Loading...
HomeMy WebLinkAbout08-09 CIP Study Session Attachment 2Attachment 2 General CIP Projects (New): North Campus Building Removal Project: Per direction received at the April 16th City Council Meeting, this project would remove the front two buildings at the North Campus, namely the Sanctuary Building and the Education Building. Once the buildings are removed lawn and irrigation will be installed as well as benches. Project Cost: $50,000 (Building Demolition) 25,000 (Sod, Irrigation, and Benches) $75,000 Yearly operational costs will be approximately $5,000 for landscape maintenance and watering of the new sod area. Corporation Yard Equipment Shelter Structure: This project is connected to the solar project listed under Operational Efficiencies and would provide the structure to which the solar panels will be mounted. Additionally, this project would increase the life expectancy of City equipment, maintenance vehicles, and rolling stock by better protecting them from adverse environmental conditions. Project Cost: $100,000 Identified Project Funding Source: Capital Improvement Fund Highway 9 Safety Improvements Phase 3: This project would improve the Austin Way intersection, install bicycle detection loops at all intersections, and perform spot shoulder widening along the Highway 9 corridor. The funding source requires a 20% local match. Project Cost: $615,000 -492,000 (Prop 116 Grant – Pending Approval) -53,200 (Local Match - Los Gatos ($3,200) & County ($50,000)) $69,800 Identified Project Funding Sources: Capital Improvement Fund North Campus Improvements Fund: The purpose of this fund is to set aside funding each year for capital improvements at the North Campus such as new public facilities. Project Cost: Dependent on Council Direction. $50,000 has been used as a placeholder for budgeting purposes. Identified Project Funding Source: Capital Improvement Fund Multi-purpose Room Improvements Fund: The purpose of this fund would be to set aside funding each year for capital improvements for the purpose of building a City multi-purpose room. Project Cost: Dependent on Council Direction. $50,000 has been used as a placeholder for budgeting purposes. Identified Project Funding Source: Capital Improvement Fund City Hall Parking Improvements: This project would create additional parking at City Hall by removing landscaping near the corner of Fruitvale and Allendale. Project Cost: $100,000 Identified Project Funding Source: Capital Improvement Fund Bus Stop Shelter Concrete Pads This project would fund the concrete pads necessary to install VTA funded bus stop shelters at 4 select locations along bus routes in the City. Project Cost: $40,000 Identified Project Funding Source: Capital Improvement Fund Hakone Gardens Upper Moon House Foundation Repair: This project would repair the foundation of the Upper Moon House at Hakone Gardens. Project Cost: $125,000 Identified Project Funding Source: Capital Improvement Fund Hakone Gardens Visitor Center Design: This project would fund the design work for the Hakone Gardens Visitor Center. Project Cost: $100,000 Identified Project Funding Source: Capital Improvement Fund Aspesi Drive Traffic Calming: This project would provide traffic calming by constructing a raised median on Aspesi Drive. The project was recommended by the TSC at their 4/12/07 meeting. Project Cost: $12,000 Identified Project Funding Source: Capital Improvement Fund Brookglen Drive Traffic Calming: This project would provide traffic calming by constructing a raised median on Brookglen Drive. The project was recommended by the TSC at their 10/11/07 meeting. Project Cost: $25,000 Identified Project Funding Source: Capital Improvement Fund Cox Avenue Traffic Calming: This project would provide traffic calming by constructing a speed bump on Cox Avenue between Paseo Presada and Quito Road. The project was recommended by the TSC at their 03/11/08 meeting. Project Cost: $8,000 Identified Project Funding Source: Capital Improvement Fund Cox Avenue Traffic and Pedestrian Safety Improvements: This project would restripe Cox Avenue between Saratoga Avenue and Paseo Presada to a single lane in each direction with a center turn lane and in pavement lighting for the mid-block crosswalk. This project was recommended by the TSC at their 03/03/08 meeting. Project Cost: $75,000 Identified Project Funding Source: Capital Improvement Fund Montalvo Road Traffic Calming: This project would provide traffic calming by constructing a raised median on Montalvo Road. The project was recommended by the TSC at their 05/08/08 meeting. Project Cost: $15,000 Identified Project Funding Source: Capital Improvement Fund Prospect Road Median Project Construction Phase: This project would implement the Prospect Road Median Master Plan (scheduled for approval at the June 4th City Council Meeting). The project can be phased if desired. Project Cost: $2,340,000 (Total Project Cost) -1,170,000 (City of San Jose 50% share) $1,170,000 For budget purposes assume splitting the project into phases. Assume first phase at $150,000 with Saratoga’s portion being $75,000. A phase can range in cost from $75,000 to $450,000. Identified Project Funding Source: Capital Improvement Fund Annual Sidewalk Repair Project: This project would fund annual sidewalk repairs for FY08/09. Project Cost: $50,000 Identified Project Funding Source: Capital Improvement Fund Annual Storm Drain Repair Project: This project would fund annual storm drain repairs for FY08/09. Project Cost: $50,000 Identified Project Funding Source: Capital Improvement Fund City Hall Emergency Generator Project: This project would fund the purchase and installation of an emergency generator which would power both the Administration Building and Community Development/Engineering Building with power in the case of an extended power outage or disaster. Project Cost: $50,000 Identified Project Funding Source: Capital Improvement Fund 3rd Street Parking Lot Improvements: This project would fund minor improvements to two small contiguous private parking lots located off of 3rd Street in order to gain public parking access. The idea would be similar in nature to the City’s parking lease agreement with West Hope Church. The estimated cost of the minor improvements is $25,000, which does not include probable lease payments to the property owners. Project Cost: $25,000 Identified Project Funding Source: Capital Improvement Fund