HomeMy WebLinkAbout08-09 CIP Study Session Attachment 3Attachment 3
Existing Unfunded CIP Projects:
1. Herriman Avenue Crosswalk Improvements: $75,000
2. Herriman Avenue Sidewalk Improvements Option 1*: $50,000
3. Herriman Avenue Sidewalk Improvements Option 2**: $150,000
4. Pedestrian Refuge Area at Quito/McCoy Intersection: $15,000
5. Glen Brae Avenue Median Choker: $15,000
6. Komina Walking Path: $75,000
7. Saratoga Elementary School Driveway and Sidewalk Modification: $70,000
8. El Camino Grande/Monte Vista Storm Drain improvements: $300,000
9. Chester Avenue Storm Drain Improvements: $178,000
10. Quito Road Sidewalk Improvements: $150,000
*Brings the pathway up to grade by filling in the void, between the concrete curb
and new berm, with asphalt.
**Constructs new sidewalk/pathway outside of the street travel way.