Loading...
HomeMy WebLinkAboutCity Council Resolution 94-17 RESOLUTION NO. 94-17 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SARATOGA GRANTING AN APPEAL FROM THE DECISION OF THE PLANNING COMMISSION PD-94-001, GREENBRIAR DEVELOPMENT COMPANY; FORMER PAUL MASSON WINERY, 13150 SARATOGA AVENUE WHEREAS, Greenbriar Development Company, the applicant, has applied for conceptual development plan approval for development of a 24 acre site in the MU-PD zoning district with 95 single family detached residences; and WHEREAS, on March 8, 1994, the Planning Commission of the City of Saratoga held a duly noticed public hearing on said application at which time all interested parties were given a full opportunity to be heard and to present evidence and following the conclusion thereof, the Planning Commission, denied the application; and WHEREAS, applicant has appealed the denial of the Planning Commission to the City Council; and WHEREAS, on April 6, 1994, the City Council (Councilmember Monia being absent) conducted a de novo public hearing on the appeal at which time any person interested in the matter was given a full opportunity to be heard; and WHEREAS, the City Council reviewed and considered the staff report, minutes of proceedings conducted by the commission relating to the application, and the written and oral evidence presented to the City Council in support of and in opposition to the appeal. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Saratoga as follows: A. By a split vote (Councilmember Anderson voting in opposition) the appeal from the Planning Commission is hereby granted and the decision of the Planning Commission is reversed, to wit: the applicant has met the burden of proof required to support the application and the following findings have been determined: The conceptual development plan, subject to the conditions set forth herein is consistent with the Goal Statements and Implementation Measures for density, circulation, development April 14, 1994 273\res\grebriar.res 1 regulations, greenbelt buffering and common greens and landscaping, as set forth in the "Paul Masson Specific Plan", adopted by the City Council on October 6, 1993. The conceptual development plan, subject to the conditions set forth herein is consistent with the purposes and objectives established for the MU-PD zoning district. B. The application of Greenbriar Development Company for Conceptual Development Plan Approval be and the same is hereby granted subject to the following conditions: 1. The Final Development Plan shall be substantially in compliance with the approved Conceptual Development Plan, including, but not limited to, the following design parameters: a. The Residential-Low Density plan shall not include more than 94 single family detached residences. b. The internal loop road shall not be less than 28 ft. in paved width; allowing parking along one side of the road only. Cul-de-sacs shall be a full 36 ft. in paved width to allow parking along both sides. c. The average home size shall not exceed 3,066 sq. ft. (excluding the garages). d. Residences shall not exceed 26 ft. in height. e. Future homes shall maintain a minimum side-yard setback of 5 ft. from property lines and a minimum separation of 11 ft. from structure to structure. At least 25% of the homes shall have a minimum distance of 12 ft. between them on one side and at least 24% of the homes shall have a minimum distance of 13 ft. between them on one side. f. Front yard setbacks shall be 20 ft. as measured to the front property line, except that up to 25% of the lots may have front yard setbacks of 18 ft. if an equal number of homes have front yard setbacks of at least 22 ft. These setbacks may be increased if deemed necessary by the City in order to provide sufficient on-site vehicular apron parking. April 14, 1994 273\res\grebriar.res 2 2. The Final Development Plan shall incorporate, at a minimum, the following common open space requirements: a. 4.78 acres of common open space. This 4.78 acres shall not include any of the landscaped/open space areas within the Saratoga Avenue or McFarland Avenue public rights-of-way. b. The Saratoga Avenue perimeter greenbelt buffer shall be extended to include McFarland Avenue. c. A pedestrian walkway connection/open space feature shall be provided at the northeast corner of the site (within the vicinity of lots #12 and #13) to allow pedestrian circulation through this portion of the property to McFarland Avenue. This feature shall be similar in design to the proposed pedestrian connection at Afton Avenue and shall be a minimum of 20 to 40 ft. in width. 3. The applicant/property owner shall pay park-in- lieu fees, as established by City Council Resolution, for each of the 94 lots. 4. As a condition of Final Plan approval, the applicant/property owner shall enter into a development agreement to ensure that the entire development is completed. 5. All requirements for Final Plan submittal contained in the Multiple Use-Planned Development (MU-PD) zoning ordinance shall apply, including, but not limited to: a. An economic analysis of the development in terms of cost and revenue to the City. b. Any environmental support documentation deemed necessary by City staff. The conceptual development plan approval only constitutes an indication that the City is initially receptive to the proposed development and is willing to consider the project in more detail. This approval confers no vested rights or other rights April 14, 1994 273\res\grebriar.res 3 upon the applicant to proceed with the project and the City may hereafter reject the final development plan even though it complies with the approved conceptual plan. Passed and adopted at a regular meeting of the City Council of the City of Saratoga held on the 20th day of .April , 1994, by the following vote: AYES: Counci]smembe:rs.Anderson, Burger, Kohler, Monia and Mayor Tucker NOES: None ::~! ABSENT: None ABSTAIN: None, .... ,or ATTEST: Deputy City April 14, 1994 273\res\grebriar.res 4