Loading...
HomeMy WebLinkAbout07-19-2008 City Council Agenda Large SpreadsheetCapital Improvement Plan Project List FUNDING CRITERIA FUNDED 0 UNFUNDED FY 2008-2009 Update . # # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 KEY: 43 43 PROJECT Proposed Projects - FY 08/09 Existing Unfunded Projects - Approved in Previous Fiscal Years STREET IMPROVEMENT PROJECTS Street Repair & Resurfacing Projects Annual Street Resurfacing: Annual Street Restriping: Saratoga Sunnyvale Road Resurfacing: Roadway Safety/Traffic Calming Pedestrian Refuge Area at Quito/McCoy Intersection: Herriman Avenue Crosswalk Improvements: Herriman Avenue Sidewalk Improvements Option 1: Herriman Avenue Sidewalk Improvements Option 2: Komina Walking Path: Saratoga Elementary School Driveway and Sidewalk Modification: Solar Powered Radar Feedback Signs: Traffic Safety: Cox Avenue Traffic and Pedestrian Safety Improvements: Glen Brae Avenue Median Choker: Montalvo Road Traffic Calming: Aspesi Drive Traffic Calming: Brookglen Drive Traffic Calming: Cox Avenue Traffic Calming: Highway 9 Safety Project Phase I: Highway 9/Oak Place Pedestrian Crosswalk Safety Improvements: Cox Avenue Railroad Crossing Arms Upgrade: ADA Accessible Traffic Signal Project: Highway 9 Safety Project Phase II: Street Median & Landscape Improvements Prospect Road Median Project Construction Phase: Median Repairs (Landscaping/Irrigation): Village Tree Lighting - Side Streets: Prospect Road Medians - Master Plan: City Entrance Signs/Monuments Including Highway 9: Sidewalks, Curbs & Storm Drains Annual Sidewalk Repair: Quito Road Sidewalk Improvements: Annual Storm Drain Upgrades: El Camino Grande/Monte Vista Storm Drain Improvements: Chester Avenue Storm Drain Improvements: El Quito Area Curb & Gutter Replacement: Sobey Road Culvert Repair: Village Streetscape Improvements (Sidewalk/C&G): Saratoga Sunnyvale Road ADA Curb Ramps: Village Pedestrian Enhancement Project Village News Rack Enclosures: Village Façade Matching Program: Saratoga-Sunnyvale Road Gateway Project (pathways): Saratoga Avenue Sidewalk Project: Bridge and Retaining Wall Projects Quito Road Bridge Replacement Project (Design): Quito Road Bridge Replacement Project (Construction): 4th Street Bridge: Total Street Improvement Projects PARK & TRAIL IMPROVEMENT PROJECTS Park Projects Kevin Moran Park Improvements: West Valley College Soccer Field Improvements Beauchamps Park Playground Safety Project: Wildwood Park Improvements: Wildwood Park Water Feature - Seating Improvements: Historic Park Landscaping Improvements: Park/Trail Repairs: Citywide Tree Replanting: Hakone Garden D/W: Hakone Gardens Visitor Center/Matching Funds: Ravenswood Park Playground Upgrade Project: Wildwood Park Pedestrian Bridge Rehabilitation: El Quito Park Improvements: Trail Projects De Anza Trail: Heritage Orchard Perimeter Path Improvements: Trail Segment #3 Repairs: Teerlink Ranch Trail Repair: San Marcos Open Space Trail: Calabazas Creek Trail: Odd Fellows Trail Development: Carnelian Glen Trail - Foot Bridge Replacement: Total Park & Trail Projects FACILITY IMPROVEMENT PROJECTS North Campus Building Removal Project Corporation Yard Equipment Shelter Structure North Campus Improvements Fund Multi-Purpose Room Improvements Fund Big Basin Way Turn Around City Hall Parking Improvements Bus Stop Shelter Concrete Pads & Wooden Shelters Hakone Gardens Upper Moon House Foundation Repair Hakone Gardens Visitor Center Design City Hall Emergency Generator Project 3rd Street Parking Lot Improvements City Compost Bins Historical Park Buildings - Fire Alarm System: North Campus Improvements: North Campus Recreation Facility Matching Program: Warner Hutton House Improvements: Civic Center Landscape Improvements: McWilliams House/Book-Go-Around Fire Alarm: Annual Facility Improvements: Total Facility Improvement Projects OPERATIONAL EFFICIENCY IMPROVEMENTS City Hall Solar Project: Cool Roofs: High Efficiency HVAC Systems: Double Pane Windows: Energy Star Compliant Appliances: Ceiling Insulation: Motion Control Lighting: Total Operational Efficiency Improvements ADMINISTRATIVE PROJECTS Financial System Upgrade: Document Imaging Project - Public Works Total Administrative Projects TOTAL ALL CIP PROJECTS PROJECT DESCRIPTION SUMMARY Upgrade of crossing arm in conjunction with rail surface improvements. Plant replacement and irrigation improvements in existing medians. Storm drain improvements in the El Camino Grande/Monte Vista Area Replacement of rolled curb & gutter for drainage mitigation. Replace sidewalk and curb & gutter for safety and beautification. Replacement of two bridges on Quito Road Replacement of existing substandard bridge at 4th & Saratoga Creek. Development of unimproved areas at Kevin Moran Park. Various infrastructure improvements to City parks and trails. Driveway and retaining wall improvements. Development of new trail along the UPR Railroad. San Marcos Open Space Trail: Various infrastructure improvements to City parks and trails. Development of new trail along the UPR Railroad. PROJECT DESCRIPTION SUMMARY Annual street resurfacing connected to the City's Pavement Management Program Annual Street Restriping Work Overlay and Pavement Rehabilitation on Saratoga-Sunnyvale Road (Blauer to Herriman) Center refuge area and crossing improvements on Quito Road at McCoy. Crosswalk enhancements located on Herriman Avenue @ Lexington and Saratoga Vista. Asphalt sidewalk/pathway leveling course between AC berm and PCC Curb. New sidewalk/pathway along the south side including retaining walls and landscape modifications. Walking Path on one side of Komina adjacent to Oak Street School. Driveway and sidewalk modification to increase capacity of drop-off lane. Provides funding for 4 solar powered radar feedback signs. Location(s) to be determined by the Traffic Commission. Traffic safety funds for implementation of safety improvements approved by Traffic Safety Commission. This project would provide crosswalk and other safety imrpovements on Cox Avenue between Saratoga Avenue and Paseo Presada Concrete median choker on Glen Brae Avenue for traffic calming. This project would provide traffic calming by constructing a raised median on Montalvo Road. This project would provide traffic calming by constructing a raised median on Aspesi Drive. This project would provide traffic calming by constructing a raised median on Brookglen Drive. This project would provide traffic calming by constructing a speed bump on Cox Avenue between Paseo Presada and Quito Road. Saratoga's portion of the three City Highway 9 Safety corridor project. Project to focus on bicycle improvements. Enhanced in-pavement crosswalk safety lights @ Highway 9 & Oak Place. Caltrans approval required. Const. Phase. Railroad crossing surface upgrade for safety and improved drivability. Audible Signal Project at various traffic signal locations throughout the City. Project to focus on ped improvements along the Highway 9 corridor. Majority of improvements in Saratoga. This project would implement the Prospect Road Median Master Plan. Plant replacement and irrigation improvements in existing medians. Install necessary electrical improvements for side street tree lighting. Development of Median Master Plan on Prospect Road. Installation of Entry Signs/Monument at City entry points where none exist. Removal of tripping hazards on City owned sidewalks. Construction of new sidewalk improvements on Quito Road between Highway 85 and Allendale Avenue. 2nd round of annual funds for storm drain rehabilitation and drainage improvements. Storm drainage improvements in the Monte Vista/El Camino Grande area. Storm drainage improvements in the Chester Avenue area. Replacement of rolled curb & gutter for drainage mitigation. Replacement of CMP Culvert undermined during winter of 05/06. Replace sidewalk and curb & gutter for safety and beautification. ADA curb ramp improvements at various locations along Saratoga-Sunnyvale Road. Crosswalk safety improvements and other pedestrian related enhancements in the Village. Enhancements to the Village News Rack Enclosures. Matching funds to business/property owners directed at improving building facades. Continuation of Gateway Project directed at pathway improvements. Continuation of sidewalk/pathway improvements along Saratoga Avenue: Replacement of two existing substandard bridges on Quito Road - Design Phase Replacement of two existing substandard bridges on Quito Road - Environmental/Construction Phase Rehabilitation of existing bridge at 4th & Saratoga Creek. Development of unimproved areas at Kevin Moran Park. Funding for Improvements to two soccer fields located at West Valley College. Replacement of existing substandard play equipment. Rebuild of Wildwood Park wood stage due to structural integrity issues and other minor improvements to the park. Installation of concrete seating improvements around the perimeter of the water feature. Removal of existing landscaping and installation of new landscaping and irrigation. Various infrastructure improvements to City parks and trails. Citywide tree replanting project including irrigation for parks, medians, right-of-ways, and open spaces. Driveway and retaining wall improvements. Matching Funds from Park Development Fees for Visitor Center at Hakone Gardens. Replacement of existing substandard play equipment. Rehabilitation of existing pedestrian bridge to Wildwood Park. Various improvements to El Quito Park including new water fountain, rehab of ex. picnic area and frontage landscaping. Development of new trail along the PG&E right-of-way. Construction of a dirt path around the perimeter of the Heritage Orchard. Erosion repair work to Trail Segment #3 ('Tank Trail'). Repair of trail segment located in Teerlink Ranch damaged during winter of 05/06. Development of a new trail through the San Marcos Open Space. Installation of a pathway running along Calabazas Creek from Saratoga-Sunnyvale Road to the UPRR Tracks. Development of a new trail through the Odd Fellows property establishing a link to the San Marcos Open Space. Replace three foot bridges along the Carnelian Glen Trail. This project would remove the front two buildings at the North Campus. This would provide the structure to which solar panels could be mounted as well as provide shelter for vehicles and equipment. The purpose of this fund is to set aside funding each year for capital improvements at the North Campus such as new public facilities The purpose of this fund would be to set aside funding for the purpose of building a City multi-purpose room. This project would construct a turn around at the end of the Village that would provide drivers an additional option for circulation through Village. This project would create additional parking at City Hall by removing landscaping near the corner of Fruitvale and Allendale. This project would fund the concrete pads and wooden shelters necessary to install bus stop shelters at 4 select locations along bus routes in the City. This project would repair the foundation of the Upper Moon House at Hakone Gardens. This project would fund the design work for the Hakone Gardens Visitor Center. This project would fund the purchase and installation of an emergency generator at City Hall. This project would fund minor improvements to two small contiguous private parking lots located off of 3rd Street in order to gain public parking access This project would construct one or more large compost bins to be located on City owned property such as a park. Installation of fire alarm system in the Historical Buildings located in Historical Park. Exterior and interior upgrades to the facilities at the North Campus. North Campus matching fund program for recreation activities. Improvements to the Warner Hutton for rentals: Landscape, irrigation, and hardscape improvements at the Civic Center, Provides funding for installation of fire alarm system for the McWilliams House and Book-Go-Around buildings. Provides funding for various facility maintenance projects. This project would provide solar power to the Community Center and Maintenance Building. This project would replace aging roofs at the Community Center and City Hall with sunlight reflecting “cool roof systems” This project would replace aging Heating, Ventilation, and Air Conditioning (HVAC) systems at the Community Center and City Hall This project would replace the old single-pane windows at the Community Center and City Hall with new double-pane windows This project would replace the old dishwashing machines, clothes washers and dryers, refrigerators, freezers, etc This project would increase the R-Value of all ceiling insulation in City buildings. This project would automate the lighting controls in City buildings. Financial software and hardware system upgrade. Transfer of hard copy documents into electronic imaging format. Proposed FY 08/09 CIP Projects and CIP Projects previously approved but unfunded. Prior year approved and funded CIP projects. ESTIMATED COST A 1434358 30000 600000 15000 25000 25000 150000 100000 50000 50000 25000 75000 15000 15000 12000 25000 8000 100000 203310 539641 74526 1020000 150000 182500 50000 35000 27821 50000 150000 50000 300000 300000 460264 150000 626000 57309 540000 30000 20000 74147 42489 465729 2978000 587000 11918094 1500000 325000 50000 40000 10000 37200 230000 175000 200000 250000 55000 125000 125000 1997577 25000 16500 30000 27500 100000 60500 18000 5397277 75000 100000 50000 600000 100000 100000 40000 125000 100000 50000 25000 10000 7425 501000 40000 94100 110000 25000 100000 2252525 444326 164000 690000 157000 20000 160000 8000 1643326 100000 113000 213000 19171697 APPROVED BUDGET B 1434358 0 600000 100000 203310 539641 74526 1020000 182500 50000 35000 27821 460264 150000 626000 57309 540000 30000 20000 74147 42489 465729 2978000 587000 10298094 1500000 325000 50000 40000 10000 37200 230000 175000 180000 250000 55000 0 125000 1997577 25000 16500 30000 27500 0 0 18000 5091777 7425 501000 40000 94100 110000 25000 100000 877525 0 100000 113000 213000 15602871 182500 0 IDENTIFIED SOURCE OF FUNDS CIP FUND C 463983 0 210615 100000 34110 70000 0 90000 182500 7000 35000 27821 460264 0 0 0 115000 30000 20000 74147 0 41800 113000 100000 2175240 1197546 250000 0 0 0 0 230000 0 180000 0 0 0 0 0 0 0 0 0 0 0 0 1857546 7425 500000 40000 94100 110000 0 100000 851525 0 100000 113000 213000 4245786 PARK DEV. FUND D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75000 50000 0 10000 37200 0 0 0 250000 55000 0 0 0 25000 16500 30000 27500 0 0 18000 594200 0 0 0 0 0 0 0 0 0 0 0 0 594200 GRANTS E 506375 0 389385 0 169200 469641 74526 900000 0 0 0 0 0 0 0 57309 425000 0 0 0 42489 364799 2636423 487000 6522147 302454 0 0 40000 0 0 0 0 0 0 0 0 0 1598062 0 0 0 0 0 0 0 1940516 0 0 0 0 0 0 0 0 0 0 0 0 8462663 OTHER SOURCE F 0 0 0 0 0 0 0 30000 0 43000 0 0 0 0 626000 0 0 0 0 0 0 59130 227718 0 985848 0 0 0 0 0 0 0 175000 0 0 0 0 125000 399515 0 0 0 0 0 0 0 699515 0 1000 0 0 0 0 0 1000 0 0 0 0 1685363 GAS TAX FUND G 464000 0 0 0 0 0 0 0 0 0 0 0 0 150000 0 0 0 0 0 0 0 0 0 0 614000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 614000 465729 PROJECT EXPENDITURE TO DATE (06/30/07) H 0 0 0 41040 199001 424886 0 0 178479 0 0 4033 295265 0 3154 0 0 0 0 0 0 455999 0 0 1601857 85248 94132 25424 27728 0 0 185442 68470 35717 0 0 0 0 291421 0 3024 0 2172 0 0 0 818778 881.81 178975 0 69100 46296 0 0 295252.81 0 29266 14454 43720 2464355 PROJECT BALANCE (07/01/07) I 1434358 0 600000 58960 4309 114755 74526 1020000 4021 50000 35000 23788 164999 150000 622846 57309 540000 30000 20000 74147 42489 9730 2978000 587000 8696237 1414752 230868 24576 12272 10000 37200 44558 106530 144283 250000 55000 0 125000 1706156 25000 13476 30000 25328 0 0 0 4254999 6543.19 322025 40000 25000 63704 25000 100000 582272.19 0 70734 98546 169280 13120516 UNFUNDED PROJECT AMOUNT J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20000 0 0 125000 0 0 0 0 0 0 100000 60500 0 305500 0 0 0 0 0 0 0 0 0 0 0 0 305500 PROJECT STATUS SUMMARY (NOTES) New Project FY 07/08. Funding previously in the operating budget. New Project FY 07/08. Funding previously in the operating budget. New Project FY 07/08. Funding previously in the operating budget. Construction to begin Fall 2007. Project 99% complete. Project 99% complete. New Project FY 07/08. CDBG grant funded. Approved by City Council on 3/21/07. New Project FY 07/08. Funding identified. Approved by City Council on 4/4/07. Work ongoing. Work to be incorporated into future Village Improvement Project. Consultant contract approved. $15k available for redistribution to other CIP projects. Existing monuments rehabilitated. New entry monuments to be determined. Funds for Highway 9 entry monument included in project. Work ongoing. Project completion scheduled prior to Winter 2007. $741,000 funded by Caltrans. $115,000 Transferred to Village Pedestrian Enhancement Project for local match. New Project FY 07/08. CDBG grant funded. Approved by City Council on 11/01/06. New Project FY 07/08. VTA grant funded. $115,000 required for local match. Funding identified. New Project FY 07/08. Funding identified. New Project FY 07/08. Funding identified. New Project FY 07/08. Funding identified. New Project FY 07/08. TDA grant funded. Approved by City Council on 05/16/07. Design 95% complete. Project delayed due to right of way issues. Project delayed due to right of way issues. HBRR application submitted. Project ongoing. $302,454 from 2002 Park Bond Act. One of two playfields improved. Project 95% complete. Stage rehabilitation complete. Work ongoing. Funding via tree violation fines. Work also includes tree replanting along City right-of-ways. Driveway mitigation work to be included in 2007/2008 PMP project. $20,000 allocated to North Campus Mathcing Fund Program. New Project FY 07/08. Funding identified. New Project FY 07/08. Funding unidentified. New Project FY 07/08. Landscape and Lighting funded project. Conceptual design complete. Environmental to be complete fall 2007. Work tentatively scheduled prior to Winter 2007. Work ongoing. Work scheduled to begin in Fall 2007. Work ongoing. Completion scheduled Fall 2007. Unfunded Project. Unfunded Project. New Project FY 07/08. Funding identified. Work ongoing. Work ongoing. Work ongoing. New Project FY 07/08. Previously included in the operating budget. New Project FY 07/08. Funding previously in the operating budget. New Project FY 07/08. Funding previously in the operating budget. # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 PROJECT Public Safety Projects Saratoga-Sunnyvale/Seagull Traffic Signal: Quito Road Bridge Replacement Project: Herriman Avenue Traffic Signal: Verde Vista Ln. Traffic Signal: 4th Street Bridge: Traffic Calming (NTMP): Safe Routes to Schools: ADA Improvements (Hakone): Highway 9 Traffic Signal Modifications: Playground Safety (Brookglen, El Quito, Wildwood): Kirkmont Dr. Traffic Signal: Sobey Road/Quito Road Traffic Improvements: Norton Road Fire Access: Aloha Street Safety Improvements: Highway 9/Oak Place Pedestrian Signal: Total Public Safety Projects Saratoga-Sunnyvale/Seagull Traffic Signal: Quito Road Bridge Replacement Project: Herriman Avenue Traffic Signal: Verde Vista Ln. Traffic Signal: 4th Street Bridge: Traffic Calming (NTMP): Safe Routes to Schools: ADA Improvements (Hakone): Highway 9 Traffic Signal Modifications: Playground Safety (Brookglen, El Quito, Wildwood): Kirkmont Dr. Traffic Signal: Sobey Road/Quito Road Traffic Improvements: Norton Road Fire Access: Aloha Street Safety Improvements: Highway 9/Oak Place Pedestrian Signal: Total Public Safety Projects Infrastructure Projects City Wide Traffic Signal Upgrades: El Camino Grande/Monte Vista Storm Drain Improvements: Saratoga-Sunnyvale Road "Gateway" Improvements: El Quito Area Curb & Gutter Replacement: Village Streetscape Improvements (Sidewalk/C&G): Village Streetscape Improvements (Landscaping): Storm Drain Upgrades: Median Repairs (Landscaping/Irrigation): Cox Avenue Railroad Crossing Arms Upgrade: Prospect Avenue Medians: Blaney Plaza Improvements - Master Plan Phase: City Entrance Signs/Monuments: Blaney Plaza Improvements - Construction Phase: Chester Avenue Storm Drain Improvements: Total Infrastructure Projects New traffic signal @ Saratoga-Sunnyvale & Seagull Replacement of two bridges on Quito Road New traffic signal @ Herriman & Saratoga. Warrant study needed. New traffic signal @ Verde Vista & Sara-Sunny. Meets warrants. Replacement of existing substandard bridge at 4th & Saratoga Creek. Annual funding for implementation of traffic calming toolkit. Annual funding for implementation of Safe Routes to School Program. ADA improvements per Hakone Foundation lease agreement. Modification to Hwy 9 traffic signal in connection w/new fire dept. Replacement of existing substandard play equipment. New traffic signal @ Kirkmont & Sara-Sunny. Warrant study needed. Software and hardware upgrades to the City's traffic signals Storm drain improvements in the El Camino Grande/Monte Vista Area Roadway improvements to Saratoga-Sunnyvale Road Replacement of rolled curb & gutter for drainage mitigation. Replace sidewalk and curb & gutter for safety and beautification. Landscape beautification improvements. Annual funds for storm drain rehabilitation and drainage improvements. Plant replacement and irrigation improvements in existing medians. Upgrade of crossing arm in conjunction with rail surface improvements. New landscaped medians for beautification of Prospect Avenue. New traffic signal @ Saratoga-Sunnyvale & Seagull. Meets warrants. Replacement of two existing substandard bridges on Quito Road. New traffic signal @ Herriman & Saratoga. Warrant study required. New traffic signal @ Verde Vista & Sara-Sunny. Meets warrants. Rehabilitation of existing bridge at 4th & Saratoga Creek. Annual funding for implementation of traffic calming toolkit. Funding for implementation of Safe Routes to School. ADA improvements per Hakone Foundation lease agreement. Modification to Hwy 9 traffic signal in connection w/new fire dept. Replacement of existing substandard play equipment. New traffic signal @ Kirkmont & Sara-Sunny. Warrant study needed. Sobey Road/Quito Road roadway improvements to increase safety in the vicinity of Marshall Lane School. Construction of a fire access road connecting Norton Road to Montalvo's Artist In Residency Road. Roadway safety improvements at the intersection of Aloha Street and Highway 9. New pedestrian traffic signal @ Highway 9 & Oak Place. Warrant study and Caltrans approval required.. City wide signal upgrades including integration of smart corridor technology. Storm drainage improvements in the MonteVista/El Camino Grande area. Infrastructure improvements to Saratoga-Sunnyvale Road concentrated between Prospect Road and the UPRR. Replacement of rolled curb & gutter for drainage mitigation. Replace sidewalk and curb & gutter for safety and beautification. Landscape beautification improvements. Annual funds for storm drain rehabilitation and drainage improvements. Plant replacement and irrigation improvements in existing medians. Railroad crossing surface upgrade for safety and improved drivability. New landscaped medians for beautification of Prospect Avenue. Master plan for the rehabilitation and beautification of Blaney Plaza. Installation of Entry Signs/Monument at City entry points where none exist. Implementation of improvements based on the Blaney Plaza Master Plan. Storm drainage improvements in the Chester Avenue area. 152500 2372900 150000 150000 500000 250000 250000 317500 250000 350000 150000 150000 110000 49500 145000 5347400 508705 100000 3112379.9 550000 850000 275000 250000 182500 539641 500000 19400 17500 121000 178000 7204125.9 152500 2372900 5000 5000 500000 250000 50000 250000 250000 350000 5000 150000 110000 49500 4000 4503900 508705 100000 3112379.9 460264 0 225000 250000 182500 539641 25000 19400 17500 121000 0 5561389.9 182500 0 0 5000 5000 100000 250000 50000 0 225000 0 5000 150000 110000 49500 0 949500 0 0 0 460264 0 225000 250000 182500 70000 25000 19400 17500 121000 0 1370664 0 0 0 0 0 0 0 0 0 66000 0 0 0 0 0 66000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32500 158193 0 0 0 0 0 0 0 0 0 0 0 0 0 190693 72705 100000 2232279.9 0 0 0 0 0 0 0 0 0 0 0 2404984.9 0 1898320 0 0 400000 0 0 200000 0 284000 0 0 0 0 0 2782320 436000 0 880000 0 0 0 0 0 469641 0 0 0 0 0 1785641 0 316387 0 0 0 0 0 50000 25000 0 0 0 0 0 0 391387 0 0 0 0 0 0 0 0 0 0 0 0 0 0 152500 465004.3 0 0 0 68376 26043.63 65501.1 167066.27 346201.14 0 100799.44 8000 0 4000 1403491.88 441753.77 0 716914.5 0 0 85526.16 250000 133017.48 124916.43 0 19400 0 10160.56 0 1781688.9 0 1907895.7 5000 5000 500000 181624 23956.37 184498.9 82933.73 3798.86 5000 49200.56 102000 49500 0 3100408.12 66951.23 100000 2395465.4 460264 0 139473.84 0 49482.52 414724.57 25000 0 17500 110839.44 0 3779701 Saratoga-Sunnyvale/Seagull Traffic Signal: Quito Road Bridge Replacement Project: Herriman Avenue Traffic Signal: Verde Vista Ln. Traffic Signal: 4th Street Bridge: Traffic Calming (NTMP): Safe Routes to Schools: ADA Improvements (Hakone): Highway 9 Traffic Signal Modifications: Playground Safety (Brookglen, El Quito, Wildwood): Kirkmont Dr. Traffic Signal: Sobey Road/Quito Road Traffic Improvements: Norton Road Fire Access: Aloha Street Safety Improvements: Highway 9/Oak Place Pedestrian Signal: Total Public Safety Projects Infrastructure Projects City Wide Traffic Signal Upgrades: El Camino Grande/Monte Vista Storm Drain Improvements: Saratoga-Sunnyvale Road "Gateway" Improvements: El Quito Area Curb & Gutter Replacement: Village Streetscape Improvements (Sidewalk/C&G): Village Streetscape Improvements (Landscaping): Storm Drain Upgrades: Median Repairs (Landscaping/Irrigation): Cox Avenue Railroad Crossing Arms Upgrade: Prospect Avenue Medians: Blaney Plaza Improvements - Master Plan Phase: City Entrance Signs/Monuments: Blaney Plaza Improvements - Construction Phase: Chester Avenue Storm Drain Improvements: Total Infrastructure Projects 30 31 32 33 34 35 36 37 38 152500 2372900 150000 150000 500000 250000 250000 317500 250000 350000 150000 150000 110000 49500 145000 5347400 508705 100000 3112379.9 550000 850000 275000 250000 182500 539641 500000 19400 17500 121000 178000 7204125.9 152500 2372900 5000 5000 500000 250000 50000 250000 250000 350000 5000 150000 110000 49500 4000 4503900 508705 100000 3112379.9 460264 0 225000 250000 182500 539641 25000 19400 17500 121000 0 5561389.9 McWilliams House Civic Center Master Plan (Design): Animal Control Facility: Civic Theater Lower Perimeter Re-Roof: Civic Center Eave Replacement (Community Dev./Engineering): Historical Park Buildings - Fire Alarm System: Village Façade Matching Fund: Book-Go-Around Repairs: North Campus Improvements - Fellowship Hall: 182500 Termite damage repair at Chamber Building. Comprehensive Master Plan preparation for Civic Center 0 0 5000 5000 100000 250000 50000 0 225000 0 5000 150000 110000 49500 0 949500 0 0 0 460264 0 225000 250000 182500 70000 25000 19400 17500 121000 0 1370664 0 0 0 0 0 0 0 0 0 66000 0 0 0 0 0 66000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Improvements to structure. Comprehensive Master Plan preparation for Civic Center. City's share of JPA cost for Construction of New Animal Control Facility Re-Roof the lower perimeter of the Civic Theater. Replacement of courtyard eaves on the Community Development/Engineering wing of the Civic Center. Installation of fire alarm system in the Historical Buildings located in Historical Park. Matching funds to business/property owners directed at improving building facades. Roof repair and storage room repair work at the Book-Go-Around building. ADA restroom improvements and interior upgrades at the North Campus Fellowship Hall. 120000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32500 158193 0 0 0 0 0 0 0 0 0 0 0 0 0 190693 72705 100000 2232279.9 0 0 0 0 0 0 0 0 0 0 0 2404984.9 150000 250000 300000 49500 25000 7425 50000 35000 151800 0 1898320 0 0 400000 0 0 200000 0 284000 0 0 0 0 0 2782320 436000 0 880000 0 0 0 0 0 469641 0 0 0 0 0 1785641 30000 0 300000 49500 17600 7425 50000 35000 151800 0 316387 0 0 0 0 0 50000 25000 0 0 0 0 0 0 391387 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30000 0 300000 49500 17600 7425 50000 0 151800 152500 465004.3 0 0 0 68376 26043.63 65501.1 167066.27 346201.14 0 100799.44 8000 0 4000 1403491.88 441753.77 0 716914.5 0 0 85526.16 250000 133017.48 124916.43 0 19400 0 10160.56 0 1781688.9 0 0 0 0 0 0 0 0 0 0 1907895.7 5000 5000 500000 181624 23956.37 184498.9 82933.73 3798.86 5000 49200.56 102000 49500 0 3100408.12 66951.23 100000 2395465.4 460264 0 139473.84 0 49482.52 414724.57 25000 0 17500 110839.44 0 3779701 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30000 0 300000 41854.73 0 881.81 21163.76 33326.19 0 0 0 0 7645.27 17600 6543.19 28836.24 1673.81 151800