Loading...
HomeMy WebLinkAboutCity Council Resolution 780.20 RESOLUTION ~.. 780-20 A RESOLUTION ALTERING & ESTABLISHING FEE SCHEDULE The City Council of the City of Saratoga hereby resolves as follows: SECTION 1: The following schedule of fees is hereby established for payment to the City of Saratoga on application for each of the following enumerated applications, and no delivery to nor acceptance by the City or any of its officers, agents or employees of any of the following enumerated applications shall be con- sidered as filing thereof, until said fee has been paid in full. This fee schedule shall become effective immediately and shall be applicable to all applications filed from and after its effective date. TYPE FEE CHANGE IN ZONING $1000 DESIGN REVIEW Residential Single family $400 (building greater than 22')* (hillside lots)* Condo/Multiple Family $500/lot Non-Residential $700/lot Modification of Approved Application $150/lot Signs $100 *PUBLIC HEARING CHARGE $50 + $150 deposit* (First hearing and additional charge for any requested con- tinuance for re-noticing) APPLICANT REQUEST FOR CONTINUANCE FEE $100 USE PERMIT Residential (single-family districts) $250 Tennis Court $200 Multi-Family $1000 Non-Residential $500 PD (General Plan Designation) $1000 Temporary ($200 cleanup deposit in $100 addition) VARIANCE Residential $250 Non-Residential $300 ENVIRONMENTAL IMPACT REPORT Environmental Impact Assessment $75 Environmental Impact Report Admin- $500 strative and Handling *If the actual cost of the consultant's noticing is less than $150 the difference will be refunded to the applicant. If the cost is greater an additional deposit will be required before the noticing is done. TYPE FEE SITE APPROVAL Single Family Residential $250/lot plus Building Site Approval up noticing fee for to and including 4 lots 2 or more lots Building Site Approval $500/lot for all other types Single Family Residential $1500 Subdivision Approval first 10 lots - each lot over 10 $50/lot Multiple-Family Building Site Approval Lots of 1 acre or less $600/lot Lots of 3 acres or less $1200/lot Lots of more than 3 acres $2000/lot Modification of Site Development Plan $100 Lot Line Adjustment $150 Preliminary Tentative Map $200 Reversion to Acreage $125/lot (Public hearing cost additional) TIME EXTENSION TO APPROVED APPLICATIONS $100 FINAL MAP 1st lot $150 2nd and above $50/lot GENERAL PLAN CHANGE $1000 ANNEXATION $100 Plus LAFCO Fee LAFCO Fee ENCROACHMENT PERMIT Fences, walls and hedges $200 Non-fence Actual Cost ($50 Minimum) SIGN PERMIT $50 MINISTERIAL PERMIT (i.e. horse) $25 STORM DRAIN FEE "A" $1100/lot R-1-10,000 $600/lot R-1-12,500 $650/lot R-1-15,000 $720/lot R-1-20,000 $850/lot R-1-40,000 $1100/lot Planned Development Same as fee for District with which PD is combined RM & PA District $2400/gross acre C & M Districts $2800/gross acre Churches, Schools, etc. $i425/gross acre Public Utilities and other quasi- $2400/gross acre commercial TYPE FEE *IMPROVEMENT PLAN CHECKING & INSPECTION FEE For the first $10,000 15% For the next $30,000 12% For the next $60,000 8% For all improvements over $100,000 6% Deposit of 25% at time of submission. *Where slopes are greater than 10%, increase fee by 1% above fee percentage shown. SECTION 2: The portion of Resolution 780-16 Altering and Estab- lishing Fees for Building, Plumbing, Heating, Com- fort Cooling, Electrical, Plan Checking and Grading Permits is hereby rescinded and pursuant to Section 3-3, 3-19, 3-41 and 6-2.2 of the Saratoga City Code, as amended by Ordinance 38-83, the following schedule of fees elaborated in Exhibit "A", "B", "C" "D" and "E" is hereby established for payment to the City , of Saratoga on application for each of the enumerated applica- tions, and no delivery to nor acceptance by the City or any of its officers, agents, or employees of any of the following enum- erated applications shall be considered as filing thereof, until said fee has been paid in full. This fee schedule shall become effective immediately and shall be applicable to all applications filed from and after its effective date. SECTION 3: Except as above-modified, the schedule of fees heretofore adopted by Resolution 780, as amended, shall be and remain in full force and effect. The above and foregoing resolution was adopted at a Regular Meeting of the City Council of the City of Saratoga held on the 21st day of July , 1982_, by the following vote: AYES: Councilmembers Clevenger, Fanelli, Mallory, Moyles and Mayor Callon NOES: None ABSENT: None MAYOR ATTEST: CITY CLERK EXHIBIT "A" BUILDING PERMIT FEES TOTAL VALUATION FEE $1.00 to $2,000.00 $30.00 $2,001.00 to 25,000 $32.50 for the first $2,000.00 plus $6.00 for each additional $1000.00 or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $170.50 for the first $25,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $283.00 for the first $50,000.00 plus $3.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 100,000.00 and up $433.00 for the first $100,000.00 plus $2.50 for each additional $1,000.00 or fraction thereof Plan Check Fees shall be 65% of the Permit Fee EXHIBIT "B" PLUMBING PERMIT FEES 1) New Single Family Dwelling 3.0¢/SOF. 2) Commercial/Professional 3.0¢/S.F. 3) Institutions, Multiple Residential 3.5¢/S.F. 4) Additions of more than ~000 S.F. 3.0¢/S.F. 5) Additions of less than 1000 S.F. $30.00 6) Remodels, residential $35.00 7) Remodels, commercial $50.00 8) Swimming Pools (with pump & heater) $30.00 9) Misc. Structures $30.00 10) Misc. permits without associated $30.00 building permit EXHIBIT "C" HEATING & COMFORT COOLING PERMITS 1) New single family dwelling 1.5¢/S.F. 2) Commercial/Professional 1.7¢/S.F. 3) Institutional, Multiple Residential 1.7¢/S.F. 4) Additions of less than 2500 S.F. $30.00 5) Additions of more than 2500 S.F. 1.2¢/S.F. (Minimum $30.00) 6) Remodels, residential 1.5¢/S.F.(Minimum $30.00) 7) Remodels, commerical 1.7¢/S.F.(Minimum $30.00) 8) Misc. Structures $30.00 9) Misc. permits without associated $30.00 building permit Plan check fees shall be 25% of the permit fee EXHIBIT "D" ELECTRICAL PERMITS 1) Single family dwelling 3.0¢/SF 2) Commercial/Professional 3.0¢/SF 3) Institutional, Multiple Residential 3.5¢/SF 4) Additions less than 1000 SF $30.00 5) Additions more than 1000 SF 3.0¢/SF 6) Remodels, residential $35.00 7) Remodels, commercial $50.00 8) Swimming Pools, etc. (with pump & $30.00 heater 9) Misc. Structures $30.00 10) Misc. permits without associated $30.00 building permit Plan check fees shall be 25% of the permit fee EXHIBIT "E" GRADING PERMITS PLAN CHECKING FEES 65% of Grading Permit Fee GRADING PERMIT FEES 50 Cubic Yards or Less $30.00 50 to 100 Cubic Yards $45.00 101 to 1000 Cubic Yards.S45.00 for the first 100 Cubic Yards plus $15.00 for each additional 100 Cubic Yards or fraction thereof. 1001 to 10,000 Cubic Yards $180.00 plus $12.00 for each additional 1000 Cubic Yards or fraction thereof. 10,001 to 100,000 Cubic Yards $288.00 plus $50.00 for each additional 10,000 Cubic Yards of fraction thereof. 100,001 Cubic Yards or more $738.00 plus $30.00 for each additional 10,000 Cubic Yards of fraction thereof.