Loading...
HomeMy WebLinkAboutCity Council Resolution 91-74 RESOLUTION 91- 74 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA UPHOLDING A THE DECISION OF THE PLANNING COMMISSION AR-91-016-GTE Mobilnet WHEREAS, the Applicant has applied to the City of Saratoga for design review approval to construct two 40-foot tall cellular transmission towers within the Professional and Administrative (PA) Zone District, at 14375 Saratoga Avenue; and WHEREAS, on October 9, 1991, the Planning Commission of the city of saratoga conducted a public hearing on said Application, and fOllowing the conclusion thereof, the Planning Commission denied the Application; and WHEREAS, the Applicant has appealed the decision of the planning Commission to the City Council; and WHEREAS, on November 20, 1991, the city Council conducted a ªª DQYQ public hearing on the appeal, at which time any person interested in the matter was given an opportunity to be heard; and WHEREAS, the City Council reviewed and considered the staff reports, minutes of proceedings conducted by the Planning Commission relating to said Application, and the written and oral evidence presented to the city Council in support of and in opposition to the appeal; NOW, THEREFORE, be it resolved by the City council of the City of Saratoga as follows: 1. The appeal from the decision of the Planning Commission is hereby denied and the decision of the Planning Commission is affirmed, to wit: The Applicant has not met the burden of proof required to support said application, and the following findings have been determined: (i) The proposed structures constitute a new main structure in the PA Zone District and are therefore subject to design review. (ii) The structures are not harmonious with the existing architectural features and landscaping of mnrw\273\res\GTE 1 neighboring residential and commercial structures in the immediate area, including but not limited to, height, elevations, material, color and appurtenances. (iii) The proposed structures are not compatible in terms of height, bulk and design with other existing structures in the immediate area, in that surrounding buildings are two stories in height, and the poles will extend above these by approximately 14 feet, and the 40-foot tall tapered wood poles equipped with three 1-foot wide by 2.5-foot long box-shaped directional antenna mounted flush against the pole are totally out of harmony and incongruous with the residential and commercial structures in the immediate area, resulting in the visual prominence of the proposed structures being highly incongruous in comparison with surrounding structures. (iv) The proposed project is not exempt from the requirements of CEQA in that written and oral testimony submitted to the Planning Commission and the City council make it clear that the proposed project may have negative, adverse impacts on the environment from electromagnetic radiation emitted by the antennae. (v) The parking for the existing two-story office building located on the subject site is non-conforming, in that it is not in compliance with the current parking standards which require one space for each 200 square feet of gross floor area. In order to bring the parking into conformance, the Applicant would have to provide six additional parking spaces, which the Applicant is unable to do, due to the physical constraints of the subject site. By adding the proposed structures to an existing non-conforming use, the proposal would constitute an alteration, enlargement, expansion or intensification of the non- conforming use, in violation of the zoning ordinance. *** Passed and adopted at a regular meeting of the City council of the City of Saratoga held on the 4 th day of December I 1991, by the following vote: AYES: Council members Anderson, Clevenger, and Mayor Kohl ~r NOES: None ABSENT: Council members Moni a and Stutzman ABSTAIN: None mnrw\273\res\GTE 2 ATTEST: kty ~l!;:¡ November 21, 1991 mrw\273\res\GTE " /., "",,,,,, ~/? /:'::,::;,,;1'.. /7" ,,/~/ ~ /..... ...<::~'¿.,,0~ ,.,. /,/·ítáý"r - 3