Loading...
HomeMy WebLinkAbout12-15-1999 Agenda Item 7BSARATOGA CITY COUNCIL EXECUTIVE SUMMARY NO. 3~z~ AGENDA ITEM CITY MGR: ~~~ , DEPT. HEAD: ~ .~ MEETING DATE: DECEMBER 15,1999 ORIGINATING DEPT.: PUBLIC WORKS SUBJECT: Approval of a Professional Services Agreement for design, environmental and Right-of--Way acquisition services and Adoption of a Resolution Adjusting the F.Y. 99-00 Budget in connection with the Quito Road Bridge Replacement Project, C.I.P. No. 9111 1. Approve a Professional Services Agreement with AN West, Inc. of Richmond in the amount of $259,556. 2. Adopt Resolution Adjusting the F.Y. 99-00 Budget in connection with the Quito Road Bridge Replacement Project, C.I.P. No. 9111. Interviews of qualified consulting firms which can provide design, environmental and Right-of- Way acquisition services in connection with the Quito Road Bridge Replacement Project, C.I.P. No. 9111 were held on Apri128, 1998. The consulting engineering firm, AN West, Inc. of Richmond was ranked at the top. City staff and representatives from the Town of Los Gatos interviewed a total of six firms. The Quito Road Bridge Replacement Project is a Federal Aid Project funded through the Highway Bridge Rehabilitation and Replacement (HBRR) Program. The HBRR Program will fund 80% of the cost of the project, while the remaining 20% will be shared equally between the Town of Los Gatos, the Santa Clara Valley Water District and the City. The total budget required for project development services is estimated to be $265,000 with the City's share being $17,666.67. The City has taken on the role of lead agency for the project and cooperative agreements are being finalized with the Town and the Water District for their share of this cost. The City Attorney has reviewed and approved the proposed agreement and will also draft the Co-op Agreements with the Town and the District. In January of this year, the City formally requested from Caltrans an increase in the HBRR allocation for the project that would insure reimbursement of the project development costs negotiated in the contract with AN West. After a lengthy negotiating process with Caltrans, they approved the City's request in late October and issued the City an amended E-76 form acknowledging the funding increase. Because of uncertainties about whether Caltrans would increase the HBRR allocation for the project, the amount of additional funding which might be approved, and the amount of time it would take for the request to be processed, the approved budget for the project has yet to be modified. Now, however, it is appropriate to adjust the budget for the project by increasing the appropriation for engineering services by $191,250 to a total of $265,000. This can be accomplished by adopting the attached Resolution. Of this amount 93.3% will be reimbursed to the City through the HBRR Program and the cooperative agreements with the Town of Los Gatos and the Water District. Final plans and specifications for the project will be developed in approximately five months and construction is tentatively scheduled for next summer. FTSC'Ai, iMPAC'TS; Funding for project development work is programmed in the adopted budget in Capital Project No. 9111 (Quito Road Bridge Replacement) -Account No. 4013 (Contract Services). C'nN~F iTFNC'F4 nF NnT A(''TiNG nN THF, RFC'nMMF,NnFD MnTi(1NS; 1. A Professional Services Agreement with AN West, Inc. will not be approved. The Council may direct staff to negotiate a contract with another design firm. However, staff does not believe that this will result in finding a more competent consultant for this work due to the thorough interview process through which the candidate consultants went. 2. The Resolution adjusting the F.Y. 99-00 Budget would not be adopted. If the Resolution is not adopted, only a portion of the design services could be completed this fiscal year, with the remaining design work postponed until F.Y. 00-01. This would most likely delay construction until F.Y. 01-02. None in addition to those stated above. 1. The Professional Services Agreement will be executed and work will begin immediately. 2. The budget will be amended. Nothing additional. 1. Location Map. 2. Professional Services Agreement. 3. Resolution Adjusting the F.Y. 99-00 Budget. STANDARD CONTRACTUAL SERVICES AGREEMENT THIS AGREEMENT is made at Saratoga, California, as of , 19_, by and between the CITY OF SARATOGA, a municipal corporation ("City"), and ("Contractor"), who agree as follows: 1. SERVICES. Subject to the terms and conditions set forth in this Agreement, Contractor shall provide to City the services described in Exhibit A. Contractor shall provide said services at the time, place and in the manner specified in Exhibit A. 2. PAYMENT. City shall pay Contractor for services rendered pursuant to this Agreement at the time and in the manner set forth in Exhibit B. The payments specified in Exhibit B shall be the only payments to be made to Contractor for services rendered pursuant to this Agreement. Contractor shall submit all billings for said services to City in the manner specified in Exhibit B; or, if no manner be specified in Exhibit B, then according to the usual and customary procedures and practices which Contractor uses for billing clients similar to City. 3. FACILITIES AND EQUIPMENT. Except as set forth in Exhibit C, Contractor shall, at its sole cost and expense, furnish all facilities and equipment which maybe required for furnishing services pursuant to this Agreement. City shall furnish to Contractor only the facilities and equipment listed in Exhibit C according to the terms and conditions set forth in Exhibit C. 4. GENERAL PROVISIONS. The general provisions set forth in Exhibit D are part of this Agreement. In the event of any inconsistency between said general provisions and any other terms or conditions of this Agreement, the other term or condition shall control insofar as it is inconsistent with the general provisions. 5. EXHIBITS. All exhibits referred to herein are attached hereto and are by this reference incorporated herein. - administered by 6. CONTRACT ADMINISTRATION. This Agreement shall be ("Administrator"). All correspondence shall be directed to or through the Administrator or his or her designee. 7. NOTICES. Any written notice to Contractor shall be sent to: Any written notice to City shall be sent to: Standard Contractual Services Agreement Executed as of the day first above stated: CITY OF SARATOGA, a municipal corporation Attest: City Clerk Approved as to form: City Attorney Approved as to budget authority: Finance Director By "City" By "Contractor" Standard Contractual Services Agreement Exhibit A Scope Of Services PART A - DESCRII'TION OF PROJECT The Project for which professional consulting services are to be provided consists of the replacement of two existing 20+ foot wide concrete bridges with single-span bridges. Design will include plans for retaining walls, drainage structures, landscaping, traffic striping, pedestrian walkways and all other improvements necessary to accommodate the new bridge construction. Design will also address aesthetic considerations as well as the effect on the San Tomas Aquino Creek of replacing the existing bridges which are 48 years old with eroded substructure, restricted creek flow, and narrow alignment, with new bridges designed to minimize flooding potential and increase safety. PART B -SCOPE OF ENGINEERING SERVICES BASIC SERVICES Engineer shall perform the following detailed engineering services: Conduct one initial project meeting with each of the following: a. City and California Department of Transportation (State) to: 1.) Discuss Project objectives, design criteria budget factors. 2.) Obtain record drawings, City standards and other available information. 3.) Visit the project site to discuss design considerations. b. Meet with Saratoga City Engineering staff, Los Gatos Town Engineer and Santa Clara Valley Water District, so design concepts can be discussed and understood. The design focus will include ideas and premises, with special consideration given to aesthetic sensitivity to the bridge design in light of the surrounding environs, appropriate pedestrian and vehicular alignment, striping and marking, concealed utility chases, historical significance and the like. Exhibit "A" 2. Maintain continuing liaison with the City, the California Department of Transportation (State) and the Federal Highway Administration (FHWA) as required in the interest of expediting the project. 3. Prepare preliminary plans, specifications and estimated as required for approval by the City, the State, and the FHWA (35% Submitted). a. Arrange for photogrammetric mapping and/or field survey work necessary to supplement existing data and to provide an adequate basis for design, and construction of the project. b. Arrange for the oversee and hydraulic investigations and studies necessary to supplement available studies performed by Santa Clara Valley Water District, Army Corps of Engineers and the State Department of Fish and Game for the San Tomas Aquino Creek/Quito Road bridge replacements in connection with design, construction and permit applications for the project. Engineer shall be responsible for evaluating the effects of the evaluating the effects of the proposed bridge design so they are consistent with the findings of said studies. Arrange for and oversee the application and processing of required environmental documentation to obtain both California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) clearances for this project per Tasks 3a, 3c, 3d, 3f, and 3g as specified on Exhibit B-1. d. Obtain maps showing location of existing utilities. e. Submit drawings of the preliminary plan to the City for review and comment, to the utility companies for design input and to Caltrans for review. Exhibit "A" 4. Final Plans. Prepare detailed contract plans for the project (100% Submitted). a. Revise the preliminary plan to include consensus of comments and recommendations of City, Caltrans, Utility agencies, and prepare cost estimates. During this phase, engineer may consult with Caltrans Office of Structures as required to insure that all state requirements are met. (If the preliminary plan presentation and revision process described in section 3e necessitate more than one cycle, the City agrees to compensate the engineer for any additional work requested in writing by the City, in accordance with the provisions in Part D, "Compensation," herein.) b. Based on the approved preliminary plan, prepare contract plans showing the bridge improvements and work to be performed, including removals, and pavement striping and marking. c. Prepare technical special provisions, for utilization in conjunction with Caltrans' standard specifications and the specifications of the City of Saratoga. d. Submit final plans, details, technical special provisions, and cost estimates to City and State for review and approval. e. Meet with City and State staff to discuss final plans and cost estimates. f. Furnish original drawings and forms of the contract plans, and technical provisions to the city for advertising by the city. 5. Assist City with interpretation of plans and specifications as needed during bidding period. Tabulate and analyze bids, and make a recommendation on award of contract. 6. Present periodic written progress memos to the City, with copies to the State and FHWA, at approximately one month intervals during the design of the project. Exhibit "A" 7. In addition to the meetings, conferences, and site visits, specifically included in sections la, lb, and 4f above, attend a maximum of thirteen format meetings, conferences and site visits with representatives of the City, State, FHWA, and other interested agencies, including any meetings, conferences and site visits requested in accordance with sections B through 10 below. 8. Coordinate all plans, designs, specifications, permits, and all phases of the work connected with the project which are to be furnished or performed by the engineer with the City, State, the FHWA and any other affected agencies. 9. Furnish to appropriate agencies any revisions or supplemental data needed by such agencies during and throughout the submittal and submission to the city of any plans, specifications, designs, and estimates. 10. In the event that it becomes necessary for the City, the State or the FHWA to make a special field inspection trip during the progress of the design, it shall be the duty of the engineer to accompany the inspection party when requested. 11. Perform right-of--way engineering, including the preparation of plats and legal descriptions of construction easements or additional right-of--way, if any required for the project. Exhibit "A" SUPPLEMENTAL SERVICES In addition to the basic services described above, engineer shall furnish and perform the supplemental services described below, if requested by the City. The City shall provide compensation to engineer on a fair and equitable basis, as mutually agreed prior to furnishing and performing any such supplemental services. 1. Make public presentations and/or attend meetings or site visits in addition to those included in the preceding scope of basic services. 2. Assist City in preparation of agreements, which City is required to make with State and FHWA in connection with the project. Provide consultation and advice during construction. 4. Make observations at specific critical stages of construction and a final observation of the completed project. 5. Furnish technical observation of construction for the purpose of determining whether the construction work complies substantially with the requirements of the plans, specifications and contract documents. This work would include observation of on-site construction, as well as observation of off-site operations of local suppliers and manufacturers whose products are incorporated into the project (e.g. plant materials). The exact responsibilities and fees would be negotiated with the City prior to construction, when the needs are more specifically known. 6. Review shop and working drawings, if any, furnished by the contractor. 7. Review change orders as needed. Assist the city in preparing record drawings as needed. PART C -AUTHORIZATION TO PROCEED In recognition of the fact that financing for a portion of the City's share of the project will be from federal funds, engineer shall not begin work on the project until authorized in writing by the City, subject to approval by state and FHWA. Exhibit "A" EXHIBIT B PAYMENT SCHEDULE City shall pay Contractor an amount not to exceed the total sum of ($259,556.) for services to be performed and reimbursable costs incurred pursuant to this Agreement. Contractor shall submit invoices, not more often than once a month during the term of this Agreement, based on the cost for services performed and reimbursable costs incurred prior to the invoice date. Invoices shall contain the following information. 1. Serial identifications of progress bills, i.e., Progress Bill No. 1. 2. The beginning and ending dates of the billing period. 3. A Task Summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available and the percentage of completion. 4. For each work item in each task, a copy of the applicable time sheets shall be submitted showing the name of the person doing the work, the hours spent by each person, a brief description of the work, and each reimbursable expense. City shall make monthly payments, based on such invoices, for services satisfactorily performed, and for authorized reimbursable costs incurred. City shall pay the last 10% of the total sum due pursuant to this Agreement within forty- five (45) days after completion of the services and submittal to City, if all services due pursuant to this Agreement have been satisfactorily performed. The total sum stated above shall be the total which City shall pay for the services to be rendered by Contractor pursuant to this Agreement. City shall not pay any additional sum for any expense or cost whatsoever incurred by Contractor in rendering services pursuant to this Agreement. City shall make no payment for any extra, further or additional service pursuant to this Agreement unless such extra service and the price therefore is agreed to in writing executed by the City Manager or other designated official of City authorized to obligate City thereto prior to the time such extra service is rendered and in no event shall such change order exceed twenty- five (25%) of the initial contract price. Fees for work performed by Contractor on an hourly basis shall not exceed the amounts shown on the fee schedule of hourly billing included as Attachment B-1. Exhibit "B" Reimbursable expenses are specified on Attachment B-1, and expenses not listed on Exhibit B-1 are not chargeable to City. The services to be provided under this Agreement maybe terminated without cause at any point in time in the sole and exclusive discretion of City. In this event, City shall compensate the Contractor for all outstanding costs incurred for work satisfactorily completed as of the date of written notice thereof. Contractor shall maintain adequate.logs and timesheets in order to verify costs incurred to date. The Contractor is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of a fully executed Purchase Order from the City. Exhibit "B" EXHIBIT B-1 FOR THE DESIGN OF TWO QUITO ROAD BRIDGES IN THE CITY OF SARATOGA, CALIFORNIA PRELIMINARY & DESIGN ENGINEERING DIRECT LABOR HOURS RATE TOTAL Senior Principal 80 $ 48.077 3,846.16 Principal Engineer 378 $ 41.587 15,719.89 Senior Bridge Engineer 672 $ 35.577 23,907.74 Assistant Civil Engineer 780 $ 24.519 19,124.82 CADD Operator 636 $2~.ooo-2s.soo $ 13,674.00 EMPLOYEE BENEFITS 45.71 % $ 34,864.21 DIRECT COSTS QUANTITY PER UNIT TOTAL Bluelines 500 $ 4.00 $ 2,000.00 CADD Plots 100 $ 20.00 $ 2,000.00 Reprographics 20,000 $ 0.10 $ 2,000.00 SUBCONSULTANTS Allied Engineering Company $ 18,500.00 David J. Powers $ 29,100.00 INDIRECT COSTS (OVERHEAD) 99.744% $ 76,077.73 Subtotal 240,814.55 FEE (PROFIT) 10% 18,721.45 TOTAL COST, NOT TO EXCEED $ 259,536.00 NOTE: This Exhibit B-1 is not intended to establish payment limit s for any specific line items shown on this sheet. A-N West, Inc., at its discretion, may reassign direct labor budgets, direct cost budgets, and subconsultant budgets to elsewhere within the project. The "Total Cost, Not To Exceed" amount shown on t his sheet will not be exceeded without written approval from the City. Ql!{TO ROAD BRIDGES -COMBINED CITY OF SARATOGA FEE ESTIMATE DOLLARS PER TASK BY CLASSIFICATION 3 DEC 1999 SHEET 1 OF 3 TASK DIRECT LABOR FACTOR = 2.700 SENIOR PRIN PRIN ENGR SEN BRIDGE ASST CIVIL CADD SUB-CONTRACTOR TOTAL $129.808 $112.285 $96.058 $66.201 $58.050 1. GROUND SURVEY /MAPPING 1.a. Field Survey $8,000 ALLIED ENGR $8,000 1.b. Office Mapping $4,000 ALLIED ENGR $4,000 SUB-TOTAL $12,000 $12,000 2. UTILITIES COORDINATION 2.a. Obtain Utility Maps $750 ALLIED ENGR $750 2.b. Utility Meetings/Coordination $1,038 $1,347 $794 $750 ALLIED ENGR $3,930 SUB-TOTAL $1,038 $1,347 $794 $1,500 $4,680 3. ENVIRONMENTAL CLEARANCE AND PERM ITS 3.a. PES Forms /Field Review $225 $1,500 POWERS $1,725 3.b. Not Used 3.c. Section 106 Compliance $4,500 POWERS $4,500 3.d. Natural Environment Study $76,250 POWERS $16,250 3.e. Not Used 3.f. Permits [excluding permit fees] $4,000 POWERS $4,000 3.g. Coordination and Meetings $225 $2,500 POWERS $2,725 SUB-TOTAL $449 $28,750 $29,199 4. HYDRAULIC STUDIES 4.a. Bridge Hydraulic Report $260 $1,572 $3,178 $929 $5,938 4.b. Location Hydraulic Study $260 $1,347 $3,178 $929 $5,713 4.c. CoordinatelMeetwith SCVWD $1,038 $449 $530 $2,017 SUB-TOTAL $1,558 $3,369 $6,885 $1,858 $13,669 5. NOT USED 5.a. 5.b. 5.c. 5.d. 5.e. SUB-TOTAL 6. NOT USED 6a. 6.b. 6.c. SUB-TOTAL QUITO ROAD BRIDGES -COMBINED FEE ESTIMATE 3 DEC 1999 CITY OFSARATOGA DOLLARS PER TASK BY CLASSIFICATION SHEET20F3 TASK DIRECT LABOR FACTOR = 2.700 SENIOR PRIN PRIN ENGR SEN BRIDGE ASST CIVIL CADD SUB-CON TRACTOR TOTAL $129.808 $112.285 $96.058 $66.201 $58.050 7. PS&E 7.a.1. Bridge Plans (35 percent) $1,347 $15,369 $7,430 $24,147 7.a.2 Road Plans (35 percent) $519 $898 $11,387 $3,715 $16,519 1.b.1. Not Used 1.b.2. Not Used 7.b.3. Not Used 7.c.1 Bridge Plans (100 percent) $2,246 $43,034 $14,861 $60,140 7.c.2. Road Plans (100 percent) $1,038 $1,347 $22,773 $6,502 $31,661 1.c.3. Special Provisions -Technical $519 $6,737 $7,256 7.d. Cost Estimate $519 $1,347 $3,842 $3,178 $8,887 7.e. Final PS&E $1,347 $2,305 $2,383 $697 $6,733 SUB-TOTAL $2,596 $15,271 $64,551 $39,721 $33,205 $155,343 8. RIGHT OF WAY ENGINEERING -SEE SHEET 3 OF 3 8.a. 8.b. SUB-TOTAL 9, NOT USED 9.a. 9.b. 9.c. 9.d. 9.e. 9.f. SUB-TOTAL 10. ADMINISTRATION / MGMT 10.a. Contract Administration $5,192 $4,491 $9,684 10.b. Project Management $13,923 $13,923 SUB-TOTAL $5,192 $18,415 $23,607 TOTAL TASKS 1 THROUGH 10 $10,385 $38,851 $64,551 $47,400 $35,062 $42,250 $238,498 SUB-CONTRACTOR ODC A-N WEST ODC TOTAL ODC'S $6,350 David J. Powers $350.00 Bluelines @ $4.00 each $2,000.00 CADD Plots @ $20 each $2,000.00 Reprographics $2,000.00 TOTAL TASKS 1 THROUGH 10 $244,848 QUITO ROAD BRIDGES -COMBINED FEE ESTIMATE 3 DEC 1999 CITY OFSARATOGA DOLLARS PER TASK BY CLASSIFICATION SHEET30F3 TASK DIRECT LABOR FACTOR = 2.700 SENIOR PRIN PRIN ENGR SEN BRIDGE ASST CIVIL CADD SUB-CONTRACTOR TOTAL $129.808 $112.285 $96.058 $66.201 $58.050 SUPPLEMENTAL TASKS 11. RIGHT OF WAY ENGINEERING 11.a. Obtain Right of Way Record Data from City $400 ALLIED ENGR $400 11.b. Find and Tie to Street Monuments from Record Data $1,500 ALLIED ENGR $1,500 11.c. Identify Right of Way Conflicts $1,200 ALLIED ENGR $1,200 11.d. Propose Best Fit Solutions $1,000 ALLIED ENGR $1,000 11.e. Obtain Right of Way Resolutions from CITY $100 ALLIED ENGR $100 11.f. Plot Existing Right of Way on Topo Maps $800 ALLIED ENGR $800 11.g. Identify Right of Way Requirements $898 $2,118 $697 $3,713 11.h. Prepare Legal Descriptions $1,797 $1,797 11.i. Prepare Maps for Acquisitions & Easements $898 $2,118 $1,161 $4,178 SUB-TOTAL SUPPLEMENTAL TASK 11 $3,593 $4,237 $1,858 $5,000 $14,688 TOTAL FROM PREVIOUS SHEET $244,848 TOTAL PROJECT $259,536 3 DEC 1999 SHEET 1 OF 3 FEE ESTIMATE (CATION TOTAL D L A$ S I F SUB-CONTRACTOR gINED TASK B Y CADD H O U R S PER ASST CNIL m9n+dde~ I Z QUITO ROAD BRIDGES - GOM IN pRIN ENGR SEN BRIDGE 64 TY OF SARATOGA deVerrier [ ENGR SENIOR PR PNmerino Kw°ng 6q ALLIED 52 CI W worth 52 ALLIED ENGR 116 TASK 116 GROUND SURVEY t MAPPING 1. 8 1.a Field Survey g ALLIED ENGR AO pff'ice Mapping SUB-TOTAL 1.b. 8 ALLIED ENGR 48 12 16 RDINATION 12 12 2. UTILITIES COQ g 14 Utility Maps 8 12 2.a. ObtainM~Ung dination SUB-TOTAL 12 POWERS 2.b. Utility slCoa' 20 2 20 POWERS 20 ANCE AND PERMITS 20 POWERS 3. ENVIRONMENTAL CI~~ 53 PES Forms (Field Review POWERS 3.a. 53 22 3.b. Not Used I'~Ce 20 POWERS 129 Sectiai 106 Come 3.c. t Study 125 3.d. Natural Environm~' 2 3 e Not Used 80 4 3.f. Permits 78 3 g Meetings SUBTOTAL 16 ~ 48 16 14 48 178 2 12 8 HYDRAULIC STUDIES 2 32 ~' raulic Repot 4 104 4.a Bridge Hyd Study 8 raul'~c 30 4.b. location Hyd 12 C~rdinatetMeetw~thSCVWD SUB-TOTAL 4.c. 5 NOT USED 5.a. 5.b. 5.c. 5.d. SUB-TOTAL 5.®• ti_ NOT USED ~'"'~~ QUITO ROAD BRIDGES -COMBINED FEE ESTIMATE 3 DEC 1999 CITY OF SARATOGA HOURS PER TASK BY CLASSIFICATION SHEET 2 OF 3 TASK SENIOR PRIN PRIN ENGR SEN BRIDGE ASST CIVIL CADD SUB-CONT RACTOR TOTAL Woodworth Palmerino Kwong de Verrier [ mgn+dde J 12 7. PS&E 7.a.1. Bridge Plans (35 percent) 12 160 128 300 7.a.2 Road Plans (35 percent) 4 8 172 64 248 7.b.1. Not Used 7.b.2. Not Used 7.b.3. Not Used 7.c.1 Bridge Pfans (100 percent) 20 448 256 724 7.c.2. Road Plans (100 percent) 8 12 344 112 476 7.c.3. Special Provisions -Technical 4 60 ~ 7.d. Cost Estimate 4 12 40 48 104 7.e. Find PSB,E 12 24 36 12 84 SUB-TOTAL 20 136 672 600 572 2000 8. RIGHT OF WAY ENGRG -SEE SHEET 3 OF 8.a. 8.b. SUB-TOTAL 9. NOT USED 9.a. 9.b. 9.c. 9.d. 9.e. 9.f. SU8-TOTAL 10. ADMINISTRATION t MGMT 10.a. Contract Administration 40 40 80 10.b. Project Management 124 124 SUB-TOTAL 40 164 204 TOTAL PROJECT 80 346 672 716 604 257 2,675 QUITO ROAD BRIDGES -COMBINED FEE E S T I M A T E CITY OFSARATOGA HOURS PER TASK BY CLASSIFICATION 3 DEC 1999 SHEET 3 OF 3 TASK SENIOR PRIN PRIN ENGR SEN BRIDGE ASST CIVIL CADD SUB-CONTRACTOR TOTAL Woodworth Palmerino Kwong de Verrier (mgn+dde / 2 SUPP LEMENTAL TASKS 11. RIGHT OF WAY ENGINEERING 11.a. Obtain Right of Way Record Data from City 4 ALLIED ENGR 4 11.b. Find and Tie to SVeet Monuments from Record Data 12 ALLIED ENGR 12 11.c. Identify Right of Way Conflicts 12 ALLIED ENGR 12 11.d. Propose Best Fit Solutions 10 ALLIED ENGR 10 11.e. Obtain Right of Way Resdutions from CITY 1 ALLIED ENGR 1 11.f. Plot Ebsting Right of W ay on Topo Maps 8 ALLIED ENGR 8 11.g. Identify Right of W ay Requirements 8 32 12 52 11.h. Prepare Legal Descriptions 16 16 11.i. Prepare Maps for Acquisitions & Easements 8 32 20 60 SUB-TOTAL SUPPLEMENTAL TASK 11 32 64 32 47 175 TOTAL FROM PREVIOUS SHEET 80 346 672 716 604 257 2,675 TOTAL PROTECT 80 378 672 780 636 304 2,850 EXHIBIT C Facilities and Equipment City shall furnish physical facilities such as desks, filing cabinets, and conference space, as maybe reasonably necessary for Contractor's use while consulting with City employees and reviewing records and the information in possession of City. The location, quantity, and time of furnishing said physical facilities shall be in the sole discretion of City. In no event shall City be obligated to furnish any facility, which may involve incurring any direct expense, including, but not limiting the generality of this exclusion, long-distance telephone or other communication charges, vehicles, and reproduction facilities. Exhibit "C" EXHIBIT D GENERAL PROVISIONS 1. INDEPENDENT CONTRACTOR. At all times during the term of this Agreement, Contractor shall be an independent contractor and shall not be an employee of City. City shall have the right to control Contractor only insofar as the results of Contractor's services rendered pursuant to this Agreement; however, City shall not have the right to control the means by which Contractor accomplishes services rendered pursuant to this Agreement. 2. LICENSES; PERMITS; ETC. Contractor represents and warrants to City that it has all licenses, permits, qualifications and approvals of whatsoever nature, which are legally required for Contractor to practice its profession. Contractor represents and warrants to City that Contractor shall, at its sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals which are legally required for Contractor to practice its profession. In addition to the foregoing, Contractor shall obtain and maintain during the term hereof a valid City of Saratoga Business License. 3. TIME. Contractor shall devote such time to the performance of services pursuant to this Agreement as maybe reasonably necessary for satisfactory performance of Contractor's obligations pursuant to this Agreement. 4. INSURANCE REQUIREMENTS. Contractor shall procure and maintain for the duration of the contract "occurrence coverage" insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, employees or subcontractors. The cost of such insurance shall be included in the Contractor's bid. (a) Minimum Scope of Insurance. Coverage shall be at least as broad as: Insurance Services Office form number GL 0002 (Ed. 1/73) covering comprehensive General Liability and Insurance Services Office form number GL 0404 covering Broad Form Comprehensive General Liability; or Insurance Services Office Commercial General Liability coverage ("occurrence" form CG 0001.) 2. Insurance Services Office form number CA 0001 (Ed. 1/78) covering Automobile Liability, code 1 "any auto" and endorsement CA 0025. 3. Workers' Compensation Insurance as required by the Labor Code of the State of California and Employers Liability Insurance. Exhibit "D" (b) Minimum Limits of Insurance. Contractor shall maintain limits no less than: General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. If commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. 2. Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage. 3. Workers' Compensation and Employers Liability: Workers' Compensation limits as required by the Labor Code of the State of California and Employers Liability limits of $1,000,000 per accident. (c) Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials and employees; or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. (d) Other Insurance Provisions. The policies are to contain, or be endorsed to contain, the following provisions: General Liability and Automobile Liability Coverage. a. The City, its officers, officials, employees and volunteers are to be covered as insured as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the Contractor, premises owned, occupied or used by the Contractor, or automobiles owned, leased, hired or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of the protection afforded to the City, its officers, officials, employees or volunteers. b. The Contractor's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Contractor's insurance and shall not contribute with it. Exhibit "D" c. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its officers, officials, employees or volunteers. d. The Contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. 2. Workers' Compensation and Employers Liability Coverage. The insurer shall agree to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses arising from work performed by the Contractor for the City. 3. Professional Liability. Contractor shall carry professional liability insurance in an amount deemed by the City to adequately protect the Contractor against liability caused by negligent acts, errors or omissions on the part of the Contractor in the course of performance of the services specified in this Agreement. 4. All Coverage's. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the City. (e) Acceptability of Insurers. Insurance is to be placed with insurers with a Bests' rating of no less than A:VII. (f) Verification of Coverage. Contractor shall furnish City with certificates of insurance and with original endorsements effecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time. Exhibit "D" (g) Subcontractors. Contractor shall include all subcontractors as insured's under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverage's for subcontractors shall be subject to all of the requirements stated herein. (h) The Risk Manager of City may approve a variation in those insurance requirements upon a determination that the coverage, scope, limits and forms of such insurance are either not commercially available or that the City's interests are otherwise fully protected. 5. CONTRACTOR NO AGENT. Except as City may specify in writing, Contractor shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Contractor shall have no authority, express or implied, pursuant to this Agreement to bind City to any obligation whatsoever. 6. ASSIGNMENT PROHIBITED. No party to this Agreement may assign any right or obligation pursuant to this Agreement. Any attempted or purported assignment of any right or obligation pursuant to this Agreement shall be void and of no effect. 7. PERSONNEL. Contractor shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any such persons, Contractor shall, immediately upon receiving notice from city of such desire of City, cause the removal of such person or persons. 8. STANDARD OF PERFORMANCE. Contractor shall perform all services required pursuant to this Agreement in the manner and according to the standards observed by a competent practitioner of the profession in which Contractor is engaged in the geographical area in which Contractor practices its profession. All instruments of service of whatsoever nature, which Contractor delivers to City pursuant to this Agreement, shall be prepared in a substantial, first class and workmanlike manner and conform to the standards of quality normally observed by a person practicing in Contractor's profession. Exhibit "D" 9. HOLD HARMLESS AND RESPONSIBILITY OF CONTRACTORS. Contractor shall take all responsibility for the work, shall bear all losses and damages directly or indirectly resulting to him, to any subcontractor, to the City, to City officers and employees, or to parties designated by the City, on account of the performance or character of the work, unforeseen difficulties, accidents, occurrences or other causes predicated on active or passive negligence of the Contractor or of any subcontractor. Contractor shall indemnify,. defend and hold harmless the City, its officers, officials, directors, employees and agents from and against any or all loss, liability, expense, claim, costs (including costs of defense), suits, and damages of every kind, nature and description directly or indirectly arising from the negligent performance of the work. This paragraph shall not be construed to exempt the City, its employees and officers from its own fraud, willful injury or violation of law whether willful or negligent. For purposes of Section 2782 of the Civil Code the parties hereto recognize and agree that this agreement is not a construction contract. By execution of this Agreement, Contractor acknowledges and agrees that it has read and understands the provisions hereof and that this paragraph is a material element of consideration. Approval of the insurance contracts does not relieve the Contractor or subcontractors from liability under this paragraph. 10. GOVERNMENTAL REGULATIONS. To the extent that this Agreement maybe funded by fiscal assistance from another governmental entity, Contractor shall comply with all applicable rules and regulations to which City is bound by the terms of such fiscal assistance program. 11. DOCUMENTS. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda or other written documents or materials prepared by Contractor pursuant to this Agreement shall become the property of City upon completion of the work to be performed hereunder or upon termination of the Agreement. 12. COMPLIANCE WITH APPLICABLE LAWS. Contractor shall comply with all laws applicable to the performance of the work hereunder, including, but not limited to, laws prohibiting discrimination based on race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status or sex. 13. USE OF RECYCLED PRODUCTS. Contractors shall prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper. Exhibit "D" 14. PROFESSIONAL SEAL. Where applicable in the determination of the contract administrator, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the reportldesign preparation. The stamp/seal shall be in a block entitled "Seal and Signature of Registered Professional with reportidesign responsibility" as per sample below. Seal and Signature of Registered Professional with reportldesign responsibility. Exhibit "D" RESOLUTION NO.00- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA MAKING ADJUSTMENTS TO THE FISCAL YEAR 1999-00 BUDGET WHEREAS, the City Council adopted Resolution No. 99-36 adopting the budget for Fiscal Years 1999-00 and 2000-01 on June 16, 1999; and WHEREAS, the Quito Road Bridge Replacement project is an approved capital project to replace two existing bridges on Quito Road, and WHEREAS, in October, 1999, Caltrans approved increased funding through the HBRR program for engineering design services for the Quito Road Bridge Replacement project, CIP No. 9111; and WHEREAS, the fiscal year 1999-00 budget did not include sufficient funding to complete the engineering design services, and requires an increase of $191,250, for a total project cost of $265,000, and WHEREAS, the City is required to contribute 6.67% to the cost of the project, totaling $12,756. This will be funded by an operating transfer into the Street and Road Fund, which is supported by the General Fund. NOW, THEREFORE, the City Council of the City of Saratoga hereby resolves to increase estimated revenues by $191,250 and appropriate the same amount to fund engineering design services for the Quito Road Bridge Replacement project as follows: FHWA Refunds and Reimbursements Operating Transfers Into Street Fund Quito Road Bridge Replacement project Revenues/ Fund Balance 150-3005-432-11.00 $153,000 150-1040-441-04.00 25,494 150-1040-421-03.00 12,756 150-9010-622-40.13 -9111 General Fund Balance 12,756 Operating Transfers Out of General Fund 001-1040-421-03.00 Expenditures $191,250 12,756 The above and foregoing resolution was passed and adopted at an adjourned meeting of the Saratoga City Council held on the 19th day of May, 1999 by the following vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: City Clerk MJW:mjw 12/9/1999 Mayor QuitoRd 2