Loading...
HomeMy WebLinkAboutCity Council Resolution 119.1 RESOLUTION NO. 119.1 A RESOLUTION ESTABLISHING THE SCHEDULE OF STORM DRAIN CONSTRUCTION COSTS FOR CREDIT AGAINST STORM DRAINAGE FEES The City Council of the City of Saratoga hereby resolves as follows: Reference is hereby made to Paragraph (F) of Table I, Ordinance NS-60, of the City of Saratoga. Section 1: The following is hereby adopted as the schedule of Storm Drain Construction Costs for use in computing the credit to be allowed by the City of Saratoga against 75% of the storm drainage fee more particularly set forth in the above- referred to table. The within schedule constitutes a schedule of all costs. Wherever.the credit is applied by reason of over- sizing in-tract drainage facilities, the same shall be determined by deducting the cost per lineal foot for normal sizing from the cost per lineal foot for over-sizing. Size and/or Material Costs 12" Pipe .............................. $6.00 per lin. ft. 15" Pipe .............................. $7.00 per lin. ft. 18" Pipe .............................. $8.50 per lin. ft. 21" Pipe .............................. $10.00 per lin. ft. 24" Pipe .............................. $11.50 per lin. ft. 27" Pipe .............................. $13.50 per lin. ft. 30" Pipe .............................. $16.00 per lin. ft. 33" Pipe .............................. $19.00 per lin. ft. 36" Pipe .............................. $22.00 per lin. ft. 42" Pipe .............................. $26.00 per lin. ft. 48" Pipe .............................. $31.00 per lin. ft. 54" Pipe .............................. $36.00 per lin. ft. 60" Pipe .............................. $41.00 per lin. ft. 66" Pipe .............................. $47.00 per lin. ft. 72" Pipe .............................. $53.00 per lin. ft. Inlets ............................... $400.00 Manholes .............................. $450.00 Conc. Sack Rip Rap .................... $50.00/C.Y. Struct. Reinf. P.C.C ................. $150.00/C.Y. Pavement Replacement* a. Double Armor coat - up to 6" A.B. - 25 cents per sq. ft. b. 3" plant mix - up to 8" A.B. '~!~60 cents per sq. ft. c. 3" plant mix - 8" to 12" A.B. - 85 cents per sq. ft. All other items Cost to install as agreed to by City Engineer prior to installation. *Replacement footage will be allowed for a width of 2½ feet more than O.D. of C.M.P.: 3 feet more than O.D. of R.C.P. Section 2: Deductible costs shall not include any costs other than as above set forth, and without limiting the gen- erality of the foregoing, shall not include allowances for land required to be dedicated, profit, overhead, inspection, or engineering costs to the subdivider, except as may otherwise expressly be included in the above schedule. The above and foregoing resolution was passed and adopted by the City Council of the City of Saratoga on the' 20 day of July , 19 77 __, by the following vote: Page 2. ) AYES: CouncTlmen Bridge~, Brigham, Krcaus, Corr & Matteoni NOES: C 3 CLERK