Loading...
HomeMy WebLinkAboutCity Council Resolution 780.4 RESOLUTION NO. 780-4 A RESOLUTION ALTERING & ESTABLISHING FEE SCHEDULE The City Council of the City of Saratoga hereby resolves as follows: SECTION 1: The following schedule of fees is hereby established for payment to the City of Saratoga on application for each of the following enumerated applications, and no delivery to nor acceptance by the City or any of its officers, agents or employees of any of the following enumerated applications shall be considered as filing thereof, until said fee has been paid in full. This fee schedule shall become effective immediately and shall be applicable to all applications filed from and after its effective date. TYPE FEE Storm Drainage Fees "A" $1,100/lot R-l-10,000 600/lot R-1-12,500 650/lot R-l-15,000 720/lot R-I-20,000 850/lot R-i-40,000 1,100/lot Planned Development Same as fee for District with which PD is combined RM & PA Districts 2,400/gross acre C & M Districts 2,800/gross acre Churches, Schools, etc. 1,425/gross acre Public Utilities & other quasi-commercial 2,400/gross acre * Improvement, Plan Checking & Inspection Fees For the first $10,000 12% For the next Igg,000 10% For the next ,000 6% For all improvements over $100,000 4% Community Center R~ntal Security Damage Deposit · Function without alcoholic beverage 50 ® Function with alcoholic beverage 100 If security damage deposit paid and event cancelled with less than 15 days notice, $25.00 of security damage deposit shall be retained * Where slopes are greater than 10%, increase fee by 1% above fee percentage shown. TYPE FEE Resident Non-Resident Multi-purposeRoomandSnackBarArea $30/hr. $40/hr. Multi-purpose Room only 20/hr. 30/hr. Snack Bar Area only 15/hr. 20/hr. Meeting Room only 15/hr. 20/hr. Arts and Crafts Room only 15/hr. 20/hr. Kitchen Use with Dishes and Utensils $35/day Kitchen Use without Dishes and Utensils 20/day Backyard Use 30/day Fee for Set-up and Clean-up Time 10/hr. Building Supervision Fee Day and Evening $ 4/hr. After Midnight 5/hr. SECTION 2: Except as above-modified, the schedule of fees heretofore adopted by Resolution 780, as amended, shall be and remain in full force and effect. SECTION 3: Resolution 699 (A Resolution Altering and Establishing Fees for Building, Plumbing, Heating, Comfort Cooling, Electrical, Plan Checking and Grading Permits) is hereby rescinded and pursuant to Sections 3-3, 3-19, 3-41 and 6-2.2 of the Saratoga City Code, as amended by Ordinance 38-83, the following schedule of fees elaborated in Exhibit "A", "B", "C", "D", "E", and "F" is hereby established for payment to the City of Saratoga on appli- cation for each of the following enumerated applications, and no delivery to nor acceptance by the City or any of its officers, agents, or employees of any of the following enumerated appli- cations shall be considered as filing thereof, until said fee has been paid in full. This fee schedule shall become effective immediately and shall be applicable to all applications filed from and after its effective date. The above and foregoing resolution was adopted at an Adjourned Regular Meeting of the City Council of the City of Saratoga held on the 27th day of June , 1978, by the following vote: AYES: Councilraen Kalb, Matteoni, Kraus & Corr NOES: Council~ Callon ABSENT: None )R ATTE S~, CITY CLERK EXHIBIT "A" BUILDING PERMIT FEES Total Valuation Fee $1.00 to $5oo.oo $15.00 $501.00 to $2,000.00 $15.00 for the first $500.00 plus $2.00 for each additional $100.00 or fraction thereof, to and including $2,000.00 $2,001.00 to $10,000.00 $45.00 for the first $2,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof, to and including $10,000.00 $10,000 to $25~000.00 $85.00 for the first $10,000.00 plus $4.00 for each $1,000.00 or fraction thereof, to and including $25,000.00 $25,000.00 to $50,000.00 $145.00 for the first $25,000.00 lus $3.00 for each additional 1,000.00 or fraction thereof, to and including $50,000.00 $50,001.00 to $i00,000.00 $220.00 for the first $50,000.00 lus $1.50 for each additional 1,000.00 or fraction thereof, to and and including $100,000.00 $100,001.00 to $500,000.00 $295.00 for the first $100,000.00 lus $1.50 for each additional 1,000.00 or fraction thereof, to and including $500,000.00 $500,001.00 and up $895.00 for the first $500,000.00 plus $1.00 for each additional $1,000.00 or fraction thereof Plan Check Fees shall be 65% of the Permit Fee. EXHIBIT "B" PLUMBING PERMIT FEES 1) New Single Family Dwelling 2¢/SF 2) Commercial/Professional 1.5¢/SF 3) Institutions, Multiple Residential 3¢/SF 4) Additions of more than 500 SF 30/SF 5) Additions of less than 500 SF $15 6) Remodels, residential $25 7) Remodels, commercial $40 8) Swimming Pools (with pump & heater) $15 9) Misc. Structures $20 10) Misc permits without associated building permit $15 EXHIBIT "C" HEATING & COMFORT CC~LING PERMITS 1) New single family dwelling .8¢/SF 2) Commercial/Professional 1.0¢/SF 3) Institutional, Multiple Residential 1.3¢/SF 4) Additions of less than 500 SF $15 5) Additions of more than 500 SF .6¢/SF 6) Remodels, residential .6¢/SF 7) Remodels, commercial .8¢/SF 8) Misc. Structures ~15 9) Misc. permits without associated building permit $20 EXHIBIT"D" ELECTRICAL PERMITS 1) Single Family dwelling 2¢/SF 2) Commercial/Professional 2.5¢/SF 3) Institutional, Multiple Residential 2.5¢/SF 4) Additions less than 500 SF $15 5) Additions more than 500 SF 1.5¢/SF 6) Remodels, residential $15 7) Remodel, commercial $30 8) Swimming Pools etc. (with pump and heater) $15 9) Misc Structures $15 10) Mist. Permits without associated building permit $15 EXHIBIT "E" GRADING PERMITS PLAN CHECKING FEES 50 to 100 Cubic Yards $ 25.00 101 to 500 Cubic Yards $ 25.00 501 to 1000 Cubic Yards $ 50.00 1001 to 10,000 Cubic Yards $100.00 10,001 to 100~O00 Cubic Yards $100.00 for the first 10,000 Cubic Yards plus $11.00 for each additional 10,000 Cubic Yards or fraction thereof. 100,001 to 200,000 Cubic Yards $200.00 for the first lO0,00O Cubic Yards plus $10.00 for each additional 10,000 Cubic Yards or fraction thereof. 200,001 Cubic Yards or more $300.00 for the first 200,000 Cubic Yards plus $5.00 for each additional 10,000 Cubic Yards or fraction thereof. GRADING PERMIT FEES 50 Cubic Yards or Less $ 20.00 50 to 100 Cubic Yards $ 30.00 101 to 1000 Cubic Yards - $30.00 for the first 100 Cubic Yards plus $12.00 for each additional 100 Cubic Yards or fraction thereof. 1001 to 10,000 Cubic Yards $130.00 plus $10.00 for each additional 1000 Cubic Yards or fraction thereof. 10,001 to 100,000 Cubic Yards $220°00 plus $45.00 for each additional 10,000 Cubic Yards or fraction thereof. 100,001 Cubic Yards or more $610.00 plus $25.00 for each additional 10,000 Cubic Yards or fraction thereof. ATTACHMENT 2 EXHIBIT F Fire Related Plan Checks & Ihspections 1. The following uses or categories shall require an annual permit fee: A. Institutions (Hospitals, Board and Care, Residential Care) 1. Over 50 persons ............................... ~75.00 2. More than six persons ......................... $50.00 B. Day Care Nurseries: 1. Six or more ................................... $25.00 2. Less than six ................................. NO FEE 2. The following uses Dr categories shall require a one time basic inspection fee of thirty dollars ($30.00) and an additional one time individual permit fee as listed below: A. Compressed gases .................................. $ 5.00 B. Containers for welding and cutting gases, storageo$ 5.00 C. Flammable finj~hing~ material ..................... $ 5.00 D. Flammable or combustible liquid storage ........... $15.00 E. Hazardous chemicals ............................... $ 5.00 F. Magnesium ......................................... $ 5.00 G. Oil burning equipment ............................. $ 5.00 H. Organic coatings ......................... ~ ........ $ 5.00 I. Ovens and furnaces ................................ $ 5.00 J. Places of assembly ................................ $15.00 K. All tanks and equipment installation, per site .... $ 5.00 L. Tent erections .................................... $ 5.00 3. The following uses, categories, and/or licenses shall require fees as listed below: A. Bowling establishments (per each resurfacing) ..... $ 5.00 B. Explosives storage facility installation (one time only) .......... ' ................................... $45.00 C. Flammable liquid tanks removal, repair, relocation disassembly (per tank over 100 Gallons) ........... $15.00 3. CONTINUED D. Modification of F.P.C., application for ............... $45.00 E. Non-flammable medical Gas Manifold installation (one time charge only) ....... each .......................... $20.00 F. Site Inspection (special request) ..................... $50.00 4. Fire protection equipment installation (one time only) A. Automatic Sprinkler System at 0.25¢ per head or $45.00 for inspection, whichever is greater. Exceptions: additions and or alterations on new construction. No fee under ten (10) sprinklers will be charged. B. A plan check of 65% of the total head charge (as per A above) will be made for plan checking. C. Fixed extinguisher system at $2.50 per nozzle or $30.00 per in- spection, whichever is greater. 5.. Fire alarm and detector System. A. 0.25¢ per unit, or $30.00 per inspection whichever is greater. Exception: no fee will be charged for 5 or less. 6~ Penalties for Non-Renewal. A. Penalty for non-renewal of any permit after 30 day notice..$30.00 B. Penalty for Violations ..................................... $30.00 7. Site Approval Review A. For each application ....................................... $25.00 B. Plus for each hydrant ...................................... $10.00