Loading...
HomeMy WebLinkAboutCIP Draft (FY08-09)Draft Capital Improvement Plan Project List FUNDING CRITERIA FUNDED 0 UNFUNDED FY 2008-2009 Update . # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 KEY: 43 43 Draft PROJECT STREET IMPROVEMENT PROJECTS Street Repair & Resurfacing Projects Annual Street Resurfacing: Annual Street Restriping: Roadway Safety and Traffic Calming Projects Highway 9 Safety Project Phase I: ADA Accessible Traffic Signal Project: Solar Powered Radar Feedback Signs - Phase I: Traffic Safety: Highway 9 Safety Project Phase II: Highway 9 Safety Project Phase III: Traffic Safety and Traffic Calming Funding Source: Unfunded Roadway Safety and Traffic Calming Projects Pedestrian Refuge Area at Quito/McCoy Intersection: Herriman Avenue Crosswalk Improvements: Herriman Avenue Sidewalk Improvements Option 1: Herriman Avenue Sidewalk Improvements Option 2: Komina Walking Path: Saratoga Elementary School Driveway and Sidewalk Modification: Solar Powered Radar Feedback Signs - Phase II: Glen Brae Avenue Median Choker: Cox Avenue Traffic and Pedestrian Safety Improvements: Montalvo Road Traffic Calming: Aspesi Drive Traffic Calming: Brookglen Drive Traffic Calming: Cox Avenue Traffic Calming: Street Median & Landscape Improvements Prospect Road Median Project - Phase I: Village Tree Lighting - Side Streets: City Entrance Signs/Monuments Including Highway 9: Unfunded Median & Landscape Improvements Prospect Road Median Project - Subsequent Phases: Sidewalks, Curbs, Gutters & Storm Drains Annual Sidewalk Repair: Annual Storm Drain Upgrades: Sobey Road Culvert Repair: Village Streetscape Improvements (Sidewalk/C&G): Saratoga Sunnyvale Road ADA Curb Ramps: Village Pedestrian Enhancement Project: Village News Rack Enclosures: Village Façade Matching Program: Saratoga-Sunnyvale Road Gateway Project (pathways): Saratoga Avenue Sidewalk Project: Unfunded Sidewalk and Storm Drain Projects Quito Road Sidewalk Improvements: Chester Avenue Storm Drain Improvements: El Camino Grande/Monte Vista Storm Drain Improvements: Bridge and Retaining Wall Projects Comer Drive Retaining Wall Repair: Quito Road Bridge Replacement Project (Design): Quito Road Bridge Replacement Project (Construction): 4th Street Bridge: Total Street Improvement Projects PARK & TRAIL IMPROVEMENT PROJECTS Park Projects Kevin Moran Park Improvements: West Valley College Soccer Field Improvements Wildwood Park Improvements: Wildwood Park Water Feature - Seating Improvements: Historic Park Landscaping Improvements: Park/Trail Repairs: Citywide Tree Replanting: Hakone Garden D/W: Hakone Gardens Visitor Center/Matching Funds: Ravenswood Park Playground Upgrade Project: El Quito Park Improvements: Trail Projects De Anza Trail: Heritage Orchard Perimeter Path Improvements: Trail Segment #3 Repairs: Teerlink Ranch Trail Repair: San Marcos Open Space Trail: Unfunded Park & Trail Projects (# ) = Funding Priority (1) Park Restroom Improvement Work: (2) Lower Tank Trail (Parker Ranch) Repair Project: (3) Petanque Court at Azule Park: (4) De Anza Trail Phase II: (5) Wildwood Park Pedestrian Bridge Rehabilitation: (6) Village Creek Trail: (7) Calabazas Creek Trail: (8) Odd Fellows Trail Development: (9) Heritage Orchard Monument Sign: Total Park & Trail Projects FACILITY IMPROVEMENT PROJECTS North Campus Building Removal Project: Multi-Purpose Room Improvements Fund: Hakone Gardens Upper Moon House Foundation Repair: Corporation Yard Equipment Shelter Structure: KSAR Audio/Video Upgrades: McWilliams House Improvements - Phase 2: North Campus Improvements: Warner Hutton House Improvements: Civic Center Landscape Improvements: Annual Facility Improvements: Unfunded Facility Projects North Campus Improvements Fund: Big Basin Way Turn Around: City Hall Parking Improvements: Bus Stop Shelter Concrete Pads & Wooden Shelters: Hakone Gardens Visitor Center Design: City Hall Emergency Generator Project: 3rd Street Parking Lot Improvements: City Compost Bins: Total Facility Improvement Projects OPERATIONAL EFFICIENCY PROJECTS Document Imaging Project - Community Development: City Website Upgrade Project: Operational Efficiency Funding Source: Unfunded Operational Efficiency Projects City Hall Solar Project: Cool Roofs: High Efficiency HVAC Systems: Double Pane Windows: Energy Star Compliant Appliances: Ceiling Insulation: Motion Control Lighting: Total Operational Efficiency Improvements ADMINISTRATIVE PROJECTS Financial System Upgrade: Document Imaging Project - Public Works Total Administrative Projects TOTAL ALL CIP PROJECTS PROJECT DESCRIPTION SUMMARY Replace sidewalk and curb & gutter for safety and beautification. Storm drain improvements in the El Camino Grande/Monte Vista Area Replacement of two bridges on Quito Road Replacement of existing substandard bridge at 4th & Saratoga Creek. Development of unimproved areas at Kevin Moran Park. Various infrastructure improvements to City parks and trails. Driveway and retaining wall improvements. Development of new trail along the UPR Railroad. San Marcos Open Space Trail: Various infrastructure improvements to City parks and trails. Development of new trail along the UPR Railroad. PROJECT DESCRIPTION SUMMARY Annual street resurfacing connected to the City's Pavement Management Program Annual Street Restriping Work Saratoga's portion of the three City Highway 9 Safety corridor project. Project to focus on bicycle improvements. Audible Signal Project at various traffic signal locations throughout the City. Provides funding for solar powered radar feedback signs. Traffic safety funds for implementation of safety improvements approved by Traffic Safety Commission. Project to focus on ped improvements along the Highway 9 corridor. Majority of improvements in Saratoga. Project to focus safety improvements at Austin Way along the Highway 9 corridor. Additional improvements include bicycle detectors at all controlled intersections. Funding aimed at implementing unfunded CIP projects related to roadway traffic safety & traffic calming. The Traffic Safety Commission will prioritize and recommend to the City Council which projects should be funded. Center refuge area and crossing improvements on Quito Road at McCoy. Crosswalk enhancements located on Herriman Avenue @ Lexington and Saratoga Vista. Asphalt sidewalk/pathway leveling course between AC berm and PCC Curb. New sidewalk/pathway along the south side including retaining walls and landscape modifications. Walking Path on one side of Komina adjacent to Oak Street School. Driveway and sidewalk modification to increase capacity of drop-off lane. Provides funding for 4 solar powered radar feedback signs. Location(s) to be determined by the Traffic Commission. Concrete median choker on Glen Brae Avenue for traffic calming. This project would provide crosswalk and other safety improvements on Cox Avenue between Saratoga Avenue and Paseo Presada This project would provide traffic calming by constructing a raised median on Montalvo Road. This project would provide traffic calming by constructing a raised median on Aspesi Drive. This project would provide traffic calming by constructing a raised median on Brookglen Drive. This project would provide traffic calming by constructing a speed bump on Cox Avenue between Paseo Presada and Quito Road. This project will implement the first phase of the Prospect Road Median Master Plan. $150,000 has been allocated for construction and $50,000 for grant matching funds. Install necessary electrical improvements for side street tree lighting. Installation of Entry Signs/Monument at City entry points where none exist. This project will implement the subsequent phases of the Prospect Road Median Master Plan. $150,000 has been allocated for Phase I construction and $50,000 for grant matching funds. The project cost is for all remaining phases. Removal of tripping hazards on City owned sidewalks. Funds for storm drain rehabilitation and drainage improvements. Replacement of CMP Culvert undermined during winter of 05/06. Replace sidewalk and curb & gutter for safety and beautification. ADA curb ramp improvements at various locations along Saratoga-Sunnyvale Road. Crosswalk safety improvements and other pedestrian related enhancements in the Village. Enhancements to the Village News Rack Enclosures. Matching funds to business/property owners directed at improving building facades. Continuation of Gateway Project directed at pathway improvements. Continuation of sidewalk/pathway improvements along Saratoga Avenue: Construction of new sidewalk improvements on Quito Road between Highway 85 and Allendale Avenue. Storm drainage improvements in the Chester Avenue area. Storm drainage improvements in the Monte Vista/El Camino Grande area. This project would repair a failing retaining wall along Comer Drive. Replacement of two existing substandard bridges on Quito Road - Design Phase Replacement of two existing substandard bridges on Quito Road - Environmental/Construction Phase Rehabilitation of existing bridge at 4th & Saratoga Creek. Development of unimproved areas at Kevin Moran Park. Funding for Improvements to two soccer fields located at West Valley College. Rebuild of Wildwood Park wood stage due to structural integrity issues and other minor improvements to the park. Installation of concrete seating improvements around the perimeter of the water feature. Removal of existing landscaping and installation of new landscaping and irrigation. Various infrastructure improvements to City parks and trails. Citywide tree replanting project including irrigation for parks, medians, right-of-ways, and open spaces. Driveway and retaining wall improvements. Matching Funds from Park Development Fees for Visitor Center at Hakone Gardens. Replacement of existing substandard play equipment. Various improvements to El Quito Park including new water fountain, rehab of ex. picnic area and frontage landscaping. Development of new trail along the PG&E right-of-way. Construction of a dirt path around the perimeter of the Heritage Orchard. Erosion repair work to Trail Segment #3 ('Tank Trail'). Repair of trail segment located in Teerlink Ranch damaged during winter of 05/06. Development of a new trail through the San Marcos Open Space. This project would provide funding for various improvements and upgrades at City Park Restrooms. This project would repair erosion and minor slides on the trail link which connects Parker Ranch Road to Picea Court in the Parker Ranch Subdivision. This project would provide funding for the construction of a Petanque Court at Azule Park adjacent to the Tennis Court. This project would extend the De Anza Trail from Saratoga-Sunnyvale Road to Arroyo De Arguello. Rehabilitation of existing pedestrian bridge to Wildwood Park. This project would fund the construction of a trail along Saratoga Creek running the length of the Village. Installation of a pathway running along Calabazas Creek from Saratoga-Sunnyvale Road to the UPRR Tracks. Development of a new trail through the Odd Fellows property establishing a link to the San Marcos Open Space. This project would fund the construction of a Heritage Orchard monument sign to be located at the corner of Fruitvale and Saratoga Avenues. Plans have been developed by the Heritage Commission. This project would remove the front two buildings at the North Campus. The purpose of this fund would be to set aside funding for the purpose of building a City multi-purpose room. This project would repair the foundation of the Upper Moon House at Hakone Gardens. This would provide the structure to which solar panels could be mounted as well as provide shelter for vehicles and equipment. This project would fund audio and video upgrades for broadcasting the KSAR Community Television station. This project would continue minor building improvements aimed at restoring the McWilliams House. Exterior and interior upgrades to the facilities at the North Campus (Administration Building and Fellowship Hall). Improvements to the Warner Hutton for rentals: Landscape, irrigation, and hardscape improvements at the Civic Center, Provides funding for various facility maintenance projects. The purpose of this fund is to set aside funding each year for capital improvements at the North Campus such as new public facilities This project would construct a turn around at the end of the Village that would provide drivers an additional option for circulation through Village. This project would create additional parking at City Hall by removing landscaping near the corner of Fruitvale and Allendale. This project would fund the concrete pads and wooden shelters necessary to install bus stop shelters at 4 select locations along bus routes in the City. This project would fund the design work for the Hakone Gardens Visitor Center. This project would fund the purchase and installation of an emergency generator at City Hall. This project would fund minor improvements to two small contiguous private parking lots located off of 3rd Street in order to gain public parking access This project would construct one or more large compost bins to be located on City owned property such as a park. This would provide the structure to which solar panels could be mounted as well as provide shelter for vehicles and equipment. This will provide funding to upgrade the City's Website to better serve residents and the public. Funding aimed at implementing unfunded CIP projects related to operational efficiencies. The Facility Division will prioritize and recommend to the City Council which projects should be funded. This project would provide solar power to the Community Center and Maintenance Building. This project would replace aging roofs at the Community Center and City Hall with sunlight reflecting “cool roof systems” This project would replace aging Heating, Ventilation, and Air Conditioning (HVAC) systems at the Community Center and City Hall This project would replace the old single-pane windows at the Community Center and City Hall with new double-pane windows This project would replace the old dishwashing machines, clothes washers and dryers, refrigerators, freezers, etc This project would increase the R-Value of all ceiling insulation in City buildings. This project would automate the lighting controls in City buildings. Financial software and hardware system upgrade. Transfer of hard copy documents into electronic imaging format. Proposed CIP Projects for Fiscal Year 08/09. ESTIMATED COST A 2405504 65000 100000 74526 62000 100000 1020000 509000 150000 15000 25000 25000 150000 100000 50000 50000 15000 75000 15000 12000 25000 8000 200000 50000 27821 2544630 50000 50000 150000 626000 57309 540000 30000 20000 74147 42489 150000 300000 300000 200000 465729 2978000 587000 14494155 1500000 325000 40000 10000 37200 230000 175000 200000 250000 55000 125000 1997577 25000 16500 30000 27500 34000 20000 25000 75000 125000 75000 100000 60500 35000 5593277 75000 250000 125000 100000 9000 10000 1140000 94100 110000 100000 50000 100000 100000 40000 100000 50000 25000 10000 2488100 60000 50000 44000 444326 164000 690000 157000 20000 160000 8000 1797326 100000 113000 213000 22097758 APPROVED BUDGET B 2405504 65000 100000 74526 62000 100000 1020000 509000 150000 0 0 0 0 0 0 0 0 0 0 0 0 0 200000 50000 27821 0 50000 50000 150000 626000 57309 540000 30000 20000 74147 42489 0 0 0 200000 465729 2977141 587000 10633666 1500000 325000 40000 10000 37200 230000 175000 180000 250000 55000 125000 0 1997577 25000 16500 30000 27500 0 0 0 0 0 0 0 0 0 5023777 75000 250000 125000 100000 9000 10000 1140000 94100 110000 100000 0 0 0 0 0 0 0 0 2013100 60000 50000 44000 0 0 0 0 0 0 0 154000 100000 113000 213000 16024443 0 0 IDENTIFIED SOURCE OF FUNDS CIP FUND C 53619 0 100000 0 62000 100000 90000 27000 150000 0 0 0 0 0 0 0 0 0 0 0 0 0 200000 7000 27821 0 50000 50000 0 0 0 115000 30000 20000 74147 0 0 41800 113000 100000 1411387 1197546 250000 0 0 0 230000 0 180000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1857546 75000 250000 125000 100000 9000 10000 990000 94100 110000 100000 0 0 0 0 0 0 0 0 1863100 60000 50000 44000 0 0 0 0 0 0 0 154000 100000 113000 213000 3635933 PARK DEV. FUND D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75000 0 10000 37200 0 0 0 250000 55000 0 0 25000 16500 30000 27500 0 0 0 0 0 0 0 0 0 526200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 526200 GRANTS E 1283693 0 0 74526 0 0 900000 482000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57309 425000 0 0 0 42489 0 364799 2636423 487000 6753239 302454 0 40000 0 0 0 0 0 0 0 0 1598062 0 0 0 0 0 0 0 0 0 0 0 0 0 1940516 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8693755 OTHER SOURCE F 474000 65000 0 0 0 0 30000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 43000 0 0 0 0 0 626000 0 0 0 0 0 0 200000 59130 227718 0 1724848 0 0 0 0 0 0 175000 0 0 0 125000 399515 0 0 0 0 0 0 0 0 0 0 0 0 0 699515 0 0 0 0 0 0 150000 0 0 0 0 0 0 0 0 0 0 0 150000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2424363 GAS TAX FUND G 594192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 150000 0 0 0 0 0 0 0 0 0 0 0 744192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 744192 465729 PROJECT EXPENDITURE TO DATE (06/30/08) H 0 0 93740 0 47806 88243.14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22055 4033 0 0 0 0 88867.43 2525 0 2219.84 570 16924.07 0 0 455999 0 0 822982.48 228942.8 316516.25 32270.57 2801.41 0 208870.52 123264.62 37170.78 0 0 6790.69 371173.5 18847.3 8588.33 7758.36 26519.71 0 0 0 0 0 0 0 0 0 1389514.84 0 0 0 0 0 0 962047.12 88232.83 106615.33 70190.31 0 0 0 0 0 0 0 0 1227085.59 0 0 0 0 0 0 0 0 0 0 0 95379.93 35269.16 130649.09 2343146.41 PROJECT BALANCE (07/01/08) I 2405504 65000 6260 74526 14194 11756.86 1020000 509000 150000 0 0 0 0 0 0 0 0 0 0 0 0 0 200000 27945 23788 0 0 0 150000 537132.57 54784 540000 27780.16 19430 57222.93 42489 200000 9730 2977141 587000 9710683.52 1271057.2 8483.75 7729.43 7198.59 37200 21129.48 51735.38 142829.22 250000 55000 118209.31 1626403.5 6152.7 7911.67 22241.64 980.290000000001 0 0 0 0 0 0 0 0 0 3634262.16 75000 250000 125000 100000 9000 10000 177952.88 5867.17 3384.67 29809.69 0 0 0 0 0 0 0 0 786014.41 60000 50000 44000 0 0 0 0 0 0 0 154000 4620.07000000001 77730.84 82350.91 13581296.59 0 PROJECT STATUS AND NOTES Construction complete. Work ongoing. CDBG grant funded. Approved by City Council on 3/21/07. Work ongoing. Work ongoing. Design work in progress. HSIP Grant Funded. Approved by City Council on 4/4/07. Construction scheduled to begin in spring 2009. New project FY 08/09. Design work to begin in fall 2008. Work ongoing. TSC will recommend specific projects that are listed as unfunded in the CIP related to traffic safety and traffic calming. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. Phase I work (Master Plan - Median #11) currently underway. Design work to be complete in fall 2008. Work to be incorporated into future Village Improvement Project. Existing monuments rehabilitated. New entry monuments to be determined. Funds for Highway 9 entry monument included in project. Grant funding will be will be sought to fund subsequent phases based on the Prospect Road Median Master Plan. New Project FY 08/09. New Project FY 08/09. Project construction scheduled summer 2009. $741,000 funded by Caltrans. $115,000 Transferred to Village Pedestrian Enhancement Project for local match. Work ongoing. CDBG grant funded. Approved by City Council on 11/01/06. Village design contract approved by City Council. VTA grant funded. $115,000 required for local match. Funding identified. Work ongoing. Work ongoing. Work scheduled fall 2008. TDA grant funded. Approved by City Council on 05/16/07. Project funded through the Economic/Hillside Reserve Fund. Design 95% complete. Project delayed due to right of way issues. Project delayed due to right of way issues. HBRR application submitted. Construction to begin in Fall 2008. $302,454 from 2002 Park Bond Act. Both playfields improved. Project 95% complete. Stage rehabilitation complete. Project 95% complete. Work ongoing. Funding via tree violation fines. Work also includes tree replanting along City right-of-ways. Driveway mitigation work to be included in 2008/2009 PMP project. $20,000 allocated to North Campus Matching Fund Program. Design underway. Construction scheduled for spring 2009. Landscape and Lighting funded project. Construction to begin in Fall 2008. Work ongoing. Work ongoing. Work scheduled to begin in Fall 2008. Work ongoing. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. Work ongoing. Administration Building remodel complete. Fellowship Hall remodel underway. Work ongoing. Work ongoing. Work ongoing. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. New Project FY 08/09. Work ongoing. Work ongoing. # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 PROJECT Public Safety Projects Saratoga-Sunnyvale/Seagull Traffic Signal: Quito Road Bridge Replacement Project: Herriman Avenue Traffic Signal: Verde Vista Ln. Traffic Signal: 4th Street Bridge: Traffic Calming (NTMP): Safe Routes to Schools: ADA Improvements (Hakone): Highway 9 Traffic Signal Modifications: Playground Safety (Brookglen, El Quito, Wildwood): Kirkmont Dr. Traffic Signal: Sobey Road/Quito Road Traffic Improvements: Norton Road Fire Access: Aloha Street Safety Improvements: Highway 9/Oak Place Pedestrian Signal: Total Public Safety Projects Saratoga-Sunnyvale/Seagull Traffic Signal: Quito Road Bridge Replacement Project: Herriman Avenue Traffic Signal: Verde Vista Ln. Traffic Signal: 4th Street Bridge: Traffic Calming (NTMP): Safe Routes to Schools: ADA Improvements (Hakone): Highway 9 Traffic Signal Modifications: Playground Safety (Brookglen, El Quito, Wildwood): Kirkmont Dr. Traffic Signal: Sobey Road/Quito Road Traffic Improvements: Norton Road Fire Access: Aloha Street Safety Improvements: Highway 9/Oak Place Pedestrian Signal: Total Public Safety Projects Infrastructure Projects City Wide Traffic Signal Upgrades: El Camino Grande/Monte Vista Storm Drain Improvements: Saratoga-Sunnyvale Road "Gateway" Improvements: El Quito Area Curb & Gutter Replacement: Village Streetscape Improvements (Sidewalk/C&G): Village Streetscape Improvements (Landscaping): Storm Drain Upgrades: Median Repairs (Landscaping/Irrigation): Cox Avenue Railroad Crossing Arms Upgrade: Prospect Avenue Medians: Blaney Plaza Improvements - Master Plan Phase: City Entrance Signs/Monuments: Blaney Plaza Improvements - Construction Phase: Chester Avenue Storm Drain Improvements: Total Infrastructure Projects New traffic signal @ Saratoga-Sunnyvale & Seagull Replacement of two bridges on Quito Road New traffic signal @ Herriman & Saratoga. Warrant study needed. New traffic signal @ Verde Vista & Sara-Sunny. Meets warrants. Replacement of existing substandard bridge at 4th & Saratoga Creek. Annual funding for implementation of traffic calming toolkit. Annual funding for implementation of Safe Routes to School Program. ADA improvements per Hakone Foundation lease agreement. Modification to Hwy 9 traffic signal in connection w/new fire dept. Replacement of existing substandard play equipment. New traffic signal @ Kirkmont & Sara-Sunny. Warrant study needed. Software and hardware upgrades to the City's traffic signals Storm drain improvements in the El Camino Grande/Monte Vista Area Roadway improvements to Saratoga-Sunnyvale Road Replacement of rolled curb & gutter for drainage mitigation. Replace sidewalk and curb & gutter for safety and beautification. Landscape beautification improvements. Annual funds for storm drain rehabilitation and drainage improvements. Plant replacement and irrigation improvements in existing medians. Upgrade of crossing arm in conjunction with rail surface improvements. New landscaped medians for beautification of Prospect Avenue. New traffic signal @ Saratoga-Sunnyvale & Seagull. Meets warrants. Replacement of two existing substandard bridges on Quito Road. New traffic signal @ Herriman & Saratoga. Warrant study required. New traffic signal @ Verde Vista & Sara-Sunny. Meets warrants. Rehabilitation of existing bridge at 4th & Saratoga Creek. Annual funding for implementation of traffic calming toolkit. Funding for implementation of Safe Routes to School. ADA improvements per Hakone Foundation lease agreement. Modification to Hwy 9 traffic signal in connection w/new fire dept. Replacement of existing substandard play equipment. New traffic signal @ Kirkmont & Sara-Sunny. Warrant study needed. Sobey Road/Quito Road roadway improvements to increase safety in the vicinity of Marshall Lane School. Construction of a fire access road connecting Norton Road to Montalvo's Artist In Residency Road. Roadway safety improvements at the intersection of Aloha Street and Highway 9. New pedestrian traffic signal @ Highway 9 & Oak Place. Warrant study and Caltrans approval required.. City wide signal upgrades including integration of smart corridor technology. Storm drainage improvements in the MonteVista/El Camino Grande area. Infrastructure improvements to Saratoga-Sunnyvale Road concentrated between Prospect Road and the UPRR. Replacement of rolled curb & gutter for drainage mitigation. Replace sidewalk and curb & gutter for safety and beautification. Landscape beautification improvements. Annual funds for storm drain rehabilitation and drainage improvements. Plant replacement and irrigation improvements in existing medians. Railroad crossing surface upgrade for safety and improved drivability. New landscaped medians for beautification of Prospect Avenue. Master plan for the rehabilitation and beautification of Blaney Plaza. Installation of Entry Signs/Monument at City entry points where none exist. Implementation of improvements based on the Blaney Plaza Master Plan. Storm drainage improvements in the Chester Avenue area. 152500 2372900 150000 150000 500000 250000 250000 317500 250000 350000 150000 150000 110000 49500 145000 5347400 508705 100000 3112379.9 550000 850000 275000 250000 182500 539641 500000 19400 17500 121000 178000 7204125.9 152500 2372900 5000 5000 500000 250000 50000 250000 250000 350000 5000 150000 110000 49500 4000 4503900 508705 100000 3112379.9 460264 0 225000 250000 182500 539641 25000 19400 17500 121000 0 5561389.9 182500 0 0 5000 5000 100000 250000 50000 0 225000 0 5000 150000 110000 49500 0 949500 0 0 0 460264 0 225000 250000 182500 70000 25000 19400 17500 121000 0 1370664 0 0 0 0 0 0 0 0 0 66000 0 0 0 0 0 66000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32500 158193 0 0 0 0 0 0 0 0 0 0 0 0 0 190693 72705 100000 2232279.9 0 0 0 0 0 0 0 0 0 0 0 2404984.9 0 1898320 0 0 400000 0 0 200000 0 284000 0 0 0 0 0 2782320 436000 0 880000 0 0 0 0 0 469641 0 0 0 0 0 1785641 0 316387 0 0 0 0 0 50000 25000 0 0 0 0 0 0 391387 0 0 0 0 0 0 0 0 0 0 0 0 0 0 152500 465004.3 0 0 0 68376 26043.63 65501.1 167066.27 346201.14 0 100799.44 8000 0 4000 1403491.88 441753.77 0 716914.5 0 0 85526.16 250000 133017.48 124916.43 0 19400 0 10160.56 0 1781688.9 0 1907895.7 5000 5000 500000 181624 23956.37 184498.9 82933.73 3798.86 5000 49200.56 102000 49500 0 3100408.12 66951.23 100000 2395465.4 460264 0 139473.84 0 49482.52 414724.57 25000 0 17500 110839.44 0 3779701 Saratoga-Sunnyvale/Seagull Traffic Signal: Quito Road Bridge Replacement Project: Herriman Avenue Traffic Signal: Verde Vista Ln. Traffic Signal: 4th Street Bridge: Traffic Calming (NTMP): Safe Routes to Schools: ADA Improvements (Hakone): Highway 9 Traffic Signal Modifications: Playground Safety (Brookglen, El Quito, Wildwood): Kirkmont Dr. Traffic Signal: Sobey Road/Quito Road Traffic Improvements: Norton Road Fire Access: Aloha Street Safety Improvements: Highway 9/Oak Place Pedestrian Signal: Total Public Safety Projects Infrastructure Projects City Wide Traffic Signal Upgrades: El Camino Grande/Monte Vista Storm Drain Improvements: Saratoga-Sunnyvale Road "Gateway" Improvements: El Quito Area Curb & Gutter Replacement: Village Streetscape Improvements (Sidewalk/C&G): Village Streetscape Improvements (Landscaping): Storm Drain Upgrades: Median Repairs (Landscaping/Irrigation): Cox Avenue Railroad Crossing Arms Upgrade: Prospect Avenue Medians: Blaney Plaza Improvements - Master Plan Phase: City Entrance Signs/Monuments: Blaney Plaza Improvements - Construction Phase: Chester Avenue Storm Drain Improvements: Total Infrastructure Projects 30 31 32 33 34 35 36 37 38 152500 2372900 150000 150000 500000 250000 250000 317500 250000 350000 150000 150000 110000 49500 145000 5347400 508705 100000 3112379.9 550000 850000 275000 250000 182500 539641 500000 19400 17500 121000 178000 7204125.9 152500 2372900 5000 5000 500000 250000 50000 250000 250000 350000 5000 150000 110000 49500 4000 4503900 508705 100000 3112379.9 460264 0 225000 250000 182500 539641 25000 19400 17500 121000 0 5561389.9 McWilliams House Civic Center Master Plan (Design): Animal Control Facility: Civic Theater Lower Perimeter Re-Roof: Civic Center Eave Replacement (Community Dev./Engineering): Historical Park Buildings - Fire Alarm System: Village Façade Matching Fund: Book-Go-Around Repairs: North Campus Improvements - Fellowship Hall: 182500 Termite damage repair at Chamber Building. Comprehensive Master Plan preparation for Civic Center 0 0 5000 5000 100000 250000 50000 0 225000 0 5000 150000 110000 49500 0 949500 0 0 0 460264 0 225000 250000 182500 70000 25000 19400 17500 121000 0 1370664 0 0 0 0 0 0 0 0 0 66000 0 0 0 0 0 66000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Improvements to structure. Comprehensive Master Plan preparation for Civic Center. City's share of JPA cost for Construction of New Animal Control Facility Re-Roof the lower perimeter of the Civic Theater. Replacement of courtyard eaves on the Community Development/Engineering wing of the Civic Center. Installation of fire alarm system in the Historical Buildings located in Historical Park. Matching funds to business/property owners directed at improving building facades. Roof repair and storage room repair work at the Book-Go-Around building. ADA restroom improvements and interior upgrades at the North Campus Fellowship Hall. 120000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 32500 158193 0 0 0 0 0 0 0 0 0 0 0 0 0 190693 72705 100000 2232279.9 0 0 0 0 0 0 0 0 0 0 0 2404984.9 150000 250000 300000 49500 25000 7425 50000 35000 151800 0 1898320 0 0 400000 0 0 200000 0 284000 0 0 0 0 0 2782320 436000 0 880000 0 0 0 0 0 469641 0 0 0 0 0 1785641 30000 0 300000 49500 17600 7425 50000 35000 151800 0 316387 0 0 0 0 0 50000 25000 0 0 0 0 0 0 391387 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30000 0 300000 49500 17600 7425 50000 0 151800 152500 465004.3 0 0 0 68376 26043.63 65501.1 167066.27 346201.14 0 100799.44 8000 0 4000 1403491.88 441753.77 0 716914.5 0 0 85526.16 250000 133017.48 124916.43 0 19400 0 10160.56 0 1781688.9 0 0 0 0 0 0 0 0 0 0 1907895.7 5000 5000 500000 181624 23956.37 184498.9 82933.73 3798.86 5000 49200.56 102000 49500 0 3100408.12 66951.23 100000 2395465.4 460264 0 139473.84 0 49482.52 414724.57 25000 0 17500 110839.44 0 3779701 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30000 0 300000 41854.73 0 881.81 21163.76 33326.19 0 0 0 0 7645.27 17600 6543.19 28836.24 1673.81 151800