HomeMy WebLinkAbout09-01-2004 City Council MinutesMINUTES
SARATOGA CITY COUNCIL
SEPTEMBER 1, 2004
The City Council of the City of Saratoga held a Joint Session with Villa Montalvo Board
in the Administrative Conference Room, 13777 Fruitvale Avenue, at 5:30 p.m.
The following Board members were present: President Greg Prow, Executive Director
Elizabeth Challener, Board members John Stuckey and Kevin McLarney. Also present
were several neighbors from the Montalvo area.
Mayor Waltonsmith stated the issues the Council would like Montalvo to address the
following issues:
• Fire access road
• Future plans
• Issue of noise
• Piedmont Road repairs
• Village Shuttle Program
Vice Mayor King added that she would like to discuss the City's new grant program.
In regards to the fire access road, John Cherbone, Public Works Director, reported that
currently the technical description ,the final documents for the easement and the
agreements between the City, Saratoga Fire Department and Montalvo were being
drafted.
Mr. Prow reported that Montalvo has been cooperating with the City throughout this
process.
In regards to the Piedmont Road repairs, Mr. Prow stated hat Montalvo offered to pay for
80% of the total costs. Mr. Prow stated that it would be approximately $300-$400 per
property owner. Mr. Prow stated that they sent letters to 51 property owners and to date
only received 18 responses - 14 in favor of the project and 4 against. Mr. Prow stated
that they sent another letter out today and added that they hope this issue would be solved
by the end of the year.
In regards to the Village Shuttle Program, Mr. Prow stated that the program has been
working out well.
Danielle Surdin, Economic Development Coordinator, thanked Montalvo for supporting
the Shuttle Program. Coordinator Surdin noted that the program has been a tremendous
success. Coordinator Surdin noted that the business owners support the program and have
told her their business has increased. Coordinator Surdin stated that the hotels have given
out 50% of the shuttle passes.
Ms. Challener suggested that the shuttle program be extended to the more popular shows
thought the year.
Coordinator Surdin suggested arranging a meeting to discuss her suggestion
A Montalvo neighbor voiced her concern in regards to a transit bus that was used for
shuttling people back and forth at a recent concert. Montalvo neighbor stated that she
called Montalvo and was told it was an "experiment".
Addressing the neighbor's concern, Ms. Challener stated that given the feed back from
the neighbors, transit buses would no longer be used.
Addressing the noise issue, Mr. Prow stated that Montalvo recently formed a committee,
composed of neighbors and Montalvo boazd members, to address 62 issues. Mr. Prow
stated that Montalvo asked for a variance from the neighbors, who denied the request, so
they moved the concert to Oak Meadow Park in Los Gatos.
A discussion took place in regards to the noise complaints and the inconsistencies with
the Sheriff Office.
Steve Prosser, Community Service Officer, stated that he has purchased new sound meter
equipment and would provide training to the Deputies. Officer Prosser stated that all of
the Sheriff Deputies have been given a copy of the Court Order and City Attorney
Wittwer would provide procedures to the Sheriff's Office at a later date.
City Manager Anderson requested contact information from Montalvo Board members
who would have the authority to make decisions when complaints are received by the
Sheriff's Office.
Mr. Prow stated that he would forward the information to the City.
Ms. Challener stated the Montalvo hires off duty Deputies to monitor the noise.
Montalvo neighbor stated that the Deputies are not stationed in the proper place in order
to get an accurate reading of the noise; they are stationed in places where the decimal
reading is lower.
City Manager Anderson stated that the City and the Sheriff s Office would make a
diligent effort to follow the Court Order.
In conclusion, Mr. Prow stated that Montalvo is making every effort to work with the
neighbors. Mr. Prow stated that Montalvo wants to be a good neighbor.
Vice Mayor King explained the new grant writer program and offered the service to
Montalvo.
Mayor Waltonsmith thanked the Montalvo Board and the neighbors for attending
tonight's Joint Session.
The City Council met in Closed Session in the Administrative Conference Room, 13777
Fruitvale Avenue, at 6:30 p.m.
Conference With Labor NeQOtiators (Gov't Code 54957.6):
Agency designated representatives: Lorie Tinfow, Assistant City Manager &
Tom Sullivan, Community Development Director
Employee organization: Non SEA Members
Public Employee Performance Evaluation (Gov't Code 54957)
Title: City Manager
Conference With Legal Counsel -Threatened Litigation: Significant exposure to
litigation pursuant to Government Code section 54956.9(b): (1 potential case)
MAYOR'S REPORT ON CLOSED SESSION - 7:00 p.m.
Mayor Waltonsmith reported there was Council discussion but no action was taken.
Mayor Waltonsmith called the Regular City Council meeting to order at 7:00 p.m. and
requested that Shahab Moghdalm, Saratoga Boy Scout Troop #581, lead the Pledge of
Allegiance.
ROLL CALL
PRESENT: Councilmembers Norman Kline, Nick Streit,
Vice Mayor Kathleen King, Mayor Ann Waltonsmith
ABSENT: Councilmember Stan Bogosian
ALSO PRESENT: Dave Anderson, City Manager
Lorie Tinfow, Assistant City Manager
Richazd Taylor, City Attorney
Cathleen Boyer, City Clerk
Tom Sullivan, Community Development Director
John Cherbone, Public Works Director
Cary Bloomquist, Administrative Analyst
REPORT OF CITY CLERK ON POSTING OF AGENDA FOR SEPTEMBERl,
2004
Cathleen Boyer, City Clerk, reported that pursuant to Government Code Section 54954.2,
the agenda for the meeting of September 1, 2004 was properly posted on August 25,
2004.
COMMUNICATIONS FORM COMMISSIONS & PUBLIC
ORAL COMMUNICATIONS
Ray Davis noted that on Saturday at the Los Gatos Community Foundation's annual fund
raising event, the names of the men and women serving in the armed forces from this
area were mentioned. Mr. Davis also noted that the "Citizens for the Safety of Highway
9" recently persuaded VTA to include pedestrian crossing in the CIP project. Mr. Davis
also requested that the City of Saratoga remove several trees on Austin Lane @ Highway
9.
ANNOUNCEMENTS
None
CEREMONIAL ITEMS
None
SPECIAL PRESENTATIONS
lA. DARKEN DEFFNER/ PG&E -NON-RESIDENTIAL ENERGY
EFFICIENCY PROGRAMS
STAFF RECOMMENDATION:
Informational only.
Darren Deffner, Government Relations, thanked the City Council for the
opportunity to present PG&E's Energy Efficient Programs. Mr. Deffner stated
that the programs provide information and financial incentives to help business
customers save money on energy costs. Mr. Deffner introduced Ben Mehta, PG&E
Energy Efficiency Manager.
Mr. Mehta explained the total electricity use per capita from 1960-2001and
explained the business efficiency incentives program. Mr. Mehta stated that the
City of Saratoga earned a $16,455 rebate when the 2001 LED Traffic Light Project
was completed. Mr. Mehta pointed out future opportunities such as:
• Energy audit of large facilities and prioritize actions for retrofit
opportunities and cost reductions
• "Free" products under the Express Efficiency Pilot Program
• Compact Florescent Lamps, LED Exit signs, Programmable Thermostats
• Vending machine controllers for additional cost of $50 each after a $90
rebate
Mayor Waltonsmith thanked Mr. Deffner and Mr. Mehta for their presentation.
1B. VALLEY TRANSPORTATION AUTHORITY -COMMUNITY BUS
SERVICE PROGRAM
STAFF RECOMMENDATION:
Accept report and provide input to VTA.
John Cherbone, Public Works Director, presented staff report.
Director Cherbone reported that on August 11, 2004, City staff attended the first
meeting regarding the proposed Community Bus Service Program. In attendance
were representatives from Los Gatos, Cupertino, Campbell, Monte Sereno, and
San Jose. It was agreed that the first step in developing the service would be a
short presentation to each City Council by VTA staff.
Joanne Benjamin. , VTA/Transportation Policy & Program Manager, thanked the
Council for allowing VTA to present the Community Bus Program.
Chris Tucker, VTA/ Chief of Operations, explained the Community Bus Program
and listed its attributes as follows:
• Use of small vehicles
• Routes are short and continuous within a defined community
• Match travel patterns ofcommunity-oriented activity
• Flexibility to meet varying community needs
Mr. Tucker described the Community Bus typical services and provided sample
route coverage.
Mr. Tucker described the Community Bus Program's ITS technologies.
Mr. Tucker stated that current Community Bus Programs exist in Washington D.C.
and Phoenix, Arizona.
Mr. Tucker explained the next steps of the proposed program as follows:
• Define Community/Transit market to be served:
o Initiate meetings with cities -Summer 2004
o Conduct market segmentation analysis
o Initiate consensus building planning process
o Develop budget and identify funding sources
• Develop transit plans -Spring 2005
• Public/CityBoazd review -Summer 2005
• Vehicle purchase - Summer/Fa112005
• Start operations -January 2006
Councilmember Kline stated that he attended the August 18`h VTA Board meeting.
and pointed out the Board did not approve the program. Councilmember Kline
noted that he is excited about the program, but would be hesitant to get involved
until the Board actually approved the program.
Mr. Tucker responded that the VTA Boazd adopt the short-range program a year
and half ago. Mr. Tucker stated Saratoga doesn't have to participate in the
Community Bus Program.
Mayor Waltonsmith asked the City Council if they would like to agendize this
issue.
Councilmember Kline suggested that two Councilmembers and a staff person
work with VTA on this issue.
Mayor Waltonsmith thanked VTA for the presentation
CONSENT CALENDAR
2A. APPROVAL OF CITY COUNCIL MINUTES -JULY 21, 2004
STAFF RECOMMENDATION:
Approve minutes.
STREIT/KING MOVED TO APPROVE CITY COUNCIL MINUTES FROM
JULY 21.2004. MOTION PASSED 4-0-1 WITH BOGOSIAN ABSENT.
2B APPROVAL OF CITY COUNCIL MINUTES -AUGUST 9, 2004
STAFF RECOMMENDATION:
Approve minutes.
STREIT/ KING MOVED TO APPROVE CITY COUNCIL MINUTES FROM
AUGUST 9.2004. MOTION PASSED 4-0-1 WITH BOGOSIAN ABSENT.
2C. APPROVAL OF CITY COUNCIL MINUTES -AUGUST 11, 2004
STAFF RECOMMENDATION:
Approve minutes.
STREIT/ KING MOVED TO APPROVE CITY COUNCIL MINUTES FROM
AUGUST 11, 2004. MOTION PASSED 4-0-1 WITH BOGOSIAN ABSENT.
2D. APPROVAL OF CITY COUNCIL MINUTES -AUGUST 16, 2004
STAFF RECOMMENDATION:
Approve minutes.
STREIT/ KING MOVED TO APPROVE CITY COUNCIL MINUTES FROM
AUGUST 16, 2004. MOTION PASSED 4-0-1 WITH BOGOSIAN ABSENT.
2E. APPROVAL OF CITY COUNCIL MINUTES -AUGUST 18, 2004
STAFF RECOMMENDATION:
Approve minutes.
STREIT/ KING MOVED TO APPROVE CITY COUNCIL MINUTES FROM
AUGUST 18, 2004. MOTION PASSED 4-0-I WITH BOGOSIAN ABSENT.
2F. APPROVAL OF CHECK REGISTER
STAFF RECOMMENDATION:
Approve check register.
STREIT/ KING MOVED TO APPROVE CHECK REGISTER. MOTION
PASSED 4-0-I WITH BOGOSIAN ABSENT.
2G CONTRACT EXTENSION FOR ALLISON KNAPP, CONSULTING
SENIOR PLANNER FOR THE BARRY SWENSON/QUITO ROAD
PROJECT
STAFF RECOMMENDATION:
Approve employment agreement extension with Allison Knapp not to exceed
$20,000 without further Council authorization.
STREIT/ KING MOVED TO APPROVE EMPLOYMENT AGREEMENT
EXTENSION WITH ALLISON KNAPP NOT TO EXCEED $20,000
WITHOUT FURTHER COUNCIL AUTHORIZATION. MOTION PASSED
4-0-1 WITH BOGOSIAN ABSENT.
2H. 2ND READING & ADOPTION OF UUT ORDINANCE
STAFF RECOMMENDATION:
Adopt ordinance.
STREIT/ KING MOVED TO ADOPT ORDINANCE. MOTION PASSED 4-0-1
WITH BOGOSIAN ABSENT.
2I. PARKS AND RECREATION COMMISSION MEETING TIME CHANGE
REQUEST
STAFF RECOMMENDATION:
Adopt resolution.
RESOLUTION: 04-070
STREIT/ KING MOVED TO ADOPT RESOLUTION CHANGING THE
PARKS AND RECREATION MEETING TO 7:00 P.M. MOTION PASSED
4-0-1 WITH BOGOSIAN ABSENT.
2J. CONTRACT RENEWAL FOR CITY SURVEYOR
STAFF RECOMMENDATION:
Approve two-year contract renewal with McDowell Associates and authorize City
Manager to execute the same.
STREIT/ KING MOVED TO APPROVE TWO-YEAR CONTRACT
RENEWAL WITH MCDOWELL ASSOCIATES AND AUTHORIZE CITY
MANAGER TO EXECUTE THE SAME. MOTION PASSED 4-0-1 WITH
BOGOSIAN ABSENT.
2K. CONTRACT RENEWAL FOR CITY GEOTECHNICAL CONSULTANT
STAFF RECOMMENDATION:
Approve two-year contract renewal with Cotton, Shires & Associates and
authorize City Manager to execute the same.
STREIT/ KING MOVED TO APPROVE TWO-YEAR CONTRACT
RENEWAL WITH COTTON. SHIRES & ASSOCIATES AND
AUTHORIZE CITY MANAGER TO EXECUTE THE SAME. MOTION
PASSED 4-0-1 WITH BOGOSIAN ABSENT.
2L. CONTRACT RENEWAL FOR MONTHLY LANDSCAPE
MAINTENANCE SERVICES
STAFF RECOMMENDATION:
Approve one-year contract renewal with Gachina Landscape Maintenance and
authorize City Manager to execute the same.
STREIT/ KING MOVED TO APPROVE ONE-YEAR CONTRACT
RENEWAL WITH GACHINA LANDSCAPE MAINTENANCE AND
AUTHORIZE CITY MANAGER TO EXECUTE THE SAME. MOTION
PASSED 4-0-1 WITH BOGOSIAN ABSENT.
2M. STATE OF CALIFORNIA DEPARTMENT OF PARK AND RECREATION
2002 RESOURCES BOND ACT (PROPOSITION 40): APPROVAL OF THE
PER CAPITA GRANT RESOLUTION AND ROBERT-Z'HARRIS URBAN
OPEN SPACE AND RECREATION PROGRAM BLOCK GRANT
RESOLTUION
STAFF RECOMMENDATION:
Adopt resolution in support of the 2002 Per Capita Grant Program; adopt
resolution in support ofRobert-Z'Berg-Hams Block Grant Program.
RESOLUTION: 04-68 & 69
Mary Robertson requested that item 2M be removed from the Consent Calendar.
Mrs. Robertson asked if the resolution was strictly to acquire the funds.
Director Cherbone responded that the purpose of this resolution lock up the funds
so the State knows the City of Saratoga is interested in keeping the funds in
Saratoga.
Mrs. Robertson asked if the funds would be used for the Kevin Moran Park
Improvement Project.
Director Cherbone noted that in the CIP the City does have the funds appropriated
to the Kevin Moran Park Improvement Project. The funds to pay for the majority
of the funds would come from this grant. Director Cherbone explained that at this
time the City is not directing the funds to any specific project- Kevin Moran Park
Improvement Project is on hold. Director Cherbone noted that the City could
reallocate these funds to another project.
STREIT/ KING MOVED TO ADOPT RESOLUTION IN SUPPORT OF THE
2002 PER CAPITA GRANT PROGRAM; ADOPT RESOLUTION IN
SUPPORT OF ROBERT-Z'BERG-HARRIS BLOCK GRANT PROGRAM.
MOTION PASSED 4-0-1 WITH BOGOSIAN ABSENT.
Consensus of the City Council to move to item 6 & 7.
NEW BUSINESS
6. SHERIFF'S OFFICE AGREEMENT
STAFF RECOMMENDATION:
Accept and authorize City Manager to execute the Law Enforcement Contract with
Santa Clara County.
Lorie Tinfow, Assistant City Manager, presented staff report.
Assistant City Manager Tinfow explained that the City has contracted with the
Santa Clara County Sheriff s Office for law enforcement services for many years.
Recent substantial cost increase associated with salary and pension increases for
public safety employees resulted in discussions with the Sheriff s Office about the
contract's future and produced the proposed contract.
Assistant City Manager Tinfow highlighted the most significant elements of the
proposed contract:
• The term of the contract is for 10 years with a possible extension of an
additional 5 years.
• Service levels will be reviewed annually and can be modified at the City's
discretion.
• Cost controls have been put in place based on funding levels included in
the City's 2004-2005 budget. Salary increases are tied to either actual
increases or CPUW plus 2% whichever is smaller. Pension increases will
reflect the City's proportion of actual increases sustained by the Sheriff s
Office.
• The contract also addresses costs associated with moving the Sheriff s
Office operations to a new location.
• The City or the County can terminate the contract at any time with 180
days written notice.
Mayor Waltonsmith thanked City Manager Anderson and Assistant City Manager
Tinfow for their work on this contact.
Councilmember Streit stated that he was apprehensive in signing aten-year
contract that would tie the hands of future Councils. Councilmember Streit
expressed his concerns in regards to operating expenses that cannot becontrolled -
i.e. utilities and insurance. Councilmember Streit noted that the rent is locked into
at 3% but all other expenses could substantially increases over time.
9
Captain John Hirakawa, SCC Sheriff s Office, responded that the property owner
of the building in Cupertino has requested that utilities, taxes, and CIP have no
cost cap. Captain Hirakawa stated that if there is a change of ownership there
could be an increase of property taxes.
Councilmember Streit stated that he doesn't fee the Council has done their due
diligence on this contract - to many unknown cost. Councilmember Streit
requested that this item be postponed until the next meeting.
Consensus of the City Council to bring this item back on September 15, 2004.
WEST VALLEY MISSION COLLEGE STADIUM
STAFF RECOMMENDATION:
Accept and authorize City Manager to execute the Agreement Pertaining to a
Stadium at West Valley College.
Dave Anderson, City Manager, presented staff report.
City Manager Anderson stated that the issue of a football stadium at West Valley
College has been a controversy in the community for over 35 years. This issue has
been the subject of legislation, court cases, and political maneuvering.
Last spring, City Manager Anderson explained that representatives for the College
District, the surrounding neighborhood, and the City have generated a conceptual
agreement. The City Council approved the conceptual agreement in June and
directed staff to move forward with a final agreement. The City Attorney has
worked with the College's District Attorney to formulate the final three-party
agreement.
City Manager Anderson highlighted the most significant elements of the proposed
agreement:
• The District will comply with the City's code and use permit requirements
governing use of the football/track facility and will limit the use of the
facility by outside groups (only k-12 school or non-profit youth groups will
be allowed).
• The District will not challenge the legality or enforcement of the City's
code with respect to the football/track facility or imitate or implement any
action that would permit construction of an athletic stadium on the West
Valley Campus.
• The City will recognize the current uses of existing athletic fields and the
District swimming pool as legal non-conforming uses not subject to the
code's restrictions on matters such as seating and amplified sound. This
applies only to existing uses of existing facilities. Any new or expanded
uses would be subject to the code. For atwo-year period the City will use
its enforcement discretion in a way that allows the District to use portable
hand held amplified sound equipment at two specified track events each
year.
• The neighbors will create a formal neighborhood organization with legal
status allowing the organization to be a party to the agreement.
10
• The agreement covers 30 years and maybe amended by agreement of all
three parties.
• The three parties have agreed to enforcement provisions that include
mediation procedures and the possibility of liquidated damages.
Jack Lucas, President/Board of Trustees, thanked the neighborhood group and the
City Council for all of their efforts to resolve this issue. Mr. Lucas introduced the
new President of West Valley College, Dr. Phil Hartley.
Stan Arterberry, Chancellor, thanked City Manager Anderson for his efforts and
thanked the Committee for bringing closure to this issue.
Phil Hartley, President, stated that he was involved in the last part of this process
and commented on the professionalism and courtesy that the Committee showed
each other. Mr. Hartley noted that it is now his duty is to honor the agreement.
Evan Baker noted that he represented that neighborhood group. Mr. Baker urged
the City Council to accept the agreement.
Councilmember Streit thanked everyone for working on this issue.
Councilmember Streit stated that throughout the process there were good
negotiations and every one was very respectful.
City Manager Anderson thanked Chancellor Arterberry for his leadership and
thanked the other members of the AdHoc.
STREIT/WALTONSMITH MOVED TO ACCEPT AND AUTHORIZE CITY
MANAGER TO EXECUTE THE AGREEMENT PERTAINING TO A
STADIUM AT WEST VALLEY COLLEGE. MOTION PASSED 4-0-1 WITH
BOGOSIAN ABSENT.
Mayor Waltonsmith declared aten-minute break at 8:50 p.m.
Mayor Waltonsmith reconvened the meeting at 9:00 p.m.
Consensus of the City Council to move to item #4
OLD BUSINESS
4. GRANT OPPORTUNITIES REVIEW BY CITY COUNCIL /REVIEW OF
GRANT WRITER UTILIZATION AND GUIDANCE POLICY
STAFF RECOMMENDATION:
Review grant opportunities and provide direction to staff; Review Grant Writer
Utilization and Guidance Policy for possible changes.
Cary Bloomquist, Administrative Analyst, presented staff report.
Analyst Bloomquist reported that on June 2, 2004 the City of Saratoga adopted a
City of Saratoga Grant Wirier Utilization Procedure and Guidance Policy.
Analyst Bloomquist noted that as stated in these documents, City staff is required
to forward grant opportunities utilizing the service of our contacted grant writer,
11
Randall Funding and Development, to City Council for review.
Analyst Bloomquist noted that there were three grant opportunities requiring
review by the City Council. Analyst Bloomquist summarized the grant
opportunities as follows:
• City ofSaratoga - 2002 State of California Bond Act -amount to be
determined
• Saratoga Historical Foundation -Office of the State Historian- $60,000
• Saratoga Historical Museum -Institution of Museum and Library Services
-$20,000
In regards to the Grant Writer Utilization and Guidance Policy, Analyst
Bloomquist request that City Council revise the Procedure and Policy as follows:
• Make changes to expand the jurisdictions served by the grant writer to
include County Agencies and surrounding municipalities. This would
enable staff to work closely with these agencies and offer the use of our
contracted Grant Writer should mutually beneficial projects surface at
some future date.
• Appoint a two member City Council AdHoc Committee to review grant
applications in the event a grant submittal deadline does not allow
sufficient time to schedule a review at a regularly scheduled City Council
meeting.
Mayor Waltonsmith noted that she would be willing to support expanding the
grant writing services to other jurisdictions as long as there is a benefit to Saratoga.
Councilmember Kline stated that an AdHoc should review grant applications that
are within Saratoga, but outside applications should come before the entire
Council. Councilmember Kline suggested the Mayor and Vice Mayor be assigned
to the AdHoc Committee.
April Halberstadt thanked the City Council for contracting with Randall Funding.
Ms. Halberstadt explained their grant application.
STREIT/KLINE MOVED TO DIRECT RANDALL FUNDING TO SUBMIT
GRANT APPLICATIONS: ESTABLISH ADHOC COMMITTEE WITH
STAFF MAYOR AND VICE MAYOR; SUPPORT CHANGES TO POLICY
AND PROCEDURES. MOTION PASSED 4-0-1 WITH BOGOSIAN ABSENT.
PUBLIC HEARINGS
AMENDMENT AND EXTENSION OF AN INTERIM ORDINANCE
PROHIBITING NEW PERSONAL SERVICES BUSINESSES ON THE
GROUND FLOOR FRONTING A STREET IN THE VILLAGE
STAFF RECOMMENDATION:
Conduct Public Hearing and adopt ordinance.
TITLE OF ORDINANCE:
Tom Sullivan, Community Development Director, presented staff report.
12
Director Sullivan stated that the draft ordinance amends and extends Ordinance
223, which prohibits the establishment of new Personal Service Businesses in the
Village. Director Sullivan noted that the ordinance would continue to bar against
new Personal Service Businesses from locating in ground floor spaces fronting a
street in the Village. Personal Service Businesses include, but are not limited to
hair and nail salons and day spas. Director Sullivan stated that this ordinance
would extend the Interim Ordinance by one year and may not be extended again.
Mayor Waltonsmith opened the public hearing and invited public comments.
Seeing none, Mayor Waltonsmith closed the public hearing.
STREIT/KLINE MOVED TO ADOPT AMENDMENT AND EXTENSION OF
AN INTERIM ORDINANCE PROHIBITING NEW PERSONAL
SERVICES BUSINESSES ON THE GROUND FLOOR FRONTING A
STREET IN THE VILLAGE. MOTION PASSED 4-0-1 WITH BOGOSIAN
ABSENT.
OLD BUSINESS
5. REVIEW COUNCILMEMBER ASSIGNMENTS TO DEANZA TRAIL
TASK FORCE
STAFF RECOMMENDATION:
Accept report and direct staff accordingly.
John Cherbone, Public Works Director, presented staff report.
Director Cherbone reported that at the time the DeAnza Trail Task Force was
established, two Councilmembers agreed to participate -Bogosian and
Waltonsmith. The Mayor recently asked that these assignments be reviewed to
determine whether schedules allow for adequate participation.
Mayor Waltonsmith pointed out the Councilmember Bogosian has missed the last
four meetings.
Vice Mayor King suggested that Councilmember Streit take Councilmember
Bogosian's place on the DeAnza Trail Task Force.
KING/STREIT MOVED TO REPLACE COUNCILMEMBER BOGOSIAN
WITH COUNCILMEMBER STREIT ON THE DEANZA TRAIL TASK
FORCE. MOTION PASSED 4-0-1 WITH BOGOSIAN ABSENT.
PERMISSION TO FILL FACILITIES MAINTENANCE WORKER I
POSITION VACANCY
STAFF RECOMMENDATION:
Council designate the position as "essential" and authorize the City Manager to fill
the Facilities Maintenance Worker I position.
Lorie Tinfow, Assistant City Manager, presented staff report.
13
Assistant City Manager Tinfow stated that the staff hiring freeze enacted in 2003-
04 continues to be in effect for FY 04-05. A current Facility Maintenance Worker
has filled the vacant Parks Maintenance Worker II position and this action
produces a new vacancy. At this time staff requests direction on whether or not
Council considers this position "essential" and wishes to authorize the City
Manager to release the hiring freeze in order to fill this position.
A discussion took place in regards to amending hiring freeze resolution to exclude
positions filled by internal employees.
KING/KLINE MOVED TO DESIGNATE THE POSITION AS
"ESSENTIAL" AND AUTHORIZE THE CITY MANAGER TO FILL THE
FACILITIES MAINTENANCE WORKER I POSITION AND AMEND THE
RESOLUTION ON THE HIRING FREEZE TO EXCLUDE IN HOUSE
PROMOTIONS. MOTION PASSED 4-0-1 WITH BOGOSIAN ABSENT.
AGENCY ASSIGNMENTS
Mayor Ann Waltonsmith had no reportable information
Vice Mayor King had no reportable information.
Councilmember Norman Kline reported the following information:
Librazy Joint Powers Association -announced that libraries would start closing on
Mondays.
Vallev Transnortation Authority PAC -Grand Jury report has been released. The City of
Los Altos sent letter to the Board requesting reformation. Councilmember Kline
requested that this item be agendized.
Councilmember Streit reported the following information:
West Vallev Solid Waste Joint Powers Association -continuing to work on the RFP for
solid waste.
West Vallev Sanitation District -starting the process of taking over the Town of Los
Gatos sewer system. One-year transition, which will save over $300k per year.
CITY COUNCIL ITEMS
Referring to the presentation by PG&E, Councilmember Kline requested that staff
investigate solar power on city owned buildings.
Consensus of the City Council to support Councilmember Kline's request
OTHER
City Attorney Taylor noted that he would be on vacation for the next two weeks and
noted that Attorney Wittwer would be attending the September 15th meeting.
CITY MANAGER'S REPORT
City Manager Anderson thanked Assistant City Manager Tinfow for acting as City
Manager during his vacation.
14
ADJOURNMENT
There being no further business, Mayor Waltonsmith adjourned the meeting at 10:05 p.m.
Respectfi
Cathleen
City Clerl
15