Loading...
HomeMy WebLinkAbout1998 Parks Site SummariesCITY OF SARATOGA, PARK DEVELOPMENT PROJECT ATTACHMENT #1: SITE SUMMARIES Site-Notes Users O ortunities Constraints Needs/desires 1) EI Quito Park Saratoga Little Possible to put a Parking is an issue Switch from DG to League, Quito Little small (60x100yd) with the neighbors-- clay infield; Site is used as a League, Saratoga field, or almost 3 of have been complaints Soccer goals; practice field by Rec. Dept., De the "U-6" fields in in the past. the athletic Anza Youth Soccer, the out-field area; Too small for afull- groups; used Monday volleyball, Practice area in NW size game field. heavily by pick-up soccer, pre- comer w/ a portable general public school play-groups, backstop. picnic rentals. 2) MaCauliffe Cupertino American 60x100yd field area- No room for any Dirt infield; Elementary Little League, -small, but usable expansion Soccer goals school activities. for practice; Scheduling might make better use of this site. 3) Saratoga AYSO-U-8's 3x/day A 50x100yd held is School asphalt area Fix playing Elementary almost daily in Fall; scheduled to be built will be expanding; No conditions-slope and Formerly used by in the Fall-current way to widen the field drainage; School district is Saratoga Little field will be leveled area to greater than Soccer goals looking to League for practice. out and drainage 50 yds. partner with the fixed. City to help with School is trying to the development acquire add'I. space costs. which would add 80' to the length. 4) Argonaut AYSO-for practice 70x100yd field is Poor drainage and Improve turf Elementary in Fall, Saratoga potentially possible; pitting of field; old condition; Little League, 60x100yd will fit irrigation system. soccer goals formerly used by easily; 3 backstops CYSA for practice on site 5) Marshall Quito Little League If school play area is Parking is a problem Need these fields for Lane Elementary uses heavily; AYSO moved, the field in the neighbofiood; U-10 and up; QLL in Spring and Fall- space can be any attempt to locate proposed a T-ball An important site two U-8 teams 1/2 widened (though this permanent restroom field, a Farm team because of its field all week for will cost); a site facilities will meet field and 1 U~ soccer location-not practice; CYSA 1/2 redesign might yield with resistance. field; restroom many fields to field all week in Fall more efficient use of facilities; serve this part of the space, but it town. Campbell might be at School District is considerable cost. willing to partner with City to develo . A 6) Redwood AYSO-f teams in Field is large Field shape prohibits Improve turf Middle School Fall, 1 game on enough to layout options condition; Saturday; U-8's accommodate a soccer goals; City and AYSO practice on the regulation-size field pitcher's mound; contributed $ for small field; for upper division restroom facilities; field upgrades 4 Saratoga LL uses games; good storage facilities years ago. the Iwr dmd. for geographic location u r div. ractice 7) Blue Hills AYSO and CYSA Much potential with Insufficient asphalt Improve 1•ield Elementary/ split the use in Fall the inclusion of the area at school-will be condition; soccer Azule Park and Spring; Azule site: It may expanding; significant goals; restroom Cupertino LL uses be possible to fit 1- neighborhood facilities; possibly School district is for Spring practice; 70x100yd field, plus resistance to storage facility if willing to work a smaller field, plus development; parking increase in use. with the City to 2 baseball 1•telds; is a problem. arrive at a pedestrian overpass mutually to connect with beneficial Kevin Moran Park arran ement. 8) Kevin Moran AYSO has 2 teams Much potential due Much neighborhood Soccer goals; Park on the site in Fall to proximity and resistance to any kind restroom facilities; and Spring-split connection to Blue of development- larger field area; use with CYSA. Hills site; possible to including the possibly storage use one of the installation of facility if increase in orchard areas as off- restrooms; traffic and use. street pkg. Can fit parking are problems; 60x100yd, current usable area is 80x120yd, and LL small-would require baseball field in much work; residents orchard area feel City "promised" that no development would occur-passive use onl 9) Foothill LG/Saratoga Girls With facility Parking is a problem- restroom facilities; Elementary Softball; AYSO-3-4 upgrades and a though add'I. will be storage facility; School teams in Fall; vigilant maintenance built-as is the lack of snack-shack; covered program, the site facilities; dugouts; water could be improved The design options fountains, batting greatly; slight are limited due to the cage(s); pitching alterations to space multi-level nature of areas; turt and infield might make it more the site; to re-design renovation. efficient. would be a considerable cost 10) Congress AYSO, Pony Could the site be Parking is limited for Needs field upgrades- Springs Park League, Saratoga designated as a the number of people -new irrigation, re- Little League "Sports Park," in to be accommodated; grading, etc. Also The primary which case the needs new fencing game site for users could charge between the first-base soccer, baseball, entrance fees, etc. lines and the play and Pony area; storage League. 4 facilities; foul ball baseball fields screen; taller home and 5 soccer run fence; batting fields ca es; General notes: A) Turf condition is a major concern at all sites. All of the school sites have irrigation systems that are fairly old and which should be replaced. B) Large "game-size" fields are in high demand; essentially, the kids can practice anywhere there is flat grass, but there is a need for more big fields. Everyone agreed that the need for "flat grass" outweighed a lot of other considerations. C) There is a need for restroom facilities at all sites except Congress Springs and EI Quito. Currently, the groups must provide portables, and with large numbers of players, parents and siblings, the facilities are just not adequate. Permanent restroom facilities are a major cost and will have to be weighed as part of project prioritization. D) Regarding maintenance, an important factor is being able to let the turf rest-like Redwood does over the summer months. Developing a detailed use-schedule which provides for each field to be rested at least one day per week is needed. Such a schedule would also help to maximize the efficiency of the existing sites-and would cost nothing. E) There is a general call for more facilities (such as batting cages, storage areas, drinking fountains, etc.) at all sites. These kinds of upgrades will be considered and weighed against the cost of field upgrades. 3 CITY OF SARATOGA, PARK DEVELOPMENT PROJECT ATTACHMENT #2: MAINTENANCE COST COMPARISONS Enti Maint. Cost Per Acre/Year Includin - $ /acre/ r. City of Saratoga Approximately $7600/acre/year, Mowing-$882 for 55 acres in the Park system. Fertilization-$159 Park maintenance costs in Renovation-$215 1995/96=$363,054.57 adjusted Weed control-$236 @ 5%/yr. To arrive at the above Water-$130, avg. figure. NOTE: Does not include Plus: salaries, materials and vehicle and indirect costs. equipment, maintenance (trash, pruning, etc.) With indirect costs included, the cost would be approximately $10,600/acre/year. The figure would be closer to $12,500/acre/year if you proportion out the costs attributed to maintaining developed vs. Undeveloped park land. City of Los Altos Approximately $4-8000/acre/yr. Fertilization-$320 depending on the type of Aeration-$125 acreage...wide open turf areas Weed control-$345 are generally less than highly Aerate/Seed/Roll-$2,178 (not ornamental areas-though all sites) additional money is spent Hole Fill-$80 repairing the damaged athletic Plus: water, mowing, salaries, type fields. materials and equipment. Note: these are costs to maintain school sites. City of Cupertino Approximately $11,500/acre/yr Salaries, materials, and capital to maintain School District sites outlay (51.55 acres-annual cost =$602,105 City of Sunnyvale Approximately $6000/acre/yr, Renovation, mowing, contracted but this does not include water weed/pest control, aeration, costs. fertilization, materials and equipment, salaries Jensen Corporation Approximately $10,454/acre/yr. Fertilization, watering, aeration, mowing, weed control, pruning up to 12' Environmental Care Approximately $12,025/acre/yr. Mowing, edging, fertilization, weed control, water, aeration Aid',-07-1998 14:55 CITY OF SARATOGAiADMIN. 408 868 1280 P.02i03 ~r,4cc~ M'~.+~r ~~3 MEMORANbUM Date: August 6, 1998 To: Jeff Krebs, Beals Landscape Architecture From: Irene Jacobs, City of Saratoga RE. Playfield Task Force I hope that the following information will help clarify questions related to indirect costa, the FY99/00 budget and other loose ends that we discussed. Feel free to call me if you have any follow-up questions. Ind~gect Costs Attached you will find an allocation of indirect costs budgeted for the year ending June 30, 1999. The City currently allocates direct costs of the following General Government and Intergovernmental Programs: City Council, City Manager, City Clerk, Human Resources, General Services, Fined Assests and Management Information Systems to program accounts as established by the City. The direct cost of these functions is allocated as an indirect cost to both operating and intergovernmental accounts based upon a formula determined by the City. This formula attempts to allocate direct costs budgets for the above intergovernmental accounts based upon their perceived contributions to the various operating and intergovernmental programs. This is done using a combination of the program's direct budget, permanent full-time employees and all full-time employees as the basis for all allocations. If you refer to the spreadsheet you will see that Parks and open Space are listed as Department 3030. The first column has $49$,119 budgeted for direct costs and $143,426 for first allocation costs. First allocation costs are those indirect expenses that can be easily tracked to a specific program. For Parks and Open Space the first allocation costs cwnsist of Insurance cysts, existing or new equipment, facilities (the corporation yard), NIIS, and City Attorney Costs. The subtotal $641,545 which is then used to calculate the indirect cysts by using the formulas under the headings listed across the page. Utility Users Tax There was some question related to how the loss of the Utility User's Tax ([JUTJ directly affected the Parks and Open Space budget. The biggest AUG-07-1998 14 56 CITY ~ SARATOGAiADMIN. 408 868 1280 P,03i03 impact of the loss of the UUT on Parks was the reduction of staff in that department. As a result of the reorganization, the Park Maintenance Superintendent position was dissolved as well as a Park Maintenance Worker. Since the occurrence of this change, the Park Maintenance I.eadworker has been trying to pick up the administrative void that has been left with the loss of the Park Maintenance Superintendent obviously decreasing the number of hours that the leadworker normally spends working in the field. The loss of a Pazk Maintenance Worker has decreased the work on Parks by at least forty hours per week leaving the remaining crew to pick up the slack. The leadworker tells me that when we were fully staffed, his men cared for approximately six acres each and now his crew is responsible for nearly nine acres per maintenance worker even after the elimination of the time spent maintaining the median strips that has since been contracted to a private firm. In addition the monies that were allocated for contracted maintenance services has decreased. For example, in FY96/97 $2,000 was budgeted for contract services for various types of spraying. For FY 97(98 that number was reduced to $500. Irrigation repairs received a budgeted allocation of $7,400 in FY96/97 but in FY 97/98 it was reduced to $2,000. The need for spraying and irrigation repairs have not decreased but, since we have not been able t4 rely on contractual services as we have in the past, our existing crew has had to do the repairs themselves which has again decreased the amount of time that they spend on their regular duties. Another area where the Farks and Open Space budget has been affected is with the Hakone Gardens budget. In an attempt to bridge a 1.5 million dollar gap in the budget, the City proposed to the Hakone Foundation that they assume full responsibility of the operations of the gardens and with it the operational costs and responsibility for Hakone Gazdens. This relieved the city of a $90,000 budget item. TOTAL P.03