HomeMy WebLinkAboutCity Council Resolution 2097 RE~OLUTION NO. 2097
A RESOLUTION REVISING THE HOUSING NEEDS
DETERMINATIONS FOR THE CITY OF SARATOGA
WHEREAS, the Association of Bay Area Governments is the Council
of governments (hereinafter "ABAG") under the Joint Exercise of Powers
Act for the San Francisco Bay Area; and
WHEREAS, each council of governments is required by Section
65584 of the Government Code, as added by Chapter 1143, Statutes of
1980 (hereinafter "Section 65584"), to determine the existing and
projected housing needs for its region; and
WHEREAS, each council of governments is further required to
determine each city's and county's share of the regional housing
needs to update their Housing Elements by July 1, 1984 as required
by State Law; and
WHEREAS, at the July 28, 1983 meeting of ABAG's Work Program
and Coordination Committee, acting for the Executive Board, the
Housing .~eeds Determina~.~ons report was approved for distribution
to Cities and counties throughout the Bay Area for the purpose of
beginning the official review and revision of the determinations
contained therein; and
WHEREAS, the City of Saratoga desires to revise its share
of the regional housing need based on available data and accepted
planning methodology in accordance with the requirements of Section
65584;
NOW THEREFORE BE IT
RESOLVED,. that, pursuant to Section 65584, the City of Saratoga
revises its share of the regional housing need, as con-
tained in the July 1983 HoUsing Needs Determinations Re-
port published by ABAG; and be it further
RESOLVED, that this revision is made effective October 28, 1983;
and be it further
RESOLVED, that the revision, and the data and methodology use to
support such revision, is described in the attached report;
and be it further
RESOLVED, that the ABAG Executive Board is requested to act on such
revisions in accordance with the requirements of Section
65584; and be it further
RESOLVED, that a copy of this resolution and the attached report
be transmitted to the Executive Director of the Associa-
tion of Bay Area Governments.
The above and foregoing Resolution was passed and adopted
by the City of Saratoga City Council, State of California this l~h
day of October , 1983.
AYES: Counc~rs Callon, Clevenger, Fanelli, Mallory and Mayor Moyles
NOES: None
ABSENT: None
ABSTAINED: None
MAYOR ~,/~
ATTEST:
Secretary
ATKINSON · FARASYN
~TT0~Nr'r~ AT L. AVV
PAUL B. SMITH 660 WE~T DANA STREET
J. M. ATKINSON; [18cJ:~-198~)
ERIC L. FARA~.YN P,O, BOX. 279 L. M, FARASYN, (icJ15-~979)
LEONARD J. SIE, GAL
HAROLD S. TOPIDEL MOUltfAIN VIEW, CALIFORNIA 94.04-2
STEVEN G. BAIRD (415) 967-6941
JACK L. BRIDGE
GREGORY A, ~ANCH~K
M~MORANDgM
TO: Saratoga City Council
FROM Harold S. Toppel, City Attorney
DATE: October 18, 1983
SUBJECT: Revision of July 1983 ABAG Housing Needs Determinations
There are a number of factors which require that the proposed ABAG needs
determination for the City of Saratoga be revised downward. These factors include:
(1) Current data showing the ABAG determination to be unrealistic; (2) Failure by
ABAG to exclude land subject to Williamson Act Contracts; (3) Economic constraints;
and (4) Environmental constraints.
ABAG has projected that the City of Saratoga should satisfy a housing need
of 1,073 units between now and 1990. This projection would require construction of
approximately 153 units per year. However, during all of 1982 the City had a net
increase of only 11 dwelling units based on issuance of certificates of occupancy.
Similarly, during the first nine months of 1983, only 13 new dwelling units became
available for occupancy. This low production rate is clearly attributable to economic
constraints beyond the control of the City, such as land costs, availability of financing
and high construction costs. The City currently has almost 500 acres of land with final
subdivision or building site approval, representing 230 units, which only need a building
permit to be developed. Yet only a small fraction of these units have actually been
constructed. The projection by ABAG is therefore unrealistie to the extent it may
assume that approval by the City of housing units necessarily results in the construe-
tion of such units. Recent statistics would tend to show that such is not the ease.
ABAG also failed to consider land in Saratoga which is subject to
Williamson Act Contracts and therefore cannot be developed. Approximately 393
acres within the City limits and its urban service area are covered by such contracts.
This land will not be available for development until at least 1993, which is beyond the
1990 period used in the Housing Needs Determination prepared by ABAG. Under
present densities, this land might otherwise represent between 94 and 181 units.
Environmental constraints significantly affect the amount of housing that
can be produced in Saratoga. After deducting the land already approved for
development or subject to Williamson Act Contracts, most of the remaining vacant
land upon which additional units might be constructed is located in the hillside areas.
Memorandum to Saratoga City Council
October 18, 1983
Page Two
These areas are characterized by geotechnical problems (including landslides and
earthquake fault lines), erosion and drainage problems and traffic problems caused by
the limited means of access. As a result of the heavy rainstorms during the past two
years, the City has been required to expend substantial sums for landslide and road
repairs upon public streets in the hillsides, and much of this work could not have been
performed in the absence of the unexpected financial assistance from federal disaster
relief money. This federal money will not be available in future years but the City is
still confronted with the necessity to repair public improvements in the hillsides.
Because of the geologic and other environmental problems associated with
hillsides, the citizens of Saratoga adopted an initiative known as Measure "A"' which
regulated the density of development. Pursuant to the mandate of this initiative, in
1981 the City adopted a Specific Plan for the hillside area which was followed in 1982
by the adoption of an implementing zoning ordinance. The Specific Plan and zoning
ordinance require a reduction in density, or may prohibit any development at all,
where geologic hazards to life and property are identified. Consequently, it would be
erroneous to assume that any given number of units can be constructed upon any
specific parcel of vacant land based upon area alone. Detailed geoteehnic reports will
be required before any development proposal is approved and if such reports disclose
the existence of geologic hazards, the density will be reduced by such amount as may
be necessary to insure the safety of those who will ultimately reside upon the
property. In this regard, it is significant to note that most of the private property
damaged from landslides triggered by the heavy rainfall during the last two years was
suffered by older homes constructed prior to the adoption by the City of its present
development standards.
Based upon the foregoing, there would appear to be very little probability
of achieving the housing goal of 1,073 units projected by ABAG. Even if the 230 units
already approved for development are constructed between now and 1990, the
remaining 843 units would require a production rate of 120 units per year. After taking
into account the vacant land in Saratoga which is restricted by Williamson Act
Contracts or geologic constraints, it is more realistic to assume that half of this
remaining projection, or approximately 421 units, might be constructed. This reduced
estimate is still dependent upon an economic recovery and availability of construction
and permanent financing sufficient to inereas the aver e rate of production from its
present level of approximat~y 16 uni
City Attorney