HomeMy WebLinkAboutCity Council Resolution 780.20 RESOLUTION ~.. 780-20
A RESOLUTION ALTERING & ESTABLISHING
FEE SCHEDULE
The City Council of the City of Saratoga hereby resolves as
follows:
SECTION 1: The following schedule of fees is hereby established
for payment to the City of Saratoga on application for each of
the following enumerated applications, and no delivery to nor
acceptance by the City or any of its officers, agents or employees
of any of the following enumerated applications shall be con-
sidered as filing thereof, until said fee has been paid in full.
This fee schedule shall become effective immediately and shall
be applicable to all applications filed from and after its
effective date.
TYPE FEE
CHANGE IN ZONING $1000
DESIGN REVIEW
Residential
Single family $400
(building greater than 22')*
(hillside lots)*
Condo/Multiple Family $500/lot
Non-Residential $700/lot
Modification of Approved Application $150/lot
Signs $100
*PUBLIC HEARING CHARGE $50 + $150 deposit*
(First hearing and additional
charge for any requested con-
tinuance for re-noticing)
APPLICANT REQUEST FOR CONTINUANCE FEE $100
USE PERMIT
Residential (single-family districts) $250
Tennis Court $200
Multi-Family $1000
Non-Residential $500
PD (General Plan Designation) $1000
Temporary ($200 cleanup deposit in $100
addition)
VARIANCE
Residential $250
Non-Residential $300
ENVIRONMENTAL IMPACT REPORT
Environmental Impact Assessment $75
Environmental Impact Report Admin- $500
strative and Handling
*If the actual cost of the consultant's noticing is less than $150
the difference will be refunded to the applicant. If the cost is
greater an additional deposit will be required before the noticing
is done.
TYPE FEE
SITE APPROVAL
Single Family Residential $250/lot plus
Building Site Approval up noticing fee for
to and including 4 lots 2 or more lots
Building Site Approval $500/lot
for all other types
Single Family Residential $1500
Subdivision Approval first
10 lots - each lot over 10 $50/lot
Multiple-Family Building
Site Approval
Lots of 1 acre or less $600/lot
Lots of 3 acres or less $1200/lot
Lots of more than 3 acres $2000/lot
Modification of Site Development Plan $100
Lot Line Adjustment $150
Preliminary Tentative Map $200
Reversion to Acreage $125/lot
(Public hearing cost additional)
TIME EXTENSION TO APPROVED APPLICATIONS $100
FINAL MAP
1st lot $150
2nd and above $50/lot
GENERAL PLAN CHANGE $1000
ANNEXATION $100
Plus LAFCO Fee LAFCO Fee
ENCROACHMENT PERMIT
Fences, walls and hedges $200
Non-fence Actual Cost ($50 Minimum)
SIGN PERMIT $50
MINISTERIAL PERMIT (i.e. horse)
$25
STORM DRAIN FEE
"A" $1100/lot
R-1-10,000 $600/lot
R-1-12,500 $650/lot
R-1-15,000 $720/lot
R-1-20,000 $850/lot
R-1-40,000 $1100/lot
Planned Development Same as fee for
District with which
PD is combined
RM & PA District $2400/gross acre
C & M Districts $2800/gross acre
Churches, Schools, etc. $i425/gross acre
Public Utilities and other quasi- $2400/gross acre
commercial
TYPE FEE
*IMPROVEMENT PLAN CHECKING & INSPECTION FEE
For the first $10,000 15%
For the next $30,000 12%
For the next $60,000 8%
For all improvements over $100,000 6%
Deposit of 25% at time of submission.
*Where slopes are greater than 10%, increase fee by 1% above fee
percentage shown.
SECTION 2: The portion of Resolution 780-16 Altering and Estab-
lishing Fees for Building, Plumbing, Heating, Com-
fort Cooling, Electrical, Plan Checking and Grading Permits is
hereby rescinded and pursuant to Section 3-3, 3-19, 3-41 and
6-2.2 of the Saratoga City Code, as amended by Ordinance 38-83,
the following schedule of fees elaborated in Exhibit "A", "B",
"C" "D" and "E" is hereby established for payment to the City
,
of Saratoga on application for each of the enumerated applica-
tions, and no delivery to nor acceptance by the City or any of
its officers, agents, or employees of any of the following enum-
erated applications shall be considered as filing thereof, until
said fee has been paid in full. This fee schedule shall become
effective immediately and shall be applicable to all applications
filed from and after its effective date.
SECTION 3: Except as above-modified, the schedule of fees
heretofore adopted by Resolution 780, as amended,
shall be and remain in full force and effect.
The above and foregoing resolution was adopted at a Regular Meeting
of the City Council of the City of Saratoga held on the 21st day
of July , 1982_, by the following vote:
AYES: Councilmembers Clevenger, Fanelli, Mallory, Moyles and Mayor Callon
NOES: None
ABSENT: None
MAYOR
ATTEST:
CITY CLERK
EXHIBIT "A"
BUILDING PERMIT FEES
TOTAL VALUATION FEE
$1.00 to $2,000.00 $30.00
$2,001.00 to 25,000 $32.50 for the first $2,000.00
plus $6.00 for each additional
$1000.00 or fraction thereof,
to and including $25,000.00
$25,001.00 to $50,000.00 $170.50 for the first $25,000.00
plus $4.50 for each additional
$1,000.00 or fraction thereof,
to and including $50,000.00
$50,001.00 to $100,000.00 $283.00 for the first $50,000.00
plus $3.00 for each additional
$1,000.00 or fraction thereof,
to and including $100,000.00
100,000.00 and up $433.00 for the first $100,000.00
plus $2.50 for each additional
$1,000.00 or fraction thereof
Plan Check Fees shall be 65% of the Permit Fee
EXHIBIT "B"
PLUMBING PERMIT FEES
1) New Single Family Dwelling 3.0¢/SOF.
2) Commercial/Professional 3.0¢/S.F.
3) Institutions, Multiple Residential 3.5¢/S.F.
4) Additions of more than ~000 S.F. 3.0¢/S.F.
5) Additions of less than 1000 S.F. $30.00
6) Remodels, residential $35.00
7) Remodels, commercial $50.00
8) Swimming Pools (with pump & heater) $30.00
9) Misc. Structures $30.00
10) Misc. permits without associated $30.00
building permit
EXHIBIT "C"
HEATING & COMFORT COOLING PERMITS
1) New single family dwelling 1.5¢/S.F.
2) Commercial/Professional 1.7¢/S.F.
3) Institutional, Multiple Residential 1.7¢/S.F.
4) Additions of less than 2500 S.F. $30.00
5) Additions of more than 2500 S.F. 1.2¢/S.F. (Minimum $30.00)
6) Remodels, residential 1.5¢/S.F.(Minimum $30.00)
7) Remodels, commerical 1.7¢/S.F.(Minimum $30.00)
8) Misc. Structures $30.00
9) Misc. permits without associated $30.00
building permit
Plan check fees shall be 25% of the permit fee
EXHIBIT "D"
ELECTRICAL PERMITS
1) Single family dwelling 3.0¢/SF
2) Commercial/Professional 3.0¢/SF
3) Institutional, Multiple Residential 3.5¢/SF
4) Additions less than 1000 SF $30.00
5) Additions more than 1000 SF 3.0¢/SF
6) Remodels, residential $35.00
7) Remodels, commercial $50.00
8) Swimming Pools, etc. (with pump & $30.00
heater
9) Misc. Structures $30.00
10) Misc. permits without associated $30.00
building permit
Plan check fees shall be 25% of the permit fee
EXHIBIT "E"
GRADING PERMITS
PLAN CHECKING FEES
65% of Grading Permit Fee
GRADING PERMIT FEES
50 Cubic Yards or Less $30.00
50 to 100 Cubic Yards $45.00
101 to 1000 Cubic Yards.S45.00 for the first 100
Cubic Yards plus $15.00 for each additional 100
Cubic Yards or fraction thereof.
1001 to 10,000 Cubic Yards $180.00 plus $12.00 for
each additional 1000 Cubic Yards or fraction thereof.
10,001 to 100,000 Cubic Yards $288.00 plus $50.00 for
each additional 10,000 Cubic Yards of fraction thereof.
100,001 Cubic Yards or more $738.00 plus $30.00 for
each additional 10,000 Cubic Yards of fraction thereof.