RESOLUTION NO. 99- 20
A RESOLUTION OF PRELIMINARY APPROVAL OF ENGINEER'S REPORT
CITY OF SARATOGA
LANDSCAPING AND LIGHTING ASSESSMENT DISTRICT LLA-1
FISCAL YEAR 1999-2000
RESOLVED, by the City Council of the City of Saratoga, California as follows:
WHEREAS, pursuant to the Landscaping and Lighting Act of 1972, on the 17th day of
February, 1999, said Council did adopt its Resolution No, 99-10, "A Resolution Describing
Improvements and Directing Preparation of Engineer IS Report For Fiscal Year 1999-2000, II for
the City of Saratoga Landscaping and Lighting District LLA-1, in said City and did refer the
proposed improvements to the Engineer of the City and did therein direct said City Engineer to
prepare and file with the City Clerk of said City a report, in writing, all as therein more
particularly described:
WHEREAS, said City Engineer prepared and filed with the City Clerk a report in writing
as called for in said Resolution No. 99-10 and under and pursuant to said Act, which report has
been presented to this Council for consideration;
WHEREAS, said Council has duly considered said report and each and every part
thereof, and finds that each and every part of said report is sufficient, and that neither said report,
nor any part thereof should be modified in any respect;
NOW, THEREFORE, it is hereby found, determined and ordered, as follows:
1. That the plans and specifications for the existing improvements and the proposed
new improvements to be made within the assessment district or within any zone thereof,
contained in said report, be, and they are hereby preliminariLy approved.
2. That the Engineer's estimate of the itemized and total costs and expenses of said
improvements, maintenance and servicing thereof, and of the incidental expenses in connection
therewith, contained in said report, be, and each of them are hereby preliminarily approved.
3. That the diagram showing the exterior boundaries of the assessment district
referred to and described in said Resolution No. 99-10 and also the boundaries of any zones
therein and the lines and dimensions of each lot or parcel of land within said district as such lot or
parcel of land is shown on the County Assessor's maps for the fiscal year to which the report
applies, each of which lot or parcel of land has been given a separate number upon said diagram,
as contained in said report, be, and it hereby is preliminarily approved. .
1
4. That the proposed assessment of the total amount of the estimated costs and
expenses of the proposed improvements upon the several lots or parcels of land in said assessment
district in proportion to the estimated benefits to be received by such lots or parcels, respectively,
from said improvements including the maintenance or servicing or both, thereof, and of the
expenses incidental thereto, as contained in said report, be, and they are hereby preliminarily
approved.
5. That said report shall stand as the Engineer's Report for the purpose of all
subsequent proceedings to be had pursuant to said Resolution No. 99-10.
* * * *
Passed and adopted by the City Council of the City of Saratoga, California, at a meeting
thereof held on the 7th day of April, 1999 by the following vote of the members thereof:
A)1ES: Councilmembers Baker, Streit, Mehaffey, Vice Mayor BOgosian,
Mayor Shaw.
NOES: None
ABSENT: None
ABSTAIN: None
ATTEST:
~{],j~
City Clerk
~~~
o Mayor
~R~
fllc~'3
~~ ð<-
C . { /w-f-"rt
é~fJLtd2 I;~ ~
(¡ L/lf/ff )
.",'
2
CITY Of SARATOGA
LLA·I PREUMIHAR.Y ASSESSMENT SCHEDULE
FY 1999·2000
ZOHEI ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6
1/ OF PARCELS 29 85 116 693 113 64
FACTOR 0.0078 0.0227 0.0471 0.1853 0.0302 0.0171
EXPENDITURES
1001 WAGES $ 162.66 $476.75 $987.16 $1,468.66 $239.48 $ 135.63
Public Works Director 26.03 76.29 157.97 622.01 101.42 57.44
omce Speci.¡11st II 35.43 103.85 215.02 846.65 138.05 78.19
P.¡!1t Milnt. Leadworker 101.20 296.61 614.16
P.¡!1t Milnt. Worker II
P.¡!1t Milnt. Worker I
2001 BENEFITS $49.14 $144.03 $298.23 $388.33 $63.32 $35.86
Public Worts Director 6.51 19.01 39.49 155.50 25.36 14.36
Office Specialist II 9.14 28.56 59.13 232.83 37.96 21.50
P.¡!1t 'H.¡lnt. l.udwc:ñer 32.89 96.40 199.60
P.¡!1t 'H;a/nt. Worker II
P.¡!1t M.¡lnt. Worker I
4010 CONTRACT SERVICES $450.00 $800.00
4011 LEGAL SERVICES $3.88 $ 1 1.37 $23.54 $92.67 $15.11 $8.56
4013 ENGINEERING SERVICES $49.17 $144.13 $298.43 $1,175.08 $191.61 $108.52
Elll!ineer's Repon 49.17 144.13 298.43 1,175.08 191.61 108.52
New P.¡rcel O\ifII!
4014 REPAIR SERVICES
4015 MAINTENANCE SERVICES $1,740.00 $2,892.00 $2,220.00
4022 WATER $630.00 $275.00 $775.00
4023 POWER $10,000.00 $2,000.00 $2,400.00
lnipdon ControUers
StreetAplS 10,000.00 2,000.00 2,400.00
4040 ADVERTISING $9.21 $27.00 $55.91 $55.60 $9.07 $5.14
...-..........--.....-.......... .............--.....-.........-.. ...................-.........-........ ............................................. ....................---.................
..-.....................-...............
SUB·TOTAL $3,094.06 $3,970.28 $5,458.26 $13,180.35 $2/518.59 $2,693.71
8001 INDIRECT COST ALLOCATION $402.23 $516.14 $709.57 $1,713.45 $327.42 5350.18
.....___ ....... 111:l1li....- _.==_=_-= __=__c= ========
TOTAL EXPENDITURES $3,496.29 $4,486.41 $6,167.83 $14,893.79 $2,846.00 $3,043.89
(.) ESTIMATED PROPERTY TAXES $1,730.00 $345.00 $2,300.00 $20,400.00 $8,200.00
(.) PROJECTED FY 98-99 CARR.YOVER $279.66 $166.92 $114.90 $25,755.18 514,900.64 $55.77
(=) TOTAL TO ASSESS $1,486.63 $3,974.49 $3,752.93 ($31,261.39) ($20/254.64) $2,988.12
( +) CARRYOVER NOT ASSESSED IN fY 99·00
( +) PROJECTED CARRYOVER TO FY ()().() 1 $31,261.39 $20,254.64
(=) NETTO ASSESS $ 1,486.63 $3,914.49 $3,752.93 $0.00 50.00 $2,988.12
PRELIMINARY ASSESSMENT -- $46.76 $21.32 $0.00 $0.00 $46.69
MAX APPROVED ASSESSMENT $52.50 $63.00 578.75
MAX ALLOWABLE ASSESSMENT $0.00 $0.00 $0.00
LLA 99·0Cl'relim
:I1Y OF SARATOGA
.LA·1 PRELIMINARY ASSESSMENT SCHEDULE
Y 1999·2000
ZONE7A ZONE 78 ZONE 9 ZONE 10 ZONE 11 ZONE 12
# OF PAR.CELS 412 291 48 9 250 9
fACTOR 0.1262 0.0778 0.0128 0.0024 0.0669 0.0024
EXPENDITURES
OOJ WAGES $1,000.30 $616.71 $169.22 $50.48 $ 1,402.21 S50.48
PubOc WorIrJ Dlrec(()r 423.65 261.19 "'3.08 8.08 224.39 8.08
Office Speda1st II 576.65 355.52 58.64 11.00 305.43 11.00
Park Malnt. Leadworter 167.50 31.41 872.39 31.41
Park Malnt. Worker II
Parle Malnt. Worker I
>01 BENEFITS $264.49 $163.07 $81.33 $15.25 5423.62 $15.25
Pubjic WorIrJ Director 105.91 65.30 10.77 2.02 56.10 2.02
Office Specialist II 158.58 97.77 16.13 3.02 83.99 3.02
Parle Maine. leadworker 54."" 10.21 283.53 10.21
Part Maint. Worker II
Park Malnt. Worker I
10 CONTRACT SERVICES $475.00 $84.38 $125.00 $350.00
II LEGAL SERVICES $63.12 $38.91 S6.42 SI,20 $33.43 $1.20
13 ENGINEERING SERVICES $814.44 $493.43 $81.39 $ 15 .26 $423.91 $15.26
Engineer's RepOlt 800.34 493.43 81.39 15.26 423.91 15.26
New Parcel Charge 14.10
4 REPAIR SERVICES
5 MAINTENANCE SERVICES $2,352.00 $545.40 $960.00 $960.00
2 V ':R $2,100.00 5735.00 SI,I25.00 $300.00
3 POWER $5,800.00
lnipclon Controllers
Streetllliihu 5,800.00
:) ADVERTISING $37.87 $23.35 $15.25 $2.86 $79.41 $2.86
................-...-........-.. .........-...-...-....... --...-....-..-..-.. ......-........-............-.... ..-.........-.........-........... ....-..-...............................
SUB-TOTAL $7,980.23 51,335.47 55,380.62 51,449.83 $4,572.58 $1,695.05
INDIRECT COST ALLOCATION $1,037.43 5173.61 $699.48 $188,48 $594.44 $220.36
.....-. ....-.. -----.. ----... --==-_.== ----:::-=:
TOTAL EXPENDITURES 59,017.65 51,509.08 $6,080.10 $1,638.31 $5, 167.Q2 $1,915.41
.) ESTIMATED PROPERTY TAXES $21,165.92 $1,509.08
-) PROJECTED FY 98-99 CARRYOVE.R $ 1 1,170.98 SO.oo ($205.85) ($2,102.36) $341.49 ($691.72)
) TOTAL TO ASSESS (S23,319.25) $0.00 $6,285.95 $3,740.67 $4,825.53 $2,607,13
) CARRYOVER NOT ASSESSED IN FY 99-00 ($1, IS 1.731 ($672.131
) PROJECTED CARRYOVER TO FY 00-01 $23,319.25 50.00
I NET TO ASSESS SO.OO $0.00 $6,285.95 $1,588.94 $4,825.53 S1,935.oo
PRELIMINARY ASSESSMENT $0.00 $0.00 -. $287,66 $19.30 ... ----
MAX APPROVED ASSESSMENT $52.50
MAY OWABlE ASSESSMENT SO.OO $0.00 $77.08 $287.66 $207.12
OOPreiim
-- -,- - - - -- - -- -- -- -~ - .. -- ~ -~ -- --.-- -..-.- - ------. --- - - - --. --" -. --.... -
ANNUAL ASSESSMENT HISTORY
ZONE DATE FY FY FY FY FY FY FY FY
CREATED 88-89 89-90 90-91 91-92 92-93 93-94 9+95 95-96
o (7C) 4/16/80 $21.66 $2; 1.66 $ 14,604- $ 73.56 $49.72 $72.64 (1)
4/16/80 $113,54 $105.94 $95.12 $101.54 $62.20 $90.32 $77.68 $33.88
2 4/16/80 $29.66 $32.00 $34.62 $36,50 $5.98 $18.15 $118.68 $40.04
3 4/16/80 $23.06 $46.82 $13,14 $15.36 $2 5, 80 $45.21 $25.26 $32.52
4 4/16/80 $1,86 $1.86 $1.60 $2.10 $23.84 $0.00 $0.00 $0.00
5 4116/80 $4.98 $4,98 $6.24 $6.40 $0.00 $0.00 $0.00 $0.00
6 4/16/80 $10.60 $10.60 $8.62 $8.58 $0.00 $0.00 $25.40 $52.50
7 (7R) 4/16180 $2.64 $2.64 $1.78 $4.26 $6.88 $0.00 $10.88 $0.00
8 (VPD#I) 4/16/80 $330.36 $11 7.20 $0.00 $133.36 $0.00 $0.00 (I)
9 5/4/83 $113.74 $ 157.20 $ I 36,]4 $144.82 $138.82 $ 161. 30 $169.92 $201.02
10 4/18/84 $234.70 $435.S0 $348.74 $385,38 $371.12 $326.1 7 $442.58 $337.98
11 4/IS/S4 $8,04- $8.76 $9.58 $10,72 $11.32 $15.48 $19.02 $ 13.86
12 4/17/85 $168.04 $18S,04 $209.S4 $222,60 $242.42 $203.01 $380.00 $307.22
13 4/17/85 $3.60 $3.60 $3.70 $3.16 $0,00 $0.00 $3.46 $ 1.24
14 4/17/S5 $ } 4.48 $ 1 52.48 $137.56 $148.72 $192.74 $110.10 $264.58 $193.40
15 4/17/85 $83.76 $126. 18 $ 102.60 $100,72 $98,90 $227.39 $202.04 $146.92
16 4116/S6 $1.22 $3.22 $59.88 $40,56 $45.16 $42.58 $54.40 $40.80
17 4/15/87 $7.70 $7.70 $8,72 $8.66 $0.00 $5.06 $25.20 $213.18
18 411 5/87 $6.08 $135,18 $154.56 $164.94 $88.10 $0.00 $0.00 $ 104.50
19 (VPD #2) 4/19/89 $1,851.00 $1,520.30 $5,243.00 $6,969.76 $ 1 3,620.00 (I)
20 (VPD #3) 4119/89 $6,412.00 $6,414,00 $14,092,00 $ I 8,770.62 $21,252.35 (I)
21 (VPD #4) 4/19/89 $0,00 $977,78 $2,933.00 $5,406.00 $14,385.56 (1)
22 4/17/91 $36.00 $0.00 $13.21 $22.58 $21.68
23 5/1/91 $110,00 (2)
24 8/3/94 $0.00 $0.00
25 7/1/97
26 7/1/97
27 7/1/98
28 7/1/98
29 711/98
( 1 } - Zones 0, 8, 19, 20 21 merzed to aeate Zone 24.
(2) - Zone detached on 5/20/92.
(3) . Zone detached in FY 96-97.
( 4) . Zones 14 18 merpd to create Zone 27.
LLA·HISTORY
SARATOGA LANDSCAPING AND LIGHTING ASSESSMENT DISTRICT LLA·I
ANNUAL ASSESSMENT HISTORY
PrelIminary
ZONE DATE. FY FY FY FY
CREATED 96-97 97-98 98-99 99-00
o (7C) 4/16/80
4/16/80 $0.00 $0.00 $0.00 $51.26
2 4/16/80 $18.48 $23.00 $24.92 $46.76
3 4/16/80 $24.66 $38.40 $18.22 $21.32
4 4/16/80 $0.00 $0.00 $0.00 $0.00
5 4116/80 $0.00 $0.00 $0.00 $0.00
6 4116/80 $0.00 $50.50 $50.92 $46.69
7 (7R) 4/16/80 $0.00 $0.00 $0.00 $0.00
8 tVPD # 1 ) 4116/80
9 5/4/83 $175.58 $136. 14 $77.08 $130.96
10 4118/84 $337.48 $287.66 $287.66 $287.66
11 4/18/84 $9.18 $35.74 $26.84 $19.30
12 4/17/85 $285.98 $201, 12 $207.12 $215.00
13 4/17/85 (3)
14 4/17/85 $10,18 $69.78 (4)
15 4/17/85 $145.12 $127.30 $127.30 $127.30
16 4/16/86 $30,42 $60.96 $53.34 $34.31
17 4/15/87 $210.50 $35,68 $20.76 $46.07
18 4/15/87 $64.28 $64.24 (4)
19 (VPD #21 4/19/89
20 (VPD #3) 4/19/89
21 (VPD #4) 4/19/89
22 4/17/91 $9.96 $33.74 $11.36 $18,09
23 5/1/91
24 8/3/94 $0.00 $0.00 $0.00 $0,00
25 7/1/97 $26.2.26 $0.00 $0,00
26 7/1197 $207.10 $0.00 $297.44
27 7/1198 $64.24 $125.36
28 7/1198 $229.94 $356.60
29 7/1198 $ 70,34 $0.00
( 1 ) . Zones 0, 8, 19, 20 21 nJel'ltd to creaĆ Zone 24.
(2) - Zone detached on 5/20/92.
(3) - Zone detached In FY 96-97.
(4) . Zones 14 18 mtl'þd to create Zone 27.
LLA-HISTORY
SARATOGA LANDSCAPING AND LIGHTING ASSESSMENT DISTRICT LLA·1
ANNUAL ASSESSMENT HISTORY
ZONE DATE FY FY FY FY FY FY FY FY
CREA TED 80-81 81·82 82·83 83-84 8+85 85·86 86·87 87-88
o (7C) 4/16/80 $102.01 $92,50 $92.58 $ 56,80 $21.02 $34.56 S35.38 $21.60
4/16/80 $34.26 $10.54 $0.00 $10.90 $6.80 $203.76 $207.82 $113.70
2 4/16/80 $11.30 $5.62 $6.16 $6.62 $7.86 $8,86 $35.14 $27.40
3 4/16/80 $4.76 $4.46 $0,00 $0.00 $4.20 $ 11.60 $8.70 $20.50
4 4/16/80 $20.95 $18.54 $0.00 $2.06 $2.30 $5.86 $6.70 $2.26
5 <1-/16/80 $23,52 $21.28 S2.12 $0,84 $1.24 $5.00 $6.56 $5.14
6 4/16/80 $42.03 $36,68 $0.00 $15.68 $11.32 $14.78 $16.94 $10.54
7 (7R) 4/16/80 $10.41 $8.90 $6.66 $5.78 $2,54 $2.50 $3.32 $3.14
8 (YPD # I ) 4/16/80 $269.07 $ 48.26 $0.00 $0.00 $0.00 $0.00 $213.80 $341.32
9 5/4/83 $65.00 $84.86 $83.52 $90.82 $ 8 7.40
10 4/18/84 $1,416.00 $0.00 $167.34 $ 1 86.26
11 4/18/84 $14.32 $5,66 $8.38 $7.70
12 4/17/85 $ 1 72.00 $ 153.02 $154.16
13 4117/85 $18.00 $5.24 $3.04
1<1- 4/17/85 $142.10 $121.30 $107.04
15 4/17/85 $222,00 $170.76 $87.44
16 4/16/86 $2,376.44 $3.04
17 4/1 5/87 $10.00
18 4/15/87 $50.00
19 (YPD #2) 4/19/89
20 (VPD #3) 4119/89
21 (YPD #4) 4/19/89
22 4/17/91
23 5/1/91
24 8/3/94
25 7/1/97
26 7/1/97
27 7/1/98
28 7/1 /98
29 7/1/98
( I ) - Zones 0, 8, 19, 2021 merred to create Zone 24.
(2) - Zone detached on 5/20/92.
(3) . Zone detaehed in FY 96-97.
(4) - Zones 14 18 mer:ed to create Zone 27.
LLA·HISTORY
Notes for FY 99-00 Assessment Schedule
1. The Factor for each Zone represents the number of parcels in each Zone as a percentage
of the total number of parcels in the District.
2. Wages include 5% of Public Works Director, 10% of Office Specialist II, 15% of Parks
Maintenance Leadworker, and 10% of Park Maintenance Workers I & II. Wages are
spread to each zone per the factor. Wages for Parks Maintenance Leadworker are spread
proportionately to landscape districts only. Wages for the Park Maintenance Workers I & II
are assigned to Zone 24 only.
3. Benefits are spread the same as wages,
4. Contract Services are for one-time needed improvements identified in various Zones.
5. Legal Services are fixed at $500 and are spread to each Zone per the factor.
6. Engineering Services charges are spread to each Zone per the factor. New Parcel
Charges are assigned to those Zones in which new parcels have been added from the
previous year.
7. Maintenance Services are the proposed landscape maintenance costs for landscape
districts as bid in February, 1999.
8. Water is estimated annually for landscape districts based on historical usage.
9. Power is estimated for both landscaping and street lighting districts based on historical
usage.
10, Legal advertising is spread to each zone per the factor. Advertising associated with
maintenance contract bids is spread proportionately to the landscape districts only.
11. Indirect Costs are determined from the City's Indirect Cost Allocation schedule. Preliminary
estimate is 13% of direct costs.
12. Property Tax revenues are estimated annually for the original 7 Zones of the District.
13. Projected FY 98-99 Carryover is calculated from the audited fund balance figures as of
June 30, 1998 projected through the end of FY 98-99.
14. Carryover Not Assessed in FY 99-00 represents a portion of the projected FY 98-99
negative carryover amounts for which each Zone in a deficit position will not be assessed
. in FY 99-00. The amounts not assessed are covered by the available fund balance.
15. Projected Carryover to FY 00-01 represents the projected surplus for each Zone as of June
3D, 2000.
16. Preliminary Assessment is the Net to Assess for each Zone divided by the number of
parcels in each Zone, except for Zone 24.
17. Maximum Approved Assessment represents the maximum assessment which may be
levied in these Zones as approved via prior balloting, and above which another Proposition
218 ballot is necessary,
18. Maximum Allowable Assessment represents the maximum assessment which may be