Loading...
HomeMy WebLinkAbout08-09 CIP Study Session Attachment 3Attachment 3 Existing Unfunded CIP Projects: 1. Herriman Avenue Crosswalk Improvements: $75,000  2. Herriman Avenue Sidewalk Improvements Option 1*: $50,000  3. Herriman Avenue Sidewalk Improvements Option 2**: $150,000  4. Pedestrian Refuge Area at Quito/McCoy Intersection: $15,000  5. Glen Brae Avenue Median Choker: $15,000  6. Komina Walking Path: $75,000   7. Saratoga Elementary School Driveway and Sidewalk Modification: $70,000  8. El Camino Grande/Monte Vista Storm Drain improvements: $300,000  9. Chester Avenue Storm Drain Improvements: $178,000   10. Quito Road Sidewalk Improvements: $150,000      *Brings the pathway up to grade by filling in the void, between the concrete curb and new berm, with asphalt.  **Constructs new sidewalk/pathway outside of the street travel way.