZULE LIGHTING 280.42 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 SARAHILLS LIGHTING 255.01 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 CUNINGHAM/GLASGOW 9.61 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 MCCARTYSVILLE 22.93 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 PRIDES CROSSING 19.06 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 BEAUCHAMPS 72.87 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 BELLGROVE CIRCLE 759.82 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 HRSESHE DR LNDSCAP 9.59 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 QUITO LIGHTING 769.71 154904 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 TOLLGATE 23.68 TOTAL CHECK 25,080.27 154905 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 CTYWDE STREET LIGHTS 575.41 154906 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 PARKS/OPEN SPACE 187.30 154907 11111 08/20/26 173 PACIFIC GAS & ELECTRIC 63111 LIB/LDSCP LGHTS SOLAR 34,632.40 154908 11111 08/20/26 393 REED & GRAHAM, INC 81121 STREETS SUPPLIES 187.57 154909 11111 08/20/26 55 ROSS RECREATION EQUIPMENT 61348 PRKS PLYGRND SUPPLIES 2,025.23 154909 11111 08/20/26 55 ROSS RECREATION EQUIPMENT 61348 PRKS PLYGRND SUPPLIES 2,500.28 TOTAL CHECK 4,525.51 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 PARKS/OPEN SPACE 2,098.01 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 MEDIANS/PARKWAYS 2,025.00 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 MED/PRKWYS 90% BONNET 832.76 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 MED/PRKWYS 50% BRKGLE 468.31 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 MED/MCCARTYSVILLE 75% 636.85 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 FREDERICKSBURG 508.39 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 GREENBRIAR 1,901.61 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 MCCARTYSVILLE 25% 212.28 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 MCCARTYSVILLE 592.89 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 ARROYO DE SARATOGA 984.72 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 LEUTAR CT 253.71 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 BONNET WAY 10% 92.53 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 PRIDES CROSSING 2,537.85 39 SUNGARD PUBLIC SECTOR PAGE NUMBER: 3 DATE: 08/20/2026 CITY OF SARATOGA VENCHK11 TIME: 11:49:10 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 BELLGROVE 17,489.18 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 GATEWAY PROJECT 1,886.23 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 12050 BRKGLEN DR 50% 468.31 154910 11111 08/20/26 87 SAN JOSE WATER COMPANY 63112 PARAMOUNT CT 553.02 TOTAL CHECK 33,541.65 154911 11111 08/20/26 160 SIERRA PACIFIC TURF SUPPL 61341 PRKS SUPPLY TURF SEED 332.55 154912 11111 08/20/26 1690 SOUTHERN COUNTIES LUBRICA 61362 AUG 2026 FUEL 3,929.67 154913 11111 08/20/26 884 STAPLES CONTRACT & COMMER 61111 FIN OFFICE SUPPLIES 47.39 154914 11111 08/20/26 1246 STATEWIDE TRAFFIC SAFETY 68582 STREETS TRAFFIC CNTRL 2,040.00 154914 11111 08/20/26 1246 STATEWIDE TRAFFIC SAFETY 68582 STREETS TRAFFIC CNTRL 8,397.30 TOTAL CHECK 10,437.30 154915 11111 08/20/26 710 THE BANK OF NEW YORK MELL 71114 FY26-27 SRTGA2011ADMN 825.00 154916 11111 08/20/26 500 THE ENERGUY 41412 REF PERMIT #26-1055 65.28 154916 11111 08/20/26 500 THE ENERGUY 43471 REF PERMIT #26-1055 109.60 154916 11111 08/20/26 500 THE ENERGUY 43471 REF PERMIT #26-1055 85.60 154916 11111 08/20/26 500 THE ENERGUY 43117 REF PERMIT #26-1055 15.81 TOTAL CHECK 276.29 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 178.17 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 15.38 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 185.78 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 14.61 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 733.09 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 46.26 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 170.09 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 107.10 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 599.45 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 440.07 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 18.10 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 43.66 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 30.22 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 55.74 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 134.17 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 229.90 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 437.25 154917 11111 08/20/26 488 HOME DEPOT CREDIT SERVICE 61341 PARKS LNDSCP SUPPLIES 36.77 TOTAL CHECK 3,475.81 154918 11111 08/20/26 1878 URBAN37, INC 64177 JULY BLDG PLAN REVIEW 29,138.74 154919 11111 08/20/26 395 VERIZON WIRELESS 63212 ADMIN SVCS 103.48 154919 11111 08/20/26 395 VERIZON WIRELESS 63212 BLDG & INSPECTION 106.91 154919 11111 08/20/26 395 VERIZON WIRELESS 63212 BLDG MAINTENANCE 52.02 154919 11111 08/20/26 395 VERIZON WIRELESS 63212 CODE COMPLIANCE 10.68 154919 11111 08/20/26 395 VERIZON WIRELESS 63212 GENERAL ENGINEERING 228.56 154919 11111 08/20/26 395 VERIZON WIRELESS 63212 IT SVCS 52.02 154919 11111 08/20/26 395 VERIZON WIRELESS 63212 PW PARKS 87.81 154919 11111 08/20/26 395 VERIZON WIRELESS 63212 PW STREETS 97.86 TOTAL CHECK 739.34 40 SUNGARD PUBLIC SECTOR PAGE NUMBER: 4 DATE: 08/20/2026 CITY OF SARATOGA VENCHK11 TIME: 11:49:10 CHECK REGISTER ACCOUNTING PERIOD: 2/27 FUND - 009 - DISBURSEMENT FUND CHECK NUMBER CASH ACCT DATE ISSUED --------------VENDOR-------------- ACCT -------DESCRIPTION------- AMOUNT 154920 11111 08/20/26 402 VISTA LANDSCAPE & MAINTEN 64549 JULY REC/CRT LNDSCPE 445.00 154920 11111 08/20/26 402 VISTA LANDSCAPE & MAINTEN 64549 JULY CTYHLL LNDSCPE 1,050.00 154920 11111 08/20/26 402 VISTA LANDSCAPE & MAINTEN 64221 JULY DWNTWN LNDSCPE 1,050.00 154920 11111 08/20/26 402 VISTA LANDSCAPE & MAINTEN 64549 JULY PRS/SRA LNDSCPE 1,525.00 154920 11111 08/20/26 402 VISTA LANDSCAPE & MAINTEN 64549 JULY COV/PRS LNDSCPE 930.00 154920 11111 08/20/26 402 VISTA LANDSCAPE & MAINTEN 64549 JULY SGL/COX LNDSCPE 1,050.00 TOTAL CHECK 6,050.00 154921 11111 08/20/26 1934 VORTEX INDUSTRIES, LLC 64549 DOOR/LOCK REPAIRS 2,840.08 154922 11111 08/20/26 1894 YN MAINTENANCE SERVICES L 64511 8/10-8/16/26 JANI SVC 1,680.00 TOTAL FUND 227,816.64 TOTAL REPORT 227,816.64 41 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: Administrative Services PREPARED BY: Evangeline Villarico, Accountant Ann Xu, Finance Manager SUBJECT: Treasurer’s Report for the Month Ended July 31, 2026 RECOMMENDED ACTION: Review and accept the Treasurer’s Report for the month ended July 31, 2026. BACKGROUND: California government code section 41004 requires that the City Treasurer submits to the City Clerk and the legislative body a written report and accounting of all receipts, disbursements, and fund balances. The Municipal Code of the City of Saratoga, Article 2 -20, Section 2-20.035 designates the City Manager as the City Treasurer. This report is prepared to fulfill this requirement. The following attachments provide financial transaction data for the City of Saratoga’s Funds collectively as well as specifically for the City’s General (Operating) Fund, changes in investment pool balances, and historical investment returns. FISCAL STATEMENT: Cash and Investments Balance As of July 31, 2026, the City’s unaudited cash and investments totaled $51,033,125. The total balance of $51.0 million exceeds the minimum amount required to meet all of the City Council’s adopted reserve requirements. The reserve fund balances are shown in Table 1. Comerica Bank 1,621,656$ Deposit with LAIF 43,304,184$ Deposit with CalTRUST 6,107,285$ Total Cash 51,033,125$ Cash Summary 42 City’s Current Financial Position In accordance with California Government Code section 53646(b)(3), the City is financially well positioned to meet its estimated expenditures for the next six months. As of July 31, 2026, the City’s financial position remains strong, with assets of $52.1 million, liabilities of $8.4 million, and fund equity of $43.7 million. There are no current or foreseeable issues in meeting financial obligations. The Fund Balance schedule shows actual funds available for all funds at the end of the month. It differs from the Cash Summary because fund balance reflects both assets and liabilities. As shown below, ending fund balance is calculated by adjusting total cash with total assets minus total liabilities, representing the actual funds available for financial obligations. ATTACHMENTS: Table 1 – Change in Total Fund Balances by Fund Table 2 – Change in Total Fund Balances by CIP Project Chart 1 – Cash Balance by Month Table 3 – Local Agency Investment Fund (LAIF) Quarterly Apportionment Rates Table 4 – CalTRUST Liquidity Fund Quarterly Yield Rates "+ Total Cash 51,033,125$ Plus: Assets 1,021,531 Less: Liabilities (8,369,302) Ending Fund Balance 43,685,354$ Adjusting Cash to Ending Fund Balance 43 TABLE 1: CHANGES IN TOTAL FUND BALANCE *Negative fund balance due to authorized spending of anticipated revenues **Includes long-term debt for Arrowhead Community Facilities District Bond ***Fund balances are unaudited Fund Description Prior Year Carryforward 7/1/2026*** Increase/ (Decrease) July Current Revenue Current Expenditure Transfer In Transfer Out Fund Balance 7/31/2026*** General Fund Committed Fund Balances: Hillside Stability Reserve 1,000,000 - - - - - 1,000,000 Assigned Fund Balances: Future Capital Project Reserve 2,505,781 - - - - - 2,505,781 Carryforwards Reserve 100,000 - - - - - 100,000 Road and Facility Replacement Reserve 3,200,000 - - - - - 3,200,000 Unassigned Fund Balances: Working Capital Reserve 1,000,000 - - - - - 1,000,000 Fiscal Stabilization Reserve 5,150,000 - - - - - 5,150,000 Compensated Absences Reserve 230,000 - - - - - 230,000 Other Unassigned Fund Balance Reserve (Pre YE distribution)10,242,160 - 783,092 (3,191,669) - - 7,833,583 General Fund Total 23,427,941 - 783,092 (3,191,669) - - 21,019,364 Special Revenue Landscape/Lighting, ALPR & Drainage Districts 950,902 - - (47,267) - - 903,635 Special Revenue Fund Total 950,902 - - (47,267) - - 903,635 Debt Service Library Bond 1,243,569 - - (772,030) - - 471,539 Arrowhead Bond (1,262,320) - - - - - (1,262,320) ** Debt Service Fund Total (18,751) - - (772,030) - - (790,781) Internal Service Fund Liability/Risk Management 2,147,188 - 450,000 (12,102) - - 2,585,086 Workers Compensation 694,307 - 100,000 (80,413) - - 713,894 Office Support 165,470 - 25,858 (1,078) - - 190,250 Information Technology Services 878,855 - 125,000 (75,037) - - 928,818 Vehicle & Equipment Maintenance 134,869 - 100,000 (40,849) - - 194,020 Facility Maintenance 876,639 - 450,000 (85,599) - - 1,241,040 Vehicle & Equipment Replacement 812,037 - 50,000 - - - 862,037 Technology Replacement 1,001,736 - 2,500 - - - 1,004,236 Facility FFE Replacement 954,338 - 10,000 (7,593) - - 956,745 Internal Service Fund Total 7,665,439 - 1,313,358 (302,671) - - 8,676,126 Trust/Agency WVSA Agency Fund 646,036 - - (67,346) - - 578,690 Trust/Agency Fund Total 646,036 - - (67,346) - - 578,690 Capital Project Street Projects 5,583,886 - 100,000 (37,166) - - 5,646,720 Park and Trail Projects 1,043,682 - - (535) - - 1,043,147 Facility Projects 473,121 - - - - - 473,121 Administrative Projects 2,622,382 - 118,670 - - - 2,741,052 Tree Fine Projects 149,615 - 25,300 - - - 174,914 Park In-Lieu Projects 1,634,177 - 82,328 - - - 1,716,505 CIP Grant Street Projects (82,476) - - - - - (82,476) * CIP Grant Park & Trail Projects 1,026,487 - - - - - 1,026,487 CIP Grant Administrative Projects (183,484) - - - - - (183,484) * CIP Grant ARPR/SLFRF Projects 820,811 - - (195,534) - - 625,277 Gas Tax Fund Projects 117,061 - - - - - 117,061 CIP Fund Total 13,205,261 - 326,297 (233,236) - - 13,298,320 Total City 45,876,825 - 2,422,747 (4,614,219) - - 43,685,354 44 TABLE 2: FUND BALANCES BY CIP PROJECT *Negative fund balance due to authorized spending of anticipated revenues ***Fund balances are unaudited CIP Funds/Projects Prior Year Carryforward 7/1/2026*** Increase/ (Decrease) July Current Revenue Current Expenditure Transfer In Transfer Out Fund Balance 7/31/2026*** Street Projects Annual Road Improvements 1,064,146 - - (31,895) - - 1,032,250 Roadway Safety & Traffic Calming 6,516 - - - - - 6,516 Traffic Signal Controller Upgrades 17,504 - - - - - 17,504 Safe Routes to School Implementation 339,467 - - - - - 339,467 Citywide Bikeways and Sidewalk Masterplan 57,395 - - - - - 57,395 Pedestrian Street Lights 33,288 - - - - - 33,288 Prospect/Saratoga Median Improvement 304,954 - - - - - 304,954 Saratoga/Herriman Traffic Signal 842,707.00 - - - - - 842,707 Village Clock 230 - - - - - 230 Annual Infrastructure Maintenance & Repairs 9,950 - - - - - 9,950 Annual Corrugated Pipe Rehabilitation Project 31,860 - - - - - 31,860 Saratoga Village Crosswalk & Sidewalk Rehabilitation 21,709 - - - - - 21,709 Quito Road Sidewalk Improvements 43,370 - - - - - 43,370 Saratoga/Sunnyvale Road Sidewalk 92,158 - - - - - 92,158 Quito Road Sidewalk Gap Closure Phase 1 182,609 - - - - - 182,609 Quito Road Sidewalk Rehabilitation Gap Closure Phase 2 300,000 - 100,000 - - - 400,000 Pierce Road Culvert Repairs (7,213) - - - - - (7,213) * Fourth Street Bridge Widening 134,331 - - - - - 134,331 Quito Road Bridge Replacement 127,478 - - - - - 127,478 Quito Road Bridge - ROW Acquisition 1,623 - - - - - 1,623 Bridge Rehabilitation Project Phase 1 697,400 - - - - - 697,400 Annual Retaining Wall Maintenance & Repairs 454,388 - - - - - 454,388 Mt. Eden Erosion Repair 78,017 - - (5,271) - - 72,746 Hillside Roads Stabilization Project 750,000 - - - - - 750,000 Total Street Projects 5,583,886 - 100,000 (37,166) - - 5,646,720 Parks & Trails Projects Park/Trail Repairs 51,169 - - (535) - - 50,633 Annual Mechanical Weed Abatement 50,000 - - - - - 50,000 Residential Tree Planting Program 64,153 - - - - - 64,153 Hakone Gardens Infrastructure Improvements 6,392 - - - - - 6,392 Hakone Pond Reconstruction 42,145 - - - - - 42,145 Guava/Fredericksburg Entrance 295,565 - - - - - 295,565 Saratoga Village to Quarry Park Walkway - Design 218,723 - - - - - 218,723 Park and Trail Fire Mitigation 315,536 - - - - - 315,536 Total Parks & Trails Projects 1,043,682 - - (535) - - 1,043,147 Facility Projects Open Work Space 3,300 - - - - - 3,300 Civic Theater Improvements 89,337 - - - - - 89,337 PEG Funded Project 221,294 - - - - - 221,294 Corp Yard Charging Station 150,000 - - - - - 150,000 Library Building Exterior Maintenance 9,190 - - - - - 9,190 Total Facility Projects 473,121 - - - - - 473,121 Administrative and Technology Projects Safe Routes to School 80,111 - - - - - 80,111 CDD Tech Development (133) - - - - - (133) * Software Technology Management 824,745 - 47,506 - - - 872,251 LLD Initiation Match Program (7,309) - - - - - (7,309) * Horseshoe Beautification (656) - - - - - (656) * Citywide Accessibility Assessment 18,436 - - - - - 18,436 City Art Program 96,498 - - - - - 96,498 Safe Routes to School Needs Assessment 14,478 - - - - - 14,478 El Quito Neighborhood Improvements 284,507 - - - - - 284,507 ADA Self Assessment 287,750 - - - - - 287,750 General Plan Update 1,023,955 - 71,164 - - - 1,095,119 Total Administrative and Technology Projects 2,622,382 - 118,670 - - - 2,741,052 45 TABLE 2 (cont.): FUND BALANCES BY CIP PROJECT *Negative fund balance due to authorized spending of anticipated revenues ***Fund balances are unaudited CIP Funds/Projects Prior Year Carryforward 7/1/2026*** Increase/ (Decrease) July Current Revenue Current Expenditure Transfer In Transfer Out Fund Balance 7/31/2026*** Tree Fine Projects Citywide Tree Planting Program 149,615 - 25,300 - - - 174,914 Total Tree Fine Projects 149,615 - 25,300 - - - 174,914 Park In-Lieu Projects Orchard Irrigation & Tree Planting 3,236 - - - - - 3,236 Hakone Gardens Infrastructure 25,198 - - - - - 25,198 Hakone Gardens Neighbor Wood Fence Replacement 5,750 - - - - - 5,750 Heritage Orchard Pathway Improvement 3,172 - - - - - 3,172 Historical Museum Landscape 30,220 - - - - - 30,220 Quarry Park Maintenance Building Utility Project 144 - - - - - 144 Quarry Park Parking Expansion 75,000 - - - - - 75,000 Bellgrove Park Playground Replacement 200,000 - - - - - 200,000 Congress Springs Park Concrete Repair 64,180 - - - - - 64,180 Congress Springs Park Backstop 11,000 - - - - - 11,000 El Quito Park Pickleball 430 - - - - - 430 El Quito Park Community Garden 3,694 - - - - - 3,694 Trail Pet Stations 25,000 - - - - - 25,000 Saratoga Village to Quarry Park Walkway - Design 223,810 - - - - - 223,810 Village Oaks Bridge Reconstruction and Erosion Control 5,400 - - - - - 5,400 Unallocated Park In-Lieu Funds 957,943 - 82,328 - - - 1,040,271 Total Park In-Lieu Projects 1,634,177 - 82,328 - - - 1,716,505 CIP Grant Street Projects Local Roadway Safety Plan (4,882) - - - - - (4,882) * Safe Route to School 40,654 - - - - - 40,654 Citywide Bikeways & SW MP 2,312 - - - - - 2,312 Prospect/Saratoga Median Improvement (4,876) - - - - - (4,876) * Saratoga Ave Sidewalk (115,406) - - - - - (115,406) * Village Sidewalk, Curb & Gutter - Phase II Construction (91) - - - - - (91) * Saratoga Village Crosswalk & Sidewalk Rehabilitation (24,176) - - - - - (24,176) * 4th Street Bridge 15,011 - - - - - 15,011 Quito Bridge Replacement 18,597 - - - - - 18,597 Quito Road Bridges - ROW Acquisition (9,619) - - - - - (9,619) * Total CIP Grant Street Projects (82,476) - - - - - (82,476) CIP Grant Park & Trail Projects Blue Hills Elementary Pedestrian Crossing at UPPR 1,015,468 - - - - - 1,015,468 Park and Trail Fire Mitigation 11,019 - - - - - 11,019 Total CIP Grant Park & Trail Projects 1,026,487 - - - - - 1,026,487 CIP Grant Administrative Projects CDD Software/ADA 39,736 - - - - - 39,736 Safe Routes to School Needs Assessment (2,040) - - - - - (2,040) * General Plan Update (LEAP)(221,180) - - - - - (221,180) * Total CIP Grant Administrative Projects (183,484) - - - - - (183,484) CIP Grant ARPA/SLFRF Projects Park Sewer Lateral Replacement and Upgrades 479 - - - - - 479 Storm Drain Master Plan 46,526 - - - - - 46,526 Saratoga Village Water Improvement 770,471 - - (195,534) - - 574,937 City Hall Green STW Infrastructure 3,335 - - - - - 3,335 Total CIP Grant ARPA/SLFRF Projects 820,811 - - (195,534) - - 625,277 Gas Tax Fund Projects Annual Roadway Improvements 61,698 - - - - - 61,698 Prospect/Saratoga Median Improvements 48,278 - - - - - 48,278 Quito Road Bridges 7,085 - - - - - 7,085 Total Gas Tax Fund Projects 117,061 - - - - - 117,061 Total CIP Funds 13,205,261 - 326,297 (233,236) - - 13,298,320 46 CHART 1: CASH BALANCE BY MONTH $0 $5,000,000 $10,000,000 $15,000,000 $20,000,000 $25,000,000 $30,000,000 $35,000,000 $40,000,000 $45,000,000 $50,000,000 Treasury Balance General Fund CIP Internal Service L&L Districts Debt Service 47 TABLE 3 March June September December 1977 5.68 5.78 5.84 6.45 1978 6.97 7.35 7.86 8.32 1979 8.81 9.10 9.26 10.06 1980 11.11 11.54 10.01 10.47 1981 11.23 11.68 12.40 11.91 1982 11.82 11.99 11.74 10.71 1983 9.87 9.64 10.04 10.18 1984 10.32 10.88 11.53 11.41 1985 10.32 9.98 9.54 9.43 1986 9.09 8.39 7.81 7.48 1987 7.24 7.21 7.54 7.97 1988 8.01 7.87 8.20 8.45 1989 8.76 9.13 8.87 8.68 1990 8.52 8.50 8.39 8.27 1991 7.97 7.38 7.00 6.52 1992 5.87 5.45 4.97 4.67 1993 4.64 4.51 4.44 4.36 1994 4.25 4.45 4.96 5.37 1995 5.76 5.98 5.89 5.76 1996 5.62 5.52 5.57 5.58 1997 5.56 5.63 5.68 5.71 1998 5.70 5.66 5.64 5.46 1999 5.19 5.08 5.21 5.49 2000 5.80 6.18 6.47 6.52 2001 6.16 5.32 4.47 3.52 2002 2.96 2.75 2.63 2.31 2003 1.98 1.77 1.63 1.56 2004 1.47 1.44 1.67 2.00 2005 2.38 2.85 3.18 3.63 2006 4.03 4.53 4.93 5.11 2007 5.17 5.23 5.24 4.96 2008 4.18 3.11 2.77 2.54 2009 1.91 1.51 0.90 0.60 2010 0.56 0.56 0.51 0.46 2011 0.51 0.48 0.38 0.38 2012 0.38 0.36 0.35 0.32 2013 0.28 0.24 0.26 0.26 2014 0.24 0.22 0.24 0.25 2015 0.26 0.28 0.32 0.37 2016 0.46 0.55 0.60 0.68 2017 0.78 0.92 1.07 1.20 2018 1.51 1.90 2.16 2.40 2019 2.55 2.57 2.45 2.29 2020 2.03 1.36 0.84 0.63 2021 0.44 0.33 0.24 0.23 2022 0.32 0.75 1.35 2.07 2023 2.74 3.15 3.59 4.00 2024 4.30 4.55 4.71 4.62 2025 4.48 4.40 4.34 4.20 2026 3.98 3.92 Quarterly Apportionment Rates Local Agency Investment Fund 48 TABLE 4 March June September December 2019 2.50 2.37 2.06 1.69 2020 0.98 0.25 0.15 0.03 2021 0.05 0.03 0.03 0.03 2022 0.16 1.37 2.75 4.62 2023 4.59 5.06 5.44 5.69 2024 5.43 5.39 5.34 4.83 2025 4.40 4.39 4.34 4.06 2026 3.80 3.75 CalTRUST Liquidity Fund Quarterly Yield Rates 49 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: Administrative Services Department PREPARED BY: Monica LaBossiere, Human Resources Manager SUBJECT: Response to 2025-2026 Civil Grand Jury of Santa Clara County Report “Pothole Damage: Improving Claims Processes within Santa Clara County” RECOMMENDED ACTION: Approve the draft response to the 2025-2026 Civil Grand Jury of Santa Clara County Report “Pothole Damage: Improving Claims Processes within Santa Clara County.” BACKGROUND: The Santa Clara County Civil Grand Jury (“Grand Jury”) reviews local government operations and may issue reports containing findings and recommendations. When a Grand Jury report requests a response from a public agency, California Penal Code Sections 933 and 933.05 establish the response timing and content requirements. On June 12, 2026, the Grand Jury issued a report titled, “Pothole Damage: Improving Claims Processes within Santa Clara County.” The report examines how the County of Santa Cl ara and the cities and towns within Santa Clara County process claims for vehicle damage caused by potholes and recommends improvements to make the claims process more accessible and transparent. Regarding the City of Saratoga, the report issued the following findings and recommendations: Finding 1 Jurisdictions within Santa Clara County rejected 92% of pothole claims from 2020 to 2025 due to reasons including missed deadlines, incorrect jurisdiction, and lack of prior notice. Recommendation 1 No recommendation. 50 Finding 2 Claims are often rejected because the claimant filed with the incorrect jurisdiction, which can happen because jurisdictional lines are often unclear or poorly communicated. The claims websites of all jurisdictions within Santa Clara County lack information about how to determine if a road is in its jurisdiction. Recommendation 2a All jurisdictions within Santa Clara County should include a link to a map or list of roads they maintain on their claims website. The jurisdictions should implement this by December 15, 2026. Recommendation 2b All jurisdictions within Santa Clara County should update their claims websites to identify roads that are commonly mistaken as being in their jurisdictions. The jurisdictions should implement this by December 15, 2026. Finding 3 Fifteen jurisdictions, including the County, Campbell, Cupertino, Gilroy, Los Altos, Los Altos Hills, Los Gatos, Milpitas, Monte Sereno, Morgan Hill, Mountain View, Palo Alto, San José, Santa Clara, and Saratoga, have websites with deficiencies that make it difficult to file a claim. Recommendation 3a Eleven jurisdictions, including the County, Campbell, Cupertino, Los Altos, Los Altos Hills, Milpitas, Monte Sereno, Morgan Hill, Mountain View, San José, and Saratoga, should update their websites to provide clear instructions and information about how to file a claim in addition to a link to the claim form. The jurisdictions should implement this by December 15, 2026. By statute, agencies must respond to Grand Jury Findings and Recommendations within ninety (90) days of the issuance of the report, unless otherwise directed by the Presiding Judge. In addition, for each of the Grand Jury's findings, the response must indicate either: 1. Agreement with the finding; or 2. Disagreement with the finding, either wholly or in part, identifying the disputed portion and explaining the reason for the disagreement. For each of the Grand Jury's recommendations, the response must indicate one of the following: 1. The recommendation has been implemented, with a summary of the implementing action; 51 2. The recommendation has not yet been implemented, but will be implemented in the future, with a timeframe for implementation; 3. The recommendation requires further analysis, with an explanation and the scope and parameters of the analysis or study, and a timeframe no longer than six months for the matter to be prepared for discussion by the appropriate City official or the City Council; or 4. The recommendation will not be implemented because it is not warranted or is not reasonable, with an explanation. DISCUSSION: The June 12, 2026, Grand Jury report directs Findings 1, 2, and 3 and Recommendations 2a, 2b, and 3a to the City of Saratoga (“City”). The report found that, countywide, jurisdictions rejected 92% of pothole claims filed between 2020 and 2025, most commonly because a claim was filed after the statutory deadline, filed with an agency lacking jurisdiction over the location, or because the responsible agency lacked prior notice of the pothole under the California Government Claims Act. Regarding Finding 1, the proposed response, attached hereto, agrees with the finding. Claims are properly rejected when filed after the statutory deadline (generally six months from the date of the incident, as required under the Government Claims Act), filed with an agency lacking jurisdiction over the location, or when the City lacked actual or constructive notice of the condition (i.e., the City did not create the condition, had not received a prior report of it, no City employee observed and reported it, and the condition had not existed long enough that the City should have discovered it through routine inspection). The City’s claims are administered in coordination with its third - party claims administrator Carl Warren & Company, which investigates and evaluates claims on the City’s behalf in accordance with the Government Claims Act. The City’s claims data for this period is consistent with the countywide trend identified by the Grand Jury, and no recommendation is directed to the City in connection with this finding. Regarding Finding 2 and Recommendations 2a and 2b, the proposed response agrees that jurisdictional boundaries for road maintenance can be unclear to the public, particularly where City streets adjoin state routes, such as State Route 9 (Big Basin Way), or fall within unincorporated county pockets located inside the City's boundaries that remain under County, rather than City, jurisdiction. The City already maintains on its website an interactive GIS map that identifies City boundaries; however, this map is not currently linked from the City's claims webpage, and the claims webpage also does not separately identify roadways commonly mistaken as being within City jurisdiction, such as State Route 9 (Big Basin Way), which is owned and maintained by Caltrans notwithstanding its location within the Saratoga Village commercial district. Approval of the proposed response would commit the City to linking its existing GIS map and adding this roadway information to its claims webpage by December 15, 2026. 52 Regarding Finding 3 and Recommendation 3a, the proposed response agrees in part. The City agrees that its claims webpage does not currently provide clear step-by-step instructions for filing a claim beyond a link to the claim form itself and commits to adding such instructions by December 15, 2026. The proposed response also notes that the City is one of only two jurisdictions countywide, along with the City of Palo Alto, that currently offers an online e-filing option for claims, and that the City also provides website and claim form translation into multiple languages, both of which the Grand Jury’s report recognized as notable accessibility features. For the above reasons, staff recommends that the City Council approve the proposed response attached and authorize the Mayor to sign and transmit it to the Presiding Judge of the Superior Court, in accordance with California Penal Code Sections 933 and 933.05. ATTACHMENTS: Attachment A - City of Saratoga Draft Response Attachment B - Civil Grand Jury Report “Pothole Damage: Improving Claims Processes within Santa Clara County” 53 Incorporated October 22, 1956 CITY OF SARATOGA 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 • (408) 868-1200 COUNCIL MEMBERS: Chuck Page Tina Walia Kookie Fitzsimmons Yan Zhao Belal Aftab September 3, 2026 The Honorable Julie A. Emede Presiding Judge Superior Court of California, County of Santa Clara 191 North First Street San Jose, CA 95113 RE: City of Saratoga Response to the 2025-2026 Santa Clara County Civil Grand Jury Report, “Pothole Damage: Improving Claims Processes within Santa Clara County” Dear Judge Emede: Pursuant to California Penal Code sections 933(c) and 933.05, the City of Saratoga (City) respectfully submits its response to the findings and recommendations directed to the City in the 2025-2026 Santa Clara County Civil Grand Jury’s (Civil Grand Jury) final report, “Pothole Damage: Improving Claims Processes within Santa Clara County,” dated June 12, 2026. The City is required to respond to Findings 1, 2, and 3 and Recommendations 2a, 2b, and 3a, and does so below in accordance with the response requirements of Penal Code section 933.05. Response to Findings Finding 1: “Jurisdictions within Santa Clara County rejected 92% of pothole claims from 2020 to 2025 due to reasons including missed deadlines, incorrect jurisdiction, and lack of prior notice.” Response: Agree. The City reviews each pothole claim in accordance with the California Government Claims Act. Claims are properly rejected when they are filed after the statutory deadline (generally six months from the date of the incident, as required under the Government Claims Act), filed with an agency that lacks jurisdiction over the location in question, or when the City did not have actual or constructive notice of the condition prior to the incident (i.e., the City did not create the condition, had not received a prior report of it, no City employee observed and reported it, and the condition had not existed long enough that the City should have discovered it through routine inspection). The City’s 54 claims are administered in coordination with its third-party claims administrator (Carl Warren & Company), which investigates and evaluates claims on the City’s behalf in accordance with the Government Claims Act. The City’s claims data for this period is consistent with the countywide trend identified by the Civil Grand Jury. Finding 2: “Claims are often rejected because the claimant filed with the incorrect jurisdiction, which can happen because jurisdictional lines are often unclear or poorly communicated. The claims websites of all jurisdictions within Santa Clara County lack information about how to determine if a road is in its jurisdiction.” Response: Agree. The City agrees that jurisdictional boundaries for road maintenance can be unclear to the public, particularly where City streets adjoin state routes, such as State Route 9 (Big Basin Way), or fall within unincorporated county pockets located inside the City's boundaries that remain under County, rather than City, jurisdiction. The City maintains on its website an interactive GIS map that identifies City boundaries, City- maintained roadways, and a list of private roads; however, this resource is not currently linked from the City's claims webpage. The City will address this gap through Recommendations 2a and 2b below. Finding 3: “Fifteen jurisdictions, including the County, Campbell, Cupertino, Gilroy, Los Altos, Los Altos Hills, Los Gatos, Milpitas, Monte Sereno, Morgan Hill, Mountain View, Palo Alto, San José, Santa Clara, and Saratoga, have websites with deficiencies that make it difficult to file a claim.” Response: Agree in part. The City agrees that its claims webpage does not currently provide clear step-by-step instructions for filing a claim beyond a link to the claim form itself, and the City will address this through Recommendation 3a below. The City notes, however, that it is one of only two jurisdictions countywide, along with the City of Palo Alto, that currently offers an online e-filing option for claims, and it also provides website and form translation into multiple languages, both of which the Civil Grand Jury’s report recognized as notable accessibility features. The City will build on these existing capabilities as it implements the improvement described below. Response to Recommendations Recommendation 2a: “All jurisdictions within Santa Clara County should include a link to a map or list of roads they maintain on their claims website. The jurisdictions should implement this by December 15, 2026.” Response: The recommendation has not yet been implemented but will be implemented by the recommended timeframe. The City maintains on its website an interactive GIS map that identifies City boundaries; however, this resource is not currently 55 linked from the City’s claims webpage. The City will add a direct link to this GIS map to its claims webpage by December 15, 2026. Recommendation 2b: “All jurisdictions within Santa Clara County should update their claims websites to identify roads that are commonly mistaken as being in their jurisdictions. The jurisdictions should implement this by December 15, 2026.” Response: The recommendation has not yet been implemented but will be implemented by the recommended timeframe. The City will update its claims webpage to identify roadways commonly mistaken as being within City jurisdiction, including State Route 9 (Big Basin Way), which is owned and maintained by Caltrans notwithstanding its location within the Saratoga Village commercial district. This addition will be implemented by December 15, 2026. Recommendation 3a: “Eleven jurisdictions, including the County, Campbell, Cupertino, Los Altos, Los Altos Hills, Milpitas, Monte Sereno, Morgan Hill, Mountain View, San José, and Saratoga, should update their websites to provide clear instructions and information about how to file a claim in addition to a link to the claim form. The jurisdictions should implement this by December 15, 2026.” Response: The recommendation has not yet been implemented but will be implemented by the recommended timeframe. The City will update its claims webpage to include clear written instructions describing the claims process, required documentation, and applicable deadlines, in addition to the existing link to the claim form and e-filing option. This will be implemented by December 15, 2026. The City appreciates the Civil Grand Jury’s review of this important issue and its recommendations to improve the accessibility and transparency of the claims process countywide. The City is committed to responsive, transparent local government and will continue to evaluate opportunities to improve the claims process for residents. Please contact the City Clerk’s Office at 408-868-1294 or bavrit@saratoga.ca.us with any questions regarding this response. Respectfully submitted, Chuck Page, Mayor City of Saratoga 56 2025-2026 Santa Clara County Civil Grand Jury Pothole Damage: Improving claims processes within Santa Clara County June 12, 2026 57 Page 1 of 20 POTHOLE DAMAGE T ABLE OF CONTENTS SUMMARY ................................................................................................................................... 2 BACKGROUND ........................................................................................................................... 3 Who Is Responsible for Pothole Damage ................................................................................ 3 Why So Many Claims Are Rejected ........................................................................................ 3 The California Government Claims Act ................................................................................. 4 Why the Civil Grand Jury Conducted This Investigation .................................................... 4 METHODOLOGY ....................................................................................................................... 5 INVESTIGATION ........................................................................................................................ 6 How Jurisdictions Investigate Claims ..................................................................................... 6 Two Common Reasons for Rejection ...................................................................................... 7 Rejection Notices are Often Vague .......................................................................................... 8 Filing a Claim: Determining which Jurisdiction is Responsible .......................................... 9 Filing a Claim: Obtaining and Submitting a Claim Form .................................................. 10 CONCLUSION ........................................................................................................................... 13 FINDINGS AND RECOMMENDATIONS ............................................................................. 14 REQUIRED RESPONSES......................................................................................................... 16 APPENDIX A: Reporting a Pothole ......................................................................................... 17 REFERENCES............................................................................................................................ 18 58 Page 2 of 20 POTHOLE DAMAGE SUMMARY If you hit a pothole within Santa Clara County and damage your vehicle, chances are that your local government will decline to reimburse you for repairs. According to data analyzed by the 2025-26 Santa Clara County Civil Grand Jury (Civil Grand Jury), 92% of pothole claims filed with the County of Santa Clara (County) and the 15 cities and towns in Santa Clara County from 2020 to 2025 were rejected. People who file claims may find this high rejection rate disappointing. They may also be frustrated by the state law that establishes the claims process, which can often be complex and opaque. For example, in some jurisdictions, it’s not easy to figure out how to file a claim. Also, while the City of Palo Alto (Palo Alto) and the City of Saratoga (Saratoga) offer e-filing options, claims filed in other jurisdictions must be mailed in or returned in person. And when a claim is denied, the rejection notice often provides little or no explanation. The County, cities, and towns can and should do better. Specifically, they should: x Make online claim forms available or easier to find, and include clearer instructions and timelines; x Provide forms in multiple languages that reflect their specific demographics; x Make it easier for claimants to determine which jurisdiction is responsible for a given roadway; x Update their rejection letters to specify why claims were denied. Implementing these changes would make the claims process simpler and more accessible. It would also minimize at least one source of frustration for residents who are already burdened by unexpected repair costs. 59 Page 3 of 20 POTHOLE DAMAGE BACKGROUND For the purposes of this report, a pothole is defined as a depression or hole in the road that forms when pavement breaks apart due to traffic stress and weather conditions. Potholes can cause severe damage to tires and the underside of vehicles, with a particular risk to two-wheeled vehicles. If drivers believe the local government is responsible for their damage, they can file a claim seeking reimbursement. According to local media reports, Bay Area drivers in 2022 filed more than 1,000 claims for potholes and other road damages. According to data that the California Department of Transportation (Caltrans) provided to CBS News, it rejected more than 95% of Bay Area claims (Feingold and Manthey, 2024; Manthey and Watts, 2024). Who Is Responsible for Pothole Damage Claims for road-related damage must be filed with the state, county, or city agency that has jurisdiction over the road where the damage occurred. For example: x Caltrans is generally responsible for major freeways and highways, such as US-101, I-280, and State Route 87. x The County is responsible for expressways and county roads, such as Capitol and Lawrence Expressways. x Cities and towns are generally responsible for local streets within their boundaries, including residential neighborhoods. Why So Many Claims Are Rejected The Civil Grand Jury requested and received claims data from the County and the 15 cities and towns in Santa Clara County covering the period from 2020 to 2025. The Civil Grand Jury’s analysis of that data revealed that only 9% of pothole claims across Santa Clara County were settled. Under the California Government Claims Act (Cal. Gov. Code §§ 810 et seq.), local agencies have wide discretion to reject a pothole claim for reasons including but not limited to: x The claim form was incomplete or not filed by the required deadline; 60 Page 4 of 20 POTHOLE DAMAGE x It was filed in the wrong jurisdiction; x The responsible county, city, or town either was not aware of the pothole or was aware but had not had sufficient time to repair it. These laws make it difficult for a claimant to dispute a denial. For example, if an agency rejects a claim on the grounds that it was not aware of the pothole, the law does not require it to provide evidence to back up its assertion. In addition, because different agencies can have jurisdiction over different sections of the same road, it can be difficult for a claimant to determine which agency is responsible for the specific location where the damage occurred. If the person files with the wrong jurisdiction, the agency can reject the claim with no obligation to specify the reason or redirect the claimant to the correct jurisdiction. If a claim is rejected, the claimant can pursue legal action according to the California Government Claims Act. The California Government Claims Act The California Government Claims Act (Cal. Gov. Code §§ 810 et seq.) establishes timelines and procedures for filing lawsuits seeking money or damages from a public entity. In general, the Government Claims Act specifies that a claim must be filed no later than six months from the date of the incident. The claim must include what happened, what harm occurred, and the amount of compensation requested. Once the public entity receives the claim, it has 45 days to review, investigate, and decide whether to settle or reject it. If a claim is rejected, the claimant has six months to file a lawsuit. Why the Civil Grand Jury Conducted This Investigation The Civil Grand Jury believes that claims processes should be consistent, accessible, and transparent. It also believes the public interest is served by highlighting when processes fall short of that standard. The Civil Grand Jury conducted this investigation to: x Examine how local government agencies manage pothole claims; x Understand why so many claims are denied; 61 Page 5 of 20 POTHOLE DAMAGE x Recommend how jurisdictions can make it easier for potential claimants to engage in the process. METHODOLOGY The Civil Grand Jury requested data from all 16 jurisdictions responsible for road maintenance within Santa Clara County. The data excluded state routes and interstate highways because Caltrans, a state agency, is not subject to Civil Grand Jury review. Jurisdictions provided data about all claims filed against them for road-related damages between 2020 and 2025. Information provided included the number of pothole claims, the amount claimed, the resolution, and the reason for rejection. Three jurisdictions provided response letters sent to claimants. The Civil Grand Jury reviewed the websites of the following 16 agencies to analyze what content was included and how clearly it was presented: x County of Santa Clara (County) x City of Campbell (Campbell) x City of Cupertino (Cupertino) x City of Gilroy (Gilroy) x City of Los Altos (Los Altos) x Town of Los Altos Hills (Los Altos Hills) x Town of Los Gatos (Los Gatos) x City of Milpitas (Milpitas) x City of Monte Sereno (Monte Sereno) x City of Morgan Hill (Morgan Hill) x City of Mountain View (Mountain View) x City of Palo Alto (Palo Alto) x City of San José (San José) x City of Santa Clara (Santa Clara) x City of Saratoga (Saratoga) x City of Sunnyvale (Sunnyvale) The Civil Grand Jury also interviewed representatives from four jurisdictions that together account for about two-thirds of the roads in Santa Clara County. These interviews provided further insight into the agencies’ processes and decisionဩmaking practices. 62 Page 6 of 20 POTHOLE DAMAGE INVESTIGATION There are over 10,000 miles of locally maintained lanes in Santa Clara County (Metropolitan Transportation Commission, 2026). Between 2020 and 2025, the agencies received exactly 400 claims specifically due to potholes. Of the pothole claims, the Civil Grand Jury determined that the jurisdictions collectively settled 34 claims, or 8.5%. The percentage of settlements for damages varied among the individual entities. The data showed that during that five-year period: x Gilroy and Saratoga each settled 50% of claims filed (however, they each averaged 1-2 claims per year, among the smallest sample sizes in Santa Clara County). x Four jurisdictions paid at least 10% of claims: Morgan Hill (17%), the County (11%), Santa Clara (11%), and Milpitas (10%). x The remaining jurisdictions paid 9% of claims or fewer. The Civil Grand Jury acknowledges that the significance of this data is limited; if an entity received a high volume of claims filed in the wrong jurisdiction, it will not settle those claims. How Jurisdictions Investigate Claims Jurisdictions within Santa Clara County generally follow a similar process for receiving and evaluating a claim. First, the claim gets submitted to a city clerk, city manager, or equivalent official, who logs it along with any accompanying documents. Next, the official notifies the local public works department so it can investigate the incident site as needed. In the meantime, the official assigns the claim to an investigator, usually in the city attorney’s or county counsel’s office. The investigator verifies whether the agency has jurisdiction, ensures the form was filled out correctly, and reviews any photographs and receipts that were submitted. If the jurisdiction agrees to pay out the claim, it will often mail a check. But if the claim involves injuries or death, or the claimant is seeking tens of thousands of dollars, the settlement may need approval from the respective city council or the County Board of Supervisors. If the jurisdiction rejects the claim, it will inform the claimant via a form letter or email. The California Government Claims Act does not require jurisdictions to specify the reason for denial. 63 Page 7 of 20 POTHOLE DAMAGE Two Common Reasons for Rejection According to the data provided to the Civil Grand Jury, claims are frequently denied for one of two reasons: The claim was out of the entity’s jurisdiction, or the County, city, or town had no prior notice of the pothole. Out of Jurisdiction A claim must be filed with the agency that has jurisdiction over the specific location where the incident occurred. According to interviews conducted by the Civil Grand Jury, claims that are filed with the wrong jurisdiction will almost certainly be rejected as outside of jurisdiction. A road’s location within an agency’s boundaries does not necessarily mean that agency is responsible for receiving or resolving related claims. Jurisdiction over road maintenance can shift multiple times as roads cross between state, county, and municipal boundaries. This patchwork of responsibility can be confusing, making it hard for claimants to figure out which agency has jurisdiction over the specific location of their incident. Agencies typically verify their jurisdiction by consulting their local public works, utilities, or roads departments. No Prior Notice The Government Claims Act also establishes limits to the public entities’ liability for the condition of its roadways. One of those limitations is the issue of notice to the public entity. The Civil Grand Jury found this was one of the two most common reasons pothole claims are rejected. Notice typically requires evidence that at least one of four circumstances exists: 1. The public entity created the condition; 2. The pothole had been reported prior to an incident in which a vehicle was damaged; 3. An agency’s employee observed the pothole and reported it; 4. The pothole existed long enough that the jurisdiction should have known about it through regular inspections. If none of these circumstances applies, the agency can declare it had no prior notice and deny the claim. When an agency receives notice of a pothole, state law allows for a reasonable period to address the hazard. It does not specify what constitutes a reasonable timeframe. 64 Page 8 of 20 POTHOLE DAMAGE Drivers can help ensure that a jurisdiction receives prior notice by promptly reporting any potholes. All jurisdictions have a mechanism for reporting potholes and other issues (see Appendix A). Rejection Notices are Often Vague As noted above, it is not unusual for an agency to withhold its reason for rejecting a claim. A rejection notice would contain this language, in part, which is required by the California Government Claims Act (Cal. Gov. Code § 913): NOTICE OF REJECTION OF CLAIM Dear Claimant, Notice is hereby given that the claim you presented to (insert title of board or officer) on (date) was rejected on (date). WARNING Subject to certain exceptions, you have only six (6) months from the date this notice was personally delivered or deposited in the mail to file a court action on this claim. See Government Code Section 945.6. You may seek the advice of an attorney of your choice in connection with this matter. If you desire to consult an attorney, you should do so immediately. Agencies may provide further information, such as the reason for rejection. A notice of denial can be aggravating enough, but when it is written in minimal legalistic terms, claimants may feel even more frustrated. The Civil Grand Jury learned about rejection letters from the County, Los Altos, Los Gatos, Mountain View, Palo Alto, and San José and found that some but not all rejection letters provide a reason for rejection. Rejection letters from other jurisdictions may follow this same approach. In Civil Grand Jury interviews, one agency official suggested that people who receive a letter like this contact the agency and see if it will share the reason for rejection. Although the reason for rejection is recorded by the agency, there is no legal obligation to provide this information, and agencies may limit this information. 65 Page 9 of 20 POTHOLE DAMAGE Filing a Claim: Determining which Jurisdiction is Responsible Caltrans Jurisdiction If a pothole is located on a state route or interstate highway, the claim would generally fall under Caltrans’s jurisdiction. These routes, which, according to Caltrans, cover about 250 miles throughout Santa Clara County (California Department of Transportation, 2025) include: x U.S. Route 101 (US-101) x Interstate 280 (I-280) x Interstate 680 (I-680) x Interstate 880 (I-880) x State Route 17 (SR-17) x State Route 35 (SR-35) x State Route 82 (SR-82), which includes El Camino Real x State Route 85 (SR-85) x State Route 87 (SR-87) x State Route 130 (SR-130), which includes part of Alum Rock Road and Mount Hamilton Road x State Route 152 (SR-152) x State Route 237 (SR-237) Residents may not realize that some common local routes fall under Caltrans jurisdiction. These include SR-82, a large part of which includes El Camino Real; Mount Hamilton Road; and SR- 130, which is part of Alum Rock Avenue. When a local road crosses or overlaps a state route or interstate, that portion is generally under Caltrans jurisdiction. County Jurisdiction Expressways and many county roads are maintained by the County Roads and Airports Department. Major roads include: x Almaden Expressway x Capitol Expressway x Central Expressway x Foothill Expressway x Lawrence Expressway 66 Page 10 of 20 POTHOLE DAMAGE x Montague Expressway x Oregon Expressway x San Tomas Expressway x Southwest Expressway Complicated Exceptions Further complicating efforts to determine which agency has jurisdiction over a particular area, cities, Caltrans, the County, and even the federal government (such as near Moffett Federal Airfield) have maintenance agreements that specify which agency is responsible for certain roadway segments – such as onramps, offramps, and other defined areas (City of Mountain View, 2019). It is not always easy to determine which agency is responsible for which segments. Complicated Maps Some jurisdictions have no public maps indicating which roads they are responsible for. The County and some cities, including San José, Campbell, and Mountain View, do post searchable maps online that can help the public narrow down which jurisdiction is responsible for a particular road. However, the maps often use complicated interfaces rather than a simple image or printout, and many maps are not specific to just the roads maintained by the jurisdictions. San José, which maintains more than 4,000 miles of locally maintained lanes within its borders, has its own mapping website (Metropolitan Transportation Commission, 2026; City of San José, 2020). It shows whether a particular street within its boundaries is maintained by San José, the County, a private entity, or another agency. The website provides a large amount of information, although it is complicated for the average user to navigate. An alternative source of information is pavement management plans that some agencies make available. These plans may list all roads maintained by the jurisdiction and can be used as a reference. As an example, Morgan Hill has a link to its latest 2024 Pavement Management Report with a list of streets at the end. However, there is no direct link from the claim forms webpage, so claimants would not be aware of this reference (AMS Consulting, 2025). Filing a Claim: Obtaining and Submitting a Claim Form Once a person has found the proper jurisdiction, the next step is to download the claim form from the local agency’s website. Of the 16 jurisdictions, the Civil Grand Jury found that only Gilroy, Los Gatos, Palo Alto, Santa Clara, and Sunnyvale provide adequate claims process information on their webpages or on the claim form itself. 67 Page 11 of 20 POTHOLE DAMAGE Most jurisdictions provide forms only in English. This is an omission that could potentially disenfranchise community members who have limited proficiency in English. The Civil Grand Jury identified three cities that took the helpful step of providing additional language options: x Morgan Hill provides a PDF of its claim form in English and Spanish. x Sunnyvale has a translation feature that allows claimants to translate the form into one of 200+ languages. Users can either fill out the translated form online and print a copy or print out a blank translated form and fill it out by hand. x Saratoga’s website uses a third-party widget to translate its website in addition to an online form to many other languages. The Civil Grand Jury also investigated how easy it is to find claim forms on each jurisdiction’s website by searching for the term “claim form.” The Civil Grand Jury could not find any information about submitting a pothole claim in four entities: Campbell, Los Altos, Los Altos Hills, and Monte Sereno. Cupertino provides a claim form, but users must use the website’s search function to find it. Gilroy does not link directly to a claim form, although it does provide instructions on how to request a form by email or in person. 68 Page 12 of 20 POTHOLE DAMAGE Table 1: Access to online claim process instructions and link to claim form (See References for links) Jurisdiction Online Claims Process Instructions Link to Claim Form Caltrans Yes Yes County of Santa Clara No Yes Campbell No No Cupertino No Yes Gilroy Yes No Los Altos No No Los Altos Hills No No Los Gatos Yes Yes Milpitas No Yes Monte Sereno No No Morgan Hill No Yes Mountain View No Yes Palo Alto Yes Yes San José No Yes Santa Clara Yes Yes Saratoga No Yes Sunnyvale Yes Yes Many jurisdictions recommend that claimants deliver the claim form in person, including all relevant information, such as photos, receipts, and witness statements. The claimant should retain a signed copy. Some agencies allow for email submission, but this is the exception. Alternatively, a claimant could submit the claim by mail to the city or town clerk (or, for the County, the Clerk of the Board). According to the California Government Claims Act, the agency has 45 days from the date the claim form was mailed or delivered in person to respond to the claimant. 69 Page 13 of 20 POTHOLE DAMAGE CONCLUSION Even though state law sets strict rules for filing and reviewing claims, local government agencies retain significant discretion over their processes. By offering clearer online information, improving access to claim forms, expanding language options, and providing more detailed explanations when claims are denied, jurisdictions can significantly improve public trust, reduce frustration, and increase fairness. Implementing the recommended updates is not only feasible, but it also aligns with the spirit of responsive and transparent public service. The Civil Grand Jury urges all jurisdictions to adopt these improvements by the recommended deadlines to ensure that the claims process is fairer, more consistent, and easier for the public to navigate. 70 Page 14 of 20 POTHOLE DAMAGE FINDINGS AND RECOMMENDATIONS Finding 1 Jurisdictions within Santa Clara County rejected 92% of pothole claims from 2020 to 2025 due to reasons including missed deadlines, incorrect jurisdiction, and lack of prior notice. Recommendation 1 No recommendation. Finding 2 Claims are often rejected because the claimant filed with the incorrect jurisdiction, which can happen because jurisdictional lines are often unclear or poorly communicated. The claims websites of all jurisdictions within Santa Clara County lack information about how to determine if a road is in its jurisdiction. Recommendation 2a All jurisdictions within Santa Clara County should include a link to a map or list of roads they maintain on their claims website. The jurisdictions should implement this by December 15, 2026. Recommendation 2b All jurisdictions within Santa Clara County should update their claims websites to identify roads that are commonly mistaken as being in their jurisdictions. The jurisdictions should implement this by December 15, 2026. Finding 3 Fifteen jurisdictions – the County, Campbell, Cupertino, Gilroy, Los Altos, Los Altos Hills, Los Gatos, Milpitas, Monte Sereno, Morgan Hill, Mountain View, Palo Alto, San José, Santa Clara, and Saratoga – have websites with deficiencies that make it difficult to file a claim. Recommendation 3a Eleven jurisdictions – the County, Campbell, Cupertino, Los Altos, Los Altos Hills, Milpitas, Monte Sereno, Morgan Hill, Mountain View, San José, and Saratoga – should update their websites to provide clear instructions and information about how to file a claim in addition to a link to the claim form. The jurisdictions should implement this by December 15, 2026. 71 Page 15 of 20 POTHOLE DAMAGE Recommendation 3b Fourteen jurisdictions – the County, Campbell, Cupertino, Gilroy, Los Altos, Los Altos Hills, Los Gatos, Milpitas, Monte Sereno, Morgan Hill, Mountain View, Palo Alto, San José, and Santa Clara – should incorporate useable software on their websites that can translate claim forms into multiple languages or provide claim forms in multiple languages based on the demographics they serve. The jurisdictions should implement this by December 15, 2026. Finding 4 When pothole claims are rejected, claimants filing claims against the County, Los Altos, Los Gatos, Mountain View, Palo Alto, and San José receive a notice that provides little or sometimes no explanation for the rejection. Although jurisdictions within Santa Clara County are not legally obligated to provide a reason for rejection, the lack of clarity in the decisions made on the claims can add to a claimant’s frustration. Recommendation 4 The County, Los Altos, Los Gatos, Mountain View, Palo Alto, and San José should update their rejection letters to specify whether the decision was due to lack of timeliness, incorrect jurisdiction, lack of prior notice, or other reason and to provide a specific contact to call or email if the claimant has further questions about the reason for rejection. The jurisdictions should implement this by December 15, 2026. 72 Page 16 of 20 POTHOLE DAMAGE REQUIRED RESPONSES Pursuant to California Penal Code section 933(a) et seq. and California Penal Code section 933.05, the 2025-2026 Santa Clara County Civil Grand Jury requests responses from the following governing body: Responding Agency Findings Recommendations County of Santa Clara 1, 2, 3, 4 2a, 2b, 3a, 3b, 4 City of Campbell 1, 2, 3 2a, 2b, 3a, 3b City of Cupertino 1, 2, 3 2a, 2b, 3a, 3b City of Gilroy 1, 2, 3 2a, 2b, 3b City of Los Altos 1, 2, 3, 4 2a, 2b, 3a, 3b, 4 Town of Los Altos Hills 1, 2, 3 2a, 2b, 3a, 3b Town of Los Gatos 1, 2, 3, 4 2a, 2b, 3b, 4 City of Milpitas 1, 2, 3 2a, 2b, 3a, 3b City of Monte Sereno 1, 2, 3 2a, 2b, 3a, 3b City of Morgan Hill 1, 2, 3 2a, 2b, 3a, 3b City of Mountain View 1, 2, 3, 4 2a, 2b, 3a, 3b, 4 City of Palo Alto 1, 2, 3, 4 2a, 2b, 3b, 4 City of San José 1, 2, 3, 4 2a, 2b, 3a, 3b, 4 City of Santa Clara 1, 2, 3 2a, 2b, 3b City of Saratoga 1, 2, 3 2a, 2b, 3a City of Sunnyvale 1, 2 2a, 2b 73 Page 17 of 20 POTHOLE DAMAGE APPENDIX A: Reporting a Pothole Residents who see a pothole can report it so the jurisdiction can repair it in a timely manner. Based on a Civil Grand Jury review, here is a list of contacts (as of April 15, 2026) where potholes or other needed street repairs can be reported: Jurisdiction Website to report a pothole Caltrans https://csr.dot.ca.gov/index.php/Msrsubmit County of Santa Clara https://roads.santaclaracounty.gov/services/service-requests Campbell https://www.campbellca.gov/requesttracker.aspx Cupertino https://cupertinoca.citysourced.com/servicerequests/create Gilroy https://seeclickfix.com/gilroy Los Altos https://www.losaltosca.gov/FormCenter/Public-Works-6/ Maintenance-Service-Request-46 Los Altos Hills https://www.losaltoshills.ca.gov/requesttracker.aspx Los Gatos https://www.losgatosca.gov/FormCenter/PPW-15/Report-a- Parks-Public-Works-Concern-87 Milpitas https://seeclickfix.com/web_portal/ chZ2d7WdKoe4V2BriJxUCFqd/report/category Monte Sereno https://www.montesereno.org/forms.aspx?FID=80 Morgan Hill https://www.morganhill.ca.gov/509/Maintenance Mountain View https://www.mountainview.gov/our-city/departments/public- works/roads-and-transportation/street-maintenance Palo Alto https://www.paloalto.gov/Residents/Services/Report-an-Issue San José https://311.sanjoseca.gov/ Santa Clara https://www.santaclaraca.gov/our-city/government/mayor-and- council/contact-city-council Saratoga https://www.saratoga.ca.us/FormCenter/Report-a-Concern- 6/Fix-It-Form-45 Sunnyvale https://sunnyvale.dynamics365portals.us/neighborhood- complaints/ 74 Page 18 of 20 POTHOLE DAMAGE REFERENCES Bibliography AMS Consulting. “Pavement Management Technical Assistance Program (P-TAP) Round 25, 2024/2025 Pavement Management Report.” March 21, 2025. (https://www.morganhill.ca.gov/DocumentCenter/View/53950/Updated-Morgan-Hill- PTAP-25-Rev01-for-Web). Accessed April 16, 2026. Cal. Gov. Code § 810 et seq. Cal. Gov. Code § 913 et seq. California Department of Transportation. “California Road Data 2024.” November 2025. (https://dot.ca.gov/-/media/dot-media/programs/research-innovation-system- information/documents/hpms/hpms-2024-prd-a11y.pdf). Accessed April 28, 2026. California Department of Transportation. “Submit Damage Claim.” n.d. (https://dot.ca.gov/ online-services/submit-damage-claim). Accessed April 15, 2026. City of Cupertino. “Claim Form.” September 2022. (https://cupertinoca.prelive.opencities.com/files/assets/city/v/1/your- city/documents/claim-form-rev-102523.pdf). Accessed April 29, 2026. City of Gilroy. “How to File a Claim.” n.d. (https://www.cityofgilroy.org/966/How-to-File-a- Claim). Accessed April 15, 2026. City of Milpitas. “Helpful Links.” n.d. (https://www.milpitas.gov/188/Helpful-Links). Accessed April 15, 2026. City of Morgan Hill. “Claim for Damages Form.” n.d. (https://www.morganhill.ca.gov/1411/ Claim-for-Damages-Form). Accessed April 15, 2026. City of Mountain View. “Claim Form.” n.d. (https://www.mountainview.gov/our-city/ departments/city-attorneys-office/claim-form). Accessed April 15, 2026. City of Mountain View. “GIS/Mapping Portal, Map Road Centerline” July 18, 2019. (https://data-mountainview.opendata.arcgis.com/search?q=roads). Accessed April 28, 2026. 75 Page 19 of 20 POTHOLE DAMAGE City of Palo Alto. “Submit a Claim Against the City.” n.d. (https://www.paloalto.gov/ Departments/City-Attorney/Submit-a-Claim-Against-the-City). Accessed April 15, 2026. City of San José. “File Claim Against City Form.” n.d. (https://www.sanjoseca.gov/your- government/appointees/city-clerk/forms-filings/file-claim-against-city-form). Accessed April 15, 2026. City of San José. “Streets.” August 27, 2020. (https://gisdata- csj.opendata.arcgis.com/datasets/CSJ::streets/about). Accessed April 16, 2026. City of Santa Clara. “Frequently Asked Questions.” July 23, 2015. (https://www.santaclaraca.gov/our-city/departments-a-f/city-attorney-s-office/frequently- asked-questions). Accessed April 15, 2026. City of Saratoga. “Claims Against Saratoga.” n.d. (https://www.saratoga.ca.us/FormCenter/ Claims-Form-37/Claims-Against-Saratoga-102). Accessed April 15, 2026. City of Sunnyvale. “File a Claim Against the City.” n.d. (https://www.sunnyvale.ca.gov/your- government/city-clerk/file-a-claim-against-the-city). Accessed April 15, 2026. County of Santa Clara. “File a claim of loss against the County.” n.d. (https://cob.santaclaracounty.gov/services/file-claim-loss-against-county). Accessed April 15, 2026. Feingold, Lindsey and Manthey, Grace. “Less than 4% of Bay Area Caltrans pothole, other damage claims approved in recent years: data.” KGO-TV. January 25, 2024. (https:// abc7news.com/post/bay-area-potholes-caltrans-claims-car-damages/14359988/). Accessed April 14, 2026. Metropolitan Transportation Commission. “Pavement Conditions of Bay Area Jurisdictions 2024.” January 5, 2026. (https://mtc.ca.gov/digital-library/5099739-pavement-condition- bay-area-jurisdictions-2024). Accessed April 15, 2026. Town of Los Gatos. “File a Claim.” n.d. (https://www.losgatosca.gov/2422/File-a-Claim). Accessed April 15, 2026. Watts, Julie and Manthey, Grace. “California freeways with the most potholes and car damage claims.” CBS News California. May 23, 2024. (https://www.cbsnews.com/news/california-freeways-most-potholes-damage-claims/). Accessed April 14, 2026. 76 Page 20 of 20 POTHOLE DAMAGE This report was ADOPTED by the 2025-2026 Santa Clara County Civil Grand Jury on this 12th day of June, 2026. ______________________________ Dinesh Ramde Foreperson 77 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: City Manager PREPARED BY: Leslie Arroyo, City Manager SUBJECT: Response to 2025-2026 Civil Grand Jury of Santa Clara County Report “VTA’s Management and Oversight of BART Silicon Valley Phase II” RECOMMENDED ACTION: Approve the draft response to the 2025-2026 Civil Grand Jury of Santa Clara County Report “VTA’s Management and Oversight of BART Silicon Valley Phase II.” BACKGROUND: The Santa Clara County Civil Grand Jury (“Grand Jury”) reviews local government operations and may issue reports containing findings and recommendations. When a Grand Jury report requests a response from a public agency, California Penal Code Sections 933 and 933.05 establish the response timing and content requirements. On June 17, 2026, the Grand Jury issued a report titled, "VTA’s Management and Oversight of BART Silicon Valley Phase II." The report examines VTA’s financial planning, project oversight, and coordination, as well as the continuity and appointment practices of VTA’s Board of Directors (“Board”). Regarding the City of Saratoga, the report issued the following findings and recommendations: Finding 6 VTA Board Appointing Authority Groups 2 through 5 often do not follow VTA Administrative Code (Section 2-14) admonitions to “appoint individuals with appropriate experience and qualifications in transportation” and to “reappoint representatives to consecutive terms.” Recommendation 6 VTA Board Appointing Authority Groups 2 through 5 should certify to the VTA Board that they will adhere to VTA Administrative Code (Section 2-14) admonitions regarding Board member expertise and appointment to consecutive terms. 78 Finding 7 VTA Board Appointing Authority Groups 2 through 5 have different processes for making Board appointments. Recommendation 7 The cities represented in Appointing Authority Groups 2 through 5 should agree on a uniform process for making Board appointments. By statute, agencies must respond to Grand Jury Findings and Recommendations within ninety (90) days of the issuance of the report, unless otherwise directed by the Presiding Judge. In addition, for each of the Grand Jury’s findings, the response must indicate either: 1. Agreement with the finding; or 2. Disagreement with the finding, either wholly or in part, identifying the disputed portion and explaining the reason for the disagreement. For each of the Grand Jury’s recommendations, the response must indicate one of the following: 1. The recommendation has been implemented, with a summary of the implementing action; 2. The recommendation has not yet been implemented, but will be implemented in the future, with a timeframe for implementation; 3. The recommendation requires further analysis, with an explanation and the scope and parameters of the analysis or study, and a timeframe no longer than six months for the matter to be prepared for discussion by the appropriate City official or the City Council; or 4. The recommendation will not be implemented because it is not warranted or is not reasonable, with an explanation. DISCUSSION: The June 17, 2026, Grand Jury report directs Findings 6 and 7 and Recommendations 6 and 7 to the towns and cities that participate in VTA Board Appointing Authority Groups 2 through 5. The City of Saratoga (“City”) is a member of Group 3, which includes the towns and cities of Campbell, Cupertino, Los Gatos, and Monte Sereno. Section 2-14 of the VTA Administrative Code (“Code”) provides that each city grouping determines its own procedure for selecting directors and alternates for VTA’s Board. The Code also strongly encourages appointing authorities, where possible, to consider transportation experience and qualifications, sufficient remaining time in elected office, and consecutive terms. Regarding Finding 6 and Recommendation 6, the proposed response, attached hereto, partially disagrees with the finding in that it agrees that transportation qualifications and continuity are important, but does not agree with the broad conclusion that the appointing groups often fail to follow the Code. In practice, the Group 3 cities’ existing process considers qualifications, elected- term availability, continuity, equitable representation, and the needs of the participating jurisdictions. Approval of the proposed response would confirm the City’s continued commitment to consider the Section 2-14 factors, where possible. Regarding Finding 7 and Recommendation 7, the proposed response does agree with Finding 7 that the appointing groups use different appointment processes and recommends no change to the Group 3 process at this time. The current process is considered adequate and is consistent with the 79 Code’s delegation of appointment procedures to each grouping. The City and the other Group 3 towns and cities would remain open to considering a specific alternative process developed or recommended by VTA, including supporting legal and operational analysis. In the absence of such a proposal, the City does not intend to pursue a uniform countywide appointment process. For the above reasons, staff recommends that the City Council approve the proposed response attached and authorize the Mayor to sign and transmit it to the Presiding Judge of the Superior Court, in accordance with California Penal Code Sections 933 and 933.05. ATTACHMENTS: Attachment A – City of Saratoga Draft Response Attachment B – Civil Grand Jury Report “VTA’s Management and Oversight of BART Silicon Valley Phase II” 80 Incorporated October 22, 1956 CITY OF SARATOGA 13777 FRUITVALE AVENUE • SARATOGA , CALIFORNIA 95070 • (408) 868 -1200 COUNCIL MEMBERS: Belal Aftab Kookie Fitzsimmons Chuck Page Tina Walia Yan Zhao September 3, 2026 Honorable Julie A. Emede Presiding Judge Superior Court of California, County of Santa Clara 191 North First Street San Jose, CA 95113 Subject: City of Saratoga Response to 2026 Santa Clara County Civil Grand Jury Report, "VTA’s Management and Oversight of BART Silicon Valley Phase II" Dear Judge Emede, The City Council of Saratoga reviewed the Santa Clara County Civil Grand Jury report titled "VTA’s Management and Oversight of BART Silicon Valley Phase II" at its September 2, 2026 meeting and is providing the attached response pursuant to California Penal Code Sections 933 and 933.05. The City’s response addresses Findings 6 and 7 and Recommendations 6 and 7 concerning the qualifications, continuity, and selection processes for city-appointed members of the VTA Board of Directors. The City values effective regional representation and supports consideration of transportation qualifications and continuity when appointments are made. The City believes the existing appointment process use d by VTA Board Appointing Authority Group 3 is adequate and consistent with the discretion provided by the VTA Administrative Code. The City remains open to considering a specific alternative approach developed or recommended by VTA. In the absence of such a proposal, the city does not intend to change the current Group 3 appointment process. Respectfully submitted, Chuck Page, Mayor City of Saratoga City of Saratoga Response to 2025-2026 Santa Clara County Civil Grand Jury Report “VTA’s Management and Oversight of BART Silicon Valley Phase II” 81 2 DISCUSSION The following responses are provided pursuant to California Penal Code Sections 933 and 933.05. The City responses are organized by the finding and recommendation numbering used in the Santa Clara Co unty Civil Grand Jury report. The City of Saratoga is one of five jurisdictions in VTA Board Appointing Authority Group 3, together with Campbell, Cupertino, Los Gatos, and Monte Sereno. FINDINGS Finding 6. VTA Board Appointing Authority Groups 2 through 5 often do not follow VTA Administrative Code (Section 2-14) admonitions to “appoint individuals with appropriate experience and qualifications in transportation” and to “reappoint representatives to consecutive terms.” Response: Disagree partially. The City agrees that transportation experience and qualifications, sufficient time remaining in an appointee’s elected term, and continuity through consecutive service are important considerations. The City disagrees with the report’s broad conclusion that Appo inting Authority Groups 2 through 5 often do not follow Section 2-14. Section 2-14 states that appointing authorities are strongly encouraged to consider these factors “where possible,” while also providing that each grouping determines its own selection procedure. The Group 3 process includes consideration during a joint meeting of the Group’s mayors during monthly mayor and managers’ meetings. The report does not establish that Group 3’s current process is inadequate or that its appointments have failed to account for the Section 2-14 considerations. We are open to considering further guidance in what mechanism the Board would recommend for implementing VTA Administrative Code . Finding 7. VTA Board Appointing Authority Groups 2 through 5 have different processes for making Board appointments. Response: Agree. The appointing authority groups use different selection processes. This is consistent with Section 2-14 of the VTA Administrative Code, which provides that the procedures for selecting directors and alternates are to be determined by the cities in each respective grouping. RECOMMENDATIONS Recommendation 6. VTA Board Appointing Authority Groups 2 through 5 should certify to the VTA Board that they will adhere to VTA Administrative Code (Section 2 -14) admonitions regarding Board member expertise and appointment to consecutive terms. Response: Implemented. By approving this response, the City provides that, when participating in Group 3 appointment decisions, it will continue to consider the factors identified in Section 2-14, including appropriate transportation experience and qualifications, sufficient remaining time in elected office, and consecutive terms, where possible. This certification does not alter the discretion granted to the Group 3 cities to determine their appointment procedure or require appointment of a particular eligible elected official. Each of the other Group 3 jurisdictions acts through its own governing body and may provide a corresponding certification in its response. Recommendation 7. The cities represented in Appointing Authority Groups 2 through 5 should agree on a uniform process for making Board appointments. Response: The recommendation will not be implemented because it is not warranted or reasonable at this time. The city and the other Group 3 cities consider the current Group 3 appointment process adequate. The process reflects the composition and needs of the five participating cities and is consistent with Section 2-14, which expressly assigns each grouping responsib ility for determining its own procedure. A uniform process across Groups 2 through 5 could reduce the flexibility needed to account for differences in group size, representation, elected-term timing, and local circumstances. If VTA develops and recommends a specific alternative approach, the city would be open to considering it in coordination with the other Group 3 cities. Unless and until such a proposal is presented, the city does not intend to change the existing Group 3 appointment process. 82 SUPERIOR COURT BUILDING • 191 NORTH FIRST STREET, SAN JOSE, CALIFORNIA 95113 • (408) 882-2721 • FAX (408) 882-2795 G R A N D J U R Y S A N T A C L A R A C O U N T Y June 11, 2026 City of Saratoga c/o Ms. Britt Avrit, City Clerk 13777 Fruitvale Avenue Saratoga, CA 95070 Sent via email: bavrit@saratoga.ca.us Dear Ms. Avrit, Pursuant to Penal Code section 933.05(f), the 2025-2026 Santa Clara County Civil Grand Jury is transmitting to you its report, VTA’s Management and Oversight of BART Silicon Valley Phase II. Penal Code section 933.05(f) states the following: A grand jury shall provide to the affected agency a copy of the portion of the grand jury report relating to that person or entity two working days prior to its public release and after the approval of the presiding judge. No officer, agency, department or governing body of a public agency shall disclose any contents of the report prior to the public release of the final report. Leg. H. 1996 ch. 1170, 1997 ch. 443. Accordingly, it is the responsibility of the responding agency to ensure this report is not improperly disclosed. Depending on the substance of the report’s subject matter, you may need to confer with relevant agency officials. To avoid improper distribution of this report, you should only distribute this draft report to the fewest persons necessary to accomplish a review of the draft report. To ensure accountability, keep a record of who receives a copy of the draft report, and ensure that all recipients understand they are prohibited from further disclosing or distributing this report without authorization. This report is scheduled to be made public and released to the media on Tuesday, June 16, 2026. If you have any questions or would like to alert the Civil Grand Jury to potential errors or an oversight in the report before it is released, please contact Britney Huelbig, Deputy Manager for the Civil Grand Jury, at (408) 882-2721 or CGJ@scscourt.org and Kavita Narayan, Chief Assistant County Counsel, at (408) 299-5927 or kavita.narayan@cco.sccgov.org before June 16, 2026, at 10 a.m. Sincerely, Dinesh Ramde Foreperson 2025-2026 Civil Grand Jury Enclosures cc: Kavita Narayan, Chief Assistant County Counsel, County of Santa Clara Leslie Arroyo, Acting City Manager 83 2025-2026 Santa Clara County Civil Grand Jury VTA’s Management and Oversight of BART Silicon Valley Phase II [Release Date TBD] 84 Page 1 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II T ABLE OF CONTENTS SUMMARY ................................................................................................................................... 2 BACKGROUND ........................................................................................................................... 3 METHODOLOGY ....................................................................................................................... 7 INVESTIGATION ........................................................................................................................ 8 Financial Risks .......................................................................................................................... 8 Oversight Concerns ................................................................................................................ 13 Coordination with BART ....................................................................................................... 21 Board Experience and Continuity ......................................................................................... 22 Public Communication ........................................................................................................... 25 CONCLUSION ........................................................................................................................... 26 FINDINGS AND RECOMMENDATIONS ............................................................................. 27 REQUIRED RESPONSES ......................................................................................................... 31 APPENDIX A: BART Management Letter ............................................................................. 32 CONFLICTS ............................................................................................................................... 34 REFERENCES ............................................................................................................................ 34 85 Page 2 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II SUMMARY The Santa Clara Valley Transportation Authority (VTA) project to extend commuter rail service through downtown San José is controversial and the most costly and complex project it has ever undertaken. Known as BART Silicon Valley Phase II (BSVII), the $12.7 billion project extends rail service six miles and includes a large, single-bore underground tunnel and will take 10 years or more from 2026 to complete (VTA, March 2024). Despite significantly reduced ridership projections and uncertainty about funding sources for both capital and operating costs, VTA has awarded major construction contracts, including for the construction of a launch structure to stage a specialized one-of-a-kind Tunnel Boring Machine (TBM), which will be owned by VTA. Over the next few years, VTA anticipates awarding further construction contracts worth billions of dollars. To reduce uncertainty, the spokesperson for a federally sponsored peer review of the project urged VTA to move quickly to “build as much as you can, as fast as you can” (VTA Special Board Meeting, 2025). Such an approach assumes that there will be political will and taxpayer support to finish an incomplete project regardless of cost increases, delays, or reduced ridership. The VTA’s Board of Directors (Board) has recognized the need for additional oversight and guidance, but the Board has failed to exercise its obligation to provide the strategic direction needed for a successful project. The Oversight Committee it created has been left to define its own role. It was not required to, and does not, provide reports that share available independent analyses of critical issues. The Oversight Committee does not routinely make policy recommendations to the Board and does not hold VTA staff accountable for providing the timely analysis it has requested. The 2025-26 Santa Clara County Civil Grand Jury (Civil Grand Jury) investigated the role of the VTA Board, its Oversight Committee, its staff, and officials in the management and oversight of the BSVII project. This report identifies financial challenges, risks, and accountability issues that VTA must address to earn the public’s trust in delivering the Bay Area Rapid Transit (BART) extension to Silicon Valley and to secure support for future sales tax measures. 86 Page 3 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II BACKGROUND The Valley Transportation Authority is a transportation agency established by state law. It is responsible for operating public transit services, including buses, light rail, and paratransit within Santa Clara County. In addition to public transit, VTA is a planning and funding agency for transportation infrastructure projects throughout Santa Clara County. As established by the California Public Utilities Code Sections 100060-100070, the VTA is governed by a 12-person Board of Directors composed of elected officials appointed by the County of Santa Clara (County) and the cities in Santa Clara County, who each serve two-year terms. The Board has many responsibilities and its monthly meeting agendas are lengthy. The San Francisco Bay Area Rapid Transit District provides regional commuter rail service and is governed by a nine-person Board of Directors elected to four-year terms from districts representing San Francisco, Alameda, and Contra Costa counties. As part of its larger regional system, BART operates the commuter rail service within Santa Clara County. By contract with BART, VTA is solely responsible for paying the capital and net operating costs of extending commuter rail service into Santa Clara County (BART and VTA, Comprehensive Agreement, 2001). Although the County was not included in the legislation establishing BART, voters of Santa Clara County supported four sales tax measures which provided funds to build and operate the extension of BART to Santa Clara County. Today, 1.625% of sales tax collected in Santa Clara County supports VTA (see Table 1). If a currently proposed measure qualifies for the ballot, in November 2026, voters will decide whether to approve an additional 0.5% sales tax to fund local transit, which would increase the County’s base sales tax rate from the current 9.75% to 10.25%. 87 Page 4 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Table 1: Countywide Sales Tax in Santa Clara County, Effective April 2026 Description Sales Tax % Expiration Funding Purpose California Base 7.250% No Expiration State General Fund Local Revenue Fund Local Public Safety Health & Social Services 1976 Measure A 0.500% No Expiration Transit: VTA 2000 Measure A 0.500% 2036 Transit: VTA, BART Silicon Valley 2008 Measure B 0.125% 2042 Transit: BART Silicon Valley 2016 Measure B 0.500% 2047 Transit: VTA + Infrastructure 2012 Measure A 0.125% No Expiration County General Fund 2020 Measure RR 0.125% 2050 Transit: Caltrain 2026 Measure A 0.625% 2031 General incl. Healthcare Total Base Sales Tax Rate 9.750% Data extracted from: California Department of Tax and Fee Administration. 2026. (https://cdtfa.ca.gov/formspubs/cdtfa105.pdf); VTA Annual Comprehensive Financial Report. Page 3-10. 2024. (https://www.vta.org/sites/default/files/2024-12/Annual-Comprehensive- Financial-Report-ACRF-FY-2024.pdf). Note: Some cities have higher voter-approved rates in addition to the County base rate; Highlighted section of the table refers to sales tax measures that fund VTA. The first phase of BART to Silicon Valley extended service to Milpitas and then to the Berryessa Transit Center (Berryessa). Construction started in 2012 and was completed in 2020. Ridership for Phase I has not met forecasts, resulting in significant financial losses for VTA. According to data reviewed by the Civil Grand Jury, BART to Silicon Valley Phase I has lost an average of $69 million annually during the first five years of operation. The second phase consists of a six-mile, four-station extension from Berryessa through downtown San José to the City of Santa Clara. For this phase, VTA is targeting completion by 2037. As a condition of federal funding, the Federal Transit Administration (FTA) has appointed a Project Management Oversight Consultant (PMOC). The PMOC uses a more conservative schedule and forecasts completion in 2039 (AtkinsRéalis USA Holdings LLC, 2026). At an early planning stage in 2014, the BSVII project cost was estimated at $4.7 billion. By 2020, the cost estimate increased to $6.9 billion. In 2022, based on the PMOC’s projected cost analysis, VTA submitted an estimate of $9.1 billion to the federal government for an Early Start Grant. In 88 Page 5 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II October 2023, VTA estimated the construction cost at $12.2 billion with operations to begin in 2036. The most recent estimate is $12.7 billion, and operations are pushed back to 2037 (VTA Auditor General Report, January 2024). The project's funding sources include federal and state grants, as well as local revenues from voter- approved sales tax measures. All the funding sources are subject to risks, which are identified in this report. Figure 1 shows the funding sources with $700 million to be determined (TBD) and $375 million from a potential ballot measure in November 2026. Figure 1: Components of $12.7 Billion in BSVII Funding Sources Source: vtabart.org website (accessed April 9, 2026) Although two years earlier, VTA had asked for a federal commitment of $6.3 billion, in August 2024, the FTA announced that its share of funding would be capped at $5.1 billion (Geha, 2024). VTA was forced to increase its reliance on local sales tax revenue and still faced a gap of approximately $700 million (VTA, Summer 2025). To reduce project costs, VTA has been studying design changes while maintaining the full six-mile extension with four stations. Options discussed by VTA staff and officials include (VTA, November 11, 2024): • Simplifying station configurations; • Modifying the Santa Clara Newhall Yard and Maintenance Facility; • Modifying the tunnel and station ventilation systems; • Substituting a surface parking lot for a parking structure; 89 Page 6 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II • Reconfiguring the tunnel to use less concrete and steel. In addition, the funding strategy assumes $375 million from the yet-to-be-approved regional sales tax measure for a total outstanding gap of $1.075 billion. Due in part to the significant increase in estimated cost and a perceived lack of communication about the project’s cost, risks, and schedule, the Board conducted a workshop in October 2023 to review the project’s status. At this workshop, individual Board members expressed a lack of confidence in the VTA staff’s management of the project and requested a new system of oversight and project management. In response, the Board chair established an Ad Hoc BART Silicon Valley Phase II oversight committee (Oversight Committee) responsible for overseeing all aspects of the project, focusing on a full, independent, and transparent review of costs, funding, risks, and completion schedule. The Oversight Committee’s bylaws later stated that its purpose was to provide “guidance and oversight” of the project (VTA, April 4, 2024). The VTA independent auditor general was tasked with providing staff support to the Oversight Committee and was authorized to contract with Subject Matter Experts (SMEs) to independently review and comment on VTA staff recommendations regarding costs, risks, and schedule. In turn, the Oversight Committee authorized the SME firm, Gall Zeidler (GZ), to independently assess the risks and viability of cost-saving alternatives. In a 2001 Agreement, VTA and BART agreed to cooperate in the project’s planning, design, and construction. They established a series of interagency committees, the latest of which is the Joint VTA/BART Working Committee, which depending on the availability of its members, is scheduled to meet quarterly. BART staff members have been assigned to co-locate with VTA engineers to participate in the preparation and review of BSVII designs in accordance with the agreed Project Design Criteria Manual. According to the BART Inspector General, VTA has reimbursed BART $19.2 million through 2025 for the cost of the assigned employees (BART, December 19, 2025). In August 2025, the BART assistant general manager, operations, rejected some of VTA’s proposed design changes and scope reductions and complained about inadequate coordination (see Appendix A). The BART inspector general issued a report in December 2025 that also raised concerns about inadequate coordination and criticized VTA’s communication with BART officials (Id). 90 Page 7 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II METHODOLOGY The Civil Grand Jury reviewed every meeting of the BSVII Oversight Committee, as well as select VTA Board meetings. This included reviewing agendas, minutes, agenda item reports, public comment submittals, and associated discussions. In addition, the Civil Grand Jury conducted 17 interviews of officials from VTA, BART, and the State of California. The Civil Grand Jury also reviewed publicly available documents as described in the reference section, as well as documents requested from VTA and submitted to the Civil Grand Jury. 91 Page 8 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II INVESTIGATION The Civil Grand Jury investigation of the BSVII project covered critical aspects of VTA’s management and oversight, including: • VTA’s funding strategy and its reliance on voter-approved sales tax measures, some of which expire before completion of the project, and some of which have yet to be approved; • The establishment of a separate Oversight Committee which provides guidance on the BSVII project and how it evaluates independent analyses provided by the VTA auditor general, contracted SMEs, and the federally mandated PMOC; • The contractual and practical requirement to closely coordinate with BART, which will serve as the system operator; • The impact of the VTA Board’s governance structure on the effectiveness of strategic direction, management, and oversight of the project; • VTA’s approach for keeping the public informed of costs, risks, and schedule. Financial Risks The 10-year project completion timeline of BSVII exposes VTA to financial risks that require careful, ongoing assessment of capital and operating costs, including that: • Rising labor and material costs, combined with aggressive construction methods and schedules, may increase total project costs and strain the budget’s contingency for unforeseen risks and unexpected expenses; • Delays or reductions in state and federal funding will create greater pressure to rely on local funding sources or scale back the scope of the project; • Lower ridership levels will increase VTA’s ongoing obligation to pay net operating costs, which would necessitate service level reductions or voter approval of new or extended sales tax measures; • Failure to maintain a cash-flow model means that contracting options for accelerating work may not be able to be financed with available resources. Risk of Increased Costs of Labor and Materials The FTA fiscal year 2025 New Starts Financial Assessment report for BSVII stated the VTA inflation estimate was optimistic. If labor and material costs were to rise above those estimated in VTA’s budget, it could lead to funding shortfalls (FTA, 2024). 92 Page 9 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II The VTA auditor general’s May 1, 2025, report to the Board also identified BSVII financial risks associated with project construction costs. The report found that the assumptions and historical data underlying VTA’s financial plan could be more robust to enable the Board and the public to evaluate the financial risk associated with the potential cost increases (VTA, 2025). Another factor that increases the difficulty in predicting materials and labor costs is the possible extension of the 2037 project completion date. The longer timeline for BSVII increases the likelihood that future costs will differ from current estimates, thereby increasing financial risk. Local, State, and Federal Funding Risks The capital cost of construction and the net operating costs are to be paid by VTA from specific revenue sources, some of which are grants with fixed amounts. The financial risks identified by the Civil Grand Jury have been experienced by other major transit agencies. For example, the various rail projects of the Los Angeles County Metropolitan Transportation Authority (LA Metro) faced escalating cost estimates, reductions in federal funding, cuts into smaller construction segments to match available funding, and shifting agency priorities (Shalby, 2026). Local Funding Risks VTA’s capital financing plan calls for the 2016 Measure B to pay $2.5 billion and for the 2000 Measure A to pay $2.0 billion of the estimated $12.7 billion BSVII project. Measure A expires in 2036, before BSVII is expected to be completed. Measure B expires in 2047 (VTA, About 2016 Measure B, n.d.). As the project’s cost estimates have evolved, so have the planned funding sources. Measure B has become a much more significant source of proposed funding. Because Measure B also funds bus transit, local streets, and highway projects, there are built-in limitations on the amount available to close a BSVII financing gap. Measure B limits spending on BSVII to 23.8% of net sales tax revenue over its 30-year life (FTA, 2024). Net sales tax revenue (defined as Program Tax Revenue in the measure) is calculated as the amount remaining after deducting administrative costs and any debt service. To close current and potential future funding gaps, VTA could issue bonds to be repaid from Measure B sales tax revenue. However, this would reduce the revenue available for other voter- approved projects. Every dollar spent on debt service for BSVII is a dollar that cannot be spent on 93 Page 10 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II the other transportation projects approved by the voters. Because of bond issuance and interest costs, the total project costs would exceed the current estimate of $12.7 billion. Another risky approach to filling funding gaps would allow the Board to change the rules and permit a greater percentage of Measure B net sales tax revenue to be used for BSVII. One VTA official acknowledged to the Civil Grand Jury that this would be a “heavy lift” because VTA would first have to notify all the local agencies of the proposed increase in the percentage limit and then approve it by a ¾ vote of the Board (9 of 12 Board members). The County and the cities that have planned other transportation measures are likely to object to reduced funding for their projects. Of course, more Measure B funds could become available to support the capital costs of BSVII if the expected sales tax revenue exceeds previously anticipated levels. While early projections were based on 2016 economic conditions, it is important for the strategic funding plan that the sales tax forecast be updated regularly. The Civil Grand Jury was informed that VTA has ordered an updated forecast. Because two key sales tax measures are set to expire, several VTA officials stated in interviews that they would simply place a measure on a future ballot for voter consideration if an extension were needed. Given the current sales tax rates applicable within Santa Clara County and the need for management and oversight reforms identified in this report, there is a risk that voters may not approve such a measure. State Funding Risk As currently planned, the capital construction funding strategy requires $1.5 billion from two State of California grants. The VTA has received commitments for nearly $200 million of that total. The sources of funding are the Transit and Intercity Rail Capital Program (TIRCP) and transportation funds administered by the Metropolitan Transportation Commission (MTC), both of which may be affected by a recent state decision to provide a bridge loan to Bay Area transit agencies (MTC, 2026). In February 2026, the California legislature appropriated $590 million from the same TIRCP account to provide a 12-year loan to MTC. These loan proceeds will be made available to San Francisco Municipal Transportation Agency, AC Transit, BART, and Caltrain to help address a greater need for public transit subsidies. The agencies are required to repay the loan over 12 years (MTC, 2026). 94 Page 11 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II The state justified the loan on the basis that the transit agencies would be able to stabilize their financial situations and avoid service reductions pending the anticipated approval in November of a regional sales tax measure. If the regional measure does not pass, or if for any other reason the agencies do not repay the loans on time, the source of funds for BSVII will be jeopardized. Further, the TIRCP account itself is funded by payments from private parties who agree to purchase pollution credits in the state’s Cap and Invest program. The program’s future is uncertain in light of federal changes to environmental regulations and pending legal challenges from the State of California (California State Transportation Agency, n.d.). Federal Funding Risk In August 2024, the FTA advised VTA that the federal government’s total contribution to the project would be limited to $5.1 billion. To receive these funds, VTA plans to apply for a Full Funding Grant Agreement (FFGA) by the end of 2026. Federal support for large-scale rail projects is uncertain. In 2025, the FTA canceled a $4.2 billion commitment to the California High-Speed Rail Project (Shalby, 2025). VTA’s lobbyists have suggested delaying the FFGA application until similar requests from other states are resolved. Considering the political, economic, and budgetary conditions of the United States, approval of VTA’s request for an FFGA is highly uncertain. It may be delayed, reduced, or denied. Low Levels of Ridership Could Increase VTA’s Future Costs BART ridership on the current regional system has not recovered to pre-pandemic levels. Ridership in January 2026 remains only 48% of the levels in January 2019 (BART, January 2026; BART, 2019). Recovering ridership may prove difficult due to the growth of hybrid work patterns. The Civil Grand Jury also reviewed the forecasts for the first phase of the project, which included the new Milpitas and Berryessa stations. For January 2026, ridership was 86% below estimates (see Table 2). 95 Page 12 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Table 2: BART Ridership at Milpitas and Berryessa Stations Forecast for Average Daily Weekday Ridership for June 2021 at launch Actual Ridership, January 2026 Ridership/Day 20,110 2,789 Source: Joint VTA/BART Working Committee Meeting, December 4, 2020; BART February 2026 Monthly Ridership Snapshot. Note: VTA created forecasts in 2020, expressed as rides per day. BART actuals are based on recorded station entries and exits. To normalize BART actuals to the VTA forecast, entries and exits were averaged to produce a daily ridership figure. An overall decrease in ridership has led BART to project a $376 million budget deficit for FY2026- 27. To seek additional revenue, BART is relying on a 0.5% additional sales tax measure on the November 2026 ballot that would begin in 2027 and remain in place for 14 years. If the ballot measure does not pass, BART has proposed closing up to 15 stations and reducing service hours and train frequency (BART, February 26, 2026). Ironically, the proposed station closures would not affect Santa Clara County because VTA is solely responsible for the net operating costs. According to VTA records reviewed by the Civil Grand Jury, for the first three years of operation, VTA forecasts annual average costs of $274 million for operations, maintenance, and capital costs. Average fare revenue is forecast at $60 million, offsetting VTA's financial obligation to BART, resulting in an average annual financial loss of $214 million. Any drop in ridership will lead to further financial losses. The Need for a BSVII Cash Flow Model With a price tag of $12.7 billion, BSVII is the largest public infrastructure project in Santa Clara County (Aragon, 2025). Nearly 60% of the planned funding sources include revenue from grants that will not be distributed in advance but will be reimbursed in accordance with each grant’s draw schedule (See Figure 1). The timing of those cash inflows must be carefully matched with the timing of payment schedules for construction contracts worth billions of dollars. VTA staff is evaluating different approaches to contracting the construction work. Alternatives are being evaluated for the following reasons: 1) to identify segments of work that could be bid out separately to accelerate the overall schedule; and 2) to identify segments for which there is a greater likelihood of strong competitive bids. For each contract, the cash outflows will be specified and must be carefully matched with the cash inflows. 96 Page 13 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II A cash flow model that matches receipts and expenditures would enable VTA decision-makers to fully evaluate the alternative approaches being studied. However, VTA officials have advised the Civil Grand Jury that such a model has not yet been developed. A cash flow model is necessary to avoid unplanned delays from cash shortfalls. Oversight Concerns VTA Board Recognizes That Oversight Must be Improved Independent reports and audits have identified problems with project management and VTA Board oversight, including those identified by a prior Civil Grand Jury, the California State Auditor, and the PMOC (AtkinsRéalis USA Holdings LLC, 2026). VTA’s cost-estimation practices, along with its lack of transparency around changes to project scope and cost, were identified as significant deficiencies. VTA’s oversight and management of the BSVII project have also been heavily criticized by the media, in public comments presented at Board meetings, and in letters to the editor of multiple local publications. VTA Board Outsources Guidance and Oversight of the BSVII Project Following a workshop on the project’s direction in October 2023, the VTA Board Chairman announced the creation of an Ad Hoc BART Silicon Valley Phase II Oversight Committee (VTA, 2023). However, only the Board can make binding decisions on the project’s scope, funding, risks, schedule, and contracting approach. While ultimately accountable itself, the Board nonetheless effectively delegated oversight to a committee without providing clear direction. By abdicating its responsibility to set its expectations of how the Oversight Committee can best support the Board, the committee has been left to set its own course. That course does not keep the Board fully informed of issues raised by independent experts or the PMOC, hampering its ability to make the best decisions about the project's funding and schedule. At its meeting on January 15, 2026, the Oversight Committee adopted what it called a revised charter intended to clarify the lines of communication and relationships among the auditor general, SME, VTA staff, and Oversight Committee (VTA, January 15, 2026). Members of the Oversight Committee had expressed concern about a perceived lack of coordination between VTA staff and the SME. Nonetheless, the question remains: Is the role of an SME to provide the Board with an independent review of VTA staff recommendations as originally intended, or is it to help VTA staff improve their recommendations? Notably, in the following excerpt, the Charter requires the 97 Page 14 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II auditor general to document issues raised by the SME and the VTA staff but does not require that the full Board be advised of the critical issues: To ensure transparency and balanced oversight, selected advisory input from SME will be documented in Oversight Committee materials. Where consensus exists between the SME and the Project Team, it will be noted. Where minority or dissenting views are expressed, the AG [auditor general] will explicitly record final input received alongside the majority view (VTA Oversight Committee Charter, 2026). During Oversight Committee meetings, there are few deliberations or actions to provide collective guidance or oversight, leaving individual members to raise questions and propose guidance for VTA staff to consider. VTA staff also receives input from individual members in private pre- meeting briefings. As a result, the full Board does not benefit from Oversight Committee analysis, and the public is not fully informed about individual Board member perspectives. The Committee Has Two Purposes: Guidance and Oversight “Guidance” suggests that the committee helps the Board establish a strategic direction and recommend actions to keep the project on track. “Oversight,” on the other hand, is a separate function that ensures VTA staff is accountable for following the Board’s direction in an efficient and effective manner. “Guidance” looks forward. “Oversight” monitors implementation as it happens. Better at Oversight than Guidance The Oversight Committee requires VTA staff to produce a comprehensive monthly report detailing the financing and construction progress of the BSVII project. The auditor general provides insightful periodic reports on his independent review of the project’s costs, risks, and schedule. The VTA staff’s monthly reports address the information gap identified in the auditor general’s January 2024 report. As a result, the Oversight Committee can effectively monitor compliance with the Board’s direction. However, the Oversight Committee often fails to provide guidance on issues critical to future strategic direction. 98 Page 15 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Strategic Guidance on Critical Issues is Informal, Intermittent, and Often Late VTA staff routinely provide private briefings to Oversight Committee members prior to meetings. Those briefings allow VTA staff to explain and advocate for their recommendations and to receive input and questions from individual members. Occasionally, some agenda materials for an Oversight Committee meeting are not published with the rest of the agenda because VTA staff members will modify presentations up to the last minute based on what they have heard in private briefings. The Oversight Committee has established an informal standard of limiting its once-monthly meetings to no more than two hours, and meetings often do not begin on time. At the meetings, VTA staff often deliver lengthy presentations on issues for which it will subsequently seek Board approval, leaving little time for committee deliberations. During these presentations, only a few members ask questions, and rarely does a committee member propose a policy recommendation that the Oversight Committee might take action on. Individual Oversight Committee members are given the opportunity to express support or concern about a proposed VTA staff position, providing VTA staff with some insight into how to frame their recommendations to the Board. The Oversight Committee receives independent analyses from the VTA auditor general, its contracted SME, and the PMOC. The committee often receives lengthy written comments from the public but limits oral comments to one minute. Members of the committee rarely comment on materials received from the public, many of which are extensive critiques of the VTA staff recommendations. Following each meeting, the Oversight Committee chair submits a short report summarizing discussion topics, which is placed on the VTA Board’s consent calendar. Following presentation to the Oversight Committee, formal VTA staff recommendations are made to the VTA Board, but without the benefit of a summary or synthesis of the alternative perspectives from the auditor general, SME, PMOC, or informed public comment. The Civil Grand Jury identified three examples of policy issues for which guidance was needed but delivered inadequately. One of the examples, the single-bore versus twin-bore issue, illustrates both the failure of the committee to make recommendations and the VTA staff’s failure to follow through on committee requests in a timely manner. 99 Page 16 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Example of Inadequate Guidance: The KST Contract Decision The Oversight Committee endorsed a major contract change without providing independent analysis, articulating its rationale, or conveying identified risks to the Board. VTA had issued a contract to a construction consortium, Kiewit Shea Traylor (KST), using a “progressive/design/build” approach, under which KST would design the tunnel project and, after reviews by VTA and its construction management consultant, KST would build it. By the spring of 2025, VTA believed that KST’s proposed design could significantly increase the project’s estimated cost by up to $1 billion and that it would be preferable to engage in a competitive bidding process for the remaining tunnel work. In a more traditional contract approach, VTA would prepare the design specifications and contract conditions. To accomplish this, it was necessary to limit the contract with KST to only the work required to prepare for the TBM, which VTA would own but make available to the tunneling contractor to operate and maintain. At its June 12, 2025, meeting, VTA staff presented its proposal to modify the KST contract to the Oversight Committee, which unanimously endorsed it. Two weeks later, the VTA Board met and approved VTA staff recommendations. Although the VTA staff agenda report did include a reference to the Committee’s recommendation, it did not include the risk analysis that had been reviewed by the Committee. The Oversight Committee’s regular report to the VTA Board was placed on the consent calendar and simply reported the committee’s concurrence with the VTA staff recommendation. There was no report or analysis laying out the reasons for the Oversight Committee’s concurrence or the SME’s risk assessment. Therefore, the Board made its decision without a complete understanding of the risks. Example of Inadequate Guidance: The Twin-Bore versus Single-Bore Decision The Oversight Committee retroactively requested a side-by-side analysis of tunnel options through Downtown San José. A preliminary design controversy was whether to tunnel two smaller bores for the downtown San José underground tracks or to tunnel a single larger bore at greater depth. Downtown businesses had raised concerns that the twin-bore approach would require additional work and disrupt their operations during construction. BART initially opposed the single-bore tunnel approach because it differed from its existing, smaller twin-bore tunnels. However, the BART inspector general reported that in the spirit of 100 Page 17 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II cooperation, BART officials consented to the single-bore approach after being assured that operational and safety concerns would be met (BART, December 19, 2025). In December 2022, VTA approved the fabrication and purchase of a large TBM for $76 million, effectively locking in the single-bore approach. In a news article dated November 7, 2023, in the Mountain View Voice, San José Mayor Matt Mahan was quoted as saying: “There is no turning back now” (Hicks, 2023). Nonetheless, individual Board members and informed public commenters continued to raise questions about whether a twin-bore approach might be cheaper, faster, and safer for BART operations. In response, members of the Oversight Committee commissioned an analysis of the two options for costs, risks, and impact on schedules. In September 2025, more than 18 months after the request, VTA and its engineering consultants presented their analysis to the Oversight Committee, confirming the single-bore approach. Although it had requested the analysis, the Oversight Committee did not make a recommendation to the Board. In October 2025, the Board was presented with the VTA staff and consultants’ analysis and tacitly confirmed the single-bore approach by declining to take steps to amend the environmental documents or modify the tunneling contracts. Example of Inadequate Guidance: Scenario 1 versus 1a Decision In October 2025, VTA decided on an approach to the construction of the tunnel without the benefit of the SME’s analysis that the Oversight Committee had requested. Before design work could progress to a more advanced level, the VTA Board needed to decide between two alternatives for staging the actual tunneling work. The SME had suggested that concurrent tunneling from both ends could reduce costs and accelerate the schedule (VTA, June 12, 2025). The two options were labeled “Scenario 1” (a straight-through tunneling using the larger TBM from west-to-east) and “Scenario 1a” (an option of concurrent tunneling starting at both the east and west portals using two TBMs). Although this would require two TBMs, the east-to-west work could be done simultaneously with a smaller-bore tunneling machine. Further, the SME reported that a smaller-bore TBM was readily available and would require less lead time than the TBM being fabricated in Germany. Because the Oversight Committee considered the potential benefits significant, the committee asked both VTA staff and the SME to analyze the options and prepare a recommendation. On 101 Page 18 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II August 4, 2025, the Oversight Committee authorized an expenditure of $110,000 and directed the auditor general to contract with GZ for the requested work. GZ presented interim reports on September 11, 2025, and October 9, 2025, and promised to deliver its completed report at the November 2025 meeting of the Oversight Committee. VTA staff subsequently presented its analysis and recommendations to the Oversight Committee on October 9, 2025. Although the Project Manager stated that the VTA staff was aware of some of GZ’s preliminary analysis (especially differing assumptions about the rate at which each of the two TBMs can move forward when digging a tunnel), VTA staff requested a Board meeting to decide between the two alternatives. In prior presentations to the Oversight Committee, VTA staff said that the analysis would be presented at a Board “workshop” (at which no formal action could be taken). However, a special meeting of the Board was called for October 17, 2025, and VTA staff made its recommendations to the Board, neglecting to advise the Board that the Oversight Committee was still awaiting the GZ analysis that the Committee had authorized. The Oversight Committee failed to present any report or recommendation at the special meeting. As a result, the Board adopted ‘Scenario 1’ without the benefit of an independent analysis of the risks. On February 12, 2026, four months after the Board made its decision, the SME presented his written report analyzing the options and raising concerns that should have been considered before the decision. VTA Staff Accountability for Responding to Oversight Committee Member Requests The auditor general maintains two types of monitoring reports: a tracking report that lists the requests of individual committee members for information or analysis, and a work plan that lists the schedule for upcoming formal reports, including risk assessments such as financing and procurement risks. Both monitoring reports establish a due date, but the deadlines are often not met. During public meetings, Oversight Committee members rarely discuss the tracking report or the work plan and do not publicly comment on changes to the expected date in subsequent reports. More importantly, neither the auditor general nor the Oversight Committee holds VTA staff accountable for late responses to issues raised in the tracking report. Below, the Civil Grand Jury presents two examples: 102 Page 19 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Example of Lack of Accountability: Prolonged Delay in Analysis of Single-Bore versus Twin-Bore The side-by-side analysis of two design options was not provided until more than 18 months after it was first requested. At the Oversight Committee’s first meeting in November 2023, a member of the public requested that the committee order a cost and risk analysis of the single-bore versus twin-bore options, which remained controversial following the VTA Board’s selection of the single-bore option in 2018. In 2023, the Chair of the Oversight Committee responded that such an “apples-to-apples” (side-by- side) analysis would be one of the committee’s first tasks. Here are some of the subsequent activities: • At the committee’s meeting on January 19, 2023, two committee members formally requested the “apples-to-apples” analysis and placed it on the committee’s tracking list. (VTA, March 2025). At its meeting on June 13, 2024, the Project Manager reported that the scope of the twin-bore analysis would be worked on and reported to the Board “over the course of the summer.” • At its meeting on August 8, 2024, a member of the public asked about the status of the “apples-to-apples” analysis. • At the September 12, 2024, Oversight Committee, the auditor general announced that VTA staff had asked engineering design contractor Mott Macdonald to conduct the “apples-to- apples” review. • The March 2025 tracking report included a comment regarding the “apples-to-apples” comparison: “These items are being evaluated as part of cost savings task force efforts with participation from GZ” (VTA, April 2024). • One year later, on September 11, 2025, Mott Macdonald presented its analysis of the twin- bore versus single-bore options – nearly 22 months after the request was first discussed at an Oversight Committee meeting – concluding that the single-bore option was preferred (VTA, September 11, 2025). Example of Lack of Accountability: An Alternative Strategy Some Call “Plan B” Despite multiple requests for an alternative strategy to address risks associated with the federal funding decision, VTA staff advised the Oversight Committee that it would wait until after the federal decision. Since the Oversight Committee meeting on October 9, 2025, committee members have stressed the need for an alternative strategy in the event the federal government delays or denies the FFGA 103 Page 20 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II for the promised $5.1 billion. Some committee members asked whether a “Plan B” might include reducing the number of planned stations or revising the funding strategy. VTA staff reported to the Civil Grand Jury that there was reluctance to discuss a “Plan B” out of concern that the discussion itself might jeopardize the FFGA. At public meetings, VTA staff dismissed requests for an alternative funding strategy, instead reporting that an alternative plan should not be prepared until the FTA made its decision in 2027. This is an example of the VTA staff’s dismissal of the Oversight Committee direction. Expediency of Decisions versus Rigorous Analysis The Civil Grand Jury identified tension between VTA Board members’ competing goals: avoiding delays in decision-making and requiring rigorous, independent analysis of costs, risks, and schedule. In public meetings, the Project Manager has often stated that each month of delay adds $20 to $30 million to the overall project cost (Dorsey, 2025). There is a strong financial incentive to keep the project moving by advancing decisions incrementally—approving one component at a time to show visible progress—without fully evaluating how each step alters the project’s overall cost, scope, and risk. For a project of this size, complexity, and cost, this piecemeal approach masks cumulative effects, increasing the likelihood of cost escalation and delays. These should be identified and addressed through rigorous, front- end analysis. With two-year terms and constituencies limited to portions of the County, Board members may understandably focus on immediate actions rather than the long-term, systemwide implications that demand a coherent strategic plan. The Role Assigned to the Auditor General The Oversight Committee benefits from periodic risk assessments and audits performed by the VTA auditor general on the BSVII project. However, by assigning the auditor general the responsibility to also provide staff support to the Oversight Committee, VTA has created a situation in which the auditor general is asked to provide an independent audit of prior decisions while also assisting the committee in evaluating future policy and management decisions. At the June 2025 public Board meeting, the auditor general stated that he sometimes feels like a referee among the analyses provided by VTA staff, the SME, the public, and the PMOC. However, the VTA Board is the final arbiter, not the auditor general. 104 Page 21 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II The Board is best served when it hears all relevant views on an upcoming decision and is presented with options and a recommendation. The auditor general’s participation and input are critical, but he should not be placed in the position of having to synthesize all the competing views, including his own. The auditor general is better placed to assist the Oversight Committee in its role of “oversight” and less so in commenting on the Oversight Committee's “guidance” functions. Accordingly, the Oversight Committee and the VTA Board would be better served if a VTA staff person were assigned responsibility for staffing the committee. This person could be part of the General Manager’s Office and should not report to the Project Manager. The position would be like that of the chief of staff, which was recently assigned to support the chair of the Board. Coordination with BART Because the County of Santa Clara is not part of the BART District, the extension of rail service to San José required a contract that established both VTA’s and BART’s commitment to cooperate. Under the 2001 Cooperative Agreement, VTA is financially responsible for paying for the design, construction, and operation of the segment in Santa Clara County (BART and VTA, Comprehensive Agreement, 2001). BART retained approval authority over design elements that affect operations, maintenance, and safety. To date, this has been accomplished through the joint preparation of a Design Criteria Manual. As recently as December 2025, BART’s Independent Office of the Inspector General (OIG) issued a report titled: “Transparency & Communication Gaps in the BSVII Project.” The report summarizes years of controversy over the single-bore versus twin-bore approach but acknowledges that BART eventually agreed to the single-bore concept evaluated in the final environmental impact statement. However, the BART OIG remained critical of the extent of cooperation between the two agencies: We also determined that the length of time since the project began, extensive media coverage of the project, conflicting subject-matter opinions, and some public displeasure with the single-bore design have created uncertainty about the project’s direction. We concluded that gaps in transparency and communication, including limited public discussions in recent years, have resulted in mixed messaging on a project that has evolved over multiple decades (BART Independent Office of the Inspector General, 2025). In August 2025, the lack of communication and cooperation was publicly exposed when a BART official wrote a letter to VTA (Appendix A) specifically objecting to the consideration of reducing 105 Page 22 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II the size of the Newhall Yard and Maintenance Facility as a capital cost-saving measure. The VTA Project Manager publicly acknowledged a failure to keep BART informed of design issues that might impact BART’s operational efficiency and pledged to develop recommendations to the administrative heads of both agencies on a more formal process to identify and resolve those issues (VTA Oversight Committee, 2025). Board Experience and Continuity Since 2019, five audits and reports have critiqued VTA’s governance structure and recommended a series of revisions to improve VTA’s capability to provide Board direction and oversight of the BART extension. Those audits have included the 2018-19 Santa Clara County Civil Grand Jury in 2019; the Auditor of the State of California, in 2024; the BART Independent Office of the Inspector General in 2025; RSM US LLC, a VTA subcontractor, in 2019; and the VTA Auditor General in 2024. VTA has accepted and acted on most of the recommendations for governance reform, except those relating to the terms and required experience level of Board members. During the investigation of the BSVII project, sources repeatedly raised concerns about the level of knowledge and decision-making ability of the full VTA Board, which is responsible for the project’s success. Decisions made today will have a direct impact on its ultimate success. Diligent oversight of its schedule, cost, progress, and scope is required. According to the California Public Utilities Code, which established the VTA Board, “to the extent possible, the appointing powers shall appoint individuals who have expertise, experience, or knowledge relative to transportation issues” (Pub. Util. Code 10000 et seq). VTA Board members are appointed to two-year terms by appointing agencies, organized into six groups as detailed in Table 3. Appointing agency groups are established and defined by VTA Administrative Code, which states “Appointing Authorities are strongly encouraged, where possible, to: (1) appoint individuals with appropriate experience and qualifications in transportation; (2) ensure that there is sufficient remaining time in the elected official’s term of office to allow full completion of their term as a Director; and (3) reappoint representatives to consecutive terms” (VTA Administrative Code § 2-13). 106 Page 23 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Table 3: Appointing Authorities Composition of the VTA Board Appointing Agency Group Jurisdiction Represented Number of Board Members Method of Appointment Group 1 San José 5 members 1 alternate Appointed by city council from city council members/mayor Group 2 Los Altos, Los Altos Hills, Mountain View, Palo Alto 1 member 1 alternate Determined by Group 2 members Group 3 Campbell, Cupertino, Los Gatos, Monte Sereno, Saratoga 1 member 1 alternate Determined by Group 3 members Group 4 Gilroy, Morgan Hill 1 member 1 alternate Determined by Group 4 members Group 5 Milpitas, Santa Clara, Sunnyvale 2 members 1 alternate Determined by Group 5 members Group 6 County of Santa Clara 2 members 1 alternate Appointed by County Board of Supervisors Source: California Pub. Util. Code section 100060. While VTA continues to insist that two-year terms are suitable for its governance (as specified in PUC § 100060.2), peer agencies in the state appoint their Board members to four-year terms, leading to much longer average lengths of service and potentially greater experience and transportation-related knowledge (see Figure 2). Multiple reports and audits have suggested weaknesses introduced by VTA’s approach to the appointment of Board members. For example, the 2019 Board Governance Assessment concluded, in part, that some processes and policies (e.g., committee structure, term limits, and Board member selection guidelines) might not reflect best practices or support long-term Board stability (VTA, 2019). Additionally, a report by the 2018-19 Santa Clara County Civil Grand Jury found that the VTA Board suffers from: • A lack of experience and limited continuity by many Board members; • Inadequate time for the directors to devote to the Board’s oversight and policy-making functions; • A lack of engagement by some of the directors, fostered in part by the committee system, resulted in VTA functioning largely as a staff-driven organization. More recently, a critical 2024 report from the State Auditor regarding VTA’s project management and financial oversight noted the following weaknesses: 107 Page 24 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II • The process for selecting directors for the Board is not always transparent enough to ensure the appointment of directors experienced in transportation issues. • Some groups of cities appoint VTA directors without public deliberation, limiting transparency and sometimes bypassing the statutory recommendation for transportation expertise. • VTA directors have shorter tenures, on average, than their peers, meaning that VTA’s Board has less experience overseeing the agency’s operations than the Boards of peer agencies. Figure 2: Average Directors’ Tenure among VTA and Peer Agencies Source: Auditor of the State of California, “Santa Clara Valley Transportation Authority, Improvements Are Necessary to Strengthen Its Project Management and Financial Oversight,” June 2024. Note: LA Metro stands for Los Angeles County Metropolitan Transportation Authority; OCTA stands for Orange County Transportation Authority; SacRT stands for Sacramento Regional Transit District. During interviews and in reviewing existing reports and audits about VTA, the Civil Grand Jury learned that Board members and elected officials broadly support a four-year term for directors. Lengthening terms would require a change to VTA’s enabling legislation. The findings of the State and VTA’s own auditors’ governance reform recommendations remain unchanged. 108 Page 25 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Public Communication Following the VTA auditor general’s report in January 2024, public communication and community outreach regarding the BSVII project have improved. The Civil Grand Jury noted improvements to the VTA BSVII project website, including efforts to deliver timely updates to residents about the impact of construction activities, and a section for frequently asked questions (FAQ) (VTA, BART Silicon Valley Phase II Project, n.d.). In addition, many interviewees told the Civil Grand Jury that VTA has made efforts to better inform the public and officials since the auditor general's report highlighted communication breakdowns in 2023. However, there are areas where the public would benefit from VTA focusing more on improving communication. The VTA’s BSVII project website does not offer a simple, clear dashboard outlining the costs, timeline, and progress of the BSVII project. Although it includes technical reports from the federally sponsored PMOC, it does not include the independent analyses by the SME or the VTA auditor general. A high-level dashboard would consolidate information from multiple sources, present project metrics to the public, and provide access to source materials. Today, information on funding, expenditures, and schedule status is available on the website, but is buried in layers of reports that are nonintuitive to find or navigate. In addition, the Civil Grand Jury found the site’s search function inadequate for locating specific details or addressing questions not covered in the FAQ, and it often returned results for irrelevant materials. The website would be more user-friendly if VTA incorporated a more robust search engine. 109 Page 26 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II CONCLUSION The VTA Board has failed in its responsibility to provide effective management, oversight, and financial control of the BSVII Project. Based on its investigation, the Civil Grand Jury concludes: • There is no realistic plan to deal with foreseeable financial risks, including significant uncertainty about BSVII’s construction and operating costs, reliance on expiring voter- approved sales tax measures, uncertain federal government support, cash flow, and declining ridership. • When considering major scope and design decisions, the Oversight Committee and the VTA Board do not take into account the ongoing operations and maintenance costs that will be borne by VTA and will require voter approval of subsequent sales tax measures. • The Oversight Committee exercises its oversight responsibility by requiring monthly progress reports and by questioning VTA project staff, but when it declines to make recommendations to the VTA Board, it fails in its responsibility to provide guidance on critical policy issues. • The Oversight Committee receives valuable input from multiple sources but does not share this information with the VTA Board in the form of helpful reports that synthesize the different perspectives of VTA staff, the Subject Matter Expert, the auditor general, the Project Management Oversight Consultant, and the public. • The VTA Board and the Oversight Committee have failed to hold VTA staff accountable for missing deadlines to provide analysis and information requested by members of the Oversight Committee. • There is a lack of meaningful communication and cooperation between BART and VTA officials, which undermines public confidence. • VTA’s failure to adopt governance reform recommendations from prior Civil Grand Jury reports and independent audits has led to a lack of Board member continuity and expertise, weakening the Board’s ability to successfully oversee the BSVII project. 110 Page 27 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II FINDINGS AND RECOMMENDATIONS Finding 1 The BSVII project currently requires voter approval of additional sales tax measures to address gaps in construction and operations funding. Recommendation 1 VTA should adopt and publish a strategy for the completion and operation of the project that reduces dependency on new sales tax measures. This should be implemented by December 31, 2026. Finding 2 VTA does not maintain a cash-flow model for the BSVII project. Recommendation 2 The VTA Board should direct the General Manager to prepare a cash-flow model for the BSVII project and present it quarterly to the Oversight Committee and the Board. This should be implemented by December 31, 2026. Finding 3 VTA has not developed an alternative funding strategy for the project in the event that planned funding sources are unavailable or insufficient. Recommendation 3 The VTA Board should direct the General Manager to prepare an alternative funding strategy to meet the project’s estimated total capital costs and VTA’s responsibility for operating and maintenance costs and present it to the Oversight Committee and Board for approval. This should be implemented by December 31, 2026. Finding 4 Project management does not consistently report the operating and maintenance cost implications of design and construction decisions to the Oversight Committee or the Board. 111 Page 28 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Recommendation 4 VTA should adopt a policy requiring staff to present an analysis of operating and maintenance costs when considering design and construction alternatives for BSVII. This should be implemented by December 31, 2026. Finding 5 The VTA Board would benefit from longer terms of office to improve continuity and institutional knowledge. Recommendation 5 VTA should reconsider its prior rejections of audit recommendations calling for the establishment of four-year terms and direct its legislative advocates to seek a legislative author to amend VTA’s enabling statute to require four-year terms. This should be implemented by December 31, 2026 Finding 6 VTA Board Appointing Authority Groups 2 through 5 often do not follow VTA Administrative Code (Section 2-14) admonitions to “appoint individuals with appropriate experience and qualifications in transportation” and to “reappoint representatives to consecutive terms.” Recommendation 6 VTA Board Appointing Authority Groups 2 through 5 should certify to the VTA Board that they will adhere to VTA Administrative Code (Section 2-14) admonitions, regarding Board member expertise and appointment to consecutive terms. This should be implemented by December 31, 2026. Finding 7 VTA Board Appointing Authority Groups 2 through 5 have different processes for making Board appointments. 112 Page 29 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Recommendation 7 The cities represented in Appointing Authority Groups 2 through 5 should agree on a uniform process for making Board appointments. This should be implemented by December 31, 2026. Finding 8 The role assigned to the auditor general is outside the traditional scope of an auditor’s responsibilities and has introduced conflict and uncertainty among VTA staff and the Oversight Committee. Being involved in the management and policy-making process threatens the auditor general’s independence. Recommendation 8 The Board should implement an alternative model for supporting the Oversight Committee that does not rely on the auditor general to provide services such as agenda preparation, monitoring of VTA staff assignments, or preparation of a synthesis of multiple independent inputs to the Committee’s deliberations. This should be implemented by December 31, 2026 Finding 9 The Board of Directors has not approved the bylaws, nor the charter of the Oversight Committee. Recommendation 9 VTA should formally adopt a revised Charter for the Oversight Committee, setting the Board’s expectations on the following issues: • Defining the role of the auditor general to no longer require him to supervise the presentations by VTA staff to the Oversight Committee; • The responsibility of the Oversight Committee to report regularly to the Board on the independent analyses of costs, risks, and schedule by the PMOC and any SMEs; and to provide the Oversight Committee’s synthesis of those analyses with recommendations to resolve conflicts when necessary; • The responsibility of the Oversight Committee to consider and present its recommendations before the Board considers major decisions such as scope of the project, contracting, risk management, budgeting, and funding strategy; 113 Page 30 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II • The responsibility of the Oversight Committee to hold subject matter experts accountable for timely analysis of costs, risk, and schedule; • The responsibility of the Oversight Committee to report to the Board on the implications of design and construction issues that impact future ongoing operations and maintenance costs to be borne by VTA. This should be implemented by December 31, 2026. Finding 10 VTA’s vtabart.org website is poorly organized and not always intuitive to navigate, making it hard to find information about the status, cost, and schedule of the BSVII project. Recommendation 10 The VTA Board should direct the General Manager to implement and maintain a project dashboard on its vtabart.org website that includes status, cost, and schedule information. This should be implemented by October 31, 2026. 114 Page 31 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II REQUIRED RESPONSES Pursuant to California Penal Code section 933(a) et seq. and California Penal Code section 933.05, the 2025-26 Santa Clara County Civil Grand Jury requests responses from the following governing bodies: Responding Agency Findings Recommendations VTA Board of Directors 1, 2, 3, 4, 5, 8, 9, 10 1, 2, 3, 4, 5, 8, 9, 10 County of Santa Clara, Board of Supervisors 6 6 The City of Campbell, City Council 6, 7 6, 7 The City of Cupertino, City Council 6, 7 6, 7 The City of Gilroy, City Council 6, 7 6, 7 The City of Los Altos, City Council 6, 7 6, 7 The Town of Los Altos Hills, Town Council 6, 7 6, 7 The Town of Los Gatos, Town Council 6, 7 6, 7 The City of Milpitas, City Council 6, 7 6, 7 The City of Monte Sereno, City Council 6, 7 6, 7 The City of Morgan Hill, City Council 6, 7 6, 7 The City of Mountain View, City Council 6, 7 6, 7 The City of Palo Alto, City Council 6, 7 6, 7 The City of San José, City Council 6, 7 6, 7 The City of Santa Clara, City Council 6, 7 6, 7 The City of Saratoga, City Council 6, 7 6, 7 The City of Sunnyvale, City Council 6, 7 6, 7 115 Page 32 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II APPENDIX A: BART Management Letter 116 Page 33 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II 117 Page 34 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II CONFLICTS Members of the Civil Grand Jury are conflicted from a Civil Grand Jury investigation if, as a result of prior or current employment or associations, investment in public or private enterprise, financial interest, bias, or personal relationship, they are subject to recusal from participating in a matter before the Civil Grand Jury. One juror was recused from this matter. REFERENCES Bibliography 2018-19 Santa Clara County Civil Grand Jury. “Inquiry Into Governance of the Valley Transportation Authority.” June 18, 2019. (https://santaclara.courts.ca.gov/system/files/cgj-vta-final-report-061819_0.pdf). Accessed April 5, 2026. Aragon, Greg, “Single-Bore Tunnel Method Chosen for BART Silicon Valley Phase II.” ENRWest. November 4, 2025. (https://www.enr.com/articles/61798-single-bore-tunnel- method-chosen-for-bart-silicon-valley-phase-ii). Accessed April 29, 2026. AtkinsRéalis USA Holdings LLC. “Project Monitoring Report.” March 9, 2026. (https://vtabart.org/transparency-commitment/#docaccess- 8dd20a14312d4f35dd29658c7e4d5f55). Accessed May 1, 2026. Auditor General, Santa Clara Valley Transportation Authority. “Auditor General’s Risk Assessment Report on VTA’s BSVII Finance Risks.” May 1, 2025. (https://santaclaravta.iqm2.com/Citizens/Detail_LegiFile.aspx?MeetingID=4412&ID= 9358). Accessed April 5, 2026. Auditor of the State of California. “Santa Clara Valley Transportation Authority, Improvements Are Necessary to Strengthen Its Project Management and Financial Oversight.” June 2024. (https://www.auditor.ca.gov/wp-content/uploads/2024/06/2023-101-Report.pdf). Accessed April 5, 2026. California State Transportation Agency. “Transit and Intercity Rail Capital Program.” n.d. (https://calsta.ca.gov/subject-areas/transit-intercity-rail-capital-prog). Accessed May 12, 2026. 118 Page 35 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Dorsey, Dustin. “Silicon Valley BART Extension construction remains on time, budget.” ABC Eyewitness News. December 8, 2025. (https://abc7news.com/post/silicon-valley-bart- extension-construction-remains-time-budget-west-portal-site/18265543/). Accessed April 29, 2026. Federal Transit Administration. “FY 2025 New Starts Financial Assessment.” June 2024. (https://www.transit.dot.gov/funding/grants/grant-programs/capital-investments/bart- silicon-valley-phase-ii-project-profile-fy-0). Federal Transit Administration. “BART Silicon Valley Phase II Extension Project San Jose, California. June 2024. (https://www.transit.dot.gov/sites/fta.dot.gov/files/2024-08/CA- BART-Silicon-Valley-Phase-II-Eng-Profile-20240705.pdf). Accessed March 30, 2026. Geha, Joseph. “Feds Commit $5.1 Billion to South Bay BART Extension.” KQED.org. August 2, 2024. (https://www.kqed.org/news/11998646/feds-commit-5-1-billion-to-south-bay- bart-extension#:~:text=Joseph%20Geha,increases%20to%20the%20current%20figure). Accessed April 22, 2026. Hicks, Tony. “VTA Board approves purchase of machine to bore BART line.” Mountain View Voice. November 7, 2023. (https://www.mv-voice.com/news/2023/11/07/vta-board- approves-purchase-of-machine-to-bore-bart-line/). Accessed April 5, 2026. Metropolitan Transportation Commission. “Agreement Reached on Loan for Bay Area Transit Agencies.” January 30, 2026. (https://mtc.ca.gov/news/agreement-reached-loan-bay-area- transit- agencies#:~:text=Because%20many%20transit%20capital%20projects,funds%20remaine d%20in%20state%20accounts.). Accessed April 28, 2026 Office of the County Counsel, County of Santa Clara. “County Counsel’s Impartial Analysis of Measure B.” 2016. (https://www.vta.org/sites/default/files/2025- 08/2016%20Measure%20B%20Ballot.pdf). Accessed April 29, 2026. Cal. Pub. Util. Code section 10000 et seq. 119 Page 36 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II San Francisco Bay Area Rapid Transit District Independent Office of the Inspector General. “Transparency & Communication Gaps in BSVII Project.” December 19, 2025. (https://www.bartoig.org/investigation-reports-2025#docaccess-98152ed2acf38 cd4da53e1efbb737c86cc96ef6c2e1f439edf6ec6f51905271f). Accessed April 5, 2026. San Francisco Bay Area Rapid Transit District and Santa Clara Valley Transportation Authority, Comprehensive Agreement, November 22, 2001. (www.bart.gov/sites/default/files/docs/O%26M%20Agreement_Silicon%20Valley%20B ART%20Extn.pdf). Accessed May 12, 2026. San Francisco Bay Area Rapid Transit District. “BART Board initially approves Alternative Service Plan outlining budget balancing details.” February 26, 2026. (https://www.bart.gov/news/articles/2026/news20260226-0). Accessed April 29, 2026. San Francisco Bay Area Rapid Transit District. "January 2026 Monthly Ridership Snapshot." February 2026. (https://www.bart.gov/sites/default/files/2026- 02/202601%20Monthly%20Ridership%20Snapshot.pdf). Accessed April 29, 2026. San Francisco Bay Area Rapid Transit District. " 2019 Monthly Ridership Reports." 2019. (https://www.bart.gov/sites/default/files/docs/ridership_2019.zip). Accessed April 29, 2026. Santa Clara Valley Transportation Authority, BART Silicon Valley Phase II Project. n.d. (https://www.vtabart.org). Accessed May 12, 2026. Santa Clara Valley Transportation Authority, “VTA Board of Directors Workshop Reviews BART Phase II Timeline, Costs, And Next Steps.” October 23, 2023. (https://www.vta.org/blog/vta-board-directors-workshop-reviews-bart-phase-ii-timeline- costs-and-next-steps). Accessed April 29, 2026. Santa Clara Valley Transportation Authority Auditor General. “Auditor General’s Initial Monitoring Report on VTA’s BART Silicon Valley Phase II Extension Project.” VTA’s BART Silicon Valley Phase II Extension Oversight Committee Agenda. Item 8a. January 19, 2024. (https://santaclaravta.iqm2.com/Citizens/Detail_Meeting.aspx?ID=4233). Accessed April 5, 2026. 120 Page 37 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Santa Clara Valley Transportation Authority/RSM US LLC. “Board Governance Assessment – Santa Clara Valley Transportation Authority.” December 20, 2019. (https://www.vta.gov/ sites/default/files/2020-01/VTA%20Board%20Governance%20Assessment%20 %281%29.pdf). Accessed April 5, 2026. Santa Clara Valley Transportation Agency. “BART Silicon Valley Extension Project Implements Major Cost Reductions.” November 13, 2024. (https://www.vta.org/blog/bart-silicon- valley-extension-project-implements-major-cost-reductions). Accessed April 23, 2026. Santa Clara Valley Transportation Authority/HayGroup. “Santa Clara Valley Transportation Authority Organizational and Financial Assessment Executive Report.” March 2007. (https://ti.org/pdfs/HayGrouponVTA.pdf). Accessed April 5, 2026. Santa Clara Valley Transportation Authority. “Operations and Maintenance Agreement By and Between the Santa Clara Valley Transportation Authority and The San Francisco Bay Area Rapid Transit District.” May 22, 2020. (https://www.vta.org/sites/default/files/2020- 12/VTA%20BART%20Operations%20and%20Maintenance%20Agreement_0.pdf). Accessed April 23, 2026. Santa Clara Valley Transportation Authority. “Santa Clara Valley Transit Authority Administrative Code (With Amendments through March 6, 2025).” March 2025. (https://www.vta.org/sites/default/files/2025-04/VTA_Administrative_Code_2025-3- 6.pdf). Accessed April 5, 2026. Santa Clara Valley Transportation Authority. “Bylaws for VTA’s BART Silicon Valley Phase II Oversight Committee.” April 4, 2024. (https://www.vta.gov/sites/default/files/2024-04/ vta-bsv-oversight-committee-bylaws_0.pdf). Accessed April 8, 2026. Santa Clara Valley Transportation Authority. Special Board Meeting. October 17, 2025. (https:// santaclaravta.iqm2.com/Citizens/FileOpen.aspx?Type=14&ID=4297&Inline=True) Accessed April 9, 2026. Santa Clara Valley Transportation Authority. “VTA's BART Silicon Valley Phase II Oversight Committee Regular Meeting”, Agenda Item 9.a, Item #25. April 17, 2024. (https://santaclaravta.iqm2.com/Citizens/FileOpen.aspx?Type=1&ID=3940&Inline=True ). Accessed May 1, 2026. 121 Page 38 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Santa Clara Valley Transportation Authority. “VTA's BART Silicon Valley Phase II Oversight Committee Regular Meeting.” Agenda Item 4, Item #4. March 13, 2025. (https://santaclaravta.iqm2.com/Citizens/FileOpen.aspx?Type=1&ID=4138&Inline=True ). Accessed May 1, 2026. Santa Clara Valley Transportation Authority. “VTA's BART Silicon Valley Phase II Oversight Committee Regular Meeting.” Item 11a. June 12, 2025. (https://santaclaravta.iqm2.com/Citizens/Detail_Meeting.aspx?ID=4430). Accessed April 29, 2026. Santa Clara Valley Transportation Authority. “BSVII Project Update.” Summer, 2025. (https://vtabart.org/vtas-bart-silicon-valley-phase-ii-extension-project-summer-2025/). Accessed May 13, 2026. Santa Clara Valley Transportation Authority. “VTA's BART Silicon Valley Phase II Oversight Committee Regular Meeting.” Item 8. January 15, 2026. (https://santaclaravta.iqm2.com/Citizens/FileOpen.aspx?Type=1&ID=4354&Inline=True ). Accessed April 22, 2026. Santa Clara Valley Transportation Authority. “2000 Measure A.” n.d. (https://www.vta.org/projects/funding/2000-measure-a). Accessed April 29, 2026. Santa Clara Valley Transportation Authority. “About 2016 Measure B.” n.d. (https://2016measureb.vta.org/about). Accessed April 29, 2026. Santa Clara Valley Transportation Authority. “VTA's BART Silicon Valley Phase II Oversight Committee Regular Meeting.” Item 10b. Slide 21. September 11, 2025. (https://santaclaravta.iqm2.com/Citizens/FileOpen.aspx?Type=1&ID=4273&Inline=True ). Accessed April 13, 2026. Santa Clara Valley Transportation Authority. “Fact Sheet: VTA's Bart Silicon Valley Phase 2 Extension Project.” March 2024. (https://www.vta.org/sites/default/files/2024- 07/VTABSV_FactSheet_2024_OverviewBenefits%201.pdf). Accessed April 13, 2026. Shalby, Colleen. “Trump administration pulls billions in funding for high-speed rail project; state leaders call decision ‘illegal.’” Los Angeles Times. July 16, 2025. (https://www.latimes.com/california/story/2025-07-16/trump-administration-cancels- funding-for-high-speed-rail-project). Accessed April 29, 2026. 122 Page 39 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II Shalby, Colleen. “Multibillion-dollar transit project to tunnel through the Santa Monica Mountains is approved by L.A. Metro.” LA Times. January 22, 2026. (https://www.latimes.com/california/story/2026-01-22/this-multibillion-dollar-transit- project-could-improve-traffic-across-la-it-goes-to-vote-today - :~:text=This is read by an,transit projects in the country). Accessed April 13, 2026. State of California. “Cal. Pub. Util. Code § 100060.” December 29, 2025 (https://california.public.law/codes/public_utilities_code_section_100060.) Accessed April 29, 2026. 123 Page 40 of 40 VTA’S MANAGEMENT AND OVERSIGHT OF BART SILICON VALLEY PHASE II This report was ADOPTED by the 2025-2026 Santa Clara County Civil Grand Jury on this __________ day of _______________, 2026. ______________________________ Dinesh Ramde Foreperson 124 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: City Manager PREPARED BY: Leslie Arroyo, City Manager SUBJECT: Saratoga Support for AB 1761 (Rogers) on Data Transparency RECOMMENDED ACTION: Approve Saratoga’s support of AB 1761 (Rogers), which would require the California Public Utilities Commission to ensure all data used to calculate charges related to the Power Charge Indifference Adjustment (PCIA) is provided to load-serving entities and ratepayer advocates. BACKGROUND: Silicon Valley Clean Energy’s customers, including residents and businesses in Saratoga, pay a fee on their electricity bills called the Power Charge Indifference Adjustment (PCIA) for certain Pacific Gas & Electric (PG&E) resources. The PCIA is a fee designed to ensure customers who leave utility generation service, like customers of a Community Choice Aggregator (CCA) or Energy Service Provider (ESP), pay their portion of legacy power costs. However, CCAs don’t get the data used to calculate this fee, despite our customers paying for these resources. AB 1761 would require that PG&E share this data with CCAs. More transparency will help ensure there are no errors in calculating this fee and will allow CCAs to better understand and plan for any rate impacts from potential changes to how the fee is calculated. ATTACHMENTS: Attachment A – City of Saratoga Letter of Support Attachment B – AB 1761 Fact Sheet 125 Incorporated October 22, 1956 CITY OF SARATOGA 13777 FRUITVALE AVENUE • SARATOGA, CALIFORNIA 95070 • (408) 868-1200 COUNCIL MEMBERS: Belal Aftab Kookie Fitzsimmons Chuck Page Tina Walia Yan Zhao September 3, 2026 Senator Ben Allen Chair Senate Energy, Utilities, and Communications Committee 1021 O Street, Suite 3350 Sacramento, CA 95814 RE: City of Saratoga Support for AB 1761 (Rogers) on Data Transparency Dear Chair Allen: On behalf of the City of Saratoga, a member agency of Silicon Valley Clean Energy, I write to support AB 1761 by Assemblymember Chris Rogers (D-Santa Rosa), a measure that supports energy affordability by improving transparency and certainty in how the Power Charge Indifference Adjustment (PCIA), a charge on nearly all energy bills, is calculated. Electricity bills in California are on the rise, in part due to challenging market conditions and outdated and inefficient regulatory policies. Families and businesses in our community are feeling the impact. Affordability is a key priority for the City of Saratoga, and lawmakers and regulators need practical, consumer-focused solutions that ensure customers do not pay more than their fair share. One tool to ensure customers receive fair, accurate energy bills is increased transparency in how PCIA charges are calculated. The PCIA is a fee designed to ensure that customers who leave utility generation service, such as customers of a Community Choice Aggregator (CCA) or Energy Service Provider (ESP), pay their share of legacy power costs. But since the PCIA was implemented, there has been no consistent standard for which data must be made available in any California Public Utilities Commission (CPUC) process or proceeding in which the PCIA or a related charge is set. Without adequate transparency, CCAs and ESPs are unable to verify the accuracy of the PCIA charges that their customers must pay and cannot confidently forecast rates – both of which are affordability tools needed to protect customers from unexpected rate increases. Additionally, the lack of consistent data creates costly disputes and inefficiencies in CPUC proceedings. To address these problems, AB 1761 proposes amending the Public Utilities Code to require the CPUC and investor-owned utilities (IOUs) to disclose all data used to calculate 126 2 PCIA costs, including cost inputs, forecasting assumptions, and methodologies. The bill would also ensure that when parties or the CPUC make proposals in a proceeding to change the PCIA, they provide all the underlying data that inform the proposal. Sensitive information would remain protected through Commission-approved nondisclosure agreements, a practice already used to protect sensitive information in other compliance areas. Greater transparency allows CCAs and ESPs to better advocate for their customers and assess proposals to change the PCIA. It reduces repeated fights over information, improves regulatory efficiency, and encourages utilities to verify their calculations because the underlying data would be open for review. It can also inform cost forecasts and shield customers from sudden rate swings, an important issue for the residents and local businesses we serve. For these reasons, the City of Saratoga strongly supports AB 1761, an important energy affordability tool that will strengthen confidence that customers pay their fair share – and not more. Sincerely, Chuck Page, Mayor City of Saratoga 127 Assembly Bill 1761 – Improving Energy Bill Transparency Updated: February 18, 2026 Assemblymember Chris Rogers, 2nd Assembly District Bill Summary AB 1761 improves transparency to how the Power Charge Indifference Adjustment (PCIA), a charge on nearly all energy bills, is calculated. Background Electricity bills in California are on the rise, in part due to challenging market conditions and outdated and inefficient regulatory policies. Families and businesses are feeling the impact. Lawmakers and regulators need practical, consumer-focused solutions that ensure customers do not pay more than their fair share. One tool to ensure customers receive energy bills that are fair and accurate is increased transparency in how PCIA charges are calculated. The PCIA is a fee designed to ensure customers who leave utility generation service, like customers of a Community Choice Aggregator (CCA) or Energy Service Provider (ESP), pay their portion of legacy power costs. But since the PCIA was implemented, there has been no consistent standard for what data must be made available in any California Public Utilities Commission (CPUC) process or proceeding where the PCIA, or a related charge, is set. Problem CCAs, ESPs, and their customers must pay the PCIA charge but often lack access to the data, assumptions, and methods used to set it. This transparency problem leads to disputes, inefficiencies, and unexpected rate impacts for customers. More specifically: •Disclosures vary by utility and by CPUC proceeding, resulting in repeated fights between CCAs and Investor-Owned Utilities (IOUs) over data access and increased administrative inefficiencies as the CPUC resolves disputes on a case-by-case basis. •Utilities sometimes make mistakes. In a 2019 PG&E proceeding, CalCCA identified $73 million in errors (including a $16 million increase for CCA customers). In a recent proceeding, PG&E identified an accounting error that would have cost CCA customers $217 million. •In an ongoing PCIA Rulemaking, the Commission withheld information on the evidence underlying their proposal and the rate impacts of a proposed change. The CPUC did not respond to a Public Records Act request for the information. Without adequate transparency, CCAs and ESPs are unable to verify the accuracy of the PCIA charges that their customers must pay and cannot confidently forecast rates – both of which are affordability tools needed to protect customers from unexpected rate increases. Solution AB 1761 proposes amending the Public Utilities Code to require the CPUC and IOUs to disclose all data used to calculate PCIA costs, including cost inputs, forecasting assumptions, and methodologies. The bill would also ensure that when parties make proposals in a proceeding to change the PCIA they provide all the underlying data informing that proposal. Sensitive information would remain protected through Commission-approved nondisclosure agreements – a practice already used to protect sensitive information in other compliance areas. Greater transparency allows CCAs and ESPs to better advocate for their customers and assess proposals to change the PCIA. It also can inform cost forecasts and shield customers from sudden rate swings. It reduces repeated fights over information, improves regulatory efficiency, and encourages utilities to verify calculations since the underlying data would be open to review. Costs to implement the proposal are miniscule, as most of this information already exists, while the benefits for rate, accuracy, stability, and consumer protection are substantial. This proposal strengthens confidence that customers pay their fair share — and not more. For More Information: Logan Pitts, Legislative Director Logan.Pitts@asm.ca.gov (916)319-2002 Support California Community Choice Association- CalCCA(sponsor) 128 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: Public Works PREPARED BY: Macedonio Nunez, City Engineer SUBJECT: Transportation Impact Fee Study Contract RECOMMENDED ACTION: Approve an $85,000 contract with Fehr and Peers for a Transportation Impact Fee (TIF) study, plus a 10% contingency. BACKGROUND: In the recently adopted budget, the City Council authorized funding for a Transportation Impact Fee (TIF) study. This study would allow the Council to consider a fee on new developments to fund related transportation infrastructure improvements. If the attached contract is approved, the City’s traffic engineering consultant, Fehr and Peers will conduct a study and report on the Council’s options to adopt a multimodal transportation impact fee. The scope of the study is set forth in Exhibit A-1 to the contract document included as Attachment A. The study will take about four to six months to complete. The findings from the study will be presented to City Council for further direction at a future date. FISCAL IMPACTS: Sufficient funds for the contract are available in the FY2026-27 Public Works Department’s Operating Budget for Traffic Engineering Services. ATTACHMENT: Attachment A – Contract with Fehr and Peers 2111245.2 129 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract Page 1 of 3 City of Saratoga Standard Services Contract This agreement is entered into at Saratoga, California by and between the City of Saratoga, a municipal corporation (“City”), and ______________________________________ (“Consultant”), who agree that: 1.Purpose of Contract. This is a contract for: The purpose of the contract is more specifically described in Exhibit A of this agreement (“Scope of Work and Payment Terms”). In the event of a conflict between (1) the “Scope of Work and Payment Terms” in Exhibit A or any of the exhibits included in Exhibit A and (2) the other terms of this agreement, the other terms of the agreement shall govern. 2. Term. Start Date:End Date: (If Start Date is left blank, start date will be date last signed below.) Or upon project completion, whichever occurs first. 3. Payment. City shall pay Consultant for work product produced and any authorized reimbursable costs pursuant to this agreement an amount not to exceed the total sum of: $___________________________________________________. If this contract is for more than one year, the maximum payment amount for each year is set forth in Exhibit A. Consultant agrees to comply with payment terms set forth in Exhibit A. Consultant is not authorized to undertake any efforts or incur any costs whatsoever under the terms of this agreement until receipt from City of a fully executed copy of this agreement. 4. Contract Administration. The authorized representatives of City and Consultant for Contract administration are listed below. The City’s Primary Representative is the Administrator. Consultant : Consultant Name: Contact Person: Street Address: Fehr and Peers Transportation Impact Fee Study Fehr and Peers Preparation of a Multimodal Transportation Impact Fee Study Report 09/02/2026 12/31/2027 85,000.00 Fehr and Peers Franziska Church, AICP 60 S. Market Street, Suite # 700 130 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract Page 2 of 3 City, State, Zip: Telephone(s): Email Address: Saratoga Business Lic. #: (Contractor shall maintain a Saratoga Business License for the Term of this agreement) City of Saratoga Department: Primary Representative: Street Address: City, State, Zip: Telephone: Email Address: 5. Addresses for Notice.Notices or communications shall be given to the parties at the addresses set forth in Section 4 (“Contract Administration”) unless otherwise designated in a written notice to the other party. In addition, notices to City shall be copied to: City Manager City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 City Clerk City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 These copies shall not constitute notice. 6. Change of Address.Any party hereto, by giving ten (10) days written notice to the other, may designate any other address as substitution of the address to which the notice or communication shall be given. 7. Insurance. Consultant agrees to procure and maintain insurance as required by the provisions set forth in Exhibit B (“Insurance”). Certificates of such insurance and copies of the insurance policies and endorsements shall be delivered to City within ten (10) days after being notified of the award of the contract, and before execution of this agreement by the City. 8. General Provisions.City and Consultant agree to and shall abide by the general provisions set forth in Exhibit C (“General Provisions”). Fehr and Peers Transportation Impact Fee Study San Jose, CA 95113 1-408-278-1700 f.church@fehrandpeers.com BUS-005772 Public Works Macedonio Nunez 13777 Fruitvale Ave Saratoga, CA 95070 1-408-868-1218 mnunez@saratoga.ca.us 131 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract Page 3 of 3 9. Supplemental Provisions. If one or both boxes are checked below this agreement includes supplemental provisions described in connection with the checked box(es): This agreement is funded in whole or in part by an entity other than City. Consultant shall comply with all rules and regulations required by such funding entity. Applicable funding entity requirements are set forth in Exhibit D (“Funding Agency Requirements”). Nothing in this paragraph or in the funding entity requirements shall be construed to relieve Consultant of its duty to ensure that it is in compliance with all applicable laws and regulations. Exhibit E (“Special Requirements”) sets forth provisions regarding: 10. Exhibits. All exhibits referred to in this agreement are attached hereto and are by this reference incorporated herein and made a part of this agreement. 11. Entire agreement. This agreement supersedes any and all agreements, either oral or written, between the parties with respect to Consultant’s completion of the Scope of Work on behalf of City and contains all of the covenants and agreements between the parties with respect to the rendering of such services in any manner whatsoever. No amendment, alteration, or variation of the terms of this agreement shall be valid unless made in writing and signed by the parties hereto. 12.Authority to Execute agreement. Each individual executing this agreement represents that he or she is duly authorized to sign and deliver the agreement on behalf of the party indicated and that this agreement is binding on such party in accordance with its terms. This agreement may be executed in counterparts, each of which shall be deemed an original, but all of which taken together shall constitute one and the same instrument. IN WITNESS WHEREOF, the parties hereto have executed this agreement. Consultant City of Saratoga Signature City Manager Date: Signer Name ATTEST: Signer Title Date:City Clerk Contract Description: Date: APPROVED AS TO FORM: City Attorney’s Office Date: Fehr and Peers Transportation Impact Fee Study ✔ Exhibit A Payment, Exhibit B Item 1 & 11, Exhibit C Items 1.3, 1.4, 8.1, 9.1, 11,12,13.3 & 21 Preparation of a Multimodal Transportation Impact Fee Study Report 132 Contractor:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit A Page 1 of 2 City of Saratoga Services Contract Exhibit A – Scope of Work and Payment Terms Consultant shall complete the scope of work and invoice the City in accordance with the payment terms shown below: AND/OR See Exhibit(s) A-incorporated by this reference. Fehr and Peers Transportation Impact Fee Study ✔1 133 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract Page 2 of 2 Payment Terms: The payments specified in this paragraph shall be the only payments to be made to Consultant in connection with Consultant’s completion of the Scope of Work pursuant to this agreement. Reimbursable expenses shall be billed only at their actual cost. Consultant shall submit all billings to City and City shall pay such billings in the manner specified in this paragraph. Payment shall be made payable to Consultant and delivered to the address specified in Section 4 on pages 1 and 2 of this agreement. The making of any payment by City, or the receipt thereof by the Consultant, shall in no way lessen the liability of the Consultant to correct or revise unsatisfactory work, even though the unsatisfactory character of such work may not have been apparent or detected at the time such payment was made. City may withhold payment to Consultant in any instance in which the Consultant has failed or refused to satisfy any material obligation provided for in this agreement. In no event shall City be liable for interest or late charges for any late payments. Consultant shall submit invoices, not more often than once a month during the term of this agreement, based on the cost for work performed in accordance with the either the hourly rates or task-based rates in the Scope of Work and authorized reimbursable expenses incurred prior to the invoice date. Invoices shall contain the following information: 1.1 Serial identifications of bills, i.e., Bill No. 1; 1.2 The beginning and ending dates of the billing period; 1.3 A summary containing the total contract amount, the amount of prior billings, the total due this period, percentage of work completed, the remaining balance available for all remaining billing periods, and a brief description of work completed during the billing period. City shall make monthly payments, based on such invoices, for satisfactory progress in completion of the Scope of Work, and for authorized reimbursable expenses incurred. City shall not be obligated to pay Consultant for work performed that falls outside the Scope of Work. -End of Exhibit A - Fehr and Peers Transportation Impact Fee Study 134 60 S. Market Street, Suite 700 San José, CA 95113 March 25, 2026 John Cherbone City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 Subject: City of Saratoga Multimodal Transportation Impact Fee Study Dear John: Fehr š Peers is pleased to partner with the City of Saratoga to prepare a Multimodal Transportation Impact Fee study. We understand that the City is interested in establishing a fee that would provide funding to implement multimodal transportation improvements throughout the City to support future growth in the City. Our proposed scope of work, schedule, and fee estimate are described below. Scope of Work We have prepared this proposal based on our recent meetings with City staff and the desired outcomes of the TIF. The work scope is divided into the following tasks. Task 1: Finalize Scope and Project Kick-Off Two Fehr š Peers staff will attend a project kick-off meeting with City staff to confirm the objectives for the fee study, discuss data sources, as well as overall project schedule and deliverables. Task 2: Define Projects A critical step in any fee program is to establish a set of capital improvement projects that the fee revenues will be used to construct. Specifically, we will work with the City to define the types of transportation facilities that will be considered eligible for TIF funding. These facilities may include state or city roadways, bicycle, and pedestrian facilities. The types of projects to be included in the TIF program should be capital projects that expand upon the current network capacity or rebuild existing roadways to new design standards to better serve the travel demands of future users and to better align with the policies and priorities of the City’s General Plan and local design standards. Sources for the projects will include the City’s General Plan, Safe Routes to School Plan, Local Roads Safety Plan, and Traffic Safety Commission identified improvements. Deliverable: List and map of eligible improvement projects. Task 3: Develop Cost Estimates This task assumes that the City of Saratoga will provide cost estimates for the identified improvements. Fehr š Peers design staff have the expertise to review cost estimates produced by others and/or to produce new cost estimates for most types of local transportation improvements. As Contractor: Fehr and Peers Project: Transportation Impact Fee Study Exhibit A-1 Page 1 of 4 &YIJCJU" 135 March 25, 2026 | 2 an optional task, Fehr š Peers could help the City produce cost estimates for the capital projects on the TIF list. Task 4: Identify Existing Deficiencies A development impact fee program should not include the costs associated with correcting existing deficiencies in the transportation system. Therefore, deficiencies should be accounted for and removed from the fee calculations. We will coordinate directly with City to identify recent studies or plans that report the existing traffic conditions and performance standards on the facilities included in the draft project list from Task 3. If there are capital projects identified on facilities where recent existing conditions information is not available from published sources, it may be necessary to arrange for new traffic counts to be conducted; this scope does not assume any new data collection activities, but that can be confirmed once the project list is defined. The existing conditions at each project location will be compared to the applicable performance standards to determine whether any existing deficiencies occur; these standards may include operational standards (such as Level of Service thresholds) or design standards. If there are existing deficiencies, we will determine how much overcapacity the facility is currently operating, and will use that result to determine the proportion of the improvement cost that should be discounted in the fee program. Task 5: Define Growth Potential As a next step in the study is to determine the amount of future growth (both for residential and non- residential land uses) that is likely to occur. It is our assumption that we will use the growth projections used in the City’s General Plan and most recent Housing Element. We will request a copy of the VTA-C/CAG Travel Demand Model used for those studies, and assume that the land use information is correct and do not assume any model validation or calibration as part of out task. From the model we will extract the amount of population and employment growth anticipated and will summarize this growth potential in tabular form to get confirmation from the City on those projections. Once the future growth potential is defined, we will develop a set of factors to convert those land uses into Dwelling Unit Equivalents (DUEs). The DUE is a unit of measurement that allows all land use categories to be compared equitably in terms of the relative burden each places on the transportation system. DUE factors typically include components such as trip generation rates, average trip lengths, the likelihood for diverted/pass-by trips, and sometimes other elements such as proximity to other compatible uses or transit facilities. We will develop DUE factors for this study based on inputs and outputs from the travel demand model, as well as industry standard reference materials and factors used in other fee programs. These factors will be reviewed with the team and will be used later in the fee calculations. Deliverable: Table of population and employment growth from the VTA-C/CAG travel model and conversion of those projections into Dwelling Unit Equivalents (DUEs). Task 6: Fair Share/Nexus Analysis The purpose of this task is to establish the required nexus between the amount of the fee being charged and the transportation system impacts caused by the new development that will be subject to the fee. Contractor: Fehr and Peers Project: Transportation Impact Fee Study Exhibit A-1 Page 2 of 4136 March 25, 2026 | 3 The VTA-C/CAG Travel Demand Model will be used to establish that there is a reasonable nexus (i.e., a connection) between the travel demands caused by new development in the City and the amount of the fee to be charged to that new development. The basic modeling technique used in this evaluation will be select link analysis on the roadway segments that are proposed to receive capital improvements through the TIF program; the results of the select link analysis will determine the proportion of traffic on each link that is attributable to new development in the City, which will then be used to define the proportion of the project costs to be included in the fee program. To the extent that non-roadway facilities are also included in the project list (from Task 2), those facilities cannot readily be reflected in a regional travel demand model so different steps will be taken to establish a nexus between new development and the improvements of those facilities. These steps may involve defining the nexus consistent with the proportional population growth occurring in the City, or establishing a nexus relationship based on City policies and design standards. These topics should be discussed with City staff from all departments before a final nexus relationship is defined. Deliverable: Table summary of fair share calculations for vehicle facilities and discussion of multi- modal transportation improvements. Task 7: Calculate Fee Based on the results from the previous task of the study, we will prepare a set of fee calculations. These calculations will represent the maximum fee that could be charged consistent with the nexus analysis; the policy-makers may decide to set a fee schedule at less than the maximum fee to support various City policy goals. Deliverable: Table summary of fee calculations. Task 8: Documentation and Meetings We will prepare a brief technical memo documenting the steps taken in the technical analysis. The memo will be provided to the City. We have assumed up to 8 hours to respond to comments and finalize the technical memo. One Fehr š Peers staff member will attend up to two public meetings. Deliverable: Draf and final technical memorandum. Fee and Schedule The time-and-materials cost to prepare the letter report described above is not-to-exceed $85,000. This fee includes all professional and support staff time, as well as direct expenses. The cost to prepare the TIF can be included in the fee calculations. Invoices will be submitted monthly and are due upon receipt. We will work with the City to develop a schedule to meet the needs of the project. Additional services, if any, will be billed on a time-and-materials basis and completed upon written authorization. The terms of this proposal are valid for a period of 30 days. Contractor: Fehr and Peers Project: Transportation Impact Fee Study Exhibit A-1 Page 3 of 4137 March 25, 2026 | 4 We appreciate the opportunity to submit this proposal and to collaborate with you and other City staff. Should you have any questions or need any additional information, please do not hesitate to call me at (408) 645-7014. Otherwise, please provide a contract amendment for our review and signature. Sincerely, FEHR š PEERS Franziska Church, AICP Principal P26-4564-SJ FEFEFEFEFEEHRHRHRHRHRHH š PEERS Contractor: Fehr and Peers Project: Transportation Impact Fee Study Exhibit A-1 Page 4 of 4138 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit B Page 1 of 3 City of Saratoga Design Services Contract Exhibit B – Insurance The insurance requirements listed below that have an “9” indicated in the space before the requirement apply to this agreement together with the general requirements. Modifications to the below requirements are shown in Exhibit E (“Special Requirements”). Contractor shall provide its insurance broker(s)/agent(s) with a copy of these requirements and request that they provide certificates of insurance complete with copies of all required endorsements to the Primary Representative listed in section 4 on page 2. During the term of this agreement Contractor shall ensure that its broker(s)/agent(s) provide the Primary Representative with updated certificates of insurance reflecting continued satisfaction of the requirements of this agreement together with updated endorsements in the event of a change in the underlying insurance policy(ies), with copies emailed to cityhall@saratoga.ca.us. All endorsements shall be signed by a person authorized by that insurer to bind coverage on its behalf. City has the right to require Contractor’s insurer to provide complete, certified copies of all required insurance policies. As described in more detail below, the City, its officers, officials, employees, agents, and volunteers are to be covered as insureds. All certificates and endorsements must be received and approved by City before work commences. Insurance Requirements Commercial General Liability Insurance covering commercial general liability on an “occurrence” basis, including products and completed operations, property damage, bodily injury, personal injury, and advertising injury with coverage minimum limits of $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Auto Liability Insurance with coverage as indicated: $1,000,000 combined single limit for bodily injury and property damage $500,000 combined single limit for bodily injury and property damage Professional/Errors and Omissions Liability (“E&O”) with coverage as indicated: $1,000,000 per loss/ $1,000,000 aggregate $2,000,000 per loss/ $2,000,000 aggregate Fehr and Peers Transportation Impact Fee Study ✔ ✔ ✔ ✔ 139 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit B Page 2 of 3 Workers' Compensation as required by the State of California, with statutory limits, and Employer’s Liability Insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease. Contractor shall submit to City a waiver of subrogation endorsement in favor of City, its officers, officials, agents, employees, and volunteers. If Contractor is not required to maintain Workers’ Compensation Insurance pursuant to State law, Contractor shall file a verification of that fact with the Primary Representative. All subcontractors used must comply with the above requirements except as noted below: General Requirements As to all of the checked insurance requirements above, the following shall apply: 1. Additional Insured Status and Primary Coverage. Contractor shall submit to City an additional insured endorsement for its Commercial General Liability policy with coverage at least as broad as ISO form CG 20 10 for ongoing operations, and coverage at least as broad as ISO Form CG 20 37 for completed operations.For Auto Liability, the policy shall contain, or be endorsed to contain, additional insured coverage for the City, its officers, officials, employees, agents and volunteers. Any available insurance proceeds broader than or in excess of the minimum insurance coverage requirements and/or limits specified in this agreement shall be available to the additional insured.The requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured; whichever is greater. The additional insured coverage under Contractor’s policy shall be ''primary and non-contributory" and will not seek contribution from the City’s insurance or self-insurance and shall be at least as broad as ISO Form CG 20 01 04 13 and CG 20 38 04 13. This requirement does not apply to errors and omissions insurance. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, employees or volunteers. 2. Separation of Insureds.The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 3. Deductibles and Self Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials and employees; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. 4. Umbrella or Excess Insurance.The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City (if agreed to in a written contract or agreement) before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured. Fehr and Peers Transportation Impact Fee Study ✔ 140 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit B Page 3 of 3 5. Waiver of Subrogation.Contractor hereby grants to City a waiver of any right to subrogation which any insurer of Contractor may acquire against City by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether City has received a waiver of subrogation endorsement from the insurer. 6. Verification of Coverage.Contractor shall furnish the City with original certificates and amendatory endorsements effecting coverage required by this Exhibit. All certificates and endorsements are to be received and approved by the City before work commences. The City reserves the right to require at any time complete, certified copies of all required insurance policies, including endorsements effecting the coverage required by these specifications and failure to exercise this right shall not constitute a waiver of any of City’s rights pursuant to this agreement. 7. Maintenance of Coverage.Contractor shall not cancel, assign, or change any policy of insurance required by this agreement or engage in any act or omission that will cause its insurer to cancel any insurance policy required by this agreement except after providing 30 days prior notice to the City. If an insurance policy required by this agreement is unilaterally cancelled or changed by the insurer, Contractor shall immediately provide written notice to the City and obtain substitute insurance meeting the requirements of this agreement. Nothing in this paragraph relieves Contractor of its obligation to maintain all insurance required by this agreement at all times during the term of the agreement. 8. Claims Made Policies.If any of the required policies provide claims-made coverage, the coverage shall be maintained for a period of five years after completion of the contract. Contractor may satisfy this requirement by renewal of existing coverage or purchase of either prior acts or tail coverage applicable to said five-year period. 9. Acceptability of Insurers.The policy or policies required by this agreement shall be issued by insurers admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide. 10. Subcontractors. Contractor agrees to include with all subcontractors in their subcontract the same requirements and provisions of this agreement including the indemnity and insurance requirements to the extent they apply to the scope of the subcontractor's work. Subcontractors hired by Contractor shall agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to the City under this agreement. Subcontractors shall further agree to include these same provisions with any sub-subcontractor. Contractor shall provide subcontractor with a copy of the indemnity and insurance provisions of this agreement as a part of Contractor’s subcontract with subcontractor. Contractor shall require all subcontractors to provide a valid certificate of insurance and the required endorsements included in the agreement prior to commencement of any work and will provide proof of compliance to the City. 11. Special Risks or Circumstances.City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. -End of Exhibit B- Fehr and Peers Transportation Impact Fee Study 141 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 1 of 9 City of Saratoga Services Contract Exhibit C – General Provisions 1. INDEPENDENT CONTRACTOR.City requires the services of a qualified consultant to provide the work product described in Exhibit A (“Scope of Work and Payment Terms”) because it lacks the qualified personnel to provide the specified work product. Consultant is qualified to provide the required work product and is agreeable to providing such work product on the terms and conditions in this agreement. 1.1 In General. At all times during the term of this agreement, Consultant shall be an independent contractor and shall not be an employee of City. Consultant shall complete the Scope of Work hereunder in accordance with currently approved methods and practices in Consultant's field. No relationship of employer and employee is created by this agreement between the City and Consultant or any subcontractor or employee of Consultant. City shall have the right to control Consultant only with respect to specifying the results to be obtained from Consultant pursuant to this agreement. City shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this agreement. Any terms in this agreement referring to direction from City shall be construed as providing for direction as to policy and the result of the Consultant’s work only, and not as to the means by which such a result is obtained. 1.2 Non-Exclusive Contract.Nothing contained in this agreement shall be construed as limiting the right of Consultant to engage in Consultant's profession separate and apart from this agreement so long as such activities do not interfere or conflict with the performance by Consultant of the obligations set forth in this agreement. Interference or conflict will be determined at the sole discretion of the City. 1.3 Standard of Care.Consultant shall complete the Scope of Work required pursuant to this agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Consultant is engaged in the geographical area in which Consultant practices its profession. All work product of whatsoever nature which Consultant delivers to City pursuant to this agreement shall be prepared in a substantial, first class and workmanlike manner and conform to the standards of quality normally observed by a person practicing in Consultant’s profession. 1.4 Qualifications.Consultant represents and warrants to City that the Consultant is qualified to perform the services as contemplated by this agreement and that all work performed under this agreement shall be performed only by personnel under the supervision of the Consultant as an employee or, if authorized by the Scope of Work, a subcontractor. All personnel engaged in the work shall be fully qualified and shall be authorized, licensed and certified under state and local law to perform such work if authorization, licensing or certification is required. The Consultant shall commit adequate resources and time to complete the project within the project schedule specified in this agreement. Fehr and Peers Transportation Impact Fee Study 142 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 2 of 9 1.5 Use of City Equipment.City shall not be responsible for any damage to persons or property as a result of the use, misuse or failure of any equipment used by Consultant, or by any of its employees, even though such equipment be furnished, rented or loaned to Consultant by City. 1.6 Payment of Taxes and Other Expenses.Should City, in its discretion, or a relevant taxing authority, including, but not limited to the Internal Revenue Service or the State Employment Development Division, determine that the Consultant is an employee for purposes of collection of any employment taxes, the amounts payable under this agreement shall be reduced by amounts equal to both the employee and employer portions of the tax due (and offsetting any credits for amounts already paid by the Consultant which can be applied against this liability). City shall then forward those amounts to the relevant taxing authority. Should a relevant taxing authority determine a liability for past services performed by the Consultant for City, upon notification of such fact by the City, the Consultant shall promptly remit such amount due or arrange with the City to have the amount due withheld from future payments to the Consultant under this agreement (again, offsetting any amounts already paid by the Consultant which can be applied as a credit against such liability). Any determination of employment status above shall be solely for the purposes of the particular tax in question, and for all other purposes of this agreement, The Consultant shall not be considered an employee of City. Notwithstanding the foregoing, should any court, arbitrator, or administrative authority determine that the Consultant is an employee for any other purpose, then the Consultant agrees to a reduction in the City's financial liability so that the City's total expenses under this agreement are not greater than they would have been had the court, arbitrator, or administrative authority determined that the Consultant was not an employee. 2. COMMUNICATION AND NOTICES. 2.1 Communications with Designated Administrator.The Administrator designated in Section 4 on page 1 of this agreement is authorized to receive information, interpret and define City's policies consistent with this agreement, and communicate with Consultant concerning this agreement. All correspondence and other communications shall be directed to or through the Administrator or the Administrator’s designee. 2.2 Communications and Notices on Compliance with Agreement.All notices or communication concerning a party's compliance with the terms of this agreement shall be in writing and may be given either personally, by certified mail, return receipt requested, or by overnight express carrier. The notice shall be deemed to have been given and received on the date delivered in person or the date upon which the postal authority or overnight express carrier indicates that the mailing was delivered to the address of the receiving party. The parties shall make good faith efforts to provide advance courtesy notice of any notices or communications hereunder via e-mail. However, under no circumstances shall such courtesy notice satisfy the notice requirements set forth above; nor shall lack of such courtesy Fehr and Peers Transportation Impact Fee Study 143 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 3 of 9 notice affect the validity of service pursuant to the notice requirement set forth above. 3. CONTRACTOR NOT AGENT. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Consultant shall have no authority, express or implied, pursuant to this agreement to bind City to any obligation whatsoever. 4. BENEFITS AND TAXES.Consultant shall not have any claim under this agreement or otherwise against City for seniority, vacation time, vacation pay, sick leave, personal time off, overtime, health insurance, medical care, hospital care, insurance benefits, social security, disability, unemployment, workers compensation or employee benefits of any kind. Consultant shall be solely liable for and obligated to pay directly all applicable taxes, including, but not limited to, federal and state income taxes, and in connection therewith Consultant shall indemnify and hold City harmless from any and all liability that City may incur because of Consultant's failure to pay such taxes. City shall have no obligation whatsoever to pay or withhold any taxes on behalf of Consultant. 5. ASSIGNMENT PROHIBITED.The services to be performed by the Consultant are personal in character and no party to this agreement may assign any right or obligation under this agreement. Any attempted or purported assignment of any right or obligation under this agreement shall be void and of no effect. However, with the consent of the City given in writing, Consultant is entitled to subcontract such portions of the work to be performed under this agreement as may be specified by City. 6. PERSONNEL.Consultant shall assign only competent personnel to complete the Scope of Work pursuant to this agreement. In the event that City, in its sole discretion, at any time during the term of this agreement, desires the removal of any such persons, Consultant shall, immediately upon receiving notice from city of such desire of City, cause the removal of such person or persons from work in connection with the Scope of Work. 7. CONFLICT OF INTEREST. 7.1 In General.Consultant understands that its professional responsibility is solely to City. Consultant represents and warrants that it presently has no interest, and will not acquire any direct or indirect interest, that would conflict with its performance of this agreement. Consultant shall not employ or subcontract with a person having such an interest in the performance of this agreement. 7.2 Subsequent Conflict of Interest.Consultant agrees that if an actual or potential conflict of interest on the part of Consultant is discovered after award, the Consultant will make a full disclosure in writing to the City. This disclosure shall include a description of actions, which the Consultant has taken or proposes to take, after consultation with the City to avoid, mitigate, or neutralize the actual or potential conflict. Within 45 days, the Consultant shall have taken all necessary steps to avoid, mitigate, or neutralize the conflict of interest to the satisfaction of the City. Fehr and Peers Transportation Impact Fee Study 144 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 4 of 9 7.3 Interests of City Officers and Staff.No officer, member or employee of City and no member of the City Council shall have any pecuniary interest, direct or indirect, in this agreement or the proceeds thereof. Neither Consultant nor any member of any Consultant’s family shall serve on any City board or committee or hold any such position which either by rule, practice or action nominates, recommends, or supervises Consultant's performance of the Scope of Work or authorizes funding to Consultant. 8. COMPLIANCE WITH LAWS 8.1 In General.Consultant shall keep itself fully informed of and comply with all laws, policies, general rules and regulations established by City and shall comply with the common law and all laws, ordinances, codes and regulations of governmental agencies, (including federal, state, municipal and local governing bodies) applicable to the performance of the Scope of Work hereunder. 8.2 Licenses and Permits.Consultant represents and warrants to City that it has all licenses, permits, qualifications and approvals of whatsoever nature which are legally required for Consultant to practice its profession. Consultant represents and warrants to City that Consultant shall, at its sole cost and expense, keep in effect at all times during the term of this agreement any licenses, permits, and approvals which are legally required for Consultant to practice its profession. In addition to the foregoing, Consultant shall obtain and maintain during the term hereof a valid City of Saratoga Business License. 9. WORK PRODUCT AND RECORDS 9.1 Property of City.All reports, data, maps, models, charts, studies, surveys, photographs, memoranda or other written documents or materials prepared by Consultant (“works”) pursuant to this agreement shall become, as between Consultant and City, the property of City upon completion of the work to be performed hereunder or upon termination of this agreement. Without limiting the generality of the foregoing, if, in connection with services performed under this agreement, the Consultant or its subcontractors create artwork, copy, posters, billboards, photographs, videotapes, audiotapes, systems designs, software, reports, diagrams, surveys, source codes or any other original works of authorship, such works of authorship shall be works for hire as defined under Title 17 of the United States Code, and all copyrights in such works are the property of City. If it is ever determined that any works created by the Consultant or its subcontractors under this agreement are not works for hire under U.S. law, the Consultant hereby assigns all of its copyrights to such works to City, and grants to City a royalty-free, exclusive, and irrevocable license to reproduce, publish, use, and to authorize others to do so, all of Consultant’s rights in such works and agrees to execute any documents necessary to effectuate such assignment and license. The Consultant may retain and use copies of such works for reference and as documentation of its experience and capabilities. 9.2 Intellectual Property. Consultant represents and warrants that it has the legal right to utilize all intellectual property it will utilize in the performance of this Fehr and Peers Transportation Impact Fee Study 145 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 5 of 9 agreement. Consultant further represents that it shall ensure City has the legal right to utilize all intellectual property involved in and/or resulting from Consultant’s performance of this agreement. Consultant shall indemnify and hold City harmless from all loss and liability, including attorneys’ fees, court costs and all other litigation expenses for any infringement of the patent rights, copyright, trade secret or any other proprietary right or trademark, and all other intellectual property claims of any person or persons in consequence of the use by City, or any of its officers or agents, of articles or services to be supplied in the performance of this agreement. 9.3 Records and Audits.Contractor and its subcontractors shall establish and maintain records pertaining to this contract. Contractor’s and subcontractors’ accounting systems shall conform to generally accepted accounting principles, and all records shall provide a breakdown of total costs charged under this contract, including properly executed payrolls, time records, invoices and vouchers. Contractor shall permit City and its authorized representatives to inspect and examine Contractor’s books, records, accounts, and any and all data relevant to this Contract at any reasonable time for the purpose of auditing and verifying statements, invoices, or bills submitted by Contractor pursuant to this contract and shall provide such assistance as may be reasonably required in the course of such inspection. City further reserves the right to examine and re-examine said books, records, accounts, and data during the four-year period following the termination of this Contract; and Contractor shall in no event dispose of, destroy, alter, or mutilate said books, records, accounts, and data in any manner whatever for four years after the termination of this Contract. Pursuant to California Government Code Section 8546.7, the parties to this Contract shall be subject to the examination and audit of representative of the Auditor General of the State of California for a period of three years after final payment under the contract. The examination and audit shall be confined to those matters connected with the performance of this contract including, but not limited to, the cost of administering the contract. 9.4 Use of Recycled Paper and Electronic Documents.Consultant shall prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper. Documents shall be printed on both sides of the page and City shall be provided with electronic copies of documents (in Word or .pdf format) except where unusual circumstances make it infeasible to do so. 10. CONFIDENTIAL INFORMATION. Consultant shall hold any confidential information received from City in the course of performing this agreement in trust and confidence and will not reveal such confidential information to any person or entity, either during the term of the agreement or at any time thereafter. Upon expiration of this agreement, or termination as provided herein, Consultant shall return materials which contain any confidential information to City. Consultant may keep one copy for its confidential file. For purposes of this paragraph, confidential information is defined as all Fehr and Peers Transportation Impact Fee Study 146 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 6 of 9 information disclosed to Consultant which relates to City's past, present, and future activities, as well as activities under this agreement, which information is not otherwise of public record under California law. 11. RESPONSIBILITY OF CONSULTANT. Consultant shall take all responsibility for the work, shall bear all losses and damages directly or indirectly resulting to Consultant, to any subcontractor, to the City, to City officers and employees, or to parties designated by the City, on account of the performance or character of the work, unforeseen difficulties, accidents, occurrences or other causes to the extent predicated on active or passive negligence of the Consultant or of any subcontractor. 12. INDEMNIFICATION.Consultant and City agree that City, its employees, agents and officials shall be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys fees, litigation costs, defense costs, court costs or any other cost incurred in relation to, as a consequence of or arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part, to the performance of this agreement as set forth below. Accordingly, the provisions of this indemnity provision are intended by the parties to be interpreted and construed to provide the fullest protection possible under the law to the City. Consultant acknowledges that City would not enter into this agreement in the absence of the commitment of Consultant to indemnify and protect City as set forth below. 12.1 General Indemnity. To the fullest extent permitted by law, Consultant shall indemnify and hold harmless City, its employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs (including, without limitation, costs and fees of alternative dispute resolution and litigation) of any kind whatsoever without restriction or limitation, incurred in relation to, as a consequence of or arising out of or in any way attributable actually, allegedly or impliedly, in whole or in part, to Consultant, or its employees, agents, or subcontractors. All obligations under this provision are to be paid by Consultant as they are incurred by the City. 12.2 Duty to Defend.In addition to Consultant’s obligation to indemnify City, Consultant shall defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City and its councilmembers, officers, and employees, immediately upon tender to Consultant of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Consultant are responsible for the claim does not relieve Consultant from its separate and distinct obligation to defend. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Consultant asserts that liability is caused in whole or in part by the negligence or willful misconduct of the indemnified party. If it is finally adjudicated that liability was caused solely by the negligence or willful misconduct of an indemnified party, Consultant may submit a claim to the City for reimbursement of reasonable attorneys’ fees and Fehr and Peers Transportation Impact Fee Study 147 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 7 of 9 defense costs in proportion to the established comparative liability of the indemnified party. 12.3 Limitation on Indemnity. Without affecting the rights of City under any provision of this agreement or this Section, Consultant shall not be required to defend, indemnify, and hold harmless City as set forth above for liability attributable to the sole fault of City, provided such sole fault is determined by agreement between the parties or the findings of a court of competent jurisdiction. This exception will apply only in instances where the City is shown to have been solely at fault and not in instances where Consultant is solely or partially at fault or in instances where City's fault accounts for only a percentage of the liability involved. In those instances, the obligation of Consultant will be all-inclusive and City will be held harmless, indemnified, and defended for all liability incurred, even though a percentage of the liability is attributable to conduct of the City. 12.4 Acknowledgement.Consultant acknowledges that its obligation pursuant to this Section extends to liability attributable to City, if that liability is less than the sole fault of City. Consultant has no obligation under this agreement for liability proven in a court of competent jurisdiction or by written agreement between the parties to be the sole fault of City. 12.5 Scope of Consultant Obligation. The obligations of Consultant under this or any other provision of this agreement will not be limited by the provisions of any workers' compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its employees and officials. 12.6 Subcontractors.Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section from each and every subcontractor, sub tier contractor or any other person or entity involved by, for, with or on behalf of Consultant in the performance or subject matter of this agreement. 12.7 No Waiver. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth herein is binding on the successors, assigns, or heirs of Consultant and shall survive the termination of this agreement or this Section. For purposes of Section 2782 of the Civil Code the parties hereto recognize and agree that this agreement is not a construction contract. By execution of this agreement, Consultant acknowledges and agrees that it has read and understands the provisions hereof and that this paragraph is a material element of consideration.City approval of insurance required by this agreement does not relieve the Consultant or subcontractors from liability under this Section. 12.8 Relation to Insurance Obligations.The defense and indemnification obligations of this agreement are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained in this agreement. Fehr and Peers Transportation Impact Fee Study 148 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 8 of 9 13. DEFAULT AND REMEDIES. 13.1 Events of default. Each of the following shall constitute an event of default hereunder: (a)Failure by Consultant to perform any obligation under this agreement and failure to cure such breach immediately upon receiving notice of such breach, if the breach is such that the City determines the health, welfare, or safety of the public is immediately endangered; or (b)Failure by either party to perform any obligation under this agreement and failure to cure such breach within fifteen (15) days of receiving notice of such breach (except for breaches subject to subparagraph (a), above); provided that if the nature of the breach is such that the non-breaching party determines it will reasonably require more than fifteen (15) days to cure, the breaching party shall not be in default if it promptly commences the cure and diligently proceeds to completion of the cure. 13.2 Remedies upon default. Upon any default, the non-defaulting party shall have the right to immediately suspend or terminate this agreement, seek specific performance and/or seek damages to the full extent allowed by law. City shall have the right to contract with another party to perform this agreement 13.3 No Waiver. Failure by City to seek any remedy for any default hereunder shall not constitute a waiver of any other rights hereunder or any right to seek any remedy for any subsequent default. 14. TERMINATION.The City may terminate this agreement with or without cause by providing 10 days’ notice in writing to Consultant. The City may terminate this agreement at any time without prior notice in the event that Consultant commits a material breach of the terms of this agreement. Upon termination, this agreement shall become of no further force or affect whatsoever and each of the parties hereto shall be relieved and discharged from the rights and obligations of this agreement, subject to payment for acceptable services rendered prior to the expiration of the notice of termination and delivery to City of any work in progress, completed work, supplies, equipment, and other materials produced as a part of, or acquired in connection with the performance of this agreement, and any completed or partially completed work which, if this agreement had been completed, would have been required to be furnished to City. Notwithstanding the foregoing and Section 2 on page 1, this Section and the provisions of this agreement concerning insurance (Exhibit B), Funding Agency Requirements (as set forth in Exhibit D if applicable), Work Product and Records, Confidential Information, Responsibility of Consultant, Indemnification, Default and Remedies, Litigation, and Jurisdiction and Severability shall survive termination or expiration of this agreement. 15. DISPUTE RESOLUTION. The parties shall make a good faith effort to settle any dispute or claim arising under this agreement. If the parties fail to resolve such disputes or claims, they shall submit them to non-binding mediation in California at shared expense of the parties for at least 8 hours of mediation. If mediation does not arrive at a satisfactory result, arbitration, if agreed to by all parties, or litigation may be pursued. In Fehr and Peers Transportation Impact Fee Study 149 Consultant:Project: Rev. 5/2023 City of Saratoga Services Contract – Exhibit C Page 9 of 9 the event any dispute resolution processes are involved, each party shall bear its own costs and attorneys’ fees. 16. LITIGATION. If any litigation is commenced between parties to this agreement concerning any provision hereof or the rights and duties of any person in relation thereto, each party shall bear its own attorneys’ fees and costs. 17. JURISDICTION AND SEVERABILITY. This agreement shall be administered and interpreted under the laws of the State of California. Jurisdiction of litigation arising from this agreement shall be in that state and venue shall be in Santa Clara County, California. 18. SEVERABILITY.If any part of this agreement is found to conflict with applicable laws, such part shall be inoperative, null and void insofar as it conflicts with said laws, but the remainder of this agreement shall be in full force and effect. 19. NOTICE OF NON-RENEWAL. Consultant understands and agrees that there is no representation, implication, or understanding that the City will request that work product provided by Consultant under this agreement be supplemented or continued by Consultant under a new agreement following expiration or termination of this agreement. Consultant waives all rights or claims to notice or hearing respecting any failure by City to continue to request or retain all or any portion of the work product from Consultant following the expiration or termination of this agreement. 20. PARTIES IN INTEREST. This agreement does not, and is not intended to, confer any rights or remedies upon any person or entity other than the parties. 21. WAIVER.Neither the acceptance of work or payment for work pursuant to this agreement shall constitute a waiver of any rights or obligations arising under this agreement. The failure by the City to enforce any of Consultant’s obligations or to exercise City's rights shall in no event be deemed a waiver of the right to do so thereafter. -End of Exhibit C- Fehr and Peers Transportation Impact Fee Study 150 Exhibit E: Special Requirements #1. Exhibit A, Payment Terms.is replaced in its entirety with the following: Payment Terms. The payments specified in this paragraph shall be the only payments to be made to Consultant in connection with Consultant’s completion of the Scope of Work pursuant to this agreement. Reimbursable expenses shall be billed only at their actual cost. Consultant shall submit all billings to City and City shall pay such billings in the manner specified in this paragraph. Payment shall be made payable to Consultant and delivered to the address specified in Section 4 on pages 1 and 2 of this agreement. The making of any payment by City, or the receipt thereof by the Consultant, shall in no way lessen the liability of the Consultant to correct or revise work that is not in conformance with this agreement, even though the character of such non-conforming work may not have been apparent or detected at the time such payment was made. City may withhold payment to Consultant in any instance in which the Consultant has failed or refused to satisfy any material obligation provided for in this agreement. In no event shall City be liable for interest or late charges for any late payments. Consultant shall submit invoices, not more often than once a month during the term of this agreement, based on the cost for work performed in accordance with the either the hourly rates or task-based rates in the Scope of Work and authorized reimbursable expenses incurred prior to the invoice date. Invoices shall contain the following information: 1.1 Serial identifications of bills, i.e., Bill No. 1; 1.2 The beginning and ending dates of the billing period; 1.3 A summary containing the total contract amount, the amount of prior billings, the total due this period, percentage of work completed, the remaining balance available for all remaining billing periods, and a brief description of work completed during the billing period. City shall make monthly payments, based on such invoices, for progress in completion of the Scope of Work in accordance with this agreement, and for authorized reimbursable expenses incurred. City shall not be obligated to pay Consultant for work performed that falls outside the Scope of Work. Consultant: Fehr and Peers Project: Transportation Impact Fee Study Exhibit E Page 1 of 6151 #2 Exhibit B, Item 1. Additional Insured Status and Primary Coverage.is replaced with the following: 1. Additional Insured Status and Primary Coverage.Contractor shall submit to City an additional insured endorsement for its Commercial General Liability policy with coverage at least as broad as ISO form CG 20 10 for ongoing operations, and coverage at least as broad as ISO Form CG 20 37 for completed operations. For Auto Liability, the policy shall contain, or be endorsed to contain, additional insured coverage for the City, its officers, officials, employees, agents and volunteers. Any available insurance proceeds broader than or in excess of the minimum insurance coverage requirements and/or limits specified in this agreement shall be available to the additional insured. The requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured; whichever is greater. The additional insured coverage under Contractor’s policy shall be ''primary and non-contributory" and will not seek contribution from the City’s insurance or self-insurance and shall be at least as broad as ISO Form CG 20 01 04 13 and CG 20 38 04 13. This requirement does not apply to errors and omissions insurance, workers’ compensation insurance, and employer’s liability insurance. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, employees or volunteers. #3. Exhibit B, Item 11. Special Risks or Circumstances.is deleted in its entirety. #4. Exhibit C, Item 1.3 Standard of Care.is replaced with the following: 1.3 Standard of Care. Consultant shall complete the Scope of Work required pursuant to this agreement in the manner and according to that degree of care, skill, and diligence ordinarily exercised by professionals performing similar services in the same or similar locale and under similar circumstances to that of Consultant under this Agreement. All work product of whatsoever nature which Consultant delivers to City pursuant to this agreement shall be prepared in accordance with this standard of care. #5. Exhibit C, Item 1.4 Qualifications.is replaced with the following: 1.4Qualifications. Consultant represents to City that the Consultant is qualified to perform the services as contemplated by this agreement and that all work performed under this agreement shall be performed only by personnel under the supervision of the Consultant Consultant: Fehr and Peers Project: Transportation Impact Fee Study Exhibit E Page 2 of 6152 as an employee or, if authorized by the Scope of Work, a subcontractor. All personnel engaged in the work shall be fully qualified and shall be authorized, licensed and certified under state and local law to perform such work if authorization, licensing or certification is required. The Consultant shall commit adequate resources and time to complete the project within the project schedule specified in this agreement. #6. Exhibit C, Item 8.1 In General.is replaced with the following: 8.1 In General.Exercising the standard of care as defined in Section 1.3 above, Consultant shall keep itself informed of and comply with all applicable laws, policies, general rules and regulations established by City and shall comply with the common law and all laws, ordinances, codes and regulations of governmental agencies, (including federal, state, municipal and local governing bodies) applicable to the performance of the Scope of Work hereunder that are then in effect at the time of performance. #7. Exhibit C, Item 9.1 Property of the City.is replaced with the following: 9.1 Property of City.All reports, data, maps, models, charts, studies, surveys, photographs, memoranda or other written documents or materials prepared by Consultant (“works”) pursuant to this agreement shall become, as between Consultant and City, the property of City upon completion of the work to be performed hereunder or upon termination of this agreement. Without limiting the generality of the foregoing, if, in connection with services performed under this agreement, the Consultant or its subcontractors create artwork, copy, posters, billboards, photographs, videotapes, audiotapes, systems designs, software, reports, diagrams, surveys, source codes or any other original works of authorship, such works of authorship shall be works for hire as defined under Title 17 of the United States Code, and all copyrights in such works are the property of City. If it is ever determined that any works created by the Consultant or its subcontractors under this agreement are not works for hire under U.S. law, the Consultant hereby assigns all of its copyrights to such works to City, and grants to City a royalty-free, exclusive, and irrevocable license to reproduce, publish, use, and to authorize others to do so, all of Consultant’s rights in such works and agrees to execute any documents necessary to effectuate such assignment and license. The Consultant may retain and use copies of such works for reference and as documentation of its experience and capabilities. However, notwithstanding the foregoing, or any provision to the contrary herein, intellectual property owned or created by any third party other than Consultant, its subconsultants, or City (“Third-Party Content”), and inventions, improvements, discoveries, methodologies, models, formats, software, algorithms, processes, procedures, designs, specifications, findings, and other intellectual properties Consultant: Fehr and Peers Project: Transportation Impact Fee Study Exhibit E Page 3 of 6153 developed, gathered, compiled or produced by Consultant or its subconsultants prior to or independently of their performance of this agreement (“Background IP”), including such Third-Party Content or Background IP that Consultant or its subconsultants may employ in their performance of this agreement, or may incorporate into any part of the works, shall not be the property of City. Consultant, or its subconsultants as applicable, shall retain all rights, titles, and interests, including but not limited to all ownership and intellectual property rights, in all such Background IP. Consultant, and its subconsultants as applicable, grant City an irrevocable, non-exclusive, non-transferable, royalty-free license in perpetuity to use, reproduce, prepare derivative works based upon, distribute, disclose, derive from, perform, and display such Background IP, but only as an inseparable part of, and only for the purpose intended by creation of, the works. In the event the works contain, or incorporate, any Third-Party Content, or derivative work based on such Third-Party Content, or any compilation that includes such Third-Party Content, Consultant shall secure all licenses to any such Third-Party Content, but only as an inseparable part of the works, where such licenses are necessary for City to utilize and enjoy Consultant's services and the works for their intended purposes. Any use of Consultant’s works for any other project or purpose not authorized in writing by Consultant, any modifications to the works made by anyone other than Consultant, and any use of incomplete works (“Unauthorized Uses”) shall be at City’s sole risk, and Consultant shall bear no liability for City’s Unauthorized Uses of the works. City agrees to indemnify, defend and hold Consultant and its officers, agents and employees harmless from any claims, losses, damages, costs, including without limitation attorneys' fees, arising out of any such Unauthorized Uses of the works by City. #8. Exhibit C, Item 11. RESPONSIBILITY OF CONSULTANT.is replaced with the following: 11. RESPONSIBILITY OF CONSULTANT.Consultant shall take all responsibility for the work, shall bear all losses and damages directly or indirectly resulting to Consultant, to any subcontractor, to the City, to City officers and employees, or to parties designated by the City, on account of the performance or character of the work, unforeseen difficulties, accidents, occurrences or other causes to the extent caused by active or passive negligence of the Consultant or of any subcontractor. #9. Exhibit C, Item 12. INDEMNIFICATION.is replaced with the following: 12. INDEMNIFICATION.To the fullest extent permitted by law, Consultant shall immediately defend, indemnify, and hold harmless City, its Council members, employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, Consultant: Fehr and Peers Project: Transportation Impact Fee Study Exhibit E Page 4 of 6154 administrative proceedings, regulatory proceedings, losses, expenses or costs (including, without limitation, costs and fees of alternative dispute resolution and litigation) of any kind whatsoever without restriction or limitation, to the extent arising out of, pertaining to or relating to the negligence, recklessness, or willful misconduct of Consultant or its employees, agents, or subcontractors. All obligations under this provision are to be paid by Consultant as they are incurred by the City. Consultant’s obligation to indemnify applies unless it is finally adjudicated that the liability was caused by the active negligence or sole willful misconduct of an indemnified party. If it is finally adjudicated that liability is caused by the comparative active negligence or willful misconduct of an indemnified party, then Consultant’s indemnification obligation shall be reduced in proportion to the established comparative liability. 12.1 Scope of Consultant Obligation.The obligations of Consultant under this or any other provision of this agreement will not be limited by the provisions of any workers' compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its employees and officials. 12.2 Subcontractors.Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth in this section from each and every subcontractor, sub tier Consultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance or subject matter of this agreement. In the event Consultant fails to obtain such indemnity obligations from others as required here, Consultant agrees to be fully responsible according to the terms of this section. 12.3 Duty to Defend.In addition to Consultant’s obligation to indemnify, Consultant shall defend, in all legal, equitable, administrative, or special proceedings, with counsel approved by the City, the City, its Council members, employees, agents and officials, immediately upon tender to Consultant of the claim in any form or at any stage of an action or proceeding, whether or not liability is established. An allegation or determination that persons other than Consultant are responsible for the claim does not relieve Consultant from its separate and distinct obligation to defend. The obligation to defend extends through final judgment, including exhaustion of any appeals. The defense obligation includes an obligation to provide independent defense counsel if Consultant asserts that liability is caused in whole or in part by the negligence or willful misconduct of the indemnified party. In no event shall the cost to defend charged to Consultant exceed Consultant’s proportionate percentage of fault. However, notwithstanding the previous sentence, in the event one or more defendants is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, Consultant shall meet and confer with other parties regarding unpaid defense costs. Consultant: Fehr and Peers Project: Transportation Impact Fee Study Exhibit E Page 5 of 6155 12.4 In General.Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth herein is binding on the successors, assigns, or heirs of Consultant and shall survive the termination of this agreement or this section. This section 13 shall in no event be construed to require indemnification by Consultant to a greater extent than permitted under the public policy of the State of California. By execution of this agreement, Consultant acknowledges and agrees that it has read and understands the provisions hereof and that this paragraph is a material element of consideration. City approval of insurance required by this agreement does not relieve the Consultant or subcontractors from liability under this paragraph. #10. Exhibit C, Item 13.3 No Waiver is replaced with the following: 13.3 No Waiver. Failure by either party to seek any remedy for any default hereunder shall not constitute a waiver of any other rights hereunder or any right to seek any remedy for any subsequent default. #11. Exhibit C, Item 21. Waiver is replaced with the following: 21. Waiver.Neither the acceptance of work or payment for work pursuant to this agreement shall constitute a waiver of any rights or obligations arising under this agreement. The failure of either party to enforce any of the other party’s obligations or to exercise the party’s rights shall in no event be deemed a waiver of the right to do so thereafter. - End of Exhibit E - Consultant: Fehr and Peers Project: Transportation Impact Fee Study Exhibit E Page 6 of 6156 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: Public Works PREPARED BY: John Cherbone, Public Works Director SUBJECT: VTA Bus Pilot Program RECOMMENDED ACTION: Receive report on resident-led bus pilot initiative program in Saratoga. BACKGROUND: A resident-led initiative, led by Traffic Safety Commissioner Dory Albert, has been developed to explore the use of existing Santa Clara Valley Transportation Authority (VTA) bus service as a school transportation option for students attending Redwood Middle School (RMS). The initiative is intended to provide families with an alternative to individual vehicle trips while reducing traffic congestion, particularly along Saratoga Avenue, and supporting walking, biking, and other Safe Routes to School efforts. The initiative has primarily been organized by parents and community volunteers in coordination with VTA and with support from the RMS PTA. According to information provided by the organizers, a 2026 parent survey generated more than 200 responses supporting a bus option, and approximately 50 students initially signed up to use VTA Route 51 for the fall 2026 school year. DISCUSSION: The pilot is intended to test whether public transit can provide a viable school transportation option while reducing vehicle trips associated with school drop-off and pick-up. Organizers have identified potential benefits including reduced traffic congestion, improved transportation options for students, increased opportunities for walking and biking, and reduced vehicle emissions. The organizers have also identified challenges with the pilot, particularly VTA service reliability. According to the organizers, ridership has declined in part due to delays and concerns about whether buses will consistently arrive on time for school. Attachment A is a comprehensive summary of the program. ATTACHMENT: Attachment A – Bus Pilot Initiative Report 157 Bus Pilot Initiative for Saratoga Presented to Saratoga City Council Who Am I? I am here this evening representing the residents of Saratoga to present a first-ever bus pilot program to the City Council. Saratoga is the only town in the state of California which does not offer school buses to its public school residents with exception of special needs. I am asking for support from the council for this School Bus Initiative highlighting its multiple, far-reaching benefits: ● Eco-friendly ● Community-building ● School-directed initiative ● Unanimously approved by our traffic commission which I am a part of. ● Supports CA state mandate to reduce carbon emissions on all streets in CA. https://lci.ca.gov/climate/carbon-neutrality/ ● Aligned with neighboring towns offering mass transit option to public schools. Menlo (private : St. Andrews and Sacred Heart take notice) just launched : “Sit back and let us do the driving” Hybrid solution. Enrollment UP! Harker, Valley Christian, Bellarmine, Kirby, Hillbrook: All Busing. https://www.menloschool.org/resources/transportation/bus-schedules/ ● Supports SRTS by reducing car congestion, encouraging more bike riding to school and walking in less car traveled streets (using the bike lane as a turning lane (video) ● Supported by RMS PTA as a safe viable transit option to school (in line with other PTA school districts offering this same transit option) ● May 2026 RMS Student VTA 51 ridership roster of 50 students equals 50 less cars on the road. As of May 2026: 1 RMS kid per car as the norm. (see below photo) The One Kid Per Car Method 158 ● Improve the walkability score in Saratoga, which is now one of the lowest in the nation https://www.walkscore.com/CA/Saratoga and is aptly called a “car dependent city.” A score of 100 is excellent, and most towns brag about 80. Saratoga scores just 28—an embarrassing number for a small, semi-rural community that should be far more walkable, and one that reflects an ineptitude in addressing even the most basic elements of pedestrian safety and accessibility. 159 Who Even Wants Buses? 2026 RMS Parent One-Month Survey on Bus Option to Redwood. ********Over 200 YES on Buses************ The number would be exponentially higher if the survey ran longer. 160 WHO CARES? It's not just the Redwood parents who are affected by the car congestion on Saratoga Ave, it’s also the neighborhoods nearby and the Saratoga community as a whole. Youtube video: The Saratoga Ave Traffic Problem: https://www.youtube.com/watch?v=VMzY1DIvNbA 161 Student Density Map showing where most RMS students live and so why buses on the perimeter of The Golden Triangle drives this transit option with high demand Yes, the Blauer/Saratoga-Sunnyvale Vta 51 bus line is within –it is in the middle –of the Saratoga School District boundaries. 162 Basic Aid = Money Strapped Saratoga Schools Because Saratoga is a Basic Aid School district, our school district receives no state funding for school buses. *A yellow school bus costs upwards of $1000 per student per year. Neighboring Basic Aid towns like Palo Also, Mountain View, Sunnyvale, have explored public transit options and implemented VTA-run school buses. We are following their same exact formats. For VTA-run school buses to work, it needs PTA, the School district, the City, City Council, VTA and parent engagement. It's a collaborative effort which supports, sustains and encourages this eco-friendly, community- building safe transit option to school. What I am asking is no different from the support that is given to other towns utilizing VTA-run mass transit to schools. 163 VTA bus routes and its infrastructure are already in Saratoga. These buses run along Saratoga Ave nearly empty. Photo: the WVC depot – across the street from RMS. 164 At the same time, on the same exact route as these VTA buses, bumper to bumper cars inch along, many times with one kid per car. We have the buses. Why aren't parents using them? (Photo taken May 2026 from the WVC VTA depot) VTA run buses were not aligned to the RMS bell schedule. They were off by 10 minutes. I met with the VTA scheduler and changed the 2 bus routes, 26 and 51, to align to the RMS morning schedule. Now we have a workable bus schedule! What our neighboring public schools are doing: 165 JLS Middle School Palo Alto: Bus It. VTA bus options are available. Bus route and schedule information can be found at www.vta.org. https://mountainviewhigh.maranausd.org/parent-tools/bus- transportation Home-to-School Transportation Program 2025-26 Update The Sunnyvale School District Home-to-School Transportation (HTST) program continues to grow as an important support system for students and families across the district. During the 2025–26 school year, the program provided transportation services to approximately 775 students across nine school sites, This is the rideshare Cupertino started over 7 years ago. It just expanded to Santa Clara this year: https://sanjosespotlight.com/silicon-valley-cities-get-funding-for-ride-share-service Example:VTA run bus schedule to Milpitas HS via Day Tripper Rout e Yellowstone/ Butano Park Victoria/Lande ss Park Victoria/Calaver as Milpita s HS School 246 7:42 AM 7:52 AM 8:05 AM School 247 7:53 AM 8:00 AM 8:13 AM School 246 7:52 AM 8:02 AM A Common Theme, in line with a State Eco-Goal 166 Across the Bay Area, successful Safe Routes to School programs recognize that no single transportation solution works for every family. Walking, biking, carpools, crossing guards, and buses all play important roles. Public transit buses are increasingly viewed as an essential tool for reducing school traffic congestion while expanding transportation options for students. VTA is also funding these school programs. State of California, Governor’s Office Transportation emissions present the State’s biggest hurdle to achieving carbon neutrality. Transportation emissions account for about 50% of total statewide emissions (transportation emissions include tailpipe emissions as well as emissions associated with fuel extraction, transportation, and refinement that have historically been attributed to the industrial sector). Wild fires are on the rise. The State is working to reduce emissions from driving overall, as well as to increase the number of Zero Emissions Vehicles (ZEVs) on the road and advance two key policy priorities that help reduce transportation emission. And so…..Beginning last Spring 2026, the VTA RMS bus initiative team began to advertise to incoming and current RMS this new bus option to school . This program started with AM drop off only. Pilot = test program. Demand from parents began growing asking for a PM bus schedule. More buses!! 167 168 169 May 2026: RMS Zoom Meeting with Parents on VTA RMS buses RMS parents have two drop off bus stops. They are located close enough for students to either walk to or bike to, again eliminating the unneeded use of cars. ● The 51 is at Blauer and Saratoga/Sunnyvale ave near Safeway in Argonaut Plaza. There will be a crossing guard at this location assisting RMS students. ● The 26 is at Cox Ave and Saratoga Ave, Both pick up at about the same time each morning, 7:50 am. Please make sure with a practice run that your child arrives on time or early. Other RMS students will be at the same stop. They could walk or bike together there in the mornings. Parents To-Do List *Parents check the VTA app in the AM to make sure there are no cancellations. This may never happen, but could. Have a plan B: a carpool set up. ● All passengers must have a Youth Clipper card. ● Make sure your student knows what number bus, the 26 or 51, s/he is riding on. ● Make sure your student knows to “pull the cord” after the bus turns onto Fruitvale. This alerts the bus driver to stop. In joining this Vta- run bus program, you and your student help: 1. Reduce traffic congestion around RMS… Especially: ● Saratoga Ave congestion ● unsafe pickup/dropoff patterns ● spillover into neighborhoods ● bike lane encroachment, allowing for more student bikers, walkers 170 2. Improve student safety ● recent pedestrian injuries on Scotland Ave ● safer, supervised transportation alternatives ● reducing chaotic parent pickup conditions Bus Initiative Accomplishments So Far: ● 2 designated VTA RMS Routes in Saratoga: VTA 26 and 51, each running down two major corridors in town, aligned to the RMS morning bell schedule, M-F ● 1 VTA RMS bus, 26 aligned to the RMS PM dismissal times M-F ● Support from RMS PTA to communicate this new transit option to its parent community ● RMS “honorary” PTA Parents help coordinate/communicate the school bus program, weigh issues, improve transit options ● 50 RMS parent sign ups on the VTA 51 for Fall 2026 ● 2 Whatsapp RMS parents bus groups updating arrival VTA arrival times, possible cancellations Proven through this Bus “Pilot” launch and Sign ups ● The RMS Parent community wants buses M-F, AM and PM ● The RMS Parent community with SHS students want the same service, M-F, AM and PM ● RMS Parents are willing to assist with this program, citing the need to improve our environment, build student independence, build community through walking to the bus stops together, carpooling ● VTA run school buses are acceptable modes of transport to RMS ● Parents are willing to pay the Youth Clipper card fee vs drive to RMS 171 Request : Support from the City Council and the City Parents have made it clear they want buses. In our 2026 RMS parent survey, more than 200 parents said they wanted a bus option, and 50 initially signed up their children to ride. At the same time, the City's number-one priority is reducing traffic on Saratoga Avenue—and getting students out of cars and onto buses directly advances that goal. Saratoga residents took the initiative and, working with VTA, got a real-world pilot up and running. It has largely been a volunteer-led effort, with no support from the City or the District. Now ridership is declining, in significant part because VTA delays are making the service unreliable. That's a problem volunteers can't solve on their own. So my question is: What is the City willing to do to help make buses a viable school transportation option in Saratoga? I'm not asking for City funding at this point. I'm asking whether the City is willing to contribute staff time, transportation expertise, its relationship with VTA, and its authority over streets and infrastructure, work with VTA on reliability, improved routes and schedules. Work with private schools: St. Andrews and Sacred Heart on bus initiatives. Help address crossing guards. Other towns have crossing guards at VTA bus stops, making buses a safe to school option. District to be flexible: If a child takes a bus to school, it arrives late, no detention for example. Parents have demonstrated the demand and residents have demonstrated that a bus program can be created. If the current VTA pilot isn't ultimately the right model, is the City willing to become an active partner in finding a transportation solution that works — whether that's private buses, or some combination of private (Zum) and public— and, if so, what are you willing to do? 172 The Band-aid Quick-Fix is No Longer a Solution Diagnosis; This patient (our town) is in critical condition. If you look at circulation in a city as it applies to the health of a town (data confirms this comparison ) clogged main arteries (like Saratoga ave) lead to car infiltration to once quiet neighborhoods disrupting and negatively changing the “integrity,” the vibrancy of these neighborhoods. (I have a study on Portos road, a cut-through to WVC and RMS. This neighborhood does not have a school embedded in it, it should not endure this cut-through pain.) Main streets are designed (master plan) to carry the major vehicle loads. When too many cars congest the main roads, alternative measures need reviewing…mass transit. Can you imagine what NYC would look like if everyone drove? That is LA. It's a mess. Is Saratoga morphing into a mini LA? Critical Mass :Eight cars take up the space of one bus on the road. Remove the cars and the streets open up allowing for other modes of transport. Improved circulation…a healthier Saratoga ! My suggestion: The City and City Council support this Bus Initiative, which was approved by our Traffic Commission, follows other neighboring towns mass transit formats, no funding asked, provide staff to track it, promote in through city’s communication channels, work with the district on crossing guards and VTA to find ways to expand and improve it (prompt arrival times, added routes), explore funding and reach out to neighboring towns (like Los Gatos and Cupertino) to possibly combine resources or share connections. City Council already has 2 VTA liaisons , this bus program could and should be under that purview. RMS PTA is already a supportive partner and should be included in this support group providing needed feedback and suggestions. The VTA app is flawed. SHS students are already at work creating our own version. The community is stepping up its game. Ojai (small town like ours) secured a grant that provides trollies in its town. Grants and opportunities are out there, our state supports this action. 173 Mass transit not only is an option for school students, but could help senior citizens, our downtown business (I ran a mini-program this summer where merchants offered 10 percent off to Clipper Card carriers, encouraging downtown foot traffic in an eco-friendly way) Mass transit like buses offload parking issues in our downtown, reduce the need to repave roads, offload the student library crowds right after school by providing other options (social: movies, food in el paseo), residents might be able to get to the post office in mid afternoon. It supports SRTS, which gets VTA and state funding by making the routes to school safe enough for parents to allow students to bike and walk. 174 175 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: City Manager PREPARED BY: Leslie Arroyo, City Manager SUBJECT: Alternative Policing Services Ad Hoc Committee RECOMMENDED ACTION: Appoint two Council representatives to an Ad-Hoc Committee to review alternative policing services in Saratoga. DISCUSSION: Staff recommends the City Council establish an Ad-Hoc Committee consisting of two Council Members to work with staff in evaluating potential long-term law enforcement options for the City. The Ad-Hoc Committee would serve in an advisory capacity, working with staff to review and provide input on a potential law enforcement services agreement with the Los Gatos-Monte Sereno Police Department, including proposed service levels, costs, contract terms, and other key considerations. Any final agreement or decision regarding the City’s law enforcement services would be brought before the full City Council for consideration and approval. 176 CITY OF SARATOGA Supplemental Report MEETING DATE: September 2, 2026 DEPARTMENT: City Manager’s Department PREPARED BY: Britt Avrit, MMC, City Clerk SUBJECT: Alternative Policing Services Ad Hoc Committee Following publication of the agenda packet for the September 2, 2026, City Council Meeting, written communications for the Agenda Item were submitted; the written communications are attached. Attachment Provided with this Supplemental Report: Attachment A - Written Communications received through noon 09/02/2026 177 From:Rocha, Heath To:Chuck Page; Tina Walia; Belal Aftab; Kookie Fitzsimmons; Yan Zhao Cc:Britt Avrit Subject:Letter of Support: LGMSPD & City of Saratoga Regional Partnership Date:Friday, August 28, 2026 9:21:00 AM Attachments:Superintendent Letter Supporting LGMSPD Saratoga Partnership.pdf CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. Dear Mayor Page, Vice Mayor Walia, and Council Members, Attached, please find a letter of support regarding the City of Saratoga's proposed regional law enforcement partnership with the Los Gatos-Monte Sereno Police Department. Sincerely, Heath L. Rocha Superintendent Los Gatos-Saratoga Union High School District 17421 Farley Road West Los Gatos, CA 95030 This email was sent by a staff member at Los Gatos-Saratoga Union High School District. This email and any attachments thereto may contain private, confidential, and privileged material for the sole use of the intended recipient. Any review, copying, or distribution of this email (or any attachments thereto) by others is strictly prohibited. If you are not the intended recipient (or have received this email in error), please contact the sender immediately and permanently delete the original and any copies of this email and any attachments thereto. 178 August 27, 2026 Mayor Page, Vice Mayor Walia, and Council Members Aftab, Fitzsimmons, and Zhao, of the City of Saratoga Council City of Saratoga 13777 Fruitvale Avenue Saratoga, CA 95070 Re: Support for Los Gatos-Monte Sereno Police Department Regional Law Enforcement Partnership Dear Mayor Page, Vice Mayor Walia, and Council Members Aftab, Fitzsimmons, and Zhao, I am writing in support of the City of Saratoga continuing to advance a regional law enforcement partnership with the Los Gatos-Monte Sereno Police Department (LGMSPD), with services anticipated to begin in 2027. Our District has a unique perspective on this decision. We serve both Los Gatos High School and Saratoga High School, and for many years we have experienced firsthand the value of LGMSPD's approach to school safety and its School Resource Officer program. That relationship extends well beyond responding to incidents or providing enforcement. LGMSPD has consistently demonstrated an approach built around education, prevention, accessibility, collaboration, appropriate intervention, and relationships with students, parents, teachers, administrators, and the broader school community. The School Resource Officer role is especially important in a high school environment. An effective SRO is not simply an officer who responds when something has gone wrong. The officer becomes a familiar and trusted visible presence who understands the school, develops credibility with students, communicates with parents and staff, recognizes emerging concerns, provides education, and can distinguish between circumstances requiring enforcement and those better addressed through counseling, intervention, diversion, or other supportive resources. That human element has been a hallmark of our experience with LGMSPD. A partnership with Saratoga would also create an important opportunity for continuity across our District. Los Gatos High School and Saratoga High School could be supported by the same municipal law enforcement organization, command structure, school-safety philosophy, training standards, and collaborative relationships. This could strengthen coordination involving school emergencies, threat assessments, student wellness concerns, traffic safety, critical incidents, investigations, emergency preparedness, large events, and communication with families, while providing students and parents greater consistency in how public safety services are delivered across our two high school communities. 179 School safety today requires much more than traditional law enforcement. Our schools routinely address concerns involving student wellness, online threats, substance use, traffic and pedestrian safety, family challenges, behavioral intervention, crisis response, and situations in which a young person may simply need a trusted adult to recognize that something is wrong. Effective public safety therefore requires officers who can become part of the educational community while maintaining their professional responsibilities. Our experience has shown that LGMSPD understands that balance. LGMSPD's broader community-policing philosophy would further benefit Saratoga students and families through youth education, traffic safety, emergency preparedness, community outreach, specialized resources, modern public-safety technology, and direct access to local police leadership. Just as importantly, the proposed regional model is intended to expand LGMSPD's personnel and organizational capacity rather than redistribute existing resources, creating a more resilience in serving Los Gatos, Monte Sereno, and Saratoga. We recognize and appreciate the many years of professional service the Santa Clara County Sheriff's Office has provided to Saratoga. This decision need not diminish that history. Rather, the question before the Council is which model best positions Saratoga for the future. From the perspective of our educational community, there is significant value in having a highly accessible municipal police department whose officers and leadership already understand our District, our educational environment, and the importance of relationship-based school policing. Most importantly, our experience with LGMSPD has demonstrated that public safety can be both highly professional and deeply personal. Students benefit when they know the officer on their campus, when that officer understands their school, and when their relationship with law enforcement is first established through conversation, education, mentorship, and trust rather than during a moment of crisis. For these reasons, I respectfully support the City of Saratoga moving forward with the Los Gatos- Monte Sereno Police Department as its future law enforcement partner and the opportunity to extend this collaborative municipal policing model to Saratoga and Saratoga High School beginning in 2027. Thank you for your thoughtful consideration of this important decision for our students, families, schools, and community. Sincerely, Superintendent Los Gatos-Saratoga Union High School District Los Gatos-Saratoga Union High School District 17421 Farley Road West, Los Gatos, CA 95030 180 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: City Manager PREPARED BY: Leslie Arroyo, City Manager SUBJECT: The Future of the Blossom Festival RECOMMENDED ACTION: Provide direction to staff on whether the City should explore options to continue the Saratoga Blossom Festival. BACKGROUND: The Saratoga Blossom Festival dates back to 1900 and is closely tied to Saratoga’s agricultural roots, when the Santa Clara Valley was known as the “Valley of Heart’s Delight.” At the time, Saratoga and the surrounding valley were covered with prune, apricot, and other fruit orchards. The first Blossom Festival was held March 20, 1900. Saratoga invited visitors from throughout the Bay Area. The celebration included picnics, food, games, athletic contests, tours of the blossoming orchards, and community hospitality. The last original Blossom Festival was held in spring 1941, ending the original annual tradition. The tradition was revived in 2013, with the Saratoga Historical Foundation organizing a modern Blossom Festival celebrating the community’s agricultural heritage. It is held around Saratoga’s Heritage Orchard and Civic Center and has historical displays and characters, antique cars and farm equipment, live music, artisans, children’s activities, orchard tours, and community organizations. The City has helped support the event, while the Saratoga Historical Foundation has produced it. DISCUSSION: Earlier this year, the Saratoga Historical Foundation had to cancel the 2026 Blossom Festival. In June, the Historical Foundation’s Board of Directors determined that the organization could no longer organize the Blossom Festival. Staff is seeking Council direction on whether to explore options to continue the Saratoga Blossom Festival in the future. 181 CITY OF SARATOGA Supplemental Report MEETING DATE: September 2, 2026 DEPARTMENT: City Manager’s Department PREPARED BY: Britt Avrit, MMC, City Clerk SUBJECT: The Future of the Blossom Festival Following publication of the agenda packet for the September 2, 2026, City Council Meeting, written communications for the Agenda Item were submitted; the written communications are attached. Attachment Provided with this Supplemental Report: Attachment A - Written Communications received through noon 09/02/2026 182 183 From:Leslie Arroyo To:DL - Council Cc:Britt Avrit Subject:Fw: Letter from the museum board re: Blossom Festival Date:Tuesday, September 1, 2026 11:58:53 AM Attachments:SHF Support fof the future of the Blossom Festival.docx Outlook-o12onw0c.png Dear Mayor, Vice Mayor, and Council Members, Please see the attached letter from the Historical Foundation regarding the Blossom Festival. Sincerely, Leslie Leslie Arroyo, MBA City Manager City of Saratoga 13777 Fruitvale Ave | Saratoga, CA | 95070 408.868.1269 | larroyo@saratoga.ca.us From: Alexandra Nugent Sent: Tuesday, September 1, 2026 11:25 AM To: Leslie Arroyo <larroyo@saratoga.ca.us> Subject: Letter from the museum board re: Blossom Festival CAUTION: This email originated from outside your organization. Exercise caution when opening attachments or clicking links, especially from unknown senders. Hi Leslie, Attached is a letter from the museum board that outlines a few thoughts and suggestions that we wanted to share with you and the City Council regarding the Blossom Festival. We extend our appreciation again to you and your staff for helping us navigate the cancellation of the festival a few months ago. Best, Alex Alexandra Nugent 184 185 SARATOGA CITY COUNCIL MEETING DATE: September 2, 2026 DEPARTMENT: City Manager PREPARED BY: Leslie Arroyo, City Manager SUBJECT: Cities Association of Santa Clara County RECOMMENDED ACTION: Discuss Saratoga’s continued involvement in the Cities Association of Santa Clara County (CASCC) JPA. BACKGROUND: In 1990, the cities and towns of Santa Clara County established the Cities Association of Santa Clara County (CASCC) to facilitate cooperation on issues of common interest. In 202 4, CASCC formed a JPA comprised of the 15 cities and towns in the County (Attachment A). CASCC provides a forum to work together on regional issues, advocate at the county, regional and state levels, and provide a voice in policymaking in Sacramento. CASCC has offered countywide symposia on topics such as housing and sustainability, automatic license plate readers, the use of electric bicycles, and emergency preparedness. CASCC also serves as the City Selection Committee (“CSC”), a state-mandated entity charged with making appointments to various regional and local boards and committees such as the Bay Area Air Quality Management District, Local Agency Formation Commission, and the Metropolitan Transportation Commission. CASCC is supported by an Executive Director. City staff time varies based on the association’s appointed President. Typically, the City Manager from the appointed president’s city attends the Executive Committee and Board meetings each month. The president serves a one-year term. CASCC is funded by membership dues, which make up the Cities Association’s Annual budget. The FY2026-27 membership dues for each agency are provided as Attachment B. Saratoga’s annual dues this fiscal year are $8,698. 186 Members are allowed to withdraw from the CASCC JPA upon six months’ notice but must cover their share of all debts, liabilities, and obligations incurred or accrued by the agency through the end of the current fiscal year, together with their share of any longer-term obligations entered into by the JPA. The JPA provides that each city and town in Santa Clara County will continue to participate in the CSC even if the city or town is not a member of CASCC. ATTACHMENTS: Attachment A – Joint Powers Agreement for the Cities Association of Santa Clara Cou nty Attachment B – CASCC FY2026-27 Membership Dues 187 45?5:@ C1>?3>1191:@ G 3>1191:@H G H 2;>@41 5@51?5-@5;:2 @-8->- A:@E 5?1:@1>10 5:@;E 0 9;:3 @41 5@51?G!19.1>?H C45/4 1 3-:5F10 0 1D5?@5:3 A:01> @41 @5@A@5;:0 8-C?2 @41 @-@1 2 852;>:5-5:C45/4 A.85/31:/51?1 8;/-@10 5:@41 A:@E 2 @-8->-0 A<;:B-8 0 2A88 1D1/A@5;:2 @41 3>1191:@ 1-@1?@41 5@51?5-@5;: 2 @-8->-A:@E 5:@ C1>?31:/E G 31:/EH @5/81?0 4-<@1>5B5?5;:5@81 2 @41 852;>:5-B1>:91:@ 01 1/@5;:1>95@ @C;9;>1 A.85/31:/51?E 3>1191:@ @;6;5:@8E 1D1>/5?1 C1>? 99;:@;@41 19.1>?0 @41 A.85/31:/E 19.1>?1D1/A@5:3 @45?1 5@51?@;C:?C5@45:@41 6A>5?05/@5;:2 @41 A:@E 2 @-8->-G A:@EH 0 @41 5@51?5-@5;:2 @-8->-A:@E 4-?1D5?@10 A:5:/;><;>-@10 5-@5;:5:/1 0 01?5>1?@;2;>9-85F1 @41 18-@5;:?45<1@C11:5@?5@E 0 C:919.1>? 0 2;>9 5:@ C1>?31:/E 5:01>@;E A@ @5B5@51?2;>@41 3;;0 2 88 5@?19.1>?0 @41 19.1>?1D1/A@5:3 @45?3>1191:@ 01?5>1 @;6;5:@;31@41>@;1-@1 1<->-@1 5:@ C1>?31:/E 2;>@41 A><;?1 2 9;@5:3 1>-@5;:9;:3 @41 19.1>?0B;/-@5:3 2;> 5@5B1 @5;:1:4-:/5:3 @41 A-85@E 2 8521 2;>@41 1?501:@?2 @41 A:@E 0 @415>5:05B50A-8 5@51? 0 1:/;A>-35:3 @41>6;5:@ 0 1>-@5B1 1:01-B;>?9;:3 @41 A.85/31:/51?2;>@415>9A@A-8 1:125@ @41 @51?3>11 @;@41 2;88;C5:3 G 5-@1 19.1>H 4-88 91-:E 5@E 8;/-8 31:/E 8;/-@10 C5@45:6A>5?05/@5;:-8 A@4;>5@E 2 @41 A:@E 2 @-8->-0 4-88 4-B1 0A8E 1D1/A@10 0 0185B1>10 @;@41 31:/E 5-@1 19.1>?45<3>1191:@ 5:@41 2;>9 2 0 2A>@41>B5010 5:@41 E8-C?2 @41 31:/E 2A>@41>B5010 5:@5/81 41>15: G 31:/EH 4-88 91-:@41 5@51?5-@5;:2 @-8->-A:@E 5:@ C1>?31:/E 1-@10 E @45?3>1191:@ G 0 2 5>1/@;>?H G 0H 4-88 91-:@41 3;B1>:5:3 0E 2 @41 31:/E G D1/A@5B1 995@@11H 4-88 91-:@41 D1/A@5B1 995@@11 2 @41 0 2 5>1/@;>?2 @41 31:/E 188 G 5?/-8 1->H 4-88 91-:@4-@ 1>5;0 2 @C18B1 9;:@4?C45/4 5?1?@-.85?410 E @41 0 2 5>1/@;>?@41 E8-C?@41 25?/-8 E1->2 @41 31:/E C45/4 4-88 A:2>;9 A8E @;A:1 2 1-/4 E1-> G B1>:91:@ 01H 4-88 91-:@41 852;>:5-B1>:91:@ 01 91:010 G 5:@ C1>?CH 4-88 91-:@5/81?0 4-<@1>5B5?5;:5@81 991:/5:3 C5@4 1/@5;:2 @41 B1>:91:@ 01 7:;C:@41 5:@ D1>/5?1 2 C1>?@ 91:010 G 135?8-@5B1 0EH 4-88 91-:@41 8135?8-@5B1 0 2 1-/4 A.85/31:/E @4-@ 5?19.1>2 @41 31:/E G!19.1>H 4-88 91-:E 5@E C45/4 4-?1D1/A@10 @45?3>1191:@ 0 4-?1/;91 919.1> 2 @41 31:/E 41 9<81@1 85?@ 2 19.1>?5?1@ 2;>@4 5:D45.5@ G H @@-/410 41>1@;0 5:/;><;>-@10 41>15:E @45?121>1:/1 G$->@51?H 4-88 91-:19.1>?5-@1 19.1>?C4;1 @E @;@45?3>1191:@ G$A.85/31:/EH 4-88 91-:A.85/31:/E 0125:10 5:B1>:91:@ 01 1/@5;: 91:010 81??@41 @1D@ 81->8E 1=A5>1?@41>C5?1 A?10 5:@45?3>1191:@ C;>0?2 @41 9-?/A85:1 2195:5:1 1A@>-8 31:01>4-88 1 @>A10 @;5:/8A01 1-/4 @41>31:01>C41: 5-@1 0 C;>0?2 @41 5:3A8->A9.1>4-88 1 @>A10 @;5:/8A01 @41 8A>-8 A9.1> 0 B5/1 B1>?-C41:5-@1 45?3>1191:@ 0 88 @41 @1>9?0 B5?5;:?41>15:4-88 1 @>A10 @;1221/@A-@1 @41 A><;?1?1@ 2;>@4 0 @;A?@-5:@41 B-8505@E 2 @4;?1 A><;?1? 45?3>1191:@ 5?1:@1>10 5:@;E @41 19.1>?5:01>@; 1B51C @A0E 01B18;<1:?A?5@5;:?0 @-71 @5;:5??A1?2 5:@1>1?@ @; 19.1>? A?8;/-8 0 135;:-8 9-@@1>?@4-@ 1 59<;>@-:@ @;A>2A@A>1 1B18;<99;:31:0-2;>@-8->-A:@E 5@51? 1>B1 A:52510 B;5/1 2;>@-8->-A:@E 5@51?5:18-@5;:?45<@;@41>31:/51? 3-:5F-@5;:?0 81B18?2 3;B1>:91:@ @-.85?4 0 095:5?@1>@41 5@E 181/@5;:995@@11 A>?A-:@ @;B1>:91:@ 01 1/@5;:91:010 0 9-71 5:@91:@?@;135;:-8 0 8;/-8 051? B5010 E 8-C 1>B1 A>/1 2 10A/-@5;:5:2;>9-@5;:0 1@C;>75:3 2;>225/5-8?2>;9 88 5@51?5: @-8->-A:@E 189 B501 2;>A9 2;>5@E 5:05B50A-8?3>;A<?0 3-:5F-@5;:?0 @41 5B-@1 1/@;> @;00>1??5@19?2 5:@1>1?@ @;@-8->-A:@E 5@51? 10A/1 0A<85/-@5;:2 122;>@ E 4->5:3 5:2;>9-@5;:0 B501 A:52510 B;5/1 0 @>;:3 0B;/-/E 8135?8-@5;:0 @41>59<;>@-:@ 5??A1?@4-@ 221/@ 5@?19.1>? @>1:3@41:@41 19.1>?I 0 31:/EI?@-:05:3 @ @41 135;:-8 @-@1 0 101>-8 81B18 @>5B1 @;1?<1/@ 8;/-8 @>;8 B501 135;:-8 1>?<1/@5B1 0 9-71 05221>1:/1 @; 181B-@1 @41 A-85@E 2 8521 @4>;A34;A@ @41 A:@E B501 2;>A9 2;>05?/A??5;:0 @A0E 2 819?99;:@;@41 19.1>?0 @; 5?@ 5:@41 01B18;<91:@ 0 59<8191:@-@5;:2 8A@5;:?@;A/4 819? B501 91@4;0 2;>@41 19.1>?@;88-.;>-@1 0 6;5:@8E 01B18;<85/51?@4-@ 1:125@ @41 135;:0 88-.;>-@1 5:A/4 C-E @4-@ 5?1225/51:@ B1?@41 6A>5?05/@5;:?@41 1D<1:?1 2 5:05B50A-8 122;>@ 0 1-@1?5@5B1 A@/;91? 4 19.1>@E @;@45?3>1191:@ 5:@1:0?@;0 0;1?@>-/@ C5@4 88 @41> 19.1>?@51?@;@45?3>1191:@ 0 C5@4 @41>A.85/31:/51?9-E 8-@1>1 0010 @51? @;@45?3>1191:@ A>?A-:@ @;@41 5:@ C1>?C 41 C5@40>-C-8 2 E @E 2>;9 @45?3>1191:@ A>?A-:@ @;@5/81 4-88 @ 221/@ @45?3>1191:@ @41 19-5:5:3 19.1>?I 853-@5;:? 45?3>1191:@ 4-88 1/;91 1221/@5B1 C41:2A88E 1D1/A@10 0 1@A>:10 @;@41 31:/E E @ 81-?@ 1534@ 19.1>?A@ 8E @;@4;?1 19.1>?@4-@ 4-B1 1D1/A@10 @41 3>1191:@ 41 31:/E 4-88 9<@8E @52E 88 19.1>?5:C>5@5:3 2 @41 1221/@5B1 0-@1 2@1>1 2A88 E1->2@1>@41 5:5@5-8 2;>9-@5;:2 @41 31:/E 4;A80 @41 919.1>?45<2-88 18;C 1B1:19.1>?0A1 @;@41 C5@40>-C-8 2 19.1>?0 @41 919.1>?45<81B18 19-5:?@ 18;C 1B1:19.1>?2;>1>5;0 2 @ 81-?@ 1 E1->0 5958->6;5:@ C1>?A@4;>5@E C5@4 @41 91 5958->C1>?0 2A:/@5;:?5? 2;>910 @-5:5:3 9-6;>5@E 2 5@51?5:@41 A:@E 2 @-8->-@41 31:/E 4-88 4-:31 5@?91 0 1>95@ @41 1C 3-:5F-@5;:@;@-71 @41 91 2 @41 31:/E @C5@4?@-:05:3 @41 91 4-:31 @45?3>1191:@ 4-88 @5:A1 5:1221/@ A:@58 @1>95:-@10 B5010 41>15:41 @1>95:-@5;:2 @45?3>1191:@ C5@4 1?<1/@ @;5:05B50A-8 19.1>A<;:5@?C5@40>-C-8 2>;9 919.1>?45<5:@41 31:/E 4-88 @ 1>-@1 @;@1>95:-@1 @45?3>1191:@ C5@4 1?<1/@ @;@41 19-5:5:3 19.1>? A>?A-:@ @;@41 5:@ C1>?C @41>1 5?41>1.E 1-@10 A.85/1:@5@E 1<->-@1 0 @ 2>;9 @41 @51?41>1@;@;1 7:;C:@41 G 5@51?5-@5;:2 @-8->-A:@E 5:@ C1>? 190 31:/EH C5@4 C1>?1 1@ 2;>@4 41>15:2;>9-@5;:2 @41 31:/E 01?/>5.10 5:@5/81 @41 5@51?5-@5;:2 @-8->-A:@E A:5:/;><;>-@10 5-@5;:4-88 2;88;C @41 1??2 05??;8A@5;:0 1-?1 @;1D5?@ A.61/@ @;@41 @1>9?2 @45?3>1191:@ @41 31:/E 4-88 4-B1 88 2 @41 C1>?2 A.85/ 31:/E 0125:10 5:@41 B1>:91:@ 01 1/@5;:91:010 0 88 005@5;:-8 C1>? 1@ 2;>@4 5:@41 5:@ C1>?C 0 @41>@-@A@1?85/-.81 @;@41 5:@ C1>?31:/E 1-@10 41>1.E 0 5?A@4;>5F10 @;0;88 @?1/1??->E 2;>@41 1D1>/5?1 2 @41?1 C1>? 14-82 2 5@?19.1>?C1>?5:/8A01 A@ 1 @ 8595@10 @;@41 2;88;C5:3 5:@41 31:/EI? C:91 9-71 0 1:@1>5:@;@>-/@? 5:/A>01.@?85-.585@51?0 853-@5;:?0 @;1:/A9.1>1>?;:-8 1>@E A5>1 4;80 05?<;?1 2 1>?;:-8 1>@E @>5.A@5;:?0 0;:-@5;:?2 1>?;:-8 1>@E 2A:0?1>B5/1?0 @41>2;>9?2 5?@-:/1 2>;9 1>?;:?25>9? @5;:?0 3;B1>:91:@ 1:@5@51? A1 0 1 A10 5:5@?C:91 0 @;1@@81 E 8-59 3-5:?@ 5@ 1/15B1 0 A?1 @>5.A@5;:?0 0B-:/1?2>;9 19.1>?B5010 5: B1>:91:@ 01 1/@5;:91:010 5:/8A05:3 @>5.A@5;:?0B-:/1?2 1>?;::18 0 1=A5<91:@ 5:B1?@ E 9;:1E 5:5@?@>1-?A>E @4-@ 5?@ 1=A5>10 2;>5@?599105-@1 1/1??5@51? A>?A-:@ @;B1>:91:@ 01 1/@5;:91:010 A5>1 @>A/@ 9-:-31 9-5:@-5:1>-@1 @5@81 @;1>?;:-8 1>@E 534@? E 5:@1>1?@ @41>15: 1@-5:@41 1>B5/1?2 31:@?@>-/@;>?0 A8@-:@? 1/15B1 881/@ 0 05?.A>?1 9;:51? 0A/@ @A051?@1?@?1B-8A-@5;:?0 5958->@5B5@51? @>-/@ 2;>1>B5/1?2>;9 19.1>?5:/8A05:3 5:75:0 1>B5/1? 0A/@ A.85/A@>1-/4 0 10A/-@5;: @5/5<-@1 5:58;@ 0 019;:?@>-@5;:61/@? 4->31 2;>1>B5/1?3>-9?0 E?@19? C;>7 C5@4 181/@10 225/5-8?0 8;/-8 135;:-8 @-@1 0 2101>-8 31:/51?5:/8A05:3 @41>6;5:@ C1>?31:/51?0 A:5:/;><;>-@10 5-@5;:?@;A>?A1 2A:05:3 1:@1> 3>1191:@?0 @41>C5?1 E A@ @41 A><;?1?2 @41 31:/E 0 191 A.61/@ @;@45?3>1191:@ @41 E8-C?2 @41 31:/E 0 8E A@4;>5F10 E @41 5:@ C1>?C @;1D1>/5?1 @41>1-?;:-.81 0 1/1??->E C1>?5:2A>@41>-:/1 A<<;>@ 2 E A><;?1 2 @41 31:/E A>?A-:@ @;0 @;@41 1D@1:@ 1=A5>10 E B1>:91:@ 01 1/@5;:91:010 @41 31:/E 4-88 1 1?@>5/@10 5:@41 1D1>/5?1 2 5@?C1>?0 4-88 1D1>/5?1 5@?C1>?5:@41 91 9-::1>@41 C:2 @;?5?1?@>5/@10 5:5@?1D1>/5?1 2 5958->C1>?B5010 @4-@ 52 @41 C:2 @;?4-88 1-?1 @;1 19.1>@41:@41 31:/E 4-88 1 1?@>5/@10 5:@41 1D1>/5?1 2 5@?C1>5:@41 91 9-::1>@41>19.1>3>110 @;E @41 9-6;>5@E 2 @41 0 2 5>1/@;>?81??1D<>1??8E B5010 2;>@41 31:/E 0;1?@ E B5>@A1 2 @45?1/@5;: @45?3>1191:@ A.61/@ 5@?182 @;@41 5:@1>:-8 85/51?05:-:/1?2 E 19.1> 41 31:/E 4-88 @ 4-B1 @41 C1>2 195:1:@ 0;9-5: 41 31:/E 4-88 @ 4-B1 @41 C1>2 @-D-@5;:41 31:/E 9-E @ 59<;?1 @-D1?A@ 9-E 1/15B1 @41 110?2 @-D1?59<;?10 E @41>1:@5@51?A.85/2A:0?2>;9 @41>1:@5@51? 41 31:/E 4-88 @ 4-B1 @41 C1>@;A5>1 A>/4-?1 4;80 05?<;?1 2 1-8 1>@E 41 31:/E 4-88 @ 4-B1 @41 C1>@;45>1 19<8;E11? 41 31:/E 4-88 @ 4-B1 @41 C1>@;5??A1 01.@ 41 31:/E 4-88 1 3;B1>:10 E @41 0 2 5>1/@;>?C45/4 4-88 1 9<;?10 2 1 5>1/@;>1<>1?1:@5:3 1-/4 19.1>4 19.1>I?135?8-@5B1 0E 05:3 @;5@?C: 10A>1?4-88 5:@ 19.1>2 @41 135?8-@5B1 0E 5>1/@;>@;1<>1?1:@ @41 19.1>@41 0 2 5>1/@;>?41 5>1/@;>4-88 1>B1 @ @41 81-?A>1 2 @415>1?<1/@5B1 135?8-@5B1 0E 41 135?8-@5B1 0E 2 1-/4 19.1>4-88 8?;5:@ 1 8@1>:-@1 5>1/@;> G 8@1>:-@1H C4;4-88 @5/5<-@1 5:0 B;@1 @ E 911@5:3 2 @41 0 C41:@41 59->E 5>1/@;>5?1:@ E B-/-:/E 5:5>1/@;>8@1>:-@1 5@5;:4-88 1 258810 E @41 5:@5:3 19.1>I?135?8-@5B1 0E A.61/@ @;@41 B5?5;:?2 @45?@5/81 99105-@18E A<;:095??5;:2 1C 19.1>@41 1C 19.1>4-88 1 1:@5@810 0 1=A5>10 @;5:@ 5>1/@;>0 1 8@1>:-@1 5>1/@;>B1>E 5>1/@;>8@1>:-@1 4-88 1 A:/58 19.1> E;>2 @415>5:05B50A-8 19.1>5@E 5>1/@;>0 8@1>:-@1 4-88 1 19;B10 2>;9 @41 0 2 5>1/@;>?A<;:@41 A>>1:/1 2 E 1 2 @41 2;88;C5:3 1B1:@?@41 31:/E 1/15B1?C>5@@1:@5/1 2>;9 @41 5:@5:3 19.1>2 @41 19;B-8 0 1<8-/191:@ 2 @41 5>1/@;>8@1>:-@1 @41 C5@40>-C-8 2 @41 19.1>2>;9 @45?3>1191:@ @41 01-@4 1?53:-@5;:2 @41 5>1/@;>8@1>:-@1 @41 31:/E 1/15B1?C>5@@1:@5/1 2>;9 @41 19.1>@4-@ @41 5>1/@;>8@1>:-@1 5?8;:31> A-852510 B5010 5:@41 25>?@ 3>-<4 2 @45?@5/81 1@ 2;>@4 5:@5/81 192 41 0 2 5>1/@;>?4-88 4-B1 @41 2;88;C5:3 C1>?0 2A:/@5;:? D/1<@ @41>C5?1 B5010 5:@45?3>1191:@ @41 0 4-88 1D1>/5?1 88 C1>?0 0A/@ 88 A?5:1??2 @41 31:/E 15@41>05>1/@8E E 01813-@5;:@;@41>051? 1>?;:? 41 0 4-88 181/@ D1/A@5B1 995@@11 B5010 5:@5/81 41 0 4-88 1 @41 85/E 1@@5:3 0E 2 @41 31:/E 41 0 4-88 5:@ 1@-5:@41 1>B5/1?2 1/1??->E 31:@?A8@-:@? 5:01<1:01:@ @>-/@;>?5:0-:/1 C5@4 @5/81 41 0 4-88 A?1 @;1 1<->10 0 4-88 1B51C 9;052E 1/1??->E 0 0;<@ @41 A-8 1>-@5:3 A031@ 2 @41 31:/E 0;<@5;:2 @41 A031@ 9-E @ 1 01813-@10 41 0 4-88 0;<@ @415>A031@ 8-@1>@4-:@41 25>?@ 58 2;88;C5:3 2;>9-@5;:0 @41:A.?1=A1:@8E E 58 2 1-/4 A//1??5B1 E1->41 0 4-88 1B51C 1@ 0 0;<@ A-8 0A1?@;1 2A:010 E 31:/E 19.1>? 41 0 4-88 1/15B1 1B51C 0 @ A<;:1>5;05/1<;>@?0 A05@?2 @41 2A:0?2 @41 31:/E 1=A5>10 A:01>@5/81 2 @45?3>1191:@ 41 0 9-E 0;<@ 85/51?13->05:3 1>?;::18 285/@?2 5:@1>1?@ 0 @41> 9-@@1>?1/1??->E B1:51:@ 2;>@41 1225/51:@ 1>-@5;:2 @41 31:/E 41 0 4-88 0;<@ 1@ 2 5;>5@51?0 C;>7 8-:2;>1-/4 25?/-8 E1->0 A.61/@ @;@41 @1>9?2 @45?3>1191:@ @41 0 4-88 4-B1 A/4 @41>C1>?0 0A@51?1 1-?;:-.8E 1/1??->E @;E A@ @41 A><;?1?2 @41 31:/E 41 0 2 5>1/@;>?4-88 4;80 @ 81-?@ 1 13A8->911@5:3 1-/4 E1->41 0 2 5>1/@;>? 4-88 25D E 1?;8A@5;:5:@41 E8-C?@41 0-@1 @591 0 8;/-@5;:2 1-/4 13A8->911@5:3 41 0 D1/A@5B1 5>1/@;>5:A8@-@5;:C5@4 @41 1?501:@ 2 @41 0 B5010 5: @5/81 18;C 9-E 88 1/5-8 911@5:3? 4 911@5:3 2 @41 0 2 5>1/@;>?5:/8A05:3 C5@4;A@ 8595@-@5;:13A8->06;A>:10 13A8-> 0 1/5-8 911@5:3?4-88 1 8810 @5/10 4180 0 0A/@10 5:0-:/1 C5@4 @41 8<4 C:@ B1>:91:@ 01 1/@5;:91:010 41 31:/E 4-88 1=A5>1 @41 1/>1@->E 1-?A>1>01?53:11 @;@-71 0 9-5:@-5:95:A@1?2 88 13A8->06;A>:10 13A8->0 1/5-8 911@5:3?@5/-.81 2@1>1-/4 911@5:3 @41 1/>1@->E 1-?A>1>01?53:11 4-88 2;>C->0 @;1-/4 0 19.1>E 2 @41 95:A@1?2 @41 911@5:3 9-6;>5@E 2 @41 19.1>?2 @41 0 4-88 @5@A@1 A;>A9 2;>@41 @>-:?-/@5;:2 A?5:1??81??@41>C5?1 1=A5>10 E 8-C B;@1 2 @41 9-6;>5@E 2 A;>A9 2 @41 919.1>? 193 1?1:@ @ 911@5:3 5?A225/51:@ @;@-71 E @5;:A:81??@41>C5?1 1/52510 5:@45? 3>1191:@ C1B1>81??@4-:A;>A9 9-E 06;A>:@41 911@5:3 @;2A@A>1 0-@1 4 19.1>2 @41 0 4-88 4-B1 1 B;@1 41 0 4-88 181/@ 225/1>?2 @41 31:/E 1?501:@ 5>?@ 5/1 1?501:@ 1/;:0 5/1 1?501:@ 1/>1@->E 1-?A>1>0 99105-@1 @ 1?501:@ @ 5@?25>?@ 911@5:3 41>1-2@1>1D/1<@ 9-E 1 @41>C5?1 B5010 5:@41 E8-C?2 @41 31:/E @41 0 4-88 181/@ @41 1?501:@ 5>?@ 5/1 1?501:@ 1/;:0 5/1 1?501:@ 1/>1@->E 1-?A>1>0 99105-@1 @ 1?501:@ @ @41 B19.1>0 2 5>1/@;>?911@5:3 @41 25>?@ 911@5:3 4180 2@1>B19.1>2 1-/4 E1-> 2 @41 225/1>?@41 1?501:@ 0 @ 81-?@ @C;@41>225/1>?9A?@ 8?;1 919.1>?2 @41 0 2 5>1/@;>?41 19-5:5:3 225/1>?9-E 1 @41 181/@10 5:@10 E;>A:/58 19.1>2 E 19.1>2 @41 31:/E 13->081??2 C41@41>@41E 1 @41 0 2 5>1/@;>?4 225/1>4-88 A91 @41 0A@51?2 45?41>225/1 A<;:181/@5;:2 @41 1?501:@ 1-?1?@;1 19.1>2 @41 0 @41 1?A8@5:3 B-/-:/E 4-88 1 258810 @ @41 1D@ 911@5:3 2 @41 0 4180 2@1>@41 B-/-:/E A>?@ 1/5-8 911@5:3 2 @41 0 8810 @;2588 @41 B-/-:/E 41 1?501:@ 4-88 1?501 @ 0 0A/@ 88 911@5:3?2 @41 0 4;A80 @41 0 1?501:@ @ 1 B-58-.81 @41:@41 45341?@ 81B18 225/1>C4;5?919.1>2 @41 0 2 5>1/@;>?4-88 1?501 2 @4-@ 5:05B50A-8 5?A:-B-58-.81 @41: E 5>1/@;>5:@10 E @41 1?501:@ 9-E 1?501 41 0 9-E 5:@ @41>225/1>?5@ 501>?1/1??->E 41 0A@51?2 @41 1/>1@->E 1-?A>1>1 1@ 2;>@4 5:@5/81?0 2 @45? 3>1191:@ 41 1/>1@->E 1-?A>1>4-88 1 5:@10 E @41 0 2 5>1/@;>?0 4-88 1 18535.81 @; 1>B1 1/>1@->E 1-?A>1>B5010 5:@41 5:@ C1>?C @ A/4 @591 @41>1 1 5:1 19.1>?@41 0 4-88 1?@-.85?4 0 181/@ D1/A@5B1 995@@11 2 @41 0 C45/4 4-88 5?@ 818E 2 @4>11 225/1>?5?@5:3 2 @41 1?501:@ 5>?@ 5/1 1?501:@ 0 1/>1@->E 1-?A>1>C45/4 4-88 1D5?@ @41>1-2@1>@ A/4 @591 @41>1 1 19.1>?@41 0 4-88 1?@-.85?4 0 181/@ D1/A@5B1 995@@11 2 @41 0 C45/4 4-88 5?@ 818E 2 25B1 225/1>?C5@4 @41 005@5;:2 @41 99105-@1 @ 1?501:@ C45/4 4-88 1D5?@ @41>1-2@1>4;A80 @41 99105-@1 @ 1?501:@ 8;:31>4;80 181/@10 225/1 @41:19.1>@ 31 9-E 1 5:@10 E @41 0 @;1>B1 @41 D1/A@5B1 995@@11 41 A-8525/-@5;:?2 @41 19.1>@ 31 1 @4-@ @41E 9A?@ 1 181/@10 5:@10 E;>A:/58 19.1>2 19.1>2 @41 31:/E A@ 110 @ 1 @41 0 2 5>1/@;>?41 @1>9?2 225/1 2 @41 19.1>? 2 @41 D1/A@5B1 995@@11 4-88 1 1 E1->41 D1/A@5B1 995@@11 4-88 0A/@ @41 A?5:1??2 @41 31:/E 1@C11:911@5:3?2 @41 0 1D1>/5?5:3 88 @4;?1 C1>?B5010 2;>5:@45?@5/81 @41>C5?1 01813-@10 @;5@ E @41 0 41 D1/A@5B1 995@@11 A.61/@ @;B-8 E @41 0 2 5>1/@;>?4-88 1D1>/5?1 88 C1>?0A@51?2 @41 0 18-@5:3 @;@41 1:@1>5:3 B-8 0 1D1/A@5;:2 3>1191:@?81-?1? 0 @41>5:?@>A91:@?2 18-@5:3 @;@41 25:-:/1?2 @41 5:@ C1>?31:/E C5@45:@41 1B5;A?8E 194 B10 A-8 A031@ 91:010 A031@ 41 D1/A@5B1 995@@11 9-E 4-B1 005@5;:-8 C1>? 01813-@10 @;5@ E @41 0 1D/1<@ 2;>@41 0;<@5;:2 @41 31:/EI?A-8 A031@ E 005@5;:-8 C1>?0 0A@51?01813-@10 4-88 1 1/52510 5:1?;8A@5;:0;<@10 E @41 0 41 D1/A@5B1 995@@11 4-88 @-5:B-8 2>;9 @41 0 12;>1 A@4;>5F5:3 0A/@5:3 E 5:B1?@53-@5;:? 5:@;@41 A?5:1??2 @41 31:/E 0 12;>1 @-75:3 1>?;::18 @5;:41?1 @5;:?9A?@ 1 A@4;>5F10 E 9-6;>5@E B;@1 2 @41 D1/A@5B1 995@@11 4 911@5:3 2 @41 D1/A@5B1 995@@11 4-88 1 8810 @5/10 4180 0 0A/@10 5:0-:/1 C5@4 @41 8<4 C:@ B1>:91:@ 01 1/@5;:91:010 41 0 9-E 1?@-.85?4 995@@11?5@ 0119?5-@1 @;0A/@ @41 A?5:1??2 @41 31:/E 5@ 9-E 5:@41 E8-C?E 1?;8A@5;:01813-@1 @45?C1>@;@41 D1/A@5B1 995@@11 E 1?;8A@5;:19.1>?2 995@@11?1D/1<@ @41>C5?1 @-@10 5:@45?3>1191:@ 4-88 1 5:@10 E @41 1?501:@ 4 995@@11 4-88 4-B1 @4;?1 0A@51?01@1>95:10 E C45/41B1>31:/E 0E 1-@10 5@ @41>C5?1 1@ 2;>@4 5:@41 E8-C?4 995@@11 4-88 911@ @41 88 2 5@? 4-5><1>?;:0 4-88 1<;>@ @;0 1 05>1/@10 E C45/41B1>1:@5@E 1-@10 5@ 9;>1 @4-:1 1<>1?1:@-@5B1 2>;9 1-/4 6A>5?05/@5;:4-88 1>B1 1-/4 995@@11 19.1>?45<2 E 995@@11 9-E 5?@ 5:C4;81 5:@ 2 1>?;:?C4;1 @ 919.1>?2 @41 0 B5010 @4-@ @41 0 9-E 01813-@1 01/5?5;:9-75:3 C1>?0 0A@51?8E @;995@@11 9-6;>5@E 2 @41 919.1>?2 C45/4 1 0 19.1>?E 995@@11 1D/1<@ @41 5@E 181/@5;:995@@11 5:C45/4 9-6;>5@E 2 @41 919.1>?1 @ 0 19.1>?9-E 2A:/@5;:8E 5:0B5?;>E 5@E 41 135?8-@5B1 @5;:995@@11 4-88 1 1>9-:1:@ 995@@11 2 @41 31:/E 4-5>10 E @41 1/;:0 5/1 1?501:@ 0 C4;?1 919.1>?4-88 1 5:@10 E @41 31:/E 19.1>?4;A80 @41>1 1 1/;:0 5/1 1?501:@ @41 135?8-@5B1 @5;:995@@11 4-88 1 4-5>10 E @41 5>?@ 5/1 1?501:@ 88 @-:05:3 995@@11?4-88 501 E @41 8<4 C:@ B1>:91:@ 01 1/@5;: 91:010 41 5@E 181/@5;:995@@11 5?1?@-.85?410 A>?A-:@ @;@-@1 8-C 0 @41 31:/E 4-88 095:5?@1>@41 5@E 181/@5;:995@@11 2;88;C?41 5@E 181/@5;:995@@11 4-88 1 1>9-:1:@ 995@@11 2 @41 31:/E 5?@5:3 2 @41 E;>2 1-/4 5@E C:5?@1:@ C5@4 B1>:91:@ 01 91:010 41 31:/E 4-88 88;C 88 5@51?5:@41 A:@E @;@5/5<-@1 5:@41 5@E 181/@5;:995@@11 C41@41>@ @41E 1 919.1>?2 @41 31:/E 41 0 2 5>1/@;>?9-E @>-/@ C5@4 5:05B50A-8?9<-:51?@;B501 @41 2;88;C5:3 1>B5/1?@ @41 81-?A>1 2 @41 0 2 5>1/@;>? 195 D1/A@5B1 5>1/@;>41 0 4-88 @>-/@ C5@4 A8@-:@ 5:01<1:01:@ @>-/@;>@;2A82588 @41 2;88;C5:3 0A@51?2 D1/A@5B1 5>1/@;>9-:-31 @41 22-5>?2 @41 31:/E A.61/@ @;@41 31:1>-8 A<1>B5?5;:0 85/E 05>1/@5;:2 @41 0 0 @41 D1/A@5B1 995@@11 B1>?11 @41 0-E @;0-E @5B5@51?2 @41 31:/E 181/@ 0 9-:-31 @41 @5B5@51?2 88 A8@-:@?0 5:01<1:01:@ @>-/@;>?@;@41 31:/E 1 1?<;:?5.81 2;>1=A5>10 2585:3?E @41 31:/E C5@4 @41 @-@1 2 852;>:5-1<->1 01813-@1 @41 1<->-@5;:2 88 911@5:3 @5/1?95:A@1?0 1=A5>10 0;/A91:@-@5;: 2 @41 31:/E 1<->1 0 1 A-8 A031@ 1<->1 1<;>@?0 1/;991:0-@5;:?2;>501>-@5;:E @41 D1/A@5B1 995@@11 0 1 1?<;:?5.81 2;>5885:3 0 881/@5;:2 A-8 0A1?9-5:@-5:@41 1/;>0?2 @41 31:/E 5?@ 8 31:/51?5:@41 1<->-@5;:0 2585:3 2 85/-@5;:?2;>@5/5<-@5;:5:@41 25:-:/5:3 3>-9?2 @41 31:/E 1D<105@1 @41 1??5:3 2 @41?1 85/-@5;:?E 88 5:B;5/1?@-D1?0 9;A:@?0A1 0 1>2;>9 @41>0A@51?1 53:10 E @41 0 0 D1/A@5B1 995@@11 41 D1/A@5B1 5>1/@;>9-E 4-B1 @41 A@4;>5@E @;53: 3>1191:@?85/-@5;:?0 @41>0;/A91:@?14-82 @41 31:/E 52 A@4;>5F10 E @41 0 D1/A@5B1 995@@11 41 D1/A@5B1 5>1/@;>4-88 4-B1 @41 A@4;>5@E @; 1:@1>5:@;5:05B50A-8 3>1191:@?C5@4 5:381 B1:0;>B1>@41 A>?1 2 25?/-8 E1-> 14-82 2 @41 31:/E A<@;@41 9;A:@ 1@ E @41 E8-C? 1:1>-8 A:?18 41 0 4-88 @>-/@ C5@4 A8@-:@ 5:01<1:01:@ @>-/@;> 8-C 25>9 @;2A82588 @41 0A@51?2 1:1>-8 13-8 A:?18 41 1:1>-8 A:?18 4-88 @-71 05>1/@5;:2>;9 @41 9-6;>5@E 2 @41 0 2 5>1/@;>?41 1:1>-8 A:?18 4-88 1 919.1>5:3;;0 @-:05:3 2 @41 852;>:5-@-@1 41 1:1>-8 A:?18 4-88 1 1?<;:?5.81 2;>@41 813-8 22-5>?2 @41 31:/E A05@;>41 A05@;>4-88 1 1>@52510 A.85/A:@-:@ 85/1:?10 @;@5/1 5:@41 @-@1 2 852;>:5-41 A05@;>C588 0A/@ A-8 25:-:/5-8 A05@?2 @41 31:/E @41>1>B5/1?41 D1/A@5B1 5>1/@;>9-E 45>1 005@5;:-8 A8@-:@?0 5:01<1:01:@ @>-/@;>?5-@1 10 A<;:1B5;A?8E B10 A031@ 41 31:/E 4-88 @ @>-/@ C5@4 1/;91 919.1>2 @41 852;>:5-A.85/ 9<8;E11?1@5>191:@ E?@19 G$H 4-88 E 31:@ A8@-:@ 5:01<1:01:@ @>-/@;>2 @41 31:/E 1/;91 919.1>2 1 1:@5@810 @;1:?5;: 1@5>191:@ 2>;9 1?A8@ 2 1>B5/1 @;@41 31:/E 0 41 A8@-:@?0 5:01<1:01:@ @>-/@;>?2A825885:3 @41 0A@51?2 D1/A@5B1 5>1/@;> @41 A05@;>@41 1:1>-8 A:?18 0 E @41>A8@-:@?5:01<1:01:@ @>-/@;>? C4;B501 1>B5/1?@;@41 31:/E 4-88 1 9<1:?-@10 5:A/4 9-::1>4-88 1 B10 E @41 0 0 1>95@@10 E 85/-.81 8-C 2 @41 0 01?5>1?@;1-@1 53:525/-:@ 3>-9?@5B5@51?C45/4 C588 A@585F1 A.?@-:@5-8 1?;A>/1?2 @41 31:/E 5@ 4-88 0;E B;@1 2 @41 0 2 @41 0 0119?5@ 1/1??->E 5@ 9-E 196 5:@ C;>75:3 995@@11 @;@A0E @41 53:525/-:@ 3>-9 @5B5@E 0 B501 5:<A@ @;@41 0 A.?@-:@5-8 1?;A>/1?0 53:525/-:@ 3>-9 @5B5@E 4-88 1 0125:10 E 3>-9 @5B5@E 1=A5>5:3 9;>1 5:A-8 1D<1:05@A>1?@45?9;A:@ 4-88 1 5:/>1-?10 E @41 A-8 @ 2 85B5:3 5:01D E 1C 53:525/-:@ 3>-9 @5B5@E 4-88 1=A5>1 C;>7 8-:0 @C;@45>0?B;@1 2 @41 19.1>?5:01>@;1 5:5@5-@10 41:1C 53:525/-:@ 3>-9 5? 5:@1:@5;:-88E 01?53:10 @;1 8595@10 5:1 A/4 @4-@ 5@ 8E B501?1:125@?@;@5/A8->19.1>? @41 31:/E 9-E 1:@1>5:@;1/525/3>-9 61/@ 3>1191:@ @4-@ 5:/8A01?181B-:@ @1>9? 13->05:3 @41 @5/A8->221/@10 19.1>?0 E A/4 3>1191:@ 4-88 1 B10 E @41 0 5;>@;@ @41 91 @591 2;>9-@5;:2 @41 53:525/-:@ 3>-9 41?1 8595@10 1 3>1191:@? 4-88 1 A.61/@ @;B-8 E @41 0 E @C;@45>0?B;@1 2 @41 19.1>? 41 31:/E 4-88 0;<@ 1>-@5:3 A031@ A>?A-:@ @;1/@5;:2 @5/81 2 @45? 3>1191:@ 41 1/>1@->E 1-?A>1>2 @41 31:/E @41 D1/A@5B1 5>1/@;>4-88 1?@-.85?4 0 9-5:@-5: 2A:0?0 A:@?9-E 1 1=A5>10 E 3;;0 A:@5:3 @5/1?0 E @41 0 7? 0 1/;>0?2 @41 31:/E 4-88 1 1:@;0 9-01 B-58-.81 2;>5:?<1/@5;:@ 88 1-?;:-.81 @591?A<;:1=A1?@ E A@4;>5F10 1<>1?1:@-@5B1?2 @41 19.1>? 41 31:/E 4-88 041>1 @;@41 @-:0->0 2 @>5/@ A:@-.585@E 2;>2A:0?0 1<;>@ 88 1/15<@? 0 05?.A>?191:@?1@ 2;>@4 5:@41 5:@ C1>?C A05@;>I?1<;>@ 41 A05@;>C5@45:1 4A:0>10 0 @C1:@E 0-E?2@1>@41 8;?1 2 1-/4 5?/-8 1->4-88 35B1 9<81@1 C>5@@1:1<;>@ 2 88 25:-:/5-8 @5B5@51?2;>@41 5;>5?/-8 1->@;@41 0 41 31:/E 4-88 15@41>9-71 @>-/@ C5@4 1>@52510 A.85/A:@-:@ @;9-71 A-8 5?/-8 1->A05@ 2 88 A:@?0 1/;>0?2 @41 31:/E 2;>95:3 5:88 1?<1/@?C5@4 @41 1=A5>191:@?2 @41 5:@ C1>?C 1<;>@ 2 @41 A05@ 4-88 1 25810 A.85/1/;>0 0 1 B5010 @;1-/4 2 @41 19.1>?0 C5@4 @41 A:@E A05@;>2 @41 A:@E 2 @-8->- @?2 @41 A05@ 4-88 1 501>10 31:1>-8 1D<1:?1 2 @41 31:/E E @?2 @41 A05@ 4-88 1 1 E @41 31:/E 0 4-88 1 4->31 3-5:?@ E A:1:/A9.1>10 2A:0?2 @41 31:/E B-58-.81 2;>@45?A><;?1 41 1/>1@->E 1-?A>1>45?41>01?53:11 4-88 4-B1 @41 A?@;0E 2 0 05?.A>?1 @41 31:/EI?2A:0?110?2 5958->853-@5;:?2 @41 31:/E 9-E 1 01<;?5@10 C5@4 @>A?@11 31:@ @41>01<;?5@->E 0 4-88 @ 1 501>10 @41 31:/EI?2A:0?2;>A><;?1?2 @45? @5/81 41 1/>1@->E 1-?A>1>9-E 01813-@1 05?.A>?191:@?@;1>?;:?9-E 1 A@4;>5F10 E @41 0 @41 D1/A@5B1 995@@11 @;1>2;>9 @4-@ 2A:/@5;:A.61/@ @;@41 1=A5>191:@?2 1/@5;:18;C 197 41 1/>1@->E 1-?A>1>01?53:11 4-88 1>2;>9 88 2A:/@5;:?@41:1=A5>10 @;1 1>2;>910 E @41 1-?A>1>A:01>@41 5:@ C1>?C 41 1/>1@->E 1-?A>1>4-88 1B51C @41 25:-:/5-8 @-@191:@?0 @41 A-8 A05@ 2 @41 31:/E A>?A-:@ @;B1>:91:@ 01 1/@5;:91:010 @41 D1/A@5B1 5>1/@;>@41 1/>1@->E 1-?A>1>0 @41>1>?;:?@41 0 9-E 01?53:-@1 4-88 4-B1 4->31 2 4-:081 0 4-B1 1??@;@41 1>@E 2 @41 31:/E 41 31:/E 4-88 1/A>1 0 E 2;> 250185@E 0 0?5:9;A:@ 9;A:@?0 5:2;>9 1/52510 E @41 0 2 5>1/@;>?B1>5:3 E 225/1>?31:@?2 @41 31:/E C4;1 A@4;>5F10 @;4;80 05?.A>?1 2A:0?2 @41 31:/E 0 E 225/1>?31:@?C4;1 A@4;>5F10 @;4-B1 4->31 2 4-:081 0 4-B1 1??@;1>@E 2 @41 31:/E 4 19.1>4-88 4-B1 @41 2;88;C5:3 1?<;:?5.585@51? 5:@ 5@?5>1/@;>0 8@1>:-@1 @;19;B1 5@?5>1/@;>0 8@1>:-@1 2>;9 @41 0 1@ 2;>@4 5:@5/81 501>10 91:091:@?@;@45?3>1191:@ 1@ 2;>@4 5:@5/81 9-71 @>5.A@5;:?5:@41 2;>9 2 A-8 919.1>?45<1??91:@?0 211?52 E 01@1>95:10 E @41 0 2;>@41 A><;?1 2 012>-E5:3 @41 @?2 B505:3 @41 A-8 1:125@?A5:3 05>1/@8E @;1-/4 @E 2>;9 @45?3>1191:@ 0 2 19.1>B501?C>5@@1:@5/1 @;@41 31:/E 2 5@?181/@5;:@;185:=A5?4 5@?@-@A? 19.1>52 19.1>2-58?@;1 1<>1?1:@10 @ 2;A>9;>1 1/A@5B1 13A8->911@5:3?2 @41 0 2 5>1/@;>?@41:@4-@ 19.1>9-E 1 011910 @;1 A?<1:010 19.1>C5@4 88 @41 534@?0 0A@51?2 5-@1 19.1>A<;:@5;: 2 @41 0 2 5>1/@;>?0A8E 0;<@10 5;>@;@41 A?<1:?5;:@41 1?501:@ 4-88 @-/@ @41 E;>0 1=A1?@ @4-@ @41>A:/58 19.1>1 5:@10 @4-@ 15:?@-@191:@ 2;>@41 A>>1:@ 19.1>1 1=A1?@10 41 A?<1:?5;:4-88 1 B10 E @41 0 2 5>1/@;>?9<@8E 2;88;C5:3 @4-@ @5;:E @41 0 2 5>1/@;>?@41 19.1>9-E 1 15:?@-@10 E 5:2;>95:3 @41 0 2 5@?5:@1:@ @;1 15:?@-@10 C5@45: @45>@E 0-E?0 @;@@1:0 88 2A@A>1 911@5:3?15@41>B5-@41 5>1/@;>8@1>:-@1 19;B-8 2 19.1>2;>2-58A>1 2 @41 5>1/@;>@;@@1:0 911@5:3?4-88 @ 1851B1 @41 19.1>2>;9 5@?853-@5;:?A:01>E A@?@-:05:3 3>1191:@?18-@5:3 @;@41 31:/EI? 25:-:/5-8 853-@5;:?1D/1<@ 5:0-:/1 C5@4 @45?3>1191:@ 5@4 @41 B-8 2 @41 0 E 5@E 8;/-@10 C5@45:@41 A:@E 2 @-8->-9-E 1/;91 @E 19.1>@;@45?3>1191:@ 5@E 1=A1?@5:3 919.1>?45<4-88 8E E 1?1:@5:3 @;@41 31:/E 1?;8A@5;:2 @41 135?8-@5B1 0E 2 @41 5@E 1B501:/5:3 5@?B-8 2 @45?3>1191:@ 41 0-@1 @4-@ @41 8E5:3 5@E C588 1/;91 19.1>C588 1 01@1>95:10 E @41 0 41 31:/E 4-88 198 1<@ 1C 19.1>?A<;:9-6;>5@E 225>9-@5B1 B;@1 2 @41 1:@5>1 0 0 A<;:E91:@ 2 E 0 01@1>95:10 1??91:@?0 211? 19.1>9-E @1>95:-@1 5@?919.1>?45<5:@41 31:/E @ E @591 A<;:35B5:3 1 4A:0>10 0 1534@E 0-E?C>5@@1:@5/1 2 C5@40>-C-8 @;@41 31:/E 41 @5/1 4-88 1 35B1:@;@41 0 2 5>1/@;>?41 1221/@5B1 0-@1 4-88 1 @41 8A?5;:2 @41 25>?@ 0 11@5:3 C45/4 A>? 2@1>@41 1 4A:0>10 0 1534@E 0-E @5/1 1>5;0 4-?10 E 19.1>C4;C5@40>-C? 4-88 19-5:853-@10 @;E 5@?4->1 2 88 01.@?85-.585@51?0 853-@5;:?5:/A>>10 A10 @4>;A34 @41 1:0 2 @41 A>>1:@ 25?/-8 E1->2 @41 31:/E 41 C5@40>-C-8 0;1?@ 5:E C-E 59<-5> E @>-/@?1?;8A@5;:?5:01:@A>1?@41>853-@5;:?2 @41 31:/E @41:5:1221/@ @41 1B1:@ 2 05?-3>1191:@ 1@C11:@41 31:/E 0 @41 C5@40>-C5:3 19.1>@;C41@41>@41 C5@40>-C-8 4-88 A?1 @41 59<-5>91:@ 2 E @>-/@?1?;8A@5;:?5:01:@A>1?@41>853-@5;:?2 @41 31:/E @41 01@1>95:-@5;:4-88 1 9-01 E 9-6;>5@E B;@1 2 @41 0 2 5>1/@;>?E 19.1>@4-@ C5@40>-C? 0 8-@1>117?15:?@-@191:@ @;@41 31:/E 4-88 B501 2A:0?@;@41 31:/E @5;:-@1 @;@415> 1?<;:?5.585@E 2;>@41 A>>1:@ 25?/-8 E1->52 @41 19.1>4-0 1B1>812@ @41 31:/E C5@40>-C5:3 19.1>4-88 5:88 1B1:@?19-5:85-.81 2;>5@?@5;:-@1 4->1 2 5 5@?2A88 9;A:@ 2 5@? @5;:-@1 4->1 2 @41 0;<@10 25?/-8 E1->A031@ 55 E 88 2;>2A:0?1??91:@ 81B510 E @41 31:/E 5;>@;@41 0-@1 5@ B501?5@?@5/1 2 C5@40>-C-8 555 E @>5.A@5;:5:1D5?@1:/1 @ @41 @591 2 @41 @5/1 2 C5@40>-C-8 2 @41 0 2 5>1/@;>?01@1>95:1?@4-@ 1-?;:-.81 A?1 1D5?@?@;19;B1 5>1/@;>2>;9 @41 0 5@ 19;B1 @41 5>1/@;>0 1=A1?@ @4-@ @41 19.1>C4;5:@10 @41 5>1/@;>5:@ 1C 5>1/@;>41 0 9-E E @C;@45>0?9-6;>5@E B;@1 2 @41 1:@5>1 0 19;B1 19.1> 10 19.1>1-/4 2 E 9-@1>5-8 @1>9 2 @45?3>1191:@ 0 @41 2-58A>1 @;A>1 @4-@ 1-/4 C5@45:5D@E 0-E?C>5@@1:@5/1 @1>95:-@10 19.1>4-88 19-5:85-.81 2;>E 853-@5;:A:01>@45?3>1191:@ 01?/>5.10 B1 58A>1 @;E 0A1?C5@45:0-E?2;88;C5:3 @5/1 4-88 1?A8@ 5:19.1>1/;95:3 A?<1:010 C5@4 88 @41 534@?2 5-@1 19.1> A?<1:010 19.1>4-88 599105-@18E 4-B1 5@?B;@5:3 534@?1?@;>10 A<;:2A88 E91:@ 2 0A1? 41 01.@?85-.585@51?0 853-@5;:?2 @41 31:/E 4-88 @ 1 @41 01.@?85-.585@51?0 853-@5;:?2 @41 19.1>?E 19.1>9-E 1<->-@18E @>-/@ 2;>A91 1?<;:?5.585@E 2;> 1/525/01.@?85-.585@51?853-@5;:?2 @41 31:/E @45:3 5:@45?3>1191:@ 4-88 1 5:@1><>1@10 @; 8595@ @41 85/-.585@E 2 @41 B5?5;:?2 B1>:91:@ 01 1/@5;: 199 45?3>1191:@ 9-E 1 @1>95:-@10 @ E @591 @4-@ 25:-:/5-8 853-@5;:?2 @41 31:/E 1 A@?@-:05:3 C5@4 @41 B-8 2 @C;@45>0?2 @41 19.1>?@1>95:-@5;:2 @45?3>1191:@ 88 1@?2 @41 31:/E 4-88 2@1>E91:@ 2 88 A:<-50 @?1D<1:?1?0 4->31?5:/A>>10 A:01>@45? 3>1191:@ 1 05?@>5.A@10 9;:3 @41 @51?@;@45?3>1191:@ 5:0-:/1 C5@4 @41 1?<1/@5B1 @>5.A@5;:?2 1-/4 2 @41 @51? 41 19.1>?2 @41 0 2 5>1/@;>?225/1>?0 995@@11 19.1>?2 @41 31:/E 4-88 A?1 05:->E 1 0 1-?;:-.81 058531:/1 5:@41 1D1>/5?1 2 @415>C1>?0 5:@41 1>2;>9-:/1 2 @415>0A@51?A>?A-:@ @;@45?3>1191:@ 41E 4-88 @ 1 5:05B50A-88E 85-.81 2;> E 95?@-71 2 6A0391:@ E @41>@5;:9-01 @-71:95@@10 E @419 5:3;;0 2-5@4 2;>E @ 95??5;:E E 31:@ A8@-:@ 5:01<1:01:@ @>-/@;>181/@10 C5@4 1-?;:-.81 1 2;>8;??5:/A>>10 1?A8@5:3 2>;9 E @5;:9-01 @-71:95@@10 E @419 5:3;;0 2-5@4 0 C5@4 1-?;:-.81 1 @4>;A34 5:B1?@91:@ 2 31:/E 2A:0?2-58A>1 @; 5:B1?@ 5>1/@;>225/1>995@@11 19.1>4-88 1 1?<;:?5.81 2;>E @ 95??5;:2 E @41>5>1/@;>225/1>995@@11 19.1>81??@41>C5?1 1=A5>10 E 8-C 5>1/@;> 225/1>995@@11 19.1>4-88 1 1=A5>10 @;35B1 0 @41>1/A>5@E @;3A->-:@11 @41 2-5@42A8 1>2;>9-:/1 2 45?41>0A@51?A>?A-:@ @;@45?3>1191:@ 41 2A:0?2 @41 31:/E 4-88 1 A?10 @;0121:0 5:019:52E 0 4;80 4->981??@41 31:/E 2;> E 5>1/@;>225/1>995@@11 19.1>2;>@415>@5;:?@-71:C5@45:@41 1 2 @41 31:/E @45:3 41>15:4-88 8595@ @41 534@ 2 @41 31:/E @;A>/4-?1 5:?A>-:/1 @;B501 B1>-31 2;>@41?1 @E<1?2 8;??1? 41?1 5:019:525/-@5;:0 0121:?1 853-@5;:?4-88 A>B5B1 @41 @1>95:-@5;:2 @41 3>1191:@ @;E @?95??5;:?A>>5:3 12;>1 A/4 @1>95:-@5;: @41 2A881?@ 1D@1:@ 88;C10 E 8-C @41 31:/E 4-88 0121:0 5:019:52E 0 B1 4->981??@41 19.1>?0 @415>3;B1>:5:3 051?225/1>?31:@?0 19<8;E11?2>;9 88 8-59?8;??1?0-9-31? @?5:6A>E 0 85-.585@E 2 1B1>E 75:0 @A>1 0 01?/>5<@5;:05>1/@8E 5:05>1/@8E 5?5:3 2>;9 @41 1>2;>9-:/1 2 E 2 @41 @5B5@51?2 @41 31:/E @41 @5B5@51?A:01>@-71:A>?A-:@ @;@45? 3>1191:@ 200 41 0 4-88 0;<@ E8-C?5?@1:@ C5@4 @45?3>1191:@ C45/4 4-88 B501 2;>@41 095:5?@>-@5;:0 9-:-3191:@ 2 @41 31:/E 41 B5?5;:?2 @41 E8-C?9;052510 2>;9 @591 @; @591 4-88 1?@-.85?4 @41 1>-@5:3 10A>1?0 @-:0->0?2;>@41 31:/E 41 31:/E 4-88 00>1??@5/1?5885:3?0 @41>99A:5/-@5;:?@;19.1>05>1/@10 E @4-@ 19.1>4 19.1>4-88 B501 @41 31:/E C5@4 @41 19-58 0 4E?5/-8 00>1??@;C45/4 99A:5/-@5;:?1 @;1 1:@ 19.1>?4-88 00>1??@5/1?0 @41>99A:5/-@5;:?@;@41 31:/E @ @41 225/1 00>1??2 @41 31:/E @41 19-58 00>1??2 @41 31:/E 05>1/@10 E @41 19.1>0 1@ 2;>@4 5:@41 E8-C? 41 31:/E 4-88 0;<@ 0 1>B1 01 2 0A/@ 0 285/@ 2 @1>1?@ 85/E 41 31:/E 4-88 9<8E C5@4 88 1=A5>191:@?2 @41 5>85@5/-8 @5/1?995??5;:1=A5>10 E 8-C 13A8-@5;: 45?3>1191:@ 9-E 1 91:010 @ E @591 E B;@1 2 @41 19.1>?@5:3 @4>;A34 @415> 135?8-@5B1 051?E 91:091:@ 2 @45?3>1191:@ 4-88 1/;91 1221/@5B1 A<;:1/15<@ E @41 31:/E 2 @5/1 2 @41 B-8 2 @41 91:091:@ E @C;@45>0?2 @41 135?8-@5B1 051?2 @41 19.1>? 4;A80 E @5;:@1>9 05@5;:B5?5;:2 @45?3>1191:@ 1 01/5010 E A>@ 2 9<1@1:@ 6A>5?05/@5;:@;1 58813-8 5:285/@ C5@4 E 8-C 2 @41 @-@1 2 852;>:5-1 @41>C5?1 1:01>10 A:1:2;>/1-.81 5:1221/@A-8 @41 B-8505@E 2 @41 19-5:5:3 @5;:?@1>9?05@5;:?0 B5?5;:?4-88 @ 1 221/@10 19.1>9-E 53:E 534@ 8-59 5:@1>1?@ 5@ 9-E 4-B1 A:01>@45?3>1191:@ 0 105@;>53:11 @45>0 @E 1:125/5->E 2 E 19.1>4-88 4-B1 E 534@ 8-59 @5@81 @;E @ 4->1 5:@1>1?@ 2A:0 1@ 2 @41 31:/E 45?3>1191:@ 4-88 1 5:05:3 A<;:0 4-88 5:A>1 @; @41 1:125@ 2 A//1??;>?2 @41 19.1>?45?3>1191:@ 5?5:@1:010 818E 2;>@41 1:125@ 2 @41 201 31:/E 0 5@?19.1>?@45>0 @E 4-88 1 011910 1:125/5->E 2 @45?3>1191:@ 4-B1 E 534@?3-5:?@ @41 31:/E 5@?19.1>? E A.85/31:/E 8;/-@10 C5@45:@41 6A>5?05/@5;:-8 A@4;>5@E 2 @41 A:@E 2 @-8->-9-E C5@4 @41 B-8 2 @41 0 2 5>1/@;>?1/;91 5-@1 19.1>2 @41 31:/E E 1D1/A@5:3 0 0185B1>5:3 @;@41 31:/E 5-@1 19.1>?45<3>1191:@ 0 B505:3 5-@1 19.1>?45<211 0 2A>@41>B5010 5:@41 E8-C?5-@1 19.1>4-88 @ 1 1:@5@810 @; 1<>1?1:@-@5;:@41 0 2 5>1/@;>?@;B;@1 E 9-@@1>95:3 12;>1 @41 0 2 5>1/@;>?@41 31:/E A:81??1<->-@1 C>5@@1:3>1191:@ 5?1:@1>10 5:@;1@C11:@41 5-@1 19.1>0 @41 31:/E 41 B5?5;:?2 @45?3>1191:@ 4-88 1 85.1>-88E @>A10 1/1??->E 1-?;:-.8E B1:51:@ @;451B1 @41 A><;?1?2 @41 31:/E C-5B1>2 @41 1-/4 2 012-A8@ 2 E 2 @41 B1:-:@?3>1191:@?1?@>5/@5;:? 05@5;:?2 @45?3>1191:@ E E 19.1>4-88 1 @>A10 @;1 C-5B1>2 E A//1105:3 1-/4 2 @41 91 @41>B1:-:@?1?@>5/@5;:?05@5;:?2 @45?3>1191:@ 018-E 95??5;:2 1D1>/5?5:3 E 534@ C1>1910E 5:@41 1B1:@ 2 1-/4 012-A8@ 4-88 1 @>A10 C-5B1>B->5-@5;:2 E 2 @41 @1>9?2 @45?3>1191:@ E 85/-.81 3>1191:@ 2 E 19.1>4-88 012-A8@ E 853-@5;:@-5:10 5:@45?3>1191:@ @41 012-A8@ 4-88 @ 1D/A?1 E @41>19.1>2>;9 2A825885:3 5@?1?<1/@5B1 853-@5;:?A:01>@45?3>1191:@ E 19.1> 4-88 1 1:@5@810 @;A>?A1 88 813-8 0 1=A5@-.81 191051?3-5:?@ @41>19.1>5:1?<;:?1 @;E 881310 012-A8@ A:01>@45?3>1191:@ E 0 88 2 @41 191051?B5010 @;@41 19.1>? 41>1A:01>E 8-C C 41>1-2@1>1:-/@10 1 A9A8-@5B1 0 @41 1D1>/5?1 2 1 534@ 1910E 4-88 @ 59<-5>@41 19.1>?@;E @41>1910E 88 @5/81 41-05:3?1 2;>121>1:/1 8E 0 1 @ 5:@1:010 @;0125:1 8595@ @41 1 2 E B5?5;:2 @45?3>1191:@ 202 41 19.1>?3>11 @4-@ E 05?<A@1 13->05:3 @41 1:2;>/191:@ 5:@1><>1@-@5;:2 E @1>9 B1:-:@ 05@5;:2 @45?3>1191:@ G 5?<A@1H 9-E 25>?@ 2;>1>5;0 2 @ 81??@4-: @45>@E 0-E?1 A.95@@10 @;9105-@5;:12;>1 9A@A-88E 1<@-.81 9105-@;>5;>@; 5:5@5-@5;:2 85@53-@5;:E @41>5:05:3 5@>-@5;:06A05/-@5B1 05?<A@1 1?;8A@5;: 1??41 19.1>?4-88 5 9105-@1 5:3;;0 2-5@4 55 1D/4-:31 88 0;/A91:@?C45/4 1-/4 1851B1?@;1 181B-:@ 0 9-@1>5-8 @;@41 5??A1 5:@41 5?<A@1 555 1D/4-:31 C>5@@1: 5@5;:1>?@-@5:3 @415>5@5;:@41 5?<A@1 0 A@85:5:3 @41 A.61/@ 9-@@1>0 A.?@-:/1 2 @41 @5/5<-@10 @1?@59;:E 2 1>?;:?4-B5:3 1>?;:-8 7:;C81031 2 @41 2-/@? A:01>8E5:3 @41 5?<A@1 0 5B 1:3-31 0 1>-@1 5:A/4 2A>@41>05?/;B1>E @41 19.1>?3>11 9105-@;>A331?@?9-E 1 1/1??->E @;2-/585@-@1 1221/@5B1 9105-@5;: 4 19.1>4-88 1->5@?C:@?@@;>:1EI?211?0 1D<1:?1?2 @41 9105-@5;:1:A1 2 @41 9105-@5;:4-88 1 9A@A-88E 3>11-.81 5@E C5@45:@-8->-A:@E 852;>:5- 2 B-58-.81 @41 31:/E 4-88 @-5:5:?A>-:/1 2;>88 19.1>?5:@10 19.1>?0 995@@11 19.1>?5:/8A05:3 A@ @ 8595@10 @;5>1/@;>?0 225/1>?85-.585@E 5:?A>-:/1 0 31:1>-8 85-.585@E 5:?A>-:/1 @-5:5:3 85/E 8595@?5:A/4 9;A:@?@41 0 2 5>1/@;>?4-88 0119 C588 1 1/1??->E @;01=A-@18E 5:?A>1 3-5:?@ @41 5?7?2 85-.585@E @4-@ 9-E 1 5:/A>>10 E @41 31:/E A>-:/1 A:01>@45?B5?5;:9-E 5:/8A01 5:?A>-:/1 8 3>-9 41 D1/A@5B1 5>1/@;>2 @41 31:/E 4-88 2581 @5/1 2 @45?3>1191:@ C5@4 @41 225/1 2 @41 852;>:5-1/>1@->E 2 @-@1 C5@45:@45>@E 0-E?2 5@?1221/@5B1 0-@1 1=A5>10 E B1>:91:@ 01 1/@5;:91:010 0 C5@45:1B1:@E 0-E?2 5@?1221/@5B1 0-@1 1=A5>10 E B1>:91:@ 01 1/@5;:91:010 45?3>1191:@ 9-E 1 1D1/A@10 5:@?A:@1><->@?1-/4 @ A:@1><->@ 15:3 1D-/@ 0A<85/-@1 2 88 @41>@?A:@1><->@?0 88 @?A:@1><->@?4-88 1 501>10 @5@A@5:3 1 9<81@1 535:-8 0 9-E 1 @@-/410 @;31@41>C41:1D1/A@10 E @41 19.1>? 41>1@;59581 0 181/@>;:5/53:-@A>1?4-88 1 5:05:3 45?3>1191:@ @5@A@1?@41 2A88 0 9<81@1 3>1191:@ 2 @41 @51?0 A<1>?101?E 5;>C>5@@1:3>1191:@ 1@C11:@41 19.1>?@41 91 @;<5/ 203 204 205 206 TOWN OF LOS ALTOS HILLS IN WITNESS WHEREOF, the parties hereto have executed this Joint Powers Agreement establishing the Cities Association of Santa Clara County Joint Powers Agency APPROVED AS TO FORM: APPROVED: Steven Mattas, Town Attorney Peter Pirnejad, Town Manager Date Date 1/23/2024 01/24/2024 207 208 209 210 211 212 213 214 215 CITY OF SARATOGA IN WITNESS WHEREOF, the parties hereto have executed this Joint Powers Agreement establishing the Cities Association of Santa Clara County Joint Powers Agency APPROVED AS TO FORM: APPROVED: Richard Taylor, City Attorney James Lindsay, City Manager Date Date DocuSign Envelope ID: 079DBB93-B099-4823-853E-64615B5BAD0F 1/26/2024 1/26/2024 216 CITY OF SUNNYVALE IN WITNESS WHEREOF,the parties hereto have executed this Joint Powers Agreement establishing the Cities Association of Santa Clara County Joint Powers Agency APPROVED AS TO FORM: 1-nt-e-ri_m_ City Attorney Date APPROVED: 217 P.O. Box 3144 Los Altos, CA 94024 www.citiesassociation.org Amount Due: $8,698 Payment Options: Please make checks payable to Cities Association of Santa Clara County and mail payment directly to Cities Association of Santa Clara County at P.O Box 3144 Los Altos, CA 94024 or Direct deposit to U.S. Bank: Account # 158301219719 Bank Routing # 122235821 For questions or comments, please email info@citiesassociation.org Thank you! Vaishali Sirkay Cities Association of Santa Clara County BILL TO Leslie Arroyo Acting City Manager 13777 Fruitvale Avenue Saratoga, CA 95070 Invoice Date: July 1, 2026 Invoice #: FY27-14 Due Date: 60 days upon receipt Invoice 2026-2027 Membership Dues 218 SARATOGA CITY COUNCIL COUNCIL ASSIGNMENTS Council Member Belal Aftab Association of Bay Area Government (ABAG) General Assembly Santa Clara County Housing and Community Development Advisory Committee Saratoga Historical Foundation Board of Directors Saratoga Ministerial Association Saratoga Sister City Committee Liaison Council Finance Advisory Committee Council Member Yan Zhao Santa Clara Valley Water Commission Valley Transportation Authority Policy Advisory Committee West Valley Sanitation District Board of Directors Council Member Kookie Fitzsimmons Cities Association of Santa Clara County City Selection Committee Hakone Foundation Board of Trustees Hakone Foundation Board Executive Board KSAR 15 Saratoga Community Access Cable Television Foundation Board of Directors Saratoga Chamber of Commerce Board of Directors Successful Aging Solutions & Community Consulting Board of Directors Vice Mayor Tina Walia Cities Association of Santa Clara County Board of Directors Cities Association of Santa Clara County Legislative Action Committee Santa Clara County Library District Board of Directors Mayor Chuck Page Silicon Valley Clean Energy Authority Board of Directors West Valley Mayors and City Managers Association West Valley Solid Waste Management Authority Board of Directors West Valley Stormwater Authority Board of Directors Council Finance Advisory Committee 219 2026 SARATOGA CITY COUNCIL ASSIGNMENTS Adopted via Resolution No. 25-072 Agency Assignments - Voting Council Member Alternate Association of Bay Area Government (ABAG) General Assembly Aftab Zhao Cities Association of Santa Clara County Board of Directors Walia Zhao Cities Association of Santa Clara County City Selection Committee Fitzsimmons Page Cities Association of Santa Clara County Legislative Action Committee Walia Zhao Hakone Foundation Board of Trustees (2 Council Members Assigned) Fitzsimmons Page Hakone Foundation Board Executive Board Fitzsimmons Page KSAR 15 Saratoga Community Access Cable Television Foundation Board of Directors Fitzsimmons Aftab Santa Clara County Housing and Community Development Advisory Committee Aftab Page Santa Clara County Library District Board of Directors Walia Fitzsimmons Santa Clara Valley Water Commission Zhao Fitzsimmons Silicon Valley Clean Energy Authority Board of Directors Page Walia Valley Transportation Authority Policy Advisory Committee Zhao Aftab West Valley Stormwater Authority Board of Directors Page Fitzsimmons West Valley Mayors and City Managers Association Page Walia West Valley Sanitation District Board of Directors Zhao Fitzsimmons West Valley Solid Waste Management Authority Board of Directors Page Fitzsimmons Liaison Assignments - Non-Voting Council Member Alternate Successful Aging Solutions & Community Consulting Board of Directors (SASCC) Fitzsimmons Page Saratoga Chamber of Commerce Board Fitzsimmons Page Saratoga Historical Foundation Board of Directors Aftab Fitzsimmons Saratoga Ministerial Association Aftab Zhao Saratoga Sister City Committee Liaison Aftab Fitzsimmons Council Committee Assignments Council Member 2nd Council Member Council Finance Advisory Committee Page Aftab 220